Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
11/06/1995 Park Board Packet
S CITY OF LINO LAKES PARK BOARD MEETING MONDAY, NOVEMBER 6, 1995 6 :30PM ***AGENDA*** 1 . Call to Order and Roll Call 6 :30pm 2 . Approval of September 20, 1995 Minutes 6 :35pm Approval of October 2, 1995 Minutes 3 . Open Mike 6 :40pm 4 . Updates and Old Business A. Pheasant Hills Playground 6 :45pm B. Trails Committee 6 :55pm C. Athletic Complex - Joint Use 7 :25pm D. Leonard & Bradley Trail Delineation 7 :40pm E. Recreation Update 7 : 50pm F. Friends of the Park Update 8 : 00pm G. Forestry Update 8 : 10pm H. Park Project Updates 8 : 20pm I . 1996 Goals and Priorities 8 :40pm J. Other Old Business and Updates 9 : 15pm 5 . New Business A. 1995 Park Board Term Expiration 9 :25pm B. Volunteer Recognition (December Meeting) 9 :35pm 6 . Other New Business 9 :45pm 7 . Schedule Next Meeting 9 :55pm 8 . Adjourn 10 : 00pm C IT Y OF INO LAW DATE: October 30, 1995 TO. Park Board Members FROM: Marty Asleson SUBJECT: Pre-Park Board Field Meeting At the last Park Board meeting it was suggested that we have our November field meeting in the new shelter building at City Hall Park. We should meet there at 5 :45pm. I hope to see you there. PARK,RECREATION,FORESTRY,AND RECYCLING DEPARTMENTS 7204 LAKE DRIVE,LINO LAKES,MINNESOTA 55014 (612)464-5562 City of Lino Lakes Park Board Goal Setting Meeting Wednesday, September 20, 1995 The goal setting meeting started at 6 : 07pm at the Lino Lakes Park, Recreation and Forestry Building on September 20, 1995 . Members present were George Lindy, Amy Donlin, Pam Taschuk, Ken Johnson, Betty Piper and Sharon Lane. Staff in attendance were Marty Asleson, Parks, Recreation and Forestry Coordinator, Barry Bernstein, Recreation Program Supervisor, Mary Vaske, Finance Director, and Sandie Wood, Recording Secretary. Joe Schmidt did not attend the meeting. Marty Asleson started the meeting by introducing Mary Vaske . Mary passed out and reviewed a summary of the 1996 general fund expenditures and a printout of the park dedication funds . She went over the park dedication funds starting in 1987 through 1995 . Marty explained that each year he does a general fund budget proposal for the Park, Recreation and Forestry Departments . In the park proposal he requests money, from the City Council, to fund maintenance for parks, supplies, and personnel . With the new growth in the city he has concerns with keeping up with the new park areas, new trails, and more maintenance and inspection needs . He asked Mary to explain where the city is with its tax base and the concerns from a funding stand point . Mary said because it is an election year the council decided not to have a tax increase. Because of this the general fund budget was figured at a zero tax increase. When the Department heads started working on the budget they requested 5 . 1 million dollars which was 1 . 1 million dollars over what the city could afford without a tax increase. The department heads wish lists have been cut back to meet the 4 . 0 million dollar general fund budget . Marty and Mary explained how the budget dollars are allocated. They also talked about tax increment financing and how that affects the taxes in the city. Ken asked if there was money allotted in the 1996 budget for trails . Marty responded yes, $15, 000 . 00 was in the budget . There was discussion on the school referendum and how that may affect what the city is trying to do with the community center or athletic complex. George and Pam said they heard 1 City of Lino Lakes Park Board Goal Setting Meeting Wednesday, September 20, 1995 alot of negatives on this issue . Marty said when we discuss goals we should keep in mind how we are going to maintain, keep up and do all the things that are needed to be done when developing a system. We should also think about safety issues and maintaining the playground equipment in the parks . Mary told the Park Board Members that there was a survey in the 1996 budget . It had originally been for the Park and Recreation Departments but it seems that it has turned into a more citywide survey. Marty said a professional polling company will be doing the survey and they know how to ask the question so you get a true reflection. Marty suggested, in the future, we will need to seal coat the trails . Amy asked if this would prolong the life of the trails . She asked what would be the life span of a trail if no maintenance was done . Marty said probably 7-10 years but if they were properly maintained they should last 20 years . Pam said maybe the city should have an adopt a trail program. The members and Marty thanked Mary for coming to speak to the board. Marty reviewed the goals in the Comprehensive Park Plan and Development Guide. He talked about the criteria for prioritizing acquisition including development patterns and population growth, land availability, community demand and preservation of significant natural resources . He went on to talk about the criteria for development, including community demand, recreational program needs and redevelopment/upgrading of facilities . He told the board that we need to continue working on joint efforts with Circle Pines on the Rice Lake Estates Park. Hopefully we will be able to get the master planning done this winter. Quail Ridge has trail issues - linking Captains Place with the dedicated land. He then talked about the athletic complex land acquisition. He feels a decision is going to have to be made in the near 2 City of Lino Lakes Park Board Goal Setting Meeting .-� Wednesday, September 20, 1995 future. He is waiting for a response on the grant that he wrote . He then discussed land development . He said the overriding objective is to develop parks that are in close proximity to established or developing neighborhoods . Barry then gave an overview of past and present data on recreation programs . He showed the increase in ballfield usage from 1993 - 1995 . He said the Centennial Little League, Forest Lake Girls Softball Program and the City of Lino Lakes ball programs played over 700 games on five ballfields . He told the board because of the lack of facilities he initiated a new reservation policy, this year, for requesting field usage . Soccer field usage - The primary user is the Centennial Soccer Association. The Lino Lakes Park and Recreation Department issued over 200 field reservation requests . The Centennial and Forest Lake Hockey Association had the majority of reserved ice time during the hours of 6-9pm. Barry then reviewed the rink attendance for 1993-1995 . At City Hall, Country Lakes, Sunrise and Birch parks the normal usage is 61 days per year. However, in 1995 the number of days used was 35 because of the weather. He said Lino Park was one of the busiest general skating rinks in 1995 . Sharon asked what the daily averages were. Barry answered Sunrise Park averaged 48, Birch Park - 20, City Halls usage was in the teens and Country Lakes averaged single digit numbers . Barry then talked about the real need for ball fields . He said he turned away over 12 teams in 1995 because of the lack of facilities . He says he will continue to accommodate as many teams as he can with the facilities he has . Marty said that he sent out questionnaires to athletic organizations and ball teams regarding the athletic complex asking them how they felt about the complex and if they 3 City of Lino Lakes Park Board Goal Setting Meeting Wednesday, September 20, 1995 would support it . He received a response back from the Centennial Soccer Association in support of the complex. The Centennial Youth Girls Fast Pitch Softball Association will raise funds and anything else they can do to support the complex. Barry said he has received favorable response from several softball teams . Many are willing to do fundraising to help pay for the lights or other needs . Marty talked about the 1988 survey and park open space acquisition. He feels the Park Board is on track with community participation, staffing needs, recreation program goals, and better record management and documentation. Marty said that a lot of the 1993/1994 goals overlapped with the 1995 goals . He then went over the 1995 goals and told the members the status of each one. He asked the board members to keep all the above information in mind, along with the information that Marty has given them, when establishing the Park Board Goals and Priorities for 1996 . Ken asked if we had a section of trail, in the city, that was longer than two blocks long. Marty said yes and pointed them out on the overhead. Marty talked about park dedication fees . He gave the members a copy of the chart he worked out on the computer. George then discussed the 20/20 Project . He feels alot of the 20/20 Advisory Committee' s ideas are in alignment with the comprehensive plan. He thought it was good that they saw the shortage in staff and were aware of the fiscal responsibilities . He is not in agreement with the advisory board on the community center concept . He feels there are other more important issues . Marty says he thinks the residents needs will come out in a survey. Pam said residents might not want a community center because surrounding communities have one. George said the survey should address this issue properly so the residents are .-� aware that it is going to cost them money to build one. Betty was concerned about offering the kids in the community enough to keep them busy to entice them away from the gangs . 4 City of Lino Lakes 11-N Park Board Goal Setting Meeting Wednesday, September 20, 1995 Marty said we really need to look at providing a place for the teens to go in the city. George said that the 20/20 advisory board sees trails as a number one issue as does the Park Board. He feels that when the Park Board does their goal setting they need to do it with more organization. They should structure it similar to the 20/20 group and put deadlines on the goals and revisit them from time to time. Marty reviewed the 20/20 report . He talked about hiring a consultant to help write grants . He then discussed trails and told the board that he had received bids at 60 cents per foot which was the same as last year. Then he said the most important thing, that could be done in 1996, was a survey and the money has been put in the budget for this . Marty told the board that he sent a letter to District 12 School Superintendent John McClellan in regards to the proposed school site on Elm Street . John has been in contact with him and was very open to discussion. They discussed the possibility of the school district building an ECFE facility on a 30 acre parcel by Pheasant Hills Preserve. John talked about doing a joint venture with the city on some of this land. After lengthy discussion, on what the members would like to see done for parks and trails, the Park Board drafted the following list of 1996 goals . These goals will be rated by each member and prioritized after the next Park Board meeting. 