RESOLUTION NO. 16-172
RESOLUTION APPROVING PUBLIC WORKS SPACE NEEDS ANALYSIS AND
EXISTING FACILITY AUDIT PROPOSAL
WHEREAS, The Lino Lakes Public Services Department is requesting City Council approval
to retain CNH Architects, Inc. to conduct a Public Works Space Needs Analysis and Existing
Facility Audit; and
WHEREAS, The Public Works Building (located at 1189 Main Street) was built in 1971 and
consists primarily of a mechanical area (for fleet and equipment repairs), break room, and office
space. Two sheds (built in 1971 and 2000) provide some storage for vehicles, equipment, and
supplies. A salt storage shed was built in 2013; and
WHEREAS, CNH Architects, Inc. will consider three approaches:
1 Renovate existing building and expand to meet future needs
2. Build a new facility at the existing site
3. Build a facility at the city property at Centerville Road and Birch Street
Topics including existing facility conditions, current and future space needs, growth potential for
each option, accessibility compliance, energy usage and potential for savings, long-term costs of
operation, and capital costs for remodeling/construction will be examined; and
�-- WHEREAS, Funding is available from the Building Facilities Fund.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Lino Lakes that
the Council accept the CNH Architects, Inc. proposal to conduct a Public Works Space Needs
Analysis and Existing Facility Audit for a fixed fee of $11,900 plus reimbursable expenses for
printing and mileage.
Adopted by the Lino Lakes City Council this 12th day of December 2016.
The motion for the adoption of the foregoing resolution was introduced by Council Member
Rafferty and was duly seconded by Council Member Maher and upon vote being
taken thereon, the following voted in favor thereof:
Rafferty, Maher, Manthey, Kusterman, Reinert
The following voted against same:
none
Jeff Reinert, a o
AT TEST:
CITY COUNCIL
AGENDA ITEM 5B
STAFF ORIGINATOR: Rick DeGardner, Public Services Director
MEETING DATE:
TOPIC: Consider Resolution No. 16-172, Approving Public Works Space
Needs Analysis and Existing Facility Audit Proposal
December 12, 2016
VOTE REQUIRED: 3/5
INTRODUCTION
The Lino Lakes Public Services Department is requesting City Council approval to retain CNH
Architects, Inc. to conduct a Public Works Space Needs Analysis and Existing Facility
Audit.
BACKGROUND
The Public Works Building (located at 1189 Main Street) was built in 1971 and consists primarily
of a mechanical area (for fleet and equipment repairs), break room, and office space. A 40' x
80'shed (also built in 1971) provides some storage for vehicles, equipment, and supplies. In 2000,
�.. a 60' x 80' shed was built to provide additional indoor storage. A salt storage shed was built in
2013.
CNH Architects, Inc. will consider three approaches:
1. Renovate existing building and expand to meet future needs
2. Build a new facility at the existing site
3. Build a facility at the city property at Centerville Road and Birch Street
Topics including existing facility conditions, current and future space needs, growth potential for
each option, accessibility compliance, energy usage and potential for savings, long-term costs of
operation, and capital costs for remodeling/construction will be examined.
Mr. Quinn Hutson, Principal Architect with CNH Architects, Inc. will lead and coordinate all
members of the design team and be the primary contact throughout the project. He brings
extensive experience with city projects, numerous reviews of client and facility needs, and
familiarity with the City and staff from past projects with the City of Lino Lakes.
RECOMMENDATION
Staff recommends the Council accept the CNH Architects, Inc. proposal to conduct a Public
Works Space Needs Analysis and Existing Facility Audit for a fixed fee of $11,900 plus
reimbursable expenses for printing and mileage.
ATTACHMENTS
Resolution No. 16-172
Public Works Space Needs Analysis and Existing Facility Audit (Dated Sep. 23, 2016).
PROPOSAL'
CITY OF LINO LA
PUBLIC WORKS
AND EXISTING F
QUINN S. HUTSON, AIA
PRINCIPAL ARCHITECT
CNH ARCHITECTS
7300 WEST 147TH STREET.
SUITE 504
APPLE VALLEY, MN55124
• PHONE 952-451441)..-i-
www.cnharch.com
SEPTEMBER 23 2416'
16088
September 23, 2016
City of lino Lakes
600 Town Center Pkwy.
Lino Lakes, MN 55014
Re: Public Works Space Needs Analysis and Existing Facility Audit
On behalf of CNH Architects, our consulting engineers and estimator, thank you for considering our Proposal to provide Facility Space Needs
Analysis services for the City of Lino Lakes.
The project team presented in this proposal has worked together for many years on City, County, and State projects in the State of Minnesota.
Our architectural/engineering team has a common goal to provide quality design services and to be at the forefront of utilizing sustainable building
methodologies. We understand the need for an organized process from the first meeting through completion of this study, with clear and detailed
documentation along the way.
