HomeMy WebLinkAbout2017-057 Council ResolutionCITY OF LINO LAKES
RESOLUTION NO. 17-57
APPROVING PURCHASE OF PLAYGROUND EQUIPMENT
FOR NORTHPOINTE PARK
WHEREAS, the project scope included the design of the playground equipment within the
footprint container area with a specified budget of $75,000. The total cost includes the
playground components, engineered wood fiber surfacing, geotextile fabric, additional necessary
resilient surfacing systems such as wear mats for swing/slide areas, certified playground installer
(installation to be completed by volunteers and City staff), an audit conducted by a Certified
Playground Safety Inspector for compliance, warranties, delivery, and taxes. All equipment must
meet all applicable ASTM, CPSC and ADA standards for safety and accessibility; and
WHEREAS, six vendors were sent an RFP for the NorthPointe Park Playground Equipment
Project; and
WHEREAS, the playground equipment proposals were on display June 12 and June 15 for
review. NorthPointe residents, Park Board Members, and the City Council were invited to
review the proposals, make comments, and provide input on the selection of the project; and
WHEREAS, in evaluating the proposals, staff also considered factors such as the quality of the
overall design (i.e. use of the space, size of structures, aesthetic appeal, capacity, number of play
elements, age-appropriate activities), equipment quality (materials used, sizes/thicknesses of
pipes), ease of maintenance, installation experience, and the play experience provided; and
WHEREAS, staff met with interested residents to make final decisions such as color selection.
WHEREAS, funding for this playground equipment project will be from the Dedicated Parks
Fund.
NOW, THEREFORE, BE IT RESOLVED by The City Council of The City of Lino Lakes that
the City hereby awards the NorthPointe Park Playground Equipment Project to Northland
Recreation, LLC in the amount of $75,000.
The motion for the adoption of the foregoing resolution was introduced by Council Member
Manthey and was duly seconded by Council MemberKustermaand upon vote being
taken thereon, the following voted in favor thereof:
Manthey, Kusterman, Rafferty, Maher, Reinert
The following voted against same:
none
ATTEST:
i me Bartell, Ci Cler
Jeff Reinert,
r
CITY COUNCIL
AGENDA ITEM 5A
STAFF ORIGINATOR: Rick DeGardner, Public Services Director
MEETING DATE: June 26, 2017
TOPIC: Consider Resolution No. 17-57, Approving Purchase of
Playground Equipment for NorthPointe Park
VOTE REQUIRED: 3/5
INTRODUCTION
The City Council is being requested to consider approving the purchase of playground
equipment for NorthPointe Park.
BACKGROUND
Six vendors were sent an RFP for the NorthPointe Park Playground Project. The project scope
included the design of the playground equipment within the footprint container area with a
specified budget of $75,000. The total cost includes the playground components, engineered
wood fiber surfacing, geotextile fabric, additional necessary resilient surfacing systems such as
wear mats for swing/slide areas, certified playground installer (installation to be completed by
volunteers and City staff), an audit conducted by a Certified Playground Safety Inspector for
compliance, warranties, delivery, and taxes. All equipment must meet all applicable ASTM,
CPSC and ADA standards for safety and accessibility.
The City received five proposals. The playground equipment proposals were on display at
Lino Lakes Fire Station #2 on June 12 and June 15 for review. NorthPointe residents, Park
Board Members, and the City Council were invited to review the proposals, make comments,
and provide input on the selection of the project.
In evaluating the proposals, staff also considered factors such as the quality of the overall
design (i.e. use of the space, size of structures, aesthetic appeal, capacity, number of play
elements, age-appropriate activities), equipment quality (materials used, sizes/thicknesses of
pipes), ease of maintenance, installation experience, and the play experience provided.
Staff met with interested residents to make final decisions such as color selection. It is
anticipated to install the playground equipment on Saturday, September 16th with residents, a
certified playground installer, and park maintenance staff.
It is staff's recommendation to award the NorthPointe Park Playground Project to Northland
Recreation, LLC. Funding for this playground equipment project will be from the Dedicated
Parks Fund.
RECOMMENDATION
Award NorthPointe Park Playground Equipment Project to Northland Recreation, LLC in the
amount of $75,000.
ATTACHMENTS
Resolution No. 17-57
Nortlipointe Park
City of Lino Lakes
BIBA
.lu Intrractirr
Pl✓Yxrnund
•
Generation
Swing
:I%irage ADA
Swing Seat
ADA Multi User Ii}ori
Crazy
Hoopla
I.: Bridge
Solo
Spinner
Stand—n-Spin
SHELTER - BY OWNER
ACE2-5 PLAY AREA'1.,
NORTHPOINTE PARK PLAYGROUND;:' /y ..w
LINO LAKES. MINNESOTA r'
l'iri r=r/
;,AUCs-12flAY- �• r^': a 1 ` f/
'�` AREA 1 , javely
a' MAXPLAY SWING SET WITH
I ADA. I TOT. I GENERATION
MULTI USER SWING A 2 BELT SEATS
SHELTER - BY OWNER
PLAYGROUND ACCESS
P SWITCHBACK MFDDTY
CUMBER til{LIMB
GROUND LEVEL PLAY AREA
-BONGO DRUM
STORE ARMY, CO NT PANEL
.SEAT PANEL
SINGLE WIDE
WAVE SLIDE
BAL /OVERLOOK
D' . W/ WHEEL
TRANSFER
STATION
PLAYGROUND
ACCESS
SINGLE WIDE
WAVE SLIDE.
GATOR WALK
PLAY SCULPTURE
S'QUANTUM
SPIRAL SUDE
CATWALK
BRIDGE
FAN -ARCH
CUMBER
DOUBLE
WIDE
SLIDE
AGE 2-5 PLAY AREA
CRAZY HOOPLA
FRIDGE
ACCORDIAN
CLIMBER
NORTHPOINTE PARK PLAYGROUND
LINO LAKES, MINNESOTA
RING CHALLENGE
OVERHEAD
NQRTHLAND
14
RECREATION
'WEEP' ADA ACCESSIBLE
MULTI USER WHIRL
FUNWHEEL STANDNSPM
OVERHEAD SPINNER
CHALLENGE
WEB WALL STEPPER
NET CUMBER
AGE 5-12 PLAY
AREA
CLIMBING WALL