Loading...
HomeMy WebLinkAbout04-13-2020 Council PacketEXPANDED AGENDA CITY COUNCIL AGENDA Monday, April 13, 2020 *********** City Council Meeting 6:30 p.m. Meeting to be held electronically Pursuant to MN Statute 13D.021 City Council: Mayor Rafferty, Councilmembers Cavegn, Lyden, Ruhland and Stoesz City Administrator: Jeff Karlson CITY COUNCIL MEETING, 6:30 P.M.  Call to Order and Roll Call - Councilmembers Stoesz, Lyden, Ruhland, Cavegn and Mayor Rafferty were present for the on-line meeting  Pledge of Allegiance  Open Mike / Public Comment (telephonically only) Jamie Jensen, St. Clair Estates developer, asked for assistance in finalizing his accounts with the City; Rebecca Ebnet-Desens, Anoka County Historical Society, touching base with cities to encourage documenting this unusual time for future history resource; survey link to her organization is available  Setting the Agenda: Addition or Deletion of Agenda Items The agenda was approved as presented 1. CONSENT AGENDA A) Consideration of Expenditures: i) April 13, 2020 (Check No. 112014 through 112087) in the amt of $856,701.95 B) Consider Approval of March 23, 2020 Work Session Minutes C) Consider Approval of March 23, 2020 Council Meeting Minutes D) Consider Approval of March 19, 2020 Emergency Council Meeting Minutes Action Taken: Motion by Stoesz, seconded by Lyden, to approve Consent Agenda Items 1A and 1D as presented, was adopted: Yeas, 5; Nays none 2. FINANCE DEPARTMENT REPORT No report 3. ADMINISTRATION DEPARTMENT REPORT A) Consider Resolution 20-35 Approving the LELS Local No. 299, Labor Contract for Police Officers, Karissa Bartholomew Action Taken: Motion by Ruhland, seconded by Cavegn, to approve Resolution No. 20-35 as presented, was adopted: Yeas, 5; Nays none How to Join the Meeting Phone: Dial 1 312 626 6799 Meeting ID: 229 232 543 Weblink: https://zoom.us/j/229232543 Council Agenda -2- April 13, 2020 B) Consideration of Personnel Reductions, Jeff Karlson Action Taken: Motion by Lyden, seconded by Stoesz, to approve the personnel reductions as recommended, was adopted: Yeas, 5; Nays none 4. PUBLIC SAFETY DEPARTMENT REPORT No report 5. PUBLIC SERVICES DEPARTMENT REPORT No report 6. COMMUNITY DEVELOPMENT REPORT A) 2020 Street Rehabilitation Project, Diane Hankee i. Consider Resolution No. 20-18, Accepting bids, Awarding a Construction Contract ii. Consider Resolution No. 20-33, Approving Construction Services Contract with WSB & Associates Action Taken: Motion by Stoesz, seconded by Ruhland, to approve Resolution No. 20-18 and Resolution No. 20-33 as presented, was adopted: Yeas, 5; Nays none B) Consider 2nd Reading of Ordinance No. 03-20 Amending Marketplace Planned Development Overlay (PDO) Design Guidelines Ordinance No. 03-05, Katie Larsen Action Taken: Motion by Cavegn, seconded by Lyden, to approve the 2nd Reading and adoption of Ordinance No. 03-20 as presented, was adopted: Yeas, 5; Nays none C) Consider Resolution No. 20-34, Approving Extended Working Hours for the Construction of Water Tower No. 3, Diane Hankee Action Taken: Motion by Cavegn seconded by Lyden, to approve Resolution No. 20-34 amended to allow working hours on Saturday and Sunday from 9:00 a.m. to 5:00 p.m., was adopted: Yeas, 5; Nays none D) Consider Resolution No. 20-36, Approving Joint Powers Agreement with Anoka County, Birch Street (CSAH 34) Reconstruction, Michael Grochala Action Taken: Motion by Cavegn, seconded by Lyden, to approve Resolution No. 20-36 as presented, was adopted: Yeas, 5; Nays none 7. UNFINISHED BUSINESS None 8. NEW BUSINESS None Adjournment Meeting adjourned at 7:57 p.m. Community Calendar – A Look Ahead April 13, 2020 through April 27, 2020 Council Agenda -3- April 13, 2020 The following meetings will be held on-line See agendas for information on accessing the meeting Monday, April 27 6:00 pm Council Work Session Monday, April 27 6:30 pm City Council Meeting Updated 4/10/2020 CITY COUNCIL AGENDA Monday, April 13, 2020 *********** City Council Meeting 6:30 p.m. Meeting to be held electronically Pursuant to MN Statute 13D.021 City Council: Mayor Rafferty, Councilmembers Cavegn, Lyden, Ruhland and Stoesz City Administrator: Jeff Karlson CITY COUNCIL MEETING, 6:30 P.M.  Call to Order and Roll Call  Pledge of Allegiance  Open Mike / Public Comment  Setting the Agenda: Addition or Deletion of Agenda Items 1. CONSENT AGENDA A) Consideration of Expenditures: i) April 13, 2020 (Check No. 112014 through 112087) in the amount of $856,701.95 B) Consider Approval of March 23, 2020 Work Session Minutes C) Consider Approval of March 23, 2020 Council Meeting Minutes D) Consider Approval of March 19, 2020 Emergency Council Meeting Minutes 2. FINANCE DEPARTMENT REPORT No report 3. ADMINISTRATION DEPARTMENT REPORT A) Consider Resolution 20-35 Approving the LELS Local No. 299, Labor Contract for Police Officers, Karissa Bartholomew B) Consideration of Personnel Reductions, Jeff Karlson 4. PUBLIC SAFETY DEPARTMENT REPORT No report 5. PUBLIC SERVICES DEPARTMENT REPORT No report How to Join the Meeting Phone: Dial 1 312 626 6799 Meeting ID: 229 232 543 Weblink: https://zoom.us/j/229232543 Council Agenda -2- April 13, 2020 6. COMMUNITY DEVELOPMENT REPORT A) 2020 Street Rehabilitation Project, Diane Hankee i. Consider Resolution No. 20-18, Accepting bids, Awarding a Construction Contract ii. Consider Resolution No. 20-33, Approving Construction Services Contract with WSB & Associates B) Consider 2nd Reading of Ordinance No. 03-20 Amending Marketplace Planned Development Overlay (PDO) Design Guidelines Ordinance No. 03-05, Katie Larsen *Council may vote to dispense with full reading of ordinance * Roll call vote is required for adoption of the ordinance C) Consider Resolution No. 20-34, Approving Extended Working Hours for the Construction of Water Tower No. 3, Diane Hankee D) Consider Resolution No. 20-36, Approving Joint Powers Agreement with Anoka County, Birch Street (CSAH 34) Reconstruction, Michael Grochala 7. UNFINISHED BUSINESS None 8. NEW BUSINESS None Adjournment Community Calendar – A Look Ahead April 13, 2020 through April 27, 2020 The following meetings will be held on-line See agendas for information on accessing the meeting Monday, April 27 6:00 pm Council Work Session Monday, April 27 6:30 pm City Council Meeting Expenditures April 13, 2020 Check #112014 to #112087 $856,701.95 City of Lino Lakes Activity Codes Code Description Code Description 401 Mayor/Council 817 Spring Fling 402 Administration 818 Winter Festival 403 Elections 819 Community Gardens 404 Cable TV 822 Family Corn Roast 405 Charter Administration 827 Gobbler Games 407 Finance 830 Adult Golf Lessons 414 Legal Consultants 835 Youth Skating Class 415 Economic Development 850 Golf Academy 416 Planning & Zoning 856 Youth Soccer 417 Engineering 857 Soccer Fundamentals 418 Community Development 860 Secret Shop 420 Police Protection 864 Preschool Playtime 421 Fire Protection 868 Little Goblins Party 422 Building Inspections 871 Flag Football 430 Streets 875 Snow Day 431 Fleet Management 876 Kite Day 432 Government Buildings 877 Rockin' in the Park 450 Parks 879 Movies in the Park 451 Recreation 890 Senior Programs 461 Environmental 462 Solid Waste Abatement 463 Forestry 494 Water 495 Sanitary Sewer 499 Other 802 Dodgeball Camp 806 Youth T-Ball 808 Youth Baseball Camp 810 Youth Playground 811 Youth Safety Camp 812 Youth Art Camps 814 Senior Programs/Book Club AP Checks by Account Number 04/13/2020 City Council Meeting Vendor Fund/Dept Account Amount Check # Description AFLAC 101-000 101-000-2040-000 76.34 112014 Insurance Premiums AFSCME Council #5 101-000 101-000-2040-000 514.90 112085 PR Batch 00002.04.2020 Union Dues AFSCME Central Pension Fund 101-000 101-000-2040-000 3,840.00 112015 March Central Pension Fund Delta Dental of Minnesota 101-000 101-000-2040-000 33.70 112031 Dental Insurance Premiums Fidelity Security Life Insurance Co. 101-000 101-000-2040-000 4.87 112039 April Vision Insurance Premiums International Union 101-000 101-000-2040-000 560.00 112086 PR Batch 00002.04.2020 Union Dues 49ers Law Enforcement Labor Services 101-000 101-000-2040-000 1,364.00 112087 PR Batch 00002.04.2020 Union Dues LELS Lincoln National Life Ins Co 101-000 101-000-2040-000 1.75 112058 Life Insurance Premiums Lincoln National Life Ins Co 101-000 101-000-2040-000 933.84 112058 Life Insurance Premiums Medica 101-000 101-000-2040-000 1,595.02 112017 Health Insurance Premiums NCPERS Group Life Insurance 101-000 101-000-2040-000 256.00 112018 April Life Insurance Premiums Medica 101-000 101-000-2041-000 10,660.58 112017 Health Insurance Premiums Delta Dental of Minnesota 101-000 101-000-2044-000 1,710.46 112031 Dental Insurance Premiums Fidelity Security Life Insurance Co. 101-000 101-000-2048-000 81.51 112039 April Vision Insurance Premiums Lincoln National Life Ins Co 101-000 101-000-3416-000 0.14 112058 Life Insurance Premiums Entenmann-Rovin 101-000 101-000-3730-000 114.79 112036 Uniform M. Carlson 101-000 Total 21,747.90 Nystrom Publishing Company 101-401 101-401-4343-000 2,620.15 112067 Spring & Summer City Newsletter and Park & Rec. Guide 101-401 Total 2,620.15 Medica 101-402 101-402-4131-000 538.42 112017 Health Insurance Premiums Lincoln National Life Ins Co 101-402 101-402-4133-000 8.22 112058 Life Insurance Premiums Lincoln National Life Ins Co 101-402 101-402-4133-000 95.30 112059 Disability Insurance Premiums Delta Dental of Minnesota 101-402 101-402-4134-000 176.40 112031 Dental Insurance Premiums First Advantage Occ. 101-402 101-402-4300-000 97.74 112040 Annual Enrollment Chapman Drug Tests Keystone Compensation Group 101-402 101-402-4300-000 7,000.00 112052 Phase I of Compensation Study Metropolitan Area Management Association 101-402 101-402-4330-000 25.00 112062 February 27 Luncheon J. Karlson Shred-it c/o Stericycle Inc. 101-402 101-402-4410-000 26.98 112074 Document Destruction 101-402 Total 7,968.06 Medica 101-407 101-407-4131-000 2,481.05 112017 Health Insurance Premiums Lincoln National Life Ins Co 101-407 101-407-4133-000 6.98 112058 Life Insurance Premiums Lincoln National Life Ins Co 101-407 101-407-4133-000 68.14 112059 Disability Insurance Premiums Delta Dental of Minnesota 101-407 101-407-4134-000 99.22 112031 Dental Insurance Premiums City of Roseville 101-407 101-407-4310-000 1,988.32 112029 Laserfiche Licenses P. Moonen & L. Hogstad City of Roseville 101-407 101-407-4310-000 528.00 112029 2020 Netmotion OPG-3 Inc. 101-407 101-407-4310-000 11,100.00 112068 Final Billing Online Permitting Solution for PermitWorks Metropolitan Area Management Association 101-407 101-407-4330-000 37.50 112062 February 27 Luncheon S. Cotton 101-407 Total 16,309.21 MN Metro North Tourism Board 101-415 101-415-4900-000 4,779.00 112063 February Tourism Tax 101-415 Total 4,779.00 Medica 101-416 101-416-4131-000 538.43 112017 Health Insurance Premiums Lincoln National Life Ins Co 101-416 101-416-4133-000 2.25 112058 Life Insurance Premiums Lincoln National Life Ins Co 101-416 101-416-4133-000 25.19 112059 Disability Insurance Premiums Delta Dental of Minnesota 101-416 101-416-4134-000 44.10 112031 Dental Insurance Premiums Evenson Neil 101-416 101-416-4331-000 150.00 112038 1st Quarter Planning & Zoning Board Stipend Laden Perry 101-416 101-416-4331-000 150.00 112055 1st Quarter Planning & Zoning Board Stipend Peacock Susan C. 101-416 101-416-4331-000 150.00 112069 1st Quarter Planning & Zoning Board Stipend Root Michael 101-416 101-416-4331-000 225.00 112071 1st Quarter Planning & Zoning Board Stipend Tralle Paul 101-416 101-416-4331-000 200.00 112078 1st Quarter Planning & Zoning Board Stipend 101-416 Total 1,484.97 Lincoln National Life Ins Co 101-418 101-418-4133-000 4.50 112058 Life Insurance Premiums Lincoln National Life Ins Co 101-418 101-418-4133-000 43.08 112059 Disability Insurance Premiums 101-418 Total 47.58 Medica 101-420 101-420-4131-000 21,069.13 112017 Health Insurance Premiums Lincoln National Life Ins Co 101-420 101-420-4133-000 73.23 112058 Life Insurance Premiums Lincoln National Life Ins Co 101-420 101-420-4133-000 744.91 112059 Disability Insurance Premiums Delta Dental of Minnesota 101-420 101-420-4134-000 1,082.64 112031 Dental Insurance Premiums Innovative Office Solutions LLC 101-420 101-420-4200-000 185.56 112049 Evidence Room Supplies Bound Tree Medical LLC 101-420 101-420-4211-000 509.00 112027 Purell Sanitizer Pumps Page 1 AP Checks by Account Number 04/13/2020 City Council Meeting Vendor Fund/Dept Account Amount Check # Description Aspen Mills Inc. 101-420 101-420-4370-000 20.45 112025 Uniform Allowance T. Vang Aspen Mills Inc. 101-420 101-420-4370-000 17.85 112025 Uniform Allowance W. Owens Aspen Mills Inc. 101-420 101-420-4370-000 170.40 112025 Uniform Allowance B. Strub Aspen Mills Inc. 101-420 101-420-4370-000 149.95 112025 Uniform Allowance D. Thill Aspen Mills Inc. 101-420 101-420-4370-000 159.95 112025 Uniform Allowance J. Mclntosh Aspen Mills Inc. 101-420 101-420-4370-000 20.45 112025 Uniform Allowance K. Kraemer Aspen Mills Inc. 101-420 101-420-4370-000 159.95 112025 Uniform Allowance M. DeMars Aspen Mills Inc. 101-420 101-420-4370-000 105.70 112025 CSO Uniform Z. Beddow Aspen Mills Inc. 101-420 101-420-4370-000 105.70 112025 CSO Uniform S. Bergeron Aspen Mills Inc. 101-420 101-420-4370-000 17.85 112025 Uniform Allowance W. Owens Entenmann-Rovin 101-420 101-420-4370-000 162.79 112036 Uniform Allowance B. Strub Entenmann-Rovin 101-420 101-420-4370-000 119.79 112036 Uniform Allowance S. Wagner Entenmann-Rovin 101-420 101-420-4370-000 157.80 112036 Uniform Allowance K. Kraemer Entenmann-Rovin 101-420 101-420-4370-000 153.80 112036 Uniform Allowance N. Hamman Entenmann-Rovin 101-420 101-420-4370-000 155.79 112036 Uniform Allowance C. Boehme Entenmann-Rovin 101-420 101-420-4370-000 165.79 112036 Uniform Allowance K. Leibel Entenmann-Rovin 101-420 101-420-4370-000 152.80 112036 Uniform Allowance T. Vang Entenmann-Rovin 101-420 101-420-4370-000 155.80 112036 Uniform Allowance A. Hallin Hallin Alexander 101-420 101-420-4370-000 212.50 112045 Damaged On Duty Uniform Replacement A. Hallin Streicher's Inc. 101-420 101-420-4370-000 380.94 112076 Uniform Allowance A. Hallin Xcel Energy 101-420 101-420-4381-000 3.74 112020 Electric-Police Aid Electric Corporation 101-420 101-420-4410-000 600.80 112022 Troubleshoot Lilac St. Civil Siren Shred-it c/o Stericycle Inc. 101-420 101-420-4410-000 94.64 112074 Document Destruction 101-420 Total 27,109.70 Medica 101-421 101-421-4131-000 1,313.91 112017 Health Insurance Premiums Lincoln National Life Ins Co 101-421 101-421-4133-000 4.40 112058 Life Insurance Premiums Lincoln National Life Ins Co 101-421 101-421-4133-000 50.52 112059 Disability Insurance Premiums Delta Dental of Minnesota 101-421 101-421-4134-000 63.96 112031 Dental Insurance Premiums Entenmann-Rovin 101-421 101-421-4370-000 147.80 112036 Uniform Allowance D. L'Allier Emergency Apparatus Maintenance 101-421 101-421-4410-000 265.00 112033 #620 Engine New E-11 NFPA Pump Test 101-421 Total 1,845.59 Medica 101-422 101-422-4131-000 1,680.96 