HomeMy WebLinkAbout2016-076 Council ResolutionCITY OF LINO LAKES
RESOLUTION NO. 16-76
APPROVING PUD DEVELOPMENT STAGE PLAN/PRELINIINARY PLAT FOR
CLEARWATER CREEK BUSINESS PARK
WHEREAS, the City has received an application for PUD Development Stage Plan/Preliminary
Plat for Clearwater Creek Business Park hereafter referred to as "Development"; and
WHEREAS, City staff has completed a review of the "Development" based on the following:
• Application and plans submitted to the City on May 16, 2016.
• Revised plans received by the City on June 17, 2016.
• Traffic Impact Study from Spack Consulting dated June 27, 2016
• Revised building elevations and renderings received by the City on July 1, 2016.
WHEREAS, a public hearing was held before the Planning & Zoning Board on June 8, 2016
and continued to July 13, 2016 and the Board recommended approval of the "Development"; and
NOW, THEREFORE BE IT RESOLVED by The City Council of The City of Lino Lakes
hereby makes the following:
FINDINGS OF FACT
Per Section 1007.024(1) Purpose and Intent, the PUD, by allowing deviation from the strict
provisions of this Ordinance related to setbacks, heights, lot area, width and depths, yards, etc.,
by conditional use permit or a mixture of uses by rezoning to a PUD District, is intended to
encourage:
1. A development pattern in harmony with the objectives of the Comprehensive Plan.
The industrial development on Lot 1 is consistent with the goals and policies of the
comprehensive plan which anticipated development of this property for industrial uses.
Clearwater Creek Business Park is consistent with the development standards in the City Code,
except that PUD flexibility is requested to allow outside storage adjacent to I -35E.
2. Innovations in development that address growing demands for all styles of economic
expansion, greater variety in type, design, architectural standards, and siting of
structures through the conservation and more efficient use of land in such developments.
The development will allow construction of a new 402,552 square foot distribution center on Lot
1 and would provide 2 outlots for future development. The development would allow this
industrial development while preserving a greenway corridor (as anticipated in the AUAR) via a
conservation easement adjacent to Clearwater Creek (Judicial Ditch No. 3).
3. The preservation and enhancement of desirable site characteristics such as existing
vegetation, natural topography and geologic features and the prevention of soil erosion.
1
The 56.45 acre site is bisected by Judicial Ditch No. 3 (Clearwater Creek), which separates the
northern third of the site from the remainder. The creek will be preserved and a conservation
easement will be provided to protect this greenway corridor. The buffer along the creek shown
on Lot 1 ranges from 20 feet to 150 feet in width and will be provided in a conservation
easement. The buffer will include all of the area between the creek, ponds and parking area. The
site has a limited number of trees, but many of those are located adjacent to the creek and will be
preserved.
4. A creative use of land and related physical development which allows a phased and
orderly transition of varying land uses in close proximity to each other.
The project will allow development of a significant distribution center and will provide two
outlots for future development. The project includes an extension of 21st Avenue to provide
access to Lot 1. The development is consistent with the development anticipated by the
Comprehensive Plan, AUAR and Zoning Ordinance.
5. An efficient use of land resulting in smaller networks of utilities and streets thereby
lowering development costs and public investments.
The development will include extension of existing streets and trunk utilities, which will be
designed and built by the developer. The infrastructure will be planned and built by the
developer.
6. Promotion of a desirable and creative environment that might be prevented through the
strict application of City zoning and subdivision regulations.
The purpose of the PUD will allow construction of the distribution center on Lot 1 in a location
that would not otherwise have been allowed under the standard zoning and subdivision
regulations.
BE IT FURTHER RESOLVED by the City Council of The City of Lino Lakes hereby
establishes that Clearwater Creek Business Park shall be developed in accordance with the
following:
1. The developer is approved to create for one lot and two outlots for "Clearwater Creek
Business Park", in accordance with the plans and application received by the City on
May 16, 2016 and the revisions received on June 17, 2016 and July 1, 2016, except as
amended by this resolution.
2. The applicant must comply with all conditions in the City Engineer's memo dated
June 2, 2016.
3. The applicant must comply with all conditions in the City Engineer's AUAR memo
dated June 28, 2016.
