Loading...
HomeMy WebLinkAbout03/09/1994 P&Z PacketCITY OF LINO LAKES PLANNING & ZONING BOARD AGENDA March 9, 1994 6:30 P.N. I. Call to Order and Roll Call: SCptINgO II. Approval of Minutes: February 9, 1994 III. Approval of Agenda - Changes/Additions A. Election of Officers IV. OPEN MIKE: V. ACTION ITEMS: A. CONTINUATION OF PUBLIC HEARING - Pine Ridge II, Preliminary Plat VI. DISCUSSION ITEMS: A. Marshan Lake Townhomes VII. ADJOURNMENT: PLANNING & ZONING BOARD February 9, 1994 CITY OF LINO LAKES PLANNING & ZONING BOARD'MINUTES I. CALL TO ORDER AND ROLL CALL: II. APPROVAL OF MINUTES: John Landers moved approval of the minutes of the January 12, 1994 meeting with the correction that Ed Schones be listed as present. Ed Schones seconded the motion. All voted aye. Motion carried. Mr. Schones then asked if some changes could be made to the Agenda including the following: Item II Approval of Minutes, Item III Approval of Agenda, Item IV Open Mike, Item V Action Items, Item VI Discussion, and Item VII Adjournment. Mr. Schones then made a motion calling for the revision of the agenda and was supported by Mr. Gelbmann. All voted aye. Motion carried. Mr. Schones then had two items to add under Discussion Items - a. Length of Meetings and b. Council Minutes. III. OPEN MIKE: No one was present to speak under Open Mike. IV. ACTION ITEMS: A. CONTINUATION OF PUBLIC HEARING - Willow Ponds Subd./Rezone Planning Consultant Brixius reviewed this item which was continued from the January 12, 1994 meeting of the P & Z. The request is to Rezone a parcel of property located north of Elm Street and east of Sunset from R-4/PDO High Density Residential with a Planned Development Overlay to R-1 Single Family Residential and plat 27 lots. The property in question had previously been approved for Senior Housing, however that particular project has not been able to secure affordable financing and the purchase agreement on the property has been withdrawn. The property owner would like to pursue development of the site at this time and has therefore requested the rezoning, back to residential, and the submittal of the preliminary plat. Staff review has determined that the use is appropriate for 1 PLANNING & ZONING BOARD February 9, 1994 the site and recommended approval of the rezoning and subdivision with several conditions as outlined in the Planning Report dated December 6, 1993. Mr. Robinson stated that this was a very nice looking plan and asked if the practice of sharing driveways was common on County Roads. Mr. Brixius explained that we try to encourage this as it is a safer arrangement on a collector or arterial roadway that has heavier traffic volume. Mr. Landers questioned the driveway standards and Kathy Nordine asked if permits had been obtained yet from the County. John Johnson, representing the developer, explained that they had discussions with the County when this project was first presented, a few years ago, and that at that time the County had no problems with the request. At this time they do not have the County permits but anticipate no problems in securing them. Additionally, driveway widths and numbers will be as determined by the County and according to their standards. Kathy Nordine stated that she would like to see landscaping included as a condition of approval. Mr. Johnson explained the landscaping plan and indicated that they will be providing deciduous as well as coniferous trees and berming along the 35W portion of the site. Ed Schones asked what had happened to the petition against the project and why had it been delayed. Mr. Landers explained that the neighbors now want to back -off from the petition. Originally they objected to the project because they wanted to see the Senior Project proceed - since this is not possible, they have meet with the developer and concur that this plan is acceptable. They would, however, like some input as to housing types and styles. In regard to why the matter was tabled, Mr. Johnson explained that when the preliminary plat application was submitted, they were under the impression that the R-4 Zoning was tied to the Senior Project. Therefore, if that project did not go in, the property was R-1. That was not the case so there was a delay necessary to allow the publication and notification time in relation to the rezoning. Mr. Gelbmann stated that he is concern about housing diversity. The Senior Project would have provided some of that diversity and he is disappointed they are not proceeding with the project. Mr. Johnson also explained that the project density is less than 2 units per acre and the average lot size is 17,000 square feet. Mr. Landers made a motion recommending approval of the rezoning from R-4/PDO to R-1 and was supported by Mr. Gelbmann. All voted aye. Motion carried. 