HomeMy WebLinkAbout03-09-2020 Council Packet EXPANDED AGENDA
CITY COUNCIL AGENDA
Monday, March 9, 2020
***********
6:30 p.m.
(Scheduled to be broadcast on Channel 16)
City Council: Mayor Rafferty, Councilmembers Cavegn, Lyden, Ruhland and Stoesz
City Administrator: Jeff Karlson
CITY COUNCIL MEETING, 6:30 P.M.
Oath of Office – Councilmember Cavegn
Roll Call - Councilmembers Stoesz, Lyden, Ruhland, Cavegn and Mayor Rafferty were
present;
Pledge of Allegiance
Open Mike / Public Comment - Jamie Jensen, St. Clair Estates developer, asked for
assistance in finalizing his accounts with the City;
Sierra Rasmussen, 640 Barbara Lane, read a statement requesting that the Council
amend the City Code to allow for bees;
Terry O’Connell, 1000 Main Street, received questions about parks from residents as
she knocked doors for her campaign for City Council. She brought those questions to
the Park Board and received some response and she’d like the council’s advice on
sharing that information
Setting the Agenda: Addition or Deletion of Agenda Items
The agenda was approved as presented
SPECIAL PRESENTATION
1. Oath of Police Service – Police Officer Matthew Carlson
1. CONSENT AGENDA
A) Consideration of Expenditures:
i) March 9, 2020 (Check No. 111865 through 111932) in the amount of
$198,884.25
B) Consider Approval of February 24, 2020 Work Session Minutes
C) Consider Approval of February 24, 2020 Council Meeting Minutes
D) Consider Approval of Resolution No. 20-23, Approving a Peddler License for
Edward Jones Financial, Daniel Chrzanowski
Action Taken: Motion by Lyden, seconded by Ruhland, to approve
Consent Agenda Items 1A and 1D as presented was adopted
Council Agenda -2- March 9, 2020
Action Taken: Motion by Lyden, seconded by Ruhland, to approve
Consent Agenda Items 1C and 1B as presented was adopted; Councilmember
Cavegn abstained from voting
2. FINANCE DEPARTMENT REPORT
No report
3. ADMINISTRATION DEPARTMENT REPORT
A) Consider Annual Appointments for 2020, Jeff Karlson
Action Taken: Motion by Lyden, seconded by Stoesz, to approve
the annual appointments as presented, was adopted
4. PUBLIC SAFETY DEPARTMENT REPORT
No report
5. PUBLIC SERVICES DEPARTMENT REPORT
A) Consider Resolution No. 20-15, Accepting bids and Awarding a Construction
Contract, Well House No. 1 Rehabilitation Project, Diane Hankee
Action Taken: Motion by Stoesz, seconded by Ruhland, to approve Resolution
No. 20-15 as presented, was adopted; Councilmember Lyden voted nay
6. COMMUNITY DEVELOPMENT REPORT
A) Nadeau Acres, Katie Larsen Action Item Postponed to Future Date
i. Consider First Reading of Ordinance No. 02-20 Rezoning Property from R, Rural
to R-1, Single Family Residential
ii. Consider Resolution No. 20-20 Approving Preliminary Plat and Opening Sub-
District 3C & 3D of Utility Staging Area 2A (2020-2025)
B) Consider Resolution No. 20-21 Approving Conditional Use Permit for Building
within the Floodplain at 7020 West Shadow Lake Drive, Kelsey Gelhar, WSB
Action Taken: Motion by Lyden, seconded by Cavegn, to approve
Resolution No. 20-21 as presented, was adopted
C) Consider Resolution No. 20-19, Approving Bid Policy, Diane Hankee
Action Taken: Motion by Stoesz, seconded by Ruhland, to approve
Resolution No. 20-19 as presented, was adopted
D) Consider Resolution No. 20-13, Accepting bids, Awarding a Construction Contract,
and Approving the Construction Services Contract for East Cedar Street & 24th
Avenue/Elmcrest Avenue North Improvement Project, Diane Hankee
Action Taken: Motion by Stoesz, seconded by Lyden, to approve
Resolution No. 20-13 as amended to withhold the construction oversight
contract with WSB & Associates for further refinement, was adopted
Council Agenda -3- March 9, 2020
E) Consider Resolution No. 20-14, Accepting Quotes and Awarding a Construction
Contract, Sanitary Sewer to Water Tower No. 3, Diane Hankee
Action Taken: Motion by Stoesz, seconded by Cavegn, to approve
Resolution No. 20-14 as presented, was adopted
F) Consider Resolution No. 20-24, Amending Stipulation Agreement, Leibel Ownership
Group, NE Drainage Area Improvement Project, Michael Grochala
Action Taken: Motion by Lyden, seconded by Stoesz, to approve
Resolution No. 20-24 as presented, was adopted
G) Consider Resolution No. 20-25, Authorize Water Treatment Plant Feasibility Study,
Michael Grochala
Action Taken: Motion by Stoesz, seconded by Lyden, to approve
Resolution No. 20-15 as presented, was adopted
7. UNFINISHED BUSINESS
None
8. NEW BUSINESS
None
Adjournment
Community Calendar – A Look Ahead
March 9, 2020 through March 23, 2020
Wednesday, March 11 6:30 pm, Council Chambers Planning & Zoning Board
Thursday, March 19 5:30 pm, Community Room Council Strategic Planning Mtg
Monday, March 23 6:00 pm, Community Room Council Work Session
Monday, March 23 6:30 pm, Council Chambers City Council Meeting
Updated 3/6/2020
CITY COUNCIL AGENDA
Monday, March 9, 2020
***********
6:30 p.m.
(Scheduled to be broadcast on Channel 16)
City Council: Mayor Rafferty, Councilmembers Cavegn, Lyden, Ruhland and Stoesz
City Administrator: Jeff Karlson
CITY COUNCIL MEETING, 6:30 P.M.
Oath of Office – Councilmember Cavegn
Call to Order and Roll Call
Pledge of Allegiance
Open Mike / Public Comment
Setting the Agenda: Addition or Deletion of Agenda Items
SPECIAL PRESENTATION
1. Oath of Police Service – Police Officer Matthew Carlson
1. CONSENT AGENDA
A) Consideration of Expenditures:
i) March 9, 2020 (Check No. 111865 through 111932) in the amount of
$198,884.25
B) Consider Approval of February 24, 2020 Work Session Minutes
C) Consider Approval of February 24, 2020 Council Meeting Minutes
D) Consider Approval of Resolution No. 20-23, Approving a Peddler License for
Edward Jones Financial, Daniel Chrzanowski
2. FINANCE DEPARTMENT REPORT
No report
3. ADMINISTRATION DEPARTMENT REPORT
A) Consider Annual Appointments for 2020, Jeff Karlson
4. PUBLIC SAFETY DEPARTMENT REPORT
No report
5. PUBLIC SERVICES DEPARTMENT REPORT
A) Consider Resolution No. 20-15, Accepting bids and Awarding a Construction
Contract, Well House No. 1 Rehabilitation Project, Diane Hankee
Council Agenda -2- March 9, 2020
6. COMMUNITY DEVELOPMENT REPORT
A) Nadeau Acres, Katie Larsen Action Item Postponed to Future Date
i. Consider First Reading of Ordinance No. 02-20 Rezoning Property from R, Rural
to R-1, Single Family Residential
ii. Consider Resolution No. 20-20 Approving Preliminary Plat and Opening Sub-
District 3C & 3D of Utility Staging Area 2A (2020-2025)
B) Consider Resolution No. 20-21 Approving Conditional Use Permit for Building
within the Floodplain at 7020 West Shadow Lake Drive, Kelsey Gelhar, WSB
C) Consider Resolution No. 20-19, Approving Bid Policy, Diane Hankee
D) Consider Resolution No. 20-13, Accepting bids, Awarding a Construction Contract,
and Approving the Construction Services Contract for East Cedar Street & 24th
Avenue/Elmcrest Avenue North Improvement Project, Diane Hankee
E) Consider Resolution No. 20-14, Accepting Quotes and Awarding a Construction
Contract, Sanitary Sewer to Water Tower No. 3, Diane Hankee
F) Consider Resolution No. 20-24, Amending Stipulation Agreement, Leibel Ownership
Group, NE Drainage Area Improvement Project, Michael Grochala
G) Consider Resolution No. 20-25, Authorize Water Treatment Plant Feasibility Study,
Michael Grochala
7. UNFINISHED BUSINESS
None
8. NEW BUSINESS
None
Adjournment
Community Calendar – A Look Ahead
March 9, 2020 through March 23, 2020
Wednesday, March 11 6:30 pm, Council Chambers Planning & Zoning Board
Thursday, March 19 5:30 pm, Community Room Council Strategic Planning Mtg
Monday, March 23 6:00 pm, Community Room Council Work Session
Monday, March 23 6:30 pm, Council Chambers City Council Meeting
Expenditures
March 9, 2020
Check #111865 to #111932
$198,884.25
City of Lino Lakes
Activity Codes
Code Description Code Description
401 Mayor/Council 817 Spring Fling
402 Administration 818 Winter Festival
403 Elections 819 Community Gardens
404 Cable TV 822 Family Corn Roast
405 Charter Administration 827 Gobbler Games
407 Finance 830 Adult Golf Lessons
414 Legal Consultants 835 Youth Skating Class
415 Economic Development 850 Golf Academy
416 Planning & Zoning 856 Youth Soccer
417 Engineering 857 Soccer Fundamentals
418 Community Development 860 Secret Shop
420 Police Protection 864 Preschool Playtime
421 Fire Protection 868 Little Goblins Party
422 Building Inspections 871 Flag Football
430 Streets 875 Snow Day
431 Fleet Management 876 Kite Day
432 Government Buildings 877 Rockin' in the Park
450 Parks 879 Movies in the Park
451 Recreation 890 Senior Programs
461 Environmental
462 Solid Waste Abatement
463 Forestry
494 Water
495 Sanitary Sewer
499 Other
802 Dodgeball Camp
806 Youth T-Ball
808 Youth Baseball Camp
810 Youth Playground
811 Youth Safety Camp
812 Youth Art Camps
814 Senior Programs/Book Club
AP Checks by Account Number
03/09/2020 City Council Meeting
Vendor Fund/Dept Account Amount Check # Description
AFLAC 101-000 101-000-2040-000 206.80 111873 Insurance Premiums
Central Pension Fund 101-000 101-000-2040-000 3,840.00 111866 February Central Pension Fund
Delta Dental of Minnesota 101-000 101-000-2040-000 363.20 111889 Dental Insurance Premiums
Lincoln National Life Ins Co 101-000 101-000-2040-000 1,090.60 111903 Life Insurance Premiums
Lincoln National Life Ins Co 101-000 101-000-2040-000 1.75 111903 Life Insurance Premiums
Lincoln National Life Ins Co 101-000 101-000-2040-000 1,192.22 111905 Life Insurance Premiums
Lincoln National Life Ins Co 101-000 101-000-2040-000 -18.10 111905 Life Insurance Premiums
Medica 101-000 101-000-2040-000 1,595.02 111907 Health Insurance Premiums
NCPERS Group Life Insurance 101-000 101-000-2040-000 256.00 111868 March Life Insurance Premiums
Medica 101-000 101-000-2041-000 10,660.58 111907 Health Insurance Premiums
Delta Dental of Minnesota 101-000 101-000-2044-000 1,710.46 111889 Dental Insurance Premiums
Fidelity Security Life Insurance Co. 101-000 101-000-2048-000 115.00 111893 March Vision Insurance Premiums
Lincoln National Life Ins Co 101-000 101-000-3416-000 0.14 111903 Life Insurance Premiums
Lincoln National Life Ins Co 101-000 101-000-3416-000 0.14 111905 Life Insurance Premiums
101-000 Total 21,013.81
Medica 101-402 101-402-4131-000 538.42 111907 Health Insurance Premiums
Lincoln National Life Ins Co 101-402 101-402-4133-000 9.00 111903 Life Insurance Premiums
Lincoln National Life Ins Co 101-402 101-402-4133-000 95.30 111904 Disability Insurance Premiums
Lincoln National Life Ins Co 101-402 101-402-4133-000 9.00 111905 Life Insurance Premiums
Delta Dental of Minnesota 101-402 101-402-4134-000 176.40 111889 Dental Insurance Premiums
Bartholomew Karissa 101-402 101-402-4330-000 2,000.00 111880 Tuition Reimbursement per Personnel Policy Section 7.1
Governmentjobs.com Inc 101-402 101-402-4410-000 4,991.00 111895 NEOGOV - Online Application Software
Shred-it c/o Stericycle Inc. 101-402 101-402-4410-000 53.96 111923 Document Destruction
TASC - Client Invoices 101-402 101-402-4410-000 302.60 111926 January Admin Fees & 2020 Renewal Fee
101-402 Total 8,175.68
Medica 101-407 101-407-4131-000 2,481.05 111907 Health Insurance Premiums
Lincoln National Life Ins Co 101-407 101-407-4133-000 6.98 111903 Life Insurance Premiums
Lincoln National Life Ins Co 101-407 101-407-4133-000 68.14 111904 Disability Insurance Premiums
Lincoln National Life Ins Co 101-407 101-407-4133-000 6.98 111905 Life Insurance Premiums
Delta Dental of Minnesota 101-407 101-407-4134-000 99.22 111889 Dental Insurance Premiums
League of Minnesota Cities 101-407 101-407-4330-000 20.00 111902 Safety & Loss Control Workshop
101-407 Total 2,682.37
Rupp Anderson Squires & Waldspurger P.A. 101-414 101-414-4301-000 1,663.93 111919 November & December Legal
101-414 Total 1,663.93
Rupp Anderson Squires & Waldspurger P.A. 101-415 101-415-4300-000 112.00 111919 November & December Legal Purchase of 7685 Lake Dr.
