HomeMy WebLinkAbout08/02/2018 EDAC PacketCITY OF LINO LAKES
ECONOMIC DEVELOPMENT ADVISORY COMMITTEE MEETING
Thursday, August 2, 2018
8:00 A.M.
Community Room
AGENDA
CALL TO ORDER AND ROLL CALL
2. APPROVAL OF MINUTES. June 7, 2018
3. DISCUSSION ITEMS
A. Lyngblomsten Senior Community
B. Project Updates
4. ADJOURN
CITY OF LINO LAKES
ECONOMIC DEVELOPMENT
ADVISORY COMMITTEE
MINUTES
DATE: June 7, 2018
MEMBERS
PRESENT: Andrew Cravaro, Thomas Colgan, Patrick Kohler, Don Johnson, Michael
Ruhland, Julie Schwartz
MEMBERS
ABSENT: Chad Wagner, Jim Schueller, Nathan Vojtech
OTHERS PRESENT: Mike Grochala, Mara Strand, Ryan Saltis, Bruce Sayler (Connexus Energy
Principal of Community and Economic Development)
APPROVAL OF MINUTES
It was moved by Mr. Kohler to approve the minutes from May 3, 2018 and seconded by Mr.
Cravaro, passing unanimously.
DISCUSSION ITEMS
A. Anoka County Economic Development Initiative -
Mr. Grochala introduced and explained the background regarding Anoka County
Economic Development Initiative and described Greater MSP.
Mr. Bruce Sayler from Connexus Energy was present. A SWOT analysis was recently
conducted. Focus has been on the southwest metro. Anoka County does not have a point
person, cities meeting to form goals and expectations for this new position, central
website/database improvement, work direction given from Directors within the cities.
Ms. Schwartz asked why the south metro is more attractive. Mr. Sayler stated geography
and interstate access are big factors. Mr. Cravero stated access to fiber.
Mr. Sayler explained how the ripple effect would be beneficial if businesses did not land
in the City of Lino Lakes directly. (Ex: If businesses were developing in Blaine it could
boost the economy for Lino Lakes indirectly through housing demands and neighboring
business) A win is considered when a business moves from outside Anoka County into
our County.
Mr. Ruhland asked about the website. MNCAR is a national database that will focus on
Anoka County. Ms. Schwartz asked why the decision was MNCAR. Anticipated roll -out
date for the website is by the end of June.
Ms. Schwartz suggested involving the community for logo and tag line suggestions.
B. Private Activity Tax -Exempt Financing Guidelines
Conduit Box — state law allows City to issue bonds for some private entities, mostly non-
profits that meet certain regulatory conditions. There is no risk to the City for issuance.
Mr. Grochala asked if the City should promote this option? Mr. Cravaro asked about the
1% administrative fee. The City often has capacity to accommodate these requests when
annual City bonding is under $10 million. Mr. Ruhland asked how often the $10 million
cap is reached. Mr. Grochala stated about every 5 years.
The Board voted unanimously to recommend use of this opportunity.
C. Project Updates
Lyngblomsten
City Council was supportive of the project and Lyngblomsten will be submitting and
application for PUD Concept Plan Review in June. The group will also be setting up a
neighborhood meeting as part of the process. The concept plan does not currently
include the corner. The City may need to help facilitate possible redevelopment of the
corner lots. The City engineer is working on plans for the extension of utilities to the
site.
Mr. Ruhland asked about the construction time line. Mr. Grochala stated the main
building would take about a year to construct. The whole project would likely buildout
over 2-3 years. Lyngblomsten is still deciding on whether to rent or sell townhomes.
Watermark
Grading is proposed to begin on southern part of the property in 2 weeks. The master
plan includes a total of 864 residential units.
Mr. Colgan asked about the staff capacity. Mr. Grochala stated the City is including a
building inspector in 2019.
Ms. Schwartz asked if there was any interest from businesses because of the increased
housing. Mr. Grochala stated that he does not know of any peaked interest specifically
because of the increase in housing units within the City. However, several developers
have inquired on the status of the Watermark project.
ADJOURNMENT
The meeting was adjourned at 8:53 A.M.
ECONOMIC DEVELOPMENT ADVISORY COMMITTEE
AGENDA ITEM 3A
STAFF ORIGINATOR: Michael Grochala, Community Development Director
EDAC MEETING DATE: August 2, 2018
REQUEST: 49 & J Development Interest - Lyngblomsten Senior
Community
CASE NUMBER: PC2018-002
APPLICANT: Lyngblomsten
Attn: Jeff Heinecke
1415 Almond Avenue
St. Paul, MN 55108
OWNERS: R.L. Co., LLC
7241 Ohms Lane, Suite 275
Edina, MN 55439
BACKGROUND
Lyngblomsten, a senior care provider, has submitted a concept plan for review. The Planning
and Zoning Board reviewed the proposal in July. A copy of the staff report is attached.
