HomeMy WebLinkAbout01/13/2021 P&Z Packet
CITY OF LINO LAKES
PLANNING & ZONING
BOARD MEETING
Wednesday, January 13, 2021
6:30 p.m.
Meeting to be held electronically
Pursuant to MN Statute 13D.021
AGENDA
1. CALL TO ORDER AND ROLL CALL
2. PLEDGE OF ALLEGIANCE
3. APPROVAL OF AGENDA
4. APPROVAL OF MINUTES: November 10, 2020
5. OPEN MIKE
6. ACTION ITEMS
A. Watermark 4th Addition PUD Final Plan/Final Plat
7. DISCUSSION ITEMS
A. Project Update
8. ADJOURN
Meeting guidelines on reverse side.
How to Join the Meeting
Phone: Dial 1-312-626-6799
Meeting ID: 813 6810 0245
Weblink:
https://us02web.zoom.us/j/81368100245
City of Lino Lakes Planning & Zoning Board
MEETING GUIDELINES
Open Mike – The purpose of a Board Meeting is to accomplish the business of the city.
When presenting at a meeting please remember to be respectful, and follow these
guidelines:
• Please address the meeting chair.
• State your name and address for the record.
• Please observe a 4 -minute limit.
• The topic must relate to city business.
• Open Mike is for items not on the agenda.
• A spokesperson must represent a group of five or more – groups will have 8 minutes.
• The Presiding Officer may limit duplicative presentations.
• Remember, the meeting is to discuss city business only.
Public Hearing - Held as a separate item of business on the agenda. The public hearing
segment is your opportunity to tell the Board how you feel about issues scheduled to be
heard. Typically, a hearing follows these steps:
• The Presiding Officer (Chair or Vice-Chair) will announce the proposal to be reviewed and
ask for the staff report. The presiding Officer shall maintain strict order and etiquette at all
meetings.
• Staff will present their report on the proposal.
• Board members will then ask City Staff questions about the proposal.
• The Presiding Officer will then open up the public hearing for anyone present who wishes to
comment on the proposal. This is the time for the public to make comments or ask questions
about the proposal.
Comments should be limited to four (4) minutes unless further time is granted by the
Presiding Officer. All comments should be directed to the Board as a body and not to any
individual Board Member or City Staff Member unless permission is granted by the Presiding
Officer. No person shall be permitted to enter into any discussion, either directly or through a
member of the Board without the permission of t he Presiding Officer.
• After everyone in the audience wishing to speak has given his/her comments, the Presiding
Officer shall close the public hearing.
• The Board will then discuss the proposal. No further public comments are allowed.
• The Board will then make a recommendation(s) and/or a decision.
When you are called upon for your comments, please step to the microphone at the
podium and state your name and address for the record.
Occasionally, the Board may continue a hearing to another meeting before taking action.
Meeting Etiquette
The Planning & Zoning Board must preserve order and decorum while the meeting
is in session. A resident shall not, by conversation or otherwise, delay or interrupt
the proceedings or the business of the Board, nor disturb any resident or Board
Member while speaking or refuse to obey the orders of the Board.
DRAFT MINUTES
CITY OF LINO LAKES
PLANNING & ZONING BOARD MINUTES
I. CALL TO ORDER AND ROLL CALL:
Chair Tralle called the Lino Lakes Planning and Zoning Board meeting to order at 6:30
p.m. on November 10, 2020.
II. PLEDGE OF ALLEGIANCE
III. APPROVAL OF AGENDA
The agenda was approved as presented.
IV. APPROVAL OF MINUTES:
Mr. Root made a correction to the October 14, 2020 meeting minutes. Agenda item 6B,
under the Board Comments section, should note Mr. Evenson, not Mr. Root, asked Ms.
Larsen if the City specifies what type of shingles residents can use on single family
homes. Mr. Evenson made a MOTION to approve the October 14, 2020 meeting minutes
as amended. Motion was supported by Mr. Root. Motion carried 5 - 0. Chair Tralle
abstained.
V. OPEN MIKE
Chair Tralle declared Open Mike at 6:34 p.m.
There was no one present for Open Mike.
Mr. Reinert made a MOTION to close Open Mike at 6:34 p.m. Motion was supported by
Mr. Evenson. Motion carried 5 - 0. Chair Tralle abstained.
DATE: November 10, 2020
TIME STARTED: 6:30 P.M.
TIME ENDED: 7:15 P.M.
MEMBERS PRESENT: Paul Tralle (Chair), Neil Evenson, Michael Root,
Perry Laden, Jeff Reinert, Nathan Vojtech
MEMBERS ABSENT: Sue Peacock
STAFF PRESENT: Michael Grochala, Katie Larsen, Diane Hankee,
Janele Waterman, Jessica Eller
Planning & Zoning Board
November 10, 2020
Page 2
DRAFT MINUTES
VI. ACTION ITEMS
A. PUBLIC HEARING: Bald Eagle Addition Preliminary Plat
Ms. Larsen, City Planner , presented the staff report.
The applicant, Bald Eagle Builders, Inc., has submitted a land use application for a
preliminary plat for Bald Eagle Addition. The applicant proposes to subdivide the
existing parcel located at 202 Elm Street into two (2) single family lots for the
purpose of constructing one (1) new single family home. The lot is 1.06 gross acres
(46,132 sf).