112017 Health Insurance Premiums Lincoln National Life Ins Co 101-422 101-422-4133-000 7.87 112058 Life Insurance Premiums Lincoln National Life Ins Co 101-422 101-422-4133-000 70.67 112059 Disability Insurance Premiums Delta Dental of Minnesota 101-422 101-422-4134-000 88.20 112031 Dental Insurance Premiums 101-422 Total 1,847.70 Medica 101-430 101-430-4131-000 3,409.16 112017 Health Insurance Premiums Lincoln National Life Ins Co 101-430 101-430-4133-000 15.19 112058 Life Insurance Premiums Lincoln National Life Ins Co 101-430 101-430-4133-000 121.92 112059 Disability Insurance Premiums Delta Dental of Minnesota 101-430 101-430-4134-000 249.16 112031 Dental Insurance Premiums Unique Paving Materials Corporation 101-430 101-430-4224-000 1,012.50 112079 Cold Mix UPM Winter Xcel Energy 101-430 101-430-4385-000 497.49 112020 Electric-Street Lights Xcel Energy 101-430 101-430-4385-000 4,142.55 112020 Electric-Street Lights 101-430 Total 9,447.97 Medica 101-431 101-431-4131-000 1,084.08 112017 Health Insurance Premiums Lincoln National Life Ins Co 101-431 101-431-4133-000 3.37 112058 Life Insurance Premiums Lincoln National Life Ins Co 101-431 101-431-4133-000 27.28 112059 Disability Insurance Premiums Delta Dental of Minnesota 101-431 101-431-4134-000 66.15 112031 Dental Insurance Premiums AmeriPride Services Inc. 101-431 101-431-4211-000 92.56 112023 Shop Towel Services Hydraulics Plus & Consulting 101-431 101-431-4221-000 98.96 112048 #218 Coupler Threads Clamps Safelite Fulfillment Inc. 101-431 101-431-4300-000 248.41 112072 #259 Windshield Replacement Advanced Graphix Inc. 101-431 101-431-4363-000 128.00 112021 Squad #394 11-17-19 Claim #CA98346 Emergency Apparatus Maintenance 101-431 101-431-4410-000 1,157.61 112033 #620 Engine New E-11 Service 101-431 Total 2,906.42 Menards - Forest Lake 101-432 101-432-4211-500 305.27 112060 Thermostat Shelving Radar Paint Dalco Inc. 101-432 101-432-4211-503 275.19 112030 Isopropyl Alcohol Dalco Inc. 101-432 101-432-4211-503 182.92 112030 Hand Sanitizers Paper Towels Interstate Power Systems Inc. 101-432 101-432-4300-500 659.00 112050 Generator Inspection 1189 Main Page 2 AP Checks by Account Number 04/13/2020 City Council Meeting Vendor Fund/Dept Account Amount Check # Description Interstate Power Systems Inc. 101-432 101-432-4300-501 456.00 112050 Generator Inspection 7741 Lake Drive Interstate Power Systems Inc. 101-432 101-432-4300-502 585.44 112050 Generator Inspection 1710 Birch St Interstate Power Systems Inc. 101-432 101-432-4300-503 907.00 112050 Generator Inspection 600 Town Center Parkway Northern Air Corporation 101-432 101-432-4300-503 581.00 112066 Repair Controller CenturyLink 101-432 101-432-4321-503 55.78 112016 Phone - Civic Complex Fire Protection Equipment Quadient Finance USA Inc. 101-432 101-432-4322-000 500.00 112019 Postage Machine Postage Xcel Energy 101-432 101-432-4381-501 405.70 112020 Electric-Fire Station #1 Xcel Energy 101-432 101-432-4381-502 1,118.35 112020 Electric-Fire Station #2 Xcel Energy 101-432 101-432-4381-503 3,822.93 112020 Electric-Civic Complex AmeriPride Services Inc. 101-432 101-432-4410-501 172.20 112023 Mats AmeriPride Services Inc. 101-432 101-432-4410-503 314.90 112023 Mats Metro Sales Incorporated 101-432 101-432-4410-503 104.28 112061 Copier Maintenance Contract Ricoh/MP C307 101-432 Total 10,445.96 Medica 101-450 101-450-4131-000 1,999.40 112017 Health Insurance Premiums Lincoln National Life Ins Co 101-450 101-450-4133-000 16.19 112058 Life Insurance Premiums Lincoln National Life Ins Co 101-450 101-450-4133-000 134.62 112059 Disability Insurance Premiums Delta Dental of Minnesota 101-450 101-450-4134-000 185.20 112031 Dental Insurance Premiums Menards - Forest Lake 101-450 101-450-4211-000 12.84 112060 Lag Screws Gooder Clark J. 101-450 101-450-4331-000 75.00 112043 1st Quarter Park Board Stipend Haworth Abby 101-450 101-450-4331-000 75.00 112046 1st Quarter Park Board Stipend Jensen Richard 101-450 101-450-4331-000 75.00 112051 1st Quarter Park Board Stipend Levi Andrew 101-450 101-450-4331-000 75.00 112057 1st Quarter Park Board Stipend Nordlund John 101-450 101-450-4331-000 75.00 112065 1st Quarter Park Board Stipend Xcel Energy 101-450 101-450-4381-000 296.29 112020 Electric-Parks 101-450 Total 3,019.54 Medica 101-451 101-451-4131-000 928.06 112017 Health Insurance Premiums Lincoln National Life Ins Co 101-451 101-451-4133-000 7.77 112058 Life Insurance Premiums Lincoln National Life Ins Co 101-451 101-451-4133-000 67.50 112059 Disability Insurance Premiums Delta Dental of Minnesota 101-451 101-451-4134-000 59.53 112031 Dental Insurance Premiums Nystrom Publishing Company 101-451 101-451-4343-000 3,023.23 112067 Spring & Summer City Newsletter and Park & Rec. Guide 101-451 Total 4,086.09 Medica 101-461 101-461-4131-000 201.91 112017 Health Insurance Premiums Lincoln National Life Ins Co 101-461 101-461-4133-000 0.85 112058 Life Insurance Premiums Lincoln National Life Ins Co 101-461 101-461-4133-000 7.28 112059 Disability Insurance Premiums Delta Dental of Minnesota 101-461 101-461-4134-000 16.53 112031 Dental Insurance Premiums Andrzejewski Paula 101-461 101-461-4331-000 150.00 112024 1st Quarter Environmental Board Stipend Flower Eric 101-461 101-461-4331-000 75.00 112041 1st Quarter Environmental Board Stipend Holmes Shawn C. 101-461 101-461-4331-000 75.00 112047 1st Quarter Environmental Board Stipend Nelson Wendy 101-461 101-461-4331-000 75.00 112064 1st Quarter Environmental Board Stipend Schwartz Alexander P. 101-461 101-461-4331-000 150.00 112073 1st Quarter Environmental Board Stipend Sullivan John E. 101-461 101-461-4331-000 200.00 112077 1st Quarter Environmental Board Stipend 101-461 Total 951.57 Medica 101-462 101-462-4131-000 134.61 112017 Health Insurance Premiums Lincoln National Life Ins Co 101-462 101-462-4133-000 0.56 112058 Life Insurance Premiums Lincoln National Life Ins Co 101-462 101-462-4133-000 4.85 112059 Disability Insurance Premiums Delta Dental of Minnesota 101-462 101-462-4134-000 11.03 112031 Dental Insurance Premiums 101-462 Total 151.05 Medica 101-463 101-463-4131-000 201.91 112017 Health Insurance Premiums Lincoln National Life Ins Co 101-463 101-463-4133-000 0.84 112058 Life Insurance Premiums Lincoln National Life Ins Co 101-463 101-463-4133-000 7.28 112059 Disability Insurance Premiums Delta Dental of Minnesota 101-463 101-463-4134-000 16.54 112031 Dental Insurance Premiums 101-463 Total 226.57 Egge Roberta 201-000 201-000-3810-890 89.00 112032 Cancelled Senior Trip Refund Egge Roberta 201-000 201-000-3810-890 267.00 112032 Cancelled Senior Trip Refund Englund Diane 201-000 201-000-3810-890 89.00 112035 Cancelled Senior Trip Refund Glomb Fran 201-000 201-000-3810-890 75.00 112042 Cancelled Senior Trip Refund Kriz Mary 201-000 201-000-3810-890 150.00 112053 Cancelled Senior Trip Refund Kuralle Donna 201-000 201-000-3810-890 89.00 112054 Cancelled Senior Trip Refund Page 3 AP Checks by Account Number 04/13/2020 City Council Meeting Vendor Fund/Dept Account Amount Check # Description Wahl Carol 201-000 201-000-3810-890 89.00 112080 Cancelled Senior Trip Refund Warren Judy 201-000 201-000-3810-890 89.00 112081 Cancelled Senior Trip Refund Watson Frances 201-000 201-000-3810-890 89.00 112082 Cancelled Senior Trip Refund Welk Kathleen 201-000 201-000-3810-890 89.00 112083 Cancelled Senior Trip Refund 201-000 Total 1,115.00 Baycom Inc. 206-420 206-420-5000-000 15,198.00 112026 Toughbooks Docks & Desktop Ports 206-420 Total 15,198.00 Northern Air Corporation 401-432 401-432-4300-000 22,000.00 112066 Main Contract LL Police Station Phase 2 TC Northern Air Corporation 401-432 401-432-4300-000 4,500.00 112066 Main Contract LL Police Station Phase 2 TC Aid Electric Corporation 401-432 401-432-5000-000 3,168.72 112022 Remodel Locker Room 401-432 Total 29,668.72 Advanced Graphix Inc. 402-420 402-420-5000-000 445.00 112021 Squad #314 K9 Reflective Graphics Emergency Automotive Technologies 402-420 402-420-5000-000 9,153.74 112034 2019 Capital Equipment Replacement K9 #386 to #314 402-420 Total 9,598.74 Landmark Structures 406-499 406-499-4400-127 663,823.90 112056 Water Tower No. 3 406-499 Total 663,823.90 Medica 601-494 601-494-4131-000 1,914.74 112017 Health Insurance Premiums Lincoln National Life Ins Co 601-494 601-494-4133-000 59.42 112059 Disability Insurance Premiums Lincoln National Life Ins Co 601-494 601-494-4133-000 7.85 112058 Life Insurance Premiums Delta Dental of Minnesota 601-494 601-494-4134-000 146.64 112031 Dental Insurance Premiums Menards - Forest Lake 601-494 601-494-4211-000 149.84 112060 100W Led Cord 48" 32W 4100K T8 30Pk Slimline Keysafe Hach Company 601-494 601-494-4222-000 329.23 112044 Reagents for Water Sampling Circle Pines Post Office 601-494 601-494-4322-000 325.45 112084 Utility Billing Postage Circle Pines Post Office 601-494 601-494-4322-000 120.00 112028 Annual Presort Fee Renewal Xcel Energy 601-494 601-494-4381-000 2,468.25 112020 Electric-Water 601-494 Total 5,521.42 Medica 602-495 602-495-4131-000 1,914.76 112017 Health Insurance Premiums Lincoln National Life Ins Co 602-495 602-495-4133-000 59.42 112059 Disability Insurance Premiums Lincoln National Life Ins Co 602-495 602-495-4133-000 7.90 112058 Life Insurance Premiums Delta Dental of Minnesota 602-495 602-495-4134-000 146.64 112031 Dental Insurance Premiums Interstate Power Systems Inc. 602-495 602-495-4300-000 487.00 112050 Generator Inspection 7199 Stage Coach Trail Interstate Power Systems Inc. 602-495 602-495-4300-000 517.00 112050 Generator Inspection 22 E Cedar St Interstate Power Systems Inc. 602-495 602-495-4300-000 500.00 112050 Generator Inspection 6611 Lake Drive Interstate Power Systems Inc. 602-495 602-495-4300-000 335.00 112050 Generator Inspection 2028 Cypress St Interstate Power Systems Inc. 602-495 602-495-4300-000 507.00 112050 Generator Inspection 6666 Black Duck Drive Interstate Power Systems Inc. 602-495 602-495-4300-000 507.00 112050 Generator Inspection 130 Gladstone Drive Interstate Power Systems Inc. 602-495 602-495-4300-000 506.62 112050 Generator Inspection 6300 Laurene Avenue Interstate Power Systems Inc. 602-495 602-495-4300-000 497.00 112050 Generator Inspection 1473 Snow Goose Trail Ritter & Ritter Sewer Service Inc. 602-495 602-495-4300-000 1,593.75 112070 Clean Sanitary Sewer Circle Pines Post Office 602-495 602-495-4322-000 120.00 112028 Annual Presort Fee Renewal Circle Pines Post Office 602-495 602-495-4322-000 325.45 112084 Utility Billing Postage Xcel Energy 602-495 602-495-4381-000 1,962.60 112020 Electric-Sewer 602-495 Total 9,987.14 Sprint 801-000 801-000-2300-000 1,394.00 112075 Escrow Closure - Sprint Antenna - Replace Check #111850 Eternity Homes LLC 801-000 801-000-2318-000 3,400.00 112037 Escrow Release 6763 Redwood Ave 801-000 Total 4,794.00 Grand Total 856,701.95 Page 4 Electronic Funds Transfer MN Statute 471.38 Subd. 3 Council Meeting April 13, 2020 Transfer In/(Out) 3/19/2020 Wire from 4M (General Acct) 650,000.00 3/20/2020 Payroll #06 (131,320.04) 3/20/2020 Payroll #06 Federal Deposit (38,431.44) 3/20/2020 Payroll #06 PERA (43,025.77) 3/20/2020 Payroll #06 State (8,609.81) 3/20/2020 Payroll #06 Child Support (570.70) 3/20/2020 Payroll #06 H.S.A. Bank Pretax (3,158.32) 3/20/2020 Payroll #06 TASC Pretax (1,034.56) 3/20/2020 Payroll #06 ICMA 457 Def. Comp #301596 (4,665.00) 3/20/2020 Payroll #06 ICMA Roth IRA #706155 (635.75) 3/20/2020 Payroll #06 MSRS HCSP #98946-01 (1,695.33) 3/20/2020 Payroll #06 MSRS Def. Comp #98945-01 (3,103.00) 3/20/2020 Payroll #06 MSRS Roth IRS #98945-01 (640.00) 3/31/2020 Utility ACH 33,045.86 4/1/2020 Wire from 4M Fund (Gen Acct) 1,000,000.00 4/1/2020 Wire to US Bank (Debt Service Pmt Due 4/1) (237,843.75) 4/3/2020 Council Payroll (3,364.82) 4/3/2020 Council Federal Deposit (146.60) 4/3/2020 Council PERA (367.62) 4/3/2020 Council State (34.06) 4/3/2020 Payroll #07 (126,206.50) 4/3/2020 Payroll #07 Federal Deposit (37,926.00) 4/3/2020 Payroll #07 PERA (42,112.00) 4/3/2020 Payroll #07 State (8,445.04) 4/3/2020 Payroll #07 Child Support (570.70) 4/3/2020 Payroll #07 H.S.A. Bank Pretax (3,158.32) 4/3/2020 Payroll #07 TASC Pretax (809.56) 4/3/2020 Payroll #07 ICMA 457 Def. Comp #301596 (4,665.00) 4/3/2020 Payroll #07 ICMA Roth IRA #706155 (615.75) 4/3/2020 Payroll #07 MSRS HCSP #98946-01 (1,695.33) 4/3/2020 Payroll #07 MSRS Def. Comp #98945-01 (3,210.00) 4/3/2020 Payroll #07 MSRS Roth IRS #98945-01 (640.00) CITY COUNCIL WORK SESSION DRAFT 1 CITY OF LINO LAKES 1 MINUTES 2 3 DATE : March 23, 2020 4 TIME STARTED : 6:00 p.m. 5 TIME ENDED : 6:30 p.m. 6 MEMBERS PRESENT : Council Member Stoesz, Lyden, Ruhland, 7 Cavegn and Mayor Rafferty 8 MEMBERS ABSENT : None 9 Staff members present: City Administrator Jeff Karlson; Community Development 10 Director Michael Grochala; Director of Public Safety John Swenson; Finance Director 11 Sarah Cotton; City Planner Katie Larsen; and City Clerk Julie Bartell 12 13 The council meeting was held telephonically on the Go To Meeting platform and as 14 allowed by Minnesota Statutes 13D.021. 15 16 Review Regular Agenda of March 23, 2020 – 17 18 Item 1B, Minutes of March 2, 2020 City Council Work Session – Mayor Rafferty 19 requested that the minutes be corrected relative to the discussion on CSAH 34 Birch 20 Street Project Update. He would like discussion added relative to the existing condition 21 of the road section between West Shadow Drive and the s-curve. The County indicated 22 that if they proceeded with the two cul-de-sac option, they would include a mill and 23 overlay of this section as part of the project. 24 25 Item 3A, Adoption of the Pandemic Response Plan – Administrator Karlson reviewed the 26 plan, noting that it lays out staff’s response currently and intents going forward with the 27 pandemic emergency situation. 28 29 Councilmember Stoesz asked if the City is well stocked with needed consumables (i.e. gas, 30 paper products). Director Swenson said he has spoken with Public Services Director 31 DeGardner on that matter. Levels have been evaluated and that will continue. Mr. 32 Swenson added that the Public Safety Department is watching its needed stock (i.e. rubber 33 gloves, masks) and monitoring what will be needed going ahead in a fragile environment. 34 35 Mayor Rafferty asked how this plan is needed in addition to the Declaration of Emergency 36 approved by the council last week. Administrator Karlson explained that staff wishes that 37 the council see and approve this plan that provides details to carry the City’s response 38 moving forward though the emergency; the city council will be asked to approve certain 39 items along that route. Mayor Rafferty asked if it would be appropriate for the Council to 40 “accept” rather than approve the plan. Mr. Karlson said staff is requesting adoption. 41 42 The meeting was adjourned at 6:30 p.m. 43 44 CITY COUNCIL WORK SESSION DRAFT 2 These minutes were considered, corrected and approved at the regular Council meeting held on 45 April 13, 2020. 