HomeMy WebLinkAbout05/27/2020 EB Packet
CITY OF LINO LAKES
ENVIRONMENTAL BOARD
MEETING
Wednesday, May 27, 2020
6:30 p.m.
Meeting to be held electronically
Pursuant to MN Statute 13D.021
AGENDA
1. CALL TO ORDER AND ROLL CALL
2. PLEDGE OF ALLEGIANCE
3. APPROVAL OF AGENDA
4. APPROVAL OF MINUTES: April 29, 2020
5. OPEN MIKE
6. ACTION ITEMS
A. Laborer’s Training Center Campus Expansion Conditional Use Permit
7. UPDATES
8. ADJOURN
How to Join the Meeting
Phone: Dial 1-312-626-6799
Meeting ID: 836 0146 0168
Weblink:
https://us02web.zoom.us/j/83601460168
DRAFT MINUTES
CITY OF LINO LAKES
ENVIRONMENTAL BOARD MINUTES
The Environmental Board meeting was held electronically on the Zoom platform as
allowed by Minnesota Statue 13D.021.
I. CALL TO ORDER AND ROLL CALL:
Mr. Sullivan called the Lino Lakes Environmental Board meeting to order at 6:30 p.m. on
April 29, 2020
II. PLEDGE OF ALLEGIANCE
III. APPROVAL OF AGENDA
Ms. Andrzejewski made a MOTION to approve the agenda as presented. Motion was
supported by Ms. Holmes. Motion carried 4 - 0
IV. APPROVAL OF MINUTES:
February 26, 2020
Ms. Holmes made a MOTION to approve the February 26, 2020 Meeting Minutes.
Motion was supported by Ms. Andrzejewski. Motion carried 4 - 0.
V. OPEN MIKE
Mr. Sullivan declared Open Mike at 6:33 p.m.
Open Mike closed at 6:34 p.m.
DATE : April 29, 2020
TIME STARTED : 6:30 P.M.
TIME ENDED : 7:26 P.M.
MEMBERS PRESENT : John Sullivan (chair), Paula Andrzejewski, Eric
Flower, Shawn Holmes,
MEMBERS ABSENT : Wendy Nelson, Alex Schwartz
STAFF PRESENT : Andy Nelson, Michael Grochala,
Enivonmental Board Minutes
April 29, 2020
Page 2
DRAFT MINUTES
VI. ACTION ITEMS –
A. I-35E Alternative Urban Areawide Review (AUAR) 5 Year Update
Mr. Grochala, Community Development Director, presented the AUAR report and Andi
Moffat of WSB and Associates was available for comments
The City of Lino Lakes adopted the I-35E Corridor AUAR in conformance with
Minnesota Rules 4410 in 2005. The City has subsequently updated the AUAR every five
years. The AUAR study area is approximately 4,500 acres and is located in the
northeastern portion of the City.
The original I-35E AUAR was a very comprehensive document covering the City’s 35E
corridor from Birch Street to our northern city limits. The most significant developments
over the past five years are the 372 acre Watermark residential development and the
402,000 square foot Distribution Alternatives fulfillment center on 21st Avenue. Each of
these projects were subject to the mitigation requirements of the AUAR including but not
limited to transportation and water management improvements.
As long as a development project is consistent with the assumptions of the analyses in the
AUAR, no additional environmental review is required. A key component of the AUAR
is the mitigation plan that addresses cumulative impacts of development as the corridor
develops. In order to remain valid, the AUAR must be revised under certain criteria.
Development in the study area will require infrastructure improvements. The analysis for
the storm water, water, wastewater, and traffic have been updated as part of this AUAR
Update.
So far the infrastructure improvements include 35E interchange, extending 21st Ave and
20th /73rd turn
Board Comments
Mr. Sullivan asked if there was any discussion of light pollution especially in the
industrial area.
Ms. Moffat stated in the state environmental review process guidance is provided but
light pollution is not required in this type of study.
Mr. Grochala mentioned that this has always been a high propriety issue. We do include
down cast lighting in our development plans.
Mr. Sullivan stated in the in the initial 2005 AUAR study it states that conservation
testing methods were used. Why it is stated that conservation methods were used.
Enivonmental Board Minutes
April 29, 2020
Page 3
DRAFT MINUTES
Ms. Moffat replied that in the area of wastewater section we will be using less because
the actual data is calculated to more realistic predication instead of general guidance from
Met Council.
Mr. Flower mentioned that looking at this report in the air section there is some reference
to vehicle emissions and mentions updated traffic study. Why isn’t stationary source and
vehicle emissions stated as not applicable to an AUAR.
Ms. Moffat replied that guidance from the state an AUAR cannot be use if you have
heavy industrial use area. This is not heavy industrial so there were certain studies that
were not needed to be done. The headings that are in this report come right from the form
that the state provides to the city.