Currently, the proposal does not include redevelopment of the corner. Staff is continuing to
discuss potential redevelopment with the developer. Redevelopment may require some
assistance from the City. Both Tax Increment Financing and Tax Abatement are potential tools
to address land acquisition or public improvements to facilitate redevelopment.
EDAC CONSIDERATION
Staff is requesting EDAC comments regarding the concept plan for the site. Staff is also seeking
interest from the board on the redevelopment of the corner.
ATTACHMENTS
1. Planning and Zoning Board Staff Report dated July 11, 2018
PLANNING & ZONING BOARD
AGENDA ITEM 5A
STAFF ORIGINATOR:
P & Z MEETING DATE:
REQUEST:
CASE NUMBER:
APPLICANT:
OWNERS:
REVIEW DEADLINE:
Kendra Lindahl, Landform
July 11, 2018
PUD Concept Plan Review
Lyngblomsten
PC2018-002
Lyngblomsten
Attn: Jeff Heinecke
1415 Almond Avenue
St. Paul, MN 55108
R.L. Co., LLC
7241 Ohms Lane, Suite 275
Edina, MN 55439
Complete Application Date:
June 11, 2018
60-Day Review Deadline:
August 10, 2018
120-Day Review Deadline:
October 9, 2018
Environmental Board Meeting:
June 27, 2018
Park Board Meeting:
July 2, 2018
Planning & Zoning Board Meeting:
July 11, 2018
Tentative City Council Work Session:
August 6, 2018
Tentative City Council Meeting:
August 13, 2018
BACKGROUND
The applicant has submitted a land use application for a Concept Plan review. The
proposed development is for a senior living campus with a continuum of care at the
northwest corner of CSAH49/Hogdson Road and CSAH 32/Ash Street/County Road J.
The campus will include a restaurant and a mix of 30 detached townhomes plus 200 units
of independent living, assisted living and memory care/enhanced care suites. The
applicant is still reviewing whether the townhomes will be rental or for sale units.
The applicant intends to purchase the 17.18 acres of property owned by R.L.Co., LLC
and considering acquisition of the adjacent liquor store and insurance buildings.
The site plan as currently configured only includes development on the 17 acre R.L. Co.
site. However, the applicant has included a conceptual layout for future commercial and
parking on the neighboring insurance, liquor store, and 49 Club property. The city will
need to ensure that any site approvals allow for access and compatible transition to these
properties.
The City reviewed a different developer's concept plan in March of this year, but the
applicant withdrew the application after hearing the P&Z concerns/comments. The
applicant has reviewed the comments from the previous applications and has tried to
address them with this concept.
The subject property is guided mixed use and will follow the standards of the "Hodgson
Road and CR J Master Planning Study" that was approved by Council in 2007. The P&Z
Board reaffirmed the vision of the master plan as part of the 2040 Comprehensive Plan
update.
ANALYSIS
Existing Site Conditions
The 17.33-acre site is currently an undeveloped parcel adjacent to single-family
residential development on the north and west and a mix of industrial and commercial
uses to the east and south. The MLCCS shows that land cover is a mix of forest,
cultivated, and herbaceous groundcover. A wetland is shown by the applicant in the
northwest corner of the site. Aerial photos show that a large portion of the site is covered
by trees. A three-phase overhead power line runs along the eastern boundary of the
property line within the right-of-way.
Zoning and Land Use
Current Zoning
GB, General Business
Current Land Use
Single Family Residence (rental)
2030 Future Land Use
Mixed Use
(Hodgson and County Road J Master Plan)
Utility Staging Area
Stage IA (2008-2015)
Hodgson Road & CR J Master Planning Study
The property is guided by the Hodgson Road & CR J Master Planning Study (the Master
Plan), which was approved in 2007, adopted as part of the 2030 Comprehensive Plan and
will also be incorporated into the 2040 Comprehensive Plan. The Master Plan anticipated
a mix of residential and commercial uses on the site, specifically noting that the mixed
2
use district "would allow for, though not mandate, the inclusion of residential units,
possibly in multi -story buildings. This would provide customers for the commercial
development, and the commercial services would be convenient to the residents."
The Master Plan had four objectives:
1. Identify appropriate land uses (present and future) in the study area
2. Plan for road improvements to provide good access and circulation
3. Identify routing & Phasing solutions for utilities to facilitate future
development
4. Plan for redevelopment while recognizing existing businesses.
The Master Plan identified planning and redevelopment requirements related to site
configuration, transportation and access, trails and open space, municipal utilities, site
design and urban form and stormwater management that should be incorporated into
proposed developments. These standards are discussed in the body of this report.
The Master Plan generally envisions townhome housing on the north and west portions of
the site with a mix of residential and commercial uses southern portions of the site. The
Master Plan also envisions a mix of residential and commercial housing on the parcel
across the street from the proposed project.
