HomeMy WebLinkAbout04-11-2016 Council PacketEXPANDED AGENDA
CITY COUNCIL AGENDA
Monday, April 11, 2016
***********
6:30 p.m.
(Scheduled to be broadcast on Channel 16)
City Council: Mayor Reinert, Council Members Kusterman, Maher, Manthey and Rafferty
City Administrator: Jeff Karlson
ECONOMIC DEVELOPMENT AUTHORITY (EDA), 6:15 P.M.
See separate agenda
CITY COUNCIL MEETING, 6:30 P.M.
Roll Call - Council Members Rafferty, Kusterman, Manthey, Maher, and Mayor
Reinert were present
Pledge of Allegiance
Open Mike / Public Comment - Nick Arnt, Arnt Construction Company, 2190
Phelps Road, notified the council that he will be requesting permission for
operation of a construction plant at his facilities in June; staff will work with Mr.
Arnt to submit an application
Setting the Agenda: Addition or deletion of agenda items
The agenda was approved as presented.
SPECIAL CEREMONY
Oath of Police Service – Police Officer Katie Kramer
1. CONSENT AGENDA
A) Consideration of Expenditures:
i) April 11, 2016 (Check No. 103450 through 103512) in the
amount of $242,635.72
B) Consider approval of March 28, 2016 Work Session Minutes
C) Consider approval of March 28, 2016 City Council Minutes
D) Consider approval of March 28, 2016 Closed Council Minutes
E) Consider Resolution 15-26, Adoption and Implementation of Wellhead
Protection Plan Part II
F) Consider approval of March 23, 2016 Jt. Council/Advisory Boards Mtg
Minutes
Action Taken: Motion by Kusterman, seconded by Maher, to approve
the Consent Agenda, Items 1A though 1F as presented, was adopted
Council Agenda -2- April 11, 2016
EXPANDED AGENDA
2. FINANCE DEPARTMENT REPORT
No report
3. ADMINISTRATION DEPARTMENT REPORT
A) Consider Resolution No. 16-22, Approving New On-Sale and Sunday
Liquor License for Fiesta Cancun Mexican Grill & Bar, Julie Bartell
Action Taken: Motion by Kusterman, seconded by Maher, to approve
Resolution No. 16-22 as presented, was adopted
4. PUBLIC SAFETY DEPARTMENT REPORT
No report
5. PUBLIC SERVICES DEPARTMENT REPORT
No report
6. COMMUNITY DEVELOPMENT REPORT
A) Approving First Amendment - Joint Powers Agreement with the City of
Centerville, 21st Avenue Improvements and Maintenance, Diane Hankee
Action Taken: Motion by Manthey, seconded by Maher, to approve
Resolution No. 16-19 as presented, was adopted
B) Rice Lake Elementary School Addition, Katie Larsen
i. Consider Resolution No. 16-20 Approving Conditional Use Permit
Amendment & Site Plan Review for Addition for Early Childhood
Education
Action Taken: Motion by Kusterman, seconded by Manthey, to approve
Resolution No. 16-20 as presented, was adopted
ii. Consider Resolution No. 16-21 Approving Site Improvement
Performance Agreement
Action Taken: Motion by Kusterman, seconded by Manthey, to approve
Resolution No. 16-21 as presented, was adopted
C) Saddle Club Second Addition, Katie Larsen
i. Consider Resolution No. 16-12 Approving Final Plat
Action Taken: Motion by Kusterman, seconded by Rafferty, to approve
Resolution No. 16-12 as presented, was adopted
ii. Consider Resolution No. 16-13 Approving Development Agreement
Action Taken: Motion by Kusterman, seconded by Maher, to approve
Resolution No. 16-13 as presented, was adopted
D) Consider Resolution No. 16-13, Designating Building as Structurally
Substandard, 49 Club, Michael Grochala
Action Taken: Motion by Kusterman, seconded by Manthey, to approve
Resolution No. 16-20 as presented, was adopted
Council Agenda -3- April 11, 2016
EXPANDED AGENDA
E) Consider Resolution No. 16-24, Approving the Plans & Specifications and
Authorizing the Ad for Bid, 2016 Mill and Overlay Project, Diane Hankee
Action Taken: Motion by Kusterman, seconded by Rafferty, to approve
Resolution No. 16-24 as presented, was adopted
F) Consider Resolution No. 16-25, Accepting the Feasibility Report, Mattamy
Homes Water Reuse, Diane Hankee
Action Taken: Motion by Kusterman, seconded by Manthey, to approve
Resolution No. 16-25 as presented, was adopted
G) Consider Resolution No. 16-27, Authorize Preparation of Water Supply Plan
Update, Michael Grochala
Action Taken: Motion by Kusterman, seconded by Maher, to approve
Resolution No. 16-27 as presented, was adopted
7. UNFINISHED BUSINESS
None
8. NEW BUSINESS
None
Adjournment
Motion by Maher, seconded by Manthey, to adjourn at 7:48 p.m, was
adopted
Community Calendar – A Look Ahead
April 11, 2016 through April 25, 2016
Wednesday, April 13 6:30 pm, Council Chambers Planning & Zoning
Monday, April 25 5:45 pm, Council Work Rm Work Session - Interview
Monday, April 25 6:00 pm, Community Room Council Work Session
Monday, April 25 6:30 pm, Council Chambers City Council Meeting
CITY COUNCIL AGENDA
Monday, April 11, 2016
***********
6:30 p.m.
(Scheduled to be broadcast on Channel 16)
City Council: Mayor Reinert, Council Members Kusterman, Maher, Manthey and Rafferty
City Administrator: Jeff Karlson
ECONOMIC DEVELOPMENT AUTHORITY (EDA), 6:15 P.M.
See separate agenda
CITY COUNCIL MEETING, 6:30 P.M.
Call to Order and Roll Call
Pledge of Allegiance
Open Mike / Public Comment
Setting the Agenda: Addition or deletion of agenda items
SPECIAL CEREMONY
Oath of Police Service – Police Officer Katie Kramer
1. CONSENT AGENDA
A) Consideration of Expenditures:
i) April 11, 2016 (Check No. 103450 through 103512) in the
amount of $242,635.72
B) Consider approval of March 28, 2016 Work Session Minutes
C) Consider approval of March 28, 2016 City Council Minutes
D) Consider approval of March 28, 2016 Closed Council Minutes
E) Consider Resolution 15-26, Adoption and Implementation of Wellhead
Protection Plan Part II
F) Consider approval of March 23, 2016 Jt. Council/Advisory Boards Mtg
Minutes
2. FINANCE DEPARTMENT REPORT
No report
3. ADMINISTRATION DEPARTMENT REPORT
A) Consider Resolution No. 16-22, Approving New On-Sale and Sunday
Liquor License for Fiesta Cancun Mexican Grill & Bar, Julie Bartell
4. PUBLIC SAFETY DEPARTMENT REPORT
No report
Council Agenda -2- April 11, 2016
5. PUBLIC SERVICES DEPARTMENT REPORT
No report
6. COMMUNITY DEVELOPMENT REPORT
A) Approving First Amendment - Joint Powers Agreement with the City of
Centerville, 21st Avenue Improvements and Maintenance, Diane Hankee
B) Rice Lake Elementary School Addition, Katie Larsen
i. Consider Resolution No. 16-20 Approving Conditional Use Permit
Amendment and Site Plan Review for Addition for Early Childhood
Education
ii. Consider Resolution No. 16-21 Approving Site Improvement
Performance Agreement
C) Saddle Club Second Addition, Katie Larsen
i. Consider Resolution No. 16-12 Approving Final Plat
ii. Consider Resolution No. 16-13 Approving Development Agreement
D) Consider Resolution No. 16-23, Designating Building as Structurally
Substandard, 49 Club, Michael Grochala
E) Consider Resolution No. 16-24, Approving the Plans & Specifications and
Authorizing the Ad for Bid, 2016 Mill and Overlay Project, Diane Hankee
F) Consider Resolution No. 16-25, Accepting the Feasibility Report, Mattamy
Homes Water Reuse, Diane Hankee
G) Consider Resolution No. 16-27, Authorize Preparation of Water Supply Plan
Update, Michael Grochala
7. UNFINISHED BUSINESS
None
8. NEW BUSINESS
None
Adjournment
Community Calendar – A Look Ahead
April 11, 2016 through April 25, 2016
Wednesday, April 13 6:30 pm, Council Chambers Planning & Zoning
Monday, April 25 5:45 pm, Council Work Rm Work Session - Interview
Monday, April 25 6:00 pm, Community Room Council Work Session
Monday, April 25 6:30 pm, Council Chambers City Council Meeting
LINO LAKES
ECONOMIC DEVELOPMENT AUTHORITY
MEETING
Monday, April 11, 2016
6:15 P.M.
City Council Chambers
1. Call to Order and Roll Call
2. Consideration of Minutes of February 8, 2016
3. Action Items
A. 49 Club Demolition, Michael Grochala
i. Consider Resolution No. 16-01, Designating Building as Structurally
Substandard, 49 Club
ii. Consider Resolution No. 16-02, Approving Preliminary Development
Agreement with DM Land, LLC
4. Adjourn
EDA MINUTES February 8, 2016
DRAFT
1
DATE : February 8, 2016
TIME STARTED : 6:20 p.m.
TIME ENDED : 6:28 p.m.
MEMBERS PRESENT : EDA Members Kusterman, Reinert, Rafferty,
Maher, Manthey
MEMBERS ABSENT : None
OTHERS PRESENT: : Administrator Jeff Karlson; Community
Development Director Michael Grochala;
City Clerk Julie Bartell
The meeting was called to order at 6:20 p.m. by Acting President Kusterman.
CONSIDERATION OF THE MINUTES OF DECEMBER 28, 2015
Economic Development Authority (EDA) Member Reinert moved to approve the December 28,
2016 minutes. EDA Member Rafferty seconded the motion. Motion carried on a voice vote;
EDA Members Maher and Manthey abstained from voting.
CONSIDERATION OF ANNUAL APPOINTMENTS
Michael Grochala, Community Development Director, informed the members that each year the
EDA is required to hold an annual meeting and make a number of appointments; the list of
appointments was before the Authority for consideration. EDA member Reinert moved to
appoint EDA Member Kusterman as president, EDA Member Rafferty as vice president and
EDA Member Manthey as treasurer. EDA member Maher seconded the motion. Motion
carried on a voice vote.
EDA member Rafferty moved to approve other appointments as outlined in the staff report.
EDA Member Manthey seconded the motion. Motion carried on a voice vote.
CONSIDERATION OF ANNUAL REPORT
Community Development Director Grochala reviewed the annual report outlining activities of
the EDA in 2015. EDA Member Manthey asked about the number of residential permits issued
in 2014. Mr. Grochala explained that there were 33 residential permits (new homes) issued in
2014 and the figure (higher) for 2015 is listed in the report.
EDA Member Maher moved to accept the 2015 Annual Report as presented. EDA Member
Manthey seconded the motion. Motion carried on a voice vote.
ADJOURNMENT
There being no further business, EDA Member Rafferty moved to adjourn. EDA Member
Maher seconded the motion. Motion carried on a voice vote.
The meeting was adjourned at 6:28 p.m.
LINO LAKES ECONOMIC DEVELOPMENT AUTHORITY
AGENDA ITEM 3A
STAFF ORIGINATOR: Michael Grochala
MEETING DATE: April 11, 2016
TOPIC: i. Consider Resolution No. 16-01, Designating Building as
Structurally Substandard, 49 Club
ii. Consider Resolution No. 16-02, Approving Preliminary
Development Agreement with DM Land, LLC
VOTE REQUIRED: 3/5
BACKGROUND
The 49 Club, located at the corner of Hodgson Road and County Road J, has been vacant since
approximately 2003. The site has become a blighted location with illegal dumping and
vandalism taking place on a regular basis. The city has received numerous complaints regarding
the property. The site has been the topic, along with the neighboring 17 acre Jensen property, of
several development proposals. However, none have advanced past the concept phase due to a
number of complicating factors including the need for public improvements, multiple property
owners, and council concern over the intensity of prior commercial development proposals.
In March of 2015 LHB Corporation was retained to determine the eligibility of the property for
TIF purposes and to document the condition of the building. As noted in the report the buildings
are structurally substandard to a degree requiring substantial renovation or clearance. Staff has
been working with the owner of the property regarding potential demolition of the buildings
either as a City project or by the owner. The owner is proposing to remove both the principal
structure and accessory garage with their own contractor.
Staff is very interested in this project as a means to clean up the site, eliminate the blight and
assist redevelopment efforts. The use of Tax Increment Financing (TIF) has previously been
discussed to help offset utility, road or land assemblage costs to facility redevelopment of the
corner.
However, removal of the building has the potential to eliminate one of the financial tools
available to assist with redevelopment. In order to establish a TIF District after demolition, the
request for certification of the TIF District must be filed with the County within three years of
the parcel being occupied by a substandard building. An actual project would need to occur
within 4 years of district certification or the site would be dropped from the district and no longer
eligible for TIF.
To retain our ability to use TIF staff has listed out the steps that the EDA/City would need to
follow in order to demolish a building prior to a redevelopment TIF District being established:
1) The EDA Board finds by resolution (adopted before demolition) that the parcel was
occupied by a structurally substandard building and that after demolition and clearance
the EDA intends to include the parcel within a TIF district;
2) The City Council adopts resolution and makes blight findings regarding the building
(based on report);
3) EDA and owner of property enter into a preliminary development agreement (before
demolition) regarding demolition of the buildings and redevelopment of the property.
The proposed development agreement does not bind the EDA and/or City to use of Tax
Increment Financing. Rather the City and Developer (owner) are agreeing cooperate with respect
to potential future redevelopment of the Property. The agreement sets for the conditions and for
consideration of city redevelopment assistance and responsibilities of each party.
The City Council will be considering the blight findings at their April 11, 2016 regular meeting.
RECOMMENDATION
Staff is recommending approval of Resolution No. 16-01 and Resolution No. 16-02.
ATTACHMENTS
1. Resolution No. 16-01
2. LHB Recommendation March 27, 2015
3. Resolution No. 16-02
4. Preliminary Development Agreement
460586v1 LN140-114
LINO LAKES ECONOMIC DEVELOPMENT AUTHORITY
RESOLUTION NO. 16-01
RESOLUTION DESIGNATING BUILDINGS AS STRUCTURALLY SUBSTANDARD
WITHIN LINO LAKES REDEVELOPMENT PROJECT
BE IT RESOLVED by the Board of Commissioners ("Board") of the Lino Lakes
Economic Development Authority ("Authority") as follows:
Section 1. Recitals.
1.01. Under Minnesota Statutes, Section 469.174, subd. 10(d), the Authority is authorized
to deem parcels as occupied by structurally substandard buildings despite prior demolition or
removal of the buildings, subject to certain terms and conditions as described in this resolution.
1.02. The Authority intends to cause demolition of the buildings located on the property
described in Exhibit A hereto (the “Designated Property”), and may in the future include the
Designated Property in a redevelopment or renewal and renovation tax increment financing district
as defined in Minnesota Statutes, Sections 469.174, Subd. 10 or Subd. 10a.
Section 2. Buildings Designated Substandard; Other Proceedings.
2.01. The Authority finds that the buildings on the Designated Property as described in
Exhibit A are structurally substandard to a degree requiring substantial renovation or clearance,
based upon the analysis of such buildings by LHB Architects dated March 27, 2015 and on file in
City Hall.
2.02. After the date of approval of this resolution, the buildings on the Designated
Property may be demolished or removed by the Authority, or such demolition or removal may be
financed by the Authority, or may be undertaken by a developer under a development agreement
with the Authority.
2.03. The Authority intends to include the Designated Property in a redevelopment or
renewal and renovation tax increment financing district, and to file the request for certification of
such district with the Anoka County auditor within three years after the date of demolition of the
buildings on the Designated Property.
2.04. Upon filing the request for certification of the new tax increment financing district,
the Authority will notify the Anoka County auditor that the original tax capacity of the Designated
Property must be adjusted to reflect the greater of (a) the current net tax capacity of the parcel, or
(b) the estimated market value of the parcel for the year in which the buildings were demolished or
removed, but applying class rates for the current year, all in accordance with Minnesota Statutes,
Section 469.174, subd. 10(d).
460586v1 LN140-114 2
2.05. Authority staff and consultants are authorized to take any actions necessary to carry
out the intent of this resolution.
Adopted by the Board of Commissioners of the Lino Lakes Economic Development
Authority this 11th day of April, 2016.
The motion for the adoption of the foregoing resolution was introduced by Board Member
_______________and was duly seconded by Board Member ________________ and upon vote
being taken thereon, the following voted in favor thereof:
The following voted against same:
William Kusterman, President
ATTEST:
Jeff Karlson, Executive Director
460586v1 LN140-114 3
EXHIBIT A
Description of Designated Property
6007 Hodgson Road, Lino Lakes, Minnesota
PID Nos. 31-31-22-43-0007, 31-31-22-43-0006, and 31-31-22-43-0017
March 27, 2015
Michael Grochala
Community Development Director
City of Lino Lakes
600 Town Center Parkway
Lino Lakes, Minnesota 55014
TIF ANALYSIS FINDINGS FOR 6007 HODGSON ROAD, LINO LAKES,
MINNESOTA 55014
LHB was hired to inspect the 49 Club building at 6007 Hodgson Road in Lino Lakes, Minnesota, in
order to determine if it meets the definition of “Substandard” as defined by Minnesota Statutes,
Section 469.174, subdivision 10. The building parcel may potentially be part of a future
Redevelopment TIF District, so will need to be compliant with all of the statutes pertaining to a
Redevelopment District.
The building is located on a three-parcel property at the northwest corner of Ash Street and
Hodgson Road (see Diagram 1).
Diagram 1
Page: 2
Date: March 27, 2015
CONCLUSION
After inspecting and evaluating the building on March 13, 2015 and applying current statutory criteria for a
Redevelopment District under Minnesota Statutes, Section 469.174, Subdivision 10, it is our professional opinion that
the building qualifies as substandard.
The remainder of this letter and attachments describe our process and findings in detail.
MINNESOTA STATUTE 469.174, SUBDIVISION 10 REQUIREMENTS
The property was inspected in accordance with the following requirements under Minnesota Statutes, Section
469.174, Subdivision 10(c), which states:
Interior Inspection
“The municipality may not make such determination [that the building is structurally substandard] without
an interior inspection of the property...”
Exterior Inspection and Other Means
“An interior inspection of the property is not required, if the municipality finds that
(1) the municipality or authority is unable to gain access to the property after using its best efforts to
obtain permission from the party that owns or controls the property; and
(2) the evidence otherwise supports a reasonable conclusion that the building is structurally
substandard.”
Documentation
“Written documentation of the findings and reasons why an interior inspection was not conducted must
be made and retained under section 469.175, subdivision 3(1).”
Qualification Requirements
Minnesota Statutes, Section 469.174, Subdivision 10 (a) (1) requires two tests for occupied parcels:
1. Coverage Test
…“parcels consisting of 70 percent of the area of the district are occupied by buildings, streets,
utilities, or paved or gravel parking lots”
The coverage required by the parcel to be considered occupied is defined under Minnesota Statutes,
Section 469.174, Subdivision 10(e), which states: “For purposes of this subdivision, a parcel is not
occupied by buildings, streets, utilities, paved or gravel parking lots, or other similar structures unless 15
percent of the area of the parcel contains buildings, streets, utilities, paved or gravel parking lots, or other
similar structures.”
The LHB team reviewed parcels 31-31-22-43-0007, 31-31-22-43-0006 and 31-31-22-43-0017:
• Parcel A (31-31-22-43-0007) is approximately 25,358 square feet and is 98 percent covered by
buildings, parking lots or other improvements.
• Parcel B (31-31-22-43-0006) is approximately 36,305 square feet and is 45 percent covered by
buildings, parking lots or other improvements.
• Parcel C (31-31-22-43-0017) is approximately 30,381 square feet and is 21 percent covered by
buildings, parking lots or other improvements.
Page: 3
Date: March 27, 2015
Findings:
The parcels are all covered by buildings, parking lots or other improvements, exceeding the 15 percent
parcel requirement.
2. Condition of Buildings Test
Minnesota Statutes, Section 469.174, Subdivision 10(a) states, “…and more than 50 percent of the
buildings, not including outbuildings, are structurally substandard to a degree requiring substantial
renovation or clearance;”
a. Structurally substandard is defined under Minnesota Statutes, Section 469.174, Subdivision
10(b), which states: “For purposes of this subdivision, ‘structurally substandard’ shall
mean containing defects in structural elements or a combination of deficiencies in
essential utilities and facilities, light and ventilation, fire protection including adequate
egress, layout and condition of interior partitions, or similar factors, which defects or
deficiencies are of sufficient total significance to justify substantial renovation or
clearance.”
i. We do not count energy code deficiencies toward the thresholds required by
Minnesota Statutes, Section 469.174, Subdivision 10(b)) defined as “structurally
substandard”, due to concerns expressed by the State of Minnesota Court of Appeals
in the Walser Auto Sales, Inc. vs. City of Richfield case filed November 13, 2001.
Findings:
The 49 Club building at 6007 Hodgson Road exceeds the criteria required to be determined a
substandard building (see the attached Building Code, Condition Deficiency and Context Analysis
Report).
b. Buildings are not eligible to be considered structurally substandard unless they meet certain
additional criteria, as set forth in Subdivision 10(c) which states:
“A building is not structurally substandard if it is in compliance with the building code
applicable to new buildings or could be modified to satisfy the building code at a cost of less
than 15 percent of the cost of constructing a new structure of the same square footage and
type on the site. The municipality may find that a building is not disqualified as structurally
substandard under the preceding sentence on the basis of reasonably available evidence, such
as the size, type, and age of the building, the average cost of plumbing, electrical, or structural
repairs, or other similar reliable evidence.”
“Items of evidence that support such a conclusion [that the building is not disqualified]
include recent fire or police inspections, on-site property tax appraisals or housing inspections,
exterior evidence of deterioration, or other similar reliable evidence.”
LHB counts energy code deficiencies toward the 15 percent code threshold required by
Minnesota Statutes, Section 469.174, Subdivision 10(c)) for the following reasons:
• The Minnesota energy code is one of ten building code areas highlighted by the
Minnesota Department of Labor and Industry website where minimum construction
standards are required by law.
• The index page of the 2007 Minnesota Building Code lists the Minnesota Energy
Code as a “Required Enforcement” area compared to an additional list of “Optional
Enforcement” chapters.
Page: 4
Date: March 27, 2015
• Chapter 11 of the 2015 Minnesota Residential Code incorporates Minnesota Rules,
Chapters, 1322 and 1323 Minnesota Energy Code.
• The Senior Building Code Representative for the Construction Codes and Licensing
Division of the Minnesota Department of Labor and Industry confirmed that the
Minnesota Energy Code is being enforced throughout the State of Minnesota.
• In a January 2002 report to the Minnesota Legislature, the Management Analysis
Division of the Minnesota Department of Administration confirmed that the
construction cost of new buildings complying with the Minnesota Energy Code is
higher than buildings built prior to the enactment of the code.
• Proper TIF analysis requires a comparison between the replacement value of a new
building built under current code standards with the repairs that would be necessary
to bring the existing building up to current code standards. In order for an equal
comparison to be made, all applicable code chapters should be applied to both
scenarios. Since current construction estimating software automatically applies the
construction cost of complying with the Minnesota Energy Code, energy code
deficiencies should also be identified in the existing structures.
Findings:
The building has code deficiencies exceeding the 15 percent building code deficiency criteria
required to be determined substandard (see the attached Building Code, Condition Deficiency
and Context Analysis Report).
TEAM CREDENTIALS
Michael A. Fischer, AIA, LEED AP - Project Principal/TIF Analyst
Michael has 28 years of experience as project principal, project manager, project designer and project
architect on planning, urban design, educational, commercial and governmental projects. He has become
an expert on Tax Increment Finance District analysis assisting over 100 cities with strategic planning for
TIF Districts. He is a Senior Vice President at LHB and currently leads the Minneapolis office.
Michael completed a two-year Bush Fellowship, studying at MIT and Harvard in 1999, earning Masters
degrees in City Planning and Real Estate Development from MIT. He has served on more than 50
committees, boards and community task forces, including a term as a City Council President and as Chair
of a Metropolitan Planning Organization. Most recently, he served as Chair of the Edina, Minnesota
planning commission. Michael has also managed and designed several award-winning architectural
projects, and was one of four architects in the Country to receive the AIA Young Architects Citation in
1997.
Philip Waugh – Project Manager/TIF Analyst
Philip is a project manager with 13 years of experience in historic preservation, building investigations,
material research, and construction methods. He previously worked as a historic preservationist and also
served as the preservation specialist at the St. Paul Heritage Preservation Commission. Currently, Philip
sits on the Board of Directors for the Preservation Alliance of Minnesota. His current responsibilities
include project management of historic preservation projects, performing building condition surveys and
analysis, TIF analysis, writing preservation specifications, historic design reviews, writing Historic
Preservation Tax Credit applications, preservation planning, and grant writing.
Page: 5
Date: March 27, 2015
Phil Fisher – Inspector
For 35 years, Phil Fisher worked in the field of Building Operations in Minnesota including White Bear Lake
Area Schools. At the University of Minnesota he earned his Bachelor of Science in Industrial Technology.
He is a Certified Playground Safety Inspector, Certified Plant Engineer, and is trained in Minnesota
Enterprise Real Properties (MERP) Facility Condition Assessment (FCA). His FCA training was recently
applied to the Minnesota Department of Natural Resources Facilities Condition Assessment project
involving over 2,000 buildings.
ATTACHMENTS
We have attached a Building Code, Condition Deficiency and Context Analysis Report, Replacement
Cost Report, Code Deficiency Report, and thumbnail photo sheets of the building.
Please contact me at (612) 752-6920 if you have any questions.
LHB INC.
MICHAEL A. FISCHER, AIA, LEED AP
SENIOR VICE PRESIDENT
M:\15Proj\150099\400 Design\406 Reports\Final Report\150099 Lino Lakes 49 Club Letter of Finding 20150327.docx
Lino Lakes 49 Club Redevelopment TIF District Letter of Finding
Building Code, Condition Deficiency and Context Analysis Report
March 26, 2015
Map No. & Address: Map A - 6007 Hodgson Road, Lino Lakes, MN 55014
Inspection Date(s) & Time(s): March 13, 2015 4:00 PM
Inspection Type: Interior and Exterior
Summary of Deficiencies: It is our professional opinion that this building is Substandard
because:
- Substantial renovation is required to correct Conditions found.
- Building Code deficiencies total more than 15% of
replacement cost, NOT including energy code deficiencies.
Estimated Replacement Cost: $940,500
Estimated Cost to Correct Building Code Deficiencies: $575,019
Percentage of Replacement Cost for Building Code Deficiencies: 61.14%
Defects in Structural Elements
1. A code required wind uplift system is missing on the exterior wall connection to the roof.
2. East and West wall are tied together with a suspect system to prevent movement.
Combination of Deficiencies
1. Essential Utilities and Facilities
a. Water service to the building has been disconnected.
b. Electrical service is disconnected.
c. There are no code accessible restrooms.
d. There is no code required accessible parking spaces.
2. Light and Ventilation
a. Electrical branch wiring has been removed.
b. All light fixtures have been removed.
c. The exhaust system has been removed.
d. The ventilation system has been disconnected. The age and condition of it make it suspect if
it would work as designed.
3. Fire Protection/Adequate Egress
a. There is not a code compliant fire protection system in the kitchen.
b. Stairs do not have code compliant hand rails.
c. The exterior steps leading from the kitchen area are missing and required by code.
d. The East and West exterior doors do not have code approved thresholds.
e. The East glass door does not have the code required 10 inch kick plates.
f. Flooring is missing, torn, or damaged preventing code compliant exiting from the building.
Lino Lakes 49 Club Redevelopment TIF District
Letter of Finding Building Report
LHB Project No. 150099 Page 1 of 2 Map A
4. Layout and Condition of Interior Partitions/Materials
a. The ceiling in the residence is stained from water intrusion and damaged by vandals.
b. Code approved wall surfacing is absent in the kitchen and restaurant areas.
c. Wall surfaces in the residence have been damaged by vandals with holes and graffiti.
d. All insulation in the kitchen and restaurant has been removed.
5. Exterior Construction
a. Roof is in need of code required replacement to prevent water intrusion.
b. Code required siding is missing on the North side of the building.
c. Soffit and fascia are missing from the North side of the building.
d. Exterior siding is damaged and in need of repair and paint to prevent water intrusion.
e. Window glass is missing and is allowing water intrusion.
f. Door glass on the west side of the building is broken.
Description of Code Deficiencies
1. Provide adequate water supply for fire and life safety system.
2. Replace all electrical wiring and electrical panels in order to provide adequate illuminated egress.
3. Install adequate plumbing for restroom accessibility.
4. Replace HVAC system that is non-existent.
5. All exit doors have non-compliant steps down to landing.
6. Thresholds at egress doors exceed allowable 1/2”.
7. Aluminum and glass doors lack required 10” high kick plate.
8. Flooring needs to be securely installed to create a slip resistant pathway to egress.
9. Replace roof to prevent water intrusion.
10. Replace exterior siding to prevent water intrusion.
11. Commercial kitchen exhaust shall have a separate fire suppression system.
12. Stairways shall have handrails on both sides.
13. Exterior walls do not conform to fire restrictive construction.
14. Install required wind up lift connection system to exterior wall and roof.
Overview of Deficiencies
The original structure was built in 1967 and has several additions, the latest having burned down several years
ago. The interior is void of all essential utilities and necessary facilities to be considered a functional place of
business.
