HomeMy WebLinkAbout03-06-2017 Council PacketWORK SESSION AGENDA
CITY OF LINO LAKES
Monday, March 6, 2017
CITY COUNCIL WORK SESSION
Community Room (not televised)
6:00 P.M.
1. American Legion Land Acquisition, Michael Grochala
2. Update from NMTV Executive Director Heidi Arnson
3. Z Systems’ Technical Services Contract, Steve Browender
4. Comprehensive Plan RFP Update, Michael Grochala
5. Advisory Board Appointment, Jeff Karlson
6. Council Updates on Boards/Commissions, City Council
7. Monthly Progress Report, Jeff Karlson
8. Review Regular Agenda
9. Adjourn
WS – Item 1
WORK SESSION STAFF REPORT
Work Session Item No. 1
Date: March 6, 2017
To: City Council
From: Michael Grochala
Re: American Legion Land Acquisition
Background
The American Legion and submitted an offer to acquire a 1 acre parcel of land, from the
City, adjacent to their property at 7731 Lake Drive. The City has established the price of
$100,200.00 based on an appraisal of the property. The American Legion has provided a
counter offer (provided under separate cover) for City Council consideration.
The American Legion has requested an opportunity to address any questions the City
Council may have regarding the offer.
While it is appropriate to ask questions of the American Legion representatives the
council should consider adjourning to a closed meeting to discuss and consider the
counteroffer for the property. A closed meeting could be held either the night of March 6
or following the City Council meeting on March 13.
Requested Council Direction
Discussion only. The council may consider holding a closed meeting to discuss the offer.
Attachments
1. City Property Map
2. Proposed Parking Lot
1 0 "PV C
2
1"PVC10"PVC10"PVC 10"PVC 21" PVC21" PVC12'' DIP6''DIP8 '' D I P 12''DIP12''DIP6''DIP12''DIP12''DI P
12''DIP
6'' DIP
12'' DIP8'' DIP
12'' DIP8''DI P12'' DIPMH0 029
MH0 030 MH0 073MH0075 MH0 140
MH0 141
MH0 142
77167716
77TH ST W77TH ST W
77417741
77347734
77467746
77107710
76917691
77027702
77317731
77227722
W09 7 5
W12 8 8 W12 9 0
W12 9 1
W17 0 5
Ü
0 100 20050FeetCity Property Map
American Legion Parking Lot Expansion
Legend
City Pr operty
Water M ains
#Sewer Gr avity Mains
290.4'150.00'12
14
13
3/14/2016
WS – Item 3
WORK SESSION STAFF REPORT
Work Session Item No. 3
Date: March 6, 2017
To: City Council
From: Jeff Karlson
Re: Technical Services Contract with Z Systems
Background
During the February 27th work session, the City Council asked questions about the cost
proposal submitted by Z Systems for consulting, design, and engineering services. Z
Systems’ proposal identified the steps needed to create a design and the key design
requirements for a high definition audio/visual production system in the Council
Chambers and master control room.
The Council was not ready to approve the technical services contract and directed staff to
invite Z Systems to the March 6th work session.
Account Manager Steve Browender will be present at the meeting to discuss Z Systems’
proposal.
Attachments
Proposed Technical Services Agreement
1
Technical Services Contract
Lino Lakes City Council Chambers Audio and Video Upgrades
Introduction
The City of Lino Lakes, Minnesota, records its City Council meetings via a live production
system utilizing remotely-controlled cameras, a video switcher, and other traditional
production gear. In the main council chambers, the main (program) feed from this system is
displayed on two large television screens, and well as small TVs dedicated to just the council
members.
This system is aging and no longer functions properly. All equipment is standard definition
only. Public-facing TVs are not large enough for the entire room to view. The chamber
microphones are problematic. The guest speaker podium in the main council chamber lacks
connectivity for today’s media. In sum, this equipment is due for replacement.
Z Systems of St. Louis Park, MN is pleased to present this engineering proposal, per the
request of the City of Lino Lakes, for the design of a new live production, recording, and
presentation system within the council chambers.
Our Mission
Z Systems is committed to providing the highest level of service and support to its clients.
This is accomplished via superior technical expertise, “no excuses” customer service, best-
of-class products, and an unwavering obligation to treat our customers in a fair and equitable
manner.
Scope of Engagement
Z Systems will partner with the City of Lino Lakes to design the following:
City Council Chambers
- A four-camera (plus a document camera), high-definition (HD) production and
recording system to replace the existing standard-definition system.
City of Lino Lakes – Z Systems Technical Service Contract
February 20, 2017
2
- A revamped presentation podium with a dedicated computer that has the ability to
display content from thumb drives, hard-copy documents, the Internet, Microsoft
PowerPoint, Word, and similar programs. Exploring integrating into the chamber
laptop a software "telestrator" so that presenters can “draw” on the screen.
- Replacing the current wall-mounted monitors with HD monitors, approximately
65" measured diagonally, to display computer presentations, videos, and other
images.
- A system of larger monitors for use by council members and staff who sit at the
dais. These new monitors would be large enough to allow two people to
comfortably use one monitor.
- A new microphone system with significantly improved fidelity.
Key Engineering Steps
- Z Systems will create a concept of the new design.
- This concept will be presented to City of Lino Lakes staff in person using
drawings and information on key equipment pieces, including cameras and
control room gear. The client will determine whether that concept, in principle,
fulfills all design requirements.
- Revisions to this concept will be made as necessary.