The Master Plan notes that "individual site layouts and uses are to be determined as part
of the development review process." While the proposed plans do not propose
commercial development on the eastern side of the property, adjacent to Hodgson Road,
they do show commercial development on the southern portion of the site including a
restaurant that is intended to be built by this developer and future commercial by a
different land owner. Additionally, this type of senior living campus does serve as an
employment center for the staff. The City has previously treated assisted living facilities
as commercial uses in both the Legacy development (Lino Lakes Assisted Living) and
with Gracewood Assisted Living. The Master Plan gives the City flexibility to approve
master plans that meet the purposes and intent of the Master Plan. Therefore, the Council
could approve these residential uses on this portion of the PUD and continue to plan for
commercial uses south and east of the site in the future.
Land Use and Housing Density
The Master Plan assumed that approximately half of the area would develop with
residential uses at approximately 10 units per acre overall. The Comprehensive Plan
identifies a density range from 8 to 15 units per acre for the Mixed Use District. The
proposed development would have a net density of 14.46 units per acre on site, which is
consistent with the Comprehensive Plan.
The plans proposed by the applicant are generally consistent with the uses identified in
that portion of the master -planned area. They include a mix of housing types. The
proposed building density and massing provides an effective transition from the lower
profile townhomes, adjacent to exiting residential, to larger, higher density uses to the
south and east, along Hodgson Road.
Site Plan
The proposal includes 30 single level detached townhomes around the perimeter of the
site. This will provide a nice transition from the existing single family homes on the
north and west to the continuum of care building on the east side of the site.
The continuum of care building includes three separate wings: a 4-story, 100-unit
independent living apartment, a 3-story, 50-unit assisted living facility and a 2-story, 48-
unit skilled nursing/memory care component.
The site design transitions from single story townhomes on the west to the 2-level skilled
nursing wing with the 3- and 4-story buildings closest to Hodgson Road.
No details have been provided for the 6,000-square foot restaurant at this time, but the
applicant intends to acquire the property and is working with a user to construct the
restaurant as part of this project. More details are expected with the preliminary
plat/PUD application.
Architecture
The Hodgson and CR J Master specifies architectural standard for development. The
applicant has made a good effort to show intent to comply with those standards. The
Master Plan states that buildings should emphasize articulated architecture on all facades
of the building and design elements that include an expression of a building base of brick
or stone, a middle, and a top with cornice elements. Section 1007.43(2)(b) of the Zoning
Ordinance provides more detailed standards for townhome development. Specifically, the
Zoning Ordinance requires a minimum 18" overhang on gabled roof and variation in
building materials. The Ordinance limits use of one type of exterior finish to 75% of the
building and requires a minimum of 25% of the structure be finished with brick, stucco,
and/or natural or artificial stone.
Senior Building
The building layout was designed to limit blank walls facing the street and the concepts
drawing provided give some idea of the building architecture. The separate wings of the
building help to break up the massing as well as transition intensity from west to east on
the site. The building elevation appears to include a variety of exterior materials and
articulation. Addition of a stronger base element should be considered.
Detached Townhomes
A formal townhome design is still being prepared. An example of the unit type and
concept drawing where provided. However, there is not enough detail to provide
meaningful feedback at this time The P&Z Board may wish to provide feedback on the
2
architectural concepts as submitted. Staff suggests that the product proposed for the site
should incorporate both a variation of materials as well as color. Garages fronts should
be in line with the building structure or setback. Building rears facing public streets
should also include a level of architectural treatment similar to building fronts. As a
guide staff would further suggest that design incorporate the following:
1. At least (2) unique architectural treatments for each housing model be provided.
2. The treatments should differ in each of three categories: a) facade color or siding
material, b) window pattern and trim detail; and c) porch, or entryway detailing.
Parking
The Zoning Ordinance requires a minimum number of parking stalls per use, as follows:
• Townhome, Quadraminium, Manor Home, Multiple Family Dwellings, and Mobile
Homes within Mobile Home Parks. At least two and one-fourth (2-1/4) rent-free
spaces per unit. In projects involving eight (8) or more units, the City may require
additional clustered guest parking spaces based upon calculation of required demand.
• Elderly (Senior Citizen) Housing. Reservation of area equal to one (1) parking space
per unit. Initial development is, however, required of only one-half (1/2) space per
unit and said number of spaces can continue until such time as the City Council
considers a need for additional parking spaces has been demonstrated.
• Rest Home, Nursing Home, Convalescent Center, or Institution. One (1) space for
each six (6) beds based upon maximum design capacity, plus one (1) space for each
two (2) employees.
• Restaurants, Cafes, Private Clubs Serving Food and/or Drinks, Bars, On -Sale
Nightclubs. Ten (10) spaces for each one thousand (1,000) square feet of dining
room, plus one (1) space for each employee of the maximum work shift.
