HomeMy WebLinkAbout06/01/1987 Council Packet AGENDA
MONDAY JUNE 1, 1987
6: 30 P.M.
LINO LAKES CITY COUNCIL CHAMBERS
THE PURPOSE OF THIS COUNCIL WORK SESSION IS TO DISCUSS SEWER
AND WATER IMPROVEMENTS IN URBAN SERVICE DISTRICT #1
(SOUTH-WEST AREA)
1 . SEWER
A. UDHE IMPROVEMENT
B . ERICKSON IMPROVEMENT
2 . WATER
A. TRUNK SYSTEM FOR ENTIRE URBAN SERVICE DISTRICT *1
B . CIRCLE PINES AGREEMENT
3. FINANCING
A. SURVEY OF OTHER COMMUNITIES ' RATES
B . ALTERNATE METHODS FOR FINANCING
C . PUBLIC IMPROVEMENT FINANCING POLICY (REVISED)
D. STAFF RECOMMENDATIONS
TOL
DUV
TKDA AND A KING,TES,IN ,A INCORPORATED
N
AND ASSOCIATES,INCORPORATED
ENGINEERS ARCHITECTS PLANNERS 2500 AMERICAN NATIONAL BANK BUILDING
SAINT PAUL,MINNESOTA 55101
612/292-4400
MEMORANDUM
To: Randy, Schumacher Reference: Sewer & Water Charges
Copies To: Lino Lakes Minnesota
From: Ron Stahlbera
Date: May 29. 1987 Commission No. 7777-007
The attached data sheets for sewer rates, connection fees, etc., is taken from
a report prepared by the City of Inver Grove Heights, dated October 13, 1986.
The attached data sheets for water rates, connection charges, etc. , is taken
from a report prepared by the City of Inver Grove Heights, dated February 13,
1986.
The other attached data sheet is the preset rates for the City of Andover.
The public improvement financing policy will be revised to incorporate the
recommendation of Bi 1 1 Hawkins, John Davidson and Dave �_�1J-yo-nv_of
Springsted.
RJS:J
FIGURE NO. 13
1 COMMUNITY RATE COMPARISON
AVERAGE
CONNECTION AREA RESIDENTIAL
CITY WATER RATES CHARGES ASSESSMENT WATER BILL
---- ----------- ----------- ---------- -----------
ROSEMOUNT .95/1 ,000 g $735.00 NONE $27.08
i CHASKA .80<7,000 g 600.00 $ 450.00 $19.58
I .65>7,000 g
BURNSVILLE .87<50,000 g 600.00 Single NONE $24.80
1 .09>500000 g 480.00 Multiple
1450.00 Commer/Ind
RICHFIELD 1 .11/1 ,000 g NONE NONE $31 .64
COTTAGE GROVE 1.00<15,000 g 470.00 1175.00 $24.45
.70>15,000 g
;
EDEN PRAIRIE 4.75 minimum 350.00 1088.00 $27.08
.95>5,000 g
I HASTINGS .77/1 ,000 g 475.00 NONE $21 .95
LAKEVILLE 8.50 minimum 820.00 NONE $21 .45
.70>10,000 g ;
WEST ST. PAUL .94/100 Cu Ft NONE NONE $35.63
f
MENDOTA HEIGHTS .94/100 Cu Ft 1250.00 Comer NONE $35.63
200.00 Res
SO. ST. PAUL .59<30,000 g 14.00/FF NONE $16.82
.39>309000 g
i I EAGAN 16.38 minimum 500.00 Single 1190.00 Res $26.40
a
.742>15,000 g 400.00 Mult 3020.00 Commer/Ind
I
INVER GROVE 11.25 minimum 1000.00 average 1500.00/acre $35.62
HEIGHTS 1.25>9.000 g
i
y Average $29.05
Sb re
o
t
i
Page 19
FIGURE N0. 1 4
COMMUNITY RATE COMPARISON
C I T Y S E W E R R A T E S O T H E R C H A R G E S
MENDOTA HEIGHTS $22.00/Resident $2.00 Penalty
(Approximately $.73/1 ,000 g) (Sewer Only)
HASTINGS $.77/1 ,000 g $5.70 Meter Charge
10% Penalty
WEST ST. PAUL $23.28/Resident 5% Penalty - 30 Days
(Approximately $.78/1 ,000 g) (Sewer Only)
COTTAGE GROVE $24.00/Resident $1 .00 Estimate Read
(Approximately $.80/1 ,000 g) 10% Penalty - 30 Days
BURNSVILLE $15.00<101000 g 101 Penalty - 25 Days
$.80>101000 g $.50 Estimate Read
RICHFIELD $17.05<10,000 g $13.00 New Customer
ON $.86>101000 g $37.00 Hydrant Flush
$2.95 Invoice Charge
on5% Penalty - 30 Days
EAGAN $17.10 Minimum $30.00 Deposit
$1 .04>15,000 g $5.00 Collection Fee
10% Penalty
ROSEMOUNT $1 .05/1 ,000 g $1 .25 Meter Maint.