2 PLANNING & ZONING BOARD February 9, 1994 Kathy Nordine made a motion recommending approval of the preliminary plat with the conditions outlined in the December 16, 1993 Planning Report and the additional condition that Landscaping be as outlined on the grading plan dated/revised 1/94. John Landers seconded the motion. All voted aye. Motion carried. B. PUBLIC HEARING - Pine Ridge II, Preliminary Plat The P & Z was advised that the developer had requested this item be continued until the March meeting. Mr. Brixius briefly reviewed the request which is to plat 9.96 acres into 18 single family lots. Mr. L. Thompson, adjoining property owner, was present and questioned the ponding area behind his property. Mr. Gelbmann made a motion recommending this item be continued until the March meeting as requested by the developer. Mr. Landers seconded the motion. All voted aye. Motion carried. C. MINOR SUBDIVISION - A. LaCasse, 6609 24th Street Planning Coordinator Wyland reviewed this item which involves a minor subdivision to split 6.21 acres from a 40 acre parcel. Ordinance 93-18 provides "...a habitable single family home constructed prior to July 13, 1992 may reduce their lot size to a minimum of one acre if the balance of the property results in a parcel of ten acres or more...". Mr. LaCasse plans to sell the larger portion of the property for development. The site is Zoned Rural and is located within the MUSA Boundary. Staff has recommended approval as submitted. Mr. Schones asked why the property owner was splitting off 6.21 acres rather than 1 acre. Mr. LaCasse's son was present representing him and indicated there are some out -buildings, a septic system, and some wetlands that will be retained with the homestead. Additionally, this was determined to be the most reasonable configuration due to extensive wetlands on the site. Mr. Schones then made a motion and was supported by Mr. Gelbmann to approve the minor subdivision splitting 6.21 acres from the balance of the property. All voted aye. Motion carried. D. VARIANCE, 1049 Black Duck Court Planning Coordinator Wyland reviewed this request which is to allow a 4' variance from the side setback in an R-1 Zoning District. Apparently when the house was staked the survey was misread and it was assumed that a side yard easement of 5' was actually 10'. The house was therefore located on the easement line. The house is now framed and the error was discovered. A letter is on file from the adjoining property owner indicating no objection to the variance. 3 PLANNING & ZONING BOARD February 9, 1994 Findings of Fact for granting a Variance were reviewed and are outlined in the staff report of February 10, 1994. Kathy Nordine made a motion and was supported by John Landers to approve the Variance as requested. All voted aye. Motion carried. V. DISCUSSION ITEMS: A. Length of Meetings: Ed Schones proposed that the P & Z have a "time certain" end for future meetings. This would prohibit meetings from lasting until midnight as in the case of last months meeting. Rick Gelbmann suggested that the audience and the developer be given a time limit on their comments/presentation. John Landers expressed concern that if the time for comments is limited, some people may not have an opportunity to speak. Al Robinson suggested that all Board Members consider this item and it be brought back for discussion at the next meeting. B. Council Minutes: Ed Schones asked if it would be possible to get the Council minutes sooner than in the P & Z Packet. Mary Kay indicated that she would check with the City Clerk to see if this is a possibility. VI. ADJOURNMENT: