HomeMy WebLinkAbout02-04-2019 Council PacketCITY COUNCIL WORK SESSION AGENDA
CITY OF LINO LAKES
Monday, February 4, 2019
Community Room
6:00 P.M.
1. Repair of Judicial Ditch 3, Phil Belfiori (RCWD)
2. 49 & J Redevelopment, Mike Grochala, Terri Heaton (Springsted), Lyngblomsten
3. Review Public Works Facility Concept Plans - Oertel Architects, Rick DeGardner
4. Recreation Complex Discussion, Rick DeGardner
5. Methods of Financing Public Facilities, Terri Heaton (Springsted, Inc.)
6. PermitWorks/Laserfiche Integration Project, Sarah Cotton
7. Emerald Ash Borer Update, Marty Asleson
8. Sale of Wetland Bank Credits, Michael Grochala
9. Council Updates on Boards/Commissions, City Council
10. Monthly Progress Report, Jeff Karlson
11. Comprehensive Plan Update/Schedule, Michael Grochala
12. Review Regular Agenda
13. Adjourn
WS — Item 1
WORK SESSION STAFF REPORT
Work Session Item No. 1
Date: February 4, 2019
To: City Council
From: Jeff Karlson, City Administrator
Re: Request from RCWD to Repair Judicial Ditch 3
Background
The Rice Creek Watershed District needs municipal approval to repair Anoka -
Washington Judicial Ditch 3. The ditch is located at Clearwater Creek. A map is
attached with the approximate location.
A resolution consenting to RCWD's request was included on the November 26 agenda,
but the Council wanted more details about the project.
RCWD Administrator Phil Belfiori and RCWD Engineer Chris Otterness will be present
to give an overview of the project and to answer questions.
Attachments
Letter from Rice Creek Watershed District
Location Map for Judicial Ditch 3
Resolution No. 18-170
Requested Council Direction
Inclusion of Resolution No. 18-170 on the February 11 agenda, approving RCWD's
request to repair Anoka -Washington Judicial Ditch 3.
RCWD
orr,�RICE CREEK WATERSHED DISTRICT
November 14, 2018
City of Lino Lakes
c/o Jeff Karlson,
Administrator
600 Town Center Parkway
Lino Lakes, MN 55014
Re: Municipal Concurrence under Statutes Section 103D.621 for Repair of Anoka -
Washington Judicial Ditch 3
Dear Mayors and Council,
The Rice Creek Watershed District (RCWD) is the Drainage Authority for Anoka -Washington
Judicial Ditch (AWJD 3) which traverses portions of your Cities. The RCWD Board is considering
a repair of AWJD 3 to be completed in 2019-20. As part of its management of public drainage
systems, the RCWD Board utilizes authorities given in statutes chapters 103E, 103B and 103D.
AWJD 3, in particular, is designated for management as a part of the RCWD's trunk conveyance
system. As part of the trunk system, costs on AWJD 3 are paid from general taxes throughout
the RCWD — rather than benefitted lands assessment as traditionally required under statutes
chapter 103E.
The authority of the RCWD to manage AWJD 3 as part of the trunk system requires municipal
concurrent under statutes section 103D.621, subd. 4. The RCWD Board requests your
concurrence in order to facilitate prompt repair of AWJD 3. Please consider the attached
resolution. If you have questions, please direct them to our administrator, Phil Belfiori, at (763)
398-3071.
For the Board of Managers,
Sincerely,
Patricia Preiner
Board President
4325 Pheasant Ridge Drive NE #6-1 I Blaine, MN 55449 I T: 763-398-307o I F: 763-398-3088 I www.ricecreek.org
BOARD OF Michael J. Bradley Barbara A. Haake Patricia L. Preiner Steven P. Wagamon John J. Waller
MANAGERS Ramsey County Ramsey County Anoka County Anoka County Washington County
Location Map of Anoka -Washington JD #3
W AVE N
.41
M1 VaAOI
x
0
0
0
— —
0
-
2
Let
th
•J
••••11111
0 / V
r r--
1 /
au NdlUdp
4
\ m
0
0
VAP
r
-4
x
•
•
I \
\
i
•
2
0
/3H tl3ddfl
a 2
Ul
0
\
\\- HARROW AVE N
2
CITY OF LINO LAKES
RESOLUTION NO. 18-170
RESOLUTION CONSENTING TO RICE CREEK WATERSHED DISTRICT'S
REQUEST TO CONDUCT PROCEEDINGS FOR ANOKA-WASHINGTON
JUDICIAL DITCH 3 UNDER MINNESOTA STATUTES, CHAPTER 103D
WHEREAS, Rice Creek Watershed District (RCWD) is the drainage authority for Anoka -
Washington Judicial Ditch 3 (the "Drainage System"); and
WHEREAS, RCWD is proceeding on a petition to repair the Drainage System;
WHEREAS, the RCWD Engineer is preparing a repair report recommending a repair option that
balances the drainage function of the Drainage System with ecological concerns in the watershed;
and
WHEREAS, Minnesota Statute 103D.621, subd. 4, grants RCWD the authority to undertake
proceedings related to the Drainage System in accordance with the Watershed Law (Minnesota
Statutes, Chapter 103D) rather than the Drainage Code (Minnesota Statues, Chapter 103E), subject
to concurrence by city councils and town boards where the Drainage System is located; and
WHEREAS, RCWD has requested concurrence from the City of Lino Lakes to conduct the
necessary proceedings related to the Drainage System under the Watershed Law rather than the
Drainage Code; and
WHEREAS, the purpose of conducting proceedings under the Watershed Law is to provide
consistent management of all drainage systems under RCWD management, comprehensive wetland
management, and appropriate administration of resource management plans; and
WHEREAS, conducting the proceedings under the Watershed Law will facilitate flexibility in
financing the recommended repair option.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Lino Lakes that the
City consents to RCWD's request to conduct proceedings for Anoka -Washington Judicial Ditch 3
under Minnesota Statutes, Chapter 103D.
Adopted by the Council of the City of Lino Lakes this l lth day of February 2019.
The motion for the adoption of the foregoing resolution was introduced by Council Member
and was duly seconded by Council Member and upon vote
being taken thereon, the following voted in favor thereof:
The following voted against same:
Jeff Reinert, Mayor
ATTEST:
Julianne Bartell, City Clerk
WS — Item 2
WORK SESSION STAFF REPORT
Work Session Item No. 2
Date: February 4, 2019
To: City Council
From: Michael Grochala, Community Development Director
Re: 49 & J Redevelopment - Lyngblomsten
Background
Staff has been working with Lyngblomsten, a senior care provider, regarding
construction of a senior community in the northwest quadrant of the Hodgson Road
(CSAH 49) and County Road J (Ash Street) intersection. The concept plan for the
development was previously reviewed by City Advisory Boards and the City Council in
2018. Lyngblomsten has submitted a formal application for preliminary plat and Planned
Unit Development (PUD) development stage plan approvals. A public hearing scheduled
for the February 13, 2019 Planning and Zoning Board meeting.
The intersection of 49 & J is a major gateway into the city and has been a high priority
redevelopment objective over the past 20 years. The site has been the focus of several
proposed commercial/residential development proposals. However it has proven to be a
challenge for development/redevelopment due to a number of factors including:
• lack of public utilities
• inadequate transportation infrastructure
• multiple property owners/businesses
• meeting neighborhood/community expectations
• development timing
Over the past six months Lyngblomsten has been working to overcome these challenges,
as well as address comments received from residents, advisory boards, and the City
Council. Lyngblomsten has incorporated the 4 corner properties into the site plan,
obtaining purchase options on each. They have also been working with Anoka and
Ramsey County Highway Departments to address some of the existing traffic concerns.
While still under review, the overall plan has addressed a number of long standing city
goals for the area.
As part of the development process Lyngblomsten has inquired about opportunities for
financial assistance, citing both extraordinary public improvement and land assembly
costs. While no formal application has been received at this time, staff believes there is
merit in having a preliminary discussion regarding any proposed assistance.
As with any financial assistance request the City would work with Springsted to examine
conformance with the City's Business Subsidy Policy. Any proposed assistance will be
evaluated to determine need, and satisfaction of economic development goals including
but not limited to:
• tax base diversification and creation,
• job creation,
• public improvement benefits
• satisfaction of city redevelopment objectives.
Assistance for redevelopment of the area has been contemplated for a number of years.
The 49 & J master plan (2007) identified the possible use of financial assistance for
redevelopment of the area. In 2016 the City entered into a predevelopment agreement
with the owner of the 49 Club property. This agreement preserved the opportunity to
establish a tax increment district as part of the site building demolition completed in that
same year.
The City's last Tax Increment Financing (TIF) district was completed in 2015 as part of
the Distribution Alternatives facility along the 35E Corridor.
Terry Heaton, from Springsted will be present to discuss process and available tools for
assistance. Representatives from Lyngblomsten will be present to discuss the project and
its anticipated benefits.
Requested Council Direction
None required. Discussion only.
Attachments
1. Proposed Site Plan
2. 3D Model of Site
3. Business Subsidy Policy
4. Springsted Memo, dated February 4, 2019
•• 3
•
4
•
6
8
9
•
10
•
A
V \
B
C
D
E
F
C
4AT/LINE
GARDEN AREA
, WETLAND 1 7
EXITING 2YR HWL = 899.65
PROFIIDSED 2YR HWL = 899.67 /
EXISTING 10YR HWL = 900.13
PROPOSED 10YR HWL = 900.0911
EXISTING 100YR HWL = 900.52
PROPOSED 100YR HWL = 900.35€
'{s.
NORTHWESTNP&RKING
5 TOTAL ST ZS
ACCESSIBLE STALLS REQUIRED = 1
ACCESSIBLE STALLS PROVIDED = 0
LOT 10
\L
9'X20•
STALLS (TYP)
/
D412
LOT 11
LOT 13
LOT 12
X % X % Y Y X i= X X % Y i= X=%��'-x x " X��Yr X-. 11
It 1
I I I 1
LOT 14
LOT 3 J I LOT 2
,:.,
���I���i%7�� / % / ,,0,-,
/ L!/1Ii��/ PAVEME/HEAVY TY/:0"
/ ' j / /
■■ 1� A / / 11� I!� 'I! _
MI■■11■■■■■■■■■■■■ ■■■■■■■■■Ic■, / / j .+}I■■■■■■■■■■■■■■NI■■■■■■ ■■■■■■'■��
1■■I ■■■ r / / ■■■ ■■ ■■■ -, IL.1\
1■■I ■■■ 1
j ■■■ ■■ ■■■ '\IEL
MEI I INN MN MN INN INC!
I ; �_ 1
IMMI
LOT 16 ;
■
.I
MEDIUM DUTY
PAVEMENT
BHCIVSE PARKING
TOTAL STALLS
ACCESSIB STALLS REQUIRED
CCESSIBLE ALLS PROVIDED =
HEAVY DUTY
PAVEMENT
O
A
PR
NORTHEAST PARKING
6 TOTAL STALLS
ACCESSIBLE STALLS REQUIRED = 1
ACCESSIBLE STALLS PROVIDED = 0
LOT 15
4" PAINT STRIPE @ 3'
O.C. WITH WORDS
"NO PARKING" (TYP)
ACCESSIBLE
SYMBOL (TYP)
CLUB
REFER TO A
FOR LA
DIMENSIONS
LAYOUT
9 20
S LL (TYP)
B612
7L \1L
r `■■■■■■1.0•10X-
■■■■■■pr
_\�1•—
HOUSE gbh-
-"WNW
AND AI
AI
`1111\-
\\. jr i
PROVOSED
PI OPERSY LINE
/ /
/
/
PROPOSED
ERTY LINE
B612
CONCRETE
ENTRANCE
SED
RTY LINE
RETAINING WALL
6612
II
IL
11
/ 1,/, 4
,,
/, 1:
\/ / / •
/
ie
\/ /
/:;e1;1 /
HEAVY DUTY
PAVEMENT r
LOT 17
CONCRETE
ENTRANCE
STALLS (TYP)
45° PARKING
(TYPICAL)
STALLS (TYP)
PROP
ROP
SED
RTY LI
MEDIUM DUTY
PAVEMENT
LOT 18
STALLS (TYP)
MEDIUM DUTY
PAVEMENT
4" WHITE
PAINT STRIPE
MAIN BUILDING
REFER TO ARCHITECTURAL
FOR LAYOUT AND
DIMENSIONS
RETAINING WALL
CONCRETE
ENTRANCE
B612
\\\S\
LOT 20
MAIN PARKING
PROPOSED
PERTY LINE
°41.$0
PAINTED DIRECTIONAL
ARROW (TYPICAL)
, B612
78 TOTAL STALLS
ACCESSIBLE STALLS REQUIRED = 4
ACCESSIBLE STALLS PROVIDED = 7
STALLS (TYP)
P
ACCESSIBLE PROP Y LINE
SIGN (TYP)
4" PAINT STRIPE @ 3'
0.C. WITH WORDS
"NO PARKING" (TYP)
ACCESBIBLE
SYMBOL (TYP)
ACCESSIBLE
SYMBOL (TYP)
RESTAUR NT PARKING
47 TOT
ACCESSIBLE ST
ACCESSIBLE ST
L STALLS
LLS REQUIRED = 2
LLS PROVIDED = 3
SIOUTH PARKING
76 TOTAL STALLS
PAINTED DIRECTIONAL
ARROW (TYPICAL)
PROPOSED
PROPERTY LINE
9'X20'
STALLS (TYP)
RESTAURANT
REFER TO ARCHITECTURAL
FOR LAYOUT AND
DIMENSIONS
ACCESSIBLE
SIGN (TYP)
0.C. WITH WORDS
"NO PARKING" (TYP)
PAINTED DI CTIONAL
ARRO (TYPICAL)
0.C. WITH WORDS
"NO PARKING" (TYP)
ACCESSIBLE
SIGN (TYP)
ACCESSIBLE
SYMBOL (TYP)
OPOSED
PROP .RTY LINE
HEAVY DUTY
PAVEMENT
HEAVY DUTY
PAVEMENT
NOTES:
1. REFER TO SHEET C1.21, SITE PLAN NORTH, FOR NOTES.
2. REFER TO SHEET C1.31, GRADING AND DRAINAGE PLAN NORTH, FOR GENERAL NOTES.
SITE STATISTICS:
NORTHEAST PARKING
TOTAL STALLS = 6
ACCESSIBLE STALLS REQUIRED = 1
ACCESSIBLE STALLS PROVIDED = 0
NORTHWEST PARKING
TOTAL STALLS = 5
ACCESSIBLE STALLS REQUIRED = 1
ACCESSIBLE STALLS PROVIDED = 0
CLUBHOUSE PARKING
TOTAL STALLS = 14
ACCESSIBLE STALLS REQUIRED = 1
ACCESSIBLE STALLS PROVIDED = 2
RESTAURANT PARKING
TOTAL STALLS = 47
ACCESSIBLE STALLS REQUIRED = 2
ACCESSIBLE STALLS PROVIDED = 3
SOUTH PARKING
TOTAL STALLS = 76
ACCESSIBLE STALLS REQUIRED = 4
ACCESSIBLE STALLS PROVIDED = 4
MAIN PARKING
TOTAL STALLS = 78
ACCESSIBLE STALLS REQUIRED = 4
ACCESSIBLE STALLS PROVIDED = 7
SIGNAGE KEY NOTES
VISITOR
PARKING
(30"x30")
MnMUTCD R5-1
(30"x30")
SIMILAR TO
MnMUTCD R7-5
LEGEND
•
•
01
6_
REFERENCE KEY TO SITE DETAILS
DETAIL I.D NUMBER (TOP)
DETAIL SHEET NUMBER (BOTTOM)
PROPOSED CONCRETE WALK
47 PROPOSED CONCRETE SLAB
PROPOSED LIGHT DUTY BITUMINOUS PAVEMENT
PROPOSED MEDIUM DUTY BITUMINOUS PAVEMENT
PROPOSED HEAVY DUTY BITUMINOUS PAVEMENT
PROPOSED TRAFFIC CONTROL SIGN
SIGNAGE KEY NOTE
PROPOSED BOLLARD
PAINTED ACCESSIBLE SYMBOL
PROPOSED MANHOLE (MH)
PROPOSED CATCH BASIN (CB)
PROPOSED FLARED END SECTION (FES)
PROPOSED HYDRANT (HYD)
PROPOSED GATE VALVE (GV)
PROPOSED POST INDICATOR VALVE (PIV)
PROPOSED FLAGPOLE - REFER TO ARCHITECTURAL PLANS
PROPOSED BUILDING STOOP - REFER TO ARCHITECTURAL PLANS
PROPOSED LIGHT POLE - REFER TO ELECTRICAL PLANS
PROPERTY LINE
LYNGBLOMSTEN
SENIOR
COMMUNITIES
HODGSON ROAD
LINO LAKES, MN 55014
LYNGBLOMSTEN
1415 ALMOND AVE W
ST. PAUL, MN 55108
WOLD ARCHITECTS
AND ENGINEERS
332 Minnesota Street, Suite W2000
Saint Paul, MN 55101
ANDERSON - JOHNSON
ASSOCIATES, 1X10111/
INC.
LANDSCAPE ARCHITECTURE • SITE PLANNING • CIVIL ENGINEERING
7575 GOLDEN VALLEY ROAD • SUITE 200 • MINNEAPOLIS. MN 55427
I hereby certify that this plan, specification or report was prepared by
me or under my direct supervision and that I am a duly Licensed
PROFESSIONAL ENGINEER
under the laws of the State of MINNESOTA
DAVID A. REY
Registration Number 40180 Date XXXX
Revisions
Description
Date
Num
Comm: XXX
Date: XXXX
Drawn: BJD
North
SITE
PLAN
OVERALL
7-77° C1.20
CITY OF LINO LAKES
LINO LAKES ECONOMIC DEVELOPMENT AUTHORITY
BUSINESS SUBSIDY CRITERIA
(Revised June 13, 2016)
Section 1. Purpose; Statutory Compliance
1.01 The purpose of this document is to establish the criteria to be considered by the City
of Lino Lakes (the "City") and the Lino Lakes Economic Development Authority
(the "EDA") in processing, evaluating and reviewing requests for business
subsidies. It is the intent of the City and the EDA in adopting these revised criteria
to comply with Minnesota Statutes, Sections 116J.993 through 116J.995 (the
"Business Subsidy Act"). The City and the EDA hereby adopts the definitions
contained in the Business Subsidy Act for application in the criteria.
1.02. Business subsidy criteria were adopted by the City on July 23, 2001, revised on
June 23, 2003 and are hereby further revised. The Board of the EDA adopted the
revised business subsidy criteria on the date hereof. The City and the EDA have the
option to amend these criteria again in the future if doing so is determined
necessary or appropriate. Amendments to these criteria are subject to the public
hearing requirements of the Business Subsidy Act.
1.03. These criteria are intended to set specific minimum requirements which recipients
must meet to be eligible to receive business subsidies. Neither the City nor the
EDA will adopt business subsidy criteria on a case by case basis.
1.04. In accordance with the Business Subsidy Act, all business subsidy requests must
comply with the Business Subsidy Act and other applicable Minnesota statutes.
The City's and the EDA's ability to grant business subsidies is subject to the
limitations established in the Business Subsidy Act.
Section 2. Goals, Objectives, and Requirements
2.01 It is the City's and the EDA's intent to advance the following goals and objectives
in granting business subsidies:
(a) Projects must be consistent with City's comprehensive plan and any other
similar plan or guide for development of the community.
(b) Business subsidies will not be provided to projects which have the
financial feasibility to proceed without a public subsidy.
2.02 When applying for a business subsidy, potential recipients will be required to
provide such studies, reports, appraisals, financial information or other data as may
be requested by the City or the EDA prior to consideration of a request for a
business subsidy.
479195v2
2.03 Business subsidies must be justified by evidence that the project cannot proceed
without the benefit of the subsidy. If tax increment financing is used to grant a
subsidy, the recipient must demonstrate compliance with all statutory requirements
of the TIF Act, including the "but for" test, if applicable, and any TIF policy
adopted by the City or the EDA. The recipient will be required to provide all
documentation necessary for the City or the EDA to make the requisite findings
under the TIF Act and the Business Subsidy Act.
2.04 Recipients will be required to enter into an agreement with the City or the EDA
which is consistent with statutory requirements and which contains measurable,
specific and tangible goals. The agreement must include a commitment to remain
in business in Lino Lakes for a minimum of five years after the benefit date (as
defined in the Business Subsidy Act, benefit date means the date the item or work
paid for with the business subsidy is placed in service), unless waived by the City or
the EDA, and a requirement to comply with the specific job and wage goals
established for the project, if any.
Section 3. Business Subsidy Criteria
3.01 The City and the EDA recognizes that every proposal is unique. Nothing in these
criteria shall be deemed to be an entitlement or to establish a contractual right to a
subsidy. The City and the EDA may modify these criteria from time to time and
reserves the right to evaluate each project on its individual merits. The City and the
EDA may deviate from these criteria by documenting in writing the reason for the
deviation and attaching a copy of the document to its next annual report to the
Minnesota state agency charged with administration thereof.
3.02 The following criteria shall be utilized in evaluating a request for a business
subsidy:
(a) Public purpose. A business subsidy must meet a public purpose, including
but not limited to increasing the tax base. Job retention may only be
considered a public purpose if the loss of jobs is specific and demonstrable.
(b) Increase in tax base. While an increase in the tax base cannot be the sole
rounds for granting a subsidy, the City and the EDA believe it is a necessary
condition for any subsidy.
(c) Jobs and Wages. In instances in which job creation is determined to be a
goal, the City and the EDA will review all of the unique circumstances
surrounding the proposed development to determine how many jobs should
be required in exchange for the proposed subsidy. If job creation is
determined to be one of the main goals of a proposed development, it is the
City's and the EDA's intent that the recipient create the maximum number
of livable wage jobs at the site, with no fewer than 5 jobs. This may include
jobs to be retained but only if retention is specific and demonstrable. The
job and wage goal must be attained within two years of the benefit date (as
defined in the Business Subsidy Act). The City and the EDA may, after a
479195v2
public hearing, extend for up to one year the period for meeting the job and
wage goal. Qualifying jobs are those which pay, at a minimum, 110 percent
of the federal minimum wage, plus benefits. Any deviation from the
established wage level must be documented in conformity with the
requirements set forth in the Business Subsidy Act. If the City or the EDA,
following a public hearing, determines that job creation or retention is not
part of the public purpose of the subsidy, the wage and job goal may be set
at zero.
(d) Economic Development. Projects should promote one or more of the
following:
1. Encourage economic and commercial diversity within the
community;
2. Contribute to the establishment of a critical mass of commercial
development within an area;
3. Increase the range of goods and services available or encourage fast
growing or other desirable businesses to locate or expand within the
community;
4. Promote redevelopment objectives and removal of blight, including
pollution cleanup;
5. Promote the retention or adaptive reuse of buildings of historical or
architectural significance;
6. Promote additional or spin-off development within the community;
7. Development of safe and affordable housing; or
8. Encourage full utilization of existing or planned infrastructure
improvements.
Section 4. Compliance and Reporting Requirements
5.01 Any subsidy granted by the City or the EDA will be subject to the requirement of a
public hearing if necessary.
5.02 It will be necessary for both the recipient and the City or the EDA to comply with
reporting and monitoring requirements of the Business Subsidy Act.
5.03 A recipient may be authorized to move from the City within five years of the benefit
date (as defined in the Business Subsidy Act) only if, after a public hearing, the City
or EDA approves the request to move. The City or EDA may discontinue the subsidy
if the recipient moves from the City.
479195v2
la Springsted
MEMORANDUM
TO: Michael Grochala, Community Development Director
Sarah Cotton, Finance Director
Springsted Incorporated
380 Jackson Street, Suite 300
Saint Paul, MN 55101-2887
Tel: 651-223-3000
Fax: 651-223-3002
www.springsted.com
FROM: Mikaela Huot, Vice President/Consultant
DATE: February 4, 2019
SUBJECT: Proposed Financing for Lyngblomsten Senior Care Campus Development
The City of Lino Lakes has been approached by Lyngblomsten to construct a senior care campus on property near
County Road J and Hwy 49. The project would include approximately 20 detached townhomes and 198-unit
continuum of care building with 100 independent living, 50 assisted living and 48 skilled care units, as well as an
approximate 4500 square foot restaurant. The developer has also proposed to acquire the properties on the corner
of County Road J and Hwy 49 for future redevelopment opportuntiies that may include retail/office buildings. There
are anticipated to be extraordinary public improvement costs associated with development of the project site and the
developer has indicated public assistance will be necessary to assist with financing a portion of those costs.
Tax abatement and tax increment financing have been identified as possible financing tools to assist with providing
financial assistance, subject to determining there is a gap and what the amount is. A proposed financing plan could
include the establishment of a tax abatement area or a housing tax increment financing (TIF) district. A tax
abatement is approved by each separate taxing entity and may include only the City's share of taxes. Tax increment
is approved by the City and includes all taxing entities incremental taxes from the new project. In order to qualify as
a housing district, one of two tests need to be met: 1) at least 20% of the units are occupied by persons with incomes
no greater than 50% of the area median income or 2) at least 40% of the units are occupied by persons with incomes
no greater than 60% of the area median income. Income limitations are based on monthly/annual salaries, not
including assets. Tax increment should reduce the term of assistance, as opposed to tax abatement.
Tax increment from a housing district can only be used solely to finance the cost of housing projects as defined in
sections 469.174, subdivision 11, and 469.1761. The cost of public improvements directly related to the housing
projects and the allocated administrative expenses of the authority may be included in the cost of a housing project
Assuming the project as proposed would qualify as a housing TIF district, the developer will submit an application for
financial assistance with supporting financial information to the City that includes sources and uses for the entire
project, including acquisition of the site to be occupied by the senior care campus, the commercial redevelopment
properties, construction and other related costs and all required public improvements. The public improvements
include off -site road and infrastructure improvements, as well as on -site infrastructure improvements for water,
sewer, utilities and streets/sidewalks. The developer has indicated the project as proposed with the extraordinary
costs for the additional property acquisition and infrastructure improvements is not feasible without assistance.
Should the Council choose to proceed, next steps would include the developer applying for financial assistance
followed by City staff, Springsted, and Kennedy & Graven reviewing the request and determining that the project
meets the requirements of a housing district and justify the need for assistance. In addition, it will be determined that
1) the project does need financial assistance and 2) if so, an appropriate level of assistance to finance a portion of
the identified extraordinary project costs that would allow it to proceed. This information would come back before
Council at a later date once the additional financial information has been submitted by the developer and reviewed
for reasonableness to provide a recommendation on a proposed financial assistance package.
Thanks for the opportunity to be of assistance to the City of Lino Lakes. Please contact me at 651-223-3036 or
mhuot@springsted.com with any questions or additional discussion.
WS — Item 3
WORK SESSION STAFF REPORT
Work Session Item No. 3
Date: February 4, 2019
To: City Council
From: Rick DeGardner, Public Services Director
Re: Review Public Works Facility Concept Plans - Oertel Architects
Background
The City Council and staff have been discussing the need for the eventual replacement of
our Public Works Facility (built in 1971) since a space needs analysis was conducted in
2011.
More recently, a Public Works Site Analysis and Space Needs Study was completed by
CNH Architects in April, 2017 (Addendum to Public Works Facility Study was
submitted October, 2017). The Public Works Facility was also discussed during the
February, 2018 and May, 2018 work sessions.
The City Council expressed concerns with the scope and costs of a new public works
facility outlined in the CNH Study. Oertel Architects was retained to reevaluate our
needs and prepare options that are more cost effective.
Mr. Jeff Oertel from Oertel Architects will be present at Monday's work session to
present some concept plans, projected costs, and answer questions.
Requested Council Direction
For informational purposes.
Attachments
❖ Oertel Architects - Lino Lakes Public Works Concepts (4)
❖ Public Works Facility Follow-up Staff Report - May 7, 2018 Work Session
❖ Public Works Facility Renovation & Expansion Staff Report - February 5, 2018
Work Session
❖ CNH Architects Addendum - October 30, 2017
❖ CNH Architects Public Works Site Analysis and Space Needs Study - April 2017
/
l�
t
it:._
%i' i , ` v,
�i -- i .
4
iE
1
_463111.1
MAIN STREET
REMOVALS
1" 40'-0"
Main 51
AVERAGE COST/SF:
COST BREAKDOWN:
FLEET BREAKDOWN:
VEHICLE STORAGE: $120/SF
VEHICLE STORAGE: $3,000,000
WARM STORAGE:
OFFICE: $160/SF
STAFF AREA/MEZZ: $75,000
LARGE (14)
STAFF AREA/MEZZ: $75/SF
VEH. MAINT.: $960,000
MEDIUM (24)
OFFICE (RENO): $50/SF
SITE PREP: $525,000
SMALL (12.5)
VEHICLE MAINT: $160/SF
TOTAL HARD CONSTRUCTION
COLD STORAGE:
SITE: $12/SF (BUILDING)
COST:
PLOW EQUIPMENT (32)
MISC. EQUIPMENT (38)
STAFF BREAKDOWN:
$4—$4.5 MILLION
TRAILERS (9)
(VARIES DEPENDENT ON
FULL—TIME: (15)/(19)
EQUIPMENT/FINISHES
SEASONAL: (10)/(13)
INCLUDED)
M
iordsiiiiii,hiiku114
4
,,tor
/ I
I I
I
I
I i I'� III II li ICI II Ir
1'rli� 1111 I1
JJ�►J�-
W.H.
11441
1
1
I lu
yl14,
11
1
BRINE
i
qua_
Main St
i
Ir
11
I
1
SALT
N
11111,
i 1
YAPPI
(3)
NEW
VEHICLE
STORAGE
BUILDING
BYPASS/
FLEX
(16
STAFF
AREA
GEN.
I1
BALL FIELD
gmegriga
NEW VEHICLE
MAINTENANCE
(PHASE 1 OR 2)
EMPLOYEE
PARKING
ACCESS n'd
CONTROL-
‘:41111rali
o i
FUTURE OFFICE
EXPANSION
EMPLOYEE
PARKING
FUEL
ISLAND
' EMPLOYEE
EXISTING PARKING
PW OFFICE
TING
NIOR
NTER
as
i•
PROPOSED
1"= 40'-0"
•
1
I PRIMARY
VEHICLE
ENTRY
PUBLIC
PARKING
STORM
WATER
POND
NAN
0
PROPOSED AREA BREAKDOWN:
VEHICLE STORAGE:
25,300 SQUARE FEET
STAFF AREA MEZZANINE:
1,000 SQUARE FEET
VEHICLE MAINTENANCE:
6,000 SQUARE FEET
10101
mil
11
Mei
(AN
•
OERTEL
ARCHITECTS
1795 Saint Clair Avenue
ST. Paul, Minnesota 55105
www.oertelarchitects.com
PROJECT NAME:
LINO LAKES
PUBLIC WORKS
SITE AND FACILITY
STUDY
CITY HALL PARK
LINO LAKES, MN
PROJECT NUMBER:
18-33
DATE OF ISSUE:
FALL 2018
DRAWN BY:
TRS
CHECKED BY:
JLO, TRS
REVISIONS:
I HEREBY CERTIFY THAT TH IS
DOCUMENT WAS PREPARED
BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM
A DULY REGISTERED ARCHITECT
IN THE STATE OF MINNESOTA
SIGNATURE
DATE
REGISTRATION
SHEET NAME:
PROPOSED
EXPANSION
SHEET NO:
OP.A-3.1
REMOVALS
1" 40'—O"
/ /
// / 7 /
�/ 1
/
/
/
•get.
alb•niniour
1
Main St
14111119.
