HomeMy WebLinkAbout2019-183 Council ResolutionCITY OF LINO LAKES RESOLUTION NO. 19-183 RESOLUTION ACCEPTING QUOTES, AND AWARDING A CONSTRUCTION CONTRACT, IRRIGATION CONTROLLER UPGRADES PROJECT WHEREAS, pursuant to a request for quotes for the construction of upgrades to fourteen (14) City irrigation controllers. quotes were received, and tabulated: CONTRACTOR TOTAL QUOTE Northway Irrigation $76,500.85 Mickman Brothers $92,968.25 WHEREAS, it appears that Northway Irrigation of Circle Pines, Minnesota is the lowest responsible bidder; and NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Lino Lakes that the Mayor and Clerk are hereby authorized and directed to enter into a contract Northway Irrigation for the construction of the Irrigation Controller Upgrades in the amount of $76.500.85; Adopted by the Council of the City of Lino Lakes this 13`h day of January 2020. The motion for the adoption of the foregoing resolution was introduced by Council Member Ruhland and was duly seconded by Council Member Lyden and upon vote being taken thereon, the following voted in favor thereof: Ruhland, LYden, Stoesz, Rafferty The following voted against same: none ATTEST: tittot,NtliP a erty, ayor CITY COUNCIL AGENDA ITEM 6A STAFF ORIGINATOR: Diane Hankee, City Engineer MEETING DATE: December 23, 2019 TOPIC: Resolution No. 19-183, Accepting Quotes, and Awarding a Construction Contract, Irrigation Controller Upgrades Project VOTE REQUIRED: 3/5 Vote Required INTRODUCTION Staff is requesting authorization to accept quotes and award the construction contract for the Irrigation Controller Upgrades Project. BACKGROUND On May 13, 2019 the City Council approved the Rice Creek Watershed District (RCWD) Stormwater Remediation Cost -Share Grant agreement. As part of the City's ongoing water conservation efforts, staff has targeted reduction in water use for irrigation as a primary means of meeting the City's conservation goals. There are additional indirect savings in terms of water system infrastructure from reduced peak season water demand. The new controllers will allow the City to use less water and operate irrigation systems centrally. The irrigation volumes at the targeted locations use an average of 9.2 million gallon annually. The use of smart controllers (weather based system) and/or soil moisture sensors have been found to reduce water use by up to 50%. This would result in 4.6 million gallons annually, representing approximately 3.4 days of water use for the entire city. The benefits of the remote water management system include: • Central Control — Ability to start and stop irrigation schedule on a smart phone or tablet via App. • Weather Based Control — Use current weather and evapotranspiration data to irrigate only when needed. • Flow Sensing and Leak Detection — Can easily monitor flow rate and water use. Real time look at system and instant alert of leaks. • Pressure Regulation — Optimizing pressure to significantly reduce wasted water. The Irrigation Controller Upgrades Project includes: Upgrading the irrigation controllers at fourteen (14) City irrigation systems to water - efficient smart controllers with local moisture sensors. Quotes for the project were received on November 29th, 2019. The quotes were checked for mathematical accuracy and tabulated. CONTRACTOR TOTAL QUOTE Northway Irrigation $76,500.85 Mickman Brothers $92,968.25 The low quote was submitted by Northway Irrigation of Circle Pines, Minnesota, in the amount of $76,500.85. The completion date for this project is August 1st, 2020. On February 27, 2019, RCWD award the City a Grant where they will contribute 50% of the project costs up to a maximum of $41,000. The City share of costs is to be funded through the City water utility. RECOMMENDATION Staff recommends adoption of Resolution No. 19-183 accepting quotes and awarding a construction contract for the Irrigation Controller Upgrades Project, in the amount of $76.500.85 to Northway Irrigation. ATTACHMENTS 1. Resolution No. 19-183 2. Location Map Irrigation Controller Upgrade Locations Irrigation Controller Upgrade Locations 0 F City of Lino Lakes, MN LN1 DES mop 0 5,000 Feet 1 inch = 5,000 feet � wsb