HomeMy WebLinkAbout03-02-2020 Council Work Session PacketCITY COUNCIL WORK SESSION AGENDA
CITY OF LINO LAKES
Monday, March 2, 2020
Community Room
6:00 P.M.
Oath of Office – Tony Cavegn
1. CSAH 34 Birch Street (509 Birch Street) Project Update, Michael Grochala
2. Water Treatment Plant Feasibility Study, Michael Grochala, Rick DeGardner & WSB
3. 87 Lilac Street Concept Plan, Katie Larsen
4. 617 Apollo Drive-Muddy Cow Site & Building Plan Review, Katie Larsen
5. Creation of Joint Powers Entity for Metro I-Net, Jeff Karlson
6. Trunk Utility Fees, Michael Grochala
7. Schedule Advisory Board Candidate Interviews, Jeff Karlson
8. Ambulance Service PSA, John Swenson
9. Use of Force Simulator, John Swenson
10. Council Updates on Boards/Commissions, City Council
11. Monthly Progress Report, Jeff Karlson
12. Review Regular Agenda
13. Adjourn
WS – Item 1
WORK SESSION STAFF REPORT
Work Session Item No. 1 (Revised)
Date: March 2, 2020
To: City Council
From: Michael Grochala, Community Development Director
Re: Birch Street (CSAH 34) proposed improvements
Background
Following discussion at the February 3, 2020 work session the Project Management
Team (PMT) has continued to work on revisions to the preliminary layout and develop
project costs estimates.
Project Layout
Anoka County in the process of trying to adjust the West Shadow roundabout to avoid
removal of the existing house in the northeast corner. This may require a variance for
front yard setback. Staff has indicated we would be supportive of a request should it be
needed.
Terminating the project immediately east of West Shadow Lake Drive will eliminate the
extension of the south side trail, linking Fawn Lane to Old Birch. The trail extension
would be completed when a permanent solution for this section is constructed.
Staff has received requests to install a street light at the Old Birch/Birch Street
intersection. Depending on the scope of the County project this may need to be
addressed separately by the City.
Anoka County has received a couple additional resident comments to include the Old
Birch roundabout in the project.
Cost Estimates
The County received a bid estimate of $4,000.00 to salvage the brick from 509 Birch
Street. The cost does not include mortar removal or hauling of the material.
A draft Joint Powers Agreement has been prepared for City review. The agreement sets
forth a basic understanding of both the City and County project responsibilities and cost
share. The City’s estimated share, based on the two roundabout option, is approximately
$571,000. Over 1/3 of the costs are related to relocation of trunk water main. This cost
will be funded by the Water Utility fund. The balance of the City’s share would be
funded by Municipal State Aid funds.
Any proposed landscaping, within the roundabouts, would be 100% City Cost. These
figures will be refined as the project design proceeds. The PMT is in the process of
reviewing the four lane signal design, and three roundabout option to provide a general
estimate of potential costs.
Representatives from Anoka County and WSB will be present at the work session to
discuss the project.
To maintain a 2021 construction schedule we are proposing to act on Municipal Consent
and JPA approval by the first meeting in April.
Requested Council Direction
Staff is requesting feedback on the design considerations, cost share and what, if any,
additional information the City Council would like provided to reach consensus on the
design.
Attachments
1. January 28, 2020 Open House comments
2. Preliminary JPA and Cost Estimate
Open House comments
We are happy about the proposed changes to Birch St. We often take the backroads to get to Hodgsen Rd
rather than attempting to cross traffic to go. Same is true when leaving Rice Lake Elementary after drop off or
pick up. Going left is our route, but will often take a right and wind through the neighborhood to reach our
house that is east of Rice Lake Elementary.
If a solution to help Old Birch intersection, do it now otherwise it will be an issue for 20 years. Possible left
turn only added. Prefer no additional stoplights. Use roundabouts. Prefer to avoid loss of ball fields - any
option to add one if we lose one?
Detours were really bad last project. Put in signals or signs at CR J & Centerville Rd for sure and something at
Ware & CR J.
I'm fearful that the introduction of two roundabouts will restrict traffic to the point that there will be gridlock
off Hodgson to Birch. It's going to create long lines on Hodgson - luck to get 6 cars/light. I would have to turn
right & travel a distance to turn left on Birch St? This is non-sensical. What does the math show? Thank you.
Two roundabouts by school should help traffic flow once people get used to them. Doesn't seem it will affect
Black Duck getting out to Birch going east either early AM or late afternoon. Too many people pass on the
shoulder if you're stopped to turn left out to Black Duck.
I like the roundabouts. I like that it ends at Kingfisher. I won't like if we need to go to Old Birch to go west.
That will make a lot of traffic for those south of Birch, between West Shadow Lake and Old Birch. Thank you
for keeping us involved with the decisions.
Add parking for Rice Lake Elementary events, cars park on the street right now.
Moving the trail in front of 441 Birch doesn't seem to have much value. The space is enough for snow and
other needs.
Seems like overkill with 2 roundabouts. Do we need 2 by the school? I don't think speed is high on that stretch
compared to east of the church to Centerville Rd. Passing on the shoulder at Black Duck Rd & Birch is
happening a fair amount and is very dangerous!! Turning onto Birch from Black Duck Road due to speed as
well.
I was hoping the project scope would include Hokah Drive.
Approve and recommend 3rd roundabout.
We think the roundabouts will help the traffic flow at the school and solve the intersection problem at West
Shadow Lake Rd. Stopping the median between West Shadow and Kingfisher Ct allows the residents to
continue to take lefts in and out of their neighborhoods. This is a win for the residents.
It doesn't make sense to only look at part of the corridor. The 2011 study is out of date and residents should
be privy to the thinking along the whole corridor. Just like in 2011, it's not a promise of what will happen, but
we should be able to see the conceptual thinking.
Two roundabouts are excellent! They will slow traffic down. I live on W Shadow Lake and at 8 am and 6 pm it
is extremely difficult to make a left turn going south away from the school. Traffic exceeds the 50 mph signs.
Excited to have a roundabout where Birch meetgs Old Birch. Great!! Thrilled to have a bike path on the south
side of Birch to Old Birch as well. Huge safety concern with all the kids moving into Saddle Club development.
Thank you for adding the roundabout at Old Birch Street as well as extening the sidewalk on the south side of
Birch. This will improve safety.
We're very much concerned with how congested traffic will be at the school entrance. We don't think the
roundabout will allow smooth, continuous flow in both directions during school start and end. A turn signal
there that could be left in amber mode on the school side & full mode during the critical school hours would
be much more effective.
I think that at the end of the school day the circles will be a grid lock. You need to run your simulation with
the volume of cars and traffic at school pick up at end of day and adjust accordingly.
Good with what is proposed as long as they keep tunnel and have crosswalks at roundabouts. Would like to
see well marked crosswalks at Deerwood.
Yes roundabouts! New ideas are often hard for everyone, but roundabouts are definitely the best. We need
to listen to the experts. PLEASE put in a roundabout at Old Birch, it's so dangerous and dark with NO street
lights and people flying/driving at 55 mph. Also please lower the speed limit. I trust the roundabouts will be
extra large. Financially it would be best to include Old Birch now when you have the bids, contractors, etc...
Later it will be a ton more $. Please go all the way to Old Birch!! :)
We are thankful for what the county is going to do along Birch St in front of the school. It would be a good
idea to add the roundabout at Birch & Old Birch (as is currently proposed). We live in the Saddle Club
development and can definitely say that traffic at that intersection can be dangerous. We have already
witnessed one accident there and would hate to see any more. Cars move on Birch at too high a rate of speed
around that corner.
When I heard that the alternative to roundabouts was a four lane Birch Street with traffic lights, I understood
better the benefits. I also learned how this design stops left-hand turns and how the roundabouts work
instead. I am encouraged that this is a good solution for the traffic problems on Birch Street
1) Thanks for listening! I see comments from the first meeting drawn up on the current plans! 2) Adding the
3rd roundabout looks like a great idea from a safety standpoint for cars and pedestrians! It acts as a natural
slow down for cars coming around the curve by the church!
Like the roundabout concept. Please consider the 3rd one at Old Birch. Possibly on at Blackduck also sooner
rather than later!
Please put the roundabout in at Old Birch & Birch Street. We live on Pheasant Run south. It can be very
dangerous pulling out onto Birch! Lighting at Old Birch Street would be great. Hard for friends to see the light
when driving to our home. Also a trail to connect us to the north side of Birch would be great. Thank you!
Yes roundabout and yes definitely need path to Old Birch and roundabout to Old Birch. Old Birch is sooo
dangerous and needs a roundabout. Do it now with this project it will be cheaper now.
Approve of all plans including 3rd roundabout.
Overall understand problems and solution - consider instead of 2 roundabout, do just one at West Shadow
and create a drive out the east side of the school to West Shadow. This would help keep traffic flowing better.
Also - consider deleting the outside curbs so as to allow for better chemical filtration. Stop creating all of
these mini toxi waste sites aka ponding. These will eventually come back to haunt us all!!
All of Birch needs to be addressed. Way too many cars and people pass on shoulder all the time. Have you
considered a center opposing left turn lane? Again, PLEASE look at Birch all the way to Centerville Rd.
I don't think the video of simulated traffic flow is realistic. Traffic will be slowed much more than depicted.
Making a right to make a left (up to 1/2 mile out and 1/2 mile back) is environmentally irresponsible. Fuel is
wasted and put into the air.
I would like to see a roundabout at Birch and Ware Rd
Continue the project through to the third roundabout - with center medians and road repair from that
roundabout through the entire project. Eliminate the roundabout at Tomahawk Trail and change the access to
Rice Lake Elementary to on in and out access at the W Shadow Lake roundabout.
Map Comments
Keep Hokah Full Access!
Have on-going community meetings or open houses throughout the planning and construction project.
Bring enough comment cards to accommodate the anticipated crowd.
Look at reconstruction (roundabout??) at OLD Birch Street to accommodate the traffic from the ever-growing
Saddle Club Development.
Don't need two roundabouts. Have Rive Lake Elementary use their driveway to go out on West Shadow Lake
Drive and eliminate the roundabout at Tomahawk.
Provide more distance from traffic to trail.
Would like a meeting where we sit in chairs and can ask you questions Please!!
Crosswalks (arrow pointing at Tomahawk roundabout).
Continue walking path east to Old Birch.
Sidewalk or trail connecting east to Old Birch.
WS – 2
WORK SESSION STAFF REPORT
Work Session Item No. 2
Date: March 2, 2020
To: City Council
From: Michael Grochala, Community Development Director
Rick DeGardner, Public Services Director
Re: Water Treatment Facility Feasibility Study
Background
At the February 3, 2020 City Council work session staff discussed the need to prepare a Water
Treatment Plant feasibility study to evaluate future water treatment options. Staff has worked
with WSB and Associates to identify the necessary scope of the study.
WSB has submitted a proposal to complete the study for $39,886. The study components
include:
1) Evaluation of Alternative Water Supply Options to address short to mid-term needs.
2) Analyze Source Water
3) Evaluate Water Treatment Options
4) Review Potential Plant Site
5) Prepare Centralized Water Treatment Plan Preliminary Drawings
6) Evaluate future system needs and phasing
7) Study Neighborhood Impacts
8) Determine Estimated Costs
WSB is proposing to complete the Study by June 1, 2020. Architectural renderings are not
included in this phase of the proposal but can be provided for an additional fee. No public
outreach is included at this time. Staff would anticipate that both architectural renderings and a
public information meeting would be part of a future project development phase.
Requested Council Direction
Staff is requesting City Council direction to place consideration of the WSB proposal on the
March 9, 2020 agenda.
