Laserfiche WebLink
It is agreed that the Exhibit "A" Layout dated November 30, 2015 has been reviewed and accepted by <br />_ the parties and is suitable for preparation of final construction documents. Any significant changes <br />made hereafter to the design as presented in the Exhibit "A" Layout will require approval by the parties <br />as an amendment to this JPA. These same changes will require a change in the cost share to include any <br />additional design engineering costs that may occur. <br />II. METHOD <br />The County shall construct Anoka County Project SP 002-612-013, in conformance with <br />proposed engineering plans and specifications. <br />IMPROVEMENTS <br />It is agreed by the parties that in 2016 the intersection of CSAH 12 and CR 53 will be reconstructed into <br />a single lane roundabout. The roadways will have a concrete median and bituminous walk to the extent <br />shown in "Exhibit A." Improvements include but are not limited to: roadway widening, roundabout <br />construction, lighting, turn lanes, shoulders, curb and gutter, and bituminous walk. The costs of these <br />improvements have been estimated for this agreement and will be finalized after bids have been <br />received. These costs will be shared by the County and the City, but only as provided in this agreement. <br />RIGHT OF WAY: <br />The parties agree that the County will acquire all necessary right-of-way and easements for the Project. <br />It is agreed by the parties that all necessary right of way and easements will be in legal possession of the <br />`,,, County prior to acceptance of bids for the Project. Any City -owned property or easements required for <br />the construction will be conveyed to the County at no cost. The County will work with the City to <br />facilitate any transfer of City -owned property or easements necessary to complete the Project. <br />DRAINAGE: <br />The City shall pay for a percentage of actual cost of the storm sewer system. The City portion of the <br />cost is based on contributing flow through the storm sewer system determined by the product of <br />contributing area and runoff coefficient for the project area. <br />BITUMINOUS WALK: <br />The parties agree that the construction of the bituminous sidewalk around the roundabout is a City cost <br />per the Exhibit C "Cost Sharing Agreement." This walk location has been agreed to by the City. If this <br />location changes in the future, the additional costs associated with this change will be the responsibility <br />of the City. <br />The parties understand that the cost for the bituminous walk includes: bituminous surfacing, aggregate <br />base, excavation (including muck excavation), borrow material (granular and topsoil), and turf <br />establishment. The parties agree that the County will pay for the design of the walk and any removal <br />items, with the exception of soils, required to construct the bituminous walk. <br />2 <br />