HomeMy WebLinkAbout01/08/1992 Park Board Packet CITY OF LINO LAKES
PARK BOARD MEETING
WEDNESDAY, JANUARY 8, 1992
6:30 PM
AGENDA
f 1. Call to Order and Roll Call
2 . Approval of Minutes from December 2, 1991
3. Open Mike
4. Old Business
✓ a. Follow-up and discussion of Black Duck Estates trail
• Shores of Marshan Lake building discussion
Pheasant Hills
. Weaver Property - Quail Ridge
e. LCMR
f. Other Old Business
5. New Business
. Upcoming public meeting - Comprehensive Park Plan Study
t/�b. Tom Jensen - Eagle Scout Project - Troop 136
6. Adjourn
PARK BOARD MINUTES
,.•� Monday, December 2, 1991
The December meeting of the Lino Lakes Park Board was called to
order by Chairman George Lindy at 6:33 pm on Monday, December 2,
1991 at Lino Lakes City Hall. Roll Call was taken, members present
were Candi Toffoli, John Baumann and George Lindy. Absent were Ken
Johnson and Bill Nissen. Also in attendance were Don Volk, Director
of Public Works, Marty Asleson, Superintendent of Parks, Recreation
and Forestry, Barry Bernstein, Parks and Recreation Program
Supervisor, and Carole Kohler, Parks Secretary.
APPROVAL OF MINUTES: John Baumann made a motion to approve the
minutes of November 14, 1991 as mailed. Candi Toffoli seconded the
motion. All were in favor. The minutes stand approved as mailed.
OPEN MIKE: No one appeared under open mike.
OLD BUSINESS:
Keith Eibensteiner/Black Duck Estates - Mr. Keith Eibensteiner
appeared in front of the park board again this month with his
proposal to meet the trail dedication requirements that the board
had requested of him at the November meeting. The board at that
time explained the importance of getting people to the other side
of Black Duck Drive to the proposed neighborhood park. Mr.
Eibensteiner explained that until he brought his proposal in front
of the Design Review Board recently, he was not aware that there
was a trail dedication to satisfy, he thought it was all taken care
of because the park dedication had previously been satisfied.
At the last meeting Mr. Eibensteiner and the park board had
somewhat agreed that a trail along the north side of Birch Street
going east and west to the end of the development would be a good
trail link. This plan would require the developer going to the
property owner of the lot on the corner of Birch Street and Outlot
J. As of this meeting Mr. Eibensteiner had not talked to the
property owners.
Marty Asleson explained to Mr. Eibensteiner that the main concern
of the board and also the recommendation of park plan consultants
(Brauer & Associates) was to get the people out to the other side
of Black Duck Drive. He went on to explain that in reviewing the
original proposal from their last meeting, he and City Engineer Dan
Boxrud feel that the house on the lot in question sits very close
to the right-of-way. He would prefer to see the trails more to the
north, running east and west behind the houses, straight through
the development. Mr. Eibensteiner reports this is a problem
because of a vein of bad soil running through this area. It's all
very low land there. This was discussed earlier in the day with Mr.
Eibensteiner, Dan Boxrud and Marty Asleson. Mr. Eibensteiner
1
PARR BOARD MINUTES
Monday, December 2, 1991
explained that if the trails present too much of a problem to them,
or if it's not affordable to develop this, they would not pursue
this option. The property purchase is contingent upon approval of
the City. He also asked who would be responsible if he were to put
a trail system in where the soil is bad and it sinks away in a
couple of years, he assumes that the developer would be responsible
for that.
George Lindy asked for a consensus of the board. John Baumann
suggested running the trails behind lots 22 & 23 and the Delzer
property and thought some decorative shrubbery or the like could be
put up to keep kids from running into private property, and direct
the flow out to the trails and on to the parks, possibly even a
split rail fence. Mr. Eibensteiner noted that there is a natural
clump of evergreens there now, so this would make use of the
natural setting. He also explained that he would not need
permission from property owners if you use the easements behind
their houses.
Mr. Lindy asked Marty Asleson for his opinion. Mr. Asleson
explained his main concern was to get the people that live in that
area out and over to Country Lakes Park and the proposed park to
the east, he expressed that this is also the opinion of Bill
Nissen.
MOTION: John Baumann made a motion to recommend to Council to
approve a trail system running east along the property easement off
of Birch Street to Black Duck Bay - then continue east between lots
26 & 25 - 24 & 27 and on the south side of 23 & 22 . Then back down
along the rear of lots 1 & 2, then south to Birch Street and
continue to the end of lot 10 and between lots 9 & 10 up to
Reshanau Circle . Motion was seconded by Candi Toffoli. There was
no further discussion. All were in favor. Motion carried. ( A map
of this approved trail is at the end of these minutes. )
Shores of Marshan Lake - Jack Menkveld - Mr. Jack Menkveld appeared
before the park board with his proposal for park dedication and
trails within his development. This development is 34+ acre site
with proposed park land in the southwest corner of the property
adjoining other un-developed land. The trail system would run along
the lake shore and would connect back to the street system in two
places. This property is low, but not -tender water. Mr. Menkveld
says that four wheelers and utility vehicles use this land now.
George Lindy asked Marty Asleson how this plan fit in with the
comprehensive park plan. Mr. Asleson explained that the plan shows
a need for between 5 and 8 acres in this area, so we would need to
get as much land as possible from the developer. He suggested to
2
PARR BOARD MINUTES
Monday, December 2, 1991
Mr. Menkveld that the park land be enlarged on the east side to
include lot 25 and make room to park about 5 or 6 cars here at the
end of the street . Mr. Menkveld was not in favor of this plan,
however, Don Volk pointed out that by making the road come straight
in to the park land and using the end of the road for a small
parking area and turn around, squaring off the adjoining lots 24 &
26, and not having a cul-de-sac there as the plat shows, there
would be a savings of road and curb costs for Mr. Menkveld.