Board Comments
Chair Tralle stated the lot line appears to be immediately next to 210 Elm Street and
he questioned if the setback was correct.
Ms. Larsen clarified the plans should be adjusted to reflect the garage at 210 Elm
Street next to the lot line rather than the house. The garage only requires a 5 ft.
setback and therefore, it meets the setback requirement.
Mr. Vojtech asked what the lot size is of 7158 2nd Avenue, the house south of 202
Elm Street.
Mr. Grochala stated the lot size is a quarter of an acre.
Mr. Vojtech asked if the new lot will be a quarter of an acre as well.
Ms. Larsen said the lot will be a little over 13,000 sq. ft. which is slightly larger than
a quarter of an acre.
Mr. Evenson questioned if there are any issues with the driveway at 202 Elm Street.
Ms. Larsen explained there are no problems with the current driveway, but she noted
a third stall garage was constructed and it is not paved in front of the third stall.
Mr. Evenson inquired if class 5 or some alternative material was used in front of the
third stall.
Ms. Larsen said the driveway in front of the third stall consists of patchy grass and
some loose gravel. She clarified there are no issues with its current state, but if the
garage is ever intended to have vehicles driven in it then the driveway should be
paved.
Planning & Zoning Board
November 10, 2020
Page 3
DRAFT MINUTES
Chair Tralle commented the driveway should be poured in front of the third stall to
ensure it is covered for future use. He asked the applicant, Jason Hohn, from Bald
Eagle Builders, if he had any comments for the board.
Applicant’s Comments
Mr. Hohn questioned why the board would require him to pave in front of the third
stall if there is no rule by the City requiring him to do so.
Chair Tralle explained by requiring the driveway to be paved, future issues and/or
complaints by the next owner or the neighbors would be eliminated.
Mr. Laden asked Ms. Larsen for verification as he understood, if vehicles were
driven into the third stall, the driveway would not have to be concrete or asphalt, but
it could be class 5.
Ms. Larsen clarified since the parcel will be less than one acre, the driveway in front
of the third stall would have to be bituminous or concrete if it is ever used for
vehicles.
Mr. Evenson wondered why the driveway was not required to be paved when the
garage was constructed.
Ms. Larsen said the purpose or intent of the third stall determines whether the
driveway needs to be paved or not. If the third stall was intended for storage
purposes and not for parking vehicles, then the driveway would not have been
required to be paved when the third stall was constructed.
Chair Tralle declared the Public Hearing open at 6:50 p.m.
Karrie Galetka, 7144 2nd Avenue, expressed concern with the amount of traffic on
2nd Avenue coming from Elm Street and with the proximity of the new lot to the
intersection. Moreover, she expressed concern for residents crossing the street at
Elm S treet since the boulevard on the southwest corner of Elm Street is small.
Chair Tralle acknowledged Ms. Galetka’s concern regarding the abnormalities of the
boulevard and the amount of traffic. However, he explained the addition of one
home is not going to substantially affect traffic and to deny the construction of the
home for such a reason is not justifiable.
Ms. Galetka asked if the board or staff knew why the boulevard, at the southwest
corner of Elm Street, was constructed as such.
Mr. Grochala explained the boulevard was altered when Elm Street was
reconstructed in 2002 and 2003. The intent of the boulevard was to reduce the speed
Planning & Zoning Board
November 10, 2020
Page 4
DRAFT MINUTES
of residents heading south on 2nd Avenue. He said the boulevard on the opposite
side of the street should have been adjusted as well.
Shannon Shaughnessy, 210 Elm Street, asked what the footprint of the new home is.
Ms. Larsen stated the house pad, according to the plan set, is typically 50 ft. x 50 ft.,
but it could be 40 ft. x 60 ft . She explained the city will not know the footprint of
the home until the applicant submit s the building permit application, but irrespective
of that, the home will not be larger than the house pad listed on the grading plan of
the preliminary plat.
Ms. Shaughnessy expressed concern regarding the size of the new lot and questioned
whether it will look cohesive with the neighborhood.
Chair Tralle stated the applicant met all of the criteria to build a house on the lot. He
asked Ms. Larsen to summarize the criteria for Ms. Shaughnessy.
Ms. Larsen explained the property is zoned R1 and is required to be, at a minimum,
80 ft. wide and 135 ft. deep. The lot is 80 ft. wide and 163 ft. deep. Thus, it exceeds
the minimum lot size requirement. The lot meets all of the side setbacks and it
exceeds the rear setback.
Ms. Shaughnessy asked if the new lot is set up with city sewer and water.
Ms. Larsen confirmed it is.
Mr. Evenson made a MOTION to close the Public Hearing at 7:03 p.m. Motion was
supported by Mr. Laden. Motion carried 5 - 0. Chair Tralle abstained.
Board Discussion
Mr. Reinert commented the lot is oversized and it will, likely, be conforming to the
neighborhood once constructed. He asked Ms. Larsen if Public Safety reviewed the
project and if so, did they have any comments.
Ms. Larsen confirmed they reviewed the project. She stated the police division and
fire division had no public safety concerns.
Mr. Reinert asked Ms. Larsen to share Ms. Galetka’s safety concern with Public
Safety to see if they would have a change in opinion.