It appears that the townhome units meet the parking requirements. The continuum of care
complex has a mix of 105 surface parking stalls (plus 5 at the club house) and some
underground parking. The 6,000-sq. ft. restaurant with 1,400-sq. ft. patio incorporates an
additional 62 stalls. Dining area and staffing levels will need to be determined to verify
conformance with the standards. Staff would suggest that consideration be given to shared
parking with the senior center if possible. This would minimize impervious areas while
better utilizing the parking provided. Consideration could also be given to providing on -
street parking along the private east -west roadway immediately north of the restaurant..
Transportation Plan
Goals of the Transportation Plan include providing connectivity, improving traffic flow,
ensuring safety and street maintenance and coordinating transportation systems with
adjacent jurisdictions.
5
The proposed development shows two new accesses on Hodgson Road and a future
access on County Road J as anticipated in the Master Plan. The project includes a loop
road that creates a public street connection from the northern access to County Road J
when the adjacent land develops. Staff recommends that this internal loop road be a 32-
foot wide street. The typical City right-of-way in the City is 60 feet. If the developer
wishes to provide a reduced right-of-way, they will need to show that sidewalks can be
incorporated. Roads will also need to be wider at the approach to Hodgson to allow for
left and right thru-turn lanes. The street serving the townhomes could be allowed as a 26-
foot wide private drive. The plans should be revised to ensure that these internal
streets/drives meet at 90 degrees for public safety and sight visibility.
Parking is permitted on one side of the public street, but is not permitted on the private
drive within the townhome area. The applicant must ensure a minimum of 22 feet
between the townhome garage and the adjacent sidewalk to ensure adequate vehicle
space in the driveway without spilling into the street or sidewalk areas. Generally, the
City requires a 6-foot boulevard between the street and the sidewalk to ensure adequate
space for vegetation to grow. Staff will work with the applicant on the final design.
The plans also provide additional right-of-way for Hodgson Road improvements. The
Comprehensive Plan identifies the Hodgson/County Road J intersection as a congested
area of concern with the existing traffic volumes. The applicant will need to complete a
traffic study prior to submittal of a preliminary plat.
Anoka County is analyzing the corridor to determine the final alignment. The applicant
should work with the City and County to ensure that right-of-way dedication for Hodgson
is consistent with County plans.
The concept plan is generally consistent with the plan for this area, but the applicant must
work with the City to finalize the design. The City Engineer's memo is attached and it
notes several items that must be addressed if this project proceeds.
Parks, Trails and Open Space
The Draft 2040 Comprehensive Plan shows the continuation of the off -road trail
constructed on the property to the west being extended through the site to Hodgson Road
where it will connect to an on -road trail that will be constructed with this project. The
Master Plan redevelopment requirements note that an "enhancement corridor" is
identified on the site in the Parks, Natural Open Space / Greenways and Trail system
plan. The plan also notes that there should be a focal point greenspace where the trail
enters the site. The concept plan provided does not show a trail connection from this
location.
The plans do show a trail along Hodgson Road, consistent with the Master Plan and
Comprehensive Plan, and sidewalks within the project. A private amenity space for
development residents, including a club house with recreation space is also provided.
71
No future neighborhood park is identified per the City's plan. The Park Board will need
to determine if park improvements should be incorporated into the site, in addition to the
trail.
Required Screening, Landscaping and Buffer Yards
Greenspace buffering is identified an important design element along property boundaries
with single family residential developments. The applicant has not provided a tree survey
of the site; however, it appears that there are significant trees located on the property. The
applicant should preserve as much existing tree cover as possible. Previous reviews have
suggested that the site design incorporate a minimum 20-foot wide buffer along north and
west sides and staff recommends an additional 25-foot building setback from the buffer
line.
The applicant's plans do show preservation of trees along the western property line
through the use of 50-foot structure setback, but ultimately the new street will shift to the
western property line as it approaches County Road J. The plans show a 30-foot setback
on the north, which may allow some tree preservation. The applicant should work to
increase this setback if possible or prepare a landscape plan that provides a transition
between the existing homes to the north and the single level townhomes proposed.
In addition to tree preservation and buffering, the applicant will be required to comply
Section 1007.043 (17) of the Zoning Ordinance which provides standards for
landscaping, buffering, and screening. Specifically, the applicant should note that
townhomes and multi -family developments are required to install 1 tree per 70 feet of
linear feet of road frontage and require open areas to be landscaped.
