Loading...
HomeMy WebLinkAbout06/04/2020 EDAC PacketHow to Join the Meeting Phone: Dial 1-312-626-6799 Meeting ID: 895 5261 4911 Web link: https://us02web.zoom.us/j/89552614911 CITY OF LINO LAKES ECONOMIC DEVELOPMENT ADVISORY COMMITTEE MEETING A f F,NI) A 1. CALL TO ORDER AND ROLL CALL 2. APPROVAL OF MINUTES: May 7, 2020 3. DISCUSSION ITEMS Thursday, June 4, 2020 11 Meeting to be held electronically Pursuant to MN Statute 13D. 021 A. COVID — 19 Update — Outdoor Seating for Restaurants and Bars B. Lyngblomsten/County Road Improvements C. Laborer's Training Facility Expansion D. Board Appointments 4. ADJOURN CITY OF LINO LAKES ECONOMIC DEVELOPMENT ADVISORY COMMITTEE MINUTES DATE : May 7, 2020 TIME STARTED : 8:02 A.M. TIME ENDED : 8:46 A.M. MEMBERS PRESENT : Jim Schueller (Chair), Andrew Cravero, Chad Wagner, Thomas Colgan, Julie Jeffrey - Schwartz, Nathan Vojtech, Patrick Kohler, Don Johnson MEMBERS ABSENT STAFF PRESENT Michael Grochala, Janele Waterman I. CALL TO ORDER AND ROLL CALL Chair Schueller called the Economic Development Advisory Committee meeting to order at 8:02 A.M. on May 7, 2020. 40 II. APPROVAL OF MINUTES Mr. Kohler made a MOTION to approve the February 6, 2020 Meeting Minutes. Motion was supported by Mr. Cravero, passing unanimously. III. DISCUSSION ITEMS A. COVID — 19 Business Impact Discussion Mr. Grochala, Community Development Director, presented the staff report. The City received a survey from Anoka County regarding where to direct federal resources made available to Anoka County by the Community Development Block Grants. Mr. Grochala asked the committee where the funds ought to be spent if funding is granted. Mr. Kohler stated businesses, specifically, are in need of assistance. Mr. Grochala asked the committee if they have heard how businesses are doing locally during the COVID-19 crisis. Mr. Colgan explained that some businesses are doing well during the crisis and some businesses are struggling. Mr. Johnson and Mr. Vojtech concurred with Mr. Colgan's statement. Mr. Grochala asked the committee if there is anything they believe the City should be doing to assist businesses during this time. Mr. Colgan stated once retail opens, there should be a push for consumers to shop locally. Mr. Vojtech asked if the City could advertise which businesses in Lino Lakes are open to the Economic Development Advisory Committee May 7, 2020 Page 2 public. Mr. Grochala said the City could send out an email to the businesses in Lino Lakes asking if they are open to the public and/or offering services at this time. Upon receiving this information, the City could then post that information on our City webpage. Ms. Jeffrey -Schwartz commented that even if businesses are closed during this time, they may have the ability to sell gift cards to promote their businesses and keep consumer spending local. Mr. Vojtech stated that landlords are also struggling financially during this time. Ms. Jeffrey -Schwartz commented that the real estate market may also be impacted by the COVID-19 crisis. B. Project Updates Mr. Grochala updated the committee on the status of board reappointments, Lyngblomsten, Birch Street, and the 2040 Comprehensive Plan update. IV. ADJOURNMENT Mr. Cravero