HomeMy WebLinkAbout2016-018 Council ResolutionCITY OF LINO LAKES RESOLUTION NO. 16-18 RESOLUTION ORDERING THE PROJECT AND AUTHORIZING PREPARATION OF PLANS AND SPECIFICATIONS FOR THE 2016 MILL AND OVERLAY PROJECT WHEREAS, it is proposed to perform mill and overlay and full depth reclamation improvements on recommended street segments, and WHEREAS, the City Council is ordering the project finding that it would be in the best interest of the city to proceed with the preparation of plans and specifications; and WHEREAS, WSB and Associates, the City Engineer, has submitted a proposal to prepare plans and specifications. NOW, THEREFORE BE IT RESOLVED by The City Council of The City of Lino Lakes: 1. The 2016 Mill and Overlay Project is hereby ordered. 2. WSB and Associates are designated as the engineer for this improvement and directed to prepare plans and specifications for the 2016 Mill & Overlay Project. 3. Staff is hereby authorized to execute the hourly based contract in an amount not exceed $25,500.00. Adopted by the Council of the City of Lino Lakes this 14th day of March, 2016. The motion for the adoption of the foregoing resolution was introduced by Council Member Knstc?rman and was duly seconded by Council Member Maher and upon vote being taken thereon, the following voted in favor thereof: Kusterman,-Maher, Rafferty, Manthey, Reinert The following voted against same: none ATTEST: i nne Bartell, City, 3 STAFF ORIGINATOR: MEETING DATE: TOPIC: VOTE REQUIRED: INTRODUCTION CITY COUNCIL AGENDA ITEM 6D Diane Hankee March 14, 2016 Consider Resolution No. 16-18, Ordering the Project and Authorizing Preparation of Plans and Specifications, 2016 Mill and Overlay Project Simple Majority Staff is requesting council authorization to prepare plans and specifications for the 2016 Mill and Overlay Project. BACKGROUND In accordance with the City's Pavement Management Plan, streets are identified for annual maintenance. The City uses Cartegraph software to annually analyze the conditions of the City's streets and recommend segments that meet the maintenance requirements. Streets were selected for maintenance based on pavement management criteria, input from Public Works, and feasibility of locations. The proposed project includes Holly Drive, Holly Court, and Old Birch Street (north/south section). It is recommended to complete a mill and overlay, and full depth reclamation on the roadways as detailed in the attached project map. The budget for the project is $350,000. WSB and Associates, the City Engineer, have submitted a proposal to complete the plans and specifications, and provide bid documents, for the not to exceed cost of $25,500 based actual time spent on the project. The schedule for this project is as follows: City Council Order Project, Authorizes Plans and Specifications City Council Approves Plans and Specifications City Council Authorizes Ad for Bids City Open Bids City Council Awards Contract Construction Begins Final Completion RECOMMENDATION March 14, 2016 April 11, 2016 April 11, 2016 May 11,2016 May 23, 2016 May 27, 2016 August 28, 2016 Staff is recommending approval of Resolution No. 16-18 ordering the project and authorizing preparation of plans and specifications. ,`, ATTACHMENTS 1. Resolution No. 1 6-1 8 2. WSB Proposal 3. Project Location Map 2 WSB 4111111 Engineering • Planning • Environmental ■ Construction & Associates, Inc. February 18, 2106 City of Lino Lakes Mr. Michael Grochala 600 Town Center Parkway Lino Lakes, MN 55014 Re: 2016 Street Maintenance Project Civil Engineering Design Services Dear Mr. Grochala: 701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 Tel: 763-541-4800 Fax: 763-541-1700 We appreciate the opportunity to provide this proposal for civil engineering design services. The City of Lino Lakes is requesting assistance with design of its 2016 Street Maintenance Project. The streets designated for rehabilitation are local streets as determined by their OCI ratings established in the City's Pavement Management Study. This proposal has been broken out for each site. Holly Lane — Full