1 . Birch Park Purchase a piece of property (peninsula) and create a trail connection between Birch Park and the northern portion of Trappers Crossing. 2 . Clearwater Creek Trail development . 3 . Quail Ridge Master plan, trail and boardwalk. 5 City of Lino Lakes Park Board Goal Setting Meeting Wednesday, September 20, 1995 4 . City Hall Park a. Playground equipment b. Ball fields 5 . Country Lakes Park Trails and general grading. 6 . A-3 Complex Open ended financial commitment for land acquisition. 7 . Trails a. Completing dead end segments (i .e . Birch street) . b. Paving existing graded trails . C . Trail connection to Regional Park. d. equitable trail dedication ordinance. Along with the 1996 goals the board formed the following mission statements . Mission Statements 1 . The Lino Lakes Park Board would like to explore the possibility of creating a joint use athletic complex (A-3) with the cities of Centerville and Circle Pines . 2 . In an effort to connect the northern part of the city to the southern part by means of a trail corridor, we would like to go on record in support of a new bridge wide enough to accommodate a transportation trail at the Hwy. 49 crossing of Rice Creek between Baldwin Lake and Rice. Lake. 3 . The Park Board supports any cooperative efforts with the school district regarding joint development and joint use of school district recreational facilities . Ken asked if there was any high land in the N-2 Park (Woolens Park) . Marty responded he had been in the area and there is highlands there . Ken asked if Marty ever heard from residents about this land. Marty said no. Marty did say, however, that he has heard from residents off and on all summer about the Fawn Lane Park/Trail . He said there is half an acre or less of land there and the residents want to know what is going to be done with it . Marty feels the residents either want it mowed or establish 6 City of Lino Lakes Park Board Goal Setting Meeting Wednesday, September 20, 1995 native vegetation on the land. The problem is that it is wet, therefore, it is hard to mow. He said we could drain tile it to keep the water running better, and establish a native plant policy for along trails . Marty also thought resident involvement was important to help maintain trails . George asked what the original plan was for this property. Marty could not answer the questions because this property happened before he came to work for the city. It was decided to put this item on a future Park Board agenda. Being no other business the goal setting meeting was adjourned at 9 : 15pm. 7 r CITY OF LINO LAKES PARK BOARD MEETING MONDAY, OCTOBER 2, 1995 The October 2, 1995, City of Lino Lakes Park Board meeting was called to order at 6 :35pm by George Lindy, Chair. Roll call was taken, members present were George Lindy, Ken Johnson, Betty Piper, Sharon Lane, and Pam Taschuk. Also present were Marty Asleson, Park Recreation, and Forestry Coordinator, Barry Bernstein, Recreation Program Supervisor, and Sandie Wood, Recording Secretary. Members absent were Joe Schmidt and Amy Donlin. APPROVAL OF SEPTEMBER 11, 1995 MINUTES: George made a correction to the minutes on Page 4, second paragraph. The minutes read; George asked if the Forest Lake Hockey Association will be having scheduled time at this rink. The minutes should have read if the hockey associations will be having scheduled time at this rink. Ken Johnson made a motion to approve the minutes as amended, seconded by Pam Taschuk. Minutes were approved as amended. INTRODUCTION: Marty introduced Mary Fogarty, Park, Recreation, and Forestry Clerical Assistant, to the Park Board members . OPEN MIKE• There was no one present for open mike. 20/20 REPORT REVIEW: Laura Wolf and Ray Weber were present to answer any questions the Park Board Members may have in regards to the final 20/20 report . George thinks the 20/20 Advisory Group will find that the Park Board has other issues they feel are important but are quite aligned with the trail system and the need for a trail system. It always comes back to fiscal responsibility. Financing the "dream goals" is another issue. If the citizens want them they will have to find a way to finance them. Laura responded that we need to come up with a figure to develop the system and then come up with a time table to complete it . There was discussion on establishing a Trail Subcommittee to address the trail issues . Marty has been in contact with John VonDeLinde, Anoka County Park Department, regarding a 1 CITY OF LINO LAKES PARK BOARD MEETING n MONDAY, OCTOBER 2, 1995 tri-city trail committee . (He would like to see this committee comprised of staff people) John is also interested in having this committee meets during the day at set intervals . George wanted to know who should take the initiative to setup a trail committee. Ray felt it should be a subcommittee of the Park Board Committee. And should meet quarterly. George said he would like this issue put on the next Park Board meeting agenda. We need to look at how to advertise this committee, to get members other than Park Board members and city staff, what organizations to contact for participants, and how to set it up. There was discussion on obtaining grants and ISTEA funding. Marty said there is money available but without joint cooperative efforts it will be hard to obtain any of these grants . He said Centerville is real interested in our trail plan and athletic complex. Marty said he will also be attending a meeting with the City of Hugo in January. He is hoping we can include them in a joint efforts project . Ray thought the survey is a great way to get a definite answer on what the residents want in the city. Marty said there is money in the 1996 budget to do a survey. Sharon thanked the 20/20 group for the job they did and the hard work they put into the process . She said the Park Board appreciated their input and guidance . UPDATES AND OLD BUSINESS: Athletic Complex: Marty said he was on the City of Centerville' s October Council Agenda for the athletic complex and trail issues . He said they are excited about the complex and trails and are interested in working with the City of Lino Lakes on these issues . He reported that he received a letter from the Minnesota Department of Natural Resources notifying the city on the status with the Outdoor Recreation Grant that he submitted for the athletic complex. Marty called the DNR to find out where we ranked, and we were placed in the second grouping under the 19 applications that were granted. They will assign a person to our area in 2 CITY OF LINO LAKES PARK BOARD MEETING r� MONDAY, OCTOBER 2, 1995 the near future, and hopefully at that time we can find out what we have to do to get funded on the next round. He did find out that we had lost points for not having cooperative relationships established with the surrounding communities that were alluded to in the text . Marty is hoping that we can do a joint venture with the City of Circle Pines, the City of Hugo, and the City of Centerville. Marty said Circle Pines is working on their comprehensive plan and may be interested in working with us on cooperative efforts . Betty wanted to know if not having the land purchased was a reason for not approving the grant . Marty said the grant was for land acquisition so this was not a factor. Pam asked if they were looking for letters of support from the surrounding communities Park Boards . Marty said other grants that have been funded did have letters of agreements between the cities and he thinks this is what we are going to have to do. Sharon wanted to know if those grants were written jointly. Marty wasn' t sure but said he would have to look into that . Marty told the Park Board that the second round should be sometime in March. George said we should start working with the surrounding communities now. Marty said yes we should and he will let the Park Board know when Lino Lakes is invited to the Circle Pines Council or Park Board meeting so members can attend the meeting. N-7 Behms Park Update: Marty put an overhead on the screen and reviewed the development layout of this park. He discussed the trail . He said Phase I will be done next year and Phase II may be done next year depending on the economy. Marty has been in contact with Kate Drury, Rice Creek Watershed District and John Johnson, project representative, and he is not sure of the status of the application. He got different stories from both individuals . Pam asked if there was an access to the Park. Marty said there is and he has driven to it . He said it is between houses and looks like someone' s side yard, but it is there. 3 CITY OF LINO LAKES PARK BOARD MEETING MONDAY, OCTOBER 2, 1995 Ken asked about the trail being put in Phase II of the project . He voiced his concern about the trail not being put in if Phase II of the project was not done. Marty said if Phase II does not go in we will probably get some additional park land. Projects: Wenzel Farms - Marty told the members that the additional piece of playground equipment was going to be installed on October 1, 1995 . He said they will also have to drain tile the playground because water is pooling in this area. Pheasant Hills - Marty reported that this park may also have to be drain tiled. This park is in the planning stages and there is $15, 000 in the budget for playground equipment for this park. Birchwood Acres - This park will be worked on this winter and the residents will be doing a fund-raiser to help pay for things that are needed in the park. Country Lakes Park - Marty told the members that the parking lot has been moved. The final cost for this move was approximately $3 , 500 . The hydro ax is scheduled to come in and brush out the area. Marty said this will really open up the park. George asked if there was highland from County Lakes Park to Country Lakes Estates . Marty said he walked the area with Tom Hovy, DNR, last year and Mike Hoffman this year and there are highlands to put the trail on. The trail will come out onto the beach area. Marty continued by saying it was too late this year to seed and he thought it was better to wait until next year because there still was some grading work that needed to be done. City Hall Park - The building has been moved in and is now bolted down to the ground. It needs a paint job but it looks good. Marty said the city saved a lot of money by using city staff to do the concrete work. He thought the final cost of the project would be approximately $7, 000 . We still need a new heater, some utility work done, and the phone line installed. 