made a MOTION to adjourn the meeting at 8:46 A.M. Motion was supported by Mr. Kohler, passing unanimously. Respectfully submitted, Janele Waterman, Administrative Assistant or DRAFT MINUTES ECONOMIC DEVELOPMENT ADVISORY COMMITTEE AGENDA ITEM 3A STAFF ORIGINATOR: Michael Grochala, Community Development Director EDAC MEETING DATE: June 4, 2020 REQUEST: Discussion Items Backl1round A number of new commercial projects are going through the review process. COVID -19 Update Outdoor Dining for Bars and Restaurants. Governor Walz issued an executive order on May 20 allowing outdoor dining for bars and restaurants in a limited capacity. The City Council took action on May 26 to allow some interim flexibility for our outdoor seating requirements. Business mailing and information is attached. Lyngblomsten The City received final plan and final plat application for the first phase of the Lyngblomsten Project. The Planning and Zoning Board will be reviewing the proposal on June 10. The project will include the independent senior living and assisted living components along with the townhome development. The skilled nursing facility and commercial development will be part of future phases. The building elevations have changed due to programming and cost considerations but continue to meet requirements and provide a strong architectural presence along Hodgson Road. Staff has also been working with the development team, Anoka and Ramsey Counties and the City of Shoreview on proposed improvements to County Road J and Hodgson Road. The latest concept would include turn lane improvements to both roadways. Laborer's Training Facility Expansion. The Laborer's Training Center, located on the City's east side off of Main Street is planning a 37,000 square foot addition. A public hearing is scheduled before the Planning and Zoning Board on June 10. The LTC was originally constructed in 1993. Attachments 1. Outdoor Dining Letter and Information 2. Lyngblomsten Site Plan and CRJ/Hodgson layout 3. Laborer's Training Facility CITY O F JINO KES May 28, 2020 RE: Outdoor Seating for Restaurants and Bars Business Owners: As you are probably aware, Governor Walz provided guidance to begin allowing outdoor dining at restaurants. The City is working swiftly to provide some ideas and guidance to help you through this process. The City Council took action this past Tuesday to provide some flexibility and provide new opportunities for businesses to open. While these are interim provisions, we are optimistic that they will be helpful to local businesses. This is a learning process for all as we slowly build back up our operations. Businesses will be allowed to create outdoor patio spaces either on sidewalks and/or parking lot stalls. Please note that the City is requesting that you submit a site plan that we can share with our team for review purposes. We have found that good communication up front is a key to making this a smooth process for you. A couple of items to keep in mind: First and foremost, restaurants must follow the guidance issued by Governor Walz. The Executive Order includes the following: • Have adopted and implemented a COVID-19 Preparedness Plan • Ensure a minimum of 6 feet of distance