MN Metro North Tourism Board 101-415 101-415-4900-000 4,435.00 111911 January Tourism Tax
101-415 Total 4,547.00
Medica 101-416 101-416-4131-000 538.43 111907 Health Insurance Premiums
Lincoln National Life Ins Co 101-416 101-416-4133-000 2.25 111903 Life Insurance Premiums
Lincoln National Life Ins Co 101-416 101-416-4133-000 25.19 111904 Disability Insurance Premiums
Lincoln National Life Ins Co 101-416 101-416-4133-000 2.25 111905 Life Insurance Premiums
Delta Dental of Minnesota 101-416 101-416-4134-000 44.10 111889 Dental Insurance Premiums
American Planning Association 101-416 101-416-4452-000 653.00 111874 APA/AICP Membership K. Larsen
101-416 Total 1,265.22
Lincoln National Life Ins Co 101-418 101-418-4133-000 2.25 111903 Life Insurance Premiums
Lincoln National Life Ins Co 101-418 101-418-4133-000 28.50 111904 Disability Insurance Premiums
Lincoln National Life Ins Co 101-418 101-418-4133-000 0.00 111905 Life Insurance Premiums
101-418 Total 30.75
Medica 101-420 101-420-4131-000 21,069.13 111907 Health Insurance Premiums
Lincoln National Life Ins Co 101-420 101-420-4133-000 59.73 111903 Life Insurance Premiums
Lincoln National Life Ins Co 101-420 101-420-4133-000 592.66 111904 Disability Insurance Premiums
Lincoln National Life Ins Co 101-420 101-420-4133-000 68.73 111905 Life Insurance Premiums
Delta Dental of Minnesota 101-420 101-420-4134-000 1,126.74 111889 Dental Insurance Premiums
Innovative Office Solutions LLC 101-420 101-420-4200-000 211.43 111901 Toners & Inkcarts
Anoka County Treasury Office 101-420 101-420-4211-000 99.00 111876 PMMN4486 APX Battery
Baycom Inc. 101-420 101-420-4240-000 112.00 111882 BWC MK3 X Molle Mount & Body Worn Adapter Plates
Baycom Inc. 101-420 101-420-4240-000 57.00 111882 GPS Antenna
Otter Lake Animal Care Center 101-420 101-420-4300-000 308.84 111915 Boarding & Services for Argos
Mobraten Kristen 101-420 101-420-4330-000 120.00 111912 USPCA Region 12 PD1 K9 Trials Certification
Aspen Mills Inc. 101-420 101-420-4370-000 849.00 111877 New Hire Uniform A. Ng
Aspen Mills Inc. 101-420 101-420-4370-000 46.85 111877 New Hire Uniform A. Ng
Xcel Energy 101-420 101-420-4381-000 3.74 111931 Electric-Police
Anoka County Treasury Office 101-420 101-420-4410-000 43.26 111876 January Language Line
Shred-it c/o Stericycle Inc. 101-420 101-420-4410-000 135.81 111923 Document Destruction
Page 1
AP Checks by Account Number
03/09/2020 City Council Meeting
Vendor Fund/Dept Account Amount Check # Description
Dell Marketing LP 101-420 101-420-5000-000 1,701.00 111888 Dell Latitude 7400 Bundle Dock - W. Owens
101-420 Total 26,604.92
Medica 101-421 101-421-4131-000 1,313.91 111907 Health Insurance Premiums
Lincoln National Life Ins Co 101-421 101-421-4133-000 4.40 111903 Life Insurance Premiums
Lincoln National Life Ins Co 101-421 101-421-4133-000 50.08 111904 Disability Insurance Premiums
Lincoln National Life Ins Co 101-421 101-421-4133-000 4.40 111905 Life Insurance Premiums
Delta Dental of Minnesota 101-421 101-421-4134-000 63.96 111889 Dental Insurance Premiums
Centennial Tech Club 101-421 101-421-4200-000 12.00 111884 Laser Engraved Tags
Aspen Mills Inc. 101-421 101-421-4370-000 189.50 111877 Fire Uniform C. Menne
ACT Services 101-421 101-421-4410-000 605.00 111872 Preventative Maintenance Labor
101-421 Total 2,243.25
Medica 101-422 101-422-4131-000 1,680.96 111907 Health Insurance Premiums
Lincoln National Life Ins Co 101-422 101-422-4133-000 7.87 111903 Life Insurance Premiums
Lincoln National Life Ins Co 101-422 101-422-4133-000 70.23 111904 Disability Insurance Premiums
Lincoln National Life Ins Co 101-422 101-422-4133-000 7.87 111905 Life Insurance Premiums
Delta Dental of Minnesota 101-422 101-422-4134-000 88.20 111889 Dental Insurance Premiums
Emergency Automotive Technologies 101-422 101-422-4240-000 1,434.03 111891 Install Computer Mount Packages & Customize Tablet Cradle
101-422 Total 3,289.16
Medica 101-430 101-430-4131-000 3,409.16 111907 Health Insurance Premiums
Lincoln National Life Ins Co 101-430 101-430-4133-000 15.19 111903 Life Insurance Premiums
Lincoln National Life Ins Co 101-430 101-430-4133-000 121.83 111904 Disability Insurance Premiums
Lincoln National Life Ins Co 101-430 101-430-4133-000 15.19 111905 Life Insurance Premiums
Delta Dental of Minnesota 101-430 101-430-4134-000 249.16 111889 Dental Insurance Premiums
Menards - Forest Lake 101-430 101-430-4211-000 64.39 111908 Miscellaneous Batteries and Tools
Unique Paving Materials Corporation 101-430 101-430-4224-000 233.55 111927 Cold Mix UPM Winter
Unique Paving Materials Corporation 101-430 101-430-4224-000 345.60 111927 Cold Mix UPM Winter
Unique Paving Materials Corporation 101-430 101-430-4224-000 342.90 111927 Cold Mix UPM Winter
Cargill Inc. 101-430 101-430-4228-000 2,450.36 111883 Clear Lane Deicer
Xcel Energy 101-430 101-430-4385-000 499.47 111931 Electric-Street Lights
Xcel Energy 101-430 101-430-4385-000 4,156.71 111931 Electric-Street Lights
101-430 Total 11,903.51
Medica 101-431 101-431-4131-000 1,084.08 111907 Health Insurance Premiums
Lincoln National Life Ins Co 101-431 101-431-4133-000 3.37 111903 Life Insurance Premiums
Lincoln National Life Ins Co 101-431 101-431-4133-000 27.28 111904 Disability Insurance Premiums
Lincoln National Life Ins Co 101-431 101-431-4133-000 3.37 111905 Life Insurance Premiums
Delta Dental of Minnesota 101-431 101-431-4134-000 66.15 111889 Dental Insurance Premiums
AmeriPride Services Inc. 101-431 101-431-4211-000 71.27 111875 Shop Towel Services
Safety Kleen Corporation Inc. 101-431 101-431-4211-000 50.42 111922 Parts Washer Solvent
Mansfield Oil Company 101-431 101-431-4212-000 4,197.34 111906 1894 Conv 87 Oct R-10
Mansfield Oil Company 101-431 101-431-4212-000 1,441.54 111906 606 Dyed 70/30 B3.5 ULS ColdPro
Mansfield Oil Company 101-431 101-431-4212-000 3,650.89 111906 1802 Conv 87 Oct R-10
Mansfield Oil Company 101-431 101-431-4212-000 2,823.06 111906 1300 Dyed 70/30 B3.5 ULS ColdPro
Auto Nation Ford White Bear Lake 101-431 101-431-4221-000 60.58 111878 #394 Hatch Lift Support
Factory Motor Parts Company 101-431 101-431-4221-000 14.20 111892 #231 U-Joint
Factory Motor Parts Company 101-431 101-431-4221-000 45.65 111892 Battery Stock Warranty Replacement Core Return
Factory Motor Parts Company 101-431 101-431-4221-000 21.15 111892 #231 Brake Light
Hydraulics Plus & Consulting 101-431 101-431-4221-000 45.64 111899 #218 Hi-Pressure Hose Parker 3000 Psi
Hydraulics Plus & Consulting 101-431 101-431-4221-000 47.65 111899 Grapple Bucket Attachment
O'Reilly Automotive Stores 101-431 101-431-4221-000 12.48 111914 Stock Oil & Air Filter
O'Reilly Automotive Stores 101-431 101-431-4221-000 15.99 111914 #508 Nite Shade
Silver Star Industries 101-431 101-431-4221-000 137.85 111924 #304 2016 Explorer Seat Covers
Walser Polar Chevrolet 101-431 101-431-4221-000 155.32 111929 #231 Mirror
Winnick Supply Inc. 101-431 101-431-4221-000 97.80 111930 #508 4" Split Ring Hanger
Ziegler Inc. 101-431 101-431-4221-000 45.90 111932 #408 Cat Hydo Adv 10W
Auto Nation Ford White Bear Lake 101-431 101-431-4300-000 88.58 111878 #303 Sensors
Emergency Apparatus Maintenance 101-431 101-431-4410-000 1,026.29 111890 #609 Tanker T-21 (old 31) Service
Emergency Apparatus Maintenance 101-431 101-431-4410-000 2,260.04 111890 Ladder A-11 (Old L-21) Repair
Emergency Apparatus Maintenance 101-431 101-431-4410-000 1,116.74 111890 Ladder A-11 (Old L-21) Service
Emergency Automotive Technologies 101-431 101-431-4410-000 90.00 111891 Install Customer Supplied GPS Antenna for Arbitrator
101-431 Total 18,700.63
Image Printing & Graphics Inc 101-432 101-432-4200-000 56.00 111900 Business Cards - T. Cavegn J. Waterman
Hotsy Equipment of Minnesota 101-432 101-432-4211-501 229.95 111898 Hose
Batteries Plus Bulbs 101-432 101-432-4211-503 335.20 111881 Batteries
Grainger 101-432 101-432-4211-503 73.11 111896 Room Air Cond.
Page 2
AP Checks by Account Number
03/09/2020 City Council Meeting
Vendor Fund/Dept Account Amount Check # Description
Anoka County Treasury Office 101-432 101-432-4300-500 75.00 111876 March 2020 Cac Fiber
Anoka County Treasury Office 101-432 101-432-4300-501 75.00 111876 March 2020 Cac Fiber
Anoka County Treasury Office 101-432 101-432-4300-503 75.00 111876 March 2020 Cac Fiber
TDS Metrocom MN 101-432 101-432-4321-000 245.85 111870 Phone Service
CenturyLink 101-432 101-432-4321-503 55.78 111867 Phone - Civic Complex Fire Protection Equipment
NeoFunds by Neopost 101-432 101-432-4322-000 500.00 111869 Postage Machine Postage
Xcel Energy 101-432 101-432-4381-501 396.89 111931 Electric-Fire Station #1
Xcel Energy 101-432 101-432-4381-502 1,031.50 111931 Electric-Fire Station #2
Xcel Energy 101-432 101-432-4381-503 3,850.44 111931 Electric-Civic Complex
Olson's Sewer Service Inc. 101-432 101-432-4410-000 450.00 111913 Wastewater Removal & Disposal from Holding Tank
Star Tribune 101-432 101-432-4410-500 182.00 111925 52 Week Subscription Public Works
AmeriPride Services Inc. 101-432 101-432-4410-503 259.64 111875 Mats
AmeriPride Services Inc. 101-432 101-432-4410-503 141.99 111875 Mats
Metro Sales Incorporated 101-432 101-432-4410-503 91.65 111909 Copier Maintenance Contract Ricoh MP C307
101-432 Total 8,125.00
Medica 101-450 101-450-4131-000 1,999.40 111907 Health Insurance Premiums
Lincoln National Life Ins Co 101-450 101-450-4133-000 7.19 111903 Life Insurance Premiums
Lincoln National Life Ins Co 101-450 101-450-4133-000 64.06 111904 Disability Insurance Premiums
Lincoln National Life Ins Co 101-450 101-450-4133-000 11.69 111905 Life Insurance Premiums
Delta Dental of Minnesota 101-450 101-450-4134-000 185.20 111889 Dental Insurance Premiums
Xcel Energy 101-450 101-450-4381-000 391.11 111931 Electric-Parks
101-450 Total 2,658.65
Medica 101-451 101-451-4131-000 928.06 111907 Health Insurance Premiums
Lincoln National Life Ins Co 101-451 101-451-4133-000 -1.23 111903 Life Insurance Premiums
Lincoln National Life Ins Co 101-451 101-451-4133-000 -11.57 111904 Disability Insurance Premiums
Lincoln National Life Ins Co 101-451 101-451-4133-000 3.27 111905 Life Insurance Premiums
Delta Dental of Minnesota 101-451 101-451-4134-000 59.53 111889 Dental Insurance Premiums
101-451 Total 978.06
Medica 101-461 101-461-4131-000 201.91 111907 Health Insurance Premiums
Lincoln National Life Ins Co 101-461 101-461-4133-000 0.85 111903 Life Insurance Premiums
Lincoln National Life Ins Co 101-461 101-461-4133-000 7.28 111904 Disability Insurance Premiums
Lincoln National Life Ins Co 101-461 101-461-4133-000 0.85 111905 Life Insurance Premiums
Delta Dental of Minnesota 101-461 101-461-4134-000 16.53 111889 Dental Insurance Premiums
101-461 Total 227.42
Medica 101-462 101-462-4131-000 134.61 111907 Health Insurance Premiums
Lincoln National Life Ins Co 101-462 101-462-4133-000 0.56 111903 Life Insurance Premiums
Lincoln National Life Ins Co 101-462 101-462-4133-000 4.85 111904 Disability Insurance Premiums
Lincoln National Life Ins Co 101-462 101-462-4133-000 0.56 111905 Life Insurance Premiums
Delta Dental of Minnesota 101-462 101-462-4134-000 11.03 111889 Dental Insurance Premiums
101-462 Total 151.61
Medica 101-463 101-463-4131-000 201.91 111907 Health Insurance Premiums
Lincoln National Life Ins Co 101-463 101-463-4133-000 0.84 111903 Life Insurance Premiums
Lincoln National Life Ins Co 101-463 101-463-4133-000 7.28 111904 Disability Insurance Premiums
Lincoln National Life Ins Co 101-463 101-463-4133-000 0.84 111905 Life Insurance Premiums
Delta Dental of Minnesota 101-463 101-463-4134-000 16.54 111889 Dental Insurance Premiums
Upper Cut Tree Service 101-463 101-463-4410-000 2,952.00 111928 Remove Trees on Clearwater Creek Dr
101-463 Total 3,179.41
Baker Tilly Municipal Advisors LLC 334-470 334-470-4300-000 3,100.00 111879 Arbitrage Calc G. O. Bond Series 2010A
334-470 Total 3,100.00
Silver Star Industries 402-431 402-431-5000-000 820.47 111924 #807 Ford F-250 Running Boards BackRack Beacon Mount Floor Mats
Silver Star Industries 402-431 402-431-5000-000 365.94 111924 #417 2020 GMC Sierra 1500 BackRack Beacon Mount Floor Mats
402-431 Total 1,186.41
Cavegn Tony 403-401 403-401-5000-000 500.00 111865 Council Technology Stipend 2020
403-401 Total 500.00
Dell Marketing LP 403-451 403-451-5000-000 147.41 111888 Dell 23 Monitor P2319H - Office Specialist
403-451 Total 147.41
Finance & Commerce Inc. 421-499 421-499-4340-133 241.35 111894 Ad for Bids 2020 Street Rehabilitation Project
421-499 Total 241.35
League of Minnesota Cities 422-499 422-499-4300-000 1,000.00 111902 MN Cities Stormwater Coalition Contributions
Rupp Anderson Squires & Waldspurger P.A. 422-499 422-499-4301-125 6,294.08 111919 November& December Legal Northeast Drainage Area Phase I Project
422-499 Total 7,294.08
Central Landscaping Inc. 601-000 601-000-3714-000 -25.00 111885 Hydrant Meter Refund
Rum River Underground Utility 601-000 601-000-3714-000 -25.00 111918 Hydrant Meter Refund
S.M.Hentges & Sons Inc. 601-000 601-000-3714-000 -25.00 111920 Hydrant Meter Refund
Page 3
AP Checks by Account Number
03/09/2020 City Council Meeting
Vendor Fund/Dept Account Amount Check # Description
Central Landscaping Inc. 601-000 601-000-3855-000 -33.73 111885 Hydrant Meter Refund
Rum River Underground Utility 601-000 601-000-3855-000 -6.92 111918 Hydrant Meter Refund
S.M.Hentges & Sons Inc. 601-000 601-000-3855-000 -176.53 111920 Hydrant Meter Refund
601-000 Total -292.18
Medica 601-494 601-494-4131-000 1,914.74 111907 Health Insurance Premiums
Lincoln National Life Ins Co 601-494 601-494-4133-000 58.82 111904 Disability Insurance Premiums
Lincoln National Life Ins Co 601-494 601-494-4133-000 7.85 111905 Life Insurance Premiums
Lincoln National Life Ins Co 601-494 601-494-4133-000 7.85 111903 Life Insurance Premiums
Delta Dental of Minnesota 601-494 601-494-4134-000 146.64 111889 Dental Insurance Premiums
Hach Company 601-494 601-494-4211-000 115.82 111897 Reagents for Water Sampling
Hach Company 601-494 601-494-4211-000 41.20 111897 Reagents for Water Sampling
Minnesota Pump Works 601-494 601-494-4211-000 3,450.92 111910 Able Hoses & Rubber Fire Hoses and Connections
Core & Main LP 601-494 601-494-4215-000 1,894.38 111887 Meters
Comcast 601-494 601-494-4321-000 167.79 111886 Phone & Internet - 1180 Birch St.