4 CITY OF LINO LAKES PARK BOARD MEETING MONDAY, OCTOBER 2, 1995 Brandvwood Park - Marty said this park is scheduled for paving and the grass looks good. Trails - The paving bids came in a little cheaper than if we would have written a change order to one of our existing contracts . Marty said he would like to get started on the trails as soon as possible after the rain stops . Marty passed out a handout showing the breakdown of the projects and the costs associated with them. He talked about being able to cut some things out to lower the total cost of the paving job. George asked if there were very many trails left to be paved after this year. Marty said there were some in Pheasant Hills and approximately 3400 feet in the Clearwater Creek Phases . Rice Lake Estates - Marty said he is still waiting for Circle Pines to get him some information for the Park Board members . As soon as we get the information it will be put in the members packets . Sunset and Jeanne Drive Trail Segment - The wetland delineation should be done before October 15, 1995 . Once we get that report we will know what we are dealing with for this project . Pam asked if the residents have contacted him about this trail . Marty said they have not but he feels it is a needed trail . Recreation Report: Barry told the members that he included program planning forms/final reports and a 1995 Summer Programs report in their packets . He reviewed the 1995 Summer Programs report . He told the members that the Lino Lakes Park and Recreation Department served 371 young people in our cost incurred programs and an additional 231 in our open playground program this year. He said 81 percent were Lino Lakes residents with 93 percent of the youth attending the Centennial School District . Pam asked if T-ball was offered during the day. Barry said yes, we had three sessions . Pam then asked how the number of day participants compared to the evening participants . 5 CITY OF LINO LAKES PARK BOARD MEETING MONDAY, OCTOBER 2, 1995 Mary Fogarty said there was an average of 13 kids in the day program and 18 in the evening classes . Barry then talked about the adult programs and explained how he came up with the figures on local users vs . outside users . He said there was a good number of participants for the basketball program and a very good number of participants in the softball program. He talked about the lack of facilities and the affect it had on holding some of the programs . Barry feels we had a good but challenging summer. It was either very hot or raining. George asked Barry when he costs out expense vs income do we include chalking, mowing etc . Marty said no, we do not . Barry said the expenses include officiating staff, balls, bases, etc. not maintenance. Marty told the Park Board members that this report was going to be very helpful when meeting with surrounding communities . Pam asked Barry about the youth tennis program and how it went . She had questions on the USTA program. Barry said he would like to offer the USTA Tennis program next year but he will need to revamp the program. He will probably increase the registration fees for this program. Fawn Lane Park/Trail: Marty said we have had several mowing complaints from this area this summer. He feels we need to decide what should be done with this area. Some residents want wild areas and some residents want manicured lawns . The neighborhood association needs to put this on their agenda to get a consensus of the residents . Marty will let the Park Board know when the next meeting is going to be and he hopes some members will attend the meeting. Marty feels the land along trails is an issue that is going to have to be dealt with. Sharon feels the residents should make the decision and let Marty know what they want done. Pam asked how do the residents decide what is going to be n done and is this something that the Park Board needs to address and set a policy. George said we need to catalog these areas and the city staff people needs to use common sense on how or what needs to be done, in a specific area, and how often it needs to be done . 6 CITY OF LINO LAKES PARK BOARD MEETING MONDAY, OCTOBER 2, 1995 Friends of the Park Update: Marty reported that the Friends of the Park did not meet in September. The next golf tournament meeting will be October 3 and hopefully they will be setting a date. He asked the Park Board members to attend this meeting if they were interested in helping with the tournament . He then talked about the letter that John Saccoman sent to other businesses describing the Friends of the Park Foundation. Marty said the Friends did come up with an indemnification form and hold harmless agreement . They have gone before the Lino Lakes City Council with these forms . He then explained what these forms are intended to do. He then went on to say that the donor recognition plaques have come in and he will be giving them to the Friends of the Park Committee . ADA: Marty reported that he has hired Janet Bona as the ADA Coordinator and she will need to be approved by the City Council . She is already talking with the schoold district about the consortium, ADA, and cooperative recreations plans for people with disabilities . Sharon asked if Janet was full-time. Marty said no she is paid on an hourly as needed basis from the CDBG Grant that runs through the end of 1995 . Goal Setting Meeting: Marty had handouts he gave to the members . He then reviewed the memo he wrote on 1996 Goal Statement Cost Estimates, dated September 27, 1995 . He showed slides on the previously proposed park plan for City Hall Park. He showed the members where ball fields could be place along with a parking lot . He said the cost estimate would be about $60, 000 . George asked if these two ball fields would be a prudent use of $60, 000 . Barry said he and Marty have been discussing this and they feel it is a lot of money for two fields . He thought it was a secluded area and did not know if that would be an attraction or deterent . 7 CITY OF LINO LAKES PARK BOARD MEETING MONDAY, OCTOBER 2, 1995 Marty wanted Ken' s input on this . Ken wanted to know if it was feasible to have these fields in use until the athletic complex can be built . He said going back to the master plan this was designated as an athletic complex site and wanted to know why we weren' t using it . Marty said this is true but the property has changed, there are more wetlands since the wetland laws have changed, and part of the property is being used by the Lino Lakes Public Works Department . Ken then asked how much of the area was wetlands . Marty showed the areas that he thought were wetlands . There was discussion about public works making the best use of the land and a land trade off . Marty said there was no other area for them to move to and they need a large area for the trucks to maneuver around the salt/sand piles . Marty stated that a septic system has also been installed on the property. Marty then asked the board if there was any other information he could give the members pertaining to the 1996 goals . George said he would like the 1996 goal priorities on the next agenda. He wants to look at the priorities and put a dollar amount on the projects . Updates and Old Business: Sharon asked if the new building at City Hall Park was on blocks . Marty said the builder moves the building in and gives staff a couple of days to lay block and then the buildings is lowered onto them. (It is on blocks) Ken asked if the building was on blocks at Shoreview. Marty said no. NEW BUSINESS• Rehbein Transit Trail: Marty reviewed the September 27, 1995 memo regarding this trails . He said Mary Kay Wyland negotiated with the Rehbein Bus Transit Company for this new segment of trails and it should be placed sometime during the week. 8 . 1 CITY OF LINO LAKES PARK BOARD MEETING ,.� MONDAY, OCTOBER 2, 1995 SCHEDULE NEXT PARK BOARD MEETING: The next Park Board meeting will be held on Monday, November 6, 1995, 6 :30pm at City Hall . ADJOURN: Pam Taschuk made a motion to adjourn the meeting, seconded by Sharon Lane . Meeting was adjourned at 8 :50pm. 9 4A. Ao"N AGENDA ITEM STAFF ORIGINATOR: Marty Asleson DATE: October 27, 1995 TOPIC: M-5, Pheasant Hills Preserve Park BACKGROUND This is a developer/ Friends of the Parks project. The developer, Contractors Properties Inc. , has donated $25,000 to develop this Park in the development. A playground play structure design has been developed by Flannigan Sales of Iron Mountain Forge for the site designated in the masterplan for this park. The budget set by the developer was $15,000. Please find attached a copy of the playground structure design. I will bring a larger rendering of this design and a color photo to the meeting. The purpose of this report is to review the concept plan for this playground Structure. Upon approval, it should than be forwarded to the Friends and the City Council. OPTIONS 1. Approve the playground concept plan for M-5, Pheasant Hills Preserve Park. 2. Refer back to staff for further consideration. RECOMMENDATION 1. Approve the plan. LOCAL: (612) 486-8866 FAX: (612) 486-0285 > --FLANAGAN SALES, :NC. S un_rllieers o� D-i Recreational Eau;Invent 2.. Site AmenilipS 42i2 HIGHILANG DR1%;E. SHOREVIEW,MN 55126 WATS 800-32 -3557 DATE: October 3 , 1995 - _ Contractor Property Developers Co . CONTACT PERSOhPamela Backer jly.__ 9110 - 83rd Avenue North --.------ -- Brooklyn Park , Minnesota 55445 Pheasant Hills Park PROJECT: --- - -- ------ - -- - ---- TELEPHONE: �`-0823 In compliance with your request of September 12 , 19 9 5for a Price quotation on Play Equipment supplied by we wish to submit the following Catalog Quantity Number Description Unit Price Extension 1 KB2183 Kid Builders Play Area $14 , 975 . 0 Includes playstructure , swings and installation supervision 34 + 40mm and 75mm Red Oxide . Kid Tiles $850 . 0 - Includes adhesive 40 b ' Black Kid 'limbers - recycled plastic $1 350 . 