0
A1111111111111111111111111111111111
.16
MAIN STREET
r
1.
1J1_11l 1.1111LI HUI. IJ111JL11
1111111111111 1111111111111
•
r
H
AVERAGE COST/SF:
COST BREAKDOWN:
FLEET BREAKDOWN:
VEHICLE STORAGE: $120/SF
VEHICLE STORAGE: $3,000,000
WARM STORAGE:
OFFICE: $160/SF
STAFF AREA/MEZZ: $75,000
LARGE (14)
STAFF AREA/MEZZ: $75/SF
VEH. MAINTENANCE: $960,000
MEDIUM (24)
OFFICE (RENO): $50/SF
OFFICE: $880,000
SMALL (12.5)
VEHICLE MAINT: $160/SF
SITE PREP: $700,000
COLD STORAGE:
SITE: $12/SF (BUILDING)
TOTAL HARD CONSTRUCTION
PLOW EQUIPMENT (32)
COST:
MISC. EQUIPMENT (38)
STAFF BREAKDOWN:
TRAILERS (9)
$5.5-$6 MILLION
FULL-TIME: (15)/(19)
(VARIES DEPENDENT ON
SEASONAL: (10)/(13)
EQUIPMENT/FINISHES
INCLUDED)
.In
IIIII
04101
•
1MI
P
GROUND
111
arn•N
-711r
PROPOSED
111= 40'—O"
i
1'i 11‘r71 1 l
W.H.
I
1
BRINE
r
BALL FIELD
IIi1,
+''�II '' ' it ';j „`i
1 11
I
�II
11 11--
1 II = 1 111111111'----
Ill I III. I I III
SALT
'1' R rk,
C0
0011[IL.001!. 1
— - IIIII 1F
(9) WASH
BAY
YARD
STORAGE
NEW FUEL
ISLAND
4
iL
jori
NEW VEHICLE
MAINTENANCE
TAi +4:Imola
IIIIIIIIIIIIll ,,
1 11II
EXISTING
SIN IOR
CENTER
1:1
■11 III II1III 1 m 11�1111 i1,111I I111
EMPLOYEE
PARKING
BYPASS/
FLEX
STAFF
AREA
NEW OFFICE
AREA
PUBLIC
PARKING
STORM
WATER
POND
0
IMPOUNIi
m
1
JACCESSC NTROL
1
iliMill
PROPOSED AREA BREAKDOWN:
VEHICLE STORAGE:
25,300 SQUARE FEET
STAFF AREA MEZZANINE:
1,000 SQUARE FEET
VEHICLE MAINTENANCE:
6,000 SQUARE FEET
OFFICE:
5,500 SQUARE FEET
(AN
•
OERTEL
ARCHITECTS
1795 Saint Clair Avenue
ST. Paul, Minnesota 55105
(651)696-5186 Tel
(651)696-5188 Fax
www.oertelarchitects.com
PROJECT NAME:
LINO LAKES
PUBLIC WORKS
SITE AND FACILITY
STUDY
CITY HALL PARK
LINO LAKES, MN
PROJECT NUMBER:
18-33
DATE OF ISSUE:
FALL 2018
DRAWN BY:
TRS
CHECKED BY:
JLO, TRS
REVISIONS:
I HEREBY CERTIFY THAT THIS
DOCUMENT WAS PREPARED
BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM
A DULY REGISTERED ARCHITECT
IN THE STATE OF MINNESOTA
SIGNATURE
DATE
REGISTRATION
SHEET NAME:
PROPOSED
EXPANSION
SHEET NO:
OP.A-3.2
PLOTTED: 10-19-2018 FILE NAME: 18-33 Exansion0pt1on2.dwg
so
L
1.1
REMOVALS
1" 40'-O"
t9
'�� � per.
114
0
i
Main St
-
1
somp•P---ammilM
'1
•
4
•
1
MAIN STREET
z
.11
PIP
AVERAGE COST/SF:
COST BREAKDOWN:
FLEET BREAKDOWN:
VEHICLE STORAGE: $120/SF
VEHICLE STORAGE: $3,000,000
WARM STORAGE:
OFFICE: $160/SF
STAFF AREA/MEZZ: $75,000
LARGE (14)
STAFF AREA/MEZZ: $75/SF
VEH. MAINT.: $960,000
MEDIUM (24)
OFFICE (RENO): $50/SF
SITE PREP: $525,000
SMALL (12.5)
VEHICLE MAINT: $160/SF
TOTAL HARD CONSTRUCTION
COLD STORAGE:
SITE: $12/SF (BUILDING)
COST:
PLOW EQUIPMENT (32)
MISC. EQUIPMENT (38)
STAFF BREAKDOWN:
$4-$4.5 MILLION
TRAILERS (9)
(VARIES DEPENDENT ON
FULL-TIME: (15)/(19)
EQUIPMENT/FINISHES
SEASONAL: (1 0)/(1 3)
INCLUDED)
1
If
i
1.
p1 � iIPIMNlI■P•�„I'
i
i
PLA
GROUN
ik
W.H.
7
01P—
I'
N
N
Oho
r
BRINE
'dIh
I !NMI
NW VEHICLE ti J
Mi4INTENP1NCE
(PHASE 1 9R 2)
SALT
1
'1
iillilii
L
BALL FIELD
_ANIL
ft w
PROPOSED
1" 4II
Main St
i
gthal
11111110
1
1111111111111 1111111111 IP
3)
EXPANSION
VAULT L
11
YARD
STORAGEP
Itmlbe
(9)
NEW
VEHICLE
STORAGE
BUILDING
WASH
BAY
•
•
11111111111111111111111111111
.4111111111111..
BYPASS/
FLEX
AR A
gear
a.
EMPLOYEE
PARKING
EXISTING
PW OFFICE
FUEL
ISLAND
EXISTING
CENTER
ni ot moo inso
id
"111•11•Millillikir°
Ur -
IMPOUND
I- ACCESS
I CONTROL
•
•
PRIMARY
VEHICLE
ENTRY
111
PUBLIC
PARKING I
STORM
WATER
POND
•
11
111
110.1114
1111
0.7
411
14.
mm
ANN
PROPOSED AREA BREAKDOWN7
VEHICLE STORAGE:
25,300 SQUARE FEET
STAFF AREA MEZZANINE:
1,000 SQUARE FEET
VEHICLE MAINTENANCE:
6,000 SQUARE FEET
(AN
•
OERTEL
ARCHITECTS
1795 Saint Clair Avenue
ST. Paul, Minnesota 55105
www.oertelarchitects.com
PROJECT NAME:
LINO LAKES
PUBLIC WORKS
SITE AND FACILITY
STUDY
CITY HALL PARK
LINO LAKES, MN
PROJECT NUMBER:
18-33
DATE OF ISSUE:
FALL 2018
DRAWN BY:
TRS
CHECKED BY:
JLO, TRS
REVISIONS:
I HEREBY CERTIFY THAT THIS
DOCUMENT WAS PREPARED
BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM
A DULY REGISTERED ARCHITECT
IN THE STATE OF MINNESOTA
SIGNATURE
DATE
REGISTRATION
SHEET NAME:
PROPOSED
EXPANSION
SHEET NO:
OP.A-4.1
L
Ir
ASP'
i
/
/ /
//i /
� /
/
// //
/ / i •
��Main St
INF
f
REMOVALS
111= 40'-O"
PLOTTED: 10-19-2018 FILE NAME: 18-33 Exansion0pt1on2.dwg
c9p
•
•
N
7 \\
•
1
4
J1111111111L
MAIN STREET
41.
k
1 1's
11-1 l itti11tt1 111 {tt Y1 itt
1 rl
J
AVERAGE COST/SF:
COST BREAKDOWN:
FLEET BREAKDOWN:
VEHICLE STORAGE: $120/SF
VEHICLE STORAGE: $3,000,000
WARM STORAGE:
OFFICE: $160/SF
STAFF AREA/MEZZ: $75,000
LARGE (14)
STAFF AREA/MEZZ: $75/SF
VEH. MAINT.: $960,000
MEDIUM (24)
OFFICE (RENO): $50/SF
OFFICE: $880,000
SMALL (12.5)
VEHICLE MAINT: $160/SF
SITE PREP: $700,000
COLD STORAGE:
SITE: $12/SF (BUILDING)
TOTAL HARD CONSTRUCTION
PLOW EQUIPMENT (32)
COST:
MISC. EQUIPMENT (38)
STAFF BREAKDOWN:
TRAILERS (9)
$5.5-$6 MILLION
FULL-TIME: (15)/(19)
(VARIES DEPENDENT ON
SEASONAL: (10)/(13)
EQUIPMENT/FINISHES
INCLUDED)
44
1
1
4
p
N
1.9
•ow
ir* PIP
PROPOSED
111= 401011
r
BRINE
1
STAFF
AREA
N 4V VEHICLE
MAINTENANCE
BALL FIELD
TOWER
NEW OFFICE
AREA
VAULT
YARD
STORAGE
NEW FUEL
ISLAND
EXISTING
S:INIOR
C:NTER
WASH
BAY
EMPLOYEE
PARKING
BYPASS/
FLEX
PUBLIC
PARKING 1
STORM
WATER
POND
PRIMARY
VEHICLE
FNTRY
PROPOSED AREA BREAKDOWN:
VEHICLE STORAGE:
25,300 SQUARE FEET
STAFF AREA MEZZANINE:
1,000 SQUARE FEET
VEHICLE MAINTENANCE:
6,000 SQUARE FEET
OFFICE:
5,500 SQUARE FEET
Ilk
i
(AN
•
OERTEL
ARCHITECTS
1795 Saint Clair Avenue
ST. Paul, Minnesota 55105
(651)696-5186 Tel
(651)696-5188 Fax
www.oertelarchitects.com
PROJECT NAME:
LINO LAKES
PUBLIC WORKS
SITE AND FACILITY
STUDY
CITY HALL PARK
LINO LAKES, MN
PROJECT NUMBER:
18-33
DATE OF ISSUE:
FALL 2018
DRAWN BY:
TRS
CHECKED BY:
JLO, TRS
REVISIONS:
I HEREBY CERTIFY THAT THIS
DOCUMENT WAS PREPARED
BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM
A DULY REGISTERED ARCHITECT
IN THE STATE OF MINNESOTA
SIGNATURE
DATE
REGISTRATION
SHEET NAME:
PROPOSED
EXPANSION
SHEET NO:
OP.A-4.2
WS — Item 14
WORK SESSION STAFF REPORT
Work Session Item No. 14
Date: May 7, 2018
To: City Council
From: Rick DeGardner, Public Services Director
Re: Public Works Facility Follow-up
Background
This item was discussed at the February work session and was also included on the
March 5th work session agenda, but was tabled.
During the February work session, the City Council directed staff to provide the
following information, which is attached:
• Cost breakdown of Hugo Public Works facility
• Plans and specifications for the Hugo Public Works Facility
• An estimate of how large a building is needed to store the city's vehicles and
equipment
Requested Council Direction
This information is provided for further discussion.
Attachments
A. City of Hugo Public Works Facility Fund Breakdown, (2004-2005)
B. Plans and Specifications for the Hugo Public Works Facility - Title Sheet (T1)
and Site Layout (C1), February 2, 2004
C. Inside Storage Analysis for the City's vehicles and equipment
CITY OF HUGO
PUBLIC WORKS FACILITY FUND
ACCOUNT
NUMBER
ACCOUNT BALANCE BALANCE 2005 PROJECTED
DESCRIPTION 12/3112004 12131/2005 ACTIVITY BUDGET
417-000.000-010.100 Cash
417-000.000-010.450 ;Accrued Interest Receivable
417-000.000-120.200 Accounts Payable
417-000.000-120.600 ,Contracts Payable
417-000.000-253.000 Fund Balance
REVENUES
417-362.000-362.100 Interest Earnings
417-392.000-392.030 Transfer from Water & Sewer Utility Fund
417-393.000-393.100 Bond Proceeds
$ 539,056.14 $
$ 2,779.91 $
$ /326,000.96) $
$ (98,035.60)l $
$ 117,799.49 1 $
- $ (539.056.14)1 $
- $ (2,779.91)1 $
- 1 $ 326.000.96 1 $
$ 98,035.60 ', $
1 $ (117,799.49)': $
$ 9,126.60 I $ 9,816.35 $
$ - 1 $ 62,439.78 $
$ 2,473,787.53 1 $ 2,473,787.53 I $
2,482,914.13 $ 2,546,043.66 1 $ 63,129.53 $ 2,546,043.66
6B9.75 ! $ 9,816.35
62,439.78 $ 62,439.78
- 1 $ 2,473,787.53
EXPENDITURES
Engineering Fees:
417-431.000-403.303 WSB & Associates
417-431.000-403.352 Pro(ect Testing Services
Architect Fees:
417-431.000-403.368 Construction Documents
417-431.000-403.372 Community Room Revisions
417-431.000-403.367 Bidding Fees
417-431.000-403.369 Construction Administration
417-431.000-403.370 Reimbursable Expenses
Septic System Evaluation_
417-4310D0-403.371 Ingleside Engineering
Insurance:
417-431.000-407.362 Builders Risk Insurance
Utilities:
417-431 0004(18381 _ Electricity (to be reimbursed by Parkos) $ 640.69 ' $ 1,723.54 . $ (1,062.85) $ 1,723.54
417-431.000 408.381 Deducted from Retainage $ - $ (1,723.54) $ 1,723.54 $ (1,723.54)
417-431.000-408.383 Gas (to be reimbursed by Parkos) $ 1,527.17 $ 4,716.47 $ (3,189.30) $ 4,716.47
...
417-431.000-408.383 Deducted from Retainage $ - $ (4,716.47) $ 4,716.47 (4,716.47)
Permits:
417-431.000-412.435 NPDES Permit
Construction Contracts:
417-431.000-413.504 Building Base Bid & Alternates (Parkos) $ 1,727,980.12 $ 1,735,329.12 $ (7,349_00) $ 1,735,329.12
417-431.000-413.504 E• lectrical Work 1 $ - $ 925.00 $ (925.00) $ 925.00
417-431 000-413.504! Snow Guards i $ - $ 17,600.00 ! $ (17,600.00) $ 17,600.00
417-431.000-413.504 Change Locks 1 $ - $ 939.00 $ (939.00) $ 939.00
417-431.000-413.504 Rice Lake Park Centre Signage I $ - $ 4,977.15 $ (4,977.15) $ 4,977.15
417-431.000-413.504 Repaint Exterior $ - $ 3,553.00 ' $ (3,553.00) $ 3,553.00
417-431 000-413.507 S• prinkler System ; $ - $ 7,475.00 $ (7,475.00) $ 7,475.00
417-431.000-413.508 Sitework (Arnt Construction) 1 $ 232,731.80 $ 268,020.62 $ (35,288.82) $ 268,020.62
417-431.000-413.508 I Silt Fence $ 62.05 $ 62.05 $ $ 62.05
417-431.000-413.525 Water System (Ingleside Engineering) i $ 30,923.20 $ 30,923.20 $ $ 30,923.20
417-431.000-413.518 S• anitary Sewer System (Ingleside Engineering) i $ 10,450.00 $ 10,450.00 $ $ 10,450.00
417-431.000-413.503. Fencing (Century Fence) $ $ 16,896.00 $ (16,896.00) $ 16,896.00
417-431000-403.333 Landscaping $ - $ 12,777.78 $ (12,777.78) $ 12,777.78
Equipment: $ -
417-431.000-413.505 I Welding Hood & Blower (Airgas North Central) $ 3,198.18 $ 3,198.18 $ $ 3,198.18
417-431.000-413.512: Shop Sweeper (Tennant) $ 20,591.29 $ 21,381.62 $ (790.33) $ 21,381.62
417-431.000-413.513; Vehicle Hoists (Pump & Meter Service) 1 $ 38,399.33 $ 37,899.33 $ 500.00 $ 37,899.33
417-431.000-413.520 Exhaust Extraction System : $ 11,362.00 $ 12,363.88 $ (1,001.88) $ 12,363.88
417-431.000-413.532 Poured Concrete Pit ; $ 15,980.80 $ 15,980.80 $ - $ 15,980.80
417431.000-413.522 4,000 Gallon Holding Tank ; $ 6,696.72 $ 6,696.72 $ $ 6,696.72
417-431.000-413.528 Bulk Fuel & Lubricant Tanks j $ 23,445.05 $ 24,858.26 $ (1,413.21), $ 24,858.26
417-431.000-413.533 Air Compressor $ - 3,581.81 $ 3,581.81 $ - $ 3,581.81
417-431.000-413.521 Air Lines $ 386.93 $ 1,569.90 $ (1,182.97), $ 1,569.90
417431.000-413.526 Pressure WasherlWash Bay 9,202 52 $ 9,590.66 $ (388.14), $ 9,590.66
:Furniture, Fixtures & Equipment
417431.000413.515 Voice & Data Cabling $ 6,111.24 $ 6,384.12 . $
417-431000-413.516 Shelving $ 3,846.22 $ 11,085.15 $
417-431.000-413.535 Telephone System $ $ 26,749.26 $
417-431.000-413.541 Blinds, Bench Vise, Hydraulic Lift, Cabinets... $ 1,579 41 $ 6189 79 $
417-431.000-413.570 Office Furniture & Equipment 1 $ 3,546.45 $ 35,714.60 $
Financing Costs
Underwriters Discount
417-470.000-403.316 Cost of Issuance
Capitalized Interest
Total Project Costs
455.39
11,661.40
$
455.39 1 $
$ 11,661.40 11 $
114,000.00 $ 114,000.00 1 $
6,146.62 $ 6,146.62 i$
7,600.00 1 $ 7,600.00 $
30,400.00 $ 30,400.00 $
10,000.00 ; $ 10,000.00 $
350.00 . $ 350.00 $
1,974.00
$ 400.00 ` $ 400.00 $
$ 455.39
11,661.40
$ 114,000.00
$ 6,146.62
$ 7,600.00
$ 30 400.00
$ 10,000.00
350.00
1,974.00 $ - $ 1,974.00
- $ 400.00
(272.88) I $ 6,384.12
(7,238.93)1 $ 11,085.15
(26,749.26) $ 26,749.26
(4,610.38)1 $ 6,189.79
132,168.15)1 $ 35,714.60
I $ 2,335,230.39 $ 2,516,159.41 $ (180,929.02) $ 2,516,159.41
29,884.25 $ 29,884.25 $
I$
$ 29,884.25
-_$
$ 29,884.25 $ 29,884.25
$ 29,884.25
$ 2,365,114.64 $ 2,546,043.66 $-(180,929.02
$ 2,546,043.66
Fund Balance $ 117,799.49 $ $ (117,799.49) $
This fund was established to account for the construction of a public works facility. Funding was provided through the sale of capital: improvement bo
Page 32
HUGO PUB
Rice Lake Par
2003 6WoQusstccm Inc.:02003 femosibn Tsohnabak6
LOCATION MAP
Code Analysis
A. APPLICABLE CODES & REGULATIONS
2002 MN State Building Code (Includes 2000 Intl Building Code)
Minnesota Accessibility Code Chapter 1341
B. OCCUPANCY CLASSIFICATION
A3 - Assembly (Community Hall) 3,200 SF
S1 - Moderate Hazard Storage 19,000 SF
S2 - Light Hazard Storage 3,200 SF
C. CONSTRUCTION
TYPE II-B
Non -Combustible
Not Fire Rated
D. ALLOWABLE SQUARE FOOTAGE
A3 9500 SF Allowable
7130 SF Frontage Increase
16830 Total Allowable > 3200 SF
S117500 SF Allowable
7130 SF Frontage Increase
16630 Total Allowable (Per Floor)
> 15,800 SF - Ground Level
> 3200 SF - Mezzanine Level
S2 26000 SF Allowable
19500 SF Frontage Increase
45500 Total Allowable > 3200 SF
E. OCCUPANCY LOAD
A3213 (2 Exits)
S1 95
S2 16
F. ROOFING
Type C or Better
G. INTERIOR FINISHES
Interior Stairs - Class B
Interior Rooms - Class C
Root 1/48 Minimum
Slope (1/8 Actual)
1 Hour Firewall �lAg®I�I�I�I■
3 Hour Firewall I®I•IIIMRuIAUR•IIIu®MIIII
CODE PLAN
1/16. = I' -a'
r
L
WORKS 0•36\A-E
CONTACTS
OWNER
CITY OF HIGO
14669 Fitzgerald Ave N.
Nugo, MN 55038
Roils: (651)162-6316
Fast (651) 162-6314
ARCHITECT
ELNEee SeENea4 GRAHAM ARCHITECT8
500 Ilia Hanton Av. S. Suite 10e0
Mlmeapolie, MN 65415
Fl n., (612)339-5508
Few (612) 339-5362
CIVIL ENGINEER
STEVENS!, ENGINEERS
Ib56 Livingstone Rd
Hudson WI 54016
Prams, (115) 386-5819
Fax, L
STRUCTURAL,
MECHANICAL & ELECTRICAL ENGINEER lk 011111
NEL6ON RUM 1 ASSOCIATES, NC.
2635 lhlvanityy Ave,. W. Suite 150
6t. Paul, 184 55114
Mow (651) 644.2400
Fax: (65U 641-4120
1•14be:f"*/*
90-0,
SI - 19p00 SF (INCLUDES MEZZANINE)
OCCUPANTS
•
`3-14R FLOOR
Ae61anBI.Y-
E<-42 HIGH
GUARDRAIL
81 - 3200 SF MEZZANINE
2 OCG ,(t BASE BID ALTEFNAlE,
120
1--3-HR
PRECAST
CONCRS
SALL
-61GNAGE
-Tim Ml�Etclr l
Cal
-3-NR PRECAST
CONCRETE WALL
OGG 0T OCC.
40'-0. 40.0' 40'-0'
210,-0'
82 - 3300 8F A3 - 3,200 SP
I6 OCCUPANTS 213 OCCUPANTS
106 OCC
DRAWING INDEX
TI !Title Sheet 4 Code Plan
CIVIL
CI
Site Layout Plan
C2
Site Grading and Utility Plan - -
C3
Site Details
ARCHITECTURAL
TI
Title Sheet a Code Plan ...
Al
Ground Floor Plan
A2
Mezzanine Plan 4 Details
A3
Reflected Ceiling Plans and Interior Elevations
A4
Roof Plan 4 Details
A5
Building a Wall Sections
A6
Wall Sections 1 Details
Al
Exterior Elevations
A8
Door and Window Elevations, Details and Schedules -
STRUCTURAL
81
Foundation Plan
52
Roof Framing Plan
53
General Structural Notes and Mezzanine Framing Plan
54
Details
55
Details
86
Details
MECHANICAL
M1.1
Main Floor Plumbing Plan -. .
MI2
Mezzanine Plumbing and NVAC Plans
M2.1
Main Floor HVAC Plan
M22
Main Floor Below Slab Heating Plan -
M3.1
Mechanical. Details
M32
Mechanical Details 4 Schematics
M4.1
Medvnreal Schedules -
ME1
Mechanical/Electrical Schedules`.I
ME2
Mechanical/Electrical Schedules--` - . -
ELECTRICAL
E0.1
Electrical Site Plan -
EI.1
Electrical Power 4 Systems Plant'"
£12
Electrical Mezzanine Power 4 Systems Plan
E2.1
Electrical Lighting Plan
E22
Electrical Mezzanine Lighting Plan and Fixture Schedule
E3.1
Electrical Riser Diagram and Schedules -
Hugo Pub }pocks
• VI
S.y,
ELNBSS'SWHNSON GRAHAM
ARCHITECT$ INC.
,k •
7002141i ases swat
4av,.u41s
Pfau 612r13➢ FSOS"P 612/333 3332
Hasp ilia is rbiia;
6900 - 137t)t Stxfet Math
H p, hN 55038
T1
MVE MG IF MAMA AGIT.1i
T. En tU lm=GIES
TC
GTRRm mGROLD
VC
•
GY 0.1100 lnaMGle
PUBLIC WORKS
BUILDING
GO ET Gat MO 6.11101 VG.
TfALS ll' CMS IT
=tin, IMe MVoae. GYP
RADRR HTUNDOR VI1N E. OWE. 1141.10 GYP
NOTES;
1. CONTRACTOR SHALL VERIFY ALL UTILITIES FOR LOCATIONS, SIZES,
INVERTS AND TYPE OF PIPE. (GOPHER STATE ONE CALL 1-800-252-1166)
2. CONTRACTOR SHALL NOTIFY THE UTILITY COMPANIES AND CITY OF HUGO
PRIOR TO COMMENCING WORK AND SHALL BE RESPONSIBLE FOR THE
PROTECTION OF PUBLIC AND PRIVATE UTIUTIES DURING CONSTRUCTION.
3. • CONTRACTOR SHALL BE RESPONSIBLE FOR ARRANGING ALL REQUIRED
INSPECTIONS WITH THE GOVERNING AUTHORITY HAVING JURISDICTION
OVER THE WORK TO BE PERFORMED AND ACQUIRING PERMITS.
4. CONTRACTOR SHALL SAVE TREES WHEREVER POSSIBLE. VERIFY ALL
REMOVALS WITH THE ENGINEER AND CITY.
5. DIMENSIONS ARE TO FACE OF CURB UNLESS OTHERWISE NOTED.
6. RESTORE ALL DISTURBED AREAS WITH 4" SALVAGED TOPSOIL.
SEED AND MULCH AREAS PER SPECIFICATIONS UNLESS OTHERWISE NOTED.
awaTPAnRSEC m
SUEVALS W.T. o
DTTIt S.C. to
ET GP
ALT. 1 BID BUILDING ADDITION
ALT. 2 BID BUILDING ADDITION
BASE BID BITUMINOUS PAVEMENT SECTION
ALT. 2 81D BITUMINOUS PAVEMENT SECTION
Q
RE SOCCER FIELD
FUTURE PARKING
120 STALLS
LEGEND:
a
*
FUTURE PLAY GROUND
°6 0
.
FUTURE VOLLEYBALL COURTS
BASE BID 14" GRAVEL SECTION tyre-r-rerm EX. EDGE OF WOODS
CLEARING\GRADING LIMITS a FENCE
CONIFEROUS TREE — — SILT FENCE
DECIDIOUS TREE -0- EXISTING UTILITY POLE
GRAPHIC SCALE
i i m 10
( D2 PE4a)
1 huh- 40 ft
Hugo Public Works
Irv; Womb
ELNESS SWENSON GRAHAM
ARCHITECTS INC.
700II* Sl tSon*
w33413
tMlu 612y3.04308 Arc 6120394382
IAady elayy a. 0* aea.lte,r Ma
P.P.., tr a8. ae.rt. ay a1as,paeVV.
4th 1 ..iyYwud eRERMi
)SAS.
6COTT A. WARE)
Dori orA4+edNose
410921 <.` 1-29.04
tme.Ne. Date
STEVENS
ENGINEERS
PFofat *notation
203801
TJ8 BP81
Dram Hy Mari Hy
Shad LfommNon
81TE LAYOUT
Cl
INSIDE STORAGE ANALYSIS FOR CITY'S VEHICLES AND EQUIPMENT
28-Feb-18
EXISTING VEHICLES AND EQUIPMENT (EXCLUDING TRAILERS)
Space Name Quantity
Size
Area (SF)
Total (SF)
Large Spaces
9
18 x 36
648
5,832
Medium Spaces
37
12 x 24
288
10,656
General Equipment Storage
1
3,000
3,000
Circulation
1
8,500-10,800
8,500-10,800
TOTAL
28,000-30,300
EXISTING INSIDE STORAGE
Streets Shed
1
18 x 36
648
648
Parks Shed
1
22 x 76
1,672
1,672
TOTAL
2,320
ADDITIONAL STORAGE NEEDED
*Does not include vehicle wash bay
25,680-27,980*
WS — Item 10
WORK SESSION STAFF REPORT
Work Session Item No. 10
Date: February 5, 2018
To: City Council
From: Jeff Karlson, City Administrator
Re: Public Works Facility Renovation & Expansion
Background
The Council had much discussion in 2017 about remodeling and expanding the existing
public works facility. There was little support for building a new facility. There was no
consensus as to what direction the Council wanted to go.
During the Council's last discussion in November, it was suggested that the conversation
continue after the election.
Amongst the information included in this packet are the Site Analysis and Space Needs
Study prepared by CNH Architects and an Addendum which further explains the
deficiencies and scope of noncompliant code issues in the public works building. In the
Addendum, Quinn Hutson specifically references pages 28 and 33 of the study.
Requested Council Direction
Staff is looking for further direction from the Council.
Attachments
Addendum to Public Works Facility Study 10-30-17
2017 Staff Reports and Minutes
Public Works Facility Study 4-11-17
Original Proposal from CNH
Addendum
City of Lino Lakes
Public Works Site Analysis and Space Needs Study Addendum
October 30, 2017
The following information is intended to expand on information provided in the original study dated
April 11, 2017, to provide a more in-depth discussion of Layout Option Al, the remodeling and
expansion of the existing City of Lino Lakes Public Works facility. The information in this Addendum
does not change the space needs data, schematic layout design, estimated costs or other information in
the original study; but instead provides a more comprehensive view of the background on which the
data, design and cost estimates were based. The Addendum also reviews broad cost potentials for
future expansion labeled Phase II in the study.
Existing Public Works Remodeling Scope
The remodeling of the existing Public Works facility is shown in the study to be a relatively complete
interior gutting and rebuilding along with exterior envelope upgrades. To expand on this it is necessary
to consider how the building code evaluates maintenance versus remodeling.
First of all, ongoing maintenance of an existing building does not trigger code updates. However,
maintenance of an existing building only allows minor ongoing operational items such as changing light
bulbs (not fixtures), painting, recarpeting, patching an existing roof or repairing existing mechanical
units. Replacement of roofing systems, new mechanical units, replacement of light fixtures, and similar
upgrades however are specifically excluded from the maintenance definition and are instead considered
remodeling.
In comparison, the Minnesota State Building Code and referenced International Building Code require all
remodeled portions of a building to fully comply with current building code requirements. Further, if
the scope of a remodeling is such that the majority of the existing facility is remodeled, then the entire
facility is required to be brought into compliance with the current building code standards. Under these
provisions, the proposed remodeling and expansion of the existing Public Works facility as represented
in Layout Option Al would trigger a complete code compliant end result.
Finally, any items that are not in compliance with ADA accessibility standards, MPCA regulations, OSHA
safety standards or other similar safety, environmental, and civil rights requirements are not
"grandfathered" or allowed to remain noncompliant until a future remodeling date, but instead are to
be addressed when identified.
When reviewing the existing Public Works facility, see pages 28 through 33 for a general summary, it
was determined that the scope of code noncompliant spaces is such that no interior room was
reasonably reusable in its current basic existing condition due to configuration, construction or
operational deficiencies. This level of noncompliance was more extensive than was anticipated prior to
CNH
ARCHITECTS
the start of the study however as the documentation of existing conditions completed, the evidence was
extensive. The noncompliant items include the following partial list: corridors to narrow to meet
accessibility standards, restrooms and countertops of improper size or without accessible heights,
combustible construction in a non-combustible defined building including wood paneling and some
wood wall construction, mechanical units that did not provide minimum air quality requirements,
storage in areas without proper headroom, floor drains in vehicle accessed areas that flow into a septic
system, among many other items. The deficiencies identified in the existing Public Works facility are not
maintenance items as defined in the earlier paragraph, but can only be addressed in an extensive
remodeling of the entire existing building which is what led to the findings represented in the original
study.