Attachments
1. WSB Water Treatment Facility Feasibility Study proposal
178 E 9TH STREET | SUITE 200 | SAINT PAUL, MN | 55101 | 651.286.8450 | WSBENG.COM February 25, 2020
Mr. Rick DeGardner
Public Services Director
City of Lino Lakes
600 Town Center Parkway
Lino Lakes, MN 55014
Re: Proposal for Water Treatment Plant Feasibility Study
City of Lino Lakes, MN
Dear Mr. DeGardner:
We appreciate the opportunity to submit this letter proposal to the City of Lino Lakes to complete
the Water Treatment Plant Feasibility Study. The Minnesota Department of Health recently
tested the City’s manganese levels in each of the City’s wells as part of the EPA Unregulated
Contaminant Monitoring Rule 4 (UCMR4). The water quality testing data from MDH indicates that
five of the City’s six wells exceed the maximum recommended manganese level for infants (100
ppb), and three of the wells exceeds the maximum recommend manganese level for adults and
children (300 ppb). Therefore, the design and construction of a water treatment plant should be
studied to treat the high levels of manganese that exist in the City’s drinking water in addition to
treating other contaminants such as iron and ammonia. Alternative water supply options will also
be evaluated as part of this study.
I. SCOPE OF WORK
1. Alternative Water Supply Options
In lieu of constructing a water treatment plant(s) to treat the City’s existing wells,
alternative water supply options will also be evaluated. These options include:
A. Drilling new wells
B. Purchasing treated water from another community or water utility
2. Analyze Source Water
All existing water quality data for the City’s existing wells will be reviewed with respect to
primary and secondary drinking water standards as well as contaminants and emerging
contaminants. We recommend completing additional testing for any key water quality
parameters (ex. ammonia, total organic carbon, emerging contaminants, etc.) that
possibly have not been tested to date by the City. Our team will then develop a
comprehensive treatment plan that addresses all identified contaminants, ensures
regulatory compliance, and produces high quality water for the City’s customers. WSB
will also look ahead and evaluate the water quality parameters that will likely need to be
evaluated for both conventional and biological filtration for the water treatment pilot
testing to be completed in the next phase of the project. It is assumed for this study that
the City will pay for all water quality testing.
Mr. Rick DeGardner
February 25, 2020
Page 2
3. Water Treatment Options
Upon completion of the source water analysis, we will explore available water treatment
options and the recommending preferred processes for treating known and emerging
contaminants that will potentially need to be treated over the anticipated life of the water
treatment plant(s). The report will examine available treatment process options for
identified contaminants potentially needing treatment, recommend a preferred treatment
process for each identified contaminant, identify required space needs for preferred
treatment processes, provide recommendation as to the required size and preferred
location for the facility, and provide cost estimates for constructing and operating the
facility. We will study both conventional and biological filtration and present their benefits.
The iron, manganese, and ammonia in the City’s water could be treated without chlorine
and potassium permanganate with biological filtration. Biological filtration is commonly
practiced in the United States and Europe and is endorsed by the Minnesota Department
of Health (MDH) as an efficient and effective method for treating these (and other)
contaminants. The benefits of biological filtration include higher filtration rates, longer
filter runs (reduces backwash supply and wastewater volumes), savings in chemical
costs, and reduction in disinfection byproducts. The design of a conventional gravity
filtration process with detention and aeration can easily be modified to accommodate
biological filtration after the successful completion of a biological filtration study as
required by MDH.
WSB will coordinate and attend tours of existing water treatment facilities that utilize each
of the treatment methods being evaluated so that City staff have a clear understanding of
the treatment technologies and options that are available for the water treatment plant.
The analysis will include, but not be limited to, initial construction costs, long term
operational costs, the ability of each system to effectively and efficiently remove iron,
manganese, ammonia, and other contaminants from the water supply, the discharge of
the waste product, and the ability of the plant to be expanded or be modified in the future.
This will be a comprehensive review and recommendation on the “best” plant to meet the
current and future needs of the City.
4. Review Existing Site
A potential site for the proposed water treatment plant has been identified at the
southwest intersection of Birch Street and 12th Avenue South. The WSB team will visit
the proposed water treatment plant site and review the existing wetlands in the area. We
will also review the as-built drawings, easements, and existing infrastructure to determine
if the site is feasible for further consideration for the water treatment plant. Potential
contaminants and other barriers that may restrict or affect the layout of the plant at the
site will be evaluated up front during this analysis. Other factors such as ease of chemical
deliveries, access for maintenance trucks, security, stormwater retention, proximity to
water and sanitary sewer utilities, proximity to three phase-480 volt electrical power,
proximity to existing and future wells, and the potential for the City to acquire the property
will be evaluated during the preliminary design phase.
5. Centralized Water Treatment Plant Preliminary Drawings
We will prepare one preliminary water treatment plant floor plan drawing and one
preliminary conceptual site plan drawing for a gravity filtration plant constructed at the
southwest intersection of Birch Street and 12th Avenue South. The floor plan drawing will
show the various recommended rooms and dimensions for the plant. The conceptual site
plan will also show space for a future water treatment plant expansion.
Mr. Rick DeGardner
February 25, 2020
Page 3
6. Water Distribution System Modeling and Watermain Phasing Plan
Preliminary water distribution system modeling has indicated that a centralized water
treatment plant could initially treat Wells 1, 3, 5, and 6, and without upsizing the existing
16-inch watermain on Birch Street. The City’s maximum day water demands will
eventually exceed the hydraulic capacity of the existing 16-inch watermain on Birch
Street. If Wells 2 and 4 are left untreated and used only as peaking wells on maximum
day demands, the existing 16-inch watermain should have adequate hydraulic capacity to
convey treated water from a centralized water treatment plant for the next 10 to 15 years
based on the water demand projections in the City’s Comprehensive Plan. At that time, a
parallel 16-inch watermain will need to be constructed along Birch Street and extended
westward and eastward in phases as the capacity of the water treatment plant is
increased and possibly expanded in the future with new wells pumping to the plant.
Constructing a future plant expansion and a parallel 16-inch watermain in phases along
Birch Street will be evaluated as part of this study. The raw watermain costs to be
constructed from the City’s existing wells to the centralized water treatment plant will also
be figured-in to the estimated costs.
7. Study Neighborhood Impacts
The preliminary design report will explore potential impacts of the water treatment facility
on neighboring properties due to noise, odors, operating hours, traffic,
and other identified sources of impact and recommend a process for mitigating any
identified impacts during the final design process. Neighborhood meetings are not
anticipated for this study phase and not included in this proposal.
8. Determine Estimated Costs
The preliminary design report will include estimated construction and operating costs for
the groundwater treatment facility over the anticipated life of the facility. Estimated costs
will assume industry standard costs for a gravity filtration water treatment plant. In
addition, life cycle costs will be prepared for each alternative to provide a complete
capital-life cycle cost analysis over a 20 to 30-year planning period. The report will
explore future budget impacts based on estimated construction and operating costs and
will explore and recommend “order of magnitude” water rate revisions needed to offset
future budget impacts to fund the water treatment plant. This analysis does not replace a
water rate study that should also be completed under a separate project.
9. Report Preparation
The findings, estimated costs, and recommendations from the study will be summarized
in a report along with report figures and presented to the City Council.
10. Meetings
We will coordinate, prepare handouts, and attend up to four (4) meetings with City staff
and three (3) City Council meetings to discuss the report.
Mr. Rick DeGardner
February 25, 2020
Page 4
II. SCHEDULE AND ESTIMATED FEES
A. Project Schedule
We have estimated the time for the project to begin immediately after City authorization.
The proposed schedule includes the following milestone dates:
Task Completion Date
City Council Authorization to Proceed March 9, 2020
Complete Feasibility Study May 15, 2020
Present Feasibility Study to City Council June 1, 2020
B. Estimated Fees
Compensation for tasks shall be on an hourly basis, based on the actual hours worked
for personnel assigned to the project. We propose to perform these services for an
hourly, not-to-exceed fee of $39,886. A spreadsheet showing the estimated hours for
each task is attached to this proposal. Architectural renderings are not included in this
phase of the project but can be provided for an additional fee of $1,800 per rendering if
requested by the City. Geotechnical services are also not included in this phase of the
project. We will rely on previous soil borings to study the existing soil conditions at the
proposed site.
We will invoice the City on the basis of actual hours spent at current billing rates.
Additional services requested by the City will be invoiced on the basis of actual hours
spent at current billing rates plus the actual cost of reimbursable expenses. All services
will be invoiced monthly. Our billing rates will be adjusted on an annual basis. A detailed
list of project tasks is defined and shown on the attached task hour budget worksheet.
Tasks not shown are considered outside of the scope of services.
This letter represents our understanding of the Water Treatment Plant Feasibility Study. If you
are in agreement with the scope of services and proposed fee, please sign in the appropriate
space below and return one copy to us.
If you have any questions about this proposal, please feel free to call me at (612) 209-0140.
Sincerely,
WSB
Greg F. Johnson, PE
Director of Water/Wastewater
Cc: Diane Hankee, PE, WSB
ACCEPTED BY:
City of Lino Lakes
Name
Wetland
Scientist
Task Description TBD
1.1 2 1 8 11 $1,506.00
1.2 1 2 3 $432.00
1.3 8 8 2 18 $2,746.00
1.4 4 1 4 9 $1,410.00
1.5 12 1 4 40 8 20 85 $11,498.00
1.6 4 1 16 21 $2,850.00
1.7 1 1 3 5 $714.00
1.8 8 1 8 17 $2,658.00
1.9 18 2 40 8 68 $9,332.00
1.10 Meetings 21 21 2 44 $6,740.00
Total Estimated Hours and Fees 79 8 114 40 8 20 2 10 281
Average Hourly Billing Rate $192 $162 $120 $150 $119 $80 $125 $94
TOTAL PROJECT COST $39,886.00
Total
Hours
Project
Manager
Jon ChristensenGreg Johnson Greg Glunz
Report preparation
Alternative water supply options
Eva Kelly
Process
Drafting
Technician
Diane Hankee
Estimate of Hours and Fees
City of Lino Lakes, Minnesota
Water Treatment Plant Feasibility Study
Estimated Hours
AdminProject Engineer Landscape
Designer
Landscape
Architect Cost
Study neighborhood impacts
Determine estimated costs
Karla Pederson
City Engineer
Shaunna Berg
Analyze source water
Water treatment options and plant tours
Review of existing site
Centralized WTP preliminary drawings
Water distribution system modeling and watermain phasing
1
WS – #3
WORK SESSION STAFF REPORT
Work Session Item No. 3
Date: March 2, 2020
To: City Council
From: Katie Larsen
Re: Concept Plan Review for 87 Lilac Street
BACKGROUND
Staff is requesting Council input regarding the proposed Concept Plan for 87 Lilac Street.
The applicant, Bonfe Builders, submitted a land use application for Concept Plan
Review. The proposed development is a 4 lot residential subdivision of a 1.62 acre parcel
located at 87 Lilac Street. The property owners are Lyndal and Sally Nelson.
Due to the potential need for multiple variances and easement vacation, the applicant has
submitted a concept plan. This will give staff, Boards and Council to offer comments on
the proposal prior to incurring costs of submitting a full preliminary plat application.
This staff report is based on the following information:
Concept Plan for Bonfe Builders prepared by EG Rud & Sons, Inc. dated January
10, 2020
Soil Map from the Natural Resources Conservation Service received on January
16, 2020
An executive summary of this staff report and future land use applications can be found
at the end of this report.
ANALYSIS
Existing Site Conditions
Per the Concept Plan, the 1.62 acre site contains one (1) single family house with
attached garage on the south end of the property and a detached accessory structure. The
property is sparsely wooded with grassy yard area and tillable garden. The existing house
is served by private well and septic system. Municipal utilities are located along
Mustang Lane and four (4) services are stubbed to the site.
The parcel was platted as Lot 12, Block 2, Sunset Oaks in 1977. A large “Ponding” area
is dedicated on the plat over a portion of the subject site.
2
General Site Plan
The concept plan proposes four (4) residential lots with individual storm ponds. Lot
sizes range from 17,590 sf to 17,734 sf and lot widths range from 125 ft to 150 ft.
Land Use and Density
At the time of this staff report, the draft 2040 Comprehensive Plan is under review by the
Met Council and has not been adopted by the City Council; therefore, the 2030
Comprehensive Plan is in effect. Per the 2030 Future Land Use Map, the site is guided
Low Density Residential and requires development at 1.6 to 3.9 units per net acre.