0 border 1 - Includes galvanized stakes iQuotstion in affect until: November- 17 1995 - above Sub-Total We quote you as above V.O.B. Lino Lakes ,._-Mr1 _ Sales Tax not includ Shipment can be made in: 5 - 7 weeks _ _ i Freight included _ Lased v on credit approal - - Terms: I TOTAL "'VPORTANT INFORMATION FOR ORDER;NG: Iron Mountain Forge 1. The purchase order should be madeoutt —.They will Invoice you upon shipmen 2. Send the order to FLANAGAN SALES, INC. as shown above,thereby authorization can be completed before the order Is processed. 3. TO EXPEDITE SH I PME NT,three items 5hould show on your purchase request tax exemption num ber(If exempt),ADDRESS FOR BILLING,and ADDR ES FOR DELIVERY, FLANAGAN SAtE�$,JOC r, ey�'`� ,- L'—� DRABi(i 9,F Y / RSV. I DRAW . KB2183 STYLE KID BUILDERS Q Q[v DRAWN BY: RIF �7 WtO16CT: 11AHA6AN SALES.B< FORGE IPIMASANf IMIS PARK ( 427n2 HD°AM S90RBVBW.1INSS126 i LINO LAKES,MrMSOTA �_ 11oo3za-3157 �l! EID TBABBRS RECYCLED PLASTIC BORDER �i FALL w. ZONES WAVE SLIME J EMSTING WITH HOOD (� y Tim S HIGH SWING WTIH / I 2 BELT SEATS AND ' / 21VT SEATS ROOFCHAIN HSI Climm AOSS I 12 I i • ROOF DOUBLEAWL Mem ® BPIRAI. SLIDE CLUAM Tum ARCH BRIDGE WSA=RAILS LOOP CLIMER \ ARCH Q.MFR EXISTING DRIVERS KID I. TREE PANEL Tam WAVY LADDER I 12 g 7RANSFE51 111 STATION \\ ROOF / DOME / SLIDE 8° W THE ACCESS PATH �i 4B. AGENDA ITEM STAFF ORIGINATOR: Marty Asleson DATE: October 26, 1995 TOPIC: Trails Committee BACKGROUND Much discussion concerning the planning, maintenance, development, safety, and funding of trails has transpired over the last few years, and with added resolve from the 20/20 Vision Focus it was decided at the last Park Board meeting to investigate the formation of a Trails Committee. I was directed to make a recommendation on this. Please find enclosed copies of the City of Shorview's Resolution forming a Trails Committee, and The City of Vadnais Heights Ordinance, establishing a Trails Commission. Both groups are charged with making recommendations concerning trails. Please notice a couple of differences. Shorview has 11 members on their committee, and meets once a month, and Vadnais Heights meets on a quarterly minimum schedule with 5 members. Shorview indicated that meeting once a month was too much, they simply ran out of agenda items after a while. Vadnais Heights had 5 members with city staff members acting as liaisons and representing the Planning, Park and Public Safety aspects of trails. Shorview, indicated that it became very difficult to create liaisons to each other committee from existing committee members because after a while liaisons simply didn't show up for lengthy periods of time. They are now reevaluating this process. OPTIONS 1. Establish a committee of 5 members with staff liaisons to meet on a quarterly basis, unless otherwise needed basis. 2. Some other combination. 3 . Refer back to staff for further consideration. RECOffi ENDATION Option 1 CITY OF VADNAIS HEIGHTS ORDINANCE NO. 415 AN ORDINANCE ESTABLISHING A TRAIL COMMISSION AND ADDING CHAPTER 228 TO THE CITY CODE The City Council of the City of Vadnais Heights does hereby ordain: I . The City Code of Vadnais Heights is hereby amended by adding Chapter 228 to read as follows: 228 . Trail Commission 228 . 010. Establishment and Purpose. There is hereby established a Trail Commission whose functions shall be to identify and plan pedestrian and bicycle trails throughout the City. 228 . 020 . Membership Terms and Removal . The Commission shall consist of five ( 5 ) members appointed by the City Council for three-year terms on a calendar basis except that the Council may select members for a one or two-year term on an initial basis in order to stagger the terms of the members . The members of the Commission shall serve without compensation and 'may be removed from office at any time by the Council . There shall also be appointed by the Council two alternates who may attend and take part in the Commission hearings but shall have no vote, provided that if one or more regular members is absent from any meeting , then an alternate , in order of seniority if more than one, may sit with all the privileges of a member for that meeting only. Upon any vacancy of a regular member, the senior alternate shall automatically become a member of the Commission. 228 . 030 . Meeting Dates . The Commission shall establish its own meeting dates , but shall meet at least four ( 4 ) times a year. 228 . 040 . Procedure. The Commission may adopt its own rules and procedure consistent with this and other city ordinances and n laws of the state. These rules may include establishing a chairperson and other officers of the Commission, methods of calling meetings , conduct of hearings , methods of voting, and maintaining Commission records . 1 228 . 050 . Reports . The Commission shall send to the City Administrator a copy of the minutes of each meeting and in December of each year, tender an annual report of its activities and any recommendations to the City Council . 228 .060 . Coordination With Other Commissions . The Trail Commission shall maintain close coordination and cooperation with the Park and Recreation Commission and the Planning Commission. For that purpose, the Park and Recreation Commission and the Planning Commission shall each designate one member to attend Trail Commission meetings . II . This ordinance shall take effect and be enforced from and after its passage and publication. PASSED by the City Council of the City of Vadnais Heights , Minnesota, this19th day of January 1993 . a MAYOR ATTEST: CLE 2 Con— + ed l di e T,s a n< I.- t h C i t y x e d y a 1 wa y 8 r(lon th ro n m`e rs li Vice ell e.e �DC a ol, e From -Y At Dept. • Fax 0 Fax if • RESOLUTION NO. 8C--34 JT4 "'ORM 'WAIrk A' D LAK� QUALPY ESEST A6LISHIN- A r17rN S A MANAGEMENT Ti,,e r s )u! ,,nnnizp! the need fo Ci kizuri Pa C i'a t -n Pr, j afr_� relafi!-ig t Q S*C C,r1n and r th, WHE'RE,iS C NC i L t tf Cz of J V�v iew ci,titzens -are appointed and a r w 1� C,- I ake e ;iad neces sta r�r P I a ns qui . o n t o 1 P and P r-u, = L: t: a D e er� f such Problems and issues'. L T ,�A-y -klf P. - F...^rfOF THE CITY -v, A' S mB Ac f'-,%i 1 AP A r S LP v, W A E s t e.h I s h, rr,--n t o f r"4ttlee r" b e -nunc ' I r appOint and _tell- x_ e f f e C t z f n�-z rte by t�e mo v Ij j re, of h.6. tv f ter_. me a r. d e a a rep Conn i s S 1(if) C a Irr --f�rf4-ifk Poe"t),ers tO --Ii* Staf ZQ %be .Caqmj t-tee f spacial wh ri Z-1 z� t r� L n 'lay C- m;;A- the f rc mcr- often requireA. M em L �j ti Fit- jd of r�;e third y-ar ' f ? Shall be a-, F-01 10,4S slE all be a ppo-5 rted for term of f-i—t bE 61M(!IntE714 thr- t ,,- r tw, p pc t e Cz Fiir t h e t i d a r the Wljal Coavti��v of t Iti�E y appui�:._ 0 hall L.e appt)iMt-__-J for a thr-ae-year, teria. Vncles --az.'•p of d varjncy d rig. the tern, of office the Coa ^nUncil L a new me�-p z 41 Ores i L disab14ty, or fail- N ic nw�ber of jr4e a e r,r, a �Zpec` 'I .4ee side the C Ii t i 6. Th� rf)r fha r- In, r-a in presi and o J if b�_7 ' C Cy fej "he, V a i S 0 r, tke S ta f R, 11hroup t�.e T" a I'r—ia n of the C uwr-k i r,tee a nod t-�w f *a mi g P_r ul r, e S Al t h e mi—m- ti On A Ci at dnv t4MmE- IV.( 0 t�ri C 3-V hr-WE-er, ',e Cj expPinses th, s of the et The Cownittee sah6l! I;e 4 1 rectitd L IP.Co tc ` - 4' 1 t v il C e_-x0- at-"j Aef�-f_ the 4 Wat U t 4 0 f Aaina k`aefie it r,A I-tai ;s-&, idcntii o�,fy kr ,n and anticipated Ij " I rob I erti dreast prop-Ilse pf:ivs and >dtions thall w"I 'l resolvc. w. prevep't s t-yTr er 1 a' e u it i u c r i- 1 14 ri s i j 'y nate w4th nc-Tg" -jwrirlg 4ppliCzt. le goverrvwnt agencies _,1. 1 � re same -!j dr-1-44 advi-ce as outlined beluw: o r i en t 01 t i to n in,d u,s `se wc, rol._a% n-k t krw pe or a app ine i a.n C4. il in group- ation as 40 t er a(j- iv-, -t and flood 4. D f i r% r e a so P.- ,C+l CO er,ent o f t h A I ';-,,I i ns cars- ar r C1 T the witimate er,- s,-,o t'--at will Bird j I -'p v c. ro,grams Scope and authority analvsis� cil re—d'ations . and ;lt. u I Tur'HL P.0.4 TKDA TOLTZ.KING,DUVALL,ANDERSON AND ASSOCIATES,INCORPORATED ENGINEERS•ARCHITECTS• PLANNERS 1500 PIPER JAFFRAVPLAZA - -- -- 444 CEDAR STREET SAINT PAUL,MINNESOTA SS1012140 PNONE:612292-4400 FAX:612M92.0063 September 11, 1995 Mr.Marty Asleson Parks,Recreation, and Forestry Superintendent 1189 Main Street Lino Lakes,Minnesota 55014 Re: Bituminous Trail Paving Lino Lakes,Minnesota Commission No. 10414-950 Dear Mr. Asleson: Based on our recent telephone conversation,it is my understanding the City wants to proceed with this project as follows: 1. The bid quantity will include all of the trail segments noted in your memo dated July 24, ,.� 1995. 2. The only items to be bid is the actual paving of the trail and some minor base preparation work to provide a uniform paving surface and transverse slope. No import or removal of base material will be included in the contractors bid. 3. Based on your memo which notes about 10, 147 feet of trail is to be paved,the estimated project cost will exceed$25,000. As per State Statutes, a project of this magnitude must be advertised. 4. We will also submit the project to contractors currently under contract on City projects to determine if they would be able to complete the work as a change order to their original contract. 