Loading...
HomeMy WebLinkAbout2016-027 Council ResolutionCITY OF LINO LAKES RESOLUTION NO. 16-27 AUTHORIZING PREPARATION OF WATER SUPPLY PLAN WHEREAS, The City Council is required by the Minnesota Department of Natural Resources to prepare an update of the City's Water Supply Plan; and WHEREAS, The City has received a proposal from WSB & Associates, Inc. to prepare said update; NOW, THEREFORE BE IT FURTHER RESOLVED by The City Council of The City of Lino Lakes, Minnesota, hereby authorizes WSB & Associates, Inc. to prepare the update of the City's Water Supply Plan for the amount of $16,400. Adopted by the Council of the City of Lino Lakes this 11`h day of April, 2016. The motion for the adoption of the foregoing resolution was introduced by Council Member Kusterman and was duly seconded by Council Member Maher and upon vote being taken thereon, the following voted in favor thereof: Kusterman, Maher, Manthey, Rafferty, Reinert The following voted against same: none ATTEST: is e Bartell, Ci Cle Jeff Rein: , ayor CITY COUNCIL AGENDA ITEM 6G STAFF ORIGINATOR: Michael Grochala MEETING DATE: April 11, 2016 TOPIC: Consider Resolution No. 16-27, Authorizing Update of Water Supply Plan VOTE REQUIRED: 3/5 INTRODUCTION Staff is requesting City Council approval to authorize WSB and Associates to prepare the update of the City's Water Supply Plan. BACKGROUND Every ten years, all public water suppliers in Minnesota that serve more than 1,000 people must have a water supply plan approved by the Department of Natural Resources (DNR). This requirement, in place since the 1990s, is designed to encourage communities to deal proactively with providing sustainable drinking water for citizens, businesses and industry. The City's updated Water Supply Plan is due December, 31, 2016. The Water Supply Plan is also a required component of the City's 2040 Comprehensive Plan Update. The plan includes: 1. Review and evaluation of our existing water system; 2. Emergency Response Procedures; 3. Water Conservation Plan. WSB has submitted a proposal to complete the Water Supply Plan update in the amount of $16,400. Funding for the plan update is proposed to come from the City's Trunk Utility Fund. RECOMMENDATION Staff is recommending that the City Council adopt Resolution 16-27 authorizing preparation of the Water Supply Plan update. ATTACHMENTS 1. Resolution No. 16-27 2. Proposal from WSB & Associates, Inc. dated March 14, 2016. WSB Building a legacy - your legacy. 701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 Tel: 763-541-4800 Fax: 763-541-1700 Date: March 14, 2016 TO: Michael Grochala, AICP City of Lino Lakes, MN RE: PROPOSAL TO PROVIDE SERVICES TO COMPLETE THE CITY OF LINO LAKES' WATER SUPPLY PLAN Dear Mr. Grochala: We are pleased to provide you with this proposal for services to assist the City of Lino Lakes(City) in completion of its Water Supply Plan (Plan) as required by the Minnesota Division of Natural Resources (DNR). Our multi -faceted team includes professionals in Water/Wastewater, Water Resources, City Planning, and GIS; ensuring that the City's Plan will be a cohesive document that will not only meet state regulations but will be a useful planning document throughout the next decade. Not only does WSB have the technical skills to deliver high-quality Plans, but we are also experienced in navigating the regulatory process required for such submittals. The combination of our technical expertise and project management experience ensures that the final product delivered to the DNR will be Below is description of the required components and the method by which WSB will address them in the City's Water Supply Plan Update. Task One: Water Supply System Description and Evaluation 1.1 Analysis of Water Demand Using the City's Wellhead Protection Plan alongside appropriations permits and water use data, WSB will evaluate the past ten years of water demand data. The per capita usage and number of connections, Targe quantity users, and water used for essential versus non-essential uses will be considered, among other factors. 1.2 Treatment and Storage Capacity An evaluation of the City's existing treatment and storage will be conducted. WSB will outline the treatment process and compare the capacity of treated water versus the demand. 1.3 Water Sources Three types of resources will be considered: groundwater, surface water, and interconnection. We will evaluate emergency interconnections and determine if there are any deficiencies. Equal Opportunity Employer wsbeng.com Si\Community Development \ Projects \Planning Studies \2016 Water Supply Plan \Staff Reports \LTR PROP- Lino Lakes - Water Supply Plan.do , M. Grochala March 14, 2016 Page 2 1.4 Future Demand Projections Future demand projections are listed as a Key Metropolitan Council Benchmark. Using data compiled in the previous sections, WSB will determine what trends, if any, are seen. We will attempt to determine the cause behind any significant patterns. Using this analysis, the Plan will project demands through 2040 by estimating population served, per capita water demand, and peak water usage. 1.5 Resource Sustainability WSB will outline water quality and quantity monitoring efforts currently undertaken by the City. From this data, it will be determined if there are any potential water supply issues or natural resource impacts as a result of permitted withdrawals. Each natural resource type will be evaluated to determine if water usage will have a negative impact. The results of the City's Wellhead Protection and Source Water Protection Plans will be described. 