Loading...
HomeMy WebLinkAbout2016-171 Council ResolutionCITY OF LINO LAKES RESOLUTION NO. 16-171 RESOLUTION APPROVING LED RETROFIT PROJECT FOR CIVIC COMPLEX WHEREAS, The Lino Lakes Public Services Department is requesting City Council approval to convert all interior lighting fixtures at the Civic Complex, excluding the Council Chambers, from fluorescent lighting to LED (Light -emitting diode) lighting; and WHEREAS, There are many advantages of LED vs. fluorescent lighting including more energy efficient, longer lifetime, less maintenance, more durable, excellent color rendering, and more environmentally friendly; and WHEREAS, The project quote prepared by Meridian Energy Products is $33,736. X -Cel Energy is providing $10,236 in rebates, resulting in a net total project cost of $23,500; and WHEREAS, Funding is available from the Building Facilities Fund. With estimated annual energy savings of $7,057, the projected pay back is 34 months. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Lino Lakes that the Public Services Director is authorized to enter into an agreement with Meridian Energy Products for the LED Retrofit Project for the Civic Complex. Adopted by the Lino Lakes City Council this 12" day of December 2016. The motion for the adoption of the foregoing resolution was introduced by Council Member Manthey and was duly seconded by Council Member Kustermarnd upon vote being taken thereon, the following voted in favor thereof: Manthey, Kusterman, Rafferty, Maher, Reinert The following voted against same: none ATTEST: ,V eBartell, City lerk CITY COUNCIL AGENDA ITEM 5A STAFF ORIGINATOR: Rick DeGardner, Public Services Director MEETING DATE: December 12, 2016 TOPIC: Consider Resolution No. 16-171, Approving LED Retrofit Project for Civic Complex VOTE REQUIRED: 3/5 INTRODUCTION The Lino Lakes Public Services Department is requesting council approval to convert all interior lighting fixtures at the Civic Complex (City Hall, Police Department, New Creations), excluding the Council Chambers, from fluorescent lighting to LED (Light -emitting diode) lighting. BACKGROUND There are many advantages of LED lighting including: • More energy efficient - The low power consumption leads to significant energy savings, approximately $7,000 per year for the Civic Complex • Longer lifetime • Less maintenance • More durable - Made of solid material with no filament or tube or bulb to break • Excellent Color Rendering - Does not wash out colors like fluorescents • Environmentally friendly - Contains no mercury or other hazardous substances The project quote prepared by Meridian Energy Products is $33,736. X -Cel Energy is providing $10,236 in rebates, resulting in a net total project cost of $23,500. Funding is available from the Building Facilities Fund. With estimated annual energy savings of $7,057, the projected pay back is 34 months. RECOMMENDATION Staff recommends the Council approve Resolution No. 16-171, Approving the LED Retrofit Project for the Civic Complex. ATTACHMENTS Meridian Energy Products Project Analysis Sheet (Dated November 16, 2016) MERIDIAN PROJECT ESTIMATE FOR: Rick DeGardner Public Services Director City Hall, Lino Lakes 600 Town Center Pkwy Lino Lakes MN nteriar(f` 55014 Project Cost $33,736 ourcil Chambe PREPARED BY Jeff Rutz 6996 2nd Ave Lino Lakes MN 55014 (651) 792-5851 Annual Savings $7,100.00 NERGY PRODUCTS Date Estimate Only Valid for 30 Days FridgeWize Standard Terms and Conditions Apply 11/16/2016 Utility Incentive of: $10,236 Cost of Waiting $3,550.00 Every six months $250,000.00 $200,000.00 $150,000.00 1100,000.00 $50,000.00 — $0.00 Ten Year Analysis 1 2 Cost of Waiting 4 5 6 7 8 9 Invest in Efficiency (includes cost of new LED Lights) estimates based on the following from our conversation Lights Electric Rate KW Rate Utility incentive Old Wattage LED Wattage Installation By 754 $ 0.095 9.5 $10,235.82 73 19 Meridian Old Lighting Kw LED Kw Savings Old Lighting Annual KWh LED Annual KWh Savings 50.31 31.70 18.61 177,004.00 111,803.00 65,201.00 Old Lighting Annual Cost LED Annual Cost Annual Savings Investment Payback in Months Ten Year Simple ROI (Saving - Cost) / Cost Ten Year Cumulative Savings PROJECT FINANCING AVAILABLE $19,139.00 $12,082.00 $7,057.00 33.91 254% $59,652,54