between tables • Limit on -premise capacity to no more than 50 persons • Limit table service to 4 persons, or 6 if part of one family unit • Require reservations in advance • Require workers to wear masks and strongly encourage masks be worn by customers • Establish regular disinfection routine and train workers • Patios in parking stalls and sidewalks should have physical barriers to protect the safety of patrons • If using parking stalls to create outdoor patio space, the following guidance must be followed Patio must not take up ADA Accessible Parking Stalls Patios must have clear exiting strategies Areas serving alcohol must follow State Liquor License standards If serving alcohol, the seating are must be contiguous to the building. Check with the Deputy City Clerk to determine liquor license requirements. 651 982-2424. Tents, and/or canopies will be permitted , as long as at least half of the sides are open or screened and they meet State Fire Code requirements. Please note that State guidance regarding the Executive Order may continue to change. This guidance will be updated as we learn more about operations. As a reminder please submit an application, with site plan, to the City Building Department at: Building@linolakes.us so we can quickly check conformance with applicable laws and regulations. We are not looking for engineering quality site plans. You may sketch ideas on existing aerial photos or building site plan. We are attempting to keep this easy while capturing necessary information. Our goal is to be adaptable and streamline certain approval steps. I could not craft this message to cover all aspects of this guidance without overwhelming the system. Please be cognizant of our need to learn as well. Industry Guidance for safely reopening can by found on the State of Minnesota website by following this link: https://mn.gov/deed/assets/restaurant-bar-industry-guidance-ACC tcm1045-432897.pdf Frequently Asked Questions regarding Outdoor Dining can be found on this link: https:Hmn.gov/deed/newscenter/social-media/deed-developments/#/detail/appld/ 1 /id/433776 Attached you will find an application form and submittal requirements for you to follow. Please feel free to email if you have any questions. Michael Grochala, Community Development Director, mgrochala@linolakes.us Katie Larsen, City Planner, klarsen@linolakes.us Patrick Moonen, Building Official, pmoonen@linolakes.us 061 C I T Y O F INCVAKES Business Name: Property Address: Community Development Interim Administrative Permit Application Outdoor Dining Will Alcohol Be Served in the Outdoor Dining Area? ❑ No ❑ Yes* *If Yes, please contact Lisa Hogstad-Osterhues, Deputy City Clerk at 651-982-2424 to discuss Liquor License Requirements Please note: In signing this application, I hereby acknowledge that I have read and fully understand the applicable provisions of the State Regulations, City Ordinances and current COVID-19 policies. All interim administrative permits must comply with the requirements for that use as established by the Zoning Ordinance, and must be conducted or located on sites that are property zoned for such uses. Applicant Name: Signature: Phone: Address: Cell: City: State: Zip: Fax: E-mail: Property Owner Name (if different than applicant): Signature: Phone: Address: Cell: City: State: Zip: Fax: E-mail: Permit Fee: $0 (Fees have been waived for the Interim Administrative Permit Application) FIRE DIVISION APPROVAL: PLANNING APPROVAL: BUILDING APPROVAL: CITY CLERK/DEPUTY APPROVAL*: *Approval required if alcohol will be served outside PERMIT # DATE: DATE: DATE: DATE: 1 Application and Site Plan Submittal Requirements: Applications and Complete Site Plans may be emailed to the Lino Lake Building Department at buildingglinolakes.us or mailed to the Lino Lakes Building Department, 600 Town Center Parkway, Lino Lakes, MN 55014 1. Site Plan. Please submit a site plan that includes the following information: • Outdoor boundary of the seating area • Table arrangement and number of seats • Entrance/exit locations • Type of containment structure or barriers that will enclose the service area • Dimensions between tables and aisles • Show accessible route from outdoor dining area to restrooms and parking facilities • Location of refuse receptacles, and wait stations 2. Tent/Canopy. Please indicate if a tent or canopy will be used. At least half of the sides of tent must be open or screened. Use of these items will require conformance with State Fire Code. Approval may be subject to additional state guidance on outdoor seating. 3. If alcoholic beverages are served or consumed in the outdoor area, the proper license required by Chapter 700 of the City Code must be current. The site plan above may serve as your "Description of Premise" required by Liquor License requirements. 4. The dining/seating area shall be surfaced with concrete, bituminous or decorative pavers or may consist of a deck with wood or other flooring material that provides a clean, attractive, and functional surface. 5. The outdoor dining/seating area shall be at least partially segregated from through pedestrian and vehicle circulation by means of temporary or permanent fencing, bollards, ropes, plantings, or other methods. 6. ADA accessible parking stalls shall not be used for seating area. General Requirements Storage of furniture shall not be permitted outdoors between November 1 and March 31. Outdoor furniture that is immovable or permanently fixed or attached to the sidewalk shall not be subject to the storage prohibition of this section. However, any immovable or permanently fixed or attached furniture must be reviewed as part of the administrative permit application. 2. Refuse containers shall be provided for self-service outdoor dining/seating areas. Such containers shall be placed in a manner which does not disrupt pedestrian circulation, and must be designed to prevent spillage and blowing litter. 3. The outdoor area shall be kept clean and otherwise maintained in an orderly, sanitary, attractive condition. 4. Termination. The interim administrative permits issued under these provisions shall terminate when the public emergency declared by the governor under Minn. Stat. Chapter 12 terminates, or the governor permits bars and eateries to reopen for indoor service, whichever occurs first. If indoor service is limited to less than full capacity, the establishment may request that it be allowed to continue, in whole or in part, the outdoor service allowed. f 2 3 4 5 6 7 8 9 ID MN C A B C E F G I 211 WOODRIDGE LANE LINO LAKES, MN 55014 215 WOODRIDGE LANE LINO LAKES, MN 55014 221 WOOD LINO LAKE 223 LIN NOTES: 1. REFER TO SHEET C1.21, SITE PLAN NORTH, FOR NOTES. 