HomeMy WebLinkAbout01-03-2017 Council PacketWORK SESSION AGENDA
CITY OF LINO LAKES
Tuesday, January 3, 2017
CITY COUNCIL WORK SESSION
Community Room (not televised)
6:00 P.M.
1. Police Division Vehicle Replacement Policy, John Swenson
2. Cartegraph Update, Rick DeGardner
3. 2018 Street Recon Feasibility Study WSL and LaMotte, Michael Grochala
4. Wetland/Natural Resource Restoration Revolving Fund Plan, Michael Grochala
5. Council Updates on Boards/Commissions, City Council
6. Monthly Progress Report, Jeff Karlson
7. Review Regular Agenda
8. Adjourn
WS – Item 1
WORK SESSION STAFF REPORT
Work Session Item 1
Date: January 3, 2017
To: City Council
From: John Swenson, Director of Public Safety
Re: Public Safety Department Police Division Vehicle Replacement Policy
Background
During the Council Work Session on December 5, 2016 and the December 12, 2016
Council Meeting, staff presented a vehicle replacement policy for Council consideration.
Attached to this staff report is Mr. Karlson’s staff report from the December 5, 2016
Work Session, Mrs. Cotton’s staff report from December 12, 2016 and the Police
Division vehicle replacement policy as presented on December 12, 2016.
Also during the December 5, 2016 Council Work Session, Council Member Rafferty had
learned that some cities are leasing vehicles for use in their police departments. Council
directed staff to research leasing programs utilized in other cities. Staff has met with
representatives from Enterprise Fleet Management, which is the leasing company
working with several agencies.
Staff has provided the representatives from Enterprise Fleet Management with the
complete list of all city vehicles which could potentially be leased through Enterprise
Fleet Management. The representatives are currently reviewing this data and will prepare
a proposal for Council consideration.
Staff anticipates that Enterprise Fleet Management will have this proposal complete and
will be at the February 6, 2017 Council Work Session.
Council may want to delay any further discussion or action on this policy until the
potential of a leasing program is presented for Council consideration.
Attachments
Council Work Session Staff Report – December 5, 2016
Regular Council Meeting Staff Report – December 12, 2016
Public Safety Department – Police Division Vehicle Replacement Policy
WS – Item 7
WORK SESSION STAFF REPORT
Work Session Item No. 7
Date: December 5, 2016
To: City Council
From: Jeff Karlson, City Administrator
Re: Vehicle Replacement Schedule for Police Cars
Background
During the November 14 budget work session, the Council directed staff to prepare a
five-year replacement schedule for police vehicles. A five-year replacement schedule
was prepared by Public Safety Director John Swenson and Finance Director Sarah Cotton
and was included in the November 23 weekly update.
There are concerns that the schedule would trigger automatic replacement of a vehicle
after five years. To address any concerns about when vehicles should be replaced, staff is
in the process of revising the schedule based on the age, miles, and condition of each
vehicle. City Mechanic Brett Olander is inspecting each police vehicle so staff can create
a more realistic projection of when vehicles would likely be replaced beyond the
expected five-year life of the car. The vehicle inspections, along with Brett’s report, will
be completed by this coming Monday.
I also drafted a Vehicle Replacement Policy (attached) as a guideline for staff to follow,
which would reinforce the Council’s disposition to extend the life of the vehicles as much
as possible.
Requested Council Direction
Review replacement schedule and consider adoption of Vehicle Maintenance Policy.
Attachments
Current Vehicle Replacement Plan
Revised Vehicle Replacement Plan purchasing used vehicles for investigators
Revised Vehicle Replacement Plan purchasing new vehicles for investigators
Revised Vehicle Replacement Plans based on mechanic’s inspection of vehicles
Draft Vehicle Replacement Policy
CITY COUNCIL
AGENDA ITEM 2F
STAFF ORIGINATOR: Sarah Cotton
MEETING DATE: December 12, 2016
TOPIC: Consider Approval of Public Safety Department – Police Division
Vehicle Replacement Policy and 2017 Replacement Schedule
VOTE REQUIRED: 3/5
BACKGROUND
During the November 14th Budget Work Session, there was much discussion surrounding the
replacement of police vehicles. Staff was directed to prepare a five-year replacement schedule;
however, there was concern that the schedule prepared would trigger automatic replacement of
a police vehicle after five years. Therefore, staff prepared a revised vehicle replacement plan
and a Police Vehicle Replacement Policy that would serve as a guideline for staff to follow, in
an effort to reinforce the Council’s disposition to extend the life of vehicles as much as possible.