Diane Hankee, City Engineer, said the city has a transportation committee who
works with Public Safety and Public Works to monitor traffic. She explained the
committee receives calls about through traffic and school traffic for the entire area
from Sunset Avenue to Elm Street to Lake Street . She mentioned it can be difficult
to address traffic concerns since residents are utilizing personal vehicles for
Planning & Zoning Board
November 10, 2020
Page 5
DRAFT MINUTES
transportation more often than the bus systems which thereby increases traffic. She
concluded the committee is aware of the situatio n and as roadway improvements are
made, the committee works to remedy those congested areas.
Chair Tralle recommended the motion be amended to require the driveway to be
paved in front of the third stall garage at 202 Elm Street.
Mr. Evenson accepted the recommendation.
Mr. Evenson made a MOTION to recommend approval of the preliminary plat for
Bald Eagle Addition with the condition the driveway is paved in front of the third
stall garage at 202 Elm Street. Motion was supported by Mr. Root. Motion carried
5 - 0. Chair Tralle abstained.
VII. DISCUSSION ITEMS
A. Project Updates
Staff provided verbal updates to the Board on current City projects.
VIII. ADJOURNMENT
Mr. Laden made a MOTION to adjourn the meeting at 7:15 p.m. Motion was supported
by Mr. Evenson. Motion carried 5 - 0. Chair Tralle abstained.
Respectfully submitted,
Janele Waterman, Administrative Assistant
1
PLANNING & ZONING BOARD
AGENDA ITEM 6A
STAFF ORIGINATOR: Katie Larsen, City Planner
P & Z MEETING DATE: January 13, 2021
REQUEST: Watermark 4th Addition PUD Final Plan/Final Plat
CASE NUMBER: PF2020-002
FP2020-005
APPLICANT S: U.S. Home Corporation dba Lennar
Attn: Josh Metzer
16305 36th Avenue N., Suite 600
Plymouth, MN 55446
OWNER: U.S. Home Corporation
REVIEW SCHEDULE:
Complete Application Date: December 15, 2020
60-Day Review Deadline: February 12, 2021
Environmental Board Meeting: N/A
Park Board Meeting: N/A
Planning & Zoning Board Meeting: January 13, 2021
City Council Work Session: February 1, 2021
Tentative City Council Meeting: February 8, 2021
BACKGROUND
Watermark is a 372 acre master planned residential community consisting of 692 single family
lots and 172 townhome units totaling 864 housing units. Lennar submitted a Land Use
Application for Watermark 4th Addition PUD Final Plan/Final Plat. The plat proposes 91 single
family lots, one (1) HOA clubhouse lot and 5 outlots.
Previous Council approvals include:
• June 13, 2016: Resolution No. 16-51 approving PUD Development Stage
Plan/Preliminary Plat
• October 9, 2017: Resolution No. 17-95 approving Amendment #1 to Land Use Plan
• December 11, 2017: Resolution No. 17-133 approving Amendment #2 to Architectural
Design Standards
2
• October 14, 2019: Resolution No. 19-131 approving Amendment #3 to Architectural
Design Standards
This staff report is based on the following information:
• Cost Estimate Summary prepared by Carlson McCain dated December 14, 2020
• 4th Addition Specification Book prepared by Carlson McCain dated December 4, 2020
• Stormwater Management Plan prepared by Carlson McCain dated December 14, 2020
• Final Plat prepared by Carlson McCain
• Sanitary Sewer, Water Main, Storm Sewer and Street Construction Plans prepared by
Carlson McCain dated December 4, 2020
• Construction Plans for Turn Lanes by Carlson McCain dated December 14, 2020
• Site Landscape Plan prepared by Carlson McCain dated December 14, 2020
• Grading, Development & Erosion Control Plan prepared by Carlson McCain dated April 16,
2018
• Watermark 4th Addition Home Plans Booklet prepared by Lennar dated December 14, 2020
• Watermark Architectural Standards Matrix
ANALYSIS
PUD Development Stage Plan/Preliminary Plat
The PUD Development Stage Plan approved by Resolution No. 16-51 establishes Watermark’s
overall land use plan, street and utility layout, parks and open space plan, architectural design
standards, landscaping and lot development standards. These standards are summarized in the
PUD Master Plan Booklet and are incorporated as part of the Master Development Agreement.
Each phase (i.e. addition) of development shall submit a PUD Final Plan consistent with the
PUD Development Stage Plan.
In October 2017, Council approved an amendment to the PUD Development Stage Plan’s overall
Land Use Plan. The Land Use Plan established 871 housing units. As the applicant has worked
through final plan design to address City and RCWD comments from the preliminary plat, the
number of 55’ wide Villas was reduced from 127 units to 120 units. The net number of housing
units is now 864.
The net density is 3.39 units per acre and is consistent with the 2030 Comprehensive Plan’s
required 3.0 to 4.5 units per acre.
October
2018
Gross Area (acres) 372.24
Wetlands & Water Bodies 45.09
Public Parks & Open Space 66.25
Arterial ROW 5.46
Other (Undevelopable) 0.62
3
Net Area (acres) 254.82
# of Housing Units 864
Gross Density (units/acre) 2.32
Net Density (units/acre) 3.39
Grading and Trunk Utility Improvements
Lennar commenced grading and trunk utility improvements in September 2018. Phase I grading
was approximately 140 acres and Phase II grading was approximately 20 acres. Phase III will
grade out the balance of the site, approximately 212 acres. The 4th Addition final plat is within
the Phase III grading limits.