CNH Architects has worked with the City of Lino Lakes as well as numerous municipalities throughout the Twin Cities metropolitan area to provide
assessment services, reviewing current conditions of many existing governmental facilities and identifying immediate as well as future growth
needs. We communicate closely with our engineers and cost estimator so that our observations are shared and comprehensive, while keeping
a holistic approach on the entire project so that the overall building performance and client vision is considered when individual components and
systems are under analysis. Details can impact both short and long term effects on cost, maintenance and occupant use, and as a design team we
are attentive to these implications at every scale.
We look forward to serving the City of Lino Lakes and together evaluate the facility needs of the Public Works Department now and into the future.
Respectfully submitted,
Quinn S. Huston, AEA, LEED AP
Principal
CNH Architects, Inc.
CNH Architects, Inc.
7300 West 147th Street Suite 504 Apple Valley, MN 55124 Phone 952-4314433 www.cnharch.com
PROJECT TEAM'
Our Team for your project consists of Architects, Mechanical / Electrical Engineers and Cost
Estimator. It is our intention to maintain a consistent team of the principal architect and engineers
presented in this proposal from the first meeting through completion of the study. By doing this,
we will provide continuity of information, communications and understanding of the city's goals
as the study progresses. This team will be supported by staff architects, designers and engineers
as needed for the workflow and timeline developed in coordination with City staff.
Principal Architect, Quinn Hutson, will lead and coordinate all members of the design team and
be the primary contact throughout the project. He brings extensive experience with city projects,
numerous reviews of client and facility needs, and familiarity with the City and staff from past
projects with the City of Lino Lakes.
Architect of Record
CNH Architects, Inc.
7300 W. 147th Street, Suite 504
Apple Valley, MN 55124-7580
952-431-4433
Project Architect: Quinn S. Hutson, AIA, LEED AP
Mechanical/Electrical Engineers
Engineering Design Initiative, Ltd. (edi)
1112 Fifth Street North
Minneapolis, MN 55411
612-343-5965
Mechanical Engineer Larry Svitak, PE
Electrical Engineer. Jay S. Hruby, PE
Cost Estimator
Professional Project Management (PPM)
1858 East Shore Drive
Maplewood, MN 55109
651-776-5590
Cost Estimator. Doug Holmberg
CITY OF LINO LAKES PUBLIC WORKS SPACE NEEDS ANALYSIS MND. EXISTING FACILITY AUDIT
2
PROJECT APPROACH
PROJECT NEEDS ASSESSMENT
In order to put together a comprehensive assessment that addresses issues thoroughly and
makes sound recommendations going forward, CNH Architects will collect information about
the existing facilities as exhaustively as possible. Our team will interview appropriate City Staff
to understand both their current needs as well as future operational changes and anticipated
growth areas. We will compare these areas to other similar cities, providing not only relational
size comparisons but interjecting potential issues that may not have been considered. To create
accountability and clarity in our investigation, we make it a priority to gather initial information
with rigor such that assumptions are minimal, collaborating closely with our engineers to pinpoint
existing and potential issues that may or may not already be identified. In this process, owner and
facility management involvement is critical, particularly in revealing and weighing components
that contribute towards small and large scale building performance and longevity.
ACCESSIBILITY AND CODE COMPLIANCE
Many existing buildings are not up to code with building codes and accessibility requirements.
We have extensive experience working with code and ADA guidelines, including recent projects
completed with the State of Minnesota in upgrading all restrooms in their 4 -story, 78,000 sf
administrative building on the Capitol grounds, plus the unique security and accessibility issues
of the Dakota County LEC 8100 Cell Block remodeling. These aspects of a project can easily
become a costly component, and our familiarity with many issues related to accessibility
upgrades can lead to efficient and proactive solutions.
MAINTENANCE & LONGEVITY
Durable materials, equipment and finishes are considered for longevity when providing
recommendations in the assessment report, and consideration will be taken to balance initial
construction cost versus cost over the life of the product and its implications on the rest of the
structure if any. We would present a list of options, innovative ways to keep cost at a minimum,
and review the pros and cons of each option to best achieve identified project goals.
Buildings inevitably deteriorate and require periodic maintenance. While keeping safety and
durability of paramount importance, the Project Team is prepared to recommend options that
help reduce maintenance costs and create an environment where building upkeep is simple and
straightforward.
CITY OF LINO LAKES PUBLIC WORKS SPACE NEEDS ANALYSIS AND EXISTING FACIUTY AUDIT
3
A'
i
PROJECT APPROACH
SUSTAINABILITY
The Project Team will provide recommendations for sustainable opportunities in the existing
city public works campus as well as any future facilities or sites. CNH has many years of green
building experience, with several awarded projects listed in our firm portfolio. We just recently
assisted the City of Roseville in utilizing the excess heat generated by the Ice Arena on their city
campus to fully heat the new Fire Station we designed for them, providing significant energy cost
savings. Creative approaches such as this will be evaluated for Lino Lakes, including initial cost
and payback analysis to assist you in making informed choices that best fit the goals and values
of the City.
OPTION ANALYSIS
After gathering all the information on space needs, evaluated the existing public works campus,
and developed future needs based on expected growth; CNH will review three approaches for the
City of Lino Lakes to meet their Public Works needs. These will include:
Option 1— Renovate the existing building and expand to meet future needs.
