HomeMy WebLinkAbout12-02-2019 Council PacketCITY COUNCIL WORK SESSION AGENDA CITY OF LINO LAKES Monday, December 2, 2019 Community Room 6:00 P.M. 1. Well No. 7 Feasibility Study, Diane Hankee 2. CSAH 34 Birch Street Project Update, Michael Grochala 3. Pavement Management Update and 2020 Mill and Overlay Project, Diane Hankee 4. Private Well City Code amendment, Michael Grochala 5. Ambulance Service, John Swenson 6. Council Updates on Boards/Commissions, City Council 7. Monthly Progress Report, Jeff Karlson 8. Review Regular Agenda 9. Adjourn WS – Item #1 WORK SESSION STAFF REPORT Work Session Item No. 1 Date: December 2, 2019 To: City Council From: Diane Hankee, City Engineer Re: Well House No. 7 Feasibility Study Background On December 10, 2018, the City Council authorized the preparation of a Feasibility Study for Well House No. 7. The Feasibility Study evaluates the construction of Well No. 7 and the use of an existing farm house as the well house. The Feasibility Study also included the evaluation and construction of a test well. The existing farm house and proposed well are located at 509 Birch Street. 509 Birch Street was purchased by Anoka County for future access to Birch Street in coordination with the Centennial School District. During the drilling of the test well, in March of 2019, the test well collapsed and the test well was not able to be completed. At the April 1, 2019, Council work session, the collapse of the test well was discussed with Council along with the options for the test well moving forward. A screen test well was recommended. Prior to the approval the screened test well staff brought back additional information to the May 6, 2019 work session. WSB engineers and Oertel Architects provided preliminary layouts and cost estimates for re-purposing the farmhouse as a well house. They also provided a comparison cost of a new well house. On June 10, 2019 the Council awarded the bid for the screened test well. The test well and water system modeling was completed. The Feasibility Study for Well No. 7 has been finalized. Jeff Oertel of Oertel Architects and Greg Johnson of WSB will be present at the work session to go through the Feasibility Study. Requested Council Direction Direct staff to include the Feasibility Study for Well House No. 7 on a future City Council agenda for Acceptance. Attachments 1. Well House No. 7 Feasibility Study FEASIBILITY REPORT WELL HOUSE NO. 7 FEASIBILITY STUDY LINO LAKES | ANOKA COUNTY | MINNESOTA NOVEMBER 15, 2019 Prepared for: City of Lino Lakes 600 Town Center Parkway Lino Lakes, MN 55014 WSB PROJECT NO. 013434-000 Well House No. 7 Feasibility Study City of Lino Lakes, MN WSB Project No. 013434-000 FEASIBILITY REPORT WELL HOUSE NO. 7 FEASIBILITY STUDY FOR THE CITY OF LINO LAKES ANOKA COUNTY, MINNESOTA NOVEMBER 15, 2019 Prepared By: & Oertel Architects November 15, 2019 Michael Grochala City of Lino Lakes 600 Town Center Parkway Lino Lakes, MN 55014 Re: Well House No. 7 Feasibility Study City of Lino Lakes, MN WSB Project No. 013434-000 Dear Mr. Grochala: Attached is the Well House No. 7 Feasibility Study for the City’s review and consideration. We would be happy to discuss it with you at your convenience. If you have any questions, please do not hesitate to call me at 651.286.8466. Sincerely, WSB Greg Johnson, PE Director of Water/Wastewater c: Justin Williams Diane Hankee Well House No. 7 Feasibility Study City of Lino Lakes, MN WSB Project No. 013434-000 CERTIFICATION Well House No. 7 Feasibility Study City of Lino Lakes, MN WSB Project No. 013434-000 TITLE SHEET LETTER OF TRANSMITTAL CERTIFICATION SHEET TABLE OF CONTENTS 1. INTRODUCTION...............................................................................................................................1 2. SITE ASSEMENT.............................................................................................................................2 2.1 EXISTING SITE CONDITIONS...............................................................................................2 3. TEST WELL BACKGROUND ..........................................................................................................3 3.1 TEST WELL RESULTS...........................................................................................................3 3.1.1 GEOLOGY .................................................................................................................3 3.1.2 TEST WELL CONSTRUCTION .................................................................................3 3.1.3 WELL CAPACITY.......................................................................................................4 3.1.4 WATER QUALITY......................................................................................................4 3.1.5 TEST PUMPING RESULTS.......................................................................................5 3.1.6 CONCLUSION AND FUTURE MUNICIPAL WELL CONSTRUCTION RECOMMENDATIONS..............................................................................................5 4. BUILDING ASSESSMENT...............................................................................................................6 5. CONCEPT.........................................................................................................................................7 6. COST ESTIMATE.............................................................................................................................8 6.1 COMPARISONS BETWEEN NEW BUILDING AND REPURPOSE OF HISTORIC HOUSE.8 6.2 ESTIMATED CONSTRUCTION COST FOR A NEW, COMPACT WELL HOUSE.........................................................................................................................8 6.3 ESTIMATED CONSTRUCTION COST TO RE-PURPOSE AND ADAPTIVELY REUSE HISTORIC HOUSE.................................................................................................................8 6.4 ESTIMATED CONSTRUCTION COST WELL NO. 7 ...........................................................10 APPENDIX A Figures APPENDIX B Well logs Test pumping data APPENDIX C Architectural drawings and renderings Well House No. 7 Feasibility Study City of Lino Lakes, MN WSB Project No. 013434-000 Page 1 1. INTRODUCTION The City of Lino Lakes commissioned WSB and Oertel Architects to prepare a feasibility study to evaluate the repurposing of a historical Lino Lakes house as a well pump house and determine if a future municipal well can be constructed on the site. This study involved reviewing site and geologic data, developing a design concept, preparing basic well house plans, constructing a test well, analyzing test pumping results, and preparing a preliminary cost estimate. Well House No. 7 Feasibility Study City of Lino Lakes, MN WSB Project No. 013434-000 Page 2 2. SITE ASSEMENT The site of the historical house (Site) owned by Anoka County is located within the southwest corner of 509 Birch Street property in Lino Lakes (see Figure 1). The site was analyzed based on distance to the existing water distribution system, site topography, setback distances from potential sources of contamination, local water quality, and property availability. 