Mr. Sullivan is impressed by the document and the 70% reduction is run off with the
improvements in the area.
Ms. Andrzejewski made a MOTION to recommend the approval of the 2020 AUAR
update – Motion was supported by Mr. Sullivan. Motion carried 4-0.
This approved report will go before City Council and act on it and then submitted back to
the agencies to let them know that it has been adopted.
VII. DISCUSSION ITEMS
A. Status of Annual Recycling Day
Mr. Nelson announced that the Annual Recycling Day which was to be held on May 16,
has been canceled. Hopefully in June, the monthly recycling day will begin again and
maybe a Fall Annual recycling day will be held. It is still uncertained at this time.
For appliances, All Disposal, of East Bethel will take your item and if you mentioned you
are a Lino Lakes resident – he will honors the prices on city literature.
B. Boulevard Tree Plans
Mr. Nelson 80 trees have been planted and with 30 more to be planted.
VIII. ADJOURNMENT
Ms. Holmes made a MOTION to adjourn the meeting at 7:26 p.m. Ms. Andrzejewski
supported the motion. Motion carried 4 - 0.
Respectfully submitted,
Mary Fogarty
1
ENVIRONMENTAL BOARD
AGENDA ITEM 6A
STAFF ORIGINATOR: Andy Nelson, Environmental Coordinator
MEETING DATE: May 27th, 2020
REQUEST: Conditional Use Permit for Laborer’s Training
Center Campus Expansion (2350 Main Street)
APPLICANT: Laborer’s Training Center
Attn: Dean Mills
2350 Main Street
Lino Lakes, MN 55038
OWNER: Same
PROPOSED ADDITION
BACKGROUND
Laborer’s Training Center (LTC) is located at 2350 Main Street. The applicant is
proposing to construct a 37,284 sf training facility to the east of the existing facility.
The Land Use Application is for the following:
• Conditional Use Permit
o Two (2) or more buildings on the same lot
• Site and Building Plan Review
This staff report is based on a review of the following documents:
• Laborer’s Training Center Campus Expansion Plan Set, prepared by Barr
Engineering Co. dated 5/11/20
• Stormwater Management Plan prepared by Barr Engineering Co. dated May 2020
• Geotechnical Exploration Report prepared by Haugo Geotechnical Services dated
February 2020
• Wetland Delineation Report prepared by Barr Engineering Co. dated August 2019
2
ANALYSIS
Background
Per the applicant’s narrative, Laborer’s Training Center offers construction industry
vocational training. They have been at this location since 1993 and have outgrown their
current working/training bays, classrooms, and storage space.
The proposed project will include a new building with working/training bays, classrooms,
offices, and an auditorium. The expansion will also include additional parking, an access
road, utilities, and stormwater ponds.
General Site Characteristics
The existing site is approximately 18 acres. The current training facility is approximately
40,000 square feet with an outdoor training facility to the east and a parking lot with 163
spaces to the west. The southern half of the site is generally composed of wetlands and
wooded open space that will not be impacted by the site expansion.
The proposed addition will include a building covering 37,284 square feet and an
additional 167 parking spots.
Soils
Per the Geotechnical Exploration Report, four soil borings encountered 0.5-1.0 foot of
topsoil comprised of sandy lean clay. Beneath the topsoil was sandy lean clay glacial till
that extended to the termination of the borings at 14.5 feet.
Infiltration was not deemed possible for this site due to the low permeability of the soils
and the high water table indicated by the surface elevation of the wetlands.
Stormwater Management, Erosion and Sediment Control
Stormwater management plan has been submitted and is being reviewed by the City
Engineer.
The following general review is adapted from the May, 2020 Stormwater Management
Plan prepared by Barr Engineering Co.
All impervious surfaces for the site will be routed through two proposed stormwater
ponds, which will be constructed south of the existing and proposed buildings and north
of existing wetlands. The outlet structure for both ponds will connect to existing 12”
storm sewer pipes, which outlet into wetlands to the south.
Ultimately, water discharges through wetlands to the south, then to Clearwater Creek,
and finally to Peltier Lake.
3
Stormwater Pollution Prevention Plan (SWPPP)
SWPPP has been submitted and will be reviewed with final construction plans.
This site will drain to impaired waters, Clearwater Creek and Peltier Lake, so
stabilization of exposed soil areas must occur within 7 days after the construction activity
in that area permanently ceases.
Redundant perimeter controls will be required near wetlands on the site wherever a 50
foot natural buffer cannot be maintained. This is noted in the SWPPP.
Flood Plain
Site does not fall within the flood management zone.
Wetlands
Per the wetland delineation report prepared by Barr Engineering Co., three wetlands were
delineated within the site totaling 7.52 acres that are protected by the Wetland
Conservation Act. This prohibits draining, filling, and excavating in wetlands unless the
activity is exempt or the wetland impacts are mitigated. The overall goal of the WCA is
no net loss of wetlands. No impact to these 7.52 acres of wetlands is proposed.