Both the Police Division Vehicle Replacement Policy and 2017 Replacement Schedule were
further reviewed by the City Council at the December 5th Work Session.
RECOMMENDATION
Staff recommends approval of the Public Safety Department – Police Division Vehicle
Replacement Policy and 2017 Replacement Schedule.
ATTACHMENTS
Public Safety Department – Police Division Vehicle Replacement Policy
2017 Police Vehicle Replacement Schedule
1
City of Lino Lakes
Public Safety Department – Police Division
Vehicle Replacement Policy
1. Purpose
The purpose of this Vehicle Replacement Policy is to propose a vehicle replacement plan for the
Police Division to follow, and to establish the specific vehicle needs and requirements of the
City. This document may be modified or updated annually due to the changing needs of citizens
or changes in the automotive industry.
2. Objectives
The primary objectives of the City of Lino Lakes is to control the overall cost of operating and
maintaining the fleet of vehicles, to maintain the vehicles in a manner that extend their useful
life, to control the growth in size of the fleet, to standardize the composition of the fleet, and to
accurately budget for maintenance replacement costs. All new purchases for vehicles are part of
the budget cycle and are coordinated through the City Administrator for recommendation.
3. Acquisition
The goal of the City’s acquisition practices is to obtain the lowest possible price and the highest
possible quality for vehicles. Before preparation of the Police Capital Equipment Plan, the
Public Safety Director will review the vehicle replacement schedule and appropriate
maintenance and repair records with the Public Services Director and Mechanic and plan the
acquisition of replacement vehicles. Any request for new vehicles that will increase the size of
the fleet must be approved by the City Council.
4. Maintenance
The goal of the Public Safety Department is to keep vehicles in sound operating condition.
Accurate and complete vehicle maintenance records are a key tool for making management
decisions. Preventative maintenance routines and intervals are based on local driving conditions
and manufacturer’s recommendations of each type of vehicle. Preventative maintenance is the
key to avoiding the repair or replacement of costly major vehicle components such as engines,
transmissions, and drive trains. Appropriate records for each vehicle are maintenance logs, fuel
usage logs, and cumulative costs of parts and labor.
5. Replacement
It is the policy of the City of Lino Lakes to replace police vehicles after 60 months or 100,000
miles of use. However, vehicle maintenance costs are variable and distinct to each vehicle. The
goal is to analyze the costs associated with a vehicle and to identify the point when each vehicle
is reasonably depreciated but not yet incurring significant maintenance costs. Based on the
vehicle records, it may be determined that a vehicle can be replaced later or may need to be
2
replaced earlier than the schedule calls for. Any request for replacing vehicles must be cost-
justified to the City Administrator and City Council.
6. Guidelines and Procedures
The Police Division has inventoried existing vehicles and has prepared a replacement schedule
for police vehicles. The schedule will be updated annually and will be used as the basis for
planning for the replacement of vehicles through the annual budget. Each vehicle recommended
for replacement will include the following information:
a. Age in years, also known as life
b. Miles of use
c. Useful life (based on commonly used standards for police vehicles)
d. Cost of maintenance
e. Overall condition (mechanical, operating, safety, and appearance)
f. Downtime
g. Availability of replacement parts
h. Funding
The guidelines for vehicles considered for replacement are based on 60 months of age or 100,000
miles of use, but additional consideration is given to functionality and overall condition of the
vehicle. As vehicles reach this threshold for age or miles, a vehicle maintenance evaluation will
be performed by the Public Services Director and Mechanic. If the evaluation indicates the
vehicle would be economical to retain for an additional year, the vehicle will be retained.
Depending on the availability of funds, vehicles will be replaced when they are at the end of their
economic life, no longer safe to operate, not reliable enough to perform their intended function,
or there is a demonstrated cost savings to the City of Lino Lakes.
