1. NPDES Stormwater Permit Update, Mike Grochala, Jeff Peters (WSB)
2. Review of Metro I-Roseville IT Manager)
3. Monthly Progress Report
Review Regular Agenda
Adjourn
WS –Item#1
WORK SESSION STAFF REPORT
Work Session Item No.1
Date:
October 7, 2013
To:
City Council
From:
Michael Grochala
Re:
MS4 Update
Background
The Municipal Separate Storm Sewer System (MS4) general permit is mandated by
federal regulations under the Clean Water Act and administered byt the Minnesota
Pollution Control Agency. The permit allows for owners of storm sewer systems to
discharge stormwater into lakes, river and wetlands provided certain regulatory
requirements are met.
The City of Lino Lakes has been operating it’s system under a permit issued in 2006.
Reissuance of the permit was approved by the state in May of 2013 and went into effect
August 1, 2013. Under the permit requirements the City will be required to submit an
application for permit reauthorizationby December 29, 2013. The reauthorization will
also require the preparation of an updated Storm Water Pollution Prevention Program
(SWPPP).
The SWPPP is comprised of 6 components, referred to as Minimum Control Measures
(MCM’s) that provide for implementation of the permit requirements:
1.Public education and outreach, which includes teaching citizens about better
stormwater management
2.Public participation: Include citizens in solving stormwater pollution problems.
This includes a required public annual meeting and an annual report.
3.A plan to detect and eliminate illicit discharges to the stormwater system (like
chemical dumping and wastewater connections)
4.Construction-site runoff controls
5.Post-construction runoff controls
6.Pollution prevention and municipal “good housekeeping” measures, like covering
salt piles and street-sweeping.
Over the next 6 to 9 months staff will be working with WSB and Associates to draft the
new SWPPP. Jeff Peters (WSB) will be present at the work session to provide an
overview of the new permit requirements.
Requested Council Direction
None Required.
Attachments
1Draft MS4 Permit Update Schedule
MS4 Permit - Schedule of Permit Compliance - Permit Term: August 1, 2013 to July 31, 2018
City of Lino Lakes
Prepared by: Jeff Peters, WSB & Associates, Inc.
Permit Percent
ItemActivitySubmittal Date
ReferenceComplete
ApplicationSubmit application for reauthorization012/29/2013
Complete revisions to the existing SWPPP to include activities, schedules, and timeframes for meeting the new
SWPPP012/29/2013
permit requirements. This shall identify the reponsible party for completing various SWPPP activities.
Organization ChartDevelop an organizational chart to identify what departments are responsible for specific BMP activities.07/29/2014
Enforcement Response Procedures
Develop (ERPs) to compel compliance with illicit discharge detection and
ERPselimination, construction site erosion and sediment control, and post construction stormwater management 07/29/2014
requirements.
Update the stormwater system map to include all pipes greater than 12 inches in diameter, outfalls, structural
Mapping and
stormwater BMPs, receiving waters (lakes and wetlands), and ponds. The pond mapping shall be completed 07/29/2014
Inventory
using a form provided by the MPCA.
General
Identify all approved Total Maximum Daily Loads (TMDLs) within your MS4 community and identify all
activities that will be completed to achieve compliance with the TMDL Waste Load Allocation (WLA)
Annually - June 30th
TMDLsreduction requirements. This will include identifying progress towards meeting the TMDL goals, BMPs either 0
of each year
implemented or planned to be implemented, an estimate of cumulative load reductions, and a narrative
describing what strategies will be taken if the WLA is not being achieved by the desired date.
Annually - June 30th
Annual ReportSubmit an annual report each year to describe the status of compliance with permit terms and conditions.On-going
of each year
Develop a mechanism to track activities being completed by the MS4. This will include educational activities,
Record Keepingcomplaints, plan reviews, inspections of active construction sites, inspections of the storm sewer system, a 07/29/2014
facilities inventory along with BMPs implemented and quarterly inspections, and training.
Focus on a high priority stormwater related issues to be emphasized for education and outreach during the
MCM 1Prioritize Educationpermit term. (e.g. - specific TMDL reduction targets, changing local business practices, promoting adoption of 07/29/2014
the residential BMPs).
The city will need to have one annual opportunity for the public to offer input on the communities MS4 Annually - June 30th
MCM 2Annual MeetingOn-going
program. of each year
Prioritize areas likely to have illicit discharge and perform additional illicit discharge inspections in these areas
Prioritize Areas07/29/2014
that have a higher potential to have an illicit discharge.
