HomeMy WebLinkAbout2017-043 Council ResolutionCITY OF LINO LAKES RESOLUTION NO. 17-43 RESOLUTION ACCEPTING BIDS AND AWARDING A CONSTRUCTION CONTRACT TO SUNRAM CONSTRUCTION INC., NORTHPOINTE PARK PROJECT WHEREAS, the City Council approved plans and specifications and authorized the advertisement for bids during the April 10, 2017 City Council meeting; and WHEREAS, bids were received, opened and tabulated according to law, and the following bids were received complying with the advertisement; and CONTRACTOR BASE BID TOTAL ALTERNATES (1-6) TOTAL BID Sunram Construction Inc. $239,973 $67,675 $307,648 WHEREAS, Sunram Construction, Inc. is the lowest responsible bidder; and WHEREAS, the City Council finds that it would be in the best interests of the city to proceed with the construction of NorthPointe Park to include the base bid as well as Alternates 3, 4, 5, and 6; and WHEREAS, funding for this project is the Dedicated Parks Fund. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Lino Lakes: 1. The Mayor and Clerk are hereby authorized and directed to enter into a contract with Sunram Construction, Inc., in the name of the City of Lino Lakes for the construction of the NorthPointe Park Project according to the plans and specifications approved by the City Council and on file in the office of the City Clerk. 2. The Mayor and Clerk are hereby authorized and directed to enter into a contract with Sunram Construction, Inc., in the name of the City of Lino Lakes for the construction services of the NorthPointe Park Project in the amount of $280,823 to include the base bid as well as Alternates 3, 4, 5, and 6. Adopted by the Council of the City of Lino Lakes this 22nd day of May, 2017. The motion for the adoption of the foregoing resolution was introduced by Council Member Rafferty and was duly seconded by Council Member Maher and upon vote being taken thereon, the following voted in favor thereof: Rafferty, Maher, Kusterman, Manthey, The following voted against same: none ATTEST: Julia e Bartell, City Jeff Reinert, Mayer WSB Aliammak May 10, 2017 Mr. Rick DeGardner Director of Parks & Recreation City of Lino Lakes 600 Town Hall Center Parkway Lino Lakes, MN 55014 Re: NorthPointe Park Development WSB Project No. 2988-25 Dear Mr. DeGardner: 701 Xenia Avenue South 1 Suite 300 1 Minneapolis, MN 55416 1 (763) 541-4800 Bids were received for the above -referenced project on May 10, 2017, and were opened and read aloud. A total of one were received. The bid was checked for mathematical accuracy and tabulated, and there are no errors made on the Proposal Form. The bid tabulation indicates the low bidder as Sunram Construction, Inc., in the amount of $307,648.00 for Base Bid plus all Alternates, which overall was approximately 6% over the engineer's estimate. WSB has worked with Sunram Construction on previous projects and would recommend that the City consider this bid and award a contract to Sunram Construction, Inc. for $280,823.00 to include the base bid and alternates 3 - 6 as detailed below: Base Bid' $239,973 Alternate #3: Export unsuitable soils for court $15,400 Alternate #4: Import select granular borrow for court $21,700 Alternate #5: Remove & replace curb & gutter $1,500 Alternate #6: Remove and replace concrete walk $2,250 Total Contract Amount: $280,823.00 We also recommend setting aside a construction contingency of 10% of the construction budget to allow or any unknowns on the site that may require change to the construction contract. It has been a pleasure working with the City