Gross Area (acres) 1.62
Wetlands & Water Bodies 0.00
Public Parks & Open Space 0.00
Arterial ROW 0.00
Other (Utility Transmission Easement) 0.00
Other (Wetland Buffer Area) 0.00
Net Area (acres) 1.62
# of Units 4
Gross Density (units/acre) 2.47
Net Density (units/acre) 2.47
The proposed net density is 2.47 units per acre and is consistent with low density
residential land uses.
Rezoning
The property is currently zoned R, Rural and would be rezoned to R-1, Single Family
Residential which is consistent with adjacent sewered parcels in the neighborhood.
3
Zoning and Land Use
Current Zoning R, Rural
Current Land Use Rural Residential
Future Land Use
(Both 2030 & 2040) Low Density Residential
Utility Staging Area 1A (2008-2015)
Surrounding Zoning and Land Use
Direction Zoning Current Land Use Future Land Use
North R-1, Single Family Single Family
Residential
Low Density
Residential
South R, Rural Rural Residential Low Density
Residential
East R-1, Single Family Single Family
Residential
Low Density
Residential
West R, Rural Rural Residential Low Density
Residential
Zoning Requirements
The property will be rezoned from R, Rural to R-1, Single Family Residential.
R-1
Requirements 87 Lilac St
Min. Lot Size 10,800 sf Ave. 17,660 sf
Min. Lot Width
-Interior Lot 80 ft 150 ft
-Corner Lot 100 ft 117 ft
Min. Lot Depth 135 ft 1171 ft
Double Frontage Lots 145 ft NA
Building Setback
-From Streets
--Local Street 30 ft NA
--Collector
(Mustang Ln & Lilac St) 40 ft 301 ft
--Corner lot 40 ft 301 ft
4
-Rear
--Principal 30 ft 30 ft
--Accessory 5 ft 5 ft
-Side
--Principal 10 ft 10 ft
--Accessory 5 ft 5 ft
--Corner lot 30 ft 30 ft
Buffer
15’ if side or
rear lot abuts
collector or
arterial street
Required along
Mustang Lane
1Variance required
As proposed on the concept plan, Lots 1, 2 and 3 would need variances for lot depth and
street setback. As discussed later in this report, road right-of-way dedication and street
and utility improvements are required between Lot 1 and 2 that extends west from
Mustang Court. Those lots will then front off of the new road and lot depth and setbacks
can be met, eliminating the need for variances. Lot 3 will still require the variances. It
should be noted the lot area of Lot 3 is 17,639 sf and exceeds the required 10,800 sf
minimum.
It should be noted the existing house does not currently meet west side lot line setback
and the existing detached accessory structure does not meet east street lot line setback.
Variances should be considered after the fact. In 2000, City Council approved a 3.5 ft
variance allowing an addition to the attached garage to be setback 26.5 ft from Mustang
Lane which was classified as a local road at the time.
Building Type and Construction
Each new single family house shall be compliant with Section 1007.043(2)(a), General
Building Provisions and Section 1007.090(4), Building Requirements regarding floor
area, garage and design and construction standards.
Subdivision Ordinance
Blocks and Lots
The concept plan depicts 4 lots for the purpose of constructing 3 new houses and the
existing house.
Streets and Alleys
5
Per the 2030 and 2040 Comprehensive Plans, both Lilac Street and Mustang Lane are
classified as minor collector streets. Section 302.03 of City Code Chapter 300: Public
Property and Improvements requires 80 feet of road right-of-way for collector streets.
The existing platted road right-of-way per the Sunset Oaks plat is 66 feet. Therefore, the
subdivision of 87 Lilac Street would require an additional 7 feet of road right-of-way
dedicated on the plat.
Staff suggests possibly amending the City Code regarding required road right-of-way
widths and setbacks for arterial, collector and local streets. This would apply to not only
87 Lilac Street but all future subdivisions. A variance could also be considered.
Section 1001.100 of City Code Chapter 1001: Subdivisions requires streets provide for
future connections to adjoining unsubdivided tracts. Road right-of-way shall be
dedicated extending west across from Mustang Court and paved road improvements
installed. The front lot lines and driveways for Lot 1 and Lot 2 will then come off of the
new street. This should eliminate the need for lot depth and setback variances for these
two (2) lots.
Ideally, the driveway of the existing house would be relocated to access off of Mustang
Lane. Lilac Street is a collector road that carries higher volumes of traffic than Mustang
Lane.
Easements
The Sunset Oaks plat has a 160 foot x 190 foot ponding easement dedicated on the plat
which encumbers the subject site at 87 Lilac Street. The applicant proposes vacating this
easement. An extensive stormwater drainage study will be required to determine the
purpose of the easement and what impacts vacating the easement may have on adjacent
properties.
Standard drainage and utility easements at least 10 feet wide shall be provided along all
lot lines.
Stormwater Management and Erosion and Sediment Control
The concept plan depicts 3 linear stormwater ponds located between the lots. The soils
map indicates Lino loamy fine sand and Zimmerman fine sand. The Hydrologic Soil
Group is Type A. These are typically good soils for infiltration.
The Sunset Oaks plat has a 160 foot x 190 foot ponding easement dedicated on the plat
which encumbers the subject site at 87 Lilac Street. A 15” storm sewer pipe installed in
1998 extends from the easement area and drains east and north to a storm pond north of
Pony Court. The applicant proposes vacating this easement. An extensive stormwater
drainage study will be required to determine the purpose of the easement and what
impacts vacating the easement may have on adjacent properties.
6
The site is subject to RCWD stormwater and erosion control regulations. A stormwater
management plan and erosion and sediment control plan in accordance with City
Ordinance Chapter 1011 shall be required.
Utilities
Public water, sanitary and storm sewer utilities are required to serve the development.
Standard utility trunk, availability and Bisel amendment fees apply.
Sanitary Sewer
The parcel is in Sanitary Sewer District 2 and Utility Staging Area 1A (2008-2015). A
15” sanitary sewer main installed in 1998 along Mustang Lane services the site. Four (4)
services were stubbed to the property. The sanitary sewer system has capacity for four (4)
more residential units.
Sanitary sewer main shall be installed within the required road right-of-way to the west
property line to serve future development. The existing house located at 87 Lilac Street
shall hook up to municipal sanitary sewer.
Watermain
A 12” watermain installed in 1998 along Mustang Lane services the site. Four (4)
services were stubbed to the property. The water supply system has capacity for four (4)
more residential units.
Watermain shall be installed within the required road right-of-way to the west property
line to serve future development. The existing house located at 87 Lilac Street shall hook
up to municipal sanitary sewer.
Public Land Dedication
Park land was dedicated and fees were paid to the City for the original development of
Sunset Oaks. Therefore, public land dedication requirements have been satisfied for the
existing lot, 87 Lilac Street. Three (3) residential units of cash in lieu of parkland
dedication will be required for the 3 new lots being created.
87 Lilac Street
3 lots x $3,150 = $9,450
Behm’s Park is located north of the subject site. Public trail exists along the north side of
Lilac Street and within Behm’s Park. A trail could be installed along 87 Lilac Street to
provide a connection between Lilac Street and the park; however, park dedication fees
would not cover the cost. It is recommended that park dedication fees be collected for
future park and/or trail improvements.
Required Screening, Landscaping and Buffer Yards
7
Section 1007.043(17) of the City Code Chapter 1007: Zoning requires landscape and
buffer screens between residential uses and collector streets. Buffer screens would be
required along Mustang Lane. If the existing driveway is relocated to Mustang Lane, a
buffer screen should be considered along Lilac Street.
Open area landscape standard and boulevard tree requirements may apply depending on
final subdivision design.
Comprehensive Plan
The proposed 4 lot residential subdivision is generally consistent with the 2030
Comprehensive Plan in regards to resource management, land use, housing,
transportation, water supply and sanitary sewer.
Wetlands
There are no wetlands indicated on site.
Floodplain
There is no FEMA floodplain on site.
EXECUTIVE SUMMARY
The following is a summary of the staff report:
Rezone property from R, Rural to R-1, Single Family Residential
Variances Required
o Lot depth for Lot 3
135 feet required
117 feet proposed
o Road right-of-way width (Mustang Lane)
80 feet required
66 proposed
o Street Setback (Mustang Lane)
40 feet required
30 feet proposed
o Lot Line Setbacks for Existing House
Seven (7) feet of additional road right-of-way are required along Mustang Court
unless an amendment is made to the city code or a variance is granted
Road right-of-way dedication and street and utility improvements are required
between Lot 1 and 2 that extends west from Mustang Court.
Lots 1 and 2 shall front and have driveway access from the new road.
If possible, the driveway of the existing house should be relocated to Mustang
Lane.
8
An extensive stormwater drainage study will be required to determine the purpose
of the ponding easement and what impacts vacating the easement may have on
adjacent properties.
A stormwater management plan and erosion and sediment control plan in
accordance with City Ordinance Chapter 1011 shall be required.
The 3 new houses and existing house shall hook up to municipal watermain and
sanitary sewer.
Standard utility trunk, availability and Bisel amendment fees apply.
Park dedication fee of $9,450 for 3 new lots is required.
Landscape and buffer screens are required along Mustang Lane.
See WSB City Engineer memo for additional comments.
Future land use applications may include:
Rezoning
Variances
Preliminary Plat
Drainage & Utility Easement Vacation
Final Plat
PLANNING & ZONING BOARD
The Planning & Zoning Board reviewed the concept plan on February 12, 2020. The
Board agreed the road and public utilities should be extended to the property line at this
time. Lot 1 and Lot 2 would then front the new road. Mr. Laden suggested a 30 foot street
setback for Lot 3 may be acceptable since older lots along Lilac Street are at 30 feet. Mr.
Root supported a possible amendment to City ordinance regarding road right-of-way and
setbacks for certain collector and arterial roads.
Mr. Joe Bonfe, applicant, requested the road and public utilities not be required due to
cost. He suggested possibly dedicating an outlot to City for future road right-of-way. He
stated his son was possibly going to move into the existing house at 87 Lilac Street and
didn’t see any issue with relocating the driveway to Mustang Lane.
REQUESTED COUNCIL DIRECTION
Staff is requesting Council input regarding the proposed Concept Plan for 87 Lilac Street.
A concept plan does not require formal Council approval or denial via resolution. This is
only an informal review so the applicant can be advised of staff, Board and Council
comments.
The City’s review and comments on the concept plan’s relation to the Comprehensive
Plan and development regulations does not grant any rights to the applicant to develop
the property as depicted by the concept plan.
9
ATTACHMENTS
1. Site Location Map
2. Aerial Map
3. WSB City Engineer memo dated February 5, 2020
4. Concept Plan for Bonfe Builders prepared by EG Rud & Sons dated January 10, 2020
0 1,000 2,000500
Feet
IJ53
§¨¦I-35W LLAAKKEEDDRRAPO LLO DRAPO LLO DRPONY CTPONY CT
SS TT AA LL LL IIOO NN LLNN
BBEEHHMMLL NN LOIS LNLOIS LNMUSTANG CTMUSTANG CT PALOMI
NO LNPALOMI
NO LN4TH AVE4TH AVEJEANNE DRJEANNE DRMARSHAN LN
MARSHAN LN
MORGAN LN
MORGAN LN
LILAC STLILAC ST
BR A D L E Y STBRADLEY ST
CONNIE LNCONNIE LN VILLAGE DRVILLAGE DRCOUNTRY LNCOUNTRY LNMARCIA LNMARCIA LN
C AR L S TCARL S T
MUSTANG LN
MUSTANG LN 77TH ST77TH STCCEENNTTUURRYYTTRRLL
PATTI DRPATTI DRNOTTINGHAM LNNOTTINGHAM LNTH O M A S S TTHOMAS S T MEADOW VIEW TRLMEADOW VIEW TRLLEONARD AVELEONARD AVESUNSET AVESUNSET AVESUNSET AVE NESUNSET AVE NEUNNAMED
Site Location Map µ
87 Lilac Street
0 200 400100
Feet
76127612
74744646
106106
101101
3131
101101
76577657
76517651
113113107107
7373
76587658
1717
76017601
76257625
75997599
11211287875959
100100
100100
4545
76997699
118118
101101
119119
75987598
114114
125125
76137613
106106
115115
76727672
122122
76077607
129129
124124
LI L AC S TLILAC S T MUSTANG LNMUSTANG LNLEONARD AVELEONARD AVEJEANNE DRJEANNE DRPONY CTPONY CT
QUARTER HORSE CTQUARTER HORSE CTMUSTANG CTMUSTANG CT
Aerial Map87 Lilac Street µ
178 E 9TH STREET | SUITE 200 | SAINT PAUL, MN | 55101 | 651.286.8450 | WSBENG.COM Memorandum
To: Katie Larsen, City Planner, City of Lino Lakes
From: Diane Hankee, City Engineer, City of Lino Lakes
Date: February 5, 2020
Re: 87 Lilac Street Subdivision
Concept Plan
Enclosed are our engineering review comments for the Concept Plan at 87 Lilac Street in Lino Lakes,
MN, prepared by EG Rud & Sons, Inc. dated January 10, 2020.