2. REFER TO SHEET C1.31, GRADING AND DRAINAGE PLAN NORTH, FOR GENERAL NOTES. SITE STATISTICS: NORTHEAST PARKING TOTAL STALLS = 6 ACCESSIBLE STALLS REQUIRED = 1 ACCESSIBLE STALLS PROVIDED = 0 NORTHWEST PARKING TOTAL STALLS = 5 ACCESSIBLE STALLS REQUIRED = 1 ACCESSIBLE STALLS PROVIDED = 0 MAIN PARKING TOTAL STALLS = 77 ACCESSIBLE STALLS REQUIRED = 4 ACCESSIBLE STALLS PROVIDED = 7 LEGEND REFERENCE KEY TO SITE DETAILS 1 DETAIL I.D NUMBER (TOP) c2.1 DETAIL SHEET NUMBER (BOTTOM) C —7PROPOSED CONCRETE WALK 23 24 2.1 2.1 PROPOSED CONCRETE SLAB 3 4 5 2.1 2.1 5 PROPOSED BITUMINOUS TRAIL PAVEMENT 2.1 PROPOSED MEDIUM DUTY BITUMINOUS PAVEMENTO 2.1 PROPOSED URBAN STREET PAVEMENTe 2.1 PROPOSED RETAINING WALL 2.1 17 18 PROPOSED DECORATIVE METAL FENCE 2 1 01 PROPOSED TRAFFIC CONTROL SIGN 10 11 12 13 14 15 2.1 2.1 2.1 2.1 2.1 2.1 O PROPOSED BOLLARD G ® PAINTED ACCESSIBLE SYMBOL O PROPOSED MANHOLE (MH) 24 8 C2.1 2.1 ® PROPOSED CATCH BASIN (CB) 22 ( c2.1 d PROPOSED FLARED END SECTION FES 1 2 ( ) 2.1 2.1 + PROPOSED HYDRANT (HYD) ET ►� PROPOSED GATE VALVE (GV) 2 ® PROPOSED POST INDICATOR VALVE (PIV) 2 PROPOSED BUILDING STOOP - REFER TO ARCHITECTURAL PLANS PROPOSED FLAGPOLE - REFER TO ARCHITECTURAL PLANS • PROPERTY LINE Lyngblomsten Lino Lakes Campus LYNGBLOMSTEN 14115 ALMOND AVE W ST. PAU L, MN 55108 WOLD ARCHITECTS AND ENGINEERS 332 Minnesota Street, Suite W2000 Saint Paul, MN 55101 woldae.com 1 651.227.7773 ANDERSON-JOHNSON ASSOCIATES, INC. MA". LANDSCAPE ARCHITECTURE • SITE PLANNING • CIVIL ENGINEERING 7575 GOLDEN VALLEYROAD SUITE 200 MINNEAPOLIS. MN 55427 FAX (763) 544-0531 PH (763) 544-7129 I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed PROFESSIONAL ENGINEER under the laws of the State of MINNESOTA ri�L r *1 6y�' DAVID A. REY Registration Number 40180 Da 10/04/2019 Revisions Num PUD FINAL PLANS 05/11/2020 1 1 Comm: 196015 Date: 10/04/2019 Drawn: BJD Check DAR North SITE PLAN OVERALL Scale: 1 "=60' 0 30 60 C1 ■ 2o f 2 • e I • • d e e r, e e R e e 7 • e R • • a e e FALLS SOUTH 10 , Lyngblomsten Lino Lakes Campus MN C A B C C E F G I z x. OGNN? CC kNE 014 i, MN 55014 N \\ LOT 12 229 WOODRIDGE LANEL \ LINO LAKES, MN 55014 \\ REFER TO ARCHITECTURAL \ PLAN R3.200 FOR ALL \ TOWNHOME LAYOUT AND \ DIMENSIONS (TYP) \ N- 231 WOODRIDGE LANE LINO LAKES, MN 55014 \\ MATCHLINE — o�N�c� — — — — — — — — — — ------\ --- NOTES: N O z W W m LYNGBLOMSTEN 14115 ALMOND AVE W ST. PAU L, MN 55108 WOLD ARCHITECTS cn to AND ENGINEERS W 332 Minnesota Street, Suite W2000 Q p a z O Saint Paul, MN 55101 woldae.com 1 651.227.7773 0 ~ m ANDERSON-JOHNSON ASSOCIATES, to EDGE INC. mio"INLO W LANDSCAPE ARCHITECTURE • SITE PLANNING • CIVIL ENGINEERING 7575 GOLDEN VALLEYROAD SUITE 200 MINNEAPOLIS. MN 55427 Q FAX (763) 544-0531 PH (763) 544-7129 1. REFER TO SHEET C1.31, GRADING AND DRAINAGE PLAN NORTH, FOR GENERAL NOTES. 2. CHECK ALL PLAN AND DETAIL DIMENSIONS AND VERIFY SAME BEFORE FIELD LAYOUT. 