Stormwater Management and Erosion and Sediment Control
The Master Plan requires developers to provide filtration and infiltration elements such as
rain gardens, swales, dry creeks, infiltration chambers and other ecologically based
methods along with more traditional ponds and pipes. The Master Plan also stipulates that
stormwater management ponds should be designed as a site amenity, including
appropriate landscape elements. The plans show preservation of the wetland in the
northwest portion of the site and two treatment ponds near the townhomes. More detailed
stormwater plans will be provided with the preliminary plat. A wetland delineation has
not yet been provided to the city and must be completed prior to the in preliminary plat
submittal.
Utilities
New public water, sanitary and storm sewer utilities are required to serve the
development. The Master Plan requires municipal utilities for developments on this site,
and provisions that water trunk lines must be looped. The proposed plans would provide
for extension of public utilities to serve the site and abutting uses. The City Engineer's
memo includes detailed comments and requirements.
7
Sanitary Sewer
The City has studied the sanitary sewer in this area and plans for a forcemain and lift
station improvement are being developed now. The development could be served with
gravity sewer that would flow southwest to the planned lift station.
Wntarmnin
There is currently no water main serving the site. The City is developing plans for a trunk
watermain improvement that would serve this site and would be extended from through
the development from Woodbridge Lane to Hodgson Road and looped.
Powerline
A three-phase overhead power line runs along the eastern boundary of the property line
within the right-of-way. Section 1007.024, 3 of the Zoning Ordinance states that all
utilities serving a two family and townhome development, including telephone,
electricity, gas, and cable, shall be installed underground. Consideration to burying the
three phase power line should be given in coordination with any proposed Hodgson Road
improvements.
Public Safety
The Police Department has reviewed the plans. The attached memo notes that a traffic
study must be completed to ensure traffic safety at the proposed access points. More
detailed comments will be provided regarding lighting, access, etc. with the preliminary
plat application.
Next Steps
If the request is approved, the next step would be a land use application for Rezoning
from GB (General Business) to PUD (Planned Unit Development) and PUD
Development Stage/Preliminary Plat review.
SUMMARY
The proposed plans generally meet the goals, policies and standards of the
Comprehensive Plan and the Hodgson Road and County Road J Master Plan.
Construction of residential homes will support and catalyze future commercial
development in the area, including the restaurant planned by this developer. However,
there are a number of improvements to the plans that should be addressed to meet the
standards outlined in Hodgson Road and County Road J Master Plan, primarily:
• The applicant will need to provide pedestrian and bike circulation throughout the
development. Proposed pedestrian and trail connections and design should be
consistent with the Master Plan and Comprehensive Plan.
N.
• The applicant will need to design the site to preserve the tree coverage, with a
focus on preserving a 20-foot tree buffer or adding a landscape buffer along the
property lines to the north and west as well as on Hodgson Road adjacent to the
townhomes.
• The site should be designed to incorporate stormwater treatment as amenity
features of the development.
• The Master Plan envisions a more urban form. Therefore, the applicant may shift
the continuum of care facility to the east. Consideration should be given to bury
the power lines to accommodate the reduced setbacks along Hodgson for these
buildings.
• A transportation study will be required to evaluate required improvements at the
intersections serving the site. Additional right-of-way will be needed and
improvements (including turn lanes) are anticipated along Hodgson.
• This development will loop water through the site and sewer will be gravity fed to
the planned lift station to the southwest.
• A higher level of architectural treatment is expected on the buildings for this
development. The applicant should explore architectural treatments that will
incorporate a greater variety of materials, building articulation, and colors so that
the different buildings within the development are compatible but have some
variety.
RECOMMENDATION
The applicant is requesting comments on this sketch plan. Any comments given by the
Planning & Zoning Committee are advisory in nature and non -binding. While the
comments are non -binding, the applicant will consider the comments from the City when
they prepare their formal submittal.
ATTACHMENTS
1. Aerial Location Map
2. CR 49 and J Master Plan Concept
3. Police Department memo dated June 26, 2018
4. WSB/City Engineer memo dated June 28, 2018
5. Applicant's Narrative
6. Applicant's Concept Plan
7. Senior Center Elevations
8. Town Elevations
9
t
- - - - --- I -
S:�
C O F
LNC1 KES
� AR
Lino Lakes Public Safety
Police Division
Memorandum
TO: Director John Swenson
FROM: Sergeant Curt Boehme
DATE: June 26, 2018
RE: Lyngblomsten Senior Housing Complex — CPTED Review
Director Swenson,
The concept plan for the Lyngblomsten Senior Housing Complex proposes the purchase of the
approximate 17.18 acre site at the northwest corner of Hodgson Rd and Ash St. A four story, 200 unit
apartment style building offering facilities for independent senior living, assisted living, memory care,
short-term transitional care and enhanced care suites/long-term nursing care would be built on the east
side of the property near Hodgson Rd. On the west side of the development, 30 stand-alone senior
living townhomes would be constructed. The plans call for two access/egress points to the
development off of Hodgson Rd with potential future road access to Ash St.