Lino Lakes 49 Club Redevelopment TIF District
Letter of Finding Building Report
LHB Project No. 150099 Page 2 of 2 Map A
Lino Lakes 49 Club Redevelopment TIF District Letter of Finding
Replacement Cost Report
Map A - 49 Club
City of Lino Lakes
6007 Hodgson Road, Lino Lakes, MN 55014
Building Type:
Restaurant with Wood Siding / Wood
Frame
Location:SAINT PAUL, MN
Story Count:1
Story Height (L.F.):12
Floor Area (S.F.):5150
Labor Type:OPN
Basement Included:No
Data Release:Year 2015
Cost Per Square Foot:$182.62
Building Cost:$940,500
% of Total Cost Per S.F. Cost
8.89% $14.76 $76,000.00
A1010 Standard Foundations $3.44 $17,700.00
A1030 Slab on Grade $5.69 $29,300.00
A2010 Basement Excavation $0.57 $2,950.00
A2020 Basement Walls $5.03 $25,900.00
24.80% $41.17 $212,000.00
B1010 Floor Construction $1.17 $6,050.00
B1020 Roof Construction $7.69 $39,600.00
B2010 Exterior Walls $6.85 $35,300.00
B2020 Exterior Windows $10.58 $54,500.00
B2030 Exterior Doors $5.65 $29,100.00
Estimate Name:
Costs are derived from a building model with basic components.
Scope differences and market conditions can cause costs to vary significantly.
A Substructure
Strip footing, concrete, reinforced, load 11.1 KLF, soil bearing
capacity 6 KSF, 12" deep x 24" wide
Spread footings, 3000 PSI concrete, load 25K, soil bearing capacity
3 KSF, 3' - 0" square x 12" deep
Slab on grade, 4" thick, non industrial, reinforced
Excavate and fill, 4000 SF, 4' deep, sand, gravel, or common earth,
on site storage
Foundation wall, CIP, 4' wall height, direct chute, .148 CY/LF, 7.2
PLF, 12" thick
B Shell
Wood column, 8" x 8", 20' x 20' bay, 12' unsupported height, 160
BF/MSF, 160 PSF total allowable load
Wood roof, truss, 4/12 slope, 24" O.C., 30' to 43' span
Wood siding, 2"x4" studs 16"OC, insulated wall, 1" x 12" sawn cedar,
1" x 4" battens
Aluminum flush tube frame, for 1/4"glass,1-3/4"x4", 5'x6' opening, no
intermediate horizontals
Glazing panel, plate glass, 1/4" thick, tempered
Door, aluminum & glass, without transom, full vision, double door,
hardware, 6'-0" x 7'-0" opening
Door, aluminum & glass, with transom, non-standard, double door,
hardware, 6'-0" x 10'-0" opening
Lino Lakes 49 Club Redevelopment TIF District
Letter of Finding
LHB Project No. 150099 Page 1 of 3
Replacement Cost Report
Map A
% of Total Cost Per S.F. Cost
B3010 Roof Coverings $9.07 $46,700.00
B3020 Roof Openings $0.10 $500.00
15.50% $25.73 $132,500.00
C1010 Partitions $4.50 $23,200.00
C1020 Interior Doors $2.17 $11,200.00
C1030 Fittings $0.70 $3,600.00
C3010 Wall Finishes $2.04 $10,500.00
C3020 Floor Finishes $9.05 $46,600.00
C3030 Ceiling Finishes $7.26 $37,400.00
50.82% $84.37 $434,500.00
D2010 Plumbing Fixtures $10.78 $55,500.00
D2020 Domestic Water Distribution $8.31 $42,800.00
D3050 Terminal & Package Units $36.89 $190,000.00
Door, steel 18 gauge, hollow metal, 1 door with frame, no label, 3'-0"
x 7'-0" opening
Wood roofing, cedar shingles, 16" x 5", 4" min slope, 5" exposure,
1.6 PSF
Insulation, rigid, roof deck, fiberglass, 3'x4' or 4'x8' sheets, 15/16"
thick, R3.70
Gutters, box, aluminum, .027" thick, 5", enameled finish
Downspout, aluminum, rectangular, 2" x 3", embossed mill finish,
.020" thick
Skylight, plastic domes, insulated curbs, nominal size to 10 SF,
double glazing
C Interiors
Wood partition, 5/8"fire rated gypsum board face, none base,2 x 4,@
16" OC framing,same opposite face, 0 insul
5/8" gypsum board, taped & finished, painted on metal furring
Door, single leaf, wood frame, 3'-0" x 7'-0" x 1-3/8", birch, hollow
core
Toilet partitions, cubicles, ceiling hung, plastic laminate
Painting, interior on plaster and drywall, walls & ceilings, roller work,
primer & 2 coats
Ceramic tile, thin set, 4-1/4" x 4-1/4"
Carpet tile, nylon, fusion bonded, 18" x 18" or 24" x 24", 35 oz
Tile, quarry tile, mud set, minimum
Tile, quarry tile, mud set, maximum
g, , ,
channel grid, suspended support
D Services
Water closet, vitreous china, bowl only with flush valve, wall hung
Urinal, vitreous china, wall hung
Lavatory w/trim, vanity top, PE on CI, 20" x 18"
Kitchen sink w/trim, countertop, stainless steel, 44" x 22" triple bowl
Service sink w/trim, PE on CI,wall hung w/rim guard, 24" x 20"
Shower, stall, baked enamel, terrazzo receptor, 36" square
Water cooler, electric, wall hung, dual height, 14.3 GPH
Gas fired water heater, commercial, 100< F rise, 500 MBH input, 480
GPH
Rooftop, multizone, air conditioner, restaurants, 3,000 SF, 15.00 ton
Commercial kitchen exhaust/make-up air system, rooftop, gas, 2000
CFM
Lino Lakes 49 Club Redevelopment TIF District
Letter of Finding
LHB Project No. 150099 Page 2 of 3
Replacement Cost Report
Map A
% of Total Cost Per S.F. Cost
D4010 Sprinklers $8.70 $44,800.00
D4020 Standpipes $2.00 $10,300.00
D5010 Electrical Service/Distribution $4.35 $22,400.00
D5020 Lighting and Branch Wiring $9.48 $48,800.00
D5030 Communications and Security $3.50 $18,000.00
D5090 Other Electrical Systems $0.32 $1,650.00
0% $0.00 $0.00
E1090 Other Equipment $0.00 $0.00
0% $0.00 $0.00
0% $0.00 $0.00
100% $166.03 $855,000.00
10.00% $16.60 $85,500.00
0.00% $0.00 $0.00
0.00% $0.00 $0.00
$182.62 $940,500.00
Wet pipe sprinkler systems, steel, light hazard, 1 floor, 2000 SF
Wet pipe sprinkler systems, steel, ordinary hazard, 1 floor, 1000 SF
Wet standpipe risers, class III, steel, black, sch 40, 4" diam pipe, 1
floor
Overhead service installation, includes breakers, metering, 20'
conduit & wire, 3 phase, 4 wire, 120/208 V, 400 A
Feeder installation 600 V, including RGS conduit and XHHW wire,
400 A
Switchgear installation, incl switchboard, panels & circuit breaker,
120/208 V, 1 phase, 400 A
Receptacles incl plate, box, conduit, wire, 10 per 1000 SF, 1.2 watts
per SF
Miscellaneous power, 1.8 watts
Central air conditioning power, 6 watts
Fluorescent fixtures recess mounted in ceiling, 1.6 watt per SF, 40
FC, 10 fixtures @32watt per 1000 SF
Communication and alarm systems, fire detection, addressable, 12
detectors, includes outlets, boxes, conduit and wire
Fire alarm command center, addressable without voice, excl. wire &
conduit
Generator sets, w/battery, charger, muffler and transfer switch,
gas/gasoline operated, 3 phase, 4 wire, 277/480 V, 15 kW
E Equipment & Furnishings
F Special Construction
G Building Sitework
SubTotal
Contractor Fees (General Conditions,Overhead,Profit)
Architectural Fees
User Fees
Total Building Cost
Lino Lakes 49 Club Redevelopment TIF District
Letter of Finding
LHB Project No. 150099 Page 3 of 3
Replacement Cost Report
Map A
Lino Lakes 49 Club Redevelopment TIF District Letter of Finding
Code Deficiency Cost Report
Map A - 6007 Hodgson Road, Lino Lakes, MN 55014 - PID 31-31-22-43-0007
Code Related Cost Items Unit Cost Units
Unit
Quantity Total
Accessibility Items
Restrooms
Install plumbing fixtures for accessible restrooms 10.78$ SF 5,150 55,517.00$
Structural Elements
Wind up lift requirement
Install code required wind up lift system between
trusses/rafters and exterior wall 1.75$ SF 5,150 9,012.50$
Exiting
Thresholds
Correct elevation drop from interior to exterior landing 1,000.00$ Ea 4 4,000.00$
Reduce threshold elevation to less than 1/2 inch 250.00$ Ea 4 1,000.00$
Glass Dooors
Install code required 10 inch kick plate 150.00$ Ea 4 600.00$
Flooring
Install level flooring to allow emergency egress 9.05$ SF 5,150 46,607.50$
Lighting
Install branch wiring and lights for egress 9.48$ SF 5,150 48,822.00$
Fire Protection
Commercial Kitchen
Install code required fire suppression system 3.70$ SF 2,000 7,400.00$
Entire building
Install code required fire alarm system 3.50$ SF 5,150 18,025.00$
Interior walls/ceilings
Install code required wall and ceiling finishes 9.30$ SF 5,150 47,895.00$
Exterior Construction
Wood Siding
Repair/replace wood siding to prevent water intrusion 5.00$ SF 5,150 25,750.00$
Lino Lakes 49 Club Redevelopment TIF District
Letter of Finding
LHB Project No. 150099
Page 1 of 2
Code Deficiency Cost Report
Map A
Code Related Cost Items Unit Cost Units
Unit
Quantity Total
Roof Construction
Replace roof that has failed.
Remove old roof 0.90$ SF 5,150 4,635.00$
Replace with new roof 9.07$ SF 5,150 46,710.50$
Mechanical- Electrical
Electrical
Install new electrical service 4.35$ SF 5,150 22,402.50$
Plumbing
Install domestic water distribution system 8.31$ SF 5,150 42,796.50$
Mechanical
Install HVAC system 36.89$ SF 5,150 189,983.50$
Provide electrical service to new HVAC 0.75$ SF 5,150 3,862.50$
Total Code Improvements 575,019.50$
Lino Lakes 49 Club Redevelopment TIF District
Letter of Finding
LHB Project No. 150099
Page 2 of 2
Code Deficiency Cost Report
Map A
Lino Lakes 49 Club Redevelopment TIF District Letter of Finding
Map A, 6007 Hodgson Road - Photos
Page 1 of 6
P1020945.JPG P1020946.JPG P1020948.JPG
P1020949.JPG P1020950.JPG P1020951.JPG
P1020953.JPG P1020955.JPG P1020956.JPG
P1020957.JPG P1020958.JPG P1020959.JPG
Page 2 of 6
Lino Lakes 49 Club Redevelopment TIF District
Letter of Finding
LHB Project No. 150099
Photos
Map A
P1020960.JPG P1020961.JPG P1020962.JPG
P1020963.JPG P1020964.JPG P1020966.JPG
P1020967.JPG P1020968.JPG P1020969.JPG
P1020970.JPG P1020971.JPG P1020972.JPG
Page 3 of 6
Lino Lakes 49 Club Redevelopment TIF District
Letter of Finding
LHB Project No. 150099
Photos
Map A
P1020973.JPG P1020974.JPG P1020975.JPG
P1020976.JPG P1020977.JPG P1020979.JPG
P1020980.JPG P1020981.JPG P1020982.JPG
P1020983.JPG P1020984.JPG P1020985.JPG
Page 4 of 6
Lino Lakes 49 Club Redevelopment TIF District
Letter of Finding
LHB Project No. 150099
Photos
Map A
P1020986.JPG P1020987.JPG P1020988.JPG
P1020989.JPG P1020990.JPG P1020991.JPG
P1020994.JPG P1020995.JPG P1020996.JPG
P1020997.JPG P1020998.JPG P1020999.JPG
Page 5 of 6
Lino Lakes 49 Club Redevelopment TIF District
Letter of Finding
LHB Project No. 150099
Photos
Map A
P1030001.JPG P1030002.JPG P1030003.JPG
P1030004.JPG P1030005.JPG P1030006.JPG
P1030007.JPG P1030008.JPG P1030009.JPG
P1030010.JPG P1030011.JPG P1030012.JPG
Page 6 of 6
Lino Lakes 49 Club Redevelopment TIF District
Letter of Finding
LHB Project No. 150099
Photos
Map A
P1030013.JPG P1030014.JPG P1030017.JPG
P1030018.JPG P1030019.JPG P1030020.JPG
P1030021.JPG P1030022.JPG P1030023.JPG
P1030024.JPG P1030025.JPG
476794v1 JAE LN140-114
LINO LAKES ECONOMIC DEVELOPMENT AUTHORITY
RESOLUTION NO. 16-02
RESOLUTION APPROVING A PRELIMINARY DEVELOPMENT AGREEMENT
WITH DM LAND, LLC
WHEREAS, the Lino Lakes Economic Development Authority (the “Authority”) desires to
promote redevelopment of property located in the City of Lino Lakes, Minnesota (the “City”)
known as the Old 49 Club Site (the “Property”); and
WHEREAS, the Developer owns the Property and intends to demolish the restaurant and
garage buildings currently located on the Property; and
WHEREAS, pursuant to a report from LHB, dated March 27, 2015, the buildings are in
substandard condition; and
WHEREAS, the Board of Commissioners of the Authority (the “Board”) has previously
found the buildings located on the Property to be structurally substandard within the meaning of
Minnesota Statutes, Section 469.174, subdivision 10; and
WHEREAS, demolition of the existing buildings will encourage the redevelopment of the
Property; and
WHEREAS, there has been presented before the Board a form of Preliminary Development
Agreement (the “Preliminary Development Agreement”) proposed to be entered into between the
Authority and the Developer, which sets forth the Developer’s intentions and the conditions under
which the Developer will demolish the existing buildings on the Property and undertake the
redevelopment of the Property; and
WHEREAS, a preliminary development agreement entered into prior to demolition is
required by Minnesota Statutes, Section 469.174, subdivision 10 in order for the Authority to be
able to establish a redevelopment tax increment district after the demolition occurs; and
WHEREAS, the Authority has reviewed the Preliminary Development Agreement and
finds that the execution thereof by the Authority and the performance of the Authority’s obligations
thereunder are in the best interest of the City and its residents;
NOW, THEREFORE, BE IT RESOLVED BY THE Board of Commissioners of the
Lino Lakes Economic Development Authority as follows:
2
476794v1 JAE LN140-114
1. The Preliminary Development Agreement in substantially the form presented to the
Board and on file with the Community Development Director of the City is hereby in all respects
approved, subject to modifications that do not alter the substance of the transaction and that are
approved by the President and Executive Director; provided that execution of such documents by
such officials shall be conclusive evidence of approval.
2. The President and Executive Director are hereby authorized to execute the
Preliminary Development Agreement on behalf of the Authority and to carry out on behalf of the
Authority the Authority’s obligations thereunder.
Adopted by the Board of Commissioners of the Lino Lakes Economic Development Authority this
11th day of April, 2016.
The motion for the adoption of the foregoing resolution was introduced by Board Member
_______________and was duly seconded by Board Member ________________ and upon vote
being taken thereon, the following voted in favor thereof:
The following voted against same:
William Kusterman, President
ATTEST:
Jeff Karlson, Executive Director
445151v1 JAE WA445-15
PRELIMINARY DEVELOPMENT AGREEMENT
THIS PRELIMINARY DEVELOPMENT AGREEMENT (this “Agreement”), dated this
___ day of ____________, 2016, by and between the Lino Lakes Economic Development
Authority, a municipal corporation and political subdivision under the laws of the State of
Minnesota (the “EDA”) and DM Land, LLC, a Minnesota limited liability company, or its
successors or assigns (the “Developer”):
WITNESSETH
WHEREAS, the EDA desires to promote redevelopment of property known as the 49 Club
Site, located in the City of Lino Lakes, and legally described in Exhibit A (the “Property”); and
WHEREAS, the Developer owns the Property and intends to demolish the restaurant
building and garage currently located on the Property; and
WHEREAS, pursuant to a report from LHB, dated March 27, 2015, the buildings are in
substandard condition; and
WHEREAS, by resolution adopted on the date hereof, the EDA Board has found the
buildings located on the Property to be structurally substandard within the meaning of Minnesota
Statutes, Section 469.174, subd. 10(b); and
WHEREAS, the EDA and the Developer have determined that it is in the best interest of the
parties to demolish the existing building and agree to cooperate with respect to potential future
redevelopment of the Property, all as further described in this Agreement;
NOW, THEREFORE, in consideration of the foregoing and of the mutual covenants and
obligations set forth herein, the parties agree as follows:
1. During the term of this Agreement, the Developer (or its successors and assigns)
shall:
(a) At no cost to the EDA, cause the existing buildings on the Property to be
demolished and all demolition debris to be removed from the Property as soon as reasonably
practicable after the date of this Agreement. The parties agree that Developer will not be
required to remove the existing concrete and asphalt slabs on the Property. The parties agree
that such demolition shall occur no later than July 31, 2016.
(b) Maintain the Property in compliance with City ordinances. The Parties agree
that leaving the concrete and asphalt slabs on the Property are in compliance with City
ordinances.
(c) If the Developer determines not to undertake redevelopment of the Property
directly, it will use its best efforts to seek a successor entity that will proceed with such
445151v1 JAE WA445-15 2
redevelopment.
(d) Negotiate in good faith with the EDA regarding any proposed
redevelopment of the Property, including any possible public financial assistance related
thereof, all with the goal of entering into a contract for private redevelopment (the
“Contract”).
2. During the term of this Agreement, the EDA agrees to:
(a) Review any proposed successor to the Developer, and if the EDA determines
to approve that successor, thereafter cooperate with the successor as the Developer under
this Agreement.
(b) Cooperate with the Developer or its successor in evaluating any
redevelopment proposal submitted by the Developer, including whether any public financial
assistance is warranted in connection with that effort.
(c) Proceed to seek all necessary information with regard to the anticipated
public costs associated with any proposed redevelopment.
(d) If the EDA determines that tax increment assistance is reasonably necessary
in order to induce the proposed redevelopment of the Property, with the Developer’s
assistance, begin the process to create a redevelopment, a housing or a renewal and
renovation tax increment financing district encompassing the Property, including the
preparation of a tax increment financing plan, pursuant to Minnesota Statutes, Sections
469.174 through 469.1799, as amended (collectively, the “TIF Act”); provided that parties
agree and understand that the EDA must file a request for certification of such a tax
increment financing district within three years after the date of demolition of the building on
the Property, unless Section 469.174, subd. 10(d) is hereafter amended to extend that time
period.
(e) Negotiate in good faith with the Developer or a successor regarding any
proposed redevelopment of the Property, including any possible public financial assistance
related thereto, all with the goal of entering into a Contract.
3. It is expressly understood that execution and implementation of the Contract shall be
subject to:
(a) A determination by the EDA in its sole discretion that its undertakings are
feasible based on (i) the projected tax increment revenues and any other revenues designated
by the EDA; (ii) the purposes and objectives of any tax increment, development, or other
plan created or proposed for the purpose of providing financial assistance for the
Redevelopment; and (iii) the best interests of the EDA.
(b) A determination by the EDA that any EDA financial assistance is reasonably
necessary in order to make the Redevelopment financially feasible.
445151v1 JAE WA445-15 3
(c) A determination by the Developer or its successor that the Redevelopment is
economically feasible and in the best interests of the Developer or his successor.
4. This Agreement is effective from the date hereof through December 31, 2017. After
such date, neither party shall have any obligation hereunder except as expressly set forth to the
contrary herein. Notwithstanding anything to the contrary herein, the term of this Agreement may
be extended by mutual written agreement of the parties, provided that the EDA’s approval of such
extension may be given by the EDA Executive Director.
5. The Developer shall solely be responsible for all costs incurred by the Developer,
and the EDA shall be solely responsible for all costs incurred by the EDA, in connection with the
negotiation and drafting of this Agreement and the parties obligations hereunder.
6. This Agreement may be terminated upon ten (10) days written notice by either party
to the other of any of the following events of default, only if such events of default shall remain
uncured during the aforementioned notice period:
(a) an essential precondition to the execution of the Contract cannot be met; or
(b) if, in the sole discretion of the EDA, an impasse has been reached in the
negotiation or implementation of any material term or condition of this Agreement or the
Contract; or
7. If any portion of this Agreement is held invalid by a court of competent jurisdiction,
such decision shall not affect the validity of any remaining portion of the Agreement.
8. In the event any covenant contained in this Agreement should be breached by one
party and subsequently waived by another party, such waiver shall be limited to the particular
breach so waived and shall not be deemed to waive any other concurrent, previous or subsequent
breach. This Agreement may not be amended nor any of its terms modified except by a writing
authorized and executed by all parties hereto.
9. Notice or demand or other communication between or among the parties shall be
sufficiently given if sent by mail, postage prepaid, return receipt requested or delivered personally:
(a) As to the EDA:
Lino Lakes Economic Development Authority
Lino Lakes City Hall
600 Town Center Pkwy
Lino Lakes, MN 55014-1182
Attn: Community Development Director
445151v1 JAE WA445-15 4
(b) As to the Developer:
DM Land, LLC
14814 102nd Street Circle N
Stillwater, MN 55082
Attn: Damon K. Lawson
and
Brutlag, Hartmann, & Trucke, P.A.
3555 Plymouth Blvd. Ste. 117
Plymouth, MN 55447
Attn: Matthew Doherty
10. This Agreement may be executed simultaneously in any number of counterparts, all
of which shall constitute one and the same instrument.
11. This Agreement shall be governed by and construed in accordance with the laws of
the State of Minnesota.
476746v1 JAE LN140-114 S-1
IN WITNESS WHEREOF, the parties have caused this Agreement to be duly executed as
of the day and year first above written.
LINO LAKES ECONOMIC DEVELOPMENT
AUTHORITY
By
________________________
Its President
By
________________________
Its Executive Director
DM LAND, LLC
Damon K. Lawson
Its _____________
476746v1 JAE LN140-114 A-1
EXHIBIT A
DESCRIPTION OF PROPERTY
Parcel A
Address: 6007 Hodgson Road, Lino Lakes, Minnesota
PID: 31-31-22-43-0007
Parcel B
Address: 295 Ash Street, Lino Lakes, Minnesota
PID: 31-31-22-43-0006
Parcel C
Address: [no street address]
PID: 31-31-22-43-0017
CITY COUNCIL WORK SESSION March 28, 2016
DRAFT
1
CITY OF LINO LAKES 1
MINUTES 2
3
DATE : March 28, 2016 4
TIME STARTED : 6:00 p.m. 5
TIME ENDED : 6:25 p.m. 6
MEMBERS PRESENT : Councilmember Rafferty, Kusterman, 7
Maher, Manthey and Mayor Reinert 8
MEMBERS ABSENT : None 9
10
11
Staff members present: City Administrator Jeff Karlson; Deputy Public Safety Director 12
Police – Kelly McCarthy; City Clerk Julie Bartell 13
14
1. ACE Program Update – Jeff Karlson noted the high level of activity for the 15
city’s ACE Program. The council had received a report at the last meeting on the activity 16
level along with three options to meet the increasing demands – limit participation in the 17
program, add an additional part time Community Service Office (CSO) position or add an 18
Office Tech in Administration to handle the work. Mr. Karlson said he has eliminated 19
the Office Tech possibility because a CSO is much costly. He reviewed the cost of the 20
CSO position and noted that, without a change, the Police Department will have to begin 21
limiting participation in the program now (they are already not allowing the option for 22
speeding tickets). 23
24
Council Member Maher noted the department’s grant funded traffic safety officer 25
position and asked how long it is in place. Deputy Director McCarthy explained that it is 26
in place for an additional two to three years. Administrator Karlson noted that the 27
position is also tied to production but that has not been a problem. 28
29
The council discussed the usual term of an individual in a CSO position, with staff 30
explaining it is commonly about two years; most often individuals in that position move 31
into police officer positions, either here or within other departments. 32
33
The idea of automation was brought up at the last meeting and staff explained the option 34
was reviewed but was not found to be feasible; Deputy Director McCarthy explained the 35
department’s evaluation of automating the process. Additionally the volunteers that 36
were working with the program have pretty much stepped away but that’s the nature of 37
using volunteers – they aren’t always going to be there. 38
39
Mayor Reinert reiterated his concern that any new position would have to be tied to a 40
certain activity level so it could be lowered if that activity goes down. Deputy Director 41
McCarthy said she’d have to get more data together to tie a position to activity numbers. 42
Council Member Manthey said he’d like to know if the program was originally budgeted 43
based on an accurate number. Administrator Karlson noted that the budget has increased 44
CITY COUNCIL WORK SESSION March 28, 2016
DRAFT
2
from its onset and Council Member Manthey suggested that it would interesting to review 45
a participation and cost comparison timeline. 46
47
The council discussed the effectiveness of the program with Deputy Director McCarthy 48
who explained how the department continues to gauge the benefit. She also noted the 49
positive feedback they’ve received. 50
51
The council discussed why speeding tickets have been eliminated rather than other tickets 52
and Deputy Director McCarthy explained the analysis that went into that decision. It’s 53
based on continuing with areas where they feel people benefit most from an educational 54
push. 55
56
Mayor Reinert suggested that it’s appropriate to consider a change if a thorough review 57
indicates one but, again, only with a threshold included where that staffing can drop if 58
that becomes appropriate. The council concurred noting the benefit of the program to the 59
community, the learning potential and increased revenue associated with the program. 60
61
2. Review Regular City Council Agenda – There were no changes to the council 62
agenda. 63
64
The meeting was adjourned at 6:25 p.m. 65
66
These minutes were considered, corrected and approved at the regular Council meeting held on 67
April 14, 2016. 68
69
70
71
72
Julianne Bartell, City Clerk Jeff Reinert, Mayor 73
74
COUNCIL MINUTES March 28, 2016
DRAFT
1
CITY OF LINO LAKES 1
MINUTES 2
3
DATE : March 28, 2016 4
TIME STARTED : 6:30 p.m. 5
TIME ENDED : 6:35 p.m. 6
MEMBERS PRESENT : Council Member Rafferty, Kusterman, Maher, 7
Manthey, and Mayor Reinert 8
MEMBERS ABSENT : 9
10
Staff members present: City Administrator Jeff Karlson; Director of Public Safety John Swenson; 11
and City Clerk Julie Bartell 12
13
PUBLIC COMMENT 14
15
No one was present to address the council regarding a matter not on the agenda. 16
17
SETTING THE AGENDA 18
19
The agenda was approved as presented. 20
21
CONSENT AGENDA 22
23
Council Member Kusterman moved to approve the Consent Agenda, Items 1A through 1C, as 24
presented. Council Member Maher seconded the motion. Motion carried on a voice vote. 25
26
ITEM ACTION 27
28
Consideration of Expenditures: 29
30
March 28, 2016 (Check No. 103357– 31
103449, $610,326.24) Approved 32
33
Centennial Fire District (Check No. 2016002 34
in the amt of $885.14) Approved 35
36
March 7, 2016 Council Work Session 37
Minutes Approved 38
39
March 14, 2016 City Council Meeting 40
Minutes Approved 41
42
FINANCE DEPARTMENT REPORT 43
44
There was no report from the Finance Department. 45
COUNCIL MINUTES March 28, 2016
DRAFT
2
ADMINISTRATION DEPARTMENT REPORT 46
47
There was no report from the Administration Department. 48
49
PUBLIC SAFETY DEPARTMENT REPORT 50
51
There was no report from the Public Safety Department. 52
53
PUBLIC SERVICES DEPARTMENT REPORT 54
55
There was no report from the Public Services Department. 56
57
COMMUNITY DEVELOPMENT DEPARTMENT REPORT 58
59
There was no report from the Community Development Department. 60
61
UNFINISHED BUSINESS 62
63
There was no Unfinished Business. 64
65
NEW BUSINESS 66
67
There was no New Business. 68
69
COMMUNITY CALENDAR 70
71
Community Calendar – A Look Ahead 72
March 28, 2016 through April 11, 2016 73
Wednesday, March 30 6:30 pm, Council Chambers Environmental Board 74
Monday, April 4 6:00 pm, Community Room Council Work Session 75
Thursday, April 7 8:00 am, Community Room EDAC 76
Monday, April 11 6:30 pm, Council Chambers City Council Meeting 77
78
ADJOURN 79
80
There being no further business, Council Member Rafferty moved to adjourn at 6:35 p.m. Council 81
Member Maher seconded the motion. Motion carried on a voice vote. 82
83
These minutes were considered and approved at the regular Council Meeting, April 11, 2016. 84
85
86
87
88
Julianne Bartell, City Clerk Jeff Reinert, Mayor 89
90
CLOSED COUNCIL SESSION March 28, 2016
DRAFT
1
1
CITY OF LINO LAKES 2
MINUTES 3
CLOSED COUNCIL SESSION 4
5
DATE : March 28, 2016 6
TIME STARTED : 6:40 p.m. 7
TIME ENDED : 8:16 p.m. 8
MEMBERS PRESENT : Council Members Rafferty, Maher, 9
Manthey, Kusterman and Mayor Reinert 10
MEMBERS ABSENT : none 11
12
Staff present: City Administrator Jeff Karlson. 13
14
Mayor Reinert called the meeting to order at 6:40 p.m. in the Council Work Room at 15
Lino Lakes City Hall. Before the meeting was closed, Mayor Reinert read a statement on 16
the purpose of the meeting. The meeting was closed as a session of the city council 17
pursuant to the Open Meeting Law for the purpose of discussing labor negotiations. 18
19
The meeting was recorded. 20
21
The meeting was adjourned at 8:16 p.m. 22
23
These minutes were considered, corrected and approved at the regular Council meeting held on 24
April 14, 2016. 25
26
27
28
29
Julianne Bartell, City Clerk Jeff Reinert, Mayor 30
31
CITY COUNCIL
AGENDA ITEM 1E
STAFF ORIGINATOR: Diane Hankee, City Engineer
MEETING DATE: April 11, 2016
TOPIC: Consider Resolution No. 16-26, Adoption and Implementation of
Wellhead Protection Plan Part II
VOTE REQUIRED: 3/5
INTRODUCTION
Staff is requesting City Council consideration for the Adoption and Implementation of
Wellhead Protection Plan Part II.