While providing for more upgrade costs than originally would have been anticipated, the extent of the
needed remodeling upgrades identified in the study is valuable knowledge for use by the City of Lino
Lakes in effectively planning for the current and future needs of the Public Works Department in a
manner to ensure that upgrades budgeted address the short-term and long-term goals developed for
the facility.
Future Expansion (Phase II) Timing and Cost
The future expansion labeled as Phase II in the study represents possible future growth needs for the
Public Works department looking out at least 15 to 20 years. This data is based on typical anticipated
additional departmental needs to serve the increase in the population of the City of Lino Lakes as
projected by the Metropolitan Council by the year 2040. This population projection is more than two
decades in the future and only time will indicate if this growth level materializes. Further, the additional
square footage of vehicle storage needed to serve this larger population is estimated based on staff
input and comparison to other cities of similar population to the Metropolitan Council's future
population estimate and also may not fully materialize. The intent of the study is to identify the
maximum potential departmental facility needs within the requested timeframe reviewed such that, if
needed, the site and building masterplan layout can accommodate this future facility growth without
relocation or other inefficiencies.
The study is not intended to indicate that the Phase II storage building expansion will be required, only
that if the projections both for growth of population and equipment needs achieves the maximum
envisioned levels, the site and building masterplans developed remain viable. The City of Lino Lakes
would need to revisit actual needs based on updated data over the coming decades.
Due to the unknown size and timing of the potential future expansion (Phase II) a cost estimate for this
building addition was not included in the study results. However, to provide some concept of potential
future expansion costs, the following table has been added to this Addendum.
Future Expansion Size
Building
Area (sf)
Low Cost
/SF*
High Cost
/SF*
Low Range
High Range
Minor Addition
15,000
$110
$150
$1,650,000
$2,250,000
Maximum Addition
30,000
$110
$150
$3,300,000
$4,500,000
*Costs in 2017 dollars and does not include inflation
CNH
ARCHITECTS
As the table indicates, the low end cost for a small addition of a scope that still allows for efficient
construction costs represents a construction cost of $1.65 million for a low -temperature heated open
plan storage addition. Conversely, if the population and equipment growth projections hit their most
aggressive levels represented in this study, the maximum addition cost would range from $3.3 million to
a high end of $4.5 million. As noted, these construction estimates are based on recent construction
costs for Public Works facilities of similar types and are listed in 2017 dollars.
Thank you for the opportunity to provide this additional data to better explain the study methodology
and the intended limitations of the future expansion cost ranges.
Best Regards
Quinn Hutson, AIA, LEED AP
Principal
CNH Architects, Inc.
CNH
ARCHITECTS
CITY COUNCIL
AGENDA ITEM 513
STAFF ORIGINATOR: Rick DeGardner, Public Services Director
MEETING DATE: December 12, 2016
TOPIC: Consider Resolution No. 16-172, Approving Public Works Space
Needs Analysis and Existing Facility Audit Proposal
VOTE REQUIRED: 3/5
INTRODUCTION
The Lino Lakes Public Services Department is requesting City Council approval to retain CNH
Architects, Inc. to conduct a Public Works Space Needs Analysis and Existing Facility
Audit.
3ACKGROUND
The Public Works Building (located at 1189 Main Street) was built in 1971 and consists primarily
of a mechanical area (for fleet and equipment repairs), break room, and office space. A 40' x
80'shed (also built in 1971) provides some storage for vehicles, equipment, and supplies. In 2000,
a 60' x 80' shed was built to provide additional indoor storage. A salt storage shed was built in
2013.
CNH Architects, Inc. will consider three approaches:
1. Renovate existing building and expand to meet future needs
2. Build a new facility at the existing site
3. Build a facility at the city property at Centerville Road and Birch Street
Topics including existing facility conditions, current and future space needs, growth potential for
each option, accessibility compliance, energy usage and potential for savings, long-term costs of
operation, and capital costs for remodeling/construction will be examined.
Mr, Quinn Hutson, Principal Architect with CNH Architects, Inc. will lead and coordinate all
members of the design team and be the primary contact throughout the project. He brings
extensive experience with city projects, numerous reviews of client and facility needs, and
familiarity with the City and staff from past projects with the City of Lino Lakes.
RECOMMENDATION
Staff recommends the Council accept the CNH Architects, Inc. proposal to conduct a Public
Works Space Needs Analysis and Existing Facility Audit for a fixed fee of $11,900 plus
reimbursable expenses for printing and mileage.
ATTACHMENTS
Resolution No. 16-172
Public Works Space Needs Analysis and Existing Facility Audit (Dated Sep. 23, 2016).
CITY OF LINO LAKES
RESOLUTION NO. 16-172
RESOLUTION APPROVING PUBLIC WORKS SPACE NEEDS ANALYSIS AND
EXISTING FACILITY AUDIT PROPOSAL
WHEREAS, The Lino Lakes Public Services Department is requesting City Council approval
to retain CNH Architects, Inc. to conduct a Public Works Space Needs Analysis and Existing
Facility Audit; and
WHEREAS, The Public Works Building (located at 1.189 Main Street) was built in 1971 and
consists primarily of a"mechanical area (for fleet and equipment repairs), break room, and office
space. Two sheds (built in 1971 and 2000) provide some storage for vehicles, equipment, and
supplies. A salt storage shed was built in 2013; and
WHEREAS, CNH Architects, Inc, will consider three approaches;
1. Renovate existing building and expand to meet future needs
2. Build a new facility at the existing site
3. Build a facility at the city property at Centerville Road and Birch Street
Topics including existing facility conditions, current and future space needs, growth potential for
each option, accessibility compliance, energy usage and potential for savings, long-term costs of
operation, and capital costs for remodeling/construction will be examined; and
WHEREAS, Funding is available from the Building Facilities Fund.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Liiio Lakes that
the Council accept the CNH Architects, Inc. proposal to conduct a Public Works Space Needs
Analysis and Existing Facility Audit for a fixed fee of $11,900 plus reimbursable expenses for
printing and mileage.
Adopted by the Lino Lakes City Council this 12`h day of December 2016.
The motion for the adoption of the foregoing resolution was introduced by Council Member
Rafferty and was duly seconded by Council Member Maher and upon vote being
taken thereon, the following voted in favor thereof;
Rafferty, Maher, Manthey, Kusterman, Reinert
The following voted against same:
none
Jeff Reinert,
ATTEST:
� \n
Juiiafir�e Bartell, City Clerk
CITY COUNCIL SPECIAL WORK SESSION May 1, 2017
APPROVED
46 and staff intends that there will be more information and discussion in the future with
47 resident involvement included.
48
49 The council expressed their support for strong neighborhood involvement. The residents
50 would be directly affected by additional traffic control (or no additional traffic control)
51 and should have their voices heard. City Engineer Hankee explained that staff is still
52 looking at the validity of the stop sign request from an engineering perspective. Staff
53 could provide notice to the area residents at any time with council direction. Council
54 Member Kusterman pondered the council's authority if it comes to overruling a staff
55 recommendation. Ms. Hankee explained that safety is the number one priority and so a
56 recommendation would be based first on that consideration. If the addition of a stop sign
57 isn't the right action, there could be other traffic calming recommendations.
58
59 Council Member Rafferty asked if a traffic study and the work occurring on this situation
60 is a standard response to a resident's request and staff confirmed that they review several
61 requests each year as part of their normal work load.
62
63 3. Public Works Site Analysis and Space Needs Study — Public Services Director
64 DeGardner introduced Quinn Hutson (Principal Architect) and Jessica Johnson
65 (Architectural Designer) representing CNH Architects, to present their report.
66
67 Mayor Reinert noted that he believes the council requested an option of fixing the current
68 facility but that doesn't seem to be included in the analysis. Mr. Hutson said that Option
69 One includes renovating the current facility with a building expansion.
70
71 Jessica Johnson and Quinn Hutson, reviewed a PowerPoint presentation that included
72 information on:
73 Overview of analysis they have completed;
74 Public Works site options map (site options are the existing site as Option A, or
75 site adjacent to fire station #2 as Option B);
76 - Space needs for the city's public works program: office, vehicle storage, vehicle
77 maintenance, and departmental shops;
78 - Growth consideration for the next 20 years;
79 - A comparison with other public works facilities in cities in the area and with
80 similar population;
81 - Layout options (two at site one and one at site two);
82 - Sanitary and water service addition would be required at current site; there would
83 be some disruption of services at current facilities (Council Members expressed
84 concern about losing the baseball field and suggested that should not be
85 necessary);
86 - Site Option B advantages were noted (sewer and water hookup;, etc); the site is
87 sufficient to meet the needs of both Phase 1 and 2;
88 - An architectural review of the current facilities; accessibility and code review
89 (several issues noted); mechanical systems review;
2
CITY COUNCIL SPECIAL WORK SESSION May 1, 2017
APPROVED
90 Cost estimate: Phase 1, all three options priced, both low cost options to higher
91 cost (Mayor Reinert remarked that a remodel without a space expansion hasn't
92 been priced and Mr. Hutson said that is because that option wouldn't address
93 future space needs). Mayor Reinert suggested that there is an even lower cost
94 option that would basically add an unheated pole barn, although Director
95 Grochala suggested there could be some space/utility services issues.
96
97 Mayor Reinert noted his concern about costs and prudence in spending the taxpayer's
98 funds. He is more supportive of exploring improvements at the Fire Station No. 2 land
99 for community use, such as a park, and improving the current public works facilities to
10o get equipment protected (i.e. unheated pole barn). Council Member Kusterman
101 remarked that perhaps a more detailed, lower level explanation of costs would be helpful
102 in a careful consideration of spending. Mayor Reinert remarked that the city just dug out
103 of a recession and he'd like to keep the city's budget small. He supports forward and
104 innovate thinking but this requires a lot of thought and there may be more urgent needs
105 right now.
106
107 In addition to more information on costs (at a more micro level),
108 a comparison of proposed square footages to current space would be helpful. Council
109 Member Rafferty remarked that city hall is a good example of a decision based on future
110 needs and the rocky road and changes that can occur as the future comes upon you.
111
112 Council Member Rafferty noted that one option would move facilities to the south side of
113 the city and he wonders if that is best location for service provision. Director DeGardner
114 suggested that the closer to the core of the city, the better as far as saving trips and driving
115 economy. Mayor Reinert noted that the future could mean population changes however.
116 Mr. Hutson added that with the south site, it is anticipated that the current site facilities
117 would continue to some extent.
118
119 The mayor asked Administrator Karlson, if the roof were leaking here at city hall, what
120 procedure and funding is available to address the problem. Mr. Karlson noted the
121 facilities fund that is available for building expenses at city hall; for the work itself, a
122 bidding process would be appropriate. The mayor asked, would that facilities fund be
123 the same source to fund repairs to the public works facilities. Director DeGardner
124 explained that staff makes judgements about how to move on repair situations. Mayor
125 Reinert suggested that repairs should be done as needed along the way and he feels the
126 funds were available for repairs.
127
128 The council concurred that they will receive additional information as they have
129 requested. Council Member Manthey asked about the move of city hall from the old
130 building to the current. Director Grochala noted a study that involved creating a town
131 center as well as the space needs that developed.
132
133 Council Member Rafferty requested that the Hugo, Shoreview, etc. public works
134 locations be shared with the council.
3
WS — Item 4
WORK SESSION STAFF REPORT
Work Session Item No. 4
Date: July 5, 2017
To: City Council
From: Rick DeGardner, Public Services Director
Re: Public Works Facility Audit Payment and Proposal for Additional
Architectural Services
Background
December 12, 2016 - City Council approved Resolution 16-172 (Attachment 1), retaining
CNH Architects to conduct a Public Works Space Needs Analysis and Existing Facility
Audit (Attachment 2). Three approaches were identified:
1. Renovate existing building and expand to meet future needs
2. Build a new facility at the existing site
3. Build a facility at the city property at Centerville Road and Birch Street
April 14, 2017 - Public Works Site Analysis and Space Needs Study delivered to all City
Councilmembers (Attachment 3).
May 1, 2017 - Mr. Quinn Hutson, Principal Architect and Ms. Jessica Johnson,
Architectural Designer, present the study to the City Council. The City Council wanted
additional information including an option of fixing the current facility, a more detailed
explanation of costs, and a comparison of proposed square footages to current space.
June 12, 2017 - City Council removed the payment of $764.30 to CNH Architects from
the consent agenda and directed staff to place this item on the July work session agenda.
A proposal for Additional Architectural Services from CNH Architects is included for
consideration (Attachment 4). This would expand the scope of the original Public Works
Facility Space Needs Study to breakout individual costs for remodeling the existing
public works facility.
Requested Council Direction
Authorize staff to forward payment to CNH Architect for services rendered. Determine
whether to proceed with proposal for Additional Architectural Services with CNH
Architects.
Attachments
Attachment 1 - Staff Report and Resolution 16-172
Attachment 2 - Public Works Space Needs Analysis & Existing Facility Audit Proposal
Attachment 3 - Completed Public Works Site Analysis and Space Needs Study
Attachment 4 - Proposal for Additional Architectural Services
PROPOSAL FOR ADDITIONAL ARCHITECTURAL SERVICES
PROJECT: Lino Lakes Public Works Space Needs Study
CNH No,: 16088
CLIENT: City of Lino Lakes
May 24, 2017
Mr, Rick DeGardner
Public Works Director - City of Lino Lakes
600 Town Center Pkwy.
Lino Lakes, MN 55014
DESCRIPTION
The additional services under this proposal is to expand the original Public Works Facility Space
Needs Study to breakout individual costs for Option Al - the remodeling of the existing public works
facility to evaluate the costs of individual portions of the remodeling and prioritize these items to
consider a multi -phased approach.
GENERAL
We propose to perform the following additional services:
ADDITIONAL ARCHITECTURAL SERVICES
Our services for this part of the work consist of expanding the scope of the Space Needs Analysis
Study with the following items
SERVICES PROVIDED
- Meetings with Staff as required
- Review structural element capacity and implications related to remodeling existing building
- Breakout elements of upgrade and remodeling of existing facility
— Prioritize maintenance and upgrade options
- Develop approximate budgets for each partial phase maintenance and upgrade option
- Update Study document — printed and pdf copies
- Presentation at City Council Workshop
SERVICES NOT PROVIDED
— Mechanical/Electrical design
— Civil design
7300 West 147"' St, Suite 504, Apple Valley, MN 55'124 952.43'1,4433 www.cnharch,com Page 1
FEE
We propose the services indicated above for a fixed fee of $4,800, plus reimbursable expenses as indicated below.
This proposal fee is valid for 90 days from the date of this document.
AGREEMENT
This proposal updates the original Space Needs Proposal as indicated in this document, all other items remain as
originally indicated.
The fee is due within 30 days of monthly invoices. A finance charge of 1,5% per month will be charge to unpaid bills
after 30 days.
REIMBURSABLE EXPENSES
Reimbursable expenses include the following items and will be billed as they occur:
Miscellaneous B&W and color printing at cost
— Miscellaneous postage, shipping and messenger service at cost
Mileage, at IRS designated rate
SCHEDULE
The work indicated above will be completed for presentation at the early August City Council Workshop.
We appreciate the opportunity to expand the study to cover these additional elements.
Sincerely,
g(A4;0—"uinn Stso , AIA, LEED AP
Principal
CNH Architects, Inc
ACCEPTED BY:
Signature:
Name:
Title:
Date:
7300 West 147`' St, Suite 504, Apple Valley, MN 55124 ( 952,431.4433 ( +,wvw.cnharch.com 1 Page 2
CITY COUNCIL WORK SESSION July 5, 2017
APPROVED
134 Council Member Rafferty recalled the department's early recommendation on the
135 purchase from Woodbury and asked if those trucks were intended for training from the
136 onset? Director Swenson recalled the development of the need for training. Mayor
137 Reinert said he's comfortable with the fact that the equipment has served a purpose and
138 may provide revenue to the city.
139
140 Director Swenson said he would proceed with working with the Brinlee Mountain
141 Company on the marketing of the equipment. Mayor Reinert directed staff to try and
142 make as much off the trucks as possible. Council Member Manthey asked if there is
143 time to work the market and Director Swenson said it's tied to the timing of the
144 requirement for recertification.
145
146 Director Swenson also received council concurrence on donating some hard suction host
147 that is no longer useful to the city. It was agreed that the equipment would be donated to
148 the Centennial Fire District. He will bring the matter to the council for official
149 authorization.
150 4) Public Works Facility Audit Payment and Proposal for Additional Architectural
151 Services - Public Services Director DeGardner reviewed his written staff report,
152 including the history of this project to date.
153
154 Mayor Reinert remarked that the council wants to receive the infoituation that they paid
155 for. The work received didn't include what was specifically requested. Now the
156 council is receiving this (representing the work originally requested) with a request to be
157 paid for the "additional" work. He suggests that the council work session recording of
158 previous council consideration will tell the tale. He clarified that he has stated in a
159 previous meeting that he isn't interested in new buildings. He sees the goal as getting the
160 city's equipment out of the weather. He didn't see anything representing that option
161 brought back.
162
163 Council Member Manthey said he recalls the three options brought forward and actually
164 that was what he expected. He would like to see additional information but he doesn't
165 necessarily recall that request. He recalls discussion about what the city will need
166 looking ahead to the future.
167
168 Mayor Reinert suggested that providing only three $12 million options isn't what he
169 wanted and isn't appropriate. This is the difference between a want and a need — the
170 need being to get equipment out of the weather and repair the public works building.
171
172 Council Member Kusterman suggested that he got what he expected, not to say that he's
173 interested in spending that much money.
174
175 Mayor Reinert said he recalls specifically his request and he feels it was ignored. He
176 doesn't think that the bill should be paid until the job is finished.
177
4
CITY COUNCIL WORK SESSION July 5, 2017
APPROVED
178 Council Member Maher suggested that the council voted and approved a resolution that
179 authorizes what came forward. Mayor Reinert suggested then that, to be clear, the
180 council will have to have every element of their discussion included in what they vote on
181 in the future.
182
183 Council Member Kusterman noted that the council's discussion included a request for an
184 itemization so they could look at what is really needed.
185
186 Director DeGardner remarked that he believes Mr. Hutson of CNH Architects thinks he
187 provided what he was asked to. Mr. DeGardner added that by keeping a shell and
188 attempting to retrofit the existing facility was probably not a level of improvement that
189 was considered. Mr. DeGardner said he can inform Mr. Hutson that the city doesn't
190 want to pay the remainder of the bill based on this discussion. Mayor Reinert added that
191 the job wasn't done as requested. He should finish the job with what he was paid or the
192 city can get someone else.
193
194 Council Member Maher said she hasn't listened to the tape to confirm what was said.
195
196 Council Member Kusterman suggested that the mayor seems to want the council to listen
197 to the tape to confirm the direction.
198
199 Council Member Rafferty recalled that he wasn't interested in spending a huge sum of
200 money at this point although he knows eventually facilities have to be upgraded. He does
201 see that Mr. Hutson tried to basically break things down in his report; perhaps Mr. Hutson
202 may have seen that it didn't make sense in his mind to not move to a new facility.
203 Council Member Rafferty said he doesn't see the need to withhold payment of the bill.
204
205 Mayor Reinert said he'd be willing to let go of the issue of payment of the bill but he
206 won't be willing to work with that company again. He'd like to see three contractors
207 brought in to view the current facility and hear what they could do to update that facility.
208
209 Council Member Manthey suggested that the process of discussion now is a good thing;
210 he always anticipated that there would be more council discussion to decide on the best
211 option for this city. He feels the council has to be very clear on the information they
212 want to receive. He thinks part of the discussion are things like bringing in water and
213 sewer and thinking ahead to needs in the future.
214
215 Council Member Rafferty suggested that even a contractor has to understand what is
216 being asked and that type of information isn't prepared.
217
218 Mayor Reinert asked, for the $12,000 that this company will be paid, will there be value
219 to the city in the future. Council Member Rafferty said he believes so.
220
221 The council concurred that the payment will be added to the next council agenda for their
222 consideration (as an item separate from the expenditure list). Staff was directed to look at
5
CITY COUNCIL WORK SESSION July 5, 2017
APPROVED
223 alternative options to get information from contractors or architects who specialist in
224 remodeling.
225 4.5) New Facility Rental Charges Impacting Recreation Department — Rick
226 DeGardner and Brian Hronski were present. Director DeGardner reviewed his written
227 report outlining charges for facility use that have been instituted by Centennial School
228 District (CSD). He reviewed the fall 2016 programs offered by the city and how the
229 revenue for those programs will not cover the costs of facility rental and result in a
230 significant deficit situation for the department. He reported that staff has attempted to
231 work this out with CSD but they are firm in their determination to charge the fees. The
232 department has worked hard to move what programs they can to city facilities or other
233 non -charge sites; some programs may have to be discontinued. He identifies two
234 scenarios within the staff report to deal with the situation — either challenge the
235 Recreation Supervisors to come up with solutions, or let certain programs go and hope
236 that the school district picks up on those activities and with that a loss of a recreation staff
237 position.
238
239 Mayor Reinert suggested that there's been a deterioration in the relationship between the
240 city and the school district in areas such as this and he fears it is mostly on their side. He
241 recalled ways that the city has worked with the district to assist. He suggested that there
242 are ways to charges back city costs to the district. He'd like to see if CSD would
243 reconsider.
244
245 Council Member Manthey asked if the school board members are aware and supportive
246 of this action. Mayor Reinert said he would write a letter to the superintendent and copy
247 the school board members; he'd rather unwind this before having to look at charging
248 back.
249
250 Director DeGardner remarked that the youth sports organizations have been given a
251 higher priority and as a result an exemption from the use fees. This would be a big
252 impact to the department and he can state that they have tried to work this out with his
253 contemporaries but that hasn't worked. He is really faced with a "what do we do for this
254 fall" and he is recommending the direction to staff to work on solutions.
255
256 Mayor Reinert asked that staff help him with a letter to the Superintendent, copied to the
257 school board members and perhaps a visit to the next school board meeting.
258
259 Council Member Kusteiinan said he is frustrated especially because he would like to see
260 more budgetary consideration to providing even more recreation opportunities. He
261 agrees with going to the school hierarchy to attempt to work this out.
262
263 The council directed staff to proceed with their recommended option one, including the
264 change to the $10,000 contribution.
6
WS — Item 10
WORK SESSION STAFF REPORT
Work Session Item No. 10
Date: August 7, 2017
To: City Council
From: Jeff Karlson
Re: Public Works Facility
Background
During the July 5th work session, the Council directed staff to seek alternative options for
upgrading the public works facility. Since that meeting I have talked to several of you,
including staff, about what direction we need to take. None of us seem to be on the same
page. Therefore, it is unclear to staff what direction the Council wants to go.
Is it the Council's intent at this point to only address deficiencies with the building before
moving forward with a plan for additional storage?
Requested Council Direction
Staff is requesting further direction.
CITY COUNCIL WORK SESSION August 7, 2017
APPROVED
303 10. Public Works Facility _Mayor Reinert explained that he has met with
304 staff and has received much more information on this subject and will be receiving more.
305 Perhaps that information will includes what he felt was lacking earlier. He feels it could
306 be beneficial for city officials to look at other facilities.
307
308 Council Member Manthey asked about the goal of touring other facilities. Administrator
309 Karlson can work with other city staff to arrange visits. Council Member Kusterman said
310 he'd be happy to share some documents that he has from the City of Shoreview and their
311 process of phasing improvements.
312
313 The council agreed on the date of Tuesday, August 22, 5:30 p.m.
314 7. Council Updates on Boards/Commissions, City Council
315 8. Monthly Progress Report — Administrator Karlson reviewed the progress report.
316 This item included an update on the Laserfiche project by the City Clerk.
317 9. Review Regular Agenda — The agenda for the August 14, 2017 council meeting
318 was reviewed and there were no changes.
319
320 The meeting was adjourned at 10:00 p.m.
321
322
323 August 28, 2017.
324
325
326
327. J
328 Juliae Bartell, City Clerk
329
These minutes were considered, corrected and approved at the regular Council meeting held on
8
WS — Item 8
WORK SESSION STAFF REPORT
Work Session Item No. 8
Date: November 6, 2017
To: City Council
From: Jeff Karlson, City Administrator
Re: Public Works Facility
Background
During the Council Work Session on May 1, 2017, Quinn Hutson, Principal Architect for
CNH Architects, presented a Public Works Site Analysis and Space Needs Study. Mr.
Hutson identified three options in the study along with the cost estimates for each option.
Mayor Reinert was of the opinion that CNH did not provide an option to remodel the
existing facility. There has been much discussion and debate the last several months
about what the City Council should do.
Public Services Director Rick DeGardner requested that Mr. Hutson provide a more in-
depth explanation of his evaluation regarding Option Al, which was to remodel and
expand the existing public works building.
Attached is an Addendum that Mr. Hutson prepared last week. The Public Works Site
Analysis and Space Needs Study are also attached. Hutson specifically references pages
28 through 33, which illustrates the deficiencies and scope of noncompliant code issues
in the public works building.
Requested Council Direction
Staff is looking for further direction from the Council.
Attachments
October 30, 2017 Addendum to Public Works Facility Study
April 11, 2017 Public Works Site Analysis and Space Needs Study
CITY COUNCIL WORK SESSION November 6, 2017
APPROVED
225 Mr. Hillesheim reported on the current status of the city's equipment and the benefits of
226 replacing units. On the question of funding, staff is recommending use of 2017 budget
227 surplus for the units and funding of controls from the building maintenance fund. The
228 NAC representative spoke to replacement/down time if the units were to fail. The
229 council discussed replacement brand proposed as well as energy savings as a result of
230 replacement.
231
232 8. Public Works Facility — Administrator Karlson explained that, as a result of
233 questions that came up during a previous presentation by Quinn Hutson of CNH
234 Architects, an addendum is being presented further outlining the option of remodeling
235 and expanding the existing public works facility. He is asking if the council has further
236 direction on the matter.
237
238 Mayor Reinert feels opinions on this project are subjective. To address that, he thinks
239 that more information and different perspective is needed. Perhaps an opinion from
240 someone who doesn't specialize in government projects would be appropriate.
241
242 Council Member Manthey suggested that the council should give more detail on what is
243 wanted in order to get additional information. He suggested he'd prefer more discussion
244 for the whole council of possibilities and stages.
245
246 Mayor Reinert noted a Hugo facility that cost $2 million. His concern is that there's no
247 better level of services offered to the constituents with a more expensive building. He
248 wants to get the best for the residents' money.
249
250 Council Member Manthey warned against oversimplifying. It isn't just putting trucks in
251 a garage. He recommends the council review the whole situation and decide of what
252 should be spent, including what the facility can provide in the future. Mayor Reinert said
253 he is oversimplifying to make a point.
254
255 Council Member Rafferty remarked that the conversation should be held with the
256 upcoming council. Council Member Maher added that she isn't certain all the
257 information has gotten to the architect that needs to and that can be solved by more
258 discussion and direction.
259
260 9. 2018 West Shadow Lake Drive and LaMotte Drive — City Engineer Hankee
261 explained that staff is continuing to work on the project design. They are still planning on
262 holding a neighborhood meeting at the end of November. Communication is underway
263 with the webside and phone calls being taken. Drainage, a critical component, is being
264 worked on. Ms. Hankee was informed that residents have contacted the mayor with
265 questions about lake level and she explained that she is working to address those
266 questions with the DNR and watershed district.
267
6
Public Works Site Analysis and
Space Needs Study '°
CNH ARCHITECTS
7300 West 147th Street, Suite 504
Apple Valley, MN 55124
952.431.4433
www.cnharch.com
04/11/17
16088
TEAM
CNH Architects
Quinn Hutson, AIA
Principal Architect
Jessica Johnson, LEED AP BD + C
Architectural Designer
7300 West 147th Street, #500
Apple Valley, MN 55124
(952) 431-4433
www.cnharch.com
Engineering Design Initiative, Ltd. (edi)
Larry Svitak, PE
Mechanical Engineer
1112 Fifth Street North
Minneapolis, MN 55411
(612) 343-5965
www.edilimited.com
Professional Project Management (PPM)
Doug Holmberg
Cost Estimator
1858 East Shore Drive
Maplewood, MN 55109
651-776-5590
I HEREBY CERTIFY THAT THIS PLAN,
SPECIFICATION, OR REPORT WAS
PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY
LICENSED ARCHITECT UNDER THE LAWS OF
THE STATE OF MINNESOTA
PRINT NAME: QUINN HUTSON
DATE: 4/11/17
LICENSE NO: 21234
TABLE OF CONTENTS
Executive Summary 2
Overview of Study 6
Site A: Existing Public Works Site
Introduction
Site Analysis
Site B: Fire Station Site
Introduction
Site Analysis
Program Overview
Space Needs Program
Comparison Matrix
8
10
12
14
16
20
Option Al: Existing Building Expansion
Introduction 22
Layout 23
Option A2: New Facility - Existing Public
Works Site
Introduction 24
Layout 25
Option B1: New Facility - Flre Station Site
Introduction
Layout
26
27
Existing Facility & Site Review
Architectural Review 28
Accessibility and Code Review 31
Mechanical Systems Review 32
Cost Estimate
Option Al 35
Option A2 35
Option B1 35
CNH
ARCHITECTS 1
EXECUTIVE
SUMMARY
2 Public Works Site Analysis and Space Needs Study
EXECUTIVE SUMMARY
Site A
Site B
Introduction
The main facility of the current Lino Lakes Public Works Facility was built in 1971 with several
additional cold storage sheds, salt and brine shed, and a mobile office out -building added to the
site, since that time. The current site is on the northwest portion of Lino Lakes, off Main Street.
While the facility has functioned in the past 45 years, the City Council and staff determined that it
would be appropriate to analyze the condition of the current buildings along with the operational
needs of the Public Works Department to best serve the community for the next 20 years. The
long-term growth anticipated for the Public Works facility was also selected to be analyzed with
two possible sites to be considered - the current location labeled Site A in this study and the site
adjacent to Fire Station #2 on Centerville Road and Birch Street referred to as Site B.
With this goal in mind, the City of Lino Lakes contracted CNH Architects to perform an analysis of
three approaches for the Public Works Facility, now and into the future. The goal of this study is to
provide evidence based recommendations to address the needs of each department and analyze
site conditions for each site. This study evaluates each of the sites identified, rating them for a
broad series of attributes. The information provided in this study includes site data, gathered and
analyzed by CNH Architects and valuable input from Lino Lakes city staff. The report includes this
Executive Summary followed by supporting data and diagrams.
Process
Over the past few months, CNH Architects and our consulting team performed a detailed study
and analysis. The study process evaluated the following four major steps:
Step 1: Assess conditions of the current facility, including taking photos of the existing site. This
step includes reviewing current code and accessibility compliance, deferred maintenance, and
short-term anticipated maintenance requirements.
Step 2: Develop a Space Needs Program of current space needs, as well as evaluating impacts
on the space needs based on the projected growth of the City of Lino Lakes by 2040. This step
started by gathering data from Lino Lakes city staff regarding current and projected space and
site needs. Other public works facilities in similar, neighboring communities were reviewed as
comparative case studies to create proper metrics for gauging the appropriate scope of work.
Step 3: Develop an analysis of relevant site attributes for the two sites being considered. This
analysis includes availability of public utilities, buildable area after easement and wetlands were
located, efficiency of potential space use, and adjacent land uses.