Final Draft Completed 12/08/16
WS – Item #3
WORK SESSION STAFF REPORT
Work Session Item No. 3
Date: January 3, 2017
To: City Council
From: Michael Grochala, Community Development Director
Re: Street Reconstruction Feasibility Study – West Shadow and LaMotte Area
Background
On June 23, 2014 the City Council held a public hearing and took action to adopt Resolution No.
14-65 approving the 5 Year Street Reconstruction Plan (2015 – 2019). The plan included the
proposed reconstruction of the Shenandoah Area in 2015 and the West Shadow and LaMotte
Area in 2019. The Shenandoah project was completed in 2016 and was well received.
Staff is requesting council authorization for preparation of an updated feasibility study for the
West Shadow Area as well as a study including the LaMotte Area. These two areas continue to
rate poorly in our annual street ratings and are increasingly consuming Public Services resources.
Both locations experience drainage problems as well deteriorating street surface.
Upon completion of the studies staff anticipates bringing forward an updated 5 Year Street
Reconstruction Plan for consideration by the City Council in June of 2017. This would allow
authorization of the improvements for construction as early as 2018.
WSB and Associates, City Engineer, are preparing a proposal for the feasibility study and will be
available for discussion at the work session. Funding for the study will be from the Pavement
Management Fund.
Requested Council Direction
Staff is requesting council direction to place the feasibility authorization on the January 9, 2017
City Council agenda.
Attachments
1. 2015-2019 5 Year Street Reconstruction Plan
6/23/2014
2015 through 2019
Five-Year Street Reconstruction Plan for the
City of Lino Lakes, Minnesota
June, 2014
6/23/2014
City of Lino Lakes
Five-Year Street Reconstruction Plan
2015 through 2019
I. PURPOSE
Street reconstruction is a major expenditure of city funds for the
reconstruction of streets. Street reconstruction may include bituminous
overlays, utility replacement and relocation, public safety street
modifications, and other incidental activities, turn lanes and other
improvements having a substantial public safety function, realignments,
other modifications to intersect with state and county roads, and the local
share of state and county road projects. Except in the case of turn lanes,
safety improvements, realignments, intersection modifications, and local
share of state and county road projects, street reconstruction does not
include the portion of project costs allocable to widening a street or adding
curbs and gutters where none previously existed. A Street Reconstruction
Plan (“SRP”) is a document designed to anticipate street reconstruction
expenditures and schedule them over a five-year period so that they may be
purchased in the most efficient and cost effective method possible. An SRP
helps enable the matching of expenditures with anticipated income. As
potential expenditures are reviewed, the city considers the benefits, costs,
alternatives and impact on operating expenditures.
The City of Lino Lakes, Minnesota (the “City”) believes the street
reconstruction process is an important element of responsible fiscal
management. Major capital expenditures can be anticipated and
coordinated so as to minimize potentially adverse financial impacts caused
by the timing and magnitude of capital outlays. This coordination of capital
expenditures is important to the City in achieving its goals of adequate
physical public assets, preservation of public assets and sound fiscal
management. Good planning is essential for the wise and prudent use of
limited financial resources.
The SRP is designed to be updated periodically. The Street Reconstruction
Plan is a part of the City’s capital improvement plan. In this manner, it
6/23/2014
becomes an ongoing fiscal planning tool that continually anticipates future
capital expenditures and funding sources.
II. THE STREET RECONSTRUCTION PLANNING PROCESS
For the City to use its authority to finance expenditures under Chapter
475.58, Subdivision 3b, it must meet the requirements provided therein. The
street reconstruction planning process is as follows:
The City staff prepares an SRP reflecting the street reconstruction projects
anticipated to be undertaken within the next five years (based on their
priority, fiscal impact, and available funding) and the estimated costs
thereof. If general obligation bonding is deemed necessary, the City works
with its financial advisor to prepare a bond sale and repayment schedule. A
public hearing is held to solicit input from citizens on the SRP and the
issuance of bonds. Notice of such hearing must be published in the official
newspaper of the City at least 10, but not more than 28 days prior to the
date of the public hearing. The City Council must approve the SRP and the
sale of street reconstruction bonds by a unanimous vote of those members
present at the meeting following the public hearing.