PUD Final Plan
Watermark 4th Addition creates 91 single family lots, one (1) HOA clubhouse lot and 5 outlots.
The PUD Final Plan is consistent with the PUD Development Stage Plan in regards to the land
use plan, street and utilities, parks and open space, lot standards and landscaping.
The following housing types and products proposed for the 4th Addition are consistent with the
approved Land Use Plan.
Housing Type Lot Width Housing Product # Lots
Single Family 75’ Landmark 28
Single Family 65’ Heritage 14
Single Family 55’-60’ Lifestyle Villas 49
TOTAL 91
Architectural Standards
Resolution No. 17-133 and Resolution No. 19-131 detail architectural design standards for the
entire Watermark development. As required, a Watermark 4th Addition Home Plans summary
booklet and Architectural Standards Matrix were submitted. The booklet and matrix detail
compliance of the housing products with the resolutions in regards to exterior materials and
styles, house elevations and garage and porch requirements. There are 20 different single family
house plans with multiple facade and elevation options for a combination of over 100 different
housing styles proposed for the 4th Addition.
Color packages and anti-monotony plans will be included with each building permit application
to ensure that the homes elevations are varied with a minimum of five different styles and those
homes in proximity to each other not look alike in terms of the combination of color of siding,
accent and roofing materials. Coventry by Alside v inyl s iding with .042” panel thickness is
proposed on all the housing units. All houses have minimum 4” window trim on the side and
4
rear elevations to meet resolution requirements to incorporate an architectural feature into those
elevations that are visible from 20th Avenue (CSAH 54), 21st Avenue N. and the public park.
In summary, the Watermark 4th Addition single family housing types and products meet the
architectural design standards requirements of Resolution No. 17-133 and Resolution No. 19-
131.
Landscaping
The Watermark 4th Addition Site Landscape Plan has been reviewed by staff and is consistent
with the PUD Development Stage Landscaping Plan. The Environmental Coordinator Memo
dated January 7, 2021 notes some minor comments such as seed mix types, clear vision areas and
planting details.
Subdivision Ordinance
Conformity with the Comprehensive Plan and Zoning Code
The Watermark 4th Addition final plat has been reviewed for compliance with the comprehensive
plan, zoning and subdivision ordinance. The proposed final plat meets the performance
standards of the subdivision and zoning ordinance and is consistent with the PUD Development
Stage Plan/Preliminary Plat and Final Plan.
Plat Phases
The following summarizes the number of lots platted per addition:
Addition # SF Lots
Remaining
#SF Lots # TH Lots
Remaining
#TH Lots
Total # Lots
Remaining
692 172 864
1st 100 592 93 79 671
2nd 57 535 0 79 614
3rd 96 439 79 0 439
4th 91 348 0 0 348
It should be noted the plat contains 91 single family lots and one (1) lot for the future HOA
clubhouse for a total of 92 platted lots.
Blocks and Lots
The final plat creates 91 single family lots, one (1) HOA clubhouse lot and 5 outlots. The
following chart summarizes the purpose of the outlot :
5
Outlot Purpose
A Lake 10, Wetland and Open Space
B Lake 10 and Open Space
C Public Park
D Lake 20 and Open Space
E Future Development
Outlot s A, B, D and E will be deeded, owned and maintained by a Homeowners Association
(HOA). Outlot C will be deeded to the City for the public park.
Easements
Standard drainage and utility easements are being dedicated on individual lots and over Outlot s
A, B and D.
Street and Utilities
The 4th Addition proposes construction of the following streets which are consistent with the
PUD Development Stage Plan:
Street Name Right-of-Way Width Street Width
(Back to Back)
Watermark Way 60-110 ft 32 feet
Crane Drive 60 feet 32 feet
Forest Lane 60 feet 32 feet
Watermark Way is the main gateway and entrance into the development. It features an arched
bridge, stone piers, monument signs and landscaped medians. The road right -of-way starts at
110 feet wide and tapers to 60 feet with 32 feet back to back paved roadway. A 5ft wide
concrete sid ewalk is on the south side and a 10 ft wide bituminous trail is on the north side.
A 12 ft wide northbound right turn lane and 12 ft wide thru lane are provided on 20th Avenue
(CSAH 54) at Watermark Way. A 12 ft wide southbound bypass lane and 12 ft wide thru lane
are also being constructed. The developer shall submit plans to Anoka County for final review
and approval.
Watermain, sanitary sewer main, stormwater facilities, streets, sidewalks and trails are being
constructed consistent with the PUD Development Stage Plan.
Public Land Dedication and Fees
6
As approved with Resolution No. 16-51, the City will require the following combination of land
dedication and cash in lieu of land dedications:
1. Land dedication for the public and private parks will be credited from the total payment
in lieu.
2. Costs for public park improvements and trail construction will be credited from the total
payment in lieu.
3. Improvements to the private parks and recreational center will not be credited from the
total payment in lieu.
A 10 ft wide bituminous trail will be constructed 2,900 lf along CSAH 54 (20th Avenue) within
the right -of-way. Trail will also be constructed along Watermark Way. Permanent Trail
Easements are not required because the trails will be constructed within the road right-of-way.
Trail construction costs will be credited.
