HomeMy WebLinkAbout2018-013 Council ResolutionCITY OF LINO LAKES RESOLUTION NO. 18-13 RESOLUTION ACCEPTING THE 2017 PAVEMENT MANAGEMENT REPORT WHEREAS, pursuant to Resolution 17-109 Authorizing the Update of the Pavement Management Plan; and WHEREAS, the 2017 Pavement Management Report was completed and presented to Council; and WHEREAS, the City Council finds that it would be in the best interests of the City to accept the 2017 Pavement Management Report, NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Lino Lakes that the Mayor and Clerk are do hereby accept the 2017 Pavement Management Report. Adopted by the Council of the City of Lino Lakes this 12th day of February, 2018. The motion for the adoption of the foregoing resolution was introduced by Council Member Maher and was duly seconded by Council Member Rafferty and upon vote being taken thereon, the following voted in favor thereof: Maher, Rafferty, Mantheyy,Stoesz, einert The following voted against same: none ATTEST: Ju tan,.e Bartell, City Clerk Jeff Reinert, ayo STAFF ORIGINATOR: C. C. MEETING DATE: TOPIC: CITY COUNCIL AGENDA ITEM 6B Diane Hankee February 12, 2018 Pavement Management Program i. Consider Resolution 18-13, Accepting 2017 Pavement Management Report ii. Consider Resolution 18-14, Authorize the Preparation of Plans and Specifications, 2018 Mill and Overlay Project VOTE REQUIRED: 3/5 INTRODUCTION The City Council authorized the 2017 Pavement Management Report on September 25, 2017 to evaluate the current condition of the City's roadway system and to generate a 5 -year Capital Improvement Plan. The 2017 Pavement Management Report was presented at the Council on February 5, 2018 along with the proposed 5 -year Capital Improvement Plan. The proposed 2018 Mill and Overlay project includes Ware Road and the Brandywood neighborhood. After further evaluation of pavement ratings and pavement core data completed in the Brandywood area it was determined that this was a priority. The estimated project cost is $715,000. The project would be funded through the pavement management budget and state aid funds. The project includes the following roadways: Ware Road (Ash Street to 300' south of Birch Street) Buckthorn Lane White Oak Road Whitetail Trail Chokecherry Road Velvetleaf Lane The proposed schedule for this project is as follows: City Council Authorizes Plans and Spec's City Council Orders Project & Approves Plans and Specifications City Council Authorizes Ad for Bids City Open Bids City Council Awards Contract Feb. 12, 2018 Mar. 12, 2018 Mar. 12, 2018 April 16, 2018 April 23, 2018 CITY OF LINO LAKES RESOLUTION NO. 18-13 RESOLUTION ACCEPTING THE 2017 PAVEMENT MANAGEMENT REPORT WHEREAS, pursuant to Resolution 17-109 Authorizing the Update of the Pavement Management Plan; and WHEREAS, the 2017 Pavement Management Report was completed and presented to Council; and WHEREAS, the City Council finds that it would be in the best interests of the City to accept the 2017 Pavement Management Report, NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Lino Lakes that the Mayor and Clerk are do hereby accept the 2017 Pavement Management Report. Adopted by the Council of the City of Lino Lakes this 12th day of February, 2018. The motion for the adoption of the foregoing resolution was introduced by Council Member and was duly seconded by Council Member and upon vote being taken thereon, the following voted in favor thereof: The following voted against same: Jeff Reinert, Mayor ATTEST: Julianne Bartell, City Clerk WSB 701 Xenia Avenue South, Suite 300 Minneapolis. MN 55416 (763) 541-4800 ( wsbeng corn PAVEMENT MANAGEMENT REPORT Lino Lakes, MN Prepared for City of Lino Lakes 600 Town Center Parkway Lino Lakes, MN 55014 WSB Project No. 010884 1/8/2018 • WSB Pavement Management Report TABLE OF CONTENTS I. Executive Summary 1 II. Introduction 2 What is a Pavement Management Program? 2 Why establish a Pavement Management Program? 2 What is Pavement Forensics? 2 III. Pavement Condition Report 3 EXISTING PAVEMENT CONDI FION 3 Pavement Rating Examples 5 IV. Pavement Management Report 9 Special Maintenance Actions Recommended 9 Preventative Maintenance 9 Preservation 11 Reclamation 11 Reconstruction 11 PAVER Modeling and Analysis 12 Introduction 12 PCI Deterioration Models 12 Condition Performance Analysis 13 Work Planning Models 13 Recommendations and 5 -year CIP 22 Appendices 23 Appendix A 24 Pavement PCI Map 24 Appendix B 25 Pavement PCI Ratings 25 WSB Pavement Management Report Page 11 EXECUTIVE SUMMARY This report summarizes the findings for the pavement inspection of the road segments performed by WSB & Associates in the city of Lino Lakes completed in October 2017. This report gives an overview of the road condition in the city and provides recommendations on pavement management. Per the City plan, pavement conditions for one-fourth of the City roadways are rated annually. Roadways not rated in the current year are then projected using the PAVER software. The projections are based on past inspection ratings and decreased based on a deterioration curve. Recent roadway improvement projects were updated in the condition ratings. Private roadways and gravel roadways were not evaluated. A summary of the pavement condition findings are as follows: • WSB's GIS system states that there are currently 97 miles of bituminous roadways in Lino Lakes, which 22 miles were inspected in 2017. • The current weighted average Pavement Condition Index (PCI) for bituminous roads in Lino Lakes is 71.32. The PCI is based on a 0 to 100 scale, with increasing PCI as better condition roadways. This weighted average is taken from the PCI values generated on each segment based on the distresses identified in the field, and averaged depending on the area of each segment. Any type of road maintenance (i.e. patching or crack sealing) done prior to inspections would be accounted for in each PCI value. • Percentage of bituminous roadways in respective category, in terms of area, are as follows: o "Adequate" category requiring preventative maintenance — 62.8% o "Marginal" category requiring preservation — 22.8% o "Problem" category requiring reconstruction — 14.4% • There are 3.99 miles of gravel roadways and 3.67 miles of private roadways within Lino Lakes, which are not included in the pavement management. A majority of the roadways within the City are currently in adequate condition. The City has been adding new roadways constructed with development, and has also completed roadway maintenance/reconstruction on existing roadways. In modeling the pavement condition over 20 years, it was found that the marginal category roadways drop into problem category roadways if not preserved within a certain time frame. A budget driven model and a target PCI model were analyzed to determine the level of funding needed to cost effectively maintain the roadways. An analysis of the preservation budget showed an 8 to 10 percent per year increase matched the maintenance needs. It was also concluded that if funding is available in the near future, the City should consider a larger preservation project to keep marginal roadways from becoming problem roadways. WSB Pavement Management Report Page 12 INTRODUCTION WHAT IS A PAVEMENT MANAGEMENT PROGRAM? A pavement management program includes a systematic method of inspecting and rating the pavement condition of roads in a network, followed by performing a cost-effective analysis of various maintenance and rehabilitation strategies, which assists decision makers in making the best decision on the use of available resources. The pavement management ideology, if successfully implemented, can result in drastic improvement of the life cycle costs, performance, and life of roads. The main objectives of a pavement management program are to maintain a high-level network, evaluate the effectiveness of different alternatives, and optimize timing of maintenance and construction activities. These objectives can be met by routinely inspecting the road conditions. The data is typically managed with pavement management software that can manage, sort, and store the collected data. Using the software, various models can be generated that allows the user to run different budget scenarios. WHY ESTABLISH A PAVEMENT MANAGEMENT PROGRAM? A Pavement Management Program can serve as a good guide for the City to make strategic and appropriate decisions relating in maintenance and reconstruction activities to maximize the life cycle of the pavements. The program will also provide some financial strategies to help the City to allocate available resources in an efficient manner. WHAT IS PAVEMENT FORENSICS? Pavement forensics involves taking cores on the roadways to identify the pavement structure and condition under the visible layer of the pavement, such as the depths of pavement layers, signs of bonding or de -bonding, and distresses that might not be visible from the surface. Recommendations can then be made on certain maintenance or reconstruction activity is best suited for the roadway. Several factors should be considered when determining the number of cores to be taken, which include the pavement condition or visible distresses present on the pavement and the variability in the pavement depth as the cores are being taken. The findings from the pavement forensic have been proven to lead to cost savings and better solutions for roadway maintenance. WSB Pavement Management Report Page 13 III. PAVEMENT CONDITION REPORT EXISTING PAVEMENT CONDITION Pavement Condition Index (PCI) was used to measure pavement condition on a scale from 0 to 100, with 100 being a perfect roadway with no distress. This report provides the latest pavement conditions. PAVER, which is an asset management software, was used to record and estimate the conditions of the roadways. The software calculates the PCI using the deduct values, which are based on the distress type, distress severity, and distress quantity. Examples of distress type are alligator cracking, pothole, and rutting. Distress severity is divided into low, medium, and high. Distress quantity is either the number of counts, length, or area depending on the distress type. Majority of the bituminous roadway systems at the time of inspection are in good condition, and are in need of maintenance to preserve the road structure. The following is the breakdown of the pavement overall condition in the City: Pavement Condition Index Mileage Percent of System Adequate Category (70.01-100.00) 59.8 62.8 Marginal Category (40.01 — 70.00) 21.9 22.8 Problem Category (0.00-40.00) 15.6 14.4 Pavements that fall into the adequate category are recommended to have surface treatment preventative maintenance performed. The lower the PCI, the less effective a preventative maintenance activity is in preserving the life of the roadways. Each type of preventative maintenance serves its own function, and project selection depends on the type and severity of distresses observed on the surface of the road. Streets that fall into the lower range of the adequate category, with PCI in low the 70s, may be prompted to perform a Texas Underseal or mill and overlay in order to extend the life of the road. It is recommended to evaluate the road condition prior to project selection to determine the appropriate type of construction for the roadways. Pavement preservation is recommended to be conducted on roadways that fall into the marginal category. Some of the pavement preservation methods are partial and full depth mill and overlay. Roadways that fall into the lower range of the marginal category, with PCI in the 40s, may be monitored without performing any maintenance activities since they have degraded to the point that pavement preservation methods are no longer effective and the roadways still have another few years' time before a reconstruction is needed. Prior to any mill and overlay or full depth bituminous removal and replacement, coring is strongly recommended to determine if the bituminous layer thickness is sufficient and underlying pavement is in good condition. If there are