Option 2 — Build an all new facility at the existing west site to provide long-term value.
Option 3 — Build an all new facility at the city property at Birch Street and Centerville
Road leaving some appropriate elements at the existing west site.
The study will review each of the above options, analyzing and listing comparative data on each
option in order to provide the City of Lino Lakes with the tools to make an informed decision on
the future of the Public Works department facilities. Among others, the review of each option will
include the following topics:
• Space needs — current and future
• Growth potential for each option
• Existing facility conditions
• Deferred and short-term maintenance
• Building code / OSHA compliance
• Accessibility compliance
• Energy usage and potential for savings
• Long-term costs of operation
• Capital costs for construction / remodeling proposed
• Site location relative to population and infrastructure
CITY OF LINO LAKES PUBLIC WORKS SPACE NEEDS ANALYSIS AND EXISTING FACILITY AUDIT
4
FIRM BACKGROUND
EXECUTIVE SUMMARY
CNN Architects is a full-service architectural firm providing architectural design, engineering,
interior planning and landscape architecture for corporate, commercial, manufacturing, and
recreational facility owners as well as government agencies. The Principals, Wayne Hilbert and
Quinn Hutson, are directly responsible for all design work.
CNN Architects has a staff with advanced training and certification in several areas including
Certified interior Designers, Certified Construction Specifier, LEED Accredited Professionals,
NCARB certification, Construction Document Technologist, and Green Globe Professional.
With an efficient project team and over 50 years of experience, CNH Architects has a strong
reputation for well thought-out design plans and personal attention to client requirements. CNH
stresses strong design, quality contract documents, close communications with clients, and an
intense field review and follow-up program. We are organized to assume full, single source
responsibility for a thoroughly integrated and cost effective service. From a projects beginning,
program, budget, and schedule are established, and a team of experts is assembled under the
principal and project manager to assure that elements are addressed, questions answered, and
the design and construction process is fully coordinated. A growing list of satisfied and repeat
clients is testimony to the discipline and persistence of an organization that will not settle for
partial success.
Over the last several years, CNH Architects has worked on construction projects which total
between 20 - 30 million dollars annually. Our projects have varied including city, county, and state
work, along with church and private sector clients.
COMPOSITION OF FIRM
Licensed Architects 5
Designers 5
Administrative Support 2
Sustainable design is an integral part of our practice. A majority of our professional staff has
LEED Accreditation and our office designed the first Green Globe projects in Minnesota. This is
a third party national verification system as administered by the Green Building Initiative,
CITY OF LINO LAKES PUBLIC WORKS SPACE NEEDS ANALYSIS AND EXISTING FACIJTY AUDIT
Ikfgltli(is
5
PROJECTS
,>'ni.N0.r31 ED
^ed Ain. P011�Emvr Rv®nm . - ♦�
XNeendgm.CNRm MSLNIW C,ew ED
EAGAN CITY HALL AND POLICE DEPARTMENT ADDITION AND REMODEL
EAGAN, MN
After over 25 years of use without significant remodeling, the City of Eagan found that the
growth of the staff both in administration and the police department was stretching their facility
past its ability to meet the current needs. CNN Architects did a comprehensive review of all
staffing departments and operations and, along with city staff, developed a space needs
analysis identifying both under-utilized space as well as significant shortfalls inoperational space
standards. In addition, the building condition was reviewed to determine elements that were
either failing or reaching their expected usable life.
From this space needs study, CNH developed multiple options for addressing the needs
identified in both City Hall and Police Department portions of the building. With staff input, these
options were then modified to best meet operational flows, space needs, efficiency, and budget.
A detailed construction cost was then determined and the project budget was set.
The city is completing the financial planning for this addition and remodeling project which will
then move into the construction document and actual construction phases in the near future.
Project Architect Quinn Hutson, CNN Architects
Reference Dave Osberg, City Administrator, 651-675-5000
POUICESPACE SUMMARY
First Floor
Addition.
Remodel
Enclosed Vehicle Garage :.'.
45 squad WW1 :..
24,30033'
From Lobby/Sally Port- increase Security
210 SF
Renovate Evidence intake lab and Evidence Storage
36050
Renovate Man's and Women's Locker Rooms
2,2003F
Relocate Tactical Team Room / Renovate Garage g2
3353F
Enlarge Computer Forensics OFfue Area
BO SF
Reduce Number O'Hiddln5 Cells to increase Storage
400 SF
Sub -Total first Floor
::::`i.: 14.3000E
3,525 SF
Second Floor
Addition
Remodel
Felice Office Expansion
3,495 5F
Add ;new tiga6om Meeting Room
30050
Rer0341, Records Storage Arca
37050
Enlarge bilging Conference Room
1,00050
Add 2 Administrative Offices at existing Brook Room
403 SF
Sub -Total Second Floor 3405 SF 10025
Total Proposed Polus Space '17,7g55f{ .5.035 SF
vaaeaStPeamecr
a+n. an.ira 5rp5d05ora
New 11Wilna0iSIOe
Garage M10Nn ::..