TDS Metrocom MN 601-494 601-494-4321-000 39.01 111870 Phone Service
Circle Pines Post Office 601-494 601-494-4322-000 369.84 111871 Utility Billing Postage
Safe-Fast Inc. 601-494 601-494-4370-000 5.15 111921 Uniform Allowance - T. Paulno
Xcel Energy 601-494 601-494-4381-000 3,118.67 111931 Electric-Water
Ranger Chevrolet 601-494 601-494-5000-000 47,459.01 111917 2020 GMC Sierra 250 1GT49LEY2LF214562
Silver Star Industries 601-494 601-494-5000-000 63.06 111924 Backrack Installation Hardware Kit BackRack Light Brkt
Silver Star Industries 601-494 601-494-5000-000 318.57 111924 2020 GMC Sierra 6.5 2500 BackRacks
601-494 Total 59,179.32
Medica 602-495 602-495-4131-000 1,914.76 111907 Health Insurance Premiums
Lincoln National Life Ins Co 602-495 602-495-4133-000 7.90 111903 Life Insurance Premiums
Lincoln National Life Ins Co 602-495 602-495-4133-000 7.90 111905 Life Insurance Premiums
Lincoln National Life Ins Co 602-495 602-495-4133-000 58.83 111904 Disability Insurance Premiums
Delta Dental of Minnesota 602-495 602-495-4134-000 146.64 111889 Dental Insurance Premiums
Menards - Forest Lake 602-495 602-495-4211-000 80.76 111908 Cell Core ABS Pipe Hanging Bracket Press Gauge
Circle Pines Post Office 602-495 602-495-4322-000 369.84 111871 Utility Billing Postage
Safe-Fast Inc. 602-495 602-495-4370-000 5.14 111921 Uniform Allowance - T. Paulno
Xcel Energy 602-495 602-495-4381-000 1,881.58 111931 Electric-Sewer
Silver Star Industries 602-495 602-495-5000-000 318.57 111924 2020 GMC Sierra 6.5 2500 BackRacks
Silver Star Industries 602-495 602-495-5000-000 63.06 111924 Backrack Installation Hardware Kit BackRack Light Brkt
602-495 Total 4,854.98
Central Landscaping Inc. 801-000 801-000-2301-000 400.00 111885 Hydrant Meter Refund
Rum River Underground Utility 801-000 801-000-2301-000 400.00 111918 Hydrant Meter Refund
S.M.Hentges & Sons Inc. 801-000 801-000-2301-000 400.00 111920 Hydrant Meter Refund
Paul Emmerich Construction Inc. 801-000 801-000-2318-000 3,425.00 111916 Escrow Release 2099 Cypress St
Rupp Anderson Squires & Waldspurger P.A. 801-000 801-000-2323-103 45.00 111919 November& December Legal Direct Bore
Rupp Anderson Squires & Waldspurger P.A. 801-000 801-000-2353-103 67.50 111919 November& December Legal St. Clair Estates
Rupp Anderson Squires & Waldspurger P.A. 801-000 801-000-2388-103 495.00 111919 November& December Legal Watermark
801-000 Total 5,232.50
Grand Total 198,884.25
Page 4
Electronic Funds Transfer
MN Statute 471.38 Subd. 3
Council Meeting March 9, 2020 Transfer In/(Out)
2/21/2020 Payroll #04 (133,399.00)
2/21/2020 Payroll #04 Federal Deposit (39,393.04)
2/21/2020 Payroll #04 PERA (42,698.36)
2/21/2020 Payroll #04 State (8,608.13)
2/21/2020 Payroll #04 Child Support (570.70)
2/21/2020 Payroll #04 H.S.A. Bank Pretax (3,198.32)
2/21/2020 Payroll #04 TASC Pretax (1,001.86)
2/21/2020 Payroll #04 ICMA 457 Def. Comp #301596 (4,665.00)
2/21/2020 Payroll #04 ICMA Roth IRA #706155 (635.75)
2/21/2020 Payroll #04 MSRS HCSP #98946-01 (1,695.33)
2/21/2020 Payroll #04 MSRS Def. Comp #98945-01 (3,403.00)
2/21/2020 Payroll #04 MSRS Roth IRS #98945-01 (640.00)
2/25/2020 Wire from 4M (General Acct) 650,000.00
2/28/2020 Election Payroll 2-11-20 (7,236.52)
2/28/2020 Election Payroll Federal Deposit (20.96)
CITY COUNCIL WORK SESSION
DRAFT
1
CITY OF LINO LAKES 1
MINUTES 2
3
DATE : February 24, 2020 4
TIME STARTED : 6:00 p.m. 5
TIME ENDED : 6:28 p.m. 6
MEMBERS PRESENT : Council Member Stoesz, Lyden, Ruhland 7
and Mayor Rafferty; Council Member 8
Elect Cavegn 9
MEMBERS ABSENT : None 10
11
Staff members present: City Administrator Jeff Karlson; Public Services Director Rick 12
DeGardner; City Clerk Julie Bartell 13
14
1. Schedule Date for Strategic Planning Meeting –– The meeting was set for 15
March 19, 2020 at 5:30 p.m. in the Community Room. 16
Administrator Karlson also asked the council to arrive early on March 9th to have group 17
and individual official photos taken. 18
2. Review Regular Agenda – 19
Item 5A, Contract with Northland Recreation, Inc. for Woods Edge Park 20
Playground Equipment – Public Services Director DeGardner reviewed his written 21
request to proceed with a contract to purchase the necessary equipment for this new park 22
facility. He noted that he is comfortable with the contractor as they have provided 23
services to the City in the past. 24
Council Member Lyden asked about how the playground will be surfaced and Mr. 25
DeGardner said it will be surfaced with engineered wood fiber and it will be ADA 26
accessible. 27
Council Member Lyden added that he’d find it advantageous to have a visual of what is 28
planned; he wants to see equipment that engages the children. He also asked if the 29
YMCA is partnering or planning to utilize this park and Mr. DeGardner said that the 30
YMCA has not decided to officially be a part of the park project but he expects there may 31
be some unofficial use. Council Member Lyden asked if there will be benches for 32
parents and how much sunshine the site will provide Mr. DeGardner said some trees are 33
being trimmed but the site will be quite shady; he will review the master plan at the 34
council meeting. 35
Council Member Stoesz asked if signage for this park will clearly indicate that this is a 36
Lino Lakes’ park and not a YMCA park. Mr. DeGardner responded that he will make 37
that a consideration as signage is installed. 38
CITY COUNCIL WORK SESSION
DRAFT
2
Item 5B, Sprint Spectrum L.P. Lease Agreement – Public Services Director 39
DeGardner reviewed his written report requesting authorization to enter a lease agreement 40
for the second city tower. The City recently approved an identical agreement (except for 41
location) for the other water tower. 42
NOT ON PRINTED AGENDA 43
Council Member Ruhland asked why the work session is not held in the council 44
chambers. City Clerk Bartell noted that historically the council has chosen to hold its 45
work sessions in the less formal environment of the community room; all meetings are 46
recorded and so are accessible to interested parties. 47
Council Member Stoesz suggested a discussion about not televising the advisory board 48
meetings since there is a cost involved and perhaps a less formal atmosphere would be 49
good for their discussions. Council Member Lyden remarked that there is a real need to 50
stay transparent and connect with the public; he’d have to think further on such a change. 51
The meeting was adjourned at 6:28 p.m. 52
53
These minutes were considered, corrected and approved at the regular Council meeting held on 54
March 9, 2020. 55
56
57
58
59
Julianne Bartell, City Clerk Rob Rafferty, Mayor 60
61
COUNCIL MINUTES
DRAFT
1
1
CITY OF LINO LAKES 2
MINUTES 3
4
DATE : February 24, 2020 5
TIME STARTED : 6:30 p.m. 6
TIME ENDED : 6:45 p.m. 7
MEMBERS PRESENT : Council Member Stoesz, Lyden, Ruhland, and 8
Mayor Rafferty; Councilmember Elect Cavegn 9
MEMBERS ABSENT : 10
11
Staff members present: City Administrator Jeff Karlson; Public Services Director Rick DeGardner; 12
City Clerk Julie Bartell 13
14
PUBLIC COMMENT 15
There were no comments. 16
SETTING THE AGENDA 17
The agenda was approved as presented. 18
CONSENT AGENDA 19
20
Council Member Lyden moved to approve the Consent Agenda, Items 1A through 1E, as presented. 21
Council Member Ruhland seconded the motion. Motion carried on a voice vote. 22
23
ITEM ACTION 24
Consideration of Expenditures: 25
A) February 24, 2020 (Check No. 111769 through 111864) in 26
the Amount of $805,374.21 Approved 27
B) Consider Approval of February 3, 2020 28
Work Session Minutes Approved 29
C) Consider Approval of February 10, 2020 30
Council Meeting Minutes Approved 31
D) Consider Approval of February 18, 2020 Canvassing 32
Board Minutes Approved 33
E) Consider Approval of Exempt Raffle Event for Lino 34
Lakes Elementary School PTO Approved 35
FINANCE DEPARTMENT REPORT 36
There was no report from the Finance Department. 37
ADMINISTRATION DEPARTMENT REPORT 38
There was no report from the Admininstration Department. 39
40
COUNCIL MINUTES
DRAFT
2
PUBLIC SAFETY DEPARTMENT REPORT 41
There was no report from the Public Safety Department. 42
PUBLIC SERVICES DEPARTMENT REPORT 43
5A) Consideration of Resolution No. 20-16, Approving Contract with Northland Recreation 44
Inc. for Woods Edge Park Playground Equipment – Public Services Director DeGardner 45
reviewed his written request to authorize a contract for playground equipment for the new Woods 46
Edge Park. He reviewed the location, the cost, construction award contract and the process utilized 47
to seek the contractor. The funding source was also noted. 48
Council Member Stoesz asked for a time schedule; an end of May construction time was noted by 49
staff. 50
Council Member Ruhland asked what would not be included from the master plan – Mr. DeGardner 51
noted those elements and their cost of about $45,000. 52
Mayor Rafferty suggested that individuals could visit Northpointe Park that was recently developed 53
(and Sunrise Park that was improved); at those locations you could see the work of this firm. 54
Council Member Stoesz moved to approve Resolution No. 20-16 as presented. Council Member 55
Lyden seconded the motion. Motion carried on a voice vote. 56
5B) Consideration of Resolution No. 20-17, Approving Sprint Spectrum L.P. Lease 57
Agreement – Water Tower #2 – Public Services Director DeGardner reviewed his request for 58
authorization to enter into a lease agreement with Sprint Spectrum for their equipment on Water 59
Tower #2. 60
Council Member Ruhland moved to approve Resolution No. 20-17 as presented. Council Member 61
Stoesz seconded the motion. Motion carried on a voice vote. 62
COMMUNITY DEVELOPMENT DEPARTMENT REPORT 63
64
There was no report from the Community Development Department. 65
66
UNFINISHED BUSINESS 67
68
There was no Unfinished Business. 69
70
NEW BUSINESS 71
72
There was no New Business. 73
74
COMMUNITY EVENTS 75
76
4th ANNUAL GUNS AND HOSES HOCKEY GAME – this event will be held on Thursday, 77
February 27. Contact the Public Safety Department at 651-982-2323 for more details. 78
79
80
COUNCIL MINUTES
DRAFT
3
COMMUNITY CALENDAR 81
82
Community Calendar – A Look Ahead 83
February 24, 2020 through March 9, 2020 84
85
Wednesday, February 26 6:30 pm, Council Chambers Environmental Board 86
Monday, March 2 6:00 pm, Community Room Council Work Session 87
Wednesday, March 4 6:30 pm, Council Chambers Park Board 88
Thursday, March 6 8:00 am, Community Room EDAC 89
Monday, March 9 6:30 pm, Council Chambers City Council Meeting 90
91
ADJOURN 92
93
There being no further business, Council Member Stoesz moved to adjourn at 6:45 p.m. Council 94
Member Ruhland seconded the motion. Motion carried on a voice vote. 95
96
These minutes were considered and approved at the regular Council Meeting on March 9, 2020. 97
98
99
100
101
Julianne Bartell, City Clerk Rob Rafferty, Mayor 102
103
CITY COUNCIL
AGENDA ITEM 1D
STAFF ORIGINATOR: Lisa Hogstad-Osterhues, Deputy Clerk
MEETING DATE: March 9, 2020
TOPIC: Resolution No. 20-23, Approving a Peddler License for
Edward Jones Financial – Daniel Chrzanowski
VOTE REQUIRED: 3/5
BACKGROUND
Daniel Chrzanowski, Representative from Edward Jones Financial has submitted a
peddler’s license application to the City Clerk's office. He plans to travel through Lino
Lakes’ neighborhoods going door to door offering financial services to interested
potential clients.
The City has received all the necessary forms required to issue this company
representative a license. There is a current background on file. The background
indicated no reason to deny the application.
The application and all other required information is on file in the City Clerk's office for
review.
RECOMMENDATION
Approve Resolution No. 20-23, Approving the issuance of a Peddler License for a six
month period starting April 15, 2020 through October 5, 2020.
CITY OF LINO LAKES
COUNTY OF ANOKA
RESOLUTION NO. 20-23
APPROVING A PEDDLER LICENSE FOR EDWARD JONES FINANCIAL
WHEREAS, Daniel Chrzanowski, Financial Advisors for Edward Jones Financial has
submitted a peddlers license application to the city clerk's office; and
WHEREAS, Daniel Chrzanowski has complied with all of the provisions of Chapter 613 of the
Lino Lakes City Code for obtaining the necessary license; and
WHEREAS, the Lino Lakes Public Safety Department has conducted a background check on
the company representative that will be working in Lino Lakes, Daniel Chrzanowski within the
past 12 months; and
NOW, THEREFORE, BE IT RESOLVED that the Lino Lakes City Council hereby approves
the request of Edward Jones Financial to sell services door to door for a period of six-months
beginning April 15, 2020 and ending October 15, 2020.