Candi Toffoli noted that the trail runs through the back of lots 9
through 15. Mr. Menkveld agrees that this is not ideal, but it does
serve trail needs, and,that the trail is not close to the houses.
Marty Asleson says he has seen this in other communities and the
citizens seem to like the natural setting of the trails. He says
one of the main ideas is to hook up to the regional trails on the
other side of Marshan Lake from here.
Don Volk suggested to the board that they should be sure when they
make their recommendation to the council, that they note that
trails in the area be held to 884 contour, no lower, and also if
the board agrees to allow a trail here, the developer be required
to obtain DNR permits, which he would most likely do anyway. Mr.
Menkveld says there should be no problem with this. Mr. Volk
questioned the type of soil, as the City will have to use equipment
here. The ground is very solid here. And would be under water for
a short time during heavy rains, probably only a few times a year.
MOTION: Candi Toffoli made a motion to recommend to council to
accept for park dedication, the proposed trail dedication along the
lake, with the stipulation that the trail be no lower than an
elevation of 884 contour, and that the developer get DNR approval
for this, and for park land dedication, eliminate the cul-de-sac on
Park Circle, eliminate lot 25, and re-configure lots 24 and 26
slightly to square off the park land. The motion was seconded by
John Baumann. All were in favor. The motion carried.
Weaver Property - Kirk Corson - This is an update of the park
proposal that was accepted at the August 5, 1991 meeting. The
Weaver property being developed by Hokanson Development will be
called Quail Ridge. That proposal was contingent upon acceptance of
the DNR and the Anoka County Highway Department. The highway
department would have to accept the trail coming across the right-
of-way on Birch street, east of Pheasant Run. Our city engineers
have written the highway department asking for approval, and we
have not had a response as of this date. Marty Asleson says that
the reply could be here by the first of the year. Don Volk added
3
PARK BOARD MINUTES
,.., Monday, December 2, 1991
that he knows it is not normal practice for the county to allow
trails on their right-of-way. Mr. Corson asked what other options
he has, if that should be the case. This would mean that the
developer would then be responsible to build a trail over to
Captain's Place, so that people can get out to Black Duck Drive on
the east. Captain's Place is now owned by the City.
Mr. Corson noted that he has submitted his final plat, and expects
to be on the council agenda in December. Marty Asleson said he
expects to have an answer from the county and/or DNR within a
month.
MOTION: A motion was made by John Baumann to approve the Quail
Ridge 15 foot trail easement to run from Wild Turkey Trail to the
proposed 3. 1 acre park in this development, and also a trail system
at the rear of lots 8 & 9 that come out to Captain's Place. This
motion is contingent upon the jog being accepted by the Highway
Department, or adding on to the existing culvert to make the path
connect. Motion was seconded by Candi Toffoli. All were in favor.
Motion carried.
Pheasant Hills Land Trades - Don Volk preceded Mr. Vaughan's
presentation by explaining the history of the Pheasant Hills
development. Back in June of 1990 park dedication was accepted that
would include an island of approximately 10-15 acres and a
peninsula of approximately 3 acres in size. (a copy of those
minutes is enclosed) . Mr. Vaughan handed out written proposals to
the board, and explained that after meeting with Dave Torkildson
from Anoka County, he (Mr. Vaughan) would propose to keep the
island part of his dedication for development in exchange with the
county to access Sherman and Ward Lakes, the county would then give
him a 20 acre parcel of buildable land from within their Regional
Park Preserve so that he would be able to trade this parcel for the
island. This property is located north of Marshan Lake and
southeast of the I-35W and Hwy 49 interchange. This trade would
give the county control of the access that they want into the
Regional Park from the lakes and would also serve to satisfy Mr.
Vaughan's park land dedication to the city. Mr. Vaughan feels
that if he can keep and develop the island, he will be able to
build a road from the north of the Weaver Property (Quail Ridge) to
the island.
Don Volk explained that the comprehensive park plan shows a need
for a larger parcel of land near the school property, and suggested
the park board may want to negotiate this within the parcel to
satisfy park needs. Mr. Vaughan says his preliminary plat has
already been accepted, and that he has nothing inside his boundary
to dedicate for park land.
4
PARR BOARD MINUTES
^ Monday, December 2, 1991
Mr. Vaughan thinks that the city would gain in that they would be
able to collect taxes from the additional upper level executive
homes that he proposes for the island. He also stated that he
considers the island to be worth approximately a half million
dollars, and if the city wants to keep it he will probably never
sell the property around it.
Marty Asleson explained that in talking with Dave Torkildson he
discovered that Metropolitan Council lands cannot be traded, they
must go through the purchase process.
George Lindy asked Mr. Vaughan why he was anxious to relinquish the
island when the park dedication proposal first came to the park
board. Mr. Vaughan explained that he never really wanted to give up
the island, but he felt by doing so, it would expedite the process
with the city. Mr. Lindy also questioned how the additional 20
acres would fit into the comprehensive park plan.
A discussion of the over all comprehensive park plan followed.
There is a meeting planned for next week on December 10 between all
the city boards, the Council and Mayor, the city engineers and the
Park System Planning Advisory Committee. The purpose of this
meeting is to present the comprehensive plan for review.