The concept plans contain limited information and therefore a thorough assessment cannot be
completed. As the project moves forward, a study should be conducted on how this development
would affect traffic on Hodgson Rd. Hodgson Rd is a SO mph, two lane highway with narrow shoulders.
The addition of the access/egress point would present a traffic safety issue if turn lanes, bypass lanes or
other highway improvements were not part of the development. Additionally, I would like to review
specific plans for the apartment buildings and lightings designs for the parking areas as they become
available.
Building a legacy —your legacy.
Memorandum
To: Katie Larsen, City Planner
From: Diane Hankee PE, City Engineer
Date: June 29, 2018
Re: Lyngblomsten
Concept Plan Review for the City of Lino Lakes
WSB Project No. R-012365-000
701 Xenia Avenue South
Suite 300
Minneapolis, MN 55416
Tel: 763-541-4800
Fax: 763-541-1700
We have reviewed the Lyngblomsten Concept Plan documents dated June 11, 2018, prepared by
Wold Architects. The proposed development is located on a 17.18 acre parcel located in the
proximity of the northwest quadrant of County Road J (Ash Street) and CSAH 49 (Hodgson
Road).
Engineering
• Grading, Erosion and Sediment Control
A concept plan including an aerial photo was provided. Wetlands are present on the site and
have not been delineated. A proposed grading plan was not provided in the submittal packet.
Comments:
1. A grading and erosion control plan will be required at the time of Preliminary Plat
submittal.
2. The existing wetland located in the northwest corner of the site will require protection
from erosion and sediment.
• Stormwater Management
The proposed stormwater management for the Lyngblomsten development consists of two
small ponding areas. It is presumed that conveyance to these basins will be through an
internal storm sewer system and overland swales.
Comments:
1. The City's stormwater ordinance shall apply. It should be noted that existing wetlands
may not be used to treat stormwater.
Equal Opportunity Employer
wsbeng.com
SACommonity DevelopmentTr jeetsTlanning Cases\Lyngblomsten\StaffReports\20180714 PZ Lyngblomsten CP\a4, 20180628 Engineering CPR-Lyngblomsten.drex
Ms. Katie Larsen
June 29, 2018
Page 2
2. The outlet for the ponding system is through an existing storm sewer system west of the
site between lots 21 & 22 block 2 of Woodridge Estates.
3. The plan does not appear to provide enough stormwater management on site. A formal
Stormwater Management Plan will be required at the time of Preliminary Plat submittal.
4. If infiltration is being considered as part of the stormwater management plan, soil
borings including infiltration data will be required as part of the Preliminary Plat
submittal.
• Water Supply
A concept utility plan for the Lyngblomsten development was not provided with this
submittal. Water service is currently only available to a portion of the southeast part of the
site.
Comments:
1. The City of Lino Lakes has studied the watermain infrastructure in this area. Plans for a
trunk watermain improvement are being developed at this time.
2. A watermain loop will need to be extended through the development connecting mains
along Hodgeson Road and County Road J/Ash Street.
3. The developer should work closely with the City Engineer to coordinate the design of
public and private utilities and their points of connection.
4. A utility plan for the development will be required at the time of Preliminary Plat
submittal.
• Sanitary Sewer
A concept utility plan for the Lyngblomsten development was not provided with this
submittal. Sanitary sewer service is not currently available to serve the area.
Comments:
1. The City of Lino Lakes has studied the sanitary sewer infrastructure in this area. Plans
for a sanitary sewer forcemain and lift station improvement are being developed at this
time.
2. The Lyngblomsten development could be served internally with a gravity sanitary sewer
system that would flow southerly to a lift station located just south of the development.
3. The developer should work closely with the City Engineer to coordinate the design of
public and private utilities and their points of connection.
4. A utility plan for the development will be required at the time of Preliminary Plat
submittal.
• Transportation
The Lyngblomsten development proposes two entrance off of CSAH 49 (Hodgson Road)
where a new internal roadway is anticipated to connect from Hodgson Road to County Road
S:\Community D—lopment\Pr jectsWlanning Cases\Lyngblomsten\Staff Reports\20180714 PZ Lyngblomsten CP\a4, 20180628 Engineering CPR-Lyngblomst
Ms. Katie Larsen
June 29, 2018
Page 3
J. Turning lanes are proposed be added to access the development from Hodgson Road.
Interior drives and parking areas are proposed.
The intersection of Hodgson Road (CSAH 49) and Ash Street/County Road J (CSAH 32)
has been identified in the City's Comprehensive Transportation Plan as a congested area of
concern with the existing traffic volumes.
Comments:
1. A Traffic Impact Study shall be prepared to provide an analysis of the existing LOS with
and without the proposed development as outlined in the City's Zoning Code.