The applicant is proposing 4 single family lots (1 existing) on a 1.62 acre site along Mustang Lane and
Lilac Street.
Engineering
• Grading
Grading will be reviewed with a future submittal.
• Stormwater Management
The City’s surface water management requirements shall be met. There is an existing ponding area
on the site that has not been accommodated through the proposed side yard swales. There is an
existing 15-inch concrete storm sewer outlet pipe that conveys water via a piped system to the
Century Farms ponding system. The applicant will be required to complete a drainage study that
addressed the existing pond and conveyance. Currently they are proposing a new home in an
existing ponding area. The applicant shall anticipate a larger centralized area for ponding that
perpetuates the adjacent property’s drainage. This will likely lead to the need for revised easements
at 73 Lilac Street.
• Water Supply
There is an existing 12-inch watermain located within Mustang Lane. There are (4) existing 1-inch
service stubs to the property. The existing water system is designed with the capacity to serve this
parcel and, to the west, the Sunset Oaks area.
1. The applicant shall extend mainline watermain to the western boundary of their lot to serve
properties to the west as outlined in the comprehensive plan.
• Sanitary Sewer
There is an existing 15 inch sanitary sewer main in Mustang Lane. There are (4) existing 4-inch
service stubs to the property. The existing sanitary sewer system is designed with the capacity to
serve this parcel and, to the west, the Sunset Oaks area.
Ms. Katie Larsen
02/05/2020
Page 2
87 Lilac Street Concept Plan Engineering Review
1. The applicant shall extend mainline sanitary sewer at maximum depth to the western
boundary of their lot to serve properties to the west as outlined in the comprehensive plan.
• Transportation
Lilac Street and Mustang Lane are identified as minor collectors. Lilac Street has an existing 120
foot right of way and Mustang Lane has an existing 66 foot right of way. Current City ordinance
would require an additional 7 feet of right of way be dedicated along Mustang Lane. Staff is
reviewing the required road right of way widths for collector roadways which could lead to the
existing right of ways remaining.
1. The proposed development shall provide roadway access to the westerly Sunset Oaks
development area for future access and roadway network connectivity.
2. The applicant shall relocate the existing house driveway from Lilac Street to Mustang Lane.
3. The development should accommodate a future trail along Mustang Lane.
• Wetlands and Mitigation Plan
There are no known wetlands on the proposed development site.
• Floodplain
There is no floodplain on the proposed development site.
• Drainage and Utility Easements
There is an existing ponding easement located on both the 73 & 87 Lilac Street properties.
Surface water conveyance shall be maintained and existing/ future drainage easements are
anticipated. See stormwater management section for additional information.
Development Agreement
A development agreement will be required with the final plat.
Grading Agreement
A grading agreement is not applicable at this time.
• Stormwater Maintenance Agreement
It is anticipated that the stormwater maintenance will be covered by the City’s programmatic
agreement with RCWD.
• Permits Required
Permits will be identified with a preliminary plat submittal.
If you or the applicant has any questions regarding these comments, please contact Diane Hankee at
(651) 982-2430 or dhankee@linolakes.us.
WS – #4
WORK SESSION STAFF REPORT
Work Session Item No. 4
Date: March 2, 2020
To: City Council
From: Katie Larsen, City Planner
Re: Ordinance Amendment for Site Plan and Building Modifications for 617
Apollo Drive
Background
Staff will be presenting the attached March 11, 2020 Planning & Zoning staff report to
the Council.
The applicant, Sergei Nazarenko, submitted a Land Use Application for an Ordinance
Amendment for site plan and building modifications at 617 Apollo Drive. The applicant
is proposing to construct a restaurant with rooftop dining in the existing building. Eagle
Liquors currently occupies the north portion of the retail building. The 1.02 acre site is
legally described as Lot 3, Block 1, Lino Lakes Market Place. Per the Marketplace
Planned Development Overlay (PDO) Design Guidelines Ordinance No. 03-05,
substantial departures from the approved plans require an amendment to the ordinance.
Requested Council Direction
None. The project will be formally presented to the Council for action on March 23,
2020. Staff wanted to provide opportunity for Council review and comment at tonight’s
work session.
Attachments
1. March 11, 2020 Planning & Zoning Staff Report
1
PLANNING & ZONING BOARD
AGENDA ITEM 6A
STAFF ORIGINATOR: Katie Larsen, City Planner
P&Z MEETING DATE: March 11, 2020
REQUEST: PUBLIC HEARING
Ordinance Amendment for Site Plan and Building
Modifications for 617 Apollo Drive
CASE NUMBER: PD2019-003
SP2019-004
APPLICANT: Sergei Nazarenko
14891 95th Avenue North
Maple Grove, MN 55056
OWNER: Same
REVIEW DEADLINE:
Complete Application Date: February 6, 2020
60-Day Review Deadline: April 6, 2020
120-Day Review Deadline: June 5, 2020
Environmental Board Meeting: NA
Park Board Meeting: NA
Planning & Zoning Board Meeting: March 11, 2020
City Council Work Session: March 2, 2020
Tentative City Council Meeting: March 23, 2020
BACKGROUND
The applicant, Sergei Nazarenko, submitted a Land Use Application for an Ordinance
Amendment for site plan and building modifications at 617 Apollo Drive. The applicant
is proposing to construct a restaurant with rooftop dining in the existing building. Eagle
Liquors currently occupies the north portion of the retail building. The 1.02 acre site is
legally described as Lot 3, Block 1, Lino Lakes Market Place. Per the Marketplace
Planned Development Overlay (PDO) Design Guidelines Ordinance No. 03-05,
substantial departures from the approved plans require an amendment to the ordinance.
The Land Use Application is for the following:
2
Ordinance Amendment to Ordinance No. 03-05
Site and Building Plan Review
This staff report is based on the followings plan sets:
Architectural Plan Set prepared by Jamb Architects dated December 12, 2020
Color Rendering Elevations prepared by Jamb Architects dated December 12,
2020
Applicant Narrative prepared by Jamb Architects dated February 3, 2020
ANALYSIS
History
Lino Lakes Marketplace is a master planned shopping/retail center approved in 2001. The
development includes Target and Kohl’s, the four Apollo Drive retail buildings as well as
those commercial buildings along Lake Drive. Ordinance No. 16-01 and amended by
Ordinance No. 03-05 regulates site plan and design guidelines for the development. The
design guidelines detail requirements for building composition, materials, lighting,
signage, landscaping and building elevations. Per the Marketplace Site Plan, the subject
site is the Retail B building.
The existing building located at 617 Apollo Drive received administrative site and
building plan approval in 2016 and was constructed in 2017. The multi-tenant building is
6,058 sf. Eagle Liquors currently occupies the north portion of the building.
Per the Marketplace Planned Development Overlay (PDO) Design Guidelines Ordinance
No. 03-05, substantial departures from the approved plans require an amendment to the
ordinance.
Zoning and Land Use
The subject site is zoned GB, General Business with a PDO, Planned Development
Overlay as established by Ordinance No. 16-01 and amended by Ordinance No. 03-05
and Ordinance No. 04-05.
Current Zoning GB, General Business w/ PDO
Current Land Use COM-Commercial
Future Land Use per CP Commercial
Utility Staging Area 1A=2008-2015
3
Surrounding Zoning and Land Use
Direction Zoning Current Land Use Future Land Use
North GB-General
Business Commercial Commercial
East GB-General
Business Commercial Commercial
South GB-General
Business Commercial Commercial
West GB-General
Business Commercial Commercial
Site and Building Plan Review
A full site and building plan review was completed in 2016. The building complies with
site plan, stormwater management, public utilities and landscaping requirements. The
proposed amendment relates to an increase in building height, exterior staircase structure
and both ground and rooftop mechanical equipment screening.
Site Plan
The existing site plan meets the performance standards of the zoning ordinance and the
Lino Lakes Marketplace PDO Design Guidelines.
Staff Comments:
1. Sheet A1.1, Site Plan
a. The sidewalk and striped pedestrian crossing across Marketplace Drive as
required with construction of the original building shall be completed.
b. Landing pad for middle door shall be marked.
c. The middle rear door may need to be wider for emergency exit requirements.
d. Concrete sidewalk shall be extended from the landing of the exterior staircase
to the existing sidewalk.
e. Should a fence be installed south of the hood exhaust to provide additional
screening?
f. Should the fence along the trash enclosure drive be continuous?
Grading Plan and Stormwater Management
No stormwater management changes are required for the building modifications. The
existing site BMPs consist of an infiltration area to the west and an existing infiltration
pond to the north for treatment, volume control and rate control.
Public Utilities
4
No changes to the public utilities are required. The site is served by an 8” watermain and
8” sanitary sewer line located along Market Place Drive. A 6” watermain line serves the
building. These utilities can accommodate the demands of the retail building and
proposed restaurant.
Landscaping and Tree Preservation
Twenty-two (22) deciduous trees and thirty-five (35) shrubs are planted on site which is
consistent with the Marketplace Master Landscape Plan. Additional shrubs are proposed
along the screen fencing.
Architectural Plans and Exterior Building Materials
The existing exterior materials consist of CMU, brick, EFIS, glass, metal flashing and an
awning. The building façade has recognizable elements of a base, middle and top, with
various building materials and complementary colors. Materials and colors are compliant
with the Lino Lakes Marketplace PDO Design Guidelines.
The existing building height is 16’0-16’8” to the rooftop, 18’8” to the parapet and 22’4”
to the cornice.
The proposed restaurant includes ground mounted mechanical equipment with 6 ft cedar,
stained fence screening and exterior stair structure. The rooftop includes dining/bar areas,
restrooms, stone fire pits, elevator shaft, metal guardrails and mechanical equipment with
6 ft cedar, stained fence screening. Exterior materials include glass, stucco and metal
parapet cap flashing to match existing. These materials are compliant with the Lino Lakes
Marketplace PDO Design Guidelines.
The proposed building height is 17’6” to the rooftop, 29’6” to bar and restroom parapet
and 33’2” to elevator shaft parapet. These improvements increase the height of the
building in some areas by 11 feet.
West (Rear) Elevation
Ground mounted mechanical equipment is proposed along the west (rear) elevation of the
building. Equipment consists of cooler freezer condensers, makeup air, dishwasher
exhaust and hood exhaust. The equipment is shown on the plan sheets as dashed lines
behind the screen fences. Per Sheet A1.1, Site Plan, the applicant proposes to install four
(4) sections of a 6 ft high stained cedar screen fence adjacent to the rear sidewalk and
trash enclosure driveway to screen the equipment. Shrubs are also proposed along the
fence. The plan sheet notes that gaps between the fence boards may occur when not using
tongue and groove system. The 6 ft tall fence does not completely screen the 9 ft tall
exhaust unit.
Staff Comments
5
1. Screen fencing may not block egress paths.
2. Sheet A6.1 under Exterior Elevation Keynote the last #23 shall be revised to #25.
3. Is the proposed 6 ft high stained cedar fence (non-tongue and groove) acceptable?
4. The screen fence shall be high enough to screen the exhaust unit.
5. Should fencing be installed south of the hood exhaust to provide additional
screening?
6. Restroom exhaust location and details shall be shown.
7. Dishwasher exhaust location shall be clearly shown. Is it above or into the trash
enclosure?