3. SIGNAGE SHALL GENERALLY BE INSTALLED 18" BEHIND THE BACK OF CURB. 4. ALL DISTURBED AREAS OUTSIDE THE BUILDING PAD WHICH ARE NOT DESIGNATED TO BE PAVED SHALL RECEIVE AT LEAST 6" OF TOPSOIL. REFER TO LANDSCAPING PLANS BY OTHERS FOR SOD AND SEED RESTORATION. LEGEND REFERENCE KEY TO SITE DETAILS 1 DETAIL I.D NUMBER (TOP) C2.1 DETAIL SHEET NUMBER (BOTTOM) C_ PROPOSED CONCRETE WALK 23 24 2.1 2.1 PROPOSED CONCRETE SLAB 2 1 2.1 2 1 PROPOSED BITUMINOUS TRAIL PAVEMENT 9 2.1 PROPOSED MEDIUM DUTY BITUMINOUS PAVEMENTG 2.1 f�i f�i f PROPOSED URBAN STREET PAVEMENT G PROPOSED RETAINING WALL 2.1 17 18 PROPOSED DECORATIVE METAL FENCE 2 1 01 PROPOSED TRAFFIC CONTROL SIGN 10 11 12 13 14 15 2.1 2.1 2.1 2.1 2.1 2.1 o PROPOSED BOLLARD 16 ® PAINTED ACCESSIBLE SYMBOL O PROPOSED MANHOLE (MH) "24 8 C2.1 2.1 ® PROPOSED CATCH BASIN (CB) 22 ( c2.1 1 2 d PROPOSED FLARED END SECTION (FES) 2 1 2.1 + PROPOSED HYDRANT (HYD) (all ►� PROPOSED GATE VALVE (GV) 0 ® PROPOSED POST INDICATOR VALVE ( PIV 13 ) 2.1 PROPOSED BUILDING STOOP - REFER TO ARCHITECTURAL PLANS PROPOSED FLAGPOLE - REFER TO ARCHITECTURAL PLANS PROPERTY LINE I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed PROFESSIONAL ENGINEER under the laws of the State of MINNESOTA r DAV*AREY1 Registration Number 40180 A 10/04/2019 Revisions Num PUD FINAL PLANS 05/11/2020 1 1 Comm: 196015 Date: 10/04/2019 Drawn: BJD Check DAR North SITE PLAN NORTH Scale: 1 "=40' C1.21 MN C 2 e o 3 e e 4 o o 5 6 o o 7 o o 8 9 . . 10 _ W Lyngblomsten Lino :EF \7 \\BUILDING COLUMNSER TO o CD Lakes Campus // / / 20A ARCHITECTURAL PLANS 2'1 24 m I 2 9 / / // C2.1 C2.1 0 1 22 I B618 1 / // / 7 20A C2.1 1 A MATCH LINE 2 25'TERMINATOR _________________ _____- - - - - -���--------- - - -________C2.1_------___ 17 18 233 WOODRIDGE LANE c2.1 2.1 / // / 0 7 22 17' TERMINATOR 1 LINO LAKES, MN 55014 �\ // /// // 1 � 2.1 c2.1 I 2.1 24 I LYNGBLOMSTEN e OU1 N7 239 WOODRIDGE LANE LINO LAKES, MN 55014 B C C E F G 1i 241 WOODRIDGE LANE LINO LAKES, MN 55014 245 WOODRIDGE L LINO LAKES, MN 55014 = x. OG N� 251 WOODRIDGE LANE LINO LAKES, MN 55014 existing 253 WOODRIDGE LANE se LINO LAKES, MN 55014 255 WOODRIDGE LINO LAKES, MN D I I V M I III V V H S/ / NOTES: 1. REFER TO SHEET C1.21, SITE PLAN NORTH, FOR NOTES. 2. REFER TO SHEET C1.31, GRADING AND DRAINAGE PLAN NORTH, FOR GENERAL NOTES. LEGEND REFERENCE KEY TO SITE DETAILS 1 DETAIL I.D NUMBER (TOP) C2.1 DETAIL SHEET NUMBER (BOTTOM) PROPOSED CONCRETE WALK 23 24 2.1 2.1 e PROPOSED CONCRETE SLAB 2.1 2.1 2 1 / PROPOSED BITUMINOUS TRAIL PAVEMENT 2.1 PROPOSED MEDIUM DUTY BITUMINOUS PAVEMENTe 2.1 i� Ii f PROPOSED URBAN STREET PAVEMENTe 2.1 PROPOSED RETAINING WALL 17 2.1 PROPOSED DECORATIVE METAL FENCEG 01 PROPOSED TRAFFIC CONTROL SIGN11 10 11 12 13 14 15 2.1 Lj 2.1 2.1 2.1 2.1 o PROPOSED BOLLARD 26 IN PAINTED ACCESSIBLE SYMBOL O PROPOSED MANHOLE (MH) 24 8 C2.1 2.1 0 PROPOSED CATCH BASIN (CB) 22 ( c2.1 1 2 d PROPOSED FLARED END SECTION (FES) 2 1 2.1 + PROPOSED HYDRANT (HYD) Q11 ►� PROPOSED GATE VALVE (GV) 2.1 12 ® PROPOSED POST INDICATOR VALVE (PIV) 2 PROPOSED BUILDING STOOP - REFER TO ARCHITECTURAL PLANS PROPOSED FLAGPOLE - REFER TO ARCHITECTURAL PLANS DD/IDGDTV I IAIF DASHED AREA = FUTURE i0 �W t? ) 14115 ALMOND AVE W ST. PAU L, MN 55108 WOLD ARCHITECTS AND ENGINEERS 332 Minnesota Street, Suite W2000 