After much discussion, the board mutually agreed to hold off on any
decision concerning the "Pheasant Hills Land Trade" until after the
comprehensive park plan meeting on December loth.
Parks, Recreation and Forestry - Marty Asleson explained that he
had discussed the new park dedication formula with Marty Walsh, the
Parks Director from the City of Vadnais Heights. Our new
commercial/industrial formula was based upon the one from Vadnais
Heights. Mr. Walsh reported that the new formula is working well
within his city. John Baumann mentioned that he would like to keep
the park dedication fee low for future new businesses coming into
the city, and wondered how this new formula would affect them.
Marty Asleson commented that we will have to "wait and see" as
commercial development grows, and perhaps change as we go along.
Golf Course Discussion - Marty Asleson reported that he and Bill
Nissen had previously discussed the golf course issue. He (Marty)
reports that he recently attended a MRPA convention, and talked
quite a bit with golf course people and seems to have gotten some
direction from them. He hasn't had time to pursue this with Bill
Nissen any further. The idea of using a student intern for research
is still being considered.
George Lindy referred to the mention at the last meeting of
5
PARR BOARD MINUTES
Monday, December 2, 1991
another golf course that may be going in, and asked who Marty had
been referring to. Mr. Asleson explained that Al Robinson has been
talking about building one, and that there could possibly be a
joint venture here. The first thing would be to start to collect
some data and facts by going through the Minnesota Public Golf
Association.
Recreation Programs - Barry Bernstein explained his plans for
winter programs. He noted that skating will soon be starting, and
he and Marty Asleson are in the final stages of hiring warming
house attendants. Both Marty and Barry are keeping a close watch on
the budget, and are trying to do the best job within a limited
budget. They went on to explain that some first year programs are
experimental, but we are learning from that experience.
Marty Asleson has suggested a broomball league for junior high age
students. He would like to see some constructive type of activity
on our rinks for teens. There are also plans to try a co-rec
softball program for that same age group in the Spring.
District #831 Agreement - Mr. Asleson informed the board that the
agreement with the Forest Lake School District has been approved by
our city attorney, and will now go on to the council.
Comprehensive Park Plan - Mr. Asleson reported that the
Comprehensive Park Plan Advisory Committee has reached the point
where they will be ready for public input. He referred to the
meeting coming up on December loth and expects to be ready for a
public meeting sometime after the first of the year.
Warming House at Birch Park - George Lindy asked about the warming
house at Birch Park, the costs and the current status, are we still
leasing it? Yes, with option to buy. Marty Asleson explained he
just recently negotiated a new deal to lease for one more year. At
the end of this year we have to pay it off. The cost for leasing
the shelter is $160. 00 month. It doesn't appear that there will be
any money budgeted for another alternative to this building for
some time to come. George Lindy suggested that maybe it would be
prudent to purchase the shelter now instead of making payments, and
perhaps add cedar siding and upgrade the looks of it. Don Volk will
research the options involved here, and report back to the park
board.
There was no other old business.
NEW BUSINESS: - There was no new business
ADJOURN: Candi Toffoli made a motion to adjourn. It was seconded by
6
PARR BOARD MINUTES
Monday, December 2, 1991
John Baumann. All were in favor. Meeting was adjourned at 8:35 pm.
NEXT PARR BOARD MEETING WILL BE AT 6:30 PM ON MONDAY, JANUARY 6,
1992.
7
: r
North PRELIMINARY PLAT,OF.:_
I '
BLA + .. K DUCK ESTATES ,
........ ..
�.:e..,e.,:o�i., d V' \\ ,� r`� ....._ _ ..._ s. - p.",,,"r••__f,✓/,.r A�%)p/'�D lurrur � �r��i�_J �/ 1II
•(—fir //,. l L rfr�i. rt, �•��, 1`l / �. N' I
J, /�` .' ,.v fr°i„ �� .. '�J• ° \\/ •_ 'Y!4' wr• ` lI � •� I '✓/� i�� �\\ } ---- //^\\ � \� ```' I1�I�IV Qi I
/ '/ ' !S.7 '^•,\, •• ,+r \ .lpl� �_,.,3� L__'f I�,.-
_ (• i +,a I li.i 1 Y III ,*'✓ /.'Bi�4�.V,tu' ^yy
+,/y tJ l!l „.\ 'I' ,tP'! °'�..✓. I �� may%-_-.—� �r,_i--�- e '6�--,�.--•I� _L.__ r �\''a Aa.._ I I i
20 , I .I � `V \ (.I,(, ' /r \• e
�/ ,d•/a / I / / Ir ,f 'd GIs\ X �,'j�� /' ' i �I ,, t.f S ,� _., s 'l�a Is 1 .�
!.I� j ;�: Lr
i \j r yi 1j V fT`�( fi'(,.�_1"� ��1 u F Z `�i PI/ I ,{--�...�. �i• L
�''
/.' , m Y
f ' r / y �'` \ ''� �•�`� j1,4`,I•�,, \Y\ p� '.r ..l' I,i��. P�iD,' •\` ��.