Other areas evaluated on the site include three stormwater ponds and a created ditch
totaling 0.9 acres. These excavated ponds, impoundments, and drainage ditches do have
wetland characteristics, but they were created for the purpose of water retention or
detention and drainage. These areas were created in upland, and would not be regulated
by WCA. This is going to be reviewed by Rice Creek Watershed District.
The wetlands are within the Wetland Management Corridor and conservation easement
and wetland buffers are required. The applicant proposes a 25 foot buffer. This will be
reviewed by RCWD.
As part of the 1999 building expansion project, a Declaration of Restrictions and
Covenants (DORC) was recorded over the wetlands. This is being modified as part of the
Rice Creek Watershed District wetland permit review. The DORC will be modified to
reflect the current delineations.
A separate public drainage and utility easement covering the delineated wetland,
conservation easement and WMC buffer shall be drafted and recorded against the
property.
4
Alternative Urban Areawide Review (AUAR) Considerations
The site is within the 2005 I-35E Corridor AUAR environmental review boundary. The
AUAR was updated in May 2020. The AUAR identified this site as industrial in all 3
land use scenarios. The LTC campus expansion project is consistent with industrial
development. No further environmental assessment is required.
Drinking Water Protection
The site is within the Drinking Water Supply Management Area (DWSMA) and is
moderately vulnerable with a highly vulnerable section in the south. No stormwater
infiltration is proposed on the site and the site is connected to City water and sewer.
Landscape Plan
Tree Preservation and Mitigation Standards
The purpose of these standards is to protect valuable trees and stands of vegetation while
not interfering with landowners’ reasonable use and development of property. The goal
is to minimize unnecessary loss of habitat, biodiversity, and forest resources and to
replace removed trees in areas where tree cover is most critical.
There are 124 trees slated for removal. 112 new trees are proposed. Clarification will
have to be provided on numbers of trees in basic use areas, which will not require
mitigation, and trees that will have to be mitigated for.
See staff recommendations.
Open Areas Landscape Standards
The purpose of these standards is to provide general site beautification and high aesthetic
quality with a mix of plant materials in open areas.
Open area landscape standards call for 1 large tree and 3 large shrubs per 2000 sq.ft.
The following substitutions are allowable:
1 large tree = 1.5 medium or 2 small trees
1 large shrub = 1.5 medium or 3 small shrubs
70,293 sq. ft. of open space calls for 36 large trees and 106 large shrubs.
102 large trees, 11 medium trees, 61 large shrubs, and 68 medium shrubs have been
provided. Open areas landscape standards have been met.
Buffer and Screen Standards
The purpose of this requirement is to separate and buffer different land use types, screen
roads and parking, and screen utility and loading areas.
5
Continuous, year-round planting screens require at the minimum a double row of plants
with triangulated spacing. Buffer and screen standards are not currently met, as the
double row of triangulated plants is not continuous.
See staff recommendations.
Canopy Cover
Canopy cover standards call for a minimum of 40% canopy coverage. Canopy coverage
values are calculated per tree based on the anticipated size 15 years after planting, and the
distance to hardscape edge from the planting location.
33,322 sq. ft. required 38,650 sq. ft. provided
Canopy cover requirements have been met.
Foundation Landscaping
The purpose of these standards is to soften and enhance building architecture, define
access points, add color and seasonal interest, and to blend buildings in with the natural
environment.
2 large trees and 6 large shrubs are required per 100 linear feet of building. These plants
should be within 30 feet of the building.
The following substitutions are allowable:
1 large tree = 1.5 medium or 2 small trees
1 large shrub = 1.5 medium or 3 small shrubs
For 440 linear feet of foundation, 9 large trees and 27 large shrubs are required for the
north and east building faces.
9 large trees, 3 large shrubs, and 50 medium shrubs have been provided.
The Foundation Landscape requirements have been met.
Sod and Ground Cover Standards
All areas not otherwise improved in accordance with the approved site plans shall have a
minimum depth of 4 inches of topsoil and be sodded including boulevard areas. Seed
may be provided in lieu of sod in certain cases, including when the area is adjacent to
natural areas or wetlands.
The applicant is proposing to provide 6 inches of topsoil and MnDOT seed mix 25-131 in
place of sod over 53,973 sq. ft. This mix is low maintenance turf grass which is salt,
shade, and drought tolerant and requires less frequent mowing and less fertilization than
conventional turf grass.
See staff recommendations.
6
Areas around stormwater ponds totaling 16,320 sq. ft. will be seeded with MnDOT 33-
261, Stormwater South and West, which is a native mix of grasses, forbs, sedges, and
rushes for stormwater pond edges.