Park dedication fees will also be credited for the 5.39 acre public park land platted as Watermark
4th Addition, Outlot C. Per the Master Developer Agreement (MDA), the parkland dedication
fees are based on an appraisal of fair market value. An appraisal was prepared in December
2018 by Insight Realty Advisors, Inc. The credited value of Outlot C, Watermark 4th Addition is
$207,000. This outlot will be deeded to the City. The public park will be developed by City
consistent with the approved Master Plan.
Lot 1, Block 3, Watermark 4th Addition is being platted for the future construction of the HOA
clubhouse. Per the Master Development Agreement, the developer shall construct a private club
house for the use of the residents of the Development once final plat approval for 518 lots has
been granted by the City. With the approval of the 4th addit ion final plat, there will be 516
approved lots.
Per the Watermark 3rd Addition Development Agreement, the townhome tot lot, play equipment
and associated landscaping on Outlot I, Watermark shall be completed by August 30, 2021. Per
Resolution No. 16-51, credit will not be given for theses private park improvements.
The following is a summary of the land dedication and fees:
Watermark 4th Addition
Total # Units = 91
x Park Dedication Fee $3,160
= Cash in Lieu Value $287,560
- Land dedication value (Outlot C, Watermark 4th) ($207,000)
7
- Trail Construction Costs ($120,000)
TOTAL CASH FEE DUE = ($39,440)
There are 348 remaining lots to be platted. The negative cash balance will be carried over and
balanced with the next phase of development.
Wetlands
Wetland delineations were approved by RCWD and USACE in 2015. The delineation identified
28 wetlands totaling approximately 20 acres in size. The original approved WCA Sequencing
Application proposed wetland impacts, wetland creation, wetland restoration and upland buffer
establishment. In April 2018, the developer revised the application to purchase 3.3671 acres of
wetland banking credits as the proposed compensatory mitigation action. The wetland fill,
impacts and mitigation (wetland bank credits) occurred within the Phase I grading limits and are
complete.
In December 2020, the developer submitted another Wetland Replacement Plan to RCWD for
the balance of the site. Phase 3 grading impacts 5.9784 acres of wetland which require a 1:1
mitigation. The plan was to buy wetland credits for mitigation; however, viable wetland
restoration and creation opportunities exist within Phase 3; therefore, onsite restoration and
creation will be used for mitigation. This is consistent with the Parks and Open Space Plan and
the establishment of the greenway corridor including wetlands, trails and open space.
An Open Space Easement in favor of the City was recorded in March 2019 over outlots
containing wetlands, open space, stormwater po nds, berms etc. Additional easements and
declarations in favor of RCWD will be recorded over the wetlands and buffers. The Watermark
4th Addition Final Landscape Plan details the location of required “Protected Open Space Area”
signs.
Development Agreement
Master Development Agreement
A Master Development Agreement was recorded in March 2019. The Agreement covers the
entire 372 acre site and details the terms and conditions of City approvals, the Development
Plans, the required public and private improvements as part of the first and subsequent phase, the
standards for the timing and financing of the improvements, required HOA documents and the
terms of payment.
Development Agreement and Planned Unit Development Agreement
The City will also require our standard Development Agreement specific to each phase of
development. This agreement further details required improvements and securities. The City
Engineer will draft this Agreement and it shall be approved by the City Council.
8
Homeowner’s Association (HOA)
The City Attorney is reviewing the submitted HOA documents. Any comments shall be
addressed prior to release of the mylars.
Title Commitment
The City Attorney is reviewing the title commitment and final plat. Any comments shall be
addressed prior to release of the mylars.
Stormwater Maintenance Agreement
The stormwater facilities will be covered under the City’s Programmatic Stormwater
Management Agreement after they have been installed and accepted by the City.
RECOMMENDATION
Staff recommends approval of the Watermark 4th Addition PUD Final Plan/Final P lat subject to
the following conditions:
1. The 4th Addition Development Agreement shall be approved by the City Council,
executed and recorded against the property.
2. The City Attorney shall review the title commitment prior to the release of the final plat
mylars.
3. The City At torney shall review the Homeowner’s Association (HOA) documents prior to
release of the final plat mylars.
4. A copy of the recorded Homeowner’s Association documents shall be submitted to the
City prior to issuance of building permits.
5. A copy of the recorded deed for Outlot C shall be submitted to the City.
6. Per the Watermark 3rd Addition Development Agreement, the townhome tot lot, play
equipment and associated landscaping on Outlot I, Watermark shall be completed by
August 30, 2021.
The following comments shall also be addressed:
1. All comments from the City Engineer Letter dated January 7, 2021 shall be addressed.
2. All comments from Environmental Coordinator Memo dated January 7, 2021 shall be
addressed.
3. A draft copy of the deed for Outlot C shall be submitted to the City for review and
approval.
4. Watermark 4th Addition Landscape Plan Sheets:
a. The plans shall include the Main Entrance Monument and Entrance Monument
signs.
9
ATTACHMENTS
1. City Engineer Letter dated January 7, 2021
2. Environmental Coordinator Memo dated January 7, 2021
3. Watermark Land Use Plan
4. Watermark 4th Addition Final Plat
178 E 9TH STREET | SUITE 200 | SAINT PAUL, MN | 55101 | 651.286.8450 | WSBENG.COM Memorandum
To: Katie Larsen, City Planner, City of Lino Lakes
From: Kelsey Gelhar EIT, WSB
Diane Hankee PE, City Engineer, City of Lino Lakes
Date: January 7, 2021
Re: Watermark 4th Addition
Construction Plan Review
017363-000
As requested by City Staff, WSB has reviewed the Final Plat and Construction Plans for the
Watermark 4th Addition in Lino Lakes, MN. The following comments were made on the following
documents:
• Watermark 4th Addition Plat prepared by Carlson McCain, received December 14, 2020.