5. The project will proceed according to the following schedule: Send Construction Details to Existing Contractors for Review as Change Order Work September 12, 1995 Receive Quotes from Existing Contractors September 18, 1995 Advertise in the Quad Community Press September 19, 1995 Open Bids and Award Contract October 2, 1995 Contractor Completes the Construction October 13, 1995 Mr.Marty Asleson September 11, 1995 Page 2 This schedule indicates the paving would be completed yet this fall but if the City wanted to expedite the process the quantity of trail paving could be reduced by about 20%which would reduce the project cost to be level where advertisement would not be required. However,unless we hear otherwise,we will proceed according to the above schedule and will keep you informed of the status as the project proceeds. If you have any questions or comments,please contact me. Sincerely, ohn M. Powell, P.E. JMP/mha cc: D.Ahrens, City of Lino Lakes T.T,,r.DA TOLTZ.KING.DUVALL.ANDERSON AND ASSOCIATES,INCORPORATED ENGINEERS•ARCHITECTS• PLANNERS 1500 PIPER JAFFRAY PLAZA 444 CEDAR STREET SAINT PAUL,MINNESOTA 55101-2140 PHONE:6IZ"2-"M FAX:612=-0063 September 5, 1995 Mr. lack Menkveld North Suburban Development,Inc. 8741 Central Avenue NE Blaine,Minnesota 55434 Re: Boardwalk Trail Construction Shores of Marshan Lake Lino Lakes,Minnesota Commission No. 10232-02 Dear Mr. Menkveld: We have recently reviewed the boardwalk trail which you have installed within the referenced development. As per our meeting in the Fall of 1994,the posts for the hand rail are loose and need to be stabilized with additional spikes or bolts. There are also areas where the decking screws are loosening causing them to pull away from the decking. Both of these problems must be corrected immediately. Please contact us with a schedule for your contractor's correction of these items. It is our understanding that the City is withholding issuance of building permits within the subdivision due to an escrow account deficit. If you do not complete the necessary boardwalk repairs before September 29, 1995,we will recommend to the City that they retain a contractor to complete the repairs and bill you for the repair costs plus 50% as per your development agreement. If you have any questions,please contact me at 292-4433. /hn 1y . P I ell, P.E. JMP/mha cc: D. Ahrens, City of Lino Lakes M.Asleson, City of Lino Lakes M. K. Wyland, City of Lino Lakes 100fts MEMORANDUM Date: September 7, 1995 From: Marty Asleson To: Lino Lakes Park and Recreation Board Subject: Packet Please find enclosed a copies of articles from Athletic Business News concerning Referendums and the planning of sports facilities. I will periodically copy information for you on Parks, Recreation, and Forestry issues. Please notice that the packet is quite thin this month. unless information comes in late Friday, as it usually does on packet week, there were no action items this month. We have been very busy with the projects, thus the meeting shall consist of mostly verbal updates. n n N I r1VQ` n the one hand,you've got your major headaches— like the laminated wood roof that collapses in the humid confines of a natatorium. Or the rest rooms built— remember your high school physics? — below the elevation of a facility's septic tank and drainfield.Or the cold-climate recreation center outfitted with a fabric roof —but without an adequate dehumidification system—that results in scat- tered showers moving through the south-central portions of the facility's j multicourt forum. .q f But then there are those facility problems which, while not as cata- strophic,nonetheless are imbued with what we might call a high level of A.F. —the Annoyance Factor.These are the rest rooms whose floor drains are set in the floor's high spot; the basketball courts with misplaced electrical outlets,which allow the tangle of wires to trip up unsuspecting players who i • venture too close to the scorer's I table; the soft-backed gym ceiling insulation, pocked with holes from kicked or thrown athletic balls. I These and other gaffes(for a list of Rains some of those submitted by AB read- «. ers, see p. 31) occur with startling regularity in spite of the best efforts �... of facility owners and operators, t ,x.• . ` design professionals, engineers and contractors.Nationally,falling objects r ro r have recently made headlines,raised welts and inspired lawsuits after in& Some of the mistakes committed during the dents in Seattle's and Toronto's i domed stadiums,but everyday other planning and construction of a sports facility facility operators contend with t wreak more havoc than others — although if unpublicized troubles such as foot- ball fields that won't dry out, pool its your facility, there's no such thing as a shells that rust through and locker . -. small problem. room changing areas that sit in clear T view of patrons passing by the open door. Assigning blame is not only difficult,but also counterproductive—and as a * By Andrew Cohen facility owner, maybe even a little self-incriminating. As Jon Wiggins, senior parks planner for the Fulton County (Ga.) Department of Parks and Recre- ation, suggests, a proactive owner, fully involved in the planning process, could have helped ward off even the above natatorium's failed laminated roof. "If you have a proper mechanical design,that laminated wood is about as good as anything going,"Wiggins says."But what you have to be conscious of as an owner, is what could happen if the mechanical system fails. The huge risk falls squarely on the owner's shoulders,and it only takes one situ- ation like that to create such negative press that it's a near impossibility to 28 ATHLETIC BUSINESS August 1995 DirectorsAthletic • • Coaches i 1 9 L — right the wrong after it's been done,aside and people are swimming around, bang- from putting up a sign that says, 'Under ing into these mushrooms. New Management.'" The trouble is,anticipating change is o — ® What's the problem?Read these,and no simple task.Older basketball courts, r weep: notes Bill Canning, assistant vice presi- o • Lack of oversight. Sad but true — dent of recreation at Tulane University, poor oversight is the cause of many may appear to have electrical outlets in CarronKnow problems, particularly some of those the wrong areas of the floor, but these smaller, irksome ones. A possible sce were designed when the game was • _ nario is one in which the architectural slower and the athletes smaller—when There's A Carri drawing shows a floor drain, but the scorer's tables sat closer to the game Dealer N- • plumber neglects to put the line in — than they do now, in other words. and the contractor,for whatever reason, Indeed,Canning says he's never painted Carron Netcan '- all doesn't think of it either. "None would permanent three-point arcs on Tulane's your •• net --• like to admit it, but it happens on every basketball courts since he's been We • - the most complete project," says David Body, a principal expecting the distance to change. line of • • • custom with Cannon-Parkin in Los Angeles.Adds Putting down the lines with tape every they're described Al Oberlander, an architect with RDG year saves the eventual expense of •ur catalog and-they Bussard Dikis in Des Moines, Iowa, "In resanding the entire floor when the trey FREE_ available ur my mind those are never a client's fault." line changes, but Canning says he's • •ll • • •Poor up-front planning.Wiggins calls beginning to wonder whether he might _ • of qualified • • this "the greatest flaw I've ever seen," be too far-sighted after all. authorized dealer akin to building without a blueprint. Anticipating change is a lot easier representatives, "Any architect or consultant worth when the planning team includes a man- their salt will spend a considerable ager or programmer who's lived with For the name of the dealer amount of time with the owner defining various mistakes in other venues. How- -' ll ll Free the very finite details of the program," ever, the entire team is responsible for Nationwide '' Wiggins says. "In an aquatic facility, for visualizing the way the building is most example,you have to define what sort of likely to be used. programs you want in that pool before "Needs can change over time," Can- you begin to think about the size,shape, ning says. "A gymnasium built just for depth, and whether you'll add slides or basketball doesn't need to have the sprinklers or any of the other things that greatest acoustics in the world. But CARRON NET COMPANY, are becoming popular these days. Some after it's built,and somebody sees what • BOX 177 9 Two Rivers,WI 54241 of those leisure-pool components, once a wonderful space it is and decides to you get them in there you can't get them hold high school graduations there,and L QUALITY NETS SINCE 1934 out again—so what are you going to do all of a sudden you can't hear the if your program changes to lap swimming speaker — that's not the fault of the i 30 ATHLETIC BUSINESS August 1995 OPEN UP THE OSS P I B 1 L I T I ES j I F 711i11✓}i 1•",1 1 I I��w�11�.1�..1 Il•I11 fr''�i�:{i;�ii` 1 r�li h i1t1 4 ilii. A!. �I i� 3 :Y� I1 1 1 II�It 111�11 11���� `*♦� a.•3. 1 ICY'`^•.1i;1�Y.�1.>jh(,'��,1�:111 II �.A. \\ .•i� II t11.711.�1111�11•'�,1111 /-�/�- Le �yI1y121-�1'it�l*icl+�ry�/Cl 1':1t' oy"jiiYi`I:1$ i: tl•� '- 91-0-Akr' 'YII 111 1 1114 1 .� 11 Ily i. 111 il; 11':i ���v ,' _ .. ��•._ 1.1 1 jA.�.��lt..ln!�w.l .' '�'is I+i 1 s�.I; .I �•',' 1 � •��li�r11';.` Si11iA'„tillrala�'�IYi�Jyl,i'ill �©���� ♦ .F�••♦ -, �_ t�lp.+l�ij%Y11,�IT-y 1}�1„31i%, 11,`}Zlltls�l"1'i � l e• � .� 1SIll�.1.. y P 11 y l..a• ■(((,A.�1111111 `� }1� ,.I P44.' 11 L!r11 ` r _.8 1111•'ll a \ _I n/1Y �1 i�.u�1�1 1�.1 1 � � I� '•� 1 d- ..r.•,•;. i1% " 1F, al�`if i7 1 1 l�i iri?Qi1 /�� c 'W_bW " ;aw t� �w i 1YI!#1Sfifl�'•� 11 .IIII of1 1 In �iy it�'��,',.IL _- ^'Y ..1yt•`e7sT' v Create a year-round aquatic environment the way nature intended with an OPENAIRE "retractable roof" enclosure. OPENAIRE enclosures are equipped with motorized roof - panels which at the touch of a button open 50% of the roof area to let in the warmth of direct sunshine and the ' '•" - freshness of clean air. OPENAIRE'S unique product is • ' capability far-sightedenough. space." constructed of a maintenance-free thermally broken • • cut comers.Another possible aluminum frame that is designed to withstand the harsh • ' environment of an indoor pool. By calling OPENAIRE the approva•I of just about. • •. but today, our in-house engineering department will assist . you in opening up to the possibilities. / • • •� ^ OPENAIRE INC. 1 • :. -. •�~ 6581 Kitimat Road, Unit#3 P.O. Box 376 ••: •• •w • Mississauga,ON L5N 3T5 Cedarburg,WI 53012-0376 ' 1 -800-267-4877 the.client draw up a list which,in the in the process if it will incur hundreds architect or consultant to have a broad event that something has to go, sped- of dollars in costs further down the line and deep knowledge of sports architec- fies what goes first. "Owners sometimes allow a facility to ture. Philip Szostak, director of sport "When you start cutting,you have to be designed that may be contrary to facility architecture at NBBJ in Research have a shopping list In your pocket of their best needs or long-term Interests," Triangle Park,N.C.,says the field is see- things you're willing to give up," says he says."It's like the old adage that build- ing a shift toward coinmunities choos- Wiggins."It helps to have a dollar figure Ing cheaply Is the most expensive way to ing local architects` over more attached to each,which you've worked go.Somebody can cut corners for the well-established firms based farther out with your architect,and make sure sake of the up-front budget,only to be away,something that could partially off- they're prioritized. That way, if you met a few years down the road with hor- set the general rise in sports facility need a small cut or a big cut you have a rendous costs to replace or repair some- expertise seen in the last decade. But separate list for each situation." thing that has worn out way too