1.6 Capital Improvement Plan The adequacy of each component of the existing water supply system will be determined. This includes wells, storage and treatment facilities, and distribution systems. Proposed future water sources will be outlined as well as any alternatives available. WSB will consider the feasibility of water reuse, including reclaimed stormwater and/or wastewater, as well as interconnection to nearby suppliers. Task Two: Emergency Planning and Response Procedures WSB will describe the current status of the City's 1) Federal Emergency Response Plan; 2) Operational Contingency Plan; and 3) Emergency Response Procedures. We will include in the Emergency Response Procedures the method by which the City will augment water supplies (if required), the allocation and demand reduction procedures, any emergency demand reduction conditions or triggers in place, and several other related items. Task Three: Water Conservation Plan Component 3.1 Progress since 2006 WSB will describe any initiatives the City has undertaken since its last Water Supply Plan was approved by the DNR. Conservation practices the City is implementing — such as pricing, regulations, and education — will be included. S:\Community Development \ Projects \Planning Studies\2016 Water Supply Plan \Staff Reports\LTR PROP - Lino Lakes - Water Supply Plan.doca M. Grochala March 14, 2016 Page 3 3.2 Triggers for Allocation and Demand Reduction Actions This section will include future conditions and actions during a Governor's "Critical Water Deficiency Order" or other instances in which usage reductions must occur. WSB will work with the City to determine what triggers should be selected to initiate short- or long-term demand reductions, and what actions will be taken should such an instance arise. 3.3 Conservation Objectives and Strategies This section of the Plan serves as a Key Benchmark for the DNR. It will include strategies by which the City will reduce unaccounted for water loss. The DNR has set a goals for each community, including the following: 1) Reaching 75 gallons per capita of water usage daily; 2) Achieving at least a 1.5% per year reduction for industrial, commercial, and agricultural water use; 3) Decreasing the trend in total per capita demand; 5) Reducing the City's peaking factor to less than 2.6; 6) Implementing a conservation water rate structure; and 7) Support Wellhead Protection Planning. WSB will work with the City to highlight the goals that have already been achieved and to outline the method the City will implement to achieve the remaining benchmarks. Included in the analysis will be possible regulatory changes, retrofitting potential, and educational programs. Task Four: Items for Metropolitan Area Water Suppliers Because the City is within the seven -county metropolitan area, the Metropolitan Council requires additional information. WSB will include in the Plan water demand projections through 2040, potential water supply issues, possible approaches to meet extended water demand projections, and value-added water supply planning efforts (if desired by the City). Task Five: Project Management, Coordination, and Meetings Project management is a key task included in each project undertaken by WSB. This task consists of management and administration, project coordination, and overall communication with the City and DNR. Proper completion of this task will help keep all affected parties routinely updated and informed regarding project issues, as well as keep the project on schedule and within budget. The proposed work plan will include one City Council meeting and two meetings with the City prior to finalizing the Plan. Task Six: Estimated Fee WSB will complete the proposed work plan as proposed herein on an hourly, not -to -exceed fee of $14,600. This cost does not include additional hours that may be required as a result of the White Bear Lake settlement agreement. These hours will be billed hourly and are estimated at an additional $1,800. The hourly breakdown by task for each employee class proposed for the project is included on the attached spreadsheet. The proposed fee is based on our 2016 rate schedule. Sincerely, WSB & Associates, Inc. S:\Community Development \ Projects \Planning Studies \2016 Water Supply Plan\Staff Reports\LTR PROP - Lino Lakes - Water Supply Plan.docx M. Grochala March 14, 2016 Page 4 Diane Hankee, PE Erin Heydinger City Engineer Project Engineer ACCEPTED BY: City of (CITY) Name Title Date S:\Community Development \Projects\Planning Studies \2016 Water Supply Plan\Staff Reports\LTR PROP - Lino Lakes Water Supply Plan.doco AEstimate City of Lino WSBProfessional Services of Cost Lakes, Minnesota to Complete Water Supply Plan Division of Natural Resources & Associates, inc. Task No. Description Estimated Hours Project Manager Project Engineer GIS Specialist 1 Water Supply System Description and Evaluation 2 16 12 2 Emergency Planning and Response Procedures 4 16 8 3 Water Conservation Plan Component 4 36 10 4 Items for Metropolitan Area Water Suppliers (7-County Metro Only) 4 6 4 6 Project Management, Coordination, and Meetings 8 4 2 Total Hours 22 78 36 F ,y Billing Rate $ 158.00 $ 93.00 $ 74.0C Total WSB Direct Labor Costs $ 3,476.00 $ 7,254.00 $ 2,664.0C Estimated Hours for Northeast Metro Area 4 12 Estimated Additional Fee for Northeast Metro Area $ 632.00 $ 1,116.00 Grand Total with Northeast Metro Area Work S:\Community Development\Projects\Planning Studies\2016 Water Supply Plan\Staff Reports\WaterSupplyPlan_LinoLakes