Lighting
The purpose of the lighting requirements in the Zoning Code is to reduce light pollution,
promote energy conservation, and increase night time safety, utility, security, and
productivity. Lighting is reviewed by the City Planner, but some highlights of the
lighting requirements follow.
• Maximum height of the fixture and pole must not exceed 30 feet.
• The luminaire shall contain a cutoff which directs and cuts off the light at an
angle of 90 degrees or less.
• Light cast on a public street shall not exceed one foot candle as measured from
the right of way. Light cast on adjacent residential property must not exceed 0.4
foot candles as measured from the property line.
• Lights serving industrial businesses shall be turned off one hour after closing,
except for approved security lighting.
• Any illuminated signs for advertising purposes shall be turned off between
12:00AM and sunrise except that said signs may be illuminated while the business
facility on the premise is open for service.
Recycling
Applicant is planning to construct an enclosure for trash and recycling. This enclosure
will be reviewed by the City Planner.
RECOMMENDATIONS
Staff recommends approval of the conditional use permit and site plan review for
Laborer’s Training Center Campus Expansion subject to the following comments:
1. Trees in the proposed west pond will have to be surveyed and accounted for in the
Tree Preservation and Mitigation Standards. Surface water detention ponds are
not considered part of the basic use area, and thus are not exempt from surveys or
mitigation standards. Clarification is needed on numbers of trees not in basic use
area that are to be removed and thus potentially requiring mitigation.
2. Buffer and screen standards can be met on the eastern perimeter by planting a
triangulated double row of coniferous trees that curves west to meet with the
northeast edge of the east pond. It is recommended that two or three species
suitable for the site conditions are alternated to make this screen more resistant to
pests and pathogens than it would be if it were comprised of a single species.
7
3. Tree protection zones should extend 5ft. farther from the trunk than the dripline.
Tree protection fence should be installed prior to any construction activities
taking place on the site.
4. Install tree protection fence at the construction limits east of the East Pond to limit
tree removals in that area.
5. Foundation plantings should be irrigated.
6. Allow substitution of MnDot 25-131 and 6 inches of topsoil for 4 inches of
topsoil with sod.
7. Wetland buffers need to be a minimum of 25 feet wide and an average of 50 feet
wide.
ATTACHMENTS
1. Site Location Map
2. Site Overview with Aerial Image
3. Existing Drainage Plan
4. Proposed Drainage Plan
5. Site Restoration Key Plan
6. Site Restoration Plan East
Laborer's Training Center
May 22, 2020
Map P owered By DataLink
1 in = 1,505 ft
±
SSSSSS
WTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWT
WT
WT
WT
WT
WT
WT
WTWTWTWTWTWTWTWTWTWT
WTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWT WT WT WT
WT
WT
WT
WT WT
WT
WT
WTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWT
WT
WT
WTWTWTWTWTWTWTWTWTWTWT WT
WTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWT
WT WT WT WT WT WT WT WT WT WT WT WT WT WT WT WT WT WT WT WT WT
WT WT WT WT WT WT
WTWTW W W W W W W W W W W W W W WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW W W W W W W W
W
W
W
W
W
W
W
W
W
W
SANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSAN SAN
SAN
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GASGASGASGASGASGASGASGASGASGAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
UEUEUEUEUEUEUEUEUECATVCATVUEUEUEUEUEUEUEUEUECATVCATVCATVCATVCATVCATVSSSSSSSSSSSSSSSS
SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS
SSSSSS
SS
SS
SS
SS
SS
SS SS
SSSSSS
SS
SS
S
S SS
OE OE OE OE OE OE OE OE OE OE OE OE OEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEWT
WT WT WT WT
WTWTWTWTWTWTWTWTWTWTWTWTWTWTWT
WT WT WT WT WT
W
T
W
T
WTWTWTWTWT
WT WTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWT
WT
WT
WT
WT
WT
WT WTWTWTWTWTWT WT WT WT
W
T
W
T
WT WT WT WTWTWTWTWTWT
>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>
>>>>>>>>>>>>SANSANSANSANSANW W W W W W WWWWWWWWWWWWWWWWWWWWW W W W W W WWWWWWWWWWWWWWWWWWWWSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSAN>>>>>>>>
>>>>>>>>>>>>>>>>>>>>>>>>>>>>9
1
0
9
1
0920920920920920920912912912912
91
2
91
2914914914914
914914916916916916916916
916916916916918918918918918918918918918918 910910920920 920920
9209209209209209209089089129129149149149149149149169169
16
9
16 916916918918918918918918922922 922922
9229229229229249249249249109109109109209209209209
2
0
9
2
0
918918
92
0
92
0 918918920920
918918
916916
916916916916
91091091091091
8
91
8
1
-
PLAN: SITE OVERVIEW NREVISION DESCRIPTIONDATEAPP.BYNO. CHK.