8. Details are required for proposed rooftop fence screening.
9. Is red an acceptable color for the rooftop safety railings?
East (Front) Elevation
There are no proposed changes to the east (front) elevation of the building.
North (Side) Elevation
A metal exterior stair structure is proposed to provide to emergency exit from the rooftop.
The staircase will egress onto a concrete sidewalk. Per the color rendering, the staircase
will be painted red. It is assumed the red matches the existing exterior light fixtures on
the building.
Staff Comments
1. Is red an acceptable color for the stair structure?
2. Stairway lights and details are required.
South (Side) Elevation
There are no proposed changes to the south (side) elevation of the building.
Staff Comments
1. Sheet A6.0, Existing Exterior Elevations does not accurately show the existing
metal overhead door that replaced the glass windows. Are the overhead doors
being replaced with glass windows?
Parking
During the 2016 site plan review and approval, the applicant expressed an interest
regarding a restaurant as a possible second tenant. Per the Marketplace Master Site Plan,
the subject site was designed for retail only. Thirty (30) parking stalls were required and
constructed for this retail parcel. A restaurant would require additional parking spaces.
Per the approved 2001 Marketplace Site Plan, parking requirements are as follows:
6
Retail = (Floor Area/1,000) * 5 spaces
Restaurant = ((Dining Area/1,000) * 10 spaces) + 1 spaces per employee
Per City Ordinance No. 09-18, parking requirements for outdoor dining are as follows:
Outdoor Dining = For seating area > 500 sf: 1 parking space per 100 sf outdoor
dining area
The following chart shows parking calculations based on 10 restaurant employees:
617 Apollo Drive Use Floor
Area (sf)
# Stalls
Required
# Stalls
Provided1
Eagle Liquors Retail 2,165 11
Restaurant Restaurant 2,172 32
Rooftop Dining Restaurant 3,298 28
Subtotal 4,337 71 75
130 parking stalls currently exist on site. 45 parking stalls are provided through a
Commercial Lease Agreement with Discount Tires.
As noted, the applicant obtained a Commercial Lease Agreement with Discount Tires to
lease 45 parking stalls through March 2058. Per City Zoning Ordinance Section
1007.044(9), Control of Off-Site Parking Facilities is allowed with a recorded long term
lease agreement.
(9) Control of Off-Site Parking Facilities. When required, accessory off-street
parking facilities are provided elsewhere than on the lot in which the principal use
served is located, they shall be in the same ownership or control either by deed or
long term lease, as the property occupied by such principal use, and the owner of
the principal use shall file a recordable document with the City requiring the
owner and his or her heirs and assigns to maintain the required number of off-
street spaces during the existence of said principal use.
Parking requirements are met. It should be noted that City approval of these parking
requirements does not supersede any private agreements related to the overall
Marketplace development.
Signage
All signage shall comply with by the Lino Lakes Marketplace PDO Design Guidelines. A
separate Sign Permit Application is required for all permanent and temporary signs.
7
Comprehensive Plan
Resource Management System
The Resource Management System Plan goal of preserving surface water quality is
supported by the implementation of stormwater management BMP infiltration basins.
Land Use Plan
The Comprehensive Plan guides the subject site for commercial use. The existing retail
business and proposed restaurant is consistent with the designated land use.
Housing Plan
The goals and policies of Housing Plan are not negatively impacted by existing retail
business and proposed restaurant.
Economic Development
A goal of the Economic Development Plan is to promote Lino Lakes’ location within the
metropolitan region as an advantage in doing business. The existing retail business and
proposed restaurant support this goal.
Transportation Plan
Goals of the Transportation Plan are to ensure that street and roads are as safe as possible
and to reduce unnecessary traffic. The existing retail business and proposed restaurant are
accessed via two main driveways off of Market Place Drive and there are no required
improvements to these driveways. Market Place Drive is directly accessed either from
Apollo Drive or CSAH 23/Lake Drive, an “A” minor reliever road that has capacity for
the commercial building.
Sanitary Sewer and Water Supply Plan
The subject site is served by an 8” sanitary sewer line and an 8” watermain located along
Market Place Drive. The public utilities can accommodate the demands of the existing
retail business and proposed restaurant.
Community Facilities Plan
The goals and policies of Community Facilities Plan are not negatively impacted by
existing retail business and proposed restaurant.
8
Findings of Fact-Ordinance Amendment
Per City Zoning Ordinance Section 1007.015(5), the Planning and Zoning Board shall
consider possible adverse effects of the proposed amendment. Its judgement shall be
based upon, but not limited to, the following factors:
(a) The proposed action has been considered in relation to the specific policies
and provisions of and has been found to be consistent with the official City
Comprehensive Plan.
The existing retail business and proposed restaurant are consistent with the City’s
Comprehensive Plan in regards to resource management, land use, housing, economic
development, transportation, sanitary sewer and water supply plan and community
facilities.
(b) The proposed use is or will be compatible with present and future land uses
of the area.
The existing retail business and proposed restaurant are compatible with present and
future land uses.
(c) The proposed use conforms with all performance standards contained
herein.
The existing retail business and proposed restaurant conforms with all performance
standards with minor revisions required as noted.
(d) The proposed use can be accommodated with existing public services and
will not overburden the City’s service capacity.
The existing retail business and proposed restaurant can be accommodated with existing
public services and will not overburden the City’s service capacity.
(e) Traffic generation by the proposed use is within capabilities of streets
serving the property.
The traffic generated by the existing retail business and proposed restaurant are within
the capabilities of the streets serving the property.
Wetlands
There are no wetlands located on site.
Floodplain
The site is not within a floodplain.
9
Stormwater Maintenance Agreement
A Declaration for Maintenance of Stormwater Facilities was recorded on January 6, 2017
and includes both the existing retail business and proposed restaurant.
Site Improvement Performance Agreement
A Site Improvement Performance Agreement is required.
RECOMMENDATION
Staff requests the following input from the Planning & Zoning Board:
1. Should a fence be installed south of the hood exhaust to provide additional
screening?
2. Should the fence along the trash enclosure drive be continuous?
3. Is the proposed 6 ft high stained cedar fence (non-tongue and groove) acceptable?
a. For both ground mounted and rooftop screening?
4. Is red an acceptable color for the rooftop metal safety guardrails?
5. Is red an acceptable color for the stair structure?
Staff recommends approval of the ordinance amendment and site and building plan
review for 617 Apollo Drive with the following conditions and items being addressed:
1. Screen fencing may not block egress paths.
2. Details are required for proposed rooftop fence screening.
3. Details are required for the rooftop metal safety guardrails.
4. Details for stairway lights are required.
5. Sheet T1.1, Title Page:
a. Revise title from Eagle Liquors to 617 Apollo Drive.
b. Revise parking calculations.
6. Sheet A1.1, Site Plan:
a. The sidewalk and striped pedestrian crossing across Marketplace Drive as
required with construction of the original building shall be completed.
b. The landing pad for middle door shall be marked.
c. The middle door may need to be wider for emergency exit requirements.
d. A concrete sidewalk shall be extended from the landing of the exterior
staircase to the existing sidewalk.
7. Sheet A6.0, Existing Exterior Elevations:
a. The plan sheet does not accurately show the existing metal overhead door
that replaced the glass windows.
i. Are the overhead doors being replaced with glass windows?
8. Sheet A6.1, Exterior Elevations:
a. Under Exterior Elevation Keynote the last #23 shall be revised to #25.
b. The fence shall be high enough to screen the exhaust unit.
a. Restroom exhaust location and details shall be shown.
10
b. Dishwasher exhaust location shall be clearly shown.
i. Is it above or into the trash enclosure?
ATTACHMENTS
1. Site Location Map
2. Aerial Map
3. 2001 Marketplace Master Site Plan
4. 617 Apollo Drive Site Plan, Floor Plans and Building Elevations
5. Color Rendering
0 1,000 2,000500
Feet
§¨¦I-35W
LAKE DRLAKE DRAPO LLO DRAPO LLO DREAGLE CTEAGLE CTMMAARRIILLYYNN DD RR
OAK LNOAK LNCARL STCARL ST
4TH AVE4TH AVECCOOUUNNTTRRYYLLNNBARBARA LNBARBARA LN
LILAC STLILAC ST OOAAKKCCTTVILLAGE DRVILLAGE DRLOIS LNLOIS LNMARSHAN LN
MARSHAN LN KNOLL DRKNOLL DRNOTTINGHAM LNNOTTINGHAM LN77TH ST77TH ST
TT OO WW NN CC EENNTTEERRPPKKWWYYCCAARROOLLEEDDRRA P O L L O D R
A P O L L O D R
GEORGEWATCH LAKE100-yr 886.1
Site Location Map µ
617 Apollo Drive
617 Apollo D rive
February 21, 2020
1 in = 100 ft
±
Ma p P owered By DataLink
WS – 5
WORK SESSION STAFF REPORT
Work Session Item No. 5
Date: March 2, 2020
To: City Council
From: Jeff Karlson, City Administrator
Re: Creation of JPA between Current Metro I-Net Members
Background
The Metro I-Net consortium currently has 35 member agencies who receive full-time IT services
and nine associate members who receive limited IT services. Metro I-Net’s entire operation is
under the control of the City of Roseville. Metro I-Net employees are employed by Roseville
and come under its personnel policy and liability insurance. Metro I-Net’s $3.5 million budget is
part of Roseville’s budget.
It has become increasingly apparent that the current arrangement is not sustainable. Roseville
City Manager Pat Trudgeon pointed out several reasons in his February 13, 2020 memo to
members.
• Metro I-Net has grown considerably since its creation;
• It’s a challenge for the City of Roseville to take on additional employees, space, and
liability;
• Recruiting and retaining employees is challenging as Roseville’s compensation plan lags
behind the market;
• The Roseville City Council could decide to no longer participate in the consortium;
• Giving members more say in governance, policies, and costs removes uncertainty about
the future of Metro I-Net.
For these reasons, a sub-group of six members met several times to lay out a basic framework for
a joint powers agreement. The law firm, Kennedy & Graven, helped draft an agreement. The
highlights of the JPA are summarized in Trudgeon’s memo. The group is now seeking
commitments from members who want to enter into a joint powers agreement. The JPA would
become effective January 1, 2021. The annual cost of overhead for operating the JPA is
estimated at an additional $175,000, which represents a five percent increase for each member.
Requested Council Direction
Staff is seeking a commitment from the City Council to join other Metro I-Net agencies to enter
into a joint powers agreement, subject to final review and approval of JPA.
Attachments
Roseville City Manager Pat Trudgeon’s February 13, 2020 Memo
2020 Budget Summaries
Metro I-Net Program Description
Draft of Joint Powers Agreement
WS – 6
WORK SESSION STAFF REPORT
Work Session Item No. 6
Date: March 2, 2020
To: City Council
From: Michael Grochala, Community Development Director
Re: Utility Connection Fees
Background
Council members Ruhland and Stoesz requested a comparison of the City’s trunk utility
fees with those charged by neighboring cities. A concern was expressed that the fee’s
charged may be a deterrent to economic development.
The City of Lino Lakes established trunk utility fees in 1988 to fund sanitary sewer and
water system trunk improvements. Sanitary sewer trunk improvements include: lift
stations, force mains, oversized sewer mains, and highway crossing casing pipes. Water
system trunk improvements include: wells, pump houses, storage tanks, oversized water
mains, treatment and highway crossing casing pipes. The utility fees are charged to new
users. This method of financing trunk system improvements is a common practice for
cities.
In 2016 the City Council initiated a Connection Fee Study to evaluate the current fee
structure and to minimize impacts to the end user, specifically when changing use. The
fee structure was modified into two components, a trunk fee and an availability charge.
The trunk fee is collected at the time of development. The study resulted in a total fee
reduction of $707 per unit.
The current fees for 2020 are:
Trunk SAC/WAC Total/Unit
Water 2,306 1,451 3,757
Sewer 1,606 1,502 3,108
A single dwelling unit is equivalent to one unit. Commercial, Industrial, and Institutional
uses are based on a residential equivalency unit (REU) determined by Metropolitan
Council Environmental Services (MCES).
