HomeMy WebLinkAbout2017-043 Council ResolutionCITY OF LINO LAKES
RESOLUTION NO. 17-43
RESOLUTION ACCEPTING BIDS AND AWARDING A CONSTRUCTION CONTRACT
TO SUNRAM CONSTRUCTION INC., NORTHPOINTE PARK PROJECT
WHEREAS, the City Council approved plans and specifications and authorized the advertisement
for bids during the April 10, 2017 City Council meeting; and
WHEREAS, bids were received, opened and tabulated according to law, and the following bids
were received complying with the advertisement; and
CONTRACTOR
BASE BID
TOTAL
ALTERNATES
(1-6)
TOTAL BID
Sunram Construction Inc.
$239,973
$67,675
$307,648
WHEREAS, Sunram Construction, Inc. is the lowest responsible bidder; and
WHEREAS, the City Council finds that it would be in the best interests of the city to proceed with
the construction of NorthPointe Park to include the base bid as well as Alternates 3, 4, 5, and 6; and
WHEREAS, funding for this project is the Dedicated Parks Fund.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Lino Lakes:
1. The Mayor and Clerk are hereby authorized and directed to enter into a contract with
Sunram Construction, Inc., in the name of the City of Lino Lakes for the construction of the
NorthPointe Park Project according to the plans and specifications approved by the City
Council and on file in the office of the City Clerk.
2. The Mayor and Clerk are hereby authorized and directed to enter into a contract with
Sunram Construction, Inc., in the name of the City of Lino Lakes for the construction
services of the NorthPointe Park Project in the amount of $280,823 to include the base bid
as well as Alternates 3, 4, 5, and 6.
Adopted by the Council of the City of Lino Lakes this 22nd day of May, 2017.
The motion for the adoption of the foregoing resolution was introduced by Council Member
Rafferty and was duly seconded by Council Member Maher and upon
vote being taken thereon, the following voted in favor thereof:
Rafferty, Maher, Kusterman, Manthey,
The following voted against same:
none
ATTEST:
Julia e Bartell, City
Jeff Reinert, Mayer
WSB
Aliammak
May 10, 2017
Mr. Rick DeGardner
Director of Parks & Recreation
City of Lino Lakes
600 Town Hall Center Parkway
Lino Lakes, MN 55014
Re: NorthPointe Park Development
WSB Project No. 2988-25
Dear Mr. DeGardner:
701 Xenia Avenue South 1 Suite 300 1 Minneapolis, MN 55416 1 (763) 541-4800
Bids were received for the above -referenced project on May 10, 2017, and were opened and read aloud.
A total of one were received. The bid was checked for mathematical accuracy and tabulated, and there
are no errors made on the Proposal Form.
The bid tabulation indicates the low bidder as Sunram Construction, Inc., in the amount of $307,648.00
for Base Bid plus all Alternates, which overall was approximately 6% over the engineer's estimate.
WSB has worked with Sunram Construction on previous projects and would recommend that the City
consider this bid and award a contract to Sunram Construction, Inc. for $280,823.00 to include the base
bid and alternates 3 - 6 as detailed below:
Base Bid' $239,973
Alternate #3: Export unsuitable soils for court $15,400
Alternate #4: Import select granular borrow for court $21,700
Alternate #5: Remove & replace curb & gutter $1,500
Alternate #6: Remove and replace concrete walk $2,250
Total Contract Amount: $280,823.00
We also recommend setting aside a construction contingency of 10% of the construction budget to allow
or any unknowns on the site that may require change to the construction contract.
It has been a pleasure working with the City of Lino Lakes on this project and I look forward to seeing this
project move into construction. If you have any questions or concerns, please call me directly at (763)
231-4848.
Sincerely,
WSB & Associates, Inc.
Candace Amberg, RLA
Project Manager
Attachments: Bid Tabulation
of
Building a legacy — your legacy.
Equal Opportunity Employer 1 wsbeng.com
K:102988-250Wdmin\Construction Admin12988-25 LTR reccomenda0on 051017.docx
Opening Time: 10:00 a.m.
Opening Date: May 10, 2017
City of Lino Lakes
600 Town Center Parkway
Lino Lakes, MN 55014
BLD TABULATION
NORTHPOINTE PARK DEVELOPMENT PROJECT
WSB PROJECT NO. 2988-250
I hereby certify that this is an exact reproduction of bids received.
Landscape Architect: Candace Amberg
Northpointe Park Development
City of Lino Lakes, Minnesota
Page - 1 of 3
ESTIMATE
SUNRAM
CONSTRUCTION INC.
No.