$5.00 Estimate Read
10% Penalty - 20 Days
CHASKA $1 .24/1 ,000 g 5% Penalty - 15th
INVER GROVE HEIGHTS $15.00 Minimum N 0 N E
$1.25>12,000 g
EDEN PRAIRIE $6.75 Minimum $12.50 Recovery
$1 .35>5,000 g 1% Penalty - 30 Days
LAKEVILLE $17.50 Minimum 5% Penalty - 30 Days
$1 .47>10,000 g
SOUTH ST. PAUL $2.03/1 ,000 g 5% Penalty
� �'` 7•Sp 1�E✓L eruct r��'/.
Page 18
SEWER OPERATING RATES
As previously illustrated in Figure No. 6, the sewer rates necessary to break
even with expenditures increase by approximately 5 percent. It is proposed
that sewer rates be structured as follows:
CURRENT PROPOSED START 11/1/86
1st 10,000 g - $14.25 1st 12,000 g - $15.00
OVER 100000 g - $.85/1 ,000 g OVER 12,000 g - $1 .25/1 ,000 g
Because sewer rates are calculated, based on winter quarter water consumption,
the new rates are recommended for implementation, effective November 1 , 1986.
This is the beginning of the calculation period for the following year. In
addition, it is proposed that sewer rates be increased five cents annually
through 1990 when an additional study would be done.
A survey of other communities was done and the result is shown in Figure No.
14. This table indicates that with the rates as proposed, the City of Inver
Grove Heights would be rated 10 out of the 13 communities listed. However,
the City of Inver Grove Heights does not have penalties or other charges re-
lated to servicing the community.
UN
Page 17
FIGURE NO. 13
COMMUNITY FEE COMPARISON
CONNECTION AREA
CITY FEE ASSESSMENT COMMENTS
Mendota Heights N 0 N E N 0 N E
Richfield N 0 N E N 0 N E System is Complete
Cottage Grove $180/Acre $735/Acre No MWCC Interceptors
Eagan $100 $1 ,240/Acre
West St. Paul $175/Residential N 0 N E
$750/Acre (Commercial)
Chaska $200 $430/Acre
Inver Grove Heights $200 $1 ,550/Acre As recommnded. The
(4" Residential) current rates are:
$62/Connection
$850/Acre
Eden Prairie $255 $1 ,632/Acre
Hastings $350 N O N E
Burnsville $400 $1 ,000/Acre
Lakeville $605 N 0 N E
Rosemount $735 N 0 N E Typical Residential
Fee. Actual charge
depends on size of ser-
vice
South St. Paul $16/FF N 0 N E
��Sc°ys Syr .
7,>ovE�2
See Proposed Assessment Roil .
The proposed Assessment Roll is divided Into sections by date of proposed
service for the sanitary sewer improvements and by trunk improvement area
for watermain improvements.
' Asses Rates (July 1986 Base Rate)
1 . Sanitary Sewgrj
Trunk Area Charge $821 .00/Acre D
Trunk Connection Charge $201 . 10/Unit - Residential
E201.10/R.E.U. - Commercial/Industr I
Lateral Front Foot Charge $20.00/Front Foot
AA
2. Water=I1�
Trunk Area Charge $875.00/Acre
Trunk Connection Charge $950.00/Unit - Residential
$475.00/R.E.U. - Commercial/industrial
or $4,750.00/Acre (whichever is greater)
Lateral Front Foot Charge $20.00/Front Foot
r (R.E.U. = Residential Equivalent Unit)
Connection charges are based on 2.0 units/acre for residential ar s and
most commercial/industr.ial areas, since many areas may be rezone . Known
commerclal/industrial areas were charged higher rates. All rates and
charges are subject to revision prior to final assessment.
MAssessment rates are for the 1986 construction season and will be revised
to ref lect 1 987 construction costs, based on the ENR Construction Cost
Index, prior to the actual assessment.
In addition to the assessments shown lateral assessments will be
collected, but will depend on the final routing and future street layouts.
Assessment areas for each property are based on gross buildable area. This
includes street right-of-way but deducts land to the flood plain. All lots
within a development are charged for the same area unless there is a
significant difference in size and/or benefit. The assessable area does
not necessarily relate to the actual measured area or legally described
area.
