Loading...
HomeMy WebLinkAbout02-03-2020 Council Work Session PacketCITY COUNCIL WORK SESSION AGENDA CITY OF LINO LAKES Monday, February 3, 2020 Community Room 6:00 P.M. 1. CSAH 34 Birch Street Project Update, Michael Grochala 2. Water Supply System – Manganese Update, Michael Grochala 3. Presentation from Dean Quimby, Anoka Co.-Blaine Airport Advisory Council 4. West Shadow Lake Drive Project Change Order No. 2, Diane Hankee 5. Well No. 7 (509 Birch) Review Update, Michael Grochala 6. WoodsEdge (Civic Center) Monument Sign, Michael Grochala 7. Council Updates on Boards/Commissions, City Council 8. Monthly Progress Report, Jeff Karlson 9. Review Regular Agenda 10. Adjourn WS – Item 1 WORK SESSION STAFF REPORT Work Session Item No. 1 Date: February 3 , 2020 To: City Council From: Michael Grochala, Community Development Director Re: Birch Street (CSAH 34) proposed improvements Background Anoka County is continuing to work through the preliminary design to reconstruct Birch Street (County State Aid Highway 34), from Hokah Drive easterly to the s-curve at Old Birch Street. The improvement s are proposed to be completed in the 2021 and 2022 construction seasons. At the December 2, 2019 work session the County discussed the possibility of adding a 3rd round about to address access issues raised by residents east of West Shadow Lake Drive. The City Council expressed some concern over the additional roundabout, noting uncertainty with the function of the two already planned . Anoka County proposed to hold a 2nd Open House to gather additional public input. The 2 nd Open House was held on January 28, 2020. Nearly a hundred residents were in attendance. The County provided a number of different information pieces including traffic simulations, road layouts , roundabout education pieces and right-of-way impact mapping. All of this information is now available on the project website at: https://www.anokacounty.us/3666/Birch-Street-CSAH-34-Reconstruction-Proj In response to prior comments the County did prepare a revised layout that terminates the project east of West Shadow. This would allow for future consideration of a 3rd roundabout or alternative design at a later date. Generally, a lot of positive feedback was received at the open house. While there are still residents with some hesitation regarding roundabouts the information provided helped address many questions. Overall the project design appears to address the majority of resident concerns to improve safety, slow speeds, minimize right-of-way impacts, while still accommodating traffic flow through the corridor. Project Management Team representatives from Anoka County Highway Department and WSB will be present to provide the council with a review of the information provided at the open house and a recap of the public comment received. The County would like to get the council’s feedback and receptiveness to the design. In order to stay on target for construction in 2021 a decision on the design will need to be made in the next 30 to 60 days. Requested Council Direction Staff is requesting feedback on the design considerations and what if any additional information the City Council would like provided to reach consensus on the design. Attachments Project Layout. RICE LAKE ELEMENTARY SCHOOL POTENTIAL POND BIRCH STREET HOKAH DRTOTEM TRAILTOMAHAWK TRAILW SHADOW LAKE DRDEERWOOD LANEDEERWOOD LANE BIRCH STREETOLD BIRCH ST OLD BIRCH STWARE ROADReshanau Lake Anoka County, Minnesota CSAH 34 (Birch Street) Improvements 2021 Phase Layout with Future Option 12'LANE 13'RTL 13'LTL 13'SHLD 14'LANE 1:15 12'LANE 13'LTL 14'LANE 13'RTL 18' 18' 14'LANE 13'LTL 14'LANE 13'RTL 1:15 1:15 12'LANE 13'RTL 1:10 1:5 14'LANE 13'RTL 1:5 14'LANE 13'RTL 1:5 13'LTL 14'LANE 14'LANE 13'RTL 1:101:10 14'LANE 13'RTL Blvd/Central Island Driveway Apron Potential Future Access Concept Potential Pond Location Anoka County TRANSPORTATION DIVISION Highway January 23, 2020 763-324-3100 Department with any questions: Contact Anoka County Highway The actual project plan may differ from this draft plan. the project as shown in part or in whole. This draft document does not commit Anoka County to construct information only. This document is a draft, subject to change, and is provided for This drawing represents a potential design concept only. Disclaimer: PRELIMINARY DRAFT - SUBJECT TO CHANGE LEGEND Trail Median/Curb & Gutter Roadway Shoulder Truck Apron SCALE IN FEET 50 1000 763-324-3100 Department with any questions: Contact Anoka County Highway The actual project plan may differ from this draft plan. the project as shown in part or in whole. This draft document does not commit Anoka County to construct information only. This document is a draft, subject to change, and is provided for This drawing represents a potential design concept only. Disclaimer: PRELIMINARY DRAFT - SUBJECT TO CHANGE 34 C O UNTY 34 C O UNTY WS – Item #2 WORK SESSION STAFF REPORT Work Session Item No. 2 Date: February 3, 2020 To: City Council From: Michael Grochala, Community