• Watermark 4th Addition Sanitary Sewer, Water Main, Storm Sewer, and Street
Construction Plans prepared by Carlson McCain, dated December 4, 2020, received
December 14, 2020.
• Watermark 4th Addition Construction Plans for Turn Lanes, prepared by Carlson McCain,
dated December 14, 2020, received December 14, 2020.
• Watermark 4th Addition Landscape Plans prepared by Carlson McCain, dated December
14, 2020, received December 14, 2020.
The following review comments should be responded to in writing by the applicant.
Engineering
• Grading
A review of the entire Phase 3 grading plan is underway. The Watermark 4th Addition is
part of the Phase 3 grading. The Watermark 4th Addition includes site grading for Crane
Drive, Forest Lane, and Watermark Way.
Comments:
1. Verify that the low floor elevations for the proposed homes are at least 4-ft
above the seasonal high groundwater level and provide low floor elevations
on the grading plans.
2. See Floodplain section for comments regarding turn lane grading.
3. On sheet 16 of the Utility Plans, the high point station is different in the plan
view and the profile view. The profile shows the high point at station 10+50
and the plan view shows the high point at station 10+00.
4. The typical sections on sheet 23 of the Utility Plans do not match the plans
for 4th Addition.
Ms. Katie Larsen
01/07/2020
Page 2
Watermark 4th Addition Engineering Review
i. Crane Drive and Watermark Way (Stations 7+50 to 17+70) have
concrete sidewalk on both sides of the street.
ii. Watermark Way (Stations 17+70 to 25+61) has sidewalk on the
north side of the street.
iii. The typical section for Forest Lane north of the roundabout is
missing.
iv. The typical section for streets 30’ wide B/B does not apply to this
addition.
5. The typical sections on sheet 24 of the Grading Plans should be updated to
reflect parts i-iii of comment 3 and should also be updated to reflect the
following:
i. Review all street sections to show sidewalk on correct side of street
or on both sides of the street.
ii. The grading plans do not show sidewalks along Kronis Cir, Victoria
Cir, and Pepin Dr (Station 13+50 to Cul-de-sac).
• Stormwater Management
Stormwater management for the Watermark 4th Addition has a storm sewer conveyance
system , including rear yard drainage systems.
Comments:
1. Applicant to submit final design for the stormwater reuse system.
2. Revise Grading and Utility Plan to label “Lake 10” as “Pond 10” to be
consistent with other public utility stormwater ponds and the grading plan.
3. Revise Utility Plan to label “Pond20” as “Lake 20” to be consistent with the
Grading Pl an.
4. No outlet control structures from stormwater ponds are proposed with the 4th
Addition for outlets from Pond 400, Lake 20, or Pond 10. Future additions
shall be reviewed for outlet control structures to be consistent with future
utility plans.
5. With the rest of the site grading being completed with the 4th Addition,
provide details on temporary drainage from stormwater ponds beyond the 4th
Addition as storm sewer will not be installed until construction of later
additions.
6. Provide Existing and Proposed Total Phosphorus (lb/yr) and Total
Suspended Solids (lb/yr) for the entire development site. This information is
provided in “treatment volume” for the stormwater ponds in Appendix E, but
is required to be calculated in terms of annual loading of the pollutants. Per
the MPCA water quality certification permit for this area, the site must not
exceed the existing pollutants. Stormwater Irrigation Reuse system should
be included as applicable. Acceptable water quality modeling programs
include the MPCA MIDS calculator or P8. I
7. Provide the total area irrigated for the stormwater reuse system.
8. Applicant to review storm sewer layout near roundabout radii for conflicts
between storm sewer pipe and the proposed lighting and signs.
• Water Supply
Ms. Katie Larsen
01/07/2020
Page 3
Watermark 4th Addition Engineering Review
The proposed water system extension is consistent with preliminary plat. The development
is being served by either 16- inch, 12- inch, or 8- inch diameter ductile iron pipe (DIP) water
main and 1-inch Type K copper services extended to each lot.
Comments:
1. The applicant shall space all fire hydrants at a maximum distance of 400
feet.
2. The applicant shall install temporary hydrants at dead ends.
3. The Utility Plans currently show 5 feet of separation between the steel
casing and the bridge bottom (sheet 4). This will be reviewed again once
bridge plans are submitted.
4. Applicant to update the plan view note for the watermain crossing 20th Ave
(CSAH 54) on sheet 4. The plan view states that the pipe is 12” DIP being
directionally drilled, while the profile view says 12” fused PVC. The City will
allow 12” DIP watermain in a casing to be installed by open cut if
construction is performed when the road is closed for city storm sewer
installation.
5. Applicant to show insulation over pipe where 7.5’ minimum cover cannot be
reached (see ditch section on sheet 4).
6. The well in Outlot D needs to be abandoned and documentation must be
provided to the building official.
7. Applicant to show a future 16” gate valve along the water main that extends
through Outlot C (see sheet 7).