Upon the unanimous consent of the Board the meeting was adjourned at 8:00 P.M. 4 WEMORANDUX TO: Planning & Zoning Board FROM: Mary Ray Wyland DATE: March 4, 1994 SUBJECT: Misc. Information Due to the "light" agenda for the March 9th P & Z meeting, I have decided to mail out the Agenda and distribute the packets at the meeting. The action item is Pineridge II which was in your Agenda Packet from the February meeting - the staff report has not changed. If you would like a copy of the item before the meeting - please let me know. Information regarding the Marshan Lake Townhomes will be provided by the developer, Hokenson, at the meeting - this item is for general discussion and information only. mk STAFF ORIGINATOR DATE TOPIC AGENDA ITEM v. A Al Brixius, Planning Consultant January 4, 1994 Pine Ridge II Preliminary Plat Background The applicant, Mr. Richard Carlson is requesting preliminary plat approval of a 9.96 acre single family subdivision entitled Pine Ridge II. The subject site is proposed to contain 18 lots and is zoned R -1X, Single Family Executive Residential with a PDO, Planned Unit Development overlay designation. The property lies east of Ware Road and south of Pine Ridge I Addition. Attached for reference. Exhibit A - Site Location Exhibit B Detailed Site Location Exhibit C - Preliminary Plat Exhibit D - Grading and Drainage Plan Exhibit E -Vir.A6 Letter Recommendatiioa In review of the submitted preliminary plat, the majority of required ordinance standards have been satisfactorily met and the proposed layout of streets and lots is reflective of the surrounding area land uses and zoning. Based on the following analysis of issues, we reco►end that the Pine Ridge II Preliminary Plat be approved subject to the conditions as outlined below: A full cul.-de=sac is provided at the terminus of the western most street within the 60 foot right-of-way. The cul-de-sac must be constructed either within the subject plat boundaries 5775 Wayzata Blvd.' Suite 555 • St. Louis Park. Nil 55416 • (612) 595 -9636 -Fax. 595-9837 F E E- 4- 9 4 F R I 1 0 0 1 0 P or within the adjacent westerly property. To accommodate cul- de-sac construction, appropriate easements must be obtained. The said cul-de-sac will be removed and right-of-way vacated at such time when extension of the street occurs. 2. The grading plan and location of drainage and utility easements are found to be acceptable by the City Engineer. 3 Park and trail dedication requirements are met as dictated by the City Park Board. 4. Any other comments of City Staff. ISSUES ANALYSIS nez.ty, Within R -1X zoning districts, the maximum number of dwelling units per acre must not exceed three. The proposed plat contains 18 lots at a density of 1.8 units per acre and is therefore acceptable according to ordinance standards. pot Area. According to established City policy, lot area calculations must exclude all. waterbodies. As such, the lot area calculations on the submitted preliminary plat must be revised prior to final plat submittal. Within R -1X zoning districts, the minimum lot size exclusive of wetlands is 12,825 square feet. All proposed lots meet the minimum lot area standard. Lot MAO). A minimum lot width of 90 feet is required of all interior R -1X zoned lots with a width of 115 feet on corner lots. All proposed lots have been found to comply with minimum lot width requirements. Lrat Dei thy, According to the Zoning Ordinance, lots within R -1X districts must provide 135 feet of depth. All proposed lots meet this requirement as shown on the Preliminary Plat. getbacks. The following setback requirements are required for structures in the R -1X zoning district: Front Yard 30 feet Side Yard (Interior) 10 feet (Corner) 30 feet Rear Yard 30 feet All lots show an ability to accommodate required setbacks. 