Step 4: Develop a total of three preliminary site and building layouts on the two proposed sites and
obtain cost estimates for each option. The three options that have been identified for evaluation
for the Public Works Facility are shown on the Public Works Facility Site Option Map and consist
of the following:
Option Al: Remodel & Building Expansion on Existing Public Works Site (Site A)
Option A2: New Facility on Existing Public Works Site (Site A)
Option B1: New Facility at Birch Street & Centerville Road adjacent to Fire Station #2
(Site B)
CNH
ARCHITECTS 3
EXECUTIVE SUMMARY
Site A Statistics
0000.Adjacent Land Uses
00000 Infrastructure
0•••• Buildable Area
000•• Easements - Existing or Future
0000 • Floodplain
0000• Wetland
0•••• Site Visibility
00000 Noise Issues
00000 Potential Neighborhood Resistance)
Site B Statistics
00000Adjacent Land Uses
11 00000 Infrastructure
0000•
O00•
Buildable Area
• Easements - Existing or Future
1000..Floodplain
00000 Wetlands
10•••• Site Visibility
00000 Noise Issues
100000 Potential Neighborhood Resistance
Conclusions
The study determined that the existing facility, while having served the city well for 45 years, has
fallen well behind current standards both for codes, safety, facility maintenance and appropriate
size for a Public Works Department serving a city, the size of Lino Lakes. The building's code
deficiencies include total lack of accessibility standards, multiple building code noncompliance
items, OSHA workplace concerns, inappropriate sanitary waste conditions, and significant HVAC
air quality issues. Similarly, the existing building has deferred maintenance issues such as leaking
roof and windows as well as future near -term maintenance items that will require attention in the
next 1 to 5 years. These items can all be addressed by remodeling or replacement, but need to
be factored into the cost of relevant options being evaluated.
The review of the Space Needs for the Public Works Department, evaluated current space use,
shortfalls in needed space, and the future growth in staff and equipment projected within the
study timeframe of looking forward to 2040 needs. The approach included storage of all vehicles,
equipment and equipment accessories within a weather -protected semi -heated facility as is
typical within current public works facilities. This approach will provide long term value to the city
in significantly longer lifespan of the equipment and reduced upkeep. The results of the Space
Needs Program indicate a need for a total building area around 80,000 square feet by the end of
the 2040 timeframe. The study indicates that all categories are short of space, currently with the
largest shortage being in the Vehicle Storage category. Based on this review, we recommend
a two-step construction with Phase 1 addressing current and near -term shortfalls and Phase 2
adding additional Vehicle Storage space later in the masterplan. With this phased approach, the
Space Needs Program indicated a Phase 1 size of approximately 55,000 square feet with Phase
2 adding the remaining 30,000 square feet of Vehicle Storage.
These Space Needs were then compared to facilities at Hugo, Shoreview, Otsego and Hopkins.
The areas of each category of space were translated in square feet per population to equalize the
comparisons. The results indicate that Phase 1 Space Needs area goals are very conservative
being at or under the areas represented by all the cities in comparison. The Phase 2 Space
Needs area goals for the Vehicle Storage category rise into the middle of the comparison data still
remaining conservative as this phase for Lino Lakes looks out to 2040 and beyond.
The next step of the study analyzed site characteristics of the two potential sites being considered
for the future Public Works Facility, Site A, the current Public Works site and Site B, adjacent
to Fire Station #2. Site A scored moderately positive on buildable area and site visibility and
moderately negative on six other statistics. It scored negative on the infrastructure due to the
current lack of municipal water and sanitary sewer serving the site, which would be required to
remodel or replace the facility on this site. In review of Site B, this location rated infrastructure as
a positive since all utilities are already stubbed to the site from the fire station work. This site rated
moderately positive for four statistics, neutral for buildable area and flood plain, and moderately
negative for two remaining items. However, understanding not all statistics are of equal weight,
Site A scored an average of 2.22 out of 5 total points and Site B scored an average of 3.44 out
of 5 total points. While Site B has features that result in a better analysis, both sites are workable
and can be considered for the future of the Public Works Department, assuming of course that
municipal water and sanitary sewer is extended to Site A.
Finally, the study developed three public work facility masterplan site layout options representing
both a remodel / expansion approach as well as all new facilities. All three options result in
facilities that function and meet the minimum goals of the Space Needs Program. The following
are highlights of each option with more detailed information to be found in the main body of the
study report. As shown in the cost analysis, there is approximately a 5% range in initial costs
between the options however there are other factors for the City of Lino Lakes to consider in
the selection such as long-term location within the city, life -cycle maintenance and utility costs,
operation of public works staff during construction, and best uses of city property.
4 Public Works Site Analysis and Space Needs Study
EXECUTIVE SUMMARY
Option Al
Option A2
Option Bl
Option Al: Remodel & Building Expansion on Existing Public Works Site (Site A)
Remodeling and expansion of the existing public works building is the first option reviewed
and provides the main advantages of reuse of the existing building structure. There is also the
advantage of a somewhat larger overall site. However due to the extensive code, accessibility
and safety issues, the building's interior would need to be mostly rebuilt to address these minimum
requirements. There would also need to be exterior upgrades of the existing structure such as
reroofing the building to replace the currently failing roof. For either option on Site A, the project
also includes the requirement to bring municipal water and sanitary service to the site to provide
mandatory fire suppression and treatment of vehicle floor drain sanitary flows. This option also
impacts the public works department's operations, related to working around the remodeling and
addition process. Based on the detailed preliminary cost estimates done by the cost consultant,
this option's cost falls in the middle of the three options reviewed. However, when the increased
maintenance costs of the remodeled portion of the building is factored in; this option is likely the
costliest over the next decades.
Option A2: New Facility on Existing Public Works Site (Site A)
The approach on this option is the demolition of the existing public works facility and construction
of an all -new facility on Site A on Main Street. This option has several advantages including the
flexibility to place the new facility on the site to maximize the use, providing a more compact
building and better screening of the outdoor storage and salt building area. This option also
allows the continued use of the newer, of the two existing cold storage garages for the next 10 to
20 years until its life -expectancy is reached and Phase 2 is completed. The other main benefit
of a new facility is the elimination of the increased maintenance and replacement requirements
inherent in remodeling the existing building under Option Al. Similar to the first option however,
this option would require the extension of municipal water and sanitary service to the site to
provide mandatory fire suppression and treatment of vehicle floor drain sanitary flows. Operations
of the Public Works Department would also be significantly impacted between the demolition
and new construction of the facility, although the construction timeline would be reduced by
not working around ongoing operations. Finally, this option has the highest initial cost of all the
options considered, but would be less than Option Al over the next few decades when increased
maintenance costs of the remodeled building is factored in.
Option B1: New Facility at Birch Street & Centerville Road adjacent to Fire Station #2 (Site B)
This option represents a new facility at the south Site B location where preparations for future
city facilities were provided in the Fire Station #2 project. The advantages of this site include
existing municipal utilities stubbed into the site, a location closer to the future population density
projections, and the smallest most efficient building footprint of the three options. Other benefits
of building on this site is the ability to not impact the operations of the Public Works Department
during the construction process as they will be able to work from the existing facility until the new
building opens. Also, by not building on Site A, there is not the loss of the one ballfield and hockey
rink, maintaining more park and recreation usage within the city. Replacement costs for these
recreational areas were not included in the study. Under this option, the existing salt storage
building, material storage bins, as well as the existing cold storage buildings would remain on the
north Site A location, at least through Phase 2 construction, providing the benefit of more available
storage space in the short term. However, there will be a mixed impact of having public works
elements on two sites. Option B1 has the lowest initial cost as well as the lowest life -cycle cost of
the three options analyzed.
CNH
ARCHITECTS 5
PUBLIC WORKS FACILITY SITE OPTION MAP
Option Al:
Option A2:
Option B1:
Existing Site: Expand to meet future needs
Existing Site: New Facility
Birch St. & Centerville Rd.: New Facility
Public Works Facility Option Location Map
The map above shows the two sites that were identified by city staff for consideration as potential
properties for the proposed Public Works Facility. Options Al and A2 are located at the current
Public Works Facility. Option B1 is located adjacent to Fire Station #2.
6 Public Works Site Analysis and Space Needs Study
OVERVIEW OF STUDY
Project Needs Assessment
CNH interviewed appropriate City Staff to understand both their current needs as well as future
operational changes and anticipated growth areas. We compared these areas to similar nearby
cities, providing not only relational size comparisons but interjecting potential issues that may not
have been considered. To create accountability and clarity in our investigation, we made it a priority
to gather initial information with rigor such that assumptions are minimal, collaborating closely with
our engineers to pinpoint existing and potential issues that may or may not already be identified.
Option Analysis
After gathering all the information on space needs, CNH evaluated the existing public works cam-
pus, and developed future needs based on expected growth; CNH reviewed three approaches for
the City of Lino Lakes to meet their Public Works needs. These include:
Option Al — Renovate the existing building and expand to meet future needs.
Option A2 — Build an all new facility at the existing site to provide long-term value.
Option Bl — Build an all new facility at the city property at Birch Street and Centerville
Road leaving some appropriate elements at the existing site.
The study has reviewed each of the above options, analyzing and listing comparative data on each
option in order to provide the City of Lino Lakes with the tools to make an informed decision on the
future of the Public Works department facilities. Among others, the review of each option will include
the following topics:
• Space needs — current and future
• Growth potential for each option
• Existing facility conditions
Deferred and short-term maintenance
Building code / OSHA compliance
• Accessibility compliance
• Capital costs for construction / remodeling proposed
• Site location relative to population and infrastructure
CNH
ARCHITECTS 7
Site A consists of the existing site for the current
Senior Citizen Center and Public Works Facility.
The property's current zoning designation is
for Public and Semi -Public District (PSP). It
has a gross area of 27.46 acres of which 17.6
acres are suitable for building. The city owns
the property of this existing facility. The site is
surrounded by residential neighborhoods to the
east and south, baseball fields to the west and
agricultural land to the north.
Photograph:
View of the existing Vehicle Maintenance
portion of the Public Works Facility
•
8 Public Works Site Analysis and Space Needs Study
SITE A
CNH
ARCHITECTS 9
Site
A
i
Site Analysis
PSP
i
Public and Semi -Public District
80 Main Street
Lino Lakes, MN 55025
2 Properties
Owned by
City of Lino Lakes
Gross Site Area
17.6 Acres
Wetlands
000••
There are designated wetlands running through
the middle of the property which reduces the
buildable area and mostly separating the
northwest storage area from the main buildable
area. The wetlands represent approximately
40% of the overall site.
Infrastructure
00000
This city owned property is served by electricity
and natural gas utilities, but does not have
municipal sanitary or water service. The current
facility uses well water and has a private mound -
style septic system limiting the ability to install
fire suppression and requiring storage tanks
for future vehicle wash and floor drain sanitary
flows. Extension of municipal sanitary is highly
recommended. Municipal water and sanitary
are located approximately 1 mile to the west.
Floodplain
000e*
There is a large floodplain running through the
middle of the property mostly duplicating the
wetland areas.
10 Public Works Site Analysis and Space Needs Study
Easements
000
There is one gas easement running on the
southwest corner of the site. This easement
defines the southwest edge of the main
buildable area.
Site Analysis
Site Statistics
Public Works Analysis
Site
A
000••
00000 Infrastructure
0••••
000•
Adjacent Land Uses
Buildable Area
• Easements - Existing or Future
00000 Floodplain
00000 Wetland
00.00 Site Visibility
000110 Noise Issues
00000 Potential Neighborhood Resistance!
Rating Scale
••••• o•••• oo••• 000•• 00000
Positive Moderately Neutral Moderately Negative
Positive Negative
Buildable Area
0•...
This site is approximately 27.4 acres, of which
12 acres is buildable area. This buildable area
is separated into three distinct blocks with only
the southeast block of 7.7 acres large enough to
be considered for this project.
CNH
ARCHITECTS 11
Site B:
Site B is located on the southeast intersection
of Birch Street and Centerville Road. The
property's current zoning designation is for
Public and Semi -Public District (PSP). It has
a gross area of 17.6 acres of which 3 acres
are suitable for building. It is adjacent to Fire
Station #2 to the north and agricultural land
on the east and west sides. To the south the
property extends toward 46 acres of land owned
by the City. There is one private residence on
agricultural land to the southwest.
Photograph:
View of the site from the east
12 Public Works Site Analysis and Space Needs Study
CNH
ARCHITECTS 13
B
Site Analysis
•
PSP
Public and Semi -Public District •
1710 Birch Street
Lino Lakes, MN 55038
1 Property
Owned by
City of Lino Lakes
Gross Site Area
17.6 Acres
-
Wetlands
000•0
The designated wetlands run along the North,
East and West sections of the property and
decreases the buildable area within this parcel.
Infrastructure
•000•
This city owned property is served by all
public utilities including electrical, natural
gas, municipal water, and municipal sanitary
services. The water and sanitary pipes were
stubbed into the site as part of the recent Fire
Station #2 project. The site is also served by
the new city street with completed connections
to both Centerville Road (County 21) and Birch
Street (County 34).
Floodplain
0000•
The floodplain runs through the East part
of the property, but since the construction
of the fire station the FEMA map should be
updated to reflect the correct contours of
the site. The diagram above represents the
approximate corrected floodplain zone. It is our
understanding that the floodplain update is in
process.
14 Public Works Site Analysis and Space Needs Study
Easements
000%
There are no easements on the south buildable
area being considered for this project other than
standard drainage and utility setbacks along the
property lines and roads.
Site Analysis
Site Statistics
Public Works Analysis
Adjacent Land Uses
II 0000.Infrastructure
100••• Buildable Area
0•...
Site
B
Easements - Existing or Future
100••• Floodplain
000•• Wetlands
10•••• Site Visibility
00.00Noise Issues
1000.0Potential Neighborhood ResistanceI
Rating Scale
••••• o•••• oo••• 000 00000
Positive Moderately Neutral Moderately Negative
Positive Negative
Buildable Area
00•0.
This site is approximately 17.6 acres not
including the over 46 acres to the south. After
deducting the fire stations' built area, there is
3 acres of remaining buildable area for this
potential project.
CNH
ARCHITECTS 15
SPACE NEEDS
PROGRAM
16 Public Works Site Analysis and Space Needs Study
ARCHITECTURAL CONSIDERATIONS - SPACE NEEDS PROGRAM
Overview
The current Lino Lakes Public Works Facility was built in 1971. While the facility has functioned in the past 45 years, the City Council and staff
determined that a space needs program be developed to assess the existing, current and future needs. The Space Needs Program captures the
conclusions made from the assessment exercise over the last months to express the scale and scope of modifications needed to the facility for both
short and long term operational demands.
A comparison matrix at the end of this section reflects other Public Works facilities as they relate to the scale of this project. Public works facilities in
the Twin Cites metro of Hugo, Shoreview, Otsego, and Hopkins were used as references. While each city's needs and approaches are different, the
comparisons can provide additional insight when considering the best fit for the City of Lino Lakes.
Space Needs Analysis Approach
The space needs reviewed are based on the following assumptions to address the long-term needs of the Public Works Department for the City of
Lino Lakes. While other approaches may be pursued, the assumptions indicated in this study represent the facility designs commonly taken by other
similar municipalities within the greater region.
A. Departments Included within the Facility: This space needs program for the overall Public Works Department includes the streets, utilities, vehicle
maintenance and park & recreation operations. This combination of operations creates efficiencies in operations and facilities as many functions
overlap and require similar facilities.
B. Protection of Equipment: This space needs program provides space for all vehicles and equipment to be stored within the protection of the
proposed building. This would include fully heated operational areas as well as partially heated storage areas, depending on the needs of the individual
spaces. Much of the current equipment and many vehicles are currently stored outside within the current Public Works site significantly reducing its
life -expectancy and increasing maintenance requirements. The space needs program assumes that all equipment and vehicles would be stored within
the facility providing reduced life -cycle costs for the equipment and vehicles within the public works department.
C. Growth Projections: The space needs program allows room for the anticipated growth needs within the following 20 years at a minimum as is
typical for a public facility built to operate for a period approaching 50 years. The City of Lino Lakes is projected by the Metropolitan Council's study to
expand in population to 31,100 by 2040, or a growth of 49% from current. The growth built into the space needs program represents only the added
staff and equipment that was determined to be needed with the increase in population and associated streets, parks, and utilities. Consequently the
building space needs growth is only 14% above the current needs, significantly less than projected population growth.
CNH
ARCHITECTS 17
SPACE NEEDS PROGRAM
Office Area
Vehicle
Storage
1
Space Name
Public Works Superintendent
Open Office Area
T 1 7 •
Quantity 1 Size I Area 1 Total 1
1 1 12'x14' 168 I 168
1 4 1 1_
1 I 15'x20' 1 300 1 300
Reception
1
1 16'x10' 160 160
Private Offices I 9 1 12'x10' 1 120 1 1,080
Shop Supervisor Office 1 1 1 12'x10' 120 120
Copy Room 1 1 1 9'x10' I 90 1 90
IT/Server Room 1 9'x10' 90 i 90
Multi -Purpose Room 1 1 1 40'x45' 1 1,800 I 1,800
Lunch Room 1 30'x40' 1,2001 1,200
Men's Restroom & Locker Room 1 1 1 30'x40' 1 1,200 I 1,200—i
Women's Restroom & Locker Room 1 15'x25' 375 1 375
L 1 1 1
Storage 1 1 1 10'x25' 1 250 1 250 1
Janitor's Closet 1 10'x12' 120 r 120
L 4 1 1
Mechanical/Electrical Room 1 1 1 20'x30' 1 600 1 600
Public Restrooms 21 9'x10' 90 L 180
Subtotals
Circulation
Total
15%
Space Name Quantity
Large Spaces (Angled 60°)
Medium Spaces
7,773 1
1,160
8,893 1
Size i Area i Total
16 18'x36' 835 13,3601
4 1 1-
49 1 12'x24' I 288 1 14,112
Small Spaces
Mezzanine Storage
20 I 8'x12' 96 1,920
1
1 1 30'x40' 1 1,200 I 1,200
General Storage 1 1
1 L 20'x100' 2,000
L 2,000
1
Vehicle Wash Bay 1 1 1 35'x50' 1 1,750 1 1,750 J
Circulation 1 1 30'x6600' 19,789 19,789 1
L 1 1 L
Total
54,131
1
18 Public Works Site Analysis and Space Needs Study
SPACE NEEDS PROGRAM
Vehicle
Maintenance
Departmental
Shops
Total Area
Summary
Space Name Quantity
Large Maintenance Bay
Size Area Totali
2 1 24'x48' 1 1,152 1 2, 304-1
Small Maintenance Bay
2 i 20'x40' 800 L 1,600
Welding Bay / Fabrication 1 1 I 28'x40' 1 1,120 1 1,1201
Small Engine Repair Bay 1 20'x40' 1 800 800
1 L
Tire & Brake Shop 1 1 1 20'x28' I 560 1 560_I
Tire Storage ( Mezzanine) 1 1 I 30'x10' 1 300 I 300 i
Lube Room I 1 7 12'x16' 192 r 192
Parts Storage & Tools Room L 11 20'x50' 1,000 L 1,000 J
Subtotals
Circulation
Total
15%
7,876
1,181
9,057,
Space Name i Quantity Size Area Total
Sign Storage 1 1 I 30'x40' 1 1,200 1 1,200 J
Woodworking Shop 1 20'x30' 600 600
Parks Storage I 1 30'x40' 1,200
Water Meter Shop / Storage 1 15'x30' 450 r 450
1 1 L
1
1,200
Subtotals
Circulation
Total
15%
3,450
518
3,968,
Subtotals 76,049
Exterior Wall and Building 10% 7,605
Services
Total 83,654
As this Space Needs Program indicates, the Public Works Department will need a total building area approaching approximately 84,000 square feet by
the end of the study target of 2040. While the population of the City of Lino Lakes is projected to grow 50% by 2040, the projected total Space Needs
Program is only 15% more than the current space needs because of operational efficiencies of a larger city. Due to this future growth and also the
potential use of some existing cold storage space over the next 10 to 15 years, the Space Needs Program can be met in a two phase approach with
Phase 2 encompassing approximately 25,000 square feet of future Vehicle Storage needs.
CNH
ARCHITECTS 19
COMPARISON MATRIX
Comparative Square Footage Calculation
The Comparison matrix reflects size of areas in comparative Public Works Facilities. The following formula was used to create comparison factors.
Formula for Comparison:
Square feet
Population
__ Comparison
Factor
The comparative factors are not a definitive means for determining the appropriate size and scale of Lino Lakes' expansion needs, particularly con-
sidering many other factors can influence how and why departmental allocations are established. However, this information can be helpful in guiding
the space needs program with a larger perspective that acknowledges the external factor of city population and growth and how that impacts the
operational capacity of the Public Works facility.
From the chart below, we can see that Hopkins' has a somewhat smaller population. Hopkins' total square footage for their Vehicle Storage space
(shown to the right) is 37,800 square feet which is 85.5% larger than Lino Lakes' actual area of 5,512 square feet. Lino Lakes has a much smaller
Vehicle Storage area. It is not surprising that Lino Lakes' Public Works facility is smaller than comparison facilities given Lino Lakes' growth in popula-
tion and service needs since the current facility was built approximately 45 years ago.
City Population (2013 Census)
' Lino Lakes Hugo 1 Shoreview Otsego Hopkins �
,,
' 20,862 14,082 ' 25,931 14,524 18,025 '
Projected Population (2040)
. Lino Lakes �
l,
1. 31,100 ,l
20 Public Works Site Analysis and Space Needs Study
COMPARISON MATRIX
I Existing
L
Phase 1
Phase 2 0 I
Vehicle Storage
Square Feet
OAS^ psO^ pis^ .o
Lino Lakes (Existing)
(5,512 sf / 20,862)
Lino Lakes (Proposed)
(24,359 sf (54,131 sf) / 31,100)
Hugo
(15,000 sf / 14,082)
Shoreview
(38,410 sf / 25,931)
Otsego
(18,300 sf / 14,524)
Hopkins
(37,800 sf / 18,025)
••'
/ Population
sz\
0000000G
O 00000001
O 00000001
0000001
600
a)
v
O
lad
Iy
I V
Ic
I a) v)
Lino Lakes (Existing)
(3,545 sf / 20,862)
Lino Lakes (Proposed)
(8,893 sf / 31,100)
Hugo
(6,400 sf / 14,082)
Shoreview
(15,620 sf / 25,931)
Otsego
(4,300 sf / 14,524)
Hopkins
(13,596 sf / 18,025)
Lino Lakes (Existing)
(5,742 sf / 20,862)
Lino Lakes (Proposed)
(13,025 sf / 31,100)
Hugo
(6,400 sf / 14,082)
Shoreview
(13,990 sf / 25,931)
Otsego
(5,850 sf / 14,524)
Hopkins
(10,917 sf / 18,025)
oc
O 000
O 00001
00(
410001
O 0001
CNH
ARCHITECTS 21
Option
Al
Layout
Description
Option Al is located at the current Public Works and Senior Center Facility site. This option includes extensive remodeling of the existing Public
Works and Senior Center Facility into Public Works' office space and vehicle maintenance area. The expansion includes additional office,
additional vehicle maintenance, departmental shops and vehicle storage. The existing salt building and material storage bins will be reused. Due
to the limitations of the buildable area and the location of the existing cell tower, a portion of the vehicle storage is rotated at a 120 degree angle.
This option would involve a total gutting of the existing building as needed to address deficiencies in the current building related to accessibility,
energy code, fire suppression and mechanical systems. Option Al and the following option by using the existing public works site will also require
an extension of the municipal water service and municipal sanitary service to the site.
Due to the site layout limitations working around the existing office and maintenance building, the existing cold storage buildings will not be able to
remain. This will reduce the total available storage for the Public Works department until Phase 2 is built, and may also result in the need to build
Phase 2 sooner than the other option in order to meet the city's growth.
1 Pros
I
I • Re -use of existing Public Works building structure
I • Use of existing Salt Building
I • Use of existing Material Storage Bins
I • Use of existing miscellaneous site storage
I • Re -use of existing site
I • Large buildable area
I
I
I
I
•
•
Cons
• Potential long construction period of existing building disrupting operations
• Cost of bringing new Water main to site due to fire suppression requirements
• Loss of use of existing ice rink and cost to remove
• Loss of use of existing baseball field and cost to remove
• Cost of remodel based on code and handicapped accessibility deficiencies
• Non -efficient floor plan of vehicle storage to fit site and keep existing building
• Cost of bringing municipal sanitary sewer to site (or impacts of large storage
tank and regular pumping for floor drains and wash bay sanitary)
• Reduced facility life expectancy and increased maintenance for the remodeled
portion of the building compared to an all new facility
Total Square Footage
• Remodel 12,752 s.f.
• New 67,582 s.f.
• Total 80,334 s.f.
•
•
•
22 Public Works Site Analysis and Space Needs Study
Existing
Material
Storage
Bins
LI
Existing
Baseball
Field
Wetlands
Fuel Trailer
Island Storage
Vehicle
Storage Wash
` Bay
• Vehicle
Maintenance
Existing
• Cell
/ Tower
55 Parking
Stalls
Option
Ex.
Retention
Pond
Main Street
CNH
eau Lake Dr.
ARCHITECTS 23
Option
A2
•
•
•
Layout
Description
Option A2 is located at the current Public Works and Senior Center Facility site. This option provides for an all -new Public Works Facility which
includes office, vehicle maintenance, departmental shops and vehicle storage. The existing salt building, cold storage garage and material storage
bins will be reused.
Since this option removes the existing 45 year old building, it provides the flexibility to place the building on the site in a more advantageous layout.
This results in a more compact building footprint, better screening of the building to the east neighborhood, and the option for drive -through parking
for large equipment within the storage garage. This site option also allows for the continued use of the newer of the two existing cold storage
garages which will provide more available space for the Public Works department, especially until Phase 2 is added. Option A2, using the existing
public works site, requires an extension of the municipal water service and municipal sanitary service to the site.
Pros
• Use of existing salt building
• Use of existing material storage Bins
• Use of existing miscellaneous site storage
• Use of existing cold storage garage
• Longer life -expectancy and reduced maintenance for an all new facility
• Large buildable area
• Drive through stalls for large vehicle storage parking
• Flexibility in building placement to best fit uses and site
Cons
• Cost of demolishing existing facility
• Disruption of operations during construction period
• Cost of bringing new water main to site for fire suppression requirements
• Loss of use of existing ice rink and cost to remove
• Loss of use of existing baseball field and cost to remove
• Cost of bringing municipal sanitary sewer to site (or impacts of large storage
tank and regular pumping for floor drains and wash bay sanitary)
Total Square Footage
• Remodel None
• New 79,503 s.f.
• Total 79,503 s.f.
• Existing Cold Storage 4,835 s.f.
•
•
•
24 Public Works Site Analysis and Space Needs Study
Option
"2
Existing
Material
Storage
Bins
sew
ehf
Existing
Baseball
Field
Existing Roa
0
0
0
0
0
Wetlands
Existing Salt Phase 2
Building r —
Trailer
Storage I I
Existing
Garage 1
Existing,,
Cell
Tower
55 Parking Office
Stalls =
Vehicle
Storage
Vehicle
/` I
Maintenance 1
...� Wash
Bay
1
Shops
ch. 410111114
t
e e e
a e
Ex.
Retention
Pond
ir
Main Street
d
4•
ondeau Lake Dr.
CNH
ARCHITECTS 25
Option
B1
Layout
Description
Option B1 is located adjacent to Fire Station #2. This option includes a new Public Works Facility which includes office, vehicle maintenance,
departmental shops and vehicle storage. The existing salt building and material storage bins will be reused at the existing Public Works site.
This option would allow for the use of the existing public works storage buildings throughout the construction period reducing operational disruption
and cost during construction. Option B1 would also allow for the continued use of the north site facilities after construction until they reach there
anticipated life -expectancy allowing for more flexibility and space for the Public Works department, especially until Phase 2 is added to the building.
•
I, I
I Pros
•
•
• Existing municipal sanitary sewer connection located on site
• Existing municipal water main connection located on site
• Use of existing ice rink on Site A
• Use of existing baseball fields on Site A
• Efficient floor plan of vehicle storage
• No disruption at the current Public Works facility during construction
• Located adjacent to Fire Station #2
• Closer to future population density as Lino Lakes grows
• Existing storage buildings at north site can continue to be used
Cons
• Smaller buildable area creates minimal clearances for site functions
• Existing salt building is located on Site A
• Existing material storage bins are located on Site A
• High visibility from future road
Total Square Footage
• Remodel None
• New 76,017 s.f.
• Total 76,017 s.f.
• Ex. Public Works Storage 14,799 s.f.
•
•
26 Public Works Site Analysis and Space Needs Study
Office
Layout
Infiltration
Wetlands Basin
Vehicle Storage Wash
;,� Bay
Birch Street
Infiltration
Basin
Existing
Fire
Wetlands
Fuel
Island
Trailer
Storage
Station
Infiltration
Basin
Existing Road
" II III' Phase 2-\
55 Parking Stalls
r
CNH
Option
B1
ARCHITECTS 27
ARCHITECTURAL REVIEW
Introduction
The current Lino Lakes Public Works Facility was built in 1971 and does not have access to municipal water or municipal sanitary sewer. Due to fire
code requirements that limit the square footage of the facility the existing Public Works building cannot be expanded unless municipal water is brought
to the site. The additions to this facility include 4 separate buildings. The majority of the vehicles are stored outdoors, which inherently reduces their
life span. Equipment is currently stored in 3 buildings and is not conducive to an efficient work flow. The building has water damage and leaking in
several locations.
Equipment Storage
Public Works is currently storing most of their
equipment outside where they are covered in
snow and have a greater chance of being rusted,
therefore reducing their life span.
Vehicle Storage
Public Works is currently storing vehicles outside,
where they are covered in snow and have a greater
chance of being rusted, therefore reducing their life
span.
Vehicle Maintenance
The current Vehicle Maintenance area and tool
storage area does not provide adequate space to
service the city's fleet of vehicles.
28 Public Works Site Analysis and Space Needs Study
ARCHITECTURAL REVIEW
Exterior Brick
Exterior brick on the building has severe water
damage in multiple places and is in need of repair.
Roof leakage
The existing standing seam roof needs to be
replaced as there are multiple locations where
leaking has occurred.
Gutters
There are several locations around the building
where gutters are failing or not in place, snow is
melting off of the roof and causing water damage
and icy conditions, which are hazardous for the
public and employees.
Offices and Storage
Current offices and storage areas are intermingled
and do not provide an efficient use of space.
CNH
ARCHITECTS 29
ARCHITECTURAL REVIEW
Break Room/Office
One of the additional buildings on -site houses one
office and a break room due to limited space in the
main facility.
Locker room
The current locker room does not have adequate
lockers to accommodate employees and is used as
a circulation space which doesn't have privacy for
employees.
Lunch Room
The current lunch room does not have adequate
appliances and chairs to accommodate Public
Works employees.
Server / Telephone Storage
The current server is located in the main hallway,
isn't easily accessible and is an eyesore. The data
and telephone phone board is currently in the
storage room.
30 Public Works Site Analysis and Space Needs Study
ACCESSIBILITY & CODE REVIEW
Introduction
The current Public Works facility was built in 1971 and has major deficiencies related to accessibility, energy code, fire suppression and mechanical
systems. Our accessibility review identifies conditions in the existing building that require immediate attention including; restroom clearances (water
closet, lavatory and shower), non -accessible door hardware, accessible door clearances and accessible counter heights.
The existing building does not meeting current energy code requirements, fire suppression requirements, exiting requirements and mechanical system
requirements as discussed on the following page. We did not complete a full OSHA safety assessment as a part of this study, but there are several
items in the building that should be assessed further, including proper headroom clearances under the Vehicle Maintenance mezzanine.
