Loading...
HomeMy WebLinkAbout2020-025 Council Resolution• • CITY OF LINO LAKES RESOLUTION NO. 20-25 RESOLUTION AUTHORIZING THE PREPARATION OF A WATER TREATMENT PLANT FEASIBILITY STUDY WHEREAS, the City Council, is evaluating short, mid and long term options to reduce manganese levels in the municipal water supply, and WHEREAS, the construction of a Water Treatment Plant is a possible course of action for the City to evaluate, and WHEREAS, WSB and Associates. the City Engineer, has submitted a proposal to prepare the Feasibility Study. NOW, THEREFORE BE IT RESOLVED by The City Council of The City of Lino Lakes: 1. The Water Treatment Plant Feasibility Study is hereby ordered to determine if the proposed improvement is necessary, cost-effective, and feasible and as to whether it should best be made as proposed, and at the estimated cost of the improvement. 2. WSB and Associates are directed to prepare the Feasibility Study for Water Storage in an amount not exceed $34,538. Adopted by the Council of the City of Lino Lakes this 9th day of March, 2020. The motion for the adoption of the foregoing resolution was introduced by Council Member Stoesz and was duly seconded by Council Member Lyden and upon vote being taken thereon, the following voted in favor thereof: Lyden, Stoesz, Ruhland. Cavegn. Rafferty The following voted against same: None ATTEST: Rob7 Cafferty, Mayor