2.1 EXISTING SITE CONDITIONS The site is within the 509 Birch Street property and is located within 100-feet of the existing 16-inch trunk watermain. The site is relatively flat, with a slight rise from the southwest to northeast. Topographic information indicates that the site’s elevation ranges from 898-ft to 900-ft (see Figure 1). The property has a two-story brick house located in the center of the property. During a site investigation, two abandoned wells and an abandoned cesspool were discovered. As of September 2019, Anoka County has had both wells sealed and the cesspool excavated and removed from the site. With the removal of the abandoned wells and cesspool, there are no known potential contaminant sources that would be of concern during the development of this site for a future well house and production well. Existing Site - 2019 Well House No. 7 Feasibility Study City of Lino Lakes, MN WSB Project No. 013434-000 Page 3 3. TEST WELL BACKGROUND During the 2008 Water Supply Plan review, the City was pre-approved for two additional production wells, Well No. 7 and 8. In 2017 the DNR was ordered to take measures to immediately amend all appropriations permits within a 5-mile radius of White Bear Lake, which resulted in the suspension of the original approval. As of 2019, DNR approval is still suspended pending additional information from test wells, which are recommended to examine a site for geologic conditions, potential well interference, water quality, and aquifer capacity. In the Spring of 2019, Anoka County provided the City of Lino Lakes access to the site for the construction of Test Well No. 7. The southwestern corner of the property was chosen for a future production well based on future site layouts provided by Anoka County, local geology, topography, and proximity to existing utilities. Two test wells were constructed on the southwest corner of the 509 Birch Street property. Both test wells were termed Test Well No. 7, however the first attempt was sealed after it failed during drilling. Minnesota Department of Health (MDH) assigned the failed Test Well No. 7 the Well and Boring Sealing Unique Number 841553. The second Test Well No. 7 was successful and was assigned Well and Boring Unique Number 843388. Well and boring reports for both wells are included in Appendix B. 3.1 TEST WELL RESULTS Test Well No. 7 was completed as an open hole well (no screen installed) in the Jordan Sandstone (Jordan) formation in the southwest corner of the site (see Figure 1). This location on the property was determined acceptable for production Well No. 7 based on the observed geology, potential well capacity, water quality, and absence of adjacent well interference. 3.1.1 GEOLOGY The geology in this area typically consists of sand and gravel overlying glacial deposits. Glacial drift and the St. Peter, Prairie du Chien, Jordan, St. Lawrence, Tunnel City, Wonewoc, Eau Claire, and Mt. Simon formations are all present around the Lino Lakes area. The City’s existing wells currently utilize the Prairie du Chien, Jordan, and St. Lawrence formations. The glacial drift at the test well location is unconsolidated Quaternary deposits consisting of layers of fine to pebbly sand, gravel, silt and clay that are approximately 127-feet thick. The glacial drift can be vulnerable to pollution and is not generally used for high capacity production wells due to the high likelihood of domestic well interference. The Prairie du Chien formation in this area is approximately 50-feet thick and is sometimes used for high capacity production wells. At this location, a zone of uncemented limestone, mixed with glacial sands was encountered 10-feet into the Prairie du Chien. The uncemented formation was deemed unstable. The Jordan formation in this area is approximately 105-feet thick and is most frequently used for high capacity production wells within the City. The top part of the formation at the test well location consisted of 10-feet of unconsolidated sandstone and 95-feet of mostly consolidated sandstone immediately below. 3.1.2 TEST WELL CONSTRUCTION During the construction of the failed bedrock test well, the well contractor (contractor) drilled approximately 142-feet into the Prairie du Chien formation. The Prairie du Chien formation at this site was uncemented, not stable, and continually collapsed as the contractor attempted to reach the Jordan formation below. The contractor decided to change drilling methods and was able to reach a depth of approximately 187-feet, almost the depth of Jordan formation. During this construction, the well continued to collapse within the uncemented zone and produced sediment filled water. In working with the contractor and another local well drilling contractor, it was concluded that a bedrock test well would not be feasible in this unique formation using cable tool drilling methods. It was recommended that the failed test well be sealed and a screened or bedrock test well be constructed using a rotary drill rig. Well House No. 7 Feasibility Study City of Lino Lakes, MN WSB Project No. 013434-000 Page 4 The test well was constructed using a 10-inch outer casing and a 6-inch inner casing. The 10- inch casing was extended to 225-feet to temporarily seal off the glacial drift, uncemented Prairie du Chien, and top uncemented portion of the Jordan formation. A 10-inch nominal open hole was drilled to a depth of 287-feet to the bottom of the Jordan formation. The 6-inch casing was set to 230-feet to penetrate approximately 20-feet into the Jordan formation to ensure a stable borehole, without compromising yield. The 6-inch casing was grouted while pulling back the 10-inch outer casing. The 10-inch outer casing was entirely removed to allow the formation to better absorb the grout and provide an improved sanitary seal between the inner well casing and uncemented formations. 3.1.3 WELL CAPACITY Test pumping of the Jordan formation at 280 gallons per minute (gpm) resulted in a drawdown of 11 feet for a specific capacity of approximately 25 gpm per foot of drawdown. This specific capacity is very high for a test well. Assuming a conservative estimate for specific capacity of 20 gpm per foot of drawdown, pumping a municipal well at 1,000 gpm would result in a drawdown of approximately 50 feet which is not excessive for a municipal well. Currently, the City’s average well capacity is approximately 950 gpm. 3.1.4 WATER QUALITY Water quality from the test well indicated iron and manganese concentrations above the recommended Secondary Maximum Contaminant Levels (SMCL). Treatment for SMCL contaminants is optional; however, these contaminants can cause undesired discoloration and unpleasant taste in drinking water. In addition to aesthetics, elevated levels of manganese (100 ppb for infants and 300 ppb for adults) in drinking water can have negative health effects in in young children or adults who consume too much water with elevated levels of manganese. Iron bacteria was also present in this well, which may combine with iron, manganese, and oxygen to form deposits of bacterial cells