As a result of the extent and variety of code, accessibility, and safety deficiencies in the current building, it is our opinion that the most economical
approach if remodeling is considered would be to remove all existing interior rooms and reconstruct the interior build -out of the vast majority of the
existing space. This also results in the best design fit with the long-term needs of the Public Works department.
The existing Men's Restroom does not have proper
clearances for accessibility, with any amount of
remodeling the restrooms would need to comply
with the latest Minnesota State accessibility code.
The existing Women's Restroom does not have
proper clearances for accessibility, with any amount
of remodeling the restrooms would need to comply
with the latest Minnesota State accessibility code.
CNH
ARCHITECTS 31
MECHANICAL SYSTEMS REVIEW - VEHICLE MAINTENANCE
Ventilation System
Current ventilation system is inadequate. Current
codes require .75 cfm per square foot of ventilation
interlocked with an outdoor air intake. The current
system operates manually with independent
control switch for both the fan and intake damper.
The exhaust fans appear dated and most likely
have exceeded their expected service life.
Exhaust System
Vehicle Maintenance requires carbon monoxide
sensors (gasoline engine fumes) and nitrogen
dioxide sensors (diesel engine fumes) to enable the
exhaust system in the event that the concentrations
exceeds code minimum set point. These sensors
are not installed.
Heating
General heating is accomplished with gas fired
infrared heaters. These units are dated and most
likely have exceeded their expected service life.
Sanitary Waste
The sanitary waste from the trench drains and
floor drains are routed directly to the septic system.
This is a code violation. For buildings served with
a septic system, the flammable waste from trench
drains must be routed to a storage tank separate
from the septic system. Tanks are emptied
periodically and trucked to a proper waste facility.
32 Public Works Site Analysis and Space Needs Study
MECHANICAL SYSTEMS REVIEW - OFFICES/SENIOR CENTER
Furnace Room - Offices
The office space is served by three furnaces and
associated split system air conditioning units.
The units were installed in 2010 and are in good
condition. The ductwork connected to these
units would need to be replaced based upon the
condition of the current ductwork and the change
in zoning due to renovation schemes. In addition,
current requirements for ventilation air will require
an air-to-air energy recovery unit to temper the
outdoor air before it is introduced into the furnaces.
Furnace Room - Senior Center
The community space is also served by three
furnaces and associated split system air handlers.
They were installed in 2010 as well and are in good
condition. The comments for item 1 above applies
to these systems as well.
- One of the units has a capacity of 5
tons. The Mn Energy Code requires a system of
this capacity to be equipped with an economizer.
The economizer introduces outdoor air into the
space when outdoor air temperatures are favorable
and cooling is required by utilizing outdoor air for
cooling as opposed to operating compressors.
CNH
ARCHITECTS 33
COST ESTIMATE
34 Public Works Site Analysis and Space Needs Study
COST ESTIMATE
Option Al
Remodel & Expansion
Phase 1
•
Option A2
New Facility at Existing Site
Phase 1
•
Option B1
New Facility at Fire Station Site
Phase 1
•
Cost Estimate Summary
Low Cost
Public Works Facility
Sanitary Sewer and Water
Total
(2017 Dollars)
$ 9,707,342
$ 360,000
$ 10,067,342
*Inflation not taken into account in this estimate
High Cost
Public Works Facility
Sanitary Sewer and Water
Total
(2017 Dollars)
•
$ 12,195,113
$ 360,000
$ 12,555,113 1
Low Cost
Public Works Facility
Sanitary Sewer and Water
Total
(2017 Dollars)
$ 10,040,359
$ 360,000
$ 10,400,359
*Inflation not taken into account in this estimate
High Cost
Public Works Facility
Sanitary Sewer and Water
Total
(2017 Dollars)
•
$ 12,458,171
$ 360,000
12,818,171
Low Cost
Public Works Facility
Total
(2017 Dollars)
9,922,715
$ 9,922,715
*Inflation not taken into account in this estimate
High Cost
Public Works Facility
Total
(2017 Dollars)
•
$ 12,380,093
$ 12,380,093
The cost estimates shown above represent our teams professional opinion of probable construction cost based on the uses proposed, and typical
construction costs for similar facilities within the greater metropolitan area. The low cost to high cost range represents the preliminary level of the
designs done within this study, as well as the range in quality, life -cycle, and aesthetic choices that would be reviewed and selected by the city during
the design process. The costs, as indicated are current construction costs and an inflation factor would need to be applied when a specific time line
is developed.
The prices shown represent the estimated hard costs of the site and building construction shown in each option layout and vary only about $500,000
when comparing the Low Cost for each option or 5% of the total cost. However, there are other cost factors not indicated that should also be taken
into consideration when comparing options that would create a greater final cost differential between options. A partial list of these items include:
• Operational cost to move Public Works functions off -site during construction for Site A options
• Loss of use of ball field and hockey rink at Site A if expansion occurs there
• Additional maintenance costs for reused portions of the existing structure under Option Al,
compared to an all -new facility in the other options
• Ability to continue to use one existing cold storage building under Option A2 and two existing
cold storage buildings under Option B1, thus postponing the date when Phase 2 of the Public
Works storage shown in each option layout would be needed
CNH
ARCHITECTS 35
PROPOSAL
CITY OF LINO LAKES
PUBLIC WORKS SPACE NEEDS A
AND EXISTING FACILITY AUDIT
QUINN S. HUTSON, AIA
PRINCIPAL ARCHITECT
CNH ARCHITECTS
7300 WEST 147TH STREET
SUITE 504
APPLE VALLEY, MN 55124
PHONE 952-431-4433
www.cnharch.com
SEPTEMBER 23, 2016
16088
September 23, 2016
City of Lino Lakes
600 Town Center Pkwy.
Lino Lakes, MN 55014
Re: Public Works Space Needs Analysis and Existing Facility Audit
On behalf of CNH Architects, our consulting engineers and estimator, thank you for considering our Proposal to provide Facility Space Needs
Analysis services for the City of Lino Lakes.
The project team presented in this proposal has worked together for many years on City, County, and State projects in the State of Minnesota.
Our architectural/engineering team has a common goal to provide quality design services and to be at the forefront of utilizing sustainable building
methodologies. We understand the need for an organized process from the first meeting through completion of this study, with clear and detailed
documentation along the way.
CNH Architects has worked with the City of Lino Lakes as well as numerous municipalities throughout the Twin Cities metropolitan area to provide
assessment services, reviewing current conditions of many existing governmental facilities and identifying immediate as well as future growth
needs. We communicate closely with our engineers and cost estimator so that our observations are shared and comprehensive, while keeping
a holistic approach on the entire project so that the overall building performance and client vision is considered when individual components and
systems are under analysis. Details can impact both short and long term effects on cost, maintenance and occupant use, and as a design team we
are attentive to these implications at every scale.
We look forward to serving the City of Lino Lakes and together evaluate the facility needs of the Public Works Department now and into the future.
Respectfully submitted,
Quinn S. Huston, AIA, LEED AP
Principal
CNH Architects, Inc.
CNH Architects, Inc.
7300 West 147th Street Suite 504 Apple Valley, MN 55124 Phone 952-431-4433 www.cnharch.com
PROJECT TEAM
e
Our Team for your project consists of Architects, Mechanical / Electrical Engineers and Cost
Estimator. It is our intention to maintain a consistent team of the principal architect and engineers
presented in this proposal from the first meeting through completion of the study. By doing this,
we will provide continuity of information, communications and understanding of the city's goals
as the study progresses. This team will be supported by staff architects, designers and engineers
as needed for the workflow and timeline developed in coordination with City staff.
Principal Architect, Quinn Hutson, will lead and coordinate all members of the design team and
be the primary contact throughout the project. He brings extensive experience with city projects,
numerous reviews of client and facility needs, and familiarity with the City and staff from past
projects with the City of Lino Lakes.
Architect of Record
CNH Architects, Inc.
7300 W. 147th Street, Suite 504
Apple Valley, MN 55124-7580
952-431-4433
Project Architect: Quinn S. Hutson, AIA, LEED AP
Mechanical/Electrical Engineers
Engineering Design Initiative, Ltd. (edi)
1112 Fifth Street North
Minneapolis, MN 55411
612-343-5965
Mechanical Engineer: Larry Svitak, PE
Electrical Engineer: Jay S. Hruby, PE
Cost Estimator
Professional Project Management (PPM)
1858 East Shore Drive
Maplewood, MN 55109
651-776-5590
Cost Estimator: Doug Holmberg
CITY OF LINO LAKES PUBLIC WORKS SPACE NEEDS ANALYSIS AND EXISTING FACILITY AUDIT
2
PROJECT APPROACH
PROJECT NEEDS ASSESSMENT
In order to put together a comprehensive assessment that addresses issues thoroughly and
makes sound recommendations going forward, CNH Architects will collect information about
the existing facilities as exhaustively as possible. Our team will interview appropriate City Staff
to understand both their current needs as well as future operational changes and anticipated
growth areas. We will compare these areas to other similar cities, providing not only relational
size comparisons but interjecting potential issues that may not have been considered. To create
accountability and clarity in our investigation, we make it a priority to gather initial information
with rigor such that assumptions are minimal, collaborating closely with our engineers to pinpoint
existing and potential issues that may or may not already be identified. In this process, owner and
facility management involvement is critical, particularly in revealing and weighing components
that contribute towards small and large scale building performance and longevity.
ACCESSIBILITY AND CODE COMPLIANCE
Many existing buildings are not up to code with building codes and accessibility requirements.
We have extensive experience working with code and ADA guidelines, including recent projects
completed with the State of Minnesota in upgrading all restrooms in their 4-story, 78,000 sf
administrative building on the Capitol grounds, plus the unique security and accessibility issues
of the Dakota County LEC 8100 Cell Block remodeling. These aspects of a project can easily
become a costly component, and our familiarity with many issues related to accessibility
upgrades can lead to efficient and proactive solutions.
MAINTENANCE & LONGEVITY
Durable materials, equipment and finishes are considered for longevity when providing
recommendations in the assessment report, and consideration will be taken to balance initial
construction cost versus cost over the life of the product and its implications on the rest of the
structure if any. We would present a list of options, innovative ways to keep cost at a minimum,
and review the pros and cons of each option to best achieve identified project goals.
Buildings inevitably deteriorate and require periodic maintenance. While keeping safety and
durability of paramount importance, the Project Team is prepared to recommend options that
help reduce maintenance costs and create an environment where building upkeep is simple and
straightforward.
CITY OF LINO LAKES PUBLIC WORKS SPACE NEEDS ANALYSIS AND EXISTING FACILITY AUDIT
3
PROJECT APPROACH
SUSTAINABILITY
The Project Team will provide recommendations for sustainable opportunities in the existing
city public works campus as well as any future facilities or sites. CNH has many years of green
building experience, with several awarded projects listed in our firm portfolio. We just recently
assisted the City of Roseville in utilizing the excess heat generated by the Ice Arena on their city
campus to fully heat the new Fire Station we designed for them, providing significant energy cost
savings. Creative approaches such as this will be evaluated for Lino Lakes, including initial cost
and payback analysis to assist you in making informed choices that best fit the goals and values
of the City.
OPTION ANALYSIS
After gathering all the information on space needs, evaluated the existing public works campus,
and developed future needs based on expected growth; CNH will review three approaches for the
City of Lino Lakes to meet their Public Works needs. These will include:
Option 1 — Renovate the existing building and expand to meet future needs.
Option 2 — Build an all new facility at the existing west site to provide long-term value.
Option 3 — Build an all new facility at the city property at Birch Street and Centerville
Road leaving some appropriate elements at the existing west site.
The study will review each of the above options, analyzing and listing comparative data on each
option in order to provide the City of Lino Lakes with the tools to make an informed decision on
the future of the Public Works department facilities. Among others, the review of each option will
include the following topics:
• Space needs — current and future
• Growth potential for each option
• Existing facility conditions
Deferred and short-term maintenance
Building code / OSHA compliance
• Accessibility compliance
• Energy usage and potential for savings
• Long-term costs of operation
• Capital costs for construction / remodeling proposed
• Site location relative to population and infrastructure
CITY OF LINO LAKES PUBLIC WORKS SPACE NEEDS ANALYSIS AND EXISTING FACILITY AUDIT
4
FIRM BACKGROUND
EXECUTIVE SUMMARY
CNH Architects is a full -service architectural firm providing architectural design, engineering,
interior planning and landscape architecture for corporate, commercial, manufacturing, and
recreational facility owners as well as government agencies. The Principals, Wayne Hilbert and
Quinn Hutson, are directly responsible for all design work.
CNH Architects has a staff with advanced training and certification in several areas including
Certified Interior Designers, Certified Construction Specifier, LEED Accredited Professionals,
NCARB certification, Construction Document Technologist, and Green Globe Professional.
With an efficient project team and over 50 years of experience, CNH Architects has a strong
reputation for well thought-out design plans and personal attention to client requirements. CNH
stresses strong design, quality contract documents, close communications with clients, and an
intense field review and follow-up program. We are organized to assume full, single source
responsibility for a thoroughly integrated and cost effective service. From a project's beginning,
program, budget, and schedule are established, and a team of experts is assembled under the
principal and project manager to assure that elements are addressed, questions answered, and
the design and construction process is fully coordinated. A growing list of satisfied and repeat
clients is testimony to the discipline and persistence of an organization that will not settle for
partial success.
Over the last several years, CNH Architects has worked on construction projects which total
between 20 - 30 million dollars annually. Our projects have varied including city, county, and state
work, along with church and private sector clients.
COMPOSITION OF FIRM
Licensed Architects 5
Designers 5
Administrative Support 2
Sustainable design is an integral part of our practice. A majority of our professional staff has
LEED Accreditation and our office designed the first Green Globe projects in Minnesota. This is
a third party national verification system as administered by the Green Building Initiative.
CITY OF LINO LAKES PUBLIC WORKS SPACE NEEDS ANALYSIS AND EXISTING FACILITY AUDIT
5
PROJECTS
First Floor Plan 61542.81
Enlarged Plan - Police Entry /Receoton _
Enlarned Plan - Citv Hall Main Lobby ED
EAGAN CITY HALL AND POLICE DEPARTMENT ADDITION AND REMODEL
EAGAN, MN
After over 25 years of use without significant remodeling, the City of Eagan found that the
growth of the staff both in administration and the police department was stretching their facility
past its ability to meet the current needs. CNH Architects did a comprehensive review of all
staffing departments and operations and, along with city staff, developed a space needs
analysis identifying both under-utilized space as well as significant shortfalls in operational space
standards. In addition, the building condition was reviewed to determine elements that were
either failing or reaching their expected usable life.
From this space needs study, CNH developed multiple options for addressing the needs
identified in both City Hall and Police Department portions of the building. With staff input, these
options were then modified to best meet operational flows, space needs, efficiency, and budget.
A detailed construction cost was then determined and the project budget was set.
The city is completing the financial planning for this addition and remodeling project which will
then move into the construction document and actual construction phases in the near future.
Project Architect Quinn Hutson, CNH Architects
Reference Dave Osberg, City Administrator, 651-675-5000
POLICE SPACE SUMMARY
First Floor
Addition
Remodel
Enclosed Vehicle Garage
-35 squad stalls
14,300 SF
Front Lobby / Sally Port - Increase Security
210 SF
Renovate Evidence Intake Lab and Evidence Storage
360 SF
Renovate Men's and Women's Locker Rooms
2,200 SF
Relocate Tactical Team Room / Renovate Garage #7
335 SF
Enlarge Computer Forensics Office Area
80 SF
Reduce Number of Holding Cells to Increase Storage
400 SF
Sub -Total First Floor
14,300SF
3,585SF
Second Floor
Addition
Remodel
Police Office Expansion
3,485 SF
Add Investigations Meeting Room
380 SF
Renovate Records Storage Area
170 SF
Enlarge Existing Conference Room
1,000 SF
Add 2 Administrative Offices at existing Break Room
400 SF
Sub -Total Second Floor 3,485SF 1,950SF
Total Proposed Police Space 17,785 SF 5,535 SF
PROPOSED PROJECT
Renovation Area
Expansion Area
New Building Addition
Fir. Floor Police Garage Addition
$3,061,000
Security Upgrades to Fire Station R3
Seto. Floor Police / City Hall
Addition
$60,000
$2,581,000
Existing Campus Facility
Lower Level Police/CRY Hall
Renovation Bi Overall Building
First Floor Police Renovation
$27,00c
$312,00(
Second Floor Police Renovation
Second Floor City Hall Renovation
$205,00(
$112,00c
Exterior site
Police Parking Lot Expansion
$109 o00
andSySIPMS 2nd
Floor City Hall tRenovation
$535,000
Systems Furniture at 2nd Floor Police
/ City Hall Expansion
Moving of Communications
Equipment
$1so,0o0
$11,000
Sub -total
Total Estimated Cost (Revised)
Cost Reduction from Original
$1,352,006
$6,/11,000
Sa,o63,000
Ss9o,a00
CITY OF LINO LAKES PUBLIC WORKS SPACE NEEDS ANALYSIS AND EXISTING FACILITY AUDIT
6
PROJECTS
ywwwwrr-wi_mcm maw..
-
-
Fire Slaliou Four
BUILDING ASSESSMENTS (CNH Architects)
CITY OF BLOOMINGTON, MN
CNH Architects is hired by the City of Bloomington to provide ongoing architectural consulting
on design and maintenance projects. These projects have involved studies, design options,
maintenance recommendations, and aesthetic opinions. Along with our consulting engineers
and designers, our services to date have included:
• Improving locker room drainage at a pool facility.
• Developing new site design options for street turning lanes and municipal center complex.
• Studying material upgrades for a Senior Center.
• Finish replacement options for public lobby at City Hall.
• Acoustical study and design for private offices, conference room, and performance studio
at public works and performing arts areas.
• Pistol range storage options study.
Office area remodeling to accommodate additional staff.
BISHOP HENRY WHIPPLE FEDERAL BUILDING (EDI)
FORT SNELLING, MN
Engineering Design Initiative completed a comprehensive feasibility study for the Bishop
Henry Whipple Federal Building located in Fort Snelling, MN. Facility sustainability and energy
efficiency were the primary focus of the study. The existing mechanical, electrical and plumbing
(MEP) systems serving the building are very inefficient, have greatly exceeded their normal
operating lifetimes and have become increasingly problematic. Asbestos containing materials
(ACM) are also a major concern.
EDI identified four facility alternatives ranging from refurbishing and replacing selected MEP
equipment to complete ACM abatement and facility renovation. The study included conceptual
design, construction cost estimating, tenant relocation planning, sustainability concepts and life
cycle cost analysis. Based on the study results, the US General Services Administration has
implemented a program to completely renovate the building so that it can continue to serve the
regional offices of the Federal Government well into the future.
CITY OF EAGAN FIRE STATION #4 - FACILITY STUDY (CNH Architects)
EAGAN, MN
CNH Architects provided a complete facility assessment of existing Fire Station #4 for the City of
Eagan. This study evaluated the existing condition of fire station exterior envelope and all interior
elements to determine their life expectancy and repair costs. The facility was also reviewed for
ADA accessibility, identifying deficiencies and recommended upgrades. In addition, the facility
was evaluated for function, current staff and equipment needs, and finally fire fighter safety.
From this review, CNH developed a list of recommended remodeling elements and an expansion
to better fit the current apparatus and to expand gear locker clearance to meet NFPA safety
standards.
After identifying the facility's maintenance, accessibility, function and safety deficiencies, CNH
Architects provided preliminary design of measures to address the existing concerns. Once these
project goals were determined, an itemized cost estimate was developed for the maintenance,
remodeling and expansion project. Finally, CNH worked along with the city staff to develop a
written report and digital presentation to present this information to the City Council.
CITY OF LINO LAKES PUBLIC WORKS SPACE NEEDS ANALYSIS AND EXISTING FACILITY AUDIT
7
RESUMES
Quinn S. Hutson, AIA, LEED AP
Principal Architect
CNH Architects
As principal in the firm, Quinn's responsibilities cover all facets of architectural design, design
development and construction document preparation. Individual project tasks include:
client need assessment, alternative concept development, design/construction document
preparation, building material and finish selection, cost estimating, code compliance
verification and approval assurance. In addition to over 30 years with CNH Architects,
Quinn's background includes many years of construction experience and annual continuing
education to bring current construction knowledge to all of his projects.
Years of Experience: 30
Education: Bachelor of Architecture, University of Minnesota
Registration: Professional Architect, Minnesota; Minnesota State Architecture Registration No.
21234; Certified Interior Designer, Minnesota; LEED Accredited Professional
Affiliations: Rotary International, past President Eagan Rotary; Eagan Rotary Foundation, past
Chair; American Institute of Architects; Firm Membership in the US Green Building Council
Facility Assessments
City of Eagan City Hall / Police Department - Facility Assessment and Needs Analysis Masterplan
City of Eagan Fire Station #4 - Facility Assessment and Upgrade Study
City of Rosemount Steeple Center (Former St. Joseph's Church) - Facility & Accessibility Study
360 Communities - Facility Assessment & Maintenance Budget Report
Dakota County - Rooftop Fall Protection Study (32 buildings)
Dakota County LEC - 8100 Cell Block Renovation
Other Relevant Projects
ABLE Fire Training Center - Burnsville, MN
B. Robert Lewis House Renovation - Eagan, MN
City of Apple Valley, MN
Apple Valley Liquor Store #1 & #2
Police Facility
City of Eagan, MN
City Hall Community Room
Fire Station #2 Remodel
Fire Station #3 Remodel
City of Rosemount, MN
Community Center Arena Wall
Community Center Banquet Upgrades
Steeple Center Renovations
City of Roseville Fire Station - Roseville, MN
Dakota County, MN
Community Development Agency - Eagan
Courtroom Build -Out - Hastings
Judicial Center- Hastings
Judicial Center Addition & Remodel
Law Enforcement Center - Hastings
Independent School District 192 - Farmington, MN
ECSE Program
Farmington High School MMI Renovation
Special Education
Superintendant Office
Independent School District 196 - Rosemount/
Apple Valley/Eagan, MN
Apple Valley High School Baseball Field
Eastview High School Mechanical Catwalk
ISD 196 Pathways, Apple Valley Commons II
ISD 196 Transition Plus, Apple Valley
Commons II
Rosemount High School Theater Light Access
Transportation Building
Metropolitan Council Regional Maintenance
Facility Addition/Remodel - Eagan, MN
Metropolitan Mosquito Control District Division
Headquarters - Scott, Carver, Anoka, &
Dakota Counties
Minnesota Department of Transportation (MnDOT)
District Facility - Detroit Lakes, MN
Straight River Wayside Rest - Owatonna, MN
CITY OF LINO LAKES PUBLIC WORKS SPACE NEEDS ANALYSIS AND EXISTING FACILITY AUDIT
8
RESUMES
Timothy M. Nielsen, LEED AP BD+C
Architect
CNH Architects
Mr. Nielsen has participated in numerous projects requiring the assessment of existing building
components and systems. Examples of this experience include renovation and repair
projects for municipal/government facilities as well as historic preservation projects that have
required a full assessment and analysis of all building components and systems to determine
their appropriateness and cost effectiveness for reuse.
Years of Experience: 20
Education: Master of Architecture, University of Kansas; Bachelor of Science in Architectural
Studies, University of Nebraska
Registration: Professional Architect, Minnesota; NCARB Certificate; Certified Building Official
(CBO), State of Minnesota; LEED AP BD+C
Affiliations: Competent Toastmaster (CTM), Toastmasters Int'I; Member, National Trust for
Historic Preservation
Facility Assessments
City of Eagan City Hall / Police Department - Facility Assessment and Needs Analysis Masterplan
Dakota County LEC - 8100 Cell Block Renovation
Hennepin County"- multiple facilities
Minnesota Air National Guard"
Reroofing and exterior renovation projects
Hotel Kaddatz - Fergus Falls, MN"
Historic building renovation / repairs for adaptive reuse
North Branch Library - Minneapolis, MN"
Historic building renovation / repairs for adaptive reuse
Flour Exchange Building - Minneapolis, MN"
Historic building exterior repairs
Other Relevant Projects
Department of Administration, State of Minnesota
Water Intrusion Repairs - Judicial Center
Exterior Paver Replacement - Judicial Center
Buerkle Acura - White Bear Lake, MN
Dakota County Western Service Center Public Health Remodel - Apple Valley, MN
Metropolitan Mosquito Control District - Plymouth, MN
* denotes projects completed with other firms
CITY OF LINO LAKES PUBLIC WORKS SPACE NEEDS ANALYSIS AND EXISTING FACILITY AUDIT
9
PROJECT TEAM
rill
1:
Larry Svitak, PE
, Principal, Engineering Design Initiative, Ltd.
'1 - Mechanical Engineer
Larry has been involved in the design, construction administration, and project management
of a variety of HVAC systems for over 12 years. Throughout that time Larry has earned the
respect of his colleagues and clients through his hard work, attention to detail, and his great
skills in communicating the complexities of HVAC systems to his customers. These skills
stem not only from his technical grasp of HVAC systems, but from the practical experiences
he gained in his first career as an Owner of an HVAC sheet metal firm.
Years of Experience: 30
Registration: Registered Professional Engineer in Minnesota, South Dakota and Wisconsin.
Minnesota Registration No. 25091
Affiliations: American Society of Heating, Refrigeration, and Air Conditioning Engineers;
American Society of Plumbing Engineers; Firm Membership in the Consulting Engineering
Council; Firm Membership in the U.S. Green Building Council
Select Projects:
Aitkin County Public Works Building - Aitkin, MN
Anoka County Public Safety Campus Facility Analysis - Andover, MN (Minnesota B3)
City of Eagan
Fire Station #1
Fire Station #4
City of Minneapolis, MN
Building Automation System Installation in 13 Fire Stations
Paving Lab Study, Hiawatha Site
Water Works Fridley Maintenance Facility (B3) - Fridley, MN
Crow Wing County Highway Department, Brainerd Complex - Brainerd, MN
Dakota County LEC 8100 Block - Hastings, MN
Lino Lakes Fire Station - Lino Lakes, MN
Lower St. Croix Valley Fire Station - Lakeland, MN
LSS Data System Assessment - Minnetonka, MN
MCF Rush City Property Space Renovation - Rush City, MN
Metro Transit Overhaul Office Remodel - St. Paul, MN
MnDOT
District Facility - Detroit Lakes, MN
Storage Facility - Maplewood, MN
Safety Rest Area Energy Upgrades - New Market, Heath Creek, Albert Lea, and Straight River, MN
Mora Police Facility Study & Schematic Design - Mora, MN
Morrison County - Little Falls, MN
Jail Expansion
Public Works, Landfill Site
Public Works, River Site
Nobles County Public Works Building - Worthington, MN
Roseville Fire Station - Roseville, MN
Sherburne County - Zimmerman, MN
Maintenance Facility
Public Safety Building
Staples City Garage - Staples, MN
CITY OF LINO LAKES PUBLIC WORKS SPACE NEEDS ANALYSIS AND EXISTING FACILITY AUDIT
10
PROJECT TEAM
Jay S. Hruby, PE
Principal, Engineering Design Initiative, Ltd.
Electrical Engineer
Jay has committed a large percentage of his electrical engineering career to the promotion
of energy conservation and sustainability within his designs of commercial, industrial,
educational and correctional buildings. Nearly all of Jay's recent projects have incorporated
technologies that allow the buildings to exceed current energy code. Jay has teamed with
utilities, environmental groups and energy conservation organizations to provide owners
with sustainable buildings that meet the owner's performance goals. Jay has been involved
in forensic engineering and commissioning of an array of electrical and communication
systems.
Years of Experience: 19
Registration: Registered Professional Engineer in Minnesota, Iowa, Wisconsin, North Dakota
and Illinois
Minnesota Registration No. 40290
Affiliations: Institute of Electric and Electronics Engineers; Consulting Engineering Council of
Minnesota; Firm Membership in the U.S. Green Building Council
Select Projects:
Beltrami County Highway Department Study - Bemidji, MN
City of Eagan
Fire Station #1
Fire Station #4
City of Minneapolis, MN
2710 Pacific Ave. Maintenance Facility Remodel
60th & Harriet Maintenance Facility Remodel
Hiawatha Maintenance Facility (LEED Project)
Paving Lab Study, Hiawatha Site
Royalston Maintenance Facility Fire Alarm Commissioning
Water Works Maintenance Facility, Fridley (MN - B3)
City of Staples Maintenance Facility - Staples, MN
Crow Wing County - Brainerd, MN
Highway Department, Brainerd Complex
Maintenance Facility
Dakota County Empire Transportation Facility Remodel - Apple Valley, MN
Heartland Express Transportation Maintenance Facility - Luverne, MN
Lino Lakes Fire Station - Lino Lakes, MN
Metro Transit
Mall of America Transit Station Remodel — Bloomington, MN
Mall of America Transit Shelter — Bloomington, MN
725 Building Addition & Remodel — Minneapolis, MN
Reuter Facility Remodel & Addition — Brooklyn Center, MN
Transit Overhaul Office Remodel - St. Paul, MN
Metropolitan Mosquito Control District Maintenance Facility (MN - B3) - Anoka, MN
Minneapolis Schools Transportation Remodel - Minneapolis, MN
MnDOT
Equipment Storage Building Renovation — Maplewood, MN
Safety Rest Areas Remodel & Energy Upgrades
Mora Police Facility Study & Schematic Design - Mora, MN
Morrison County - Little Falls, MN
Maintenance Facility
Public Works, Landfill Site
Public Works, River Site
Northstar Corridor LRT Terminal Target Field Station - Minneapolis, MN
Pine County Public Works - Sandstone, MN
Roseville Fire Station - Roseville, MN
Staples City Garage - Staples, MN
CITY OF LINO LAKES PUBLIC WORKS SPACE NEEDS ANALYSIS AND EXISTING FACILITY AUDIT
11
PROJECT TEAM
Doug Holmberg, PE
President, Professional Project Management (PPM)
Cost Estimator
Years of Experience: 37
Registration: Registered Professional Civil Engineer
Select Projects:
88th RRC Tenant Build -Out - Arden Hills, MN
Apple Valley City Hall - Apple Valley, MN
Apple Valley Fire Station #2 - Apple Valley, MN
Apple Valley Fire Station #3 - Apple Valley, MN
Army National Guard Training and Community Center - Hutchinson, MN
Brainerd RTC Mechanical and Electrical Upgrades (3 Buildings) - Brainerd, MN
Bureau of Criminal Apprehension Office Build Out - St. Paul, MN
Capitol Complex Power House Electrical Upgrade - St. Paul, MN
Cedar Street National Guard Armory Renovation - St. Paul, MN
CENTRO Latin Community Center - Minneapolis, MN
Chisago County Health and Human Services Building - North Branch, MN
City of Sterling Colliseum Remodel (City Hall & Police) - Sterling, IL
Command Operations Facility - Camp Pendleton, CA
Dakota Communications Center - Empire, MN
Delano Fire Station - Delano, MN
Department of Labor: Job Corps Center Building 1 & 2 Renovation - Dayton, OH
Fergus Falls City Hall Improvements - Fergus Falls, MN
Fern Hill Park Picnic Shelter - St. Louis Park, MN
Hennepin County Domestic Abuse Service Center - Minneapolis, MN
Hennepin County Probate Court Floor C-4 Remodel - Minneapolis, MN
Hennepin Parks Admin Headquarters Addition & Renovation - Plymouth, MN
Improve Old Shoot Range House, Range 130 - Camp Pendleton, CA
LaCrosse Transit Center - LaCrosse, WI
Lesueur County Front Entry Remodel - Lesueur County, MN
Metro Transit Canopy @ 7th Street (Typical Bay) - Minneapolis, MN
Metro Transit Expansion 24th Street Facility - Minneapolis, MN
Metro Transit Rail Support Facility - Minneapolis, MN
Metro Transit South Garage Landscape Improvements - St. Paul, MN
Metropolitan Council Regional Maintenance Facility Addition - Minneapolis, MN
Minneapolis City Hall / MBC MPOP Upgrades - Minneapolis, MN
Minnesota Valley Transit Authority (MVTA) Bus Garage Expansion - Eagan, MN
Minnesota Valley Transit Authority Office Consolidation - Burnsville, MN
MN National Guard Camp Ripley Remodel - Little Falls, MN
MN National Guard Flight Simulator Re -Roof - Minneapolis MN
MN National Guard Military Vehicle Storage Building - Olivia, MN
MN National Guard Roof Replacement - Northfield, MN
MN National Guard Roof Replacement - Olivia, MN
MnDOT District Headquarters - Detroit Lakes, MN
MnDOT Maplewood Bridge Crew Building - St. Paul, MN
MnDOT Truck Station - Maple Grove, MN
Neighborhood House / El Rio Vista Recreation Center - St. Paul, MN
Oakdale City Hall Remodel - Oakdale, MN
Olmsted County Human Services Center 2116 Building - Rochester, MN
Ramsey City Hall Meeting Room / Kitchenette Remodel - St. Paul, MN
Ramsey County License Bureau Remodel - St. Paul, MN
Rochester Bus Shelters - Rochester, MN
Sherburne County / City of Becker Public Works Facility - Becker, MN
Shoreview Community Center Addition & Renovation - Shoreview, MN
Shoreview Community Center Remodel - Shoreview, MN
Union Depot - St. Paul, MN
Wabasha Hi -Rise Exterior Modifications - St. Paul, MN
Wright County Remodel - Buffalo, MN
CITY OF LINO LAKES PUBLIC WORKS SPACE NEEDS ANALYSIS AND EXISTING FACILITY AUDIT
12
DESIGN INNOVATION
Minnesota Zoo Black Bear Exhibit
Valleywood Clubhouse
zmmiiw.
