HomeMy WebLinkAbout11/14/2019 EDAC PacketCITY OF LINO LAKES
ECONOMIC DEVELOPMENT ADVISORY COMMITTEE MEETING
Thursday, November 14, 2019
8:00 A.M.
Community Room
AGENDA
1. CALL TO ORDER AND ROLL CALL
2. APPROVAL OF MINUTES: September 9, 2019
3. DISCUSSION ITEMS
A. I-35E AUAR Update
B. Otter Lake Road Extension Plan
C. Updates
i. October BRE visits
ii. Lyngblomsten Update
iii. Birch Street Reconstruction
iv. 2040 Comprehensive Plan Update
4. ADJOURN
CITY OF LINO LAKES
ECONOMIC DEVELOPMENT
ADVISORY COMMITTEE
MINUTES
MEETING DATE: September 5, 2019
MEMBERS PRESENT: Jim Schueller, Andrew Cravero, Don Johnson, Chad Wagner, Thomas
Colgan, Julie Jeffrey -Schwartz, Nathan Vojtech, Patrick Kohler
MEMBERS ABSENT:, Michael Ruhland
OTHERS PRESENT: Mike Grochala, Mara Strand, Katharine Dowlding
APPROVAL OF MINUTES
It was moved by Mr. Cravero to approve the minutes from July 2, 2019. The motion was
seconded by Mr. Johnson, passing unanimously.
DISCUSSION ITEMS
A. Board Member Strengths and Experiences.
Mr. Schuller stated that he wanted to discuss members strengths and experiences to assist
businesses within the community. He noted, however, that given the upcoming election and
possible new council he requested that the item be tabled until the first of the new year.
Board members noted that finding employees seems to be one of the most difficult issues
facing local businesses. Opportunities to attract employees should be investigated.
Transportation was noted as one of the biggest problems. Mr. Grochala noted that Anoka
County hosts monthly job fairs that employers are welcome to attend.
B. Business Retention Expansion (BRE) Program Visits
Mr. Grochala stated that several businesses responded on the BRE survey that they would
welcome a meeting with the City to discuss their operation. He explained staff will be
setting up meetings in October and November. It was suggested that this would be a good
opportunity for committee member outreach by accompanying staff on these meetings. A
sign-up sheet for EDAC members interested in participation will be made and distributed.
C. Lyngblomsten TIF recap.
Mr. Grochala provided an update on the Lyngblomsten Tax Increment Financing request.
He stated that the City Council approved the request detailed in the staff report. A total of
$3.6 million will be provided. The TIF note is expected to be paid off within 7.5 years
based on an initial taxable market value of $33,000,000.
Lyngblomsten is working on final plan submittal and is hoping to break ground in late fall.
D. Project Updates
Mr. Grochala provided an update on the Minnesota Tech Corridor. He noted that it has
grown from a marketing stand point and there is a lot of interest. The City has worked out
partnerships with electric company and property owner to share site investigation costs. ,
The City is doing preliminary work regarding how the site will be served by utilities
He also noted the following:
There is pavement in Watermark, small utilities are being worked on, and permits will start
to be issued.
Construction will begin on the model homes in Eastside Villas.
Nature's Refuge is pending City Council approval.
All Season's Rental is under construction.
Otter Lake Animal Care Center expansion is going to City Council.
Main Street Shoppes 2nd Addition is progressing.
Hy-Vee pulled out of a purchase agreement for a property on the south side of the City.
A study was completed on Centerville and County Road J and identified a potential
roundabout. Centerville Road and Ash Street was identified as a problem. Discussion
regarding on and off ramps at the County Road J/35E interchange is in progress with
Ramsey County, Anoka County, Mn/DOT and local property owners.
An open house for Birch Street will take place this fall. The road was paved this year,
roundabouts are going to be developed, and some school entrances will be relocated.
A contract was awarded for water tower #3 and will be located near the fire station.
The City is still working on the well #7 project, which would be the restoration of the old
house. The test well tested well but at this point the City cannot get a new well due to the
White Bear Lake case. An update on the White Bear Lake case was discussed.
Saddle Club 4th Addition will connect Foxborough and Saddle Club.
Progress is being made on Lino Lakes Mini Storage.
ADJOURNMENT
The meeting was adjourned at 9:10 A.M.
ECONOMIC DEVELOPMENT ADVISORY COMMITTEE
AGENDA ITEM 3A
STAFF ORIGINATOR: Michael Grochala, Community Development Director
EDAC MEETING DATE: November 14, 2019
TOPIC: I-35E Alternative Urban Areawide Review (AUAR) 5 year
update
BACKGROUND
Minnesota Law requires that development activities, including Commercial, Industrial and
Residential projects, that surpass certain size thresholds must complete an Environmental
Assessment Worksheet (EAW) or an Environmental Impact Statement (EIS). Another option is
the preparation of an Alternative Urban Areawide Review (AUAR) that allows for a review of
possible development scenarios rather than a specific project.
