Loading...
HomeMy WebLinkAbout04-04-2016 Council PacketWORK SESSION AGENDA CITY OF LINO LAKES Monday, April 4, 2016 CITY COUNCIL WORK SESSION Community Room (not televised) 6:00 P.M. 1. NE Drainage Study Update, Diane Hankee and Katy Thompson 2. FEMA Floodplain Map Revisions, Diane Hankee and Katy Thompson 3. Stormwater Re-use Feasibility Study, Diane Hankee and Erin Heydinger 4. Wellhead Protection Plan, Diane Hankee and Erin Heydinger 5. ACE Program, John Swenson To Follow 6. Advisory Board Applicant 7. Council Updates on Boards/Commissions 8. Monthly Progress Report 9. Review Regular Agenda 10. Adjourn WS – Item #1 WORK SESSION STAFF REPORT Work Session Item No. 1 Date: April 4, 2016 To: City Council From: Diane Hankee and Katy Thompson, WSB Engineering Re: NE Lino Drainage Feasibility Study Update Background WSB & Associates, Inc. (WSB) was tasked to prepare a Feasibility Study for the proposed Peltier Lake outfall in northeastern Lino Lakes, Minnesota. The project seeks to determine the economic and environmental impacts of providing a new outfall to Peltier Lake. The Northeast area of Lino Lakes is bound by Main Street to the south, the City of Hugo to the east, and Peltier Lake to the west and Rehbein Street to the north. It includes portions of Lino Lakes, Centerville, and Hugo. Land use in this area is predominantly agricultural. A majority of this watershed currently drains to the south via field drains to Clearwater Creek and ultimately to Peltier Lake. Clearwater Creek has had a history of significant bank erosion problems and Peltier Lake is impaired for nutrients, with phosphorus having been identified as the main pollutant. The surface water in the Northeast area of Lino Lakes was landlocked until the installation of agricultural field drains in the early 20th century. The agricultural drainage systems have limited capacity, and as such, cannot convey any additional runoff from development within the watershed. In addition, the agricultural drains do not provide any water quality benefits for Peltier Lake and Clearwater Creek. The Northeast Lino Lakes Area Drainage Feasibility Study update evaluates water quality improvements and a new surface water outlet to Peltier Lake. The purpose of the feasibility study is to: • Confirm modeling results and parameters • Examine design alternatives and develop a preferred alternative • Prepare preliminary plans and cost estimates • Develop and recommend proposed alignment • Identify effected property owners and stakeholders • Identify all necessary permits • Identify potential funding options Council authorized completion of the feasibility study in September 2015. The draft feasibility study was completed in January 2016 and during review by City staff, an additional outlet alternative was requested to be included in the study. The original preferred alternative included a 72-inch pipe outlet to Peltier Lake from 20th Avenue, a new culvert crossing under I-35E, storm sewer along the proposed Otter Lake Trail extension, and regional ponding facilities to detain peak storm flow and prevent increasing the flood levels on Peltier Lake. The requested alternative includes the new culvert crossing under I-35E, storm sewer and regional ponding facilities; however it replaces the 72-inch pipe outlet with an open channel greenway between Peltier Lake Drive and 20th Avenue. The conceptual alignment and typical cross-section have been developed with the intent to provide live storage for flood events within the channel; be in agreement with the City’s AUAR and greenspace requirements; and avoid wetland impacts as much as possible. The greenway option also provides additional water quality treatment opportunities for the study area, above and beyond the City’s and RCWD’s development requirements. At the January Environmental Board meeting, additional data on the water quality calculations for the pipeline option was requested. RCWD provided guidance on the calculation of water quality impacts for this conceptual analysis using a simple land use analysis. This analysis is based on a 1.1-inch rainfall depth, which corresponds to RCWD volume reduction requirements, and uses total phosphorus concentrations provided by the District. Environmental Board member Heiskary provided different total phosphorus concentrations which change the calculations. Heiskary’s calculations result in the need for additional water quality treatment BMP’s. WSB staff is reviewing the basis for these revised numbers and will adjust the design accordingly. It is expected that that greenway option would be able to accommodate additional treatment requirements with minimal additional cost. Finally, the Environmental Board requested information on how existing drainage rights would be maintained at the January board meeting. The proposed project will not adversely impact existing drainage rights. No property will lose drainage rights due to the installation of the new outlet; the design of the system includes all upstream flows and will continue to pass ditch flows downstream, as under existing conditions. With the new outfall, it is likely that upstream property owners will experience increased capacity and less maintenance of their system as water can move through the system more efficiently. As development in the study area occurs, these individual developments, along with the property owner, will have to petition the Rice Creek Watershed District for re-alignment or abandonment of the drain tile on their property. This process is dictated by the Minnesota Statutes Chapter 103E and includes public hearings to ensure no adverse impacts to benefitted landowners will occur. The following is a tentative schedule to finalize the feasibility: April 2016 – Hold informational meeting with property owners and other stakeholders April 2016 – Present the final feasibility study to the Environmental Board for review and consistency with the AUAR May 2016 – Formally present the final study to Council. WSB & Associates staff will be in attendance at the work session to provide an update on the project. Requested Council Direction None required. Information only. Attachments 1. Location map 2. Conceptual greenway design 3. Preliminary water quality calculations 4. Revised water quality calculations per S. Heiskary 3/24/16 Feasibility Report Northeast Lino Lakes Drainage Improvement Project WSB Project No. 02029-790 Appendices kj Clearwater Creek20th AvenuePeltier Lake Lino Lakes Stormwater Greenway Option N LEGEND kj Outlet Control Structure Proposed Stream Channel Bankfull Top of Floodplain Bank Project Area Proposed Regional Storage Existing Wetlands 0 500 Feet 4 Bankfull Greenway Channel Cross-Section 4Floodplain and Wet Meadow 4100-Yr Flood Elevation 4 4H:1V Vegetated Slope 4Top of Bank Table 1.  Total Phosphorus Concentrations by Land Use [RCWD] LAND USE CATEGORY Agricultural Row Crops Open Space / Meadow Urban Impervious Area Urban Open Space Table 2.  Existing Conditions ‐ UNTREATED AREA S TP LAND USE CATEGORY [ac] [in][in][ac‐ft] [lbs] Agricultural Row Crops 1,060 81 2.41 0.13 11.14 0.320 9.70 Open Space / Meadow 315 65 5.50 0.00 0.00 0.010 0.00 Urban Impervious Area 42 99 0.07 1.02 3.57 0.100 0.97 Urban Open Space 0 73 3.79 0.03 0.00 0.110 0.00 TOTAL 1,417 78 1.17 14.71 10.67 Table 3. Proposed Conditions ‐ UNTREATED AREA S TP LAND USE CATEGORY [ac] [in][in][ac‐ft] [lbs] Agricultural Row Crops 80 81 2.41 0.13 0.84 0.320 0.73 Forest / Woods 311 65 5.50 0.00 0.00 0.010 0.00 Urban Impervious Area 559 99 0.07 1.02 47.53 0.100 12.92 Urban Open Space 467 73 3.79 0.03 1.10 0.110 0.33 TOTAL 1,417 82 1.17 49.47 13.99 3.32 lbs 44 ac‐ft 6.99 lbs ‐3.68 lbs 0.17 0.9 0.008 0.7 0.11 ASSUMED RUNOFF C 0.40 0.10 0.90 0.30 0.32 0.01 0.10 TP CONCENTRATION [mg/L] ESTIMATED EXPORT [lb/ac/yr] Water Quality Treatment Volume Required by RCWD Reduction in Loading Gained via Water Reuse, Treatment Ponding or Infiltration BMPs Estimated Decrease in Total Phosphorus Load from Required Treatment TP CONC  [mg/L] WEIGHTED  CN 1.1‐IN EVENT  RUNOFF VOLUME TP CONC  [mg/L] WEIGHTED  CN 1.1‐IN RUNOFF  Estimated Increase in Total Phosphorus Load Without Treatment Table 4.  Existing Conditions ‐ UNTREATED [Revised per S. Heiskary 3/24/16 email] AREA S TP LAND USE CATEGORY [ac] [in][in][ac‐ft] [lbs] Agricultural Row Crops 1,060 81 2.41 0.13 11.14 0.320 9.70 Open Space / Meadow 315 65 5.50 0.00 0.00 0.010 0.00 Urban Impervious Area 42 99 0.07 1.02 3.57 0.400 3.88 Urban Open Space 0 73 3.79 0.03 0.00 0.200 0.00 TOTAL 1,417 78 1.17 14.71 13.58 Table 5. Proposed Conditions ‐ UNTREATED [Revised per S. Heiskary 3/24/16 email] AREA S TP LAND USE CATEGORY [ac] [in][in][ac‐ft] [lbs] Agricultural Row Crops 80 81 2.41 0.13 0.84 0.320 0.73 Forest / Woods 311 65 5.50 0.00 0.00 0.010 0.00 Urban Impervious Area 559 99 0.07 1.02 47.53 0.400 51.70 Urban Open Space 467 73 3.79 0.03 1.10 0.200 0.60 TOTAL 1,417 82 1.17 49.47 53.03 39.45 lbs 44 ac‐ft 26.51 lbs 12.92 lbs Reduction in Loading Gained via Water Reuse, Treatment Ponding or Infiltration BMPs Estimated Decrease in Total Phosphorus Load from Required Treatment WEIGHTED  CN 1.1‐IN EVENT TP CONC  [mg/L] WEIGHTED  CN 1.1‐IN RUNOFF TP CONC  [mg/L] Estimated Increase in Total Phosphorus Load Without Treatment Water Quality Treatment Volume Required by RCWD WS – Item #2 WORK SESSION STAFF REPORT Work Session Item No. 2 Date: April 4, 2016 To: City Council From: Diane Hankee and Katy Thompson, WSB Engineering Re: FEMA Floodplain Map Revisions Background As part of a national five-year map modernization effort, FEMA flood insurance rate maps have been updated for Anoka County, effective December 16, 2015. These maps are used to determine flooding risks and flood insurance premiums for property owners. The City of Lino Lakes was first mapped in 1976, with the last map revision occurring in 1982. Since the adoption of the new flood risk maps, residents in Lino Lakes have begun receiving notices from their mortgage lenders notifying them of their flood risk and requirements for flood insurance. These notices are part of updates to the National Flood Insurance Program due to the Flood Insurance Reform Act of 2012 and the Homeowner Flood Insurance Affordability Act of 2014. National Flood Insurance Program Updates The Flood Insurance Reform Act of 2012 phases out subsidies for grandfathered rates and requires homeowners pay for the full risk of their property, as determined by the elevation of their home in relation to the flooding source elevation. The Homeowner Flood Insurance Affordability Act of 2014 gave lenders the ability to purchase flood insurance, at the borrower’s expense, if at any time during the life of the loan it is determined that the home is not covered by flood insurance or is inadequately covered by flood insurance. After FEMA updates the Flood Insurance Rate Maps, lenders review the revised data against their policies and notify affected borrowers of the need to obtain flood insurance within 45 days of notification or the lender will purchase insurance on the borrower’s behalf. Since Lino Lakes was first accepted into the National Flood Insurance Program in 1978, there have been only minor changes to the floodplain extents. With the latest map revision in 2015, the maps were provided digitally and updated with aerial photos and landmarks to make the maps easier to read. With the older maps, it was sometimes difficult to determine if a structure was in or out of the floodplain; now with the new maps, residents potentially being notified for the first time that they are in the floodplain, even though they may have always been in it. 2015 Flood Insurance Study WSB reviewed the data that was provided to FEMA during the map update process. The City provided topographic information and Letter of Map Revisions to the FEMA contractors. The City also requested that Rice Creek Watershed District submit their technical modeling on the City’s behalf. Rice Creek Watershed District provided FEMA with a lake level frequency analysis