Iff! 13 4 4 ill'
Apple Valley Liquor Store No. 3
ABLE Burn Building
CNH Architects address issues of concern and opportunity for our clients with creative and
innovative design solutions. Some of these design solutions are exemplified by the following
examples:
CUSTOMER EXPERIENCE
When designing the Minnesota Zoo's new Black Bear Exhibit there were numerous challenges:
the sloping site, exhibit safety, meeting the needs of the bears, fitting into the existing zoo's MN
Trail, and creating a great visitor experience. This last challenge, to create a great customer
experience, is a common issue with public facilities. For this exhibit, our design involved minimizing
public view to caging and other institutional looking animal security features, while emphasizing
the natural looking materials. A rock wall is positioned to hide the bear doors leading into the
cage dens and creates a barrier to maintain the bears within their exhibit space. Landscaping
is used to hide security fencing while giving the exhibit a natural feel. A cave for the bears also
allows for an intimate viewing of sleeping bears, especially by the children that visit the exhibit.
Large windows in the viewing gallery, with heated rocks just in front, help to attract the bears to
a more visible viewing location. These and many other features increase the chances for visitors
to see the bears while not being distracted by functional aspects of the exhibit.
FLEXIBILITY
Designing flexibility into a project is more than just creating a large featureless space. In the case
of Valleywood Clubhouse, the facility was designed to accommodate a steady flow of golfers
during the golf season, full course tournament events, and special occasion events in both the
golf and non -golf seasons. To achieve this mix of activities and maintain the building footprint
within the client's budget, a strategy of flexible rooms was developed. The main event room
overlooks the 18th hole for a beautiful view of the course and the natural setting. It is sized to
appeal to both golfers and special event users. This room is also equipped with audio/visual
capabilities and has connections with an outdoor patio, bar serving window, commercial kitchen
and a casual bar seating area. The casual bar seating area can serve as an overflow event space
or accommodate a steady stream of golfers while another event is booked. The main entrance
lobby with fireplace is ideal for setting a casual tone for golfers and allows enough space for a
reception table for special events. All these rooms are nicely detailed and are equipped with
features that can be used by either golfers and/or special event guests.
ENERGY
Reducing energy costs to a third of similar retail operations gives a building owner a competitive
advantage. To achieve these savings, a comprehensive and innovative approach to building
design was required. One strategy for the free standing Apple Valley Liquor Store No. 3 was
to tie waste heat from the beverage coolers to a geothermal heat pump loop system that is
used to heat and cool the building. Along with this system, a well -insulated building also limits
the need for temperature adjustments. To further reduce energy consumption, efficient lighting
and building systems were used. By incorporating natural daylight, the need for artificial lighting
during daytime hours was reduced, and consequently the heat created by light fixtures. LED
lighting and other high efficiency light sources were used. Pay back on the energy systems
was calculated and verified by the owner at 6 to 7 years. This project is a Green Globe certified
project and achieved Energy Star certification after a full year of operation.
FIRST COSTS
This fire training tower combines both a training tower and a fire burn facility. With 14 training
rooms and participation from four communities, this facility reduces the need for multiple
facilities and expands the training capabilities for the local fire departments. Within the facility
sacrificial walls were used to allow protection of the permanent structural elements. Fires can do
tremendous damage to a facility and these sacrificial block walls will need to be replaced every
5 years or more, but the overall structure should last for generations. This sacrificial system was
selected in place of very expensive fire tile construction, saving the communities over $200,000
or more than 10 percent of the construction budget.
�f
CIi1TEcTS
13
CITY OF LINO LAKES PUBLIC WORKS SPACE NEEDS ANALYSIS AND EXISTING FACILITY AUDIT
SUSTAINABLE DESIGN
Valleywood Clubhouse - Three Green Globes
Apple Valley Liquor Store #3 - Two Green Globes
Apple Valley City Hall
DESIGN OF SUSTAINABLE BUILDINGS
A majority of CNH Architects' architectural and intern staff are LEED Accredited Professionals
and designed the first two projects in Minnesota to be awarded a Green Globe certification.
Wayne Hilbert is a principal with CNH Architects and one of the first architects LEED accredited
and the first architect to receive certification as a Green Globe Professional in Minnesota.
CNH Architects, along with our design team, evaluate and develop sustainable strategies with
our clients. We are familiar with a variety of rating systems and have incorporated multiple
sustainable and high-performance strategies in our projects.
These projects not only highlight our energy strategies, but also include multiple approaches to:
Performance Management
Site and Water
Energy and Atmosphere
Indoor Environment Quality
Materials and Waste
ROSEVILLE FIRE STATION
With an existing Ice Arena on the city campus, the new Roseville Fire Station took advantage of
the economies and included the development of a campus geothermal loop system. The piping
loop harvests excess heat created in the process of freezing the ice sheet and distributes this
heat through the city campus to the new fire station building. This first phase of the campus
geothermal loop provides sufficient energy to fully heat the entire fire station building for only
the cost of circulating the fluid in the loop piping, with capacity to spare for other city buildings
on the campus.
APPLE VALLEY LIQUOR STORE #3
Completed in 2008, this project was the first project in Minnesota to receive a Green Globe
certification. The Green Building Initiative recognized this project with a "Two Globe" rating, and
the building is also Energy Star certified. Using a highly efficient geothermal heat pump system
and ventilation exchange allows this building to greatly reduce energy usage. The beer coolers
are also integrated into the geothermal system.
APPLE VALLEY CITY HALL
Using both Minnesota Sustainable Design Guide and LEED as outlines for design, this project
incorporates multiple sustainable strategies. It is listed on the Minnesota Office of Environmental
Assistance website as an example of green architecture. It has also been published in American
City and County Magazine and The National League of Cities for its sustainable strategies.
APPLE VALLEY SENIOR CENTER - APPLE VALLEY, MN
Completed in 2009, this project was awarded Two Globes under the Green Globe rating system.
This facility uses a combination of daylight harvesting, heat pumps, ventilation air exchange and
in -floor radiant heating to provide comfort and reduce energy consumption.
VALLEYWOOD CLUBHOUSE - APPLE VALLEY, MN
First facility in Minnesota to earn Three Green Globes for new construction. Overlooking the
18th hole, this building combines energy efficiency with a contemporary design to create a very
successful event venue.
CITY OF LINO LAKES PUBLIC WORKS SPACE NEEDS ANALYSIS AND EXISTING FACILITY AUDIT
14
FEE PROPOSAL
The services for this study will result in a report document that will include the following study
elements and recommendations:
• Space needs
• Current and future growth
• Comparisons to similar cities
• Growth potential for each option
• Existing facility conditions
• Deferred and short-term maintenance
• Building code / OSHA compliance
• Accessibility compliance
• Site location relative to population and infrastructure
• Energy usage and potential for savings
• Long-term costs of operation
• Capital costs for construction / remodeling proposed
In addition to preparing the above study results, CNH Architects and our consultant team will
meet with staff as needed to gather the study information and review study drafts as well as
present study results to the City Council.
We propose the services indicated above for a fixed fee of $11,900, plus reimbursable expenses
for printing and mileage.
Thank you for the opportunity to provide this proposal and we look forward to working with the
City of Lino Lakes.
Quinn S. Hutson, AIA, LEED AP
Principal
CNH Architects, Inc.
Accepted by:
Name
Title
Owner (Firm name)
CITY OF LINO LAKES PUBLIC WORKS SPACE NEEDS ANALYSIS AND EXISTING FACILITY AUDIT
15
Addendum
City of Lino Lakes
Public Works Site Analysis and Space Needs Study Addendum
October 30, 2017
The following information is intended to expand on information provided in the original study dated
April 11, 2017, to provide a more in-depth discussion of Layout Option Al, the remodeling and
expansion of the existing City of Lino Lakes Public Works facility. The information in this Addendum
does not change the space needs data, schematic layout design, estimated costs or other information in
the original study; but instead provides a more comprehensive view of the background on which the
data, design and cost estimates were based. The Addendum also reviews broad cost potentials for
future expansion labeled Phase II in the study.
Existing Public Works Remodeling Scope
The remodeling of the existing Public Works facility is shown in the study to be a relatively complete
interior gutting and rebuilding along with exterior envelope upgrades. To expand on this it is necessary
to consider how the building code evaluates maintenance versus remodeling.
First of all, ongoing maintenance of an existing building does not trigger code updates. However,
maintenance of an existing building only allows minor ongoing operational items such as changing light
bulbs (not fixtures), painting, recarpeting, patching an existing roof or repairing existing mechanical
units. Replacement of roofing systems, new mechanical units, replacement of light fixtures, and similar
upgrades however are specifically excluded from the maintenance definition and are instead considered
remodeling.
In comparison, the Minnesota State Building Code and referenced International Building Code require all
remodeled portions of a building to fully comply with current building code requirements. Further, if
the scope of a remodeling is such that the majority of the existing facility is remodeled, then the entire
facility is required to be brought into compliance with the current building code standards. Under these
provisions, the proposed remodeling and expansion of the existing Public Works facility as represented
in Layout Option Al would trigger a complete code compliant end result.
Finally, any items that are not in compliance with ADA accessibility standards, MPCA regulations, OSHA
safety standards or other similar safety, environmental, and civil rights requirements are not
"grandfathered" or allowed to remain noncompliant until a future remodeling date, but instead are to
be addressed when identified.
When reviewing the existing Public Works facility, see pages 28 through 33 for a general summary, it
was determined that the scope of code noncompliant spaces is such that no interior room was
reasonably reusable in its current basic existing condition due to configuration, construction or
operational deficiencies. This level of noncompliance was more extensive than was anticipated prior to
CNH
ARCHITECTS
the start of the study however as the documentation of existing conditions completed, the evidence was
extensive. The noncompliant items include the following partial list: corridors to narrow to meet
accessibility standards, restrooms and countertops of improper size or without accessible heights,
combustible construction in a non-combustible defined building including wood paneling and some
wood wall construction, mechanical units that did not provide minimum air quality requirements,
storage in areas without proper headroom, floor drains in vehicle accessed areas that flow into a septic
system, among many other items. The deficiencies identified in the existing Public Works facility are not
maintenance items as defined in the earlier paragraph, but can only be addressed in an extensive
remodeling of the entire existing building which is what led to the findings represented in the original
study.
While providing for more upgrade costs than originally would have been anticipated, the extent of the
needed remodeling upgrades identified in the study is valuable knowledge for use by the City of Lino
Lakes in effectively planning for the current and future needs of the Public Works Department in a
manner to ensure that upgrades budgeted address the short-term and long-term goals developed for
the facility.
Future Expansion (Phase II) Timing and Cost
The future expansion labeled as Phase II in the study represents possible future growth needs for the
Public Works department looking out at least 15 to 20 years. This data is based on typical anticipated
additional departmental needs to serve the increase in the population of the City of Lino Lakes as
projected by the Metropolitan Council by the year 2040. This population projection is more than two
decades in the future and only time will indicate if this growth level materializes. Further, the additional
square footage of vehicle storage needed to serve this larger population is estimated based on staff
input and comparison to other cities of similar population to the Metropolitan Council's future
population estimate and also may not fully materialize. The intent of the study is to identify the
maximum potential departmental facility needs within the requested timeframe reviewed such that, if
needed, the site and building masterplan layout can accommodate this future facility growth without
relocation or other inefficiencies.
The study is not intended to indicate that the Phase II storage building expansion will be required, only
that if the projections both for growth of population and equipment needs achieves the maximum
envisioned levels, the site and building masterplans developed remain viable. The City of Lino Lakes
would need to revisit actual needs based on updated data over the coming decades.
Due to the unknown size and timing of the potential future expansion (Phase II) a cost estimate for this
building addition was not included in the study results. However, to provide some concept of potential
future expansion costs, the following table has been added to this Addendum.
Future Expansion Size
Building
Area (sf)
Low Cost
/SF*
High Cost
/SF*
Low Range
High Range
Minor Addition
15,000
$110
$150
$1,650,000
$2,250,000
Maximum Addition
30,000
$110
$150
$3,300,000
$4,500,000
*Costs in 2017 dollars and does not include inflation
CNH
ARCHITECTS
As the table indicates, the low end cost for a small addition of a scope that still allows for efficient
construction costs represents a construction cost of $1.65 million for a low -temperature heated open
plan storage addition. Conversely, if the population and equipment growth projections hit their most
aggressive levels represented in this study, the maximum addition cost would range from $3.3 million to
a high end of $4.5 million. As noted, these construction estimates are based on recent construction
costs for Public Works facilities of similar types and are listed in 2017 dollars.
Thank you for the opportunity to provide this additional data to better explain the study methodology
and the intended limitations of the future expansion cost ranges.
Best Regards
Quinn Hutson, AIA, LEED AP
Principal
CNH Architects, Inc.
CNH
ARCHITECTS
Public Works Site Analysis and
Space Needs Study '°
CNH ARCHITECTS
7300 West 147th Street, Suite 504
Apple Valley, MN 55124
952.431.4433
www.cnharch.com
04/11/17
16088
TEAM
CNH Architects
Quinn Hutson, AIA
Principal Architect
Jessica Johnson, LEED AP BD + C
Architectural Designer
7300 West 147th Street, #500
Apple Valley, MN 55124
(952) 431-4433
www.cnharch.com
Engineering Design Initiative, Ltd. (edi)
Larry Svitak, PE
Mechanical Engineer
1112 Fifth Street North
Minneapolis, MN 55411
(612) 343-5965
www.edilimited.com
Professional Project Management (PPM)
Doug Holmberg
Cost Estimator
1858 East Shore Drive
Maplewood, MN 55109
651-776-5590
I HEREBY CERTIFY THAT THIS PLAN,
SPECIFICATION, OR REPORT WAS
PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY
LICENSED ARCHITECT UNDER THE LAWS OF
THE STATE OF MINNESOTA
PRINT NAME: QUINN HUTSON
DATE: 4/11/17
LICENSE NO: 21234
TABLE OF CONTENTS
Executive Summary 2
Overview of Study 6
Site A: Existing Public Works Site
Introduction
Site Analysis
Site B: Fire Station Site
Introduction
Site Analysis
Program Overview
Space Needs Program
Comparison Matrix
8
10
12
14
16
20
Option Al: Existing Building Expansion
Introduction 22
Layout 23
Option A2: New Facility - Existing Public
Works Site
Introduction 24
Layout 25
Option B1: New Facility - Flre Station Site
Introduction
Layout
26
27
Existing Facility & Site Review
Architectural Review 28
Accessibility and Code Review 31
Mechanical Systems Review 32
Cost Estimate
Option Al 35
Option A2 35
Option B1 35
CNH
ARCHITECTS 1
EXECUTIVE
SUMMARY
2 Public Works Site Analysis and Space Needs Study
EXECUTIVE SUMMARY
Site A
Site B
Introduction
The main facility of the current Lino Lakes Public Works Facility was built in 1971 with several
additional cold storage sheds, salt and brine shed, and a mobile office out -building added to the
site, since that time. The current site is on the northwest portion of Lino Lakes, off Main Street.
While the facility has functioned in the past 45 years, the City Council and staff determined that it
would be appropriate to analyze the condition of the current buildings along with the operational
needs of the Public Works Department to best serve the community for the next 20 years. The
long-term growth anticipated for the Public Works facility was also selected to be analyzed with
two possible sites to be considered - the current location labeled Site A in this study and the site
adjacent to Fire Station #2 on Centerville Road and Birch Street referred to as Site B.
With this goal in mind, the City of Lino Lakes contracted CNH Architects to perform an analysis of
three approaches for the Public Works Facility, now and into the future. The goal of this study is to
provide evidence based recommendations to address the needs of each department and analyze
site conditions for each site. This study evaluates each of the sites identified, rating them for a
broad series of attributes. The information provided in this study includes site data, gathered and
analyzed by CNH Architects and valuable input from Lino Lakes city staff. The report includes this
Executive Summary followed by supporting data and diagrams.
Process
Over the past few months, CNH Architects and our consulting team performed a detailed study
and analysis. The study process evaluated the following four major steps:
Step 1: Assess conditions of the current facility, including taking photos of the existing site. This
step includes reviewing current code and accessibility compliance, deferred maintenance, and
short-term anticipated maintenance requirements.
Step 2: Develop a Space Needs Program of current space needs, as well as evaluating impacts
on the space needs based on the projected growth of the City of Lino Lakes by 2040. This step
started by gathering data from Lino Lakes city staff regarding current and projected space and
site needs. Other public works facilities in similar, neighboring communities were reviewed as
comparative case studies to create proper metrics for gauging the appropriate scope of work.
Step 3: Develop an analysis of relevant site attributes for the two sites being considered. This
analysis includes availability of public utilities, buildable area after easement and wetlands were
located, efficiency of potential space use, and adjacent land uses.
Step 4: Develop a total of three preliminary site and building layouts on the two proposed sites and
obtain cost estimates for each option. The three options that have been identified for evaluation
for the Public Works Facility are shown on the Public Works Facility Site Option Map and consist
of the following:
Option Al: Remodel & Building Expansion on Existing Public Works Site (Site A)
Option A2: New Facility on Existing Public Works Site (Site A)
Option B1: New Facility at Birch Street & Centerville Road adjacent to Fire Station #2
(Site B)
CNH
ARCHITECTS 3
EXECUTIVE SUMMARY
Site A Statistics
0000.Adjacent Land Uses
00000 Infrastructure
0•••• Buildable Area
000•• Easements - Existing or Future
0000 • Floodplain
0000• Wetland
0•••• Site Visibility
00000 Noise Issues
00000 Potential Neighborhood Resistance)
Site B Statistics
00000Adjacent Land Uses
11 00000 Infrastructure
0000•
O00•
Buildable Area
• Easements - Existing or Future
1000..Floodplain
00000 Wetlands
10•••• Site Visibility
00000 Noise Issues
100000 Potential Neighborhood Resistance
Conclusions
The study determined that the existing facility, while having served the city well for 45 years, has
fallen well behind current standards both for codes, safety, facility maintenance and appropriate
size for a Public Works Department serving a city, the size of Lino Lakes. The building's code
deficiencies include total lack of accessibility standards, multiple building code noncompliance
items, OSHA workplace concerns, inappropriate sanitary waste conditions, and significant HVAC
air quality issues. Similarly, the existing building has deferred maintenance issues such as leaking
roof and windows as well as future near -term maintenance items that will require attention in the
next 1 to 5 years. These items can all be addressed by remodeling or replacement, but need to
be factored into the cost of relevant options being evaluated.
The review of the Space Needs for the Public Works Department, evaluated current space use,
shortfalls in needed space, and the future growth in staff and equipment projected within the
study timeframe of looking forward to 2040 needs. The approach included storage of all vehicles,
equipment and equipment accessories within a weather -protected semi -heated facility as is
typical within current public works facilities. This approach will provide long term value to the city
in significantly longer lifespan of the equipment and reduced upkeep. The results of the Space
Needs Program indicate a need for a total building area around 80,000 square feet by the end of
the 2040 timeframe. The study indicates that all categories are short of space, currently with the
largest shortage being in the Vehicle Storage category. Based on this review, we recommend
a two-step construction with Phase 1 addressing current and near -term shortfalls and Phase 2
adding additional Vehicle Storage space later in the masterplan. With this phased approach, the
Space Needs Program indicated a Phase 1 size of approximately 55,000 square feet with Phase
2 adding the remaining 30,000 square feet of Vehicle Storage.
These Space Needs were then compared to facilities at Hugo, Shoreview, Otsego and Hopkins.
The areas of each category of space were translated in square feet per population to equalize the
comparisons. The results indicate that Phase 1 Space Needs area goals are very conservative
being at or under the areas represented by all the cities in comparison. The Phase 2 Space
Needs area goals for the Vehicle Storage category rise into the middle of the comparison data still
remaining conservative as this phase for Lino Lakes looks out to 2040 and beyond.
The next step of the study analyzed site characteristics of the two potential sites being considered
for the future Public Works Facility, Site A, the current Public Works site and Site B, adjacent
to Fire Station #2. Site A scored moderately positive on buildable area and site visibility and
moderately negative on six other statistics. It scored negative on the infrastructure due to the
current lack of municipal water and sanitary sewer serving the site, which would be required to
remodel or replace the facility on this site. In review of Site B, this location rated infrastructure as
a positive since all utilities are already stubbed to the site from the fire station work. This site rated
moderately positive for four statistics, neutral for buildable area and flood plain, and moderately
negative for two remaining items. However, understanding not all statistics are of equal weight,
Site A scored an average of 2.22 out of 5 total points and Site B scored an average of 3.44 out
of 5 total points. While Site B has features that result in a better analysis, both sites are workable
and can be considered for the future of the Public Works Department, assuming of course that
municipal water and sanitary sewer is extended to Site A.
Finally, the study developed three public work facility masterplan site layout options representing
both a remodel / expansion approach as well as all new facilities. All three options result in
facilities that function and meet the minimum goals of the Space Needs Program. The following
are highlights of each option with more detailed information to be found in the main body of the
study report. As shown in the cost analysis, there is approximately a 5% range in initial costs
between the options however there are other factors for the City of Lino Lakes to consider in
the selection such as long-term location within the city, life -cycle maintenance and utility costs,
operation of public works staff during construction, and best uses of city property.
4 Public Works Site Analysis and Space Needs Study
EXECUTIVE SUMMARY
Option Al
Option A2
Option Bl
Option Al: Remodel & Building Expansion on Existing Public Works Site (Site A)
Remodeling and expansion of the existing public works building is the first option reviewed
and provides the main advantages of reuse of the existing building structure. There is also the
advantage of a somewhat larger overall site. However due to the extensive code, accessibility
and safety issues, the building's interior would need to be mostly rebuilt to address these minimum
requirements. There would also need to be exterior upgrades of the existing structure such as
reroofing the building to replace the currently failing roof. For either option on Site A, the project
also includes the requirement to bring municipal water and sanitary service to the site to provide
mandatory fire suppression and treatment of vehicle floor drain sanitary flows. This option also
impacts the public works department's operations, related to working around the remodeling and
addition process. Based on the detailed preliminary cost estimates done by the cost consultant,
this option's cost falls in the middle of the three options reviewed. However, when the increased
maintenance costs of the remodeled portion of the building is factored in; this option is likely the
costliest over the next decades.
Option A2: New Facility on Existing Public Works Site (Site A)
The approach on this option is the demolition of the existing public works facility and construction
of an all -new facility on Site A on Main Street. This option has several advantages including the
flexibility to place the new facility on the site to maximize the use, providing a more compact
building and better screening of the outdoor storage and salt building area. This option also
allows the continued use of the newer, of the two existing cold storage garages for the next 10 to
20 years until its life -expectancy is reached and Phase 2 is completed. The other main benefit
of a new facility is the elimination of the increased maintenance and replacement requirements
inherent in remodeling the existing building under Option Al. Similar to the first option however,
this option would require the extension of municipal water and sanitary service to the site to
provide mandatory fire suppression and treatment of vehicle floor drain sanitary flows. Operations
of the Public Works Department would also be significantly impacted between the demolition
and new construction of the facility, although the construction timeline would be reduced by
not working around ongoing operations. Finally, this option has the highest initial cost of all the
options considered, but would be less than Option Al over the next few decades when increased
maintenance costs of the remodeled building is factored in.
Option B1: New Facility at Birch Street & Centerville Road adjacent to Fire Station #2 (Site B)
This option represents a new facility at the south Site B location where preparations for future
city facilities were provided in the Fire Station #2 project. The advantages of this site include
existing municipal utilities stubbed into the site, a location closer to the future population density
projections, and the smallest most efficient building footprint of the three options. Other benefits
of building on this site is the ability to not impact the operations of the Public Works Department
during the construction process as they will be able to work from the existing facility until the new
building opens. Also, by not building on Site A, there is not the loss of the one ballfield and hockey
rink, maintaining more park and recreation usage within the city. Replacement costs for these
recreational areas were not included in the study. Under this option, the existing salt storage
building, material storage bins, as well as the existing cold storage buildings would remain on the
north Site A location, at least through Phase 2 construction, providing the benefit of more available
storage space in the short term. However, there will be a mixed impact of having public works
elements on two sites. Option B1 has the lowest initial cost as well as the lowest life -cycle cost of
the three options analyzed.
CNH
ARCHITECTS 5
PUBLIC WORKS FACILITY SITE OPTION MAP
Option Al:
Option A2:
Option B1:
Existing Site: Expand to meet future needs
Existing Site: New Facility
Birch St. & Centerville Rd.: New Facility
Public Works Facility Option Location Map
The map above shows the two sites that were identified by city staff for consideration as potential
properties for the proposed Public Works Facility. Options Al and A2 are located at the current
Public Works Facility. Option B1 is located adjacent to Fire Station #2.
6 Public Works Site Analysis and Space Needs Study
OVERVIEW OF STUDY
Project Needs Assessment
CNH interviewed appropriate City Staff to understand both their current needs as well as future
operational changes and anticipated growth areas. We compared these areas to similar nearby
cities, providing not only relational size comparisons but interjecting potential issues that may not
have been considered. To create accountability and clarity in our investigation, we made it a priority
to gather initial information with rigor such that assumptions are minimal, collaborating closely with
our engineers to pinpoint existing and potential issues that may or may not already be identified.
Option Analysis
After gathering all the information on space needs, CNH evaluated the existing public works cam-
pus, and developed future needs based on expected growth; CNH reviewed three approaches for
the City of Lino Lakes to meet their Public Works needs. These include:
Option Al — Renovate the existing building and expand to meet future needs.
Option A2 — Build an all new facility at the existing site to provide long-term value.
Option Bl — Build an all new facility at the city property at Birch Street and Centerville
Road leaving some appropriate elements at the existing site.
The study has reviewed each of the above options, analyzing and listing comparative data on each
option in order to provide the City of Lino Lakes with the tools to make an informed decision on the
future of the Public Works department facilities. Among others, the review of each option will include
the following topics:
• Space needs — current and future
• Growth potential for each option
• Existing facility conditions
Deferred and short-term maintenance
Building code / OSHA compliance
• Accessibility compliance
• Capital costs for construction / remodeling proposed
• Site location relative to population and infrastructure
CNH
ARCHITECTS 7
Site A consists of the existing site for the current
Senior Citizen Center and Public Works Facility.
The property's current zoning designation is
for Public and Semi -Public District (PSP). It
has a gross area of 27.46 acres of which 17.6
acres are suitable for building. The city owns
the property of this existing facility. The site is
surrounded by residential neighborhoods to the
east and south, baseball fields to the west and
agricultural land to the north.
Photograph:
View of the existing Vehicle Maintenance
portion of the Public Works Facility
•
8 Public Works Site Analysis and Space Needs Study
SITE A
CNH
ARCHITECTS 9
Site
A
i
Site Analysis
PSP
i
Public and Semi -Public District
80 Main Street
Lino Lakes, MN 55025
2 Properties
Owned by
City of Lino Lakes
Gross Site Area
17.6 Acres
Wetlands
000••
There are designated wetlands running through
the middle of the property which reduces the
buildable area and mostly separating the
northwest storage area from the main buildable
area. The wetlands represent approximately
40% of the overall site.
Infrastructure
00000
This city owned property is served by electricity
and natural gas utilities, but does not have
municipal sanitary or water service. The current
facility uses well water and has a private mound -
style septic system limiting the ability to install
fire suppression and requiring storage tanks
for future vehicle wash and floor drain sanitary
flows. Extension of municipal sanitary is highly
recommended. Municipal water and sanitary
are located approximately 1 mile to the west.
Floodplain
000e*
There is a large floodplain running through the
middle of the property mostly duplicating the
wetland areas.
10 Public Works Site Analysis and Space Needs Study
Easements
000
There is one gas easement running on the
southwest corner of the site. This easement
defines the southwest edge of the main
buildable area.
Site Analysis
Site Statistics
Public Works Analysis
Site
A
000••
00000 Infrastructure
0••••
000•
Adjacent Land Uses
Buildable Area
• Easements - Existing or Future
00000 Floodplain
00000 Wetland
00.00 Site Visibility
000110 Noise Issues
00000 Potential Neighborhood Resistance!
Rating Scale
••••• o•••• oo••• 000•• 00000
Positive Moderately Neutral Moderately Negative
Positive Negative
Buildable Area
0•...
This site is approximately 27.4 acres, of which
12 acres is buildable area. This buildable area
is separated into three distinct blocks with only
the southeast block of 7.7 acres large enough to
be considered for this project.
CNH
ARCHITECTS 11
Site B:
Site B is located on the southeast intersection
of Birch Street and Centerville Road. The
property's current zoning designation is for
Public and Semi -Public District (PSP). It has
a gross area of 17.6 acres of which 3 acres
are suitable for building. It is adjacent to Fire
Station #2 to the north and agricultural land
on the east and west sides. To the south the
property extends toward 46 acres of land owned
by the City. There is one private residence on
agricultural land to the southwest.
Photograph:
View of the site from the east
12 Public Works Site Analysis and Space Needs Study
CNH
ARCHITECTS 13
B
Site Analysis
•
PSP
Public and Semi -Public District •
1710 Birch Street
Lino Lakes, MN 55038
1 Property
Owned by
City of Lino Lakes
Gross Site Area
17.6 Acres
-
Wetlands
000•0
The designated wetlands run along the North,
East and West sections of the property and
decreases the buildable area within this parcel.