and a slimy material that may allow for the bacteria to attach itself to well column pipe and pump. Iron bacteria is not known to cause disease but may require additional maintenance throughout the life of the well. It should be noted that the water quality observed in Test Well No. 7 is similar to that in the other municipal wells (see table below). Lino Lakes Municipal Well Water Quality Comparison: Well No. Calcium (μg) Iron (μg) Manganese (μg) Well No. 1 75600 839 134 Well No. 3 79600 ND 339 Well No. 4 63900 147 61.7 Well No. 5 78400 356 170 Well No. 6 84000 93.2 390 Test Well No. 7 58600 638 65.2 Average 73350 415 193 *1μg = 1ppb Well House No. 7 Feasibility Study City of Lino Lakes, MN WSB Project No. 013434-000 Page 5 3.1.5 TEST PUMPING RESULTS During the test pumping of Test Well No. 7, water levels were monitored in Lino Lakes Municipal Well No. 2, the adjacent failed test well, and a nearby private well. Well No. 2 is constructed in the Jordan formation, the adjacent failed test well is a Prairie du Chien well, and the private well is constructed in the glacial drift. During the pumping of Test Well No. 7, there were no influences observed in Well No. 2 or the private well. Drawdown results are provided in Appendix B. Locations of the wells monitored during the test pumping are shown in Figure 2 Further investigation of the City’s well field was completed as a part of this study and consisted of using the City’s existing groundwater model to determine the impacts to the City’s drinking water supply management area (DWSMA). The model was updated with existing Well No. 6 and proposed Well No. 7. For Well No. 6 and Well No. 7, pumping rates of 1,200 and 1,000 gpm, respectively, were applied to the model. The results of this modeling exercise resulted in the expansion of the City’s DWMSA in the south/southwest portion near existing Well No. 6 and proposed Well No. 7, as shown in Figure 3. 3.1.6 CONCLUSION AND FUTURE MUNICIPAL WELL CONSTRUCTION RECOMMENDATIONS Based on the site conditions and test well results, an open hole Jordan aquifer well at this site appears to be feasible and should be capable of producing a pumping capacity near 1,000 gpm. Using the assumed pumping rate of the 1,000 gpm, the boundary of the DWSMA is expected to expand to the south/southwest. The DWSMA boundary is an estimation, as the City’s existing model would need to be updated with additional information from MDH models to accurately regenerate a new Wellhead Protection Area (WHPA) boundary. WHPA boundaries are analyzed in conjunction with property and natural boundaries to regenerate DWSMA boundaries. Lastly, the City’s groundwater model was used with estimated pumping rates, that may change during future system operations. If the City decides to construct a future municipal well at this site, the resulting recommendations are as follows: Submit an appropriations permit amendment request to the DNR. Confirm with the DNR that the conversion of Test Well No. 7 into a Jordan observation well will not be required. The proposed Municipal Well No. 7 should be bid as an open hole well but with a bid alternate to be constructed as a screened well, if deemed necessary during construction, due to the observed changes in geology. Work with MDH during the amendment of the City’s WHPP Part 1 to better understand the changes the City’s DWSMA, associated aquifer vulnerabilities, and interactions with the addition of existing and proposed wells. Well House No. 7 Feasibility Study City of Lino Lakes, MN WSB Project No. 013434-000 Page 6 4. BUILDING ASSESSMENT The existing building is a two-story masonry structure which has a “T” shaped configuration for the floor plan. Internally, there are conventional wood stud walls, joists and decking. There is also a small one- story addition made of wood framing on a concrete block foundation which is attached to the rear of the building. The house was built in 1890 and could be called local vernacular in style although it does have returns at the cornices which are a carryover from the Greek Revival style. Perhaps the only distinctive features are the cornice and the round windows at the upper walls. Despite its simplicity, it is an attractive building in a style not used since the late 1800s. Considering the age of the building, the overall condition is fair to good. Comments on the structure by category are as follows: Foundation: The house has an existing stone foundation wall. The foundation is in fair condition but it does not matter since the building would need to be set on a new foundation if relocated. Masonry structure: The structure is in good condition. The walls are made of brick masonry with 12” thick walls. There is currently little sign of structural cracks, failures and structural concerns within the walls. The masonry pointing is in fair condition and would be a good candidate for tuckpointing even though there are no significant signs of missing mortar. Wood trim: The existing wood is in fair condition overall with some areas of rot and cracking. This will require some work in order to make this exterior be less of a maintenance item in the years to come. Roofing: The existing roofing is in marginal condition and should be replaced. Although not visible, it is possible that portions of the wood deck are rotted or less than structurally acceptable. Doors and windows: The doors and windows vary in condition but, here too, this does not matter since it is anticipated that they will all be replaced. Interior walls and framing: The existing condition is simply wood framing and most of it is exposed with the plaster removed. Some of the old wood lath remains. Mechanical / electrical: The condition is poor to non-existent and it is assumed that all new heating, plumbing, electrical work and lighting will be necessary. Well House No. 7 Feasibility Study City of Lino Lakes, MN WSB Project No. 013434-000 Page 7 5. CONCEPT The concept is to retain the front portion of the house and demolish the rear section. In other words, the rectangular block facing the front (or the street) would remain. The not-as-visible rear block would be removed and the brick reused for a new addition, as is possible. The remaining front of the house would be secured and relocated at the same site but to a new location. Prior to the move, a new foundation would be constructed at its new location and the relocated house set in place. The new equipment, well and addition would be installed but it is not certain yet if this takes place before or after the move. The new addition would include all new well equipment and would be moved to where the new well is constructed. The original house structure would be modified and renovated and would contain associated storage areas. The upper floor of the original structure would be abandoned except that existing window openings would be used for ventilation purposes, as shown on the renderings in Appendix C. It is anticipated that, once a renovation is complete, the building would look very similar to the way it appears today except that it would have a fresher appearance. Since the structure is not on