Adopted by the Council of the City of Lino Lakes this 9th day of March, 2020.
The motion for the adoption of the foregoing resolution was introduced by Council Member
_____________ and was duly seconded by Council Member ___________ and upon vote being
taken thereon, the following voted in favor thereof:
The following voted against same:
_____________________
Rob Rafferty, Mayor
ATTEST:
________________________
Julianne Bartell, City Clerk
CITY COUNCIL
AGENDA ITEM 3A
STAFF ORIGINATOR: Jeff Karlson, City Administrator
MEETING DATE: March 9, 2020
TOPIC: Annual Appointments
VOTE REQUIRED: 3/5
INTRODUCTION
On January 13 the City Council made its annual appointments to the various committees that
council and staff members serve on every year. One of the committee assignments left open
was the Joint Law Enforcement Council, which I suggested could be assigned to the newly-
elected councilmember.
Mayor Rafferty recently indicated he would like to serve as the City’s delegate on the Joint
Law Enforcement Council. Since there are no other committee assignments to be filled, I would
recommend councilmember-elect Tony Cavegn be considered as an alternate to the North
Metro Telecommunications Committee and/or Anoka Co. Fire Protection Council.
RECOMMENDATION
Approve appointments to vacant committee assignments.
2019 2020
1. Acting Mayor Rob Rafferty Dale Stoesz
2. Legal Newspaper Quad Community Press Quad Community Press
3. Legal Services
Barna, Guzy & Steffen
Kennedy & Graven
Rupp, Anderson, Squires, &
Waldspurger
Geck, Duea & Olson
Barna, Guzy & Steffen
Kennedy & Graven
Rupp, Anderson, Squires, &
Waldspurger
Geck, Duea & Olson
4. Labor Services
Barna, Guzy & Steffen
Riley, Dettman & Kelsy
Springsted, Inc.
Barna, Guzy & Steffen
Riley, Dettman & Kelsy
Baker Tilly
5. Fiscal Agent Springsted, Inc. Baker Tilly
6. Assessor Anoka County Anoka County
7. North Metro
Telecommunications
Committee
Dale Stoesz
Melissa Maher (Alternate)
Dale Stoesz
Tony Cavegn (Alternate) (?)
8. Vadnais Lake Watershed
District
Rob Rafferty
Rob Rafferty
9. County Corrections
Program
Michael Manthey
John Swenson
Chris Lyden
John Swenson
10. Joint Law Enforcement
Council
Michael Manthey
John Swenson
Rob Rafferty
John Swenson
11. Anoka Co. Fire Protection
Council
Jeff Reinert
Michael Manthey (Alternate)
Mike Ruhland
Tony Cavegn (Alternate) (?)
12. City Depositories
First Resource Bank
LMC 4M Fund
Wells Fargo Securities
Wells Fargo Advisors
US Bank
RBC Capital Markets
Morgan Stanley
F&M Bank
Others as needed
First Resource Bank
LMC 4M Fund
Wells Fargo Securities
Wells Fargo Advisors
US Bank
RBC Capital Markets
Moreton Capital Markets
F&M Bank
Others as needed
13. City Treasurer1 Sarah Cotton Sarah Cotton
14. City Engineer WSB & Associates WSB & Associates
15. Data Practices Officer Julie Bartell Julie Bartell
16. City Auditor Redpath & Company Redpath & Company
17. Twin Cities Gateway Jeff Karlson
Jeff Karlson
Dale Stoesz (Alternate)
18. Anoka Co./Blaine Airport
Advisory Council Dean Quimby Dean Quimby
19. Hearing Officer
John Swenson
Rick DeGardner (Alternate)
John Swenson
Rick DeGardner (Alternate)
20. Local Board of Appeal &
Equalization Training Melissa Maher
Mike Ruhland
Rob Rafferty
21. Secretarial Services TimeSaver, Inc. TimeSaver, Inc.
1The City Council delegates the authority to make electronic funds transfers to the City
Treasurer. The City Treasurer may delegate certain duties to finance staff, but shall remain
responsible for the transfer program.
CITY COUNCIL
AGENDA ITEM 5A
STAFF ORIGINATOR: Diane Hankee PE, City Engineer
MEETING DATE: March 9, 2020
TOPIC: Consider Resolution No. 20-15, Accepting bids and Awarding a
Construction Contract, Well House No. 1 Rehabilitation Project
VOTE REQUIRED: 3/5
INTRODUCTION
Staff is requesting council’s consideration to accept bids and award the construction contract
for the Well House No. 1 Rehabilitation Project.
BACKGROUND
On January 27, 2020, the City Council approved the preparation of the plans and specifications for
the Well House No. 1 Rehabilitation project. Well House No. 1 was the City’s first well house
constructed in 1970. The project includes remodeling the existing structure, adding 2 chemical
rooms, a pitched roof, plumbing, electrical, mechanical, fire protection, seepage pit and associated
improvements. The completed project will upgrade the facility to meet current environmental and
safety standards. The rehabilitated well house will provide a level of service comparable to a new
Well House reducing long term maintenance cost.
The project provides equipment upgrades and necessary repairs to the existing Well House No. 1
including:
1. The addition of separate internal fluoride and chlorine rooms (within existing well
house) and seepage pit per Minnesota Department of Health requirements.
2. Rehabilitation of existing Well House No. 1 including a new pitched shingled
roof, soffit lighting and exterior siding.
3. New exterior door and replacement of existing doors.
4. New bituminous driveway and subgrade, and expanded pavement behind the well
house for chemical delivery vehicles and well maintenance rig.
5. Replacement of existing chemical feed equipment and associated appurtenances.
6. Replacement of existing HVAC systems.
7. Building additions will be provided with mechanical systems as required to meet
the space heating load and ventilation air change rate.
8. Replacement of main switchgear and motor control center.
9. Replace existing control panel and other electrical equipment inside the well house
(i.e. lights, receptacles, switches, cable and conduit, etc.).
10. Replacement of well instrumentation, i.e. pressure transducers, prelube solenoid
valve, magnetic flow meter, door entry switches, etc.
The project was bid on March 4, 2020 and one bid was received from Municipal Builders, Inc. in
the base bid amount of $669,900.00. A bid alternate was included to do some additional exterior
concrete or asphalt paving. Staff is recommending award of the base bid only. The project is
proposed to be funded through the Water Operating Fund. The completion date for this project is
December 31, 2020.
RECOMMENDATION
Staff recommends adoption of Resolution No. 20-15, Accepting the Bid and Awarding a
Construction Contract in the amount of $669,900.00 to Municipal Builders, Inc. for the Well
House No. 1 Rehabilitation Project.
ATTACHMENTS
1. Resolution 20-15
2. Drawings
3. Bid Summary
CITY OF LINO LAKES
RESOLUTION NO. 20-15
ACCEPTING BASE BID, AWARDING A CONSTRUCTION CONTRACT, WELL
HOUSE NO. 1 REHABILITATION PROJECT
WHEREAS, pursuant to an advertisement for bids for the construction of the Well House No. 1
Rehabilitation Project, bids were received, opened and tabulated according to law, one bid was
received from Municipal Builders, Inc. in the base bid amount of $669,900.00; and
WHEREAS, it appears that Municipal Builders, Inc. is the lowest responsible bidder; and
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Lino Lakes:
1. The Mayor and Clerk are hereby authorized and directed to enter into a contract with
Municipal Builders, Inc. in the name of the City of Lino Lakes for the construction of the
Well House No. 1 Rehabilitation Project according to the plans and specifications approved
by the City Council and on file in the office of the City Clerk.
2. The City Clerk is hereby authorized and directed to return forthwith to all bidder the Bid
Bonds made with their bids, except that the deposits of the successful bidder and the next
two lowest bidders shall be retained until a contract has been signed.
Adopted by the Council of the City of Lino Lakes this 9th day of March, 2020.
The motion for the adoption of the foregoing resolution was introduced by Council Member
_______________and was duly seconded by Council Member ________________ and upon
vote being taken thereon, the following voted in favor thereof:
The following voted against same:
_______________________________
Rob Rafferty, Mayor
ATTEST:
________________________
Julianne Bartell, City Clerk
1
CITY COUNCIL
AGENDA ITEM 6B
STAFF ORIGINATOR: Diane Hankee P.E., City Engineer
Kelsey Gelhar, Project Engineer
MEETING DATE: March 9, 2020
TOPIC: Consider Resolution No. 20-21 Approving Conditional Use
Permit for Building within the Floodplain at 7020 West Shadow
Lake Drive
VOTE REQUIRED: 3/5
INTRODUCTION
Staff is requesting City Council consideration of the Conditional Use Permit for building a
single family home using alternative elevation methods at 7020 West Shadow Lake Drive.
Complete Application Date: January 13, 2020
60-Day Review Deadline: March 13, 2020
120-Day Review Deadline: May 12, 2020
Environmental Board Meeting: N/A
Park Board Meeting: N/A
Planning & Zoning Board Meeting: February 12, 2020
City Council Work Session: March 2, 2020
City Council Meeting: March 9, 2020
BACKGROUND
The applicant, Leslie Schuhbauer, is proposing to build a home at 7020 West Shadow Lake
Drive. A conditional use permit is required for building within the floodplain using alternative
elevation methods. The parcel is approximately 0.31 acres.
The Land Use Application is for the following:
• Conditional Use Permit (CUP)
o Building within floodplain using alternative elevation methods
This staff report is based on the following submittal information:
• Certificate of Survey prepared by EG Rud & Sons, Inc. dated December 11, 2019
• Certificate of Survey and Volume Calculations prepared by EG Rud & Sons, Inc. dated
December 12, 2019
2
• House Plans prepared by Croix Design & Drafting, Inc., dated November 8, 2019
• ICC-ES Evaluation Report for Smart Vent Automatic Foundation Flood Vents,
reissued February 2019
• Applicant’s Rice Creek Watershed District permit application, dated December 19,
2019
ANALYSIS
History
The parcel was created as part of the Lakes Addition No. 1 in 1969. The parcel remained
vacant since it was platted. Based on historic county aerials, the accessory structure was
constructed sometime between 2005 and 2008. Sanitary sewer and water services were
installed to the right-of-way as part of the West Shadow Lake Drive Street and Utility
Improvement Project in 2019.
Existing Site Conditions
The existing parcel contains a 150 square foot accessory structure and gravel and paved patio
areas, three trees and open grass areas. The parcel is serviced by municipal water and sanitary
sewer. West Shadow Lake Drive abuts on the north/northwest. The parcel has floodplain and
shoreland. The Ordinary High Water Level elevation is 883.77 and extends onto the site. The
FEMA Flood Elevation is 887 and extends onto the site.
Zoning and Land Use
The parcel was rezoned from R, Rural to R-1X, Single Family Executive in 2018 with
Ordinance No. 19-18 in conjunction with the West Shadow Lake Drive Street and Utility
Improvement Project.
Current Zoning R-1X, Single Family Executive
Current Land Use Single Family Residential
Future Land Use per CP Low Density Sewered Residential
Utility Staging Area 1A=2008-2015
Surrounding Zoning and Land Use
Direction Zoning Current Land Use Future Land Use
North R-1X Single Family Residential Low Density
Residential
East Reshanau Lake Lake Lake
South R-1X Single Family Residential Low Density
Residential
West R-1X Single Family Residential Low Density
Residential
3
Shoreland Management Overlay District
The parcel is located in the Shoreland Management Overlay District of Reshanau Lake. This
lake is classified as a Recreational Development Lake and has an 883.77 OHWL elevation. The
required setback from the OHWL is 75 feet for sewered lots and the maximum allowed
impervious surface area is 30% of the site area. The proposed OHWL setback is 75 feet and
the proposed impervious surface area is 30% of the site area. Both shoreland requirements are
met.
Floodplain Management
The 2015 DFIRM indicates Zone AE floodplain on the parcel. The FEMA base flood elevation
(BFE) is 887. The proposed single family home is positioned on the parcel so that it is in the
Zone AE floodplain. The lowest elevation of the proposed single family home is 885, which is
described as the assumed grade in the crawl space.
Per procedures listed under Section 1103.07(2), it has been determined the parcel is in the
Flood Fringe district. The FEMA Flood Map Service Center does not indicate that a regulatory
floodway is on the site. Due to the absence of a floodway and the presence of the BFE, the
parcel is in the Flood Fringe district.
Per Section 1103.06(3)(a) Conditional Uses, any structure that is not elevated on fill or flood
proofed in accordance with division (2)(a) Standards for flood fringe permitted uses, of this
section, requires a conditional use permit.
The proposed single family home does not meet the requirements of (2)(a) Standards for flood
fringe permitted uses, which requires that all structures, including accessory structures, must be
elevated on fill so that the lowest floor, as defined, is at or above the regulatory flood protection
elevation. The finished fill elevation for structures must be no lower than one foot below the
regulatory flood protection elevation and the fill must extend at the same elevation at least 15
feet beyond the outside limits of the structure.
Per Section 1103.06(4)(f), the Standards for Flood Fringe conditional uses:
(f) Alternative elevation methods other than the use of fill may be utilized to elevate a
structure's lowest floor above the regulatory flood protection elevation. These
alternative methods may include the use of stilts, pilings, parallel walls, etc., or
above-grade, enclosed areas such as crawl spaces or tuck under garages. The base or
floor of an enclosed area shall be considered above-grade and not a structure's
basement or lowest floor if:
1. The enclosed area is above-grade on at least one side of the structure;
The enclosed area is above-grade on at least one side of the structure as the low floor elevation
of the home is above-grade.
2. It is designed to internally flood and is constructed with flood resistant
materials; and
The crawl space is designed to internally flood through the use of flood vents and will use
materials as outlined in the building code.
4
3. It is used solely for parking of vehicles, building access or storage. The above-
noted alternative elevation methods are subject to the following additional
standards:
No other use has been designated on the floor plans or would be approved other than “crawl
space”.
a. Design and certification. The structure's design and as-built condition must
be certified by a registered professional engineer or architect as being in
compliance with the general design standards of the State Building Code
and, specifically, that all electrical, heating, ventilation, plumbing and air
conditioning equipment and other service facilities must be at or above the
regulatory flood protection elevation or be designed to prevent flood water
from entering or accumulating within these components during times of
flooding.
The design of the structure will be reviewed through the building permit process and will be
required to meet building code standards and flood proofing requirements. The furnace and hot
water heater are shown on the first floor of the home, above the flood protection elevation. The
air conditioning equipment was not shown.
b. Specific standards for above-grade, enclosed areas. Above-grade, fully
enclosed areas such as crawl spaces or tuck under garages must be designed
to internally flood and the design plans must stipulate:
i. The minimum area of openings in the walls where internal flooding is to
be used as a flood proofing technique. There shall be a minimum of two
openings on at least two sides of the structure and the bottom of all
openings shall be no higher than one foot above grade. The automatic
openings shall have a minimum net area of not less than one square inch
for every square foot of enclosed area subject to flooding unless a
registered professional engineer or architect certifies that a smaller net
area would suffice. The automatic openings may be equipped with
screens, louvers, valves, or other coverings or devices provided that they
permit the automatic entry and exit of flood waters without any form of
human intervention; and
The house plans show at least two openings on two sides of the structure. The flood vent details
and report state that the bottom of the vents shall be no more than one foot above final grade.