Staff has prepared a comparative table showing similar fees charged by other suburban
communities. Fees vary by community in both amount and method. It should be noted
that our fees are based on the estimated costs of developing our trunk utility system.
Requested Council Direction
None required.
Attachments
1. 2016 Utility Connection Fee Study
2. 2020 Trunk Fee Survey
JUSTIFICATION REPORT
UTILITY CONNECTION FEES
ANOKA COUNTY | LINO LAKES, MINNESOTA
September 11, 2017
Prepared for:
City of Lino Lakes
600 Town Center Parkway
Lino Lakes, MN 55014
WSB PROJECT NO. 2988-26
Justification Report
Utility Connection Fees
City of Lino Lakes, MN
WSB Project No. 2988-26
JUSTIFICATION REPORT
UTILITY CONNECTION FEES
WSB PROJECT NO. 2988-26
FOR THE
CITY OF LINO LAKES, MINNESOTA
September 11, 2017
Prepared By:
477 Temperance Street | St. Paul, MN 55101 | (651) 286-8450
Building a legacy – your legacy.
Equal Opportunity Employer | wsbeng.com
September 11, 2017
Honorable Mayor and City Council
City of Lino Lakes
600 Town Center Parkway
Lino Lakes, MN 55014
Re: Justification Report
Utility Connection Fees
City of Lino Lakes, MN
WSB Project No. 2988-26
Dear Mayor and City Council Members:
The enclosed justification report presents the proposed connection fee structure and proposed
utility connection fee methodology for both the sanitary sewer and water distribution systems.
We would be happy to discuss this report with you at your convenience. Please contact me at
(763) 287-8319 if you have any questions or concerns.
Sincerely,
WSB & Associates, Inc.
Jay Kennedy, PE Erin Heydinger
Vice President Project Engineer
Enclosure
cc: Michael Grochala, City of Lino Lakes
Diane Hankee, WSB & Associates, Inc.
Justification Report
Utility Connection Fees
City of Lino Lakes, MN
WSB Project No. 2988-26
CERTIFICATION
I hereby certify that this plan, specification, or report was prepared
by me or under my direct supervision and that I am a duly licensed
professional engineer under the laws of the State of Minnesota.
James W. Kennedy, PE
Date: September 11, 2017 Lic. No. 24490
Prepared By:
Erin Heydinger, EIT
Date: September 11, 2017
TABLE OF CONTENTS
Justification Report
Utility Connection Fees
City of Lino Lakes, MN
WSB Project No. 2988-26
TITLE SHEET
LETTER OF TRANSMITTAL
CERTIFICATION SHEET
TABLE OF CONTENTS
1. EXECUTIVE SUMMARY .................................................................................................1
2. BACKGROUND .................................................................................................................2
2.1 Existing System ..........................................................................................................2
3. CONNECTION FEES ........................................................................................................3
3.1 Trunk Fee ...................................................................................................................3
3.2 Calculation of Trunk Units .........................................................................................4
3.2.1 New Developments ............................................................................................4
3.2.2 Unserviced, Developed Properties................................................................4
3.2.3 Redeveloped Properties ................................................................................5
3.3 Sewer/Water Availability Charge ..............................................................................5
3.4 Calculation of SAC/WAC units .................................................................................5
3.4.1 New Developments ............................................................................................5
3.4.2 Unserviced, Developed Properties ....................................................................6
3.4.3 Redeveloped Properties ................................................................................6
4. FEE CALCULATIONS ......................................................................................................8
4.1 2030 Unit Projections .................................................................................................8
4.2 Trunk Fee ...................................................................................................................8
4.3 Sewer/Water Availability Charge ..............................................................................9
4.4. Nonresidential Fee Determination .............................................................................9
5. EXAMPLES ......................................................................................................................10
5.1 Low Density Residential ..........................................................................................10
5.2 Medium Density Residential ....................................................................................10
5.3 New Commercial – Example One ............................................................................10
5.4 New Commercial – Example Two ...........................................................................11
5.5 Commercial Use Change ..........................................................................................11
6. RECOMMENDATION ....................................................................................................12
Appendix A
Figures
Appendix B
Opinion of Probable Cost for the Trunk Sanitary Sewer System
Appendix C
Opinion of Probable Cost for the Trunk Water Distribution System
Justification Report
Utility Connection Fees
City of Lino Lakes, MN
WSB Project No. 2988-26 Page 1
1. EXECUTIVE SUMMARY
The City of Lino Lakes’ current connection fee ordinance was passed in 2008, where the Sewer
Access Charge (SAC) and Water Access Charge (WAC) are based on estimated utility usage and
are collected at the time of development, connection, or building permit. The City’s current SAC
and WAC fees are $3,073 and $4,069, respectively, or $7,142 total. The City Council authorized
a study be conducted to evaluate the current water and sewer connection fee structure and
recommend changes. Based on the City’s system costs and trunk facility needs, the justification
report recommends a revised fee structure whereby the existing fees are broken into two
categories:
• Trunk Water and Sewer fees due at the time of platting or development, and
• Water Access and Sewer Access charges due at the time of connection to the system
The trunk sewer and water fees are derived from the costs associated with constructing the trunk
systems needed to support the anticipated growth through 2030. Trunk facilities include trunk
mains (over 8-inch diameter), as well as designated lift stations, wells, and water towers that are
required to accommodate the anticipated growth. The total costs to build the 2030 trunk sanitary
sewer and 2030 trunk water systems are approximately $12,400,000 and $18,704,600
respectively. The total costs to build the systems are divided by the projected number of
residential equivalent units to be developed to obtain a uniform trunk fee per unit.
The availability charges are derived from the value of the existing respective sewer and water
systems. The present-day value of the existing sanitary sewer and water systems are
approximately $23,064,159 and $22,271,449, respectively.
The recommended sanitary sewer and water utility connection fees per unit are as follows:
Water Trunk Fee: $2,162 per unit
Water Availability Charge (WAC): $1,360 per unit
Water Total: $3,522
Existing WAC Fee: $3,073
Sewer Trunk Fee: $1,505 per unit
Sewer Access Charge (SAC): $1,408 per unit
Sewer Total: $2,913
Existing SAC Fee: $4,069
Grand Total: $6,435
Existing Fee Total: $7,142
Difference: -$707
The difference between the existing and proposed fee marginal; the recommended changes will
primarily change the way in which the fees are charged, rather than the total dollar amount. It is
recommended that the fees be reevaluated every five years.
Justification Report
Utility Connection Fees
City of Lino Lakes, MN
WSB Project No. 2988-26 Page 2
2. BACKGROUND
On February 12, 2016, the Lino Lakes City Council authorized the preparation of a report to
evaluate and make recommendations regarding the City’s current utility connection fee structure.
2.1 Existing System
The City currently collects SAC and WAC fees to finance improvements to the utility systems. The
2017 connection fees are $4,069 per SAC unit for water, and $3,073 per SAC unit for sewer.
Connection fees are collected at the time of development or building permit, typically in the
following instances:
• New Residential Development
• New Commercial/Industrial
• Expanded Commercial/Industrial
• Properties served by private wells/septic systems
• Redeveloped property, determined based on the increase in SAC units related to the new use
if applicable
The vast majority of connection fees are derived from new development projects of varying land
uses. The other circumstances listed above are less common, but do occur.
Justification Report
Utility Connection Fees
City of Lino Lakes, MN
WSB Project No. 2988-26 Page 3
3. CONNECTION FEES
3.1 Trunk Fee
The City’s sewer and water trunk fees are based on the costs associated with constructing the
trunk systems needed to support the anticipated growth through 2030. The additional trunk
sanitary sewer and water system infrastructure is based on the Land Use Plan included in the
City’s Comprehensive Plan. The timing of future trunk sanitary sewer and water system
improvements will be influenced by several parameters including development in specific areas,
failing on-site septic systems, regulatory requirements, availability of funds, etc. As a result, it is
difficult to accurately predict the timing of future improvements, especially those which may
occur far into the future. Therefore, the Capital Improvement Plan outlined in the
Comprehensive Plan is intended to serve as a guide only for future fiscal planning and should be
reviewed on a regular basis as more current planning and cost data becomes available.
The trunk sanitary sewer and water system fees will be applied as a uniform trunk fee per total
projected 2030 units. The value used for projected 2030 units was the average of the projections
based on land use and predicted water usage.
Trunk facilities include sewer and water pipe oversizing and sewer overdepth, as well as the
designated municipal wells, water towers, and lift stations. The designated future trunk facilities
are shown on the comprehensive sanitary sewer and water system maps contained in Appendix
A. The following items are general policy guidelines to be considered when reviewing and/or
revising the City’s sanitary sewer fee structure:
Overdepth and Oversizing
The cost of additional depth for sanitary sewer only shall be defined by differences in cost for the
depth required to serve the property within the development and the depth required for trunk
facilities. No watermain overdepth will be paid for with trunk fees.
Trunk oversizing is defined as the differential of pipe costs between the required oversized pipe
and the minimum pipe size required to serve property within a development. Pipe oversizing is
generally considered as pipe sizes that are larger than 8 inches in diameter. Bid pricing shall not
be the sole determinate in defining a developer credit. The City shall determine if a credit will
be given for a project.
Sanitary Lift Stations, Water Storage, and Water Supply
Trunk lift stations will be defined as those included as part of the Comprehensive Sewer Plan as
designated on the comprehensive plan sanitary sewer system figure in Appendix A. The cost of
trunk lift stations will be financed by the City. Additional lift stations may be required to serve
developments and lift stations that do not fit the definition for a trunk lift station will be
constructed and financed privately as needed to serve individual developments. All lift stations
will be designed and constructed in accordance with City standards.
Justification Report
Utility Connection Fees
City of Lino Lakes, MN
WSB Project No. 2988-26 Page 4
Trunk storage and supply facilities are defined as the City supply wells and water storage
facilities that serve the City as a whole as designated on the comprehensive plan water system
figure in Appendix A. These improvements will be constructed and financed by the City. All
storage and supply systems shall be designed and constructed in accordance with City standards.
No private wells and water storage will be paid for with trunk fees.
3.2 Calculation of Trunk Units
3.2.1 New Developments
Residential
Residential fees will be applied on a per unit basis at the time of plat, regardless of residence
type. One unit will be assigned to each new residence, regardless of density. High wastewater
generators and water users will be evaluated on a case-by-case basis.
Non-Residential
Non-residential fees, such as commercial, industrial, or institutional land uses, will be applied
based on the assumed number of units per acre for each respective land use category as
designated in Appendix C. In the case of mixed use developments, the trunk fee will be applied
based on the sum of all respective land uses within the development at the time of plat. High
wastewater generators and water users will be evaluated on a case-by-case basis at the time of
plat and will have higher fees applied if deemed necessary by the City Council.
3.2.2 Unserviced, Developed Properties
There are a number of existing developed areas that do not receive utility service within the City
limits. The trunk systems have been designed to accommodate all existing developed unserviced
properties within the City, but it is not the policy of the City to force individual property owners
to connect to City services immediately. Lino Lakes ordinance 401.02 states that any building
shall connect to City water when its present on-site water system fails, and connection to the
sanitary sewer shall be required within seven years from the date of connection to the water
system or sewer system availability. Therefore, properties may not connect to municipal utilities
for ten or more years after those utilities become available. If an individual property owner or
group of neighboring property owners wish to connect to City services where it is not yet
available, the City will review whether or not it is an economically viable alternative to provide
services to the area at the time of the request for connection.
Residential Properties
Existing developed unserviced residential properties will be treated as new development and be
required to pay the uniform trunk fees per residential unit at the time of connection. Each
residential property will be charged per unit regardless of the number of acres for the respective
property. In developed, unserviced areas where individual sewage treatment systems are in
place, those units will be charged the trunk fee at the time of connection.
Non-Residential Properties
Existing unserviced commercial/industrial or other non-residential properties wishing to connect
to municipal utilities will be treated as new development. Each newly connected property will
Justification Report
Utility Connection Fees
City of Lino Lakes, MN
WSB Project No. 2988-26 Page 5
be required to pay all trunk fees according to the assumed number of units per acre outlined in
the appendices of this report at the time of connection. In the case of mixed use developments,
the trunk fee will be assessed based on the sum of all respective land uses within the
development. High wastewater generators and water users will be evaluated on a case-by-case
basis at the time of connection.