BACKGROUND
On February 26, 2016, the Minnesota Department of Health (MDH) notified the City of Lino
Lakes that its Part 2 Wellhead Protection Plan (WHPP) was officially approved. The
preparation of the City’s WHPP is a requirement of Minnesota Rules 4720.5100 to 4720.5590.
The goal of the Plan is to prevent human-caused contaminants from entering the water supply
wells and to protect all who use the water supply from adverse health effects associated with
groundwater contamination. The Plan falls under the jurisdiction of the MDH and consists of
two parts (Part 1 and Part 2).
Part 1
Part 1 of Lino Lakes’ WHPP was completed in 2014. Part 1 is a technical exercise that uses
groundwater modeling to delineate the wellhead protection area (WHPA), Drinking Water
Supply Management Area (DWSMA) and includes a well and aquifer vulnerability assessment.
Part 1 addresses the three municipal water supply wells used by the City and the associated
source water aquifer.
Part 2
Part 2 of the WHPP describes how the results of the Part 1 can be applied to best protect a
community’s water supply. Data elements were collected and interpreted, and then impacts of
changes in land and water use were assessed. This allowed issues, problems, and opportunities
to be identified and included in the WHPP.
Next Steps
The goals and objectives of the Part 2 WHPP focus on managing potential contaminant sources
within the DWSMA, reducing the potential contaminant pathways to the source water aquifer
that may be provided by private wells, educating property owners and water supply users, and
working with the cities within the DWSMA to ensure proper management of the portion within
their respective community. Once adopted, the City must begin implementation of these
objectives. Specific goals outlined in Chapter 5 of the Part 2 Plan fall under the following
categories:
A. Well Management
B. Public Education
C. Storage Tank Management
D. Septic Systems (ISTS)
E. Stormwater Management
F. Hazardous Waste Management
G. Data Collection
H. Water Conservation
I. Planning and Zoning
J. Implementation
K. Evaluation
Specific examples of implementation activities include educating the public on lawn care
practices, maintain an up-to-date septic system inventory, and notifying storage tank owners
within the DWSMA that the tank is in a source water protection area.
The annual cost for WHPP implementation is approximately $10,000. Source Water Protection
grants from the Minnesota Department of Health are available to offset some of this cost.
These grants are available twice annually and do not require a cost-share.
The WHPP implementation plan was approved by the Environmental Board on March 30,
2016.
RECOMMENDATION
Staff is recommending that the City Council adopt Resolution 16-26 for the Adoption and
Implementation of Wellhead Protection Plan Part II.
ATTACHMENTS
1. Resolution 16-26
CITY OF LINO LAKES
RESOLUTION NO. 14-54
AUTHORIZING PROFESSIONAL ENGINEERING SERVICES TO PREPARE
AMENDMENT TO WELLHEAD PROTECTION PLAN - PART II
WHEREAS, The City Council is required by the Minnesota Department of Health to prepare
an amendment to the Wellhead Protection Plan;
WHEREAS, The City has received a proposal from WSB & Associates, Inc. to prepare Part II
of the required amendment to the Wellhead Protection Plan;
NOW, THEREFORE BE IT FURTHER RESOLVED by The City Council of The City of
Lino Lakes, Minnesota, that an amendment to the City’s Wellhead Protection Plan – Part II is
authorized to be performed by WSB & Associates, Inc at a cost of $19,499.
Adopted by the Council of the City of Lino Lakes this 9th day of June, 2014.
The motion for the adoption of the foregoing resolution was introduced by Council Member
_____________and was duly seconded by Council Member and upon vote being
taken thereon, the following voted in favor thereof:
The following voted against same:
_____________________
Jeff Reinert, Mayor
ATTEST:
________________________
Julianne Bartell, City Clerk
CITY OF LINO LAKES
RESOLUTION NO. 16-26
RESOLUTION ADOPTING AND IMPLEMENTING THE CITY OF LINO LAKES’
WELLHEAD PROTECTION PLAN
WHEREAS the City of Lino Lakes is a municipal corporation, organized and existing under the
laws of the State of Minnesota; and
WHEREAS, the City Council of the City of Lino Lakes has completed developing its Wellhead
Protection Plans pursuant to the requirements of Minnesota Rules 4720.5100 to 4720.5590; and
WHEREAS, the goal of the Wellhead Protection Plan is to prevent human-caused contaminants
from entering the water supply wells and to protect all who use the water supply from adverse
health effects associated with groundwater contamination; and
WHEREAS, Part I of the Wellhead Protection Plan is a technical exercise that uses ground
water modeling to delineate the wellhead protection area (WHPA), Drinking Water Supply
Management Area (DWSMA) and includes a well and aquifer vulnerability assessment; and
WHEREAS, Part 1 was developed and approved by the Minnesota Department of Health in
August of 2012; and
WHEREAS, Part 2 of the Wellhead Protection Plan describes how the results of the Part 1 can
be applied to best protect a community’s water supply, through the evaluation of several data
elements, including physical environment, land use, public utilities, water quantity and water
quality, an inventory of potential contaminants, and the preparation of a management portion of
the plan; and
WHEREAS, a public hearing was held, as required by Minnesota Rules (part 4720.5350, subpart
4) on March 9, 2015 for review of Part 2 prior to submittal to the Minnesota Department of
Health for approval; and
WHEREAS, the Minnesota Department of Health has found that the plan provides an adequate
assessment of the City’s source waters and contains goals, objectives and action strategies for the
potential sources covered by the plan; and is consistent with Minnesota’s wellhead protection
rules; and
NOW THEREFORE BE IT RESOLVED, by the City Council of the City of Lino Lakes that
Part 1 and Part 2 of the Wellhead Protection Plan are formally adopted.
Adopted by the Council of the City of Lino Lakes this 11th day of April, 2016.
The motion for the adoption of the foregoing resolution was introduced by Council Member
_______________and was duly seconded by Council Member ________________ and upon
vote being taken thereon, the following voted in favor thereof:
The following voted against same:
_______________________________
Jeff Reinert, Mayor
ATTEST:
________________________
Julianne Bartell, City Clerk
SPECIAL JOINT COUNCIL MEETING
DRAFT
March 23, 2016
1
CITY OF LINO LAKES 1
MINUTES 2
SPECIAL JOINT SESSION OF THE CITY COUNCIL, 3
PARK BOARD, ENVIRONMENTAL BOARD, PLANNING & ZONING BOARD 4
& ECONOMIC DEVELOPMENT ADVISORY COMMITTEE 5 6 7
DATE : March 23, 2016 8
TIME STARTED : 6:30 p.m. 9
TIME ENDED : 8:05 p.m. 10
11
COUNCIL MEMBERS PRESENT : Council Members Manthey, Rafferty, 12
Kusterman and Mayor Reinert 13
14
PLANNING AND ZONING PRESENT : P&Z Members Stoesz, Kassner, Evenson, 15
Root, Masonick and Tralle 16
17
ENVIRONMENTAL BOARD PRESENT : Environmental Board Members Heiskary, 18
Bor, Sullivan, Kaufenberg, Andrzejewksi 19
20
PARK BOARD PRESENT : Park Board Members Lindy, Nordlund, Jensen, 21
Huelman 22
23
EDAC PRESENT : EDAC Members Johnson, Masonick, Vojtech, Colgan 24
25 26
Staff members present: City Administrator Jeff Karlson; Community Development Director 27
Michael Grochala; Environmental Coordinator Marty Asleson; Public Services Director Rick 28
DeGardner; City Planner Katie Larsen; City Engineer Diane Hankee; City Clerk Julie Bartell 29 30
CALL TO ORDER 31
32
Community Development Director Grochala introduced city staff present as well as consultant 33
Kendra Lindahl of Landform who would be updating the group on the Watermark project that is 34
proposed for the northeast area of the city. 35
36
COMMUNITY DEVELOPMENT - PRESENTATION ON WATERMARK 37
DEVELOPMENT PROPOSAL BY MATTAMY HOMES 38
39
Ms. Lindahl reviewed a PowerPoint presentation on the Watermark development proposal by 40
Mattamy Homes (full presentation on file). The presentation included information on required 41
elements such as an amendment to the city’s comprehensive plan, rezoning, a preliminary plat 42
and PUD development staging plan. She reviewed what the schedule looks like at this point, 43
noting that the development is at the first step of a multi-step process. 44
45
The presentation included information on: 46
- Existing condition of the site; 47
SPECIAL JOINT COUNCIL MEETING
DRAFT
March 23, 2016
2
- AUAR done for the site in 2015; 48
- Comprehensive plan implications for the site; 49
- Zoning map implications for the site; 50
- Master planning; 51
- Parks and open space planning; 52
- Connections to future development (train connections, commercial facilities); 53
- Land use planning (density and consistency with the city’s comprehensive plan); 54
- Lot area exhibit showing lot sizes/house types; 55
- Plans to model all types of homes at the entrance to the development; 56
- Entry features for the development area (bridge, park concept); 57
- Streets planned within the development with green space to be maintained by the 58
development; 59
- A recreation center complex (5,000 sq ft). 60
61
Next steps for the proposed development will be advisory board review and hearings. 62
63
QUESTIONS AND COMMENTS 64
65
Environmental Board Member Barbara Bor asked about signaling planned for the development 66
area and Community Development Director Grochala reviewed plans for streets, including 67
signaling standards, and noted that signals will be possible and a part of design planning. 68
69
There were questions raised about the drainage system and whether it leads to the lakes that are 70
being created within the development. Mr. Grochala explained the current ditch system and the 71
drainage study that has been underway for the northeast area of the city; that impacts the 72
development area and involves the lake in the development. The lake itself would provide 73
irrigation water for the development. 74
75
A question arose about density and affordability and Community Development Director Grochala 76
explained that housing fitting into the affordable category isn’t a part of the development at this 77
time. He explained how density is phased and planned so that it generally increases toward the 78
commercial area to the south. Roads would be designed to carry a balanced amount of traffic. 79
80
In a discussion about transportation and the lack of commercial within the development, Mr. 81
Grochala noted that recent improvements to the intersection of 35E and CSAH 14 were key, and 82
along with improvements coming through a new drainage plan that in turn encourages more 83
rooftops in the area, will draw commercial to the area. 84
85
Mayor Reinert concurred, adding that one benefit of a master plan is that development doesn’t 86
occur piecemeal. He noted that a more dense development was originally planned for this site but 87
this is scaled down and still provides some of the density called for in the city’s comp plan. The 88
mayor noted his favor with the quick build-out of parks and the inclusion of a community center; 89
those elements will be present for residents very early rather than fifteen or so years down the line. 90
He said that overall he feels the development is a good addition to Lino Lakes but he still wants to 91
hear any concerns from board members as they review the plans. 92
93
The group discussed the availability of single level living space with development representative 94
Rick Packer outlining some single family styles that have a generational element. 95
96
SPECIAL JOINT COUNCIL MEETING
DRAFT
March 23, 2016
3
Elevation requirements around the water features was discussed; a priority will certainly be that 97
flood plain will not be included/created. The depth of the lakes themselves will be up to about 25 98
feet. 99
100
As the group reviewed the renderings of exterior home styling, it was pointed out that Mattamy 101
Homes is known for its variation in all areas of their homes, offering different products and 102
elevations throughout their developments. 103
104
ADJOURN 105
106
There being no further business to discuss, the meeting was adjourned at 8:05 p.m. 107
108
These minutes were considered, corrected and approved at the regular Council meeting held on 109
April 11, 2016. 110
111 112 113 114
City Clerk, Julianne Bartell Jeff Reinert, Mayor 115 116
AGENDA ITEM 3A
STAFF ORIGINATOR: Lisa Hogstad-Osterhues, Deputy Clerk
MEETING DATE: April 11, 2016
TOPIC Consider Resolution 16-22, Approving New
On-Sale Liquor and Sunday Sales License for Katrina’s
Mexican Grill and Cantina d/b/a/ Fiesta Cancun Mexican
Grill & Bar
VOTE REQUIRED: 3/5
INTRODUCTION
Katrina’s Mexican Grill and Cantina d/b/a Fiesta Cancun Mexican Grill & Bar is a new
restaurant that will be opening at 566 Lilac Street upon approval of the liquor license and
certificate of occupancy from the building department.
BACKGROUND
The application submitted to the City is complete, the related fees have been paid and insurance
information has been provided to the City as required. In addition, the Lino Lakes Police
Department has conducted the required background investigation on the applicant.
In accordance with the Lino Lakes Code of Ordinances, Section 701 relating to Liquor
Licensing, this application requires approval by the City Council. The code also requires that
opportunity shall be given to any person to be heard for or against the granting of the license.
The council may then, in its discretion, grant or refuse the application.
If local approval is granted, Monica Silva’s application for a liquor license will be forwarded to
the Minnesota Alcohol & Gambling Enforcement Division for review.
The applicant is aware that approval is subject to all the provisions and conditions of the laws of
the city, state and federal government.
RECOMMENDATION
Staff recommends the approval of the On-Sale Liquor and Sunday Sales License for Fiesta
Cancun Mexican Grill & Bar.
ATTACHMENTS
Resolution No. 16-22
CITY OF LINO LAKES
RESOLUTION NO. 16-22
APPROVING ISSUANCE OF NEW ON-SALE LIQUOR AND SUNDAY
LICENSE FOR KATRINA’S MEXICAN GRILL AND CANTINEA D/B/A/
FIESTA CANCUN, 566 LILAC STREET
WHEREAS, the city has received an application for an On-Sale Liquor and Sunday
License from Monica Silva, d/b/a Fiesta Cancun Mexican Grill & Bar located at 566
Lilac Street; and
WHEREAS, city staff has reviewed said application and determined that the request
meets the requirements of the City Code and Minnesota State Statutes for the type of
licenses requested; and
WHEREAS, the Police Department of the City of Lino Lakes has conducted an
investigation of the applicant, and;
WHEREAS, the applicant has provided proof of insurance as required and paid the
necessary fees;
NOW, THEREFORE BE IT RESOLVED, that the City Council of the City of Lino
Lakes hereby approves a new on-sale liquor and Sunday license for Fiesta Cancun
Mexican Grill & Bar subject to all the fees, provisions and conditions of the laws of the
city, state and federal government and the applicant will comply with all said laws.
Adopted by the Lino Lakes City Council this 11th day of April, 2016.
The motion for the adoption of the foregoing resolution was introduced by Council
Member
_____________and was duly seconded by Council Member ________ and upon vote
being taken thereon, the following voted in favor thereof:
The following voted against same:
______________________________
Jeff Reinert, Mayor
ATTEST:
______________________________________
Julianne Bartell, City Clerk
CITY COUNCIL
AGENDA ITEM 6A
STAFF ORIGINATOR: Diane Hankee
MEETING DATE: April 11, 2016
TOPIC: Consider Resolution No. 16-19, Approving First
Amendment - Joint Powers Agreement with the City of
Centerville, 21st Avenue Improvements and Maintenance
VOTE REQUIRED: 3/5
INTRODUCTION
Staff is requesting City Council consideration of a First Amendment - Joint Powers Agreement
with the City of Centerville for 21st Avenue Street and Utility Improvements and Maintenance.
BACKGROUND
On August 6, 2013 the City Council approved Resolution No. 13-91, for a Joint Powers
Agreement with the City of Centerville regarding the 21st Avenue Improvement Project. The
21st Avenue Improvement project was from Main Street (CSAH 14) to a point approximately
1,400 feet to the north. The project included a new roadway, storm sewer, water main, sanitary
sewer, and pedestrian facilities.
21st Avenue is centered on the corporate limits of Lino Lakes and Centerville. Accordingly an
agreement between both cities was required for construction; and this amendment addresses the
ongoing maintenance. The City of Centerville approved the agreement at their March 9, 2013
City Council meeting.
RECOMMENDATION
Staff is recommending approval of Resolution No. 16-19.
ATTACHMENTS
1. Resolution No. 16-19
2. Joint Powers Agreement
CITY OF LINO LAKES
RESOLUTION NO. 16-19
APPROVING FIRST AMENDMENT- JOINT POWERS AGREEMENT
BETWEEN THE CITY OF LINO LAKES AND THE CITY OF CENTERVILLE
REGARDING 21st AVENUE STREET AND UTILITY IMPROVEMENTS AND
MAINTENANCE
WHEREAS, 21st Avenue between Main Street and a point approximately 1,400 feet
north of Main Street is a line road between Lino Lakes and Centerville, with the
corporate boundary in the center of the street, as platted; and
WHEREAS, The City of Centerville and the City of Lino Lakes paved 21st Avenue
between Main Street and a point approximately 1,400 feet north of Main Street pursuant
to a Joint Powers Agreement; and
WHEREAS, the two Cities also desire to enter into a Joint Powers Agreement for the
ongoing maintenance of 21st Avenue.
NOW, THEREFORE BE IT RESOLVED by the City Council of the City of Lino
Lakes that the Joint Powers Agreement with the City of Centerville concerning the
ongoing maintenance of 21st Avenue between Main Street and a point approximately
1,400 feet north of Main Street.
Adopted by the Council of the City of Lino Lakes this 11th day of April, 2016.
The motion for the adoption of the foregoing resolution was introduced by Council
Member _______________and was duly seconded by Council Member
________________ and upon vote being taken thereon, the following voted in favor
thereof:
The following voted against same:
______________________________
Jeff Reinert, Mayor
ATTEST:
________________________
Julianne Bartell, City Clerk
o Uz o
U
b
w 0cn 4-, v ZN o
W
C7U >U
wxW
0
Oo NJ o
z z A Con F- < °
04
1 0 G
Wp zEw, . o U) 41
UF" WdW O : wW0 o
4-49L4U
o zOfE-ZdF" ,Wj
3
UWP waW o C) Up
P4 u o O ai
w o gOP,x
4-+ d a [ Z " obUwAba
cd1-4
Oz ~ o v; Z 4 c b
W Wad'0 c° w v
x xtooO (DwH -d
o zU -SO (n d d H
i
u
o p a0i
a°i
O cON N N a
U O
a 0 ami 44
4-4
OwWOZU a -do g c
dZU N
U U - N ,
I I 0.4O F V "C O M W 1
1-
20
0
Cd 0
cli
rA
U U cd
pop 030
Cd
lurAo
w >, U U U N O L; a 30 U p N
W U C4-4 o U o 0 3 0 o
rn
0
Cd
64
0-4
co
a
0
0
0
b
d
ami
U a
O
w
b
v
O
U o
W
4 w_
w
i
i
1
CITY COUNCIL
AGENDA ITEM 6B
STAFF ORIGINATOR: Katie Larsen, City Planner
MEETING DATE: April 11, 2016
TOPIC: Rice Lake Elementary School Addition
i. Consider Resolution No. 16-20 Approving Conditional
Use Permit Amendment and Site Plan Review for
Addition for Early Childhood Education
ii. Consider Resolution No. 16-21 Approving Site
Improvement Performance Agreement
VOTE REQUIRED: 3/5
INTRODUCTION
Staff is requesting City Council consideration of a Conditional Use Permit Amendment and
Site Plan Review for the Rice Lake Elementary School Addition for Early Childhood
Education.
Complete Application Date: February 5, 2016
60-Day Review Deadline: April 5, 2016
120-Day Review Deadline: June 4, 2016
Environmental Board Meeting: February 24, 2016
Park Board Meeting: NA
Planning & Zoning Board Meeting: March 9, 2016
City Council Work Session: April 4, 2016
City Council Meeting: April 11, 2016
BACKGROUND
Rice Lake Elementary School is proposing a 17,064 s.f. addition on the southeast corner of the
existing building for early childhood education. The school currently houses early childhood
family education and early childhood special education; however, they are in need of additional
space. The property address is 575 Birch Street. Construction is scheduled to start in June
2016 with substantial completion in December 2016.
The Planning & Zoning Staff Report dated March 9, 2016 details compliance of the project
with the City’s Comprehensive Plan and zoning ordinances. The Planning & Zoning Board
2
held a public hearing on March 9, 2016. There were no public comments and the Board
recommended approval with a 5-0 vote.
A Site Improvement Performance Agreement is required as detailed in Resolution No. 16-21.
The School Board approved the Agreement on March 28, 2016.
RECOMMENDATION
Staff and the Board recommend approval of Resolution Nos. 16-20 and No. 16-21.
ATTACHMENTS
1. Site Location Map
2. Sheet A-Overall Site Plan
3. Sheet A1 & A2, Exterior Elevations
4. Resolution No. 16-20
5. Resolution No. 16-21
6. Site Improvement Performance Agreement
0 2,000 4,0001,000
Feet
IJ49
IJ53
BIRCH STBIRCH STLAKE DRLAKE DRHHOODDGGSSOONNRRDDRICE CT
RICE CT
LINDA LALINDA LAEGRET LAEGRET LA S IO U X L ASIOUX L A
HOLLOW LAHOLLOW LAW A R E R DWARE R D
LAKOTA TRLAKOTA TRF
A
WN
L
A
F
A
WN
L
AGLENVIEW LAGLENVIEW LAS GLEN TRS GLEN TRLINDA AVELINDA AVE FOX RDFOX RDSUNRISE AVESUNRISE AVELINDEN LALINDEN LAHHOOKKAAHHDDRRBLA
C
K D
U
C
K D
R
BLA
C
K D
U
C
K D
R
HHOOLLLLYYCCTTPHEASANT RUN SPHEASANT RUN SOLD BIRCH STOLD BIRCH STWWSSHHAADDOOWWLLAAKKEEDDRR12TH AVE S12TH AVE SLAKEVIEW DRLAKEVIEW DRWOODRIDGE LAWOODRIDGE LA WARE RDWARE RD22NNDDAAVVEEH A W T H O R N R DHAWTHORN R D
HOLLY DRHOLLY DR62ND ST62ND STRICECREEKBALDWIN LAKEOHWL 883.1100-yr 886.1
WARDSLAKERESHANAU LAKEOHWL 883.5100-yr 886.0
RICE LAKEOHWL 883.1100-yr 886.0
CENTERVILLELAKE OHWL 885.0100-yr 886.3
CEDARLAKE OHWL892.9
Lino Lakes
Site Location Map µ
Rice Lake Elementary School
NEW BUILDING ADDITIONFFE = 900.50RAIN GARDENRAIN GARDENRELOCATEDTREESSPLIT-RAILWOOD FENCEDescriptionRev.DateSheet:Sheet Title:Project #:Drawn By:Checked By:Issue Date:12156103.000JAN3.30.163524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2015 Larson Engineering, Inc. All rights reserved.P:\Projects\Projects - 2015\12156103- Rice Lake Elementary\C. Design\Drawing Files\Rice Lake - Overall Site Plan.dwg3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comProject Title:Client:First M. Last, P.E.Date: Reg. No.:XXXXXI hereby certify that this plan,specifications or report was preparedby me or under my direct supervisionand that I am a duly licensedProfessional Engineer under the lawsof the state of Minnesota.of11AOVERALLSITE PLAN0NORTH204080RICE LAKE ELEMENTARY575 BIRCH STREETLINO LAKES, MN 55014CENTENNIAL SCHOOLSI. S. D. #124707 NORTH ROADCIRCLE PINES, MN 55014TOTAL PARKING STALL COUNT = 200TOTAL STALL COUNT REQUIREDBY CITY CODE = 143EXISTING IMPERVIOUS = 7.39 ACRESEXISTING PERVIOUS = 46.78 ACRESPROPOSED NEW IMPERVIOUS = 0.35ACRES9 TREES ARE BEING REMOVED.2 OF THOSE TREES HAVE ALREADYBEEN RELOCATED BY THE SCHOOL,THE LOCATES ARE SHOWN ON THEOVERALL SITE PLAN.PARKING STALL CALCULATIONS:1 SPACE FOR EACH CLASSROOM (53 CLASSROOMS) = 53 STALLS1 SPACE FOR EACH 300 STUDENTS (572 STUDENTS) = 2 STALLS1 SPACE FOR EACH EMPLOYEE (88 EMPLOYEES) = 88 STALLS1 SPACE FOR EACH 4 SEATS IN AUDITORIUM (NO AUDITORIUM) = 0 STALLSTOTAL = 143 STALLS
BASEML100'-0"EC ADDITION99'-6"EC TOP OF MASONRY114'-1 3/8"EXISTING T.O. PARAPET114'-8 3/8"04.0504.0204.0504.0104.0304.0404.0904.0504.0404.0904.0504.0404.0904.0504.0504.0104.0204.0308.3008.2804.0508.3008.2804.0508.3008.2804.0508.3008.2804.0508.3008.2804.0508.3008.2804.0204.0204.0104.0504.0904.04E001-AW6W6W1W1W1W126.9726.9722.98C.J.C.J.C.J.C.J.C.J.C.J.C.J.C.J.C.J.C.J.C.J.C.J.BRICK LEDGE ELEVATION: 99'-2"BRICK LEDGE ELEVATION: 98'-6"EXISTINGBUILDINGBEYOND07.38MATERIALS BREAKDOWN:MATERIALS BREAKDOWN:MATERIALS BREAKDOWN:MATERIALS BREAKDOWN: 3% PREFINISHED ALUMINIUM, 10% GLASS, 87% BRICK & GLAZED BLOCKBASEML100'-0"EC ADDITION99'-6"EC TOP OF MASONRY114'-1 3/8"EXISTING T.O. PARAPET114'-8 3/8"04.0504.0104.0304.0204.0404.0904.0504.0126.97C.J.BRICK LEDGE ELEVATION: 99'2"07.38MATERIALS BREAKDOWN:MATERIALS BREAKDOWN:MATERIALS BREAKDOWN:MATERIALS BREAKDOWN: 100% BRICK & GLAZED BLOCKBASEML100'-0"EC ADDITION99'-6"EC TOP OF MASONRY114'-1 3/8"EXISTING T.O. PARAPET114'-8 3/8"04.0504.0904.0304.0504.0104.0107.3804.0204.0504.0504.0504.0904.0504.0104.0204.0904.0504.0104.0504.0504.0504.0904.0504.0104.0904.0504.0104.0904.0504.0104.0904.0504.0104.0504.0304.0204.0108.3008.18SEE ELEVATIONB1/A6.0304.0204.0204.0208.3008.1808.3008.1808.3008.1808.3008.1808.3008.1808.3008.18W1W1W1E003-AW6W6W6W608.0308.0726.9726.9726.9710.0710.0722.98C.J.C.J.C.J.C.J.C.J.C.J.C.J.C.J.C.J.C.J.C.J.C.J.C.J.C.J.BRICK LEDGE ELEVATION: 98'-6"EXISTING BUILDING BEYONDEXISTINGBUILDINGBEYONDMATERIALS BREAKDOWN:MATERIALS BREAKDOWN:MATERIALS BREAKDOWN:MATERIALS BREAKDOWN: 3% PREFINISHED ALUMINIUM, 7% GLASS, 90% BRICK & GLAZED BLOCKBASEML100'-0"EC ADDITION99'-6"EC TOP OF MASONRY114'-1 3/8"EXISTING T.O. PARAPET114'-8 3/8"04.0904.0504.0104.0104.0504.0204.0307.3808.0308.0704.0904.0504.0104.0904.0504.0104.0904.0504.0104.0508.3008.28W6E00426.9726.97C.J.C.J.C.J.C.J.C.J.C.J.C.J.BRICK LEDGE ELEVATION: 98'-6"EXISTINGBUILDINGBEYOND22.98MATERIALS BREAKDOWN:MATERIALS BREAKDOWN:MATERIALS BREAKDOWN:MATERIALS BREAKDOWN: 2% PREFINISHED ALUMINIUM, 7% GLASS, 91% BRICK & GLAZED BLOCKBASEML100'-0"EC ADDITION99'-6"EC TOP OF MASONRY114'-1 3/8"EXISTING T.O. PARAPET114'-8 3/8"04.0504.0104.0304.0104.0404.0904.0504.0204.0508.3008.2804.0104.0404.0904.0504.0508.3008.2804.02W6W6C.J.C.J.C.J.C.J.C.J.C.J.C.J.C.J.BRICK LEDGE ELEVATION: 98'-6"EXISTING BUILDINGMATERIALS BREAKDOWN:MATERIALS BREAKDOWN:MATERIALS BREAKDOWN:MATERIALS BREAKDOWN: 1% PREFINISHED ALUMINIUM, 6% GLASS, 93% BRICK & GLAZED BLOCKBASEML100'-0"AAEC ADDITION99'-6"EC TOP OF MASONRY114'-1 3/8"04.0104.0304.0104.0404.0904.0504.02C.J.BRICK LEDGE ELEVATION: 98'-6"MATERIALS BREAKDOWN:MATERIALS BREAKDOWN:MATERIALS BREAKDOWN:MATERIALS BREAKDOWN: 100% BRICK & GLAZED BLOCKB1A1B5A1D1A1F2A1F7A1F1A1F1A1MIRNKEYPLANNexus Solutions, LLCTHIS DRAWING IS PROPERTY OFNEXUS SOLUTIONS, LLC. USE OR REPRODUCTIONWITHOUT WRITTEN PERMISSION IS PROHIBITED.2016 BUILDING ADDITIONDRAWING NUMBERCDRAWING TITLEI HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, ORREPORT WAS PREPARED BY ME OR UNDER MY DIRECTSUPERVISION AND THAT I AM A DULY LICENSEDPROFESSIONAL ARCHITECT UNDER THE LAWS OF THESTATE OF MINNESOTA.PRINTED NAME:SIGNATURE:DATE: REG. NO.11188 ZEALAND AVENUE NORTHCHAMPLIN, MN 55316Phone: 763-201-8400Fax: 763-201-8410DRAWINGSCONSTRUCTIONCheck:Drawn:Date: Comm:CENTENNIAL PUBLIC SCHOOLS - ISD #12RICE LAKE ELEMENTARY SCHOOLPaul Aplikowski4273711/02/2015BID PACKAGE 17575 BIRCH STREETLINO LAKES, MN 55014^ÄÅÇÉCheckerAuthor11/02/2015 152131EXTERIOR ELEVATIONS -CONDITIONAL USEPERMITA1RevisionsDescription Date Num0 1/8" = 1'-0"WEST ELEVATIONB16' 12'0 1/8" = 1'-0"NORTH ENTRANCE NORTH ELEVATIONB56' 12'0 1/8" = 1'-0"SOUTH ELEVATIOND16' 12'0 1/8" = 1'-0"EAST ELEVATIONF26' 12'0 1/8" = 1'-0"NORTH ELEVATIONF76' 12'0 1/8" = 1'-0"MAIN ENTRY EAST ELEVATIONF16' 12'MATERIALS KEYMATERIALS KEYMATERIALS KEYMATERIALS KEYKEYKEYKEYKEYMATERIALMATERIALMATERIALMATERIAL04.0104.0104.0104.01 BRICK 1BRICK 1BRICK 1BRICK 104.0204.0204.0204.02 BRICK 2BRICK 2BRICK 2BRICK 204.0304.0304.0304.03 BRICK 3BRICK 3BRICK 3BRICK 304.0404.0404.0404.04 BRICK 4BRICK 4BRICK 4BRICK 404.0504.0504.0504.05 BRICK 1 SOLDIER COURSEBRICK 1 SOLDIER COURSEBRICK 1 SOLDIER COURSEBRICK 1 SOLDIER COURSE04.0904.0904.0904.09 GLAZED BLOCKGLAZED BLOCKGLAZED BLOCKGLAZED BLOCK07.3807.3807.3807.38 PREFINISHED ALUMINUM COPINGPREFINISHED ALUMINUM COPINGPREFINISHED ALUMINUM COPINGPREFINISHED ALUMINUM COPING08.0308.0308.0308.03 PREFINISHED ALUMINUM DOORPREFINISHED ALUMINUM DOORPREFINISHED ALUMINUM DOORPREFINISHED ALUMINUM DOOR08.0708.0708.0708.07 PREFINISHED ALUMINUM FRAMEPREFINISHED ALUMINUM FRAMEPREFINISHED ALUMINUM FRAMEPREFINISHED ALUMINUM FRAME08.1808.1808.1808.18 PREFINISHED SILLPREFINISHED SILLPREFINISHED SILLPREFINISHED SILL08.2808.2808.2808.28 PREFINISHED WINDOW SILLPREFINISHED WINDOW SILLPREFINISHED WINDOW SILLPREFINISHED WINDOW SILL08.3008.3008.3008.30 PREFINISHED ALUMINUM WINDOWPREFINISHED ALUMINUM WINDOWPREFINISHED ALUMINUM WINDOWPREFINISHED ALUMINUM WINDOW10.0710.0710.0710.07 PAINTED DIMENSION LETTER SIGNAGEPAINTED DIMENSION LETTER SIGNAGEPAINTED DIMENSION LETTER SIGNAGEPAINTED DIMENSION LETTER SIGNAGE22.9822.9822.9822.98 ROOF DRAIN DOWNSPOUT (SEE MECH.)ROOF DRAIN DOWNSPOUT (SEE MECH.)ROOF DRAIN DOWNSPOUT (SEE MECH.)ROOF DRAIN DOWNSPOUT (SEE MECH.)26.9726.9726.9726.97 EXTERIOR LIGHTING (SEE ELEC.)EXTERIOR LIGHTING (SEE ELEC.)EXTERIOR LIGHTING (SEE ELEC.)EXTERIOR LIGHTING (SEE ELEC.)OVERALL MATERIALS BREAKDOWN:OVERALL MATERIALS BREAKDOWN:OVERALL MATERIALS BREAKDOWN:OVERALL MATERIALS BREAKDOWN:89% BRICK (RED, TAN, AND BROWN)8.5% GLASS1.5% PERFINISHED ALUMINIUM1% GLAZED BLOCKEXTERIOR ELEVATIONKEY PLAN Copy 1
A'A'B'B'1'1'2'2'3'3'4'4'010102020303040405050606AAAABBBBCCCCDDDDEEEECLASSROOME101856 SFPARENTEDUCATIONE102846 SFOFFICEE103C117 SFOFFICEE103B117 SFWORKROOME103D287 SFCONFERENCEE103A205 SFMAIN OFFICEE103749 SFVESTIBULEE003CORRIDORE002CORRIDORE004CORRIDORE005SIBLING CAREE123382 SFLOUNGEE121295 SFASSESSMENT/SENSORYE122104 SFRESTROOME12048 SFRESTROOME11948 SFCLASSROOME105855 SFCLASSROOME107855 SFCLASSROOME108855 SFMOTOR ROOME118855 SFSTORAGEE118A106 SFRESTROOME117226 SFRESTROOME115226 SFJANITORE11633 SFRESTROOME114B48 SFELECTRICALE114A56 SFSCHOOLREADINESSE114855 SFCLASSROOME113855 SFSPEECHE11293 SFSPEECHE11193 SFSPEECHE11093 SFHOME VISITOFFICEE109411 SFSTORAGEE106186 SFCLASSROOME104853 SFCORRIDORE001CORRIDORE103EDATAE106A65 SF100'-0"100'-0"99'-6"100'-0"SQUARE FOOTAGE SUMMARY:SQUARE FOOTAGE SUMMARY:SQUARE FOOTAGE SUMMARY:SQUARE FOOTAGE SUMMARY: 17,064 GROSS SQUARE FEET - 100% 'E' OCCUPANCYCLASSROOMNKEYPLANNexus Solutions, LLCTHIS DRAWING IS PROPERTY OFNEXUS SOLUTIONS, LLC. USE OR REPRODUCTIONWITHOUT WRITTEN PERMISSION IS PROHIBITED.2016 BUILDING ADDITIONDRAWING NUMBERCDRAWING TITLEI HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, ORREPORT WAS PREPARED BY ME OR UNDER MY DIRECTSUPERVISION AND THAT I AM A DULY LICENSEDPROFESSIONAL ARCHITECT UNDER THE LAWS OF THESTATE OF MINNESOTA.PRINTED NAME:SIGNATURE:DATE: REG. NO.11188 ZEALAND AVENUE NORTHCHAMPLIN, MN 55316Phone: 763-201-8400Fax: 763-201-8410DRAWINGSCONSTRUCTIONCheck:Drawn:Date: Comm:CENTENNIAL PUBLIC SCHOOLS - ISD #12RICE LAKE ELEMENTARY SCHOOLPaul Aplikowski4273711/02/2015BID PACKAGE 17575 BIRCH STREETLINO LAKES, MN 55014^ÄÅÇÉCheckerAuthor11/02/2015 152131TYPICAL FLOOR PLANS-CONDITIONAL USEPERMITA2RevisionsDescription Date Num0 1/8" = 1'-0"MAIN LEVEL FLOOR PLAN - CONDITIONAL USE PERMITF16' 12'0 1/4" = 1'-0"TYPICAL ROOM PLAN - CONDITIONAL USE PERMITH63' 6'
1
CITY OF LINO LAKES
RESOLUTION NO. 16-20
RESOLUTION APPROVING A CONDITIONAL USE PERMIT AMENDMENT
AND SITE PLAN REVIEW FOR
RICE LAKE ELEMENTARY SCHOOL ADDITION (575 BIRCH STREET)
WHEREAS, the City has received an application for a conditional use permit
amendment and site plan review for an addition to the existing elementary school for
early childhood education hereafter referred to as “Development”; and
WHEREAS, the property is zoned PSP, Public and Semi-Public and allows for schools
(public and private) with a conditional use permit; and
WHEREAS, per Section 1007.016(2)(n), the school is considered to have an existing
conditional use permit because it was existing as of July 14, 1997 and any change
involving a structural enlargement of the facility requires an amendment to the
conditional use permit; and
WHEREAS, the legal descriptions of the subject properties are:
(Per Warranty Deed Doc. No. 937240)
That part of Government Lot 4 Section 29, Township 31, Range 22, Anoka
County Minnesota described as follows:
Commencing at the southwest corner of said government Lot 4; thence North 00
degrees 39 minutes 48 seconds East, assumed bearing, 60.00 feet to the north
right-of-way line of C.S.A.H. No. 10 and the point of beginning of the part to be
described; thence South 88 degrees 52 minutes 59 seconds East 625.56 feet;
thence north 00 degrees 43 minutes 03 seconds East 1262.73 feet to the north line
of said government Lot 4; thence North 88 degrees 51 minutes 16 seconds west
626.80 feet to the West line of said government lot 4; thence South 00 degrees 39
minutes 41 seconds West along the west line of said government lot 4 a distance
of 1263.06 feet to the point of beginning.