The City completed an AUAR for 4,660 acres along the I-35E Corridor Alternative Urban
Areawide Review (AUAR) in 2005. The AUAR serves as a substitute environmental review.
As long as a development project is consistent with the assumptions of the analyses in the
AUAR, no additional environmental review is required. In order to remain valid as a substitute
form of environmental review, the AUAR must be revised under certain criteria. One of the
criteria is the passing of five years. The AUAR was last updated in October of 2015. An update
of the plan is proposed for 2020.
The AUAR includes multiple development scenarios that are evaluated for possible impacts.
This evaluation, in turn, is used to create a mitigation plan to avoid any adverse impacts. This
provides a great deal of flexibility for review of future development patterns and projects.
The update will include revision of the development scenarios evaluated. Scenario 1 will be
eliminated (old Comprehensive Plan) and replaced by the update of the current comprehensive
plan. Scenario 2 (commercial/industrial focus) and 3 (residential focus) will be adjusted to
reflect actual conditions to date. The update will also allow for the City to accommodate any
considerations to further facilitate the Minnesota Technology Corridor along 35E.
The AUAR serves as both an important economic development tool as well as a comprehensive
framework for mitigating possible environmental impacts of development. The environmental
review process can add six to 12 months to the approval process for development projects. By
having the AUAR in place, projects typically requiring Environmental Review, can be expedited
by addressing the mitigation requirements established in the AUAR. A separate Environmental
Review is no longer necessary.
EDAC CONSIDERATION
Discussion on proposed development scenarios.
ATTACHMENTS
1. AUAR Boundary Map
2. Existing AUAR Development Scenarios
PROJECT LOCATION
CITY OF LINO LAKES,MINNESOTA
1-35E CORRIDOR AUAR UPDATE
e 0 5,000 10,000
Feet
FIGURE 5-1
1
f. '
CI'r vljfti0F
VNOLAKE.
71
Anoka CountForest Lake
li - — -JG -
Lino a es � ' e._.I:.+ � Hugo
W�
•
r—
Scenario 2
Figure 6-3
City of Lino Lakes, Minnesota
ALTAR Dowry
Urban Reserve{Hugo}
&isimg Trail
1-35E Corridor AUAR
M"n piBauadwy
Rural ReaiderrWAgnaultre(Golurbua)
- -- PrcposedTrail
unty Boundary
Lmv Dcr i RestdeMial f 3 Wa (Hugo]
s Futue Neighborhood Pad
Rural Land Ilse
Lim to Wei— Density R.gMntel (Cantervillej
{Centel of Serve Fvea]
Low Density IJnsw—d Residential
Magid use (Csr7xrrille 8 Hwp]
Low Dmisity Severed Rehdmko
Cam.—iarAndudrid(Centerwlle)
Low to Medan D—dy Residential
2= LYhan Development flidgo}
Medum Density Resdadial
_, ; vmiamde
Medum to High Densely Reoedan�l
Paces
Hugh Densely Resident e l
m= Futae City Roade
-.unE_. 2`4]`_
=000 +.eao a
_ S:arxeercial
lndislrial
a000 Fes Church
CaunlY Dlainar- Inhashucius
Ppoltnu
— Stream
A _s V ISPudWa(.rlSanl�ublc
(Parxs)
$71Bdh'I 1W11 Buffs'
7(u
TKDA`VJaler
msn n .•-.^...--
� ■ * ■ 4� i
111111■III �- ` � , , `� ..- �:= � .- -: ,:: ' ;e�_tw : �1,,.. - � - ��
IM
�5E II
i a
i��
I � _
� � ■■��� �� ��Jillll IVI � i � .
~ �A ill!■■Il . : !
