HomeMy WebLinkAbout2020-012 Council ResolutionCITY OF LINO LAKES RESOLUTION NO. 20-12 RESOLUTION APPROVING CHANGE ORDER NO. 2 AND ACCEPTING THE EXTENSION OF THE ENGINEERNG CONSTRUCTION SERVICES CONTRACT WEST SHADOW LAKE AREA IMPROVEMENT PROJECT WHEREAS, pursuant to resolution 18-127 of the Council adopted on October 8, 2018, awarding the contract for the West Shadow Lake Area Improvement Project to Geislinger & Sons: and WHEREAS, pursuant to resolution 19-27 of the Council adopted on March 11. 2019, approving Change Order No. 1 in the amount of $41,849.00 for the extension of concrete curbing; and WHEREAS, a complete summary of costs and schedule are detailed in Change Order No. 2; and WHEREAS, WSB and Associates has submitted a construction services contract extension in the amount of $65.700.00. NOW, THEREFORE, BE IT RESOLVED by the City Council of Lino Lakes, Minnesota approves Change Order No. 2 in a reduced amount of $139,983.00, and the extension of the engineering construction services contract. BE IT FURTHER RESOLVED Adopted by the Council of the City of Lino Lakes this loth day of February, 2020. The motion for the adoption of the foregoing resolution was introduced by Council Member Lyden and was duly seconded by Council Member Stoesz and upon vote being taken thereon, the following voted in favor thereof: Stoesz, Ruhland, Lyden, Rafferty, The following voted against same: none Rob Rae 61V ayor ATTEST: Julianne Bartell, City Cle crtti4N-'j CITY COUNCIL AGENDA ITEM 6B STAFF ORIGINATOR: Diane Hankee PE, City Engineer MEETING DATE: February 10, 2020 TOPIC: Consider Resolution No. 20-12, Approving Change Order No. 2 and Accepting the Extension of the Engineering Construction Services Contract. West Shadow Lake Area Improvement Project VOTE REQUIRED: 3/5 INTRODUCTION For the West Shadow Lake Area Improvement Project, staff is requesting council consideration of Change Order No. 2 reducing the contract amount and acceptance of the extension of the engineering construction services contract. BACKGROUND On October 8, 2018, the City Council awarded the bid for the West Shadow Lake Area Improvement Project to Geislinger and Sons, Inc. in the amount of $4.940,636.57. Construction has been ongoing since October of 2018. On March 11, 2019 the City Council approved Change Order No. 1 in the amount of $41,849.00 for the extension of concrete curbing. The 2019 construction season set a record for the number of rainfall events, a total of 39 days. This led to difficult and delayed construction season for the West Shadow Lake Area Improvement Project which required additional maintenance of erosion control measures, pumping of standing water, maintaining the roadway, providing temporary and passable access to residents, and time needed to dry out the site. The contractor met substantial completion 2.5 months late but did not meet the final completion date of November 1. 2019. Construction of the project is almost complete with the final lift of bituminous and boulevard restoration remaining. Due to the inclement weather and additional time spent to maintain the site, the contractor has requested a final completion date extension to June 26, 2020. Changing the final completion date would be approved by Council through Change Order No. 2. During the initial construction of the roadbed. and with further exploratory excavations, the project engineers noted that the soils in the north portion of the project met the road subgrade requirements and the typical section was modified from 24 inches of sand to 18 inches. In addition, there