issues in the base and subgrade layers, pavement preservation methods are not recommended and those roadways would fall into the problem category that a reclamation or reconstruction needs to be done. WSB Pavement Management Report Page 14 Reclamation or reconstruction is recommended to be performed on streets that fall into the problem category. Reclamation can only be done if there is enough gravel underneath the bituminous layer. Thus, coring would be recommended prior to any design work to determine the appropriate improvement. The PCI values obtained were based on visual inspection and the recommended strategies for each category shall only be used as guidelines. Recommended maintenance activities are further explained in the Pavement Management Report. Appendix A includes maps of all the pavements in the City showing their PCI classification. The specific PCI rating for each pavement segment is included in Appendix B. WSB Pavement Management Report Page 15 PAVEMENT RATING EXAMPLES PCI Rating = 27 Tolle Lane (Segment ID: 541) Detailed Distresses: • Patching, Low Severity, 50.17% • Alligator Cracking, Low Severity, 10.03% • Alligator Cracking, Medium Severity, 1.00% • Alligator Cracking, High Severity, 10.05% WSB Pavement Management Report Page 16 PCI Rating = 43 Timberwolf Trail (Segment ID: 564) Detailed Distresses: • Patching, Low Severity, 3.94% • Patching, Medium Severity, 7.87% • Alligator Cracking, Low Severity, 10.01% • Alligator Cracking, Medium Severity, 0.98% • Block Cracking, Medium Severity, 10.03% A WSB Pavement Management Report Page 17 PCI Rating = 77 Tele Drive (Segment ID: 553) Detailed Distresses: • Alligator Cracking, Low Severity, 2.83% • Alligator Cracking, Medium Severity, 0.28% • Linear Cracking, Low Severity, 0.02% WSB Pavement Management Report Page 18 PCI Rating = 97 Rolling Hills Drive (Segment ID: 454) Detailed Distresses: • Linear Cracking, Low Severity, 0.04% WSB Pavement Management Report Page 19 IV. PAVEMENT MANAGEMENT REPORT This pavement management report includes a systematic method of inspecting and rating the pavement condition of roads in a network, followed by performing a cost-effective analysis of various maintenance and rehabilitation strategies, which assists decision makers in making the best decision on the use of available resources. It is also used to supply updated information regarding the current management plan. SPECIAL MAINTENANCE ACTIONS RECOMMENDED Lino Lakes has many options available for pavement preventative maintenance, preservation, and reconstruction including reclamation, mill and overlays, and Texas underseal to extend the life of a roadway. These maintenance actions are anticipated to last several years and be cost effective. PREVENTATIVE MAINTENANCE Preventative maintenance can be defined as a treatment to an existing road that will help preserve and protect the road, while also slow future deterioration. This type of maintenance will improve the condition of the system without increasing its structural capacity. Implementing a preventative maintenance strategy is both cost effective and appropriate since maintenance costs increase with pavement age. Preventative maintenance actions can be completed at a much lower cost than preservation actions such as mill and overlays. By applying the appropriate preventative maintenance strategy at the right time, it can keep the good roads in good condition at a lower cost, which is a better strategy than waiting for the road to deteriorate before applying an improvement. With preventative maintenance techniques, you can extend the life of a pavement from 20 years to close to 50 years if the maintenance is done at the correct time. Preventative maintenance is best performed on newer pavements prior to the appearance of significant and/or severe distresses. Types of preventative maintenance include crack sealing, fog sealing, chip sealing, micro surfacing. Crack Seal Crack sealing is a type of preventative maintenance done to prevent the intrusion of water and incompressible materials into cracks. When water enters the cracks, it can soften the sub -base and base layers and lead to further cracking and the development of more severe alligator cracking and subsequently the formation of potholes. In Minnesota where freeze/thaw cycles exist, the water that enters the system through cracks can lead to frost heaving issue. Crack sealing should be completed as preventative maintenance early in the life of a new pavement or overlay, typically in 2 to 4 years, and roughly every 7 years or as determined to be necessary. This technique will not improve the structural capacity of the pavement but will slow down future structural deterioration that could be caused when water enters the system. It is recommended that crack sealing is done prior to either fog sealing or chip sealing. WSB Pavement Management Report Page X10 Chip Seal Chip sealing process involves an application of a uniform layer of emulsified asphalt followed immediately by a layer of cover aggregate across the pavement surface. Pre -sweeping and filling of all cracks shall be done prior to the chip seal application. Chip sealing creates a waterproof surface membrane to the existing membrane, which helps to slow down the deterioration of the pavement from oxidation as well as to prevent the intrusion of water. Chip sealing is typically completed one year after crack sealing. Normally, a good chip seal placed on a newer road can last 5 to 10 years. This assumes the chip seal is protected during placement to allow proper time to cure. Other factors which affect a chip seals performance include the type of binder that is used, the condition of the underlying road and external factors such as plow damage. It is the responsibility of the owner to ensure that these external factors do not contribute to premature failure of a chip seal. It is important to note that chip seals can be effective if constructed properly and if placed on a road that is a good candidate for chip seal. Field surveys will assist in determining which roads are candidates for a chip seal. WSB would recommend the City to reference MnDOT Spec 2356 or the 2006 Minnesota Chip Seal Handbook for guidelines to use when chip sealing. It would be our recommendation that on residential streets, the City use CRS - 2 oil with 1/8" Dresser Trap Rock at a rate of .24 to .26 gallons per square yard. On arterials with no bike traffic, it would be our recommendation to use FA -2 aggregate with CRS -2P emulsion at a rate of .26 to .28 gallons per square yard. On heavy commercial streets, it would be our recommendation to use FA -3 aggregate with CRS -2P emulsion at a rate of .35 to .4 gallons per square yard. The larger size aggregate will withstand the heavier vehicle traffic. Fog Seal WSB would recommend the City reference MnDOT Spec 2355 for more information on fog sealing guidelines. Fog sealing is typically completed one year after crack sealing. Typically, a fog seal will last 3 to 5 years. It is important to note that while the color of a fog seal may fade as early as a year after its application, a fog seal remains effective for as many as 2 to 4 years. Fog sealing is another type of preventative maintenance in which only the asphalt emulsion is applied to the roadway to protect the roadway surface from environmental aging, moisture damage, and oxidation. This preventative maintenance technique will not add any strength to the pavement. Micro surfacing WSB would recommend the City reference MnDOT Spec 2354 for more information on micro surfacing guidelines. Micro surfacing is a mix of crushed aggregate, mineral filler, and latex -modified emulsified asphalt. It is applied by a truck equipped with a squeegee or spreader box. Micro surfacing can be applied in multiple layers. It is effective at sealing low -severity cracks, including fatigue cracking, longitudinal cracking, and transverse cracking. It also addresses raveling, friction loss, moisture infiltration, bleeding, and roughness. Micro surfacing is often selected to inhibit raveling and oxidation, as well as improving surface friction and filling minor irregularities and rutting in a roadway. A micro surfacing treatment can be expected to extend a roadway's life by 3 to 6 years, depending on the number of layers applied. WSB Pavement Management Report Page 111 This treatment provides resurfacing from 3/8" to 3/4" thick and returns traffic use in one hour under average conditions. This can be applied in multiple applications and provide minor reprofiling. Micro surfacing can also fill wheel ruts up to 1 1/2" in depth in one pass and produces high surface friction. PRESERVATION An overlay involves placing a new layer of bituminous material on top of an existing asphalt surface. A mill and overlay involves grinding all or a portion of the in-place asphalt surface and topping it with a bituminous wearing course over the entire surface. This type of action provides a structural improvement to the roadway. We recommended pavement coring to evaluate the subsurface conditions. Information such as depths of pavement layers, signs of bonding and de -bonding, and distresses that are not visible from the road surface can be obtained through pavement coring. Texas underseal is a non -conventional pavement preservation method, which a chip seal is placed under an overlay. The chip seal layer acts as stress relief membrane providing a crack resistance asphalt layer. We recommend that the City consider Texas undersea) for overlay projects. RECLAMATION There are two conventional types of reclamation, which are full depth reclamation (FDR) and stabilized full depth reclamation (SFDR). FDR involves grinding the asphalt pavement with a portion of the underlying base, followed by an overlay or a surface treatment. SFDR is FDR with the addition of stabilizing additive, which are asphalt based, chemical based, or compaction aids. The asphalt additives can be foamed asphalt or asphalt emulsion. Reclamation brings the pavement condition back to a 100 (perfect condition) rating. RECONSTRUCTION Reconstruction includes removing and replacing the existing pavement and subgrade. Subsurface water management is a significant component of a reconstruction project. Thus, addressing roadway drainage is included in roadway reconstruction projects. Reconstruction also brings the pavement condition back to a 100 (perfect condition) rating. A WSB Pavement Management Report Page 112 PAVER MODELING AND ANALYSIS INTRODUCTION PAVER software was utilized in the pavement management for the streets in the City of Lino Lakes. First step in the pavement management process was to develop a pavement deterioration curve for bituminous roadways. Next step was to apply the deterioration curve to all the roadways, and run the 20 -year design model. Two main models of interest were budget driven model and target PCI driven model. A curve was also generated when there will not be any maintenance activities done over the years to show the importance of performing maintenance actions to prolong the life of pavements. PCI DETERIORATION MODELS Pavement performance curve, which was based on the Army Corps of Engineer data (Figure IVa), was used to estimate pavement performance for roadways that were not inspected this year. The graph below represents typical pavement deterioration rate, and it may varies depending on the type of maintenance activities done over the period of pavement life. In order to predict pavement performance, all the bituminous roadways were assigned to the following deterioration curve. Figure IVa. Pavement performance curve applied to all bituminous roadways in Lino Lakes. A WSB Pavement Management Report Page 113 CONDITION PERFORMANCE ANALYSIS Work history obtained from the City was included in the model to accurately portray the condition of the streets with respect to the year since construction. The three main inputs for the model were chip seal, mill and overlay, and reclamation / reconstruction. Chip seal was treated as a surface treatment and it does not affect the