for the Chain of Lakes, hydrologic and hydraulic modeling for Clearwater Creek, Hardwood Creek, Rice Creek, and Anoka County Ditches 10-22-32, 15, 25, 31 and 46. For the lake level frequency analysis, RCWD reviewed all available gage records on the lakes and interpolated the 100-year flood elevation for each lake. For the modeling, RCWD reviewed both the 100-year 24-hour storm and the 100-year 10 -day storm, which simulates flooding caused by spring snowmelt. The higher of the two 100-year events was used to establish the 100-year floodplain elevation and extents. The result of the RCWD studies is that the 100-year flood elevations on the Chain of Lakes increased due to the longer gage record available since 1981. FEMA uniformly accepted RCWD’s data for the Chain of Lakes, Rice Creek, ACD 15 and 10-22-32. FEMA accepted portions of the ACD 25, Clearwater Creek and Hardwood Creek studies. Areas with approximate Zone A were essentially left unchanged. Revising the Effective Maps After the maps have been adopted and published, there are a few options for communities to contest the final mapping. The first option would be to authorize a City-wide independent detailed study to determine the floodplain elevations and extents. This is an expensive option and does not guarantee that the results would be any different than the 2015 maps. A second option would be to revise the approximate Zone A areas and establish flood elevations for these areas for future reference and existing homeowners’ benefit. Areas under development are already required to establish a base flood elevation as part of the development review. A third option would be to enter into the Community Rating System which would allow the City to provide discounted rates on flood insurance to its residents. WSB & Associates staff will be in attendance at the work session to answer questions. Requested Council Direction None required. Information only. Attachments 1. 1982 Flood Insurance Rate Map 2. 2015 Flood Insurance Rate Map 3. 2015 Digital Data 4. Changes Since Last FIRM 5. Example of Structures Affected by Floodplain at Reshanau Lake 1982 FIRM 2015 PANEL 2015 DIGITAL DATA 35E 35E 35E 35W 35W 35W LEGEND City Boundaries Floodplain Decrease No Change Floodplain Increase N 0 2,000 Feet 100-YEAR FLOODPLAIN BOUNDARY CHANGES SINCE 1982 FLOOD INSURANCE STUDY 1 inch = 1,000 feet Legend Always Out Added (25) Removed (21) Always In (61) Document Path: K:\02029-210\GIS\Maps\Impervious.mxd Reshanau Lake Structure Analysis Notes:1. A total of 225 parcels aroun d the lake ¯800 0 800400 Feet R e s h a n a u L a k e BFE: 886.2 (1981) 887.0 (2015) 1 inch = 800 feet 1 WS – Item #3 WORK SESSION STAFF REPORT Work Session Item No. 3 Date: April 4, 2016 To: City Council From: Diane Hankee and Erin Heydinger, WSB Engineering Re: Feasibility Study for Mattamy Water Reuse Background The City Council approved Resolution 15-53 on June 8, 2015 authorizing the Feasibility Study for the Mattamy Water Reuse. The feasibility study has been completed and presented to City’s Environmental Board for Approval on March 30, 2016. The feasibility Study provides an overview of three options for stormwater reuse in the proposed Mattamy development: 1. Reusing stormwater to irrigate public places; 2. Reusing stormwater to irrigate public places and the townhomes; and 3. Reusing stormwater to irrigate the entire development. A water balance was conducted to determine if there was sufficient water quantity available for each of the three options. The balance evaluated runoff, precipitation, evaporation, and irrigation. The proposed stormwater pond will receive enough runoff to implement Options 1 or 2, but a potable water connection will be required to implement Option 3. The developer has reservations regarding option 3 based on their past experience. In addition, the cost of each of the three options was estimated. After considering water supply and cost, WSB recommended that the City implement Option 2: reusing stormwater to irrigate public places and the townhomes for an estimated cost of $463,000. Financing was delineated for the recommended option, as well as ownership and maintenance recommendations. It is recommended that development fees cover $197,000 of the total cost, with the remaining funded by the City’s Trunk Water fund. Requested Council Direction Staff will be recommending acceptance of the Mattamy Homes Water Reuse Study and implementation of Option 2 at the April 11, 2016 City Council meeting. Attachments 2 1. Mattamy Homes Water Reuse Study   City of Lino Lakes, MN 600 Town Center Parkway • Lino Lakes, MN 55014 June 8, 2015 Mattamy Homes Water Reuse City of Lino Lakes Hennepin, MN WSB Project No. 2988-01 Feasibility Report Mattamy Homes Water Reuse WSB Project No. 2988-01 FEASIBILITY REPORT MATTAMY HOMES WATER REUSE FOR THE CITY OF LINO LAKES, MINNESOTA June 8, 2015 Prepared By: WSB & Associates, Inc. 477 Temperance Street St. Paul, MN 55101 651-286-8450 651-286-8488 (Fax) Feasibility Report Mattamy Homes Water Reuse WSB Project No. 2988-01 CERTIFICATION I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. DRAFT Greg F. Johnson, PE Date: March 30, 2016 Lic. No. 26430 Prepared By: DRAFT Erin J. Heydinger Date: March 30, 2016 Feasibility Report Mattamy Homes Water Reuse WSB Project No. 2988-01 TABLE OF CONTENTS 1. EXECUTIVE SUMMARY ....................................................................................................... 4 2. MATTAMY HOMES WATER REUSE .................................................................................. 5 2.1 INTRODUCTION ............................................................................................................... 5 2.2 GENERAL BACKGROUND .............................................................................................. 5 2.3 PROPOSED IMPROVEMENTS ........................................................................................ 6 3. FINANCING ............................................................................................................................. 8 3.1 OPINION OF COST ............................................................................................................ 8 3.2 FUNDING ............................................................................................................................ 8 4. RECOMMENDATION .......................................................................................................... 10 Appendix A Figure 1 – Project Location Figure 2 – Option 1: Irrigating Public Spaces Figure 3 – Option 2: Irrigating Public Spaces and Townhomes Figure 4 – Option 3: Irrigating Entire Development Appendix B Table 1 – Estimated Annual Irrigation Appendix C Table 1 - Water Balance Summary Table 2 – Option 1 Cost Summary Table 3 – Option 2 Cost Summary Table 4 – Option 3 Cost Summary Appendix D Water Balance Tech Memo Feasibility Report Mattamy Homes Water Reuse WSB Project No. 2988-01 1. EXECUTIVE SUMMARY The proposed Mattamy Homes Development is a 400 acre residential development located east of Interstate 35E and north of Main Street in the City of Lino Lakes. Surface water management for the project would include storm water quality, storage and rate control. The storm water storage area will hold a significant amount of water that can be used to provide irrigation verses conventional groundwater use for irrigation. Over the past three years, management of both surface water and groundwater resources have received increased awareness both locally and regionally. Lino Lakes is included in the North and East Metro Groundwater Management District established by the Department of Natural Resources (DNR). The goal is to protect of water resources through sustainable water use solutions such as the one being proposed. The water reuse project was evaluated through a water balance analysis and multiple options for an irrigation reuse system. The options for an irrigation reuse system are: 1. Irrigate the park and public spaces 2. Irrigate the townhomes, park, and public spaces 3. Irrigate the entire development, including single-family residences The options were evaluated based on the estimated costs, ownership, storm water requirements, and maintenance. Option 2 is recommended: it includes irrigat ion of the townhomes, park and public spaces. The estimated project cost for Option 2 is $463,000 which includes 10% construction contingency and 20% indirect costs. Funding for the project is proposed through development fees generated from surface water management fees, and City trunk water system funds. This project is feasible and cost-effective from an engineering standpoint, and should be constructed as proposed herein. Feasibility Report Mattamy Homes Water Reuse WSB Project No. 2988-01 2. MATTAMY HOMES WATER REUSE 2.1 INTRODUCTION 2.1.1 Authorization On June 8, 2015, the City of Lino Lakes City Council authorized the preparation of a feasibility report for the Mattamy Homes Water Reuse project. 2.1.2 Scope The Mattamy Homes Development includes a large storm water storage area that can be used as an irrigation source. The proposed project includes storm water used for irrigating the development. This report evaluates several options for water reuse and considers water resources, cost, regulatory requirements, and value of the reuse irrigation system. 2.1.3 Data Available Information and materials used in the preparation of this report include the following:  City of Lino Lakes Comprehensive Plan  City of Lino Lakes Base Map and/or Topography Maps  Minnesota Department of Natural Resources Water Usage Reports  Grading plans and plat for the Mattamy Homes development 2.2 GENERAL BACKGROUND 2.2.1 Project Location The Mattamy Homes Development is located in the City of Lino Lakes, west of Interstate 35E, east of 20th Avenue North, north of Main Street, and south of the bounds extended by 77th Street East. A map showing the project area can be found in Figure 1, Appendix A of this report. 2.2.2 Existing Conditions The existing land use at Mattamy Homes is agricultural, with stormwater currently running through the site via Anoka County Ditch 55 (ACD-55) and Anoka County Ditch 72 (ACD-72). These ditch systems receive storm water runoff from watersheds located in the cities of Hugo and Lino Lakes and discharge to Peltier Lake. A study is being completed to address the surface water in the NE area or Lino Lakes. This report assumes that ditch water is not available as a source for irrigation and will be addressed through the NE Drainage Study. 2.2.3 Stormwater Management The Rice Creek Watershed District (RCWD) Rules state that stormwater volume and rate control must occur in any location with new or reconstructed impervious surfaces, such as the Mattamy development. Stormwater infiltration is the preferred method of volume control. Prior to this feasibility study, an analysis was conducted to determine if the site was suitable for infiltration. Because a large portion of the site is within a vulnerable portion of the Drinking Water Supply Management Area (DWSMA), and the Minnesota Department of Health recommends that infiltration not occur in a vulnerable DWSMA, it Feasibility Report Mattamy Homes Water Reuse WSB Project No. 2988-01 was determined that infiltration is not feasible. In this instance, the RCWD Rules state that stormwater irrigation can occur in lieu of infiltration as a volume reduction practice. The three scenarios in this study reflect this determination. 2.2.3 Current Irrigation Practices The City currently regulates irrigation within the community to promote water conservation. It is estimated that irrigation accounts for 43% of the potable water used in the City each year (Appendix B, Table 1). The large proportion of water allocated towards irrigation presents an opportunity for the City to reduce its summer demand on the potable water system through water reuse. 