of Lino Lakes on this project and I look forward to seeing this project move into construction. If you have any questions or concerns, please call me directly at (763) 231-4848. Sincerely, WSB & Associates, Inc. Candace Amberg, RLA Project Manager Attachments: Bid Tabulation of Building a legacy — your legacy. Equal Opportunity Employer 1 wsbeng.com K:102988-250Wdmin\Construction Admin12988-25 LTR reccomenda0on 051017.docx Opening Time: 10:00 a.m. Opening Date: May 10, 2017 City of Lino Lakes 600 Town Center Parkway Lino Lakes, MN 55014 BLD TABULATION NORTHPOINTE PARK DEVELOPMENT PROJECT WSB PROJECT NO. 2988-250 I hereby certify that this is an exact reproduction of bids received. Landscape Architect: Candace Amberg Northpointe Park Development City of Lino Lakes, Minnesota Page - 1 of 3 ESTIMATE SUNRAM CONSTRUCTION INC. No. Item Description Quantity Units Unit Price Total Price Unit Price Total Price BASE BID SCHEDULE 1 GENERAL REMOVALS AND SITE WORK 1 LUMP SUM 512,46920 $12,469.20 $11,400.00 $11,400.00 MOBILIZATION & TRAFFIC CONTROL (NOT TO EXCEED 5% OF PROJECT VALUE) 2 GENERAL EARTHWORKJSUBGRADE PREP 1 LUMP SUM $50,000.00 $50,000.00 $20,800.00 $20,800.00 3 WATER 20 MGAL $50.00 $1,000.00 $25.00 $500.00 4 IMPORT AND PLACE COMMON BORROW (LV) 1,800 CU YD $8.00 $14,400.00 $21.50 $38,700.00 5 IMPORT AND PLACE SELECT GRANULAR BORROW 150 CU YD $30.00 54,500.00 $26.60 $3,990.00 (CV) 6 GEOTEXTILE FABRIC TYPE V 700 SQ YD $2.50 $1,750.00 $225 $1,575.00 UTILITIES 7 ELECTRICAL WORK I LUMP SUM $16,000.00 $16,000.00 $13,260.00 $13,260.00 8 4" PERFORATED DRAINTIL,E IN ROCK TRENCH 670 LIN FT $20.00 $13,400.00 $13.75 $9,212.50 9 4" NON -PERFORATED PVC PIPE 100 LIN FT $20.00 $2,000.00 $1625 $1,625.00 10 CORE DRILL CONNECTION INTO TURF CB 1 LUMP SUM $800.00 $80000 $850.00 $850.00 11 DRAINTILE CLEANOUT 13 EACH $200.00 $2,600.00 $350.00 84,550.00 PAVEMENT AND SITE IMPROVEMENTS 12 BASKETBALL BITUMINOUS PAVING (RAP -FREE) WITH AGGREGATE CLASS 5 BASE 406 SQ YD $35.00 $14,210.00 $33.65 $13,661.90 Northpointe Park Development City of Lino Lakes, Minnesota Page - 1 of 3 Northpointe Park Development City of Lino Lakes, Minnesota Page - 2 of 3 ESTIMATE SUNRAM CONSTRUCTION INC. No. Item Description Quantity Units Unit Price Total Price Unit Price Total Price 13 8' WIDE BITUMINOUS TRAIL PAVING WITH 600 SQ YD $32.00 $19,200.00 $23.65 $14,190.00 AGGREGATE CLASS 5 BASE 14 COURT COLOR COATING & LINE STRIPING 406 SQ YD $7.00 $2,842.00 $10.85 $4,405.10 15 BASKETBALL COURT STANDARD 1 EACH $4,500.00 $4,500.00 $4,000.00 $4,000.00 16 PICKLEBALL NET SYSTEM 1 EACH $4,500.00 $4,500.00 $2.500.00 $2,500.00 17 CONCRETE PLAYGROUND CURB 350 LIN FT $25.00 $8,750.00 $33.75 $11,812.50 18 4" THICK CONCRETE PAVEMENT OVER GRANULAR 520 SQ FT $6.00 $3,120.00 $8.15 $4,238.00 BASE 19 6" THICK CONCRETE PAVEMENT W/THICKENED EDGE 1,500 SQ FT $12.00 $18,000.00 $10.05 $15,075.00 OVER AGGREGATE BASE 20 SHELTER STRUCTURE W/FOOTINGS 1 EACH $36,000.00 $36,000.00 $30,250.00 $30,250.00 LANDSCAPE & EROSION CONTROL 21 TYPE 1 TURF SEED 1.30 ACRE $2,000.00 $2,600.00 $6,960.00 $9,048.00 22 SOD 16 SQ YD $7.00 $112.00 $20.00 $320.00 23 EROSION CONTROL BLANKET 3,000 SQ YD $2.00 $6,000.00. $1.30 $3,900.00 24 2.5 INCH CAL B&B DECIDUOUS TREE 16 EACH $500.00 $8,000.00 $500.00 88,000.00 25 1.5 INCH CAL B&B DECIDUOUS TREE 2 EACH $350.00 $700.00 $440.00 $880.00 26 8 FOOT B&B CONIFEROUS TREE 4 EACH $300.00 $1,200.00 $510.00 $2,040.00 27 25 -GALLON P011 ED TREE 8 EACH $15000 $1,200.00 $255.00 $2,040.00 28 DEWATERING AND PERMIT 1 LUMP SUM $5,000.00 $5,000.00 $850.00 $850.00 29 BIOROLL 500 LIN FT $3.50 $1,750.00 $3.10 $1,550.00 30 HEAVY DUTY EROSION CONTROL SILT FENCING 1,500 LIN FF $2.50 $3,750.00 $2.60 $3,900.00 31 ROCK CONSTRUCTION ENTRANCE DRIVE 1 LUMP SUM $1,500.00 $1,500.00 $850.00 $850.00 Northpointe Park Development City of Lino Lakes, Minnesota Page - 2 of 3 Northpointe Park Development City of Lino Lakes. Minnesota Page - 3 of 3 ESTIMATE SUNRAM CONSTRUCTION INC. No. Item Description Quantity Units Unit Price Total Price Unit Price Total Price TOTAL BASE BID: - $261,853.20 $239,973.00 ALTERNATE BID SCHEDULE A1 EXPORT UNSUITABLE SOILS FOR SHELTER PAD (LV) 400 CU YD $10.00 $4,000.00 $22.00 $8,800.00 A2 IMPORT AND PLACE COMMON BORROW (CV) 400 CU YD $10.00 $4,000.00 $31.00 $12,40000 A3 EXPORT UNSUITABLE SOILS FOR COURT (LV) 700 CU YD $10.00 $7,000.00 $22.00 $15,400.00 A4 (IMPORT AND PLACE SELECT GRANULAR BORROW 700 CU YD $10.00 $7,000.00 $31.00 $21,700.00 A5 REMOVE AND REPLACE CURB & GUTTER 30 LIN FT $30.00 $900.00 $50.00 $1,500.00 A6 REMOVE AND REPLACE CONCRETE WALK 150 SQ FT $10.00 $1,500.00 $15.00 $2,250.00 A7 HYDRAULIC SOIL STABILIZER 1 ACRE $4,000.00 $4,000.00 $5,625.00 $5,625.00 TOTAL ALTERNATES: $28,400.00 $67,675.00 TOAL BASE BID + ALTERNATES $290,253.20 $307,648.00 Northpointe Park Development City of Lino Lakes. Minnesota Page - 3 of 3 CITY COUNCIL AGENDA ITEM 5A STAFF ORIGINATOR: Rick DeGardner, Public Services Director MEETING DATE: May 22, 2017 TOPIC: Consider Resolution No. 17-43, Accepting Bids and Awarding a Construction Contract to Sunram Construction Inc., NorthPointe Park Project VOTE REQUIRED: 3/5 INTRODUCTION Staff is requesting council authorization to accept bids and award a construction contract to Sunram Construction Inc., for the development of NorthPointe Park. BACKGROUND The City Council approved plans and specifications and authorized the advertisement for bids during the April 10, 2017 City Council meeting. Fourteen Project Manuals were distributed. The bid opening was conducted on Wednesday, May 10 at City Hall. One bid was received. The bid was checked for mathematical accuracy and tabulated. WSB Engineering has worked with Sunram Construction Inc., on previous projects and recommends that the City award a contract to Sunram Construction Inc., for $280,823.00 to include the base bid and Alternates 3-6. Funding for this project is the Dedicated Parks Fund. RECOMMENDATION Staff recommends adoption of Resolution No. 17-43, Accepting the Base Bid and Alternates Numbers 3, 4, 5, and 6 resulting in awarding a Construction Contract in the amount of $280,823.00 to Sunram Construction Inc., of Corcoran, MN. Estimate Sunram Consruction Base Bid $261,853 $239,973 Alternate 1 $4,000 $8,800 Alternate 2 $4,000 $12,400 Alternate 3 $7,000 $15,400 Alternate 4 $7,000 $21,700 Alternate 5 $900 $1,500 Alternate 6 $1,500 $2,250 Alternate 7 $4,000 $5,625 Total Alternates $28,400 $67,675 Base Bid + Total Alternates $290,253 $307,648 WSB Engineering has worked with Sunram Construction Inc., on previous projects and recommends that the City award a contract to Sunram Construction Inc., for $280,823.00 to include the base bid and Alternates 3-6. Funding for this project is the Dedicated Parks Fund. RECOMMENDATION Staff recommends adoption of Resolution No. 17-43, Accepting the Base Bid and Alternates Numbers 3, 4, 5, and 6 resulting in awarding a Construction Contract in the amount of $280,823.00 to Sunram Construction Inc., of Corcoran, MN. ATTACHMENTS 1. Resolution No. 17-43 2. NorthPointe Letter of Recommendation 3. Bid Tabulation