structural capacity of the pavement, while mill and overlay was treated as major maintenance and repair activity since it improves the structural capacity of the pavement. Reclamation and reconstruction were input as new construction. A condition performance analysis was performed to predict the PCI ratings for the roadways that were not inspected this year. WORK PLANNING MODELS Maintenance cost increases considerably with the age of pavement. Thus, implementing a preventative maintenance strategy proves to be both cost effective and appropriate. Preventative maintenance activities such as crack seal, fog seal, chip seal, and micro surfacing are done at a much lower cost compared to preservation actions such as mill and overlay. The main idea behind the preventative maintenance strategy is that applying the appropriate maintenance action at the right time will keep the good roads in good condition at a lower cost. This is often a better strategy than leaving the road to deteriorate over time before performing maintenance. With the application of proper preventative techniques, the pavement life often can be extended from 20 years to up to 50 years, provided the maintenance is done at the correct time frame. In PAVER, Preventive Maintenance involves crack seal, patching, and joint seal, along with surface treatments such as chip seal, fog seal, and micro surfacing. The critical condition index used was 70 PCI, which is the threshold that mill and overlay, surface reconstruction, reclamation, and complete reconstruction or new construction will be carried out. Using PAVER, the funding level needed to maintain the current weighted average PCI can be predicted. This dollar budget will continue to expand if a pavement management plan is not implemented. A good pavement management plan will budget for preventative maintenance to maintain the pavements in good condition, and preservation to improve the structural capacity of the existing roadway. Figure IVb shows the pavement condition over a course of 20 years, with a variable annual budget available. Figure IVc shows the budget required to maintain various PCI levels for the pavements, including the weighted average PCI of 71.32 at the time of inspection, with no condition tolerance. These scenarios include maintenance activities listed above to be performed, which are Preventative Maintenance, Preservation and Reconstruction. These models also accounted for an inflation rate of 3%. Preservation was set to only be done when the PCI ranges from 70 to 100, when the roads are still in adequate condition. Re -planning of projects was set to every 3 years after recommended maintenance activities were performed since routine inspection and planning help to keep track of the condition of the streets thus appropriate maintenance can be applied. WSB Pavement Management Report Page 14 Unit pricing for the maintenance activities that were included in the 5 -year Capital Improvement Plan (CIP) and PAVER analysis were provided by the City, which were obtained from recent project costs. The unit pricing includes engineering, legal, financial, and administrative costs. Following are the unit pricing for each type of maintenance activity. Type of Activity Unit Pricing (Per Linear Foot) Mill and overlay $ 65 Full depth reclamation $ 95 Reconstruction $ 235 Under the 5 -year CIP, reconstruction costs were used to evaluate all the projects that fall under the "problem" category. Although some of the roadway segments may be a candidate for full depth reclamation, further investigation such as pavement forensics needs to be performed on the roadways to determine if there are enough underlying good materials for a full depth reclamation. Thus, a more conservative approach was conducted by applying the reconstruction costs than to utilizing the reclamation costs. PAVER runs the analysis using unit pricing for all the maintenance activities in terms of square foot instead of linear foot. All the unit pricing listed above was converted to the unit pricing that PAVER uses. An average road width of 32 -feet was used to run the model. WS1 B Pavement Management Report Page 115 BUDGET DRIVEN MODEL Two scenarios were analyzed to determine if the current City budget is sufficient to maintain the streets in a cost- effective manner. The City's Preservation "Mill and Overlay" budget was specifically reviewed. These marginal roadways are the focus due to the aging infrastructure in this category and the time dependent structural maintenance. A model was analyzed with the existing funding and another one where the Preservation funding was increased. The first model was based on: • Existing budget for Preventative $50,000 (crack fill, pothole patching) + $80,000 (chip seal, other) • Existing budget for Preservation $580,000 (2018 budget, increase 5% per year) • Proposed budget for Reconstruction including $5,200,000 allocated in 2018 and $2,600,000 allocated in 2021. After that $3,250,000 was programed in every 3 years. A second model was performed with: • Existing budget for Preventative $50,000 (crack fill, pothole patching) + $80,000 (chip seal, other) • Increase budget for Preservation $580,000 (2018 budget, increase 10% per year) • Proposed budget for Reconstruction as in the first model A WSB Table IVa. Existing Annual budget Pavement Management Report Page 116 Year Preventative Budget 2018 $130,000 Preservation Budget $580,000 Reconstruction Budget Total Existing Annual Budget $5,200,000 $5,910,000 2019 2020 2021 2022 2023 $130,000 $130,000 $130,000 $130,000 $130,000 $609,000 $639,450 $671,423 $704,994 $740,243 $2,600,000 $739,000 $769,450 $3,401,423 $834,994 $870,243 2024 $130,000 2025 2026 2027 2028 2029 $130,000 $130,000 $130,000 $130,000 $130,000 $777,255 $816,118 $3,250,000 $856,924 $899,770 $944,759 $991,997 $3,250,000 $4,157,255 $946,118 $986,924 $4,279,770 $1,074,759 $1,121,997 2030 2031 2032 2033 $130,000 $130,000 $130,000 $130,000 2034 2035 2036 $130,000 $130,000 $130,000 $1,041,597 $1,093,677 $1,148,360 $1,205,778 $1,266,067 $1,329,371 $1,395,839 $3,250,000 $3,250,000 $3,250,000 $4,421,597 $1,223,677 $1,278,360 $4,585,778 $1,396,067 $1,459,371 $4,775,839 2037 $130,000 $1,465,631 $1,595,631 Average $130,000 $958,913 $3,435,714 $2,291,413 Total $2,600,000 $19,178,253 $24,050,000 $45,828,253 A WSB Pavement Management Report Table IVb. 10 % Increase Per Year in Budget for Preservation Page 1 17 Year Preventative Budget Preservation Budget Reconstruction Budget Total Annual Budget with 10% Increase Per Year 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 $130,000 $130,000 $130,000 $130,000 $130,000 $130,000 $130,000 $130,000 $130,000 $130,000 $130,000 $130,000 $130,000 $580,000 $638,000 $701,800 $771,980 $849,178 $934,096 $1,027,505 $1,130,256 $1,243,282 $1,367,610 $1,504,371 $1,654,808 $1,820,288 $5,200,000 $2,600,000 $3,250,000 $5,910,000 $768,000 $831,800 $3,501,980 $979,178 $1,064,096 $3,250,000 $3,250,000 $4,407,505 $1,260,256 $1,373,282 $4,747,610 $1,634,371 $1,784,808 $5,200,288 2031 2032 2033 $130,000 $130,000 $130,000 $2,002,317 $2,202,549 $2,422,804 $3,250,000 $2,132,317 $2,332,549 $5,802,804 2034 2035 2036 $130,000 $130,000 $130,000 $2,665,084 $2,931,593 $3,224,752 $3,250,000 $2,795,084 $3,061,593 $6,604,752 2037 $130,000 $3,547,227 $3,677,227 Average $130,000 $1,660,975 $3,435,714 $2,993,475 Total $2,600,000 $33,219,500 $24,050,000 $59,869,500 WSB 80 75 a 70 00 ca Q 65 Op 60 55 50 Pavement Management Report Budget Driven Annual Condition 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 Years ........Current Budget 10% Increase for Preservation Figure IVc. Annual weighted average PCI with different budget available. Page 118 A. WSB Pavement Management Report Page 119 As shown in Figure IVc, if the City maintains its current budget for pavement management it will result in a pavement condition difference of approximately 10 PCI in 20 years. By increasing the Preservation budget by 10% per year the City can maintain a more reasonable PCI. The Reconstruction budget could also be reviewed to increase the PCI however that has been modeled at this time. Initially, the weighted average PCI drops and that is due to a significant number of roadways deteriorating before Preservation and Reconstruction activities are performed. The drop is then followed by a gradual increase after appropriate maintenance activities are carried out. Figure IVc shows that by increasing the annual budget for Preservation, the City would be able to maintain their roadway condition over time. Since there will be an increase in the percentage of roadways that falls under the marginal category in a few years, we would recommend the City consider a larger scale of mill and overlay project in the near future to address the roadways before needing a reclamation or reconstruction. A WSB Pavement Management Report Page X20 TARGET PCI DRIVEN MODEL Three scenarios were run to determine the budget required to maintain or achieve a certain target PCI. Models ran include decreasing to a PCI of 65, maintaining current PCI (71.32), increasing to a PCI of 75. Maximum iteration was employed for each model to achieve the most accurate results, with no condition tolerance. Table IVc. Annual budget required to maintain desired condition rating. Year 65 PCI Maintain Current PCI 75 PCI 2018 $2,164,204 $2,596,375 $2,975,384 2019 $2,164,705 $2,591,058 $2,977,368 2020 $2,159,715 $2,589,842 $2,976,986 2021 $2,158,969 $2,593,401 $2,976,239 2022 $2,155,974 $2,562,111 $2,948,787 2023 $2,157,451 $2,577,644 $2,939,425 2024 $2,120,846 $2,554,443 $2,974,845 2025 $2,164,801 $2,596,961 $2,975,335 2026 $2,159,990 $2,579,632 $2,966,675 2027 $2,150,392 $2,595,832 $2,973,715 2028 $2,160,778 $2,587,333 $2,976,734 2029 $2,163,895 $2,593,600 $2,974,830 2030 $2,151,566 $2,583,764 $2,939,283 2031 $2,164,796 $2,596,533 $2,981,384 2032 $2,162,524 $2,596,594 $2,981,519 2033 $2,164,330 $2,596,774 $2,981,235 2034 $2,161,290 $2,596,781 $2,979,862 2035 $2,164,013 $2,596,995 $2,981,382 2036 $2,163,878 $2,597,268 $2,981,718 2037 $2,162,397 $2,596,801 $2,978,314 Average $2,158,826 $2,588,987 $2,972,051 Total $43,176,513 $51,779,743 $59,441,020 The results above show budget representation annually and that differs from the City's reconstruction budget that is bonded every 3 years. Although the budgets could not be compared directly, the average and total annual budget over a period of 20 years could be compared to determine if the City's current funding is sufficient to maintain and improve the condition of the roadways. The current annual budget is insufficient to maintain the current weighted average PCI. Based on an iterative review of the total budget it shows that a budget increase of 8 to 10 percent per year would better match the maintenance needs. $3,500,000 $3,000,000 w CCw w ri $2,500,000 $2,000,000 Pavement Management Report TARGET PCI DRIVEN ANNUAL FUNDING —4-65 PCI Maintain Current PCI 75 PCI NEM 2018 2020 2022 2024 2026 2028 2030 2032 2034 2036 Average YEARS Figure IVc. Annual funding required to maintain desired weighted average PCI. Page X21 WSB Pavement Management Report Page 22 RECOMMENDATIONS AND 5 -YEAR CIP Using the PAVER software analysis, different alternatives were run to determine the optimal actions to extend the pavement life in a most cost-effective manner. The key to achieving that goal is performing maintenance when it is required to preserve the road structure. It is recommended to maintain a roadway network condition under PCI rating of at least 70 in the long term. To achieve this goal, the funding of maintenance activities should be increased by 8 to 10 percent per year. It is recommended to allocate additional funding to preserve "marginal" roadways such as mill and overlay and Texas Underseal. These maintenance activities are cost effective and increase the pavement life if applied at the appropriate time. Roadways that are in need of reconstruction prior to the City being able to fund could be considered with a temporary solution such as chip sealing to hold the pavement together. WSB recommended the City perform preventative maintenance treatments in the early life of the pavement, normally within the first 5 years, as it would be the optimum time frame to maximize its performance. A 5 -year CIP from 2018 to 2022 was developed based on the funding information provided by the City. Upon reviewing the roadways that are currently under the "problem" category, it would take the City roughly 15 years to reconstruct all these roadways. There would also be roadways that are currently under the "marginal" category that will be gradually deteriorating into the "problem" category if there is no increase in funding to lengthen the service life of these streets. A map showing the 5 -year project areas and a spreadsheet presenting the respective project cost are attached to the report. This is intended to be used as a guide and assist engineers in decision making on road maintenance. Other factors such as scheduling of other projects, use of the road, expected life, cost, public perception should also be considered. WSB Pavement Management Report Page 123 APPENDICES WSB Pavement Management Report Page 124 APPENDIX A PAVEMENT PCI MAP Figure A.1. Map showing PCI category and recommended maintenance activity for all the roadways in the City of Lino Lakes. 