early." also, he believes, the field is changing '.k Sometimes budgetary realities do • Inexperience. Many facility opera- rapidly enough to render even many force clients and their architects into tors start out without an extensive facil- facility owners'experiences obsolete. the cost-cutting mode, but Wiggins ity planning background, but even the "Even those who have built rec facili- warns against pruning one dollar early most experienced would want their ties before—these facilities have gone through tremendous changes over the �� of "Owners sometimes allow a facility to be designed that may be contrary to their best I f 1 needs or long-term interests." i nlast five years," Szostak says. "They're ng o ■ Bleacher more than recfacility facilities now." "A lot of facility owners are more pro- gram- and finance-oriented, and they really don't know about the bricks and sticks, adds Wiggins. "Hence the importance of a good consultant,some- Pmblems? body who can advise the owner on what choices are the best for them and what decisions they need to avoid mak- ¢ " ing altogether for the sake of the return Get Back on their investment. As a consultant, you cringe when somebody from a in the Game! small town in South Carolina with a lim- ited budget comes to you and says, '1 $ S Replacement boards and want a facility exactly like the one I saw 4 parts from H & H Enterprises in Los Angeles.'It's a virtual impossibil- will return your bleachers to top ity,it flies in the face of the architectural notch condition. We stock industry- axiom that form follows function." standard bleacher boards to fit all •The fast track.For major sports proj- ects, Szostak says, one danger is the I makes—prefinished and ready to install. accelerated schedule that tends to fol- io We also carry hard to find repair parts and accessories for all your low the awarding of a pro sports fran- indoor bleacher needs.One phone call gets you back in the game! chise or the go-ahead from a university committee. "A football stadium has been talked about in Charlotte for almost 10 years, Call but then all of a sudden we get the Car- olina Panthers and we've got to get that stadium built," he says. "There are going to be more mistakes made the faster you go." H & H ENTERPRISES • Old team, new team.Times change THE BLEACHER PEOPLE and methods change—and so do the people involved in the sometimes cir- cuitous world of facility planning.Szostak Phone °1-800-878-7777 says, "I was involved with a project PO Box 585 • Grand Haven, MI 49417• Fax: 616-846-1004 recently where we started off with an owner committee,and one guy who had 32 ATHLETIC BUSINESS August 1995 Cirde 22 an Reply Card built a gym five to seven years ago was any urban design issues.And the more because the janitorial staff will be designated the maln decision-maker multipurpose the building Is, the more tempted to spray water instead of since he'd been through the process. possible tradeoffs there are." damp-mopping, thereby rusting the Then, halfway through the project, the It Is for this reason that Cannon- lockers. In these cases, the architect's g committee hired someone as operations Parkin's Body believes that many of the pretty helpless because people don't manager who had run these types of things commonly called mistakes are in always agree." I j buildings before,and he had a totally dif- reality mere differences of opinion. These facilities sometimes undergo ferent idea of how it should be designed." "Apart from the very obvious ones, I unfortunate changes after they're con- "Sometimes mistakes happen with a do think in many cases one man's error structed,like the one Wiggins saw,built change of client," agrees Oberlander. is another man's preference," says with beautiful clerestories that were "You design it to one key person's Body. "A classic example is whether subsequently boarded up because of specs, the building gets built and that you have floor drains in a locker room glare that a portion of the staff found person leaves, and the person who or not. Some people like to have them unacceptable. comes In next thinks of those design because obviously if there's a spill "There is no question that the safest decisions differently." there's somewhere for the water to go, pool is one that either has no daylight- • Code-mandated mistakes. Louisiana, but some don't like to have drains ing or has just diffuse light from directly says Tulane's Canning, is one of a num- "A lot of facility owners are more program-and finance-oriented, and they really don't know about the bricks and sticks." ber of states requiring sprinkler sys- tems inside racquetball courts."We had one sprinkler head that got hit by a ball and bent enough that it started leaking," Canning says. "When maintenance was called in to fix it, someone turned an incorrect valve and we had 1,500 gal- lons of water on the wood floor before we were able to shut it off."Part of the floor had to be replaced, Canning reports. "And," he adds, "this is a very well-designed building." • Conflicting goals. "A poker game" is how Wiggins describes the design process."When you're dealing with a$6 million facility,there's give and take on both sides," says Wiggins. "The archi- tect has ideas about what he or she wants,and you've got ideas about what you want." Szostak says the struggle for archi- tects is in meeting the demands of the client and also keeping in mind the responsibility they feel toward the pub- lic at large. "As architects, we are taught that we're keepers of the flame,so to speak," Szostak says. "It's pretty well ingrained in us that these buildings are seen in a larger scope of the world,so a lot of the ` discussions we have about every proj- ect come down to a tradeoff.The best- operating facility is a big concrete-block box without any windows.We can come up with a very pragmatic list of things that will make a building the best4unc- tioning facility,except it will have no city or regional context, nor will it address Circle 23 on Reply Card August 1995 ATHLETIC BUSINESS 33 i above it,"Body says."But owners very often have to make a choice between having no glare at all or allowing a little Curves Ahead glare because they want to be able to open the pool deck out onto a lawn or sand volleyball areas. "If you actually took the most conserva- tive position on every one of these issues, you'd probably finish up with a fairly life- less building,"he says."There are flat-out errors that occur in facility planning,but a lot of decisions are judgment calls." 1 "It's unfortunate for the people who have these failures,but It's comforting to �, "'� •-,,, the rest of us to realize there's nothing new about them,"says Wiggins. "Fortu- nately, all of these problems have solu- tions,and all can be avoided with proper attention to details at the outset." Solutions found within one year of +' completion are often paid for by archi- tects or contractors, who after all are service professionals —they'll stand behind their work because not doing so I' �'0 V. "Apart from the very obvious THE SCIENCE OF MOTION i tt F ones, I do think in many 'The ARCUATE series of products by Pacific Fitness accomplishes several of my principal goals in strength training. That is, they cases one man's error Is employ selectorized equipment in the delivery of a safe exercise while simultaneously engaging multiple joints to provide a natur- another man's preference." al arc like motion with variable resistance over the full exercise ' range. The ARCUATE series can be used easily by the novice as well . K: as the advanced exerciser. These machines are aggressively chat- reflects poorly on them. Oberlander lenging and yet offer the ultimate in safety.I'm impressed with the says his firm will typically return to a project 11 months after its completed biomechanical advantage the machines provide the user." to walk through each room with the Donald A. Chu, Ph.D., R.P.T. client,so that he or she has time to take 11 Ather Sports Injury Clinic, Castro Valley, California advantage of any one-year warranties. "If they're design-related—like carpet- ing or door closers that were mis-speci- fied and haven't held up well —there can be some reparation,"he says. e / Canning,who in addition to working in { r college recreation has served as a facility /J consultant on several dozen projects, describes such problems as inevitable. Chest Press Incline Press Seated Row Shoulder Press "If you talk to folks who say there's nothing wrong with their building, The industry has changed With club is guided by a pre-determined arc- they're not telling you the whole truth," owners demanding new innovations, like path which follows the human he says."As much input as you can pos- designs, and technologies, many of body's natural movement. This sibly get, there still are going to be the strong equipment manufacturers insures safety and consistency omissions and errors." of the are being replaced b through each repetition,giving you a Those things just happen,"Oberlan- P g ep Y g pe n,9T g Y der says. "When you mass-produce aggressive companies of the future. better, more efficient workout. For cars, for example, you design a proto- Arcuate Technology by Pacific Fitness more information about ARCUATE type and then make hundreds of thou- is a perfect example of this new way of technology and the complete line of sands of them and there's time to thinking. The most important aspect Pacific's commercial products, call refine the design. Everything in a of this new technology is that the user 1-800-722-3482• sports facility is custom-designed and ��,,, no two are exactly alike, and all the Pacific Fitness Corporation parts that go into a building are at least 6600 W. Katella Ave Cypress,CA 90630 as complicated as those in cars. You (800) PACFIT2, Fax: (714)373-1226 �, �� can't expect it to be perfect and not have some problems."