was less common excavation required to construct the boulevards. This resulted in the ability to reduce excavation and sand quantities. This reduction has been included in the enclosed Change Order No. 2. The West Shadow Lake Area Improvement Project contract with Geislinger and Sons. Inc. and Change Order No. 2 would reduce the contract amount by $139,983.00. Original Contract Amount Change Order No. 1 Change Order No. 2 Revised Contract $ 4,940,636.57 $ 41,849.00 - $ 139.983.00 $ 4,842,502.57 As part of the project completion date extension, the construction services will be subsequently extended. WSB and Associates has provided a not to exceed fee of $65,700, which includes the time the contractor exceeded the substantial and final completion dates in 2019. and the time to complete the project by June 26, 2020. The overall project costs including these changes is projected to be $6,332,000.00 which is approximately $525,000 under budget. RECOMMENDATION Staff is recommending approval of Resolution No. 20-12 for Change Order No. 2 and accepting the extension of the engineering construction services contract, for the West Shadow Lake Area Improvement Project. ATTACHMENTS 1. Resolution 2. Change Order No. 2 CHANGE ORDER NO.2 /-"S WEST SHADOW LAKE DRIVE STREET AND UTILITY IMPROVEMENTS CITY OF LINO LAKES, MN WSB PROJECT NO. R-013170-000 12/20/2019 OWNER: CONTRACTOR: CITY OF LINO LAKES 600 TOWN CENTER PARKWAY LINO LAKES, MN 55014 GEISLINGER & SONS, INC. 511 CENTRAL AVENUE SOUTH, PO BOX 437 WATKINS, MN 55389 YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENT DESCRIPTION: EXTEND THE FINAL COMPLETION DATE TO JUNE 26, 2020 DUE TO THE EXCESSIVLEY WET WEATHER DURING THE 2019 CONSTRUCTION SEASON. TOTAL CONTRACT AMOUNT REDUCED DUE TO A CHANGE IN THE DESIGN TO REDUCE EXCAVATION AND SELECT GRANULAR QUANTITIES. IT IS UNDERSTOOD THAT THIS CHANGE ORDER INCLUDES ALL ADDITIONAL COSTS AND TIME EXTENSIONS WHICH ARE IN ANY WAY, SHAPE, OR FORM ASSOCIATED WITH THE WORK ELEMENTS DESCRIBED ABOVE. CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIME ORIGINAL CONTRACT PRICE: PREVIOUS CHANGE ORDERS: CO #1 CONTRACT PRICE PRIOR TO THIS CHANGE ORDER: NET DECREASE OF THIS CHANGE ORDER: CONTRACT PRICE WITH ALL APPROVED CHANGE ORDERS: $4,940,636.57 $41,849.00 $4,982,485.57 -$139,983.00 $4,842,502,57 ORIGINAL CONTRACT TIME: NET CHANGE FROM PREVIOUS CHANGE ORDERS: CONTRACT TIME PRIOR TO THIS CHANGE ORDER: NET INCREASE OF CHANGE ORDER: CONTRACT TIME WITH APPROVED CHANGE ORDERS. 11/1/2019 NONE 11/1/2019 8 MONTHS 6/26/2020 RECOM ^: •1a. BY: J STREM , PE, PROJECT MANAGER WSB & ASSOCIATES, INC. ENGINEER APPROVED BY: Air CONTRACTOR SIGNATURE GEISLINGER & SONS, INC. CONTRACTOR APPROVED BY: CITY ENGINEER DATE CITY ADMINISTRATOR DATA K:1010326-0001AdminlCansNucdon AdmIn1WSL Concfuclion AdminMChange Orders1Changs Order No. 21 Page 1 di 010326-000 CO2 121729-Finai3CO2 CHANGE ORDER NO. 2 DETAIL WEST SHADOW LAKE DRIVE STREET AND UTILITY IMPROVEMENTS /• CITY OF LINO LAKES, MN WSB PROJECT NO. R-013170-000 12/20/2019 ADDED ITEMS Item No. Mat. No. Description 15 2105.501 COMMON EXCAVATION (EV) (P) 17 2105.507 SUBGRADE EXCAVATION (EV) 18 2105.522 SELECT GRANULAR BORROW (CV) Qty Unit Price Extended Amount -3876.00 CY $ 13.00 $ (50,388.00) -2715.00 CY $ 13.00 $ (35,295.00) -2715.00 CY $ 20.00 $ (54,300.00) TOTAL ADDED ITEMS CHANGE ORDER NO. 2 TOTAL ADJUSTMENT TO ORIGINAL CONTRACT AMOUNT -$139,983.00 -$139,983.00 K:1010326-0001Admin1Construction AdmFnIWSL Construction Admin%Change OrderslChange Order No. 21 Page 1 of 1 010326-000 CO2 121719 - Final3C0 2 Detail