any historic register, a full restoration is not needed. Plus, since National Registration in particular does not allow for relocated buildings, this is a moot point. Since the new addition of the house would include all of the well equipment, MDH stated that they would not oppose this type of construction as long as it is secure and meets the requirements of a well house in accordance with the Minnesota Well Code and Recommended 10 States Standards. Well House No. 7 Feasibility Study City of Lino Lakes, MN WSB Project No. 013434-000 Page 8 6. COST ESTIMATE 6.1 COMPARISONS BETWEEN NEW BUILDING AND REPURPOSE OF HISTORIC HOUSE To evaluate advantages and disadvantages between the conversion and repurposing of the house and constructing a new well house building, the following facts should be considered by the City: The house has roughly 30 percent more space than a compact new building. The primary advantage and reason to convert the house into a well is that in doing so an important historic property in Lino Lakes would be saved. The existing house (and repairs/improvements) includes two stories versus one story with a new building. The second story could become wasted or unused space if the building is converted to a well house. The house requires relocation, restoration items, rebuilding of walls and improvements to many other building components for long term use. A new building would have low maintenance materials and various warranties while the house exterior, in particular, consists of old materials that have less certain longevity over the long term. There are more risks with the reuse of the house, from the actual relocation to any damage caused as a result of this otherwise uncertain situation. The house has been vacant and unheated. Adding heat and attaching a new addition causes a slight amount of uncertainty due to the change in environmental conditions. 6.2 ESTIMATED CONSTRUCTION COST FOR A NEW, COMPACT WELL HOUSE The costs for a new well house can vary depending on materials used and any additional storage that might be included for various purposes. As a starting point, the construction cost might be between $850,000.00 and $900,000.00. The cost would exceed one million dollars if additional storage were included in the building. 6.3 ESTIMATED CONSTRUCTION COST TO RE-PURPOSE AND ADAPTIVELY REUSE HISTORIC HOUSE The following are estimated costs for the project as designed. In addition, there are costs for permits, fees, expenses, engineering, architecture, and field administration that amount to about 25 percent of the estimated construction costs. Work Category Estimated Cost General Conditions $75,000.00 Relocation $25,000.00 Site work $63,100.00 Utilities $52,000.00 Process / program / chem $143,300.00 Selective demo $7,000.00 Concrete $28,000.00 Well House No. 7 Feasibility Study City of Lino Lakes, MN WSB Project No. 013434-000 Page 9 Work Category Estimated Cost Masonry / CMU $75,000.00 Tuckpointing $25,000.00 Carpentry / wood $14,000.00 Insulation / sealants $8,000.00 Roofing / sheet metal $30,000.00 Doors / windows / hardware $25,000.00 Interior walls $13,000.00 Painting / prep $20,000.00 Specialties $8,000.00 Mechanical $127,500.00 Electrical / lighting $255,000.00 Overhead & profit $25,000.00 Total $1,018,900.00 The following are sub-components of the line items above: General conditions: Bonds and insurance Permits Salaries Protections / temporary enclosures Safety Temporary power Tools Dumpsters / clean up Site work: Mass excavation Digging footings Backfill Compaction Class V and pavement Site concrete Masonry New CMU walls Brick infill wall at NW corner Miscellaneous repairs to existing brick Interior walls: Framing at interior side of exterior walls FRP wall panels Specialties: Roof hatch Louvers Signage Fire extinguishers Well House No. 7 Feasibility Study City of Lino Lakes, MN WSB Project No. 013434-000 Page 10 6.4 ESTIMATED CONSTRUCTION COST WELL NO. 7 The table below shows the estimated construction costs for a new municipal well, excluding any property acquisition/easement costs. Item No. Item Approx. Quantity Unit Unit Price Amount 1 Mobilization & Demobilization 1 LS $15,000.00 $15,000.00 2 Drill and Drive 24-inch casing 230 LF $125.00 $28,750.00 3 Drill 24-inch Nominal Open Hole 57 LF $105.00 $5,985.00 4 Furnish and install 18-inch casing 230 LF $80.00 $18,400.00 5 Plumbness and Alignment Test 1 LS $500.00 $500.00 6 Grout casing 14 CY $525.00 $7,350.00 7 Pull 24-inch casing back from 230-ft 230 LF $125.00 $28,750.00 8 F.I.R. Development Equipment 1 LS $6,000.00 $6,000.00 9 Blasting with Explosives 100 LBS $40.00 $4,000.00 10 Sandstone Removal 45 CY $90.00 $4,050.00 11 Operate Development Equipment 80 HRS $350.00 $28,000.00 12 F.I.R. Test Pumping Equipment 1 LS $5,000.00 $5,000.00 13 Install Temporary Discharge Piping 800 LF $15.00 $12,000.00 14 Test Pumping 48 HRS $175.00 $8,400.00 15 F.I.R. Electronic data loggers (4 private wells)4 EACH $125.00 $500.00 16 Sampling and Testing 1 LS $4,700.00 $4,700.00 17 Silt Fence 500 LF $6.00 $3,000.00 18 Gamma Log 1 EACH $1,500.00 $1,500.00 19 Televise Well 1 EACH $1,500.00 $1,500.00 20 Disinfect Well Bid Alternate 21 Furnish and install 12-inch stainless steel telescoping screen 57 LF $350.00 $19,950.00 22 Furnish and install gravel pack 50 CF $32.00 $1,600.00 Total Base Quotation for Completed Construction $183,400.00 Well House No. 7 Feasibility Study City of Lino Lakes, MN WSB Project No. 013434-000 APPENDIX A Figures !< G!5 BIRCH ST TOMAHAWK TRL902 900 90 0898900898886894886 900 898 9 0 4 898 896 896900898 900888888890892890902 900 89489 2 900896 894 906 896 89 8 904902 1 inch = 100 feet Document Path: K:\013434-000\GIS\Maps\Feasibility Report Figures\Figure 1 - Site Location.mxd Date Saved: 10/22/2019 8:43:53 AMTest Well No. 7 City of Lino Lakes !<Test Well No. 7 Project Site Existing Sanitary Sewer Existing Watermain Figure 1 - Test Well No. 7 Location 0 100 Feet¯ !< !< !< !< 1 inch = 1,000 feet Document Path: K:\013434-000\GIS\Maps\Feasibility Report Figures\Figure 2 - Monitored Well Location.mxd Date Saved: 10/22/2019 1:17:48 PMTest Well No. 7 City of Lino Lakes Project Site Figure 2 - Monitored Wells Locations 0 1,000 Feet¯ Municipal Well No. 2 Private Drift Well Failed Test Well Test Well No. 7 !< !< !< !< !< !<!< Lino Lakes No. 1Lino Lakes No. 2 Lino Lakes No. 3 Lino Lakes No. 4 Lino Lakes No. 5 Lino Lakes No. 6 Proposed No. 7 1 inch = 5,200 feet Document Path: K:\013434-000\GIS\Maps\Feasibility Report Figures\Figure 3 - DWSMA Boundary.mxd Date Saved: 10/22/2019 1:19:37 PMTest Well No. 7 City of Lino Lakes !