AND
(Per Warranty Deed Doc. No. 937239)
That part of Government Lot 5, Section 29, Township 31, Range 22, Anoka
County Minnesota described as follows:
Commencing at the southwest corner of said government Lot 5; thence North 00
degrees 39 minutes 48 seconds East, assumed bearing, 60.00 feet to the north
right-of-way line of C.S.A.H. No. 10 and the point of beginning of the part to be
2
described; thence North 88 degrees 52 minutes 00 seconds West 896.68 feet;
thence north 00 degrees 32 minutes 38 seconds East 240.02 feet; thence North 88
degrees 52 minutes 00 seconds West 420.02 feet; thence North 00 degrees 32
minutes 38 seconds East 1023.34 feet to the East-West Quarter line of said section
29; thence South 88 degrees 51 minutes 16 seconds East, along said East-West
Quarter Line 1319.29 feet to the East line of said government lot 5; thence South
00 degrees 39 minutes 41 seconds west 1263.06 feet to the point of beginning.
WHEREAS, City staff has completed a review of the proposed “Development” based on
the revised plan set prepared by Nexus Solutions and Larson Engineering dated March
14, 2016; and
WHEREAS, a public hearing was held before the Planning & Zoning Board on March 9,
2016 and the Board recommended approval of the conditional use permit amendment and
site plan review; and
WHEREAS, the City Council of the City of Lino Lakes makes the following findings of
fact:
1. The proposed development application has been found to be consistent with the
policies and recommendations of the Lino Lakes Comprehensive Plan including:
a. Land Use Plan.
b. Transportation Plan.
c. Utility (Sewer and Water) Plans.
d. Local Water Management Plan.
e. Capital Improvement Plan.
f. Policy Plan.
g. Natural Environment Plan.
The proposed school addition for early childhood education is consistent with the
policies and recommendations of the comprehensive plan in regards to the Resource
Management System, Land Use Plan, Transportation Plan, Utility Plans and
Community Facilities. This is detailed in the March 9, 2016 Planning & Zoning
Staff Report.
2. The proposed development application is compatible with present and future land
uses of the area.
The proposed school addition for early childhood education is compatible with
present and future land uses. The property to the north is zoned PSP, Public and
3
Semi-Public and is guided for park and open space. This property is part of the
Anoka County Rice Creek Chain of Lakes Park Reserve. The properties to the west,
east and south are zoned and guided for single family residential development.
Single family homes exist in the surrounding neighborhood.
3. The proposed development application conforms to performance standards herein and
other applicable City Codes.
The proposed school addition conforms to performance standards and other
applicable City Codes. A Site and Building Plan Review has been completed and the
proposed school addition meets zoning performance standards in regards to exterior
building materials, setbacks, landscaping and parking.
4. Traffic generated by a proposed development application is within the capabilities of
the City when:
a. If the existing level of service (LOS) outside of the proposed subdivision is A
or B, traffic generated by a proposed subdivision will not degrade the level of
service more than one grade.
b. If the existing LOS outside of the proposed subdivision is C, traffic generated
by a proposed subdivision will not degrade the level of service below C.
c. If the existing LOS outside of the proposed subdivision is D, traffic generated
by a proposed subdivision will not degrade the level of service below D.
d. The existing LOS must be D or better for all streets and intersections
providing access to the subdivision. If the existing level of service is E or F,
the subdivision developer must provide, as part of the proposed project,
improvements needed to ensure a level of service D or better.
e. Existing roads and intersections providing access to the subdivision must have
the structural capacity to accommodate projected traffic from the proposed
subdivision or the developer will pay to correct any structural deficiencies.
f. The traffic generated from a proposed subdivision shall not require City street
improvements that are inconsistent with the Lino Lakes Capital Improvement
Plan. However, the City may, at its discretion, consider developer-financed
improvements to correct any street deficiencies.
g. The LOS requirements in paragraphs a. to d. above do not apply to the I-
35W/Lake Drive or I-35E/Main St. interchanges. At City discretion,
interchange impacts must be evaluated in conjunction with Anoka County and
the Minnesota Dept. of Transportation, and a plan must be prepared to
determine improvements needed to resolve deficiencies. This plan must
determine traffic generated by the subdivision project, how this traffic
contributes to the total traffic, and the time frame of the improvements. The
4
plan also must examine financing options, including project contribution and
cost sharing among other jurisdictions and other properties, that contribute to
traffic at the interchange.
h. The City does not relinquish any rights of local determination.
Traffic generated by the proposed school addition is within the capabilities of the
City. CSAH 34/Birch Street is a “B” minor arterial road. The school is accessed via
two main driveways off of CSAH 34 and there will be no changes to these driveways.
The early childhood education program currently operates out of the existing school.
There will be no additional students or teachers increasing traffic and no impacts to
the traffic levels of service are anticipated.
5. The proposed development shall be served with adequate and safe water supply.
The proposed school addition will be served with an adequate and safe water supply.
The site is served by a 16” ductile iron watermain located along CSAH 34/Birch
Street that can accommodate the demands of the proposed school addition.
6. The proposed development shall be served with an adequate and safe sanitary sewer
system.
The proposed school addition will be served with an adequate and safe sanitary
sewer system. The site is served by a 12” sanitary sewer line located along CSAH
34/Birch Street that can accommodate the demands of the school addition.
7. The proposed development shall not result in the premature expenditures of City
funds on capital improvements necessary to accommodate the proposed development.
No City funds are being expended on this project.
8. The proposed development will not involve uses, activities, processes, materials,
equipment and conditions of operation that will be detrimental to any persons,
property, or the general welfare because of excessive production of traffic, noise,
smoke, fumes, glare, or odors.
The proposed school addition for early childhood education is an allowed use within
the PSP, Public and Semi-Public District with an approved conditional use permit.
The addition will not generate excessive traffic, noise, smoke, fumes, glare or odors.
9. The proposed development will not result in the destruction, loss, or damage of a
natural, scenic or historic feature of major importance.
The proposed school addition will not result in the destruction, loss or damage of
natural, scenic or historic features of major importance because there are none
existing on site.
5
WHEREAS, in addition to the criteria established under Section 1007.016, Conditional
Use Permits above, Section 1007.130(8)(a) establishes the following conditions that shall
be met:
1. Side yards shall be double that required for the district, but no greater than thirty (30)
feet.
The standard side yard setback is 10 feet so a 20 foot setback is required. The proposed
school addition is 500+ feet from the east property line and 700+ feet from the west
property line.
2. Adequate screening from abutting residential uses and landscaping is provided in
compliance with §1007.043 (17) of this Ordinance.
Adequate screening from abutting residential uses and landscaping is provided. The
proposed school addition is more than 400 feet from the nearest residential property. No
addition landscaping or screening is required.
3. Adequate off-street parking and access is provided on the site or on lots directly
abutting or directly across a public street or alley to the principal use in compliance
with §1007.044 of this Ordinance and that such parking is adequately screened and
landscaped from surrounding and abutting residential uses in compliance with
§1007.043 (17) this Ordinance.
Adequate off-street parking and access is provided on the site. The 200 existing parking
stalls located off-street exceed the required 143 parking stalls and will adequately serve
the existing school and addition. The site is accessed via 2 driveways onto CSAH
34/Birch Street and these will not be altered.
4. Adequate off-street loading and service entrances are provided and regulated where
applicable by §1007.045 of this Ordinance.
There is no off-street loading associated with the proposed school addition.
5. The provisions of §1007.016 of this Ordinance are considered and determined to be
satisfied.
The provisions of Section 1007.016 are satisfied as noted above and in the March 9, 2016
Planning & Zoning Staff Report.
NOW, THEREFORE BE IT RESOLVED by the City Council of the City of Lino
Lakes hereby approves the conditional use permit amendment and site plan review for the
Rice Lake Elementary School Addition subject to the following conditions:
1. A Site Improvement Performance Agreement shall be executed and securities and
escrows in place prior to issuance of a building permit.
6
2. A Declaration for Maintenance of Stormwater Facilities shall be executed prior to
issuance of a building permit.
3. A permit from Rice Creek Watershed District shall be required.
4. A separate Sign Permit shall be submitted to the City for review and approval.
5. A building permit shall be required.
Adopted by the Council of the City of Lino Lakes this 11th day of April, 2016.
The motion for the adoption of the foregoing resolution was introduced by Council
Member_______________ and was duly seconded by Council Member
________________ and upon vote being taken thereon, the following voted in favor
thereof:
The following voted against same:
______________________________
Jeff Reinert, Mayor
ATTEST:
________________________
Julianne Bartell, City Clerk
CITY OF LINO LAKES
RESOLUTION NO. 16-21
RESOLUTION APPROVING A SITE IMPROVEMENT PERFORMANCE
AGREEMENT WITH CENTENNIAL ISD #12
(RICE LAKE ELEMENTARY SCHOOL ADDITION)
WHEREAS, the City has completed the review of the conditional use permit amendment and
site plan review for the Rice Lake Elementary School Addition located at 575 Birch Street; and
WHEREAS, Section 1007.020(5)(d) of the Lino Lakes Zoning Ordinance requires the execution
of a site improvement performance agreement prior to issuance of a building permit.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Lino Lakes that
the Site Improvement Performance Agreement between the City of Lino Lakes and Centennial
ISD #12 is hereby approved, and the Mayor and City Clerk are authorized to execute such
agreements on behalf of the City.
Adopted by the Council of the City of Lino Lakes this 11th day of April, 2016.
The motion for the adoption of the foregoing resolution was introduced by Council
Member_______________and was duly seconded by Council Member ________________ and
upon vote being taken thereon, the following voted in favor thereof:
The following voted against same:
_______________________________
Jeff Reinert, Mayor
ATTEST:
________________________
Julianne Bartell, City Clerk
6 20160411Rice Lake Elementary Addition Site Performance Agreement.doc page 1 of 8
CITY OF LINO LAKES, MINNESOTA
SITE IMPROVEMENT PERFORMANCE AGREEMENT
THIS AGREEMENT made this _______ day of _______________, 2016, is by
and between the City of Lino Lakes, a municipal corporation organized under the laws of
the State of Minnesota, and Centennial ISD #12 (Developer).
WHEREAS, the Developer has received approval of Site Development Plans,
hereinafter called the "Plans", by the City of Lino Lakes on the day of ________,
2016, and in accordance with the Plans all of which are made a part hereof by reference.
In consideration of such approval, the Developer, its successors and assigns, does
covenant and agree to perform the work as set forth in the Plans, in the aforesaid
approval, and as hereinafter set forth upon the real estate (hereinafter referred to as
"Property") described as follows:
(Per Warranty Deed Doc. No. 937240)
That part of Government Lot 4 Section 29, Township 31, Range 22, Anoka
County Minnesota described as follows:
Commencing at the southwest corner of said government Lot 4; thence North 00
degrees 39 minutes 48 seconds East, assumed bearing, 60.00 feet to the north
right-of-way line of C.S.A.H. No. 10 and the point of beginning of the part to be
described; thence South 88 degrees 52 minutes 59 seconds East 625.56 feet;
thence north 00 degrees 43 minutes 03 seconds East 1262.73 feet to the north line
of said government Lot 4; thence North 88 degrees 51 minutes 16 seconds west
626.80 feet to the West line of said government lot 4; thence South 00 degrees 39
minutes 41 seconds West along the west line of said government lot 4 a distance
of 1263.06 feet to the point of beginning.
AND
(Per Warranty Deed Doc. No. 937239)
That part of Government Lot 5, Section 29, Township 31, Range 22, Anoka
County Minnesota described as follows:
Commencing at the southwest corner of said government Lot 5; thence North 00
degrees 39 minutes 48 seconds East, assumed bearing, 60.00 feet to the north
right-of-way line of C.S.A.H. No. 10 and the point of beginning of the part to be
described; thence North 88 degrees 52 minutes 00 seconds West 896.68 feet;
thence north 00 degrees 32 minutes 38 seconds East 240.02 feet; thence North 88
degrees 52 minutes 00 seconds West 420.02 feet; thence North 00 degrees 32
minutes 38 seconds East 1023.34 feet to the East-West Quarter line of said section
29; thence South 88 degrees 51 minutes 16 seconds East, along said East-West
6 20160411Rice Lake Elementary Addition Site Performance Agreement.doc page 2 of 8
Quarter Line 1319.29 feet to the East line of said government lot 5; thence South
00 degrees 39 minutes 41 seconds west 1263.06 feet to the point of beginning.
NOW, THEREFORE, in consideration of the mutual promises of the parties made
herein,
IT IS AGREED BY AND BETWEEN THE PARTIES HERETO:
I. DESIGNATION OF IMPROVEMENTS.
A. Improvements on the project site to be installed at the Developer’s
expense by the Developer as hereinafter provided are hereinafter referred
to as “On-site Work”.
B. Improvements off the project site to be installed at the Developer’s
expense, if any, by the Developer as hereinafter provided are hereinafter
referred to as “Off-Site Work”.
C. Developer shall enter into a Declaration for Maintenance of Stormwater
Facilities.
II. ON-SITE WORK.
A. On-Site Work. The On-site Work shall consist of the improvements
described in the approved Plans, to include any approved subsequent
amendments, and shall be in compliance with all applicable statutes, codes
and ordinances of the City. The Work includes all on-site exterior
amenities as shown on the approved Plans and as required by the plan
approval, such as, but not limited to: landscaping, private driveways,
parking areas, sanitary sewer extension, water system extension, storm
drainage systems, curbing, lighting, fencing, fire lanes, sidewalks, exterior
building architectural design and building elements, site grading and
erosion control measures.
Such improvements shall be completed in accordance with Section IV
herein.
B. Cost Estimates. The Developer shall provide the City with a written
estimate of all applicable costs of the On-Site Work, itemized by type; the
estimates shall be based upon the actual estimates provided by the
contractors who are to do the Work. Said cost estimates shall be reviewed
by the City, and the City shall establish the actual amount of the financial
guarantee. The description and estimated cost of Developer's On-site
Work are as follows:
6 20160411Rice Lake Elementary Addition Site Performance Agreement.doc page 3 of 8
Description of Improvements Estimated Costs
1. Grading $16,500
2. Utilities $28,000
3. Curb and Gutter $14,000
4. Pavement $24,000
5. Sidewalk $27,000
6. Lot Lighting $6,800
7. Landscaping $13,000
Total Estimated Cost of Developer
Improvements
$129,300
Security Requirement (Total * 35%) $45,255
III. Record Drawings
A record drawing that includes an as-built survey of all storm water
BMP’s (ponds, rain gardens, trenches, swales, etc.) is to be submitted to
the City for verification of compliance with the approved plans. A hard
copy and an electronic copy of the record drawing must be submitted.
IV. COMPLETION DATE.
If the activities authorized by site and building plan approval are not initiated
within twelve (12) months from the final execution of this agreement, then
Developer will need to start the site and building plan approval process from
the beginning.
V. GUARANTEE.
A. The Developer will fully and faithfully comply with all terms and
conditions of any and all contracts entered into by the Developer.
Concurrently with the execution hereof by the Developer, the Developer
will furnish to, and at all times thereafter maintain with the City, a cash
deposit, certified check, or Irrevocable Letter of Credit, based on thirty-
five (35%) percent of the total estimated cost of Developer's On-site
Work. An Irrevocable Letter of Credit shall be for the exclusive use and
benefit of the City of Lino Lakes and shall state thereon that the same is
issued to guarantee and assure performance by the Developer of all the
terms and conditions of this Development Contract, construction of all
required improvements in accordance with the ordinances and
specifications of the City and guarantees the workmanship and materials
for the landscape improvements for a period of one year following the
City’s acceptance of the landscape improvements. The City reserves the
6 20160411Rice Lake Elementary Addition Site Performance Agreement.doc page 4 of 8
right to draw, in whole or in part, on any portion of the Irrevocable Letter
of Credit for the purpose of guaranteeing the terms and conditions of this
contract, if Developer has been found to be in default of this agreement
and only after providing Developer with written notice and opportunity to
cure any default. The Irrevocable Letter of Credit shall be automatically
extended for additional periods of one year from present or future
expiration dates unless sixty (60) days prior to such the City Clerk or
Administrator is notified in writing by certified mail or overnight mail that
the Letter of Credit will not be renewed.
B. Upon written request, The City will grant a reduction of the Letter of
Credit, or cash deposit based on prepayment or the value of the completed
improvements at the time of the requested reduction. The Developer may
make such requests three times throughout the life of this agreement, with
the third and/or final request being at the completion of the project. The
City will respond to such request within 30 days time. Prior to the final
acceptance of the Developer’s Improvements the City shall require a
Letter of Credit or Cash Escrow to cover the warranty provisions of the
agreement. The amount shall be agreed to by the City Engineer and
Developer and Developer may use the Letter of Credit discussed in
Section V.A above.
VI. REIMBURSEMENT OF COSTS.
A. The Developer agrees to establish a non-interest bearing escrow account
with the City in an amount established by the City Engineer or his
designee for the payment of all City fees and costs incurred by the City
related to the On-site Work, including, but not limited to, the following:
1. Site Plan Review Fee $1,500
2. Administration (Legal, Engineering, Planning, and Contract administration) $3,500
3. Sanitary Sewer Trunk Unit Fee (16 units @ $3,073 per unit) $49,168
4. Water Trunk Unit Fee (16 units @ $4,069 per unit) $65,104
5. Surface Water Management Fee $1,417
Total Estimated (Budget) Costs for Escrow Account $120,689
B. If it appears that the actual costs incurred will exceed the estimate or that
the actual costs incurred will be less than the estimate, then Developer and
City shall review the costs required to complete the project. In such case,
if the actual costs exceed the estimate, then Developer shall promptly pay
the additional sums to the City to pay for the agreed upon increase.
However, in such case where the actual costs are less than the estimate,
the City shall promptly reimburse to Developer any amounts overpaid by
6 20160411Rice Lake Elementary Addition Site Performance Agreement.doc page 5 of 8
the Developer. The Developer may request a statement of the account
each month for review.
C. Intentionally Deleted.
VII. REMEDIES FOR BREACH
A. The City shall give prior written notice to the Developer of any default
hereunder before proceeding to enforce such financial guarantee or before
the City undertakes any work for which the City will be reimbursed
through the financial guarantee. If within twenty (20) days after receipt of
such written notice to it, the Developer has not notified the City by stating
in writing the manner in which the default will be cured and the time
within which such default will be cured, the City will proceed with the
remedy it deems reasonably appropriate.
B. At any time after the completion date and any extensions thereof, if any of
the work is deemed incomplete, the City may proceed in any one or more
of the following ways to enforce the undertakings herein set forth, and to
collect any and all expenses reasonably incurred by the City in connection
therewith, including, but not limited to, engineering, legal, planning and
litigation costs and expense. The enumeration of the remedies hereunder
shall be in addition to any other remedies available to the City.
1. Specific Performance. The City may in writing direct the surety or
the Developer to cause the Work to be undertaken and completed
within a specified reasonable time. If the Developer fails to cause
the Work to be done and completed in a manner and time
reasonably acceptable to the City, the City may proceed to bring an
action for specific performance to require work to be undertaken.
2. Completion by the City. The City, after written notice, may enter
the premises and proceed to have the Work done either by contract,
by day labor or by regular City forces. The Developer may not
question the manner of doing such work or the letting of any such
contracts for the doing of any such work; provided that all such
work is performed in a reasonable manner, the costs are reasonable
and the work is completed in a good and workman-like manner
and in accordance with the approved plans and specifications.
Upon completion of such work, the Developer shall promptly pay
the City the full cost thereof as aforesaid.
3. Deposit of Financial Guarantee. In the event the financial
guarantee has been submitted in the form of a Letter of Credit, the
City may draw on the Letter of Credit the sum equal to the
reasonably estimated cost of completing the Work, plus the City's
6 20160411Rice Lake Elementary Addition Site Performance Agreement.doc page 6 of 8
reasonably estimated expenses as defined herein, including any
other reasonable costs, expenses, and damages for which the surety
may be liable hereunder, but not exceeding the amount set forth on
the Letter of Credit. The money shall be deemed to be held by the
City for the purpose of reimbursing the City for any reasonable
costs incurred in completing the Work as hereinafter specified.
Any funds remaining after completion of the project shall be
promptly returned to the Developer.
VIII. OCCUPATION OF PREMISES
The Developer agrees that it will not cause to be occupied any portion of the
building or improvements to be constructed upon the premises until completion of
the building and site improvements as more fully described in the approved plans
and following issuance of a Certificate of Occupancy.
IX. INSURANCE
Developer or its general contractor shall take out and maintain until one year after
the City accepted the Developer Improvements, public liability and property
damage insurance covering personal injury, including death, and claims for
property damage which may arise out of the Developer's or general contractor’s
work, as the case may be, or the work of its subcontractors or by one directly or
indirectly employed by any of them. Limits for bodily injury and death shall be
not less than Five Hundred Thousand and no/100 ($500,000.00) Dollars for one
person and One Million and no/100 ($1,000,000.00) Dollars for each occurrence;
limits for property damage shall be not less then Two Hundred Thousand and
no/100 ($200,000.00) Dollars for each occurrence; or a combination single limit
policy of One Million and no/100 ($1,000,000.00) Dollars or more. The City, its
employees, its agents and assigns shall be named as an additional insured on the
policy, and the Developer or its general contractor shall file with the City a
certificate evidencing coverage prior to the City signing the plat. The certificate
shall provide that the City must be given ten days advance written notice of the
cancellation of the insurance. The certificate may not contain any disclaimer for
failure to give the required notice.
X. REIMBURSEMENT FOR LITIGATION EXPENSES
The City and Developer agree that the prevailing party in any litigation pertaining
to the enforcement of this Agreement shall be entitled to reimbursement from the
non-prevailing party for all reasonable costs incurred by said prevailing party
including court costs and reasonable engineering and attorneys' fees.
XI. VALIDITY
6 20160411Rice Lake Elementary Addition Site Performance Agreement.doc page 7 of 8
If a portion, section, subsection, sentence, clause, paragraph or phrase in this
Agreement is for any reason held to be invalid by a court of competent
jurisdiction, such decision shall not affect or void any of the other provisions of
the Site Improvement Performance Agreement.