Saint Paul, MN 55101 woldae.com 1 651.227.7773 ANDERSON-JOHNSON ASSOCIATES, INC. MA". LANDSCAPE ARCHITECTURE • SITE PLANNING • CIVIL ENGINEERING 7575 GOLDEN VALLEYROAD SUITE 200 MINNEAPOLIS. MN 55427 FAX (763) 544-0531 PH (763) 544-7129 I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed PROFESSIONAL ENGINEER under the laws of the State of MINNESOTA ri�L r *1 6y�' DAVID A. REY Registration Number 40180 Da 10/04/2019 Revisions Description Date Num UD FINAL PLANS 05/11/202 Comm: 196015 Date: 10/04/2019 Drawn: BJD Check DAR North SITE PLAN SOUTH Scale: 1 "=40' C 1.22 Wol EXTERIOR VIEWS LYNGBLOMSTEN LINO LAKES Wol EXTERIOR VIEWS LYNGBLOMSTEN LINO LAKES NOW Mft�m L, Wol • Y � III � ^� Ili��� � i i �, N G IM F rye,. zoo::;p /�_ �, \ — —_ — as as—aa—aa ae—�_—asys=——r— ,s —sii -- --- --- _ ---- --- ------------ — -- _ /-------- ------ —/ — �� _ _ — — _ — —!. — _ — — /l 1 wr—w• ---�-- /` oPs/ / \ //// — >r-_.,y.—• 91fi-_ » — — »= "T—wr_w,_,n_ ----_ — Y-c — -- ------ ----- —--91, 922920 F.F.E. = 920'_U" �F.F.E. = 920'_0" vE=906.5 04/03/2019 i - I EX. 12" FES I(INV 910.0) � A J W !2 I A _— 919 D PATTERN LEGEND0— > 'SYMBOLAN 19 750 EX 10' CONTOUR __ EX 2'CONTOUR I i / s2o — I / _ _ / �• — 752 — I I �� as—ss EX STORM SEWER a�—e�N— EX SANITARY SEWER GENERAL NOTES: EX GAS LINE 1. SEE SHEETS G-04 AND G-05 FOR w — w EX WATER MAIN TEMPORARY EROSION CONTROL Ex WETLAND i/ AND TREE PROTECTION MEASURES. of — of I I / / EX OVERHEAD ELECTRIC 09 2. SEE SHEET C-07 FOR SANITARY UE — uE W 1 s / 3 1 / ' ?S• \ 1 AND WATER PLAN. EX UNDERGROUND ELECTRIC I � ' I I / ® EXISTING BUILDING I I / / / 3. SEE SHEET E-01 FOR LIGHTING EX BURIED CABLE LINE I� (INV'9'13ES f�IM �� ,r "r'O PLAN. F.F.E.=919'-0„ I 4. SEE SHEET C-10 FOR PAVING PLAN. I \ \ R 5. SEE SHEETS R-00 THROUGH R-05 Ex TREE 2 I FOR RESTORATION PLANS. EX PROPERTY BOUNDARY 1 i------- / I I I d I z �I � I� III � � � � I - �� I�1� �� �.� -- \ I � � � J CONSTRUCTION LIMITS �•� PROP 1' CONTOUR ' I I 1 I �w• I I I k/ — PROP STORM SEWER PROP CONCRETE WEST pPONn D PROP BITUMINOUS II I III /I PROP GRAVEL i 111A N\I S 20 No w m m 1 1 1 A V\ \ �45'o 0� 1 co --912---------- — 11 � I AV A t I>' I A\ -_ _ -- _:—`916'=—__ _ _ o 3 I I I 42.7g/ / I I q 1 s �"s a� HHas� `�4�a � � H � i _ / 91 / 11 a ,� a"a H m — ---- 6--- 1 A k _—__—__—__—__--- �---�-- \ +`- ___-__—__---�--------------- — or — of ISSUED FOR PERMITTING 1 PLAN: SITE o 40 60 I- 1 1 8 1 O NOT FOR CONSTRUCTION SCALE IN FEET HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR CLIENT Pmlec[Office: Style ASSHOWN BARB PROJECT NO. REPORT WASPREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. BARR — Mina of H, Mine ,t a: Minneapolis, Minnesota Ph: 1-800-632-2211 BARB ENGINEERING CO. 4300 MARKETPOINTE DRIVE $UIIB 200 MINNEAPOLIS, MN 55435 Ph: i-800-632-2277 Fax: (952)832-2801 wwwbarr.com LABORERS TRAINING CENTER, LINO LAKES, MN LTC CAMPUS EXPANSION LINO LAKESMN 23/02- 1 079.00 BID Date OS/11/2020 CONSTRUCTION PERMITTING 05/11120 — Drawn EPF CLIENT PROJECT No. PRINTED NAME MICHELLE KIMBLE — — — — — — — Checked MAK SITE PLAN SIGNATURE RELEASED TO/FOR A B C 0 1 2 3 Designed BARR DWG. No. 06 REV. No. A NO. BY CHK. APP. DATE REVISION DESCRIPTION DATE osrl vzozo ucBNBEm 42012 DATE RELEASED Approved MAK