TO/FOR
RELEASED
DATE RELEASED Approved
Designed
Drawn
Checked
Date
Scale
DWG. No.
BARR PROJECT No.
CLIENT PROJECT No.
REV. No.Minneapolis, Minnesota
Ph: 1-800-632-2277
Corporate Headquarters:
DATE LICENSE #
SIGNATURE
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR
REPORT WAS PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER THE LAWS OF THE
STATE OF MINNESOTA.
BARR ENGINEERING CO.
Project Office:
PRINTED NAME
AS SHOWN
05/11/2020
PEB
MAK
BARR
MAK
LABORERS TRAINING CENTER
LINO LAKES, MN
LTC CAMPUS EXPANSION
LINO LAKES, MN
SITE OVERVIEW
WITH AERIAL IMAGE
23/02-1079.00
-
G-08 A
05/11/2020 42012
ISSUED FOR PERMITTINGNOT FOR CONSTRUCTION
MICHELLE KIMBLE
CADD USER: PATRICK E. BROCKAMP FILE: M:\DESIGN\23021079.00\23021079_G-08.DWG PLOT SCALE: 1:2 PLOT DATE: 5/14/2020 8:13 AMCLIENT
BID
CONSTRUCTION
PERMITTING
-------
-------
-------
05/11/20------
-------
A B C 0 1 2 3
Suite 200
4300 MARKETPOINTE DRIVE
Fax: (952) 832-2601
www.barr.com
Ph: 1-800-632-2277
MINNEAPOLIS, MN 55435
WEST PONDEAST PONDEXISTING BUILDING
PROPOSED BUILDING
F.F.E. = 920'-0"COUNTY HWY 14 (MAIN ST.)F.F.E. = 919'-0"
PROPOSED BUILDING
F.F.E. = 920'-0"
VICTOR PATH
SCALE IN FEET
100500
25'
W
E
T
L
A
N
D
OF
F
S
E
T
CONSTRUCTION LIMITS
PROPERTY LINE32.7'75'75'PROPERTY LINE
WTWTWTWT
WTWTWTWTWTWTWTWT WTWTWTWTWT
WT
WT
WT
WT
WT
WTWTWTWTWTWTWTWT
WT
WTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWT
WT
WT
WT WT WT
WT
WT
WT
WT
WT
WT
WTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWT
W
T
WT
WTWTWTWTWTWTWTWTWT
WTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWT WT WT WT WT WT WT WT WT WT WT WT WT WT WT WT WT WT WT WT
WT
WT WT WT
WTOE OE OE OE OE OE OE OE OE OE OEOEOEOEOEOEOEOEOEOEOEOEWT
WT WT WT WT
WTWTWTWTWTWTWTWTWTWTWTWT
WT
WT
WT
WT
WTWTWTWTWT WTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWT
WT
WT
WT
WT WTWTWTWT
WT
WT WT
WT
WT
WT WT
WT
WT
A
A
C
B
D
G
N
P
9209209189189229229209209209209169169169169169169169169189189189189
1
8
9
1
8
918918922922924924926926928928910910910910912912912912912912914914908908908908910910
906906908908910910910910 90290290
2
90
2
904904906906908908904904
906906
908908
910910
906906
908908
910910
906906
908908
910910908908912912914914916916
9
1
2
9
1
2
914914914914
916916920920920920914914
914914
916916
916916
916916
918918920920
914914
916916
918918
922922
924924
914914916916918918916916 918918
91
4
91
4 916916918918912912912912
912912
914914
914914
914914
914914
916916
916916
916916
916916
922922922922920920
920920918918
918918
920920918918922922924924
EXISTING
STORMWATER
POND G
EXISTING
STORMWATER
POND D
EXISTING
WETLAND N
EXISTING
STORMWATER
POND P
EXISTING
WETLAND B
SITE
DISCHARGES
TO SOUTH
1
-
PLAN: EXISTING DRAINAGE PLAN NSCALE IN FEET
120600
REVISION DESCRIPTIONDATEAPP.BYNO.CHK.TO/FOR
RELEASED
DATE RELEASED Approved
Designed
Drawn
Checked
Date
Scale
DWG. No.
BARR PROJECT No.
CLIENT PROJECT No.
REV. No.Minneapolis, Minnesota
Ph: 1-800-632-2277
Corporate Headquarters:
DATE LICENSE #
SIGNATURE
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR
REPORT WAS PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER THE LAWS OF THE
STATE OF MINNESOTA.
BARR ENGINEERING CO.