Infrastructure
•000•
This city owned property is served by all
public utilities including electrical, natural
gas, municipal water, and municipal sanitary
services. The water and sanitary pipes were
stubbed into the site as part of the recent Fire
Station #2 project. The site is also served by
the new city street with completed connections
to both Centerville Road (County 21) and Birch
Street (County 34).
Floodplain
0000•
The floodplain runs through the East part
of the property, but since the construction
of the fire station the FEMA map should be
updated to reflect the correct contours of
the site. The diagram above represents the
approximate corrected floodplain zone. It is our
understanding that the floodplain update is in
process.
14 Public Works Site Analysis and Space Needs Study
Easements
000%
There are no easements on the south buildable
area being considered for this project other than
standard drainage and utility setbacks along the
property lines and roads.
Site Analysis
Site Statistics
Public Works Analysis
Adjacent Land Uses
II 0000.Infrastructure
100••• Buildable Area
0•...
Site
B
Easements - Existing or Future
100••• Floodplain
000•• Wetlands
10•••• Site Visibility
00.00Noise Issues
1000.0Potential Neighborhood ResistanceI
Rating Scale
••••• o•••• oo••• 000 00000
Positive Moderately Neutral Moderately Negative
Positive Negative
Buildable Area
00•0.
This site is approximately 17.6 acres not
including the over 46 acres to the south. After
deducting the fire stations' built area, there is
3 acres of remaining buildable area for this
potential project.
CNH
ARCHITECTS 15
SPACE NEEDS
PROGRAM
16 Public Works Site Analysis and Space Needs Study
ARCHITECTURAL CONSIDERATIONS - SPACE NEEDS PROGRAM
Overview
The current Lino Lakes Public Works Facility was built in 1971. While the facility has functioned in the past 45 years, the City Council and staff
determined that a space needs program be developed to assess the existing, current and future needs. The Space Needs Program captures the
conclusions made from the assessment exercise over the last months to express the scale and scope of modifications needed to the facility for both
short and long term operational demands.
A comparison matrix at the end of this section reflects other Public Works facilities as they relate to the scale of this project. Public works facilities in
the Twin Cites metro of Hugo, Shoreview, Otsego, and Hopkins were used as references. While each city's needs and approaches are different, the
comparisons can provide additional insight when considering the best fit for the City of Lino Lakes.
Space Needs Analysis Approach
The space needs reviewed are based on the following assumptions to address the long-term needs of the Public Works Department for the City of
Lino Lakes. While other approaches may be pursued, the assumptions indicated in this study represent the facility designs commonly taken by other
similar municipalities within the greater region.
A. Departments Included within the Facility: This space needs program for the overall Public Works Department includes the streets, utilities, vehicle
maintenance and park & recreation operations. This combination of operations creates efficiencies in operations and facilities as many functions
overlap and require similar facilities.
B. Protection of Equipment: This space needs program provides space for all vehicles and equipment to be stored within the protection of the
proposed building. This would include fully heated operational areas as well as partially heated storage areas, depending on the needs of the individual
spaces. Much of the current equipment and many vehicles are currently stored outside within the current Public Works site significantly reducing its
life -expectancy and increasing maintenance requirements. The space needs program assumes that all equipment and vehicles would be stored within
the facility providing reduced life -cycle costs for the equipment and vehicles within the public works department.
C. Growth Projections: The space needs program allows room for the anticipated growth needs within the following 20 years at a minimum as is
typical for a public facility built to operate for a period approaching 50 years. The City of Lino Lakes is projected by the Metropolitan Council's study to
expand in population to 31,100 by 2040, or a growth of 49% from current. The growth built into the space needs program represents only the added
staff and equipment that was determined to be needed with the increase in population and associated streets, parks, and utilities. Consequently the
building space needs growth is only 14% above the current needs, significantly less than projected population growth.
CNH
ARCHITECTS 17
SPACE NEEDS PROGRAM
Office Area
Vehicle
Storage
1
Space Name
Public Works Superintendent
Open Office Area
T 1 7 •
Quantity 1 Size I Area 1 Total 1
1 1 12'x14' 168 I 168
1 4 1 1_
1 I 15'x20' 1 300 1 300
Reception
1
1 16'x10' 160 160
Private Offices I 9 1 12'x10' 1 120 1 1,080
Shop Supervisor Office 1 1 1 12'x10' 120 120
Copy Room 1 1 1 9'x10' I 90 1 90
IT/Server Room 1 9'x10' 90 i 90
Multi -Purpose Room 1 1 1 40'x45' 1 1,800 I 1,800
Lunch Room 1 30'x40' 1,2001 1,200
Men's Restroom & Locker Room 1 1 1 30'x40' 1 1,200 I 1,200—i
Women's Restroom & Locker Room 1 15'x25' 375 1 375
L 1 1 1
Storage 1 1 1 10'x25' 1 250 1 250 1
Janitor's Closet 1 10'x12' 120 r 120
L 4 1 1
Mechanical/Electrical Room 1 1 1 20'x30' 1 600 1 600
Public Restrooms 21 9'x10' 90 L 180
Subtotals
Circulation
Total
15%
Space Name Quantity
Large Spaces (Angled 60°)
Medium Spaces
7,773 1
1,160
8,893 1
Size i Area i Total
16 18'x36' 835 13,3601
4 1 1-
49 1 12'x24' I 288 1 14,112
Small Spaces
Mezzanine Storage
20 I 8'x12' 96 1,920
1
1 1 30'x40' 1 1,200 I 1,200
General Storage 1 1
1 L 20'x100' 2,000
L 2,000
1
Vehicle Wash Bay 1 1 1 35'x50' 1 1,750 1 1,750 J
Circulation 1 1 30'x6600' 19,789 19,789 1
L 1 1 L
Total
54,131
1
18 Public Works Site Analysis and Space Needs Study
SPACE NEEDS PROGRAM
Vehicle
Maintenance
Departmental
Shops
Total Area
Summary
Space Name Quantity
Large Maintenance Bay
Size Area Totali
2 1 24'x48' 1 1,152 1 2, 304-1
Small Maintenance Bay
2 i 20'x40' 800 L 1,600
Welding Bay / Fabrication 1 1 I 28'x40' 1 1,120 1 1,1201
Small Engine Repair Bay 1 20'x40' 1 800 800
1 L
Tire & Brake Shop 1 1 1 20'x28' I 560 1 560_I
Tire Storage ( Mezzanine) 1 1 I 30'x10' 1 300 I 300 i
Lube Room I 1 7 12'x16' 192 r 192
Parts Storage & Tools Room L 11 20'x50' 1,000 L 1,000 J
Subtotals
Circulation
Total
15%
7,876
1,181
9,057,
Space Name i Quantity Size Area Total
Sign Storage 1 1 I 30'x40' 1 1,200 1 1,200 J
Woodworking Shop 1 20'x30' 600 600
Parks Storage I 1 30'x40' 1,200
Water Meter Shop / Storage 1 15'x30' 450 r 450
1 1 L
1
1,200
Subtotals
Circulation
Total
15%
3,450
518
3,968,
Subtotals 76,049
Exterior Wall and Building 10% 7,605
Services
Total 83,654
As this Space Needs Program indicates, the Public Works Department will need a total building area approaching approximately 84,000 square feet by
the end of the study target of 2040. While the population of the City of Lino Lakes is projected to grow 50% by 2040, the projected total Space Needs
Program is only 15% more than the current space needs because of operational efficiencies of a larger city. Due to this future growth and also the
potential use of some existing cold storage space over the next 10 to 15 years, the Space Needs Program can be met in a two phase approach with
Phase 2 encompassing approximately 25,000 square feet of future Vehicle Storage needs.
CNH
ARCHITECTS 19
COMPARISON MATRIX
Comparative Square Footage Calculation
The Comparison matrix reflects size of areas in comparative Public Works Facilities. The following formula was used to create comparison factors.
Formula for Comparison:
Square feet
Population
__ Comparison
Factor
The comparative factors are not a definitive means for determining the appropriate size and scale of Lino Lakes' expansion needs, particularly con-
sidering many other factors can influence how and why departmental allocations are established. However, this information can be helpful in guiding
the space needs program with a larger perspective that acknowledges the external factor of city population and growth and how that impacts the
operational capacity of the Public Works facility.
From the chart below, we can see that Hopkins' has a somewhat smaller population. Hopkins' total square footage for their Vehicle Storage space
(shown to the right) is 37,800 square feet which is 85.5% larger than Lino Lakes' actual area of 5,512 square feet. Lino Lakes has a much smaller
Vehicle Storage area. It is not surprising that Lino Lakes' Public Works facility is smaller than comparison facilities given Lino Lakes' growth in popula-
tion and service needs since the current facility was built approximately 45 years ago.
City Population (2013 Census)
' Lino Lakes Hugo 1 Shoreview Otsego Hopkins �
,,
' 20,862 14,082 ' 25,931 14,524 18,025 '
Projected Population (2040)
. Lino Lakes �
l,
1. 31,100 ,l
20 Public Works Site Analysis and Space Needs Study
COMPARISON MATRIX
I Existing
L
Phase 1
Phase 2 0 I
Vehicle Storage
Square Feet
OAS^ psO^ pis^ .o
Lino Lakes (Existing)
(5,512 sf / 20,862)
Lino Lakes (Proposed)
(24,359 sf (54,131 sf) / 31,100)
Hugo
(15,000 sf / 14,082)
Shoreview
(38,410 sf / 25,931)
Otsego
(18,300 sf / 14,524)
Hopkins
(37,800 sf / 18,025)
••'
/ Population
sz\
0000000G
O 00000001
O 00000001
0000001
600
a)
v
O
lad
Iy
I V
Ic
I a) v)
Lino Lakes (Existing)
(3,545 sf / 20,862)
Lino Lakes (Proposed)
(8,893 sf / 31,100)
Hugo
(6,400 sf / 14,082)
Shoreview
(15,620 sf / 25,931)
Otsego
(4,300 sf / 14,524)
Hopkins
(13,596 sf / 18,025)
Lino Lakes (Existing)
(5,742 sf / 20,862)
Lino Lakes (Proposed)
(13,025 sf / 31,100)
Hugo
(6,400 sf / 14,082)
Shoreview
(13,990 sf / 25,931)
Otsego
(5,850 sf / 14,524)
Hopkins
(10,917 sf / 18,025)
oc
O 000
O 00001
00(
410001
O 0001
CNH
ARCHITECTS 21
Option
Al
Layout
Description
Option Al is located at the current Public Works and Senior Center Facility site. This option includes extensive remodeling of the existing Public
Works and Senior Center Facility into Public Works' office space and vehicle maintenance area. The expansion includes additional office,
additional vehicle maintenance, departmental shops and vehicle storage. The existing salt building and material storage bins will be reused. Due
to the limitations of the buildable area and the location of the existing cell tower, a portion of the vehicle storage is rotated at a 120 degree angle.
This option would involve a total gutting of the existing building as needed to address deficiencies in the current building related to accessibility,
energy code, fire suppression and mechanical systems. Option Al and the following option by using the existing public works site will also require
an extension of the municipal water service and municipal sanitary service to the site.
Due to the site layout limitations working around the existing office and maintenance building, the existing cold storage buildings will not be able to
remain. This will reduce the total available storage for the Public Works department until Phase 2 is built, and may also result in the need to build
Phase 2 sooner than the other option in order to meet the city's growth.
1 Pros
I
I • Re -use of existing Public Works building structure
I • Use of existing Salt Building
I • Use of existing Material Storage Bins
I • Use of existing miscellaneous site storage
I • Re -use of existing site
I • Large buildable area
I
I
I
I
•
•
Cons
• Potential long construction period of existing building disrupting operations
• Cost of bringing new Water main to site due to fire suppression requirements
• Loss of use of existing ice rink and cost to remove
• Loss of use of existing baseball field and cost to remove
• Cost of remodel based on code and handicapped accessibility deficiencies
• Non -efficient floor plan of vehicle storage to fit site and keep existing building
• Cost of bringing municipal sanitary sewer to site (or impacts of large storage
tank and regular pumping for floor drains and wash bay sanitary)
• Reduced facility life expectancy and increased maintenance for the remodeled
portion of the building compared to an all new facility
Total Square Footage
• Remodel 12,752 s.f.
• New 67,582 s.f.
• Total 80,334 s.f.
•
•
•
22 Public Works Site Analysis and Space Needs Study
Existing
Material
Storage
Bins
LI
Existing
Baseball
Field
Wetlands
Fuel Trailer
Island Storage
Vehicle
Storage Wash
` Bay
• Vehicle
Maintenance
Existing
• Cell
/ Tower
55 Parking
Stalls
Option
Ex.
Retention
Pond
Main Street
CNH
eau Lake Dr.
ARCHITECTS 23
Option
A2
•
•
•
Layout
Description
Option A2 is located at the current Public Works and Senior Center Facility site. This option provides for an all -new Public Works Facility which
includes office, vehicle maintenance, departmental shops and vehicle storage. The existing salt building, cold storage garage and material storage
bins will be reused.
Since this option removes the existing 45 year old building, it provides the flexibility to place the building on the site in a more advantageous layout.
This results in a more compact building footprint, better screening of the building to the east neighborhood, and the option for drive -through parking
for large equipment within the storage garage. This site option also allows for the continued use of the newer of the two existing cold storage
garages which will provide more available space for the Public Works department, especially until Phase 2 is added. Option A2, using the existing
public works site, requires an extension of the municipal water service and municipal sanitary service to the site.
Pros
• Use of existing salt building
• Use of existing material storage Bins
• Use of existing miscellaneous site storage
• Use of existing cold storage garage
• Longer life -expectancy and reduced maintenance for an all new facility
• Large buildable area
• Drive through stalls for large vehicle storage parking
• Flexibility in building placement to best fit uses and site
Cons
• Cost of demolishing existing facility
• Disruption of operations during construction period
• Cost of bringing new water main to site for fire suppression requirements
• Loss of use of existing ice rink and cost to remove
• Loss of use of existing baseball field and cost to remove
• Cost of bringing municipal sanitary sewer to site (or impacts of large storage
tank and regular pumping for floor drains and wash bay sanitary)
Total Square Footage
• Remodel None
• New 79,503 s.f.
• Total 79,503 s.f.
• Existing Cold Storage 4,835 s.f.
•
•
•
24 Public Works Site Analysis and Space Needs Study
Option
"2
Existing
Material
Storage
Bins
sew
ehf
Existing
Baseball
Field
Existing Roa
0
0
0
0
0
Wetlands
Existing Salt Phase 2
Building r —
Trailer
Storage I I
Existing
Garage 1
Existing,,
Cell
Tower
55 Parking Office
Stalls =
Vehicle
Storage
Vehicle
/` I
Maintenance 1
...� Wash
Bay
1
Shops
ch. 410111114
t
e e e
a e
Ex.
Retention
Pond
ir
Main Street
d
4•
ondeau Lake Dr.
CNH
ARCHITECTS 25
Option
B1
Layout
Description
Option B1 is located adjacent to Fire Station #2. This option includes a new Public Works Facility which includes office, vehicle maintenance,
departmental shops and vehicle storage. The existing salt building and material storage bins will be reused at the existing Public Works site.
This option would allow for the use of the existing public works storage buildings throughout the construction period reducing operational disruption
and cost during construction. Option B1 would also allow for the continued use of the north site facilities after construction until they reach there
anticipated life -expectancy allowing for more flexibility and space for the Public Works department, especially until Phase 2 is added to the building.
•
I, I
I Pros
•
•
• Existing municipal sanitary sewer connection located on site
• Existing municipal water main connection located on site
• Use of existing ice rink on Site A
• Use of existing baseball fields on Site A
• Efficient floor plan of vehicle storage
• No disruption at the current Public Works facility during construction
• Located adjacent to Fire Station #2
• Closer to future population density as Lino Lakes grows
• Existing storage buildings at north site can continue to be used
Cons
• Smaller buildable area creates minimal clearances for site functions
• Existing salt building is located on Site A
• Existing material storage bins are located on Site A
• High visibility from future road
Total Square Footage
• Remodel None
• New 76,017 s.f.
• Total 76,017 s.f.
• Ex. Public Works Storage 14,799 s.f.
•
•
26 Public Works Site Analysis and Space Needs Study
Office
Layout
Infiltration
Wetlands Basin
Vehicle Storage Wash
;,� Bay
Birch Street
Infiltration
Basin
Existing
Fire
Wetlands
Fuel
Island
Trailer
Storage
Station
Infiltration
Basin
Existing Road
" II III' Phase 2-\
55 Parking Stalls
r
CNH
Option
B1
ARCHITECTS 27
ARCHITECTURAL REVIEW
Introduction
The current Lino Lakes Public Works Facility was built in 1971 and does not have access to municipal water or municipal sanitary sewer. Due to fire
code requirements that limit the square footage of the facility the existing Public Works building cannot be expanded unless municipal water is brought
to the site. The additions to this facility include 4 separate buildings. The majority of the vehicles are stored outdoors, which inherently reduces their
life span. Equipment is currently stored in 3 buildings and is not conducive to an efficient work flow. The building has water damage and leaking in
several locations.
Equipment Storage
Public Works is currently storing most of their
equipment outside where they are covered in
snow and have a greater chance of being rusted,
therefore reducing their life span.
Vehicle Storage
Public Works is currently storing vehicles outside,
where they are covered in snow and have a greater
chance of being rusted, therefore reducing their life
span.
Vehicle Maintenance
The current Vehicle Maintenance area and tool
storage area does not provide adequate space to
service the city's fleet of vehicles.
28 Public Works Site Analysis and Space Needs Study
ARCHITECTURAL REVIEW
Exterior Brick
Exterior brick on the building has severe water
damage in multiple places and is in need of repair.
Roof leakage
The existing standing seam roof needs to be
replaced as there are multiple locations where
leaking has occurred.
Gutters
There are several locations around the building
where gutters are failing or not in place, snow is
melting off of the roof and causing water damage
and icy conditions, which are hazardous for the
public and employees.
Offices and Storage
Current offices and storage areas are intermingled
and do not provide an efficient use of space.
CNH
ARCHITECTS 29
ARCHITECTURAL REVIEW
Break Room/Office
One of the additional buildings on -site houses one
office and a break room due to limited space in the
main facility.
Locker room
The current locker room does not have adequate
lockers to accommodate employees and is used as
a circulation space which doesn't have privacy for
employees.
Lunch Room
The current lunch room does not have adequate
appliances and chairs to accommodate Public
Works employees.
Server / Telephone Storage
The current server is located in the main hallway,
isn't easily accessible and is an eyesore. The data
and telephone phone board is currently in the
storage room.
30 Public Works Site Analysis and Space Needs Study
ACCESSIBILITY & CODE REVIEW
Introduction
The current Public Works facility was built in 1971 and has major deficiencies related to accessibility, energy code, fire suppression and mechanical
systems. Our accessibility review identifies conditions in the existing building that require immediate attention including; restroom clearances (water
closet, lavatory and shower), non -accessible door hardware, accessible door clearances and accessible counter heights.
The existing building does not meeting current energy code requirements, fire suppression requirements, exiting requirements and mechanical system
requirements as discussed on the following page. We did not complete a full OSHA safety assessment as a part of this study, but there are several
items in the building that should be assessed further, including proper headroom clearances under the Vehicle Maintenance mezzanine.
As a result of the extent and variety of code, accessibility, and safety deficiencies in the current building, it is our opinion that the most economical
approach if remodeling is considered would be to remove all existing interior rooms and reconstruct the interior build -out of the vast majority of the
existing space. This also results in the best design fit with the long-term needs of the Public Works department.
The existing Men's Restroom does not have proper
clearances for accessibility, with any amount of
remodeling the restrooms would need to comply
with the latest Minnesota State accessibility code.
The existing Women's Restroom does not have
proper clearances for accessibility, with any amount
of remodeling the restrooms would need to comply
with the latest Minnesota State accessibility code.
CNH
ARCHITECTS 31
MECHANICAL SYSTEMS REVIEW - VEHICLE MAINTENANCE
Ventilation System
Current ventilation system is inadequate. Current
codes require .75 cfm per square foot of ventilation
interlocked with an outdoor air intake. The current
system operates manually with independent
control switch for both the fan and intake damper.
The exhaust fans appear dated and most likely
have exceeded their expected service life.
Exhaust System
Vehicle Maintenance requires carbon monoxide
sensors (gasoline engine fumes) and nitrogen
dioxide sensors (diesel engine fumes) to enable the
exhaust system in the event that the concentrations
exceeds code minimum set point. These sensors
are not installed.
Heating
General heating is accomplished with gas fired
infrared heaters. These units are dated and most
likely have exceeded their expected service life.
Sanitary Waste
The sanitary waste from the trench drains and
floor drains are routed directly to the septic system.
This is a code violation. For buildings served with
a septic system, the flammable waste from trench
drains must be routed to a storage tank separate
from the septic system. Tanks are emptied
periodically and trucked to a proper waste facility.
32 Public Works Site Analysis and Space Needs Study
MECHANICAL SYSTEMS REVIEW - OFFICES/SENIOR CENTER
Furnace Room - Offices
The office space is served by three furnaces and
associated split system air conditioning units.
The units were installed in 2010 and are in good
condition. The ductwork connected to these
units would need to be replaced based upon the
condition of the current ductwork and the change
in zoning due to renovation schemes. In addition,
current requirements for ventilation air will require
an air-to-air energy recovery unit to temper the
outdoor air before it is introduced into the furnaces.
Furnace Room - Senior Center
The community space is also served by three
furnaces and associated split system air handlers.
They were installed in 2010 as well and are in good
condition. The comments for item 1 above applies
to these systems as well.
- One of the units has a capacity of 5
tons. The Mn Energy Code requires a system of
this capacity to be equipped with an economizer.
The economizer introduces outdoor air into the
space when outdoor air temperatures are favorable
and cooling is required by utilizing outdoor air for
cooling as opposed to operating compressors.
CNH
ARCHITECTS 33
COST ESTIMATE
34 Public Works Site Analysis and Space Needs Study
COST ESTIMATE
Option Al
Remodel & Expansion
Phase 1
•
Option A2
New Facility at Existing Site
Phase 1
•
Option B1
New Facility at Fire Station Site
Phase 1
•
Cost Estimate Summary
Low Cost
Public Works Facility
Sanitary Sewer and Water
Total
(2017 Dollars)
$ 9,707,342
$ 360,000
$ 10,067,342
*Inflation not taken into account in this estimate
High Cost
Public Works Facility
Sanitary Sewer and Water
Total
(2017 Dollars)
•
$ 12,195,113
$ 360,000
$ 12,555,113 1
Low Cost
Public Works Facility
Sanitary Sewer and Water
Total
(2017 Dollars)
$ 10,040,359
$ 360,000
$ 10,400,359
*Inflation not taken into account in this estimate
High Cost
Public Works Facility
Sanitary Sewer and Water
Total
(2017 Dollars)
•
$ 12,458,171
$ 360,000
12,818,171
Low Cost
Public Works Facility
Total
(2017 Dollars)
9,922,715
$ 9,922,715
*Inflation not taken into account in this estimate
High Cost
Public Works Facility
Total
(2017 Dollars)
•
$ 12,380,093
$ 12,380,093
The cost estimates shown above represent our teams professional opinion of probable construction cost based on the uses proposed, and typical
construction costs for similar facilities within the greater metropolitan area. The low cost to high cost range represents the preliminary level of the
designs done within this study, as well as the range in quality, life -cycle, and aesthetic choices that would be reviewed and selected by the city during
the design process. The costs, as indicated are current construction costs and an inflation factor would need to be applied when a specific time line
is developed.
The prices shown represent the estimated hard costs of the site and building construction shown in each option layout and vary only about $500,000
when comparing the Low Cost for each option or 5% of the total cost. However, there are other cost factors not indicated that should also be taken
into consideration when comparing options that would create a greater final cost differential between options. A partial list of these items include:
• Operational cost to move Public Works functions off -site during construction for Site A options
• Loss of use of ball field and hockey rink at Site A if expansion occurs there
• Additional maintenance costs for reused portions of the existing structure under Option Al,
compared to an all -new facility in the other options
• Ability to continue to use one existing cold storage building under Option A2 and two existing
cold storage buildings under Option B1, thus postponing the date when Phase 2 of the Public
Works storage shown in each option layout would be needed
CNH
ARCHITECTS 35
WS — Item 4
WORK SESSION STAFF REPORT
Work Session Item No. 4
Date: February 4, 2019
To: City Council
From: Rick DeGardner, Public Services Director
Re: Recreation Complex Discussion
Background
Mr. Jason Amberg from WSB Engineering attended the January work session to review
an updated master plan and preliminary cost estimates for Phase 1A (area immediately
south of Fire Station), and Phase 1B (ball field area).
The attached updated Recreation Complex Masterplan reflects comments made at last
month's work session. Phase 1A - Option A (Two additional pickleball courts and full
size basketball court) has been incorporated into the masterplan as well as the addition of
sand volleyball courts at the south end.
A memorandum providing an overview of updated cost estimates reflecting the changes
are attached.
The total estimated cost for Phase 1A Base Development is $592,232.55, including
contingency and design fees. This does not include the park shelter ($45,000) and full
size basketball court ($25,000).
Secured funding amounts to $375,000. Staff has identified potential funding sources to
fill the gap:
$137,000 Remaining portion of 2018 Parks and Trail Capital Projects Fund
$ 80,233 Dedicated Parks Fund
Requested Council Direction
For informational purposes. Staff will need further direction if the City Council wishes to
proceed with construction.
r -
I
PHASE 1A
PARKING
TRAILS
6 PICKLEBALL COURTS
2 TENNIS COURTS
BASKETBALL COURT (OPTIONAL)
SHELTER (OPTIONAL)
Parking
(+/- 36 Stalls)
Basketball
Court
Bypass
Lane
PHASE 1 B
PARKING
PHASE 1B
PARKING
TRAIL TO BALLFIELDS & PLAZA
4 200' BALLFIELDS
K:\012854-000\Cad\Exhibits\012854 lino lakes _Rec MP_20190129
Stormwater
Ponds
Turn
Lane
Parking
(+/- 200 Stalls)
Warming House/
Restrooms
Hockey
Rinks
xisting
■■�s� rrM��-"���4
■aee 1ae1111E4e®NAPI
Cf�<f9ORrJt�A'!7!
PEPS EGIlles
6 Pickleball Courts
13-Frc-1 LStree t589.24'11;E
Shelter
2 Tennis Courts
8.5' Wide
Trails
Stormwater
Pond ,
r'
411*
Park Drive
Parking .•
Shelter &
Play Area
eneral
Skating
Batting
Recreation complex Masterplan
Lino Lakes, Minnesota
January 29, 2019 WSB Project number: 012854-000
Storm
BIRCH STREET
Open
Lawn
(C.S.A.H`NO. 34
APPRO%IMATE FLOODP W H
003 5g FIR 10CW O
Or
240' x 36
Multi -Purpose
Field
W • IP
240'x360'
Multi -Purpose
Field
200'
Scale in Feet
r Utility
Easement
Games
Court
Shelter
Parking (+/- 145 Stalls)
10' Wide
Regional Trail
8.5' Wide
Trails
Concrete Pad for
Portable
Concessions
(Future Building)
Screening
Future Molitor
Drive Extension
400wsb
WSBENG.COM
763.541.4800
LO
LO
MINNEAPOLIS, MN
SUITE 300
701 XENIA AVENUE S
wsb
Memorandum
To: Rick DeGardner, Lino Lakes
From: Jason Amberg, WSB
Bailey Krause, WSB
Date: January 29, 2019
Re: Lino Lakes Recreation Complex — Updated Cost Estimates
WSB Project No. 012854-000
Rick, the following pages provide an overview of the probable costs to construct Phase 1 A (the
court area) and Phase 1 B (the ballfield area) based on the final concept master plan which has
been updated per your direction following the council meeting on Jan. 7, 2019. This information
will be updated and reviewed with you in the next steps of final design for phases / elements
approved by the City.
Phase 1A - Base Development
ITEM
DESCRIPTION
UNIT
Unit Price
PROJECT TOTAL
Est. Qty.
Est. Cost
1
Mobilization (MAX. 5%)
LS
$21,693.50
1
$21,693.50
2
Grading, Earthwork & Erosion Control
CY
$4.00
2,500
$10,000.00
3
Stormsewer System
LS
$15,000.00
1
$15,000.00
4
Bituminous Parking Lot w/ 10" Compacted Agg. Base (36
Stalls) - assumes 24" Soil Corrections
SY
$33.00
1,700
$56,100.00
5
Curb & Gutter
LF
$25.00
750
$18,750.00
6
8.5' Wide Bituminous Trails w/ 6" Compacted Agg. Base
& Assuming 24" Soil Corrections
SY
$32.00
135
$4,320.D0
7
10' Wide Bituminous Regional Trail w/ 6" Compacted
Agg. Base & Assuming 24" Soil Corrections
SY
$32.00
225
$7,200.00
8
(6) Pickle Ball Courts (Assumes 36" Sail Corrections]
Includes: Surfacing, Fencing and Post & Net System
Ls
$155,000.00
1
5155,000.00
9
(2) Tennis Courts (Assumes 36" Soil Corrections) Includes:
Surfacing, Fencing, and Post & Net System
LS
$160,000.00
1
$160,000.00
10
Landscaping Restoration
ACRE
$4,500.00
1
$4,500.00
11
Trees & Plantings
LS
$3,000.00
1
$3,000.00
PROJECT SUBTOTAL
$455,563.50
15% CONTINGENCY
$68,334.53
15% DESIGN FEES
$68,334.53
TOTAL
$592,232.55
Phase 1A - Potential Add-Ons
ITEM
DESCRIPTION
UNIT
Unit Price
PROJECT
Est. Qty.
TOTAL
Est. Cost
1
24' Shelter with Concrete Base & Picnic Tables
LS
$45,000.00
1
$45,000.00
2
1 Full Basketball Court
LS
$25,000.00
1
$25,000.00
Add-Ons Subtotal:
$70,000.00
15% CONTINGENCY
$10,500.00
15% DESIGN FEES
$10,500.00
Add-Ons TOTAL
$91,000.00
K:\012854-000\Quantity\Preliminary\012854_Lino Lakes_Memorandum .docx 2019-01-29.docx
Rick DeGardner
January 29, 2019
Page 2
Phase 1B - Base Development
ITEM
DESCRIPTION
UNIT
Unit Price
PROJECT TOTAL
Est. Qty.
Est. Cost
1
Mobilization (MAX. 5%)
LS
$90,860.25
1
$90,860.25
2
Grading, Earthwork & Erosion Control
CY
$4.00
34,500
$138,000.00
3
Tree Clearing
ACRE
$4,500.00
3.0
$13,500.00
4
Wetland Impacts
LS
$35,000.00
1
$35,000.00
5
Well
LS
$30,000.00
1
$30,000.00
6
Stormsewer System
LS
$32,000.00
1
$32,000.00
7
Centerville Road Modifications (Turn Lanes / Bypass)
LS
$500,000.00
1
$500,000.00
8
Bituminous Drive & Parking w/ 10" Compacted Agg. Base
(Assumes 24" Soil Corrections)
SY
$33.00
11,900
$392,700.00
9
Curb & Gutter
LF
$20.00
2,100
$42,000.00
10
8.5' Wide Bituminous Trails w/ 6" Compacted Agg. Base
& Assuming 24" Soil Corrections
SY
$32.00
615
$19,680.00
11
200' Little League Ballfield - Includes: Irrigation, Fencing,
Agglime, Backstop, Benches & Bleachers
LS
$120,000.00
4
$480,000.00
12
Bituminous Ballfield Plaza w/ 6" Compacted Agg. Base &
Assuming 24" Soil Corrections
SY
$32.00
2,600
$83,200.00
13
Concrete Pad for Portable Concession
SF
$11.00
625
$6,875.00
14
Landscaping Restoration
ACRE
$4,500.00
4.5
$20,250.00
15
Trees
LS
$24,000.00
1
$24,000.00
PROJECT SUBTOTAL
$1,908,065.25
15% CONTINGENCY
$286,209.79
15% DESIGN FEES
$286,209.79
TOTAL
$2,480,484.63
Phase 1B - Potential Add-ons
ITEM
DESCRIPTION
UNIT
Unit Price
PROJECT TOTAL
Est. Qty.
