Loading...
HomeMy WebLinkAbout2016-062 Council ResolutionCITY OF LINO LAKES RESOLUTION NO. 16-62 ACCEPTING FEASIBILITY REPORT NE AREA DRAINAGE STUDY WHEREAS, by a resolution passed by the City Council on September 14, 2015, the City Engineer was directed to prepare a Feasibility Study related to the NE Area Drainage Study; and WHEREAS, the City has identified the need to develop a surface water management system to convey surface water from land lying north of Main Street between the City of Hugo and Peltier Lake; and WHEREAS, the Feasibility Report provides information regarding whether the proposed improvement is necessary, cost-effective, and feasible; whether it should best be made as proposed; the estimated cost of the improvement as recommended; and NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Lino Lakes that: The NE Area Drainage Study be accepted to provide a plan for improvements to manage surface water from land lying north of Main Street between the City of Hugo and Peltier Lake. Adopted by the Council of the City of Lino Lakes this 27th day of June, 2016. The motion for the adoption of the foregoing resolution was introduced by Council Member Kusterman and was duly seconded by Council Member Manthey and upon vote being taken thereon, the following voted in favor thereof: Kusterman, Manthey, Rafferty, Reinert The following voted agamsr'same: none (Absent — Maher) ATTEST: .w� ne Bartell, Ci y Cle Jeff Reinert for CITY COUNCIL AGENDA ITEM 6B STAFF ORIGINATOR: Diane Hankee, City Engineer MEETING DATE: June 27, 2016 TOPIC: Consider Resolution No. 16-62, Accepting Feasibility Study, NE Area Drainage Study VOTE REQUIRED: 3/5 INTRODUCTION Staff is requesting council acceptance of the feasibility study for the NE Area Drainage Study. BACKGROUND The City Council authorized preparation of a feasibility study for the NE Area Drainage Study on September 14, 2015 to provide surface water management to land lying north of Main Street between the City of Hugo and Peltier Lake. The surface water in the northeast area of Lino Lakes is landlocked inhibiting site improvements within this area. The area has been historically landlocked until the installation of agricultural field drains in the early 20th century. These agricultural drains are now at capacity and are incompatible with future development within the watershed. In addition the agricultural drains do not provide water quality benefits to the receiving waterbody, Peltier Lake. A majority of this watershed currently drains to the south via field drains to Clearwater Creek. Clearwater Creek is impaired for aquatic life and has had a history of significant bank erosion problems. Multiple alternatives were considered and refined with input from land owners, potential developers, neighboring communities, the Rice Creek Watershed District (RCWD), the Minnesota Department of Transportation and the Minnesota Department of Natural Resources. As a condition of the project, a Comprehensive Surface Water Management Plan (CSMP) is in development. The CSMP and the associated surface water modeling includes regional water quality best management practices (BMPs), stormwater volume and rate control improvements, and a new outlet to Peltier Lake. The CSMP also includes design standards for future developments in the Northeast area. Peltier Lake is impaired for nutrients and it is imperative that the new system does not adversely impact the lake and other downstream interests. The proposed project will benefit nearly 1,300 acres and includes: • A new stormwater conveyance system; • Multi-purpose regional stormwater management facilities; • Pedestrian trail extensions; and • Improvements to Peltier Lake Drive The project will be implemented using a phased approach based on preliminary development patterns. The phases and cost per phase are as follows: vr" " Development Phase Cost Phase 1— Peltier Lake Outlet Improvements $2,248,023 Phase 2 — I -35E Crossing $750,914 Phase 3 — East Side Improvements $639,925 Phase 4 — West Side Improvements $557,491 TOTAL COST $4,196,353 Funding for the project will be through surface water management fees, and potential grants from Rice Creek Watershed District (RCWD), Minnesota Board Water and Soil Resources (BWSR), and the Public Facilities Authority (PFA). The Environmental Board recommended approval of the feasibility study with the addition that water quality be improved beyond what is required by permitting and as possible. RECOMMENDATION Staff is recommending approval of Resolution No. 16-62 Accepting Feasibility Study, NE Area Drainage Study. ATTACHMENTS 1. Resolution No. 16-62 2. NE Drainage Area Feasibility Study