Depth Reclamation The scope of services includes the preparation of construction documents for full depth reclamation of Holly Lane from, Ash Street to Holly Court (approximately 0.67 miles). Our design services include survey of existing conditions, preparation of construction plans, preparation of a project manual (specifications) and assistance with project bidding. The engineering fee to complete the described design services above is $12,500. Holly Court — Mill and Overlay The scope of services includes the preparation of construction documents for mill and overlay of Holly Court from Holly Lane to the existing cul de sac located approximately 0.30 miles east of Holly Lane. Our design services include survey of existing conditions, preparation of construction plans, preparation of a project manual (specifications) and assistance with project bidding. The engineering fee to complete the described design services above is $6,200. Birch Street — Mill and Overlay The scope of services includes the preparation of construction documents for mill and overlay of Birch Street from Pheasant Run South (Saddle Club) north to the proposed cul de sac located at CSAH No. 34 (approximately 0.25 miles). Our design services include survey of existing Minneapolis • St Cloud Equal Opportunity Employer Mr. Michael Grochala February 18, 2016 Page 2 conditions, preparation of construction plans, preparation of a project manual (specifications) and assistance with project bidding. The engineering fee to complete the described design services above is $6,800 The engineering fee to complete the 2016 Street Maintenance Project is $25, 500 (not to exceed). This letter represents our complete understanding of the proposed scope of services. A separate proposal for construction surveying and inspection services can be prepared If you are in agreement with the scope of services and proposed fee, please sign in the appropriate space below and return one copy to us. If you have any questions about this proposal, please feel free to call me at 763-287-7167. Sincerely, WSB & Associates, Ina Edward C. Youngquist Project Manager ACCEPTED BY: City of Lino Lakes Name Title Date WSB Associates. Inc. l Design Service Project Fees 2016 Mill & Overlay Improvements City of Lino Lakes, Minnesota PO. crip00. Estlmatbd Hours Survey Engineer G3raduate Office . Total;; Sr.•Project Mgr ..., ... drew specialist :' Engineer j'. Techni arr L .......,;Hours I. Preliminary Design A. Survey Crew B. Base Mapping C. Private Utility Coordination Subtotal - Preliminary Design Phase Services 2 14 14 6 2 9 2 4 7 14 8 6 30 2,296.00 $ 1,016.00 $ 763.00 $ 4,074.00 II. Final Design Phase Services A. Project Management B. GSOC coordination C. Preparation of Plans & Specifications Street Full Depth Reclamation Street Mill and Overlay Specifications D. Review submittal - 60% Plans & Specifications E. Review submittal - 90% Plans & Specifications F. Revise Plans & Specifications post -review G. Prepare Opinion of Probable Construction Cost H. Prepare Agency permits 4 6 2 4 4 2 2 2 4 1 6 1 2 3 2 8 32 2 34 16 2 18 6 12 6 26 4 4 12 4 4 12 4 12 18 4 8 4 18 2 2 10 $ 663.00 $ 308.00 $ 1,106.00 $ 3,780.00 $ 1,988.00 $ 2,592.00 $ 1,428.00 $ 1,428.00 $ 1,918.00 $ 1,826.00 $ 1,370.00 Subtotal - Design Phase Services 26 4 76 48 11 164 $ 18,407.00 Ili. Bidding Phase Services A. Advertisement for bids B. Distribute Plans/Specifications C. Maintain Planholders list D. Respond to Bidder questions E. Attend Bid Opening and Tabulate Bids F. Bid results letter/recommendation for award 2 2 2 1 1 2 4 1 1 4 6 2 2 4 2 8 4 6 2 4 $ 360.00 $ 510.00 $ 160.00 $ 938.00 $ 694.00 $ 444.00 Subtotal - Bidding Phase Services 8 6 4 14 32 $ 2,996.00 Grand Total All Phases Hourly Rates 34 I $147.00 18 89 68 25 224 26,477.00 $164.00 1 $112.00 1 $98.00 $75.00 98.96 I 'TOTAL PROJECT COST Is 25,500.00 CITY=: OF ItNOL KES 2016 Reclaimation & Overlay 1" Overlay - 2" Mill & Overlay --- Full Depth Reclaimation 0 4,000 Feet WSB & Associates, Inc. K:\02029-003\GIS\Maps\2016ReclaimationOverlay.mxd Date: 12130/2015 oommmwo Alternate 1