■ 34 A1Mfr1C BUSINESS August 1995 Circle 25 as Reply Card 4-%-` F As bond issues become increasingly difficult to pass, it's more important than ever to craft a strategic plan that focuses on getfing many community groups involved in the project. By Brad Simmons n 1987, $105 billion in mu- seeking ways to pay for those costs. nicipal bonds were issued Citizens are demanding more services for ,7 to various public entities fewer tax dollars, and cities and towns are throughout the United States.Two years ago,that looking at bond issues as one method of meeting number jumped to$292 billion.In 1986,there were 9.6 those demands. million financings and seven years later,that number Historically, bond issues have been designed to nearly doubled to 18.1 million. financially keep pace with the expansive and often As city governments struggle to maximize shrinking expensive needs of the community,such as establish- budgets to fit expanding community needs,municipali- ing new programs and facilities or upgrading existing ties are stepping back,assessing the public's needs and ones. Recently, though, bond issues have become Pnulu_-fdmnen15iinpson'fPG IrnurnaUnnal August 1995 ATHLETIC BUSINESS 37 increasingly difficult to pass,so before Determining what the public wants, task force of interested citizens,or struc- diving into building plans, new equip- One of the key steps to a successful cam- tured using a professional consultant. ment, capital expenditures and, most paign begins well before the public opin- Typical opinion poll questions often important, the voting booth, the first ion polls and renderings—establishing include: How do you feel about a tax and most critical step is to establish a a task force and involving special inter- increase to support this project?Would strategic planning framework. Correct est groups, user groups and people of you vote yes if..? What types of financ- and thorough development of the various ages, cultures and backgrounds ing would you be willing to support for strategic approach can increase the within the community in the early plan- this project? Where should the facility chance of success. ning phases. be located? How should users pay for The strategic planning approach can Once these groups are energized, it's the services offered? generally be organized into seven fun- important to begin assessing the general Some communities, however, get damentals. While these components mood of the community. Determine caught up in what one consultant terms are organized and discussed in a par- what voters are thinking by conducting the`Santa Claus'or`feel-good'survey that ticular sequence, they all are closely public opinion surveys and public input asks community members if they would intertwined and generally overlap in sessions within the community. These like to have a new recreation center.The sequence. surveys can be done informally by a response will always be an overwhelming yes, but that doesn't do any good. You need to know specifics, such as whether residents would support building a corn- Determine what • voters are thinking Win big with your concessions at by conducting public any event featuring Gold Medal Funfood Equipment & Supplies. opinion surveys Sell Popcorn, Sno-Kones°, Cotton and public input Candy...all 75% to 85% profit funfoods...and turn your sessions within the Mal concessions stand into a winner! . . s Gold Medal will give you the community. knowledge you need to pput profit power back munity recreation facility if it increased p p their taxes by a certain amount or if it used a certain form of financing. How in your concessions! Call write or fax toda for would residents feel about paying daily PWW9 y admission fees or annual pass rates. !t complete information. Developing a financing approach and plan.A financing plan must be estab- lished as soon as the results from the opinion polls are in. Financing questions ® to answer at this stage include:What type [ j of bond structure should be used, and in how many years can it be repaid?Are the bonds ratable?What is the lowest possi- ble cost of borrowing the money? There might be two or three different f ways to finance the program, and the $mplfplQS advantages and disadvantages of each -_L should be examined. Once a prefers ed choice is selected, planners should determine not only the type of financ- ing, but what and who it involves, and 1 _. . when things are to be done. Seeking an optimum facility pro gram mix. Another key ingredient in determining and building public support is developing an optimum facility pro gram mix. A new service or facility should be tailored to the people who pay. GOLD MEDAL` PRODUCTS CO. for it.Before discussing design plans and. square footage, the task force, special 38 World Headquarters Bldg.,2001 Dalton Avenue,Cincinnati,OH 45214 interest groups and consultants should (513)381-1313•TOLL FREE 1-800-543-0862•FAXACTION 1-800-542-1496 take note of what the community wants 38 ATHLETIC BUSINESS August 1995 Circle 27 on Reply Card and needs in a recreational facility,while enough revenue to cover operating In addition to the typical construction keeping in mind what services other costs. Many cities believe that if their costs, which include construction labor g communities offer and the current user centers generated enough revenue to and materials, furniture and equipment demands unique to the service area. pay 80 percent of operating costs, they budgets must be established and should When voters approved a recent bond would be doing well. include even smaller maintenance items issue to build a recreational complex in Building a project cost model. Early like vacuum cleaners and trash recepta- Missouri, planners axed the idea of car- and definitive understanding of all cles.Signage and artwork should also be diovascular and free-weight areas potential project costs is crucial. The considered at this early stage. because a local YMCA had recently project cost model should be the bud- Other costs, known as the"soft costs" upgraded similar facilities. But because get blueprint and reference point for the (architectural and engineering design j the demand for ice time in the region project as it moves forward.A common fees, specialty consultant fees, permits, was high,they included an ice rink even tactical error is evaluating only the con- environmental remediation, surveys and though a nearby recreational complex struction costs rather than the entire start-up funds), must also be built into also offered a rink. cost of the project. This can cause sig- the budget model. nificant embarassment later in the proj- Creating a design and construction j ect,and can even jeopardize it. implementation plan.Integral with con- A common tactical error is evaluating only the constructionfell ' costs rather than " the entire cost of the project. • Bond issue strategists must always keep in mind that the issue at hand is passing a bond issue—not designing a building. A common mistake made by clients and consultants during this early stage is the urge to design the building and show renderings. This can be a deadly tactical error because the sell campaign can be half lost before it begins, based upon the potential early bias of people without complete infor mation. Rather than drawings, use a list of activities and a program mix to show- • _ case a potential new facility. Operations planning — under- standing the "business" aspects. A paradigm shift has occurred during the • last few years in community-based facil- ities. Since most communities are on tight budgets, new facilities and ser- vices are expected to do more than just service the community— they must move toward making enough money to become self-sufficient and operate at a profit just as a traditional business would. The public will be asking ques- tions such as: When will the facility be �" able to generate revenue? How much will it take to start up the facility? How , a ' }o 3 much will it cost to run the facility? 4 r What are the proposed fees for the users?Consultants and community spe cial interest groups must be prepared I `� g P P P -~•� to provide the answers. t Traditionally, many parks and recre- ational facilities have operated at a loss, WYY1 and only a carefully planned and varied optimum program mix complemented by a well-designed center will bring in Circle 28 on Reply Card August 1995 ATHLETIC BUSINESS 39 —�1 expect to see progress immedi Bonds Issued for Public Facilities incly. Options c consider ma, include fast-tracking, where the 1g project is rapidly moved forward 16.6 by advancing design and construe 16 tion activities in a package for deliv- ery. This approach is frequenth 1 14 used in design/construction man agement and single-source deliver\ 12 systems. The design/construction man 10 .2 .3 agement approach is one in whirl ,.0 8.2 early in the process an owner selects a design organization and 8 6.5 construction management organi- zation to work in tandem to ensure 6 5 compliance with budget,schedule 3.7 and cons tructability. While this 4 2.9 alternative eases the interactiot between design and constructio! 2 objectives at an earlier stage, i still requires significant owner 0 leadership. 1987 1988 1989 1990 1991 1992 1993 1994 Relatively new to the industry are single-source delivery meth- Source: Securities Data Company and The Bond Buyer,June 7, 1995 ods such as total program man- (Numbers listed in the billions of dollars) agement or design/build. These approaches offer a cohesive blend struction cost modeling is an action plan agement and risk solely on the owner of design and construction with leade. that addresses the actual construction and requires leadership and a significant ship and responsibility from one consul.