17k"v# r I i j.. i 1 ri I IJ -!_ � r F i)__ Figure A.1. Map showing PCI category and recommended maintenance activity for all the roadways in the City of Lino Lakes. WSB Pavement Management Report Page 125 APPENDIX B PAVEMENT PCI RATINGS Table B.1. PCI ratings for each bituminous segment, recommended maintenance activity for each segment was based on visual inspection. Streets with Section ID "TBD" are newer roadways that do not have Section ID assigned to them yet. Street Name Section ID Length (ft) Width (ft) Area (ft2) PCI Recommended Maintenance Activity 81stStree 49 1,034.25 24. 24,82202 .00 Reconstruction Diane Cour 192 46. 30. 1,380.00 .00 Reconstruction Lamotte Dr 342 281.22 28. 7,874.25 .00 Reconstruction Rondeau La 463 1,966.13 24. 47,187.11 .00 Reconstruction Shadow Lak 494 3,32736 24. 79,856.69 .00 Reconstruction Woodland D 636 1,363.65 22. 30,000.38 .00 Reconstruction Lamotte Dr 978 839.32 28. 23,501.00 .00 Reconstruction Lamotte Ci 1221 825.63 28. 23,117 68 .00 Reconstruction Shadow Cou 480 281.94 28. 7,894.29 .29 Reconstruction Shadow Lak 485 3,362.7 24. 80,704.83 2.44 Reconstruction Diane Cour 191 213.71 30. 6,411.27 4.23 Reconstruction Danube Str 177 502.41 30. 15,072.20 5.23 Reconstruction Shadow Lak 493 846.5 24. 20,315.95 5.66 Reconstruction Carl Stree 132 1,315.64 24. 31,575.40 6.22 Reconstruction 4th Avenue 22 1,363.48 24. 32,723.57 8.28 Reconstruction Evergreen 215 1,13521 28. 31,785.92 8.28 Reconstruction Orange Str 674 827.17 28. 23, 160.69 8.28 Reconstruction Sandpiper 473 333.47 22 Z336.28 9.08 Reconstruction 4th Avenue 20 3,83756 24. 92,101.38 9.31 Reconstruction Shadow Lak 487 330.57 24. Z933.69 11.45 Reconstruction Rehbein St 443 2,080.78 30. 62,423.29 11.51 Reconstruction Rondeau La 465 1,349.3 24. 32,383.19 11.51 Reconstruction Red Maple 439 431.72 28. 12,088.14 12.69 Reconstruction Rondeau La 455 1,68202 24. 40,368.41 12.72 Reconstruction Karth Road 317 1,220.16 30. 36,604.77 12.99 Reconstruction Rondeau La 464 2,60266 24. 62,463.92 13.93 Reconstruction 81st Stree 1000 1,252.54 24. 30,060.85 13.93 Reconstruction Evergreen 214 884.24 30. 26,52732 14.52 Reconstruction Red Maple 441 1,110.58 28. 31,096.32 14.92 Reconstruction Peltier La 408 2,901.63 22. 63,835.82 16.42 Reconstruction Rondeau La 462 1,293.84 24. 31,052 16 16.42 Reconstruction Olive Stre 673 799.32 24. 19,183.66 16.64 Reconstruction Nordin Str 1261 221.45 28. 6,200.48 16.64 Reconstruction Oak Lane 663 2,256.07 18. 40,609.26 16.66 Reconstruction Joyer Lane 316 1,971.86 30. 59,15573 16.99 Reconstruction Rondeau La 456 2,471.38 24. 59,313. 17 17.68 Reconstruction Main St 1260 623.84 22. 13,724.41 17.68 Reconstruction WSB Pavement Management Report Page X26 Street Name Section ID Length (ft) Width (ft) Area (ftz) PCI Recommended Maintenance Activity Red Maple 438 1,514.78 28. 42,413.94 18.31 Reconstruction Gaage Lane 235 831.47 30. 24,944.13 18.99 Reconstruction Diane Stre 193 1,549.55 30. 46,486.35 19.85 Reconstruction 64th Stree 30 708.41 24. 17,001.94 19.99 Reconstruction Rondeau La 458 1,505.11 24. 36,12274 20.25 Reconstruction Canfield R 128 5624 30. 16,872.13 20.99 Reconstruction Gladstone 1020 643.49 22. 14,156.73 21.55 Reconstruction Olive Stre 672 498.4 24. 11,961.64 22.00 Reconstruction Gordon Ave 249 452.92 30. 13,58758 22.88 Reconstruction Lamotte Dr 344 306.84 28. 8,591.39 22.88 Reconstruction Diane Stre 194 510.87 30. 15,326.12 25.26 Reconstruction Rustic Lan 471 784.51 18. 14,121.26 25.54 Reconstruction Otter Lake 679 1,24277 24. 29,826.47 25.99 Reconstruction 64th Stree 1001 374.3 24. 8,983.14 25.99 Reconstruction Evergreen 213 502.57 28. 14,071.87 26.35 Reconstruction Gordon Ave 250 224.41 30. 6,73244 26.91 Reconstruction Talle Lane 541 1, 129.55 30. 33,886.43 26.99 Reconstruction Holly Driv 1008 3,893.9 24. 93,453.50 27.99 Reconstruction James Stre 307 2,202 17 28. 61,660.81 28.55 Reconstruction Knoll Driv 989 1,018.61 28. 28,520.95 30.76 Reconstruction Fairmont D 216 603.96 22. 13,28712 30.99 Reconstruction 77th Stree 37 2,086.95 22 45,91294 31.04 Reconstruction Lakeview D 1042 1,307.31 24. 31,375.34 32.39 Reconstruction Old Birch 671a 900. 24. 21,600.00 33.74 Reconstruction Cedar Stre 135 727.81 28. 20,378.54 33.98 Reconstruction Barbara La 994 542.71 28. 15,195.98 35.18 Reconstruction Lakeview D 1045 1,316.06 24. 31,58536 36.63 Reconstruction 77th Stree 38 623.83 22 13,724.31 38.03 Reconstruction Glenview D 244 629.58 22 13,850.70 38.03 Reconstruction Karth Road 318 454.09 30. 13,62273 38.99 Reconstruction Timberwolf 563 260.05 32 8,321.73 38.99 Reconstruction Gladstone 239 619.12 22 13,620.61 39.39 Reconstruction Oak Lane 662 2,012.74 24. 48,305.77 39.67 Reconstruction Holly Driv 1012 7258 18. 13, 064.38 39.99 Reconstruction Fairmont D 217 620.08 22. 13,641.83 40.75 Preservation Buckthorn 127 499.75 28. 13,99297 40.99 Preservation Ware Road 597 2630.32 35. 92,061.03 41.06 Preservation 81st Stree 50 414.95 30. 12448.61 41.89 Preservation Maple Stre 389 926. 16 24. 22,227.85 41.89 Preservation Timberwolf 564 423.35 30. 12700.56 42.99 Preservation 77th Stree 40 1,264.26 24. 30,34229 43.01 Preservation Glenview D 1098 654.96 22 14,409.20 43.45 Preservation Orange Str 675 1,01734 24. 24,416.21 44.10 Preservation Black Duck 111 498.04 28. 13,94505 44.68 Preservation Shadow Lak 491 498. 40. 19,920.01 44.69 Preservation WSB Pavement Management Report Page X27 Street Name Section ID Length (ft) Width (ft) Area (ft=) PCI Recommended Maintenance Activity White Owl 612 726.1 28. 20,330.73 44.69 Preservation Lakeview D 1044 1,324.03 24. 31,776.80 44.74 Preservation Merganser 642 55248 28. 15,469.31 44.99 Preservation Terra Cour 556 365.9 28. 10,24523 45.20 Preservation Fox Road 228 634.26 28. 17,759.20 45.85 Preservation Hickory PI 269 184.68 28. 5,171. /8 45.85 Preservation Shadow Lak 489 15715 40. 6,286.14 45.85 Preservation Pondview C 426 425.13 28. 11,903.77 46.00 Preservation Black Duck 109 32733 28. 9,165.35 46.99 Preservation Black Duck 112 149.05 28. 4,173.46 46.99 Preservation Pheasant R 418 505.22 28. 14,146.15 46.99 Preservation Pheasant H 412 323.44 28. 9,056.46 47.00 Preservation Whitetail 618 335.73 28. 9,400.42 47.00 Preservation Whitetail 619 555.9 28. 15,565.07 47.00 Preservation Painted Tu 681 47527 28. 13,30745 47.00 Preservation Glenview D 245 475.3 22 10,456.61 47.17 Preservation Service Ro 477 459.65 24. 11,031.54 47.18 Preservation 81st Stree 51 348.44 30. 10,453.14 47.37 Preservation Sherman La 504 481.81 28. 13,490.76 48.00 Preservation Sherman La 506 458.41 28. 12,835.48 48.00 Preservation Timberwolf 565 468.54 28. 13,119.00 48.00 Preservation White Oak 608 496.75 28. 13,908.99 48.00 Preservation White Oak 611 851.52 28. 23,84247 48.00 Preservation Fox Road 229 1,056.47 28. 29,581.07 48.11 Preservation Shadow Lak 488 21257 44. 9,353.15 48.11 Preservation Gladstone 236 345.46 27 9,32745 48.32 Preservation Chokecherr 146 42507 28. 11,902.09 49.00 Preservation Chokecherr 147 476.68 28. 13,34718 49.00 Preservation Sherman La 505 611.38 28. 17,118.68 49.00 Preservation Linda Lane 371 331.96 28. 9,294.90 49.18 Preservation Shadow Lak 495 38787 40. 15,514.99 49.20 Preservation Green Bria 254 909.65 27 24,560.61 49.42 Preservation Ulmer Driv 588 928.32 27 25,064.77 49.42 Preservation Bloom Cour 121 471.38 24. 11,313.02 50.00 Preservation Sherman La 498 228.81 28. 6,406.61 50.00 Preservation White Pine 616 90732 28. 25,404.83 50.24 Preservation Lonesome P 384 333.82 28. 9,34708 50.26 Preservation Post Road 429 84527 27 22,822.36 50.45 Preservation Stage Coac 524 589.36 28. 16,50216 50.45 Preservation Nancy Driv 963 1,156.26 30. 34,687.86 50.51 Preservation Meadow Cou 403 585.34 28. 16,389.56 50.52 Preservation Sherman La 503 51582 28. 14,442.98 51.00 Preservation Timberwolf 558 212.71 48. 10,210.19 51.00 Preservation White Oak 610 23267 28. 6,514.75 51.00 Preservation Black Duck 113 1,651.78 28. 46,249.76 51.29 Preservation WSB Pavement Management Report Page X28 Street Name Section ID Length (ft) Width (ft) Area (ft2) PCI Recommended Maintenance Activity Deerwood L 182 988.09 28. 27,666.55 51.29 Preservation Hawthorn R 263 59549 28. 16,673.86 51.29 Preservation River Birc 450 769.47 28. 21,545.14 51.29 Preservation Shadow Lak 490 41752 40. 16,700.79 51.29 Preservation 77th Stree 39 551.34 24. 13,232.15 51.54 Preservation Elbe Stree 203 864.09 30. 25,922.68 51.55 Preservation White Oak 609 4529 28. 12,681.25 52.00 Preservation Linda Lane 372 1,038.94 28. 29,090.32 52.28 Preservation Lantern La 356 55584 28. 15,563.47 52.30 Preservation Elbe Stree 202 176.81 30. 5,304.16 52.55 Preservation Sherman La 501 1,07787 28. 30,180.40 53.00 Preservation Timberwolf 560 585.73 28. 16,400.32 53.00 Preservation Kingfisher 324 489.63 28. 13,709.73 53.29 Preservation Lonesome P 386 523.07 28. 14,646.07 53.29 Preservation Stage Coac 525 290.98 28. 8,147.39 53.39 Preservation Antelope D 62 333.29 27 8,998.79 53.41 Preservation Heather Co 265 477.66 28. 13,374.47 53.55 Preservation Timberwolf 559 268.49 28. 7517.74 54.00 Preservation Black Duck 117 48735 28. 13,64591 54.25 Preservation Shadow Lak 482 558.28 28. 15,631.90 54.25 Preservation Fox Circle 970 17258 28. 4,83227 54.25 Preservation Stage Coac 527 344.65 28. 9,650.09 54.32 Preservation Lakeview D 1043 1,324.57 24. 31,789.58 54.32 Preservation Rondeau La 461 678.16 24. 16,27586 54.34 Preservation Snow Owl C 518 393.24 28. 11,010.71 54.34 Preservation Shadow Lak 496 538.01 40. 21,520.27 55.21 Preservation Green Brie 255 383.98 27 10,36736 55.25 Preservation Sherman La 497 101.66 50. 5,083.17 56.00 Preservation Fawn Lane 218 801.77 28. 22,449.59 56.15 Preservation Linden Lan 373 1,317.35 28. 36,885.74 56.15 Preservation Painted Tu 682 46293 28. 12,961.91 56.15 Preservation Coyote Tra 990 746.54 28. 20,903.23 56.15 Preservation Eva Street 212 325.3 30. 9,758.88 56.48 Preservation Velvetleaf 591 277.51 28. 7,770.18 57.00 Preservation Hunters Ri 1019 983.24 28. 27530.59 57.00 Preservation Antelope D 61 176.27 27 4,759.28 57.04 Preservation Caribou Ci 130 363.44 27 9,81289 57.04 Preservation Wildflower 622 603.94 27 16,306.30 57.04 Preservation Sandhi!! D 472 891.46 28. 24,960.97 57.07 Preservation Fox Road 225 164.01 28. 4,59239 57.09 Preservation Ironwood C 301 220.62 28. 6,177 37 57.09 Preservation Gladstone 237 383.23 28. 10,730.46 57.93 Preservation Beaver Tra 99 533.67 28. 14,942.84 58.02 Preservation Black Duck 119 583.36 28. 16,333.97 58.02 Preservation Coyote Tra 169 37763 28. 10,573.72 58.02 Preservation WSB Pavement Management Report Page X29 Street Name Section ID Length (ft) Width (ft) Area (ft2) PCI Recommended Maintenance Activity River Birc 449 651.6 28. 18,244.72 58.02 Preservation Shadow Lak 492 330.6 40. 13,224.00 58.02 Preservation Coyote Tra 991 773.45 28. 21,656.68 58.02 Preservation Cinnamon T 148 340.37 28. 9,530.36 58.81 Preservation Gray Heron 252 1,159. 3 28. 