13
Wane New
o
Pa,lavl-a
5;555.3,
E500 CanwutHNm
Vsteat aP05xt/RYWx
...on 6a.nan 5nada,g
SWAM
nuttier,' Mkt awatation
1310000
Sword new Fine nmox0an
1305,00
1 s.iatnx Olrxdlaananden
0110000
Pm 0.40 tie bons.,
4.CM Fumexrt ar wand,.
mar an,R00toe Don
$045,000
S,,mw roma,, st 1nd f her Poke
/0000;5550,60
65000100 Comm aro
1ryayme0
1150400
Swam
SEbiaRl
Taal lMiatNvon ineavdl
lot adapimhwnar10050
30.350000
000
CITY OF IJNO LAKES PUBLIC WORKS SPACE NEEDS ANALYSIS AND EXISTING FACILITY AUDIT
6
EP Station root
NAM.' 1•111=t2142
*am, •Iilyttantslaslaebalte
PROJECTS
BUILDING.ASSESSMENTS ..(CNH _Architects)
CITY OF BLOOMINGTON, MN
CNH Architects is hired by the City of Bloomington to provide ongoing architectural consulting
on design and maintenance projects. These projects have involved studies, design options,
maintenance recommendations, and aesthetic opinions. Along with our consulting engineers
and designers, our services to date have included:
• Improving locker room drainage at a pool facility.
• Developing new site design options for street turning lanes and municipal center complex.
• Studying material upgrades for a Senior Center.
• Finish replacement options for public lobby at City Hall.
• Acoustical study and design for private offices, conference room, and performance studio
at public works and performing arts areas.
• Pistol range storage options study.
Office area remodeling to accommodate additional staff.
BISHOP HENRY WHiPPLE FEDERAL BUILDING (EDI)
FORT SNELLING, MN
Engineering Design Initiative completed a comprehensive feasibility study for the Bishop
Henry Whipple Federal Building located in Fort Snelling, MN. Facility sustainability and energy
efficiency were the primary focus of the study. The existing mechanical, electrical and plumbing
(MEP) systems serving the building are very inefficient, have greatly exceeded their normal
operating lifetimes and have become increasingly problematic. Asbestos containing materials
(ACM) are also a major concern.
EDI identified four facility alternatives ranging from refurbishing and replacing selected MEP
equipment to complete ACM abatement and facility renovation. The study included conceptual
design, construction cost estimating, tenant relocation planning, sustainability concepts and life
cycle cost analysis. Based on the study results, the US General Services Administration has
implemented a program to completely renovate the building so that it can continue to serve the
regional offices of the Federal Government well into the future.
CITY OF EAGAN FIRE STATION #4 - FACILITY STUDY (CNH Architects)
EAGAN, MN
CNH Architects provided a complete facility assessment of existing Fire Station #4 for the City of
Eagan. This study evaluated the existing condition of fire station exterior envelope and all interior
elements to determine their life expectancy and repair costs. The facility was also reviewed for
ADA accessibility, identifying deficiencies and recommended upgrades. In addition, the facility
was evaluated for function, current staff and equipment needs, and finally fire fighter safety,
From this review, CNH developed a list of recommended remodeling elements and an expansion
to better fit the current apparatus and to expand gear locker clearance to meet NFPA safety
standards.
After identifying the facility's maintenance, accessibility, function and safety deficiencies, CNH
Architects provided preliminary design of measures to address the existing concerns, Once these
project goals were determined, an itemized cost estimate was developed for the maintenance,
remodeling and expansion project. Finally, CNH worked along with the city staff to develop a
written report and digital presentation to present this information to the City Council.
CITY OF LINO LAKES PUBLIC WORKS SPACE NEEDS ANALYSIS AND EXISTING FACIUTY AUDIT
7
RESUMES
Quinn S. Hutson, AIA, LEED AP
Principal Architect
CNH Architects
As principal in the firm, Quinn's responsibilities cover all facets of architectural design, design
development and construction document preparation. Individual project tasks include:
client need assessment, alternative concept development, design/construction document
preparation, building material and finish selection, cost estimating, code compliance
verification and approval assurance. In addition to over 30 years with CNH Architects,
Quinn's background includes many years of construction experience and annual continuing
education to bring current construction knowledge to all of his projects.
Years of Experience: 30
Education: Bachelor of Architecture, University of Minnesota
Registration: Professional Architect, Minnesota; Minnesota State Architecture Registration No.