46 47 48 49 50 Julianne Bartell, City Clerk Rob Rafferty, Mayor 51 52 COUNCIL MINUTES DRAFT 1 CITY OF LINO LAKES 1 MINUTES 2 3 DATE : March 23, 2020 4 TIME STARTED : 6:30 p.m. 5 TIME ENDED : 9:00 p.m. 6 MEMBERS PRESENT : Councilmember Stoesz, Lyden, Ruhland, Cavegn 7 and Mayor Rafferty 8 MEMBERS ABSENT : 9 Staff members present: City Administrator Jeff Karlson; Community Development Director Michael 10 Grochala; Director of Public Safety John Swenson; Finance Director Sarah Cotton; City Planner 11 Katie Larsen; and City Clerk Julie Bartell 12 13 The council meeting was held telephonically on the Go To Meeting platform and as allowed by 14 Minnesota Statutes 13D.021. 15 16 PUBLIC COMMENT 17 Jamie Jensen, St. Clair Estates developer, asked for the council’s assistance in getting funds released 18 from the city. He specifically noted funds related to open space planting. He asked that the council 19 determine who is right in this matter, him or staff, and back that decision. Mayor Rafferty said he 20 would work to get the information needed to resolve the matter. 21 SETTING THE AGENDA 22 The agenda was approved as presented. 23 CONSENT AGENDA 24 Councilmember Stoesz moved to approve the Consent Agenda, Items 1A through 1C (with a 25 correction to Item 1B as discussed in the work session). Councilmember Ruhland seconded the 26 motion. Motion carried: Yeas, 5; Nays none. 27 28 ITEM ACTION 29 Consideration of Expenditures: 30 A) March 23, 2020 (Check No. 111933 through 112013) in 31 the Amount of $367,382.93. Approved 32 B) Consider Approval of March 2, 2020 33 Work Session Minutes Approved 34 C) Consider Approval of March 9, 2020 35 Council Meeting Minutes Approved 36 FINANCE DEPARTMENT REPORT 37 There was no report from the Finance Department. 38 39 COUNCIL MINUTES DRAFT 2 ADMINISTRATION DEPARTMENT REPORT 40 A) Consider Adoption of the Pandemic Response Plan – City Administrator Karlson 41 explained that staff is presenting this Plan and requesting council adoption. This document will serve 42 to guide the City through the current emergency and gives the council information on how staff 43 intends to proceed through a process of preparation and response on an escalating basis as needed. 44 He explained that department directors are preparing to escalate if necessary and the council will be 45 kept fully informed moving forward. 46 Councilmember Lyden noted that Anoka County hasn’t provided an update for a few days; he’s 47 curious about those numbers. Public Safety Director Swenson noted that the number of confirmed 48 cases in the county is currently at six. 49 Councilmember Stoesz noted, with the Declaration of Emergency approved by the council last week, 50 he is struggling with also approving this more detailed plan. He pointed out that elected officials are 51 not experts and staff has done a good job in responding to this point. He feels that staff was given 52 authority to proceed with their actions by that declaration. Administrator Karlson responded that 53 policies are generally brought to the council for approval and added that the League of Minnesota is 54 recommending that cities have a plan such as this. Mr. Karlson said it is the council’s choice as to 55 how they will approach adoption of this p lan but staff will proceed to respond. 56 Councilmember Cavagn noted that he recognizes that staff brings policy forward for council 57 consideration and they do so having done the appropriate background work. 58 Councilmember Ruhland said he concurs with Cavegn but also understands the question that has 59 arisen about expertise. 60 Councilmember Lyden asked if how the council should act is a question of legal authority? 61 Administrator Karlson said he hasn’t spoken to the City Attorney on this document specifically but 62 as he has explained, the plan represents recommendations on how staff would intend to proceed; 63 there’s intent to keep the council fully involved in decisions going forward. 64 Councilmember Stoesz said his intent is not to hold up the plan so he will support moving forward 65 with the understanding of his comments. 66 Councilmember Ruhland moved to accept the Plan as presented. Councilmember Cavegn seconded the 67 motion. Motion carried: Yeas, 5; Nays none. 68 B) Consider Building Official Salary Increase, Karissa Bartholomew 69 i. Consider Resolution 20-32 Appointing an Interim Building Official and Approving a 70 Professional Service Contract for Building Official Services. 71 Administrator Karlson reviewed the written staff report. The City’s building official, Patr ick Moonen 72 has submitted his resignation. Mr. Kar lson said that Mr. Moonen is an exceptional employee. He 73 stated that the City’s salary for the building official position is below market and so staff is requesting an 74 increase to that salary. Mr. Karlso n also noted that the City is in the process of conducting a 75 compensation study and he expects that there will be a recommendation to increase the salary as part of 76 that study. His point is that there is a quality individual in a very important and requir ed city position. 77 The staff recommendation is to increase the position salary by $7,000 in the hopes of retaining Mr. 78 Moonen. If Mr. Moonen is not retained, the City will have to look at an outside contract for the 79 building official services. He pointed out the monthly cost of contracting for services is much higher in 80 comparison to the monthly salary of Mr. Moonen. 81 COUNCIL MINUTES DRAFT 3 Community Development Director Grochala noted that Building Official Patrick Moonen has served the 82 City very well and is a huge and knowledgeable resource. He also provides plan review and expertise 83 on septic systems. Knowing that there is a potential for an increase down the road (with the 84 compensation study), he believes it makes sense to retain the current employee. The only contracting 85 firm available to the City is presented in the report. They are well regarded in the field. It would likely 86 take three to four months to get through a hiring process. He noted that the cost of the services are 87 born through the City of Lino Lakes’ building fees. 88 Mayor Rafferty noted that he has reviewed this situation with staff. Mr. Moonen has done a wonderful 89 job for the city. He does work in a field that generates complaints naturally. He recognizes that there 90 is a compensation study underway with recommendations coming soon. There is a budget in place. He 91 believes the $7,000 is not all inclusive with benefits, etc. He suggested that this request comes during a 92 difficult period for the City and that is concerning. 93 Councilmember Cavegn asked if the resignation is related to salary and Mr. Grochala noted that Mr. 94 Moonen found an opportunity where the salary is greater and the location closer to home. 95 Councilmember Cavegn remarked that looking at data on line, he’s seen a lower salary range. 96 Administrator Karlson pointed out that the City looks at the salary range in comparable cities and the 97 City is clearly under market. Councilmember Cavegn said he isn’t opposed to paying for qualified 98 employees. 99 Councilmember Ruhland asked staff to repeat the comparison of contracted costs versus the cost of 100 retaining Mr. Moonen. He also asked if the contracted services would be month to month and Mr. 101 Grochala suggested staff would set it up for four months to cover the hiring process period. 102 Councilmember Ruhland asked for more information on the cost of benefits. Mayor Rafferty noted 103 health care and pension benefits. Administrator Karlson remarked that benefits are compared 104 occasionally and the City is not unusual. Council Member Ruhland remarked that he also recognizes 105 that the timing is awful but he doesn’t fault any individual for trying to get ahead. 106 Councilmember Lyden said he looked at this matter objectively and while he understands concerns that 107 have been brought forward by other councilmembers, looking at the numbers it is clear what the council 108 must do. The additional expense of contracted services is too high. He supports saving up to $72,000. 109 Administrator Karlson added that the quality work that Mr. Moonen offers the City is a big value here. 110 Councilmember Stoesz remarked that this is a good case to raise the salary if not for the timing. 111 Administrator Karlson remarked that the timing isn’t relevant since the current pandemic emergency 112 situation will pass; the building official is charged with great responsibility to ensure building and other 113 requirements are met. 114 Mayor Rafferty said he has fully reviewed the situation and he’s heard the position of staff as to the 115 importance of the position. He is very familiar with Mr. Moonen and he recognizes how difficult it is to 116 do his job well. Further he has looked at other cities. The salary survey and its data are still 117 outstanding. He cannot accept the $7,000 increase at this time but would consider something more in 118 line with what he sees in other cities. He could support something in the range of 5.5% and he asked 119 the council to consider that amount. 120 Councilmember Cavegn said he could support Option A. He also noted that he has experience in hiring 121 in his professional life and he wonders about the full story behind the resignation. In his experience, 122 offering more money doesn’t often mean long term retention. 123 Director Grochala added that salary has been an issue for a number of years. Mr. Moonen has found a 124 better opportunity closer to home and probably with less responsibility. He did indicate that 125 COUNCIL MINUTES DRAFT 4 compensation is a factor for him. Mr. Grochala suggested that he is hopeful and somewhat confident 126 that, if given the opportunity, he would remain. 127 Mayor Rafferty explained that he is looking for the opportunity to keep this employee in place. In that 128 light, he is offering an alternative. 129 Administrator Karlson noted that the benefit cost implication of a 5.5% raise would be about $800. 130 Councilmember Lyden asked for objectivity and to look at the additional cost of contracted services. 131 He asked if the council would support Option A at an amount of $6,000. 132 Mayor Rafferty concurred but he still sees some issues. 133 Community Development Director Grochala noted that he’d like to forward the comment that this will 134 still be a part of the forthcoming compensation study. Also if the offer isn’t accepted, the council should 135 act to bring in contracted services. 136 Councilmember Ruhland asked how long it would take for another employee to qualify for the position. 137 Director Grochala explained that the next senior official is working toward the goal but has some time 138 to go and does lack the many years of experience as well. 139 Councilmember Cavegn asked about a current or proposed review process with employees to see where 140 they’re at to avoid this in the future. Administrator Karlson remarked that he gets nervous when the 141 council gets heavily involved in personnel issues; he added that some positions are competitive. Mr. 142 Karlson also said that there can occasionally be a level of distrust by staff; to get a handle on those 143 matters, more council involvement could be discussed. 144 Finance Director Cotton remarked that it’s important going ahead to build a trust level between council 145 and staff. She recognizes that staff is aware in some areas of market salaries and also that a 146 compensation study is in the works. 147 Councilmember Lyden moved to approve Option A with a salary increase of $6,000 with benefits and 148 direction to proceed with contracted services if that becomes necessary. Councilmember Ruhland 149 seconded the motion. Motion carried: Yeas, Ruhland, Cavegn, Lyden, Rafferty; Nays, Stoesz 150 PUBLIC SAFETY DEPARTMENT REPORT 151 There was no report from the Public Safety Department. 152 PUBLIC SERVICES DEPARTMENT REPORT 153 There was no report from the Public Services Department. 154 COMMUNITY DEVELOPMENT DEPARTMENT REPORT 155 6A) 617 Apollo Drive (Marketplace Retail B Building) - 156 Consider 1st Reading of Ordinance No. 03-20 Amending Marketplace Planned Development 157 Overlay (PDO) Design Guidelines Ordinance No. 03-05 158 Consider Resolution No. 20-26 Approving Site and Building Plan Modifications 159 City Planner Larsen reviewed a PowerPoint presentation outlining the following: 160 - Ordinance amendment to put in place a rooftop dining establishment; 161 - Location and history review; 162 - Building requirement s that are met; wiil be a substantial depature from current look; 163 COUNCIL MINUTES DRAFT 5 - Elevations of proposed improvements and improvement details; 164 - Parking calculations and requirements; 165 - Planning and Zo ning Board review and recommendations that are reflected in the council 166 resolution; 167 - No comments received at the Board public hearing. 168 Councilmember Stoesz moved to approve the 1st Reading of Ordinance No. 03-20 as presented. 169 Councilmember Lyden seconded the motion. Motio n carried: Yeas, 5; Nays none. 170 Councilmember Stoesz moved to approve Resolution No. 20-26 as presented. Councilmember 171 Ruhland seconded the motion. Motio n carried: Yeas, 5; Nays none. 172 6B) Consider Resolution No. 20-28, Supporting Federal Funding for I-35E and County Road J 173 Interchange and the Centerville Road and County Road J Intersection Project – Community 174 Development Director Grochala reviewed his written report and explained the history of improvement 175 consideration for this inter section. Staff is recommending that a grant request be submitted again in an 176 multi jurisdicational effort led by Ramsey County. Staff is requesting that the council support the 177 application. 178 Mayor Rafferty asked if a roundabout is planned and Mr. Grochala said options are being considered. 179 Councilmember Ruhland asked about the current condition of the bridge in the area. Mr. Grochala 180 suggested that the bridge was constructed in about 1967 and while it is structurally sound, it cannot be 181 widened including for additional facilities; plans would include replacement to allow for the addition of 182 pedestrian and bicycle use. Councilmember Ruhland asked about plans to straighten out the “s” curve 183 and Mr. Grochala said that improvement is a consideration but would be a separate project. 184 Councilmember Lyden asked if there could be some improvements phased earlier rather than waiting for 185 the entire project to move. Mr. Grochala suggested that if funded this would be a 2024 project; there is 186 the possibilty of t hat intersection being a separate project coming forward. 