I/� �,,j( C� 1s `,7 �ll i•. j! /.BA✓ 7- 21 //,%134� .ti'f•,y +` I lP� Fi d
1 � r /I nti ��{jI1�!`£I �1•'Y,;% (�, ��'.� %r�� -ram _ .� l �1 �1.. s r v ;.". ; _ _ '�-
•t� ,3 � \ / C / � �l/��J �..���.I�' i / -_,_l.�•.= .�• ;_`,�; I q � -r 1 1\ 6.\c\�'-/' - _ e. '"_*"��I .+ .,.,
� / //, \:� e �."(/y� j � •�� .%� ` ?• �err` lj_ti 12 �/ /^ a .� ,� 1,� r, -, .,,/-r-•�-\. � � .L _ q ply.-� ` /4 � � �I/v i3 /, �� I \ "..�''�'� �•��j 'iResFanau �j IV I V �
�
/ ?'2? ^`1` �1 ! ® ��\ /, .._ \r' �/!j 12 ~\ ��ir�// •,r/,17\' / �23\i Ir\'22 e'+/ li ,\ '���`��( � "f•�'-�•-•.....C' •�.T'`-/{�O / I� I� �
/ L.J�I.,,i, r ,w ',•...aw.�i.. I �, `, �_(L.�,��1 7� ' �•II �� m1 9/' = _ �17J IC°r1�J e`.,F--�._1= / _ ��'��(i I ,.� M .� , � �',�. -I I � •- r �1 t$.�J� t �t �,\ ®/` 'I I,
a � ^ � tom r.10 ��'I \ ..,•j�1/ ,I/� �� �27�' .f �`{/ Ir•'"` ---i I � r-•��',"'8`�� � �� _, �i-\ ��, 26•. ,j 8 'V ... n i \ `�P+o i r.l�.n•r .. \�
+,'
�-r N,I (4EY
IP
litARK
-i - V�w ar i,•� a us ter- .nr`r--r-..,...oz. _ ) rr
TY STATE rd ..._.. —____.... _ ..._�._._.__ -•� _ .,•, � .........................
GOUN
AIO 1.1lfaHWAY 10 - 51RCF1
PARR BOARD MINUTES
June 4, 1990
plat. Bill Nissen seconded the motion and the motion was
approved unanimously.
CONSIDERATION OF PHEASANT HILLS PRESERVE PARR
DEDICATION/LARRY SIEBERLICH, ED VAUGHAN,
Larry Sieberlich addressed the board. He stated that the
proposed Pheasant Hills Preserve will be the largest
residential development to be ..,constructed in the City of Lino
Lakes.
The development consists of 307 acres. Of that 307 acres,
210 will be platted as Pheasant Hills Preserve. Of the 210
acres, only 43% will actually be platted as lots because of
the extensive wetlands on the site.
The development will be constructed in phases. Phase 1
consists of 22 1/2 acres or 25 lots. Because of open areas,
only 15 acres will be platted with lots.
Jeff Shopek from Merilla & Association displayed maps
outlining the proposed trail systems through the plat. He
explained that there are many natural amenities within the
site.
The plat is surrounded by Anoka County Regional Park land.
Mr. Vaughn spoke with Dave Torkildson, Anoka County Park
Director. He informed Vaughn that an area north of this plat
is planned for active recreation. Marty Asleson added that
he spoke with Ron Cox on this subject and gave Marty the same
information. Mr. Vaughn stated that once development occurs
in the county park land it would have to be fenced in, and
center posts would have to be installed on the trails
entering the park land so that vehicles could not enter the
park. Marty stated that the city would not have access to
scheduling time for and ballfields that may be constructed in
the county park site.
The developer will install passive walking trails, wild life
areas, and scenic overlooks.
The Centennial School District owns a 40 acre parcel of land
in the center of the south end of the plat. Mr. Vaughn is
-. unsure of the school's intentions with the parcel. He is
ri hoping that the school district will sell the property to
x� Vaughn.
Don Volk stated that water service to this area will come
from the west. City sewer will be extended from the LaMotte
sewer area.
The following options were discussed for park purposes.
1• Obtaining the Anoka County Regional Park Land.
Page 3
PARK BOARD MINUTES
June 4, 1990
r
2 . School District Property. If a school is built on this
site, a joint facility could be provided.
3 . Off Site. The developer could consider an option to buy
a parcel outside of his plat.
4. The Island. The island is approximately five acres in
size and is located in the western portion of the
Pheasant Hills property. It is heavily treed and has a
topographic relief of 12 to 14 feet. It is accessible
from the southwest.
5. The Peninsula. This area is located in the eastern
portion of the Pheasant Hills site. It contains
approximately 2 `5 acres of upland located adjacent to
the wetland area. It is accessed by the proposed trail
system. This land is both treed and open. It is
suitable for both passive and certain types of active
recreation.
Don Volk addressed the board. He proposes that the city try
to lease the Anoka County Regional Park land. Secondly, he
recommended to obtain the island for part of the park
dedication and use it for an interpretive nature center. It
would tie into the city's overall trail system extremely
r� well.
After further discussion a motion was made.
MOTION: Ray Johnson moved to recommend to the city council
that park dedication for Pheasant Hills Preserve includes an
island consisting of approximately 10 - 15 acres of land and
a peninsula consisting of approximately 3 acres. This park
dedication would satisfy the requirement for the entire plat
of Pheasant Hills Preserve including the school property only
if Mr. Vaughn obtains that parcel. John Bauman seconded the
motion and the motion was approved unanimously.
CONSIDERATION OF PROPOSED PARK DEDICATION FOR RICE LAKE
ESTATES/MARTY ASLESON
Marty Asleson submitted three maps that Jon Tennessen sent
him that illustrated his neighborhood park concerns.
Mr. Asleson also displayed a map drawn up by Barry Brainerd
This map depicted a joint agreement between the City of
Circle Pines and Lino Lakes to use the Circle Pines area to
the north west of the Lino Lakes well house. Lino Lakes
could install a tennis court and/or playground equipment that
could compliment the Baldwin Park area, including a trail to
the park and possibly around the swamp. Marty stated that an
exercise trail could be incorporated into this type of trail.