2.3 PROPOSED IMPROVEMENTS There were three options identified to coincide with the Mattamy development Option 1: Irrigating Public Spaces with Storm Water Option 1 includes a water reuse irrigation system for public open spaces within the Mattamy Homes Development. This system includes the park in the center of the development as well as the berm on the east side of the development. In total, the irrigated area for Option 1 is 11 acres. A figure depicting Option 1 is shown as Appendix A, Figure 2. Option 2: Irrigating Public Spaces and Townhomes with Storm Water Option 2 includes a water reuse irrigation system for public open spaces and multi-family residential (townhome) area in the southeastern portion of the development. The townhome area includes 12 acres of green space that will require irrigation, in addition to the 11 acres irrigated in the public space. A figure depicting Option 2 is shown as Appendix A, Figure 3. Option 3: Irrigating all of the Mattamy Development with Storm Water Option 3 includes a water reuse irrigation system for public open spaces, multi- family residential townhomes, and single-family residences. A fourth municipal utility would be installed throughout the development . The third option requires homeowner education and interaction for system management and coordinatation with City maintenance staff. The total irrigated area for Option 3 is 144 acres. A figure depicting Option 3 is shown as Appendix A, Figure 4. A water balance analysis was completed and can be found in Appendix D. The water balance summary for each option: Option 1: Irrigating Public Spaces with Storm Water The water balance model indicates that the storm water stored can sufficiently supply water for irrigation of the public spaces with minimal pond level fluctuations. Feasibility Report Mattamy Homes Water Reuse WSB Project No. 2988-01 Option 2: Irrigating Public Spaces and Townhomes with Storm Water The water balance model indicates that the storm water stored can sufficiently supply water for irrigation of the public spaces and townhomes with minimal pond level fluctuations. Option 3: Irrigating all of the Mattamy Development with Storm Water The water balance model indicates that the storage area cannot supply enough irrigation water to support this option. The model showed that storage levels will reach significantly low levels and that the reuse system would require supplementation from the municipal water system. The cost to supplement the water reuse system with the municipal supply is not a cost that required with Option 1 or 2. In addition there will be vegetation issues if the storage area is drawn down this low, along with it is anticipated that residents will not desire to have the storage area this low. Option 2 is recommended because it provides the most surface water reuse without a fourth municipal utility system and individual service lines. Option 2 can be implemented without supplementation/connection to the municipal water system. 2.3.1 Pump and Pipe Materials Appendix C includes pump and forcemain layouts for each option, as well as suggested meter locations. The pump size should be determined by the irrigation designer, and they sho uld be controlled by soil-moisture sensors, to ensure that watering is dictated by weather and soil conditions. The proposed forcemain is 2 to 4” diameter, high density polyethylene (HDPE). 2.3.2 Water Quality Prior to each irrigation season, it is recommended that the storage area be tested for water quality. The Minnesota Pollution Control Agency has recommended water quality parameters as outlined in Appendix D. If the parameters are not met, additional treatment should be considered to ensure the storage water remains of high enough quality to use for irrigation. 2.3.3 Ownership Recommendation It is recommended that the City own and operate the system, and within the townhome area, the City should have a maintenance agreement with the HOA where they are responsible for maintaining the system in the townhome area. 2.3.4 Metering, Usage, and Billing It is recommended that the park and berm irrigation systems be operated with independent meters so that the townhome maybe invoiced for their water usage to support maintenance of the system. Watering restrictions should remain in place for consistency and promote water conservation. 2.3.5 Permitting A Rice Creek Watershed District (RCWD) permit will be required. The project will meet volume reduction, treatment and rate control per RCWD rules. A Minnesota Department of Natural Resources (DNR) appropriations permit will also be required for the project. Feasibility Report Mattamy Homes Water Reuse WSB Project No. 2988-01 2.3.6 Right of Way The proposed reuse system with Option 2 would be constructed within public right of ways and public land or land owned by the Home Owner Association for the townhomes. Option 3 may require additional easement or right of way dedicated through platting for the distribution system. 3. FINANCING 3.1 OPINION OF COST The detailed opinion of probably cost for each of the three options can be found in Appendix C of this report. The opinions of cost incorporate estimated construction costs and include a 10% construction contingency and 20% for indirect costs (legal, administrative, engineering, and financing items). Table 4 below provides a summary of the estimated cost for each of the three options considered: Option Construction with Contingency Indirect (20%) Total Option 1: Public Areas Irrigated $296,000 $60,000 $356,000 Option 2: Public Areas and Townhomes Irrigated $386,000 $77,000 $463,000 Option 3: Public Areas, Townhomes, and Single- Family Homes Irrigated $2,151,000 $431,000 $2,582,000 3.2 FUNDING Funding for the project is proposed through development fees generated from surface water management fees, and City trunk water system funds. The proposed funding for Option 2 is outlined as follows: Funding Source Amount Surface Water Management $197,000 Trunk Water $266,000 Total $463,000 Feasibility Report Mattamy Homes Water Reuse WSB Project No. 2988-01 The trunk fee is calculated based on 40% of the $4,069 trunk water fee for each townhome unit, based on the estimated water savings. It was assumed that each townhome is one Residential Equivalency Unit (REU). The project may be eligible for grants from the Metropolitan Council of Environmental Services for Targeted Storm Water. Grant funding opportunities will be evaluated during the design of the project. Feasibility Report Mattamy Homes Water Reuse WSB Project No. 2988-01 4. RECOMMENDATION The project is feasible, necessary, and cost -effective from an engineering perspective. WSB & Associates, Inc. recommends construction of the proposed improvements as detailed in this report. The economic feasibility of this project will be determined by the City Council. Feasibility Report Mattamy Homes Water Reuse WSB Project No. 2988-01 APPENDIX A Figure 1: Project Location Figure 2: Option 1: Irrigating Public Spaces Figure 3: Option 2: Irrigating Public Spaces and Townhomes Figure 4: Option 3: Irrigating Entire Development %&c( %&c( Rehbein St 73rd St Brian Dr20th Ave N20th Ave N77th St E Document Path: K:\02988-010\GIS\Maps\Figure1_MatamyHomeProjectArea.mxdÜ Figure 1Mattamy Homes Project Area 0 1,000Feet Project A rea Single Family Homes Townhomes Irrigation Source Ponds Par k Berm ROW "/ "/ %&c( Rehbein St 73rd St Brian Dr20th Ave N20th Ave N77th St E Document Path: K:\02988-010\GIS\Maps\Figure2_Scenario1.mxdÜ Figure 2Option 1 - Parks and Berm 0 1,000Feet Irrigated Area "/Pump Park Irrigation System Berm Irrigation System Project A rea Single Family Homes Townhomes Irrigation Source Ponds Par k Berm ROW %&c( Rehbein St 73rd St Brian Dr20th Ave N20th Ave N77t h St E Document Path: K:\02988-010\GIS\Maps\Figure3_Scenario2.mxdÜ Figure 3Option 2 - Parks, Berm, and Townhomes 0 1,000Feet Irrigated Area "/Pump Park Irrigation System Berm Irrigation System Townhome Irrigation System Project A rea Single Family Homes Townhomes Irrigation Source Ponds Par k Berm ROW "/ "/ "/ "/ "/ "/ %&c( Rehbein St 73rd St Brian Dr20th Ave N20th Ave N77th St E Document Path: K:\02988-010\GIS\Maps\Figure4_Scenario3.mxdÜ Figure 4Option 3 - Entire Development Irrigated 0 1,000Feet Irrigated Area "/Pump Single Family Irrigation System Park Irrigation System Berm Irrigation System Townhome Irrigation System Project A rea Single Family Homes Townhomes Irrigation Source Ponds Par k Berm ROW Feasibility Report Mattamy Homes Water Reuse WSB Project No. 2988-01 APPENDIX B Table 1 - Estimated Annual Irrigation Pumping Data 2011 2012 2013 2014 Average January 25,888,000 25,071,000 27,807,000 25,983,000 26,187,250 February 23,596,000 22,437,000 23,407,000 22,194,000 22,908,500 March 23,542,000 24,787,000 23,681,000 24,295,000 24,076,250 April 26,549,000 35,803,000 27,568,000 25,505,000 28,856,250 May 32,688,000 48,084,000 35,966,000 36,576,000 38,328,500 June 61,591,000 66,619,000 38,388,000 42,654,000 52,313,000 July 66,370,000 95,916,000 83,252,000 64,403,000 77,485,250 August 59,137,000 93,978,000 101,316,000 73,428,000 81,964,750 September 69,350,000 90,784,000 89,821,000 47,160,000 74,278,750 October 51,635,000 56,177,000 34,861,000 33,170,000 43,960,750 November 25,097,000 24,722,000 24,858,000 24,064,000 24,685,250 December 26,704,000 25,046,000 24,703,000 25,310,000 25,440,750 Total 492,147,000 609,424,000 535,628,000 444,742,000 520,485,250 Summer Usage:367,320,000 487,361,000 411,172,000 322,896,000 397,187,250 Winter Usage:124,827,000 122,063,000 124,456,000 121,846,000 123,298,000 Average Monthly Winter Use:24,659,600 Average Monthly Summer Use:56,741,036 Average Estimated Irrigation:224,570,050 Percent of Total:43.1% Feasibility Report Mattamy Homes Water Reuse WSB Project No. 2988-01 APPENDIX C Table 1 - Water Balance Summary Table 2 – Option 1 Cost Summary Table 3 – Option 2 Cost Summary Table 4 – Option 3 Cost Summary Irrigated Area (ac)Volume Required to Irrigate  Area (gal)Average Days Irrigating from Lake YearlyAverage Daily Irrigation Demand (gal)Annual Lake Water Used (MG)Annual Lake Water Used (ac‐ft)Annual Potable Water Used (MG)Option 1: Irrigate Park and Berm10.79 42,000156 35,3366.54 20.06 0Option 2: Irrigate Park, Berm, and Townhome23.04 88,000156 74,03813.69 42.02 0Option 3: Irrigate Entire Development*143.7 547,000134 460,215 73.09 224.3 12.05*Numbers assume an 11' protective depth Item No. Description Unit Estimated Total Quantity Estimated Unit Price Estimated Total Cost 1 MOBILIZATION LUMP SUM 1 $8,000.00 $8,000.00 2 CLEARING AND GRUBBING LUMP SUM 1 $500.00 $500.00 3 DEWATERING LUMP SUM 1 $5,000.00 $5,000.00 4 2" FORCE MAIN HDPE LIN FT 6,991 $18.00 $125,832.87 5 ELECTRICAL SERVICE LUMP SUM 1 $12,000.00 $12,000.00 6 IRRIGATION METER AND CONTROLS EACH 2 $3,000.00 $6,000.00 7 LIFT STATION, FILTER, CONTROLS, AND APPURTENANCES* LUMP SUM 2 $55,000.00 $110,000.00 8 SILT FENCE, TYPE HEAVY DUTY LIN FT 250 $3.50 $875.00 9 CONCRETE PUMP PAD EACH 2 $1,000.00 $1,000.00 SUBTOTAL $269,207.87 + 10% CONTINGENCY $26,920.79 CONSTRUCTION SUBTOTAL $296,128.66 + 20% INDIRECT $59,225.73 TOTAL $356,000.00 Opinion of Probable Cost A. Irrigating Public Spaces (Park and Berms) Item No. Description Unit Estimated Total Quantity Estimated Unit Price Estimated Total Cost 1 MOBILIZATION LUMP SUM 1 $16,700.00 $16,700.00 2 CLEARING AND GRUBBING LUMP SUM 1 $500.00 $500.00 3 DEWATERING LUMP SUM 1 $5,000.00 $5,000.00 4 2" FORCE MAIN HDPE LIN FT 6,991         $18.00 $125,838.00 5 ELECTRICAL SERVICE LUMP SUM 1 $12,000.00 $12,000.00 6 IRRIGATION METER AND CONTROLS EACH 3 $3,000.00 $9,000.00 7 LIFT STATION, FILTER, CONTROLS, AND APPURTENANCES* LUMP SUM 2 $55,000.00 $110,000.00 8 SILT FENCE, TYPE HEAVY DUTY LIN FT 250 $3.50 $875.00 9 CONCRETE PUMP PAD EACH 2 $1,000.00 $2,000.00 11 4" FORCE MAIN HDPE LIN FT 3,807 $18.00 $68,531.73 SUBTOTAL $350,444.73 + 10% CONTINGENCY $35,044.47 CONSTRUCTION SUBTOTAL $385,489.21 + 20% INDIRECT $77,097.84 TOTAL $463,000.00 B. Irrigating Public Spaces and Townhomes Opinion of Probable Cost Item No. Description Unit Estimated Total Quantity Estimated