<City Wells Existing DWSMA Updated DWSMA Potential Emergency Reponse Areas City Boundary Figure 3 - DWSMA Boundary 0 5,200 Feet¯ Well House No. 7 Feasibility Study City of Lino Lakes, MN WSB Project No. 013434-000 APPENDIX B Well logs Test Pumping Data Minnesota Unique Well Number MINNESOTA DEPARTMENT OF HEALTH WELL AND BORING REPORT Minnesota Statutes Chapter 1031841553 County Anoka Entry Date 04/09/2019 Quad Centerville Update Date 08/30/2019 Quad ID 119A Received Date 05/16/2019 Well Name Township Range Dir Section Subsection Well Depth Depth Completed Date Well Completed CITY OF LINO 31 22 W 29 CACCCD 187 ft. 187 ft. 03/19/2019 Elevation 899 ft.Elev. Method LiDAR 1m DEM (MNDNR)Drill Method Non-specified Rotary Drill Fluid Bentonite Address Use test well Status Sealed Well Hydrofractured?XYes No From To Casing Type Single casing No X Above/BelowYesDrive Shoe? Joint Well 509 BIRCH ST LINO LAKES MN 55014 Contact 600 TOWN CENTER PK LINO LAKES MN 55014 Geological Material From To (ft.) Color Hardness TOP SOIL 0 1 SOFTBROWN CLAY 1 14 MEDIUMBROWN CLAY 14 16 MEDIUMGRAY SAND & GRAVEL 16 18 SOFTBROWN CLAY 18 57 MEDIUMGRAY SAND & GRAVEL WITH 57 65 SOFTBROWN CLAY & ROCKS WITH 65 110 MEDIUMBROWN SAND & GRAVEL 110 125 SOFTBROWN SHALE 125 132 MEDIUMWHITE LIMESTONE 132 145 HARDTAN FRACTURED 145 185 MEDIUMTAN SANDSTONE 185 187 SOFTYELLOW Stratigraphy Information Casing Diameter Weight 6 146 18.9in. To ft. lbs./ft. Hole Diameter 10 146in. To ft. 6 187in. To ft. Screen?MakeType 146Open Hole From ft. To ft.187 Static Water Level Pumping Level (below land surface) HOLE NOT STAYING OPEN. OVERNIGHT CAVED IN BACK TO 155FT LOST CIRCULATION AT 147FT. SWITCHED TO REVERSE AIR ROTARY. STILL COULD NOT KEEP HOLE OPEN. SEALED 07-01-2019 BY 1404 Material FromAmount To cement-sand ft.11 146 ft.2 Cubic yards other ft. 11 ft.6 Wellhead Completion Pump Nearest Known Source of Contamination Abandoned Variance Well Contractor Minnesota Well Index Report 841553 HE-01205-15 Printed on 10/22/2019 Pitless adapter manufacturer Model At-grade (Environmental Wells and Borings ONLY) Casing Protection 12 in. above grade X X Does property have any not in use and not sealed well(s)? Grouting Information Well Grouted?Yes No Not Specified No ft.19 Measureland surface 03/18/2019 feet Direction Type Well disinfected upon completion?X Yes X Not Installed Date Installed Manufacturer's name Model Number HP Volt Length of drop pipe Capacity Typft g.p. XYes No Was a variance granted from the MDH for this well?Yes X No Licensee Business Lic. or Reg. No. Name of Driller Mark J Traut Wells, Inc. 1404 Remarks Miscellaneous Last Strat Aquifer Depth to Bedrock Located by Locate Method First Bedrock Minnesota Department of Health GPS SA Off (averaged) (15 meters) System X Y490824 4998782 ft UTM - NAD83, Zone 15, Meters Unique Number Verification Input Date 03/06/2019Info/GPS from data Angled Drill Hole Minnesota Unique Well Number MINNESOTA DEPARTMENT OF HEALTH WELL AND BORING REPORT Minnesota Statutes Chapter 1031843388 County Anoka Entry Date 06/20/2019 Quad Centerville Update Date 08/16/2019 Quad ID 119A Received Date Well Name Township Range Dir Section Subsection Well Depth Depth Completed Date Well Completed CITY OF LINO 31 22 W 29 CACCCA 287 ft. 287 ft. 06/19/2019 Elevation 899 ft.Elev. Method LiDAR 1m DEM (MNDNR)Drill Method Dual Rotary Drill Fluid Water Address Use test well Status Well Hydrofractured?XYes No From To Casing Type No Above/BelowYesDrive Shoe? Joint Well 509 BIRCH ST LINO LAKES MN Contact 600 TOWN CENTER PK MN Geological Material From To (ft.) Color Hardness FINE SAND 0 15 SOFTTAN FINE SILT 15 20 SOFTLT. GRY GRAVEL 20 25 SOFTGRAY CLAY AND GRAVEL 25 57 SOFTGRAY COURSE SAND AND 57 100 MEDIUMGRY/BRN COURSE SAND AND 100 117 MEDIUMVARIED SHALE AND 117 127 SOFTGRN/WHT FRACTURED 127 145 MEDIUMTAN/BRN FRACTURED 145 164 MEDIUMTAN/BRN COURSE SAND/ 164 165 SOFTVARIED LIMESTONE W/ 165 180 MED-HRDBROWN SANDSTONE 180 181 SFT-MEDYEL/TAN SANDSTONE 181 200 SFT-MEDYEL/TAN SANDSTONE 200 225 SOFTYELLOW CEMENTED 225 230 MEDIUMTAN/PNK CEMENTED 230 240 MEDIUMGRAY CEMENTED 240 279 MEDIUMPNK/GRN SHALE SILTSTONE 279 281 MEDIUMGRY/BRN SHALE & SILTSTONE 281 283 MEDIUMTAN/GRN SANDSTONE W/ SHALE 283 287 MEDIUMGRY/GRN Stratigraphy Information Casing Diameter Weight 6 230 18.9in. To ft. lbs./ft. Hole Diameter 10 287in. To ft. Screen?MakeType 230Open Hole From ft. To ft.287 Static Water Level Pumping Level (below land surface) 10' CASING DRIVEN TO 225' THEN REMOVED AFTER GROUTING Material FromAmount To neat cement ft. 235 ft.10 Cubic yards Wellhead Completion Pump Nearest Known Source of Contamination Abandoned Variance Well Contractor Minnesota Well Index Report 843388 HE-01205-15 Printed on 10/14/2019 Pitless adapter manufacturer Model At-grade (Environmental Wells and Borings ONLY) Casing Protection 12 in. above grade X X Does property have any not in use and not sealed well(s)? Grouting Information Well Grouted?Yes No Not Specified No ft.21.5 Measureland surface 06/19/2019 ft.41 hrs.3 Pumping at 300 g.p.m. 55 feet North Direction Septic tank/drain field Type Well disinfected upon completion? Yes X Not Installed Date Installed Manufacturer's name Model Number HP Volt Length of drop pipe Capacity Typft g.p. XYes No Was a variance granted from the MDH for this well?Yes X No Licensee Business Lic. or Reg. No. Name of Driller Mark J Traut Wells, Inc. 1404 TRAUT, T Remarks Pr.du Chien/Shakopee Fm Miscellaneous Last Strat Aquifer Depth to Bedrock Located by Locate Method First Bedrock Jordan Sandstone Minnesota Geological Survey 127 Digitization (Screen) - Map (1:24,000) (15 meters or System X Y490823 4998799 ft UTM - NAD83, Zone 15, Meters Unique Number Verification Input Date 06/20/2019Info/GPS from data Angled Drill Hole -5 5 15 25 35 45 55 65 6/19/19 0:00 6/20/19 0:00 6/21/19 0:00 6/22/19 0:00 6/23/19 0:00 6/24/19 0:00 6/25/19 0:00Drawdown (ft)Time LINO LAKES TEST WELL 7 DRAW DOWN -5 5 15 25 35 45 55 6/19/2019 0:00 6/20/2019 0:00 6/21/2019 0:00 6/22/2019 0:00 6/23/2019 0:00 6/24/2019 0:00 6/25/2019 0:00Drawdown (ft)Time LINO LAKES MUNICIPAL WELL #2 DRAW DOWN -5 0 5 10 15 20 25 30 35 6/19/2019 0:00 6/20/2019 0:00 6/21/2019 0:00 6/22/2019 0:00 6/23/2019 0:00 6/24/2019 0:00 6/25/2019 0:00Drawdown (ft)Time PRIVATE WELL AT 563 ARROWHEAD DRIVE DRAW DOWN Well House No. 7 Feasibility Study City of Lino Lakes, MN WSB Project No. 013434-000 APPENDIX C Architectural Drawings and Renderings Lino Lakes Well House - Option 1 Lino Lakes Well House - Option 1 - South Elevation Lino Lakes Well House - Option 1 - West Elevation Lino Lakes Well House - Option 1 - North Elevation Lino Lakes Well House - Option 1 - East Elevation Lino Lakes Well House - Option 1 WS – Item 2 WORK SESSION STAFF REPORT Work Session Item No. 2 Date: December 2, 2019 To: City Council From: Michael Grochala, Community Development Director Re: Birch Street (CSAH 34) proposed improvements Background Anoka County is proposing to reconstruct Birch Street (County State Aid Highway 34), from Hokah Drive easterly to the s-curve at Old Birch Street, to address deteriorating pavement conditions and safety concerns. The improvements are proposed to be completed in the 2021 and 2022 construction seasons. The Birch Street Corridor Study, completed in 2010, proposed a four lane roadway from Ware through West Shadow Lake Drive to accommodate existing and proposed traffic volumes. The County is now considering a two lane roadway within this section. Roundabouts are being evaluated to improve access at Rice Lake Elementary. A public information meeting was held on October 1, 2019. An estimated 150 to 170 interested persons attended. The County has been working on addressing comments received at the meeting. A