21234; Certified Interior Designer, Minnesota; LEED Accredited Professional
Affiliations: Rotary International, past President Eagan Rotary; Eagan Rotary Foundation, past
Chair; American institute of Architects; Firm Membership in the US Green Building Council
Facility Assessments
City of Eagan City Hall ! Police Department- Facility Assessment and Needs Analysis Masterplan
City of Eagan Fire Station #4 - Facility Assessment and Upgrade Study
City of Rosemount Steeple Center (Former St. Joseph's Church) - Facility & Accessibility Study
360 Communities - Facility Assessment & Maintenance Budget Report
Dakota County - Rooftop Fall Protection Study (32 buildings)
Dakota County LEC - 8100 Cell Block Renovation
Other Relevant Projects
ABLE Fire Training Center - Burnsville, MN
B. Robert Lewis House Renovation - Eagan, MN
City of Apple Valley, MN
Apple Valley Liquor Store #1 & #2
Police Facility
City of Eagan, MN
City Hall Community Room
Fire Station #2 Remodel
Fire Station #3 Remodel
City of Rosemount, MN
Community Center Arena Wall
Community Center Banquet Upgrades
Steeple Center Renovations
City of Roseville Fire Station - Roseville, MN
Dakota County, MN
Community Development Agency- Eagan
Courtroom Build -Out - Hastings
Judicial Center- Hastings
Judicial Center Addition & Remodel
Law Enforcement Center - Hastings
Independent School District 192 - Farmington, MN
ECSE Program
Farmington High School MMI Renovation
Special Education
Superintendent Office
Independent School District 196 - Rosemount!
Apple Valley/Eagan, MN
Apple Valley High School Baseball Field
Eastview High School Mechanical Catwalk
ISD 196 Pathways, Apple Valley Commons II
ISD 196 Transition Plus, Apple Valley
Commons II
Rosemount High School Theater Light Access
Transportation Building
Metropolitan Council Regional Maintenance
Facility Addition/Remodel - Eagan, MN
Metropolitan Mosquito Control District Division
Headquarters - Scott, Carver, Anoka, &
Dakota Counties
Minnesota Department of Transportation (MnDOT)
District Facility - Detroit Lakes, MN
Straight River Wayside Rest- Owatonna, MN
CITY OF LINO LAKES PUBLIC WORKS SPACE NEEDS ANALYSIS AND EXISTING. FACILITY AUDIT
RESU
ES
Timothy M. Nielsen, LEED AP BD+C
Architect
CNH Architects
Mr. Nielsen has participated in numerous projects requiring the assessment of existing building
components and systems. Examples of this experience include renovation and repair
projects for municipal/government facilities as well as historic preservation projects that have
required a full assessment and analysis of all building components and systems to determine
their appropriateness and cost effectiveness for reuse.
Years of Experience: 20
Education: Master of Architecture, University of Kansas; Bachelor of Science in Architectural
Studies, University of Nebraska
Registration: Professional Architect, Minnesota; NCARB Certificate; Certified Building Official
(CBO), State of Minnesota; LEED AP BD+C
Affiliations: Competent Toastmaster (CTM), Toastmasters lnt'l; Member, National Trust for
Historic Preservation
Facility Assessments
City of Eagan City Hall ! Police Department- Facility Assessment and Needs Analysis Masterplan
Dakota County LEC - 8100 Cell Block Renovation
Hennepin County*- multiple facilities
Minnesota Air National Guard*
Reroofing and exterior renovation projects
Hotel Kaddatz - Fergus Falls, MN*
Historic building renovation / repairs for adaptive reuse
North Branch Library - Minneapolis, MN*
Historic building renovation / repairs for adaptive reuse
Flour Exchange Building - Minneapolis, MN*
Historic building exterior repairs
Other Relevant Projects
Department of Administration, State of Minnesota
Water Intrusion Repairs - Judicial Center
Exterior Paver Replacement - Judicial Center
Buerkle Acura - White Bear Lake, MN
Dakota County Western Service Center Public Health Remodel - Apple Valley, MN
Metropolitan Mosquito Control District -Plymouth, MN
* denotes projects completed with other firms
CITY OF LINO LAKES PUBLIC WORKS SPACE NEEDS ANALYSIS AND EXISi1ND FACILITY AUDIT
9
PROJECT TEA
Larry Svitak, PE
Principal, Engineering Design Initiative, Ltd.
- Mechanical Engineer
Larry has been involved in the design, construction administration, and project management
of a variety of HVAC systems for over 12 years. Throughout that time Larry has earned the
respect of his colleagues and clients through his hard work, attention to detail, and his great
skills in communicating the complexities of HVAC systems to his customers. These skills
stem not only from his technical grasp of HVAC systems, but from the practical experiences
he gained in his first career as an Owner of an HVAC sheet metal firm.
Years of Experience: 30
Registration: Registered Professional Engineer in Minnesota, South Dakota and Wiscansin.
