HomeMy WebLinkAbout2016-006 Council ResolutionCITY OF LINO LAKES
RESOLUTION NO. 16-06
RESOLUTION APPROVING THE PLANS AND SPECIFICATIONS AND
AUTHORIZING ADVERTISEMENT FOR BIDS - LINO LAKES FIRE STATION #1
ROOF REPLACEMENT
WHEREAS, the roof at Lino Lakes Fire Station #1 is experiencing leaks in various places and
is need of replacement, and
WHEREAS, the roof was constructed in 1991 and has exceeded its expected lifetime, and
WHEREAS, an inspection was performed by Roof Spec, Inc. in August, 2015, and
WHEREAS, the inspection report recommends the roof be scheduled for replacement, and
WHEREAS, funding for this project is from the Building Facilities Fund.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
LINO LAKES, MINNESOTA:
1. Such plans and specifications, a copy of which is attached hereto and made part hereof, are
hereby approved.
2. The City Clerk shall prepare and cause to be inserted in the official paper and in the
Construction Bulletin an advertisement for bids for the making of such improvement under
such approved plans and specifications. The advertisement shall be published for 3 weeks,
shall specify the work to be done, shall state that bids will be received by the Clerk, at which
time they will be publicly opened in the City Hall by the City Clerk and Public Services
Director, will then be tabulated, and will be considered by the Council, in the Council
Chambers of the City Hall. Any bidder whose responsibility is questioned during
consideration of the bid will be given an opportunity to address the Council on the issue of
responsibility. No bids will be considered unless sealed and filed with the Clerk and
accompanied by a cash deposit, cashier's check, bid bond or certified check payable to the
Clerk for five (5) percent of the amount of such bid.
Adopted by the Lino Lakes City Council this 25th day of January, 2016.
The motion for the adoption of the foregoing resolution was introduced by Council Member
Kusterman and was duly seconded by Council Member Maher and upon vote being
taken thereon, the following voted in favor thereof:
Kusterman, Maher, Manthey, Rafferty, Reinert
The following voted against same:
none
ATTEST:
C--251-4-Li Bartell, City Cle k
STAFF ORIGINATOR:
COUNCIL MEETING DATE:
TOPIC:
VOTE REQUIRED:
CITY COUNCIL
AGENDA ITEM 5A
Rick DeGardner, Public Services Director
January 25, 2016
Consideration of Resolution No. 16-06, Approving Plans
and Specifications and Authorizing Advertisement for Bids,
Lino Lakes Fire Station #1 Roof Replacement
Simple Majority
BACKGROUND:
The roof at Lino Lakes Fire Station #1 is experiencing leaks in various places and is need of
replacement. The building was constructed in 1991 and the roof has exceeded its expected
lifetime. An inspection was performed by Roof Spec, Inc. in August, 2015 (attached). There is
significant weathering and cracking. The 24 year old membrane typically has a 10 - 15 year
service life and is failing. The inspection report recommends the roof be scheduled for
replacement.
The estimated replacement cost is $80,000 - $95,000. Funding for this project is from the
Building Facilities Fund.
The schedule for this project is as follows:
City Council Approves Plans and Specifications
City Council Authorizes Ad for Bids
Pre -Bid Meeting
Open Bids
City Council Awards Contract
January 25, 2016
January 25, 2016
February 19, 2016
February 29, 2016
March 14, 2016
RECOMMENDATION:
Approve Resolution No. 16-06, Approving Plans and Specifications and Authorizing
Advertisement for Bids, Lino Lakes Fire Station #1 Roof Replacement.
ATTACHMENTS:
Resolution No. 16-06
Roof Spec Inc. Inspection Report, August 24, 2015
Project Manual - Preliminary
AUGUST 24, 2015
REVIEW OF ROOF CONSTRUCTION
CENTENNIAL FIRE STATION #2
7741 LAKE DRIVE
LINO LAKES, MN 55014
Prepared For:
RSI Project #15-12120-01
Mr. Tim Hillesheim
City of Lino Lakes
600 Town Center Parkway
Lino Lakes, MN 55014
E-mail: tim.hillesheim@ci.lino-lakes.mn.us
Prepared By:
Mr. Weston Thone, RRO, RRC, CDT
Senior Consultant
Roof Spec, Inc.