Unit Price Estimated Total Cost 1 MOBILIZATION LUMP SUM 1 $93,100.00 $93,100.00 2 CLEARING AND GRUBBING LUMP SUM 1 $500.00 $500.00 3 DEWATERING LUMP SUM 1 $5,000.00 $5,000.00 4 2" FORCE MAIN HDPE LIN FT 6,991 $18.00 $125,838.00 5 ELECTRICAL SERVICE LUMP SUM 1 $12,000.00 $12,000.00 6 IRRIGATION METER AND CONTROLS EACH 8 $3,000.00 $24,000.00 7 LIFT STATION, FILTER, CONTROLS, AND APPURTENANCES* LUMP SUM 6 $55,000.00 $330,000.00 8 SILT FENCE, TYPE HEAVY DUTY LIN FT 250 $3.50 $875.00 9 CONCRETE PUMP PAD EACH 6 $1,000.00 $1,000.00 10 CONNECT TO POTABLE WATER EACH 6 $8,000.00 $48,000.00 11 4" FORCE MAIN HDPE LIN FT 36,944 $18.00 $664,992.00 12 POTABLE WATER SYSTEM OVERSIZING LUMP SUM 1 $650,000.00 $650,000.00 SUBTOTAL $1,955,305.00 + 10% CONTINGENCY $195,530.50 CONSTRUCTION SUBTOTAL $2,150,835.50 + 20% INDIRECT $430,167.10 TOTAL $2,582,000.00 C. Irrigating Entire Development Opinion of Probable Cost Feasibility Report Mattamy Homes Water Reuse WSB Project No. 2988-01 APPENDIX D Water Balance Technical Memo engineering planning environmental construction 701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 Tel: 763-541-4800 Fax: 763-541-1700 Equal Opportunity Employer wsbeng.com January 21, 2016 Mr. Mike Grochala, AICP Community Development Director City of Lino Lakes 600 Town Center Pkwy Lino Lakes, MN 55015 Re: Mattamy Homes Water Reuse – Water Balance Technical Memorandum WSB Project Number 02988-01 Dear Mr. Grochala: We are providing you this technical memorandum to summarize the results of the water balance model for the water reuse feasibility study in the Mattamy Homes development. This document describes the methodology used to calculate the quantity of stormwater available and the amount used for irrigation purposes. Project Background The City of Lino Lakes wishes to implement a water reuse program using water from the lake in the Mattamy Homes development to irrigate portions of the development. There are three potential scales with respect to water reuse that were evaluated. The first is using water in the lake to irrigate the development’s park and the berms on the eastern edge of the development. The second is to irrigate the park and the berms as well as the townhomes in the southeastern corner of the development. Finally, the water balance modeled the feasibility of irrigating the entire development, including single-family homes, with water from the lake. Water Balance Theory The water balance presented in this document evaluates the amount of water provided to the pond via stormwater runoff, the amount that will be withdrawn for irrigation, and the resulting lake levels. The estimate takes into consideration precipitation, runoff, evaporation, irrigation demand, and pond overflow. While water balances rely on historic data and do not predict future climate patterns, they are a helpful tool when determining if stormwater irrigation is feasible, and if so, whether or not potable water augmentation will be required. Calculating Drainage Area To determine the amount of water available for irrigation, the drainage area to the lake was taken from the current Lino Lakes Northeast Study being conducted by WSB & Associates for the City. In addition, drainage information was obtained from the the developer to estimate the area in the future development that will drain to the lake. Mr. Mike Grochala January 21, 2016 Page 2 The purpose of the water balance is to determine if the lake holds enough water for irrigation purposes throughout the irrigation season. Therefore, a conservative approach was taken when estimating the drainage area; only the immediate drainage within the development was considered for the water balance. Calculating Precipitation Rainfall data was obtained from the Minnesota Climatology Working Group. Data was available beginning on May 1, 1959, and extending to June 30, 2015. Days in which rainfall data was missing were assumed to have received no precipitation. Calculating Runoff The water balance uses the United States Department of Agriculture (USDA) Natural Resources Conservation Service method for determining runoff. This method, commonly known as the SCS Runoff Curve Number method, has widespread use in hydrologic modeling. The curve number for the drainage area was calculated as part of the Lino Lakes Northeast Study. The curve numbers for the drainage area within the development was estimated using soil type and single- and multi-family residential published curve numbers. Using the calculated curve numbers, an S-value (the amount of maximum soil moisture retention after runoff begins) was determined using the following equation: ܵൌ 1000 ܥݑݎݒ݁ ܰݑܾ݉݁ݎ െ10 From the S-value, the initial abstraction (Ia) was calculated as 0.2*S, per the USDA. To predict the amount of runoff (Q) from a particular rain event, the USDA gives the equation: The equation dictates that there is no runoff from a storm where the amount that falls (in inches) is less than the initial abstraction. In the single-family residential area, a storm of 0.47 inches is required, and in the multi-family residential (townhome) area, a storm of 0.26 inches is required. In the model, runoff from the three areas was considered independently to ensure the most accurate estimate of total runoff volume possible. Using the equation above, the runoff entering the lake was evaluated for each rain event from the historical rainfall data. Calculating Pond Volume Pond volume was determined using contour data from the grading plan for the lake. First, a stage to surface area relationship was developed using surface area from the grading plan. Once the surface area was evaluated at several elevations, the trapezoidal method was used to estimate overall pond volume as well as the volume at several elevations. The storage capacity of the pond is approximately 122 million gallons, with a volume of 86 million gallons at the normal water elevation. The total possible volume was assumed to be the volume at the overflow Mr. Mike Grochala January 21, 2016 Page 3 elevation. The grading plans assume a normal water level of 900 feet, which was set as the initial lake volume for modeling purposes. Calculating Evaporation Based on the estimated volume contained in the lake, the surface area was calculated in Excel using the Forecast function. The Forecast function gives a predicted value of a variable using a linear regression analysis. In this case, the function uses the elevation-surface area data calculated in the pond volume analysis to predict what the surface area would be for any volume of water. This is a necessary component for the model because the volume analysis as outlined in the previous section gives volume at one foot increments only. Once the surface area is estimated, the amount of evaporation is predicted using the pan evaporation method with a pan coefficient, as outlined by the University of Minnesota. The guiding document recommends a pan coefficient of 0.75 for Minnesota. The equation used is below: ܧݒܽ݌݋ݎܽݐ݅݋݊ ൌ ܹܽݐ݁ݎ ܵݑݎ݂ܽܿ݁ ܣݎ݁ܽ ሺ݂ݐ ଶ ሻݔ 0.75 ݔ 36.98 ݄݅݊ܿ݁ݏ 12 ݄݅݊ܿ݁ݏ/݂ݐ The value of 36.98 inches is the average pan evaporation for the State of Minnesota between 1974 and 2004. The equation above provides annual evaporation. Therefore, in the water balance, the value was divided by 180, or the approximate number of days in which evaporation occurs annually. Calculating Irrigation Requirements Using aerials and plans provided by the developer, the irrigated area was estimated for the berms, park, townhomes, and single-family homes. It is estimated that to maintain a lawn, one inch of water is required per week (including precipitation). 1-inch of irrigation weekly results in an average of 1/7, or 0.14, inches per day. Therefore, if the rainfall is greater than 0.14 inches in a given day, it was assumed in the water balance that irrigation did not occur that day. Rice Creek Watershed District rules dictate that stormwater irrigation occurs, at maximum, from April 15 to October 15 for the generation of volume reduction credits. The water balance calculates irrigation between these dates. Phase Irrigation Volume per Day (gal) 1. Park and berms only 42,000 2. Park, berms, and townhome area 88,000 3. Park, berms, townhome area, single family area 546,150 Water Balance: Final Calculation and Results Once all of the above parameters were calculated, the balance was conducted to determine lake levels throughout the irrigation season. The overall water balance equation is as follows: ܲ݋݊݀ ܸ݋݈ݑ݉݁ ൌ ܫ݊݅ݐ݈݅ܽ ܲ݋݊݀ ܸ݋݈ݑ݉݁ ൅ ܵݐ݋ݎ݉ݓܽݐ݁ݎ ܴݑ݊݋݂݂ ൅ ܦ݅ݐ݄ܿ ܫ݂݈݊݋ݓ െ ܦ݅ݏ݄ܿܽݎ݃݁ െ ܧݒܽ݌݋ݎܽݐ݅݋݊ െ ܫݎݎ݅݃ܽݐ݅݋݊ The average annual precipitation, including snowmelt, was 33.5 inches. The model predicted that on average, irrigation will occur 156 days each year, out of 184 possible irrigation days. This Mr. Mike Grochala January 21, 2016 Page 4 leads to a weekly irrigation depth of 0.84 inches, resulting in a total water depth of 1.6 inches applied to the turf on a weekly basis, including precipitation. Studies conducted by the University of Minnesota indicate that this irrigation rate is likely slightly more than necessary given the soils and precipitation. A small overestimation of the irrigation rate is desired so that the model is conservative. Option 1: Irrigating Public Spaces with Storm Water Option 1 resulted in a daily irrigation rate of 42,000 gallons on days in which irrigation occurred (days in which precipitation was less than 1/7-inch). The water balance model indicates that the storage can sufficiently supply water for irrigation of the public spaces with minimal effect on storage levels. Evaporation and irrigation combined resulted in maximum storage level fluctuation of 36.8 million gallons (MG), or 4 feet in elevation change. Option 1 is feasible in terms of water supply. Option 2: Irrigating Public Spaces and Townhomes with Storm Water Option 2 resulted in a daily irrigation rate of 88,000 gallons on days in which irrigation occurred. The water balance model indicates that the storage can sufficiently supply water for irrigation of the public spaces and townhome properties with minimal effect on storage levels. Evaporation and irrigation combined resulted in maximum storage level fluctuation of 37.0 MG, or 4 feet in elevation change. Option 2 is feasible in terms of water supply. Option 3: Irrigating all of the Mattamy Development with Storm Water Option 3 resulted in a daily irrigation rate of 547,000 gallons. The storage cannot supply enough irrigation water to support this option. The model showed that storage levels will reach approximately two feet in depth during the summer if irrigating at this rate. A protective elevation can be set, such that at a certain storage depth the irrigation system does not run. Depending on the elevation chosen, the system will turn off for different time ranges. If, for example, the protective elevation is 896 feet (corresponding two an eleven foot depth), the system would run off of potable water an average of 22 days per summer. Given the system and operating cost, Option 3 is not feasible in terms of water supply. Please contact me at (763) 287-8319 with any questions. Sincerely, WSB & Associates, Inc. Erin Heydinger Mr. Mike Grochala January 21, 2016 Page 5 Sources: Gulliver, J.S., A.J. Erickson, and P.T. Weiss (editors). 