Minnesota Registration No. 25091
Affiliations: American Society of Heating, Refrigeration, and Air Conditioning Engineers;
American Society of Plumbing Engineers; Firm Membership in the Consulting Engineering
Council; Firm Membership in the U.S. Green Building Council
Select Projects:
Aitkin County Public Works Building - Aitkin, MN
Anoka County Public Safety Campus Facility Analysis - Andover, MN (Minnesota B3)
City of Eagan
Fire Station #1
Fire Station #4
City of Minneapolis, MN
Building Automation System Installation in 13 Fire Stations
Paving Lab Study, Hiawatha Site
Water Works Fridley Maintenance Facility (63) - Fridley, MN
Crow Wing County Highway Department, Brainerd Complex - Brainerd, MN
Dakota County LEC 8100 Block - Hastings, MN
Lino Lakes Fire Station - Lino Lakes, MN
Lower St, Croix Valley Fire Station - Lakeland, MN
LSS Data System Assessment -Minnetonka, MN
MCF Rush City Property Space Renovation - Rush City, MN
Metro Transit Overhaul Office Remodel - St, Paul, MN
MnDOT
District Facility - Detroit Lakes, MN
Storage Facility - Maplewood, MN
Safety Rest Area Energy Upgrades - New Market, Heath Creek, Albert Lea, and Straight River, MN
Mora Police Facility Study & Schematic Design - Mora, MN
Morrison County - Little Falls, MN
Jail Expansion
Public Works, Landfill Site
Public Works, River Site
Nobles County Public Works Building - Worthington, MN
Roseville Fire Station -Roseville, MN
Sherburne County - Zimmerman, MN
Maintenance Facility
Public Safety Building
Staples City Garage - Staples, MN
CITY OF LINO LAKES PUBLIC WORKS SPACE NEEDS ANALYSIS AND EXISTING FACILITYAUDIT
10
PROJECT TEA
Jay S. Hruby, PE
Principal, Engineering Design Initiative, Ltd.
Electrical Engineer
Jay has committed a large percentage of his electrical engineering career to the promotion
of energy conservation and sustainability within his designs of commercial, industrial,
educational and correctional buildings. Nearly all of Jay's recent projects have incorporated
technologies that allow the buildings to exceed current energy code. Jay has teamed with
utilities, environmental groups and energy conservation organizations to provide owners
with sustainable buildings that meet the owner's performance goals, Jay has been involved
in forensic engineering and commissioning of an array of electrical and communication
systems.
Years of Experience: 19
Registration: Registered Professional Engineer in Minnesota, Iowa, Wisconsin, North Dakota
and Illinois
Minnesota Registration No. 40290
Affiliations: Institute of Electric and Electronics Engineers; Consulting Engineering Council of
Minnesota; Firm Membership in the U.S. Green Building Council
Select Projects:
Beltrami County Highway Department Study - Bemidji, MN
City of Eagan
Fire Station #1
Fire Station #4
City of Minneapolis, MN
2710 Pacific Ave, Maintenance Facility Remodel
60th & Harriet Maintenance Facility Remodel
Hiawatha Maintenance facility (LEED Project)
Paving Lab Study, Hiawatha Site
Royalston Maintenance Facility Fire Alami Commissioning
Water Works Maintenance Facility, Fridley (MN - 83)
City of Staples Maintenance Facility - Staples, MN
Crow Wing County - Brainerd, MN
Highway Department, Brainerd Complex
Maintenance Facility
Dakota County Empire Transportation Facility Remodel - Apple Valley, MN
Heartland Express Transportation Maintenance Facility - Luverne, MN
Lino Lakes Fire Station - Lino Lakes, MN
Metro Transit
Mall of America Transit Station Remodel — Bloomington, MN
Mall of America Transit Shelter — Bloomington, MN
725 Building Addition & Remodel — Minneapolis, MN
Reuter Facility Remodel & Addition —Brooklyn Center, MN
Transit Overhaul Office Remodel - St. Paul, MN
Metropolitan Mosquito Control District Maintenance Facility (MN - B3) - Anoka, MN
Minneapolis Schools Transportation Remodel - Minneapolis, MN
MnDOT
Equipment Storage Building Renovation — Maplewood, MN
Safety Rest Areas Remodel & Energy Upgrades
Mara Police Facility Study & Schematic Design - Mora, MN
Morrison County - Little falls, MN
Maintenance Facility
Public Works, Landfill Site
Public Works, River Site
Northstar Corridor LRT Terminal Target Field Station - Minneapolis, MN
Pine County Public Works - Sandstone, MN
Roseville Fire Station - Roseville, MN
Staples City Garage - Staples, MN
CITY OF LiNO LAKES PUBLIC WORKS SPACE NEEDS ANALYSIS AND EXISTING FACILITY AUDIT
11
PROJECT TEAT
Doug Holmberg, PE
s President, Professional Project Management (PPM)
xt ' LA Cost Estimator
Years of Experience: 37
Registration: Registered Professional Civil Engineer
Select Projects:
88th RRC Tenant Build -Out - Arden Hills, MN
Apple Valley City Hall - Apple Valley, MN
Apple Valley Fire Station 412- Apple Valley, MN
Apple Valley Fire Station #3 - Apple Valley, MN
Army National Guard Training and Community Center - Hutchinson, MN
Brainerd RTC Mechanical and Electrical Upgrades -(3 Buildings)—Brainerd;-MN
Bureau of Criminal Apprehension Office Build Out - St. Paul, MN
Capitol Complex Power House Electrical Upgrade - St. Paul, MN
Cedar Street National Guard Armory Renovation - St Paul, MN
CENTRO Latin Community Center - Minneapolis, MN
Chisago County Health and Human Services Building - North Branch, MN