187 Councilmember Stoesz asked if the project would be reliant on road fees for funding. Mr. Grochala 188 explained that those fees are not approved for use and they have been legally challenged in the past. 189 Mayor Rafferty remarked that this project is long overdue; with the 35E ramp nearby, traffic levels get 190 dangerously high. He clarified with staff the City boundary in the area. 191 Councilmember Ruhland moved to approve Resolution No. 20-28 as presented. Councilmember 192 Stoesz the motion. Motio n carried: Yeas, 5; Nays none. 193 6C) Consider Resolution No. 20-27, Approve Construction Services Contract, East Cedar St & 194 24th Avenue/Elmcrest Avenue N Improvement Project – Community Development Director Grochala 195 noted that staff has worked with WSB & Associates to reduce the contract as noted in the report. The 196 cost would be broken up between the two communites. 197 Mayor Rafferty asked about the change in direction and Mr. Grochala explained that some elements are 198 being broken out to allow those opportunities to other companies. 199 Councilmember Cavegn asked if the City of Hugo has approved the contract and staff said they have. 200 Councilmember Lyden moved to approve Resolution No. 20-27 as presented. Councilmember 201 Cavegn the motion. Motion carried on a voice vote. 202 203 COUNCIL MINUTES DRAFT 6 UNFINISHED BUSINESS 204 There was no Unfinished Business. 205 206 NEW BUSINESS 207 There was no New Business. 208 209 COMMUNITY EVENTS 210 There were no Community Events but Mayor Rafferty announced: 211 1) City Hall is closed to visitors but providing services through emails and phone calls; 212 2) The Lino Lakes Parks and Recreation Department has cancelled all programs and activities 213 through April 15. 214 Mayor Rafferty also thanked staff for their leadership and work during this difficult period. The 215 citizens have remained safe and well served during this emergency. 216 217 COMMUNITY CALENDAR 218 March 23, 2020 through April 13, 2020 219 Monday, April 6 6:00 p.m., Community Room Council Work Session 220 Monday, April 13 6:30 p.m., Council Chambers City Council Meeting 221 222 ADJOURN 223 224 There being no further business, Councilmember Cavegn moved to adjourn at 9:00 p.m. 225 Councilmember Ruhland seconded the motion. Motion carried on a voice vote. 226 227 These minutes were considered and approved at the regular Council Meeting on April 13, 2020. 228 229 230 231 232 Julianne Bartell, City Clerk Rob Rafferty, Mayor 233 234 COUNCIL MINUTES DRAFT 1 CITY OF LINO LAKES 1 LINO LAKES CITY COUNCIL 2 EMERGENCY MEETING 3 MINUTES 4 5 DATE : March 19, 2020 6 TIME STARTED : 6:00 p.m. 7 TIME ENDED : 6:39 p.m. 8 MEMBERS PRESENT : Council Member Stoesz (Chambers), Lyden, 9 Ruhland, Cavegn and Mayor Rafferty (via 10 telephone) 11 MEMBERS ABSENT : 12 13 Staff members present: City Administrator Jeff Karlson; Finance Director Sarah Cotton; Director of 14 Public Safety John Swenson; and City Clerk Julie Bartell 15 16 The council meeting was held telephonically on the Go To Meeting platform and as allowed by 17 Minnesota Statutes 13D.021. 18 19 PUBLIC COMMENT 20 There were no comments. 21 SETTING THE AGENDA 22 The agenda was approved as presented. 23 DECLARATION OF EMERGENCY 24 Consider Affirmation of Mayor’s Declaration of Local State of Emergency (in accordance 25 with City Code Section 209.05) 26 Administrator Karlson updated the council on staff’s work to address the pandemic situation, 27 including information on employees, closure of City Hall to the public, and the intent to provide a 28 plan moving forward. He noted that other government entit ies have passed similar declarations. 29 The Mayor has already approved the action but it remains in place for only three days and the council 30 must affirm the declaration past that. The declaration allows staff to address situations that arise in 31 this emergency situation and implement certain actions. 32 33 Mayor Rafferty remarked that he been meeting with staff regularly and sees that they have responded 34 well and continue to do so. The City is reaching out to other cities and for best practices. 35 36 Councilmember Cavegn asked if the declaration expires after 30 days. Mr. Karlson noted that City 37 Attorney Jay Squires prepared the declaration, it is indefinite and is in line with what other 38 jurisdictions are doing. 39 40 Councilmember Lyden said he appreciates that City employees have gone above and beyond to serve 41 the City during this difficult period. He hopes everyone will stay well. 42 43 Councilmember Ruhland asked for an update on the employee that may have been exposed. Also 44 are there any concerns about police services going forward. Director Swenson gave a brief update 45 COUNCIL MINUTES DRAFT 2 on public safety operations. They are doing everything they can to limit staff’s exposure to the 46 public while continuing services. They are handling situations as much as possible without direct 47 contact. The exposure that has possibility occurred was with family outside of the department but 48 any staff impacted are not reporting for work. In the office environment, the department is limiting 49 staff by working remotely and utilizing other public safety facilities. 50 51 Mayor Rafferty thanked Director Swenson for his leadership and again thanked City staff, including 52 the Public Works division who is watching over essential water and sewer services. 53 54 Councilmember Stoesz moved to affirm the Declaration of Local State of Emergency. 55 Councilmember Cavegn seconded the motion. Motion carried: Yeas, 5; Nays none. 56 57 UNFINISHED BUSINESS 58 59 There was no Unfinished Business. 60 61 NEW BUSINESS 62 63 There was no New Business. 64 65 ADJOURN 66 67 There being no further business, Council Member Ruhland moved to adjourn at 6:36 p.m. Council 68 Member Stoesz seconded the motion. Motion carried on a voice vote. 69 70 These minutes were considered and approved at the regular Council Meeting on April 13, 2020. 71 72 73 74 75 Julianne Bartell, City Clerk Rob Rafferty, Mayor 76 77 CITY COUNCIL AGENDA ITEM 3A STAFF ORIGINATOR: Karissa Bartholomew, Human Resources Manager MEETING DATE: April 13, 2020 TOPIC: Consider Resolution 20-35, Labor Agreement with LELS, Local No. 299 VOTE REQUIRED: 3/5 INTRODUCTION The City Council is being asked to consider Resolution 20-35, “Approving the 2020 Labor Agreement between the City of Lino Lakes and LELS, Local No. 299.” BACKGROUND A tentative agreement has been reached for a one-year contract with LELS, Local No. 299. A tentative agreement was reached after four meetings and the union members voted in favor of the following terms: 1) WAGES: 3% wage increase effective January 1, 2020, for all unit members. 2) HEALTH INSURANCE: The City saw a decrease this year and the union and City shared in the decrease for 2020. All remaining provisions remain the same. 3) CONVERSION OF DAYS TO HOURS: A majority of the language within the labor agreement will now reflect hours versus days, with the exception of sick leave contributions into deferred compensation and injury on duty. RECOMMENDATION Authorize execution of the 2020 labor agreement between the City of Lino Lakes and LELS, Local No. 299. ATTACHMENTS Resolution 20-35 CITY OF LINO LAKES RESOLUTION NO. 20-35 APPROVING LABOR AGREEMENT BETWEEN THE CITY OF LINO LAKES AND LELS, LOCAL NO. 299 FOR YEAR 2020 WHEREAS, the City of Lino Lakes and Law Enforcement Labor Services, Local No. 299, representing the police officers, have reached a one-year agreement for 2020. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Lino Lakes approve the terms of the labor agreement, as follows: 1) WAGES: 3% wage increase effective January 1, 2020, for all unit members. 2) HEALTH INSURANCE: The City saw a decrease this year and the union and City shared in the decrease for 2020. All remaining provisions remain the same. 3) CONVERSION OF DAYS TO HOURS: A majority of the language within the labor agreement will now reflect hours versus days, with the exception of sick leave contributions into deferred compensation and injury on duty. Adopted by the Council of the City of Lino Lakes this 13th day of April 2020. The motion for the adoption of the foregoing resolution was introduced by Council Member _____________and was duly seconded by Council Member ___________ and upon vote being taken thereon, the following voted in favor thereof: The following voted against same: _______________________________ Rob Rafferty, Mayor ATTEST: _____________________________________ Julianne Bartell, City Clerk CITY COUNCIL AGENDA ITEM 3B STAFF ORIGINATOR: Jeff Karlson MEETING DATE: April 13, 2020 TOPIC: Personnel Reductions VOTE REQUIRED: 3/5 INTRODUCTION The City Council is being asked to approve staff’s recommendation to layoff two Recreation Division employees. BACKGROUND As the Council is aware, City services have been impacted by the increased spread of the coronavirus (COVID-19). Non-essential services continue to be suspended or cancelled as the pandemic progresses. As a result, the City has had to reassess staff workloads and service needs in each department and make some difficult personnel decisions. During last Monday’s work session, the City Council was in unanimous agreement that the summer recreational programs and events be canceled in response to the coronavirus pandemic and the uncertainty of scheduling vendors and securing sponsors for Blue Heron Days. Last Thursday, Recreation Supervisor Brian Hronski and Office Specialist Kristine Kroll were notified that I would be recommending the reduction of personnel in the Recreation Division, which includes their positions, effective April 24, 2020. In accordance with Section 9.2 of the City’s personnel policy, Hronski would receive the maximum severance of twelve weeks for his length of employment with the City and Kroll three weeks’ severance. Both will be eligible for unemployment compensation and additional compensation under the federal CARES Act. RECOMMENDATION Approve the layoff of the recreation supervisor and public services office specialist, effective April 24, 2020. ATTACHMENT Section 9.2 of Lino Lakes Personnel Policy 9.2 Reduction in Force The City may lay off employees whenever such action is necessary based on budget considerations, staff workloads, and organizational restructuring. A two-week written notice of the layoff shall be given. Termination due to a reduction in force will be considered a final separation from that position. Human Resources will provide benefits counseling and answer any questions regarding separation payment for each employee affected by a reduction in force. An employee affected by a reduction in force will be eligible for one week of severance pay for each year of employment with the City up to a maximum of 12 weeks’ following an employee’s last day of employment with the City. In addition to seniority, position qualifications and job performance will be the determining factors for layoffs. CITY COUNCIL AGENDA ITEM 6A STAFF ORIGINATOR: Diane Hankee PE, City Engineer MEETING DATE: April 13, 2020 TOPIC: 2020 Street Rehabilitation Project i. Consider Resolution No. 20-18, Accepting bids, Awarding a Construction Contract ii. Consider Resolution No. 18-33, Approving Construction Services Contract with WSB & Associates VOTE REQUIRED: 3/5 INTRODUCTION Staff is requesting council’s consideration to accept bids, award construction contract, and approve a construction services contract for the 2020 Street Rehabilitation Project. BACKGROUND On January 27, 2020, the City Council ordered the project and authorized the advertisement for bid for the 2020 Street Rehabilitation Project. The proposed 2020 Street Rehabilitation Project included: Base Bid: Full Depth Reclamation, curb and gutter and storm sewer repair: • Deerwood Lane, between Birch Street and Fox Road • Fox Road, between West Shadow Lake Drive and Deerwood Lane Watermain Repair: • Bolt replacement on identified gate valves and services. Bituminous Overlay: • Carl Street from 4th Avenue to the west 1,400 feet, Rehbein Street, 77th Street, and Gordon Avenue. Curb Replacement: • Town Center Parkway The advertisement also included two alternative bids, in the event that pricing came in lower than expected: Alternate No. 1- Full Depth Reclamation of Beaver Circle. Alternate No. 2- Full Depth Reclamation of Deerwood Circle, and Fox Circle. Bids were received for the above-referenced project on Tuesday, March 17, 2020. A total of four bids were received. Below is a table of bids received: CONTRACTOR TOTAL BASE BID TOTAL BASE BID + ALT 1 TOTAL BASE BID + ALT 2 TOTAL (BASE BID + ALT 1 + ALT 2) North Valley, Inc. $856,152.22 $927,855.55 $954,893.78 $1,026,597.11 T.A. Schifsky & Sons, Inc. $879,071.02 $947,709.42 $976,305.90 $1,044,944.30 Bituminous Roadways, Inc. $942,324.25 $1,021,280.75 $1,052,718.45 $1,131,674.95 Park Construction Co., Inc. $961,222.59 $1,036,580.34 $1,065,677.75 $1,141,035.50 The total project cost, including the base bid, engineering, testing and 5% contingency is approximately $998,000. The portion of the project funded from pavement management is $751,000, slightly under the $753,000 available for 2020. Alternates 1 & 2 which came in at $71,703.33 and $98,741.56 respectively, exceed the available budget and our not being recommended for award. The project is proposed to be funded as follows: Pavement Management Fund State Aid Fund Water Operating Fund Total Street Improvements $751,500 $751,500 Watermain Repair $140,600 $140,600 Curb Replacement $106,000 $106,000 Budget $998,100 The completion date for this project is October 30, 2020. WSB and Associates has submitted a proposal to complete the construction services for the 2020 Street Rehabilitation Project in the amount of $42,914. RECOMMENDATION Staff recommends adoption of Resolution No. 20-18, Accepting the Bid and Awarding a Construction Contract in the amount of $856,152.22 to North Valley, Inc., and Approving the Construction Services Contract with WSB for the 2020 Street Rehabilitation Project, in the amount of $42,914. ATTACHMENTS 1. Resolution 20-18 & 20-33 2. Bid Tabulation 3. WSB Proposal CITY OF LINO LAKES RESOLUTION NO. 20-18 ACCEPTING BASE BID AND AWARDING A CONSTRUCTION CONTRACT 2020 STREET REHABILITATION PROJECT WHEREAS, pursuant to an advertisement for bids for the construction of the 2020 Street Rehabilitation Project, bids were received, opened and tabulated according to law, and the following bids were received complying with the advertisement; and CONTRACTOR TOTAL BASE BID TOTAL BASE BID + ALT 1 TOTAL BASE BID + ALT 2 TOTAL (BASE BID + ALT 1 + ALT 2) North Valley, Inc. $856,152.22 $927,855.55 $954,893.78 $1,026,597.11 T.A. Schifsky & Sons, Inc. $879,071.02 $947,709.42 $976,305.90 $1,044,944.30 Bituminous Roadways, Inc. $942,324.25 $1,021,280.75 $1,052,718.45 $1,131,674.95 Park Construction Co., Inc. $961,222.59 $1,036,580.34 $1,065,677.75 $1,141,035.50 WHEREAS, it appears that North Valley, Inc. is the lowest responsible bidder; and WHEREAS, the City Council finds that it would be in the best interest of the city to proceed with Base Bid, NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Lino Lakes: 1. The Mayor and Clerk are hereby authorized and directed to enter into a contract with North Valley, Inc., in the amount of $856,152.22 by the name of the City of Lino Lakes for the Base Bid construction of the 2020 Street Rehabilitation Project according to the plans and specifications approved by the City Council and on file in the office of the City Clerk. 