HomeMy WebLinkAbout2016-051 Council ResolutionCITY OF LINO LAKES
RESOLUTION NO. 16-51
APPROVING PUD DEVELOPMENT STAGE PLAN/PRELIMINARY PLAT FOR
WATERMARK
WHEREAS, the City has received an application for PUD Development Stage Plan/Preliminary
Plat for Watermark hereafter referred to as "Development"; and
WHEREAS, City staff has completed a review of the "Development" based on the following:
• Civil plans prepared by Carlson McCain revision date March 4, 2016 and received by the
City on March 7, 2016
• Tree Preservation Plan prepared by Carlson McCain revision dated March 4, 2016 and
received by the City on March 7, 2016
• Preliminary PUD Planting Plan prepared by Stantec dated January 25, 2016
• Grading and Utility Phasing Plan prepared by Carlson McCain dated March 4, 2016
• Cultural Resources Assessment prepared by The 106 Group dated February 2005
• Phase I Archaeological Survey Report prepared by Anderson Engineering of Minnesota,
LLC dated July 20, 2015
• Phase II Environmental Site Assessment prepared by Braun Intertec Corporation dated
November 4, 2013
• Phase I Environmental Site Assessed prepared by Carlson McCain dated September 12,
2014
• Geotechnical Evaluation Report -North and South Parcel prepared by Braun Intertec
Corporation dated September 24, 2013
• Traffic Impact Study prepared by Spack Consulting dated February 13, 2015
• Technical Memorandum prepared by Spack Consulting dated March 27, 2015
• Technical Memorandum prepared by Spack Consulting dated March 25, 2016
• Wetland Delineation Report prepared by Kjolhaug Environmental Services Company,
Inc. dated February 10, 2014
• Wetland Permit Application including Replacement Plan prepared by Kjolhaug
Environmental Services Company, Inc. dated February 22, 2016
• Traffic Noise Assessment prepared by David Braslau Associates, Inc. dated March 28,
2016
• Land Use Plan prepared by Carlson McCain revision date May 28, 2016
• Preliminary Plat Image Booklet dated March 18, 2016
• Draft Feasibility Report for Northeast Lino Lakes Drainage Improvement Project Study
prepared by WSB & Associates, Inc. dated January 18, 2016
• Revised Cover Sheet 1, Site Plan Sheet 22 and Preliminary Plat Sheets 3 and 15-17,
prepared by Carlson McCain revision date April 27, 2016; and
WHEREAS, a public hearing was held before the Planning & Zoning Board on April 13, 2016
and continued to May 11, 2016 and the Board recommended approval of the "Development";
and
i
NOW, THEREFORE BE IT RESOLVED by The City Council of The City of Lino Lakes
hereby makes the following:
FINDINGS OF FACT
Per Section 1007.024(1) Purpose and Intent, the PUD, by allowing deviation from the strict
provisions of this Ordinance related to setbacks, heights, lot area, width and depths, yards, etc.,
by conditional use permit or a mixture of uses by rezoning to a PUD District, is intended to
encourage:
a. A development pattern in harmony with the objectives of the Comprehensive Plan.
The proposed Watermark PUD master planned residential development is consistent with the
goals and policies of the comprehensive plan in regards to resource management, land use,
housing, transportation and utilities. The development upholds the City's public values by
creating a multi functional open space greenway corridor integrated with the stormwater
conveyance system, wetland management and trails. Watermark is consistent with mixed-use
land and density requirements and provides a variety of market driven housing products that
support life -cycle housing. Safe transportation corridors and public utilities also serve the
development.
b. Innovations in development that address growing demands for all styles of economic
expansion, greater variety in type, design, architectural standards, and siting of
structures through the conservation and more efficient use of land in such
developments.
By allowing a variety of lot sizes and residential neighborhoods, Watermark is able to provide a
mix of market driven housing products and single level living that appeals to entry-level home
buyers as well as aging populations. The flexible site design also allows for the construction of
an extensive greenway corridor and storm water management system.
c. The preservation and enhancement of desirable site characteristics such as existing
vegetation, natural topography and geologic features and the prevention of soil
erosion.
The site has limited natural desirable site characteristics. Topography is flat agricultural land
with poorly drained soils, drain tile and limited minimal significant tree stands. Existing low
functioning wetlands will be enhanced and restored into an extensive greenway corridor and
storm water management system.
d. A creative use of land and related physical development which allows a phased and
orderly transition of varying land uses in close proximity to each other.
Development will start from the south where public utilities exist and extend north. The
development transitions from the existing commercial property on the south boundary north to
compact townhome and 44' single family neighborhood to larger lot neighborhoods.
e. An efficient use of land resulting in smaller networks of utilities and streets thereby
lowering development costs and public investments.
2
Allowing lot widths to be based on the specific housing product versus a one size fits all lot width
provides an efficient use of land and lowers development and public costs.
f. Promotion of a desirable and creative environment that might be prevented through
the strict application of City zoning and subdivision regulations.
