My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2015-150 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2015
>
2015-150 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2016 1:17:06 PM
Creation date
3/11/2016 12:21:20 PM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
12/14/2015
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT "C" <br />COST-SHARING AGREEMENT <br />FOR PROJECTS CONSTRUCTED IN ANOKA COUNTY <br />USING COUNTY STATE AID FUNDS OR LOCAL TAX LEVY DOLLARS <br />ITEMS <br />COUNTY SHARE CITY SHARE <br />Concrete Curb & Gutter 50% 50% <br />Concrete Curb & Gutter for Median Construction 100% 0% <br />Concrete Median 100% 0*1 <br />Concrete Sidewalk 0% 100% <br />Concrete Sidewalk Replacement 100% 0% <br />Bikeways 0% 100% <br />Bikeway Replacement 100%, 0% <br />Unless existing trail not placed at edge of RAN <br />Construction or Adjustment of Local Utilities 0% 100% <br />Grading, Base and Bituminous 100% 0% <br />Storm Sewer based on state aid letter*2 based on state aid letter*2 <br />Driveway Upgrades 100%, in-kind 100%, of up -grades <br />Traffic Signals, new & replacements (communities larger than 5,000) '/2 the cost of it's the cost of its legs of <br />w/ State Aid approved SJR legs of the intersection the intersection plus '/2 <br />the cost of the County legs <br />of the intersection <br />Traffic Signals, new & replacements (communities less than 5,000) 100% 0% <br />w/ State Aid approved SJR <br />Traffic Signal, w/o State Aid approved SJR 0% 100% <br />EVP 0% 100% <br />Engineering Services *3 *3 <br />Right -of -Way 100%4 0% <br />Street Lights 0% 100% <br />Noise Walls 100%'5 0%*5 <br />*1 The County pays for 100% of Standard Median Design such as plain concrete. If a local unit of government requests decorative <br />median such as brick, stamped concrete, or landscaping, the local unit will pay the additional cost above the cost of standard <br />median. <br />*2 In the event no State Aid is being used, or in the event the state aid letter does not determine cost split percentages, drainage cost <br />shares will be computed by the proportion of contributing flow outside the County right of way to the total contributing flow. <br />*3 Engineering shall be paid by the Lead Agency except that any participating agency will pay construction engineering in the amount <br />of 8% of the construction costs paid by that agency. <br />*4 In the event that the Township or City requests purchase of right-of-way in excess of those right-of-ways required by County <br />construction, the Township or City participates to the extent an agreement can be reached in these properties. For instance, a <br />Township or City may request a sidewalk be constructed alongside a County roadway which would require additional right-of-way, in <br />which case the Township or City may pay for that portion of the right-of-way. Acquisition of right-of-way for new alignments shall be <br />the responsibility of the Township or City in which the alignment is located. This provision may be waived by agreement with the <br />County Board if the roadway replaces an existing alignment and the local unit of government takes jurisdiction of that existing <br />alignment. In addition, any costs, including right-of-way costs, incurred by the County because a Township or City did not acquire <br />sufficient right-of-way during the platting process or redevelopment process as requested by the County shall be paid by the <br />Township or City. <br />*5 If previously notified, the City shall be responsible for future noise wall maintenance. Notification includes any letter to the agency <br />indicating that noise will potentially be an issue in the future, likely received during the Plat Review Process. The County shall pay <br />100% of Standard Noise Wall Cost. If a local agency requests decorative noise walls, then the requesting agency will pay the <br />additional cost above the cost of standard noise wall. Furthermore, should an agency request a noise wall to be built where not <br />required by the applicable federal or state standard, the entire cost of the wall shall be borne by the requesting agency. <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.