Marty said that Mr. Kineth seemed to like the idea in
Page 4
.-. MEMORANDUM
TO: All Park Board Members
FROM: Marty Asleson
DATE: January 3, 1992
SUBJECT: Background information regarding the concerns of
Mr. Robert Appleby, 214 Woodridge Ct. and Mr. John
Kuny, 212 Woodridge Ct.
Some time ago after I had just started working for the City of Lino
Lakes, it was brought to my attention at a Park Board meeting that
there had been a trail dedication in the Woodridge Estates
development, and it was further pointed out that these trails had
not yet been rough-graded in. Mr. Richard Carlson, the developer,
was immediately notified of our concerns of having these trails
roughed-in before housing occurred around them. He assured us that
there was plenty of time to rough these trails in and that he would
start working immediately to have the plat corrected to include
trails. Since it was late Fall, Mr. Carlson felt it would be better
to wait for Spring to rough the trails in.
By the next Spring, one house had been built next to the agreed
upon trail location at 212 Woodridge Ct. , this was the Kuny
residence. After discovering a house next to the dedicated, non-
plat indicated trail (we have deeds to these trails) had been
built, Mr. Carlson was again notified and he decided that now his
decision was to move the trail to the other side of the 20'
easement. (further away from Mr. Kuny's house, but closer to the
soon to be built house at 214 Woodridge Ct. , Mr. Bob Appleby) After
the Appleby house was completed, Mr. Carlson then proceeded to
rough-in the trail.
Mr. Appleby and Mr. Kuny then contacted the City in order to find
out what the City was doing. These folks had no idea that there was
to be any sort of trail next to their houses. They further stated
that their builder had not notified hem of these trails, that the
plat did not indicate the presence of these trails, and that their
title companies also did not show evidence of these trails.
Staff then met with the property owners, the builder and the
developer in an attempt to resolve the issue and possibly relocate
this trail. This trail also happens to be an important link in the
system since all other corridors leading into the Regional Park for
this area have dissolved for one reason or another. At it turns
out, it also appears that all other options have evaporated, except
for abandoning the trail for street use.
The property owners, Mr. Appleby and Mr. Kuny) have written letters
to various people and sent copies to use. (These are enclosed) .
They also wish to appear before the Park Board to state their
concerns. They will be at the meeting and should be heard under
"Open Mike".
Also find enclosed copies of the Deed and a map of the Park Trail
Dedication locations.
4
Form)b. 30-01-Q=CLAM VM
AGENDA IT EM
No delinquent taxes and transfer entered;
Certificate of Real Estate Value 1�4 S A24 )
( )filed ( )not required 4
Certificate of Real Estate
Value No. _
19
County Auditor ENTERED
BY
Depify -
Auaift Aqo
STATE DEED TAX DUE 19MM:
Date: Ap(•1 ,21'. . 19 FS`1
(reserved for ruing data)
FOR VALUABLE CONSIDERATION, Carlson, Droppe & Associates, Inc., a corporation
under the laws of the State of,Minnesota, Grantox, hereby cawsys and quitclaims to
the City of Lino Lakes, Grantee, a public easement for bicycle path purposes over the
following described real property, in Anoka County, Minnesota:
The West 10.00 feet of Lot 5, Block 4, WOODRIDGE ESTATES;
And the Southeasterly 5.00 feet of Lot 16, Block 2, and the Northwesterly
5.00 feet of Lot 17, Block 2, WOODRIDGE ESTATES said distances being
measured at right angles to the lot line between said lots;
And the South 10.00 feet of Lot 19, Block 3, BRIDGE ESTATES;
all according to the recorded plat of said Woodridge Estates, Anoka Cokauty,
Mirresota;
together with all hereditaments and appurtenanoes belonging thereto.
Affix
SpMA (4a
Sd1, ASSOCIATES, INC.
r MirrAesota tics
l
Richard S. Carlson R
Its Secretary/Treasurer
STATE OF MINNESOTA )
Be.
COUNTY TY OF / 0 "CA _)
The foregoing instrument was acknowlodged before me this - 011 day of
A Cr. I , 14j�j, by Richard S. Carlson, the Secretary/Treasurer of Carlson, Drti7pps
& Associates, Inc., a corporation under the laws of the State of Mirr mK)ta, on behalf
of the corporation.
Notarial Stamp or Seal (Or Other Signature of Person Taking
Title or Rank Ackn wled7 ent
Mr CnMAleztem hom Dees 11 1
I THIS INSTRl TENT WAS DRAFTM BY: Tax Statements for the real
pr rty descritrrt in this
Jongon, Wevylivd & McClorkey, P.A. inst7umont should be sent to:
8525 Edinbrook Crossing -
Brooklyn Park, M 55443
(612) 424-8811 � , •.� �, _ t
s
F
3"
�t
December 1, 1991
212 Woodridge Ct.
Lino Lakes, MN 55014
Carlson, Dropps & Assoc, Inc.
Richard Carlson
7671 Old Central Ave. N.E.
Fridley, MN 55432
Dear Mr. Carlson,
I am writing you regarding the walking path on my lot in
Woodridge Estates. I know you are aware of it as well as the
problems that have arisen because of it.