Develop written procedures for conducting on-going inspections and for responding to known, suspected, and
Written Procedures07/29/2014
MCM 3
reported illicit discharges.
Complete training of all field staff in the recognition of illicit discharges, i.e. building officials, public works
Training0Annually
staff, and code enforcement staff.
Annually
Inspections0
Annually inspect a minimum of 20% of all outfalls for dry weather flows.
012/29/2013
Ordinances
Review existing ordinances to make sure they are as stringent as the existing permit requirements.
MCM 4
07/29/2014
Written Procedures
Develop written procedures for completing site plan reviews, inspection procedures, and prioritizing
inspections. These may come in the form of checklists and standardized inspections forms/letters.
07/29/2014
Public Input
Develop written procedures for receiving public input on active construction sites.
Develop and implement a Post-Construction Management Program where an MS4 must meet the following
criteria:
07/29/2014
Ordinances
a. New development no net increase in volume, TSS, TP from pre-project conditions.
b. Redevelopment net reduction of volume, TSS, and TP from pre-project conditions.
MCM 5
Develop post construction regulatory mechanisms to allow the MS4s to conduct inspections, perform
Long-term
07/29/2014
maintenance, and assess costs to maintain structural stormwater BMPs constructed after the effective date of this
Maintenance
permit.
Complete an inventory of facilities owned and operated by each MS4 that contribute pollutants to stormwater.
07/29/2014
Facilities InventoryThis inventory shall include a map and a spreadsheet of all material being stored along with BMPs designed to
prevent discharges of pollutants in stormwater.
Complete inspections as follows:
a. Structural Stormwater BMPs - annually
On-goingAnnually
Inspections b. Outfalls - once per permit term or as necessary to fullfull illicit discharge detecion requirements
c. Ponds - once per permit term
MCM 6
d. Stockpiles and Material Handling Areas at MS4 Facilities - quarterly
Pond Assessment Develop procedures and for evaluating the TSS and TP treatment effectiveness of MS4 owned/operated ponds.
07/29/2014
ProceduresThis shall include a shedule for when this actvity will be completed.
Develop and implement a stormwater management training program to commensurate with employee's job
0Annually
Training
duties.
WS –Item#2
WORK SESSION STAFF REPORT
Work Session Item No.2
Date:
October 7, 2013
To:
City Council
From:
Jeff Karlson
Re:
Review of Metro I-Net’s IT Services
Background
The City of Roseville (Metro I-Net) provides information technology services to 25
government agencies through a joint powers agreement, including Lino Lakes.
Roseville’s IT staff manages and maintains the network and computer systems for these
agencies, which include the following services:
User access to active directory services, including MS Exchange messaging
software;
Manage network communications infrastructure at city facilities;
Ongoing network maintenance, security, and upgrades;
Monitoring and evaluation of network infrastructure;
Desktop technical support for issues not resolvable in-house;
Hardware and software purchasing evaluation and testing;
Access to the Internet.
To realize efficiencies in network and domain management, the individual networks of
each agency have been consolidated into a single domain effectively creating a collective
network where all agencies share the total operation of the network.
From time to time, questions arise regarding the value the City is getting through the
shared services agreement with Roseville. Therefore, staff invited Terre Heiser,
Roseville’s IT Manager, to review the services Metro I-Net provides for Lino Lakes.
Item # 3
October 7, 2013
Item Last Action TakenStaffStatus
Elmcrest Road Improvements 5/6/13 Staff met with Hugo to discuss Michael Hugo is interested, but is
road improvements at Elmcrest & Cedar & Rick waiting for development
Utility Rate Study 4/1/13 Council discussed feasibility of a Rick This item will be included on
water treatment plant or using a deeper December 2 work session
aquifer to reduce chemical treatment costs
Digital Scanning Project 8/26/13 Council approved hiring a PT Jeff Staff interviewed 6 candidates
scanner operator and will seek authorization to
hire two for the position
7309 Lake Dr. Code 9/3/13 Council requested additional Michael Will be brought back for
Violation information on the property, including discussion at the Nov. 4 work
historical use session
Labor Negotiations 9/6/13
latest settlement offer after another Jeff the issues was certified to the
mediation session BMS Commissioner
ECFE Building 8/28/13 Staff received update from KW KW Commercial continues to
Commercial a charter school and day Jeff market the space for lease