Project Office:
PRINTED NAME
AS SHOWN
05/11/2020
EPF
MAK
BARR
MAK
LABORERS TRAINING CENTER
LINO LAKES, MN
LTC CAMPUS EXPANSION
LINO LAKES, MN
EXISTING DRAINAGE PLAN
23/02-1079.00
-
FIGURE 1 A05/11/2020 42012
ISSUED FOR PERMITTING
MICHELLE KIMBLE
CADD USER: MICHELLE KIMBLE FILE: M:\DESIGN\23021079.00\23021079_BASE_WATERSHEDS.DWG PLOT SCALE: 1:2 PLOT DATE: 5/8/2020 7:57 PMCLIENT
BID
CONSTRUCTION
PERMITTING
-------
-------
-------
05/11/20------
-------
A B C 0 1 2 3
Suite 200
4300 MARKETPOINTE DRIVE
Fax: (952) 832-2601
www.barr.com
Ph: 1-800-632-2277
MINNEAPOLIS, MN 55435
PROPOSED
WATERSHED
DIVIDES
FLOW
DIRECTION
ARROWS
PROPERTY
LINE
WTWTWTWT
WTWTWTWTWTWTWTWT WTWTWTWTWT
WT
WT
WT
WT
WT
WTWTWTWTWTWTWTWT
WT
WTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWT
WT
WT
WT WT WT
WT
WT
WT
WT
WT
WT
WTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWT
W
T
WT
WTWTWTWTWTWTWTWTWT
WTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWT WT WT WT WT WT WT WT WT WT WT WT WT WT WT WT WT WT WT WT
WT
WT WT WT
WTOE OE OE OE OE OE OE OE OE OE OEOEOEOEOEOEOEOEOEOEOEOEWT
WT WT WT WT
WTWTWTWTWTWTWTWTWTWTWTWT
WT
WT
WT
WT
WTWTWTWTWT WTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWT
WT
WT
WT
WT WTWTWTWT
WT
WT WT
WT
WT
WT WT
WT
WT
>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>
>>>>>>>>>>>>>>
>>>>>>>>>>>>>>>>>>>>>>>>A
A
C
B
D
O
G
N
P
M
I J
H
EXISTING
WETLAND B STORMWATERPOND P(EAST POND)STORMWATER
POND G
(WEST POND)
EXISTING
WETLAND N
9209209189189229229209209209209169169169169169169169169189189189189
1
8
9
1
8
918918922922924924926926928928910910910910912912912912912912914914908908908908910910
906906908908910910910910 90290290
2
90
2
904904906906908908904904
906906
908908
910910
906906
908908
910910
906906
908908
910910908908912912914914916916
9
1
2
9
1
2
914914914914
916916920920920920914914
914914
916916
916916
916916
918918920920
914914
916916
918918
922922
924924
914914916916918918916916 918918
91
4
91
4 916916918918912912912912
912912
914914
914914
914914
914914
916916
916916
916916
916916
922922922922920920
920920918918
918918
920920918918922922924924
F
SITE DISCHARGES TO SOUTH
1
-
PLAN: PROPOSED DRAINAGE PLAN NSCALE IN FEET
120600
REVISION DESCRIPTIONDATEAPP.BYNO.CHK.TO/FOR
RELEASED
DATE RELEASED Approved
Designed
Drawn
Checked
Date
Scale
DWG. No.
BARR PROJECT No.
CLIENT PROJECT No.
REV. No.Minneapolis, Minnesota
Ph: 1-800-632-2277
Corporate Headquarters:
DATE LICENSE #
SIGNATURE
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR
REPORT WAS PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER THE LAWS OF THE
STATE OF MINNESOTA.
BARR ENGINEERING CO.