I am not satisfied with its presence and would like to see it
removed as soon as possible. We purchased our lot from our
builder, Tony Palaia, on August 10, 1990. My wife and I,
along with Tony Palaia and his surveyor reviewed the plat
drawings, legal land description and papers provided by you
We learned of covenants, easements and restrictions
pertaining to the lot and were aware of drainage and utility
easements along the south side of our lot. We decided the
lot fit our needs and even reversed our house plan and placed
our deck on the south side to maximize its potential.
Mr. Carlson, we feel you are responsible for this unpleasant
situation for the following reasons:
1. The plat drawings provided by you to the builders are
different than the one we recently obtained from the
City of Lino Lakes. We, in good faith, believed you
were providing us with correct documents.
2. We have learned from John Miller, Lino Lakes City
Planner, that it was your responsibility to install
the walking path before any lots were sold. You were
negligent in doing this.
Had we known of the walking path we certainly would not have
purchased this lot. Because of the path, we have lost much
of what we found appealing from the start. We now have a
deck that will face a public path which leaves us with a loss
of privacy and security. We lost sod that we put down to
make our property more attractive and the value of our home
is reduced significantly.
We do not want this walking path to remain on our property.
We will work with you to see it is removed. Should you fail
to do this, we still have to, unfortunately resort to legal
action. Your cooperation with this matter is appreciated.
Sincerely,
John ��Liny�
cc:
Mr. Kevin Berg, Briggs & Morgan
Tony Palaia, Palaia General Contractors
John Miller, City of Lino Lakes-City Planner
Marty Asleson, City of Lino Lakes-Park Board
b..uw
214 Woodridge Court
Lino Lakes, MN 55014
November 28, 1991
Richard S. Carlson
Carlson, Dropps & Associates, Inc.
7671 Old Fridley Ave.
Fridley, MN 55432
Dear Mr. Carlson,
This is to advise you, of a problem relating to our property in
Woodridge Estates.
Last December my wife and I entered into an Agreement with Meridian
Homes to build our present home. The cul-de-sac location we chose,
although premium priced, offered maximum privacy (and security)
which were primary factors in our lot selection process. We then
chose a custom home design and, modified it at additional expense
to further optimize privacy. As Woodridge Estates developer, your
Company approved the building plan for our home.
We closed and moved into our new home in April of this year. At
that time we were aware of all easements including one along the
northeast property line. But, as stated in Article II of the
Woodridge Estates Covenants, we understood easements were for
underground utilities and if opened, required the surface to be
"restored to its former condition" .
Approximately two months after we moved into the home, your work
crew arrived, and without notice cut and installed a dirt trail
along our northeast property line. This trail intrudes about three
feet into both our lot and that of our neighbor. We contacted our
builder, John Feges of Meridian who, after checking into the
situation, advised us this was part of a nature trail system. John
said that he was not previously aware of any trail plan that would
affect our property site.
We have had several meetings with City of Lino Lakes Officials and
have established:
a. You were aware of the nature trail plan before any lots
were sold in Woodridge Estates.
b. You were responsible for installing the trails
C. The trails should have been installed before the lots
were sold. Then, the potential property owner would be
aware of them and, have the option to select or reject
the site.
A.G F Y D;ro
Page 2
If we knew when we selected the lot that a plan for the trail which
intrudes on our property existed, we definitely would have chosen
another site, and most likely a different home plan. The result now
is: the privacy we so carefully planned for has been destroyed and,
the value of our home is reduced.
We do not want this nature trail on our property and will pursue
it's removal with the Lino Lakes Park Board, the City Council and
if necessary, through legal action. Please be advised that we
consider Carlson Dropps & Associates to have a responsibility in
this matter.
Sincerely,
Robert P. Appleby
copies to:
M. Asleson, City of Lino Lakes
J. Feges, Meridian Homes
M. Hagen, Registered Abstracters, Inc.
J. Miller, City of Lino Lakes
CARLSON.LTR
.AGE.WD , I,:;M J
H'Ol7o
VP-
i� CALONE S ASSOCIATES,
;:; rLA/✓ SURVEYORS /NC.
I
MEMORANDUM
TO: Park Board Members
FROM: Marty Asleson
DATE: January 3, 1992
SUBJECT: Black Duck Estates Trails
Again, the Black Duck Estates Development (formerly the Lakecrest
Development) had no Park Dedication requirement except for a trail
link. In light of our Comprehensive Plan, it is important to link
the east to west aspects of this development into the proposed
neighborhood park to the east and Country Lakes to the west.
Because of existing soil conditions, it appears that the best place
to locate this trail was on the south side of the development. We
ran into problems at the exception (the Swenson property) . If one
recalls, it was pointed out that it seemed that the from of this
house was very close to the road right-of-way and that it probably
would not be acceptable to the property owner to place it here.
Thus the trail was conceptually approved to be placed along the
back perimeter of this property. I had indicated some of the
shortfalls of the mechanical design aspects of this trail, mainly
the 90 degree angles. This concept then went to the City Council
for public comment, and the property owner definitely was against
the placement of this trail along the back perimeters of his
property line. Mr. Sw*nson was however, fairly open minded about
the front location. Thus, it was left with Keith Eibensteiner
returning to discuss the possibilities further with the trail in
front of the Swenson house. City Staff also did research with the
County Highway Department to find out what their rules would allow
us to do should we need to/or wish to elect to cross over onto the
right-of -way.
We will update you at the meeting. Mr. Eibensteiner will be at this
meeting also.
