HomeMy WebLinkAbout2019-045 Council ResolutionCITY OF LINO LAKES RESOLUTION NO. 19-45 ACCEPTING BIDS AND AWARDING CONSTRUCTION CONTRACT FOR WOODS EDGE PARK WHEREAS, the City Council approved Resolution 19-15 (Ordering the Project, Approving Plans and Specifications, and Authorizing Advertisement of Bids for the Woods Edge Park Project) on January 28, 2019; and WHEREAS, bids were received and opened on February 28, 2019. A total of seven bids were received as follows; and Dunaway Construction $119,315.06 Pember Companies, Inc. $142,316.10 Odesa II $146,380.00 GL Contracting $148,851.90 Blackstone Contractors $167,768.00 Northland Excavating $184,905.75 Urban Companies $213,260.00 WHEREAS, the bid tabulation indicates the low bidder as Dunaway Construction, Columbus, MN, in the amount of $119,315.06 for the base bid plus all alternates; and WHEREAS, funding is from the Dedicated Parks Fund. NOW, THEREFORE BE IT RESOLVED the City Council hereby authorizes staff to enter into a contract with Dunaway Construction for the Woods Edge Park Project. Adopted by the Council of the City of Lino Lakes this 8th day of April, 2019. The motion for the adoption of the foregoing resolution was introduced by Council Member Rafferty and was duly seconded by Council Member Maher and upon vote being taken thereon, the following voted in favor thereof: Rafferty, Maher, Manthey, SToesz, Reinert The following voted against same: none ATTEST: Julianne Bartell, C ity Clerk Jeff Reinert, CITY COUNCIL AGENDA ITEM 5A STAFF ORIGINATOR: Rick DeGardner, Public Services Director MEETING DATE: April 8, 2019 TOPIC: Consideration of Resolution No.19-45, Accepting Bids and Awarding Construction Contract for Woods Edge Park, Rick DeGardner VOTE REQUIRED: 3/5 BACKGROUND The City Council approved Resolution 19-15 (Ordering the Project, Approving Plans and Specifications, and Authorizing Advertisement of Bids for the Woods Edge Park Project) on January 28, 2019. Bids were received and opened on Thursday, February 28, 2019. A total of seven bids were received as follows: Engineers Estimate $180,656.75 Dunaway Construction $119,315.06 Pember Companies, Inc. $142,316.10 Odesa II $146,380.00 GL Contracting $148,851.90 Blackstone Contractors $167,768.00 Northland Excavating $184,905.75 Urban Companies $213,260.00 The bid tabulation indicates the low bidder as Dunaway Construction, Columbus, MN, in the amount of $119,315.06 for the base bid plus all alternates. The recommended funding is from the Dedicated Parks Fund. RECOMMENDATION Staff is recommending approval of Resolution No. 19-45. ATTACHMENTS 1. Resolution No. 19-45 2. WSB Memorandum, dated March 8 3. Depiction of Project Limits NSL3ENG.COM wsb March 8, 2019 Honorable Mayor and City Council City of Lino Lakes 600 Town Center Parkway Lino Lakes, MN 55014 Re: Woods Edge Playground City of Lino Lakes WSB Project No. R-012206-000 Dear Mayor and Council Members: Bids were received for the above -referenced project on Thursday, February 28, 2019, and were opened and read aloud. A total of seven bids were received. The bids were checked for mathematical accuracy and tabulated and any errors made on the Proposal Form have been corrected and highlighted with orange. The Engineer's Estimate was $180,656.75 for the base bid plus all alternates. The bid tabulation indicates the low bidder as Dunaway Construction, Columbus, MN; in the amount of $119,315.06 for base bid plus all alternates. We recommend that the City consider these bids and award a contract to Dunaway Construction, ° based on the results of the bids received. Sincerely. INNEAPOLIS, MN J O 701 XENIP. AVENUE S WSB Candace Amberg, PLAN Senior Associate Attachments: Bid Tabulatin cc: Kevin Dunaway, Dunaway Construction Rick DeGardner, City of Lino Lakes Candace Amberg, WSB ar K:10122D3-00d.aAdmin\Constructon Adman\3iddingtR-Q122Oo-OOO _CR-O304 i9.docx LOG BALANCE B INTERPRETIVE SIG SIGNAGE/ENTRY FEATURE INTERPRETIVE SIGNAGE EXISTING PAVED TRAIL NATURE THEMEO PLAY EXPERIENCE; •'Oeep woods' Theme • Woodfond r forest en. ronments •Basswood km{ container design ...Acorns ; mushrooms •Raccoon / squirrel / bobcat FORT BUILAtNG AREA. TURE TRAIL SENSORY WALK NTERPRETIVE SIGNAGE TERPRETIVE SIGNAGE:.. !TURE GATHERI 14RirA: +vet Paet"i3iemr r`ai�nrsh clod frog ems`:wament tcd teaf dtssioo Aakj.), OUND SENSORY PIECES