2. The City Clerk is hereby authorized and directed to return forthwith to all bidder the Bid Bonds made with their bids, except that the deposits of the successful bidder and the next two lowest bidders shall be retained until a contract has been signed. Adopted by the Council of the City of Lino Lakes this 13th day of April, 2020. The motion for the adoption of the foregoing resolution was introduced by Council Member _______________and was duly seconded by Council Member ________________ and upon vote being taken thereon, the following voted in favor thereof: The following voted against same: _______________________________ Rob Rafferty, Mayor ATTEST: ________________________ Julianne Bartell, City Clerk CITY OF LINO LAKES RESOLUTION NO. 20-33 APPROVING THE CONSTRUCTION SERVICES CONTRACT 2020 STREET REHABILITATION PROJECT WHEREAS, pursuant to the City Council awarding a construction contract to North Valley, Inc. in the amount of $856,152.22, on April 13, 2020 ; and WHEREAS, WSB and Associates has submitted a proposal to complete the construction services for the 2020 Street Rehabilitation Project in the amount of $42,914; and WHEREAS, the City Council finds that it would be in the best interests of the city to proceed with the construction oversight and administration, NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Lino Lakes, the Mayor and Clerk are hereby authorized and directed to enter into a contract with WSB, in the name of the City of Lino Lakes for the construction services of 2020 Street Rehabilitation Project. Adopted by the Council of the City of Lino Lakes this 13th day of April, 2020. The motion for the adoption of the foregoing resolution was introduced by Council Member _______________and was duly seconded by Council Member ________________ and upon vote being taken thereon, the following voted in favor thereof: The following voted against same: _______________________________ Rob Rafferty, Mayor ATTEST: ________________________ Julianne Bartell, City Clerk Bid Tabulation2020 Street Rehabilitation Project/2020 Apollo Drive Trail Project City of Lino LakesBid Opening: March 17, 2020, at 11:00 AM CDTWSB Project No. 015071-000DENOTES CORRECTED FIGURELine # Mat. # Item Description Unit Quantity Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension Unit PriceExtensionSCHEDULE A. FULL DEPTH RECLAMATION1 2021.501MOBILIZATIONLS 1 $30,160.00 $30,160.00 $34,193.72 $34,193.72 $33,000.00 $33,000.00$48,000.00 $48,000.00 $100,000.00 $100,000.002 2104.502REMOVE CASTINGEACH 5 $110.00 $550.00 $198.30 $991.50 $100.00 $500.00 $130.00 $650.00 $196.00 $980.003 2104.503SAWING BIT PAVEMENT (FULL DEPTH)L F 450 $4.25 $1,912.50 $2.52 $1,134.00 $3.00 $1,350.00 $2.00 $900.00 $1.85 $832.504 2104.503REMOVE CURB & GUTTERL F 1750 $15.00 $26,250.00 $7.93 $13,877.50 $11.50 $20,125.00 $6.50 $11,375.00 $7.80 $13,650.005 2104.504REMOVE CONCRETE DRIVEWAY PAVEMENT S Y56 $12.80 $716.80 $18.40 $1,030.40 $10.00 $560.00 $20.00 $1,120.00 $23.20 $1,299.206 2104.504REMOVE BITUMINOUS DRIVEWAY PAVEMENT S Y78 $9.00 $702.00 $12.40 $967.20 $10.00 $780.00 $12.50 $975.00 $15.00 $1,170.007 2104.504REMOVE BITUMINOUS PAVEMENTS Y659 $3.50 $2,306.50 $4.69 $3,090.71 $3.00 $1,977.00 $9.35 $6,161.65 $7.40 $4,876.608 2106.507EXCAVATION - COMMONC Y220 $31.00 $6,820.00 $29.09 $6,399.80 $0.01 $2.20 $38.50 $8,470.00 $21.00 $4,620.009 2106.507EXCAVATION - SUBGRADEC Y440 $31.00 $13,640.00 $29.11 $12,808.40 $7.00 $3,080.00 $36.00 $15,840.00 $30.40 $13,376.0010 2106.507SELECT GRANULAR EMBANKMENT (CV)C Y440 $11.00 $4,840.00 $20.56 $9,046.40 $7.00 $3,080.00 $43.00 $18,920.00$18.10 $7,964.0011 2112.519SUBGRADE PREPARATION RDST 39 $190.00 $7,410.00 $212.98 $8,306.22 $325.00 $12,675.00 $340.00 $13,260.00 $241.00 $9,399.0012 2123.61STREET SWEEPER (WITH PICKUP BROOM) HOUR 50 $150.00 $7,500.00 $160.79 $8,039.50 $50.00 $2,500.00 $170.00 $8,500.00 $152.00 $7,600.0013 2123.61UTILITY CREW HOUR 10 $1,000.00 $10,000.00 $589.55 $5,895.50 $600.00 $6,000.00 $650.00 $6,500.00 $606.00 $6,060.0014 2211.507AGGREGATE BASE (CV) CLASS 5 C Y220 $35.00 $7,700.00 $19.79 $4,353.80 $0.01 $2.20 $42.00 $9,240.00 $0.01$2.2015 2215.504FULL DEPTH RECLAMATION S Y14496 $2.50 $36,240.00 $2.92 $42,328.32 $4.20 $60,883.20 $3.10 $44,937.60 $2.40 $34,790.4016 2331.603JOINT ADHESIVE L F 8718 $0.60 $5,230.80 $0.61 $5,317.98 $0.60 $5,230.80 $0.60 $5,230.80$0.58 $5,056.4417 2357.506BITUMINOUS MATERIAL FOR TACK COAT GAL 2685 $3.20 $8,592.00 $3.22 $8,645.70 $0.01 $26.85 $3.00 $8,055.00 $2.65 $7,115.2518 2360.504TYPE SP 12.5 WEAR CRS MIX(2;B)3.0" THICK S Y78 $54.75 $4,270.50 $54.18 $4,226.04 $40.00 $3,120.00 $33.50 $2,613.00 $40.20 $3,135.6019 2360.509TYPE SP 9.5 WEARING COURSE MIX (2;B) TON 1975 $68.00 $134,300.00 $66.93 $132,186.75 $62.00 $122,450.00 $57.50 $113,562.50 $71.30 $140,817.5020 2360.509TYPE SP 9.5 WEARING COURSE MIX (2;C) TON 1285 $68.00 $87,380.00 $75.65 $97,210.25 $75.00 $96,375.00 $72.50 $93,162.50 $76.40 $98,174.0021 2360.509TYPE SP 12.5 NON WEAR COURSE MIX (2;C) TON 1713 $67.00 $114,771.00 $69.59 $119,207.67 $72.00 $123,336.00 $69.00 $118,197.00 $73.50 $125,905.5022 2504.602ADJUST GATE VALVE & BOX EACH 15 $295.00 $4,425.00 $300.13 $4,501.95 $450.00 $6,750.00 $285.00 $4,275.00 $504.00 $7,560.0023 2504.602IRRIGATION SYSTEM REPAIR EACH 10 $268.00 $2,680.00 $241.18 $2,411.80 $0.01 $0.10 $230.00 $2,300.00 $227.00 $2,270.0024 2506.502ADJUST FRAME & RING CASTING EACH 19 $400.00 $7,600.00 $375.17 $7,128.23 $875.00 $16,625.00 $340.00 $6,460.00 $888.00 $16,872.0025 2506.602REPAIR CATCH BASINS EACH 8 $430.00 $3,440.00 $482.36 $3,858.88 $400.00 $3,200.00 $2,000.00 $16,000.00 $1,010.00 $8,080.0026 2506.602CHIMNEY SEALS EACH 19 $185.00 $3,515.00 $375.17 $7,128.23 $175.00 $3,325.00 $275.00 $5,225.00 $257.00 $4,883.0027 2506.602CASTING ASSEMBLY (SANITARY) EACH 5 $910.00 $4,550.00 $589.55 $2,947.75 $1,000.00 $5,000.00 $975.00 $4,875.00 $1,090.00 $5,450.0028 2521.5186" CONCRETE WALK S F 100 $16.00 $1,600.00 $15.54 $1,554.00 $14.50 $1,450.00 $13.50 $1,350.00 $15.10 $1,510.0029 2531.503CONCRETE CURB & GUTTER DESIGN SPECIAL L F 1750 $27.00 $47,250.00 $28.57 $49,997.50 $25.65 $44,887.50 $28.00 $49,000.00 $29.00 $50,750.0030 2531.5046" CONCRETE DRIVEWAY PAVEMENT S Y56 $69.00 $3,864.00 $85.75 $4,802.00 $80.00 $4,480.00 $82.00 $4,592.00 $84.50 $4,732.0031 2531.6037" CONCRETE VALLEY GUTTER L F 150 $48.00 $7,200.00 $37.52 $5,628.00 $35.00 $5,250.00 $93.00 $13,950.00 $35.80 $5,370.0032 2531.618TRUNCATED DOMES S F 20 $55.00 $1,100.00 $64.31 $1,286.20 $60.00 $1,200.00 $65.00 $1,300.00 $61.40 $1,228.0033 2540.602TEMPORARY MAIL BOX EACH 10 $48.00 $480.00 $133.99 $1,339.90 $150.00 $1,500.00 $135.00 $1,350.00 $126.00 $1,260.0034 2557.602REPAIR DOG FENCE EACH 10 $214.00 $2,140.00 $187.58 $1,875.80 $0.01 $0.10 $190.00 $1,900.00 $177.00 $1,770.0035 2563.601TRAFFIC CONTROL LS 1 $2,500.00 $2,500.00 $3,751.67 $3,751.67 $33,000.00 $33,000.00 $6,800.00 $6,800.00 $6,260.00 $6,260.0036 2573.502STORM DRAIN INLET PROTECTION EACH 21 $135.00 $2,835.00 $144.71 $3,038.91 $125.00 $2,625.00 $150.00 $3,150.00 $148.00 $3,108.0037 2573.503SEDIMENT CONTROL LOG TYPE STRAW L F 1923 $4.00 $7,692.00 $3.48 $6,692.04 $3.25 $6,249.75 $3.60 $6,922.80$3.30 $6,345.9038 2574.507COMMON TOPSOIL BORROW C Y102 $54.00 $5,508.00 $41.28 $4,210.56 $40.00 $4,080.00 $45.00 $4,590.00$40.40 $4,120.8039 2575.504SODDING TYPE LAWN S Y913 $15.00 $13,695.00 $14.58 $13,311.54 $14.00 $12,782.00 $15.50 $14,151.50 $15.80 $14,425.40$633,366.10 $644,722.32 $649,457.70 $683,861.35 $732,819.29SCHEDULE B. WATERMAIN IMPROVEMENTS40 2504.602WATER SERVICE SYSTEM EACH 6 $5,000.00 $30,000.00 $4,073.23 $24,439.38 $4,325.00 $25,950.00 $4,700.00 $28,200.00 $4,370.00 $26,220.0041 2504.602BOLT & VALVE BOX REPLACEMENT - VALVEEACH 13 $5,000.00 $65,000.00 $3,858.85 $50,165.05 $4,790.00 $62,270.00$5,200.00 $67,600.00 $5,090.00 $66,170.0042 2504.602BOLT & VALVE BOX REPLACEMENT - HYDRANT & HYDRANT VALVE EACH 11 $5,000.00 $55,000.00 $4,180.42 $45,984.62 $4,850.00 $53,350.00$5,200.00 $57,200.00 $4,900.00 $53,900.00$150,000.00 $120,589.05 $141,570.00 $153,000.00 $146,290.00SCHEDULE E. TOWN CENTER PARKWAY IMPROVEMENTS43 2021.501MOBILIZATIONLS 1 $5,000.00 $5,000.00 $5,198.73 $5,198.73 $15,000.00 $15,000.00 $5,000.00 $5,000.00 $1,000.00 $1,000.0044 2104.503REMOVE CURB & GUTTER L F 1280 $15.00 $19,200.00 $7.14 $9,139.20 $6.00 $7,680.00 $5.80 $7,424.00 $5.70 $7,296.0045 2104.518REMOVE BITUMINOUS WALK S F 400 $10.00 $4,000.00 $2.58 $1,032.00 $1.00 $400.00 $2.20 $880.00 $1.65 $660.00Park Construction CompanyBituminous Roadways Inc.T. A. Schifsky & Sons, IncNorth Valley, Inc.Engineer EstimateTOTAL SCHEDULE ATOTAL SCHEDULE B1 of 3 K:\015071‐000\Admin\Construction Admin\Bidding\Bid Results Bid Tabulation2020 Street Rehabilitation Project/2020 Apollo Drive Trail Project City of Lino LakesBid Opening: March 17, 2020, at 11:00 AM CDTWSB Project No. 015071-000DENOTES CORRECTED FIGURELine # Mat. # Item Description Unit Quantity Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension Unit PriceExtensionPark Construction CompanyBituminous Roadways Inc.T. A. Schifsky & Sons, IncNorth Valley, Inc.Engineer Estimate46 2104.518REMOVE CONCRETE WALK S F 320 $10.00 $3,200.00 $3.22 $1,030.40 $1.00 $320.00 $2.70 $864.00 $1.75 $560.0047 2331.603JOINT ADHESIVE L F 1200 $0.60 $720.00 $0.61 $732.00 $0.60 $720.00 $0.60 $720.00 $0.58 $696.0048 2357.506BITUMINOUS MATERIAL FOR TACK COAT GAL 27 $3.20 $86.40 $26.80 $723.60 $0.01 $0.27 $8.70 $234.90 $3.10 $83.7049 2360.509TYPE SP 12.5 BIT MIXTURE FOR PATCHING TON 75 $183.00 $13,725.00 $142.62 $10,696.50 $125.00 $9,375.00 $180.00 $13,500.00 $157.00 $11,775.0050 2504.602IRRIGATION SYSTEM REPAIR EACH 5 $268.00 $1,340.00 $241.18 $1,205.90 $0.01 $0.05 $550.00 $2,750.00$505.00 $2,525.0051 2521.5186" CONCRETE WALK S F 720 $16.00 $11,520.00 $15.54 $11,188.80 $14.50 $10,440.00 $13.50 $9,720.00 $15.20 $10,944.0052 2531.503CONCRETE CURB & GUTTER DESIGN B618 L F 1280 $22.00 $28,160.00 $21.28 $27,238.40 $15.85 $20,288.00 $28.00 $35,840.00 $17.40 $22,272.0053 2531.618TRUNCATED DOMES S F 180 $55.00 $9,900.00 $64.31 $11,575.80 $60.00 $10,800.00 $65.00 $11,700.00 $61.40 $11,052.0054 2573.502STORM DRAIN INLET PROTECTION EACH 4 $150.00 $600.00 $198.30 $793.20 $125.00 $500.00 $150.00 $600.00 $148.00 $592.0055 2573.503SEDIMENT CONTROL LOG TYPE STRAW L F 1200 $4.00 $4,800.00 $2.09 $2,508.00 $3.25 $3,900.00 $3.60 $4,320.00$3.30 $3,960.0056 2574.507COMMON TOPSOIL BORROW C Y74 $54.00 $3,996.00 $41.28 $3,054.72 $40.00 $2,960.00 $45.00 $3,330.00 $40.40 $2,989.6057 2575.504SODDING TYPE LAWN S Y440 $15.00 $6,600.00 $9.81 $4,316.40 $12.00 $5,280.00 $15.50 $6,820.00 $12.10 $5,324.0058 2582.518CROSSWALK MULTI COMP S F 40 $7.00 $280.00 $10.18 $407.20 $9.50 $380.00 $44.00 $1,760.00 $9.60 $384.00$113,127.40 $90,840.85 $88,043.32 $105,462.90 $82,113.30$896,493.50 $856,152.22 $879,071.02 $942,324.25 $961,222.5959 2104.502REMOVE CASTING EACH 1 $110.00 $110.00 $198.30 $198.30 $150.00 $150.00 $130.00 $130.00 $231.00 $231.0060 2104.503REMOVE CURB & GUTTER L F 140 $15.00 $2,100.00 $7.93 $1,110.20 $12.50 $1,750.00 $6.50 $910.00 $9.95 $1,393.0061 2104.504REMOVE CONCRETE DRIVEWAY PAVEMENT S Y34 $12.80 $435.20 $18.40 $625.60 $10.00 $340.00 $20.00 $680.00 $12.60 $428.4062 2104.504REMOVE BITUMINOUS DRIVEWAY PAVEMENT S Y12 $9.00 $108.00 $12.40 $148.80 $10.00 $120.00 $12.50 $150.00 $14.90 $178.8063 2104.504REMOVE BITUMINOUS PAVEMENT S Y102 $3.50 $357.00 $4.70 $479.40 $3.00 $306.00 $9.35 $953.70 $11.50 $1,173.0064 2106.507EXCAVATION - COMMON C Y32 $31.00 $992.00 $29.09 $930.88 $0.01 $0.32 $38.50 $1,232.00 $21.00 $672.0065 2106.507EXCAVATION - SUBGRADE C Y68 $31.00 $2,108.00 $29.09 $1,978.12 $7.00 $476.00 $36.00 $2,448.00 $30.40 $2,067.2066 2106.507SELECT GRANULAR EMBANKMENT (CV) C Y68 $11.00 $748.00 $20.56 $1,398.08 $7.00 $476.00 $43.00 $2,924.00 $18.20$1,237.6067 2112.519SUBGRADE PREPARATION RDST 5.3 $190.00 $1,007.00 $212.98 $1,128.79 $325.00 $1,722.50 $500.00 $2,650.00 $335.00 $1,775.5068 2123.61STREET SWEEPER (WITH PICKUP BROOM) HOUR 5 $150.00 $750.00 $160.79 $803.95 $0.01 $0.05 $170.00 $850.00 $152.00 $760.0069 2211.507AGGREGATE BASE (CV) CLASS 5 C Y34 $35.00 $1,190.00 $19.80 $673.20 $0.01 $0.34 $42.00 $1,428.00 $0.01 $0.3470 2215.504FULL DEPTH RECLAMATION S Y2241 $2.80 $6,274.80 $3.64 $8,157.24 $3.70 $8,291.70 $3.10 $6,947.10 $2.40 $5,378.4071 2331.603JOINT ADHESIVE L F 1347 $0.60 $808.20 $0.61 $821.67 $0.60 $808.20 $0.60 $808.20 $0.58 $781.2672 2357.506BITUMINOUS MATERIAL FOR TACK COAT GAL 102 $3.20 $326.40 $3.22 $328.44 $0.01 $1.02 $3.00 $306.00 $2.65 $270.3073 2360.504TYPE SP 12.5 WEAR CRS MIX(2;B)3.0" THICK S Y12 $54.75 $657.00 $54.17 $650.04 $40.00 $480.00 $33.50 $402.00 $57.30 $687.6074 2360.509TYPE SP 9.5 WEARING COURSE MIX (2;C) TON 199 $68.70 $13,671.30 $75.65 $15,054.35 $75.00 $14,925.00 $74.50 $14,825.50 $71.80 $14,288.2075 2360.509TYPE SP 12.5 NON WEAR COURSE MIX (2;C) TON 265 $67.00 $17,755.00 $69.59 $18,441.35 $72.00 $19,080.00 $72.00 $19,080.00 $76.90 $20,378.5076 2504.602IRRIGATION SYSTEM REPAIR EACH 1 $268.00 $268.00 $241.17 $241.17 $0.01 $0.01 $410.00 $410.00 $404.00 $404.0077 2504.602BOLT & VALVE BOX REPLACEMENT - HYDRANT & HYDRANT VALVE EACH 1 $5,000.00 $5,000.00 $4,180.42 $4,180.42 $6,100.00 $6,100.00 $6,500.00 $6,500.00 $6,160.00 $6,160.0078 2506.502ADJUST FRAME & RING CASTING EACH 4 $400.00 $1,600.00 $455.56 $1,822.24 $875.00 $3,500.00 $340.00 $1,360.00 $888.00 $3,552.0079 2506.602REPAIR CATCH BASINS EACH 1 $430.00 $430.00 $482.36 $482.36 $450.00 $450.00 $2,000.00 $2,000.00 $1,010.00 $1,010.0080 2506.602CASTING ASSEMBLY (SANITARY) EACH 1 $910.00 $910.00 $401.97 $401.97 $1,000.00 $1,000.00 $975.00 $975.00 $257.00 $257.0081 2506.602CHIMNEY SEALS EACH 1 $185.00 $185.00 $589.55 $589.55 $175.00 $175.00 $275.00 $275.00 $968.00 $968.0082 2531.503CONCRETE CURB & GUTTER DESIGN SPECIAL L F 140 $27.00 $3,780.00 $28.57 $3,999.80 $25.65 $3,591.00 $28.00 $3,920.00 $29.00 $4,060.0083 2531.5046" CONCRETE DRIVEWAY PAVEMENT S Y34 $69.00 $2,346.00 $85.75 $2,915.50 $80.00 $2,720.00 $82.00 $2,788.00 $104.00 $3,536.0084 2540.602TEMPORARY MAIL BOX EACH 1 $48.00 $48.00 $133.99 $133.99 $125.00 $125.00 $135.00 $135.00 $126.00 $126.0085 2557.602REPAIR DOG FENCE EACH 1 $214.00 $214.00 $187.58 $187.58 $0.01 $0.01 $330.00 $330.00 $303.00 $303.0086 2563.601TRAFFIC CONTROLLS 1 $2,500.00 $2,500.00 $1,071.91 $1,071.91 $200.00 $200.00 $750.00 $750.00 $707.00 $707.0087 2573.502STORM DRAIN INLET PROTECTION EACH 1 $135.00 $135.00 $428.77 $428.77 $125.00 $125.00 $149.00 $149.00 $147.00 $147.0088 2573.503SEDIMENT CONTROL LOG TYPE STRAW L F 265 $4.00 $1,060.00 $3.48 $922.20 $3.25 $861.25 $4.40 $1,166.00 $4.05$1,073.2589 2574.507COMMON TOPSOIL BORROW C Y6 $54.00 $324.00 $106.55 $639.30 $40.00 $240.00 $55.00 $330.00 $50.50 $303.0090 2575.504SODDING TYPE LAWN S Y52 $15.00 $780.00 $14.58 $758.16 $12.00 $624.00 $22.00 $1,144.00 $20.20 $1,050.40$68,977.90 $71,703.33 $68,638.40 $78,956.50 $75,357.75SCHEDULE F. BID ALTERNATE 1 BEAVER CIRTOTAL SCHEDULE ETOTAL SCHEDULE F - ALTERNATE 1TOTAL BASE BID2 of 3 K:\015071‐000\Admin\Construction Admin\Bidding\Bid Results Bid Tabulation2020 Street Rehabilitation Project/2020 Apollo Drive Trail Project City of Lino LakesBid Opening: March 17, 2020, at 11:00 AM CDTWSB Project No. 015071-000DENOTES CORRECTED FIGURELine # Mat. # Item Description Unit Quantity Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension Unit PriceExtensionPark Construction CompanyBituminous Roadways Inc.T. A. Schifsky & Sons, IncNorth Valley, Inc.Engineer EstimateSCHEDULE G. BID ALTERNATE 2 - DEERWOOD CIR & FOX CIR91 2104.502REMOVE CASTING EACH 1 $110.00 $110.00 $198.30 $198.30 $150.00 $150.00 $130.00 $130.00 $231.00 $231.0092 2104.503REMOVE CURB & GUTTER L F 190 $15.00 $2,850.00 $7.93 $1,506.70 $12.50 $2,375.00 $6.50 $1,235.00 $13.50 $2,565.0093 2104.504REMOVE CONCRETE DRIVEWAY PAVEMENT S Y34 $12.80 $435.20 $18.40 $625.60 $10.00 $340.00 $20.00 $680.00 $15.50 $527.0094 2104.504REMOVE BITUMINOUS DRIVEWAY PAVEMENT S Y34 $9.00 $306.00 $12.40 $421.60 $10.00 $340.00 $12.50 $425.00 $15.60 $530.4095 2104.504REMOVE BITUMINOUS PAVEMENT S Y138 $3.50 $483.00 $4.69 $647.22 $3.00 $414.00 $9.35 $1,290.30 $11.60 $1,600.8096 2106.507EXCAVATION - COMMON C Y46 $31.00 $1,426.00 $29.09 $1,338.14 $0.01 $0.46 $38.50 $1,771.00 $21.00$966.0097 2106.507EXCAVATION - SUBGRADE C Y92 $31.00 $2,852.00 $29.09 $2,676.28 $7.00 $644.00 $36.00 $3,312.00 $30.40 $2,796.8098 2106.507SELECT GRANULAR EMBANKMENT (CV)C Y92 $11.00 $1,012.00 $20.56 $1,891.52 $7.00 $644.00 $43.00 $3,956.00 $18.20 $1,674.4099 2112.519SUBGRADE PREPARATION RDST 6.2 $190.00 $1,178.00 $212.98 $1,320.48 $325.00 $2,015.00 $500.00 $3,100.00 $387.00 $2,399.40100 2123.61STREET SWEEPER (WITH PICKUP BROOM) HOUR 5 $150.00 $750.00 $160.79 $803.95 $0.01 $0.05 $170.00 $850.00 $152.00 $760.00101 2211.507AGGREGATE BASE (CV) CLASS 5 C Y46 $35.00 $1,610.00 $19.80 $910.80 $0.01 $0.46 $42.00 $1,932.00 $0.01 $0.46102 2215.504FULL DEPTH RECLAMATION S Y3030 $2.80 $8,484.00 $3.39 $10,271.70 $3.70 $11,211.00 $3.10 $9,393.00 $2.40 $7,272.00103 2331.603JOINT ADHESIVE L F 1535 $0.60 $921.00 $0.61 $936.35 $0.60 $921.00 $0.60 $921.00 $0.58 $890.30104 2357.506BITUMINOUS MATERIAL FOR TACK COAT GAL 138 $3.20 $441.60 $3.22 $444.36 $0.01 $1.38 $3.00 $414.00 $2.65 $365.70105 2360.504TYPE SP 12.5 WEAR CRS MIX(2;B)3.0" THICK S Y34 $54.75 $1,861.50 $54.17 $1,841.78 $40.00 $1,360.00 $33.50 $1,139.00 $65.90 $2,240.60106 2360.509TYPE SP 9.5 WEARING COURSE MIX (2;C) TON 269 $68.70 $18,480.30 $75.65 $20,349.85 $75.00 $20,175.00 $74.50 $20,040.50 $72.00 $19,368.00107 2360.509TYPE SP 12.5 NON WEAR COURSE MIX (2;C) TON 358 $67.00 $23,986.00 $69.59 $24,913.22 $72.00 $25,776.00 $72.00 $25,776.00 $70.00 $25,060.00108 2504.602ADJUST GATE VALVE & BOX EACH 1 $295.00 $295.00 $300.13 $300.13 $450.00 $450.00 $285.00 $285.00 $505.00 $505.00109 2504.602IRRIGATION SYSTEM REPAIR EACH 1 $268.00 $268.00 $241.17 $241.17 $0.01 $0.01 $410.00 $410.00 $404.00 $404.00110 2504.602BOLT & VALVE BOX REPLACEMENT - HYDRANT & HYDRANT VALVE EACH 2 $5,000.00 $10,000.00 $4,180.42 $8,360.84 $6,100.00 $12,200.00 $6,500.00 $13,000.00 $6,160.00 $12,320.00111 2506.502ADJUST FRAME & RING CASTINGEACH 3 $400.00 $1,200.00 $401.96 $1,205.88 $875.00 $2,625.00 $340.00 $1,020.00 $893.00 $2,679.00112 2506.602REPAIR CATCH BASINSEACH 1 $430.00 $430.00 $482.36 $482.36 $450.00 $450.00 $2,000.00 $2,000.00 $1,010.00 $1,010.00113 2506.602CASTING ASSEMBLY (SANITARY) EACH 1 $910.00 $910.00 $401.97 $401.97 $1,000.00 $1,000.00 $975.00 $975.00 $1,090.00 $1,090.00114 2506.602CHIMNEY SEALSEACH 1 $185.00 $185.00 $589.55 $589.55 $175.00 $175.00 $275.00 $275.00 $257.00 $257.00115 2521.5186" CONCRETE WALKS F 100 $16.00 $1,600.00 $15.54 $1,554.00 $14.50 $1,450.00 $13.50 $1,350.00 $17.50 $1,750.00116 2531.503CONCRETE CURB & GUTTER DESIGN SPECIALL F 190 $27.00 $5,130.00 $28.57 $5,428.30 $25.65 $4,873.50 $28.00 $5,320.00 $29.00 $5,510.00117 2531.5046" CONCRETE DRIVEWAY PAVEMENT S Y34 $69.00 $2,346.00 $85.75 $2,915.50 $80.00 $2,720.00 $82.00 $2,788.00 $104.00 $3,536.00118 2531.618TRUNCATED DOMESS F 20 $55.00 $1,100.00 $64.31 $1,286.20 $60.00 $1,200.00 $65.00 $1,300.00 $61.40 $1,228.00119 2540.602TEMPORARY MAIL BOX EACH 2 $48.00 $96.00 $133.99 $267.98 $125.00 $250.00 $135.00 $270.00 $126.00 $252.00120 2557.602REPAIR DOG FENCE EACH 2 $214.00 $428.00 $187.59 $375.18 $0.01 $0.02 $330.00 $660.00 $303.00 $606.00121 2563.601TRAFFIC CONTROL LS 1 $2,500.00 $2,500.00 $1,071.91 $1,071.91 $200.00 $200.00 $750.00 $750.00 $707.00 $707.00122 2573.502STORM DRAIN INLET PROTECTION EACH 2 $135.00 $270.00 $198.31 $396.62 $125.00 $250.00 $150.00 $300.00 $148.00 $296.00123 2573.503SEDIMENT CONTROL LOG TYPE STRAW L F 306 $4.00 $1,224.00 $3.48 $1,064.88 $4.00 $1,224.00 $4.40 $1,346.40 $4.05 $1,239.30124 2574.507COMMON TOPSOIL BORROW C Y8 $54.00 $432.00 $85.08 $680.64 $50.00 $400.00 $55.00 $440.00 $50.50 $404.00125 2575.504SODDING TYPE LAWN S Y70 $15.00 $1,050.00 $14.58 $1,020.60 $20.00 $1,400.00 $22.00 $1,540.00 $20.20 $1,414.00$96,650.60 $98,741.56 $97,234.88 $110,394.20 $104,455.16TOTAL BASE BID (A, B & E)$896,493.50 $856,152.22 $879,071.02 $942,324.25 $961,222.59TOTAL ALTERNAT 1$68,977.90 $71,703.33 $68,638.40 $78,956.50 $75,357.75TOTAL ALTERNATE 2$96,650.60 $98,741.56 $97,234.88 $110,394.20 $104,455.16GRAND TOTAL BID $1,062,122.00 $1,026,597.11 $1,044,944.30 $1,131,674.95 $1,141,035.50I hereby certify that this is an exact reproduction of bids received.Certified By:License No.43338Date: March 17, 2020TOTAL ALTERNATE 23 of 3 K:\015071‐000\Admin\Construction Admin\Bidding\Bid Results S:\Community Development\Projects\Capital Improvement Projects\2020 Street Rehabilitation Project\Staff Reports\20200413 CC Award Project & Const Services\4. 20200303 Construction Services Proposal.docx 178 E 9TH STREET | SUITE 200 | SAINT PAUL, MN | 55101 | 651.286.8450 | WSBENG.COM April 2, 2020 Mr. Michael Grochala Community Development Director City of Lino Lakes 600 Town Center Parkway Lino Lakes, MN 55014 Re: Proposal for Construction Services for 2020 Street Rehabilitation Project WSB Project No. R-015071-000 Dear Mr. Grochala: WSB & Associates, Inc. is pleased to present to you this proposal for construction services associated with the City’s 2020 Street Rehabilitation Project. This construction services proposal would be subsequent to the City Council awarding the construction contract. The City of Lino Lakes is requesting assistance with the construction services for the 2020 Street Rehabilitation Project. The streets designated for rehabilitation are local streets as determined by their OCI ratings established in the City’s Pavement Management Study. A summary of the 2020 Street Rehabilitation Project is described as follows: Full Depth Reclamation, cur b and gutter and storm sewer repair • Deerwood Lane, between Birch Street and Fox Road • Fox Road, between West Shadow Lake Drive and Deerwood Lane Watermain Repair • Bolt replacement on identified gate valves and services Bituminous Overlay • Carl St., 77th St. E., Gordon Ave. N., Rehbein St., Peltier Lake Dr. Curb Replacement • Town Center Parkway The project bid also included an alternate for cul du sacs within the project area. It is our understanding that the City will not be awarding the alternate bid. This proposal is based on the work included in the base bid only. Scope of Engineering Services WSB is pleased to provide professional construction engineering services for the 2020 Street Rehabilitation Project including contract administration, construction observation, construction staking, and public involvement with project stakeholders. Below is a detailed description of the engineering services and WSB’s proposed approach. I. Construction Services a. Project Management/Contract Administration Mr. Michael Grochala April 2, 2020 Page 2 S:\Community Development\Projects\Capital Improvement Projects\2020 Street Rehabilitation Project\Staff Reports\20200413 CC Award Project & Const Services\4. 20200303 Construction Services Proposal.docx Contract Administration includes holding meetings with the contractor & City of Lino Lakes (preconstruction & weekly construction), processing monthly quantities for pay vouchers, and communicating with residents on a regular basis. b. Construction Observation WSB will provide an experienced engineering specialist whose responsibilities will include communicating with the Contactor as an agent of the City, calculating and keeping track of daily construction quantities and costs, contact and meet with residents as necessary, and work with the Contractor to assist with a quality constructed product. c. Construction Staking (Survey) WSB will provide Surveying staff as necessary to provide field staking for necessary roadway centerlines, elevations, and any necessary curbing or structure related information. Proposed Fee A copy of the project task hour budget is attached for your reference. Based on the proposed task hour budget, WSB will complete the scope of work the project discussed herein on hourly basis for a not-to-exceed amount of $42,914.00 Tasks not shown are considered outside of the scope of services. If additional work is necessary, we will prepare a detailed scope of work and include it as an addendum to this agreement. We will not proceed with any additional work until the addendum is authorized by both parties. This letter represents our complete understanding of the 2020 Street Rehabilitation Project and the proposed scope of services. If you are in agreement with the scope of services and proposed fee, please sign in the appropriate space below and return one copy to us. If you have any questions, please feel free to call me at 763-287-7179. Thank you. Sincerely, Edward C. Youngquist Associate Attachments ACCEPTANCE: The City of Lino Lakes hereby accepts the WSB proposal of $48,586.00 for all services outlined in this letter. City of Lino Lakes Name Title Date ADMIN Office TechnicianCONST Instpector/ObserverMUNI Senior Project ManagerMUNI Graduate EngineerMUNI Project ManagerSURV Two-Person Survey CrewTotal HoursTotal CostStaff/Resource Name KP DG DH KG EY N/a Hourly Rates $92 $133 $159 $109 $145 $209 PHASES TASK IDs TASKS Start Date Finish Date I. Construction XX.1000 Project Management 4/1/2020 9/30/2020 8 8 16 $2,432 XX.1010 Pay Vouchers 5/1/2020 9/30/2020 18 4 8 30 $3,252 XX.1020 Construction Inspection Roadway 5/1/2020 8/31/2020 150 10 12 8 180 $24,008 XX.1020 Construction Inspection Utilities 5/1/2020 8/31/2020 40 8 8 8 64 $8,624 XX.1040 2 Person Survey 5/1/2020 7/31/2020 22 22 $4,598 312 $42,914 18 190 26 24 32 22 KP DG DH KG EY N/a $92.00 $133.00 $159.00 $109.00 $145.00 $209.00 $1,656.00 $25,270.00 $4,134.00 $2,616.00 $4,640.00 $4,598.00 $42,914.00 $0 $0 $0 $0 $0 $42,914 Surveys LINO LAKES, MN Totals = TotalConstruction Services Exhibit A - WSB & Assoc. Inc. ESTIMATE OF COST 2020 Street Rehabilitation Project R-015071-000 For Project Controls Administrative Municipal $0.00 $0.00 Total Project Cost Misc Expenses Total Expenses Subconsultant Fee (1) Subconsultant Fee (2) Subconsultant Fee (3) Total Subconsultant Fee Total Hours Staff Name/Resource Name Hourly Rates Total Salary Costs Expenses 1 CITY COUNCIL AGENDA ITEM 6B STAFF ORIGINATOR: Katie Larsen, City Planner MEETING DATE: April 13, 2020 TOPIC: Consider 2nd Reading of Ordinance No. 03-20 Amending Marketplace Planned Development Overlay (PDO) Design Guidelines Ordinance No. 03-05 *Council may vote to dispense with full reading of ordinance * Roll call vote is required for adoption of the ordinance VOTE REQUIRED: Simple Majority INTRODUCTION Staff is requesting City Council consideration of the 2nd reading of Ordinance No. 03-20 amending Marketplace Planned Development Overlay (PDO) Design Guidelines Ordinance No. 03-05. The 1st Reading was approved by the City Council on March 23, 2020. BACKGROUND The applicant, Sergei Nazarenko, submitted a Land Use Application for an Ordinance Amendment for site plan and building modifications at 617 Apollo Drive. The applicant is proposing to construct a restaurant with rooftop dining in the existing building. Eagle Liquors currently occupies the north portion of the retail building. Per the Marketplace Planned Development Overlay (PDO) Design Guidelines Ordinance No. 03-05, substantial departures from the approved plans require an amendment to the ordinance. ANALYSIS The proposed ordinance amendment relates to an increase in building height, exterior staircase structure and both ground and rooftop mechanical equipment screening to the existing retail located at 617 Apollo Drive. The March 23, 2020 Council staff report details the project. The Planning & Zoning Board held a public hearing on March 11, 2020 and recommended approval with a 3-0 vote. The City Council passed Resolution No. 20-26 that details the findings of fact. RECOMMENDATION Staff is recommending approval of the 2nd Reading of Ordinance No. 03-20. ATTACHMENTS 1. Ordinance No. 03-20 1 1st Reading: Publication: 2nd Reading: Effective: CITY OF LINO LAKES ORDINANCE NO. 03-20 ORDINANCE AMENDING MARKETPLACE PLANNED DEVELOPMENT OVERLAY (PDO) DESIGN GUIDELINES ORDINANCE NO. 03-05 RELATED TO 617 APOLLO DRIVE (RETAIL B BUILDING) The City Council of Lino Lakes ordains: Section 1: Findings of Fact 1. The City received a Land Use Application to amend the Marketplace Planned Development (PDO) Design Guidelines Ordinance No. 03-05. 2. Ordinance No. 03-05 is an amendment to the original PDO Ordinance No. 16-01. 3. Ordinance No. 03-05 regulates site plan and design guidelines for the Marketplace development. The design guidelines detail requirements for site plan, building composition, materials, lighting, signage, landscaping and building elevations. 4. The applicant is proposing to construct a restaurant with rooftop dining that will require modifications to the site plan and building elevations. 5. Per the 2001 Marketplace Site Plan, the subject site is the Retail B building. 6. Ordinance No. 03-05 states under Special Provisions #4 that substantial departures from the approved plans will require an amendment to the Planned Development Overlay (PDO). 7. The Planning and Zoning Board held a public hearing on March 11, 2020. 