XII. GENERAL
A. Binding Effect. The terms and provisions hereof shall be binding upon
and inure to the benefit of the heirs, representatives, successors and
assigns of the parties hereto and shall be binding upon all future owners of
all or any part of the Property and shall be deemed covenants running with
the land.
D. Notices. Whenever in this Agreement it shall be required or permitted that
notice or demand be given or served by either party to this Agreement to
or on the other party, such notice or demand shall be delivered personally
or (i) mailed by United States mail by certified mail (return receipt
requested)or (ii) sent by nationally recognized overnight carrier to the
addresses hereinbefore set forth on Page 1 . Such notice or demand shall
be deemed timely given when delivered personally or when deposited in
the mail or the overnight carrier in accordance with the above. The
addresses of the parties hereto are as set forth on Page 1 until changed by
notices given as above.
E. Incorporation by Reference. All plans, special provisions, proposals,
specifications and contracts for the improvements furnished and let
pursuant to this Agreement shall be and hereby are made a part of this
Agreement by reference as fully as if set out herein in full.
F. Hours of Construction Activity. All construction activity shall be
limited to the hours set out as follows:
Monday through Friday 7:00 a.m. to 7:00 p.m.
Saturday 9:00 a.m. to 5:00 p.m.
Sunday and Holidays No working hours allowed
XIII. VIOLATIONS/BUILDING PERMITS
In the event that Developer violates any of the covenants and agreements
contained in this Site Improvement Performance Agreement and to be performed
by the Developer, the City, at its option, and after providing written notice and
opportunity to cure to Developer in addition to the rights and remedies as set out
hereunder may refuse to issue building permits to any property within the
development and/or stop building construction within the development until such
time as such default has been corrected to the satisfaction of the City.
6 20160411Rice Lake Elementary Addition Site Performance Agreement.doc page 8 of 8
DEVELOPER CITY OF LINO LAKES
_________________________ By _________________________
Developer Mayor
ATTEST:
By _________________________
City Clerk
State of Minnesota )
) ss.
County of Anoka )
On this _____ day of ____________________, in the year of 2016 before me, a
Notary Public within and for said County, personally appeared Julianne Bartell, City
Clerk of the City of Lino Lakes, who executed the foregoing instrument, attesting to the
signature of Jeff Reinert, Mayor and acknowledged that it was executed on behalf of said
City.
____________________________________
Notary Public
STATE OF MINNESOTA )
) ss.
COUNTY OF ANOKA )
On this _______ day of _______________, 2016, before me, a Notary Public
within and for said County, personally appeared (Developer),
who executed the foregoing instrument.
______________________________
Notary Public
This instrument was drafted by:
City of Lino Lakes
600 Town Center Parkway
Lino Lakes, Minnesota 55014
1
CITY COUNCIL
AGENDA ITEM 6C
STAFF ORIGINATOR: Katie Larsen, City Planner
MEETING DATE: April 11, 2016
TOPIC: Saddle Club Second Addition
i. Consider Resolution No. 16-12 Approving Final Plat
ii. Consider Resolution No. 16-13 Approving Development
Agreement
VOTE REQUIRED: 3/5
INTRODUCTION
Staff is requesting City Council consideration of the Final Plat and Development Agreement for
Saddle Club Second Addition.
Complete Application Date: January 8, 2016
60 Day Review: March 8, 2016
Environmental Board: NA
Park Board: NA
Planning & Zoning Board: February 10, 2016
Council Work Session: April 4, 2016
City Council Meeting: April 11, 2016
BACKGROUND
Saddle Club is a PUD residential subdivision located south of Birch Street and Old Birch Street.
The preliminary plat is 39.4 gross acres and consists of 55 single family residential lots.
The applicant has submitted a land use application for final plat of Saddle Club Second Addition.
This review is based on the final plat dated December 17, 2015 and prepared by EG Rud & Sons.
Previous Council and Board Actions:
2
• February 10, 2014: City Council approval of Saddle Club PUD Development Stage
Plan/Preliminary Plat, Resolution No. 14-15
• August 25, 2014: City Council approval of Saddle Club PUD Final Plan-Final Plat,
Resolution No. 14-63
• February 10, 2016: Planning & Zoning Board recommendation of Saddle Club Second
Addition Final Plat
Analysis
Conformity with the Comprehensive Plan and Zoning Code
The final plat has been reviewed for compliance with the comprehensive plan, zoning and
subdivision ordinance. The proposed development is not considered premature and meets the
performance standards of the subdivision and zoning ordinance. The final plat is consistent with
the PUD Development Stage Plan/Preliminary Plat and Final Plan.
The phasing plan has been revised from 2 phases to 3 phases of development. The total number
of lots has not changed.
ORIGINAL PHASING PLAN # of LOTS
Phase One 28
Phase Two 27
TOTAL 55
REVISED PHASING PLAN # of LOTS
Phase One 28
Phase Two 17
Phase Three 10
TOTAL 55
An important component of the Saddle Club development is the connection of Fox Road and
extension of public utilities to the Foxborough development. This extension was to be
completed with phase two of the development. The revised phasing plan now has this
connection being made with phase three. The city will obtain financial securities from the
developer to ensure future construction of these improvements. These securities are detailed in
the Development Agreement for Saddle Club Second Addition.
3
Blocks and Lots
The final plat for Saddle Club Second Addition creates 17 lots from outlots B and C, Saddle
Club First Addition.
Streets
Black Berry Court will be constructed with this phase. As approved with the final plan, the
right-of-way width is 50 feet and street width is 30 feet back to back.
Public Utilities
Watermain and sanitary sewer will be extended down Black Berry Court per the approved
construction plans.
Easements
Standard drainage and utility easements are provided on all lot lines.
Public Land Dedication and Fees
The City is requiring cash in lieu of land dedication.
Saddle Club Second Addition
17 lots x $2,500 = $42,500
Trail
The trail will be constructed from the Foxborough development to Black Berry Court in this
phase.
Zoning
Saddle Club Second Addition is zoned PUD-Planned Unit Development as approved by the City
Council with Ordinance No. 01-14.
Comprehensive Plan
The final plat is in compliance with the Comprehensive Plan in terms of the Resource
Management System, Land Use Plan and Housing Plan.
4
Transportation Plan
By-pass Lane on Birch Street
The City is working with Anoka County on the design and construction of a by-pass lane on
CSAH 34/Birch Street. Design is 70% complete and the County anticipates construction by fall
2016.
Old Birch Street
Design on the north-south section and cul de sac on the north end of Old Birch Street is 50%
complete. The City anticipates construction by fall 2016.
The east-west section of Old Birch Street will be reconstructed by the developer in early summer
2016.
Future Fox Road and Public Utilities Connection
The City Attorney is drafting a purchase agreement with Comcast to acquire the south 550 feet
of their parcel to the west to allow for the extension of Fox Road and public utilities to
Foxborough. This purchase will require separate Council action. The city will obtain financial
securities from the developer to ensure future construction of these improvements with phase
three. These securities are detailed in the Development Agreement for Saddle Club Second
Addition.
A wetland delineation has been completed in this area and the developer is starting design of the
Fox Road and public utility extension. Construction will coincide with the submittal of the
Saddle Club Third Addition in spring 2017.
Development Agreement
A Development Agreement has been drafted by the City and shall be executed by the developer.
Title Commitment
The City Attorney reviewed the title commitment and final plat and notes Royal Oaks shall
transfer title to Dupont Holdings before the plat can be approved and recorded. The title
commitment legal description shall be revised to include Outlot B and C.
Stormwater Maintenance Agreement
A Maintenance Agreement for Stormwater Management Facilities was approved by the City
Council on August 25, 2014 with Resolution No. 14-92 for the entire Saddle Club development.
5
RECOMMENDATION
The Planning & Zoning Board reviewed the final plat on February 10, 2016. The Board and staff
recommend approval of the following items with conditions as listed:
1. Resolution No. 16-12 Approving Saddle Club Second Final Plat
2. Resolution No. 16-13 Approving Development Agreement
ATTACHMENTS
1. Original and Revised Phasing Plan
2. Resolution No. 16-12
3. Final Plat for Saddle Club Second Addition
4. Resolution No. 16-13
5. Development Agreement
6. City Engineer Letter dated February 1, 2016
1
CITY OF LINO LAKES
RESOLUTION NO. 16-12
RESOLUTION APPROVING THE FINAL PLAT
FOR SADDLE CLUB SECOND ADDITION
WHEREAS, the City has received an application for Final Plat approval for Saddle Club
Second addition hereafter referred to as “Development”; and
WHEREAS, City staff has completed a review of the proposed “Development” based on
the following plans and information:
• Final plat dated December 17, 2015 and prepared by EG Rud & Sons ; and
WHEREAS, a public hearing was held before the Planning & Zoning Board on
November 13, 2013 and continued to the January 8, 2014 meeting and the Board
recommended approval of the PUD Development Stage Plan/Preliminary Plat; and
WHEREAS, the City Council approved the rezoning from R, Rural to PUD, Planned
Unit Development with Ordinance 01-14 and the PUD Development Stage
Plan/Preliminary Plat with Resolution 14-15; and
WHEREAS, Planning & Zoning Board reviewed and recommended approval of the
Saddle Club Second Addition final plat at the February 10, 2016 meeting; and
WHEREAS, the proposed development is not considered premature and meets the
performance standards of the subdivision and zoning ordinance; and
WHEREAS, the final plat is consistent with the PUD Development Stage Plan and
Preliminary Plat; and
NOW, THEREFORE BE IT RESOLVED by the City Council of the City of Lino
Lakes hereby approves the final plat for Saddle Club Second Addition, subject to the
following conditions:
1. All comments from City Engineer letter dated February 1, 2016 shall be
addressed.
2. A Development Agreement shall be drafted by the City, executed by the City and
the developer and recorded by the developer.
3. Black Berry Court shall be revised to one word, Blackberry Court.
4. Title Commitment:
a. Royal Oaks shall transfer title to Dupont Holdings before the plat is
approved and recorded.
b. The title commitment legal description shall be revised to include Outlot B
and C.
2
Adopted by the Council of the City of Lino Lakes this 11th day of April, 2016.
The motion for the adoption of the foregoing resolution was introduced by Council
Member
_______________and was duly seconded by Council Member ________________ and
upon vote being taken thereon, the following voted in favor thereof:
The following voted against same:
______________________________
Jeff Reinert, Mayor
ATTEST:
________________________
Julianne Bartell, City Clerk
CITY OF LINO LAKES
RESOLUTION NO. 16-13
RESOLUTION APPROVING DEVELOPMENT AGREEMENT
FOR SADDLE CLUB SECOND ADDITION
WHEREAS, the City Council approved the final plat for Saddle Club Second Addition with
Resolution No. 16-12 on April 11, 2016; and
WHEREAS, the City’s subdivision ordinance and conditions of approval require the execution
of a development agreement between the Developer and the City of Lino Lakes.
NOW, THEREFORE BE IT RESOLVED by The City Council of The City of Lino Lakes
hereby approves the Development Agreement between DuPont Holdings, LLC and the City of
Lino Lakes for Saddle Club and authorizes the Mayor and City Clerk to execute such agreement
on behalf of the City.
Adopted by the Council of the City of Lino Lakes this 11th day of April, 2016.
The motion for the adoption of the foregoing resolution was introduced by Council Member
_______________and was duly seconded by Council Member ________________ and upon
vote being taken thereon, the following voted in favor thereof:
The following voted against same:
_______________________________
Jeff Reinert, Mayor
ATTEST:
________________________
Julianne Bartell, City Clerk
DEVELOPMENT AGREEMENT
and
PLANNED UNIT DEVELOPMENT AGREEMENT
Saddle Club Second Addition
THIS AGREEMENT is made this _____ day of ____________, 2016, by and between the City
of Lino Lakes, a Minnesota municipal corporation, and Dupont Holdings, LLC (“Developer”).
1. Subdivision. Developer received preliminary plat approval from the City by Resolution No.
14-15 for a plat known as Saddle Club (“Subdivision”). Unless otherwise stated, all terms
and conditions of this Agreement relate to work within the Subdivision.
2. Final Plat Approval. The City’s approval of the Saddle Club Second Addition final plat,
said property legally described in Attachment A, is contingent upon execution and
delivery of this Agreement and all required petitions, bonds, security, and documents,
and satisfaction of all conditions of approval required by Resolution No. 16-12.
3. Phased Development. The City may refuse to approve final plats of subsequent additions
of the plat if the Developer breached this Agreement and the breach has not been
remedied. Development of subsequent phases may not proceed until Development
Agreements for such phases are approved by the City.
4. Developer Plans.
a. The Subdivision shall be developed in accordance with the following Developer
Plans, original copies of which are on file with the City Engineer. The Developer
Plans may be prepared and revised after entering into this Agreement but must
be approved by the City before commencement of any work. If the plans vary
from the written terms of this Agreement, this Agreement shall control.
b. The Developer Plans as of the date of this Agreement are:
i. Saddle Club PUD plan set containing Sheets C0-C6.6, prepared by Plowe
Engineering, Inc., revised April 8, 2015.
5. Permits. The Developer shall be responsible for securing all site grading and
development approvals and permits from all appropriate Federal, State, Regional and
Local jurisdictions prior to the commencement of site grading or construction and prior
to the City awarding construction contracts for public improvements.
Saddle Club Second Addition
Development Agreement
April 2016
page 2
6. Developer Improvements. The Developer shall secure a contractor to install these
improvements, hereinafter referred to as the “Developer Improvements,” which
contractor shall be approved by the City in its absolute discretion. The cost of
Developer Improvements is as shown on Attachment B. All Developer Improvements
shall require City inspection and approval and, where appropriate, the approval of any
other governmental agency having jurisdiction. The Developer shall construct and install
at the Developer's expense the following improvements according to the following
terms and conditions:
a. Site Grading
i. No grading shall commence until all requirements of the Rice Creek
Watershed District (RCWD) have been satisfied.
ii. All site grading shall be conducted in accordance with the grading plan as
approved by the City and in accordance with NPDES and RCWD
requirements. The Developer shall perform the work in accordance with
a Storm Water Pollution Prevention Plan (SWPPP) pursuant to Minnesota
Pollution Control Agency (MPCA) requirements.
b. Grading and Erosion Control
i. The Developer shall grade the site to within 0.2 foot of the grades shown
on the approved grading plan. No deviations will be allowed unless a
revised plan is submitted and approved by the City and all other
regulatory agencies.
ii. The street right-of-way, storm water storage ponds, and surface water
drainage ways shall be graded prior to commencement of utility
construction.
iii. The Developer shall be responsible for ascertaining that site geotechnical
and groundwater conditions are adequate and conforming with the
grading and site improvement as proposed.
iv. The Developer’s engineer shall certify in writing, with an as-built survey,
that all grading complies with the approved grading plan prior to issuance
of any building permits.
v. The Developer shall promptly clear dirt and debris within public right-of-
ways and drainage and utility easements resulting from construction by
the Developer, its purchasers, builders and contractors within five days
after notification by the City. The Developer shall be responsible for all
necessary street and storm sewer maintenance, including street
Saddle Club Second Addition
Development Agreement
April 2016
page 3
sweeping, until all home construction is completed, unless otherwise
released by the City. Warning signs shall be placed when hazards
develop in streets to prevent the public from traveling on them, including
detour signs if necessary. If and when the streets become impassable,
such streets shall be barricaded and closed. The Developer shall maintain
a smooth, hard driving surface and adequate drainage on all temporary
streets.
c. Final street grading, subbase, gravel base, concrete curb and gutter, and
bituminous base course and wear course shall be furnished and installed.
d. Sidewalks, paths and street lighting as required by the City.
e. Storm sewers, when determined to be necessary by the City Engineer, including
all necessary laterals, catch basins, inlets and other appurtenances, shall be
furnished and installed.
f. Sanitary sewer mains, laterals or extensions, including all necessary building
services and other appurtenances, shall be furnished and installed.
g. Water mains, laterals or extensions, including all necessary building services,
hydrants, valves and other appurtenances, shall be furnished and installed.
h. The Developer shall place iron monuments at all lot and block corners and at all
other angle points on boundary lines. Iron monuments shall be placed after all
street and lawn grading has been completed in order to preserve the lot markers
for future property owners. Lot corner irons on the back property line shall be
installed so that the top of the iron corresponds to the finished ground elevation
in accordance with the approved grading plan. Guard stakes shall be
appropriately installed to mark these irons.
i. Landscaping shall be furnished and installed in accordance with the approved
plans.
j. The Developer shall arrange for all gas, telephone, cable TV and electric utility
services to the Subdivision in accordance with City Code and State law. The
Developer is solely responsible for the cost of utility installation.
7. Time of Performance. The Developer shall install all required improvements
enumerated in Paragraph 6 by [INSERT DATE]. The Developer may request a reasonable
extension of time from the City. If the extension is granted, it shall be conditioned upon
updating the security posted by the Developer to reflect cost increases and the
extended completion date.
Saddle Club Second Addition
Development Agreement
April 2016
page 4
8. City Improvements.
No city improvements are proposed to be constructed for this subdivision.
9. Record Drawings.
a. Upon project completion, Developer shall submit record drawings, in electronic
format, of all public and private infrastructure improvements, including roads,
sanitary sewer, watermain, storm sewer facilities, and grading, constructed by
Developer. The files shall be drawn in Anoka County NAD 83 Coordinate system
and provided in both AutoCad .dwg and Adobe .pdf file formats. The plans shall
include accurate locations, dimensions, elevations, grades, slopes and all other
pertinent information concerning the complete work.
b. A summary of the record plan attribute data for the storm sewer, water main,
and sanitary sewer structures and pipes shall be submitted in the form of an
Excel Spreadsheet provided by the City Engineer.
c. No securities will be fully released until all record drawings have been submitted
and accepted by the City Engineer.
10. Faithful Performance of Construction Contracts and Security.
a. The Developer will fully and faithfully comply with all terms and conditions of any
and all contracts entered into by the Developer for the installation and construction
of all Developer Improvements. Concurrent with the execution hereof by the
Developer, the Developer will furnish to, and at all times thereafter maintain with
the City, a cash deposit, certified check, or Irrevocable Letter of Credit, based on
one hundred fifty (150%) percent of the total estimated cost of Developer's
Improvements.
b. Irrevocable Letter of Credit. If an Irrevocable Letter of Credit is utilized, it shall be
for the exclusive use and benefit of the City of Lino Lakes and shall state that it is
issued to guarantee and assure performance by the Developer of all the terms and
conditions of this Development Agreement and construction of all required
improvements referenced therein in accordance with the ordinances and
specifications of the City. The letter shall be in a form, and from a bank, as
approved by the City. The City reserves the right to draw, in whole or in part, on
any portion of the Irrevocable Letter of Credit for the purpose of guaranteeing the
terms and conditions of this agreement. The Irrevocable Letter of Credit shall be
automatically extended for additional periods of one year from present or future
expiration dates. The Irrevocable Letter of Credit may not be terminated without
the City’s written consent.
Saddle Club Second Addition
Development Agreement
April 2016
page 5
c. Alternatively, the Developer may enter into a Public Improvement Surety
Agreement subject to City approval.
d. Reduction of Security. The Developer may request a reduction of the Letter of
Credit or cash deposit based on prepayment or the value of the completed
improvements at the time of the requested reduction.
11. Warranty. The Developer warrants all utility work required to be performed by it against
poor material and faulty workmanship for a period of two years after its completion and
acceptance by the City. All new streets shall be warranted by the developer for a period
of one year from the time the final inspection of the street is completed and accepted
by the City. All trees, grass and sod shall be warranted to be alive, of good quality and
disease free for 12 months after planting. Prior to final acceptance of the Developer
Improvements the City shall require a Performance Bond or Cash Escrow to cover the
warranty provisions of this Agreement. The amount shall be determined by the City
Engineer.
12. Dedication. The Developer shall dedicate to the City, at no cost to the City, any
permanent or temporary easements that may be necessary for the construction and
installation of the Developer Improvements. All such easements required by the City
shall be in writing, in recordable form, containing such terms and conditions as the City
shall determine.
13. Ownership of Improvements. Upon completion and City acceptance of the work and
construction required by this Agreement, the public improvements lying within public
right-of-way and easements shall become City property without further notice or action
unless the improvements are to be deemed private infrastructure.
14. Recording and Release. The Developer agrees that the terms of this Development
Agreement shall be a covenant on any and all property included in the Subdivision. The
Developer agrees that the City shall have the right to record a copy of this Development
Agreement with the Anoka County Recorder to give notice to future purchasers and
owners. This shall be recorded against the Subdivision described on Page 1.
15. Escrow for City’s Costs.
a. The Developer agrees to establish a non-interest bearing escrow account with
the City in an amount determined by the City Administrator or his designee for
the payment of all costs incurred by the City related to the development of the
Subdivision including, but not limited to, the following (See Attachment B for
breakdown of costs):
i. Administration - 3% of Developer Improvement Costs
Saddle Club Second Addition
Development Agreement
April 2016
page 6
ii. City Engineering
iii. Street lighting installation (by utility company)
iv. Traffic signing improvements
v. Boulevard tree planting
vi. Street, storm sewer and pond maintenance
vii. Property Taxes. Should the recording of the Final Plat occur after July 1st,
any and all property taxes on any public property dedicated as a part of
this plat shall be the responsibility of the Developer.
b. If the above escrow amounts are insufficient, the Developer shall make such
additional deposits as required by the City. The City shall have a right to
reimburse itself from the Escrow upon notice to the Developer, with suitable
documentation supporting the charges.
16. Developer Fees. At the time of execution of this Agreement, the Developer shall pay
the following fees related to the development of the Subdivision (See Attachment B for
breakdown of costs):
a. Park Dedication fee of $42,500.
b. The Developer shall pay 15 months of maintenance and energy costs for street
lights installed within the Subject Property at the rate of $7/month/light. After
that the City will assume the costs.
c. Sealcoating. The Developer will pay the cost of sealcoating the streets within the
development at a cost of $5,544. The sealcoating will be completed within three
to seven years following completion of the wear course placement.
d. Aerial Photo Fees.
e. Trunk Sewer Unit Charges.
The City established trunk unit charges to uniformly distribute the costs of public
trunk sanitary sewer infrastructure. Each individual connection to the sanitary
sewer system shall be charged a unit charge per SAC unit (currently at $3,073 per
SAC unit). The calculation of the SAC units shall be based on the procedure
outlined in the Metropolitan Council Environmental Services Sewer Availability
Charge Procedure Manual. Trunk sewer unit charges addressed under this
paragraph are in addition to any SAC charges imposed by Metropolitan Council
Saddle Club Second Addition
Development Agreement
April 2016
page 7
Environmental Services. An estimate of the total charge and the trunk utility
credit for developer installed trunk oversizing is specified in Attachment B.
f. Trunk Water Unit Charges
The City established trunk unit charges to uniformly distribute the costs of public
trunk water infrastructure. Each individual connection to the water system shall
be charged a unit charge per SAC unit (currently at $4,069 per SAC unit). The
calculation of the SAC units shall be based on the procedure outlined in the
Metropolitan Council Environmental Services Sewer Availability Charge
Procedure Manual. An estimate of the total charge and the trunk utility credit
for developer installed trunk oversizing is specified in Attachment B.
g. Surface Water Management Area Charges
The City established a trunk area charge to uniformly distribute the costs of
public trunk surface water infrastructure and water quality improvements. The
Surface Water Management Charge shall be based on developable acreage, in
the amount specified in Attachment B.
17. Assessment of Charges and Waiver of Rights.
a. In consideration of the construction of City Improvements listed in Paragraph 8
and /or provision of sewer, water and storm water services, the Developer
agrees that the costs of City Improvements together with Trunk Sewer Unit
Charge, Trunk Water Unit Charge and the Surface Water Management Area
Charge (collectively, “the Charges”) may be assessed against the Subdivision
parcels. The Developer hereby waives any and all procedural and substantive
objections to the special assessments, including notice and hearing
requirements, any claim that the assessments exceed the benefit to the
properties, and any right to appeal.
b. Unless the Developer pays the entire balance owed for the Charges
contemporaneously with the execution of this Agreement, the Developer shall
provide to the City a cash escrow or irrevocable letter of credit in an amount
equal to 35% of the total assessments for the Charges as estimated by the City
Engineer (see Attachment B). The letter of credit shall be in a form, and from a
bank, as approved by the City. The letter of credit or cash escrow may be used
by the City upon default by Developer in the payment of special assessments.
The cash escrow or letter of credit shall remain in place throughout the term of
the special assessments. The letter of credit may not be terminated without the
City’s written consent.
Saddle Club Second Addition
Development Agreement
April 2016
page 8
c. Developer, its heirs, successors or assigns, agrees that within 30 days after the
date of sale of a lot, the Developer, its heirs, successors or assigns, at its own
cost and expense, shall pay the entire unpaid charges assessed or to be assessed
under this agreement against such property.
d. If a certificate of occupancy is issued before the special assessments have been
levied, the Developer, its heirs, successors or assigns shall pay the City the sum
of cash equal to 120% of the Engineer's estimate of the special assessments for
such Charges that would be levied against the property. Upon such payment the
City shall issue a certificate showing the assessments are paid in full.
Notwithstanding the issuance of said certificate, the Developer shall be liable to
the City for any deficiency and the City shall pay the Developer any surplus
arising from the payment based upon such estimate.
e. Acceleration upon Default. In the event the Developer violates any of the
covenants, conditions or agreements herein, violates any ordinance, rule or
regulation of the City, County of Anoka, State of Minnesota or other
governmental entity having jurisdiction over the plat or development, or fails to
pay when due any installment of any special assessment levied pursuant to this
agreement, or any interest thereon, the City at its option, in addition to its rights
and remedies hereunder, after 10 days written notice to the Developer, may
declare all of the unpaid special assessments which are then estimated or levied
pursuant to this agreement due and payable in full, with interest. The City may
seek recovery of such special assessments due and payable from the security
provided herein. In the event that such security is insufficient to pay the
outstanding amount of such special assessments plus accrued interest the City
may certify such outstanding special assessments in full to the County Auditor
pursuant to Minnesota Statutes section 429.061, subdivision 3, for collection the
following year. The City, at its option, may commence legal action against the
Developer to collect the entire unpaid balance of the special assessments then
estimated or levied pursuant hereto, with interest, including reasonable
attorney's fees, and Developer shall be liable for such special assessments and, if
more than one, such liability shall be joint and several. In addition to any other
rights and remedies upon Developer’s default, the City may refuse to issue
building permits and/or Certificates of Occupancy for any property within the
Subdivision until such time as such default has been corrected to the satisfaction
of the City. The Developer agrees to reimburse the City for all costs incurred by
the City in the enforcement of this agreement, or any portion thereof, including
court costs and reasonable engineering and attorneys' fees, if the City prevails in
any enforcement action.
18. Building Permits. No building permits shall be issued until:
Saddle Club Second Addition
Development Agreement
April 2016
page 9
a. Site grading, City sewer, water, storm sewer, and bituminous base construction
of the streets, temporary street signs, gas, electric, and telephone are completed
and approved by the City, except as provided below.
i. Model Homes: Structures may be installed as model homes consistent
with City ordinance upon approval of the final plat. A record drawing of
the site grading for the model home lots shall be submitted prior to
issuance of building permits for the model homes.
ii. If building permits are issued prior to the completion and acceptance of
public improvements, the Developer assumes all liability and costs
resulting in delays in completion of public improvements and damage to
public improvements caused by the City, the Developer, its contractors,
subcontractors, material men, employees, agents or third parties. Any
such costs shall be reimbursed from Developer’s escrow.
19. Special Provisions. In consideration for the City’s approval of this Agreement,
Developer agrees to undertake the following off-site improvements:
a. Fox Road. Developer shall acquire from the City fee simple title to the southern
550 feet of the abutting parcel to the west of the Subdivision (a/k/a the Comcast
parcel) pursuant to a separate purchase agreement. City approval of this
Agreement is contingent upon the City and Developer entering into the purchase
agreement for the Comcast parcel and Developer depositing into escrow with
the City the purchase price of $100,000.00. Upon acquisition of, and final plat
approval for, the Comcast parcel, Developer shall:
i. Construct Fox Road across the Comcast parcel so as to join the Fox Road
segment in Saddle Club to the existing Fox Road in the Foxborough
subdivision to the southwest. All plans and specifications for Fox Road
must be approved by the City prior to construction.
ii. Install sanitary sewer and water main on the Comcast parcel so as to
connect the sanitary sewer and water main in Saddle Club to those
existing utilities in the Fox Road right-of-way in the Foxborough
subdivision to the southwest. All plans and specifications for the sanitary
sewer and water main utilities must be approved by the City prior to
construction.
iii. All Fox Road utility and roadway improvements shall be completed prior
to, or concurrent with, the utility and roadway improvements within
phase three of Saddle Club, or within two years from the date of Council
approval of the Saddle Club Second Addition final plat, whichever is
earlier.
Saddle Club Second Addition
Development Agreement
April 2016
page 10
b. Old Birch Street.
i. Developer shall mill and overlay the east-west portion of Old Birch Street.
Developer’s plans and specifications must be approved by the City prior
to Developer’s use of the Street.
ii. Developer shall pay the City for the City’s cost of creating a cul-de-sac at
the northern terminus of Old Birch Street. This payment is in lieu of
paying for the installation of a new turn lane from Birch Street to Old
Birch Street.
c. Trunk Fees. Upon completion of Fox Road and the related utilities, Developer
shall be credited $90,000.00 for the sanity sewer trunk charge and $25,000.00
for the water trunk charge. If Fox Road and the associated sanitary sewer and
water utilities are not completed within the timeline set forth in subparagraph
19(a)(iii), Developer forfeits the aforementioned trunk charge credits.
20. Hours of Construction Activity.
All construction activity shall be limited to the hours as follows:
Monday through Friday 7:00 a.m. to 7:00 p.m.
Saturday 9:00 a.m. to 5:00 p.m.
Sunday and Holidays No working hours allowed.