number of changes are being incorporated and include extending the trail on the south side of Birch to easterly to Old Birch Street. Trail and Roundabout locations are being shifted to minimize right-of-way impacts to the extent possible. County staff has also been working with property owners to address potential access changes. These discussions have led to the Anoka County considering a 3rd Roundabout at Old Birch Street. Project Management Team representatives from Anoka County Highway Department and WSB will be present to provide an overview of proposed improvement project and design options being considered. An additional open house is proposed for December 17 at City Hall. Requested Council Direction None required. Staff is requesting feedback on the design considerations. Attachments None. WS – Item #3 WORK SESSION STAFF REPORT Work Session Item No. 3 Date: December 2, 2019 To: City Council From: Diane Hankee PE, City Engineer Re: Pavement Management Update and 2020 Mill and Overlay Project Background The City’s Pavement Management Program evaluates the condition of the roadways and provides recommended maintenance. The Program involves rating of one-fourth of the City roadway system mileage per year, and using pavement management software to project the condition of the remainder of the roadways. This information along with traffic volumes, maintenance data, and geotechnical information is used for the City’s Roadway Capital Improvement Planning (CIP). The City’s 2019 Overall Condition Index Map is enclosed. OCI Rating Miles of Road Percent of System Adequate 70-100 64 miles 66.5% Marginal 40-69 20 miles 19.8% Problem 0-39 15 miles 13.7% The City’s roadway system Weighted Average OCI is 71.04. The City has added new roadways in the recent years helping keep the average. It should be noted that the Pavement Management Report identified the need to focus on the Marginal roadways so that they wouldn’t fall into the more expensive Problem category. In addition, WSB has provided a memo for pavement reactive maintenance techniques that provides information on short term solutions for roadways that need reconstruction and cannot be funded at this time. For roadways that are in the Problem category, staff is recommending a 1 to 1 ½-inch “thin” overlay until the City is able to fund a full reconstruct. The thin overlay’s have been incorporated into the City’s Capital Improvement Plan for Mill and Overlays. Enclosed is the updated 5-Year Mill and Overlay Capital Improvement Plan. In coordination the 5-Year Street Reconstruction Plan has been updated. For the Reconstruction Plan, year 2021 has been modified from the previous plan. The Joyer Ln, Karth Rd, and Gaage Ln area has be included with 4th St (Main St to the north) in the 2021 project. The Diane St, 81st St, Danube St, and Elbe St area has be included in the 2024 project. This update is a result of the condition rating, and project maintenance costs. The Mill and Overlay Capital Improvement Plan includes the updated condition ratings, the addition of thin overlays, and consideration of the Anoka County 2021 Birch St Improvements Project construction schedule. The proposed 2020 Mill and Overlay Project includes: Full Depth Mill and Overlay / Reclamation – Deerwood Lane from Birch Street south to Fox Road, and Fox Road from Deerwood Lane west to West Shadow Lake Drive Thin Overlay – Carl Street from 4th Avenue west 1,400 feet, Rehbein Street, 77th Street, and Gordon Avenue. Bid Alternate* for Olive Street, Eva Street, Orange Street, and Maple Street. Chip Seal – City Hall Parking Lot and Town Center Parkway from Lake Drive to YMCA Curb Repair – Town Center Parkway south curb line from Lake Drive to YMCA and east entrance to City Hall parking lot *A bid alternate is being included in the event that we receive favorable bids and have the ability to complete additional work. The estimated total project cost including contingency and overhead and project funding: Pavement Management Fund State Aid Fund Water Operating Fund Full Depth M & O/ Reclamation $519,000 $160,000 Thin Overlay $158,000 Chip Seal $ 44,000 $ 62,000 Curb Repair $ 55,000 Total Estimated Cost $721,000 $117,000 $160,000 Budget $753,000 $117,000 $160,000 The project schedule is set up to parallel the Apollo Drive trail project so that the projects can be bid together. The estimated schedule for the projects: Order Improvement, Authorize Plans and Specifications December 9, 2019 Approve Plans and Specifications, Authorize Ad for Bids January 20, 2020 City Opens Bids February 19, 2020 City Council Awards Contract February 24, 2020 Construction Begins April-May, 2020 Final Completion September, 2020 Requested Council Direction Staff is requesting Council direction to place the authorization the Preparation of Plans and Specifications for the 2020 Mill and Overlay Project on the December 9, 2019 City Council meeting agenda. Attachments 1. Overall Condition Index (OCI) Map 2. Pavement Reactive Maintenance Techniques Memo 3. 5-Year Street Reconstruction Plan - Updated 2019 4. 5-Year Mill and Overlay Capital Improvement Plan- Updated 2019 %&d( %&c( County Hwy 10 County Hwy 14County Hwy 21County Hwy 23County Hwy 14 Hodgson RdCounty Hwy 23County Hwy 21Pavement Ratings 0 4,200 Feet ± Today's Overall Condition Index 0 - 39 (Problem) 40 - 6 9 (Ma rginal) 70 - 1 00 (Ad equate)Other Roads Oth er Roads Gravel RoadsInspection Years 2016 2017 2018 2019 OCI Index Description Problem - Marginal - Adequate - Pavement in Failing Condition, Reconstruction Required Pavement in Marginal Condition, Mill and Overlay Required Pavement in Adequate Condition, Chip Seal Required K:\014721-000\GIS\Maps\TodaysOCI_2019-10-14.m xd Date: 10/14/2019 701 XENIA AVENUE S | SUITE 300 | MINNEAPOLIS, MN | 55416 | 763.541.4800 | WSBENG.COM Memorandum To: Diane Hankee From: Andrea Blanchette Tom Wood Sheue Torng Lee Date: October 10, 2019 Re: Pavement Reactive Maintenance Techniques This memo summarizes various pavement reactive maintenance methods. These reactive maintenance techniques can be served as temporary and short-term fixes when the City does not have sufficient funding to perform a more robust rehabilitation such as a full depth reclamation or a reconstruction. It is to our understanding that several roadways in the City of Lino Lakes, which are in poor condition, should be reclaimed or reconstructed. However, the City does not have sufficient funding at this moment to perform these major rehabilitations and the roadways are in need of immediate fixes. A table summarizing the type of reactive maintenance, its estimated cost and estimated extension of life is shown on the next page. 701 XENIA AVENUE S | SUITE 300 | MINNEAPOLIS, MN | 55416 | 763.541.4800 | WSBENG.COM Type of Reactive Maintenance Description Estimated Cost ($ per mile)1 Estimated Extension of Life Fog Sealing Involves a light uniform layer of asphalt emulsion to seal minor cracks and surface defects $6,400 0 to 4² Chip Sealing Involves spreading a thin layer of heated liquid asphalt and immediately thereafter applying small aggregates on top. $23,000 2 to 8² Double Chip Sealing Second