MEMORANDUM
TO: All Park Board Members
FROM: Marty Asleson
DATE: January 3, 1992
SUBJECT: Shores of Marshan Lake Development
This is to reiterate our phone discussion concerning the Shores of
Marshan Lake park dedication. This dedication includes a functional
28' x 64' stick-built building on a slab with well, gas, septic and
electric hook-ups. This building was sold to another person before
the City became aware of any possibilities. In our discussion with
the owner, he is willing to sell the building at a reasonable price
of $10,00 - $12, 000. The only stipulation is that he wanted
assurance that should the City not decide to buy the building, he
would have until April 1st or around that time to move it. (He was
prepared to move it immediately to his proposed site. ) The
additional time would allow him to replace his needed building for
storage on his site.
Staff still believes that this is a structurally sound building
that would have great potential for use and that the $10 - $12,000.
price is indeed reasonable should this project get final approval.
MEMORANDUM
TO: Park Board Members
FROM: Marty Asleson
DATE: January 3, 1992
SUBJECT: Follow-up information on Pheasant Hills Preserve,
Ed Vaughan
Several options for land "swaps" were presented to the Park Board
at the December meeting. These land swaps included discussions that
the developer and County become involved in. After the last Park
Board meeting we left with the feeling that in Phase II, Mr.
Vaughan did not want to proceed with the agreed upon dedication
(the island) .
Please see the enclosed letter from Mr. Vaughan to Dave Torkildson,
Anoka County Parks Director, concerning his final feelings.
Hopefully, this matter is final.
A
a
loom%"
3M FAA
'rRANSM"ITTAL
DATE
NUMBER OF PAGESg
(INCLUDING THIS COVER SHEET)
lK
TO :
FROM#
cl 0 2
P r ff-E X�_S_A_N___T_ -M_71UL�S AGENDA ITE-tv",
R V E]PRE
12-11-91
MR. DAVID TOPUKILDSON
DIRECTOR OF ANOKA COUNTY PMKS
550 SUN ER LAKE BLVD.
ANOKA, XVICNESOTA 55304
ED VAt0,HAN
600 BIRCH STREET
LINO LKKESt MH 5501-4
DEAR SIR"
I APOLOGIZE FOR TAKING UP SO MUCH OF YOUR TIME. IF I klAD GONE TO THE CITY
BEFORE COMING TO YOU I WOULD HAVE PLEILLIZED THAT THEY WOULD NOT BE INTERESTED
IN"o"CCEPTING REGIONAL PARIX LAND AS PARK DEDICATION, I ATTENDED 'A MEETING AT
LINO lJXES CITY HALL LAST NICHT WHEN THE COMPREHENSIVE PARIX PLAN FOR THE
FUTURE OF LINO LAXES WAS PRESENTED. THE ISLAND WHICH I WAS HOPING TO DEVELOP
WAS INCILWDED IN TLAtts
EIR PLAN AS PASSIVE RECREATION. NOTHING IN THE REGIONAL
PARR WAS PROPOSED FOR ACTIVE RECREATION.
ALSO HAD ATTENDED A PARYBOARD MEEIOING ON 12-2-91 WHERE I WAS PUT ON THE
AGEND 1113 ED133-C-U.SS THE POSSIBLE EXCF"lG7 OF THE 1$1 1) FC UP TO 20 ACRES OF
REGIONAL PARK LAN.D. NOTHING WAS CONCLUDED AT THE MEETING, BUT FOLLOWING THE
MEETING I HAD A DILSCUSSION WITH DON `vFOLX. HE ADVI'SFD HE AT THAT TIME TO
KEEP TINE 1-SLANZE" III PLAC't AS MY PKRX DEDICATION FOR ALL OF PHEASANT HILLS.
MY PREStNT -Ai tIXENT WITH THE PAR"OARD SlAIVES 1PFJ__T THE ISLAND PLUS A 3 ACRE
PARCEL IN LASTERN PREASANT HILLS SATISFIES My 'el-KRK DEDICATION PLUS THE PARK
DEDICATION FOR THE SC.H001, PROPER7"Y Sttr;0117�_D .1- DECIDE TO BUY IT.
60-10 6omh Street 'Llirto li_ske,�,,-', MIN 5ZV,,4 e 490-0459
P ff E�AS X--N--T--f rl E-�Lkq
WOWS PRESEIVvT
SINCE THE P1sMOARD WILL NOT ACCEPT THE 'O ACRES OF REGSONAL PARK AS MY
REOUIRED PARK DEDICATION I HAVE MADE THE DECISION TO LEAVE THE ORIGINAL
AGREEMENT IN PLACE WITH THE CITY. THIS GIVES LINO LAKES THE ISLAND AND
RELIEVES ME OF THE BURDEN OF,, HAVING TO COME UP WITH AN ALTERNATIVE PROPOSAL.
I THINK IT WOULD HAVE BEEN TO EVERYONE r S ADVANTAGE Ir THE 'TRADES WOULD HAVE
O UXED O'j'T t BUT I GUESS IT WASN'T MEANT TO HAPPEN. THANXS AGAIN FOR YOUR TIME
AND CONSIDERATION.
SIr-"LLY OURS�
ED VAUGHAN
CC RAND SCHUMACHER
JOHN MILL;
DON VOLK
ARTY ASLEESEN
DAN SOXRUD
MEMORANDUM
TO: All Park Board Members
FROM: Marty Asleson
DATE: January 3, 1992
SUBJECT: Quail Ridge
Quail Ridge, also known as the Weaver Property has been in a state
of flux because of contingencies from both the trail standpoint and
the adjacent development (Pheasant Hills) standpoint.
As you recall, the dedication for this development hinged on the
premise that trail access would be allowed as proposed in exhibit
A, from the south and north. Letters from our city engineers to the
DNR and County Highway Department were written and a reply
received. Basically the DNR alluded to their permit system and
types of trails that work better in wetlands, and the County
Highway Department suggested that the culverts on the south side be
extended.