2 F E �- 4 -9 4 F IR I 1 e @ 2 6 P - 4 wetlaxds. The subject site contains two wetlands, both of which require some mitigation to subdivide the land and install streets as indicated in the Preliminary Plat. The applicants have obtained approval of the wetland mitigation plan shown in Exhibit D from both the Army Corps of Engineers and the Rice Creek Watershed District (see Exhibit B). Street Configuration. The proposed layout of streets is viewed as appropriate given the land zoned R, Rural District which abuts the subject property to the east and south that subsequently requires minimum lot sizes of 10 acres. The parcels which exist in this vicinity at the present time are all 10 acres or less aid therefore cannot be further subdivided unless brought into the City's MUSA and rezoned and will not require street access from the Pine Ridge Plat. A full cul-de-sac must be provided at the western edge of the property or within the adjacent westerly property via easement dedication. The said cul-de-sac easement will be vacated at such time when the street is extended. Grading and Drainages,, The required ten foot drainage and utility easements have been placed along all lot sines and over wetland areas which should be Subject to the City Engineer's review and comment prior to Preliminary Plat approval. Additionally, a grading and wetland mitigation plan has been submitted which should also be subject to the Engineer's review and comment. Park Dedicaon. The subject plat does not include any provisions for park land dedication as required by ordinance. The City Park Board should provide comment/recommendation as to the appropriate cash contribution. Additionally, trail dedication will be required, although the exact location of the trail has yet to be determined by the City. CONCLUSION Based on the preceding review, it is recommended that the Pine Ridge 11 Preliminary Plat be approved provided the conditions as listed in the Executive Summary of this report are met to the satisfaction of the City. pc: Darrell Schneider Randy Schumacher Richard Carlson 3 F E - 4- -9 4 FRI 161 0$ 61 _ @ S MONTH 1 MILE CITY OF LINO LAKES MINNESOTA EXHIBIT FES — 4 — 9 4 F R I 10:04 VeaSiZief Mt 0 EXHIBIT B — 4— J4 F I 1 0 _ 05 0 r r _ O _ .. _— - �`•. r _.._ �..�� asp �.. .2 4 Q , q. N89'gg8&'S "W�+ \fly'' .C; ao� o t7o 0 � 30.00 e Ca to , fat a '�° } t b ; dor ¢cf�- o 7. 9 �13Y 39,904 SF DeN a 8 w1 14 8,552 SF 1 wl £N T 4 7 a 7.6385 1/4, 6 s 22,511 SF a ...MI _disk •_J it-dvek EXHIBIT E F- FR I 1�0;: G 0 f 1 1 11 r 1 J 1 I. 1` -. _ 1-.. -, -. 11 . • < 1 10 0 –4; J ° A • L t.� 151 0.4 Valk riV i + 900 P - 0 - d� .t _. j1 l 1 r 1 s HI PT. 902.0 CAP INV.=a 1„ A., 1-11.P T. 901.0 <1tt § tti 1 1 1 1 t 1 P 1 1 / I 1 1 � / 1 1 �/ d 1 1 i 1 r• I 1 1 1te �.tt fr/.•/`i $ EXHIBIT L .f , FEB— 4—'94 FR I 1 0 = OG 0 `. •. mow. a.•. .•... �.r .1144 20 •94 14:12 NATTKE &GII . INC.`S• RICE CURE tihT'aRfl= DISTRIC'? sttnTR 374, .AEW ; PAW, 358S LEXXNGTQN &VENtig NOM &MAN f3ILL5, MINMSOTA 55126 s1,Z7233.1210 . TO. Vcwio ?EMIT ti). 93.139 cc. Cit' of LTha iii Montgomery Watson Inspector Ek1in RCWO File 7IA412 93-x39 Richard S. Carlson �r181>u�d toi Richard S. Carlson & Associates, 7671 Central Avenue NE, Fridicy. MM 5543. L catienx Northeast quadrant of Ware Read and 62nd Street W, Lion takes Purpose* Approval of Land Development and Wetland Alteration Plans for a single-family resldentiai.develnpmant to be known as Pineridge II, 19 lots on 10 acres. At their meeting on rb 29. 199 the Beard of Managers of the Rine Creole ateme e DE reviewed youx permit applLoettort and the, rocommendetion oil the District Engineer based upon the followingexhibitq 1. Permit application dated July 27, 1993. 2. Letter prepared by Nattke Engineering, dated August 10. 1993, addressing wetlands. received August 11, 1993. 3. Preliminary pint prepared by Mattke ,ltgineering. dated August 10, 1993, received August 11, 1993. e. Grading and Drainage Plan prepared by Matto Engineering. dated August 10, 1943. received August 11, 3993. 5. MPCA Notice of Intent to Oracle Area Over G Acres, dated August 20. 1993, received August 23, 1993. 6. fetter prepared by Mattke Engineering, dated December 2, 19934 received December 2 19934 summarizing wetland impacts. 7. Mery to file from late Drewry dated November 10, 1993, received November 10. 1993. verifyingwetland classification. 8. NEC -1 caculations for 1- and 100 -year storm runoff and ponding volumes, dated December 2 1993, received December 2, 1993. 9. Skinner calculations for outlet for wast pond. dated December 2, 1993, received December 2, 1993. 