Est. Cost
1
Play Area - Includes: Wood Fiber Play Surfacing, Play
Container Concrete Curb, Sidewalks & Play Equipment
LS
5100,000.00
1
5100,000.00
2
30' Shelter with Concrete Base
LS
$60,000.00
1
$60,000.00
3
Picnic Tables
EACH
$1,100.00
4
$4,400.00
4
Sand Volleyball Courts
LS
$9,000.00
1
$9,000.00
Add-Ons Subtotal:
$173,4D0.00
15% CONTINGENCY
$26,010.00
15% DESIGN FEES
$26,010.00
Add-Ons TOTAL
$225,420.DD
K:\012854-000\Quantity\Preliminary\012854_Lino Lakes_Memorandum .docx 2019-01-29.docx
WS — Item 5
WORK SESSION STAFF REPORT
Work Session Item No. 5
Date: February 4, 2019
To: City Council
From: Sarah Cotton, Finance Director
Re: Methods of Financing Public Facilities
Background
The City Council has started discussions regarding planning for a future Recreation
Complex and Public Works Facility Improvements.
Municipalities have three basic options for financing these types of improvements,
including 1) utilizing current revenues, 2) setting aside funds to build a capital reserve, or
3) borrowing through the issuance of municipal bonds.
Local governments often borrow to finance major public facility improvements. Terri
Heaton, from Springsted, Inc. will be present to discuss some of the options that are
available.
Attachments
None
Requested Council Direction
For informational purposes only. No action is required.
WS — Item 6
WORK SESSION STAFF REPORT
Work Session Item No. 6
Date: February 4, 2019
To: City Council
From: Sarah Cotton, Finance Director
Re: PermitWorks/Laserfiche Integration Project
Background
In the fall of 2018, staff began looking into potential software solutions that would
accommodate electronic submission of permit applications, as well as online payment of
permit fees. As part of the 2019 budget process, $30,000 of General Fund surplus was
designated to fund a fully automated and integrated online permitting solution with an
electronic payment option.
OPG-3 has developed an integrated online permit application process using PermitWorks
and Laserfiche, two software/systems currently in use by the City of Lino Lakes. The
digitized, automated, and integrated system includes:
• Online submission of permit applications (automatically stored in PermitWorks
and Laserfiche)
• Automatic generation of permit fees and inspections (based on online permit
application selections)
• Digital approval process (application and plan review documents, if applicable,
are automatically routed for review and approval by appropriate staff)
• Online payment of fees (integration with a payment gateway)
• Automatic document generation (permit and inspection documents emailed to
applicant)
Staff is ready to proceed with the Online Permitting Solution for PermitWorks developed
by OPG-3. The Statement of Work details a fixed cost for the project of $22,200. Staff
anticipates additional licensing costs of approximately $5,000.
Attachments
Statement of Work — Online Permitting Solution for PermitWorks
Requested Council Direction
For informational purposes only.
oPG3
Enterprise Transformation
Statement of Work
Online Permitting Solution for PermitWorks
For: City of Lino Lakes
October 25, 2018
Laserfiche
Run Smarter
Document Management I Business Process Management I Enterprise Content
Contents
Statement of Work — Online Permitting Solution for PermitWorks 3
Project Scope and Objective 3
Change Management Process 3
Identified Phases 4
Phase 1— Confirmation of Laserfiche Infrastructure and Initial Setup 4
Phase 2 — System Development 5
Phase 3 — User Acceptance Testing 5
Phase 4 — Promotion to Production 6
Phase 5 — Training, Knowledge Transfer and Transition to Support 6
Lino Lakes Responsibilities 7
OPG-3 Responsibilities 8
Project Assumptions 8
Professional Services Pricing 9
Payment Plan 9
Statement of Work Approval 9
oPc-3
Enterprise Transformation
CONFIDENTIAL I SOW — Lino Lakes — Online Permitting Solution for
PermitWorks I Page 2
Statement of Work — Online Permitting Solution for PermitWorks
This Statement of Work ("SOW") defines the professional services ("Services") that OPG-3 will provide for
the City of Lino Lakes (Lino Lakes) in conjunction with the Online Permitting Solution for PermitWorks
("Project"). This SOW will be a part of a Professional Services Agreement between OPG-3 and Lino Lakes.
Project Scope and Objective
OPG-3 has developed an online permitting solution for use with the PermitWorks application. The solution
makes permit applications available online and is tightly integrated with PermitWorks to:
• Dynamically build out the application based on user input
• Determine necessary approval based on permit types
• Automatically calculate permit fees and accept online payment
• Generate and email permit documents as attachments
The solution requires Laserfiche Avante, Rio or Subscription, Forms Professional and the Laserfiche Forms
Portal. OPG-3 has developed a templated framework so the solution can be implemented quickly for a
fixed bid cost. Cities can choose to limit the scope of the system by choosing which types of permits are
made available but changes to the framework may require additional development at additional cost.
Change Management Process
It may become necessary to amend this SOW for reasons including, but not limited to, the following:
• Changes to the project schedule, scope or budget
• Changes in priorities (external or internal to the project) that impact the project
• Environmental or architectural impediments not previously identified
• Lack of access to personnel, facilities, or systems necessary to complete project as scoped
In the event that it is necessary to change this SOW, the following process will be followed:
A Project Scope Change Request (PSCR) will be used to communicate change. The PSCR must describe the
change, the reasons for the change, and the effect the change will have on the project, which may include
scheduling changes, pricing, etc. A PSCR will be initiated by OPG-3 but must be executed by both parties
to make it effective and binding on the parties.
oPc-3
Enterprise Transformation
CONFIDENTIAL I SOW — Lino Lakes — Online Permitting Solution for
PermitWorks I Page 3
Identified Phases
The following Phases (major project areas) are included in the services. Phases will run in parallel where
possible. Estimated project timeline is 8 weeks.
Phase 1— Confirmation of Laserfiche Infrastructure and Initial Setup
OPG-3 will confirm the prerequisite Laserfiche components are installed and configured as appropriate.
If any components need to be upgraded, OPG-3 will perform the upgrade as part of the project. OPG-3
will also determine the version of PermitWorks in place. If an upgrade is necessary, the City will need to
arrange that with PermitWorks.
Core Activities Include:
• Confirm version and configuration of prerequisite Laserfiche components and perform
upgrades as necessary
• Confirm version of PermitWorks and recommend upgrade if necessary
• Confirm admin access to SQL database utilized by PermitWorks
• Confirm list of permit types to be enabled through system
Deliverables:
• List of permit types to be enabled through system
Assumptions Driving Effort:
• The City provides remote access to network including:
■ Admin access to Laserfiche Repository, Forms Server and Workflow Server
■ Admin access to SQL database used by PermitWorks
oPc-3
Enterprise Transformation
CONFIDENTIAL I SOW — Lino Lakes — Online Permitting Solution for
PermitWorks I Page 4
Phase 2 — System Development
Core Activities Include:
• Develop solution in test (or production) environment
• Regular solution demonstrations and walkthroughs with Lino Lakes project team (PM, SMEs
and users as appropriate) to show progress and solicit feedback
• Develop test scripts to be utilized in Phase 3 — User Acceptance Testing
Deliverables:
• System deployed in test (or production) environment, ready for User Acceptance Testing.
• Test scripts to be utilized in Phase 3 — User Acceptance Testing*
Assumptions Driving Effort:
• OPG-3 project team members receive access to all necessary Lino Lakes resources by the
scheduled implementation start time in the project plan.
• Lino Lakes personnel will be available to provide any assistance OPG-3 may need in the Lino
Lakes environment.
• Lino Lakes personnel attending solution demonstrations and walkthroughs are empowered
to provide feedback that will affect overall design.
Phase 3 — User Acceptance Testing
Core Activities Include:
• Work with Lino Lakes to identify end users that will participate in UAT.
• Testing by Lino Lakes end -users using the test scripts developed in Phase 2.
• Remediate any issues discovered during UAT until acceptance criteria are satisfied.
Deliverables:
• Solution deployed in Test (or Production), approved by Lino Lakes for promotion to
Production.
Assumptions Driving Effort:
• Lino Lakes personnel will be available for UAT per a mutually agreed -upon schedule.
oPc-3
Enterprise Transformation
CONFIDENTIAL I SOW — Lino Lakes — Online Permitting Solution for
PermitWorks I Page 5
Phase 4 — Promotion to Production
If the solution is developed in a test environment, the OPG-3 project team will assist Lino Lakes in
promoting the solution from Test to Production. If Lino Lakes prefers, and provides access, the OPG-3
project team can take the lead with Lino Lakes personnel assisting.
Core Activities Include:
• Work with Lino Lakes to develop promotion plan.
• Promote solution to production.
• Functional testing of individual components, testing of solution using Test Scripts.
• Remediate any issues within scope as necessary.
Deliverables:
• Laserfiche solution deployed in production and ready for end users.
• Two weeks of Stabilization support after Promotion to Production.
Assumptions Driving Effort:
• The OPG-3 project team will continue to support the solution for two weeks after Promotion
to Production while transferring support responsibilities to the OPG-3 Support Team.
Phase 5 — Training, Knowledge Transfer and Transition to Support
Once the solution has been promoted to production and is ready for use, OPG-3 will provide training for
users and administrators.
Deliverables:
• Recorded demonstrations to show each step of the processes.
• Knowledge Transfer sessions with OPG-3 Support on solution for post -project support.
• System documentation.
• User and Administrative training onsite.
Assumptions Driving Effort:
• Lino Lakes will work with OPG-3 to help develop appropriate training materials for end -
users.
• Lino Lakes will coordinate attendance of Lino Lakes personnel for training sessions.
• Training will occur throughout this project as the OPG-3 and Lino Lakes teams work
alongside each other.
• OPG-3 may deliver a final update to the System documentation prior to project closeout if
such an update is necessary. This potential final System documentation update is not a
deliverable of this Phase.
oPc-3
Enterprise Transformation
CONFIDENTIAL I SOW — Lino Lakes — Online Permitting Solution for
PermitWorks I Page 6
Lino Lakes Responsibilities
The following are Lino Lakes's responsibilities for the Services.
1. Lino Lakes will make available, and provide access to (e.g., within two to three business days),
necessary personnel to ensure project success, including:
a. A designated project manager to help schedule meetings, facilitate project governance,
coordinate document requests, and other tasks.
b. IT personnel such as system administrators, database administrators, or help desk.
c. Subject matter specialists to provide information on Lino Lakes's business processes.
d. Personnel to execute the test scripts and document results for User Acceptance Testing ("UAT").
Personnel will be made available per the project schedule and plan.
2. Lino Lakes will work with OPG-3 to provide any necessary technical resources and support. This
includes:
a. Providing requested documentation and acceptance of key deliverables within two to three
business days. If Lino Lakes does not respond in writing to OPG-3's request for acceptance within
three business days of OPG-3's request, or Lino Lakes's refusal of such approval within the three-
day period is not reasonable, Lino Lakes will be deemed to have accepted.
b. Providing any access to the Lino Lakes environment that the OPG-3 team will need to develop the
solution.
3. Lino Lakes will be responsible for providing all hardware and licensing all software components
necessary for completing Services. This includes:
a. Windows Server 2012R2 (or higher) and SQL Server Standard/Enterprise 2012 (or higher) licenses.
b. SSL certificates for all servers that require them.
c. Licenses for all software and systems on the Lino Lakes network with which the Laserfiche system
will integrate.
oPc-3
Enterprise Transformation
CONFIDENTIAL I SOW — Lino Lakes — Online Permitting Solution for
PermitWorks I Page 7
OPG-3 Responsibilities
The following are OPG-3's responsibilities for the Services.
1. OPG-3 will make available, and provide access to (e.g., within two to three business days), necessary
personnel to ensure project success, including:
a. A designated project manager to help schedule meetings, facilitate project governance,
coordinate document requests, provide status updates and other tasks.
b. Experienced OPG-3 engineering personnel.
c. Personnel to perform preliminary testing during development and prior to UAT. Personnel will be
made available per the project schedule and plan.
2. OPG-3 will work with Lino Lakes to provide any necessary technical resources and support. This
includes escalating any issues to Laserfiche Support and Laserfiche Development as necessary.
Project Assumptions
1. The scope of the engagement will include the Services described in this SOW. Any additional scope
requests will be provided in a separate SOW or change order.
a. The Services will focus exclusively on Laserfiche and Laserfiche-related products to
support the system and solution, except where explicitly noted in this SOW.
2. If after OPG-3's request for acceptance on project closeout, Lino Lakes does not respond in writing
within five business days, or Lino Lakes's refusal of such approval in the five-day period is not
reasonable, Lino Lakes will be deemed to have accepted.
3. All Laserfiche Software Products, Professional Services and Support are sold subject to the terms
and conditions of Laserfiche's Software License Agreement, which accompanies the software. By
accepting this Statement of Work, Lino Lakes accepts all of these terms and conditions, which will
not be varied except in writing signed by both parties.
oPc-3
Enterprise Transformation
CONFIDENTIAL I SOW — Lino Lakes — Online Permitting Solution for
PermitWorks I Page 8
Professional Services Pricing
The Online Permitting Solution for PermitWorks has been developed as a templated solution offered at
a fixed cost of $22,200. Changes or additions to scope may lead to increased cost — any changes that
result in additional cost or timeline will be agreed to in writing.
Payment Plan
All Services will be performed in accordance with this mutually accepted SOW. To provide initial funding
for the project and simplify billing, an initial payment of 50% of the cost of the SOW will be billed upon
execution of the document.
The balance of Services will be billed at the close of the project. Invoices are due upon receipt. If Lino
Lakes disputes any portion of an invoice, Lino Lakes will pay the undisputed portion when due.
Changes to project scope or effort required to complete specific work items due to unforeseen
complications or issues outside of OPG-3's control will go through the Change Management Process and
will be approved by Lino Lakes.
Statement of Work Approval
By signing this document, Lino Lakes agrees that the proposed approach satisfactorily addresses all
items in scope for the project.
Lino Lakes Approval (one signeeill
uire
Signature
Name
Title
Date
OPG-3 (ontIMPIMPIIIMI
Signature
•IName Title
Date
oPc-3
Enterprise Transformation
CONFIDENTIAL I SOW — Lino Lakes — Online Permitting Solution for
PermitWorks I Page 9
WS — Item 7
WORK SESSION STAFF REPORT
Work Session Item No. 7
Date: February 4, 2019
To: City Council
From: Marty Asleson
Re: Emerald Ash Borer Update
Background
In the fall of 2017, Emerald Ash borer was found in Lino Lakes for the first time in the
Target infiltration ponds. An initial survey, after finding the Target store infested trees,
was completed by city staff, county staff, and the Minnesota Department of Agriculture
staff. Results showed a few scattered additional trees infested with the insect. In the
winter of 2017/2018, city staff and the Minnesota Department of Agriculture surveyed
the south side of 35W, from the Target infestation, and found EAB infested Ash trees in
the closest woodland area to the freeway and extending down to the trail entrance area in
back of City Hall.
In 2018, staff found new infestation areas of EAB in Country Lakes Park, Lino Park, the
Rondeau Lake Road area, 4th Avenue, and the West Shadow Lake Drive area. After
summer of 2018, those sites became infested.
Removing and replacing boulevard Ash trees started in 2010. Since that time we have
removed and replaced about half our boulevard trees and treated 2/3 of the remaining
trees.
Staff has been methodically selecting areas to treat, remove, and replace trees. Many of
the park areas in Lino Lakes have had Ash trees removed. This year Lino Park Ash trees
were removed and Country Lakes Park trees are being removed. Country Lakes Park is,
by far, the largest holder of Ash trees on public property, other than the Regional Park.
The City started treating Ash trees on boulevards in 2017 and 2018. Treatment started
before we knew there was an infestation in the City. The treatment started on the side of
the city that most of the infestation was showing up later. We have had two years of
treating our remaining boulevard trees. Trees not treated at this time are on the east and
south sides of the city. Removals or treatment of the remaining untreated areas will
continue in 2019.
The Rice Creek Chain of Lakes Park has thousands of Ash trees and will act as a conduit,
vectoring mechanism for the rapid spread of EAB in the upcoming years.
The City of Lino Lakes is, most likely, in year 5 or 6 in the death curve for this pest.
After year 6 and 7 there will be a rapid loss of all remaining Ash trees.
There are two boulevard tree areas that could use more money to remove and replace.
One area is Clearwater Creek Drive, where there are approximately 103 trees. The other
area is West Shadow Lake Drive with 55 Ash Trees.
Clearwater Creek Drive from Cedar Street to Tart Lake Road would cost twice our
annual budget of $30,000, if contracted. The cost would decrease if the city staff removes
the trees, buy smaller bare root trees (6-8 foot high), and have city staff do the planting.
In 2018, 33 trees were removed, stumps ground, yards restored, and trees replaced at a
cost of $30,000, contracted.
Attachments
1. EAB Location Map
2. EAB Loss Timeline
Requested Council Direction
This is an information update. Also, requesting additional funds to remove and replace
trees if needed.
if1E11E11k; ..,711
ralliturna lan
111r-i .-41 I 17711' ,•tkSIIiCUP:"F:" .....
2111-C 1k:3444(4'Z•
TE,Alvali111.
tak vA111111/11: ati•
ars_
111psi% rano= a Old
»
10
10
Ash Mortality from EAB
0 0 1 1 1 4 a s ) • a 10 11 12 11 J 21 36
Years After Eint EAB Infestation
WS — Item 8
WORK SESSION STAFF REPORT
Work Session Item No. 8
Date: February 4, 2019
To: City Council
From: Michael Grochala, Community Development Director
Re: Sale of Wetland Bank Credits
Background
The City Council accepted the Natural Resource Revolving Fund Plan in August of 2017.
One of the overall goals of the plan was the establishment of the wetland banks to serve
as a funding source to implement the City's greenway system.
The City currently has two banks in place.
Bank No. 1122 (Otter Lake) is located east of I-35E and south of CSAH 14. 1.482 acres
of credit are available. This bank is not Army Corp of Engineers (ACOE) approved.
Credits can only be used for wetland impacts not under ACOE jurisdiction.
Bank No. 1601(Wollan Park) is located west of Lake Drive and north of Main Street.
3.6849 acres of credit are currently available in this bank. This bank is ACOE approved.
Credits from both these banks are available for sale on the open market, much like a real
estate transaction. Typically developers and/or government agencies, that have projects
with wetland impacts, purchase the credits to meet mitigation requirements.
The 2015-16 Average Cost per Credit for Major Watershed 20, which we are located in,
was $33,377 per acre ($.76 per square foot). Locally, three known transactions over the
past three years ranged from 2.40 to 2.75 a square foot. A recent inquiry from a Maple
Grove project sold for $2.30 a square foot. ACOE approved credits have a higher value
on the market.
Proceeds from any sale are proposed to be used in the following way:
1. Repay establishment costs including restoration activities and monitoring.
2. 10% set aside for future maintenance of established banks.
3. New land acquisition and restoration.
Credits are purchased throughout the year as project approvals are sought. The City's
ability to make a sale is largely dependent on our ability to react to inquires and negotiate
a purchase price. All sales are subject to execution of a purchase agreement which in the
City's case requires City Council approval.
Staff would like to get the council's opinion on a pricing strategy as a basis for
establishing our minimum sale price.
The base price would be to recover our initial investment. In the case of the Otter Bank
(constructed as part of the Otter Lake Road project in 1997) costs where incorporated into
the overall street improvement project. No specific bank costs where tracked. Since this
is not ACOE approved values are lower. Values on non-ACOE credits are closer to 1.00
1.50 per square foot.
Woolan's Park budget is $125,000 (includes in -kind labor). A baseline price of $.80
would recover all costs. Prices in the $2.00 to $2.25 SF range would likely result in a
quicker return on investment while providing revenues for future efforts. Prices at the
high end $2.40 to $2.50 SF may result in a longer return.
SQFT $0.80/SF $1.00/SF $1.85/SF $2.00/SF $2.25/SF $2.50/SF
Fresh $ $ $ $ $ $
Meadow 124,485.77 99,588.61 124,485.77 230,298.67 248,971.54 280,092.98 311,214.42
Shallow $ $ $ $ $ $
Marsh 36,028.48 28,822.78 36,028.48 66,652.68 72,056.95 81,064.07 90,071.19
$ $ $ $ $ $
225,070.16 128,411.40 160,514.24 296,951.35 321,028.49 361,157.05 401,285.61
The council may wish to review a combination that allows for a quicker repayment on the
initial investment and then an increase in pricing for the remaining credits. We do expect
that the number of credits available from the Woolan bank will increase upon completion
of the Year 5 monitoring. Restoration activities have been highly successful and our
credit percentages are likely to be maximized.
Requested Council Direction
Staff is requesting Council feedback. Based upon the comments received staff will
formulate a pricing policy for council review.
Attachments
1. Bank Location Map
2. Sample Purchase Agreement
O
0
3
0
0
0
co
cc
co
a
0
0
0
N
V
m
01
m
x
•
0
m
(G
3
x
a
0
0
(G
0,
0
m
a
J
W
N
O_
J
(N�
01
Figure 5: Existing Wetland Bank Locations
Natural Resources Revolving Fund Plan N o 1 w�7B
City of Lino Lakes Miles
1 inch = 1 miles
The following is a sample of a possible Purchase Agreement for the sale of Wetland Banking Credits.
This Purchase Agreement does not necessarily cover all of the issues that would be important to Sellers
and Buyers, nor does it address the terms that would be appropriate for any particular transaction.
Sellers and Buyers should obtain the services of qualified legal counsel to adapt this Purchase Agreement
to meet their specific needs.
THIS AGREEMENT is made this
PURCHASE AGREEMENT
FOR
WETLAND BANKING CREDITS
_ day of _ _, 20 _ between
(Seller) and _ (Buyer).
1. Seller agrees to sell to Buyer, and Buyer agrees to buy from Seller, the wetland banking credits
(Credits) listed below:
Credits to be Sold
Credit
Subgroup
Wetland Type/Plant Community Type
Cost per Credit
Credit Amounts
Per Credit
BSA 1 $520
BSA 2 $371
BSA 3 $725
BSA 4 $1,412
BSA 5 $685
Withdrawal Fee by
BSA Enter the Withdrawal Fee
BSA 6 $1,083 for the BSA of the account:
Total
Cost:
Total
Credits:
(Withdrawal Fee x total cred'ts)
BSA 7 $1,992
Withdrawal Fee:
BSA 8 $2,577 Easement Stewardshi s Fee: (Easement stewardship fee x total credits)
BSA 9 $2,628 $302 I er credit Stewardshi i Fee:
BSA 10 $3,099 Total Fees:
BWSR fee policy: http://www.bwsr.state.mn.us/wetlands/wetlandbanking/fee and sales data/Wetland Banking Fee Policy Effective Junel 20 17.pdf
2. Seller represents and warrants as follows:
a) The Credits are deposited in an account in the Minnesota Wetland Bank administered by the
Minnesota Board of Water and Soil Resources (BWSR) pursuant to Minn. Rules Chapter
8420.0700-.0760.
b) Seller owns the Credits and has the right to sell the Credits to Buyer.
Page 1 of 2
BWSR Example Purchase Agreement
Updated July 14, 2017
3. Buyer will pay Seller a total of $_ _ for the Credits, as follows:
a) $_ _ as earnest money, to be paid when this Agreement is signed; and
b) The balance of $_ to be paid on the Closing Date listed below.
4. [❑ ] Buyer, [❑ ] Seller agrees to pay to a withdrawal fee of $_ _ to the State of Minnesota
based on the per credit fee of _ _for Bank Service Area _ _ and a stewardship fee of $_
based on the per credit fee of $_ . At the Closing Date, [❑] Buyer, [❑ ] Seller will execute a check
made out for this amount, payable to the Board of Water and Soil Resources.
5. The closing of the purchase and sale shall occur on _ , 20 _ (Closing Date) at
The Closing Date and location may be changed by written consent of both parties. Upon payment of the
balance of the purchase price, Seller will sign a fully executed Transaction Form to Withdraw Credits
provided by BWSR, provide a copy of the Transaction Form to Withdraw Credits to the Buyer and forward
the same to the BWSR along with the check for the withdrawal fee and stewardship fee.
6. Buyer has applied or will apply to _ (Local Government Unit (LGU) or other regulatory
authority) for approval of a replacement plan utilizing the Credits as the means of replacing impacted
wetlands. If the LGU has not approved the Buyer's application for a replacement plan utilizing the Credits
by the Closing Date, and no postponement of the Closing Date has been agreed to by Buyer and Seller in
writing, then either Buyer or Seller may cancel this Agreement by giving written notice to the other. In this
case, Seller shall return Buyer's earnest money, and neither Buyer nor Seller shall have any further
obligations under this Agreement. If the LGU has approved the replacement plan and the Seller is ready to
proceed with the sale on the Closing Date, but Buyer fails to proceed, then the Seller may retain the earnest
money as liquidated damages.
(Signature of Seller) (Date) (Signature of Buyer) (Date)
Page 2 of 2
BWSR Example Purchase Agreement
Updated July 14, 2017
Item # 10
Monthly Progress Report
February 4, 2019
Item
Last Action Taken
Staff
Status
Digital Scanning Project
8/7/17 — Scanning Operator Rusty Ray
submitted his resignation.
Julie
Conditional offer has been
made and will be on Feb. 11
agenda
White Bear Lake Restoration
Assn. v. Dept. of Natural
Resources (DNR)
5/21/18 — HF 4003 was signed into law
by the governor, which temporarily
suspends enforcement of the water
appropriation permit amendments
Jeff
The law is effective through
July 1, 2019
Labor Negotiations Update
1/14/19 — Council approved last
remaining labor contract (Sergeants) for
2018-2019
Jeff
All labor contracts have been
settled for 2018-2019
Employment Update
Jan. 2019 — A CSO resigned after
accepting another position.
A new officer is starting Feb. 4
Jeff
Recycling Intern — One
candidate will be interviewed
next week
WS —Item 11
WORK SESSION STAFF REPORT
Work Session Item No. 11
Date: February 4, 2019
To: City Council
From: Michael Grochala, Community Development Director
Re: Comprehensive Plan Update - Schedule
Background
December 3
Following discussion at the December 3, 2018 City Council work session staff has been working
with WSB and Landform to incorporate the land use district changes into the Comprehensive
Plan draft. We are proposing a joint meeting with the City Council and Planning & Zoning
Board on Wednesday, February 20, 2019 to review the draft. The plan schedule is as follows:
February 20, 2019
tentative
Joint Meeting - City
Council and Planning and
Zoning Board
Review Draft Plan
April 10, 2019 (6:30
p.m)
Planning and Zoning
Board
Public Hearing
May 6, 2019 (6:00 p.m.)
City Council Work
Session
Review for Distribution
May 13, 2019 (6:30 p.m.)
City Council
Council Authorizes
Distribution
May 23, 2019 —
November 21, 2019
6 month review/comment
period by adjacent
jurisdictions
November 25, 2019
(6:30 p.m.)
City Council
Adopt Draft Plan and submit
to Metropolitan Council
January 2020
City Council
Adopt Final Plan
Requested Council Direction
Staff is requesting City Council confirm February 20, 2019 Joint Meeting Date
Attachments
1. 2040 Comprehensive Plan Schedule
Lino Lakes 2040
Comprehensive Plan Update
Get Involved!
Let's talk about the future of Lino Lakes. There are many opportunities to
participate in the 2040 Update. All meetings are open to the public. Mark your
calendar and join us!
Date
Meeting
Topic
July 10, 2017 (6:30 p.m.)
July 12, 2017 (6:30 p.m.)
July 13, 2017 (8:00 a.m.)
July 26, 2017 (6:30 p.m.)
August 7, 2017 (6:00 p.m.)
August 9, 2017 (6:00 p.m.)
August 19, 2017
September 13, 2017 (6:00 p.m.)
September 27, 2017 (6:30 p.m.)
October 2, 2017 (6:00 p.m.)
October 9, 2017 (6:30 p.m.)
October 11, 2017 (6:00 p.m.)
November 6, 2017 (6:00 p.m.)
November 8, 2017 (6:00 p.m.)
November 29, 2017 (6:30 p.m.)
December 4, 2017 (6:00 p.m.)
December 13, 2017 (6:00 p.m.)
January 2, 2018 (6:00 p.m.)
January 8, 2018 (6:30 p.m.)
Park Board
Planning and Zoning Board
Economic Development Advisory
Committee
Environmental Board
City Council Work Session
Harming and Zoning Board
Blue Heron Days
Planning and Zoning Board
Environmental Board
City Council Work Session
Park Board
Planning and Zoning Board
City Council Work Session
Planning and Zoning Boaiu
Environmental Board
City Council Work Session
Planning and Zoning Board
City Council Work Session
City Council
Meeting Schedule, Updated January 23, 2019
Parks & Trails
Land Us
Economic Development
Surface Water/ Natural Resources
Land Use
Land Use/ Housing
Key Issues
Surface Water/ Natural Resources
Transportation
Review Draft Park Plan
Water (supply, sewer, surface)
Land Use/ Housing
Local Water Management Plan
mina, I I dIIb a lNdlui dl Resources
Local Water Management Plan
Parks
Economic Development,
Community Facilities
Sewer/ Water
Local Water Management Plan
Lino Lakes 2040
Comprehensive Plan Update
61.1.11 Meeting Topic
March 14, 2018 (6:00 p.m.)
April 3, 2018 (6:00-8:00 p.m.)
June 4, 2018 (6:00 p.m.)
November 14, 2018 (6:30 p.m.)
February 20, 2019 tentative
April 10 9n1Q (R.30 p.m.)
May 6, 2019 (6:00 p.m.)
May 13, 2019 (6:30 p.m.)
May 23, 2019 —
November 21, 2019
November 25, 2019 (6:30 p.m.)
January 2020
Planning and Zoning Board
Open House / Workshop
City Council Work Session
Planning and Zoning Board
Joint Meeting - City Council and
Planning and Zoning Board
Planning and Inning Board
City Council Work Session
City Council
City Council
City Council
Draft Plan
Draft Plan
Draft Plan
Update Discussion
Review Draft Plan
Public Hearing
Council Authorizes Distribution
Council Authorizes Distribution
6 month review/comment period
by adjacent jurisdictions
Adopt Draft Plan and submit to
Metropolitan Council
Adopt Final Plan
All meetings are held at Lino Lakes City Hall, unless otherwise noted. Starting times and
topics of meetings are subject to change. Meetings may be added or cancelled, please
check the website for the latest information.
Questions? Contact Community Development Director Michael Grochala
at 651-982-2427 or E-mail compplan@ci.lino-lakes.mn.us
For more information and additional opportunities to engage in the Comprehensive Plan Process
visit us online at www.ci.lino-lakes.mn.us
Meeting Schedule, Updated January 23, 2019