layer of chip seal is applied immediately after the first layer. $55,000 2 to 10² Micro Surfacing A cold-mix paving material and it is quick setting. It is applied with a specialized machine that can spread the mix in variable thicknesses to address rutting and dips. $51,000 at 30 pounds per square yard 3 to 8² ThinLay™ Is a Hot Mixed Asphalt mix placed from ½ to ¾ inch thick $36,500 for ¾ inch thick at $60 per ton of mix 2 to 10² Ultra-Thin-Bonded-Overlay (Nova Chip™) Is a grape grade HMA mixture applied with special paver that applies a heavy asphalt emulsion bonding layer immediately in front of the mix $67,000 at 75 lbs. per square yard 3 to 15² One- to 1 ½-inch Overlay A layer of hot mix asphalt is placed over the existing pavement structure. $53,000 for an inch overlay with $65 per ton mix 3 to 10² Mill and Overlay The process of grinding off the top later of existing asphalt pavement and replacing the removed layer with a new hot-mix asphalt surface. $120,000 for two-inch mill and overlay with $65 per ton mix 4 to 15² 1 Cost estimates for all activities are provided in per-mile costs based on current bid prices or historical information and assume a two- lane, 24-foot wide pavement. Cost estimates provided are based on the 2019 JPA pricing and the 2018 MnDOT Average Bid Pricing. ² The life estimates are dictated on the current condition of the pavements at the time of application of the treatments. It should be noted that applying the treatments above to roads rated with lower OCIs should apply the lower range of the estimated life extension. F or example, the range for Overlays/Mill and Overlays per the pavement management report is an OCI of 40 to 70. A road with an O CI of a 40 receiving a Thinlay™ should expect a life expectancy closer to 2 years, whereas a road with an OCI of a 70 receiving a Thinlay™ should expect a life expectancy closer to 10 years. Diane Hankee October 10, 2019 Page 3 The Estimated Extension of Life values provided will be impacted by factors including but not limited to: • Current condition of the roadway • Change in Traffic Volume • Increase in Traffic Loading • Weather • Construction CENTENNIAL GREEN PARK CENTENNIAL PARK EASTSIDE PARK LOCHNESS PARK NORTH STAR PHEASANTRUN PARK TRAIL CARL ECK PARK TAMARACK PARK INNER CENTER PARK CITY HALL PARK Wenzel Farms COUNTRY LAKES PARK BIRCH PARK SHENANDOAH PARK GROVE PARK Sunset Oaks Park CLEARWATER CREEK PARK MARSHAN PARK PHEASANT HILLS PARK Woods of Baldwin Lake BRANDYWOOD PARK ARENA ACRES HIGHLAND MEADOWS PARK Sunrise Park BEHM'S PARK LINO PARK LAURIELAMOTTEMEMORIAL PARK MCBRIDE MEMORIAL PARK ROYAL MEADOWS PARK ACORN CREEK PARK EAGLE LAKE TRAILTRAIL BALDWIN PARK GOLDEN LAKE PARK CANTERBURY PARK CANTERBURY PARK CITY HALL PARK Rondeau Lake Peltier Lake Marshan Lake Centerville Lake George Watch Lake Sherman LakeWardsLake Reshanau Lake Rice Lake Golden Lake BaldwinLake Bald Eagle Lake AmeliaLake Otter Lake Cedar Lake Rice Creek Marsh RICE CREEKCHAIN OF LAKESREGIONAL TRAIL County Hwy 10 County Hwy 14County Hwy 21County Hwy 23County Hwy 14 Hodgson RdCounty Hwy 23County Hwy 21%&d( %&c( )sBlaineLinoLakesCirclePinesLinoLakesColumbus Lino Lakes HugoLinoLakesH u g o White Bear Twp. Lino Lakes North Oaks Lino Lakes S h o r e v i e w Lino Lakes White Bear Twp. Lino Lakes Centerville Arrowhead Dr Lam otte D rL a m o t t e C i r 1 inch = 3,200 feet 5 YearStreet Reconstruction Plan Document Path: K:\02029-230\GIS\Maps\2019StreetReconPlanNew.mxd Date Saved: 10/29/2019 12:29:34 PM Street Reconstruction Plan 2021 2024 City of Lino Lakes MN ± %&d( %&c( County Hwy 10 County Hwy 14County Hwy 21County Hwy 23County Hwy 14 Hodgson RdCounty Hwy 23County Hwy 212020 Chip Seal Watermain Repairs Mill & Overlay 2020 2021 2022 2023 2024 Thin Overlay 2020 2021 2022 2024 0 4,250Feet¯Figure 2 - Mill and Overlay Document Path: K:\02029-230\GIS\Maps\MillOverlay2019.mxd Date Saved: 10/29/2019 3:12:21 PM1 inch = 4,250 f eet Lino Lakes PMP Lino Lakes, MN S:\Community Development\Code Enforcement\Active Cases\7109 Sunrise Dr\Staff Reports\20191202 WS\20191202 WS SR Private Well Construction amendment.doc WS – 4 WORK SESSION STAFF REPORT Work Session Item No. 4 Date: December 2, 2019 To: City Council From: Michael Grochala, Community Development Director Re: Possible Amendment to City Code Chapter 401 Private Well Construction Background The City Council discussed the possible amendment of Chapter 401 at the November 25, 2019. The discussion was in response to an existing City Code violation regarding construction of a new private well. Currently City Code Section 401.02 requires that a property owner hook up to city water, if available in a street, when a pre-existing on-site water system (well) fails. The property owner, Chuck Wiegmann, requested City Council consideration of a variance at the November 12, 2019 City Council meeting. As noted in a letter from the City Attorney, dated November 18, 2019, there is no variance provision set forth within City Code. Consideration to allow for the installation of the private well would require an amendment to Chapter 401 of City Code. The prohibition on new wells where municipal services are available is, in part, to recoup the City’s infrastructure investment and to protect the City’s source drinking water supply. If the City Council were to consider an amendment to allow an exception staff would recommend consideration of the following conditions: 1. Consideration would only apply to properties where a private well existed prior to availability of municipal water services. 2. The private well is not located within an area defined as a high vulnerability or very high vulnerability area in the City’s Drinking Water Supply Management Area (DWSMA) as amended. 3. The property is connected to the municipal sanitary sewer system or the Individual Sewage Treatment System (ISTS) is determined to be in conformance with the provisions of City Code and Minnesota Rules regarding ISTS systems. The applicant would be required to provide a compliance inspection report completed by a licensed inspector. If the ISTS system is determined to be noncompliant and municipal services are provided to the site, connection would be required. 4. Applicant would be required to pay the City Trunk Utility Connection Charges consisting of a Trunk Charge and Availability Charge. The rate for 2020 is $3,757. Other charges including the Lateral Connection Charge would not be due until time of actual connection to the system. Adoption of an ordinance requires two readings with at least 14 days between its introduction and final adoption. The ordinance becomes effective 30 days after publication. Based on the current City Council calendar 1st reading could be held on December 9, 2019 and the 2nd Reading on December 23, 2019. The ordinance would become effective in late January. As requested an outline of the proposed ordinance changes was provided to the property owner via email on Tuesday, November 26, 2019. Staff is will provide and update on any discussions at the meeting. If the City Council intends to move forward staff will work with the City Attorney to draft ordinance language for consideration at the December 9th, 2019 City Council meeting. Attachments 1. Drinking Water Supply Management Area (DWSMA) Requested Council Direction Staff is requesting direction on whether to draft an ordinance amendment for consideration. !