32,460.27 58.81 Preservation Sunfish Co 529 265.92 27 7179.95 58.81 Preservation White Pine 613 208.48 28. 5,83745 58.93 Preservation Birch Cour 104 128.65 28. 3,602.09 58.95 Preservation Fox Road 231 341. 13 28. 9,551.61 58.95 Preservation Lonesome P 385 861.99 28. 24,135. 75 58.95 Preservation James Stre 308 441.9 28. 12,373.22 59.38 Preservation Antelope D 63 483.83 27 13,063.48 59.70 Preservation Ware Road 601 1,461.14 35 51,139.83 59.85 Preservation Linda Circ 368 204.02 28. 5,71259 59.86 Preservation Linda Cour 369 471.93 28. 13,214.00 59.86 Preservation Black Duck 108 1, 146.55 28. 32, 103.31 59.88 Preservation Coyote Cou 166 335.28 28. 9,38798 59.88 Preservation Deerwood L 184 230.13 28. 6,443.58 59.88 Preservation Fawn Lane 219 22284 28. 6,239.49 59.88 Preservation Lonesome P 387 586.24 28. 16,414.79 59.88 Preservation Coyote Tra 992 33794 28. 9,46224 59.88 Preservation Sherman La 507 323.88 28. 9,068.54 60.00 Preservation Elm Street 1034 34261 28. 9,59296 60.56 Preservation Pelican PI 406 1,381.83 28. 38,691.31 60.78 Preservation Black Duck 114 695.19 28. 19,465.39 60.81 Preservation Deerwood L 188 484.75 28. 13,573.02 60.81 Preservation Red Hawk T 436 296.05 28. 8,289.35 60.81 Preservation Ruffed Gro 469 630.7 28. 17659.64 61.00 Preservation Lea Court 361 360.56 28. 10,095.67 61.29 Preservation Grey Squir 259 336.03 27 9,072.79 61.48 Preservation Snow Owl L 519 1,361.26 28. 38,115.25 61.48 Preservation Sunflower 531 208.05 27 5,617.41 61.48 Preservation Ware Road 603 309.33 35 10,826.59 61.71 Preservation Ware Road 944 541.64 35. 18,95730 61.71 Preservation Deerwood L 183 22291 28. 6,241.45 61.74 Preservation Cedar Stre 136 646.25 28. 18, 095.02 61.99 Preservation Sunrise Dr 535 1,00259 24. 24,06224 62.36 Preservation Sunrise Ro 537 316.38 24. 7,593.19 62.36 Preservation Smoketree 515 603.1 27 16,283.63 62.38 Preservation Snow Owl L 520 35528 28. 9,94787 62.38 Preservation Ruffed Gro 468 356.88 28. 9,99267 63.00 Preservation 4th Avenue 24 1,327. 36. 47771.89 63.22 Preservation Forsham La 223 678.22 28. 18,990.06 63.25 Preservation 62nd Avenu 28 404.34 22. 8,89552 63.61 Preservation Deerwood L 187 488.17 28. 13,668.72 63.61 Preservation WSB Pavement Management Report Page 130 Street Name Section ID Length (ft) Width (ft) Area (fr) PCI Recommended Maintenance Activity Killdeer D 321 15783 28. 4,419.34 63.61 Preservation White Birc 607 578.28 28. 16, 191.97 63.61 Preservation Painted Tu 680 152.35 28. 4,265.75 63.61 Preservation Ruffed Gro 470 269.59 28. 7,548.39 64.00 Preservation Wildflower 621 33298 27 8,990.56 64.18 Preservation Linda Aven 366 182.4 28. 5,10730 64.53 Preservation Black Duck 105 408.99 28. 11,451.61 64.55 Preservation Black Duck 116 426.27 28. 11,935.69 64.55 Preservation Deerwood C 180 118.79 28. 3,326.12 64.55 Preservation Deerwood C 181 278.92 60. 16,735.12 64.55 Preservation Deerwood L 186 441.88 28. 12,372.67 64.55 Preservation Hawthorn R 262 1,981.44 28. 55,480. 19 64.55 Preservation Pheasant R 420 961.49 28. 26,921.76 64.55 Preservation Lacasse Dr 330 50551 28. 14,154.39 64.99 Preservation Wild Turke 620 699.72 28. 19,59209 65.00 Preservation Grey Squir 257 269.67 27 7281.13 65.10 Preservation Sunflower 532 44565 27 12,03256 65.10 Preservation 4th Avenue 19 479.09 41. 19,64258 65.15 Preservation 77th Stree 41 74725 24. 17,934.05 65.15 Preservation 77th Stree 43 494.79 24. 11,875.02 65.15 Preservation Egret Lane 198 183.77 28. 5,14553 65.47 Preservation Black Duck 106 318.12 28. 8,90746 65.49 Preservation Deerwood L 185 1,241.63 28. 34,765.53 65.49 Preservation Hawthorn R 264 383.2 28. 10,729.48 65.50 Preservation Elm Street 1037 361.28 28. 10, 115.85 65.99 Preservation Ruffed Gro 467 36232 28. 10, 14508 66.00 Preservation Phelps Roa 421 1,31758 28. 36,892.35 66.02 Preservation Egret Lane 199 449.97 28. 12,599.19 66.41 Preservation White Pine 615 576.51 27 15,565.79 66.42 Preservation Killdeer D 1342 561.96 28. 15,734.91 66.44 Preservation Sunrise Dr 536 1,317.04 24. 31,608.98 66.91 Preservation Mourning D 644 334.37 27 9,02795 66.93 Preservation Blue Heron 123 639.44 28. 17904.43 67.36 Preservation Woodridge 227 262.11 27 7,076.91 67.37 Preservation Laurene Av 357 674.81 24. 16, 19542 67.37 Preservation Linda Aven 367 379.91 28. 10,63747 67.37 Preservation Black Duck 110 249.71 28. 6,991.89 67.39 Preservation Pheasant R 995 398.79 28. 11,166.25 67.39 Preservation Sunrise Dr 533 586.04 24. 14,064.88 67.83 Preservation Sunrise Ro 539 50507 24. 12,121.72 67.83 Preservation Red Clover 435 593.99 27 16,037.72 67.85 Preservation Timberwolf 566 461.78 28. 12,929.75 67.99 Preservation Egret Lane 200 418.81 28. 11,726.56 68.31 Preservation Baldwin La 95 55736 28. 15,606.20 68.32 Preservation Beaver Cir 98 528.5 28. 14,798.07 68.34 Preservation WSB Pavement Management Report Page X31 Street Name Section ID Length (ft) Width (ft) Area (ftz) PCI Recommended Maintenance Activity Red Hawk T 437 26734 28. 7,485.63 68.34 Preservation Shadow Lak 481 4075 28. 11,409.94 68.34 Preservation Robinson D 1163 40. 32. 1,279.99 68.50 Preservation Stage Coac 526 251.53 28. 7,042.93 68.75 Preservation Antelope D 60 16745 27 4,521.09 68.78 Preservation Glenview D 243 363.24 28. 10,170.76 68.78 Preservation Whippoorwi 606 1,328.92 28. 37,209.62 68.78 Preservation Lacasse Co 326 236.65 28. 6,626.17 68.99 Preservation Timberwolf 562 900.02 28. 25,200.68 68.99 Preservation Marilyn Dr 396 1,043.5 28. 29,21787 69.03 Preservation Blue Heron 122 474.95 28. 13,298.57 69.27 Preservation Egret Lane 201 463.8 28. 12,986.38 69.27 Preservation Laurene Av 358 28507 24. 6,841.74 69.27 Preservation Laurene Av 360 469.8 24. 11,27531 69.27 Preservation Mallard La 388 336.68 28. 9,42715 69.29 Preservation Sioux Cour 509 16797 28. 4,703.11 69.61 Preservation Post Road 428 442.11 27 11,936.89 69.68 Preservation Gray Heron 253 374.16 28. 10,476.60 69.70 Preservation Teal Court 551 649.85 28. 18,195.77 69.99 Preservation Cripple Cr 174 281.38 28. 7,878.69 70.00 Preservation Oakwood La 669 586.89 28. 16,433.03 70.23 Preventative Maintenance Crystal Co 176 188.57 28. 5,279.89 70.25 Preventative Maintenance Fawn Lane 221 698.35 28. 19,553.70 70.25 Preventative Maintenance Shadow Lak 483 \ 2, 166.98 28. 60,67546 70.25 Preventative Maintenance Partridge 694 798.56 28. 22359.54 70.25 Preventative Maintenance Gray Heron 251 328.72 28. 9,204.05 70.63 Preventative Maintenance Tele Lane 555 37734 28. 10,56559 70.99 Preventative Maintenance Laurene Av 359 558.16 24. 13,395.79 71.18 Preventative Maintenance Linda Aven 365 93544 24. 22,450.60 71.18 Preventative Maintenance Rohavic La 452 47735 30. 14,320.42 71.18 Preventative Maintenance Schlavin C 476 478.18 30. 14,34544 71.18 Preventative Maintenance Woodridge 638 1,058.86 27 28,589.13 71.18 Preventative Maintenance Woodridge 640 1,44232 27 38,94253 71.18 Preventative Maintenance Baldwin La 1139 1,80272 21. 37,85703 71.18 Preventative Maintenance Lantern Ci 354 582.03 28. 16,296.81 71.20 Preventative Maintenance Lantern La 355 52705 28. 14,757.53 71.20 Preventative Maintenance Aqua Lane 1004 450. 36. 16,200.15 71.53 Preventative Maintenance Mourning D 646 486.18 27 13,126.76 71.55 Preventative Maintenance Royal Pine 1179 531.68 24. 12760.24 71.99 Preventative Maintenance Rohavic La 451 44545 30. 13,363.43 72.14 Preventative Maintenance Black Duck 115 311.55 28. 8,723.35 72.16 Preventative Maintenance Red Birch 434 575.19 28. 16,10519 72.16 Preventative Maintenance Muskrat Ru 647 330.87 28. 9,264.38 72.16 Preventative Maintenance Clearwater 149 213.72 28. 5,984.29 72.99 Preventative Maintenance Ware Road 942 624.98 35. 21,874.40 73.08 Preventative Maintenance WSB Pavement Management Report Page 132 Street Name Section ID Length (ft) Width (ft) Area (ft') PCI Recommended Maintenance Activity Oakwood Dr 668 570.25 28. 15,966.90 73.09 Preventative Maintenance Killdeer C 319 155.02 28. 4,340.44 73.11 Preventative Maintenance Killdeer D 323 331.7 28. 9,28757 73.11 Preventative Maintenance Smoketree 516 328.43 27 8,86758 73.37 Preventative Maintenance Mourning D 645 370.89 27 10,013.93 73.37 Preventative Maintenance Wolf Circl 623 310.25 28. 8,687.13 73.99 Preventative Maintenance Black Duck 118 408.25 28. 11,430.97 74.06 Preventative Maintenance Fox Road 230 505.97 28. 14, 16709 74.06 Preventative Maintenance Partridge 693 719.48 28. 20,14539 74.06 Preventative Maintenance Elm Street 1041 1,070.99 28. 29,98783 74.24 Preventative Maintenance Sunrise Ro 540 864.64 24. 20,751.27 74.25 Preventative Maintenance Sunflower 530 319.95 27 8,638.58 74.27 Preventative Maintenance Ware Road 599 1,044.55 35. 36,559.41 74.97 Preventative Maintenance Clearwater 155 936.05 28. 26,209.32 74.99 Preventative Maintenance Ellen Cour 204 200.22 28. 5,606. 18 74.99 Preventative Maintenance Service Ro 479 1,360.61 24. 32,654.68 75.17 Preventative Maintenance 4th Avenue 1169 546.4 24. 13,113.60 75.19 Preventative Maintenance White Pine 614 1,216.94 27 32,857.39 75.92 Preventative Maintenance Woodridge 639 1,378.79 27 37,22728 75.92 Preventative Maintenance Aspen Lane 85 641.59 28. 17,964.54 75.94 Preventative Maintenance Tamarack L 542 571.01 28. 15,988.15 75.94 Preventative Maintenance Aspen Lane 1220 163.72 28. 4,584.06 75.94 Preventative Maintenance Trappers C 584 253.57 28. 7,099.95 76.00 Preventative Maintenance Sunrise Dr 534 451. 15 24. 10,82766 76.02 Preventative Maintenance Oak Lane 664 839.41 24. 20, 145.84 76.83 Preventative Maintenance Elm Street 1040 59738 28. 16,726.67 76.87 Preventative Maintenance Aqua Lane 1005 303.17 24. 7,276.01 76.88 Preventative Maintenance Jane Avenu 1211 182.97 32. 5,855.12 76.93 Preventative Maintenance Lacasse Dr 334 200.94 36. 7,233.77 76.99 Preventative Maintenance Tele Drive 553 630.87 28. 17,664.50 76.99 Preventative Maintenance Trappers X 579 398.45 28. 11, 156.60 76.99 Preventative Maintenance Oakwood La 670 529.94 28. 14,838.32 77.24 Preventative Maintenance Elm Street 1036 591.06 28. 16,549.55 77.72 Preventative Maintenance Grey Squir 258 330.8 27 8,931.70 77.75 Preventative Maintenance Killdeer D 320 126.84 28. 3,551.58 77.79 Preventative Maintenance 77th Stree 42 1,245.88 24. 29,901.17 77.80 Preventative Maintenance Glen Circl 240 263.6 28. 7,380.88 77.80 Preventative Maintenance Sherman La 502 1,593. 28. 44,603.98 77.99 Preventative Maintenance Tele Lane 554 355. 28. 9,939.93 77.99 Preventative Maintenance Elm Street 1033 338.98 28. 9,491.36 78.55 Preventative Maintenance Country La 161 1,410.53 28. 39,494.86 78.71 Preventative Maintenance South Glen 993 518.93 28. 14,530.10 78.71 Preventative Maintenance Apollo Cou 1226 432.7 26. 11,250.31 78.74 Preventative Maintenance Lacasse Dr 336 418.4 28. 11,71514 78.99 Preventative Maintenance Sherman La 500 49755 28. 13,931.43 78.99 Preventative Maintenance WSB Pavement Management Report Page X33 Street Name Section ID Length (ft) Width (ft) Area (ftz) PCI Recommended Maintenance Activity ElmcrestA 1187 914.95 24. 21,958.86 78.99 Preventative Maintenance Trappers C 582 322.35 28. 9,025.91 79.00 Preventative Maintenance Trappers C 583 218.77 28. 6,125.43 79.00 Preventative Maintenance Elm Street 1032 358.5 28. 10,038.09 79.37 Preventative Maintenance ElmcrestA 1233 5,618.32 28. 157,313.07 79.41 Preventative Maintenance Linda Lane 370 313.36 28. 8,774.20 79.58 Preventative Maintenance Hollow Lan 286 483.47 28. 13,537. 15 79.61 Preventative Maintenance South Glen 521 134.39 28. 3,763.01 79.61 Preventative Maintenance Marilyn Dr 391 424.87 28. 11,896.28 79.69 Preventative Maintenance Lacasse Dr 331 407.35 28. 11,405.87 79.99 Preventative Maintenance Lacasse Ci 981 244.03 28. 6,832.95 79.99 Preventative Maintenance Trappers C 585 402.08 28. 11,258.27 80.00 Preventative Maintenance Holly Driv 973 583. 24. 13,991.94 80.00 Preventative Maintenance Marshan Co 1197 142. 24. 3,408.00 80.20 Preventative Maintenance Northern L 1002 356.47 36. 12,83298 80.21 Preventative Maintenance Aspen Lane 83 581.93 28. 16,293.92 80.50 Preventative Maintenance Killdeer D 322 259.27 28. Z259.63 80.50 Preventative Maintenance Hollow Lan 285 656.85 28. 18,391.71 80.51 Preventative Maintenance South Glen 522 49724 28. 13,922.73 80.51 Preventative Maintenance South Glen 523 360.14 28. 