3.2.3 Redeveloped Properties
In instances where existing developed areas already serviced with City utilities wish to redevelop
within the City limits, it will be up to the City to evaluate whether the trunk systems can
accommodate the redeveloped sewer flows and water demand. If additional trunk facilities are
required to provide the added service to the redeveloped area, the City will review whether or not
it is an economically viable alternative to provide additional services to the area during the
redevelopment approval process.
Residential Properties
In cases where new residential lots are created from the subdivision of a currently serviced
property, the new lots created will be assessed a trunk fee at the time of subdivision approval.
Each additional lot will be charged per unit regardless of the number of acres for the respective
property.
Non-Residential Properties
Existing serviced commercial/industrial or other non-residential properties wishing to expand
will be evaluated on a case-by-case basis by the City. If the existing sewer and water service is
sufficient to serve the redeveloped property, no trunk fee will be assessed to the redeveloped
property. If the existing sewer and water system must be expanded and/or upgraded to serve the
redeveloped property, the cost of such upgrades will be borne by the property owner.
3.3 Sewer/Water Availability Charge
The City’s sewer and water availability charge (SAC/WAC) are based on the value of the
existing sewer and water systems. Values of each system were taken from the depreciation
schedules supplied from the Finance Department which are calculated on an annual basis. The
SAC/WAC charges will be applied as a uniform fee per total future 2030 units. All availability
charges are to be collected at the time of connection when a building permit is requested.
3.4 Calculation of SAC/WAC units
3.4.1 New Developments
Residential Developments
Because the number of residential units is known at the time of platting, the number of units
assigned will be based on the number of homes. Each residential connection to the City’s sewer
or water systems will be weighted the same regardless of land use density.
Justification Report
Utility Connection Fees
City of Lino Lakes, MN
WSB Project No. 2988-26 Page 6
Commercial Developments
The non-residential SAC/WAC charges will be determined based on the actual number of SAC
units calculated by MCES during the building permit process for each connection to the sanitary
sewer and water system. In the case of mixed use developments, the SAC/WAC charges will be
assessed based on the sum of all respective land uses within the development at the time of
connection. High wastewater generators and water users will be evaluated on a case-by-case
basis at the time of connection and will have higher fees applied if deemed necessary by the City
Council.
3.4.2 Unserviced, Developed Properties
There are a number of existing developed areas that do not receive utility service within the City
limits. As stated previously, it is not the policy of the City to force individual property owners to
connect to City services immediately upon availability; however, if an individual property owner
or group of neighboring property owners wish to connect to City services where it is not yet
available, the City will review whether or not it is an economically viable alternative to provide
services to the area at the time of the request for connection.
Residential Properties
Existing unserviced residential properties will be required to pay the SAC/WAC charges per
residential unit at the time of connection. Each residential property will be charged per unit
regardless of the number of acres for the respective property. In developed, unserviced areas
where individual sewage treatment systems are in place, those properties will be charged a
SAC/WAC charge per unit at the time of connection.
Non-Residential Properties
Existing unserviced commercial/industrial or other non-residential properties wishing to connect
to municipal utilities will be treated as new development. Each newly connected property will
be required to pay all SAC/WAC charges according to the actual number of SAC units as
calculated by MCES during the building permit process. The charges will be collected at the
time of connection. High wastewater generators and water users will be evaluated on a case-by-
case basis at the time of connection.
3.4.3 Redeveloped Properties
As stated in the Trunk Fee section, in instances where existing developed areas already serviced
with City utilities wish to redevelop within the City limits, it will be up to the City to evaluate
whether the sewer and water systems can accommodate the redeveloped sewer flows and water
demand. For redevelopment, WAC/SAC fees are based on the difference in the current number
of units versus the new number of units. Additional fees will be charged if infrastructure
improvements are required as a result of the redevelopment.
Residential Properties
In cases where new residential lots are created from the subdivision of a currently serviced
property, the new lots created will be assessed SAC/WAC charges at the time of utility
connection. Each additional lot will be charged per SAC unit where one residential connection
equals one SAC unit regardless of the number of acres for the respective property.
Justification Report
Utility Connection Fees
City of Lino Lakes, MN
WSB Project No. 2988-26 Page 7
Non-Residential Properties
Existing serviced commercial/industrial or other non-residential properties wishing to expand
will have both a SAC and WAC charge applied at the time a building permit is obtained. Each
redeveloped property will be required to pay all SAC/WAC charges according to the differential
between the existing number of SAC units and the redeveloped number of SAC units as
calculated by MCES during the building permit process. If a redeveloped property has a lower
number of SAC units, a refund will not be issued. High wastewater generators and water users
will be evaluated on a case-by-case basis at the time of connection.
Justification Report
Utility Connection Fees
City of Lino Lakes, MN
WSB Project No. 2988-26 Page 8
4. FEE CALCULATIONS
4.1 2030 Unit Projections
The 2030 units are based on the average of the projected units based on land use and the
projected residential equivalents based on approximate future water use.
Currently within the City of Lino Lakes, there are approximately 6,828 developable acres
proposed to be developed by the year 2030 as identified in the City’s 2030 Comprehensive Plan.
Of that amount, 5,174 are residential acres; 1,090 are commercial or industrial acres; and 564 are
mixed-use acres. The total number of units projected is the assumed number of SAC units per
acre for each land use designation, multiplied by the remaining acres to be developed by 2030,
resulting in approximately 12,790 equivalent units developing by the year 2030. The assumed
density for each land use category is included in Appendix C.
The projected units based on water usage is a residential equivalent unit volume determined by
dividing average annual water usage by the number of gallons residential users demand on
average. The projected 2030 water usage was divided by the residential equivalent volume to
determine the additional residential equivalents by 2030, resulting in approximately 6,537
additional residential equivalents developing by 2030.
The units used in this report were determined by the average of the two methodologies, resulting
in an assumed additional 9,663 units to connect to the City’s water and sewer system by 2030.
As development proceeds, this number should be tracked and updated to adjust fees every five
years, with adjustments made incrementally to address inflation.
4.2 Trunk Fee
Capital Improvement Plans (CIP) for both the sanitary sewer and water supply systems were
developed based on the City’s 2030 Comprehensive Plan. The CIPs were based on building the
trunk facilities to accommodate the 2030 estimated growth.
The trunk sanitary sewer CIP includes sanitary sewer pipe upgrades, new main installations, and
designated lift station improvements within the 2030 Urban Service Area. The trunk sanitary
sewer improvement projects and associated costs included in the trunk fee calculation are
detailed in Appendix B. The trunk water system CIP includes water main upgrades, new main
installations, and designated water supply wells and storage tanks within the 2030 Urban Service
Area. Additionally, it was assumed that the Trunk Fees would cover the cost of half of the water
treatment plant planned for construction. Because the 2030 Comprehensive Plan was written in
2009, those projects already constructed were removed, and five percent was added to the
estimated costs to address inflation. The trunk water system improvement projects and associated
costs included in the trunk fee calculation are detailed in Appendix B.
The total costs to construct the 2030 trunk sanitary sewer and 2030 trunk water systems are
estimated at $12,400,000 and $10,864,350, respectively. The total costs to construct the systems
were divided by the total number of 2030 units remaining to be developed to obtain a uniform
trunk fee per SAC unit. The calculated trunk sewer fee is $1,505 and the calculated trunk water
fee is $2,162.
Justification Report
Utility Connection Fees
City of Lino Lakes, MN
WSB Project No. 2988-26 Page 9
The current trunk fee calculation only accounts for growth within the 2030 Urban Service Area.
To serve areas of the City that are currently outside of the City’s 2030 MUSA, the trunk sewer
collection and water distribution systems will need to be extended. Trunk facilities will include
the construction of additional trunk mains, lift stations, and water supply and storage. Piping, lift
station, supply, and storage requirements will be dependent on the expected population and land
use of the areas. Costs to construct the trunk facilities outside of the 2030 MUSA will be
evaluated when service is extended. It is recommended that this study be updated every five
years, with incremental increases annually based on inflation.
4.3 Sewer/Water Availability Charge
The SAC/WAC charges were based on the 2016 value of the existing sanitary sewer and water
systems. Values of each system were taken from the depreciation schedules supplied from the
Finance Department which are calculated on an annual basis.
The 2016 value of the existing sanitary sewer and water systems are $23,064,159 and
$22,271,449, respectively. The total 2016 values of the sewer and water systems were divided
by the total estimated 2030 units to obtain a uniform SAC/WAC charge per unit. The calculated
SAC charge per SAC unit is approximately $1,408 and the calculated WAC charge per SAC unit
is approximately $1,360.
4.4. Nonresidential Fee Determination
The fee charged to non-residential developments is based on acreage and SAC determination. At
the time of plat, an estimate of 2.92 units per acre is assigned to the development. This number is
based on the assumption that an average commercial or industrial building will use 800 gallons
per acre per day. Metropolitan Council guidance recommends an assumption of 274 gallons per
day per residential unit. Therefore, a residential equivalence of 800 gallons per day, divided by
274 gallons per per unit, results in the assigned value of 2.92 units per acre for non-residential
development for the determination of the Trunk Fee.
At the time of connection, non-residential developments are charged the SAC and WAC fee
based on actual usage type. The fees assigned are determined based on the Metropolitan
Council’s SAC Procedural Manual, which provides estimates for a wide variety of commercial,
industrial, and institutional uses.
Depending on the ultimate use, the proposed fees can be either lower or higher than the existing
fees. Overall, commercial fees will be lower than existing when high-use commercial
development goes into a small parcel or when the assumed usage based on density is close to the
actual usage; fees will be higher when a low-volume user develops a large parcel.
Justification Report
Utility Connection Fees
City of Lino Lakes, MN
WSB Project No. 2988-26 Page 10
5. EXAMPLES
5.1 Low Density Residential
For an unserviced low density residential development, the fees would be calculated as shown
below. This example assumes that 2.16 acres are planned for development into six residential
units. Because the residential units are known, acreage is not considered.
Utility Units Fee Per Unit Total
Sewer Trunk Fee 6 $1,505 $9,030
Water Trunk Fee 6 $2,162 $12,972
Sewer Availability Charge 6 $1,408 $8,448
Water Availability Charge 6 $1,360 $8,160
Total $38,610
Existing Fee Structure $42,852
Difference -$4,242
5.2 Medium Density Residential
This example outlines the fees assigned to a new, medium density residential development.
Similar to the low-density residential example, the number of units is used to calculate the fee.
Utility Units Fee Per Unit Total
Sewer Trunk Fee 78 $1,505 $117,390
Water Trunk Fee 78 $2,162 $168,636
Sewer Availability Charge 78 $1,408 $109,824
Water Availability Charge 78 $1,360 $106,080
Total $510,930
Existing Fee Structure $557,076
Difference -$46,146
5.3 New Commercial – Example One
This example demonstrates the calculations to determine the fees charged to a new commercial
development 28 acres in size. The acreage is used to determine the Trunk Fees at the time of
platting, based on an assumed unit density of 2.92 units per acre . The SAC units, determined at
the time of connection, is used to calculate the Availability Charges.
Utility Units Fee Per Unit Total
Sewer Trunk Fee 82 $1,505 $123,410
Water Trunk Fee 82 $2,162 $177,284
Sewer Availability Charge 65 $1,408 $91,520
Water Availability Charge 65 $1,360 $88,400
Total $480,614
Existing Fee Structure $464,230
Difference +$16,384
Justification Report
Utility Connection Fees
City of Lino Lakes, MN
WSB Project No. 2988-26 Page 11
5.4 New Commercial – Example Two
This example outlines the calculations to determine the fees charged to new development 15
acres in size. In contrast to the previous example, the number of units estimated during
preliminary plat is lower than the actual SAC units calculated by usage prior to connection to the
system. This example is in place to demonstrate that depending on the ultimate use, the proposed
fees can be either lower or higher than the existing fees. Overall, commercial fees will be lower
than existing when high-use commercial development goes into a small parcel or when the
assumed usage based on density is close to the actual usage; fees will be high when a low-
volume user develops a large parcel.