8. Per City Zoning Ordinance Section 1007.015(5), the Planning and Zoning Board shall consider possible adverse effects of the proposed ordinance amendment. Its judgement shall be based upon, but not limited to, the following factors: (a) The proposed action has been considered in relation to the specific policies and provisions of and has been found to be consistent with the official City Comprehensive Plan. The existing retail business and proposed restaurant are consistent with the City’s Comprehensive Plan in regards to resource management, land use, housing, economic development, transportation, sanitary sewer and water supply plan and community 2 facilities. (b) The proposed use is or will be compatible with present and future land uses of the area. The existing retail business and proposed restaurant are compatible with present and future land uses. (c) The proposed use conforms with all performance standards contained herein. The existing retail business and proposed restaurant conforms with all performance standards with minor revisions required as noted in Resolution No. 20-26. (d) The proposed use can be accommodated with existing public services and will not overburden the City’s service capacity. The existing retail business and proposed restaurant can be accommodated with existing public services and will not overburden the City’s service capacity. (e) Traffic generation by the proposed use is within capabilities of streets serving the property. The traffic generated by the existing retail business and proposed restaurant are within the capabilities of the streets serving the property. Section 2: Amendment Ordinance No. 03-05 of the City of Lino Lakes is hereby amended to include the Architectural Plan Set prepared by Jamb Architects dated December 12, 2020 related to the Retail B building subject to the revisions detailed in Resolution No. 20-26. Section 3: Legal Description The subject site is legally described as Lot 3, Block 1, Lino Lakes Market Place. Section 4: Development Regulations Development of the subject site shall be in substantial conformance with the following attached exhibits from the Architectural Plan Set prepared by Jamb Architects dated December 12, 2020 subject to the revisions detailed in Resolution No. 20-26: Exhibit A: Sheet T1.1, Title Sheet Exhibit B: Sheet A1.1, Site Plan Exhibit C: Sheet A2.1, Tenant Basement Plan Exhibit D: Sheet A3.1, Tenant Floor Plan Exhibit E: Sheet A4.1, Tenant Floor Plan-Roof 3 Exhibit F: Sheet A6.0, Existing Exterior Elevations Exhibit G: Sheet A6.1, Exterior Elevations Exhibit H: Sheet A6.2, Roof Top Exterior Elevations Exhibit I: Color Rendering Section 5: Effect This ordinance shall be in force and effect from and after its passage and publication according to the Lino Lakes City Charter. The other provisions of Ordinance No. 03-05 are still in effect. Adopted by the Lino Lakes City Council this 13th day of April, 2020. The motion for the adoption of the foregoing ordinance was introduced by Council Member_____________and was duly seconded by Council Member ___________ and upon vote being taken thereon, the following voted in favor thereof: The following voted against same: ____________________________ Rob Rafferty, Mayor ATTEST: ________________________ Julianne Bartell, City Clerk CITY COUNCIL AGENDA ITEM 6C STAFF ORIGINATOR: Diane Hankee, City Engineer MEETING DATE: April 13, 2020 TOPIC: Consider Resolution No. 20-34, Approving Extended Working Hours for the Construction of Water Tower No. 3 VOTE REQUIRED: 3/5 Vote Required INTRODUCTION Staff is requesting Council consideration to extend the working hours for the construction of Water Tower No. 3. BACKGROUND On August 26, 2019 the City Council awarded a construction contract to Landmark Structures for the construction of Water Tower No. 3. Landmark Structures has construction crews from out of town and they have requested to extend the City’s working hours on weekends. The current City weekend working hours are Saturday 9 am to 5 pm and no work on Sunday’s. Landmark has requested that these be extended to Saturday and Sunday from 8 am to 6 pm. The City’s weekly working hours of 7 am to 7 pm Monday thru Friday are not proposed to change. Considerations are that the Water Tower site is approximately a quarter mile away from residential homes and the pile driving work is already complete. Future work includes the concrete work, erection of the tank and the remaining apparent site work. The project is estimated to be completed in the fall of 2021. Construction notices were sent to the adjacent property owners when the project started in November of 2019. RECOMMENDATION Staff recommends adoption of Resolution No. 20-34 approve extending the working hours for the construction of Water Tower No. 3 ATTACHMENTS 1. Resolution No. 20-34 2. Landmark Structures Letter CITY OF LINO LAKES RESOLUTION NO. 20-34 APPROVE EXTENDING THE WORKING HOURS FOR THE CONSTRUCTION OF WATER TOWER NO. 3 WHEREAS, On August 26, 2019 the City Council awarded a construction contract to Landmark Structures for the construction of Water Tower No. 3; and WHEREAS, Landmark Structures has requested to extend the City’s working hours on weekends to Saturday and Sunday from 8 am to 6 pm. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Lino Lakes approves the extension of working hours for the construction of Water Tower No. 3. Adopted by the Council of the City of Lino Lakes this 13th day of April, 2020. The motion for the adoption of the foregoing resolution was introduced by Council Member _______________and was duly seconded by Council Member ________________ and upon vote being taken thereon, the following voted in favor thereof: The following voted against same: _______________________________ Rob Rafferty, Mayor ATTEST: ________________________ Julianne Bartell, City Clerk   March 17, 2020   Greg Johnson, PE  Director of Water/Wastewater  WSB Engineers  701 Xenia Avenue S, Suite 300  Minneapolis, MN 55416    RE: 1662 – Lino Lakes, MN – Water Tower No. 3    Weekend Work Request     Mr. Johnson,          Landmark Structures 1665 Harmon Road Fort Worth, Texas 76177 817.439.8888 Phone 817.439.9001 Fax www.teamlandmark.com Landmark is requesting allowance of weekend work hours on the project specified above. Contract  documents specify Saturday 9:00 AM – 5:00 PM and NO work on Sundays. We are requesting Saturday’s  allowable hours be 8:00 AM – 6:00 PM and Sunday’s hours be 8:00 AM – 6:00 PM. While we are  requesting additional hours and days, our crews would ensure that all inspectable work be performed  during regular working hours/days. Work performed outside of the specified times listed in the contract  documents would not require inspection.    If required, Landmark can submit weekly requests detailing proposed work activities and schedule for  the upcoming weekend. These requests could be submitted electronically by COB Thursday of each week  in which weekend work is requested.    If you have any questions or need further information, please contact me at 507‐525‐6422 or  jalleven@teamlandmark.com        Respectfully,      Jesse Alleven  Project Manager  Landmark Structures  CITY COUNCIL AGENDA ITEM 6D STAFF ORIGINATOR: Michael Grochala, Community Development Director MEETING DATE: April 13, 2020 TOPIC: Consider Resolution No. 20-36 Approving the Joint Powers Agreement with Anoka County for the Reconstruction of Birch Street from Hokah Drive to Old Birch Street VOTE REQUIRED: 3/5 Vote Required INTRODUCTION Staff is requesting approval of the Joint Powers Agreement (JPA) between the City of Lino Lakes and Anoka County to facilitate the reconstruction of Birch Street in 2021. BACKGROUND Anoka County is proposing to reconstruct Birch Street from Hokah Drive to Old Birch Street in 2021. The improvements includes construction of roundabouts at Tomahawk Trail and West Shadow Lake Drive, storm water quality improvements, utility and pedestrian trail improvements and appurtenant work. The estimate construction cost of the project is $4,269,398.00. The City’s estimated share of the construction is $476,534.50. The City will also share in the cost of construction engineering at a rate of 8% of City’s construction share. This is estimated at $38,122.76. The total estimated City share of the project is $514,657.26. The City’s share of the project will be funded through Municipal State Aid (MSA) and water utility funds. Anoka County began discussion of the project with the City Council in January of 2019. In October of 2019 the County held the first open house and presented a concept layout for public comment. Following the open house, to address access issues east of West Shadow, the County proposed a 3rd roundabout at Old Birch Street. A 2nd open house was held in January of 2020. The 3rd roundabout option received mixed reviews. Following further discussion with the City Council, the County has modified the proposal to include the two roundabouts and a mill and overlay between Kingfisher and Old Birch Street. This would allow for consideration of an Old Birch Street roundabout with future corridor improvement proposals. The Joint Powers Agreement has been drafted to set forth a basic understanding of both the City and County project responsibilities and cost share. Significant Components include: • Description of improvements and agreement on layout. • Intersection access modifications. • Reservation of land for possible location of Well No. 7. • Provisions for the consideration of pedestrian flasher system at Tomahawk Trail. • Provisions for the inclusion of landscaping elements by City. • Cost Share. Actual amount will based on final contract bid. RECOMMENDATION Staff is recommending adoption of Resolution No. 20-36 approving the Joint Powers Agreement with Anoka County for Reconstruction of Birch Street. ATTACHMENTS 1. Resolution No. 20-36 2. Joint Powers Agreement CITY OF LINO LAKES RESOLUTION NO. 20-36 APPROVING THE JOINT POWERS AGREEMENT WITH ANOKA COUNTY FOR THE RECONSTRUCTION OF CSAH 34 (BIRCH STREET) FROM HOKAH DRIVE TO 550 FEET EAST OF WEST SHADOW LAKE DRIVE (SAP-002-634-003, SAP 210-020-010) WHEREAS, Anoka County and the City of Lino Lakes find that it is in the best interest of the traveling public to reconstruct County State Aid Highway 34 (Birch Street) from Hokah Drive to 550 feet east of West Shadow Lake Drive; and, WHEREAS, said parties mutually agree that CSAH 34 needs to be reconstructed; and, WHEREAS, the County has prepared preliminary design plans for the reconstruction of CSAH 34 in accordance with Anoka County and the Minnesota Department of Transportation standards to a staff-approved layout condition; and WHEREAS, Anoka County has jurisdiction over CSAH 34; and WHEREAS, the parties agree that it is in their best interest that the cost of the project be shared; and WHEREAS, Minn. Stat. § 471.59 authorizes political subdivisions of the state to enter into joint powers agreements for the joint exercise of powers common to each. NOW, THEREFORE BE IT RESOLVED by The City Council of The City of Lino Lakes approves the Joint Powers Agreement with Anoka County for the reconstruction of CSAH 34 (Birch Street) from Hokah Drive to 550 feet east of West Shadow Lake Drive. Adopted by the Council of the City of Lino Lakes this 13th day of April, 2020. The motion for the adoption of the foregoing resolution was introduced by Council Member _______________and was duly seconded by Council Member ________________ and upon vote being taken thereon, the following voted in favor thereof: The following voted against same: ______________________________ Rob Rafferty, Mayor ATTEST: ________________________ Julianne Bartell, City Clerk 1 Anoka County Contract No. C000XXXX JOINT POWERS AGREEMENT FOR THE RECONSTRUCTION OF CSAH 34 (BIRCH STREET) FROM HOKAH DRIVE TO 550 FEET EAST OF WEST SHADOW LAKE DRIVE IN THE CITY OF LINO LAKES, MN (SAP 002-634-003, SAP 210-020-010) THIS AGREEMENT is made and entered into this day of , 2020 by and between the County of Anoka, a political subdivision of the State of Minnesota, 2100 Third Avenue, Anoka, Minnesota 55303, hereinafter referred to as "County", and the City of Lino Lakes, 600 Town Center Parkway, Lino Lakes, MN 55014, hereinafter referred to as "City". WITNESSETH WHEREAS, the parties to this agreement agree it is in the best interest of the traveling public to reconstruct County State Aid Highway 34 (Birch Street) from Hokah Drive to 550 feet east of West Shadow Lake Drive; and, WHEREAS, said parties mutually agree that CSAH 34 needs to be reconstructed; and, WHEREAS, the County has prepared preliminary design plans for the reconstruction of CSAH 34 in accordance with Anoka County and the Minnesota Department of Transportation standards to a staff approved layout condition; and, WHEREAS, Anoka County has jurisdiction over CSAH 34 and, WHEREAS, the parties agree that it is in their best interest that the cost of said project be shared; and, WHEREAS, Minn. Stat. § 471.59 authorizes political subdivisions of the state to enter into joint powers agreements for the joint exercise of powers common to each. NOW, THEREFORE, IT IS MUTUALLY STIPULATED AND AGREED: I. PURPOSE The parties have joined together for the purpose of reconstructing CSAH 34 (Birch Street) from Hokah Drive to 550 feet east of West Shadow Lake Drive as described in the preliminary design plans. The County project number is SAP 002-634-003 and the City project number is SAP 210-020-010. Said engineering plans are filed in the office of the Anoka County Highway Department and incorporated herein by reference. The parties to this Joint Powers Agreement (JPA) agree in principle that construction of SAP 002-634- 003 / SAP 210-020-010 , is in the best interest of the traveling public and that the Preliminary Layout as shown in Exhibit “A” defines the preliminary design of the Project. It is agreed that the Exhibit “A” Layout dated has been reviewed and accepted by the parties and is suitable for preparation of final construction documents. Any significant changes 2 made hereafter to the design as presented in the Exhibit “A” Layout will require approval by the parties as an amendment to this JPA. These same changes will require a change in the cost share to include any additional design engineering costs that may occur. II. METHOD The County shall cause the construction of Anoka County Project SAP 002-634-003, City project number SAP 210-020-010, in conformance with proposed engineering plans and specifications. IMPROVEMENTS It is agreed by the parties that in 2021, CSAH 34 will be reconstructed with concrete median to the extent shown in ‘Exhibit A’. Improvements include but are not limited to: roadway widening, roundabout construction, storm sewer and associated ponding, turn lanes, shoulders, bituminous trails, retaining walls/fencing and concrete curb & gutter. The costs of these improvements have been estimated for this agreement and will be finalized after bids have been received. These costs will be shared by the County and the City. INTERSECTIONS: As agreed by the parties, improvements to the following intersections have been incorporated in the ‘Exhibit A’ Layout design: CSAH 34 @ Hokah Drive: Full Access CSAH 34 @ Totem Trail: ¾ Access CSAH 34 @ Tomahawk Trail: Roundabout – Full Access CSAH 34 @ West Rice Lake Elementary School Entrance: Closed (relocated to Roundabout) CSAH 34 @ East Rice Lake Elementary School Entrance: Right-in/Right-out Access CSAH 34 @ Vaughan Court: Right-in/Right-out Access CSAH 34 @ West Shadow Lake Drive: Roundabout – Full Access CSAH 34 @ Kingfisher Court: Full Access RIGHT OF WAY: The parties agree that the County will acquire all necessary right-of-way and easements for the Project. Acquisition of any additional right-of-way and/or easements needed for improvements to city street intersections beyond what is defined in the ‘Exhibit A’ Layout will be the responsibility of the City. It is agreed by the parties that all necessary right of way and easements will be in legal possession of the County prior to acceptance of bids for the project. The County will work with the City on reserving a portion of land for a potential future City well on the site of 509 Birch Street. Further details on this transfer will be discussed and negotiated in a separate JPA if the City chooses to construct a well on the site reserved by the County. The City will transfer necessary City owned property to the County if needed for the road construction project. DRAINAGE: The City shall pay for a percentage of the cost of the storm sewer system, including the detension basins and their outlet structures. The City portion of the cost is based on contributing flow through the storm sewer system determined by the product of contributing area and runoff coefficient. 