Also please find enclosed a copy of the necessary trail system
going from our proposed park dedication up to the island area. This
trail, as some of the proposed future comprehensive plan trails do,
borders the wetland to create more usefulness of these areas.
There was a question about where to cross to the island. This spot
should be at a point of least resistance, possibly where it is
located, or at the end of the two larger lots at the northwest
corner of the development. *
I will contact Kirk Carson of Hokanson Development and let him know
that this will be on the agenda.
* The connecting trail at the end of Wild Turkey Trail is also
important. This road, it was discussed, might simply dead-end or be
developed into a cul-de-sac of some sort where parking could be
facilitated.
2
111�� r
�•dllllll
E� 1,
°,'
RAM
+r
� � � mOG p9eci:CO O�
wimp r
-, .�.�.•- .�.::,.�t... ; AGENDA ��IVJ 4 �
"y � .�- �� C � •.1001w 1i!NL ! nteKaaitarw.r.wSwwMwrwr.t+p.. -
f Mrs a SOO trot
r'� eoea-A,viev Pand-e WtV
eon MOLI. t•: fr; , '""" `°°" ( 1' ..`'
41
y;/thq a"_^..ae.w.M..' f • \; �' t,l"�= � tV•Y �� `s t'c'P i ,•r.w.a
wt ttSl 1 t _ -
mr..rwas
`' -• �� T. 11 •. �� 1hMlr a.w.Pwe�.v�Nfuw' � 1 ,
.� _ 1'.y...,._,_«_ = t'f � ,• t ..+w.-N.+w.+..�_ !-.e it'r�i...kK.-w+'+V"_._._�
.Y ice,��.-�_. �.� _� ,it��, � !;C+��• � /�f/Y`•{/� a �•---^
�... z f / ° ` .�--.-. l6u Kars: II n.MtB:"�11i1�tln�lAli!r .•I��+-.
'•I r w �"� ._ � .�,`�;; ,- J'�-�' ,� •+�^'_^-- al tebol silt eq8 fC:tc us iw7ft'sGt�
� ,� � � - ' � j.,, ly - 0►ConwntY wars t�aAc pie .
- „„^�' ~'-. , •t� _ �l- �"1 c)cmd d:ruNed ateanadiic R/IF.r:ttw RlEsps
f
..—j-_ t p t• \ " , t t a - ..C� 9 tU Mbi,"io titanrfaaatssui�ZmAa�a�lwooe
Beuri4i:fM y'tOC suiaeltats ipf u4lil�cd
J ;�-'�' f - `_ � -� ` f .�i y � •� / } 31Ek.a�k�sawt,�iiiessnbja�toufiNltksitn ..
41 Sim*o4wew&w*%4 iaand:riprp pa Mo WT 1133
Li t
(,wail Ridge
'{sN�rir i1 Mir w:w. KKr t-ftA� � �".•5.
Preliminary Utility & Grading Flan
Li I. R. NEL,5[)N ENGINEERING �p�
l4so 9kd t w Nn wore_MN 53414 (612)784-7390
J _ '�-^`".."— _ +~�~ � .t. ....... _ '• w+aw et��.,w wora°`nrwo�w+ � ,
-sr- - - iv I otrt tra ttvttieretoawe+mera r.rnat. .a+
ot
Wak
Wasp
oft"&
r!
Li
L
Ll
I 1 1 I I I 1 i' ,y / L F.S ADDIT N.4J0
S1iDRl:i Gr`!N_G.' �i '' m --
` I _�
I N �� � V>i �� G ..l ,020.67_ m SO•t0'i•w = m _UI b C+
I CRV If
m
b a
i of
y � a
I
m
To 00 90
C UNTY DITCH•co
b
b b �
24
{1
N/ E
14
{e
w / t
Pn
�'o11_
12 th 03._ S �.� / aYfy. �R rte �� •ee �� �\\) '":�.
AVElk
_ usoar o•m:r t � r',
D -
_ OUTLOT D PHEASANT HILLS PRESERVE
W w•
RJR
l0000l
a" m� t�i �•
14
F�ovv
.�• �f�
/ 10
Z1
PAIP
IN
,1
ZL
60
•
1w""« -�M..••ram / �z--- 1 XI
�r
Q
Past_lt"'brand tax transmittal memo 7671 of Pay@s
To / Fro �
Phone k
Cox R Q ��5� Fax 9
MEMORANDUM
,rr%
TO: All Park Board Members
FROM: Marty Asleson
DATE: January 3, 1992
SUBJECT: 1993 LCMR RFP's
The Legislative Commission on Minnesota Resources has sent out
requests for proposals for projects designed to help maintain and
enhance Minnesota's Natural Resources. These proposals are for
projects to be implemented from July 1992 to June 1995. There's $29
million dollars available for this program.
There are several categories to be funded including recreation.
Within this recreation category, funding will be considered for the
acquisition of trails for ground use including biking, and for
persons with disabilities, and developing a network of recreational
bicycle trails, and several other issues. The application process
is quite extensive and the deadline is February 7th, 1992.
There are several areas, particularly in light of our comprehensive
plan, where we may be able to capitalize on this issue. Keep in
mind that we have a requirement to pave all of the dedicated trails
on the south developing projects, and at the new school site. There
is also a need for an underpass at this area. The thought was to
touch base with Jeff Schoenbauer since we are now actively planning
these trails, to help us to put it together.