Voters may petition for a reverse referendum on the issuance of street
reconstruction bonds. If a petition bearing the signatures of voters equal to
at least 5% of the votes cast in the last general election requesting a vote on
the issuance of street reconstruction bonds is received by the City Clerk
within 30 days after the public hearing, the City may only issue general
obligation street reconstruction bonds after approval by voters at an
election. If no petition is submitted, general obligation street reconstruction
bonds may be issued without an election.
In subsequent years, the process is repeated annually or as expenditures are
completed and new needs arise.
III. PROJECT SUMMARY AND FINANCING
Street reconstruction projects anticipated to be undertaken within the next
five years and the estimated costs thereof are set forth in Appendix A. A
map of the proposed project streets is included in Appendix B. Those for
6/23/2014
which street reconstruction bonds are anticipated to be issued are marked
with an asterisk in Appendix A and are currently anticipated to include the
following:
2015 Street Reconstruction Bond Financed Expenditures –
The 2015 Street Reconstruction Project includes the reconstruction of the following
streets; Hokah Drive, Rice Court, Totem Trail, Arrowhead Drive, Tomahawk Trail,
Tomahawk Court, Chippewa Trail, and Arrowhead Court, by replacement of curb and
gutter as needed, required upgrades of the existing stormwater management system
and bituminous surfacing.
General obligation street reconstruction bonds are proposed to be issued in 2015 in an
aggregate principal amount of approximately $3,150,000 for the costs of the
Shenandoah Area Improvements and the costs of issuing the bonds. Such bonds may
be combined with other financing tools, including general obligation improvement
bonds, to finance other capital improvements in the City.
Street reconstruction bonds are included in the amount of indebtedness of the City
which cannot, under Minnesota Statutes, Section 475.53, exceed 3% of the assessor’s
taxable market value for the City (“TMV”). The proposed bonds will not exceed
statutory limits.
All other foreseeable capital expenditures are expected to be financed through other
revenue or financing sources.
2019 Street Reconstruction Project
The 2019 Street Reconstruction Project includes the reconstruction of the following
streets; West Shadow Lake Drive, Sandpiper Drive, Shadow Court, LaMotte Drive, and
LaMotte Circle which may include required upgrades of existing stormwater
management system and bituminous surfacing.
No bonds are being contemplated for this project at the present time.
6/23/2014
APPENDIX A
PROJECT COSTS
2015 2016 2017 2018 2019
Shenandoah Area
Improvements: Hokah Dr,
Rice Ct, Totem Tr,
Arrowhead Dr, Tomahawk
Tr, Tomahawk Ct, Chippewa
Tr, Arrowhead Ct
Total Shenandoah* $3,009,125
West Shadow and LaMotte
Area Improvements: West
Shadow Lake Drive, Shadow
Ct, Sandpiper Drive,
LaMotte Dr, LaMotte Circle
Total West Shadow and LaMotte
$3,040,015
Totals by year $3,009,125 0 0 0 $3,040,015
*Expenditures proposed to be financed by Street Reconstruction Bonds to be issued in
an aggregate principal amount of approximately $3,150,000 in 2015.
Rondeau Lake
Peltier Lake
Marshan Lake
Centerville Lake
George Watch Lake
Sherman LakeWardsLake
Reshanau Lake
Rice Lake
Golden Lake
BaldwinLake
Bald Eagle Lake
AmeliaLake
Otter Lake
Cedar Lake
Rice Creek Marsh
RICE CREEKCHAIN OF LAKESREGIONAL TRAIL
County Hwy 10 County Hwy 14County Hwy 21County Hwy 23County Hwy 14
Hodgson RdCounty Hwy 23Frenchman Rd
County Hwy 21%&d(
%&c(
)s
Blaine BlaineLinoLakesShoreviewCirclePinesLexington CirclePinesLinoLakesCircle PinesShoreview
ColumbusLinoLakes Forest Lake
GrantWhiteBearTwp.HugoLinoLakesHugoWhiteBearTwp.
Lino LakesNorthOaksLinoLakesShoreview Lino LakesWhiteBearTwp.