I 1=m �naai 1. .;
Imo' u.n■a' ...... �- 11
� iwrt
.f Ik11.111f1■Ii1ii1■�i. y11In4 '
• =�111 nn_m■ aA
Scenario 3
Figure 6-4
City of Lino Lakes, Minnesota
Eauildy
UrLan Reserve {kArgo}
� Csling Trail
1-35E CorridorALTAR
§A.I.J�lR
0 Dounm y
Rurar Residenb.tAg xulMe
PttpasadTrall
My Emrdary
Low 0e 4fiesldentm11,3u'a tHugv]
'Ut— Neighborhood Perk
Rural Land Use
L-to Medium D.-Hy Resdental rc.q ripe]
{Center of SHvte N9a)
Low Deir 4 Unsermred Rs idenlial
Mwed use (C—Wville 8 Hugo)
Low Dewily l wmmj Resldanta
Cal¢merclaVlnouslrrek(Galterv�le)
Lm to Medum Density Residential
2M Man DavalWnad (Hugo)
r Medum Density Rgsidmvial
_— i,'"°� wNlands
Medu. w High DensrResdenhal
0y Pmels
High Densely Re dN tan — Ft— Clry Roans J.W). 2W5
f.nnmercul — Courtly Drainage I rfrashud_
2W0 1.007 0 2,ppp Fact � Church —Stream L ��
PuhkdSemi-PtlM(Pe ic rks} M rw m 100119u1fer -_ - :___
I1ma.aho�b.. snlw wgL4a. x. WYMm KD
ECONOMIC DEVELOPMENT ADVISORY COMMITTEE
AGENDA ITEM 3B
STAFF ORIGINATOR: Michael Grochala, Community Development Director
EDAC MEETING DATE: November 14, 2019
TOPIC: Otter Lake Road Extension
BACKGROUND
Otter Lake Road, north of Main Street, is planned to extend northerly and connect with
Elmcrest/241h Avenue along our shared border with the City of Hugo. The City's
Comprehensive Plan classifies the road as a future arterial roadway serving the east side of the
35E corridor. The initial phase of the project was completed concurrently with the McDonald's
project in 2013.
Since the proposed roadway will cross several properties it is necessary for the City to coordinate
the overall location and design. Additionally, alignment alternatives will have wetland impacts
that will need to be evaluated to determine a preferred route. The City did complete some initial
considerations in 2013 with phase one of the extension. However, it will be necessary to
evaluate additional options due to the anticipated impacts.
Staff is now working with WSB and Associates, City Engineer, to develop a preliminary
design/concept plan for the proposed extension. The process will include preparation of two
alignment alternatives to the north. A property owner meeting will be included in the design
process.
EDAC CONSIDERATION
Discussion on proposed extension.
ATTACHMENTS
1. Otter Lake Road Extension location map
2. Otter Lake road Alignment Options
t
4p
r _
%82N ST.E � E 4r
It
80TH ST E °: F: •y"r
�q
Lu
77TH ST E
-
- .R(HBEIN ST _ �
W
■' 7
L } -
i
fie' ♦.�t
:.
W
e�
O. L
RD ST uj
>
Main _j
72ND ST z
Z LLI
'o
!r Main Q ROBIN LN N
F Q p�
u
a =.' U) v)
-
Interceptor- W
Q
mad Ext.
y
`.44
m a N
133122130002
133122420001 1
1:33,122,19UQ0,1
[1:3.3;12341:0.005]
133122440001
D
C
County Road 14
1 T 17 A
I
I '^
I
1
I C
N
I �
I
G,
I 3
v
I y
I
.I N
f
0
O �
4
HERITAGE PARKWAY
10
CLevel 1 Potential Wetland Areas
Level 2 Wetland Delineations
Otter Lake Rd Extension
Phase 1
Phase 2
Phase 3
1
Property Parcels
i
G H 1 1. Avoid/minimize larger wetland impact
I
to the east
2. Avoid/minimize larger wetland impact
to the west
j 3. Connection to Elmcrest and Oneka
Parkway through 158th
4. Direct connection to Heritage Parkway
to serve existing residence
5. Cannot meet state aid design for curve
radius between intersections if road is
realigned to the east
6. Avoid crossing County Ditch 55
7. Existing right-in/right-out access to
Elmcrest. Reconstruct of Elmcreast to
CSAH design standards would require
a full access signalized intersection.
8. Intersection spacing on 14 cannot be
less than 1/8 mile.
1 9. Straight approaches required for turn
I lanes.
10. Avoid private residence (eminent
domain)
11. Private residence taking (eminent domain)
I
12. Phase 3 intersection locations are
development driven.
13. Phase 2 requires right-in/right-out to
adjoining parcels (minimizes wetland
impact) with median proximity to
intersection.
14. 90-Degree connection required for
three-legged intersection
15. Abandon Elmcrest Avenue
10
Figure 3. Alternative 1 (Proposed) & Sequencing Considerations N
C *JK
1 Otter Lake Road Extension- Phases 2& 3 WSB
LS City of Lino Lakes, MN 1 inch =400feet
& Associates, Inc.
"m
rf T'F �, i � ill:• • �,. � 1Y+�'' %� • � r;f � - /� � � .• ,j • � -
•-
�"4 !'!' • _ INTERSTATE 35E
i�=�'•. •.-: 16
0 FT 200 400
OA 700' RADIUS ESTIMATED WETLAND
IMPACTS
CD1000' RADIUS Oj SEQUENCING ISSUE
❑A WETLAND I.D.
PROJECT NUMBER
v tt�—
O�
O
d"
•+� Jy
ROAD
W
OOTTER"�LAKL
Z
F '� • _
i <G
N Cl) C
4
f
VW
Y
ALTERNATE 2
OTTER LAKE ROAD I SHEET OF TXT SHEETS