10,083.95 80.51 Preventative Maintenance Elm Street 1038 973.6 28. 27,260.91 80.95 Preventative Maintenance Clearwater 158 679.17 28. 19,016.69 80.99 Preventative Maintenance Lacasse Co 980 275.07 28. 7,701.98 80.99 Preventative Maintenance Country La 160 221.95 28. 6,214.69 81.38 Preventative Maintenance Elm Street 1035 485.57 28. 13,595.97 81.72 Preventative Maintenance Elm Street 1039 338.31 28. 9,47269 81.72 Preventative Maintenance Ulmer Driv 589 643.14 27 17,364.71 81.75 Preventative Maintenance Arthur Cou 82 548.51 28. 15,358.32 81.99 Preventative Maintenance 62nd Avenu 26 96239 22. 21, 17262 82.25 Preventative Maintenance Shadow Lak 484 1,614.28 44. 71,028. 18 82.25 Preventative Maintenance Park Court 1198 560.53 32. 17,937.07 82.47 Preventative Maintenance 21stAvenu 7 908.46 30. 27,253.68 82.51 Preventative Maintenance Quarter Ho 433 285.91 28. 8,005.42 82.51 Preventative Maintenance Lacasse Dr 332 529.47 28. 14,825.11 82.99 Preventative Maintenance Lacasse Dr 333 764.35 28. 21,401.89 82.99 Preventative Maintenance Fawn Lane 220 473.24 28. 13,250.60 83.10 Preventative Maintenance Robinson D 1168 83.28 24. 1,998.66 83.20 Preventative Maintenance Ulmer Driv 590 374.1 27 10, 100.58 83.24 Preventative Maintenance Holly Driv 293 244.96 24. 5,879.01 83.99 Preventative Maintenance Osprey Cou 676 522.81 28. 14,638.73 83.99 Preventative Maintenance Holly Driv 972 286.99 24. 6,88778 83.99 Preventative Maintenance Cherokee T 142 514.12 28. 14,395.43 84.00 Preventative Maintenance Stage Coac 1202 174.38 32 5,580.01 84.54 Preventative Maintenance Stage Coac 1218 342.39 32 10,956.47 84.63 Preventative Maintenance Rice Lake 447 1,77514 28. 49,703.83 84.66 Preventative Maintenance WSB Pavement Management Report Page 34 Street Name Section ID Length (ft) Width (ft) Area (ft') PCI Recommended Maintenance Activity 62nd Avenu 29 2,31263 22. 50,87778 84.74 Preventative Maintenance Prairie FI 431 573.47 28. 16,057. 15 84.74 Preventative Maintenance Ravens Cou 1177 472.65 24. 11,343.50 84.75 Preventative Maintenance Oak Hollow 1178 975.99 24. 23,423.65 84.75 Preventative Maintenance Clearwater 152 350.46 28. 9,813.01 84.99 Preventative Maintenance Mineral Po 643 418.24 28. 11,710.67 85.00 Preventative Maintenance Holly Driv 974 759.85 24. 18,236.33 85.00 Preventative Maintenance Trappers C 1254 155.6 90. 14,003.62 85.00 Preventative Maintenance Town Cente 1258 481.23 40. 19,249.26 85.36 Preventative Maintenance 21stAvenu 6 386.02 34. 13,124.58 85.37 Preventative Maintenance Ware Road 605 570.86 28. 15,984. 19 85.56 Preventative Maintenance Lakota Tra 1154 553.68 26. 14,395.68 85.56 Preventative Maintenance Oak Hollow 1256 146.51 24. 3,516.33 85.57 Preventative Maintenance Country La 162 160.19 28. 4,48532 85.60 Preventative Maintenance Tart Lake 546 32735 28. 9,165.87 85.99 Preventative Maintenance Meadowlark 641 243.02 28. 6,804.70 85.99 Preventative Maintenance Cripple Cr 173 785.08 28. 21,98211 86.00 Preventative Maintenance Holly Driv 975 899.25 24. 21,582.02 86.00 Preventative Maintenance Cherokee T 1090 324.38 28. 9,08266 86.00 Preventative Maintenance Aqua Circl 1227 2,399.37 24. 57,584.90 86.01 Preventative Maintenance Town Cente 574 75564 44. 33,248. 17 86.04 Preventative Maintenance Marilyn Dr 395 1,313.32 28. 36,77283 86.17 Preventative Maintenance Palomino L 683 358.32 28. 10,033.08 86.17 Preventative Maintenance Sioux Lane 511 35795 28. 10,02268 86.37 Preventative Maintenance Sioux Lane 512 63727 28. 17,843.61 86.37 Preventative Maintenance Sioux Lane 513 288.98 28. 8,091.40 86.37 Preventative Maintenance Ware Circl 596 20575 28. 5,761. 12 86.37 Preventative Maintenance Ojibway Pa 1158 1,098.61 26. 28,563.91 86.37 Preventative Maintenance Ware Road 1170 67742 24. 16,258.04 86.37 Preventative Maintenance Chippewa T 1232 263.44 28. Z376.25 86.37 Preventative Maintenance 62nd Avenu 27 61737 22 13,58209 86.41 Preventative Maintenance Aspen Lane 84 183. 19 28. 5,129.41 86.41 Preventative Maintenance Pheasant R 1341 1,50562 28. 42,157.34 86.41 Preventative Maintenance Marshan La 400 93769 20. 18,753.85 86.71 Preventative Maintenance Town Cente 575 343.94 44. 15, 133.44 86.71 Preventative Maintenance Villiage D 595 791.85 22. 17,420.77 86.71 Preventative Maintenance Clearwater 150 407.74 32. 13,04774 86.99 Preventative Maintenance Trappers X 577 794.74 28. 22,25278 86.99 Preventative Maintenance Langer Lan 1105 700. 16 25. 17,504.03 86.99 Preventative Maintenance Stella Lan 1110 52769 24. 12,664.57 86.99 Preventative Maintenance Molitor Dr 1133 781.29 28. 21,876.25 86.99 Preventative Maintenance Cripple Cr 172 34549 28. 9,673.61 87.00 Preventative Maintenance Nancy Driv 962 39288 30. 11,786.51 87.06 Preventative Maintenance Palomino L 685 80271 28. 22476.00 87.07 Preventative Maintenance Patti Driv 696 736.81 30. 22, 104.16 87.07 Preventative Maintenance WSB Pavement Management Report Page X35 Street Name Section ID Length (ft) Width (ft) Area (ft2) PCI Recommended Maintenance Activity Lilac Stre 1191 89531 28. 25,068.75 87.07 Preventative Maintenance Lilac Stre 1264 1,78789 28. 50,060.79 87.07 Preventative Maintenance Prairie FI 430 243.04 28. 6,80501 87.17 Preventative Maintenance Sioux Look 514 736.32 28. 20,616.83 87.17 Preventative Maintenance Ware Road 947 241.05 28. 6,749.51 87.17 Preventative Maintenance Lakota Tra 1156 223.63 26. 5,814.48 87.17 Preventative Maintenance Arrowhead 1224 276.04 24. 6,62502 87.17 Preventative Maintenance Sioux Lane 1335 184.82 28. 5,174.96 87.17 Preventative Maintenance Linda Lane 1174 444.2 24. 10,660.69 87.18 Preventative Maintenance Ravens Cou 1175 350.55 24. 8,413.10 87.18 Preventative Maintenance Ravens Cou 1176 530.55 24. 12,733.10 87.18 Preventative Maintenance Rice Lake 446 528.29 28. 14,792.00 87.37 Preventative Maintenance NULL 1333 52778 40. 21,111.16 87.37 Preventative Maintenance Stage Coac 1200 13246 32. 4,238.57 87.49 Preventative Maintenance 79th Stree 46 441.7 28. 12,367.72 87.95 Preventative Maintenance Oak Court 661 369.63 28. 10,349.73 87.95 Preventative Maintenance Lois Lane 1222 520.44 30. 15,613.09 87.95 Preventative Maintenance Behm Lane 101 788.39 28. 22,074.81 87.96 Preventative Maintenance Savanna Co 475 423.97 26. 11,023.26 87.96 Preventative Maintenance Arrowhead 1171 186.25 24. 4,470.09 87.96 Preventative Maintenance Arrowhead 1172 759.48 24. 18,22745 87.96 Preventative Maintenance Lakota Tra 1225 198. 26. 5,148.00 87.96 Preventative Maintenance Pine Stree 1323 3,84598 30. 115,379.53 87.96 Preventative Maintenance Linda Lane 1173 229.38 24. 5,50516 87.97 Preventative Maintenance Clearwater 157 7358 28. 20,60244 87.98 Preventative Maintenance 65th Stree 1007 750.34 24. 18,008. 13 87.98 Preventative Maintenance Cassiopeia 134 360. 15 28. 10,084.21 88.00 Preventative Maintenance Holly Driv 292 449.4 24. 10,78570 88.00 Preventative Maintenance Trappers C 581 221.88 28. 6,21261 88.00 Preventative Maintenance Hudson Tra 997 673.47 28. 18,857. 15 88.00 Preventative Maintenance Carpenter 1161 343.42 32 10,989.38 88.00 Preventative Maintenance Rice Lake 448 1,768.77 28. 49,52543 88.02 Preventative Maintenance Town Cente 1195 618.36 40. 24,734.31 88.02 Preventative Maintenance Villiage D 1196 863.82 40. 34,552.95 88.02 Preventative Maintenance Woods Edge 1223 667.74 40. 26,709.71 88.02 Preventative Maintenance Town Cente 1337 325.76 28. 9,121.24 88.16 Preventative Maintenance 20th Ave S 1340 1,241.77 28. 34,769.50 88.16 Preventative Maintenance Otter Lake 1343 599.34 28. 16,781.65 88.16 Preventative Maintenance Town Cente 1336 598.07 40. 23,92288 88.66 Preventative Maintenance Peltier La 409 655.88 22. 14,429.43 88.67 Preventative Maintenance Rondeau La 457 3,088.24 24. 74,117.72 88.67 Preventative Maintenance Lakota Tra 1155 61.85 26. 1,608.09 88.75 Preventative Maintenance 79th Stree 45 763.09 28. 21,366.43 88.84 Preventative Maintenance Highland D 274 488. 15 28. 13,668. 17 88.84 Preventative Maintenance Arlo Lane 1102 441. 19 29. 12,794.46 88.84 Preventative Maintenance WSB Pavement Management Report Page X36 Street Name Section ID Length (ft) Width (ft) Area (ft2) PCI Recommended Maintenance Activity Patti Driv 695 663.19 30. 19,895.59 88.85 Preventative Maintenance Thomas Str 999 1,349.47 30. 40,484.17 88.85 Preventative Maintenance Pine Stree 1324 1,811.45 30. 54,343.65 88.85 Preventative Maintenance Clearwater 151 438.88 28. 12,288.66 88.98 Preventative Maintenance Clearwater 1112 740.84 28. 20,743.44 88.98 Preventative Maintenance Durango Po 197 474.86 28. 13,296.18 89.00 Preventative Maintenance Trappers C 587 440.55 28. 12335.33 89.00 Preventative Maintenance Bluebill L 968 882.75 28. 24,71700 89.41 Preventative Maintenance Stage Coac 1201 336.03 32. 10,752.80 89.45 Preventative Maintenance Arlo Lane 75 818.34 28. 22913.46 89.72 Preventative Maintenance Oak Lane 97 473.06 28. 13,245.67 89.72 Preventative Maintenance Carl Stree 131 773.37 24. 18,560.84 89.72 Preventative Maintenance Highland C 270 128.74 28. 3,604.83 89.72 Preventative Maintenance Highland C 271 333.06 28. 9,325.62 89.72 Preventative Maintenance Highland D 275 146.55 28. 4,103.28 89.72 Preventative Maintenance Highland L 277 196.49 28. 5,501.85 89.72 Preventative Maintenance Joseph Cou 314 225.24 28. 6,306.81 89.72 Preventative Maintenance Lois Lane 374 452.74 30. 13,582.09 89.72 Preventative Maintenance 4th Avenue 25 1,317 12 40. 52684.61 89.73 Preventative Maintenance Jeanne Dri 311 720.46 30. 21,613.65 89.73 Preventative Maintenance Marcia Lan 390 750.04 30. 22,501.11 89.73 Preventative Maintenance Pinto Lane 425 403.05 28. 11,285.26 89.73 Preventative Maintenance Teckla Cou 552 315.86 28. 8,844.06 89.73 Preventative Maintenance Mustang La 652 498.33 28. 13,953. 13 89.73 Preventative Maintenance Palomino L 684 481.56 28. 13,483.58 89.73 Preventative Maintenance Palomino L 687 698.19 28. 19,549. 19 89.73 Preventative Maintenance Pine Stree 1327 1,542.14 30. 46,264.29 89.73 Preventative Maintenance Apollo Dri 1259 474.99 36. 17099.61 89.74 Preventative Maintenance Iverson Co 302 60281 28. 16,878.72 89.98 Preventative Maintenance Tart Court 543 34244 28. 9,588.39 89.98 Preventative Maintenance Pheasant H 411 144.79 28. 4,054.19 89.99 Preventative Maintenance Holly Driv 971 339.89 24. 8,157.30 89.99 Preventative Maintenance Oakview Co 1121 311. 28. 8,70787 89.99 Preventative Maintenance Arlo Lane 73 421.9 28. 11,813.29 90.59 Preventative Maintenance Highland D 272 809.35 28. 22661.89 90.59 Preventative Maintenance Lois Lane 383 296.77 30. 8,903.03 90.59 Preventative Maintenance Vicky Lane 592 1,343.23 30. 40,296.91 90.59 Preventative Maintenance Wood Duck 626 70205 28. 19,65754 90.59 Preventative Maintenance Appaloosa 68 1,199.1 28. 33,574.73 90.60 Preventative Maintenance Behm Lane 100 152.6 28. 4,27273 90.60 Preventative Maintenance Connie Lan 159 661. 15 30. 19,834.44 90.60 Preventative Maintenance Mustang La 651 793. 28. 22203.95 90.60 Preventative Maintenance Palomino L 686 784.84 28. 21,975.44 90.60 Preventative Maintenance Palomino L 688 586.1 28. 16,410.72 90.60 Preventative Maintenance Century Tr 1125 6072 28. 17,001.65 90.60 Preventative Maintenance WSB Pavement Management Report Page X37 Street Name Section ID Length (ft) Width (ft) Area (ft') PCI Recommended Maintenance Activity Albert Cou 54 266.88 24. 6,40513 90.98 Preventative Maintenance Delina Cir 189 260.25 24. 6,246.06 90.98 Preventative Maintenance Langer Lan 352 453.86 24. 10,892.61 90.98 Preventative Maintenance Tart Lake 545 173.06 28. 4,845.82 90.98 Preventative Maintenance Tart Lake 548 671.81 28. 18,810.78 90.98 Preventative Maintenance Langer Lan 1103 45585 25 11,396.33 90.98 Preventative Maintenance Stella Lan 1109 350.89 24. 8,421.41 90.98 Preventative Maintenance Stella Lan 1111 309.62 24. 7,430.90 90.98 Preventative Maintenance Hawk Ridge 261 163.2 21. 3,42711 90.99 Preventative Maintenance Meadowview 1124 232.79 28. 6,51824 90.99 Preventative Maintenance Pheasant H 1137 403.09 28. 11,286.45 90.99 Preventative Maintenance Holly Cour 287 1,871.99 24. 44,927.75 91.00 Preventative Maintenance Pheasant R 1357 1,118.45 28. 31,316.52 91.14 Preventative Maintenance Saddle Clu 1358 18211 28. 