1. Insurance. Insurance. Developer or its general contractor shall take out and maintain
until one year after the City accepted the Developer Improvements, Commercial
General Liability, Automobile Liability and Employers Liability Insurance. Limits for
Commercial General Liability shall be not less than One Million and no/100
($1,000,000.00) Dollars per occurrence and Two Million and no/100 ($2,000,000.00)
Dollars in aggregate. Limits for Automobile Liability shall be not less than One Million
and no/100 ($1,000,000.00) Dollars for each occurrence. Limits for Liability Insurance
shall be not less than Five Hundred Thousand and no/100 ($500,000) Dollars. The City,
its employees, its agents and assigns shall be named as an additional insured on the
policy, and the Developer or its general contractor shall file with the City a certificate
evidencing coverage prior to the City signing the plat. The certificate shall provide that
the City must be given ten days advance written notice of the cancellation of the
insurance. The certificate may not contain any disclaimer for failure to give the required
notice.
2. Developer’s Default. In the event of default by the Developer as to any of the work to
be performed by it hereunder, the City may, at its option, perform the work and the
Developer shall promptly reimburse the City for any expense incurred by the City,
provided the Developer is first given notice of the work in default, not less than 48 hours
Saddle Club Second Addition
Development Agreement
April 2016
page 11
in advance. This Agreement is a license for the City to act, and it shall not be necessary
for the City to seek a court order for permission to enter the land. When the City does
any such work, the City may, in addition to its other remedies, levy the cost in whole or
in part as a special assessment against the Subject Property. Developer waives its rights
to notice of hearing and hearing on such assessments and its right to appeal such
assessments pursuant to Minnesota Statutes, chapter 429.
3. General.
a. Binding Effect
The terms and provisions hereof shall be binding upon and inure to the benefit
of the heirs, representatives, successors and assigns of the parties hereto and
shall be binding upon all future owners of all or any part of the Subdivision and
shall be deemed covenants running with the land, unless otherwise released
pursuant to section 14 of this Agreement.
b. Validity.
If a portion, section, subsection, sentence, clause, paragraph or phrase in this
agreement is for any reason held to be invalid by a court of competent
jurisdiction, such decision shall not affect or void any of the other provisions of
the Development Agreement.
c. Notices
Whenever in this agreement it shall be required or permitted that notice or
demand be given or served by either party to this agreement to or on the other
party, such notice or demand shall be delivered personally or mailed by United
States mail to the addresses below by certified mail (return receipt requested).
Such notice or demand shall be deemed timely given when delivered personally
or when deposited in the mail in accordance with the above. The addresses of
the parties are as set forth until changed by notice given as above.
DuPont Holdings, LLC
Attn: Marcel Eibensteiner
1000 County Road West, Suite 150
Shoreview, MN 55126
Community Development Director
City of Lino Lakes
600 Town Center Parkway
Lino Lakes, MN 55014
Saddle Club Second Addition
Development Agreement
April 2016
page 12
4. Land Use Controls - Planned Unit Development.
a. Saddle Club Second Addition is a Planned Unit Development (PUD) as approved
by the City Council by Ordinance No. 02-14, and Resolution No. 14-15.
Saddle Club Second Addition
Development Agreement
April 2016
page 13
DEVELOPER CITY OF LINO LAKES
By ______________________ By _________________________
Mayor
Its ______________________
ATTEST:
By ______________________ By _________________________
City Clerk
STATE OF MINNESOTA )
) ss.
COUNTY OF ANOKA )
This instrument was acknowledged before me on _______ day of _______________,
2016, by Jeff Reinert as Mayor of the City of Lino Lakes on behalf of said City.
______________________________
Notary Public
STATE OF MINNESOTA )
) ss.
COUNTY OF ANOKA )
This instrument was acknowledged before me on _______ day of _______________,
2016, by Julianne Bartell as City Clerk of the City of Lino Lakes on behalf of said City.
______________________________
Notary Public
Saddle Club Second Addition
Development Agreement
April 2016
page 14
STATE OF MINNESOTA )
) ss.
COUNTY OF __________ )
On this _______ day of _______________, 2016, before me, a Notary Public within and
for said County, personally appeared Marcel Ebensteiner, __________________ of DuPont
Holdings, LLC. (Developer), who executed the foregoing instrument.
______________________________
Notary Public
This instrument was drafted by:
City of Lino Lakes
600 Town Center Parkway
Lino Lakes, Minnesota 55014
Saddle Club Second Addition
Development Agreement
April 2016
page 15
ATTACHMENT A
Legal Description and Final Plat
Outlot B and Outlot C, Saddle Club First Addition, Anoka County, Minnesota
4/6/2016
PROJECT: Saddle Club 2nd Addition NUMBER OF REU's:17
APPLICANT: DuPont Holdings, LLC NO. OF LOT FRONTAGES 19
AREA:6.2 ACRES
IMPROVEMENTS COST NOTES
DEVELOPER IMPROVEMENT COSTS
SITE GRADING $15,430
EROSION CONTROL $8,000
LANDSCAPING $6,485
TRAIL $4,462
STREETS $74,985
STORM SEWER CONST.$28,834
SANITARY SEWER CONST.$33,231
WATERMAIN CONST.$32,886
OLD BIRCH CUL DU SAC CONSTRUCTION $50,000 Marcel needs to provide bid $
OLD BIRCH PAVING (EAST - WEST SECTION)$50,000 Marcel needs to provide bid $
ENGINEERING & SURVEYING $6,000
Total $310,313
Letter of Credit Amount X 150%$465,470 Surety Agreement Option is 125%
CITY IMPROVEMENT COSTS
TRUNK SANITARY SEWER $52,241 $3,073/REU
TRUNK SANITARY SEWER CREDIT Future Credit Old Birch Extension $90,000
TRUNK WATERMAIN $69,173 $4,069/REU
TRUNK WATERMAIN CREDIT Future Credit Foxborough Extension $25,000
TOTAL TRUNK SEWER & WATER FEES $121,414
SURFACE WATER MANAGEMENT $39,160 $0.145/SF of Development Area
SURFACE WATER MANAGEMENT CREDIT ($6,482)Credit 3 & 5
TOTAL SURFACE WATER MANAGEMENT FEES $32,679
Total $154,093
Letter of Credit Amount X 35%$53,940
ESCROW
PLANNING REVIEW $1,500
ADMINISTRATION $9,310 3% of construction
ENGINEER PLAN REVIEW $5,500
OLD BIRCH CUL DU SAC DESIGN $7,200
ENGINEER CONSTRUCTION SERVICES $18,500
PROJECT FINAL DOCUMENTS & CITY ENGINEER $2,500
STREET LIGHT INSTALLATION $5,000 (2 lights) $2,500/Light
STREET & STORMWATER MAINTENANCE $2,500
PROPERTY TAXES $0 If final plat between July 1 and Dec. 31
BOULEVARD TREE PLANTING $9,215 (x tree) $485/ tree
Total $61,225
DEVELOPMENT FEE DEPOSIT
PARK DEDICATION $42,500 $2,500/res unit: $2,175/com ac
PARK DEDICATION CREDIT (TRAIL)$0
SEAL COATING FEE $5,544 $0.33/SF of road
AERIAL PHOTO FEE $1,530 $90/Lot
STREET LIGHTING OPERATION $210 (2 lights) $105/Light
Total $49,784
SUMMARY OF COSTS
LETTER OF CREDIT DEVELOPER IMP'MENT COSTS $465,470
LETTER OF CREDIT CITY IMPROVEMENT COSTS $53,940
ESCROW $61,225
DEVELOPMENT FEES $49,784
ATTACHMENT B
engineering planning environmental construction 701 Xenia Avenue South
Suite 300
Minneapolis, MN 55416
Tel: 763-541-4800
Fax: 763-541-1700
St. Cloud Minneapolis St. Paul
Equal Opportunity Employer
wsbeng.com S:\Community Development\Projects\Planning Cases\Saddle Club\Second Addition\Staff Reports\20160411 CC-Final Plat\6 20160201 Engineering Review Saddle Club 2nd.docx
Memorandum
To: Katie Larsen, City Planner
From: Diane Hankee PE, City Engineer
Date: February 1, 2016
Re: Saddle Club 2nd Addition
Plan Review
WSB Project No. 2029-633
We have reviewed the Final Plat for Saddle Club 2nd Addition in Lino Lakes, MN prepared by
E.G. Rudd and Sons, Inc. dated December 17, 2015. Note the construction plans were
previously reviewed with the Saddle Club 1st Addition.
Based on our review, we offer the following comments that should be responded to in writing by
the applicant:
GRADING, EROSION AND SEDIMENT CONTROL
1. The applicant is to verify that the NPDES permit and SWPPP are current.
STORMWATER MANAGEMENT
1. The stormwater management was previously reviewed with the 1st Addition and a
Stormwater Management Agreement is in place for the overall plat. There are no
additional comments at this time.
FLOODPLAIN
1. A LOMR was completed based on the meets and bounds and there remains floodplain on
some of the lots. The developer should consider a LOMA for those lots.
WETLANDS
1. For the future extension of Fox Road (south section as a separate plat), an approved
RCWD wetland mitigation plan will need to be approved.
Ms. Katie Larsen
February 1, 2016
Page 2
S:\Community Development\Projects\Planning Cases\Saddle Club\Second Addition\Staff Reports\20160411 CC-Final Plat\6 20160201 Engineering Review Sadd
WATER SYSTEM
1. The proposed water system extension was previously reviewed with the 1st Addition.
There are no additional comments at this time.
SANITARY SEWER SYSTEM
1. The proposed sanitary sewer system extension was previously reviewed with the 1st
Addition. There are no additional comments at this time.
TRANSPORTATION
1. The trail should be constructed from the Fox Borough development, and signage installed
per plan. A detail of the trail section adjacent to wetlands is to be submitted.
2. A temporary cul-du-sac or turnaround is to be constructed at the end of Fox Road in the
1st Addition.
3. The developer is responsible for milling and overlaying the east-west section of Old
Birch Street. The south edge will need to be a full depth patch where it has broken up
from construction. The inside curve at the match point of Old Birch and Pheasant Run
needs to be brought up to a higher grade.
4. The Old Birch Street access (north-east) at Birch Street is to be removed and a cul-du-sac
constructed.
5. A by-pass lane on Birch Street at the intersection with Old Birch (south-west ) is to be
constructed. The City has been working with Anoka County on the design of the by-pass
lane. Anoka County plans construct the by-pass lane with their 2016 Roadway Project.
This work includes the reconstruction of a section of trail adjacent to the by-pass lane.
Anoka County has also expressed and interest in re-locating the driveway access at 855
Birch Street. Anoka County would lead the effort to re-locate the driveway access.
DEVELOPMENT AGREEMENT
1. A Development Agreement is being drafted for Saddle Club 2nd Addition. The cost
estimates for the oversizing and other development costs have been updated.
2. The developer shall provide security for grading work associated with Fox Road.
3. The proposed Saddle Club 2nd Addition has been modified from the preliminary plat.
The current proposed 2nd Addition includes Black Berry Court and does not include Fox
Road. The Fox Road connection is needed with a future phase to:
a. Complete the transportation network in the area.
b. Provide watermain looping that is needed to maintain water service pressure and
fire fighting capacity.
Ms. Katie Larsen
February 1, 2016
Page 3
S:\Community Development\Projects\Planning Cases\Saddle Club\Second Addition\Staff Reports\20160411 CC-Final Plat\6 20160201 Engineering Review Sadd
PERMITS
1. Permits were obtained with the overall Saddle Club development, 1st Addition.
2. The Fox Road connection at the south end (future plat) will require RCWD permitting for
wetland mitigation.
If you or the applicant has any questions regarding these comments, please contact Diane
Hankee at (651) 982-2430 or diane.hankee@ci.lino-lakes.mn.us.
CITY COUNCIL
AGENDA ITEM 6D
STAFF ORIGINATOR: Michael Grochala
MEETING DATE: April 11, 2016
TOPIC: i. Consider Resolution No. 16-23, Designating Building as
Structurally Substandard, 49 Club
VOTE REQUIRED: 3/5
INTRODUCTION
Staff is requesting City Council approval to designate buildings (49 Club) as structurally
substandard.
BACKGROUND
The 49 Club, located at the corner of Hodgson Road and County Road J, has been vacant since
approximately 2003. The site has become a blighted location with illegal dumping and
vandalism taking place on a regular basis. The city has received numerous complaints regarding
the property. The site has been the topic, along with the neighboring 17 acre Jensen property, of
several development proposals. However, none have advanced past the concept phase due to a
number of complicating factors including the need for public improvements, multiple property
owners, and council concern over the intensity of prior commercial development proposals.
In March of 2015 LHB Corporation was retained to determine the eligibility of the property for
TIF purposes and to document the condition of the building. As noted in the report the buildings
are structurally substandard to a degree requiring substantial renovation or clearance. Staff has
been working with the owner of the property regarding potential demolition of the buildings
either as a City project or by the owner. The owner is proposing to remove both the principal
structure and accessory garage with their own contractor.
Staff is very interested in this project as a means to clean up the site, eliminate the blight and
assist redevelopment efforts. The use of Tax Increment Financing (TIF) has previously been
discussed to help offset utility, road or land assemblage costs to facility redevelopment of the
corner.
However, removal of the building has the potential to eliminate one of the financial tools
available to assist with redevelopment. In order to establish a TIF District after demolition, the
request for certification of the TIF District must be filed with the County within three years of
the parcel being occupied by a substandard building. An actual project would need to occur
within 4 years of district certification or the site would be dropped from the district and no longer
eligible for TIF.
To retain our ability to use TIF staff has listed out the steps that the EDA/City would need to
follow in order to demolish a building prior to a redevelopment TIF District being established:
1) The EDA Board finds by resolution (adopted before demolition) that the parcel was
occupied by a structurally substandard building and that after demolition and clearance
the EDA intends to include the parcel within a TIF district;
2) The City Council adopts resolution and makes blight findings regarding the building
(based on report);
3) EDA and owner of property enter into a preliminary development agreement (before
demolition) regarding demolition of the buildings and redevelopment of the property.
The EDA is considering the substandard building findings and the preliminary development
agreement at their April 11, 2016 meeting.
RECOMMENDATION
Staff is recommending approval of Resolution No. 16-23.
ATTACHMENTS
1. Resolution No. 16-23
2. LHB Recommendation March 27, 2015
460588v1 LN140-114
CITY OF LINO LAKES
RESOLUTION NO. 16-23
RESOLUTION DESIGNATING BUILDINGS AS STRUCTURALLY SUBSTANDARD
WITHIN LINO LAKES REDEVELOPMENT PROJECT
BE IT RESOLVED by the City Council of the City of Lino Lakes ("City") as follows:
Section 1. Recitals.
1.01. Under Minnesota Statutes, Section 469.174, subd. 10(d), the City or the Lino Lakes
Economic Development Authority (the “Authority”) is authorized to deem parcels as occupied by
structurally substandard buildings despite prior demolition or removal of the buildings, subject to
certain terms and conditions as described in this resolution.
1.02. The City or Authority intends to cause demolition of the buildings located on the
property described in Exhibit A hereto (the “Designated Property”), and may in the future include
the Designated Property in a redevelopment or renewal and renovation tax increment financing
district as defined in Minnesota Statutes, Sections 469.174, Subd. 10 or Subd. 10a.
Section 2. Buildings Designated Substandard; Other Proceedings.
2.01. The City finds that the buildings on the Designated Property as described in Exhibit
A are structurally substandard to a degree requiring substantial renovation or clearance, based upon
the analysis of such buildings by LHB Architects dated March 27, 2015 and on file in City Hall.
2.02. After the date of approval of this resolution, the buildings on the Designated
Property may be demolished or removed by the City, or such demolition or removal may be
financed by the City, or may be undertaken by a developer under a development agreement with the
City.
2.03. The City intends to include the Designated Property in a redevelopment or renewal
and renovation tax increment financing district, and to file the request for certification of such
district with the Anoka County auditor within three years after the date of demolition of the
buildings on the Designated Property.
2.04. Upon filing the request for certification of the new tax increment financing district,
the City will notify the Anoka County auditor that the original tax capacity of the Designated
Property must be adjusted to reflect the greater of (a) the current net tax capacity of the parcel, or
(b) the estimated market value of the parcel for the year in which the buildings were demolished or
removed, but applying class rates for the current year, all in accordance with Minnesota Statutes,
Section 469.174, subd. 10(d).
2.05. City staff and consultants are authorized to take any actions necessary to carry out
the intent of this resolution.
460588v1 LN140-114 2
Adopted by the Council of the City of Lino Lakes this 11th day of April, 2016.
The motion for the adoption of the foregoing resolution was introduced by Council Member
_______________and was duly seconded by Council Member ________________ and upon
vote being taken thereon, the following voted in favor thereof:
The following voted against same:
_______________________________
Jeff Reinert, Mayor
ATTEST:
________________________
Julianne Bartell, City Clerk
460588v1 LN140-114 3
EXHIBIT A
Description of Designated Property
6007 Hodgson Road, Lino Lakes, Minnesota
PID Nos. 31-31-22-43-0007, 31-31-22-43-0006, and 31-31-22-43-0017
March 27, 2015
Michael Grochala
Community Development Director
City of Lino Lakes
600 Town Center Parkway
Lino Lakes, Minnesota 55014
TIF ANALYSIS FINDINGS FOR 6007 HODGSON ROAD, LINO LAKES,
MINNESOTA 55014
LHB was hired to inspect the 49 Club building at 6007 Hodgson Road in Lino Lakes, Minnesota, in
order to determine if it meets the definition of “Substandard” as defined by Minnesota Statutes,
Section 469.174, subdivision 10. The building parcel may potentially be part of a future
Redevelopment TIF District, so will need to be compliant with all of the statutes pertaining to a
Redevelopment District.
The building is located on a three-parcel property at the northwest corner of Ash Street and
Hodgson Road (see Diagram 1).
Diagram 1
Page: 2
Date: March 27, 2015
CONCLUSION
After inspecting and evaluating the building on March 13, 2015 and applying current statutory criteria for a
Redevelopment District under Minnesota Statutes, Section 469.174, Subdivision 10, it is our professional opinion that
the building qualifies as substandard.
The remainder of this letter and attachments describe our process and findings in detail.
MINNESOTA STATUTE 469.174, SUBDIVISION 10 REQUIREMENTS
The property was inspected in accordance with the following requirements under Minnesota Statutes, Section
469.174, Subdivision 10(c), which states:
Interior Inspection
“The municipality may not make such determination [that the building is structurally substandard] without
an interior inspection of the property...”
Exterior Inspection and Other Means
“An interior inspection of the property is not required, if the municipality finds that
(1) the municipality or authority is unable to gain access to the property after using its best efforts to
obtain permission from the party that owns or controls the property; and
(2) the evidence otherwise supports a reasonable conclusion that the building is structurally
substandard.”
Documentation
“Written documentation of the findings and reasons why an interior inspection was not conducted must
be made and retained under section 469.175, subdivision 3(1).”
Qualification Requirements
Minnesota Statutes, Section 469.174, Subdivision 10 (a) (1) requires two tests for occupied parcels:
1. Coverage Test
…“parcels consisting of 70 percent of the area of the district are occupied by buildings, streets,
utilities, or paved or gravel parking lots”
The coverage required by the parcel to be considered occupied is defined under Minnesota Statutes,
Section 469.174, Subdivision 10(e), which states: “For purposes of this subdivision, a parcel is not
occupied by buildings, streets, utilities, paved or gravel parking lots, or other similar structures unless 15
percent of the area of the parcel contains buildings, streets, utilities, paved or gravel parking lots, or other
similar structures.”
The LHB team reviewed parcels 31-31-22-43-0007, 31-31-22-43-0006 and 31-31-22-43-0017:
• Parcel A (31-31-22-43-0007) is approximately 25,358 square feet and is 98 percent covered by
buildings, parking lots or other improvements.
• Parcel B (31-31-22-43-0006) is approximately 36,305 square feet and is 45 percent covered by
buildings, parking lots or other improvements.
• Parcel C (31-31-22-43-0017) is approximately 30,381 square feet and is 21 percent covered by
buildings, parking lots or other improvements.
Page: 3
Date: March 27, 2015
Findings:
The parcels are all covered by buildings, parking lots or other improvements, exceeding the 15 percent
parcel requirement.
2. Condition of Buildings Test
Minnesota Statutes, Section 469.174, Subdivision 10(a) states, “…and more than 50 percent of the
buildings, not including outbuildings, are structurally substandard to a degree requiring substantial
renovation or clearance;”
a. Structurally substandard is defined under Minnesota Statutes, Section 469.174, Subdivision
10(b), which states: “For purposes of this subdivision, ‘structurally substandard’ shall
mean containing defects in structural elements or a combination of deficiencies in
essential utilities and facilities, light and ventilation, fire protection including adequate
egress, layout and condition of interior partitions, or similar factors, which defects or
deficiencies are of sufficient total significance to justify substantial renovation or
clearance.”
i. We do not count energy code deficiencies toward the thresholds required by
Minnesota Statutes, Section 469.174, Subdivision 10(b)) defined as “structurally
substandard”, due to concerns expressed by the State of Minnesota Court of Appeals
in the Walser Auto Sales, Inc. vs. City of Richfield case filed November 13, 2001.
Findings:
The 49 Club building at 6007 Hodgson Road exceeds the criteria required to be determined a
substandard building (see the attached Building Code, Condition Deficiency and Context Analysis
Report).
b. Buildings are not eligible to be considered structurally substandard unless they meet certain
additional criteria, as set forth in Subdivision 10(c) which states:
“A building is not structurally substandard if it is in compliance with the building code
applicable to new buildings or could be modified to satisfy the building code at a cost of less
than 15 percent of the cost of constructing a new structure of the same square footage and
type on the site. The municipality may find that a building is not disqualified as structurally
substandard under the preceding sentence on the basis of reasonably available evidence, such
as the size, type, and age of the building, the average cost of plumbing, electrical, or structural
repairs, or other similar reliable evidence.”
“Items of evidence that support such a conclusion [that the building is not disqualified]
include recent fire or police inspections, on-site property tax appraisals or housing inspections,
exterior evidence of deterioration, or other similar reliable evidence.”
LHB counts energy code deficiencies toward the 15 percent code threshold required by
Minnesota Statutes, Section 469.174, Subdivision 10(c)) for the following reasons:
• The Minnesota energy code is one of ten building code areas highlighted by the
Minnesota Department of Labor and Industry website where minimum construction
standards are required by law.
• The index page of the 2007 Minnesota Building Code lists the Minnesota Energy
Code as a “Required Enforcement” area compared to an additional list of “Optional
Enforcement” chapters.
Page: 4
Date: March 27, 2015
• Chapter 11 of the 2015 Minnesota Residential Code incorporates Minnesota Rules,
Chapters, 1322 and 1323 Minnesota Energy Code.
• The Senior Building Code Representative for the Construction Codes and Licensing
Division of the Minnesota Department of Labor and Industry confirmed that the
Minnesota Energy Code is being enforced throughout the State of Minnesota.
• In a January 2002 report to the Minnesota Legislature, the Management Analysis
Division of the Minnesota Department of Administration confirmed that the
construction cost of new buildings complying with the Minnesota Energy Code is
higher than buildings built prior to the enactment of the code.
• Proper TIF analysis requires a comparison between the replacement value of a new
building built under current code standards with the repairs that would be necessary
to bring the existing building up to current code standards. In order for an equal
comparison to be made, all applicable code chapters should be applied to both
scenarios. Since current construction estimating software automatically applies the
construction cost of complying with the Minnesota Energy Code, energy code
deficiencies should also be identified in the existing structures.
Findings:
The building has code deficiencies exceeding the 15 percent building code deficiency criteria
required to be determined substandard (see the attached Building Code, Condition Deficiency
and Context Analysis Report).
TEAM CREDENTIALS
Michael A. Fischer, AIA, LEED AP - Project Principal/TIF Analyst
Michael has 28 years of experience as project principal, project manager, project designer and project
architect on planning, urban design, educational, commercial and governmental projects. He has become
an expert on Tax Increment Finance District analysis assisting over 100 cities with strategic planning for
TIF Districts. He is a Senior Vice President at LHB and currently leads the Minneapolis office.
Michael completed a two-year Bush Fellowship, studying at MIT and Harvard in 1999, earning Masters
degrees in City Planning and Real Estate Development from MIT. He has served on more than 50
committees, boards and community task forces, including a term as a City Council President and as Chair
of a Metropolitan Planning Organization. Most recently, he served as Chair of the Edina, Minnesota
planning commission. Michael has also managed and designed several award-winning architectural
projects, and was one of four architects in the Country to receive the AIA Young Architects Citation in
1997.
Philip Waugh – Project Manager/TIF Analyst
Philip is a project manager with 13 years of experience in historic preservation, building investigations,
material research, and construction methods. He previously worked as a historic preservationist and also
served as the preservation specialist at the St. Paul Heritage Preservation Commission. Currently, Philip
sits on the Board of Directors for the Preservation Alliance of Minnesota. His current responsibilities
include project management of historic preservation projects, performing building condition surveys and
analysis, TIF analysis, writing preservation specifications, historic design reviews, writing Historic
Preservation Tax Credit applications, preservation planning, and grant writing.
Page: 5
Date: March 27, 2015
Phil Fisher – Inspector
For 35 years, Phil Fisher worked in the field of Building Operations in Minnesota including White Bear Lake
Area Schools. At the University of Minnesota he earned his Bachelor of Science in Industrial Technology.
He is a Certified Playground Safety Inspector, Certified Plant Engineer, and is trained in Minnesota
Enterprise Real Properties (MERP) Facility Condition Assessment (FCA). His FCA training was recently
applied to the Minnesota Department of Natural Resources Facilities Condition Assessment project
involving over 2,000 buildings.
ATTACHMENTS
We have attached a Building Code, Condition Deficiency and Context Analysis Report, Replacement
Cost Report, Code Deficiency Report, and thumbnail photo sheets of the building.
Please contact me at (612) 752-6920 if you have any questions.
LHB INC.
MICHAEL A. FISCHER, AIA, LEED AP
SENIOR VICE PRESIDENT
M:\15Proj\150099\400 Design\406 Reports\Final Report\150099 Lino Lakes 49 Club Letter of Finding 20150327.docx
Lino Lakes 49 Club Redevelopment TIF District Letter of Finding
Building Code, Condition Deficiency and Context Analysis Report
March 26, 2015
Map No. & Address: Map A - 6007 Hodgson Road, Lino Lakes, MN 55014
Inspection Date(s) & Time(s): March 13, 2015 4:00 PM
Inspection Type: Interior and Exterior
Summary of Deficiencies: It is our professional opinion that this building is Substandard
because:
- Substantial renovation is required to correct Conditions found.
- Building Code deficiencies total more than 15% of
replacement cost, NOT including energy code deficiencies.
Estimated Replacement Cost: $940,500
Estimated Cost to Correct Building Code Deficiencies: $575,019
Percentage of Replacement Cost for Building Code Deficiencies: 61.14%
Defects in Structural Elements
1. A code required wind uplift system is missing on the exterior wall connection to the roof.
2. East and West wall are tied together with a suspect system to prevent movement.
Combination of Deficiencies
1. Essential Utilities and Facilities
a. Water service to the building has been disconnected.
b. Electrical service is disconnected.
c. There are no code accessible restrooms.
d. There is no code required accessible parking spaces.
2. Light and Ventilation
a. Electrical branch wiring has been removed.
b. All light fixtures have been removed.
c. The exhaust system has been removed.
d. The ventilation system has been disconnected. The age and condition of it make it suspect if
it would work as designed.
3. Fire Protection/Adequate Egress
a. There is not a code compliant fire protection system in the kitchen.
b. Stairs do not have code compliant hand rails.
c. The exterior steps leading from the kitchen area are missing and required by code.
d. The East and West exterior doors do not have code approved thresholds.
e. The East glass door does not have the code required 10 inch kick plates.
f. Flooring is missing, torn, or damaged preventing code compliant exiting from the building.
Lino Lakes 49 Club Redevelopment TIF District
Letter of Finding Building Report
LHB Project No. 150099 Page 1 of 2 Map A
4. Layout and Condition of Interior Partitions/Materials
a. The ceiling in the residence is stained from water intrusion and damaged by vandals.
b. Code approved wall surfacing is absent in the kitchen and restaurant areas.
c. Wall surfaces in the residence have been damaged by vandals with holes and graffiti.
d. All insulation in the kitchen and restaurant has been removed.
5. Exterior Construction
a. Roof is in need of code required replacement to prevent water intrusion.
b. Code required siding is missing on the North side of the building.
c. Soffit and fascia are missing from the North side of the building.
d. Exterior siding is damaged and in need of repair and paint to prevent water intrusion.
e. Window glass is missing and is allowing water intrusion.
f. Door glass on the west side of the building is broken.
Description of Code Deficiencies
1. Provide adequate water supply for fire and life safety system.
2. Replace all electrical wiring and electrical panels in order to provide adequate illuminated egress.
3. Install adequate plumbing for restroom accessibility.
4. Replace HVAC system that is non-existent.
5. All exit doors have non-compliant steps down to landing.
6. Thresholds at egress doors exceed allowable 1/2”.
7. Aluminum and glass doors lack required 10” high kick plate.
8. Flooring needs to be securely installed to create a slip resistant pathway to egress.
9. Replace roof to prevent water intrusion.
10. Replace exterior siding to prevent water intrusion.
11. Commercial kitchen exhaust shall have a separate fire suppression system.
12. Stairways shall have handrails on both sides.
13. Exterior walls do not conform to fire restrictive construction.
14. Install required wind up lift connection system to exterior wall and roof.
Overview of Deficiencies
The original structure was built in 1967 and has several additions, the latest having burned down several years
ago. The interior is void of all essential utilities and necessary facilities to be considered a functional place of
business.