8. Applicant to show a future 12” gate valve at the north end of the water main
along Forest Lane (see sheet 8) and shall remove the gate valve at station
3+55.
9. Applicant to move the gate valve on the 12” line at station 3+65 (Forest Ln
alignment) to the 8” line near station 5+85 (Watermark Way alignment) (see
comments on sheet 8).
10. Applicant to add a gate valve on the east side of 20th Avenue (CSAH 54) at
Watermark Way.
• Sanitary Sewer
The proposed sanitary sewer is consistent with the preliminary plat. The development is
being served by 8- inch, 10- inch, and 15- inch diameter poly-vinyl chloride (PVC) pipe
along with 4-inch diameter Schedule 40 PVC service pipe to each lot.
Staff does not have any comments at this time.
• Transportation
The proposed roadways are consistent with the preliminary plat. The work in this addition
includes extending Crane Drive, Watermark Way, and Forest Lane. Crane Drive, Forest
Lane, and Watermark Way are proposed to be 32’ wide from back-of -curb to back-of -curb.
The applicant is proposing to add a designated right turn lane to Watermark Way from
northbound 20th Avenue (CSAH 54). The applicant is also proposing to add a bypass lane
for southbound traffic on 20th Avenue (CSAH 54). The proposed entrance to the
development will include a bridge over Lake 10 and a roundabout at the intersection of
Watermark Way and Forest Lane.
Ms. Katie Larsen
01/07/2020
Page 4
Watermark 4th Addition Engineering Review
Comments:
1. Applicant to submit bridge design and supporting documentation.
2. Revise median at Watermark Way and 20th Avenue (CSAH 54) to
incorporate both right and left turn lanes.
3. Add a center left turn lane on 20th Avenue (CSAH 54) that can
accommodate future development to the west.
4. Make sure pavement section for 20th Avenue (CSAH 54) matches the
existing through lane section.
5. Add crosswalk markings to the crossing at Watermark Way and 20th Avenue
(CSAH 54).
6. Update the stop sign on Watermark Way at 20th Avenue (CSAH 54) to be a
36”x36” stop sign and update sign B (on turn lane plans) to be a “RIGHT
LANE MUST TURN RIGHT” R3-7R sign.
7. Anoka County to review turn lane layout on 20th Avenue (CSAH 54) prior to
final plat approval.
8. The turn lane cross sections show the ditch and floodplain being filled. The
applicant shall review and adjust. The cross sections should be shown
approximately 20 feet beyond the right of way to show trail drainage.
9. Roundabout Comments
i. Should provide the following checks:
1. Fast Path
2. Truck Turning
3. Sight Distance (this will help determine location of
plantings (any areas within a sight distance triangle shall
be limited to under 2’ in height)
ii. Sheet 23: Instead of S524, the curb used should be the R424.
iii. Sheet 23: Staff recommends tipping the gutter of the R424 and
B612 in and placing catch basins in those locations. This prevents
melting and refreezing in the spring. Many agencies do not tip the
B612 in, but most tip the R424 in.
iv. Sheet 23: The truck apron detail, the dowel bars can be eliminated
and the joint type can be C3P-U. Eliminate the interior tie bar,
applicant can keep the exterior tie bar, but it won’t actually be an
L1TH, as it will just be a butt joint as they are poured separately.
v. Sheet 23: The roundabout typical section should show to the center
of the central island. This should be graded with ~1:6 to the center.
vi. Sheet 23: Grade on truck apron should be 1%
vii. Sheet 15: Pedestrian Ramps should be detailed somewhere
showing the ramps, landing, etc. Just referencing the details does
not tell enough information needed to choose the appropriate type of
ramp to use.
viii. Sheet 19: The 4” dotted stripe at the edge of the roundabout should
be an 8” dotted (3’ stripe, 3’ gap)
• Wetlands and Mitigation Plan
Wetlands and mitigation plan reviewed during the Preliminary Plat.
• Landscaping
Ms. Katie Larsen
01/07/2020
Page 5
Watermark 4th Addition Engineering Review
The Watermark 4th Addition Site Landscape Plan has been reviewed by staff and the City’s
Environmental Coordinator. The Environmental Coordinator will provide separate comments.
Comments:
1. Staff recommends that the seed mixes proposed with Watermark 4th
Addition match the wetland replacement plan prepared by Kjolhaug as noted
by the City Environmental Coordinator’s review.
2. The applicant shall adjust tree locations so that trees are outside of sight
clearances (sight triangles) at intersections with adjacent streets.
3. Trees shall not be placed over utility pipes. Staff recommends that trees be
moved 20-ft from proposed trunk sanitary sewer line along 20th Avenue
(CSAH 54).
4. Applicant to review plantings near roundabout to ensure that plantings do
not obstruct view of pedestrian ramps.
• Geotechnical
Additional geotechnical data will need to be provided with the final bridge design.
• Floodplain
The Watermark 4th Addition does impact the existing floodplain. Applicant is still
working on FEMA Floodplain Approval associated with Watermark 2nd Addition.
Anoka County wants the removal of the floodplain in the Anoka County right-of -
way to be included with the modified LOMR.
Comments:
1. Applicant is working on adjusting floodplain limits to eliminate the floodplain
from Anoka County ROW. The turn lane plans do not appear to show the
proposed ditch floodplain that is part of the FEMA application and exhibits.