4. The applicant must comply with the Environmental Board recommendations in the
memo dated June 29, 2016.
5. The applicant must obtain approvals from RCWD and must comply with all related
2
conditions of approval.
6. The applicant must provide a final wetland mitigation plan for City review and
approval.
7. The applicant must provide a fmal floodplain impact and mitigation plan for City
review and approval.
8. The applicant must provide lighting fixture details to ensure compliance with
ordinance lighting standards.
9. All sides of the principal and accessory structures are to have essentially the same or
a coordinated harmonious fmish treatment pursuant to § 1007.043 (2) of this
Ordinance. The site plan must be revised to show the location of the guard house to
ensure setbacks would be met and material details must be provided to ensure
harmonious fmish treatment.
10. All mechanical equipment, such as air handling units located anywhere on the
property, including rooftop equipment, shall be screened from view from adjacent
streets, public rights of way, and adjacent properties. Final details must be provided
with the fmal plans to ensure compliance.
11. The plans shall be revised to provide a wall on the east and west side of the enclosure
with a wood composite fence/gate on the south. Exterior wall or fence treatment shall
be similar and/or complement the principal building.
12. The Site Plan shows a 40 -foot street easement for 21st Avenue. This must be revised
to show a 40 -foot street right-of-way.
13. The applicant must provide final construction details for construction of 21st Avenue,
including all wetland, floodplain and ditch permits. City Engineer's memo notes that
additional information is required to facilitate these permits.
14. An access easement agreement between the affected properties must be provide to
allow the shared access between Lot 1 and Outlot B.
15. The applicant shall provide turning radius exhibits to show that the vehicles can
maneuver through the site to the docks and to the storage areas.
16. Fire access shall be reviewed and approved by the City prior to fmal plan approval.
17. The landscape plan shows landscaping in the planned drive aisle between Lot 1 and
Outlot B. The conifer trees in this location must be increased from the proposed 6 feet
to 8 feet at planning.
18. All signage must comply with City Code requirements.
19. The existing billboards (off -premises signs) are legal, non -conforming signs and are
allowed to remain, but shall not be allowed to be relocated.
3
20. Material samples must be provided to ensure compliance with architectural standards
in the Zoning Ordinance.
Adopted by the Council of the City of Lino Lakes this 25 day of July , 2016.
The motion for the adoption of the foregoing resolution was introduced by Council Member
Rafferty and was duly seconded by Council Member Maher and upon
vote being taken thereon, the following voted in favor thereof:
Rafferty, Maher, Manthey, Kusterman, Reinert
The following voted against same:
none
ATTEST:
e Bartell, Ci Cler
4
CITY COUNCIL
AGENDA ITEM 6A
STAFF ORIGINATOR: Kendra Lindahl, Landform
MEETING DA 1'F.: July 25, 2016
TOPIC: Clearwater Creek Business Park PUD
ii. Consider First Reading of Ordinance No. 07-16, Rezoning
Certain Real Property from LI, Light Industrial to PUD,
Planned Unit Development
iii. Consider Resolution No. 16-76, Approving Development
Stage Plan and Preliminary Plat, Clearwater Creek
Business Park
VOTE REQUIRED: 3/5
INTRODUCTION
The applicant has submitted a land use application for a Rezoning to Planned Unit Development
(PUD) and PUD Development Stage/Preliminary Plat review. The proposed development is for
Clearwater Creek Business Park located in the northeast quadrant of Cedar Street and 21st
Avenue. I -35E is the eastern border of the site.
The 56.45 acre site is bisected by Judicial Ditch No. 3 (Clearwater Creek), which separates the
northern third of the site from the remainder. The applicant is proposing to create 1 lot and 2
outlots. Lot 1 would be developed with a 402,552 square foot distribution center and the outlots
would be available for future development.
The Land Use Applications are:
• Rezone property from Light Industrial (LI) to Planned Unit Development (PUD) for Lot
1, Block 1
•
• PUD Development Stage Plan/Preliminary Plat
BACKGROUND
The Planning & Zoning staff reports dated June 8, 2016 and July 13, 2016 details the project
(attached). The project is generally consistent with the Comprehensive Plan, the AUAR and City
ordinances.
1