2. The intersections that should be analyzed are:
• Hodgson Road (CSAH 49) at the proposed site entrance
• Hodgson Road (CSAH 49) at Ash Street/CR J (CSAH 32)
• Ash Street/CR J (CSAH 32) at proposed site entrance
• Ash Street/CR J (CSAH 32) at St Albans Street
3. The Traffic Study and proposed site accesses shall be reviewed and approved by Anoka
County. The proposed south access off Hodgson Road has been determined by Anoka
County to be a right-in/right-out access. This intersection shall be included in the Traffic
Study to determine the impact it will have on the adjacent intersections.
4. Future connection to County Road J will require participation and agreements with
property owners to the south. Said agreements must be in place and recorded as part of
the developer's agreement. Location and alignment of the southerly road extension must
be consistent with the Master Planning Study of Hodgson Road and CR J, approved by
Lino Lakes City Council on February 12, 2007.
5. The development shows the dedication of additional right of way along CSAH 49. This
right of way will need to be adjusted based on Hodgson Road future improvement
layouts. Review and approval by the Anoka County Highway Department will be
required.
6. There shall be a 32 foot wide internal public road that connects the north Hodgson access
to the south at CR J.
7. Private roadways shall be 26 foot wide.
8. A multi -use bituminous trail along CSAH 49 will be required from the north line of the
development to County Road J.
9. The north Hodgson Road access will be a future signalized intersection and the internal
roadway intersection shall be set back to accommodate. Aligned intersections is
preferred.
10. Internal road intersections shall be 90 degrees for a minimum of 100 feet to accommodate
turning for emergency services and site distances.
• Environmental
Based on the housing threshold, an Environmental Assessment Worksheet is not required.
• Floodplain
No Floodplain is present on the proposed Lyngblomsten development.
S:\Community D—lopment\Pr jectsWlanning Cases\Lyngblomsten\Staff Reports\20180714 PZ Lyngblomsten CP\a4, 20180628 Engineering CPR-Lyngblomst
Ms. Katie Larsen
June 29, 2018
Page 4
• Wetlands and Mitigation Plan
There is a wetland in the northwest corner of the Lyngblomsten development site.
Comments:
1. A current and certified wetland delineation report will be required at the time of
Preliminary Plat submittal.
2. If wetlands will be impacted due to development of the project, a mitigation plan will be
required at the time of Preliminary Plat submittal.
• Drainage and Utility Easements
The Lyngblomsten development appears to have internal drainage basins that would receive
stormwater from the proposed public streets.
Comments:
1. The city will require drainage and utility easements over storm sewer systems that
convey drainage from public right of way (including ponds and detention basins).
2. The city will require drainage and utility easements over sanitary sewer and water
systems.
• Development Agreement
The Lyngblomsten development will require a Development Agreement.
• Stormwater Maintenance Agreement
The Lyngblomsten development will require a Stormwater Maintenance Agreement with the
City of Lino Lakes.
• Permits Required
Permits from governing agencies will be required and determined through the preliminary
plat process.
If you or the applicant has any questions regarding these comments, please contact Diane
Hankee at (651) 982-2430 or diane.hankee@ci.lino-lakes.mn.us.
S:\Community D—lopment\Pr jectsWlanning Cases\Lyngblomsten\Staff Reports\20180714 PZ Lyngblomsten CP\a4, 20180628 Engineering CPR-Lyngblomst
June 11, 2018
The Site:
L'
The property is nestled in the northwest quadrant at Hodgson Road and County Road J in
Lino Lakes, Minnesota. This intersection is an important gateway into Lino Lakes with the
current appearance of this location in need of improvement. The hard corner is 2+ acres of
vacant land with two older structures to the north that house an insurance business and a
liquor store. Immediately north of those buildings is a 17.18 acre site that is mostly
wooded with an old single family house situated on the property. Property on the east side
of Hodgson Road is dominated by parking lots and automobile facilities with a rock garden
to the north of the automotive uses.
Lyngblomsten proposes to purchase approximately 17.18 acres on the northwest quadrant
of the property owned by R.L. Co., LLC located at 6075 Hodgson Road in Lino Lakes,
Minnesota, along with the insurance and liquor store buildings for the purpose of
developing a senior living community and facilitating the development of a stand-alone
restaurant. The vision is to create a vibrant continuum -of -care campus offering up to a
total of 200 units comprised of a mix of independent living, assisted living, and memory
care/enhanced care suites/skill nursing care plus complementary campus amenities and
30 stand along senior living townhomes.
The Project:
In alignment with the mission of Lyngblomsten and the demand for more senior housing in
the area, Lyngblomsten seeks to create a second campus offering a full continuum of
services for older adults. The majority of units would be independent and assisted living
for those age 62+. The market -rate units are planned to be mid -range in price, amenities,
and size (variety of 1- and 2-bedroom units), with a goal of serving people from a variety of
income levels. Overall, like we've done on our Como Park campus (St. Paul), Lyngblomsten
seeks to create a comfortable Christian home for older adults of all faiths and cultures that
is welcoming, creates community, values individual preferences, and promotes dignity.