The ICC-ES Evaluation Report for the flood vents states that the Model 1540-520 can
accommodate 200 square foot of the enclosed space. Based on the provided plans, the enclosed
crawl space is approximately 1,636 square foot, which will require nine (9) flood vents. The
ICC-ES Evaluation Report states that the flood vents are mechanically operated and are
activated by rising water.
ii. That the enclosed area will be designed of flood resistant materials in
accordance with the FP-3 or FP-4 classifications in the State Building
Code and shall be used solely for building access, parking of vehicles or
storage.
5
No other use has been designated on the floor plans other than “crawl space”. Design will be
approved through the building permit process.
Comprehensive Plan
Resource Management System
The Resource Management System Plan goal of preserving surface water quality is supported
by regulating the amount of allowed on site impervious surfaces. The proposed 30%
impervious meets the allowed 30% Shoreland District impervious surface requirements.
Land Use Plan
The 2030 and draft 2040 Comprehensive Plan guide the parcel for low density residential
development. The proposed single family home construction is consistent with low density
residential land use.
Housing Plan
The goals and policies of the Housing Plan are not negatively impacted by the floodplain
alteration required for the construction of a single family home.
Transportation Plan
Goals of the Transportation Plan are to ensure that street and roads are as safe as possible and
to reduce unnecessary traffic. West Shadow Lake Drive is a reconstructed local street and has
capacity to accommodate one (1) new single family home.
Sanitary Sewer Plan
A goal of the sanitary sewer plan is to provide an affordable and safe sanitary sewer system.
Municipal sanitary sewer has been installed along West Shadow Lake Drive and has capacity
for the construction of one (1) new single family home.
Water Supply Plan
A goal of the water supply plan is to provide residents affordable potable water that is safe and
of high quality for daily consumption and fire demand. Municipal watermain has been
installed along West Shadow Lake Drive and has capacity for the construction of one (1) single
family home.
Planning and Zoning Board
The Planning and Zoning Board reviewed the project on February 12, 2020. The Board
requested input from the staff on the following items:
1. Is the crawl space intended to flood? Is storage allowed in the crawl space? Do the vents
open automatically? How does the water leave the crawl space?
6
Staff clarified that the crawl space is intended to flood and is to only be used for storage.
Habitable space is not allowed. Staff also clarified that the vents open automatically. The vents
are to be installed 1-foot from the bottom of the crawl space. In order to empty the crawl space
of water, pumps may need to be used. A door to the crawl space is also proposed and could be
opened when the water levels recede.
2. Is the choice using the crawl space and vent construction over the use of stilts or fill for
aesthetic purposes?
Staff clarified that the use of the crawl space instead of stilts is an aesthetic decision. The
applicant is seeking a conditional use permit in order to avoid using fill.
3. What is the crawl space floor elevation and are plantings allowed near the vents?
Staff stated that the proposed crawl space floor elevation is 885. The details for the vents and
the City Code both require the area in front of the vents to be clear. Staff did not recommend
planting any landscaping in front of the vents.
The Planning & Zoning Board held a public hearing on February 12, 2020.
The applicant, Leslie Schuhbauer, introduced herself to the Planning & Zoning Board. No other
public comments were made at the public hearing.
The Board recommended approval with a 3-0 vote with conditions as detailed in Resolution
No. 20-21.
Findings of Fact
Resolution No. 20-21 details the Conditional Use Permit Findings of Fact.
RECOMMENDATION
Staff and Planning & Zoning Board recommend approval of the Conditional Use Permit for the
proposed single family home at 7020 West Shadow Lake Drive.
ATTACHMENTS
1. Site Location & Aerial Map
2. Certificate of Survey
3. House Plans
4. Resolution No. 20-21
N
SCALE IN FEET
0 300150
Aerial Map
7020 West Shadow Lake DriveWESTSHADOW LAKE DRSAND
P
I
P
E
R
D
R
7033
7027
7021
7015
7026
7020
7006
7002
6996
6994
6988
6982
6976
6964
6987
6999656
6756556967696569636961
1
CITY OF LINO LAKES
RESOLUTION NO. 20-21
RESOLUTION APPROVING CONDITIONAL USE PERMIT FOR BUILDING
WITHIN THE FLOODPLAIN AT 7020 WEST SHADOW LAKE DRIVE
WHEREAS, the City received a land use application for a Conditional Use Permit for
building with within the floodplain at 7020 West Shadow Lake Drive and hereafter
referred to as “Development”; and
WHEREAS, the property is zoned R-1X, Single Family Executive and allows for
construction of a single family home within the floodplain using alternative elevation
methods with a conditional use permit; and
WHEREAS, the legal description of the subject property is as follows:
Lot 2, Block 4, LAKES ADDITION NO. 1, Anoka County, Minnesota.
WHEREAS, City staff has completed a review of the land use application based on the
following plans:
• Certificate of Survey prepared by EG Rud & Sons, Inc. dated December 11, 2019
• Certificate of Survey and Volume Calculations prepared by EG Rud & Sons, Inc.
dated December 12, 2019
• House Plans prepared by Croix Design & Drafting, Inc., dated November 8, 2019
• ICC-ES Evaluation Report for Smart Vent Automatic Foundation Flood Vents,
reissued February 2019
• Applicant’s Rice Creek Watershed District permit application, dated December
19, 2019; and
WHEREAS, a public hearing was held before the Planning & Zoning Board on February
12, 2020, and the Board recommended approval of the conditional use permit.
NOW, THEREFORE BE IT RESOLVED by The City Council of The City of Lino
Lakes hereby makes the following findings:
FINDINGS OF FACT
1. The proposed development application has been found to be consistent with the
policies and recommendations of the Lino Lakes Comprehensive Plan including:
a. Land Use Plan.
b. Transportation Plan.
c. Utility (Sewer and Water) Plans.
2
d. Local Water Management Plan.
e. Capital Improvement Plan.
f. Policy Plan.
g. Natural Environment Plan.
The proposed single family home with alternative elevation methods is consistent with
the Land Use, Utility, Local Water Management, Capital Improvement, Policy and
Natural Environmental Plans and recommendations of the comprehensive plan with
the required plan revisions as detailed in February 12, 2020, staff report.
2. The proposed development application is compatible with present and future land
uses of the area.
The proposed single family home with alternative elevation methods is compatible
with present and future land uses. The parcel and adjacent parcels are guided and
zoned for residential use. A single family home is consistent the residential land
uses.
3. The proposed development application conforms to performance standards herein and
other applicable City Codes.
A Site Plan Review has been completed and the proposed single family home with
alternative elevation methods will meet zoning performance standards if conditions
listed in staff report are met.
4. Traffic generated by a proposed development application is within the capabilities of
the City when:
a. If the existing level of service (LOS) outside of the proposed subdivision is A
or B, traffic generated by a proposed subdivision will not degrade the level of
service more than one grade.
b. If the existing LOS outside of the proposed subdivision is C, traffic generated
by a proposed subdivision will not degrade the level of service below C.
c. If the existing LOS outside of the proposed subdivision is D, traffic generated
by a proposed subdivision will not degrade the level of service below D.
d. The existing LOS must be D or better for all streets and intersections
providing access to the subdivision. If the existing level of service is E or F,
the subdivision developer must provide, as part of the proposed project,
improvements needed to ensure a level of service D or better.
3
e. Existing roads and intersections providing access to the subdivision must have
the structural capacity to accommodate projected traffic from the proposed
subdivision or the developer will pay to correct any structural deficiencies.
f. The traffic generated from a proposed subdivision shall not require City street
improvements that are inconsistent with the Lino Lakes Capital Improvement
Plan. However, the City may, at its discretion, consider developer-financed
improvements to correct any street deficiencies.
g. The LOS requirements in paragraphs a. to d. above do not apply to the I-
35W/Lake Drive or I-35E/Main St. interchanges. At City discretion,
interchange impacts must be evaluated in conjunction with Anoka County and
the Minnesota Dept. of Transportation, and a plan must be prepared to
determine improvements needed to resolve deficiencies. This plan must
determine traffic generated by the subdivision project, how this traffic
contributes to the total traffic, and the time frame of the improvements. The
plan also must examine financing options, including project contribution and
cost sharing among other jurisdictions and other properties, that contribute to
traffic at the interchange.
h. The City does not relinquish any rights of local determination.
The proposed single family home with alternative elevation methods does not change
the level of service along West Shadow Lake Drive. It is a local road and is capable
of handling the traffic volume proposed by the single family home.
5. The proposed development shall be served with adequate and safe water supply.
The proposed single family home with alternative elevation methods will be served by
an adequate and safe water supply. The parcel is served by a 12” municipal
watermain located along West Shadow Lake Drive.
6. The proposed development shall be served with an adequate and safe sanitary sewer
system.
The proposed single family home with alternative elevation methods will be served by
an adequate and safe sanitary sewer system. The parcel is served by a 3” municipal
force main sanitary sewer located along West Shadow Lake Drive.
7. The proposed development shall not result in the premature expenditures of City
funds on capital improvements necessary to accommodate the proposed development.
No City funds are being expended on this project.
4
8. The proposed development will not involve uses, activities, processes, materials,
equipment and conditions of operation that will be detrimental to any persons,
property, or the general welfare because of excessive production of traffic, noise,
smoke, fumes, glare, or odors.
The proposed single family home with alternative elevation methods is an allowed use
within the R-1X, Single Family Executive District with an approved conditional use
permit. The project will not generate excessive traffic, noise, smoke, fumes, glare or
odors.
9. The proposed development will not result in the destruction, loss, or damage of a
natural, scenic or historic feature of major importance.
There are no natural, scenic or historic features on the existing site.
BE IT FURTHER RESOLVED by The City Council of Lino Lakes in addition to the
administrative requirements of a conditional use permit, the following standards of
Section 1103.06(4)(f), are being met:
(f) Alternative elevation methods other than the use of fill may be utilized to
elevate a structure's lowest floor above the regulatory flood protection
elevation. These alternative methods may include the use of stilts, pilings,
parallel walls, etc., or above-grade, enclosed areas such as crawl spaces or
tuck under garages. The base or floor of an enclosed area shall be considered
above-grade and not a structure's basement or lowest floor if:
1. The enclosed area is above-grade on at least one side of the structure;
The enclosed area is above-grade on at least one side of the structure as the low floor
elevation of the home is above-grade.
2. It is designed to internally flood and is constructed with flood resistant
materials; and
The crawl space is designed to internally flood through the use of flood vents and will use
materials as outlined in the building code.
3. It is used solely for parking of vehicles, building access or storage. The
above-noted alternative elevation methods are subject to the following
additional standards:
No other use has been designated on the floor plans or would be approved other than
“crawl space”.
a. Design and certification. The structure's design and as-built condition
must be certified by a registered professional engineer or architect as
being in compliance with the general design standards of the State
Building Code and, specifically, that all electrical, heating, ventilation,
plumbing and air conditioning equipment and other service facilities
must be at or above the regulatory flood protection elevation or be
5
designed to prevent flood water from entering or accumulating within
these components during times of flooding.
The design of the structure will be reviewed through the building permit process and will
be required to meet building code standards and flood proofing requirements. The
furnace and hot water heater are shown on the first floor of the home, above the flood
protection elevation. The air conditioning equipment was not shown.
b. Specific standards for above-grade, enclosed areas. Above-grade, fully
enclosed areas such as crawl spaces or tuck under garages must be
designed to internally flood and the design plans must stipulate:
i. The minimum area of openings in the walls where internal
flooding is to be used as a flood proofing technique. There shall be
a minimum of two openings on at least two sides of the structure
and the bottom of all openings shall be no higher than one foot
above grade. The automatic openings shall have a minimum net
area of not less than one square inch for every square foot of
enclosed area subject to flooding unless a registered professional
engineer or architect certifies that a smaller net area would suffice.
The automatic openings may be equipped with screens, louvers,
valves, or other coverings or devices provided that they permit the
automatic entry and exit of flood waters without any form of
human intervention; and
The house plans show at least two openings on two sides of the structure. The flood vent
details and report state that the bottom of the vents shall be no more than one foot above
final grade. The ICC-ES Evaluation Report for the flood vents states that the Model
1540-520 can accommodate 200 square foot of the enclosed space. Based on the
provided plans, the enclosed crawl space is approximately 1,636 square foot, which will
require nine (9) flood vents. The ICC-ES Evaluation Report states that the flood vents are
mechanically operated and are activated by rising water.
ii. That the enclosed area will be designed of flood resistant materials
in accordance with the FP-3 or FP-4 classifications in the State
Building Code and shall be used solely for building access, parking
of vehicles or storage.
No other use has been designated on the floor plans other than “crawl space”. Design
will be approved through the building permit process.
BE IT FURTHER RESOLVED by The City Council of Lino Lakes the following
standards of Section 1103.11 (5) are also being met:
(5) General considerations. The community shall consider the following factors in
granting variances and imposing conditions on variances and conditional uses in
floodplains:
(a) The potential danger to life and property due to increased flood heights or
velocities caused by encroachments;
6
The potential danger to life and property due to increased flood heights or
velocities is mitigated through the use of the enclosed crawl space equipped with
flood vents for temporary flood storage.
(b) The danger that materials may be swept onto other lands or downstream to
the injury of others;
The danger that materials may be swept onto other lands or downstream to the
injury of others is mitigated through the use of the enclosed crawl space equipped
with flood vents for temporary flood storage.
(c) The proposed water supply and sanitation systems, if any, and the ability of
these systems to minimize the potential for disease, contamination and
unsanitary conditions;
The parcel is currently served by existing municipal watermain and sanitary
sewer. The single family home will connect to those services following current
editions of the CEAM Standards and the City of Lino Lakes Standard
Specifications.
(d) The susceptibility of any proposed use and its contents to flood damage and
the effect of such damage on the individual owner;
The proposed single family home with alternative elevation methods includes an
enclosed crawl space equipped with flood vents for temporary flood storage. The
garage slab and first floor of the single family home are above the floodplain
elevation.
(e) The importance of the services to be provided by the proposed use to the
community;
The proposed single family home with alternative elevation methods provides no
services to the community. The parcel is zoned R-1X, Single Family Executive.
(f) The requirements of the facility for a waterfront location;
The proposed single family home with alternative elevation methods meets the
requirements of a facility for a waterfront location.
(g) The availability of viable alternative locations for the proposed use that are
not subject to flooding;
There are no viable alternative locations for the proposed single family home on
the parcel. They are all subject to flooding.
(h) The compatibility of the proposed use with existing development and
development anticipated in the foreseeable future;
7
The proposed use of the existing parcel is compatible with the anticipated use of
the parcel in the future.
(i) The relationship of the proposed use to the comprehensive land use plan and
flood plain management program for the area;
The proposed use of the existing parcel is compatible with the comprehensive
land use plan and the floodplain management program for the area.