5,099.02 91.14 Preventative Maintenance Pheasant R 1359 454.69 28. 12,731.23 91.14 Preventative Maintenance Fox Road 1360 376.81 28. 10,550.79 91.14 Preventative Maintenance Fox Road TBD 645.86 28. 18,084.08 91.14 Preventative Maintenance Black Berry Ct TBD 465.8 28. 13,04240 91.14 Preventative Maintenance Pheasant R 1361 321.41 28. 8,999.53 91.14 Preventative Maintenance Marshan Co 1203 340.42 32. 10,893.49 91.41 Preventative Maintenance Highland D 273 66262 28. 18,553.30 91.46 Preventative Maintenance Highland T 278 661.53 28. 18,522.77 91.46 Preventative Maintenance Marilyn Dr 392 213.55 28. 5,979.44 91.46 Preventative Maintenance Marilyn Dr 398 457.21 28. 12,801.92 91.46 Preventative Maintenance Wood Duck 624 169.43 28. 4,743.99 91.46 Preventative Maintenance Myrtle Lan 653 766.43 28. 21,459.98 91.46 Preventative Maintenance Oak Court 660 343.72 28. 9,624.18 91.46 Preventative Maintenance 4th Avenue 21 1,299.95 40. 51,998.09 91.47 Preventative Maintenance Appaloosa 66 367.04 28. 10,277.11 91.47 Preventative Maintenance Appaloosa 67 438.74 28. 12,284.79 91.47 Preventative Maintenance Jeanne Dri 312 1,251.98 30. 37,559.27 91.47 Preventative Maintenance Marvy Stre 402 61267 28. 17,154.89 91.47 Preventative Maintenance Mustang La 650 364.66 28. 10,210.34 91.47 Preventative Maintenance Stallion L 1129 1,355.05 28. 37941.43 91.47 Preventative Maintenance Pinto Lane 1130 290.8 28. 8,142.39 91.47 Preventative Maintenance Robinson D 1162 402.93 32 12,893.67 91.47 Preventative Maintenance Carl Stree 1164 59737 28. 16,726.26 91.47 Preventative Maintenance Carole Dri 133 1,483.47 30. 44,503.96 91.49 Preventative Maintenance Clearwater 153 214.97 28. 6,019.09 91.98 Preventative Maintenance Clearwater 154 1,235.81 28. 34,602.57 91.98 Preventative Maintenance Lacasse Dr 335 581.21 28. 16,273.90 91.98 Preventative Maintenance Langer Lan 350 1,712.3 24. 41,095.17 91.98 Preventative Maintenance Tart Lake 547 33745 28. 9,448.70 91.98 Preventative Maintenance Tart Lake 549 916.3 28. 25,656.48 91.98 Preventative Maintenance Tart Lake 550 6154 28. 17,231.12 91.98 Preventative Maintenance WSB Pavement Management Report Page X38 Street Name Section ID Length (ft) Width (ft) Area (ft2) PCI Recommended Maintenance Activity Sherman La 1115 271.45 28. Z600.72 91.99 Preventative Maintenance Osprey Cou 1253 122.09 80. 9,766.96 91.99 Preventative Maintenance 4th Avenue 23 2,661.12 40. 106,444.65 92.32 Preventative Maintenance Lois Lane 376 1,428.15 30. 42,844.45 92.32 Preventative Maintenance Lois Lane 381 306.7 30. 9,200.96 92.32 Preventative Maintenance Marilyn Dr 393 32754 28. 9,171.19 92.32 Preventative Maintenance Meadowview 404 1,461.56 30. 43,846.90 92.32 Preventative Maintenance Nottingham 659 1,319.39 30. 39,581.65 92.32 Preventative Maintenance Arlo Lane 1101 272.02 25. 6,800.45 92.32 Preventative Maintenance Behm Lane 102 230.59 28. 6,456.55 92.33 Preventative Maintenance Jeanne Dri 310 658.79 30. 19,763.67 92.33 Preventative Maintenance Marvy Stre 401 1,936.98 28. 54,235.53 92.33 Preventative Maintenance Patti Driv 405 1,27526 30. 38,25768 92.33 Preventative Maintenance Palomino L 689 642.86 28. 17,999.99 92.33 Preventative Maintenance Century Tr 1127 854.14 28. 23,915.83 92.33 Preventative Maintenance Pinto Lane 1131 550.75 28. 15,421.01 92.33 Preventative Maintenance Robinson D 1263 425.67 32. 13,621.57 92.33 Preventative Maintenance Robinson D TBD 1,492.31 32. 47,753.92 92.33 Preventative Maintenance Century Tr 1320 641.64 28. 17,965.78 92.33 Preventative Maintenance Lois Lane 380 2, 168.01 30. 65,040.30 92.34 Preventative Maintenance Arrowhead 77 21724 28. 6,082.77 92.55 Preventative Maintenance Arrowhead 78 4574 28. 12,80708 92.55 Preventative Maintenance Arrowhead 79 53587 28. 15,004.49 92.55 Preventative Maintenance Arrowhead 80 580.61 28. 16,25700 92.55 Preventative Maintenance Arrowhead 81 779.52 28. 21,826.51 92.55 Preventative Maintenance Chippewa T 144 759.05 28. 21,253.34 92.55 Preventative Maintenance Chippewa T 145 19267 28. 5,394.70 92.55 Preventative Maintenance Hokah Driv 279 15279 68. 10,389.40 92.55 Preventative Maintenance Hokah Driv 280 473.43 28. 13,256.05 92.55 Preventative Maintenance Hokah Driv 281 47565 30. 14,269.44 92.55 Preventative Maintenance Hokah Driv 282 664.89 28. 18,616.85 92.55 Preventative Maintenance Hokah Driv 283 806.57 30. 24,196.96 92.55 Preventative Maintenance Hokah Driv 284 868.53 30. 26,056.01 92.55 Preventative Maintenance Rice Court 445 404.08 28. 11,314.17 92.55 Preventative Maintenance Tomahawk C 567 252.83 28. 7079.32 92.55 Preventative Maintenance Tomahawk T 568 34527 28. 9,66767 92.55 Preventative Maintenance Tomahawk T 569 291.52 28. 8,16263 92.55 Preventative Maintenance Tomahawk T 570 533.61 28. 14,940.97 92.55 Preventative Maintenance Totem Trai 571 541.86 28. 15,17213 92.55 Preventative Maintenance Totem Trai 572 282.02 28. 7896.63 92.55 Preventative Maintenance Totem Trai 573 32572 28. 9,120.29 92.55 Preventative Maintenance Arrowhead 1140 557.38 28. 15,606.66 92.55 Preventative Maintenance 12th Avenu 1 783.53 24. 18,804.79 92.99 Preventative Maintenance 12th Avenu 3 309.75 33. 10,221.86 92.99 Preventative Maintenance 12th Avenu 4 1,197.55 24. 28,741.26 92.99 Preventative Maintenance WSB Street Name Section ID Length (ft) Width (ft) Area (ft2) PCI Pavement Management Report Page X39 Recommended Maintenance Activi 12th Avenu 5 33787 24. 8,108.80 92.99 Preventative Maintenance Pheasant H 413 360.8 28. 10, 10236 92.99 Preventative Maintenance Pheasant H 414 348.85 28. 9,767.93 92.99 Preventative Maintenance Pheasant H 415 245.77 28. 6,881.58 92.99 Preventative Maintenance Pheasant H 416 259.54 28. 7267.23 92.99 Preventative Maintenance Pheasant H 417 873.78 28. 24,465.86 92.99 Preventative Maintenance Trappers C 576 327.13 28. 9, 159.69 92.99 Preventative Maintenance Snow Goose 977 289.34 28. 8, 101.39 92.99 Preventative Maintenance Sherman La 1116 469.89 28. 13, 157.01 92.99 Preventative Maintenance Sedge Cour 1117 35232 28. 9,865.09 92.99 Preventative Maintenance Stoneybroo 1118 367.78 28. 10,297.81 92.99 Preventative Maintenance Stoneybroo 1119 1,616.37 28. 45,258.24 92.99 Preventative Maintenance Sherman La 1138 729.57 28. 20,42786 92.99 Preventative Maintenance Trappers X 1255 113.7 90. 10,233.04 92.99 Preventative Maintenance Broken Oak 9778 301.19 28. 8,433.34 92.99 Preventative Maintenance Country La 163 1,528.81 30. 45,864.43 93.18 Preventative Maintenance Country La 165 811.46 30. 24,343.91 93.18 Preventative Maintenance Greenwood 256 575.02 30. 17,250.72 93.18 Preventative Maintenance Henry Lane 267 450.6 28. 12,616.93 93.18 Preventative Maintenance Highland D 276 386.47 28. 10,821.03 93.18 Preventative Maintenance Joseph Cou 315 3327 28. 9,315.72 93.18 Preventative Maintenance Lois Lane 375 1,37721 30. 41,316.31 93.18 Preventative Maintenance Praire Vie 432 578.85 30. 17,36548 93.18 Preventative Maintenance Sherwood L 508 492.78 38. 18,725.62 93.18 Preventative Maintenance Wood Duck 964 333.44 28. 9,336.45 93.18 Preventative Maintenance Andall Str 59 1,254.22 30. 37,626.46 93.19 Preventative Maintenance Bradley St 125 605.19 30. 18,155.82 93.19 Preventative Maintenance Jon Avenue 313 658.77 28. 18,445.58 93.19 Preventative Maintenance Leonard Av 362 1,715.67 28. 48,038.85 93.19 Preventative Maintenance Leonard Av 363 1,559.45 28. 43,664.69 93.19 Preventative Maintenance Pony Court 427 262.3 28. 7344.36 93.19 Preventative Maintenance Century Tr 1126 951.82 28. 26,650.99 93.19 Preventative Maintenance Century Tr 1160 329.76 28. 9,233. 18 93.19 Preventative Maintenance Clydesdale 1165 310.01 28. 8,680.34 93.19 Preventative Maintenance Aenon Plac 53 1,112.89 30. 33,386.81 93.20 Preventative Maintenance Lois Lane 379 933.73 30. 28,01204 93.20 Preventative Maintenance Flora Cour 222 349.98 24. 8,399.43 93.98 Preventative Maintenance Langer Cir 1104 171.74 60. 10,304.56 93.98 Preventative Maintenance Hartford C 1106 1652 43. 7,103.40 93.98 Preventative Maintenance Pheasant H 1122 982.79 28. 27,518.04 93.99 Preventative Maintenance Pheasant H 1136 451.26 28. 12,63529 93.99 Preventative Maintenance Henry Lane 266 1,351.33 28. 37,83721 94.04 Preventative Maintenance Lois Lane 377 176.72 30. 5,301.53 94.04 Preventative Maintenance Lois Lane 1214 258.76 30. 7,762.77 94.04 Preventative Maintenance Andall Str 58 699.31 30. 20,979.23 94.05 Preventative Maintenance WSB Pavement Management Report Page 140 Street Name Section ID Length (ft) Width (ft) Area (ft=) PCI Recommended Maintenance Activity Mustang Co 648 351.73 28. 9,848.31 94.05 Preventative Maintenance Wood Duck 966 3,1228 28. 87,438.38 94.05 Preventative Maintenance Arabian Ci 1132 314.61 28. 8,808.97 94.05 Preventative Maintenance Century Tr 1159 439.09 28. 12,294.45 94.05 Preventative Maintenance Lilac Stre 1270 5, 163.54 28. 144,579.21 94.05 Preventative Maintenance Park Court 1199 36761 32. 11,763.62 94.33 Preventative Maintenance Wood Duck 625 243.51 28. 6,818.26 94.89 Preventative Maintenance Andall Str 56 791.84 30. 23,755.23 94.90 Preventative Maintenance Andall Str 57 904.84 30. 27 145.32 94.90 Preventative Maintenance Blackbird 120 751.55 28. 21,043.51 94.90 Preventative Maintenance Mustang La 649 479.38 28. 13,422.77 94.90 Preventative Maintenance Wood Duck 967 678.93 28. 19,010.01 94.90 Preventative Maintenance Century Tr 1128 121.45 92 11, 173.74 94.90 Preventative Maintenance Lois Lane 378 572.66 30. 17 179.80 94.91 Preventative Maintenance Tart Lake 544 22279 28. 6,23798 94.98 Preventative Maintenance August Cir 1107 169.85 43. 7303.37 94.98 Preventative Maintenance Stella Cir 1108 134.57 43. 5,786.42 94.98 Preventative Maintenance Langer Lan 1134 196.96 25 4,924.12 94.98 Preventative Maintenance Butternut 1354 144.75 28. 4,05289 94.98 Preventative Maintenance Peregrine 410 345.86 26. 8,992.36 94.99 Preventative Maintenance Pheasant H 1120 1, 133.62 28. 31,741.34 94.99 Preventative Maintenance Goldenrod 1123 258.65 28. 7,242.27 94.99 Preventative Maintenance Pheasant H 1135 29793 28. 8,341.94 94.99 Preventative Maintenance Apollo Dri 64 321.09 36. 11,559.12 95.77 Preventative Maintenance Oakwood La 1250 622.3 28. 17424.44 95.85 Preventative Maintenance Fox Road 1144 238.99 28. 6,691.66 95.90 Preventative Maintenance Red Oak La 1346 560.17 28. 15,684.66 95.98 Preventative Maintenance Cottonwood 1347 160.05 28. 4,481.33 95.98 Preventative Maintenance Red Oak La 1348 24577 28. 6,881.47 95.98 Preventative Maintenance Red Oak La 1349 190.47 28. 5,333.15 95.98 Preventative Maintenance Old Birch 671 1,238.86 24. 29,73266 96.00 Preventative Maintenance Cedar Stre 1252 888.22 22 19,540.80 96.98 Preventative Maintenance Cedar Stre 1356 30.19 22 664.27 96.98 Preventative Maintenance Rolling Hi 454 1,6572 24. 39,77276 96.99 Preventative Maintenance Fox Road 1145 723.57 26. 18,81283 97.07 Preventative Maintenance Fox Road 1146 450.2 26. 11,705.30 97.07 Preventative Maintenance Red Fox Ro 1147 783.91 26. 20,381.65 97.07 Preventative Maintenance Red Fox Ro 1148 77736 26. 20,211.42 97.07 Preventative Maintenance Bubble 1151 100. 120. 12,000.00 97.07 Preventative Maintenance Cedar Stre 1344 1, 12725 22 24,799.51 97.98 Preventative Maintenance Cedar Stre 1345 1973 22 4,340.70 97.98 Preventative Maintenance Palm Stree 1350 1, 175.03 28. 32,900.89 97.98 Preventative Maintenance Deer Pass 179 523.35 28. 14,653.84 97.99 Preventative Maintenance Foxtail Co 232 804.12 30. 24,123.52 97.99 Preventative Maintenance Foxtail Dr 233 946.32 30. 28,389.56 97.99 Preventative Maintenance WSB Pavement Management Report Page 141 Street Name Section ID Length (ft) Width (ft) Area (ft=) PCI Recommended Maintenance Activity Foxtail Dr 234 591.78 30. 17,753.41 97.99 Preventative Maintenance Reiling Ro 444 871.78 28. 24,409.79 97.99 Preventative Maintenance Rolling Hi 453 551. 1 24. 13,226.47 97.99 Preventative Maintenance Sargent Co 474 910.92 28. 25,505.90 97.99 Preventative Maintenance Whitetail 617 412. 30. 12,359.96 97.99 Preventative Maintenance Woodchuck 627 821.24 30. 24,63734 97.99 Preventative Maintenance Woodchuck 628 588.06 30. 17,641.79 97.99 Preventative Maintenance Woodchuck 629 764.33 30. 22,929.89 97.99 Preventative Maintenance Woodchuck 630 572.54 30. 