Item Description
Quantity
Units
Unit Price Total Price
Unit Price Total Price
BASE BID SCHEDULE
1
GENERAL REMOVALS AND SITE WORK
1
LUMP SUM
512,46920 $12,469.20
$11,400.00 $11,400.00
MOBILIZATION & TRAFFIC CONTROL (NOT TO
EXCEED 5% OF PROJECT VALUE)
2
GENERAL EARTHWORKJSUBGRADE PREP
1
LUMP SUM
$50,000.00 $50,000.00
$20,800.00 $20,800.00
3
WATER
20
MGAL
$50.00 $1,000.00
$25.00 $500.00
4
IMPORT AND PLACE COMMON BORROW (LV)
1,800
CU YD
$8.00 $14,400.00
$21.50 $38,700.00
5
IMPORT AND PLACE SELECT GRANULAR BORROW
150
CU YD
$30.00 54,500.00
$26.60 $3,990.00
(CV)
6
GEOTEXTILE FABRIC TYPE V
700
SQ YD
$2.50 $1,750.00
$225 $1,575.00
UTILITIES
7
ELECTRICAL WORK
I
LUMP SUM
$16,000.00 $16,000.00
$13,260.00 $13,260.00
8
4" PERFORATED DRAINTIL,E IN ROCK TRENCH
670
LIN FT
$20.00 $13,400.00
$13.75 $9,212.50
9
4" NON -PERFORATED PVC PIPE
100
LIN FT
$20.00 $2,000.00
$1625 $1,625.00
10
CORE DRILL CONNECTION INTO TURF CB
1
LUMP SUM
$800.00 $80000
$850.00 $850.00
11
DRAINTILE CLEANOUT
13
EACH
$200.00 $2,600.00
$350.00 84,550.00
PAVEMENT AND SITE IMPROVEMENTS
12
BASKETBALL BITUMINOUS PAVING (RAP -FREE) WITH
AGGREGATE CLASS 5 BASE
406
SQ YD
$35.00 $14,210.00
$33.65 $13,661.90
Northpointe Park Development
City of Lino Lakes, Minnesota
Page - 1 of 3
Northpointe Park Development
City of Lino Lakes, Minnesota
Page - 2 of 3
ESTIMATE
SUNRAM
CONSTRUCTION INC.
No.
Item Description
Quantity
Units
Unit Price Total Price
Unit Price Total Price
13
8' WIDE BITUMINOUS TRAIL PAVING WITH
600
SQ YD
$32.00 $19,200.00
$23.65 $14,190.00
AGGREGATE CLASS 5 BASE
14
COURT COLOR COATING & LINE STRIPING
406
SQ YD
$7.00 $2,842.00
$10.85 $4,405.10
15
BASKETBALL COURT STANDARD
1
EACH
$4,500.00 $4,500.00
$4,000.00 $4,000.00
16
PICKLEBALL NET SYSTEM
1
EACH
$4,500.00 $4,500.00
$2.500.00 $2,500.00
17
CONCRETE PLAYGROUND CURB
350
LIN FT
$25.00 $8,750.00
$33.75 $11,812.50
18
4" THICK CONCRETE PAVEMENT OVER GRANULAR
520
SQ FT
$6.00 $3,120.00
$8.15 $4,238.00
BASE
19
6" THICK CONCRETE PAVEMENT W/THICKENED EDGE
1,500
SQ FT
$12.00 $18,000.00
$10.05 $15,075.00
OVER AGGREGATE BASE
20
SHELTER STRUCTURE W/FOOTINGS
1
EACH
$36,000.00 $36,000.00
$30,250.00 $30,250.00
LANDSCAPE & EROSION CONTROL
21
TYPE 1 TURF SEED
1.30
ACRE
$2,000.00 $2,600.00
$6,960.00 $9,048.00
22
SOD
16
SQ YD
$7.00 $112.00
$20.00 $320.00
23
EROSION CONTROL BLANKET
3,000
SQ YD
$2.00 $6,000.00.
$1.30 $3,900.00
24
2.5 INCH CAL B&B DECIDUOUS TREE
16
EACH
$500.00 $8,000.00
$500.00 88,000.00
25
1.5 INCH CAL B&B DECIDUOUS TREE
2
EACH
$350.00 $700.00
$440.00 $880.00
26
8 FOOT B&B CONIFEROUS TREE
4
EACH
$300.00 $1,200.00
$510.00 $2,040.00
27
25 -GALLON P011 ED TREE
8
EACH
$15000 $1,200.00
$255.00 $2,040.00
28
DEWATERING AND PERMIT
1
LUMP SUM
$5,000.00 $5,000.00
$850.00 $850.00
29
BIOROLL
500
LIN FT
$3.50 $1,750.00
$3.10 $1,550.00
30
HEAVY DUTY EROSION CONTROL SILT FENCING
1,500
LIN FF
$2.50 $3,750.00
$2.60 $3,900.00
31
ROCK CONSTRUCTION ENTRANCE DRIVE
1
LUMP SUM
$1,500.00 $1,500.00
$850.00 $850.00
Northpointe Park Development
City of Lino Lakes, Minnesota
Page - 2 of 3
Northpointe Park Development
City of Lino Lakes. Minnesota
Page - 3 of 3
ESTIMATE
SUNRAM
CONSTRUCTION INC.