City of Sterling Colliseum Remodel (City Hall & Police) - Sterling, IL
Command Operations facility - Camp Pendleton, CA
Dakota Communications Center - Empire, MN
Delano Fire Station - Delano, MN
Department of Labor. Job Corps Center Building 1 & 2 Renovation - Dayton, OH
Fergus Fails City Hall Improvements Fergus Falls, MN
Fern Hill Park Picnic Shelter -St. Louis Park, MN
Hennepin County Domestic Abuse Service Center - Minneapolis, MN
Hennepin County Probate Court Floor C-4 Remodel - Minneapolis, MN
Hennepin Parks Admin Headquarters Addition & Renovation - Plymouth, MN
Improve Old Shoot Range House, Range 130 - Camp Pendleton, CA
LaCrosse Transit Center -LaCrosse, WI
Lesueur County Front Entry Remodel - Lesueur County, MN
Metro Transit Canopy @ 7th Street (Typical Bay) - Minneapolis, MN
Metro Transit Expansion 24th Street Facility - Minneapolis, MN
Metro Transit Rail Support Facility - Minneapolis, MN
Metro Transit South Garage Landscape Cmprovements - St. Paul, MN
Metropolitan Council Regional Maintenance Facility Addition - Minneapolis, MN
Minneapolis City Hall / MBC MPOP Upgrades - Minneapolis, MN
Minnesota Valley Transit Authority (MVTA) Bus Garage Expansion - Eagan, MN
Minnesota Valley Transit Authority Office Consolidation - Burnsville, MN
MN National Guard Camp Ripley Remodel - Little Falls, MN
MN National Guard Flight Simulator Re -Roof- Minneapolis MN
MN National Guard Military Vehicle Storage Building - Olivia, MN
MN National Guard Roof Replacement - Northfield, MN
MN National Guard Roof Replacement - Olivia, MN
MnDOT District Headquarters - Detroit Lakes, MN
MOOT Maplewood Bridge Crew Building - St Paul, MN
MnDOT Truck Station - Maple Grove, MN
Neighborhood House / El Rio Vista Recreation Center - St. Paul, MN
Oakdale City Hall Remodel - Oakdale, MN
Olmsted County Human Services Center 2116 Building - Rochester, MN
Ramsey City Hall Meeting Room 1 Kitchenette Remodel - St. Paul, MN
Ramsey County License Bureau Remodel - St. Paul, MN
Rochester Bus Shelters - Rochester, MN
Sherburne County / City of Becker Public Works Facility - Becker, MN
Shoreview Community Center Addition & Renovation - Shoreview, MN
Shoreview Community Center Remodel - Shoreview, MN
Union Depot- St. Paul, MN
Wabasha Hi -Rise Exterior Modifications - St. Paul, MN
Wright County Remodel - Buffalo, MN
CITY OF LING LAKES PUBLIC WORKS SPACE NEEDS ANALYSIS AND EXISTING FACILIiYAUDIT
12
Minnesota Zoo Black Bear Exhibit
Valleywood Clubhouse
Apple Valley Liquor Store No. 3
ABLE Burn Building
DESIGN INNOVATION
CNH Architects address issues of concern and opportunity for our clients with creative and
innovative design solutions. Some of these design solutions are exemplified by the following
examples:
CUSTOMER EXPERIENCE
When designing the Minnesota Zoo's new Black Bear Exhibit there were numerous challenges:
the sloping site, exhibit safety, meeting the needs of the bears, fitting into the existing zoo's MN
Trail, and creating a great visitor experience. This last challenge, to create a great customer
experience, is a common issue with publicfacilities. For this exhibit, ourdesign involved minimizing
public view to caging and other institutional looking animal security features, while emphasizing
the natural looking materials. A rock wall is positioned to hide the bear doors leading into the
cage dens and creates a barrier to maintain the bears within their exhibit space. Landscaping
is used to hide security fencing while giving the exhibit a natural feel. A cave for the bears also
allows for an intimate viewing of sleeping bears, especially by the children that visit the exhibit.
Large windows in the viewing gallery, with heated rocks just in front, help to attract the bears to
a more visible viewing location. These and many other features increase the chances for visitors
to see the bears while not being distracted by functional aspects of the exhibit.
FLEXIBILITY
Designing flexibility into a project is more than just creating a large featureless space. In the case
of Valleywood Clubhouse, the facility was designed to accommodate a steady flow of golfers
during the golf season, full course tournament events, and special occasion events in both the
golf and non -golf seasons. To achieve this mix of activities and maintain the building footprint
within the client's budget, a strategy of flexible rooms was developed. The main event room
overlooks the 18th hole for a beautiful view of the course and the natural setting. It is sized to
appeal to both golfers and special event users. This room is also equipped with audio/visual
capabilities and has connections with an outdoor patio, bar serving window, commercial kitchen
and a casual bar seating area. The casual bar seating area can serve as an overflow event space
or accommodate a steady stream of golfers while another event is booked. The main entrance
lobby with fireplace is ideal for setting a casual tone for golfers and allows enough space for a
reception table for special events. All these rooms are nicely detailed and are equipped with
features that can be used by either golfers and/or special event guests.