2010. Stormwater treatment: Assessment and Maintenance. University of Minnesota, St. Anthony Falls Laboratory. Minneapolis, MN. http://stormwaterbook.safl.umn.edu/content/evaporation-and-evapotranspiration Minnesota Climatology Working Group. Nearest Station Precipitation Data Retrieval. Available online: http://climate.umn.edu/HIDradius/radius_new.asp USDA. Urban Hydrology for Small Watersheds – Technical Review 55. Available online: http://www.nrcs.usda.gov/Internet/FSE_DOCUMENTS/stelprdb1044171.pdf 1 WS – Item #4 WORK SESSION STAFF REPORT Work Session Item No. 4 Date: April 4, 2016 To: City Council From: Diane Hankee and Erin Heydinger, WSB Engineering Re: Adoption and Implementation of Wellhead Protection Plan Background On February 26, 2016, the Minnesota Department of Health (MDH) notified the City of Lino Lakes that its Part 2 Wellhead Protection Plan (WHPP) was officially approved. The preparation of the City’s WHPP is a requirement of Minnesota Rules 4720.5100 to 4720.5590. The goal of the Plan is to prevent human-caused contaminants from entering the water supply wells and to protect all who use the water supply from adverse health effects associated with groundwater contamination. The Plan falls under the jurisdiction of the MDH and consists of two parts (Part 1 and Part 2). Part 1 Part 1 of Lino Lakes’ WHPP was completed in 2014. Part 1 is a technical exercise that uses groundwater modeling to delineate the wellhead protection area (WHPA), Drinking Water Supply Management Area (DWSMA) and includes a well and aquifer vulnerability assessment. Part 1 addresses the three municipal water supply wells used by the City and the associated source water aquifer. Part 2 Part 2 of the WHPP describes how the results of the Part 1 can be applied to best protect a community’s water supply. Data elements were collected and interpreted, and then impacts of changes in land and water use were assessed. This allowed issues, problems, and opportunities to be identified and included in the WHPP. Next Steps The goals and objectives of the Part 2 WHPP focus on managing potential contaminant sources within the DWSMA, reducing the potential contaminant pathways to the source water aquifer that may be provided by private wells, educating property owners and water supply users, and working with the cities within the DWSMA to ensure proper management of the portion within their respective community. Once adopted, the City must begin implementation of these objectives. Specific goals outlined in Chapter 5 of the Part 2 Plan fall under the following categories: A. Well Management B. Public Education 2 C. Storage Tank Management D. Septic Systems (ISTS) E. Stormwater Management F. Hazardous Waste Management G. Data Collection H. Water Conservation I. Planning and Zoning J. Implementation K. Evaluation Specific examples of implementation activities include educating the public on lawn care practices, maintain an up-to-date septic system inventory, and notifying storage tank owners within the DWSMA that the tank is in a source water protection area. The annual cost for WHPP implementation is approximately $10,000. Source Water Protection grants from the Minnesota Department of Health are available to offset some of this cost. These grants are available twice annually and do not require a cost-share. Staff presented the WHPP implementation plan to the Environmental Board on March 30, 2016 for approval. Requested Council Direction Staff is recommending adoption and implementation of the Wellhead Protection Plan which will be on the City Council April 11, 2016 meeting consent agenda. Attachments 1. WHPP – Part 2 Objectives and Plans of Action Wellhead Protection Plan ‐ Part 2 June 2015 City of Lino Lakes, MN WSB Project No. 2029‐43 Page24         CHAPTER FIVE – OBJECTIVES AND PLANS OF ACTION (4720.5250)   I. OBJECTIVES   Given the issues, problems, and opportunities discussed in Chapter Three and the goals stated in Chapter Four, the WHP Plan delegates direct management efforts to the following areas to prevent future contamination of the aquifer and increase awareness of groundwater protection:     A. Well Management B. Public Education C. Storage Tank Management D. Septic Systems (ISTS) E. Stormwater Management F. Hazardous Waste Management G. Data Collection H. Water Conservation I. Planning and Zoning J. Implementation K. Evaluation  Each activity shall only be implemented in the sections of the DWSMA that are of the vulnerability level that is applicable to that specific action item per MDH requirements. In general, action items shall follow the basic rule for activities relating to the following areas:  Low vulnerability areas – wells  Moderate vulnerability areas – wells and tanks  High vulnerability areas – all land uses and potential contaminant sources, including wells and tanks II. Plan of Action     A. WELL MANAGEMENT   Objective A1: Take measures to promote proper sealing of abandoned, unused, unmaintained, or damaged wells.   Action A1.1: Make property owners aware of potential technical and financial resources that are available to assist them in securing grant funding for properly sealing wells.   Who: City of Lino Lakes Sta ff Cooperators: Anoka County, WellheadProtectionJoint PowersGroup Time Frame: On‐going Estimated Cost: $500 annually How: Use the City’s website,newsletters,ordirect mailingstomake well owners aware of well sealing cost‐share programs. Provide information to realtors to pass along to property owners preparing to sell and during disclosure process.   Wellhead Protection Plan ‐ Part 2 June 2015 City of Lino Lakes, MN WSB Project No. 2029‐43 Page25     Action A1.2: Seek funding when available and feasible to locate and/or seal wells located on City property.   Who: City Staff Cooperators: Anoka and Washington Counties, Consultant Time Frame: On‐going, when grant funding is available Estimated Cost: $2,000 (grant application); additional cost for sealing TBD. How: If wells are discovered on City owned property, grant funding shall be sought after to properly seal the well. Objective A2: Take measures to identify properties with abandoned, unused, unmaintained, or damaged wells and potential cross connections between private wells and the City’s water system.   Action A2: Identify properties with potential water supply cross connections or wells that pose a hazard to the public water supply.   Who: City of Lino Lakes Staff or consultant Cooperators: MDH, Anoka County,Cityof LinoLakes Time Frame: 3 to 5 years Estimated Cost: $5,000 to $6,000 research effort, remaining work dependent on results How: Through mapping and field investigation, as well as historical records. When possible, the list of parcels likely to have wells will be incorporated into the City Building Officials records or shared with other jurisdictions in the DWSMA. When the application is made to rebuild or demolish an existing building, the records can be reviewed to determine if a well search is required.   Objective A3: Educate the public about proper well management.   Action A3: Provide links to MDH and County well management websites on the City’s website, include information in the City’s newsletter or other direct mailings.   Who: City of Lino Lakes Staff or consultant Cooperators: MDH Time Frame: Ongoing Estimated Cost: $500 How: Use the City’s website,newsletters,ordirect mailings. Use local newspaper, public access or social media sites      Wellhead Protection Plan ‐ Part 2 June 2015 City of Lino Lakes, MN WSB Project No. 2029‐43 Page26       Objective A4: Investigate “unlocated” or undocumented wells within the City and DWSMA.   Action A4: Provide data to MDH, County well management, and the Minnesota Geological Survey regarding the measured location of “unlocated” and undocumented wells, and investigate the “as built” construction of wells without construction records.   Who: City of Lino Lakes Sta ff Cooperators: MDH, Hugo, Centerville,CirclePines,Blaine Time Frame: 5 to 7 years Estimated Cost: unknown How: Apply for grant funding to investigate the location of unlocated wells through Objective A2, surface measurements, and inspections.   Objective A5: Incorporate WHP initiatives into City Plans   Action A5: The City will use this Wellhead Protection Plan as a resource when updating its Comprehensive Plan, Local Water Management Plan, Water Supply Plan, and other relevant plans. Who: City of Lino Lakes Staff orconsultants Cooperators: City of Hugo, CirclePines,Centerville Time Frame: When other plans are revised Estimated Cost: Varies per plan How: WHP initiatives willbeaddressedandincorporatedinto the City’s variousplan updates.   Objective A6: Identify New High-Capacity Wells within the DWSMA.   Action A6: The City will identify new high capacity wells that are proposed for construction in or near the City’s DWSMA, and/or major changes to groundwater appropriations for existing high capacity wells, to determine whether the pumping of wells will alter the current boundaries of the DWSMA delineations or other portions of the City’s WHP Plan.   Who: City of Lino Lakes Sta ff or consultant Cooperators: Comprehensive WaterSupplyPlancontents Time Frame: 3 to 5 years Estimated Cost: varies How: City will request to be notified of new permits or changes to existing appropriation permits for high capacity wells near the DWSMA. If determined to potentially be impactful, City Staff, Consultant, and MDH will be requested to evaluate whether proposed pumping will change the boundaries of the DWSMA delineated for the City’s wells or if the vulnerability of the aquifer will be affected.        Wellhead Protection Plan ‐ Part 2 June 2015 City of Lino Lakes, MN WSB Project No. 2029‐43 Page27       Objective A7: Continue to monitor the water quality from City’s wells (existing and new) to ensure water quality standards are met.   Action A7: Examine and review the annual water quality reports to ensure maximum levels of contaminants are not changing.   Who: City of Lino Lakes Sta ff Cooperators: Consultant Time Frame: MDH Estimated Cost: When reports are available How: No additional cost – staff time   Objective A8: Encourage owners on ISTS and private wells to connect to city services, when they become available.   Action A8: Re-evaluate the sewer and water connection policy when services become available in the DWSMA.   Who: City of Lino Lakes CommunityDevelopment staff Cooperators: City Council Time Frame: 3 to 5 years Estimated Cost: No cost How: Discuss the importanceof connectionstocityservices,asthey become available.   B. PUBLIC EDUCATION   Objective B1: Develop a public support and understanding for the WHP planning through the use of websites, newsletters, and handouts. Action B1.1: Include information about WHP and groundwater protection in the City newsletter, perhaps in conjunction with the City’s MS4 permitting requirements.   Who: City of Lino Lakes Sta ff Cooperators: MDH, Minnesota Rural Water Association (MRWA) Time Frame: Ongoing Estimated Cost: $500 each mailing/posting How: Identify and obtainexistingeducationalmaterialsavailable from MDH andother sources. Write newsletter articles describing WHP and include contact information and website addresses for existing educational resources.   Action B1.2: Provide information about the WHP Plan and links to other WHP related resources on the City’s website.   Who: City of Lino Lakes Sta ff Cooperators: City of Lino Lakes PublicWorksandBuildingDepartments Time Frame: Ongoing Estimated Cost: $500 each year of mailing/posting How: Provide a summaryof WHPgoalsandimplementation.Provide links to WHP related websites including MDH, Anoka County, MDA, and EPA.   Wellhead Protection Plan ‐ Part 2 June 2015 City of Lino Lakes, MN WSB Project No. 2029‐43 Page28     Action B1.3: Educate property owners of rural lands on the issues related to agricultural activity and how these issues affect or relate to the protection of the aquifer.   Who: City of Lino Lakes Sta ff or consultant Cooperators: MDH, MRWA Time Frame: Ongoing, when applicable Estimated Cost: $500 each mailing/posting How: Coordinate with AnokaCountyandMDHtoprovidebest management practices, handouts, and other resources for dissemination.   Objective B2: Educate City staff on transportation corridor and pipeline issues Action B2: Create awareness about transportation corridor and pipelines issues that may affect the public water supply. Who: City of Lino Lakes Staff Cooperators: MDH Time Frame: Year 1‐3 Estimated Cost: City staff time How: Post information available online about the importance of addressing and preventing released contaminants. Communicate the procedures in place by posting a notice in City Hall or sending an email to City staff.   