Project Office:
PRINTED NAME
AS SHOWN
05/11/2020
EPF
MAK
BARR
MAK
LABORERS TRAINING CENTER
LINO LAKES, MN
LTC CAMPUS EXPANSION
LINO LAKES, MN
PROPOSED DRAINAGE PLAN
23/02-1079.00
-
FIGURE 2 A05/11/2020 42012
ISSUED FOR PERMITTING
MICHELLE KIMBLE
CADD USER: MICHELLE KIMBLE FILE: M:\DESIGN\23021079.00\23021079_BASE_WATERSHEDS.DWG PLOT SCALE: 1:2 PLOT DATE: 5/8/2020 8:02 PMCLIENT
BID
CONSTRUCTION
PERMITTING
-------
-------
-------
05/11/20------
-------
A B C 0 1 2 3
Suite 200
4300 MARKETPOINTE DRIVE
Fax: (952) 832-2601
www.barr.com
Ph: 1-800-632-2277
MINNEAPOLIS, MN 55435
PROPOSED
WATERSHED
DIVIDES
FLOW
DIRECTION
ARROWS
PROPERTY
LINE
910(910)910(910)9
1
5
(9
1
5
)915(915)915(915)915(915)915(915
)907(907)907
(907
)908(908)9
0
8
(9
0
8
)909(909)90
9
(9
0
9
)911(911)911
(91
1
)911(911)912(912)9
1
2
(
9
1
2
)912(912)913(913)913(913)913(913)9
1
3
(9
1
3
)913(913)914(914)914(914)914(914)9
1
4
(9
1
4
)914(914)9
1
6
(9
1
6
)
916(916)916(916)916(916)916(916)917(917)9
1
7
(
9
1
7
)915(915)915(915)915(915)920(920)
92
0
(9
2
0
)911(911)912(912)913(913)914(914)916(916)916(916)916(916)917(917)917(917)917(917)917(917)917(917)918(918)918(918)918(918)918(918)918(918)919(919)919(919)919(919)XXXX X XCATVCATVCATVCATVCATV9" MAPLE7" MAPLE++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++WTWTWTWTWTWTWTWTWTWTWTWTWT
WT
WT WT WT
WT
WT
WT
WT
WTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWT WT WT WT WT WT WT WT WT WT WT WT WT WT
WT WT
WT
WT
WTWT
WTWTWTWTWT
WT
WT
WT
WTWT
WTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWT
WT
WT WTWTWT
WT
WT
WT WT
WT++++915(915)915(915)915(915)911(911)912(912)913(913)914(914)916(916)916(916)916(916)917(917)917(917
)917(917)918(918)915(915)920(920)916(916)917(917)918(918)919(919)910910
915915
908908
909909
911911
912912
913913
914914
919919
919919
919919
920920 917917916916
917917
917917
918918918918 919919
915915 912912913913914914916916917917
91
8
91
8
919919 91691691791791
8
91
8
919919
922922920920921921910910
915915909909
911911912912913913914914
916916
917917REVISION DESCRIPTIONDATEAPP.BYNO.CHK.TO/FOR
RELEASED
DATE RELEASED Approved
Designed
Drawn
Checked
Date
Scale
DWG. No.
BARR PROJECT No.
CLIENT PROJECT No.
REV. No.Minneapolis, Minnesota
Ph: 1-800-632-2277
Corporate Headquarters:
DATE LICENSE #
SIGNATURE
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR
REPORT WAS PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER THE LAWS OF THE
STATE OF MINNESOTA.
BARR ENGINEERING CO.
Project Office:
PRINTED NAME
AS SHOWN
05/11/2020
AMW
MAK
BARR
MAK
LABORERS TRAINING CENTER
LINO LAKES, MN
LTC CAMPUS EXPANSION
LINO LAKES, MN
SITE RESTORATION
KEY PLAN
23/02-1079.00
-
R-01 A05/11/2020 52234
ISSUED FOR PERMITTING
NOT FOR CONSTRUCTION
ANDREA M. WEDUL
CADD USER: Andrea M. Wedul FILE: C:\USERS\AMW\DESKTOP\TEMP\23021079\23021079_R-01.DWG PLOT SCALE: 1:2 PLOT DATE: 5/10/2020 9:02 PMBAR M:\AutoCAD 2011\AutoCAD 2011 Support\enu\Template\Barr_2011_Template.dwt Plot at 1 10/05/2010 14:03:50..CLIENT
BID
CONSTRUCTION
PERMITTING
-------
-------
-------
05/11/20------
-------
A B C 0 1 2 3
Suite 200
4300 MARKETPOINTE DRIVE
Fax: (952) 832-2601
www.barr.com
Ph: 1-800-632-2277
MINNEAPOLIS, MN 55435
1
-
PLAN: SITE RESTORATION KEY PLAN
N0 40 80
SCALE IN FEET
WEST POND
EAST
POND
COUNTY HWY 14 (MAIN ST.)SEE R-04
SEE R-02
SEE R-03
PROPOSED
BUILDING
(PHASE 2)
F.F.E. = 920.0'
PROPOSED
BUILDING (PHASE 1)
F.F.E. = 920.0'
EXISTING BUILDING
F.F.E. = 919.0'
WEST AREA
EAST AREA
NORTH AREA
NOTES:
1.SEE GENERAL SITE RESTORATION NOTES AND LEGEND ON SHEET R-00.
2.SEE SHEET R-00 FOR PLANTING AND SEEDING SCHEDULES.
3.SEE SHEET R-04 FOR SEEDING MIX DESIGN.
7,820 SF TYPE B SEEDING
AT POND SLOPES
8,510 SF TYPE B SEEDING
AT POND SLOPES
53,980 SF TYPE A SEEDING
AT ALL GENERAL SITE
RESTORATION AREAS, TYP.
NO SEEDING BELOW
WEST POND NWL
(914.0')
NO SEEDING BELOW
EAST POND NWL (913.0')
EXISTING WETLAND
BOUNDARY, TO PROTECT,
TYP.