Watermark will create a natural greenway corridor and regional stormwater conveyance system
through the construction 40+ acres of lakes and storm ponds and 20+ acres of restored and
created wetlands; and
BE IT FURTHER RESOLVED by the City Council of The City of Lino Lakes hereby
establishes that Watermark shall be developed in accordance with the following:
ARCHITECTURAL DESIGN STANDARDS
1. The following are acceptable exterior materials and styles for both the single family
homes and the townhomes:
a. Exterior Materials
i. Vinyl, aluminum or steel siding (acceptable only on single family homes,
not townhomes)
ii. Brick
iii. Stone
iv. Stucco
v. Wood
vi. Engineered siding products such as LP board, Hardie board or similar
b. Styles
i. Lap siding
ii. Board and batten
iii. Shakes
2. One of the following three architectural features shall be incorporated into the single
family home side and rear elevations that are visible from 20th Avenue (CSAH 54), Street
A, Street E and the public park:
a. A minimum of 4 inch window trim on side and/or rear elevations to match the
dimensions of the front elevation.
b. Incorporate trim and banding in complementary colors to add interest and variety
to the side and/or rear elevations.
c. Incorporate more than one exterior material and/or style on the side and/or rear
elevations.
3. The following minimum architectural standards shall be incorporated into the townhome
neighborhood:
3
a. A minimum of three (3) unique building facades (A, B and C) for each elevation
of the townhomes shall be provided.
b. A table of architectural facade data shall be included for each elevation.
c. A unique building color package shall be included for each phase of development.
d. At no point will the same facade and same color package be specified on
buildings that are immediately adjacent to or directly across the road from each
other.
e. A minimum of 4 inch window trim on side and/or rear elevations to match the
dimensions of the front elevation.
f. In no case shall any exterior material be less than 10%.
g. Front elevations shall have a combination of 3 exterior materials and/or styles as
defined above.
h. At least 60% (e.g. two of the three buildings) of the facades in each phase shall
include brick, stone or stucco on the front elevation.
i. Rear elevations shall have a combination of 2 exterior materials and/or styles.
j. Rear elevations shall include some vertical trim or element to break up the longer
horizontal planes.
k. Side elevations that are exposed to roadways or open space and are highly visible
will incorporate architectural details to match the front facade (e.g. the Tanager
and the Maxwell Side (exposed)).
1. Side elevations that are not exposed to roadways or open space shall require only
one exterior material (e.g. Maxwell (unexposed)).
m. Decorative garage doors are required on all units.
n. At least 60% of the buildings shall have decorative garage doors with windows
for any given development phase.
LOT SIZE
1. Lot sizes for single family lots shall be continuous buildable land and at a minimum size
of the Lot Width Product x 130 feet.
a. Example:
i. 44 feet x 130 feet = 5,720 s.f.
ii. 55 feet x 130 feet = 7,150 s.f.
iii. 65 feet x 130 feet =8,450 s.f.
iv. 75 feet x 130 feet = 9,750 s.f.
2. Flexibility may be allowed during PUD Final Plan/Final Plat phases to allow for a lot
depth of 120 feet only if a public value of creating open space or protecting a natural
resource is achieved.
3. The 100 year High Water Level shall not encroach into any yard.
4. Wetlands and buffers shall not encroach into any yards.
5. The required 10 feet drainage and utility easement above the HWL may be included in
the lot as part of the standard D&U easement.
PUBLIC LAND DEDICATION
The City will require a combination of land dedication and cash is lieu of land dedications.
1. Land dedication for the public and private parks will be credited from the total payment
in lieu.
2. Costs for public park improvements and trail construction will be credited from the total
payment in lieu.
3. Improvements to the private parks and recreational center will not be credited from the
total payment in lieu.
BE IT FURTHER RESOLVED by the City Council of The City of Lino Lakes in order to
provide maximum PUD flexibility and adapt to changing market demands, detailed civil, grading
and landscaping plans and architectural design standards, floor plans, elevations, exterior
materials, styles, color packages and HOA documents will be reviewed and approved with each
PUD Final Plan/Final Plat; and
BE IT FURTHER RESOLVED by The City Council of The City of Lino Lakes hereby
approves the PUD Development Stage Plan/Preliminary Plat for Watermark subject to the
following conditions:
1. The Comprehensive Stormwater Management Plan for the Proposed Peltier Lake Outlet
shall be approved by Rice Creek Watershed District prior to issuance of building permits.
2. The developer shall provide a PUD Master Plan & Standards and Preliminary Plat
Booklet that establishes discernable public values and baseline development standards for
both the single family and townhome neighborhoods for the entire development.
3. The developer shall enter into a Master PUD Development Agreement for the entire
development and individual Development Agreements with each PUD Final Plan/Final
Plat phase of development
4. The developer shall submit one Master HOA document and sub-HOA's with each PUD
Final Plan/Final Plat phase of development.
5. Tree Preservation and Landscape, Buffer and Screen Standards
a. Detailed landscape berm plans and sections are required along CSAH 54.
b. Landscape screening and buffers shall be installed along CSAH 54, I -35E and in
between the townhomes and commercial.