Development Director Re: Water System Manganese Update Background At the January 6, 2020 City Council work session staff presented the city’s public water system manganese test results and background information on Minnesota Department of Health (MDH) guidance values for safe drinking water. Subsequent to that meeting the City sent out advisory letters to property owners and residents which included notice of a public informational meeting. The public informational meeting was held on January 22, 2020 where the City and MDH representatives presented information on the manganese levels and recommended actions. The meeting was well attended by approximately 50 people. The city presented short-, mid-, and long-term solutions to address the levels of manganese in the city’s municipal water supply. The long term solution is to consider a Water Treatment Plant. It is recommend that the city complete a Water Supply and Treatment Feasibility Study. City is staff is working with WSB and Associates to establish a project scope for the study. It is anticipated that a proposal will be presented for City Council consideration in March. Requested Council Direction None required. Discussion only. Attachments None. WS – Item #4 WORK SESSION STAFF REPORT Work Session Item No. 4 Date: February 3, 2020 To: City Council From: Diane Hankee, City Engineer Jim Stremel, WSB & Associates Re: West Shadow Lake Drive Project Change Order No. 2 Background On October 8, 2018, the City Council awarded the bid for the West Shadow Lake Area Improvement Project to Geislinger and Sons, Inc. in the amount of $4,940,636.57. Construction has been ongoing since October of 2018. On March 11, 2019 the City Council approved Change Order No. 1 in the amount of $41,849.00 for the extension of concrete curbing. The 2019 construction season set a record for the number of rainfall events, a total of 39 days. This led to difficult and delayed construction season for the West Shadow Lake Area Improvement Project which required additional maintenance of erosion control measures, pumping of standing water, maintaining the roadway, providing temporary and passable access to residents, and time needed to dry out the site. The contractor met substantial completion 2.5 months late but did not meet the final completion date of November 1, 2019. Construction of the project is almost complete with the final lift of bituminous and boulevard restoration remaining. Due to the inclement weather and additional time spent to maintain the site, the contractor has requested a final completion date extension to June 26, 2020. Changing the final completion date would be approved by Council through Change Order No. 2. During the initial construction of the roadbed, and with further exploratory excavations, the project engineers noted that the soils in the north portion of the project met the road subgrade requirements and the typical section was modified from 24 inches of sand to 18 inches. In addition, there was less common excavation required to construct the boulevards. This resulted in the ability to reduce excavation and sand quantities. This reduction has been included in the enclosed Change Order No. 2. The West Shadow Lake Area Improvement Project contract with Geislinger and Sons, Inc. and Change Order No. 2 would reduce the contract amount by $139,983.00. Original Contract Amount $ 4,940,636.57 Change Order No. 1 $ 41,849.00 Change Order No. 2 - $ 139,983.00 Revised Contract $ 4,842,502.57 As part of the project completion date extension, the construction services will be subsequently extended. WSB and Associates has provided a not to exceed fee of $65,700, which includes the time the contractor exceeded the substantial and final completion dates in 2019, and the time to complete the project by June 26, 2020. The overall project costs including these changes is projected to be $6,332,000.00 which is approximately $525,000 under budget. Requested Council Direction Staff is requesting Council direction to include Change Order No. 2 and to approve the extension of construction services contract with WSB and Associates at the February 10, 2020 Council agenda. Attachments 1. Change Order No. 2 WS – Item #5 WORK SESSION STAFF REPORT Work Session Item No. 5 Date: February 3, 2020 To: City Council From: Michael Grochala, Community Development Director Re: Well House No. 7 Update Background WSB and Associates and Jeff Oertel of Oertel Architects presented the Well No. 7 feasibility study to the City Council at the December 2, 2019 work session. Following discussion staff proposed to have some additional structural review completed prior to any additional consideration. Additionally, Oertel Architects investigated moving costs further and adjusted the costs by approximately $40,000. This puts the “premium” on the restoration at approximately $150,000 to $200,000 or approximately 15 to 20 %. Staff will provide an update on the structure engineering at the meeting if available. Based on the information received