- The revised concept will be presented to City staff.
- Following approval, detailed drawings will be prepared depicting the layout of
gear in the master control room, as well as drawings of all pieces of the system
and how they connect.
Key Design Requirements
- Simplified design
- Four all-in-one robotic cameras
- A document camera
- A laptop connection station
- File-based and DVD program recording
- Current monitor technology in the council desk and mounted from the ceiling or
walls for public viewing of computer presentations
- Improved microphone quality and reliability
- Ability to send recorded files to an archive server for up to 90 days of storage
Key Deliverables
- 1. Engineering drawings to include the following:
City of Lino Lakes – Z Systems Technical Service Contract
February 20, 2017
3
o Master Control sketch(es) showing the relative location of equipment in
racks, on work surfaces and mounted to the wall.
o A diagram of new audio, video and control system connections and all
model numbers and configuration options.
- 2. Documents describing how audio, video and equipment control signals flow
between all equipment.
- 3. Detailed lists of the equipment shown in the drawings including manufacturer,
model number, and quantity.
- 4. Detailed installation proposal with a formal description of the system, and the
installation labor, as well as equipment, labor and materials costs.
Cost
Consulting, design, and engineering services: $7,975
Schedule
Depending on our production schedule, we should be able to start work on this project within
three weeks of contract signing.
Billing and Payment Terms
50% down payment, preferably with the signed contract, but prior to starting this
project is required. Upon successful completion, an invoice for the balance will be
submitted with Net 15 day terms. Any applicable sales taxes will be added to the
final invoice.
Approvals
City of Lino Lakes Z Systems
Lino Lakes City Hall 3724 Oregon Avenue South
600 Town Center Parkway St. Louis Park, MN 55426
Lino Lakes, MN 55014 Z Systems, inc.
By: By:
Name: Name:
Title: Title:
Date: Date:
WS – Item 4
WORK SESSION STAFF REPORT
Work Session Item No. 4
Date: March 6, 2017
To: City Council
From: Michael Grochala, Community Development Director
Re: 2040 Comprehensive Plan RFP’s
Background
At the February 6, 2017 work session the City Council directed staff to prepare a Request for
Proposal (RFP) the planning profession services to assist with the Comprehensive Plan update.
WSB and Associates will be preparing the engineering and park related components of the plan.
The RFP was prepared and distributed to five (5) firms, selected by the staff, who have a strong
background and experience with Comprehensive Plan preparation. They are:
Short, Elliott, Hendrickson
SRF Consulting Group
Landform
Stantec
Hoisington Koegler Group Inc
The deadline for proposals is March 3, 2017. Staff will provide an update of the submittals
received at the work session.
Planning Process
While the final process will be refined with the selected consultant we are currently proposing to
use the existing advisory boards as the principal review groups. We are not proposing a separate
advisory panel as done with the 2030 update. We believe much of the 2030 plan is still relevant
and we will concentrate on updates and refinements in this round. The Planning & Zoning
Board, as the City’s “Planning Agency”, will be the principal reviewer. The Environmental
Board, Park Board and EDAC will have review opportunities during the project to draw upon
their areas of expertise. The City Council will be updated monthly at work sessions during the
course of the project. Public outreach will involve both workshops, newsletters, online surveys
and use of social media.
Requested Council Direction
Staff would like to solicit council comments regarding the planning process.
Attachments
None.
WS – Item 5
WORK SESSION STAFF REPORT
Work Session Item No. 5
Date: March 6, 2017
To: City Council
From: Lisa Hogstad-Osterhues
Re: Annual Board Appointment
Background
An opening for the city’s Park Board has been advertised and 1 application has been
received.
Park Board – 1 seat, 1 applicant
Requested Council Direction
The council should determine the application review process:
1. Establish a date to interview new applicant – Kelly Jo McDonnell
(Application will be provided to council previous to the interview date if so decided.)
Item #7
Monthly Progress Report
March 6, 2017
Item Last Action Taken Staff Status
Digital Scanning Project 3/14/16 – Council approved transfer of
$15,000 from Contingency Fund for
scanning and indexing building plans
Julie Staff is in the process of hiring
another scanning operator.
The posting closes March 3rd.
White Bear Lake Restoration
Assn. v. Dept. of Natural
Resources (DNR)
8/25/16 – The NE Metro Water Summit
Group met to discuss a draft JPA that
would create a coalition of cities to work
together as one voice with regards to
water supply issues in the northeast metro
area.
Jeff The lawsuit is going to trial
starting March 6th
Legion Parking Lot 2/6/17 – The Council held a closed
meeting to discuss the Legion’s offer
Mike The Council rejected the
offer, holding firm to the
appraised value
Location of Veteran’s
Memorial
12/5/16 – The American Legion
expressed in a letter what its preferred
location was, although there was some
confusion about whether they meant
the undeveloped land at Legacy of
Woods Edge or in front of city hall
Mike
The mayor confirmed that
the Legion’s preferred site
was in front of city hall
Upgrade of HD
Audio/Visual Equipment
in Council Chambers and
Control Room
2/27/17 – Staff presented Technical
Services Contract from Z Systems for
consulting, design, and engineering
services
Jeff Z Systems will be present at
the March 6th work session
to discuss proposed
contract
Channel 16 Upgrade 10/4/16 – NMTV Operations
Committee agreed that the local
government channels needed more
attention
Jeff
Executive Director Heidi
Arnson will be present at
the March 6th work session
to provide an update
Updates are shown in italics.