Objective B3: Educate emergency management officials of the importance of spills/cleanup within the DWSMA. Action B3: Send a summary memo to the Fire Department, County Emergency Manager, County Engineer, and MnDOT regarding the DWSMA location, sensitivity, and importance of spill cleanup within the management area. Who: City Staff Cooperators: MDH, MRWA, Fire Department, MnDOT, County Time Frame: Year 2 Priority: High Estimated Cost: $500 How: Develop of summary memo to provide to local emergency management officials on the DWSMA location and importance of spill cleanup within the management areas.      Wellhead Protection Plan ‐ Part 2 June 2015 City of Lino Lakes, MN WSB Project No. 2029‐43 Page29       C. STORAGE TANK MANAGEMENT   Objective C1: Notify owners of storage tanks located within the DWSMA that the tank is in a source water protection area, and educate the owners of properties containing the storage tanks of the importance of spill prevention.   Action C1: Update list of storage tank owners and contact each property owner and make them aware of their placement within the City’s DWSMA.   Who: City of Lino Lakes Sta ff or consultant Cooperators: City of Lino Lakes administration,MDH Time Frame: 3 years Estimated Cost: $3,000 How: Send mailings out topropertyownersnotifyingthemabout the DWSMA delineation and the importance of spill prevention. Provide contact numbers for appropriate government agencies to each property owner.   D. SEPTIC SYSTEMS (ISTS)   Objective D1: Coordinate with Anoka County to educate property owners about the need for having onsite sewage treatment systems that comply with environmental standards and other regulations.   Action D1: Support County’s efforts to educate property owners about ISTS systems and proper maintenance of them.   Who: Anoka County Cooperators: City of Lino Lakes PublicWorksandBuildingdepartments Time Frame: Ongoing Estimated Cost: Staff time How: Provide assistance toAnokaCountyasrequested.Continue to discuss requirements in building department.   Objective D2: Maintain an up-to-date septic system inventory.   Action D2: Build off the inventory in this report to maintain an accurate inventory of septic system locations, especially in the high vulnerability portions of the DWSMA.   Who: City of Lino Lakes BuildingandPlanningdepartment Cooperators: Other City of Lino LakesStaff Time Frame: Ongoing Estimated Cost: $1,500 How: At the time of building or demolition permit, keep a tracking record of new or removed ISTS. Periodically review and revise database.      Wellhead Protection Plan ‐ Part 2 June 2015 City of Lino Lakes, MN WSB Project No. 2029‐43 Page30       E. STORMWATER MANAGEMENT   Objective E1: Educate the public on proper stormwater management, turf management, proper lawn care practices and water conservation Action E1: Conduct a public education campaign using existing communication devices on the importance of turf management and proper lawn care Who: City of Lino Lakes Administration Cooperators: MDH, RCWD Time Frame: On‐going Estimated Cost: $500 How: In conjunction with theSWPPPandMS4reportingrequirements, include articles on the website, in city newsletters on the importance of lawn care and water conservation.   Objective E2: Cooperate with other agencies and programs to manage stormwater quality.   Action E2: Set up an annual interagency meeting to discuss stormwater management issues and implementation of the Surface Water Management Plan Who: City of Lino Lakes Sta ff Cooperators: Rice Creek WatershedDistrict,MinnesotaPollutionControl Agency Time Frame: On‐going Estimated Cost: unknown How: When applicable and economical, the City work to assist government agencies to promote proper management of stormwater quality within the City.   F. HAZARDOUS WASTE MANAGEMENT   Objective F1: Educate the public on the proper disposal of hazardous waste items.   Action F1: Provide event information on the household hazardous waste collection day with Anoka County near Lino Lakes. Who: City of Lino Lakes Sta ff Cooperators: Other City of Lino LakesStaff andAnokaCounty Time Frame: On‐going Estimated Cost: $500 How: Include informationon theCity’swebsite,in theCity’snewsletter, distribute direct mailers, or include water billing inserts to encourage residents within the DWSMA, and throughout the City, to participate in the County’s household hazardous waste collection day.      Wellhead Protection Plan ‐ Part 2 June 2015 City of Lino Lakes, MN WSB Project No. 2029‐43 Page31       Objective F2: Educate hazardous waste generators about hazardous waste management.   Action F2: Offer information on “Hazard Waste Training Seminar” for all hazardous waste generators covering all the information that the average generator needs to stay in compliance with the rules.   Who: City of Lino Lakes Sta ff Cooperators: MDH, Anoka County,Hugo,Centerville,CirclePines,Blaine Time Frame: 2 years Estimated Cost: $1,500 How: Include information on theCity’s websiteorintheCity’snewsletter to encourage residents and business owners within the DWSMA, and throughout the City, to participate in Hazardous Waste Training Seminars sponsored by the County or other agencies.   G. DATA COLLECTION   Objective G1: Continue to collect and maintain local geologic and hydrogeologic data in order to improve and augment current information and to provide additional data for future revisions to this Plan.   Action G1.1: Monitor static and pumping levels in municipal wells.   Who: City of Lino Lakes Sta ff Cooperators: Consultant Time Frame: On‐going Estimated Cost: Staff time How: Conduct routine collectionof groundwaterlevelsinthemunicipal wells,which will provide data for the evaluation of groundwater elevation trends over time. A decreasing trend in static water levels in the municipal wells may be cause for the City to pursue more restricted water use measures and /or more effective methods to control public water supply use. Action G1.2: Cooperate and support future data collection efforts by other agencies.   Who: City of Lino Lakes Sta ff Cooperators: MPCA, DNR, MDH,USGS,RCWD Time Frame: On‐going Estimated Cost: 1,500 staff time How: Provide assistance toagenciesasrequested when reasonable and economical.      Wellhead Protection Plan ‐ Part 2 June 2015 City of Lino Lakes, MN WSB Project No. 2029‐43 Page32       Objective G2: Evaluate the water quality monitoring strategy and results to ensure that they are consistent with federal and state requirements yet also take into account local conditions. Action G2: Maintain water quality sampling requirements mandated by MDH and analyze trends in water chemistry, looking for any possible degradation of quality or changes in aquifer hydraulics.   Who: City of Lino Lakes Staff Cooperators: Consultant Time Frame: Ongoing Estimated Cost: No additional cost How: Identify changes totrendsinwaterchemistrybyevaluating records of analysis results. This includes sharing data with the MDH and the option to sample for radiological testing.   Objective G3: Maintain up to date information about wells and potential contaminant sources within the DWSMA.   Action G3: In cooperation with existing state or local agencies and programs, create and maintain a database of wells, ISTS, storage tanks, and shallow disposal wells within the DWSMA.   Who: City of Lino Lakes Sta ff Cooperators: Property owners, MDH Time Frame: On going Estimated Cost: $1,500 How: An inventory of wells and potential contaminant sources was performed as part of the development of this Plan. Database will be reviewed periodically and updated as information becomes available.   Objective G4: If new high capacity wells are completed and begin to pump into the water supply system, conduct a study to determine impact that the newly implemented high capacity wells have on DWSMA boundary.   Action G4: In cooperation with existing state or local agencies and programs, maintain database of newly implemented wells within DWSMA that was developed as a part of this WHP Plan and assess their impact on the DWSMA location and vulnerability. Who: City of Lino Lakes Sta ff Cooperators: MDH Time Frame: TBD Estimated Cost: Varies How: If the City receives a notice, or when the quality and quantity of water to be pumped from proposed Well No. 6 is known, the City will work with MnDNR and MDH to determined implications for the DWSMA or the vulnerability of the aquifer. If the changes result in a required amendment to this Plan, the City will seek grant funding for assistance.      Wellhead Protection Plan ‐ Part 2 June 2015 City of Lino Lakes, MN WSB Project No. 2029‐43 Page33       H. WATER CONSERVATION   Objective H1: Implement a community-wide water conservation program. Action H1.1: Implement conservation measures included in the Water Supply Plan as part of the 2030 Comprehensive Plan.   Who: City of Lino Lakes Sta ff Cooperators: MDH Time Frame: 3 years Estimated Cost: $2,500 How: Educate the publictoencourageuserstovoluntarilyincorporate water saving habits and tools into their lifestyles, improve the exiting water system’s operation and maintenance procedure s and incorporate costs associated with water conservation programs, adjusting water rate structure, and ensure that all customers are paying for the water they use through audits and meter replacement of calibration.   Action H1.2: Implement a water pricing model that encourages water conservation.   Who: City of Lino Lakes Sta ff Cooperators: MDH Time Frame: 3 years Estimated Cost: $2,500 How: Work with the CityCounciltostructurewaterpricingtoencourage limited watering, especially during peak times.   I. LAND USE PLANNING AND ZONING   Objective I1: Eliminate or reduce the potential pollution risks to the source water aquifer and minimize the risk of altering the WHPA and DWSMA. Action I1.1: Include a review of this Plan as part of the normal zoning and planning review process.   Who: City of Lino Lakes Planning Staff Cooperators: City of Lino Lakes Building Staf f Time Frame: On‐going Estimated Cost: Staff time How: Copies of this Plan willbedistributed to Citystaff and they will review thisPlan and incorporate it as part of their project planning review process.      Wellhead Protection Plan ‐ Part 2 June 2015 City of Lino Lakes, MN WSB Project No. 2029‐43 Page34       Action I1.2: Participate with other jurisdictions within the DWSMA to identify land use changes outside the City limits.   Who: City of Lino Lakes Planning Staff Cooperators: City of Lino Lakes Building Staf f Time Frame: On‐going Estimated Cost: $500 staff time How: Copies of this Planwillbedistributedtootherjurisdictions within the DWSMA.   Action I1.3: Consider establishment of a WHP overlay district to ensure the development of compatible land uses within the high and very high vulnerable areas of the DWSMA. Who: City of Lino Lakes Planning Staff Cooperators: City of Lino Lakes Building Staff Time Frame: On‐going Estimated Cost: $10,000 if fully implemented; $2,000 to consider implementation How: Copies of this Plan willbedistributed to citystaff and they will review this Plan and incorporate it as part of their project planning review process.     J. IMPLEMENTATION   Objective J1: Track and report WHP activities to aid in implementing WHP objectives. Action J1: Complete and submit an annual report on completed WHP activities. Who: City of Lino Lakes Sta ff Cooperators: Consultant Time Frame: Annually Estimated Cost: $500 How: Update WHP recordsof completedimplementationactivities.   