to-date, staff is not recommending to proceed with the house relocation/conversion. Requested Council Direction Staff is requesting direction regarding use of the 509 Birch Street house. Attachments None. WS – 6 WORK SESSION STAFF REPORT Work Session Item No. 6 Date: February 3, 2020 To: City Council From: Michael Grochala, Community Development Director Re: Woods Edge / Civic Complex Monument Sign Concepts Background The YMCA previously approached the City regarding the opportunity to construct additional signage along Lake Drive. The Woods Edge development master plan provided for the placement of entrance signs at Town Center Parkway and by the freeway ramps. Staff has prepared some concepts for consideration by the Council. The proposed sign would allow for both development identification and individual business signage. We are estimating a construction cost of approximately $50,000 to $60,000. If there is interest with a particular concept, with or without modifications, staff can seek out a more definitive design and cost estimate from a sign company. We would also propose to seek a partnership with the YMCA on sign costs. Requested Council Direction None required. Staff is seeking input on potential sign design. Attachments 1. Sign Concepts Sign concepts are based on this sign inside the development area. This is referred to on subsequent pages as the “City Hall” sign. Assumptions about location - sign will be located around the area where DR Horton’s sign is currently located. Signage for the City Hall and Police Station is incorporated into the new monument sign. Viewshed for 12” Text • Viewshed is 395’ • Applies to the “Woods Edge” text on the sign concepts Likely need to demo 4 trees General Sign Location Viewshed for 6” Text • Viewshed is 150’ • Applies to the “City Hall” and “Police Station” text on the sign concepts DR Horton sign City Hall / Police sign Landform® and Site to Finish® are registered service marks of Landform Professional Services, LLC. 09.03.2019 SIGN CONCEPT - WOODS EDGE • Lino Lakes, MN Sign Concepts Information 2’ 4” cabinet base 2’ 4” 2” 2” 3’ 2’ 4” 2’ 8” 1’ 4” 8” 2’ 4” cabinet base brick material to match sign at City Hall 8” stone or precast cap 6” metal posts, square 6’ sign panel ELEVATION FROM SOUTHBOUND LAKE DR ELEVATION IN GOOGLE STREETVIEW. SCALE APPROXIMATE ELEVATION FROM NORTHBOUND LAKE DR PROFILE VIEW PROFILE VIEW material to match sign cabinet at city hall 18’ 15’ 9” 16’ 4” 1’ 6” 4’ sign panel 13’ 10’ 8” 1’ 1’ 6’ 4” 8” heron logo - metal Kasota stone or matching precast pier with caps Lake Drive Town Center Pkway Landform® and Site to Finish® are registered service marks of Landform Professional Services, LLC. 09.03.2019 SIGN CONCEPT - WOODS EDGE • Lino Lakes, MN Concept 1 VARIATION WITHOUT AREA TITLE ON SIGN PANEL - APPLIES TO ALL SIGN CONCEPTS VARIATION WITH CABINET COLOR AND LOGO VARIATION WITH SAME SIGN CABINET COLOR AS CITY HALL VARIATION - LOGO AND MATERIAL - MORE BRICK 6’ 5” 6’ 8” Landform® and Site to Finish® are registered service marks of Landform Professional Services, LLC. 09.03.2019 SIGN CONCEPT - WOODS EDGE • Lino Lakes, MN Concept 1 - Variations 2’ 4” cabinet base 3’ 4” 2” 2” 1’ 4” 8” 2’ cap 3’ logo kasota stone or equivalent 8” stone or precast cap 6” metal posts, square 6’ sign panel ELEVATION FROM SOUTHBOUND LAKE DR ELEVATION FROM NORTHBOUND LAKE DR PROFILE VIEW PROFILE VIEW material to match sign cabinet at city hall - darker color 15’ 9” 3’ 18’ 8” 1’ 6” 8” 13’ 10’ 4” 1’ 1’ 7’ 6” heron logo - metal Kasota stone or matching precast pier with caps 4’ sign panel ELEVATION IN GOOGLE STREETVIEW. SCALE APPROXIMATE Lake Drive Town Center Pkway Landform® and Site to Finish® are registered service marks of Landform Professional Services, LLC. 09.03.2019 SIGN CONCEPT - WOODS EDGE • Lino Lakes, MN Concept 2 ELEVATION FROM SOUTHBOUND LAKE DR ELEVATION FROM NORTHBOUND LAKE DR PROFILE VIEW PROFILE VIEW metal material for sign cabinets. Corten steel is represented in these images 2’ 5’ 2” ELEVATION IN GOOGLE STREETVIEW. SCALE APPROXIMATE Lake Drive Town Center Pkway Width of metal panels TBD with sign fabricator Landform® and Site to Finish® are registered service marks of Landform Professional Services, LLC. 09.03.2019 SIGN CONCEPT - WOODS EDGE • Lino Lakes, MN Concept 2A - Variation with Modified Logo Location and Metal Sign Panels ELEVATION FROM SOUTHBOUND LAKE DR VARIATION WITH PLANTER VARIATION WITH PLANTER PROFILE VIEWS 2’ 4” cabinet base Kasota stone material 8” stone or precast cap 6” metal posts, square 6’ sign panel metal material, corten represented in image 17’ 4’3’ 17’ 6” 22’ 4” 4’ 3’ 1’ 6” 10’ 4” 1’ 1’ Lino Lakes color for metal pillar 4’ sign panel ELEVATION IN GOOGLE STREETVIEW. SCALE APPROXIMATE 3’ 4” Width of metal panels TBD with sign fabricator 2” 2” Lake Drive Town Center Pkway 5’ 2” Landform® and Site to Finish® are registered service marks of Landform Professional Services, LLC. 09.03.2019 SIGN CONCEPT - WOODS EDGE • Lino Lakes, MN Concept 2B - Variation with Metal Pillar