< !< !< !< !< !< Baldwin Lake Rondeau Lake BaldEagleLake WilkinsonLake Amelia Lake ReshanauLake RiceLake CentervilleLake MarshanLake GeorgeWatch Lake PeltierLake CedarLake Li l a c S t 20thAve S456721 456749 456721 456749 456714 456723 456714 456754 456754 456714456714 20thAve20thAve§¨¦35E §¨¦35W ")140 ")84 ")84 Ma in S tMain StM a in St Cedar St HodgsonRdLake DrElm St Birch St Birch StLake DrSunset AveRondeauLake Dr EAs hSt OakLn ApolloDr62ndSt N Ash St RondeauLake Rd WCenterville RdHolly Dr4th AveHolly Dr E Birch St 80thSt E 64th St White Bear TownshipCity of BlaineCity of Circle PinesCity of Columbus City of HugoCity of North Oaks City of Shoreview ´ Figure 9-7Drinking Water Supply Management Area (DWSMA) Legend City of Centerville DWSMA Boundary DWSMA Vulnerability Very High Vulnerability High Vulnerability Moderate Vulnerability Low Vulnerability !<Existing Well Open Water Right-of-Way Municipal Boundary Parcels Streams 3,500 0 3,5001,750 Feet Date: 1/22/2018 WS – Item 5 WORK SESSION STAFF REPORT Work Session Item 5 Date: December 2, 2019 To: City Council From: John Swenson, Public Safety Director Re: Ambulance Service Background During the 3rd Quarter Public Safety Update on November 4, 2019, staff updated Council on impending changes to ambulance service providers that will take effect on June 1, 2020. MHealth Fairview provided staff this notice but provided no other information regarding service delivery. Ambulance service within Lino Lakes has been an on-going conversation with the topic being discussed at the January 7, 2019 Council Work Session and January 14, 2019 Council Meeting. During the January 14, 2019 Council Meeting, Resolution 19-07 was adopted by the Council. This resolution stated its support for legislation that requires local municipal approval. During the 2019 legislative session House File (HF) 1364 and Senate File (SF) 2136 were introduced, but neither piece of legislation was given a hearing in the House or the Senate. Both pieces of legislation would require local approval for any changes to ambulance service providers. Also noted during the 3rd Quarter Public Safety Update were several ambulance calls for service that are of concern for staff. Those calls noted during the presentation and those occurring after the presentation are: • 9/27/2019 – personal injury crash on interstate – 37 minute ambulance response time • 10/4/2019 – serious gun shot – 17 minute ambulance response time • 10/20/2019 – a fifteen (15) month old child with difficulty breathing – 22 minute ambulance response time • 10/22/2019 – altered state of consciousness – 24 minute ambulance response time • 11/19/2019 – stroke – 26 minute ambulance response time • 11/22/2019 – cardiac arrest – Deputy Director L’Allier assisted the transport of this patient and noted the EMT driving the ambulance did not know how to get to Regions Hospital Our staff have also noticed that Allina Ambulance has been responding to calls in our City more frequently due to North Ambulances being unavailable to respond. Public Safety Director Swenson attended the EMSRB Executive Board Meeting on October 22, 2019 and the EMSRB Board Meeting on November 21, 2019. At these meetings the state law and process for ambulance transfer of license (name change) or ownership change were discussed as part of the impending changes in our ambulance PSA (Primary Service Area). At this time the EMSRB Board has not rendered a decision as to whether the ambulance service change in the PSA that covers Lino Lakes is change of ownership or simply a transfer of license (change of name). This distinction will determine what path the EMSRB conducts to evaluate with the impending change in ambulance providers in our PSA. The statutory language that outlines the Transfer of License process is contained in Minnesota Statute 144E.14. This statute also provides details that would require EMSRB Board to determine the change is not a transfer of license but rather a change in ownership requiring a new application process. Details on the new application process is outlined in Minnesota Statute 144E.11. It should be noted that no public input would be accepted if the EMSRB Board determines the change is simply a transfer of license. As cited in MN 144E.14, if the EMSRB Board determines that “the proposed transfer would result in an addition of a new base of operations, expansion of the service’s primary service area, or provision of a new type or types ambulance service, the board shall require the prospective licensee or owner to comply with section 144E.11.” The process would require public hearings on the proposed changes if more than five (5) written comments opposing the application are received by the EMSRB Board. Staff from the Anoka County Dispatch Center (ACDC) has contacted Public Safety Director Swenson to express their concerns of the impending change to ambulance service in our PSA. Staff hopes to meet with ACDC staff prior to the December 2nd Council Work Session to gain a better understanding of their concerns and the potential impacts on emergency services dispatching in our community. Staff is seeking Council input and direction on how to proceed. Some potential pathways to address this matter are: 1. Take no action and wait to see what the EMSRB Board decision is. At this time staff has received no information from MHealth Fairview Ambulance regarding their plan to provide ambulance service in Lino Lakes; therefore, we have no way to determine what, if any, positive or negative impacts this change may have within our community. 2. Strongly advocate that the EMSRB Board find the impending changes within our PSA does meet the requirement set out in MN 144E.14 to trigger the new application process outlined in MN 144E.11. This would provide Lino Lakes an opportunity to provide comment and input on this impending change. Absence of the process outlined in MN 144E.11 there is no mechanism in current Minnesota law allowing for local input on matters related to ambulance services. 3. Make application with the EMSRB Board to become owner of the ambulance PSA that would cover the current geographical area of the City of Lino Lakes. This endeavor would require significant time investment for staff and the potential for financial investments by the City. As part of the application process we would be required to submit a plan for providing ambulance services within our City. If Council wishes to pursue this option, staff could research two options to provide ambulance service; such as: a. Pursue ownership of the PSA and identify an existing ambulance vendor and enter into contract for that vendor to provide ambulance service within our City. b. Pursue ownership of the PSA and establish a City run ambulance service. 4. Continue to pursue a legislation that would change current MN law. Staff is requesting Council direction on this matter. Attachments None