L. EVALUATION   Objective K1: Evaluate Plan   Action K1: Complete an evaluation report every 2.5 years. Who: City of Lino Lakes Sta ff Cooperators: Consultant Time Frame: Every two and one‐half years Estimated Cost: $2,000 How: Prepare a written report usingthe MDHWHPProgram Evaluation form ora format selected by the City. Provide report to the Utility Commission, City Council and MDH Source Water Protection Unit. Wellhead Protection Plan ‐ Part 2 June 2015 City of Lino Lakes, MN WSB Project No. 2029‐43 Page35         CHAPTER SIX – EVALUATION PROGRAM (4720.5270)   The success of the WHP Plan must be evaluated in order to determine whether or not the Plan is accomplishing what the City of Lino Lakes intended to do. Monitoring and evaluation of the WHP Plan and associated activities will be conducted every two and one‐half years that the Plan is in effect. The evaluation activities will include the following items:    Track the implementation of the goals, objectives, activities, and tasks discussed in Chapter Five of this Plan;  Determine the effectiveness of specific management strategies regarding the protection of Lino Lakes’ municipal water supply;  Identify possible changes to these strategies which may improve their effectiveness; and  Determine the adequacy of financial resources and staff availability to carry out the management strategies planned for the each year.   The City will continue to coordinate with the MDH in the annual monitoring of the City’s municipal water supply to determine if the management strategies presented in this Plan are having a positive impact on water quality and to identify what water quality problems may still be occurring and how they need to be addressed.   At the end of each evaluation period (every two and one‐half years) the City will make a written report regarding progress in implementing the WHP Plan, as well as an evaluation of the costs and benefits of the Plan activities. This report may be completed using the MDH WHP Program Evaluation form. A copy of the report will also be sent to the MDH Source Water Protection Unit in St. Paul. The City will keep a copy of the report in its record s. The intent of the annual reports is to compile a complete and comprehensive study of the implementation of the source management strategies for use when the City updates or revises this Plan. As required by the WHP Rules, this Plan will be updated every 10 years at a minimum. WS – Item 5 WORK SESSION STAFF REPORT Work Session Item 5 Date: April 4, 2016 To: City Council From: John Swenson, Public Safety Director Re: Achieving Compliance through Education (ACE) Program Staffing Background Staff has provided Council information during the work session on March 8th and March 28th, and staff met with Mayor Reinert on March 16th to further discuss ACE program staffing. During the Council Work Session On March 28th member of Council asked the following questions: 1. What is the revised forecast with no speeding violation participating in ACE? Speeding violation account for approximately 80% of all the ACE participants. The remaining 20% of the ACE participants stem from violations that have lower ACE fees (i.e. parking violations); therefore, the financial impact for the reduction in ACE participants will exceed 80%. Below is a table broken down by month and quarterly: Month Estimated ACE Completion 2/2016 Adjusted ACE Completions 4/2016 * January 76 107 February 76 87 March 54 105 April 96 19 May 79 16 June 138 28 July 144 29 August 84 17 September 89 18 October 77 15 November 71 14 December 100 20 Total 1,084 475 *The numbers for January, February, & March are Actuals; the remaining months are estimates based on an 80% reduction in ACE participants. 2. How many people who receive a citation utilize the ACE program? Of the ACE eligible citations issued from January 1, 2015 to November 1, 2015, 30% of the those cited participated in the ACE program. 3. Do participants actually learn anything? Overall the feedback has been positive from ACE participants. Attached to this Staff report is presentation that was delivered to Council on April 2, 2012. This presentation contains information regarding participant satisfaction with the program. Attachments Council Work Session 3/8/2016 & 3/28/2016 – Staff Report Council Work Session 4/2/2012 – ACE Presentation WS – Item 3 WORK SESSION STAFF REPORT Work Session Item Date: March 8, 2016 To: City Council From: Sarah Cotton, Finance Director & John Swenson, Public Safety Director Re: Achieving Compliance through Education (ACE) Program Staffing Background The ACE Program was started in June of 2010, with the goal of making roadways in Lino Lakes safer. ACE provides individuals who receive a citation for a driving violation, or other minor law or ordinance violation, the opportunity to take part in an educational program. This program is administered through the Public Safety Department and is focused on the violation which the citation was issued for. ACE is a voluntary alternative to going through the court process or simply paying a fine. ACE is based on the premise that providing violators with education on the importance of following the laws and ordinances will make our community roadways safer. Since July of 2015, there has been a marked increase in the number of ACE participants. This increase coincides with the deployment of a grant funded traffic safety officer whose time is dedicated to enhancing traffic safety through community education and enforcement. Below is a table with a conservative forecast for ACE activity in 2016. Month ACE Inquires ACE Completions January 102 76 February 104 76 March 42 54 April 82 96 May 93 79 June 169 138 July 189 144 August 106 84 September 78 89 October 101 77 November 107 71 December 122 100 Total 1,295 1084 The increase in the ACE program activity has exceeded the current staffing levels within the Public Safety Department. As you can see from the table above, the number of ACE inquiries exceeds the number of individuals that complete the ACE Program. On average, it takes 24 minutes of staff time to determine if an individual qualifies for the program. It takes a total of approximately 53 minutes of staff time to get one participant through the entire ACE process. This equates to 1,041.45 staff hours to administer the ACE program in 2016. This increased ACE activity has also increased revenues to the City’s General Fund. The adopted 2016 budget estimated ACE revenues of $65,000. The above forecast for 2016 is projecting ACE revenues of $108,317, which represents an increase of $43,317 over the 2016 adopted budget. Given the current staffing levels, the increased demands of the ACE program cannot be absorbed. Staff is seeking Council direction on three options for addressing the staffing shortage created by the increase in ACE activity. 1. Limit participation in ACE to a level which can be accommodated by current staffing levels. 2. Add one part-time (.5) CSO to administer the ACE program at the forecasted 2016 numbers. This would increase the Public Safety Department staffing by one part-time CSO at a cost (salary & benefits) of $24,884. 3. Move the ACE Program to City Hall and hire one part-time (.5) Office Tech to administer the program. This would increase the Administration Department staffing by one part-time Office Tech at a cost (salary & benefits) of $31,096. Attached to this staff report is a PowerPoint presentation that was provided to Council on April 2, 2012. This will provide Council with information regarding a survey of ACE participants that was conducted. Staff believes the ACE program is a valuable asset in our efforts to make our community roadways safer, but the increase in service demand for ACE cannot be absorbed at the current staffing level. Attachments Council Work Session 4/2/2012 – ACE Presentation Lino Lakes City Council Work Session April 2, 2012 The ACE program was created to serve as an educational alternative to the standard traffic violation citation. The primary goal of ACE is to make our roadways SAFER! Process – Moving Violation Traffic stop Officer issues a citation and provides the cited driver with citation instruction pamphlet. Cited Driver completes online form or calls the police department to determine ACE eligibility (participants under 18 must be accompanied by parent). Those eligible come to the PD and take part in educational component and quiz. Upon successful completion the Anoka County citation is dismissed. A record of the individual’s participation in the ACE Program is maintained in Anoka County Law Enforcement Records System coded as a warning. The ACE program began in June of 2010. The PD conducted a survey in July 2011. All 470 ACE participants were asked to complete the survey. The survey consisted of 15 questions. 113 participants completed the survey, which was a response rate of 24%. The overall survey response was very positive. The ACE program was adequately explained to me by the officer. Strongly Agree 46 Agree 49 Neutral 13 Disagree 3 Strongly Disagree 2 The officer was courteous and helpful. Strongly Agree 52 Agree 42 Neutral 14 Disagree 3 Strongly Disagree 2 The informational pamphlet was able to answer my questions. Strongly Agree 45 Agree 58 Neutral 9 Disagree 1 Strongly Disagree 0 Scheduling the class was convenient. Strongly Agree 68 Agree 37 Neutral 4 Disagree 4 Strongly Disagree 0 The front office staff was courteous and helpful. Strongly Agree 83 Agree 27 Neutral 3 Disagree 0 Strongly Disagree 0 The ACE program changed my opinion of police and traffic enforcement in a positive way. Strongly Agree 40 Agree 46 Neutral 22 Disagree 3 Strongly Disagree 2 The videos covered the specific violation I was cited for. Strongly Agree 29 Agree 54 Neutral 19 Disagree 9 Strongly Disagree 2 The videos were of proper length. Strongly Agree 46 Agree 56 Neutral 10 Disagree 0 Strongly Disagree 1 I was made aware of additional violations I wasn’t aware of before taking the course. Strongly Agree 21 Agree 47 Neutral 27 Disagree 12 Strongly Disagree 4 The decreased fee (from a standard citation) made me think more about the violation and less about the monetary penalty.. Strongly Agree 35 Agree 44 Neutral 22 Disagree 7 Strongly Disagree 3 If the State of Minnesota required a $75 increase in the ACE fee for a court surcharge, I would still utilize the ACE program. Strongly Agree 16 Agree 26 Neutral 36 Disagree 16 Strongly Disagree 17 ACE changed the way I drive. Strongly Agree 27 Agree 57 Neutral 16 Disagree 8 Strongly Disagree 3 The ACE program was an educational alternative compared to the penalties of a standard citation. Strongly Agree 64 Agree 40 Neutral 3 Disagree 3 Strongly Disagree 1 I believe the ACE program is a positive addition to the police department. Strongly Agree 75 Agree 33 Neutral 2 Disagree 0 Strongly Disagree 1 ACE Participants 2010 – 224 Participants (program start in June 2010) 2011 – 560 Participants 2012 – 146 Participants (thru March 30, 2012) Questions WS – Item 6 WORK SESSION STAFF REPORT Work Session Item No. 6 Date: April 4, 2016 To: City Council From: Lisa Hogstad-Osterhues Re: Advisory Board Appointment Background Jim Schueller has applied for the Economic Development Advisory Committee. - EDAC – 1 seat, 1 applicant Requested Council Direction 1. When would council like to schedule an interview with the new applicant? The application was sent to council for review on February 23, 2016. Item #8 Monthly Progress Report April 4, 2016 Item Last Action Taken Staff Status Digital Scanning Project 3/14/16 – Council approved transfer of $15,000 from Contingency Fund for scanning and indexing building plans Julie In the process of executing a work order for large format scanning. Working with Roseville consultant (OPG3) to review our process. White Bear Lake Restoration Assn. v. Dept. of Natural Resources (DNR) The WBL Restoration Assn. & WBL Homeowners’ Assn. reached a settlement agreement with the DNR that imposes a three-year stay on the lawsuit so funds can be appropriated for a Northeast Metro Project. This involves a construction project to connect Northeast cities to the St. Paul Regional Water Service. Lino Lakes is one of seven cities included in the second phase of the project. Jeff The DNR developed cost estimates for augmenting White Bear Lake with surface water. Legislators and augmentation proponents questioned the construction cost estimate, which the DNR revised to $38.4 million. The total cost range is $36.5 to $78.2 million. Legion