No.
Item Description
Quantity
Units
Unit Price Total Price
Unit Price Total Price
TOTAL BASE BID: -
$261,853.20
$239,973.00
ALTERNATE BID SCHEDULE
A1
EXPORT UNSUITABLE SOILS FOR SHELTER PAD (LV)
400
CU YD
$10.00 $4,000.00
$22.00 $8,800.00
A2
IMPORT AND PLACE COMMON BORROW (CV)
400
CU YD
$10.00 $4,000.00
$31.00 $12,40000
A3
EXPORT UNSUITABLE SOILS FOR COURT (LV)
700
CU YD
$10.00 $7,000.00
$22.00 $15,400.00
A4
(IMPORT AND PLACE SELECT GRANULAR BORROW
700
CU YD
$10.00 $7,000.00
$31.00 $21,700.00
A5
REMOVE AND REPLACE CURB & GUTTER
30
LIN FT
$30.00 $900.00
$50.00 $1,500.00
A6
REMOVE AND REPLACE CONCRETE WALK
150
SQ FT
$10.00 $1,500.00
$15.00 $2,250.00
A7
HYDRAULIC SOIL STABILIZER
1
ACRE
$4,000.00 $4,000.00
$5,625.00 $5,625.00
TOTAL ALTERNATES:
$28,400.00
$67,675.00
TOAL BASE BID + ALTERNATES
$290,253.20
$307,648.00
Northpointe Park Development
City of Lino Lakes. Minnesota
Page - 3 of 3
CITY COUNCIL
AGENDA ITEM 5A
STAFF ORIGINATOR: Rick DeGardner, Public Services Director
MEETING DATE: May 22, 2017
TOPIC: Consider Resolution No. 17-43, Accepting Bids and Awarding a
Construction Contract to Sunram Construction Inc., NorthPointe
Park Project
VOTE REQUIRED: 3/5
INTRODUCTION
Staff is requesting council authorization to accept bids and award a construction contract to
Sunram Construction Inc., for the development of NorthPointe Park.
BACKGROUND
The City Council approved plans and specifications and authorized the advertisement for bids
during the April 10, 2017 City Council meeting. Fourteen Project Manuals were distributed.
The bid opening was conducted on Wednesday, May 10 at City Hall. One bid was received.
The bid was checked for mathematical accuracy and tabulated.
WSB Engineering has worked with Sunram Construction Inc., on previous projects and
recommends that the City award a contract to Sunram Construction Inc., for $280,823.00 to
include the base bid and Alternates 3-6. Funding for this project is the Dedicated Parks Fund.
RECOMMENDATION
Staff recommends adoption of Resolution No. 17-43, Accepting the Base Bid and Alternates
Numbers 3, 4, 5, and 6 resulting in awarding a Construction Contract in the amount of
$280,823.00 to Sunram Construction Inc., of Corcoran, MN.
Estimate
Sunram
Consruction
Base Bid
$261,853
$239,973
Alternate 1
$4,000
$8,800
Alternate 2
$4,000
$12,400
Alternate 3
$7,000
$15,400
Alternate 4
$7,000
$21,700
Alternate 5
$900
$1,500
Alternate 6
$1,500
$2,250
Alternate 7
$4,000
$5,625
Total Alternates
$28,400
$67,675
Base Bid + Total Alternates
$290,253
$307,648
WSB Engineering has worked with Sunram Construction Inc., on previous projects and
recommends that the City award a contract to Sunram Construction Inc., for $280,823.00 to
include the base bid and Alternates 3-6. Funding for this project is the Dedicated Parks Fund.
RECOMMENDATION
Staff recommends adoption of Resolution No. 17-43, Accepting the Base Bid and Alternates
Numbers 3, 4, 5, and 6 resulting in awarding a Construction Contract in the amount of
$280,823.00 to Sunram Construction Inc., of Corcoran, MN.
ATTACHMENTS
1. Resolution No. 17-43
2. NorthPointe Letter of Recommendation
3. Bid Tabulation