- project delivery methodology and sched- time commitment from the client. ing source.These delivery methods can ule requirements.Historically,the design However, the pressure to get facilities significantly decrease the amount of staff and construction process has taken the up and running while working around time and commitment required by an conventional design-bid-build approach. various existing operations is becoming owner and eliminate the finger-pointing y This approach places the burden of man- an increasing challenge. Communities so often present. — i p LIKE MANY ATHLETES, THEY'RE TEMPERAMENTAL, EASILY RATTLED, AND SUBJECT TO BURNOUT. Running a ballfield has enough ups and downs without having to constantly replace lamps. But maybe your problem isn't touchy light bulbs. Maybe it's your light poles. Because the more your poles vibrate, the more often you'll take in the view from a hundred feet up. But Sherman spun-cast poles vibrate ry much less than steel poles in heavy winds, so your lamps last longer, as well as your maintenance budget. And while steel poles e I rj take weeks to install, a Sherman pole can } be raised in just a few hours. So call a Sherman representative today. Because for performance, a Sherman Poles zibrate less. So replacement costs don't Sherman pole shines under any condition. get you bent out of shape. Sherman Utility Structures, Inc. 2117 Magnolia Ave.South,P.O.Box 1926 Birmingham,AL 35201 4S 2051252.6995 1-800-533-5103 FAX 2051322-4356 SHERM LN 40 ATHLETIC BUSINESS August 1995 Cirde 29 on Reply Card In addition, the financial risk of devel- years,however,with almost militant anti- ownership within the community. oping a facility is also a growing concern tax sentiment in many communities, project cannot be seen as a city's prc for many clients. Single-source delivery passing bond issues has become increas- ect or as a municipality's project — allows for risk shifting. This technique ingly difficult. School districts that used must be seen as the community's pro;l puts the burden of cost overruns,sched- to experience a lot of success are now ect and community members must fee ule compliance and quality squarely on they have ownership in it. the back of a single-source delivery ThroughouOthe campaign, communi entity. The result is a guarantee of the You and 10,000 cation is the key.The message must b( cost,schedule and quality to the owner. repetitive, persuasive and emotional This becomes very important in commu- while addressing a need or benefit. A nities where there has been a history of residents may think people to volunteer their time for tl c cost overruns, project schedule failures campaign.Networking is also importai.t and a general lack of credibility among Start with obvious constituent groups the voters.This can often become a criti- that a recreation such as sports leagues,swim teams anc cal selling point in many communities. people who have a vested interest in the Creating the sell campaign and get- facility, and then layer out from that ting the vote. While up to this point complex is a great Before long, a lot of people will be efforts have been focused on developing involved. the right product for the community, The key to a successful bond issue is 3 energies must now be shifted to concen- Idea, but there may well-designed and comprehensive stra-e. is trate on selling the product to the voters. gic planning framework that includes s if- You and 10,000 residents may think ficient planning time, the integration of that a recreation complex or other com- be 20,000 other all planning aspects (feasibility, funding. munity facility project is a great idea, design and construction), and commu- but there may be 20,000 other citizens nity involvement and commitment.■ who aren't yet sold. Since most bond citizens who aren t Brad Simmons, AIA, is a principal at issues require a vote and you want the Sverdrup Facilities Inc., 801 N. Eleventh, majority of the voters to check the St. Louis, MO 63101, 3141436-7600. The "yes"box,creating a targeted,thorough yet sold. author thanks the following people for f T). campaign is critical —and begins as viding information for this article:Ken Lab soon as the idea is established. lard, Ballard*King and Associates;Dr.Rod Years ago, if a school board voted to having trouble getting anything passed.It Wright,Attitude Research Company-James put something on the ballot, and if the is now often vital to get professional help Lahay, Stifel, Nicolaus and Company;and leadership in the community was behind in winning campaigns. Mike Oppermann, Webster Groves (Mo.) it,things passed fairly easily.In the last 10 It's important to emphasize a sense of Parks and Recreation Department. i l-,4egen(c6 0 e (OMTer aw z LP romote enduring pride and enthusiasm For a free catalog,call or write In Wc4tite', 11 C foryour valuable collection in an us today. GHENT, authentic Waddell case. Built-in locks 2999 Henkle Drive, ---- and tempered glass assure security P.O.Box410 r and safety.Choose from over 75 >, Lebanon,Ohio 45036 beautiful models m Toll Free a variety of hard- Fax 513-932-9252 wood or metal i finishes.Custom ^° �I Cadfor our FREE and built-in cases 14°°p`G``°&y' -�. are also available. _ For over a century, i WADDED z . • Waddell has show- } cased and protectedy Dl(\1 P ' } YX prized trophies and trea- sured symbols of success. 42 ATHLETIC BUSINESS August 1995 s ,, `� 2' x 10' Treated Rim Note : Shop Drawings Must Be Submitted To And Approved B y The Git y Joist - Typ. 2' x G' Treated Decking 9 For With 1Gd Nail Spacing each I�VeHand Grossin (Fasten With Two 3' Galy. Deck Screws B Each Joist-) 2' x 10' Treated Header - Typ. General NOteS Boardwalk Details As Shown Represent The City Of Lino Lakes General 10'-0' 10'-O' Requirements. They Do Not Take Site Specific Conditions CSuch As Soils 17 And Normal High Water Elevations-) Into Consideration. Given the variability jOf Site Conditions. Shop Drawings Must Be Submitted To And Approved By The City For Each Wetland Crossing. Shop Drawings Shall include 1/8' Thick x 1' Wide 3/8' GrIv_ Steel Bolts Pertinent Information Related To Soils, High Water Elevations, And Steel Strap Hold-down _ With Nuts. Flat Washers. Modifications To Boardwalk Details In Response To Site Conditions C2 Sets Req. Per And Lock Washers (Particularly With Respect To Pier Depth And Configuration). All Modif- Timber-) - Typ, icntions Shall Be Consistent With Standard Engineering Practices. WOODEN CURB ON EACH SIDE Approval Of Shop Drawings Shall Be At The Discretion Of the City r Based On Their Review. The City May Also (At Their Discretion) Require G'x6' GGA Treated Headers and Jois C r s Must Rest The Use Of Alternative Grossing Methods C5uch As A Floating Boardwalk.). .�� Timber CO.6 Retentions v On Top Of Timber - Typ. In General, The Top Of Deck Elevation Shall Be 1'-0' Above The Normal High Water Mark. Unless Otherwise Determined By The City (At Their !I 1 6x6 Treated Timber CO.6 / 1 12' Div. Concrete ° 1/2' Dia: x 7' Retentron� P Pier C4000 Discretion Based On Site Specific Circumstances. / - Typ. / d With Nut. FiatWashers. n, _ / 1 1 sib c ° Steel 1 �^ 1 And Lock Washers �d I � Wood Members 0, 2' x 10' Treated ° All Members Shall Be 545 #2 Grade Pine Or Better (Or Approved Wood Blocking - Typ. Equal.). All Members Shall s. GGA Treated r 0.4 Retention In Accordance With Grade Line Industry 5tnndards. Color Shall Be Brown.. Standard Galy. Steel Joist All Guts Shall Be Painted With Approved Brush-On Preservative To Match Hanger - Typ. Existing. 3 Fier OonneG tion De t'�5il 2' x 10' Treated Joist - T 1 Not To scare Wood Timber Deck Supports C16' O.G. �YSpacing All Members Shall Be Rough Sawn #2 Grade Southern Yellow Pine or N Better COr Approved Equal. f All Members Shall Be CCA Treated To 0.6 Retention in Accordance With 1/8' Thick Steel Plate Industry Standards. Color Shall Be Brown. Pier Bracket C6' Wide x All Guts Shall Be Painted With Approved Brush-On Preservative To Match 9' Longs Existing. 1 2' x 10' Treated Header /,-- / (Rest On Top Of Gx6 / 1 / / 1 Timber - Typ. --F�) _ \ �1 J � �"a5teners/Metals �1. ----- ° 1/2' Die. x 7' Galy. Steel r Machine Bolt W/ Lock < r ) All Fasteners CNalls. Bolts. Screws, Etc.-) Shall Be Hot-Dipped Galvanized Washer And Nut \ // Or Zinc Coated In Accordance With industry Standards. 2' x 10' Treated Rim Joist - Typ. All Metals Shall Be Hot-Dipped Galvanized in Accordance With industry Note: Verify Width of Gx6 Standards COr Approved Equal.). TOP Timbers Prior to Fabricating , Pier Bracket ORT'IOGRAPi-�tlG Bolted Connections Shall include Bolts. Nuts. Fiat Washers, And Lock Headers and Joists Must Rest Washers. Lag 5rew Connections Shall Include Flat Washers. V2* x Treated Decking WithIG th 16 p Nail Spacing 12' Dia. Gonc_ Pier On Top Of Timber Wi CFasten With Two 3' Galy. - Typ' 6, 9' Joist Hangers Shall Be Nailed With Joist Hanger Nails In Accordance Deck Screws a Each Joists Nall Rim Joist and Header q-4 1/2' With Industry Standards. Typ_ C3 - 16p Galv. Nails - Typ. 1/8' Thick Steel Plate -- Pier Bracket CG' Wide x • 9' Longs a Goncrete Piers 1/2' Die. x 7' Gaiv. Steel All Concrete Shall Be 4000 PSI s 28 days and Meet Machine Bolt W/Flat Washer City of Lino Lakes General Specifications f-)r Construction. Lock Washer And Nut i 1�%ycsyn': 1/2' Div. Steel i7aVtc: 1 3 Bracket Anchor Continuous inuo s Welded !. i 2. FRONT 51DE �. xed �os � tion Board��Ik f Ian View 2 Bier 5ro� ket Detoil - T _ 4 � ener�l 5 e � ifi� � tions �--No r Y� o t o Scale I 1 Not To Scale 1 Not To Scale hwslay c�rtNir tJ+�!hb p sp aictft�Cstm cr rspw•t win plsprrd by ms cr umfar m dtrnE apwvtsrn. I 1/8' Thick x 1' Widea8r6"� 1/2' Die. Holes For Steel Strap Hold-down 3/8' Galy. Steel Bolts C2 Sets Req. Per With Nuts. Flat Washers, Timber. - Typ. And Lock Washers Enlargement Of Wooden Curb ---- 2xG Treated Curb 1 3/4' (Continuous-) ————— 1 1/2" IOd Galy. Ring 2• � Shank Nail Thru Blocki ————(Center On Deck 1 3/4E__ Boards 2x4 Treated Curb - Typ. All Blocks Blocking 1 1/4' 2' x 6" Treated Decking Face View Side View With 1Gp Nail Spacing 3 8' x 7 Galy. Enlargement Of 1-told—Down Steel Carriage Bolt Deck Screiws ewEach Joist.) W/ Flat Washer. Lock - Typ. Washer. And Nut 8 -O Cl 1/2' Offset From Decking Center.) 2x6 Treated Curb 3/8' x 7' Galy. - Typ. Full Length (Continuous. - Typ. Steel Carriage Bolt 2' x 10' Treated I W/ Flat Washer, Lock 10d Galv. Ring 2' x G' Treated Decking Washer. And Nut Joist - Typ. Shank Nail Thru Blocking With 1Gd Nall Spacing Hanger - Typ. I 9 2x4 Treated Curb P 9 C16' O.G. Spacings Standard Galv. Steel Joist Standard Asphalt Trail (Center On Deck (Fasten With Two 3' Galy. j (As Per Typ. Gity Spec.) Blocking - Typ. Boards Gap in 2x4 Treated Deck Screws s Each Joist. f - Typ. All Blocks Gurb Blocking CTyp.� _ Typ. X 2'-0 Typ. 2' x 10' Treated Header I - ;--- :: ends FIP With Top of 2' x 10' Treated Rim O Jois t - TYP. I O 6x6 Treated Timber Deck ' Note End Pier Varies - Maximum Support (GGA Treated to C is Shifted 3' G' x G' GGA Treated Pier Bracket in to Align W/ a Timber CO.6 Retention-) 1/2' Div. x 7' Goly. Steel a 2' x 10' Treated Rim a Of 24' Above Grade Line 0.60 RetentionD Header ns - Typ. Machine Bolt W/Flat Washer. Joist - Typ. CNote: Heights in Excess OF t Shown --- Lock Washer And Nut 24' May Require Handrail-) d d O a a Grade77ine ° Existing Grade Line (Organic Soils-) - Typ. (Organic Soils.) - Typ. O ° a a I i Existing Grade Line Of ,(� O Existing Grade Line Of �J J Suitable Bearing Soils c i � 9 � v Suitable Scoria Soils 4 12' Die. Concrete Pier (Varies In Depths - 9 O (4000 psi- - Typ. ° Piers Must Extent Down ° p � (Varies In Depths - � 12' Die. Conc. Pier d A Mininum Of 24' Below i o Piers Must Extent Down a C4000 P51� - Typ. ° This Line - Typ. c N A Mininum Of 24' Below L This Line - Typ.4-1 4J c c �fi ° Undisturbed Or Compacted Subsoils - Typ. a ° to 8' Thick x 18' Die. Concrete 8' Thick x 18' Dia. Concrete Base - Typ. 7Base - Typ. CL L CL CL i I 7'-3 5 fixed -poson Board��Ik - - Side fle v� tion 6 fixed -�'osition Board��Ik - - Sep Lion AA 1 Not To Scale 1 Not To Scale —"