17176. 19 97.99 Preventative Maintenance Partridge 691 448.75 28. 12,565.05 97.99 Preventative Maintenance Rolling Hi 982 198.3 20. 3,966.08 97.99 Preventative Maintenance Deer Pass 983 119.75 28. 3,353.04 97.99 Preventative Maintenance Bald Eagle 1180 1,193. 72 24. 28,649.29 97.99 Preventative Maintenance Bald Eagle 1181 1,149.8 24. 27595. 11 97.99 Preventative Maintenance Bald Eagle 1182 37772 24. 9,065.33 97.99 Preventative Maintenance Bald Eagle 1183 1,394.5 24. 33,468.09 97.99 Preventative Maintenance Bald Eagle 1184 643.22 24. 15,43736 97.99 Preventative Maintenance Ash Street 1338 1, 173.25 28. 32,851.13 97.99 Preventative Maintenance Ash Street 1339 888.62 28. 24,881.29 97.99 Preventative Maintenance Vaughan Co 1167 222.87 28. 6,240.42 98.19 Preventative Maintenance Holly Driv 976 3,463.97 24. 83,135.40 99.00 Preventative Maintenance Red Fox Ro 1150 305.39 26. 7,940.26 99.44 Preventative Maintenance Fox Cove 1152 338. 26. 8,788.00 99.44 Preventative Maintenance Fox Hollow 1153 163.53 26. 4,251.84 99.44 Preventative Maintenance 2nd Avenue 9 338.22 40. 13,528.97 99.57 Preventative Maintenance 2nd Avenue 10 331.36 40. 13,254.37 99.57 Preventative Maintenance 2nd Avenue 11 333.44 40. 13,33758 99.57 Preventative Maintenance 2nd Avenue 12 1,457.36 40. 58,294.39 99.57 Preventative Maintenance 2nd Avenue 13 319.66 40. 12,786.35 99.57 Preventative Maintenance 2nd Avenue 14 343.35 40. 13,733.91 99.57 Preventative Maintenance 2nd Avenue 15 318.29 40. 12,731.72 99.57 Preventative Maintenance 2nd Avenue 16 483.67 40. 19,346.81 99.57 Preventative Maintenance 2nd Avenue 17 342.23 40. 13,689.35 99.57 Preventative Maintenance 2nd Avenue 18 308.67 40. 12,346.71 99.57 Preventative Maintenance Glenview A 242 494.56 27 13,353. 15 99.57 Preventative Maintenance Glenview L 247 324.6 27 8,764.14 99.57 Preventative Maintenance Parkview D 690 501.41 27. 13,538. 14 99.57 Preventative Maintenance Glenview L 984 824. 14 27 22,251.78 99.57 Preventative Maintenance Aqua Lane 1006 650. 24. 15,600.00 99.57 Preventative Maintenance Elm Street 1030 455.49 28. 12,753.62 99.57 Preventative Maintenance Elm Street 1031 411.23 28. 11,514.37 99.57 Preventative Maintenance Red Fox Ro 1149 196.09 26. 5,098.27 99.57 Preventative Maintenance Kelly Stre 1204 832.37 32 26,635.68 99.57 Preventative Maintenance Kelly Stre 1205 952.53 32 30,480.99 99.57 Preventative Maintenance Shelia Ave 1206 483.84 32. 15,482.88 99.57 Preventative Maintenance WSB Pavement Management Report Page j42 Street Name Section ID Length (ft) Width (ft) Area (ft2) PCI Recommended Maintenance Activity Timothy Co 1207 201.99 32. 6,463.69 99.57 Preventative Maintenance Kelly Stre 1208 380.12 32. 12,163.84 99.57 Preventative Maintenance Wayne Cour 1209 201.33 32. 6,442.55 99.57 Preventative Maintenance Kelly Stre 1210 620.81 32. 19,865.94 99.57 Preventative Maintenance Kelly Stre 1212 891.1 32. 28,515.28 99.57 Preventative Maintenance Butternut St TBD 513.45 28. 14,376.60 99.98 Preventative Maintenance Redwood Ct TBD 344.61 28. 9,649.08 99.98 Preventative Maintenance Cypress St TBD 2,488.42 28. 69,675.76 99.98 Preventative Maintenance Rosewood St TBD 1,459.37 28. 40,86236 99.98 Preventative Maintenance Rosewood St TBD 1,388.84 28. 38,887.52 99.98 Preventative Maintenance 21st Avenu TBD 471.8 28. 13,210.40 99.98 Preventative Maintenance 21st Avenu TBD 284.42 28. 7963.76 99.98 Preventative Maintenance 21st Avenu 1352 488.71 28. 13,683.94 99.98 Preventative Maintenance 21st Avenu 1355 238.36 28. 6,673.95 99.98 Preventative Maintenance WSB Pavement Management Report Page 143 Table B.2. List of private roadways not inspected. Name Section ID Length 82ndStE 1281 914.91 Apollo Ct 1288 1054.37 Apo/lo Dr 1272 1399.03 Apple Ln 1278 87236 Aqua Cir 1310 263.75 Baldwin Cr 1279 499.07 Baldwin Cr 1280 196.48 Baldwin Cr 1314 17264 Baldwin Cr 1315 49764 Baldwin Cr 1316 171.18 Cherry Ln 1313 6423 Ivy Ridge Ct 1311 33241 Ivy Ridge Ct 1312 513.85 Ivy Ridge Ct 1317 188.48 Ivy Ridge Ct 1318 1,53275 Market PI 399 241.22 Market PI 1286 1511.24 Market PI 1287 794.29 Market PI 1319 643.49 Morgan Ln 1283 55786 Morgan Ln 1285 47705 Nancy Ct 1305 579.09 Otter Lake 1273 1494.06 Plum Ln 1276 925.15 Shetland Ln 1284 461.08 Willow Pond TrI 1271 1,101.64 Willow Pond Trl 1300 304.84 Willow Pond Trl 1301 27295 Willow Pond Trl 1302 217.39 Willow Pond TrI 1303 315.45 Willow Pond Trl 1304 228.02 WSB Pavement Management Report Page 44 Table B.3. List of gravel roadways not inspected. Name Section ID Length 74th Street 1188 62795 74th Street 1189 36698 74th Street 1257 25694 Cedar Street E 1251 1,30211 Cedar Street E 1252 888.22 Channel Dr 1277 393.48 E/mcrestAvenue 1185 243.42 E/mcrestAvenue 1186 621.95 ElmcrestAvenue 1330 5,574.6 Elmcrest Avenue 1331 2,602.23 E/mcrestAvenue 12336 3,553.62 Pine Street 1321 1,629.99 Pine Street 1322 2,9979 MI .4111 kb Raw 11111MEM issimi8.111111111 11111711.118111111111811111111111111111 Countyt.Kwy.i4 .A friari ..II wir• AM 11111111=111Wi 111411111111111111117 11111119111E I. l'se wit 1W-- ' Mill & Overlay Year m.o. 2020 2018 2019 2021 2022 3 0 cu NJ c P- 3 0 -a CITY LINOL C.,. .4.. 0 F KES Figure 2 - Mill and Overlay Lino Lakes PMP Lino Lakes, MN A 0 4,250 =:=1Feet 1 inch = 4,250 feet WSB WSB - Engineering • Planning ■ Environmental • Construction & Associates, Inc. February 8, 2018 City of Lino Lakes Mr. Michael Grochala 600 Town Center Parkway Lino Lakes, MN 55014 Re: Engineering Proposal for the 2018 Mill and Overlay Project Dear Mr. Grochala: 701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 Tel: 763-541-4800 Fax: 763-541-1700 The City of Lino Lakes has a Pavement Management Plan which recommends preservation of local roadways based on their OCI ratings. The proposed 2018 Mill and Overlay Project (roadway preservation) includes: Mill and Overlay • Ware Road (6365 LF) Total Estimated Cost - $415,000 Project scope to include minor curb and gutter replacement and storm sewer repair • Brandywood Estates (4610 LF) Total Estimated Cost - $300,000 Whitetail Trail, White Oak Road, Buckthorn Lane, Chokecherry Road, Velvetleaf lane Project scope to include minor curb and gutter replacement and storm sewer repair Based on the City's existing street maintenance plan and discussions with staff, WSB would perform the following tasks: I. Prepare Final Project Plans/Maps Final construction plans will be prepared for the milling and overlaying of the above listed roadways. Topographic information will be collected by a combination of field survey, city parcel map information and Lidar contours. Construction plans necessary for the contractor to build the roadway to specifications will be prepared. RCWD, Ramsey County and Anoka County permits will be obtained for the project. Minneapolis • St. Cloud Equal Opportunity Employer Mr. Michael Grochala February 8, 2018 Page 2 II. Final Quantities An Engineer's Opinion of Probable Cost will be completed on the final construction plans and specifications. III. Prepare Permits, Specifications and Bidding Documents WSB will work with impacted property owners through the project design. WSB will prepare permit applications and submit to the appropriate regulatory agencies. WSB will develop the final project plans/maps and specifications based on the agency review comments. This task will include an internal QA/QC review of the final plans, quantities, and specifications. Upon completion of permitting, and agency review and approval, a final set of construction documents will be prepared for bidding. WSB will print, assemble, and submit the final contract documents to the City and request authorization to advertise the project for bidding. WSB will receive and respond to bidder inquiries concerning the plans, specifications, and intent of the project. Logs of all inquiries will be kept and maintained to document inquiries. WSB will attend the project bid opening with the City. WSB will review the low bidder's bid proposal, contractor's and subcontractor's personnel proposed for the project and relative experience, quality and availability of equipment and performance on similar projects. The engineering fee to complete the 2018 Mil and Overlay Project is $43,978.00 (not to exceed). This letter represents our complete understanding of the 2018 Mill and Overlay Project and the proposed scope of services. If you are in agreement with the scope of services and proposed fee, please sign in the appropriate space below and return one copy to us. If you have any questions about this proposal, please feel free to call me at 763-287-7167. Mr. Michael Grochala February 8, 2018 Page 3 Sincerely, WSB & Associates, Inc. Edward C. Youngquist Project Manager ACCEPTANCE: The City of Lino Lakes hereby accepts the WSB proposal of $43,978.00 for all services outlined in this letter. City of Lino Lakes Name Title Date tVB ae.aaaw. are. Budgeted Hours 2018 Road Improvement Project Mill and Overlay -Ware Rd / Brandywood Estates City of Lino Lakes Anoka County nIlirly Ca 0 Total Direct Lab,, Cars 160.00 152.00 143.00 94.00 126.00 95.00 17200 13700 32,288.00 58,460.00 122,176.00 53,230.00 13,440.00 S4}84.00 TOTAL BASE PROJECT COST $ 43,978.0 Base Estimated Hours Cost Associate/ Principal RLS Project Manager Project Engineer Engineering Specialist V Graduate Engineer IV 2 -Person Survey Crew Office Technician Total Hours Tok Dornption 1 PreWdnary Design A. Kickoff meeting 2 2 2 6 1 726.00 B. Assess existing conditions 4 8 8 20 S 2,332.00 C. Assess culverts/drainage S__ _ _ D. Propose best value solution for payment & C&G 1 - E. Propose best value solution for stoat sewer S - F. Detemnine potential areas and types of water quality imp. 1 - G. Detenno if other rehab necessary 1 H. Review televising tapes S I. Review soil borings discuss pavement solutions 2 2 4 S 378.00 J. Collect background data and private utility w& 4 8 12 1 1.384.00 K. Prepare preliminary opinion of probable cost 8 8 16 1 1.512.00 L. Create funding;sssessment roll 1 M. Maps/graphics for meetings/report 1 - N. Neigborhood meeting (61) S - 0. Prelim may (feasibility) Report Preparation 1 - Subtotal 6 24 18 10 58 S 6,33100 2 Preliminary Survey A. Topographic Survey (estimate by others) 20 20 5 3.440.00 Subtotal 20 20 $ 3,440.00 3 Deign A. Final Plans 1. Fisting Conditions Plan?opo Base Map 4 32 36 1 4,408.00 2. Removals/Demolition Plan 1 - 3. Traffic Control/Detour Plan 6 10 16 S 1.824.00 4. Street Min/Overlay Plans 10 76 86 S 10,516.00 5. Storm Sewer Repan 4 14 18 1 2,140.00 6. Sealcoat Plans 5 - 7. Woe, Quality Improvement Plan (Infiltration Area) 1 - 8. Stemmata Modeling (HydroCad) S - 9. Utility Details Plan (Sanitary/Storm) S - 10 Construction Specifications 8 16 12 36 1 3,916.00 11 Misc. Sheets (Tide/Details/etc) 10 10 $ 1260.00 B. SWPPP Plan 1 I. Prepare PW 1 - 2. Prepare report $ - C. Meetings 1 - I. Plan and specification meeting with City (#2) 6 6 12 $ 1,422.00 2 Neighborhood meeting (42) S D. Bidding Administration 1 - 1. Website creation and meitenance 2 2 2 6 1 630.00 2. Advertise bids 2 4 4 10 1 1210.00 3. CreateT Onbute Bid Package 2 4 6 S 736.00 -3 Respond to RFIs from prospective bidders 4 4 8 1 880.00 5. Issue addenda. if rey'd 4 2 4 10 S 1,11400 6. Bid Openinarrabulate results 2 4 6 S 736.00 7. Letter of Award recommendation to City 2 2 4 S 46200 8 Prepare Notice of Awad and Contract 2 2 2 6 S 748.00 Subtotal 10 60 148 20 32 270 1 32,002.00 8 Special Services' '411 Special Services are categorized as pass through items A. Permits 1. Anoka County 2 4 6 S 692.00 2. Ramsey County 2 4 6 S 692.00 B. Soil Borings & Coordination 2 2 4 8 S 820.00 C. Materials Testing & Coordination S - Subtotal 6 18 4 20 S 2,204.00 Total Hours 16 90 176 34 20 32 368 S 43,978.00 nIlirly Ca 0 Total Direct Lab,, Cars 160.00 152.00 143.00 94.00 126.00 95.00 17200 13700 32,288.00 58,460.00 122,176.00 53,230.00 13,440.00 S4}84.00 TOTAL BASE PROJECT COST $ 43,978.0 aim fNNW, 111-1 tNW[ !Id 6. CITY`; OF LNQL__KES Figure 1 - Full Depth Reclaim/Reconstruction Lino Lakes PMP Lino Lakes, MN A 0 4,250 Feet 1 inch = 4,250 feet Reclaim Year 2018 2021 A WSB ) ) Site Location Map 2018 Road Improvement Project Lino Lakes, MN