ENVIRONMENTAL BOARD MINUTES
DATE : March 30, 2016
TIME STARTED : 6:32 P.M.
TIME ENDED : 9:00 P.M.
MEMBERS PRESENT : Barbra Bor, Paula Andrzejewski, Liz Kaufenberg,
Nancie Klebba, Alex Schwartz, John Sullivan
MEMBERS ABSENT : Steve Heiskary
STAFF PRESENT : Marty Asleson, Aubrey Fonfara
I. CALL TO ORDER AND ROLL CALL:
Ms. Bor called the Lino Lakes Environmental Board meeting to order at 6:32 p.m. on
March 30, 2016.
�, FFFFFFF;,
II. APROVAL OF AGENDA
Mr. Sullivan made a MOTION to approve the agenda. Motion was supported by Ms.
Klebba. Motion carried 6 - 0.
III. APPROVAL OF MINUTES:
Ms. Andrzejewski made a MOTION to approve the February 24, 2016 Meeting Minutes.
Motion was supported by Mr. Schwartz. Motion carried 6 - 0.
IV. OPEN MIKE
Ms. Bor declared Open Mike at 6:34 p.m.
There was no one present for Open Mike.
Ms. Bor closed Open Mike at 6:34 p.m.
V. ACTION ITEM
A. NE Drainage Area Study Update
APPROVED MINUTES
Evironmental Board
March 30, 2016
Page 2
Ms. Thompson from WSB & Associates presented an update from the February
meeting. The NE Area Drainage feasibility study models the drainage for 1400
acres of land on the east and west side of I -35E, and north of Main Street. The
draft feasibility study was completed in January 2016 and submitted to City staff for
review. After review, an additional option was requested to be considered. The new
option includes an open -channel greenway between Peltier Lake and 201h Ave. The
meandering channel will be used so it doesn't look like a drainage ditch and it would
have a 60' to a 100' top width and a 10' bottom width.
Total phosphorus concentrations were provided by RCWD for use in the permit
application. Mr. Heiskary also provided some additional concentrations for
evaluation. Don't want to over treat or under treat the site for concentrations.
Ms. Bor asked if the landowners are aware of the project and if they have been
notified
Ms. Thompson said they have been notified and they are aware of the study. And
when the concept is closer to be finalized the effected landowners will be brought in
for a discussion of the plan.
Ms. Kaufenberg asked how will you go forward and figure out which phosphorus
concentrations numbers to use in the loading calculations since there is a variety of
numbers in this report.,,��Q,
Ms. Thompson said they will be reaching out to the RCWS and MPCA and also
using numbers from other studies that have been done in the area.
Mr. Sullivan asked will the Environmental Board be able to see the revised study
before it goes to Council.
Ms. Thompson said yes the board will be seeing the revised study before it goes to
Council.
Ms. Klebba asked who would be maintaining of the meandering channel.
Ms. Thompson the City would be in charge of maintaining of the waterway.
Plantings would be grasses and no trees.
Ms. Bor voiced her concern into the current drainage that occurs into Peltier Lake.
As of now the water does run over the city road.
Ms. Thompson said that RCWS will look at the study after there is a finalized plan.
APPROVED MINUTES
Evironmental Board
March 30, 2016
Page 3
B. Mattamy Storm Water Reuse and Irrigation System
Erin Heydinger, water engineer from WSB & Associates, presented the overview of
three options for Stormwater reuse in the proposed Mattamy development. The
board was first presented the feasibility study was at the January 2016 meeting.
Why water reuse — water conservation, White Bear Lake settlement —reducing water
usage by 17% and storm water maintenance.
There was a water balance study using 50 years of rainfall data making sure the lake
in the development would be sufficient for water reuse project."
The options were:
1. Reusing Stormwater to irrigate public places
2. Reusing Stormwater to irrigate public places and the townhome
3. Reusing storm water to irrigate the entire development
The City would own the system and would be involved in maintaining of the pumps
The recommendation based o ` he water balance and cost analysis is option 2. This
is watering of the townhome the park and the berm.
Some grant funding maybe available through RCWS and the Metropolitan Council
they do have some funds for storm water reusing projects.
There was discussion and concerns on:
• Depth of the pond
• Size of the berm and plantings on the berm
• Greenway plantings
• How would the system be controlled for option 2
• Association agreement of when to water and winterization of the system
• Size of sprinkler heads
• Health concerns with reuse storm water
• Aeration of the lake
• Pump filters being used to take out sediments, sensor for chloride
• Stormwater fees will be charged to residents of development for irrigation
Number of units — 840
• Signage around the lake notifying residents of water quality
• Grass buffers around lake
• The water level of a drawdown of the lake
• More information of hybrid system
Mr. Schwartz made a motion to pass this on to the council in favor of option 3.
But we need more numbers to see how much water would be needed for option 3.
APPROVED MINUTES
Evironmental Board
March 30, 2016
Page 4
Ms. Klebba was in favor of option 2 for this phase of the development and maybe in
the next phase we could look at option 3.
Ms. Bor stated as we look at this project and all the environmental considerations
and as goes through it phases and then on to Planning and Zoning our impact here is
to make a recommendation.
Ms. Hankee mentioned that more studies would cost more money and having
multiple options would also have to go through council to approve using tax payers
money for the new studies.
Ms. Bor asked if it is possible to have Mattamy representative at the next meeting.
Ms. Hankee said yes they should be here and she will co tact them.
Ms. Bor asked for a new motion.
Mr. Sullivan would like to use the water from the lake to go to all areas. So when
there is not enough water then people would have to use their sprinklers.