2400 Prior Avenue North
St. Paul, Minnesota 55113
Phone: (651) 639-0644
Fax: (651) 639-1828
www.roofspec.com
St Paul, Minnesota
• BUILDING ENVELOPE CONSULTING • SPECIFICATIONS • DESIGN • CONSTRUCTION MANAGEMENT • INSPECTIONS • TESTING •
Client: City of Lino Lakes Project: Centennial Fire Station #2
7741 Lake Drive, Lino Lakes, MN 55014
mate: 8-24-15 No: 15-12120-01 Page 2
I INTRODUCTION:
On August13, 2015, we were present at the above referenced facility to perform a review of the
existing roof assemblies:
In general, our scope of work was as follows:
A. Review each of the various roof sections to identify any deficiencies;
B. Obtain photographs to substantiate our findings;
C. Based on the information obtained, develop a report with conclusions as to the condition
of the roof assembly with recommendations for repair and/or replacement.
Our work was requested and authorized by Mr. Tim Hillesheim of the City of Lino Lakes, MN
II BACKGROUND INFORMATION:
The existing facility consists of masonry walls supporting a steel bar joists and a steel roof deck.
Drainage is accomplished via interior roof drains and overflow scuppers. The roof membrane
appears to be a 45 mil ballasted EPDM which we were informed was installed in 1991.
All information is submitted as the confidential property of our clients. Any copies or extractions are reserved pending our written approval.
Client: City of Lino Lakes
-mate: 8-24-15
III FIELD OBSERVATIONS:
Project: Centennial Fire Station #2
7741 Lake Drive, Lino Lakes, MN 55019
No: 15-12120-01 Page 3
Throughout the upper and lower roof areas, we found a large amount of shrinking to be occurring
within the EPDM membrane causing the base flashings to bridge throughout much of the perimeter.
(Refer to photographs #1 and #2.)
Photograph # 1
Photograph # 2
At the east primary drain on the upper roof area, we found that the no -hub coupling was not properly
installed on the drain bowl allowing water to enter between the drain bowl and drain piping. (Refer to
photographs #3 and #4.)
Photograph # 3
Photograph # 4
All information is submitted as the confidential property of our clients. Any copies or extractions are reserved pending our written approval.
Client: City of Lino Lakes Project: Centennial Fire Station #2
11
` • 7741 Lake Drive, Lino Lakes, MN 55014
.rate: 8-24-15 No: 15-12120-01 Page 4
At the roof -to -wall location in the southeast
corner, we found a void to be present within the
flashings. (Refer to photograph #5.)
At several of the stack locations throughout the
lower roof section, we found voids to be present
within the EPDM flashings which coincided with
interior leaks. (Refer to photographs #6 - #8.)
Photograph # 7
Photograph # 5
Photograph # 6
Photograph # 8
All information is submitted as the confidential property of our clients. Any copies or extractions are reserved pending our written approval.
Client: City of Lino Lakes
tate: 8-24-15
Throughout much of the field of the roof, the field
seams were found to be delaminating which may
allow for voids to occur at the seam locations.
(Refer to photograph #9.)
We also found delamination at many of the
patches at scupper locations. (Refer to photograph
#10.)
At the east side of the building we found that the
paver walkway was extremely deteriorated.
(Refer to photograph #11.)
Project: Centennial Fire Station #2
7741 Lake Drive, Lino Lakes, MN 55014
No: 15-12120-01 Page 5
Photograph # 9
Photograph # 10
Photograph # 11
All information is submitted as the confidential property of our clients. Any copies or extractions are reserved pending our written approval.
Client: City of Lino Lakes r Project: Centennial Fire Station #2
7741 Lake Drive, Lino Lakes, MN 55014
8-24-15
No: 15-12120-01 Page 6
IV CONCLUSIONS & RECOMMENDATIONS:
Due to the amount of shrinking in the EPDM membrane and the age of the roof, we recommend
that this roof be scheduled for replacement within the next year. Typically, ballasted 45 mil
EPDM membranes have 10 to 15 year service life, and this roof membrane is approximately 24
years old.
Until replacement can be accomplished, we recommend performing repairs to the uncured pipe
flashing at each stack location. We also recommend installing a patch in the southeast corner of
the upper roof section at the roof -to -wall location.
When replacement is accomplished, we recommend attempting to re -use the existing insulation
and mechanically attaching additional insulation over the top to achieve the required R -value. We
would then recommend installing a fully adhered EPDM membrane throughout this building.
V BUDGET FORECAST:
We estimate replacement with the above -referenced system to be approximately $80,000.00 to
$95,000.00.
VI REMARKS:
This report is not intended as a bidding document and may not address all deficiencies within the
roof area. If there are any questions or concerns regarding this report, please contact the author.
Respectfully,
ROOF SPEC, INC.
Weston Thone, RRO, RRC, CDT
Senior Consultant
WT/fj
Enclosure: Roof Plan Drawing