HomeMy WebLinkAbout2020-141 Council Resolution• • • CITY OF LINO LAKES RESOLUTION NO. 20-141 APPROVING PAYMENT NO. 2 AND FINAL FOR THE LIFT STATION NO. 5 FORCEMAIN REPAIR PROJECT WHEREAS, on April 27, 2020 the City Council passed Resolution 20-42, awarding the contract for the Lift Station No. 5 Forcemain Repair project to GM Contracting, Inc. in the amount of $150,421.21, and; WHEREAS, the total construction budget included a contingency for add on items to address the unknown field conditions related to groundwater and the location of existing utilities. The overall project construction budget was $175,000.00, and; WHEREAS, a complete summary of costs are detailed in Payment No. 2 (Final) for the Lift Station No. 5 Forcemain Repair project and can be found on file at the offices of the City of Lino Lakes; NOW, THEREFORE, BE IT RESOLVED by the City Council of Lino Lakes that Payment Request No. 2 (Final) is approved for a final contract amount of $171,916.29. Adopted by the Council of the City of Lino Lakes this 23rd day of November, 2020. The motion for the adoption of the foregoing resolution was introduced by Councilmember Lyden and was duly seconded by Councilmember Ruhland and upon vote being taken thereon, the following voted in favor thereof: Lyden, Ruhland, Stoesz, Cavegn, Rafferty The following voted against same: None AT 1'EST: nne Bartell C ty C 4Ro Rafferty, Mayor CITY COUNCIL AGENDA ITEM 5B STAFF ORIGINATOR: Diane Hankee, City Engineer MEETING DATE: November 23, 2020 TOPIC: Consider Resolution No. 20-141, Approving Payment No. 2 and Final, Lift Station No. 5 Forcemain Repair VOTE REQUIRED: 3/5 INTRODUCTION Staff is requesting council consideration to finalize the Lift Station No. 5 Forcemain Repair project. BACKGROUND On April 27, 2020, the City Council accepted the quote for the Lift Station No. 5 Forcemain Repair from GM Contracting, Inc. in the amount of $150,421.21. Lift Station No. 5 is located within the Pheasant Hill neighborhood. The sanitary sewer from Lift Station No. 5 is pumped through a forcemain to the gravity trunk sewer located west at Timberwolf Trail. This section of forcemain was corroding and had numerous failures in the spring of 2020. A new 1,800 foot long forcemain was directionally drilled. The total construction budget included a contingency for add on items to address the unknown field conditions related to groundwater and the location of existing utilities. The overall project construction budget was $175,000.00. The final construction cost was $171,916.29 which was under the budget. Funding for the project is from the Water Operating Fund. RECOMMENDATION Approve Resolution No. 20-141, Approving Payment No. 2 and Final, Lift Station No. 5 Forcemain Repair in the amount of $9,481.21 to GM Contracting, Inc. ATTACHMENTS 1. Resolution 20-141 2. Project Map 3. Final Pay Voucher • LS No. 5 and Forcemain • Sewer Network Structures Sewer Pressurized Mains D Flow Meter Active EE Lift Station Abandoned Plug > Sewer Gravity Mains Service Connection 1 in=376ft A April 22, 2020 Map Powered By DataLink WS 3 • • Lift Station No. 5 Forcemain Replacement Final Pay Voucher 2 WS Client: City of Lino Lakes 600 Town Center Parkway Lino Lakes, MN 55014-1182 Contractor: GM Contracting, Inc. P.O. Box 736 Lake Crystal, MN 56055-0736 WSB Project No.: 015965-000 Client Project No.: State Project No.: Federal Project No.: Contract Amount Funds Encumbered Original Contract $150,421.21 Original $150,421.21 Contract Changes $11,101.60 Additional N/A Revised Contract $161,522.81 Total $150,421.21 Work Certified To Date Base Bid Items Contract Changes Material On Hand Total $140,893.53 $31,022.76 $0.00 $171,916.29 Work Certified This Voucher Work Certified To Date Less Amount Retained Less Previous Payments Amount Paid This Voucher Total Amount Paid To Date $932.00 $171,916.29 $0.00 $162,435.08 $9,481.21 $171,916.29 Percent Retained: 0% Percent Complete: 106.43% FINAL PAY VOUCHER 1 hereby certify that a Final Examination has been made of the noted Contract, that the Contract has been completed, that the entire amount of Work Shown in this Final Voucher has been performed and the Total Value of the Work Performed in accordance with, and pursuant to, the terms of the Contract is as shown in this Final Voucher. Approved By WSB Countbyi2ity/Project Engineer November 17, 2020 Date Approved By City of Lino Lakes Date • Approved By GM Contracting, Inc. .7,7(9-0 Date Page 1 of 3 Lift Station No. 5 Forcemain Replacement Final Pay Voucher 2 WS D Payment Summary Na. Up Through Date Work Certified Per Voucher Amount Retained Per Voucher Amount Paid Per Voucher 1 07/08/2020 $170,984.29 $8,549.21 $162,435.08 2 11/16/2020 $932.00 5-8,549.21 59,481.21 Funding Category Name Work Certified To Date Less Amount Retained Less Previous Payments Amount Paid This Voucher Total Amount Paid To Date Local $171,916.29 $0.00 $162,435.08 $9.481.21 $171,916.29 Accounting Number Funding Source Amount Paid This Voucher Revised Contract Amount Funds Encumbered To Date Paid Contractor To Date 1 Local Water $9,481.21 $171,916.29 Contract Item Status Line No. Item Description Units Unit Price Contract Quantity Quantity This Voucher Amount This Voucher Quantity To Date Amount To Date 1 2021.501 MOBILIZATION LS $28,000.00 1 0 $0.00 1 $28,000,00 2 2563.601 TRAFFIC CONTROL LS $3,758.30 1 0 $0.01 1 $3,758.30 3 2575.601 EROSION CONTROL LS $1,073.80 1 0 $0.00 1 $1,073.80 4 2504.603 6" WATERMAIN HDPE L F $53.96 1755 0 $0.00 1718 $92,703.28 5 724.946 CONNECTION TO EXISTING LIFT STATION L SUM $6,809.96 1 0 $0.00 1 $6,809.96 6 2503.602 CONNECT TO EXISTING MANHOLES EACH $3,888.19 1 0 $0,00 1 $3,888.19 7 2503.602 AIR RELEASE MANHOLE EACH $7,531.16 1 0 $0.00 0 $0.00 8 S100.585SITE RESTORATION LS $4,660.00 1 0.2 $932.00 1 $4,660,00 Bid Totals: $932.00 $140,893.53 Project Category Totals Category Amount This Voucher Amount To Date Pheasant Hills Drive Forcemain $932.00 $140,893.53 Contract Change Item Status CC CC No. Line No. Item Description Units Unit Price Contract Quantity Quantity This Voucher Amount This Voucher Quantity To Date Amount To Date WO 1 9 2503,602 AIR RELEASE MANHOLE EACH $-7,531.16 1 0 $0.00 0 $0.00 WO 1 10 2104.603 ABANDON SANITARY FORCEMAIN LS $6,686.55 1 0 $0A4 1 $6,686.55 Page 2 of 3 • Lift Station No. 5 Forcernain Replacement Final Pay Voucher 2 wsb WO 1 11 2573.510 ' SEDIMENT REMOVAL VAC TRUCK HOUR $295.00 22 0 $0,00 64 $18,880.00 WO 1 12 2504.602 PIPING CONNECTION AT SNOW GOOSE AND PHEASANT HILLS LS $1,476.34 1 0 $0.00 1 $1,476.34 WO 1 13 2105.601 BYPASS PUMPING LS $3,979.87 1 0 $0.00 1 $3,979.87 Contract Change Totals: $0.00 $31,022.76 Contract Change Totals No. Contract Change Description Amount This Voucher Amount To Date 1 WO Work Order No. 1 $0.00 $31,022.76 Material On Hand Additions Line No. Item Description Date Added Comments Material On Hand Balance Line No. Item Description Date Added Used Remaining Page 3 of 3