Lino LakesCenterville
Arrowhead Dr Lam otte D rL a m o t t e C i r
Hokah DrShadow Ct
HokahDrC hippew a TrWShadowLakeDr1 inch = 3,200 feet8
3/6/2013
Street Reconstruction PlanCity of Lino Lakes MN
Document Path: K:\02029-700\GIS\Maps\StreetReconPlanNew.mxd Date Saved: 5/29/2014 9:28:32 AM
Street Reconstruction Plan
2015
2019
WS – Item 4
WORK SESSION STAFF REPORT
Work Session Item No. 4
Date: January 3, 2017
To: City Council
From: Michael Grochala, Community Development Director
Re: Wetland/Natural Resource Restoration Revolving Fund Plan
Background
In 2009, as an outcome of the Environmental Board goals setting process, staff began
evaluating the possible restoration of an existing wetland complex in Wollan Park,
located on the City’s north side. During the initial investigation it was determined that
the restoration efforts would be eligible for wetland banking credits. The process of
wetland banking allows the city to restore and/or create wetland and sell credits through
the state wetland bank. When completed the Wollan Park wetland bank will provide
approximately 5.96 acres of Army Corps of Engineers (ACOE) certified bank credits.
While bank credits are subject to market fluctuations recent sales in Lino Lakes have
been above $2.00 a square foot. In addition to Wollan Park the City previously
established a wetland bank along Otter Lake Road that was completed in 2013. This
bank, however, is not ACOE certified.
One of the overall goals for the establishment of the bank was to create a funding source
that would allow the city to acquire properties with potential high ecological value and
restore them as part of the City’s greenway system. With the Wollan Bank coming
online by summer of 2017 staff is proposing development of an overall policy document
that establishes the goals, priorities, and mechanics of the wetland banking program.
WSB has submitted a proposal to assist the City with the development of the plan in the
not to exceed amount of $8,182. Funding will be from the Surface Water Management
Fund. The Environmental Board has included the establishment of the plan as part
Requested Council Direction
Staff is requesting Council direction to place authorization of the study on the January 9,
2017 meeting for consideration.
Attachments
1. Wollan Park Wetland Map
2. WSB Proposal
Diane StreetWoolan's Park Wetland Bank
City of Lino Lakes, Minnesota
Aerial Photo: 2008
Woolan's Park
Lake Drive NEPine Street
Evergreen Trail
Orange Street NE
Olive Street NE
Main Street County Road 14
Figure 1
Site Locator Map
Legend
Woolan's Park Boundary
17.62 Acres
0 350 700 1,050 1,400175
Feet
±
Item #6
Monthly Progress Report
January 3, 2017
Item Last Action Taken Staff Status
Digital Scanning Project 3/14/16 – Council approved transfer of
$15,000 from Contingency Fund for
scanning and indexing building plans
Julie The large format scanning has
been completed; 50% of these
files are being quality-checked
before being integrated into
Laserfische
White Bear Lake Restoration
Assn. v. Dept. of Natural
Resources (DNR)
8/25/16 – The NE Metro Water Summit
Group met to discuss a draft JPA that
would create a coalition of cities to work
together as one voice with regards to
water supply issues in the northeast metro
area.
Jeff The group decided it was
premature to enter into a
collaborative agreement
without studies being
completed or without knowing
what further action will be
taken on the WBL lawsuit
Legion Parking Lot 3/7/16 – Staff was directed to obtain
an appraisal for City property
Mike Legion is securing
financing to purchase one
acre and plans to submit a
design in January 2017
Location of Veteran’s
Memorial
12/5/16 – The American Legion
expressed in a letter what its preferred
location was, although there was
some confusion about whether they
meant the undeveloped land at Legacy
of Woods Edge or in front of city hall
Mike
The mayor confirmed that
the Legion’s preferred site
was in front of city hall
Upgrade of HD
Audio/Visual Equipment
in Council Chambers and
Control Room
9/15/16 – Staff met with technical
advisors from Alpha Video and
NMTV to discuss upgrades
Jeff Alpha Video is preparing a
preliminary design options
Channel 16 Upgrade 10/4/16 – NMTV Operations
Committee agreed that the local
government channels needed more
attention
Jeff
NMTV staff is working
with City staff to update the
pages
Updates are shown in italics.