(j) The safety of access to the property in times of flood for ordinary and
emergency vehicles;
West Shadow Lake Drive provides access to the site and is above the flood
elevation. The safety of access to the property in times of flood for ordinary and
emergency vehicles will not be affected by the construction of the proposed single
family home.
(k) The expected heights, velocity, duration, rate of rise and sediment transport
of the flood waters expected at the site.
The expected heights, velocity, duration, rate of rise, and sediment transport of
the flood waters are not expected to be affected due to the construction of the
proposed single family home.
BE IT FURTHER RESOLVED by The City Council of the City of Lino Lakes hereby
approves the conditional use permit for building within the floodplain at 7020 West
Shadow Lake Drive subject to the following conditions:
1. The applicant shall not modify the municipal watermain and sanitary sewer that
provides service to the parcel. No floodwater may be pumped into the sanitary
sewer system.
2. The flood vents are not to be removed or blocked. The flood vents must be
constructed to the manufacturer’s standards. Landscaping may not block the
vents.
3. If in the future additional square footage is added to the single family home or
accessory structures are added to the parcel, additional floodplain management
mitigation will be required.
4. Flood-proofing measures, in accordance with the State Building Code and this
chapter must be reviewed during the building permit process. The applicant must
submit a plan or document certified by a registered professional engineer or
architect that the flood-proofing measures are consistent with the regulatory flood
protection elevation, the local water management plan and associated flood
factors for that particular area.
8
5. The applicant shall enter into a Non-Conversion Agreement, which shall stay with
the parcel, and shall state that the crawl space shall not be used for uses other than
storage and temporary flooding and that the flood vents shall not be modified in
such a way that will decrease their capacity. The City of Lino Lakes and the Rice
Creek Watershed District reserve the right to enter the property to perform annual
inspections as required by the Non-Conversion Agreement.
6. No impervious surface may be installed under the proposed deck.
BE IT FURTHER RESOLVED by the City Council of the City of Lino Lakes hereby
approves the conditional use permit subject to the following items being addressed prior
to issuance of a building permit:
1. On the Certificate of Survey prepared by E.G. Rud & Sons, Inc., dated December
11, 2019:
a. Label the existing contours.
b. Clearly show the Ordinary High Water Level.
c. Clearly show the FEMA Floodplain Elevation.
2. Include a legend for the blue and red volumes shown on the Certificate of Survey
prepared by E.G. Rud & Sons that includes the Volume Calculations dated
December 12, 2019.
3. Provide square footage of the crawl space and verify that eight flood vents are
enough to service this space. The ICC-ES Evaluation Report claims that the
Model 1540-520 Flood Vent is capable of providing flood mitigation for 200
square feet per properly installed flood vent.
4. A building permit shall be submitted and approved by the Building Department.
Adopted by the Council of the City of Lino Lakes this 9th day of March, 2020.
The motion for the adoption of the foregoing resolution was introduced by Council
Member_______________ and was duly seconded by Council Member
________________ and upon vote being taken thereon, the following voted in favor
thereof:
The following voted against same:
______________________________
Rob Rafferty, Mayor
ATTEST:
________________________
Julianne Bartell, City Clerk
CITY COUNCIL
AGENDA ITEM 6C
STAFF ORIGINATOR: Diane Hankee PE, City Engineer
MEETING DATE: March 9, 2020
TOPIC: Consider Resolution No. 20-19, Approving Bidding Policy
VOTE REQUIRED: 3/5
INTRODUCTION
Staff is requesting council approval of the Bidding Policy.
BACKGROUND
Minnesota State Statute 471.345 (Uniform Municipal Contracting Act) allows cities to receive
bids electronically, but does not provide clear guidance on the electronic bidding process. The
City of Lino Lakes Community Development Department has bid projects using electronic
bidding procedures and would like to continue to use electronic bidding because of the benefits
to both the city and the contractors bidding the projects. Electronic bidding assures complete
bids, assures accuracy in total costs, and provides efficient means for creating bid tabulations.
Contractors can update their bids at any point before the bid opening and they do not need to be
present at the bid opening.
The Bidding Policy details how the electronic bidding process would be implemented while
also maintaining language about traditional sealed bidding processes for paper submissions.
The City’s Attorney has reviewed and approved the Bid Policy.
RECOMMENDATION
Staff is recommending approval of Resolution No. 20-19 for the Bidding Policy.
ATTACHMENTS
1. Resolution 20-19
2. Bidding Policy
CITY OF LINO LAKES
RESOLUTION NO. 20-19
APPROVING BIDDING POLICY
WHEREAS, the City of Lino Lakes is proposing to implement the Bidding Policy used for
competitive sealed bidding and electronic bidding processes; and
WHEREAS, the Bidding Policy is compliant with all Minnesota State Statutes regarding
competitive bidding procedures; and
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Lino Lakes
approves the Bidding Policy.
Adopted by the Council of the City of Lino Lakes this 9th day of March 2020.
The motion for the adoption of the foregoing resolution was introduced by Council Member
_______________and was duly seconded by Council Member ________________ and upon
vote being taken thereon, the following voted in favor thereof:
The following voted against same:
_______________________________
Rob Rafferty, Mayor
ATTEST:
________________________
Julianne Bartell, City Clerk
Bidding Policy
Purpose:
This policy sets forth the general requirements for bidding and advertising for competitively bid
projects that are estimated to exceed $175,000. It defines and clarifies the city’s bidding process
that is established by state law, including processes specific to electronic bidding. Contracts that
involve public improvements under Minnesota Statutes, chapter 429 may have additional
requirements. The city of Lino Lakes follows Minnesota law in regard to municipal contracts,
including procedures for competitive bidding and all public contract requirements.
Procedure:
1. Approval. Projects or procurements must be either in the approved budget or require city
council authorization prior to bidding. All competitively bid contracts require city council
action awarding a contract.
2. Plans and Specifications. Prior to seeking bids, the city must prepare plans and
specifications that meet all laws and requirements. A standard contract template shall also
be used and will be modified as necessary for any given project. The plans and
specifications shall include the city's contract requirements based upon the estimated
contract amount. Bid bonds, responsible bidder, insurance, performance and payment
bonds and withholding affidavits are required for all competitively bid contracts. Other
submissions may also be necessary.
3. Advertisement for Bid. Specific language is required for the advertisement for bids. The
city's standard advertisement for bids should be used to ensure required language is
included. When using electronic bidding, the notice will clearly state that paper bids will
not be accepted and it will further specify the form and manner required for all electronic
submissions. Contact the city engineer for assistance with generating an advertisement for
bids if necessary. Projects estimated to exceed $175,000 require publication in the city's
official newspaper or a recognized industry trade journal at least ten days prior to the last
day for submission of the bids. Projects estimated to exceed $350,000 require publication
in the city's official newspaper and a recognized industry trade journal at least three weeks
prior to the last day for submission of the bids. An affidavit of publication is required from
each entity that published an advertisement. Minnesota Statutes, section 331A.03
authorizes the city to replace publication in the city’s official newspaper with dissemination
on the city’s website; provided, however, that the city follows the procedural requirements
contained in said statute.
4. Bid Requirements. Required documents from the bidders may include but are not limited
to a bid bond, bid form containing responsible contractor language, human rights
certification, and affidavit of non-collusion. All paper bids must be sealed and identified
on the outside wrapper. When using electronic bidding, staff shall ensure that the bidding
website has the functionality to facilitate submission of all required information and
documents to comply with all state bidding laws.
5. Bid Opening. The bid opening will take place in a conference room, council chambers, or
other public place where any person present may observe. Two city staff or agents will be
present when the bid time expires. All bids shall be opened or, in the case of electronic
bids, viewed online, acknowledged and read aloud. Bid results will become available after
this process is complete; provided, however, that only the name of the bidder and the dollar
amount specified is public information until after the city council awards a contract. For
electronic bids, all bid submittals and documents for the winning contractor, including the
bid tabulation and abstract, shall be scanned and retained.
6. After Bid Opening. Bids should be evaluated to determine the responsibility of the bidder.
If a contract is awarded, it must be awarded to the lowest responsible bidder. The City has
the right to reject all bids. If city staff determines the lowest bidder is not the lowest
responsible bidder, the city attorney shall be contacted for consultation and justification
prior to recommendation and action by the city council. Once a contract is awarded, a
signed contract, certificate of insurance, performance bond, payment bond, and any other
items required by the city shall be provided before a notice to proceed is issued.
7. All bid submissions and documents, including those submitted electronically, shall be
retained in accordance with the city’s record retention schedule.
Policy Approval: City Council approved on March 9, 2020.
CITY COUNCIL
AGENDA ITEM 6D
STAFF ORIGINATOR: Diane Hankee PE, City Engineer
MEETING DATE: March 9, 2020
TOPIC: Consider Resolution No. 20-13, Accepting bids, Awarding a
Construction Contract, and Approving the Construction Services
Contract, East Cedar Street & 24th Avenue/Elmcrest Avenue
North Improvement Project
VOTE REQUIRED: 3/5
INTRODUCTION
Staff is requesting council’s consideration to accept bids, award a construction contract, and
approve a construction services contract for the East Cedar Street & 24th Avenue/Elmcrest
Avenue North Improvement Project.
BACKGROUND
Last year, the City entered into a Joint Powers Agreement (JPA) with the City of Hugo for cost
sharing of the East Cedar Street & 24th Avenue/Elmcrest Avenue North Improvement Project. The
project includes paving 24th Avenue/Elmcrest Avenue from Tart Lake Road to the south a distance
of 2,300 feet, and East Cedar Street from Otter Lake Road to the east a distance of 2,600 feet. As
outlined in the JPA the East Cedar Street improvements are the financial responsibility of the City
of Lino Lakes and the 24th Avenue/Elmcrest Avenue improvements are the financial responsibility
of the City of Hugo.
On June 10, 2019, the City Council ordered the project, approved the plans and specifications and
authorized the advertisement for bidding. Bids were received for the project in August of 2019.
Both the City of Hugo and Lino Lakes passed Resolutions to reject bids and amended the JPA to
rebid the project early in 2020 for construction in 2020.
After the first amendment was passed, the City of Hugo received indications that there may be
development interest on a parcel adjacent to Elmcrest Avenue. A bid alternate for the extension of
sanitary sewer and watermain was included in the plans through a second amendment to the JPA.
The second amendment outlines that associated costs would be the responsibility of the City of
Hugo.
On December 9, 2019, the City Council authorized the rebidding. Bids were received on Tuesday,
January 28, 2020. A total of six bids were received. Below is a table of Grand Total Bids
received:
CONTRACTOR TOTAL BASE BID TOTAL BID + ALTERNATE 1
North Valley, Inc $700,636.80 $1,169,180.14
Northwest $825,906.83 $1,253,547.98
T.A. Schifsky & Sons, Inc. $819,599.96 $1,275,054.00
Meyer Contracting, Inc. $968,304.25 $1,301,690.81
Park Construction Company $906,917.31 $1,367,307.25
Dresel Contracting, Inc. $865,636.67 $1,437,206.84
The low bid was submitted by North Valley, Inc, in the amount of $700,636.80 for the base bid,
and $1,169,180.14 for the base bid and the bid alternate. The previous bid from August of 2019
that was rejected was in the amount of $777,551.60.
The City of Hugo is in support of completing the paving project, however they have decided
not move forward with sanitary sewer and water installation (Alternate Bid 1). Their
Resolution will be considered on March 2nd, 2020.
The City Lino Lake’s share of the construction costs is $494,350.74, and the City of Hugo’s
share of the construction cost is $206,286.07. The Lino Lake’s total project cost including soft cost
and contingency is equal to $624,000. Funding for the project is proposed through the arterial
street reconstruction fund (from special assessments for Cedar Street collected from abutting
developments) in the amount of $247,500. State aid will fund the remaining $376,500 of
project costs.
The completion date for this project is November, 2020.
WSB and Associates has submitted a proposal to complete the construction services for the
East Cedar Street & 24th Avenue/Elmcrest Avenue North Improvement Project in the amount
of $58,502. Note this cost shared with the City of Hugo as outlined in the JPA.
RECOMMENDATION
Staff recommends adoption of Resolution No. 20-13, Accepting the Bid and Awarding a
Construction Contract in the amount of $700,636.80 to North Valley, Inc, for the base bid and
Approving the Construction Services Contract with WSB for the East Cedar Street & 24th
Avenue/Elmcrest Avenue North Improvement Project, in the amount of $58,502.
ATTACHMENTS
1. Resolution 20-13
2. Bid Tabulation
3. WSB Proposal
CITY OF LINO LAKES
RESOLUTION NO. 20-13
RESOLUTION ACCEPTING BASE BID, AWARDING A CONSTRUCTION CONTRACT,
AND APPROVING THE CONSTRUCTION SERVICES CONTRACT, EAST CEDAR
STREET & 24TH AVENUE/ELMCREST AVENUE NORTH IMPROVEMENT PROJECT
WHEREAS, pursuant to an advertisement for bids for the construction of the East Cedar Street &
24th Avenue/Elmcrest Avenue North Improvement Project, bids were received, opened and
tabulated according to law, and the following bids were received complying with the advertisement;
and
CONTRACTOR TOTAL BASE BID TOTAL BID + ALTERNATE 1
North Valley, Inc $700,636.80 $1,169,180.14
Northwest $825,906.83 $1,253,547.98
T.A. Schifsky & Sons, Inc. $819,599.96 $1,275,054.00
Meyer Contracting, Inc. $968,304.25 $1,301,690.81
Park Construction Company $906,917.31 $1,367,307.25
Dresel Contracting, Inc. $865,636.67 $1,437,206.84
WHEREAS, it appears that North Valley, Inc, is the lowest responsible bidder; and
WHEREAS, The Base Bid is deemed acceptable to the City of Hugo, and the City of Hugo
recommends that Lino Lakes enter into a contract with said bidder for the construction of said
improvements for and on behalf of the City of Hugo for the base bid only.
WHEREAS, the City Council finds that it would be in the best interests of the city to proceed with
the construction oversight and administration,
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Lino Lakes:
1. The Mayor and Clerk are hereby authorized and directed to enter into a contract with North
Valley, Inc, in the amount of $700,636.80 by the name of the City of Lino Lakes for the
Base Bid construction of the East Cedar Street & 24th Avenue/Elmcrest Avenue North
Improvement Project according to the plans and specifications approved by the City
Council and on file in the office of the City Clerk.
NOW, THEREFORE, BE IT FURTHER RESOLVED,
1. The Mayor and Clerk are hereby authorized and directed to enter into a contract with WSB,
in the name of the City of Lino Lakes for the construction services of the East Cedar Street
& 24th Avenue/Elmcrest Avenue North Improvement Project in the amount of $58,502.
2. The City Clerk is hereby authorized and directed to return forthwith to all bidder the Bid
Bonds made with their bids, except that the deposits of the successful bidder and the next
two lowest bidders shall be retained until a contract has been signed.
Adopted by the Council of the City of Lino Lakes this 9th day of March, 2020.