10. Grading and sediment erosion control plan prepared by Mattke Engineering, last revised November 28, 1993. received December 2, 1993. 11. Cash Surety in the amount of 53,000 received December 22, 1993. 12. uS Amy Corpsct Engineers Nationwide Permit authorization letter dated Deceit$ er 20, 1993, reCeivcd December 2i, 1993. They found the project as planned to be in accordance with the Rales a Regulations and Guidelines of the District and therefore approved the permit as requested with the following* additional stipuxetioxi,ra NO ADDITIONAL STIPULATIONS It is the: redponsibiLity of the Permittee to provide 00.,,1,1, meresu res nec+aseary to contain sediment. on the alto dazing conetructiost. rhie Mly require the sea* of erceion contra.. Vaninix+ew flit octtl4ned yx EXHIBIT E F E F- 4 -'q 4 F R I 1 0 0 7 0 • JPsa '54 24; 13 HarmKE 'EirGjs E 61 P _ 1 0 r «� _ TCI= P833 RCwD PERMIT NO. 93-1n, continued; Pagan on the erosion oantral plan. If this requirement is not mat, the Permittee may be ordered to provide additional erosion control measures 4f deemed neceos ry by the biatxict Inspector. Immediately uupon completion of rough grading, 9tQrmwater I inagement features must be completed according t:rrlans pezmittvd by the District. It ie also the responsibility of the property owner to provide necessary maintenance to assure that the ItOrMiw ter management systems approved as part of this Permit will continuo to function as originally designed. XQTE FOR PROVIDERS OF A CASH SCRET t Failure to implement and maintain the sediment-ixosion control and cover establishment measures outlined is the permit erhibits3 may result in forfeiture of your cash surety. If such ssaeseureS are satisfactorily provided, the mash surety' will be returned with interact after permanent vegetative cover has been esstss�sbliehed. i'Xeasse notify the District Office in writing when permanent vegetative caver has been established and a final inspection will be toads. 'shoo (2) ins tions of the . project site are included with this Permits one after erasion control xanssssaurea are in place and ene after project completion and reeegctati.on, and ei r be conducted to assure compliance with all agreements, terms, and stipulations of this Permit.' Failure to comply with the foreagoing may =telt in rescission of the Permit, and is in violation of Chapter 112.89 1SA1 a mild or. Any additional inspection, requested or required, will. be billed at $25/visit. fit`hi+r dbcuee t is not transferable, and is valid for one (l) year atter the date of i eauance. Fo construction la authorized beyend the expiration date. If pwrtittee requires more time to complete construction, a zeal of the permit will be necessary. Please contact ACWD at 493.0634 when the project is about to commence no ,an inspector may view the work in progroe ." By acceptance of this Permit, Permittee has co eented to the foregoing. The enclosed O%ner's Certification form must be completed and forwarded within ten (10) days of project completion. P, C Rvwiscd 119191 act res diet, Eugene Z. Peterson ar. o ' managers 2nd Vice -Pr a dent '.7 aretaxyf *CWD pard o Ham:weirs/ Andrew .T.•„ ,arCina . Sr. s�4 rtu ry 19 . 1944 Dotes Isssuaac+ =SEN MEMORANDUM ST PAUL, MN ❑ MINNEAPOLIS, MN ❑ ST CLOUD, MN TO: Darrell Schneider FROM: Steve Heth DATE: February 3, 1994 RE: ❑ CHIPPEWA FALLS, WI ❑ MADISON, WI Lino Lakes, Minnesota Engineering Review of Pine Ridge 2nd Addition SEH No. A-LIN03336.00 1. Preliminary Plat A. No location given (section, town and range). B. Boundary does not close. 2. Grading and Drainage A. Easements - Provide adequate drainage easement on Lot 6, Block 2 for lateral drainage at back of lot. B. Street - Street should end with cul de sac on the west end. C. Typical Street Section - Current standard for location of private utilities in common trench may be changing. Be aware that a new detail may need to be used. 3. Sanitary Sewer and Water Main A. Sanitary - Invert at tie-in on north end of Coyote Trail should be 877.75 (from record drawings). B. Consideration should be given to installing sanitary sewer deep enough for future extension to the west. (Shorten drop in manhole adjacent to Lot 6, Block 2). tlo