Lino Lakes 49 Club Redevelopment TIF District
Letter of Finding Building Report
LHB Project No. 150099 Page 2 of 2 Map A
Lino Lakes 49 Club Redevelopment TIF District Letter of Finding
Replacement Cost Report
Map A - 49 Club
City of Lino Lakes
6007 Hodgson Road, Lino Lakes, MN 55014
Building Type:
Restaurant with Wood Siding / Wood
Frame
Location:SAINT PAUL, MN
Story Count:1
Story Height (L.F.):12
Floor Area (S.F.):5150
Labor Type:OPN
Basement Included:No
Data Release:Year 2015
Cost Per Square Foot:$182.62
Building Cost:$940,500
% of Total Cost Per S.F. Cost
8.89% $14.76 $76,000.00
A1010 Standard Foundations $3.44 $17,700.00
A1030 Slab on Grade $5.69 $29,300.00
A2010 Basement Excavation $0.57 $2,950.00
A2020 Basement Walls $5.03 $25,900.00
24.80% $41.17 $212,000.00
B1010 Floor Construction $1.17 $6,050.00
B1020 Roof Construction $7.69 $39,600.00
B2010 Exterior Walls $6.85 $35,300.00
B2020 Exterior Windows $10.58 $54,500.00
B2030 Exterior Doors $5.65 $29,100.00
Estimate Name:
Costs are derived from a building model with basic components.
Scope differences and market conditions can cause costs to vary significantly.
A Substructure
Strip footing, concrete, reinforced, load 11.1 KLF, soil bearing
capacity 6 KSF, 12" deep x 24" wide
Spread footings, 3000 PSI concrete, load 25K, soil bearing capacity
3 KSF, 3' - 0" square x 12" deep
Slab on grade, 4" thick, non industrial, reinforced
Excavate and fill, 4000 SF, 4' deep, sand, gravel, or common earth,
on site storage
Foundation wall, CIP, 4' wall height, direct chute, .148 CY/LF, 7.2
PLF, 12" thick
B Shell
Wood column, 8" x 8", 20' x 20' bay, 12' unsupported height, 160
BF/MSF, 160 PSF total allowable load
Wood roof, truss, 4/12 slope, 24" O.C., 30' to 43' span
Wood siding, 2"x4" studs 16"OC, insulated wall, 1" x 12" sawn cedar,
1" x 4" battens
Aluminum flush tube frame, for 1/4"glass,1-3/4"x4", 5'x6' opening, no
intermediate horizontals
Glazing panel, plate glass, 1/4" thick, tempered
Door, aluminum & glass, without transom, full vision, double door,
hardware, 6'-0" x 7'-0" opening
Door, aluminum & glass, with transom, non-standard, double door,
hardware, 6'-0" x 10'-0" opening
Lino Lakes 49 Club Redevelopment TIF District
Letter of Finding
LHB Project No. 150099 Page 1 of 3
Replacement Cost Report
Map A
% of Total Cost Per S.F. Cost
B3010 Roof Coverings $9.07 $46,700.00
B3020 Roof Openings $0.10 $500.00
15.50% $25.73 $132,500.00
C1010 Partitions $4.50 $23,200.00
C1020 Interior Doors $2.17 $11,200.00
C1030 Fittings $0.70 $3,600.00
C3010 Wall Finishes $2.04 $10,500.00
C3020 Floor Finishes $9.05 $46,600.00
C3030 Ceiling Finishes $7.26 $37,400.00
50.82% $84.37 $434,500.00
D2010 Plumbing Fixtures $10.78 $55,500.00
D2020 Domestic Water Distribution $8.31 $42,800.00
D3050 Terminal & Package Units $36.89 $190,000.00
Door, steel 18 gauge, hollow metal, 1 door with frame, no label, 3'-0"
x 7'-0" opening
Wood roofing, cedar shingles, 16" x 5", 4" min slope, 5" exposure,
1.6 PSF
Insulation, rigid, roof deck, fiberglass, 3'x4' or 4'x8' sheets, 15/16"
thick, R3.70
Gutters, box, aluminum, .027" thick, 5", enameled finish
Downspout, aluminum, rectangular, 2" x 3", embossed mill finish,
.020" thick
Skylight, plastic domes, insulated curbs, nominal size to 10 SF,
double glazing
C Interiors
Wood partition, 5/8"fire rated gypsum board face, none base,2 x 4,@
16" OC framing,same opposite face, 0 insul
5/8" gypsum board, taped & finished, painted on metal furring
Door, single leaf, wood frame, 3'-0" x 7'-0" x 1-3/8", birch, hollow
core
Toilet partitions, cubicles, ceiling hung, plastic laminate
Painting, interior on plaster and drywall, walls & ceilings, roller work,
primer & 2 coats
Ceramic tile, thin set, 4-1/4" x 4-1/4"
Carpet tile, nylon, fusion bonded, 18" x 18" or 24" x 24", 35 oz
Tile, quarry tile, mud set, minimum
Tile, quarry tile, mud set, maximum
g, , ,
channel grid, suspended support
D Services
Water closet, vitreous china, bowl only with flush valve, wall hung
Urinal, vitreous china, wall hung
Lavatory w/trim, vanity top, PE on CI, 20" x 18"
Kitchen sink w/trim, countertop, stainless steel, 44" x 22" triple bowl
Service sink w/trim, PE on CI,wall hung w/rim guard, 24" x 20"
Shower, stall, baked enamel, terrazzo receptor, 36" square
Water cooler, electric, wall hung, dual height, 14.3 GPH
Gas fired water heater, commercial, 100< F rise, 500 MBH input, 480
GPH
Rooftop, multizone, air conditioner, restaurants, 3,000 SF, 15.00 ton
Commercial kitchen exhaust/make-up air system, rooftop, gas, 2000
CFM
Lino Lakes 49 Club Redevelopment TIF District
Letter of Finding
LHB Project No. 150099 Page 2 of 3
Replacement Cost Report
Map A
% of Total Cost Per S.F. Cost
D4010 Sprinklers $8.70 $44,800.00
D4020 Standpipes $2.00 $10,300.00
D5010 Electrical Service/Distribution $4.35 $22,400.00
D5020 Lighting and Branch Wiring $9.48 $48,800.00
D5030 Communications and Security $3.50 $18,000.00
D5090 Other Electrical Systems $0.32 $1,650.00
0% $0.00 $0.00
E1090 Other Equipment $0.00 $0.00
0% $0.00 $0.00
0% $0.00 $0.00
100% $166.03 $855,000.00
10.00% $16.60 $85,500.00
0.00% $0.00 $0.00
0.00% $0.00 $0.00
$182.62 $940,500.00
Wet pipe sprinkler systems, steel, light hazard, 1 floor, 2000 SF
Wet pipe sprinkler systems, steel, ordinary hazard, 1 floor, 1000 SF
Wet standpipe risers, class III, steel, black, sch 40, 4" diam pipe, 1
floor
Overhead service installation, includes breakers, metering, 20'
conduit & wire, 3 phase, 4 wire, 120/208 V, 400 A
Feeder installation 600 V, including RGS conduit and XHHW wire,
400 A
Switchgear installation, incl switchboard, panels & circuit breaker,
120/208 V, 1 phase, 400 A
Receptacles incl plate, box, conduit, wire, 10 per 1000 SF, 1.2 watts
per SF
Miscellaneous power, 1.8 watts
Central air conditioning power, 6 watts
Fluorescent fixtures recess mounted in ceiling, 1.6 watt per SF, 40
FC, 10 fixtures @32watt per 1000 SF
Communication and alarm systems, fire detection, addressable, 12
detectors, includes outlets, boxes, conduit and wire
Fire alarm command center, addressable without voice, excl. wire &
conduit
Generator sets, w/battery, charger, muffler and transfer switch,
gas/gasoline operated, 3 phase, 4 wire, 277/480 V, 15 kW
E Equipment & Furnishings
F Special Construction
G Building Sitework
SubTotal
Contractor Fees (General Conditions,Overhead,Profit)
Architectural Fees
User Fees
Total Building Cost
Lino Lakes 49 Club Redevelopment TIF District
Letter of Finding
LHB Project No. 150099 Page 3 of 3
Replacement Cost Report
Map A
Lino Lakes 49 Club Redevelopment TIF District Letter of Finding
Code Deficiency Cost Report
Map A - 6007 Hodgson Road, Lino Lakes, MN 55014 - PID 31-31-22-43-0007
Code Related Cost Items Unit Cost Units
Unit
Quantity Total
Accessibility Items
Restrooms
Install plumbing fixtures for accessible restrooms 10.78$ SF 5,150 55,517.00$
Structural Elements
Wind up lift requirement
Install code required wind up lift system between
trusses/rafters and exterior wall 1.75$ SF 5,150 9,012.50$
Exiting
Thresholds
Correct elevation drop from interior to exterior landing 1,000.00$ Ea 4 4,000.00$
Reduce threshold elevation to less than 1/2 inch 250.00$ Ea 4 1,000.00$
Glass Dooors
Install code required 10 inch kick plate 150.00$ Ea 4 600.00$
Flooring
Install level flooring to allow emergency egress 9.05$ SF 5,150 46,607.50$
Lighting
Install branch wiring and lights for egress 9.48$ SF 5,150 48,822.00$
Fire Protection
Commercial Kitchen
Install code required fire suppression system 3.70$ SF 2,000 7,400.00$
Entire building
Install code required fire alarm system 3.50$ SF 5,150 18,025.00$
Interior walls/ceilings
Install code required wall and ceiling finishes 9.30$ SF 5,150 47,895.00$
Exterior Construction
Wood Siding
Repair/replace wood siding to prevent water intrusion 5.00$ SF 5,150 25,750.00$
Lino Lakes 49 Club Redevelopment TIF District
Letter of Finding
LHB Project No. 150099
Page 1 of 2
Code Deficiency Cost Report
Map A
Code Related Cost Items Unit Cost Units
Unit
Quantity Total
Roof Construction
Replace roof that has failed.
Remove old roof 0.90$ SF 5,150 4,635.00$
Replace with new roof 9.07$ SF 5,150 46,710.50$
Mechanical- Electrical
Electrical
Install new electrical service 4.35$ SF 5,150 22,402.50$
Plumbing
Install domestic water distribution system 8.31$ SF 5,150 42,796.50$
Mechanical
Install HVAC system 36.89$ SF 5,150 189,983.50$
Provide electrical service to new HVAC 0.75$ SF 5,150 3,862.50$
Total Code Improvements 575,019.50$
Lino Lakes 49 Club Redevelopment TIF District
Letter of Finding
LHB Project No. 150099
Page 2 of 2
Code Deficiency Cost Report
Map A
Lino Lakes 49 Club Redevelopment TIF District Letter of Finding
Map A, 6007 Hodgson Road - Photos
Page 1 of 6
P1020945.JPG P1020946.JPG P1020948.JPG
P1020949.JPG P1020950.JPG P1020951.JPG
P1020953.JPG P1020955.JPG P1020956.JPG
P1020957.JPG P1020958.JPG P1020959.JPG
Page 2 of 6
Lino Lakes 49 Club Redevelopment TIF District
Letter of Finding
LHB Project No. 150099
Photos
Map A
P1020960.JPG P1020961.JPG P1020962.JPG
P1020963.JPG P1020964.JPG P1020966.JPG
P1020967.JPG P1020968.JPG P1020969.JPG
P1020970.JPG P1020971.JPG P1020972.JPG
Page 3 of 6
Lino Lakes 49 Club Redevelopment TIF District
Letter of Finding
LHB Project No. 150099
Photos
Map A
P1020973.JPG P1020974.JPG P1020975.JPG
P1020976.JPG P1020977.JPG P1020979.JPG
P1020980.JPG P1020981.JPG P1020982.JPG
P1020983.JPG P1020984.JPG P1020985.JPG
Page 4 of 6
Lino Lakes 49 Club Redevelopment TIF District
Letter of Finding
LHB Project No. 150099
Photos
Map A
P1020986.JPG P1020987.JPG P1020988.JPG
P1020989.JPG P1020990.JPG P1020991.JPG
P1020994.JPG P1020995.JPG P1020996.JPG
P1020997.JPG P1020998.JPG P1020999.JPG
Page 5 of 6
Lino Lakes 49 Club Redevelopment TIF District
Letter of Finding
LHB Project No. 150099
Photos
Map A
P1030001.JPG P1030002.JPG P1030003.JPG
P1030004.JPG P1030005.JPG P1030006.JPG
P1030007.JPG P1030008.JPG P1030009.JPG
P1030010.JPG P1030011.JPG P1030012.JPG
Page 6 of 6
Lino Lakes 49 Club Redevelopment TIF District
Letter of Finding
LHB Project No. 150099
Photos
Map A
P1030013.JPG P1030014.JPG P1030017.JPG
P1030018.JPG P1030019.JPG P1030020.JPG
P1030021.JPG P1030022.JPG P1030023.JPG
P1030024.JPG P1030025.JPG
CITY COUNCIL
AGENDA ITEM 6E
STAFF ORIGINATOR: Diane Hankee, City Engineer
MEETING DATE: April 11, 2016
TOPIC: Consider Resolution No. 16-24 Approving the Plans &
Specifications and Authorizing the Ad for Bid, 2016 Mill and
Overlay Project
VOTE REQUIRED: 3/5 Vote Required
INTRODUCTION
Staff is requesting Council approve of plans and specifications and authorizing advertisement for
bids for the 2016 Mill and Overlay Project.
BACKGROUND
In accordance with the City’s Pavement Management Plan, streets are identified for annual
maintenance. The City uses a pavement rating review to annually analyze the conditions of the
City’s streets and recommend segments that meet the maintenance requirements. Streets are
selected for maintenance based on pavement management criteria, input from Public Works, and
feasibility of locations.
The proposed project includes Holly Drive, Holly Court, and Old Birch Street (north/south
section). It is recommended to complete a full depth reclamation or mill and overlay. The budget
for the project is $350,000.
The schedule for this project is as follows:
City Council Order Project, Authorizes Plans and Specifications March 14, 2016
City Council Approves Plans and Specifications April 11, 2016
City Council Authorizes Ad for Bids April 11, 2016
City Open Bids May 11, 2016
City Council Awards Contract May 23, 2016
Construction Begins May 27, 2016
Final Completion August 28, 2016
RECOMMENDATION
Staff recommends adoption of Resolution No. 16-24 Approving the Plans & Specifications,
Authorizing the Ad for Bid, 2016 Mill and Overlay Project.
ATTACHMENTS
1. Resolution No. 16-24
2. Plan Title Sheet/Location Map
CITY OF LINO LAKES
RESOLUTION NO. 16-24
RESOLUTION APPROVING PLANS AND SPECIFICATIONS AND AUTHORIZING
ADVERTISEMENT FOR BIDS FOR THE 2016 (ROADWAY MAINTENANCE) MILL
AND OVERLAY PROJECT
WHEREAS, the City Engineer has prepared plans and specifications for the 2016 (Roadway
Maintenance) Mill and Overlay Project and has presented such plans and specifications to the City
Council for approval;
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Lino Lakes,
Minnesota:
Such plans and specifications, a copy of which is on file at City Hall, are hereby approved. The
City Engineer is directed to advertise for bids, provide construction observation, and close out the
project once it is complete.
The City clerk shall prepare and cause to be inserted in the official paper and in Finance and
Commerce an advertisement for bids for the making of such improvement under such approved
plans and specifications. The advertisement shall be published for two weeks, shall specify the
work to be done, shall state that bids will be received by the Clerk, at which time they will be
publicly opened at the City Hall by the City Clerk and Engineer, will then be tabulated, and will be
considered by the Council at 6:30 p.m. on May 23, 2016, in the Council chambers of the City Hall.
Any bidder whose responsibility is questioned during consideration of the bid will be given an
opportunity to address the Council on the issue of responsibility. No bids will be considered
unless sealed and filed with the Clerk and accompanied by a cash deposit, cashier’s check, bid
bond or certified check payable to the Clerk for five (5) percent of the amount of such bid.
Adopted by the Council of the City of Lino Lakes this 11th day of April, 2016.
The motion for the adoption of the foregoing resolution was introduced by Council Member
_______________and was duly seconded by Council Member ________________ and upon
vote being taken thereon, the following voted in favor thereof:
The following voted against same:
_______________________________
Jeff Reinert, Mayor
ATTEST:
________________________
Julianne Bartell, City Clerk
Old Birch StreetHolly CourtHolly DriveSHEETSOFSHEET%+6;1(.+01.#-'5wsbeng.comWSB PROJECT NO. 02988--140K:\02988-140\Cad\Plan\02988-140 TS.dwg
CITY COUNCIL
AGENDA ITEM 6F
STAFF ORIGINATOR: Diane Hankee, City Engineer
MEETING DATE: April 11, 2016
TOPIC: Consideration of Resolution No. 16-25 Accepting Feasibility
Report for Mattamy Water Reuse
VOTE REQUIRED: Simple Majority
INTRODUCTION
The City Council is to consider accepting Feasibility Report for Mattamy Water Reuse project.
BACKGROUND
The City Council approved Resolution 15-53 on June 8, 2015 authorizing the Feasibility Study
for the Mattamy Water Reuse. The feasibility study has been completed and was approved by
City’s Environmental Board on March 30, 2016.
The feasibility Study provides an overview of three options for stormwater reuse in the proposed
Mattamy development:
1. Reusing stormwater to irrigate public places;
2. Reusing stormwater to irrigate public places and the townhomes; and
3. Reusing stormwater to irrigate the entire development.
A water balance was conducted to determine if there was sufficient water quantity available for
each of the three options. The balance evaluated runoff, precipitation, evaporation, and
irrigation. The proposed stormwater pond will receive enough runoff to implement Options 1 or
2, but a potable water connection will be required to implement Option 3. The developer has
reservations regarding option 3 based on their past experience.
In addition, the cost of each of the three options was estimated. After considering water supply
and cost, WSB recommended that the City implement Option 2: reusing stormwater to irrigate
public places and the townhomes for an estimated cost of $463,000. Financing was delineated
for the recommended option, as well as ownership and maintenance recommendations. It is
recommended that development fees cover $197,000 of the total cost, with the remaining funded
by the City’s Trunk Water fund.
2
Requested Council Direction
Staff recommends Resolution No. 16-25 Accepting Feasibility Report for Mattamy Water Reuse.
Attachments
1. Resolution No. 16-25
2. Mattamy Homes Water Reuse Feasibility Report
CITY OF LINO LAKES
RESOLUTION NO. 16-25
RESOLUTION ACCEPTING FEASIBILITY REPORT FOR THE MATTAMY HOMES
WATER REUSE
WHEREAS, pursuant to Resolution 15-53, Authorizing the Feasibility Study for Mattamy
Homes Water Reuse adopted by the council on June 8, 2015, a report has been prepared by WSB
and Associates, and
WHEREAS, this report was received by the council on April 4, 2016, and
WHEREAS, the report provides information regarding whether the proposed project is
necessar y, cost effective, and feasible.
NOW, THEREFORE BE IT RESOLVED by The City Council of The City of Lino Lakes:
1. The council hereby accepts the feasibility report, prepared by WSB and Associates dated
June 8, 2015.
2. The council will consider such improvements in accordance with the report and the
assessment of abutting property for a portion of the cost of the improvement pursuant to
Minnesota Statutes, Chapter 429.
3. A public hearing shall be held on such proposed improvement at a date to be determined and
the clerk shall give mailed and published notice of such hearing and improvement as required
by law.
Adopted by the Council of the City of Lino Lakes this 11th day of April, 2016.
The motion for the adoption of the foregoing resolution was introduced by Council Member
_______________and was duly seconded by Council Member ________________ and upon
vote being taken thereon, the following voted in favor thereof:
The following voted against same:
_______________________________
Jeff Reinert, Mayor
ATTEST:
________________________
Julianne Bartell, City Clerk
City of Lino Lakes, MN
600 Town Center Parkway • Lino Lakes, MN 55014
June 8, 2015
Mattamy Homes
Water Reuse
City of Lino Lakes
Anoka County, MN
WSB Project No. 2988-01
FEASIBILITY REPORT
MATTAMY HOMES WATER REUSE
FOR THE
CITY OF LINO LAKES, MINNESOTA
June 8, 2015
Prepared By:
WSB & Associates, Inc.
477 Temperance Street
St. Paul, MN 55101
651-286-8450
651-286-8488 (Fax)
Feasibility Report
Mattamy Homes Water Reuse
WSB Project No. 2988-01
CERTIFICATION
I hereby certify that this plan, specification, or report was prepared
by me or under my direct supervision and that I am a duly
Licensed Professional Engineer under the laws of the State of
Minnesota.
Greg F. Johnson, PE
Date: April 11, 2016 Lic. No. 26430
Prepared By:
_____________________________________________________
Erin J. Heydinger
Date: April 11, 2016
Feasibility Report
Mattamy Homes Water Reuse
WSB Project No. 2988-01
TABLE OF CONTENTS
1. EXECUTIVE SUMMARY ........................................................................................................... 4
2. MATTAMY HOMES WATER REUSE ...................................................................................... 5
2.1 INTRODUCTION .................................................................................................................... 5
2.2 GENERAL BACKGROUND .................................................................................................. 5
2.3 PROPOSED IMPROVEMENTS ............................................................................................ 6
3. FINANCING .................................................................................................................................. 8
3.1 OPINION OF COST ................................................................................................................ 8
3.2 FUNDING .................................................................................................................................. 8
4. RECOMMENDATION ............................................................................................................... 10
Appendix A
Figure 1 – Project Location
Figure 2 – Option 1: Irrigating Public Spaces
Figure 3 – Option 2: Irrigating Public Spaces and Townhomes
Figure 4 – Option 3: Irrigating Entire Development
Appendix B
Table 1 – Estimated Annual Irrigation
Appendix C
Table 1 - Water Balance Summary
Table 2 – Option 1 Cost Summary
Table 3 – Option 2 Cost Summary
Table 4 – Option 3 Cost Summary
Appendix D
Water Balance Tech Memo
Feasibility Report
Mattamy Homes Water Reuse
WSB Project No. 2988-01
1. EXECUTIVE SUMMARY
The proposed Mattamy Homes Development is a 400 acre residential development located east
of Interstate 35E and north of Main Street in the City of Lino Lakes. Surface water management
for the project would include storm water quality, storage and rate control. The storm water
storage area will hold a significant amount of water that can be used to provide irrigation verses
conventional groundwater use for irrigation.
Over the past three years, management of both surface water and groundwater resources have
received increased awareness both locally and regionally. Lino Lakes is included in the North
and East Metro Groundwater Management District established by the Department of Natural
Resources (DNR). The goal is to protect of water resources through sustainable water use
solutions such as the one being proposed.
The water reuse project was evaluated through a water balance analysis and multiple options for
an irrigation reuse system. The options for an irrigation reuse system are:
1. Irrigate the park and public spaces
2. Irrigate the townhomes, park, and public spaces
3. Irrigate the entire development, including single-family residences
The options were evaluated based on the estimated costs, ownership, storm water requirements,
and maintenance. Option 2 is recommended: it includes irrigation of the townhomes, park and
public spaces.
The estimated project cost for Option 2 is $463,000 which includes 10% construction
contingency and 20% indirect costs. Funding for the project is proposed through development
fees generated from surface water management fees, and City trunk water system funds.
This project is feasible and cost-effective from an engineering standpoint, and should be
constructed as proposed herein.
Feasibility Report
Mattamy Homes Water Reuse
WSB Project No. 2988-01
2. MATTAMY HOMES WATER REUSE
2.1 INTRODUCTION
2.1.1 Authorization
On June 8, 2015, the City of Lino Lakes City Council authorized the preparation of a
feasibility report for the Mattamy Homes Water Reuse project.
2.1.2 Scope
The Mattamy Homes Development includes a large storm water storage area that can be
used as an irrigation source. The proposed project includes storm water used for
irrigating the development. This report evaluates several options for water reuse and
considers water resources, cost, regulatory requirements, and value of the reuse irrigation
system.
2.1.3 Data Available
Information and materials used in the preparation of this report include the following:
City of Lino Lakes Comprehensive Plan
City of Lino Lakes Base Map and/or Topography Maps
Minnesota Department of Natural Resources Water Usage Reports
Grading plans and plat for the Mattamy Homes development
2.2 GENERAL BACKGROUND
2.2.1 Project Location
The Mattamy Homes Development is located in the City of Lino Lakes, west of Interstate
35E, east of 20th Avenue North, north of Main Street, and south of the bounds extended
by 77th Street East. A map showing the project area can be found in Figure 1, Appendix
A of this report.
2.2.2 Existing Conditions
The existing land use at Mattamy Homes is agricultural, with stormwater currently
running through the site via Anoka County Ditch 55 (ACD-55) and Anoka County Ditch
72 (ACD-72). These ditch systems receive storm water runoff from watersheds located in
the cities of Hugo and Lino Lakes and discharge to Peltier Lake. A study is being
completed to address the surface water in the NE area or Lino Lakes. This report
assumes that ditch water is not available as a source for irrigation and will be addressed
through the NE Drainage Study.
2.2.3 Stormwater Management
The Rice Creek Watershed District (RCWD) Rules state that stormwater volume and rate
control must occur in any location with new or reconstructed impervious surfaces, such
as the Mattamy development. Stormwater infiltration is the preferred method of volume
control. Prior to this feasibility study, an analysis was conducted to determine if the site
was suitable for infiltration. Because a large portion of the site is within a vulnerable
portion of the Drinking Water Supply Management Area (DWSMA), and the Minnesota
Department of Health recommends that infiltration not occur in a vulnerable DWSMA, it
Feasibility Report
Mattamy Homes Water Reuse
WSB Project No. 2988-01
was determined that infiltration is not feasible. In this instance, the RCWD Rules state
that stormwater irrigation can occur in lieu of infiltration as a volume reduction practice.
The three scenarios in this study reflect this determination.
2.2.3 Current Irrigation Practices
The City currently regulates irrigation within the community to promote water
conservation. It is estimated that irrigation accounts for 43% of the potable water used in
the City each year (Appendix B, Table 1). The large proportion of water allocated
towards irrigation presents an opportunity for the City to reduce its summer demand on
the potable water system through water reuse.
2.3 PROPOSED IMPROVEMENTS
There were three options identified to coincide with the Mattamy development
Option 1: Irrigating Public Spaces with Storm Water
Option 1 includes a water reuse irrigation system for public open spaces within
the Mattamy Homes Development. This system includes the park in the center of
the development as well as the berm on the east side of the development. In total,
the irrigated area for Option 1 is 11 acres. A figure depicting Option 1 is shown as
Appendix A, Figure 2.
Option 2: Irrigating Public Spaces and Townhomes with Storm Water
Option 2 includes a water reuse irrigation system for public open spaces and
multi-family residential (townhome) area in the southeastern portion of the
development. The townhome area includes 12 acres of green space that will
require irrigation, in addition to the 11 acres irrigated in the public space. A figure
depicting Option 2 is shown as Appendix A, Figure 3.
Option 3: Irrigating all of the Mattamy Development with Storm Water
Option 3 includes a water reuse irrigation system for public open spaces, multi-
family residential townhomes, and single-family residences. A fourth municipal
utility would be installed throughout the development. The third option requires
homeowner education and interaction for system management and coordinatation
with City maintenance staff. The total irrigated area for Option 3 is 144 acres. A
figure depicting Option 3 is shown as Appendix A, Figure 4.
A water balance analysis was completed and can be found in Appendix D. The water
balance summary for each option:
Option 1: Irrigating Public Spaces with Storm Water
The water balance model indicates that the storm water stored can sufficiently
supply water for irrigation of the public spaces with minimal pond level
fluctuations.
Feasibility Report
Mattamy Homes Water Reuse
WSB Project No. 2988-01
Option 2: Irrigating Public Spaces and Townhomes with Storm Water
The water balance model indicates that the storm water stored can sufficiently
supply water for irrigation of the public spaces and townhomes with minimal
pond level fluctuations.
Option 3: Irrigating all of the Mattamy Development with Storm Water
The water balance model indicates that the storage area cannot supply enough
irrigation water to support this option. The model showed that storage levels will
reach significantly low levels and that the reuse system would require
supplementation from the municipal water system. The cost to supplement the
water reuse system with the municipal supply is not a cost that required with
Option 1 or 2. In addition there will be vegetation issues if the storage area is
drawn down this low, along with it is anticipated that residents will not desire to
have the storage area this low.
Option 2 is recommended because it provides the most surface water reuse without a
fourth municipal utility system and individual service lines. Option 2 can be
implemented without supplementation/connection to the municipal water system.
2.3.1 Pump and Pipe Materials
Appendix C includes pump and forcemain layouts for each option, as well as suggested
meter locations. The pump size should be determined by the irrigation designer, and they
should be controlled by soil-moisture sensors, to ensure that watering is dictated by
weather and soil conditions. The proposed forcemain is 2 to 4” diameter, high density
polyethylene (HDPE).
2.3.2 Water Quality
Prior to each irrigation season, it is recommended that the storage area be tested for water
quality. The Minnesota Pollution Control Agency has recommended water quality
parameters as outlined in Appendix D. If the parameters are not met, additional
treatment should be considered to ensure the storage water remains of high enough
quality to use for irrigation.
2.3.3 Ownership Recommendation
It is recommended that the City own and operate the system, and within the townhome
area, the City should have a maintenance agreement with the HOA where they are
responsible for maintaining the system in the townhome area.
2.3.4 Metering, Usage, and Billing
It is recommended that the park and berm irrigation systems be operated with
independent meters so that the townhome maybe invoiced for their water usage to
support maintenance of the system. Watering restrictions should remain in place for
consistency and promote water conservation.
2.3.5 Permitting
A Rice Creek Watershed District (RCWD) permit will be required. The project will meet
volume reduction, treatment and rate control per RCWD rules. A Minnesota Department
of Natural Resources (DNR) appropriations permit will also be required for the project.
Feasibility Report
Mattamy Homes Water Reuse
WSB Project No. 2988-01
2.3.6 Right of Way
The proposed reuse system with Option 2 would be constructed within public right of
ways and public land or land owned by the Home Owner Association for the townhomes.
Option 3 may require additional easement or right of way dedicated through platting for
the distribution system.
3. FINANCING
3.1 OPINION OF COST
The detailed opinion of probably cost for each of the three options can be found in Appendix C
of this report. The opinions of cost incorporate estimated construction costs and include a 10%
construction contingency and 20% for indirect costs (legal, administrative, engineering, and
financing items).