910910910910915915
915915908908908908909909909909911911911911912912912912913913913913914914914914916916917917
UEXXXXXXX915915913913914914916916917917915915
913913
91
4
91
4
917917917917918918919919917917
918918
919919
917917
916916
917917
918918
917917
918918
916916
917917
918918
917917
918918
920920918918
919919
921921922922923923920920921921
920920
919919 918918
919919
918918916916917917918918
920920
918918
919919 920920918918918918919919919919
+++++++++++++++++++++WT
WT
WT
WT
WT
WT
WT
WT
WTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWT
WT WT WT
WT WT WT WT WT WT WT WT WT WT WT WT WT WT WT WT
WTWTWTWTWTWT
WT
WT
WT
WT
WT
WT
WT WTWTWTWTWTWTWT++++(7) RED-TWIGGED DOGWOOD
CORNUS BAILEYI
(7) RED-TWIGGED DOGWOOD
CORNUS BAILEYI
(7) RED-TWIGGED DOGWOOD
CORNUS BAILEYI
(7) RED-TWIGGED DOGWOOD
CORNUS BAILEYI
(7) RED-TWIGGED DOGWOOD
CORNUS BAILEYI
(16) RED-TWIGGED DOGWOOD
CORNUS BAILEYI
(7) RED-TWIGGED DOGWOOD
CORNUS BAILEYI
(7) RED-TWIGGED DOGWOOD
CORNUS BAILEYI
1
-
PLAN: SITE RESTORATION PLAN - EAST AREA
NREVISION DESCRIPTIONDATEAPP.BYNO.CHK.TO/FOR
RELEASED
DATE RELEASED Approved
Designed
Drawn
Checked
Date
Scale
DWG. No.
BARR PROJECT No.
CLIENT PROJECT No.
REV. No.Minneapolis, Minnesota
Ph: 1-800-632-2277
Corporate Headquarters:
DATE LICENSE #
SIGNATURE
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR
REPORT WAS PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER THE LAWS OF THE
STATE OF MINNESOTA.
BARR ENGINEERING CO.
Project Office:
PRINTED NAME
AS SHOWN
05/11/2020
AMW
MAK
BARR
MAK
LABORERS TRAINING CENTER
LINO LAKES, MN
LTC CAMPUS EXPANSION
LINO LAKES, MN
SITE RESTORATION PLAN
EAST AREA
23/02-1079.00
-
R-02 A05/11/2020 52234
ISSUED FOR PERMITTING
NOT FOR CONSTRUCTION
ANDREA M. WEDUL
CLIENT
BID
CONSTRUCTION
PERMITTING
-------
-------
-------
05/11/20------
-------
A B C 0 1 2 3
Suite 200
4300 MARKETPOINTE DRIVE
Fax: (952) 832-2601
www.barr.com
Ph: 1-800-632-2277
MINNEAPOLIS, MN 55435
EAST BASIN
NWL = 913.0
MATCH LINE - SHEET R-03MATCH LINE - SHEET R-04SCALE IN FEET
40200
PROTECT EXISTING
TREES, TYP.
PROPERTY
LINE, TYP.
NEW ENTRANCE DRIVE
PROPOSED
BUILDING (PHASE 1)
F.F.E. = 920.0
CADD USER: ANDREA M. WEDUL FILE: C:\USERS\AMW\DESKTOP\TEMP\23021079\23021079_R-02.DWG PLOT SCALE: 1:2 PLOT DATE: 5/10/2020 9:05 PMR-06
6
PROPOSED
BUILDING
(PHASE 2)
F.F.E. = 920.0
TYPMATCH LINE - SHEET R-03
EXISTING BUILDING
F.F.E. = 919.0'
QB
AC AC AC AC AC AC AC AC AC AC AC AC AC
AC
AC
AC AC
AC
AC AC
BP BP BP
BP
BP
BP
BP
BP
QB
AF
AG
AF
AF
QB
BP
BP
BP
BP
BP
BP
CO
SEE
R-05
1 SEE
R-05
2
SEE
R-05
3
NOTES:
1.SEE SHEET R-00 FOR SITE RESTORATION NOTES AND KEY TO FEATURES.
2.SEE SHEET R-00 FOR PLANTING AND SEEDING SCHEDULES
3.SEE SHEET R-04 FOR SEEDING MIX DESIGN.
PLANTING PLAN - WEST BUILDING AREA
PLANTING PLAN -
SOUTHEAST BUILDING AREAPLANTING PLAN - NORTHEAST BUILDING AREA
TYPE A SEEDING AT ALL
GENERAL SITE RESTORATION
AREAS, TYP.
R-00
1
AC AC AC AC AC
AF AF AF
BP
AC
AC
AC
AC
AC
AC
AC
AGAGAG
TYPE B SEEDING AT POND
SLOPES; NO SEEDING BELOW
NWL, TYP.
R-07
1
SIM