The motion for the adoption of the foregoing resolution was introduced by Council Member
_______________and was duly seconded by Council Member ________________ and upon
vote being taken thereon, the following voted in favor thereof:
The following voted against same:
_______________________________
Rob Rafferty, Mayor
ATTEST:
________________________
Julianne Bartell, City Clerk
PROJECT:
OWNER:
City of Lino Lakes
WSB PROJECT NO.:
013907-000
Bids Opened: Tuesday, January 28, 2020, at 11:00 am
Contractor
Bid Security
(5%)
Total Base Bid
(A, B & C)
Alternate 1
(Schedule D)
TOTAL BID
(Schedules
A, B, C & D)
1 North Valley, Inc X
$700,636.80 $468,543.34 $1,169,180.14
2 Northwest X
$825,906.83 $427,641.15 $1,253,547.98
3 T.A. Schifsky & Sons, Inc. X
$819,599.96 $455,454.04 $1,275,054.00
4 Meyer Contracting, Inc. X
$968,304.25 $333,386.56 $1,301,690.81
5 Park Construction Company X
$906,917.31 $460,389.94 $1,367,307.25
6 Dresel Contracting, Inc. X
$865,636.67 $571,570.17 $1,437,206.84
Engineer's Opinion of Cost $733,757.20 $436,131.15 $1,169,888.35
Denotes corrected figure
East Cedar Street & 24th Avenue/Elmcrest Avenue
North Improvement Project
BID TABULATION SUMMARY
Paul Hornby, PE Project Manager
I hereby certify that this is a true and correct tabulation of the bids as received on January 28, 2020.
K:\013907-000\Admin\Construction Admin\013907-000 Bid Summary
S:\Community Development\Projects\Capital Improvement Projects\2019 Cedar Street East 24th Ave and Elmcrest\Staff Reports\20200309 CC Award Project &
Const Services\4. 20200303 Construction Services Proposal.docx 178 E 9TH STREET | SUITE 200 | SAINT PAUL, MN | 55101 | 651.286.8450 | WSBENG.COM February 27, 2020
Mr. Michael Grochala
Community Development Director
City of Lino Lakes
600 Town Center Parkway
Lino Lakes, MN 55014
Re: Proposal for Construction Services for the East Cedar Street and 24th Avenue/Elmcrest
Avenue North Improvement Project
WSB Project No. R-013907-000
Dear Mr. Grochala:
WSB & Associates, Inc. is pleased to present to you this proposal for construction services
associated with the City’s East Cedar Street and 24th Avenue/Elmcrest Avenue North
Improvement Project.
The City of Lino Lakes is requesting assistance with construction inspection, materials testing and
contract administration services of the East Cedar Street and 24th Avenue/Elmcrest Avenue North
Improvement Project.
Project Understanding
The East Cedar Street & 24th Avenue/Elmcrest Avenue North Improvement project includes paving
24th Avenue/Elmcrest Avenue from Tart Lake Road to the south a distance of approximately
2,300 feet, and East Cedar Street from Otter Lake Road to the east a distance of approximately
2,600 feet. The East Cedar Street Improvement Project includes the reclamation of the existing
paved section from Otter Lake Road east approximately 1,300 feet and paving the gravel section
of Cedar from approximately 1,300 feet east to the City of Hugo border.
Scope of Engineering Services
WSB is pleased to provide professional construction engineering services for the East Cedar
Street and 24th Avenue/Elmcrest Avenue North Improvement Project including contract
administration, construction observation, materials testing, construction staking, and public
involvement/communications. Below is a detailed description of the engineering services and
WSB’s proposed approach.
I. Construction Services
a. Project Management/Contract Administration
Contract Administration includes holding meetings with the contractor & City of Lino
Lakes (preconstruction & weekly construction), processing monthly quantities for pay
vouchers, and communicating with residents on a regular basis.
b. Construction Observation
WSB will provide an experienced engineering specialist whose responsibilities will
include communicating with the Contactor as an agent of the City, calculating and
keeping track of daily construction quantities and costs, contact and meet with
Mr. Michael Grochala
February 27, 2020
Page 2
S:\Community Development\Projects\Capital Improvement Projects\2019 Cedar Street East 24th Ave and Elmcrest\Staff Reports\20200309 CC Award Project &
Const Services\4. 20200303 Construction Services Proposal.docx
residents as necessary, and work with the Contractor to assist with a quality
constructed product.
c. Materials Testing
WSB will provide materials testing meeting the City standards for construction.
d. Construction Staking (Survey)
WSB will provide Surveying staff as necessary to provide field staking for necessary
roadway centerlines, elevations, and any necessary curbing or structure related
information.
Proposed Fee
A copy of the project task hour budget is attached for your reference. Based on the proposed
task hour budget, WSB will complete the scope of work the project discussed herein on hourly
basis for a not-to-exceed amount of $58,502.00. Tasks not shown are considered outside of the
scope of services. If additional work is necessary, we will prepare a detailed scope of work and
include it as an addendum to this agreement. We will not proceed with any additional work until
the addendum is authorized by both parties.
This letter represents our complete understanding of the City’s East Cedar Street and 24th
Avenue/Elmcrest Avenue North Improvement Project proposed scope of services. If you are in
agreement with the scope of services and proposed fee, please sign in the appropriate space
below and return one copy to us.
If you have any questions, please feel free to call me at 763-287-7218
Sincerely,
Edward C. Youngquist
Project Manager
Attachments
CITY COUNCIL
AGENDA ITEM 6E
STAFF ORIGINATOR: Diane Hankee, City Engineer
MEETING DATE: March 9, 2020
TOPIC: Consider Resolution No. 20-14, Accepting Quotes and Awarding a
Construction Contract, Sanitary Sewer to Water Tower No. 3
VOTE REQUIRED: 3/5 Vote Required
INTRODUCTION
Staff is requesting authorization to accept quotes and award the construction contract for the
sanitary sewer to Water Tower No. 3.
BACKGROUND
The work includes extending sanitary sewer from the Fire Station No. 2 site to the Water Tower
No. 3 site. Construction of this project is to occur with the Water Tower No. 3 improvement
project. The Water Tower No. 3 operations include a chlorine residual discharge, small amount,
which Minnesota Department of Health (MDH) will not allow to be discharged into an onsite
seepage pit. The MDH requires the reagents be discharged into the City’s sanitary sewer
collection system.
Quotes for the project were received on February 27th, 2020. The quotes received are as
follows:
CONTRACTOR TOTAL QUOTE
C.W. Houle $77,760.00
Kuechle Underground $96,460.01
Olsons Sewer Service $112,387.51
Geislinger and Sons $218,415.00
Forest Lake Contracting Did not bid
Dresel Contracting Did not bid
Landmark Did not bid
The low bid was submitted by C.W. Houle, Inc. of Shoreview, Minnesota, in the amount of
$77,760.00. The project is funded through the City’s trunk utility fund. The completion date for
this project is September 4, 2020.
RECOMMENDATION
Staff recommends adoption of Resolution No. 20-14 accepting quotes and awarding a construction
contract for the sanitary sewer to Water Tower No. 3, in the amount of $77,760.00 to C.W.
Houle, Inc.
ATTACHMENTS
1. Resolution No. 20-14
2. Site Location Map
CITY OF LINO LAKES
RESOLUTION NO. 20-14
RESOLUTION ACCEPTING QUOTES, AND AWARDING A CONSTRUCTION
CONTRACT, SANITARY SEWER TO WATER TOWER NO. 3
WHEREAS, pursuant to a request for quotes for the construction of the sanitary sewer to Water
Tower No. 3, quotes were received, and tabulated:
CONTRACTOR TOTAL QUOTE
C.W. Houle $77,760.00
Kuechle Underground $96,460.01
Olsons Sewer Service $112,387.51
Geislinger and Sons $218,415.00
Forest Lake Contracting Did not bid
Dresel Contracting Did not bid
Landmark Did not bid
WHEREAS, it appears that C.W. Houle, Inc. of Shoreview, Minnesota is the lowest responsible
bidder; and
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Lino Lakes that the
Mayor and Clerk are hereby authorized and directed to enter into a contract C.W. Houle, Inc. for the
construction of the sanitary sewer to Water Tower No. 3 in the amount of $77,760.00;
Adopted by the Council of the City of Lino Lakes this 9th day of March, 2020.
The motion for the adoption of the foregoing resolution was introduced by Council Member
_______________and was duly seconded by Council Member ________________ and upon
vote being taken thereon, the following voted in favor thereof:
The following voted against same:
_______________________________
Rob Rafferty, Mayor
ATTEST:
________________________
Julianne Bartell, City Clerk
CITY COUNCIL
AGENDA ITEM 6F
STAFF ORIGINATOR: Michael Grochala, Community Development Director
MEETING DATE: March 9, 2020
TOPIC: Consider Resolution No. 20-24, Approving Amended
Stipulation Agreement, NE Drainage Improvement Project.
VOTE REQUIRED: 3/5
INTRODUCTION
Staff is requesting City C ouncil approval of the Amended Stipulation Agreement with the Leibel
Property ownership group , regarding the NE Lino Lakes Drainage Area Improvement project.
BACKGROUND
In March of 2019, the City Council authorized acquisition of property by eminent domain for the
NE Drainage Improvement Project. The City continued to negotiate directly with the Leibel
ownership group throughout 2019. This process included coordinating efforts with a private
developer interested in the balance of the property. On November 20, 2019, the City Council
approved a Stipulation Agreement with the Leibel Family regarding purchase of their property.
Under the agreement, the property owners concurred with public purpose of the condemnation
and agreed to the amount of compensation, but retained the ability to seek additional
compensation if the developer acquisition was not completed. The original dates in the
agreement established a deadline for the owners and developers to enter into a Purchase
Agreement by March 1, 2020 and close on the property by April 1, 2021.
All parties have worked diligently to meet these requirements however, additional time is
needed. Accordingly, the purchase agreement deadline and the closing date are proposed to be
changed to June 1, 2020 and July 1, 2021, respectively.
The City Attorney has reviewed the proposal and is recommending approval of the agreement.
RECOMMENDATION
Staff is recommending approval of Resolution No. 20-24.
ATTACHMENTS
1. Resolution No. 20-24
2. Amended Stipulation Agreement
3. Property Acquisition Map
CITY OF LINO LAKES
RESOLUTION NO. 20-24
APPROVING AMENDED STIPULATION AGREEMENT FOR NORTHEAST LINO
LAKES DRAINAGE AREA IMPROVEMENTS
WHEREAS , the City Council authorized staff and City Attorney to make offers on the
acquisition of land for the NE Drainage Improvement project on February 25, 2019, and
WHEREAS, the City Council authorized acquisition of property by eminent domain on May 28,
2019; and
WHEREAS, the City of Council entered into a Stipulation Agreement with the Leibel Property
ownership group regarding the purchase of their property on November 20, 2019; and
WHEREAS, all parties to support amendment of the dates within said agreement.
NOW, THEREFORE BE IT RESOLVED by The City Council of The City of Lino Lakes:
1. That the amended Stipulat ion Agreement with the Leibel Property ownership group is hereby
approved and the Mayor and City Clerk are authorized to execute the agreement on behalf of
the City.
Adopted by the Council of the City of Lino Lakes this 9th day of March, 2020.
The motion for the adoption of the foregoing resolution was introduced by Council Member
_____________and was duly seconded by Council Member and
upon vote being taken thereon, the following voted in favor thereof:
The following voted against same:
_____________________
Rob Rafferty, Mayor
ATTEST:
________________________
Julianne Bartell, City Clerk
STATE OF MINNESOTA DISTRICT COURT
ANOKA COUNTY TENTH JUDICIAL DISTRICT
Case Type: 2, Condemnation
City of Lino Lakes,
Petitioner,
vs.
James W. Salo and Bernice M. Salo,
individually and as trustees of the Trust
Agreement of James W. Salo and Bernice M.
Salo dated December 17, 2013, Novation Credit
Union, Hal Leibel, Pamela Leibel, Lyn
Arvidson, Royce Arvidson, Jim Kohler,
LeeAnn Dye, Mark Dye, Colleen Dye, County
of Anoka, Rice Creek Watershed District,
Metropolitan Council, and all other persons
unknown claiming any right, title, estate,
interest, or lien in the real estate described
herein,
Respondents.
This Amended and Restated Stipulation is entered into this ____ day of March, 2020 by
and between the City of Lino Lakes (the “City”) and Hal Leibel, Pamela Leibel, Lyn
Arvidson, Royce Arvidson, Jim Kohler, LeeAnn Dye, Mark Dye, and Colleen Dye
(collectively, the “Owners”).
RECITALS
1. The Owners in the aggregate are owners of, or have an interest in, the varied
properties identified as PID Nos. 14-31-22-12-0002, 14-31-22-14-0001, 14-31-22-
11-0002, and 14-31-22-11-0001 (collectively, the “Property”).
Court File No: 02-CV-19-5586
AMENDED AND RESTATED
STIPULATION
2. The City has filed a Petition in Condemnation in Anoka County District Court,
Court File No. 02-CV-19-5586, to acquire certain property interests over the
Property.
3. A certain developer (the “Developer”) is also negotiating with Owners to directly
purchase the balance of the Property from the Owners, and the Developer and City
are coordinating their efforts and allocating matters relating to the acquisitions
between themselves.
4. The Owners and the Developer hope to enter into a purchase agreement for the
balance of the Property in the near future.
5. In light of and in anticipation of the Owners entering into the Purchase Agreement
with the Developer, the City and Owners now wish to enter into this Stipulation as
it relates to the City’s pending Petition in Condemnation.
Based on the above, the parties agree as follows:
1. The Owners concur with the necessity and public purpose for the City’s taking, as
outlined in the City’s Petition in Condemnation.
2. The Owners stipulate to the just compensation amount consistent with the City’s
appraised value of the Property, which is the amount outlined in the City’s Petition
in Condemnation: $52,000.00 for PID No. 14-31-22-14-0001 and $386,000.00 for
PID No. 14-31-22-12-0002.
3. If either (a) Owners and Developer do not enter into a Purchase Agreement on or
before June 1, 2020, or (b) the transaction contemplated by that Agreement does
not close by July 1, 2021, Owners may elect to declare this Stipulation is null and
void, and Owners may pursue an award of just compensation at a Commissioners’
Hearing in accordance with Minnesota law. Owners must notify the City of such
election in writing by delivering to City, within two weeks of the triggering event,
a notice of cancellation of this Stipulation.
4. The parties agree the electronic signatures of this Stipulation shall constitute valid,
binding signatures.
5. This Amended and Restated Stipulation replaces and supersedes that certain
Stipulation dated November 21, 2019, entered into by the parties in this matter.
OWNERS CITY OF LINO LAKES
By By
Hal Leibel Its
By By
Pamela Leibel Its
By
Lyn Arvidson
By
Royce Arvidson
By
Jim Kohler
By
LeeAnn Dye
By
Mark Dye
By
Colleen Dye
GP:4826-0634-7701 v2
LINDNER GERALD G& CYNTHIA MNELSON RICHARD D & JANET MWITTNER STACIFARMERIE HENRYLEIBEL HAL LSALO TRUSTEE BERNICE & SALO TRUSTEE JAMESLEIBEL HAL LLEIBEL HAL LLEIBEL HALLLEIBEL HAL L20TH AVE
AUDITOR'S
S
U
B
D
I
V
I
S
I
O
N
N
O
.