5
c. A landscape screen (planting, berm or fence) is not required between the
townhomes and Street A.
i. The end units of the townhomes facing Street A will be the "Tanager"
elevation that provides a main entrance and higher aesthetic value.
d. Attention shall be made to the location of landscape plantings, buffer and berms
in regards to grading, storm sewer and utility location, catch basins, etc.
e. Water re -use pump stations shall be viewed to determine if screening is required.
6. Single Family Neighborhoods
a. Detailed house architectural plans, color renderings and material palette shall be
submitted with each PUD Final Plan/Final Plat for all single family lots
b. The developer shall provide a map highlighting the applicable single family lots
abutting CSAH54, Street A and the public park.
c. Homeowner Association documents shall be required with each PUD Final
Plan/Final Plat.
7. Townhome Neighborhood
a. A separate plan set detailing the townhome neighborhood shall be required.
i. Details on Sheet 43 are not for 32 foot wide townhome product.
b. Detailed architectural plans and color renderings shall be submitted for all
townhome building elevations with each PUD Final Plan/Final Plat.
c. Homeowner Association documents shall be required with each PUD Final
Plan/Final Plat.
d. Rear elevations shall include some vertical trim or element to break up the longer
horizontal planes.
8. Parks and Trails
a. Details on water fountains shall be required with PUD Final Plan/Final Plat.
b. A Trail Phasing Plan shall be required with PUD Final Plan/Final Plat.
c. A "trail corridor" shall be installed along one side of Street B in lieu of sidewalk
to make a connection to the park. The trail could be bituminous or concrete.
9. Wetlands and Buffers
a. The lots surrounding Outlot A shall be evaluated to verify proper wetland buffers
(10-25 feet) can be established outside of lots.
b. Wetland area calculations differ from Sheet 23 and Wetland Permit Application
and shall be adjusted accordingly.
c. Conservation easements for wetland buffers shall be recorded with the final plat.
10. Water Re -use
a. Irrigation system for public park, berm area and townhome open space shall
utilize stormwater re -use as recommended in the Watermark Water Re -Use
Feasibility Study.
11. Floodplain
a. The base flood elevation shall be determined by the applicant.
b. A Conditional Letter of Map Revision (CLOMR) and Letter of Map Revision
(LOMR) will need to be obtained from the Federal Emergency Management
Agency (FEMA) to verify the floodplain is not impacted by development.
12. The developer shall submit a revised PUD Development Stage Plan/Preliminary Plat
based on the following staff comments:
a. Comments from WSB Plan Review Letter dated April 6, 2016 and May 4, 2016
shall be addressed.
b. Comments from the Environment Board Staff Report dated April 27, 2016 shall
be addressed.
6
c. Streets and Trails
i. Cul de sacs on Street F, K, L, P and Q exceed 500 feet in length.
1. Fire hydrants shall be located every 300 feet.
2. Roadway width shall be 32 feet back to back.
ii. Temporary cul de sacs shall be required at the north end of Street D and at
the end of any street that terminates between development stages.
iii. Trail corridors shall be a minimum of 20 feet wide.
1. Revise corridor between Lots 436 & 437.
iv. Sidewalk shall be extended along the north side of Street D to CSAH
54/20th Avenue N.
v. Evaluate Lot 246 for possible driveway access onto Street W.
vi. Street V shall include sidewalk.
d. Utilities
i. Storm sewer pipes shall run along the side or rear property lines to the
greatest extent possible to avoid drainage & utility easements
encumbering large portions of side or rear yards.
1. For example: Lots 561, 505, 506, 255-258, etc.
ii. Drainage and utility easements along side lot lines over utility pipes shall
be wide enough to allow for maintenance equipment and access.
1. No encroachments (house, bay windows, A/C units, landscaping
etc.) shall be allowed in or above the drainage and utility
easements.
e. Setbacks
i. Twenty (20) foot side yard setbacks will only be allowed on back to back
lots.
ii. Twenty (20) foot side yard setbacks shall be minimized to the greatest
extent possible.
1. For example, Lots 704, 761, 412, 128, 129, 115 and 116 etc. shall
be revised.
iii. Front setbacks on Lots 237-239 shall be shown as 25 feet.
f. Sheet 3: Preliminary Plat Index Sheet
i. Under Site Data, the number of Single Family Lot shall be 706 and add 1
line for Clubhouse lot to be consistent the Land Use Plan map.
g. Sheets 19-22: Site Plan
i. The scale bar is incorrect and shall be revised.
h. The Tree Preservation Plan shall be revised to address Lots 132-135.
Adopted by the Council of the City of Lino Lakes this 1 3 day of June, 2016.
The motion for the adoption of the foregoing resolution was introduced by Council Member
Kusterman and was duly seconded by Council Member Rafferty and upon
vote being taken thereon, the following voted in favor thereof:
Kusterman, Rafferty, Maher, Manthey, Reinert
The following voted against same:
none
ATTEST:
.rine Bartell, City
Cler
8
Jeff Reinert, ayo