Not only will this development address the shortage of senior housing in the area, but for
those wishing to continue living in their existing homes, services through 2nd Half with
Lyngblomsten that would be part of the Lino Lakes campus can help support their decision
to remain and their needs associated with that decision.
The preliminary plan for the site positions the restaurant building on the southern edge of
the site with the main senior housing building immediately north of the restaurant.
Townhomes will be built to the north and west of the main building providing lower
density and building heights adjacent to the single family neighborhoods. The townhomes
are setback from adjacent single family homes and existing wetlands in order to preserve a
significant amount of the site's mature trees and natural beauty of the site as shown on the
site plan. Underground parking spaces would be provided to accommodate the parking
needs of the residents in the independent living units. Parking for guests and staff would
be provided via a new surface lot, positioned in the middle of the site and buffered to
Hodgson Road by the main building and to the neighborhood by the townhome
development. Most likely a landscaped retention pond would be created to manage water
drainage, although other options are also being explored. Vehicular access to the property
would be from a new entrance off of Hodgson Road where a new internal roadway is
anticipated to connect to Hodgson Road and County Road J.
The proposed development is anticipated to provide:
• A four-story, continuum -of -care building that includes a Life Enrichment Center
(2nd Half with Lyngblomsten), Independent Senior Housing, Assisted Living,
Memory Care, Short-term Transitional Care, and Enhanced Care Suites or Long -
Term Skilled Nursing Care. The apartments would be a combination of one- and
two -bedroom units.
• Courtyards and balconies will afford fresh air, nice views, and enjoyment of the
outdoors
• Main floor town center offering amenities such as bistro style or fine dining, a pub, a
cinema, a chapel, a fitness center and a gift shop.
• Planned events and activities, including concerts with professional local musicians
• Heated underground parking for tenants
• Surface -level parking lot for visitors and staff
• Vehicular entrance from Hodgson Road
• Professionally landscaped grounds; outdoor spaces for tenants and visitors to enjoy
• Possible shuttle service to Lyngblomsten's Como Park campus for additional
amenities —concerts, art classes, etc.
• Walking and bike paths inviting pedestrian access to connect to existing city trail on
Woodridge Lane and providing access to sidewalks along Hodgson Road. This will
also connect neighborhood to local commercial amenities.
• Professional on -site management and service coordination staff
• Articulated architecture on all facades of the building (four sided architecture).
Vertical elements that could include notched setbacks, projecting bays, changes in
height to break up the facade, change in materials and color, and elements that
provide focal features.
• Senior housing will serve as a considerable employment center in addition to a
residential facility. Commercial development will also serve as an employment
center.
• The development plan will provide enough housing units to provide customers for
the future commercial development which functions as a catalyst for redevelopment
of the adjacent properties.
• Minimize the impacts to the wetlands and preserving tree coverage on the site.
• The proposed building density and massing provides an effective transition from
the lower profile townhomes, adjacent to residential, to larger, higher density uses
to the south and east along Hodgson Road.
The Team:
Developer:
Development Consultant
Architect:
Surveyor:
Attorney:
Project Timeline:
Entitlements
Close on Land Acquisition
Permit Application
Construction Commencement
Construction Completion
Proposed Density
Lyngblomsten
Grand Real Estate Advisors
Wold Architects and Engineers
Loucks
Hoagland Law, PLLC
01/31/2019
02/28/2019
06/01/2019
08/01/2019
11/01/2020
PROPOSED DENSITY
Gross Area (acres)
17.18
Wetlands & Water Bodies
-0.31
Right -of -Way
-1.1
Net Area (acres)
15.77
#of Units
228
Gross Density (units/acre)
13.27
Net Density (units/acre)
14.46
I —
WETLAND
le r
t
,z
� tis i
dp — rc \
1�
17
� 1
--------------
8
- 7
L}
�
COUNTY ROAD J
�PRELIMINARYSITE® PLANNING & ZONING - CONCEPT
,, PRELIMINARY
Lyngblomsten
Lino Lakes Site Study
June 11, 2018
UNIT COUNT
IL: 4-STORY
100 UNITS
AL: 3-STORY
50 UNITS
SNF: 2-STORY
48 UNITS
id
DETACHED TOWNHOMES:
30 UNITS
PARKING
110 TOTAL
STALLS
RESTAURANT
6,000 SF
w/ 1,400 SF PATIO
PARKING:
62 STALLS
Comm No: 9999
Wol
Entry Perspecive
Hodgson Road Perspecive Looking South
Hodgson Road Perspecive Looking North
Lyngblomsten
Lino Lakes Site Study
June 11, 2018
Vistas and Significant Views
Comm No: 9999
�' I':_