Loading...
HomeMy WebLinkAbout2021-029 Council Resolution CITY OF LINO LAKES RESOLUTION NO.21-29 RESOLUTION ACCEPTING QUOTES,AND AWARDING A CONSTRUCTION CONTRACT,2021 TRAIL MAINTENANCE PROJECT WHEREAS,pursuant to a request for quotes for the construction of the 2021 Trail Maintenance Project,quotes were received,and tabulated: CONTRACTOR TOTAL QUOTE ACS Asphalt Concrete Solutions Did Not Quote Allied Blacktop Co. $99,379.00 Arcade Asphalt,Inc. Did Not Quote Asphalt Restoration Company,Inc. Did Not Quote Bituminous Roadways Inc. $88,000.00 Muellner Blacktop, Inc. Did Not Quote T.A. Schifsky's& Sons, Inc. Did Not Quote WHEREAS, it appears that Bituminous Roadways, Inc. of Mendota Heights,Minnesota, is the lowest responsible bidder;and WHEREAS,the funding for the project is from the general fund,park budget;and NOW,THEREFORE,BE IT RESOLVED by the City Council of the City of Lino Lakes that the Mayor and Clerk are hereby authorized and directed to enter into a contract Bituminous Roadways, Inc. for the construction of the 2021 Trail Maintenance Project in the amount of$88,000.00; Adopted by the Council of the City of Lino Lakes this 12th day of April,2021. The motion for the adoption of the foregoing resolution was introduced by Councilmember Lyden and was duly seconded by Councilmember Cavegn and upon vote being taken thereon, the following voted in favor thereof: Lyden, Cavegn,Ruhland, Stoesz, Rafferty The following voted against same: none12-4 � f I Ro Rafferty, Mayor ATTEST: u u ' e Bartell, City Cler CITY COUNCIL AGENDA ITEM 5B STAFF ORIGINATOR: Diane Hankee, City Engineer MEETING DATE: April 12,2021 TOPIC: Resolution No. 21-29, Accepting Quotes and Awarding a Construction Contract,2021 Trail Maintenance Project VOTE REQUIRED: 3/5 Vote Required INTRODUCTION Staff is requesting authorization to accept quotes and award the construction contract for the 2021 Trail Maintenance Project. BACKGROUND The 2021 Trail Maintenance Project includes: Fox Road- Trail Maintenance Maintenance of the trail that connects to Fox Road between Fox Circle and Deerwood Lane includes milling and repaving the trail, repairing existing culverts, and installing three ADA compliant pedestrian ramps at Fox Road and at West Shadow Lake Drive. A location map is enclosed. Funding for the project is from the General Fund,Parks budget. Quotes for the project were received on April 6th, 2021. CONTRACTOR TOTAL QUOTE ACS Asphalt Concrete Solutions Did Not Quote Allied Blacktop Co. $99,379.00 Arcade Asphalt, Inc. Did Not Quote Asphalt Restoration Company, Inc. Did Not Quote Bituminous Roadways Inc. $88,000.00 Muellner Blacktop,Inc. Did Not Quote T.A. Schifsky's& Sons,Inc. Did Not Quote The low bid was submitted by Bituminous Roadways, Inc. of Mendota Heights, Minnesota, in the amount of$88,000.00. Bituminous Roadways,Inc.has adequately completed numerous projects in the City of Lino Lakes.The completion date for this project is September 17th,2021. RECOMMENDATION Staff recommends adoption of Resolution No.21-29 accepting quotes and awarding a construction contract for the 2021 Trail Maintenance Project, in the amount of$88,000.00 to Bituminous Roadways, Inc. ATTACHMENTS 1. Resolution No.21-29 2. Location Map 649 6456 6462 6456 6447 6450 6450 )wer Rd . 6443 t 6444 6444 652 653 '657 bfi _. 6438 - 6439 .....6438 I,. V1*w VOoa Muskrat Run Cyr41 <� , NV 6 6420 429 642054146427 6412/.\ 6414696 639864076402 0*t , - 6397 6404 6396 O .639E 1 AillirCZ 6391 ^, 6376 6390 .... 6400 .,' a `fn '6\Coh P\ " 647 Y ", 6387 6384 664 ... '6383 6378 652 767 650 0 �# f.' Q " 759 r2 eV - '. N688 1 /, 6336 6334 a 6345 6348 6344 0 4111P:1,_ 4 ., 624 ,,.�/ / 1 6333 L __ . , 6332 2 N 74 m 737 0, 6326 c 6327 6334 6325 k 740 m Q 731 1 LEGEND 6318 701 8 O 707 725 36 713 m . 718 EXISTING CITY TRAIL 6310 6 6 ® PROPOSED TRAIL REPAIRS " 'S_ +c 720 Y r I I 1 --'N7 N Y Project Location i,.. ..,„ , , C ► T Y' ' O F 2021 Trail Maintenance Project •• LINKES City of Lino Lakes, Minnesota 0 100 200 laagal SCALE IN FEET