4
7
R
E
V
I
S
E
D
20TH AVENUE
PELTIER LAKE DRIVE
20' TEMPORARYEASEMENT229
527
405
437
493
50
168166
662884
831 27530' TEMPORARYEASEMENT-PROPOSED DRAINAGE, UTILITY ANDGREENWAY FEE ACQUISITION TOTAL AREA - 459,160 SF (10.54 AC) UPLAND - 360,514 SF (8.28 AC) WETLAND - 98,646 SF (2.26 AC)-DENOTES EXISTING WETLAND PER NWI AND WSB DELINEATION-TEMPORARY EASEMENT WEST (60,080 SF - 1.38 AC)-PERMANENT EASEMENT (71,968 SF)(1.65 AC)-TEMPORARY EASEMENT SOUTH (28,804 SF - 0.66 AC)WSB PROJECT NO.:REVISIONS
NO.DATE DESCRIPTION
13084-000SCALE:PLAN BY:DESIGN BY:CHECK BY:AS SHOWNK:\013084-000\Cad\Exhibits\13084-000 C-2019 EaseExh 05-06-19.dwg 5/13/2019 4:35:54 PM
EYPWSCALE IN FEET0H:120 240N2019 NE DRAINAGE AREA
CITY OF LINO LAKESLEIBEL HALLPARCELEXHIBITBBSTORMWATER MANAGEMENT
CITY COUNCIL
AGENDA ITEM 6G
STAFF ORIGINATOR: Michael Grochala, Community Development Director
MEETING DATE: March 9, 2020
TOPIC: Consideration of Resolution No. 20-25, Authorizing Preparation of
a Feasibility Study for Water Treatment Plant
VOTE REQUIRED: 3/5
INTRODUCTION
Staff is requesting council authorization to prepare a Feasibility Study for a Water Treatment
Plant.
BACKGROUND
In January of 2020, the City issued a Public Water Advisory regarding manganese levels in the
municipal water supply. While the City’s water supply continues to meet all Safe Drink Water
Act standards, testing by the Minnesota Department of Health (MDH) showed some of our wells
have manganese levels above MDH’s recommended health guidelines.
As part of the City’s response plan, staff has been working with engineering consultants and
MDH professionals on short, mid, and long term plans to reduce manganese levels in the
municipal water supply. One course of action is the possible construction of a Water Treatment
Plant. Staff has worked with City Engineer, WSB and Associates, to identify the necessary scope
of the study.
The study components include:
1) Evaluation of Alternative Water Supply Options to address short to mid-term needs.
2) Analyze Source Water
3) Evaluate Water Treatment Options
4) Review Potential Plant Site
5) Prepare Centralized Water Treatment Plan Preliminary Drawings
6) Evaluate future system needs and phasing
7) Study Neighborhood Impacts
8) Determine Estimated Costs
In response to City Council direction at the March 2, 2020 works session, WSB has provided a
revised proposal in the amount of $34,538.00. The Study is anticipated to be complete by June 1,
2020.
Architectural renderings are not included in this phase of the proposal, but can be provided for an
additional fee. No public outreach is included at this time. Staff would anticipate that both
architectural renderings and a public information meeting would be part of a future project
development phase.
The study will be funded through the City’s trunk water fund.
RECOMMENDATION
Staff is recommending adoption of Resolution No. 20-25 Authorizing Preparation of a Feasibility
Study for Water Treatment Plant.
ATTACHMENTS
1. Resolution No. 20-25
2. Proposal for Water Treatment Plant Feasibility Study
CITY OF LINO LAKES
RESOLUTION NO. 20-25
RESOLUTION AUTHORIZING THE PREPARATION OF A WATER TREATMENT
PLANT FEASIBILITY STUDY
WHEREAS, the City Council, is evaluating short, mid and long term options to reduce
manganese levels in the municipal water supply, and
WHEREAS, the construction of a Water Treatment Plant is a possible course of action for the
City to evaluate, and
WHEREAS, WSB and Associates, the City Engineer, has submitted a proposal to prepare the
Feasibility Study.
NOW, THEREFORE BE IT RESOLVED by The City Council of The City of Lino Lakes:
1. The Water Treatment Plant Feasibility Study is hereby ordered to determine if
the proposed improvement is necessary, cost-effective, and feasible and as to
whether it should best be made as proposed, and at the estimated cost of the
improvement.
2. WSB and Associates are directed to prepare the Feasibility Study for Water
Storage in an amount not exceed $34,538.
Adopted by the Council of the City of Lino Lakes this 9th day of March, 2020.
The motion for the adoption of the foregoing resolution was introduced by Council Member
_______________and was duly seconded by Council Member ________________ and upon
vote being taken thereon, the following voted in favor thereof:
The following voted against same:
_______________________________
Rob Rafferty, Mayor
ATTEST:
________________________
Julianne Bartell, City Clerk
178 E 9TH STREET | SUITE 200 | SAINT PAUL, MN | 55101 | 651.286.8450 | WSBENG.COM March 4, 2020
Mr. Rick DeGardner
Public Services Director
City of Lino Lakes
600 Town Center Parkway
Lino Lakes, MN 55014
Re: Proposal for Water Treatment Plant Feasibility Study
City of Lino Lakes, MN
Dear Mr. DeGardner:
We appreciate the opportunity to submit this letter proposal to the City of Lino Lakes to complete
the Water Treatment Plant Feasibility Study. The Minnesota Department of Health recently
tested the City’s manganese levels in each of the City’s wells as part of the EPA Unregulated
Contaminant Monitoring Rule 4 (UCMR4). The water quality testing data from MDH indicates that
five of the City’s six wells exceed the maximum recommended manganese level for infants (100
ppb), and three of the wells exceeds the maximum recommend manganese level for adults and
children (300 ppb). Therefore, the design and construction of a water treatment plant should be
studied to treat the high levels of manganese that exist in the City’s drinking water in addition to
treating other contaminants such as iron and ammonia. Alternative water supply options will also
be evaluated as part of this study.
I. SCOPE OF WORK
1. Alternative Water Supply Options
In lieu of constructing a water treatment plant(s) to treat the City’s existing wells,
alternative water supply options will also be evaluated. These options include:
A. Drilling new wells
B. Purchasing treated water from another community or water utility
2. Analyze Source Water
All existing water quality data for the City’s existing wells will be reviewed with respect to
primary and secondary drinking water standards as well as contaminants and emerging
contaminants. We recommend completing additional testing for any key water quality
parameters (ex. ammonia, total organic carbon, emerging contaminants, etc.) that
possibly have not been tested to date by the City. Our team will then develop a
comprehensive treatment plan that addresses all identified contaminants, ensures
regulatory compliance, and produces high quality water for the City’s customers. WSB
will also look ahead and evaluate the water quality parameters that will likely need to be
evaluated for both conventional and biological filtration for the water treatment pilot
testing to be completed in the next phase of the project. It is assumed for this study that
the City will pay for all water quality testing.
Mr. Rick DeGardner
March 4, 2020
Page 2
3. Water Treatment Options
Upon completion of the source water analysis, we will explore available water treatment
options and the recommending preferred processes for treating known and emerging
contaminants that will potentially need to be treated over the anticipated life of the water
treatment plant(s). The report will examine available treatment process options for
identified contaminants potentially needing treatment, recommend a preferred treatment
process for each identified contaminant, identify required space needs for preferred
treatment processes, provide recommendation as to the required size and preferred
location for the facility, and provide cost estimates for constructing and operating the
facility. We will study both conventional and biological filtration and present their benefits.
The iron, manganese, and ammonia in the City’s water could be treated without chlorine
and potassium permanganate with biological filtration. Biological filtration is commonly
practiced in the United States and Europe and is endorsed by the Minnesota Department
of Health (MDH) as an efficient and effective method for treating these (and other)
contaminants. The benefits of biological filtration include higher filtration rates, longer
filter runs (reduces backwash supply and wastewater volumes), savings in chemical
costs, and reduction in disinfection byproducts. The design of a conventional gravity
filtration process with detention and aeration can easily be modified to accommodate
biological filtration after the successful completion of a biological filtration study as
required by MDH.
WSB will coordinate and attend tours of existing water treatment facilities that utilize each
of the treatment methods being evaluated so that City staff have a clear understanding of
the treatment technologies and options that are available for the water treatment plant.
The analysis will include, but not be limited to, initial construction costs, long term
operational costs, the ability of each system to effectively and efficiently remove iron,
manganese, ammonia, and other contaminants from the water supply, the discharge of
the waste product, and the ability of the plant to be expanded or be modified in the future.
This will be a comprehensive review and recommendation on the “best” plant to meet the
current and future needs of the City.
4. Review Existing Site
A potential site for the proposed water treatment plant has been identified at the
southwest intersection of Birch Street and 12th Avenue South. The WSB team will visit
the proposed water treatment plant site and review the existing wetlands in the area. We
will also review the as-built drawings, easements, and existing infrastructure to determine
if the site is feasible for further consideration for the water treatment plant. Potential
contaminants and other barriers that may restrict or affect the layout of the plant at the
site will be evaluated up front during this analysis. Other factors such as ease of chemical
deliveries, access for maintenance trucks, security, stormwater retention, proximity to
water and sanitary sewer utilities, proximity to three phase-480 volt electrical power,
proximity to existing and future wells, and the potential for the City to acquire the property
will be evaluated during the preliminary design phase.
5. Centralized Water Treatment Plant Preliminary Drawing
We will design and create a footprint for a gravity filtration water treatment plant that will
be superimposed onto a conceptual site plan drawing at the southwest intersection of
Birch Street and 12th Avenue South. The water treatment plant footprint will show the
exterior dimensions of the plant and not show internal rooms or room dimensions. The
Mr. Rick DeGardner
March 4, 2020
Page 3
conceptual site plan will also show space for a future water treatment plant expansion
footprint.
6. Water Distribution System Modeling and Watermain Phasing Plan
Preliminary water distribution system modeling has indicated that a centralized water
treatment plant could initially treat Wells 1, 3, 5, and 6, and without upsizing the existing
16-inch watermain on Birch Street. The City’s maximum day water demands will
eventually exceed the hydraulic capacity of the existing 16-inch watermain on Birch
Street. If Wells 2 and 4 are left untreated and used only as peaking wells on maximum
day demands, the existing 16-inch watermain should have adequate hydraulic capacity to
convey treated water from a centralized water treatment plant for the next 10 to 15 years
based on the water demand projections in the City’s Comprehensive Plan. At that time, a
parallel 16-inch watermain will need to be constructed along Birch Street and extended
westward and eastward in phases as the capacity of the water treatment plant is
increased and possibly expanded in the future with new wells pumping to the plant.
Constructing a future plant expansion and a parallel 16-inch watermain in phases along
Birch Street will be evaluated as part of this study. The raw watermain costs to be
constructed from the City’s existing wells to the centralized water treatment plant will also
be figured-in to the estimated costs.
7. Study Neighborhood Impacts
The preliminary design report will explore potential impacts of the water treatment facility
on neighboring properties due to noise, odors, operating hours, traffic, and other
identified sources of impact and recommend a process for mitigating any identified
impacts during the final design process. Neighborhood meetings are not anticipated for
this study phase and not included in this proposal.
8. Determine Estimated Costs
The preliminary design report will include estimated construction and operating costs for
a groundwater treatment facility. Estimated costs will assume industry standard costs for
a gravity filtration water treatment plant. The report will explore and recommend “order of
magnitude” water rate revisions needed to offset future budget impacts to fund the water
treatment plant. This analysis does not replace a water rate study that should also be
completed under a separate project.
9. Report Preparation
The findings, estimated costs, and recommendations from the study will be summarized
in a report along with report figures and presented to the City Council.
10. Meetings
We will coordinate, prepare handouts, and attend up to three (3) meetings with City staff
and three (3) City Council meeting to discuss the report.
Mr. Rick DeGardner
March 4, 2020
Page 4
II. SCHEDULE AND ESTIMATED FEES
A. Project Schedule
We have estimated the time for the project to begin immediately after City authorization.
The proposed schedule includes the following milestone dates:
Task Completion Date
City Council Authorization to Proceed March 9, 2020
Complete Feasibility Study May 15, 2020
Present Feasibility Study to City Council June 1, 2020
B. Estimated Fees
Compensation for tasks shall be on an hourly basis, based on the actual hours worked
for personnel assigned to the project. We propose to perform these services for an
hourly, not-to-exceed fee of $34,538. A spreadsheet showing the estimated hours for
each task is attached to this proposal. Architectural renderings are not included in this
phase of the project but can be provided for an additional fee of $1,800 per rendering if
requested by the City. Geotechnical services are also not included in this phase of the
project. We will rely on previous soil borings to study the existing soil conditions at the
proposed site.
We will invoice the City on the basis of actual hours spent at current billing rates.
Additional services requested by the City will be invoiced on the basis of actual hours
spent at current billing rates plus the actual cost of reimbursable expenses. All services
will be invoiced monthly. Our billing rates will be adjusted on an annual basis. A detailed
list of project tasks is defined and shown on the attached task hour budget worksheet.
Tasks not shown are considered outside of the scope of services.
This letter represents our understanding of the Water Treatment Plant Feasibility Study. If you
are in agreement with the scope of services and proposed fee, please sign in the appropriate
space below and return one copy to us.
If you have any questions about this proposal, please feel free to call me at (612) 209-0140.
Sincerely,
WSB
Greg F. Johnson, PE
Director of Water/Wastewater
Cc: Michael Grochala, City of Lino Lakes
Justin Williams, City of Lino Lakes
Diane Hankee, PE, WSB
ACCEPTED BY:
City of Lino Lakes
Name
Wetland
Scientist
Task Description TBD
1.1 2 8 10 $1,344.00
1.2 1 2 3 $432.00
1.3 8 8 2 18 $2,746.00
1.4 4 1 4 9 $1,410.00
1.5 6 1 4 20 8 16 55 $7,026.00
1.6 4 1 16 21 $2,850.00
1.7 1 1 3 5 $714.00
1.8 8 1 8 17 $2,658.00
1.9 20 1 40 8 69 $9,554.00
1.10 Meetings 18 18 2 38 $5,804.00
Total Estimated Hours and Fees 72 6 111 20 8 16 2 10 245
Average Hourly Billing Rate $192 $162 $120 $150 $119 $80 $125 $94
TOTAL PROJECT COST $34,538.00
Total
Hours
Project
Manager
Jon ChristensenGreg Johnson Greg Glunz
Report preparation
Alternative water supply options
Eva Kelly
Process
Drafting
Technician
Diane Hankee
Estimate of Hours and Fees
City of Lino Lakes, Minnesota
Water Treatment Plant Feasibility Study
Estimated Hours
AdminProject Engineer Landscape
Designer
Landscape
Architect Cost
Study neighborhood impacts
Determine estimated costs
Karla Pederson
City Engineer
Shaunna Berg
Analyze source water
Water treatment options and plant tours
Review of existing site
Centralized WTP preliminary drawings
Water distribution system modeling and watermain phasing