ENERGY
Reducing energy costs to a third of similar retail operations gives a building owner a competitive
advantage. To achieve these savings, a comprehensive and innovative approach to building
design was required. One strategy for the free standing Apple Valley Liquor Store No. 3 was
to tie waste heat from the beverage coolers to a geothermal heat pump loop system that is
used to heat and cool the building. Along with this system, a well -insulated building also limits
the need for temperature adjustments. To further reduce energy consumption, efficient lighting
and building systems were used. By incorporating natural daylight, the need for artificial lighting
during daytime hours was reduced, and consequently the heat created by light fixtures. LED
lighting and other high efficiency light sources were used. Pay back on the energy systems
was calculated and verified by the owner at 6 to 7 years. This project is a Green Globe certified
project and achieved Energy Star certification after a full year of operation.
FIRST COSTS
This fire training tower combines both a training tower and a fire burn facility. With 14 training
rooms and participation from four communities, this facility reduces the need for multiple
facilities and expands the training capabilities for the local fire departments. Within the facility
sacrificial walls were used to allow protection of the permanent structural elements. Fires can do
tremendous damage to a facility and these sacrificial block walls will need to be replaced every
5 years or more, but the overall structure should last for generations. This sacrificial system was
selected in place of very expensive fire tile construction, saving the communities over $200,000
or more than 10 percent of the construction budget.
CITY OF LINO LAKES PUBLIC WORKS SPACE NEEDS ANALYSIS AND EXISTING FACIUJTYAUDIT
13
Valleywood Clubhouse - Three Green Globes
Apple Valley Liquor Store #3 - Two Green Globes
Apple Valley City Hall
SUSTAINABLE DESIGN
DESIGN OF SUSTAINABLE BUILDINGS
A majority of CNH Architects' architectural and intern staff are LEED Accredited Professionals
and designed the first two projects in Minnesota to be awarded a Green Globe certification.
Wayne Hilbert is a principal with CNH Architects and one of the first architects LEED accredited
and the first architect to receive certification as a Green Globe Professional in Minnesota.
CNH Architects, along with our design team, evaluate and develop sustainable strategies with
our clients. We are familiar with a variety of rating systems and have incorporated multiple
sustainable and high-performance strategies in our projects.
These projects not only highlight our energy strategies, but also include multiple approaches to:
Performance Management
Site and Water
Energy and Atmosphere
Indoor Environment Quality
Materials and Waste
ROSEVILLE FIRE STATION
With an existing Ice Arena on the city campus, the new Roseville Fire Station took advantage of
the economies and included the development of a campus geothermal loop system. The piping
loop harvests excess heat created in the process of freezing the ice sheet and distributes this
heat through the city campus to the new fire station building. This first phase of the campus
geothermal loop provides sufficient energy to fully heat the entire fire station building for only
the cost of circulating the fluid in the loop piping, with capacity to spare for other city buildings
on the campus.
APPLE VALLEY LIQUOR STORE #3
Completed in 2008, this project was the first project in Minnesota to receive a Green Globe
certification. The Green Building Initiative recognized this project with a "Two Globe" rating, and
the building is also Energy Star certified. Using a highly efficient geothermal heat pump system
and ventilation exchange allows this building to greatly reduce energy usage. The beer coolers
are also integrated into the geothermal system.
APPLE VALLEY CITY HALL
Using both Minnesota Sustainable Design Guide and LEED as outlines for design, this project
incorporates multiple sustainable strategies. Itis listed on the Minnesota Office of Environmental
Assistance website as an example of green architecture. It has also been published in American
City and County Magazine and The National League of Cities for its sustainable strategies.
APPLE VALLEY SENIOR CENTER - APPLE VALLEY, MN
Completed in 2009, this project was awarded Two Globes under the Green Globe rating system.
This facility uses a combination of daylight harvesting, heat pumps, ventilation air exchange and
in -floor radiant heating to provide comfort and reduce energy consumption.
VALLEYWOOD CLUBHOUSE - APPLE VALLEY, MN
First facility in Minnesota to earn Three Green Globes for new construction. Overlooking the
18thhole, this building combines energy efficiency with a contemporary design to create a very
successful event venue.
CITY OF LINO LAKES PUBLIC WORKS SPACE NEEDS ANALYSIS AND EXISTING FACILITY AUDIT
14
FEE PROPOSAL
The services for this study will result in a report document that will include the following study
elements and recommendations:
• Space needs
o Current and future growth
o Comparisons to similar cities
• Growth potential for each option
• Existing facility conditions
• Deferred and short-term maintenance
• Building code / OSHA compliance
• Accessibility compliance
• Site location relative to population and infrastructure
• Energy usage and potential for savings
• Long-term costs of operation
• Capital costs for construction / remodeling proposed
In addition to preparing the above study results, CNH Architects and our consultant team will
meet with staff as needed to gather the study information and review study drafts as well as
present study results to the City Council.
We propose the services indicated above for a fixed fee of $11,900, plus reimbursable expenses
for printing and mileage.
Thank you for the opportunity to provide this proposal and we look forward to working with the
City of Lino Lakes.
Accepted by:
Quinn S. Hutson, AIA, LEED AP
Principal Name
CNH Architects, Inc.
Title
Owner (Firm name)
CITY OF LINO LAKES PUBLIC WORKS SPACE NEEDS ANALYSIS AND EXISTING FACILITY AUDIT