Ms. Bor asked for a revised motion that would somehow build in with fairly clear
directions that as this development builds out that at each phase that additional
creativity will be used to see how to conserve water.
Mr. Asleson stated with our recommendation we could add- to the most reasonable
extent possible and have the engineers look at it.
Phase 1 will take 6 — 7 years.
Ms. Bor made a MOTION that we are recommending at a minimum the feasibility
study which encompass option 2. In addition we are encouraging the opportunity of
further enhancements of the stormwater utilizations on this project. Motion was
supported by Ms. Andrzejewski. Motion carried 6-0.
C. Wellhead Protection Plan
Ms. Heydinger presented the Adoption and Implementation of Wellhead Protection
Plan. On February 26, 2016 the MDH notified the City of Lino Lakes, that Part 2
Wellhead Protection Plan was officially approved. The goal of the plan is to prevent
human -caused contaminants from entering the water supply wells and to protect all
who use the water supply from adverse health effects associated with groundwater
contamination. The plan falls under the jurisdiction of the MDH and consists of two
parts.
APPROVED MINUTES
Evironmental Board
March 30, 2016
Page 5
Part 1 was completed in 2014 and is a technical exercise that uses groundwater
modeling to delineate the wellhead protection area (WHPA), Drinking Water Supply
Management Area(DWSMA) and includes a well and aquifer vulnerability
assessment. Part 1 addresses the three municipal water supply wells used by the City
and associated water aquifer.
Part 2 of the WHPP describes how the results of the Part 1 can be applies to best
protect a community's water supply. Once adopted, the Ciy must begin
implementation of these objectives.
Part 2 plan of action are listed with a few objectives for each: ` R
• Well Management- maintain record of public/private wells within the
DWSMA. Educate private well owners
• Public Education -use the City's newsletter, website or water bill to provide
information on wellhead and groundwater protection.
• Storage Tank Management -notify owners and educate them
• Septic Systems -Coordinate with Anoka County to educate property owners
• Stormwater Management -educate the public on waste water management,
turf management and proper lawn care and water conservation
• Hazardous Waste Management -educate the public on the proper disposal of
hazardous waste items
• Data Collection -continue to collect and maintain data in order to improve
and make revisions to the plan
• Water Conservation -Implement a community -wide water conservation
program
• Land Use Planning and Zoning -Eliminate or reduce the potential risks to the
source water aquifer
• Implementation -Track and report WHP activities to aid in implementing
WHP objectives
• Evaluation -Complete an evaluate plan every 2 years
Cost up to $10,000 per year to implement this plan. Grants are available twice a year
from MN Department of Health to assist in funding. As of this time there is no cost -
share at this time.
Next step would the City Council formally adopts Plan. Implement the Plan and
MDH evaluation —every 21/z years and WHPP amendment every 10 years.
For those that have a private well — they would have to get the information off the
website or newsletter. There is a list of all the private wells within the DSMA
Mr. Schwartz made a MOTION to approve the Plan as written. Motion was
supported by Ms. Kaufenberg.
APPROVED MINUTES
Evironmental Board
March 30, 2016
Page 6
Mr. Sullivan would like to add information to the newspaper and would like more
teeth in the well head protection plan. Items that he would like to educate public
about are water over usage, the poor quality of our lakes and proper mowing
practices.
Ms. Bor said that we can visit this again at the next meeting but would need a real
united effort by all boards and City Council to get behind an item that we are
passionate about. Put in on the web page and do weekly updates on how we are
improving.
Ms. Andrzejewski made a MOTION to recommend adopting the Well Head Plan. It
was supported by Ms. Kaufenberg. Motion carried 6 -
VI DISCUSSION ITEMS
A. Earth Day
Annual Earth Day is Saturday, April 23 at Wargo Nature Center from 12:30 —
3:00pm.
Any updated photos should beent to Mr. Heiskary so that he can upload them to the
power point presentation.
Seed balls will be the activity and Ms. Bor will order seeds and other supplies will
be gathered and made ready for event.
B. Site Visit Recommendations
Ms. Bor suggested in adding Mattamy development site and also the outlet at Peliter
Lake.
C. Organics Recycling
Most of responses came from the southern and western sections of the city. The drop
off sites will be Marshan Park and Birch Park.
Ms. Klebba suggested the fire station as a drop off site also.
Starting on May 2 there will be a soft opening and limited hours. There will be
someone there and also signage during the limited hours. Then a month of limited
hours and then on June 6 people that are signed up will receive the code for the
locked container so residents on the program can drop off whenever they like.
There is information on the city's web site about the program.
APPROVED MINUTES
Evironmental Board
March 30, 2016
Page 7
Natur-Tec® donated bags and a limited number of pails as a hand out for the
residents that have signed up for the program. Also will be contacting home owners
associations to get them interested.
Long term look out -don't see too much increase right away. During the summer we
will see what happens. This is a pilot program. Hoping that if it goes well the
county will pick up it up.
D. Other Recyclins! Updates
The City Council was presented with the Anoka County 2016 Agreement for
Residential Recycling Program and the 2016 Environmental Board Goals on March
14, 2016. Both items were approved.
Recycling Saturday on March 19, 2016 had paper shredding as an added event. It
was the most successfgul paper shredding event in Lino Lakes so far with
approximately 1200 pounds of paper shredded.
Next Recycling Saturday will be April 6, 2016.
Lino Lakes Annual Recycling Day will be Saturday, May 7, 2016 from 9AM — 3PM.
VII. ADJOURNMENT
Ms. Andrzejewski made a MOTION to adjourn the meeting at 9:00 p.m. Motion was
supported by Ms. Klebba. Motion carried 6 - 0.
Respectfully submitted,
Mary Fogarty
APPROVED MINUTES