_ -F- 8179
TKDA TOLTZ,KING,DUVALL,ANDERSON
AND ASSOCIATES,INCORPORATED
ENGINEERS ARCHITECTS PLANNERS 2500 AMERICAN NATIONAL BANK BUILDING
SAINT PAUL,MINNESOTA 55101
612/292-4400
MEMORANDUM
To: Randy Schumacher Reference: Elevated Tank/Trunk WM
Copies To: Lino Lakes, Minnesota
From: Ron Stahlbera
Date: 1987 Commission No. 8881
The attached letter was considered at the Circle Pines Utility Commission
Meeting on May 27, 1987. They approved the basic concept except that they
felt Lino Lakes should pay a share of the capital costs (depreciation) until
we have an elevated tank in service.
The depreciation share would be on a pro-rated basis equivalent to the
maintenance contract. The Circle Pines City Manager was directed to work with
us to determine an appropriate number for this.
The following chart is based on the assumptions contained in Item 3 of the
letter to Circle Pines.
10-Year 7-Year
Estimated Connections Est.Share Est. Share
Year Lino Lakes % Circle Pines Total Lino Lakes Lino Lakes
1986 122 8.97 1 ,360 1 ,482 1 ,277 1 ,665
1987 202 14.08 1 ,435 1 ,637 2,005 2,613
1988 362 19.37 1 ,510 1 ,872 2,754 3,589
1989 482 24.20 1 ,510 1 ,992 3,446 4,492
1990 602 28.20 1 ,510 2,112 4,058 5,290
1991 722 32.34 1 ,510 2,232 4,605 6,002
1992 842 35.79 1 ,510 2,352 5,096 6,643
1993 962 38.91 1 ,510 2,472 5,541 7,222
i�a�?'a■,.ter � �
El
LAKE
RICE pay
IRES14ANAU LAKE - I of
FUTUR
Los
r.
d rj 14
OFWATE • 1
PROPOSED
WATERMAN
AKE
ALT
• a
LINO LAKES
PROPOSED 1987 SANITARY SEWER CONSTRUCTION
lot
RICE LAKE LAKE = .•:;
RESMANAU
I w sr.
• ~`' � ' TRUNK SEWER
•
o I �
w
k
• � � fed 0 � •
KE = a
1100311�
i Kt i
LIFT STATION & FORCEMAIN
1 % CEDQt LAKE
' 4
S W -
C7 to
N �_ W_ a: FQ- Y _Z
W LLJ Y W C L C4 ►N-a J J Q_ CL Z
J m 2 c H W �' J F-+
O
C'3 = W W O W W
Q W W N V) J z Z CD
O F- Z Z Z I-- Z W CN W Z O U W cz
►-
�-+ 3 O c� F- _Z NC E = 3 M cn Q cn
Q O O Z �-•+ O ' J Q W O
J 3 OU OC-) J LL.
JER RATE AND $5 base 50 $4 quar. 92 /
)ST PER THOU- $39.00 $5.00 $I1.00 $16.50 $17.00 $9.35 $10.00 water $3.base base base base base quarter not $7 quar. base 95¢/ 32t/1000 1000
IND
620000 85�/100 78t/100 '.5/1000 770000 avail . 82¢/l000 55¢/100 1000
:WER RATE AND rnclJ.ude_d $25.50 $30.50 $26.45 $45.00 $21.10 $32.00 $54.00 $25.50 $8.70 $1.05/ $21.90 $16.80
)ST PER in above quarter quarter quarter quarter $1.77/ quarter quarter quarter month 1000 quarter 2 month
TARTER 1000
:WER CONNECTION no no no $190.00 $160.00 $605.00 no $1,200 $201.10 none $743.00 no $1,506
IARGE charge charge charge policy charge
includ.
,TER CONNECTION $600.00 no no $495.00 $160.00 $820.00 no not $950.00 none $743.00 $570.00 1n
ARGE charge charge policy avail . $1506
above
WER & WATER
UNK CHARGES Yes no no yes yes
VIED ON UN- yes yes no no yes yes yes times es 8 5 ��
ATTED LAND
LLS, TRUNK MNS. a -c
TER STORAGE �0
NANCED BY no yes yes (Enter- yes no yes no yes yes yes no yes 8 5
SESSMENTS priz
dER LIFTS, fund
no
2CE MNS. TRUNK yes es (Enter- Yes yes no yes yes yes yes yes yes 11 2
yes y
i. FINANCED BY policy
iESS./HOOK-UP Viindriz
( LEVIES FI-
ICE SEWER AND no no no no no no no no no no yes no no 1 12
'ER SYSTEM