Loading...
HomeMy WebLinkAbout5 Aug 5 2019 work session staff report WS – Item 3 WORK SESSION STAFF REPORT Work Session Item No. 3 Date: August 5, 2019 To: City Council From: Rick DeGardner, Public Services Director Re: Public Works Facility Background The City Council and staff have been discussing the need for the eventual replacement of our Public Works Facility (built in 1971) since a space needs analysis was conducted in 2011. Discussion of a potential new public works facility continued during the May 6, 2019 City Council work session. Mr. Jeff Oertel from Oertel Architects presented some concept plans for Phase I of a public works facility. Attached is a memorandum from Mr. Oertel providing information requested by Mayor Reinert concerning estimated costs and phasing options. Note that the costs provided are for construction only. Requested Council Direction Staff is requesting Council direction on whether to further explore Phase I options (ie. with or without maintenance area), and project timing/financing. Attachments 1. Public Works Building Concept A.2 2. Public Works Building Concept A-3.1 w/maintenance 3. Oertel Memorandum, dated May 16, 2019 STORM WATER POND PUBLIC PARKING EMPLOYEE PARKING BALL FIELD PLAY GROUND YARD STORAGE IMPOUND IMPOUND FUEL ISLAND ACCESS CONTROL EMPLOYEE PARKING TOWER EXISTING SENIOR CENTER EXISTING PW OFFICE PRIMARY VEHICLE ENTRY W.H. SALT BRINE NEW VEHICLE STORAGE BUILDING BYPASS/ FLEX STAFF AREA(3)(16) WASH BAY (9) ICE RINK ACCESS CONTROL EMPLOYEE PARKING NEW VEHICLE MAINTENANCE FUTURE OFFICE EXPANSION PROPOSED 1"= 40'-0" REMOVALS 1"= 40'-0" AVERAGE COST/SF: VEHICLE STORAGE: $120/SF OFFICE: $160/SF STAFF AREA/MEZZ: $75/SF OFFICE (RENO): $50/SF VEHICLE MAINT: $160/SF SITE: $12/SF (BUILDING) STAFF BREAKDOWN: FULL-TIME: (15)/(19) SEASONAL: (10)/(13) COST BREAKDOWN: VEHICLE STORAGE: $3,000,000 STAFF AREA/MEZZ: $75,000 VEH. MAINT.: $960,000 SITE PREP: $525,000 TOTAL HARD CONSTRUCTION COST: $4-$4.5 MILLION (VARIES DEPENDENT ON EQUIPMENT/FINISHES INCLUDED) FLEET BREAKDOWN: WARM STORAGE: LARGE (14) MEDIUM (24) SMALL (12.5) COLD STORAGE: PLOW EQUIPMENT (32) MISC. EQUIPMENT (38) TRAILERS (9) PROPOSED AREA BREAKDOWN: VEHICLE STORAGE: 25,300 SQUARE FEET STAFF AREA MEZZANINE: 1,000 SQUARE FEET VEHICLE MAINTENANCE: 6,000 SQUARE FEET GEN. (PHASE 1 OR 2)