Parking Lot 3/7/16 – Staff was directed to obtain an appraisal for City property Mike Appraisal was submitted and Springsted is reviewing financing options Landscaping Plan for Civic Complex Island 3/7/16 – The plan was delayed until the Council makes a decision on the location of a Veteran’s Memorial Rick City is waiting for design renderings for the Veteran’s Memorial Union History Report 5/4/15 – Council requested staff to put together a union history report to educate future councils Jeff Staff is gathering data Lino Lakes Environmental Board Meeting March 30, 2016 Conservation ◦Limit reliance on groundwater for nonpotable uses ◦White Bear Lake Settlement Stormwater Management ◦Required for development ◦Alternative to infiltration Infiltration is a limited option for Mattamy Lake Volume = Initial Volume + Runoff –Evaporation -Overflow Option Estimated Cost 1 $356,000 2 $463,000 3 $2,580,000 Based on the water balance and cost analysis, Option 2 is recommended Other considerations: ◦Ownership ◦Metering, Usage, and Billing ◦Permitting Funding Source Amount Surface Water Management $197,000 Trunk Water $266,000 Total $463,000 *Grant funding may be available Recommend approval of the feasibility report Questions? Lino Lakes Environmental Board Meeting March 30, 2016 Background Results Part 2 Plan of Action Estimated Cost Next Steps Questions MN Rules 4720.51 to 4720.5590 Consists of two parts: ◦Part I -Completed and approved by MDH in August 2012 ◦Part 2-Completed and approved by MDH in February 2016 Purpose: ◦Prevent human-caused contaminants from entering the water supply ◦Protect those who use the water supply Data elements: 1. Physical Environment2. Land Use3. Water Quantity4. Water Quality Categories ◦A –Well Management ◦B –Public Education ◦C –Storage Tank Management ◦D –Septic Systems (ISTS) ◦E –Stormwater Management ◦F –Hazardous Waste Management ◦G –Data Collection ◦H –Water Conservation ◦I –Planning and Zoning ◦J –Implementation ◦K -Evaluation Categories ◦A –Well Management ◦B –Public Education ◦C –Storage Tank Management ◦D –Septic Systems (ISTS) ◦E –Stormwater Management ◦F –Hazardous Waste Management ◦G –Data Collection ◦H –Water Conservation ◦I –Land Use Planning and Zoning ◦J –Implementation ◦K -Evaluation Maintain record of public/private wells within DWSMA Educate private well owners Categories ◦A –Well Management ◦B –Public Education ◦C –Storage Tank Management ◦D –Septic Systems (ISTS) ◦E –Stormwater Management ◦F –Hazardous Waste Management ◦G –Data Collection ◦H –Water Conservation ◦I –Land Use Planning and Zoning ◦J –Implementation ◦K -Evaluation Use the City’s newsletter, website, or water bill inserts to provide information on wellhead and groundwater protection. Educate City staff on transportation corridor and pipeline issues. Categories ◦A –Well Management ◦B –Public Education ◦C –Storage Tank Management ◦D –Septic Systems (ISTS) ◦E –Stormwater Management ◦F –Hazardous Waste Management ◦G –Data Collection ◦H –Water Conservation ◦I –Land Use Planning and Zoning ◦J –Implementation ◦K -Evaluation Notify and educate storage tank owners within the DWSMA on spill prevention Categories ◦A –Well Management ◦B –Public Education ◦C –Storage Tank Management ◦D –Septic Systems (ISTS) ◦E –Stormwater Management ◦F –Hazardous Waste Management ◦G –Data Collection ◦H –Water Conservation ◦I –Land Use Planning and Zoning ◦J –Implementation ◦K -Evaluation Maintain an up-to-date septic system inventory. Categories ◦A –Well Management ◦B –Public Education ◦C –Storage Tank Management ◦D –Septic Systems (ISTS) ◦E –Stormwater Management ◦F –Hazardous Waste Management ◦G –Data Collection ◦H –Water Conservation ◦I –Land Use Planning and Zoning ◦J –Implementation ◦K -Evaluation Educate property owners on proper stormwater management NPDES program Categories ◦A –Well Management ◦B –Public Education ◦C –Storage Tank Management ◦D –Septic Systems (ISTS) ◦E –Stormwater Management ◦F –Hazardous Waste Management ◦G –Data Collection ◦H –Water Conservation ◦I –Land Use Planning and Zoning ◦J –Implementation ◦K -Evaluation Hennepin County Household Hazardous Waste Collection Facility Categories ◦A –Well Management ◦B –Public Education ◦C –Storage Tank Management ◦D –Septic Systems (ISTS) ◦E –Stormwater Management ◦F –Hazardous Waste Management ◦G –Data Collection ◦H –Water Conservation ◦I –Land Use Planning and Zoning ◦J –Implementation ◦K -Evaluation Monitor groundwater levels Maintain the Potential Contamination Source Inventory database Categories ◦A –Well Management ◦B –Public Education ◦C –Storage Tank Management ◦D –Septic Systems (ISTS) ◦E –Stormwater Management ◦F –Hazardous Waste Management ◦G –Data Collection ◦H –Water Conservation ◦I –Land Use Planning and Zoning ◦J –Implementation ◦K -Evaluation Evaluate water rate structure to promote conservation Categories ◦A –Well Management ◦B –Public Education ◦C –Storage Tank Management ◦D –Septic Systems (ISTS) ◦E –Stormwater Management ◦F –Hazardous Waste Management ◦G –Data Collection ◦H –Water Conservation ◦I –Land Use Planning and Zoning ◦J –Implementation ◦K -Evaluation Utilize the WHPP in future planning processes in the City Categories ◦A –Well Management ◦B –Public Education ◦C –Storage Tank Management ◦D –Septic Systems (ISTS) ◦E –Stormwater Management ◦F –Hazardous Waste Management ◦G –Data Collection ◦H –Water Conservation ◦I –Land Use Planning and Zoning ◦J –Implementation ◦K -Evaluation Maintain records of all of the activities undertaken. Categories ◦A –Well Management ◦B –Public Education ◦C –Storage Tank Management ◦D –Septic Systems (ISTS) ◦E –Stormwater Management ◦F –Hazardous Waste Management ◦G –Data Collection ◦H –Water Conservation ◦I –Land Use Planning and Zoning ◦J –Implementation ◦K -Evaluation Complete the MDH evaluation report every 2.5 years. Approximately $10,000 per year ◦Dependent on specific activities outlined for that year Grants available from Minnesota Department of Health to assist in funding ◦Available twice annually for up to $10,000 ◦Does not require cost-share at this time 1.City Council formally adopts Plan 2.Implement the Plan of Action MDH Evaluation –every 21/2 years WHPP Amendment –every 10 years Questions? Lacasse Court Cedar St W LacasseCir c le KilldeerDriveD e linaCirclePony Court GlenCircleAlbertCourtRedHawkTrailVelvetleaf Lane L a m o tte D rShadow Court A qua CirP in toLa neElmcrestAveNFox CoveBehmLane KellySt Oakvi e w C ourtMustang Court ArabianCircleTeckla Court Bl a ck Du ck Cou rtEvaSt T r a p p e rs C o u rtG rayHeronDriveMuskrat RunJosephCourtHighlandCourtWoodDuckTrail CoyoteCourtM a lla rd L a neS tage c o achTrlT a r tCourtCarpenter Place Town Cente r P arkwayGladstone Circle Peregrin eC irc le F lo ra C o u r tSiouxLane Palomi noLaneSouthGle n Trail CassiopeiaCourtLeaCourt CaribouCircleTerraCour t Appaloosa Court ParkCt Oak CourtTeleLane20thAveSSnow OwlCircle Ri c eCourt Timberwolf TrailBlackDuckCircle81stStW Pon d v ie w C i r c leApol l oC t Tra p p er s CrossingS James Street Post Road Sunflower Lane PartridgeC ourt Lois Lane GordonAvenueNCenturyTrlShetland Ln PaintedTurtleRoadEgret La n eBloom Court L inda C o u r t DurangoPoint Northern LightsBlvd Chokecherry Road Rohavic LaneHeatherCour t NSchlavin Court 4th Ave 2ndAvenueAntelopeDriveSheliaAveMourningDoveRoadOakH ollow Lane KingfisherCourtSherwood Lane Glenview Avenue Buckthorn Lane Park vi ew Dri ve DanubeStreetElm Street SunriseRoadFox Road Diane Street Chero k e eTr ai l OspreyCourtDeer Pass Trail StellaLaneRic eLakeCourtB eaverC ircleRavens Court RoyalPinesPlaceTomahawkTrailBeaver Trail TotemTrailBarbara Lane 4thAveA rth u r Ct Mergans erCourtLantern Lane WhitetailTrailMorgan Ln Ca n f i e l d Ro ad OakwoodDriveT amarack Lane W o o d c huck Court Lois Lane Prairi e Flower Road Greenwood Lane RedBirchCourtWhiteBirch C o u r t Praire View Place LanternC irc le HollyDriveNBlackDuckDriveSMeadowCourtOakwoodLanePine St Elm Street ElmcrestAveNRed Clov er Lane IversonCo u r t Smok etr ee Lane Wi ldfl ow er Dri ve Bradley Street Centur y Tr l Fair mont Dr iv e MainSt74th Street RuffedGro u s eRoadTele Drive 2ndAvenueBlueHeronDriveAsp e n Lan e Pa l o m in o L a ne G ladstone Drive TealCo u r t Glenview Drive Peltier L ake Dr iv e HollowLaneJonAvenueConnie Lane Highland T r a il NordinStHudson T ra ilLaureneAvenueBirchCourtW a re R o a d Rondeau Lake Rd W Forsham Lake Drive BlackDuckDriveWildTurke y Trail64th StreetPartridgePlace Stella Circle Hol ly Drive E White O wlDriveCedar St E ShermanLakeRoadSiouxLo o k o u tCoyote Trai l77th Street W Marcia Lane 65th StreetBlackbirdLane LakotaTrlC h ip pewaT rail 7 9th Street W Lacasse D r i veMyr tle Lane Riv e rBirchPlace Carl Street Molitor Dr R u sticLaneCrip ple Cr e e k PassAndall Street MustangLa n e TrappersXingNWo o d sEdgeBlvdFa wnLa neWareRoadFox ta i l CourtHokahDriveHighlandDriv e CountryLaneArlo Lane Wo o dchuck CircleGlenviewLaneLamotteCirGaageLaneKellyStOakLaneShadowLakeDriveWWhiteOakRoadLonesomePineTrailElbeStreetNESunriseRoadReilingRoadBluebillLaneBaldwinLakeRdS a n dhi l lDri ve Lilac St Timberwolf Trail Green Briar Drive SargentCourtNTartLake R o a d Mapl e St Ulmer Drive Hokah Driv eLinda Avenue Cl e ar wat er Cr eekDrMarshanLane FoxtailDrivePheasantRunS62nd St H u n t e r s R i dge Deer woodLaneOrange St KnollDrive81st St E Linda Lane A u g u st C ircl e Ojibway PaRed Maple L aneAenonPlaceF o xR o ad TalleLanePh easa nt Hi l l sDriveEvergreen Trail F o x C ircle Arrowhead Dr iv e BaldEagleBoulevardN ancy Driv eCounty Rd J V illia g e D rive 12thAveSAppaloosaLaneWhite Pine Road Karth Road Clearwater Creek D r D e erwood La neJeanneDrive81st St E 77th S t r e e tW Ol ive St PattiDriveMarilynDri v eLakeviewDriveJaneAveSunriseDriveLinden Lane Phelps RoadNottinghamLaneLakeviewDriveWhippoorwillLane Hic koryP l a c e C rystalC ourtVicky Lane RondeauLakeRdWThomas Street Otter Lake Dri v e Henry Lane S t al l i o n Lane SnowOwlLane4thAveW o o d la n dD riv e Pelica n Plac e E lle nC o urt BaldEagleBoulevardCo u n t r y L a k e s D r iv e Wo o d ridge L a n e TimothyCt2ndAvenu e WareRoadMeadowviewTrailCaroleDriveLindaC ircle Rond e a u L a k e R d E Market Pla ce Drive Re d Fo x R dRobins on Dr S h e rm anLakeRoadSh a d o w L a k e Dri v eWStoneybrookDrivePine St Black D uck Drive RollingHills D r iv eRondeauLakeRdELangerLaneLeonardAvenueRiceLakeLaneRiceLakeDriveDianeCourt Holly Court E Apollo Dr ServiceRoadMarvy Street JoyerLaneHawthorn Road Rehbein Street 77th Street E ShadowLakeDriveEOak Lane Old Birch Street 62nd St N ElmcrestAveNCountyRd534thAveVaughanCourtWo o d D u c k T r ail S h a d o w LakeDriveWHollyDriveN4thAveHolly Drive E Aqua Ln MeadowviewCourtMeadowlarkCourtGoldenrod Circle Wood rid g e C o u rtSunfishCourtQuarterHorseCourtBr ok e n O a k C o u r tClydesdaleCircleWolfCircleGreySquirrelRoadSandpiperDrive CrippleCreekCourtSe d g e Court R u ffe d G ro u s e C o u rtT o m a h a w k C o u rtT i m b e r w o l f C i r c l e ShadowLakeCourtEWhitetailRidgeMineralPo i n t County Rd J DeerwoodCircleHighland Circle Killdeer Court H artford Circle LangerCircleClearwater Creek Circl Arro w h e a d C o urt IronwoodCircle 20thAveNAsh St W 80th St E SunsetAveMa i n S t 20thAveSGoiffonRd SunsetAveM ain St LakeDrNECentervilleRdLilac St Main St Li la c St Birch St No rth Rd 20thAveSAsh St Ash StHo d gsonRdBirch S t HodgsonRdA po llo Dr LakeDrNELakeDrCentervilleRd20thAveNA p ollo Dr LakeDrCounty Rd JSunsetAveBirchSt OtterLakeDriveO tterLakeD riveMain St Ash St Main St Birch StSnow Goose TrailMarshan Ct S a v . C t§¨¦ §¨¦ §¨¦ §¨¦ §¨¦ §¨¦ Centerville Hugo Blaine Columbus Twp. Circle Pines Shoreview North Oaks White Bear Twp.White Bear Twp. Ham Lake Forest Lake 35E 35E 35E 35W 35W 35W LEGEND City Boundaries Parcels with Structures Parcels with Increase of Floodplain Extents [536] Parcels with Decrease of Floodplain Extents [563] Increase and Decrease on Same Property [404] Parcels with No Change in Floodplain Boundary [57] N 0 2,000 Feet LINO LAKES PARCELS WITH STRUCTURES - 100-YEAR FLOODPLAIN BOUNDARY 1 inch = 1,000 feet