Utility Units Fee Per Unit Total
Sewer Trunk Fee 44 $1,505 $66,220
Water Trunk Fee 44 $2,162 $95,128
Sewer Availability Charge 51 $1,408 $71,808
Water Availability Charge 51 $1,360 $69,360
Total $302,516
Existing Fee Structure $364,242
Difference -$61,726
5.5 Commercial Use Change
This example demonstrates the calculations to determine the fees charged to a commercial use
change. The only charge assessed is the Availability Charge based on the increase in usage. In
this example, the SAC units increase from three units to six units. The trunk fee is not charged
because the water distribution and sewage collection systems are already in place.
Utility Increase
in Units Fee Per Unit Total
Sewer Availability Charge 3 $1,408 $4,224
Water Availability Charge 3 $1,360 $4,080
Total $8,304
Existing Fee Structure $21,426
Difference -$13,122
In this example, infrastructure has already been extended to the property. Therefore, the new user
pays for the value received from the system, but is not expected to pay for infrastructure
expansion, which is paid for by new users. If the commercial use change requires infrastructure
upgrades, the City will work with the property owner on a case-by-case basis to determine an
appropriate Trunk Fee.
Justification Report
Utility Connection Fees
City of Lino Lakes, MN
WSB Project No. 2988-26 Page 12
6. RECOMMENDATION
It is recommended to update the way in which utility fees are charged as outlined within this
report. The recommended fees are summarized below.
Utility Trunk Fee
per Unit
SAC/WAC
Charge per Unit
Total Utility
Fee per Unit
Sanitary Sewer System $1,505 $1,408 $2,842
Water Distribution System $2,162 $1,360 $3,522
The proposed fees provide a funding source for the construction of improvements to serve the
anticipated growth outlined in the 2030 Comprehensive Plan.
Justification Report
Utility Connection Fees
City of Lino Lakes, MN
WSB Project No. 2988-26
APPENDIX A
Figures
7-6
8-39
Figure 8-12: Future Water System
Justification Report
Utility Connection Fees
City of Lino Lakes, MN
WSB Project No. 2988-26
APPENDIX B
Water and Sewer Capital Improvements Plan
City of Lino Lakes Water and Sanitary Sewer Systems
2030 Capital Improvement Plan
Adapted from 2009 Comprehensive Plan
Item No.Description Cost
1 Lake Drive Trunk Watermain Strengthening (Phase 2)$346,500
2 Construction of Storage Tank and Well No. 7 $3,144,750
3 Complete Raw Watermains from Multiple Wells $1,653,750
4 Redundant 16" Watermain to Replace North Loop $2,100,000
5 Construction of Water Treatment Plant*$7,840,250
6 Complete Raw Watermain from Additional Wells $1,575,000
7 Lake Drive Trunk Watermain Strengthening (Phase 3)$658,350
8 Improve Distribution Watermain - Southwest Corner $1,386,000
$18,704,600
*50% of the Water Treatment Plant capital to come from utility connection fees
Item No.Description Cost
1 Upgrade Lift Station No. 7 $73,500
2 Upgrade Lift Station No. 8 $73,500
3 Gravity Sewer, 77th Street/Country Lane $367,500
4 Gravity Sewer, Lift Station & Forcemain, Area 1G $1,050,000
5 Gravity Sewer, Lake Drive Norht of Main Street $1,260,000
6 Upgrade Lift Station No. 10 $73,500
7 Northeast Area Trunk Sewer, Stage 2 $367,500
8 Lift Station & Forcemain, Area 3D $252,000
9 Gravity Sewers, North of Century Farms, Stage 2 $1,050,000
10 West Side Relief Sewer $3,360,000
11 Replace Lift Station No. 4 & Forcemain $840,000
12 Upgrade Lift Station No. L53 & Forcemain $210,000
13 Lift Station & Forcemain, Area 3B West of 20th Avenue $367,500
14 Lift Station & Forcemain, Area 4A $1,260,000
15 Lift Station & Forcemain, Ash Street/Area 1E $735,000
16 Lift Station & Forcemain, Pine Street/Sunset Avenue $1,207,500
18 Lift Station & Forcemain, Rondeau Lake Road/Main Street $472,500
$13,020,000
GRAND TOTAL
GRAND TOTAL
Justification Report
Utility Connection Fees
City of Lino Lakes, MN
WSB Project No. 2988-26
APPENDIX C
Densities Assigned by Land-Use Type
City of Lino Lakes Water Utility Connection Fee Study
Land-Use Densities
Land Use Units Per Acre per Acre
Commercial 2.92
Industrial 2.92
Low Density Residential 2.75
Manufactured Home Park 4.95
Medium Density Residential 4.95
High Density Residential 8
Mixed Use 4.95
Note: Residential units per acre are the average of the low and high value provided
in the City's 2030 Comprehensive Plan
The densities shown in the table above were used to estimate
the number of new units and residential equivalent units that
will be developed over the lifetime of this analysis. This number
was used to calculate the trunk fee.
Trunk Utility Survey (February 2020)
Municipality Fee Type Trunk Area Charge Notes:
Water $2,306/unit
Sewer $1,606/unit
Water $4,585/acre
Sewer $3,150/acre
Water
Sewer
Water $6,500/acre
Sewer $1,075/acre
Water
Sewer
SAC fees low
Lift Station Charges also
Water $1,800/unit for residential
Sewer 1 1/2 % Admin, With Building Permit
Water
Sewr
Water $2,591 residential
Sewer
Water $7,640/acre
Sewer $4,530/acre
Water $2392/unit Trunk charged at time of subd.
Sewer $691/unit Trunk charged at time of subd.
Water $2,624/acre
Sewer $3,523/acre
Water $7,005 - S13,770 per acre
Sewer $4320 - $4,535/acre
Water
Sewer
Water $3,483.2/acre
Sewer $5,224.8/acre
Water $3,178/acre
Sewer $2,021/acre
Water $5,774.70/acre additional $967/unit WTP charge
Sewer $2,149.70/unit upto 5 Trunk charges differ depending upon #
of units
Water
Sewer
Water includes $1,450 for water filtration
Sewer
Water
Sewer
Water $6,766 per acre
Sewer $3,743 per acre
SAC/WAC
$4,150/metro SAC
$1,310/metro SAC
$900
$1,200
$5,582/unit
$1,611/unit
$1,451/SAC unit
$1,502/SAC unit
Ramsey
$1,850/unit
$2,300/unitCenterville
Circle Pines
White Bear Lake
na
na
$2,444/acre
$1,352/acre
$670/unit
$670/unit
$3250 unit
$1500/unit
na
$119.4/SAC unit
$3,068/acre
$3,610/unit
$550
$550
Woodbury
Oakdale
Eden Prairie
Cottage Grove
Eagan
Maple Grove
Prior Lake
Chanhassen
Chaska
Lino Lakes
Andover
Water
Sewer
Forest Lake
Champlin $3,300 and increases $100 per year until $3,500
MCES Fees (no additional)
Rosemount
$3,600/unit
$3,600/unit
$2,640/unit
$2,200/unit
Different costs depending on district
$0
Hugo
Blaine
Anoka
$5,332/unit
$452/unit
$2,485/unit
$2,000/unit
$1,100/unit
$4,546/acre
$10,364/acre
$1,678/acre
$4,885/acre High due to Water Treatment Plant
$4,400/unit
WS – Item 7
WORK SESSION STAFF REPORT
Work Session Item No. 7
Date: March 2, 2020
To: City Council
From: Lisa Hogstad-Osterhues
Re: Annual Advisory Board Appointments
Background
Openings for the City’s advisory boards were advertised and applications have been
received. Attached is an outline of the applicants for each of the boards or committee.
- Environmental Board – 3 seats, 2 applicants
- Planning Board – 3 seats, 6 applicants
- EDAC – 3 seats, 3 applicants
- Park Board 4 seats, 4 applicants
Requested Council Direction
1. Establish a date to interview applicants if so desired
2. Appoint incumbents to new term and interview the new candidates
Attachments
Advisory Board Applicant List
WS – Item 7 Attachment
2020 Advisory Board Applicants
Environmental Board
1. Shawn Holmes (Incumbent)
2. Alexander Schwartz (Incumbent)
3. No Applicant
Planning & Zoning
1. Perry Laden (Incumbent)
2. Andrew Cravero (New)
3. Kavwimba (Kav) Mdumuka (New)
4. Jeff Reinert (New)
5. Robert Sibell (New)
6. Nate Vojtech (New)
Park Board
1. Andrew Levi (Incumbent)
2. John Nordlund (Incumbent)
3. Abby Haworth (Incumbent)
4. Andrea Schmidt (Incumbent)
EDAC
1. Nathan Vojtech (Incumbent)
2. Patrick Kohler (Incumbent)
3. Chad Wagner (Incumbent)
Environmental Board – 3 seats, 2 applicants
Planning &Zoning – 3 seats, 6 applicants
Park Board – 4 Seats, 4 applicants
EDAC – 3 seats, 3 applicants
WS – Item 8
WORK SESSION STAFF REPORT
Work Session Item 8
Date: March 2, 2020
To: City Council
From: John Swenson, Public Safety Director
Re: Ambulance Service - Update
Background
Staff continues to work on ensuring that ambulance services in Lino Lakes are provided
at a high level after the June 1, 2020 ambulance service transition. As part of that process
we have provide information to Council at several meetings on this issue. Attached to
this staff report are staff reports from December 2, 2019 and December 9, 2019 along
with Council Resolution 19-176.
Since those staff reports were written staff has attended Emergency Medical Services
Regulatory Board (EMSRB) Board Meeting on January 16, 2020 and EMSRB Executive
Board Meeting on December 19, 2019 and February 20, 2020. The EMSRB continues to
work on determining whether the change in ambulance services in our Primary Service
Area (PSA) will go through the change of ownership process as outlined in MN 144E.11
or a change of name process as outlined in the same statute.
Staff has learned that the entire City of Lino Lakes is covered by what the EMSRB refers
to as “PSA overlap”. This means that when the PSA maps were created two ambulance
providers own a PSA that covers our community. We know that MHealth Fairview
(formally Fairview) as well as Allina Ambulance own a PSA that includes Lino Lakes.
This has occurred in other areas of the state and when there is ambulance PSA overlap
the local jurisdiction has the ability to choose between the ambulance providers that own
the PSAs covering their community.
Staff continues to meet with both MHealth Fairview and Allina to gain the needed
information on their respective ambulance services, medical dispatching capabilities,
medical direction, and available EMS training for our staff.
Staff hopes to have all of the information to make an informed recommendation to
Council this spring prior to the June 1, 2020 transition.
Attachments
Staff Report from December 9, 2019 with Council Resolution 19-176
Staff Report from December 2, 2019
WS – Item 9
WORK SESSION STAFF REPORT
Work Session Item 9
Date: March 2, 2020
To: City Council
From: John Swenson, Public Safety Director
Re: Purchase of Use of Force Training Simulator
Background
Members of the Public Safety Department conducted extensive research on a use of force
training simulator to determine if these types of systems could improve the training
provided to our staff.
Our use of force instructors examined multiple systems and conducted two site visits to
learn more about the various systems available. The recommendation from staff is the
VirTra V-100 LE. This system would allow our instructors to conducted scenario based
training with the resources currently available to all Lino Lakes police officers, as well as
create scenarios based on video footage of actual calls that have occurred in Lino Lakes.
Attached to this staff report is a proposal prepared by the Use of Force Instructors and an
estimate from VirTra.
Staff is recommending the purchase of this system as quoted with the use of Federal
Forfeiture Funds. Use of forfeiture funds for this purchase is a permissible use of
forfeiture funds as outlined in the Guide to Equitable Sharing (July, 2018).
The total for this purchase is $48,284.85.
The Federal Narcotics Forfeiture Fund (Justice & Treasury) balance is currently
$100,549.97 (2.20.2020).
Staff is seeking Council direction prior to making this purchase.
Attachments
Use of Force Training Simulator Proposal