Table 4 below provides a summary of the estimated cost for each of the three options
considered:
Option Construction with
Contingency
Indirect
(20%) Total
Option 1: Public Areas
Irrigated $296,000 $60,000 $356,000
Option 2: Public Areas and
Townhomes Irrigated $386,000 $77,000 $463,000
Option 3: Public Areas,
Townhomes, and Single-
Family Homes Irrigated
$2,151,000 $431,000 $2,582,000
3.2 FUNDING
Funding for the project is proposed through development fees generated from surface water
management fees, and City trunk water system funds. The proposed funding for Option 2 is
outlined as follows:
Funding Source Amount
Surface Water Management $197,000
Trunk Water $266,000
Total $463,000
Feasibility Report
Mattamy Homes Water Reuse
WSB Project No. 2988-01
The trunk fee is calculated based on 40% of the $4,069 trunk water fee for each townhome unit,
based on the estimated water savings. It was assumed that each townhome is one Residential
Equivalency Unit (REU).
The project may be eligible for grants from the Metropolitan Council of Environmental Services
for Targeted Storm Water. Grant funding opportunities will be evaluated during the design of
the project.
Feasibility Report
Mattamy Homes Water Reuse
WSB Project No. 2988-01
4. RECOMMENDATION
The project is feasible, necessary, and cost-effective from an engineering perspective. WSB &
Associates, Inc. recommends construction of the proposed improvements as detailed in this
report. The economic feasibility of this project will be determined by the City Council.
Feasibility Report
Mattamy Homes Water Reuse
WSB Project No. 2988-01
APPENDIX A
Figure 1: Project Location
Figure 2: Option 1: Irrigating Public Spaces
Figure 3: Option 2: Irrigating Public Spaces and Townhomes
Figure 4: Option 3: Irrigating Entire Development
Feasibility Report
Mattamy Homes Water Reuse
WSB Project No. 2988-01
%&c(
%&c(
Rehbein St
73rd St
Brian Dr20th Ave N20th Ave N77th St E Document Path: K:\02988-010\GIS\Maps\Figure1_MatamyHomeProjectArea.mxdÜ
Figure 1Mattamy Homes Project Area
0 1,000Feet
Project A rea
Single Family Homes
Townhomes
Irrigation Source
Ponds
Par k
Berm
ROW
"/
"/
%&c(
Rehbein St
73rd St
Brian Dr20th Ave N20th Ave N77th St E Document Path: K:\02988-010\GIS\Maps\Figure2_Scenario1.mxdÜ
Figure 2Option 1 - Parks and Berm
0 1,000Feet
Irrigated Area
"/Pump
Park Irrigation System
Berm Irrigation System
Project A rea
Single Family Homes
Townhomes
Irrigation Source
Ponds
Par k
Berm
ROW
%&c(
Rehbein St
73rd St
Brian Dr20th Ave N20th Ave N77t h St E Document Path: K:\02988-010\GIS\Maps\Figure3_Scenario2.mxdÜ
Figure 3Option 2 - Parks, Berm, and Townhomes
0 1,000Feet
Irrigated Area
"/Pump
Park Irrigation System
Berm Irrigation System
Townhome Irrigation System
Project A rea
Single Family Homes
Townhomes
Irrigation Source
Ponds
Par k
Berm
ROW
"/
"/
"/
"/
"/
"/
%&c(
Rehbein St
73rd St
Brian Dr20th Ave N20th Ave N77th St E Document Path: K:\02988-010\GIS\Maps\Figure4_Scenario3.mxdÜ
Figure 4Option 3 - Entire Development Irrigated
0 1,000Feet
Irrigated Area
"/Pump
Single Family Irrigation System
Park Irrigation System
Berm Irrigation System
Townhome Irrigation System
Project A rea
Single Family Homes
Townhomes
Irrigation Source
Ponds
Par k
Berm
ROW
APPENDIX B
Table 1 - Estimated Annual Irrigation
Feasibility Report
Mattamy Homes Water Reuse
WSB Project No. 2988-01
Pumping Data
2011 2012 2013 2014 Average
January 25,888,000 25,071,000 27,807,000 25,983,000 26,187,250
February 23,596,000 22,437,000 23,407,000 22,194,000 22,908,500
March 23,542,000 24,787,000 23,681,000 24,295,000 24,076,250
April 26,549,000 35,803,000 27,568,000 25,505,000 28,856,250
May 32,688,000 48,084,000 35,966,000 36,576,000 38,328,500
June 61,591,000 66,619,000 38,388,000 42,654,000 52,313,000
July 66,370,000 95,916,000 83,252,000 64,403,000 77,485,250
August 59,137,000 93,978,000 101,316,000 73,428,000 81,964,750
September 69,350,000 90,784,000 89,821,000 47,160,000 74,278,750
October 51,635,000 56,177,000 34,861,000 33,170,000 43,960,750
November 25,097,000 24,722,000 24,858,000 24,064,000 24,685,250
December 26,704,000 25,046,000 24,703,000 25,310,000 25,440,750
Total 492,147,000 609,424,000 535,628,000 444,742,000 520,485,250
Summer Usage:367,320,000 487,361,000 411,172,000 322,896,000 397,187,250
Winter Usage:124,827,000 122,063,000 124,456,000 121,846,000 123,298,000
Average Monthly Winter Use:24,659,600
Average Monthly Summer Use:56,741,036
Average Estimated Irrigation:224,570,050
Percent of Total:43.1%
APPENDIX C
Table 1 - Water Balance Summary
Table 2 – Option 1 Cost Summary
Table 3 – Option 2 Cost Summary
Table 4 – Option 3 Cost Summary
Feasibility Report
Mattamy Homes Water Reuse
WSB Project No. 2988-01
Irrigated Area (ac)Volume Required to Irrigate Area (gal)Average Days Irrigating from Lake YearlyAverage Daily Irrigation Demand (gal)Annual Lake Water Used (MG)Annual Lake Water Used (ac‐ft)Annual Potable Water Used (MG)Option 1: Irrigate Park and Berm10.79 42,000156 35,3366.54 20.06 0Option 2: Irrigate Park, Berm, and Townhome23.04 88,000156 74,03813.69 42.02 0Option 3: Irrigate Entire Development*143.7 547,000134 460,215 73.09 224.3 12.05*Numbers assume an 11' protective depth
Item No. Description Unit
Estimated
Total
Quantity
Estimated
Unit Price
Estimated Total
Cost
1 MOBILIZATION LUMP SUM 1 $8,000.00 $8,000.00
2 CLEARING AND GRUBBING LUMP SUM 1 $500.00 $500.00
3 DEWATERING LUMP SUM 1 $5,000.00 $5,000.00
4 2" FORCE MAIN HDPE LIN FT 6,991 $18.00 $125,832.87
5 ELECTRICAL SERVICE LUMP SUM 1 $12,000.00 $12,000.00
6 IRRIGATION METER AND CONTROLS EACH 2 $3,000.00 $6,000.00
7 LIFT STATION, FILTER, CONTROLS, AND APPURTENANCES* LUMP SUM 2 $55,000.00 $110,000.00
8 SILT FENCE, TYPE HEAVY DUTY LIN FT 250 $3.50 $875.00
9 CONCRETE PUMP PAD EACH 2 $1,000.00 $1,000.00
SUBTOTAL $269,207.87
+ 10% CONTINGENCY $26,920.79
CONSTRUCTION SUBTOTAL $296,128.66
+ 20% INDIRECT $59,225.73
TOTAL $356,000.00
Opinion of Probable Cost
A. Irrigating Public Spaces (Park and Berms)
Item No. Description Unit
Estimated
Total
Quantity
Estimated
Unit Price
Estimated Total
Cost
1 MOBILIZATION LUMP SUM 1 $16,700.00 $16,700.00
2 CLEARING AND GRUBBING LUMP SUM 1 $500.00 $500.00
3 DEWATERING LUMP SUM 1 $5,000.00 $5,000.00
4 2" FORCE MAIN HDPE LIN FT 6,991 $18.00 $125,838.00
5 ELECTRICAL SERVICE LUMP SUM 1 $12,000.00 $12,000.00
6 IRRIGATION METER AND CONTROLS EACH 3 $3,000.00 $9,000.00
7 LIFT STATION, FILTER, CONTROLS, AND APPURTENANCES* LUMP SUM 2 $55,000.00 $110,000.00
8 SILT FENCE, TYPE HEAVY DUTY LIN FT 250 $3.50 $875.00
9 CONCRETE PUMP PAD EACH 2 $1,000.00 $2,000.00
11 4" FORCE MAIN HDPE LIN FT 3,807 $18.00 $68,531.73
SUBTOTAL $350,444.73
+ 10% CONTINGENCY $35,044.47
CONSTRUCTION SUBTOTAL $385,489.21
+ 20% INDIRECT $77,097.84
TOTAL $463,000.00
B. Irrigating Public Spaces and Townhomes
Opinion of Probable Cost
Item No. Description Unit
Estimated
Total
Quantity
Estimated Unit
Price
Estimated Total
Cost
1 MOBILIZATION LUMP SUM 1 $93,100.00 $93,100.00
2 CLEARING AND GRUBBING LUMP SUM 1 $500.00 $500.00
3 DEWATERING LUMP SUM 1 $5,000.00 $5,000.00
4 2" FORCE MAIN HDPE LIN FT 6,991 $18.00 $125,838.00
5 ELECTRICAL SERVICE LUMP SUM 1 $12,000.00 $12,000.00
6 IRRIGATION METER AND CONTROLS EACH 8 $3,000.00 $24,000.00
7 LIFT STATION, FILTER, CONTROLS, AND APPURTENANCES* LUMP SUM 6 $55,000.00 $330,000.00
8 SILT FENCE, TYPE HEAVY DUTY LIN FT 250 $3.50 $875.00
9 CONCRETE PUMP PAD EACH 6 $1,000.00 $1,000.00
10 CONNECT TO POTABLE WATER EACH 6 $8,000.00 $48,000.00
11 4" FORCE MAIN HDPE LIN FT 36,944 $18.00 $664,992.00
12 POTABLE WATER SYSTEM OVERSIZING LUMP SUM 1 $650,000.00 $650,000.00
SUBTOTAL $1,955,305.00
+ 10% CONTINGENCY $195,530.50
CONSTRUCTION SUBTOTAL $2,150,835.50
+ 20% INDIRECT $430,167.10
TOTAL $2,582,000.00
C. Irrigating Entire Development
Opinion of Probable Cost
APPENDIX D
Water Balance Technical Memo
Feasibility Report
Mattamy Homes Water Reuse
WSB Project No. 2988-01
engineering planning environmental construction 701 Xenia Avenue South
Suite 300
Minneapolis, MN 55416
Tel: 763-541-4800
Fax: 763-541-1700
Equal Opportunity Employer
wsbeng.com
January 21, 2016
Mr. Mike Grochala, AICP
Community Development Director
City of Lino Lakes
600 Town Center Pkwy
Lino Lakes, MN 55015
Re: Mattamy Homes Water Reuse – Water Balance Technical Memorandum
WSB Project Number 02988-01
Dear Mr. Grochala:
We are providing you this technical memorandum to summarize the results of the water balance
model for the water reuse feasibility study in the Mattamy Homes development. This document
describes the methodology used to calculate the quantity of stormwater available and the amount
used for irrigation purposes.
Project Background
The City of Lino Lakes wishes to implement a water reuse program using water from the lake in
the Mattamy Homes development to irrigate portions of the development. There are three
potential scales with respect to water reuse that were evaluated. The first is using water in the
lake to irrigate the development’s park and the berms on the eastern edge of the development.
The second is to irrigate the park and the berms as well as the townhomes in the southeastern
corner of the development. Finally, the water balance modeled the feasibility of irrigating the
entire development, including single-family homes, with water from the lake.
Water Balance Theory
The water balance presented in this document evaluates the amount of water provided to the
pond via stormwater runoff, the amount that will be withdrawn for irrigation, and the resulting
lake levels. The estimate takes into consideration precipitation, runoff, evaporation, irrigation
demand, and pond overflow. While water balances rely on historic data and do not predict future
climate patterns, they are a helpful tool when determining if stormwater irrigation is feasible, and
if so, whether or not potable water augmentation will be required.
Calculating Drainage Area
To determine the amount of water available for irrigation, the drainage area to the lake was taken
from the current Lino Lakes Northeast Study being conducted by WSB & Associates for the
City. In addition, drainage information was obtained from the the developer to estimate the area
in the future development that will drain to the lake.
Mr. Mike Grochala
January 21, 2016
Page 2
The purpose of the water balance is to determine if the lake holds enough water for irrigation
purposes throughout the irrigation season. Therefore, a conservative approach was taken when
estimating the drainage area; only the immediate drainage within the development was
considered for the water balance.
Calculating Precipitation
Rainfall data was obtained from the Minnesota Climatology Working Group. Data was available
beginning on May 1, 1959, and extending to June 30, 2015. Days in which rainfall data was
missing were assumed to have received no precipitation.
Calculating Runoff
The water balance uses the United States Department of Agriculture (USDA) Natural Resources
Conservation Service method for determining runoff. This method, commonly known as the SCS
Runoff Curve Number method, has widespread use in hydrologic modeling. The curve number
for the drainage area was calculated as part of the Lino Lakes Northeast Study. The curve
numbers for the drainage area within the development was estimated using soil type and single-
and multi-family residential published curve numbers. Using the calculated curve numbers, an
S-value (the amount of maximum soil moisture retention after runoff begins) was determined
using the following equation:
ܵൌ 1000
ܥݑݎݒ݁ ܰݑܾ݉݁ݎ െ10
From the S-value, the initial abstraction (Ia) was calculated as 0.2*S, per the USDA. To predict
the amount of runoff (Q) from a particular rain event, the USDA gives the equation:
The equation dictates that there is no runoff from a storm where the amount that falls (in inches)
is less than the initial abstraction. In the single-family residential area, a storm of 0.47 inches is
required, and in the multi-family residential (townhome) area, a storm of 0.26 inches is required.
In the model, runoff from the three areas was considered independently to ensure the most
accurate estimate of total runoff volume possible. Using the equation above, the runoff entering
the lake was evaluated for each rain event from the historical rainfall data.
Calculating Pond Volume
Pond volume was determined using contour data from the grading plan for the lake. First, a stage
to surface area relationship was developed using surface area from the grading plan. Once the
surface area was evaluated at several elevations, the trapezoidal method was used to estimate
overall pond volume as well as the volume at several elevations. The storage capacity of the
pond is approximately 122 million gallons, with a volume of 86 million gallons at the normal
water elevation. The total possible volume was assumed to be the volume at the overflow
Mr. Mike Grochala
January 21, 2016
Page 3
elevation. The grading plans assume a normal water level of 900 feet, which was set as the initial
lake volume for modeling purposes.
Calculating Evaporation
Based on the estimated volume contained in the lake, the surface area was calculated in Excel
using the Forecast function. The Forecast function gives a predicted value of a variable using a
linear regression analysis. In this case, the function uses the elevation-surface area data
calculated in the pond volume analysis to predict what the surface area would be for any volume
of water. This is a necessary component for the model because the volume analysis as outlined in
the previous section gives volume at one foot increments only. Once the surface area is
estimated, the amount of evaporation is predicted using the pan evaporation method with a pan
coefficient, as outlined by the University of Minnesota. The guiding document recommends a
pan coefficient of 0.75 for Minnesota. The equation used is below:
ܧݒܽݎܽݐ݅݊ ൌ ܹܽݐ݁ݎ ܵݑݎ݂ܽܿ݁ ܣݎ݁ܽ ሺ݂ݐ
ଶ ሻݔ 0.75 ݔ 36.98 ݄݅݊ܿ݁ݏ
12 ݄݅݊ܿ݁ݏ/݂ݐ
The value of 36.98 inches is the average pan evaporation for the State of Minnesota between
1974 and 2004. The equation above provides annual evaporation. Therefore, in the water
balance, the value was divided by 180, or the approximate number of days in which evaporation
occurs annually.
Calculating Irrigation Requirements
Using aerials and plans provided by the developer, the irrigated area was estimated for the
berms, park, townhomes, and single-family homes. It is estimated that to maintain a lawn, one
inch of water is required per week (including precipitation). 1-inch of irrigation weekly results in
an average of 1/7, or 0.14, inches per day. Therefore, if the rainfall is greater than 0.14 inches in
a given day, it was assumed in the water balance that irrigation did not occur that day.
Rice Creek Watershed District rules dictate that stormwater irrigation occurs, at maximum, from
April 15 to October 15 for the generation of volume reduction credits. The water balance
calculates irrigation between these dates.
Phase Irrigation Volume per Day (gal)
1. Park and berms only 42,000
2. Park, berms, and townhome area 88,000
3. Park, berms, townhome area, single family area 546,150
Water Balance: Final Calculation and Results
Once all of the above parameters were calculated, the balance was conducted to determine lake
levels throughout the irrigation season. The overall water balance equation is as follows:
ܲ݊݀ ܸ݈ݑ݉݁ ൌ ܫ݊݅ݐ݈݅ܽ ܲ݊݀ ܸ݈ݑ݉݁ ܵݐݎ݉ݓܽݐ݁ݎ ܴݑ݂݂݊ ܦ݅ݐ݄ܿ ܫ݂݈݊ݓ െ ܦ݅ݏ݄ܿܽݎ݃݁ െ ܧݒܽݎܽݐ݅݊ െ ܫݎݎ݅݃ܽݐ݅݊
The average annual precipitation, including snowmelt, was 33.5 inches. The model predicted that
on average, irrigation will occur 156 days each year, out of 184 possible irrigation days. This
Mr. Mike Grochala
January 21, 2016
Page 4
leads to a weekly irrigation depth of 0.84 inches, resulting in a total water depth of 1.6 inches
applied to the turf on a weekly basis, including precipitation. Studies conducted by the
University of Minnesota indicate that this irrigation rate is likely slightly more than necessary
given the soils and precipitation. A small overestimation of the irrigation rate is desired so that
the model is conservative.
Option 1: Irrigating Public Spaces with Storm Water
Option 1 resulted in a daily irrigation rate of 42,000 gallons on days in which irrigation occurred
(days in which precipitation was less than 1/7-inch). The water balance model indicates that the
storage can sufficiently supply water for irrigation of the public spaces with minimal effect on
storage levels. Evaporation and irrigation combined resulted in maximum storage level
fluctuation of 36.8 million gallons (MG), or 4 feet in elevation change. Option 1 is feasible in
terms of water supply.
Option 2: Irrigating Public Spaces and Townhomes with Storm Water
Option 2 resulted in a daily irrigation rate of 88,000 gallons on days in which irrigation occurred.
The water balance model indicates that the storage can sufficiently supply water for irrigation of
the public spaces and townhome properties with minimal effect on storage levels. Evaporation
and irrigation combined resulted in maximum storage level fluctuation of 37.0 MG, or 4 feet in
elevation change. Option 2 is feasible in terms of water supply.
Option 3: Irrigating all of the Mattamy Development with Storm Water
Option 3 resulted in a daily irrigation rate of 547,000 gallons. The storage cannot supply enough
irrigation water to support this option. The model showed that storage levels will reach
approximately two feet in depth during the summer if irrigating at this rate. A protective
elevation can be set, such that at a certain storage depth the irrigation system does not run.
Depending on the elevation chosen, the system will turn off for different time ranges. If, for
example, the protective elevation is 896 feet (corresponding two an eleven foot depth), the
system would run off of potable water an average of 22 days per summer. Given the system and
operating cost, Option 3 is not feasible in terms of water supply.
Please contact me at (763) 287-8319 with any questions.
Sincerely,
WSB & Associates, Inc.
Erin Heydinger
Mr. Mike Grochala
January 21, 2016
Page 5
Sources:
Gulliver, J.S., A.J. Erickson, and P.T. Weiss (editors). 2010. Stormwater treatment: Assessment
and Maintenance. University of Minnesota, St. Anthony Falls Laboratory. Minneapolis, MN.
http://stormwaterbook.safl.umn.edu/content/evaporation-and-evapotranspiration
Minnesota Climatology Working Group. Nearest Station Precipitation Data Retrieval. Available
online: http://climate.umn.edu/HIDradius/radius_new.asp
USDA. Urban Hydrology for Small Watersheds – Technical Review 55. Available online:
http://www.nrcs.usda.gov/Internet/FSE_DOCUMENTS/stelprdb1044171.pdf
CITY COUNCIL
AGENDA ITEM 6G
STAFF ORIGINATOR: Michael Grochala
MEETING DATE: April 11, 2016
TOPIC: Consider Resolution No. 16-27, Authorizing Update of Water
Supply Plan
VOTE REQUIRED: 3/5
INTRODUCTION
Staff is requesting City Council approval to authorize WSB and Associates to prepare the
update of the City’s Water Supply Plan.
BACKGROUND
Every ten years, all public water suppliers in Minnesota that serve more than 1,000 people must
have a water supply plan approved by the Department of Natural Resources (DNR). This
requirement, in place since the 1990s, is designed to encourage communities to deal proactively
with providing sustainable drinking water for citizens, businesses and industry.
The City’s updated Water Supply Plan is due December, 31, 2016. The Water Supply Plan is
also a required component of the City’s 2040 Comprehensive Plan Update. The plan includes:
1. Review and evaluation of our existing water system;
2. Emergency Response Procedures;
3. Water Conservation Plan.
WSB has submitted a proposal to complete the Water Supply Plan update in the amount of
$16,400. Funding for the plan update is proposed to come from the City’s Trunk Utility Fund.
RECOMMENDATION
Staff is recommending that the City Council adopt Resolution 16-27 authorizing preparation of
the Water Supply Plan update.
ATTACHMENTS
1. Resolution No. 16-27
2. Proposal from WSB & Associates, Inc. dated March 14, 2016.
CITY OF LINO LAKES
RESOLUTION NO. 16-27
AUTHORIZING PREPARATION OF WATER SUPPLY PLAN
WHEREAS, The City Council is required by the Minnesota Department of Natural Resources
to prepare an update of the City’s Water Supply Plan; and
WHEREAS, The City has received a proposal from WSB & Associates, Inc. to prepare said
update;
NOW, THEREFORE BE IT FURTHER RESOLVED by The City Council of The City of
Lino Lakes, Minnesota, hereby authorizes WSB & Associates, Inc. to prepare the update of the
City’s Water Supply Plan for the amount of $16,400.
Adopted by the Council of the City of Lino Lakes this 11th day of April, 2016.
The motion for the adoption of the foregoing resolution was introduced by Council Member
_____________and was duly seconded by Council Member and upon vote being
taken thereon, the following voted in favor thereof:
The following voted against same:
_____________________
Jeff Reinert, Mayor
ATTEST:
________________________
Julianne Bartell, City Clerk
Building a legacy – your legacy. 701 Xenia Avenue South
Suite 300
Minneapolis, MN 55416
Tel: 763-541-4800
Fax: 763-541-1700
Equal Opportunity Employer
wsbeng.com
S:\Community Development\Projects\Planning Studies\2016 Water Supply Plan\Staff Reports\LTR PROP - Lino Lakes - Water Supply Plan.docx
Date: March 14, 2016
TO: Michael Grochala, AICP
City of Lino Lakes, MN
RE: PROPOSAL TO PROVIDE SERVICES TO COMPLETE THE CITY OF LINO LAKES’ WATER SUPPLY PLAN
Dear Mr. Grochala:
We are pleased to provide you with this proposal for services to assist the City of Lino Lakes(City) in
completion of its Water Supply Plan (Plan) as required by the Minnesota Division of Natural Resources
(DNR). Our multi-faceted team includes professionals in Water/Wastewater, Water Resources, City
Planning, and GIS; ensuring that the City’s Plan will be a cohesive document that will not only meet state
regulations but will be a useful planning document throughout the next decade.
Not only does WSB have the technical skills to deliver high-quality Plans, but we are also experienced in
navigating the regulatory process required for such submittals. The combination of our technical
expertise and project management experience ensures that the final product delivered to the DNR will
be
Below is description of the required components and the method by which WSB will address them in the
City’s Water Supply Plan Update.
Task One: Water Supply System Description and Evaluation
1.1 Analysis of Water Demand
Using the City’s Wellhead Protection Plan alongside appropriations permits and water use data, WSB will
evaluate the past ten years of water demand data. The per capita usage and number of connections,
large quantity users, and water used for essential versus non-essential uses will be considered, among
other factors.
1.2 Treatment and Storage Capacity
An evaluation of the City’s existing treatment and storage will be conducted. WSB will outline the
treatment process and compare the capacity of treated water versus the demand.
1.3 Water Sources
Three types of resources will be considered: groundwater, surface water, and interconnection. We will
evaluate emergency interconnections and determine if there are any deficiencies.
M. Grochala
March 14, 2016
Page 2
S:\Community Development\Projects\Planning Studies\2016 Water Supply Plan\Staff Reports\LTR PROP - Lino Lakes - Water Supply Plan.docx
1.4 Future Demand Projections
Future demand projections are listed as a Key Metropolitan Council Benchmark. Using data compiled in
the previous sections, WSB will determine what trends, if any, are seen. We will attempt to determine
the cause behind any significant patterns. Using this analysis, the Plan will project demands through
2040 by estimating population served, per capita water demand, and peak water usage.
1.5 Resource Sustainability
WSB will outline water quality and quantity monitoring efforts currently undertaken by the City. From
this data, it will be determined if there are any potential water supply issues or natural resource impacts
as a result of permitted withdrawals. Each natural resource type will be evaluated to determine if water
usage will have a negative impact. The results of the City’s Wellhead Protection and Source Water
Protection Plans will be described.
1.6 Capital Improvement Plan
The adequacy of each component of the existing water supply system will be determined. This includes
wells, storage and treatment facilities, and distribution systems. Proposed future water sources will be
outlined as well as any alternatives available. WSB will consider the feasibility of water reuse, including
reclaimed stormwater and/or wastewater, as well as interconnection to nearby suppliers.
Task Two: Emergency Planning and Response Procedures
WSB will describe the current status of the City’s 1) Federal Emergency Response Plan; 2) Operational
Contingency Plan; and 3) Emergency Response Procedures. We will include in the Emergency Response
Procedures the method by which the City will augment water supplies (if required), the allocation and
demand reduction procedures, any emergency demand reduction conditions or triggers in place, and
several other related items.
Task Three: Water Conservation Plan Component
3.1 Progress since 2006
WSB will describe any initiatives the City has undertaken since its last Water Supply Plan was approved
by the DNR. Conservation practices the City is implementing – such as pricing, regulations, and
education – will be included.
M. Grochala
March 14, 2016
Page 3
S:\Community Development\Projects\Planning Studies\2016 Water Supply Plan\Staff Reports\LTR PROP - Lino Lakes - Water Supply Plan.docx
3.2 Triggers for Allocation and Demand Reduction Actions
This section will include future conditions and actions during a Governor’s “Critical Water Deficiency
Order” or other instances in which usage reductions must occur. WSB will work with the City to
determine what triggers should be selected to initiate short- or long-term demand reductions, and what
actions will be taken should such an instance arise.
3.3 Conservation Objectives and Strategies
This section of the Plan serves as a Key Benchmark for the DNR. It will include strategies by which the
City will reduce unaccounted for water loss. The DNR has set a goals for each community, including the
following: 1) Reaching 75 gallons per capita of water usage daily; 2) Achieving at least a 1.5% per year
reduction for industrial, commercial, and agricultural water use; 3) Decreasing the trend in total per
capita demand; 5) Reducing the City’s peaking factor to less than 2.6; 6) Implementing a conservation
water rate structure; and 7) Support Wellhead Protection Planning. WSB will work with the City to
highlight the goals that have already been achieved and to outline the method the City will implement
to achieve the remaining benchmarks. Included in the analysis will be possible regulatory changes,
retrofitting potential, and educational programs.
Task Four: Items for Metropolitan Area Water Suppliers
Because the City is within the seven-county metropolitan area, the Metropolitan Council requires
additional information. WSB will include in the Plan water demand projections through 2040, potential
water supply issues, possible approaches to meet extended water demand projections, and value-added
water supply planning efforts (if desired by the City).
Task Five: Project Management, Coordination, and Meetings
Project management is a key task included in each project undertaken by WSB. This task consists of
management and administration, project coordination, and overall communication with the City and
DNR. Proper completion of this task will help keep all affected parties routinely updated and informed
regarding project issues, as well as keep the project on schedule and within budget. The proposed work
plan will include one City Council meeting and two meetings with the City prior to finalizing the Plan.
Task Six: Estimated Fee
WSB will complete the proposed work plan as proposed herein on an hourly, not-to-exceed fee of
$14,600. This cost does not include additional hours that may be required as a result of the White Bear
Lake settlement agreement. These hours will be billed hourly and are estimated at an additional $1,800.
The hourly breakdown by task for each employee class proposed for the project is included on the
attached spreadsheet. The proposed fee is based on our 2016 rate schedule.
Sincerely,
WSB & Associates, Inc.
M. Grochala
March 14, 2016
Page 4
S:\Community Development\Projects\Planning Studies\2016 Water Supply Plan\Staff Reports\LTR PROP - Lino Lakes - Water Supply Plan.docx
Diane Hankee, PE Erin Heydinger
City Engineer Project Engineer
ACCEPTED BY:
City of (CITY)
Name
Title
Date
1 Water Supply System Description and Evaluation 2 16 12 30 2,692.00$
2 Emergency Planning and Response Procedures 4 16 8 28 2,712.00$
3 Water Conservation Plan Component 4 36 10 50 4,720.00$
4 Items for Metropolitan Area Water Suppliers (7-County Metro Only)4 6 4 14 1,486.00$
6 Project Management, Coordination, and Meetings 8 4 2 16 30 2,984.00$
22 78 36 16 152
158.00$ 93.00$ 74.00$ 75.00$
3,476.00$ 7,254.00$ 2,664.00$ 1,200.00$ 14,600.00$
Estimated Hours for Northeast Metro Area 4 12 16
Estimated Additional Fee for Northeast Metro Area 632.00$ 1,116.00$ 1,800.00$
16,400.00$
Estimate of Cost
City of Lino Lakes, Minnesota
Professional Services to Complete
Division of Natural Resources Water Supply Plan
DescriptionTask
No.Project Manager Project Engineer GIS Specialist
Grand Total with Northeast Metro Area Work
Total WSB Direct Labor Costs
Total
Hours
Total Labor
Cost
Total Hours
Estimated Hours
Hourly Billing Rate
Admin
S:\Community Development\Projects\Planning Studies\2016 Water Supply Plan\Staff Reports\WaterSupplyPlan_LinoLakes