This may result in modifying the grading plans for this area.
2. Building permits f or lots within the existing floodplain shall not be issued until
an approved LOMR is in place.
• Drainage and Utility Easements
Roadways are proposed within right-of -way and lots include standard drainage and utility
easements. Larger drainage and utility easements are provided over surface water
management features as required. Temporary easements for Pond 400 outlet will expire
with this plat.
• Development Agreement
A development agreement will be required with the final plat.
• Grading Agreement
Grading agreement not required. Grading securities to be collected through 4th Addition
Development Agreement.
Ms. Katie Larsen
01/07/2020
Page 6
Watermark 4th Addition Engineering Review
• Stormwater Maintenance Agreement
The stormwater maintenance for public facilities in the Watermark 4th Addition will be
covered under the City’s Programmatic Stormwater Management Agreement after the
facilities are have been installed and accepted by the City. Rear yard drainage systems are
to be privately maintained.
• Permits Required
1. NPDES General Construction Permit
2. City of Lino Lakes Zoning Permit for Construction
3. Minnesota Pollution Control Agency Sanitary Sewer Extension Permit
4. Minnesota Department of Health
5. Rice Creek Watershed District Permit
6. LOMR required for lots within floodplain
7. Army Corp of Engineers Permit - Received for development
If you or the applicant have any questions regarding these comments, please contact Diane
Hankee at (651) 982-2430 or dhankee@linolake.us. You may also contact Kelsey Gelhar at
(612) 709-4897 or kgelhar@wsbeng.com.
l Page 1
Memo
To: Katie Larsen
From: Andy Nelson
Date: January 7, 2021
Re: Environmental comments for Watermark 4rd Addition Landscape Plan
1. Update Landscape Plan for 4th addition in accordance with the Kjolhaug
Wetland Replacement Plan, dated 12/15/20.
2. Update the Overall Landscape Plan and Open Space Restoration and
Management Plan in accordance with the Kjolhaug Wetland Replacement
Plan, dated 12/15/20.
3. Buffer and screen trees west of Wetland 10 may have to be moved to allow
for 20 feet of distance between trees and sanitary sewer pipe that runs along
20th Avenue. See Engineering comment on this issue.
If required, relocation of trees should be coordinated with Kjolhaug staff to
ensure that potential wetland replacement plan impacts are in accordance
with wetland plans approved by the LGU, Rice Creek Watershed District.
4. Increase boulevard tree diversity. There are currently 60 hackberries along
Forest Lane and 50 honey locusts along Watermark Way. Replace all
boulevard trees on Forest Lane (only 4th addition) with 2 species other than
hackberry or maples. One third of the trees on Watermark Way can remain
honey locust. The other two thirds should be replaced with two species other
than honey locusts or maples.
5. Redundant perimeter controls will be needed around wetlands.
Environmental
>20TH AVENUE NORTH (CSAH 54)INTERSTATE HIGHWAY NO. 35E73RD ST.
ST.REHBEIN
WATERMARKLAND USE PLANf:\jobs\6721 - 6740\6731 - watermark\cad c3d\survey\6731_sba land use plan revd4.dwgSave Date:08/29/18Brian J. Krystofiak, P.E.1of1WATERMARKLino Lakes, MinnesotaI hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Professional Engineer underthe laws of the State of MinnesotaPrint Name:Signature:Date:License #:25063Drawn:Designed:Date:06/19/17BJKC#Revisions:1. 06/22/17 Revise Legend.2. 07/10/17 Revise layout.3. 04/30/18 Revise layout.4. 06/01/18 Revise layout.5. 08/27/18 Per City comments.environmentalengineeringsurveying···Cente
rv
i
l
leLake Pel
t
ie
rLakeRice
C
reekChain
o
f
lakesReserveLakeReshanau
Ci
ty
o
f
Cente
rv
i
l
le RondeauLake LOCATION MAP 3890 Pheasant Ridge Drive NE,Suite 100Blaine, MN 55449Phone: (763) 489-7900Fax: (763) 489-7959www.carlsonmccain.comLENNAR16305 - 36TH Avenue N. Suite 600Plymouth, Minnesota 55446 LEGEND 20TH AVENUE NORTH (CSAH 54)73RD ST.
ST.REHBEIN
SITE DATA SOIL BORINGS WETLANDS OWNER CONTACT
WATERMARK 4TH ADDITIONINSET 'a'(see sheet 3of 5 sheets)INSET 'b'(see sheet 4of 5 sheets)INSET 'c'(see sheet 5of 5 sheets)MATCH LINE A(SEE SHEET 2 OF 5 SHEETS)MATCH LINE A(SEE SHEET 2 OF 5 SHEETS)Detail ASee Detail AFORESTLANEWATERMARKWAYWATER
MARK WAYCRANE DRIVEFORESTLANE
WATERMARK 4TH ADDITIONMATCH LINE A(SEE SHEET 1 OF 5 SHEETS)MATCH LINE A(SEE SHEET 1 OF 5 SHEETS)
WATERMARK 4TH ADDITIONINSET AFOREST LANE
WATERMARK 4TH ADDITIONINSET BWAT
E
R
M
A
R
K
W
A
Y
WATERMARKWAYFORESTLANELANEFOREST
WATERMARK 4TH ADDITIONINSET CCRANE DRIVEWATERMARK WAYWATER
MARK WAY