3 TRAFFIC CONTROL: The parties agree and understand the cost share for traffic control for the city shall be a prorated share based on the City project cost divided by the total project cost. The parties understand and agree that CSAH 34 will be open to two-way thru traffic during some phases of construction. During certain phases of construction CSAH 34 will be open to one-way traffic, while the opposing traffic will be detoured through CSAH 49, Ash Street, CR J, CSAH 32 and CSAH 21.When necessary, CSAH 34 will be closed to through traffic and detoured through CSAH 49, Ash Street, CR J, CSAH 32 and CSAH 21. Closures will be limited. Access for local and emergency vechicles will be maintained during all phases of construction. The County in partnership with the City is currently working on completing a detailed pedestrian crossing analysis for a City requested pedestrian flasher system to be studied at the intersection of Tomahawk Trail and CSAH 34. The warrants for this crossing have yet to be determined. After the data has been analyzed the County will share the data with the City to determine how to proceed. Upon completion of the study the City and County agree to discuss costs and develop an onging maintenance agreement. DRIVEWAYS: The parties agree that all driveways affected by the Project will be reconstructed in kind at 100% project cost with the cost of any upgrades requested by the City, including concrete aprons, to be the sole responsibility of the City. LANDSCAPING/STREETSCAPING: The parties agree that if the City wishes to include landscaping or streetscape features in the project, they shall be designed in accordance with Anoka County Highway Department Landscape/Streetscape Guidelines. The City shall supply the signed plan sheets and specifications for the proposed landscape/streetscape. The total cost of the design as well as the construction cost above standard cost will be at the expense of the City. All construction documents must be submitted to the County by June 20, 2020. Maintenance of any landscaping/streetscaping will be the sole responsibility of the City. RETAINING WALLS: The parties agree that if the City wishes to include aesthetic treatment to any retaining walls, any construction cost above standard cost will be at the expense of the requesting City LIGHTING: The parties agree that the roundabout intersection lighting costs will be shared per the standard County cost share for new traffic signals, with the City paying for 75% of the roundabout lighting. If the City would like additional lighting on the project, or requests upgraded lighting materials (e.g. decorative poles, fixtures, and luminaires), this additional cost would be 100% City responsibility. Lighting will be installed in accordance with the City lighting ordinance and will contain LED fixtures wherever possible and provided such lighting is within the budget for the Project. UTILITIES: The parties agree that the ‘Exhibit A’ Layout does not include specific proposed utility locations. The City will be responsible for the design of any sanitary sewer and water main improvements and/or 4 relocations due to road reconstruction, which will be incorporated into the project bid documents. The cost of the design, construction, and inspection of these features shall be the responsibility of the City. The City’s design of the sanitary sewer and water main utilities are to include signed plans, specifications, and estimated quantities (using MnDOT Trns*port Item List Numbers) and cost. All construction documents must be submitted to the County by May 20, 2020. PERMITS: The parties agree that the County will secure all necessary permits for this Project. The City agrees to coordinate with the County in securing any permits required by the Rice Creek Watershed District, City permits or variances, as well as any other permits or variances that may be required. The County also requests that the City inform the County of any ordinances or city regulations that affect construction at the time of the signing of this JPA. (e.g. setbacks, tree clearing ordinances, or any other city ordinances.) III. COSTS The contract costs of the work, or if the work is not contracted, the cost of all labor, materials, normal engineering costs and equipment rental required to complete the work, shall constitute the actual "construction costs" and shall be so referred to herein. "Estimated construction costs" are good faith projections of the costs, which will be incurred for this project. Actual costs will vary and those will be the costs for which the relevant parties will be responsible. The estimated construction cost of the project is $4,269,398.00. The total estimated construction cost to the City is $476,534.50. State Aid funds have been allocated for this project. The City participation in construction engineering will be at a rate of eight percent (8%) of their designated construction share of $476,534.50. The estimated cost to the City for construction engineering is $38,122.76. In summary, the total City share of this project is $514,657.26 (includes construction and construction engineering costs). For a detailed breakdown of the cost splits for this project see “EXHIBIT B”. Upon award of the contract, the City shall pay to the County, upon written demand by the County, ninety five percent (95%) of its portion of the cost of the project estimated at $488,924.40. Prior to billing, this estimate will be updated by the County to reflect the actual bid prices as awarded. An updated cost estimate shall be provided to the City at the time of billing. The City's share of the cost of the project shall include only construction and construction engineering expense and does not include engineering design and administrative expenses incurred by the County. Upon final completion of the project, the City's share of the construction cost will be based upon actual construction costs. If necessary, adjustments to the initial ninety five percent (95%) charged will be made in the form of credit or additional charges to the City's share. Also, the remaining five percent (5%) of the City's portion of the construction costs shall be paid.. IV. TERM This Agreement shall continue until terminated as provided hereinafter. V. DISBURSEMENT OF FUNDS 5 All funds disbursed by the County or City pursuant to this Agreement shall be disbursed by each entity pursuant to the method provided by law. VI. CONTRACTS AND PURCHASES All contracts let and purchases made pursuant to this Agreement shall be made by the County in conformance to the State laws. VII. STRICT ACCOUNTABILITY A strict accounting shall be made of all funds and report of all receipts shall be made upon request by either party. Prior to City payment to the County, the County shall provide the City a copy of all cost participation documents submitted to MnDOT State Aid. VIII. TERMINATION This Agreement may be terminated by either party at any time, with or without cause, upon not less than thirty (30) days written notice delivered by mail or in person to the other party. If notice is delivered by mail, it shall be deemed to be received two days after mailing. Such termination shall not be effective with respect to any solicitation of bids or any purchases of services or goods which occurred prior to such notice of termination. The City shall pay its pro rata share of costs which the County incurred prior to such notice of termination. IX. MAINTENANCE A. Maintenance of the completed watermain, sanitary sewer, storm sewer (except catch basins, catch basin leads, and sump structures within the roadway), detention basins (including ponds, pond outlet structures, grit chambers / collectors outside the roadway, and filtration systems) shall be the sole obligation of the City. B. Maintenance of the bituminous trails shall be the responsibility of the City. The City shall be responsible for general routine maintenance, such as, sweeping, clearing, plowing, trash removal and other incidental items and shall be responsible for long-term maintenance, such as bituminous overlays, crack sealing and replacement (unless replacement is part of a major County road improvement project). C. Maintenance of crosswalk pavement markings on City streets shall be the responsibility of the City. The City will be responsible for all crosswalk pavement markings for the crossings at all city streets. D. Maintenance of streetlights and cost of electrical power to the streetlights shall be the sole obligation of the City. The City will be responsible for long-term maintenance and replacement of the complete street light system including items such as: poles, fixtures, luminaires, and control cabinets. XI. NOTICE 6 For purposes of delivery of any notices herein, the notice shall be effective if delivered to the County Administrator of Anoka County, 2100 Third Avenue, Anoka, Minnesota 55303, on behalf of the County, and to the City Administrator of the City of Lino Lakes, 600 Town Center Parkway, Lino Lakes, MN 55014. XII. INDEMNIFICATION The City and County mutually agree to indemnify and hold harmless each other from any claims, losses, costs, expenses or damages resulting from the negligent acts or omissions of the respective officers, agents, or employees relating to activities conducted by either party under this Agreement. 7 XIII. ENTIRE AGREEMENT REQUIREMENT OF WRITING It is understood and agreed that the entire agreement of the parties is contained herein and that this Agreement supersedes all oral agreements and all negotiations between the parties relating to the subject matter thereof, as well as any previous agreement presently in effect between the parties to the subject matter thereof. Any alterations, variations, or modifications of the provisions of this Agreement shall be valid only when they have been reduced to writing and duly signed by the parties. IN WITNESS WHEREOF, the parties to this Agreement have hereunto set their hands on the dates written below. COUNTY OF ANOKA CITY OF LINO LAKES By: By: Rhonda Sivarajah Rob Rafferty County Administrator Mayor Dated: Dated: By: Julianne Bartell City Clerk Dated: RECOMMENDED FOR APPROVAL By: Joe J. MacPherson, P.E. County Engineer Dated: APPROVED AS TO FORM By: Dan Klint Assistant County Attorney Dated: 8 EXHIBIT C COST-SHARING AGREEMENT FOR PROJECTS CONSTRUCTED IN ANOKA COUNTY ITEMS COUNTY SHARE CITY SHARE Concrete Curb & Gutter 50% 50% Concrete Curb & Gutter for Median Construction 100% 0% Concrete Median 100% 0*1 Concrete Sidewalk 0% 100% Concrete Sidewalk Replacement 100% 0% Bikeways 0% 100% Bikeway Replacement 100%, 0% Unless existing trail not placed at edge of R/W Construction or Adjustment of Local Utilities 0% 100% Grading, Base and Bituminous 100% 0% Storm Sewer based on state aid letter*2 based on state aid letter*2 Driveway Upgrades 100%, in-kind 100%, of up-grades Traffic Signals, new (communities larger than 5,000) ½ the cost of its the cost of its legs of w/ State Aid approved SJR legs of the intersection the intersection plus ½ the cost of the County legs of the intersection Traffic Signals, replacement (communities larger than 5,000) the cost of its legs of the cost of its legs of w/ State Aid approved SJR the intersection the intersection Traffic Signals, new & replacements (communities less than 5,000) 100% 0% w/ State Aid approved SJR Traffic Signal, w/o State Aid approved SJR 0% 100% EVP 0% 100% Engineering Services *3 *3 Right-of-Way 100%*4 0% Street Lights 0% 100% Noise Walls 100%, if not previously notified*5 100%, if previously notified*5 *1 The County pays for 100% of Standard Median Design such as plain concrete. If a local unit of government requests decorative median such as brick, stamped concrete, or landscaping, the local unit will pay the additional cost above the cost of standard median. *2 In the event no State Aid is being used, or in the event the state aid letter does not determine cost split percentages, drainage cost shares will be computed by the proportion of contributing flow outside the County right of way to the total contributing flow. *3 Engineering shall be paid by the Lead Agency except that any participating agency will pay construction engineering in the amount of 8% of the construction costs paid by that agency. *4 In the event that the Township or City requests purchase of right-of-way in excess of the right-of-way required by County construction, the Township or City participates to the extent an agreement can be reached in these properties. For instance, a Township or City may request a sidewalk be constructed alongside a County roadway which would require additional right-of-way, in which case the Township or City may pay for that portion of the right-of-way. Acquisition of right-of-way for new alignments shall be the responsibility of the Township or City in which the alignment is located. This provision may be waived by agreement with the County Board if the roadway replaces an existing alignment and the local unit of government takes jurisdiction of that existing alignment. In addition, any costs, including right-of-way costs, incurred by the County because a Township or City did not acquire sufficient right-of-way during the platting process or redevelopment process as requested by the County shall be paid by the Township or City. *5 Notification includes any letter to the agency indicating that noise will potentially be an issue in the future, likely received during the Plat Review Process. Maintenance shall be the responsibility of the agency paying for the initial installation. When the County is the responsible agency, it shall pay 100% of Standard Noise Wall Cost. If a local agency requests decorative noise walls, the requesting agency will pay the additional cost above the cost of standard noise wall. 6492 6518 WARE RD 6501 WARE RD 6497 6483 6550 DEERWOOD LN 6510 6526 WARE RD 6526 DEERWOOD LN 64866489 6498 6490 HOKAH DR 6492 6518 HOKAH DR 401 6489 HOKAH DR 403 6514 FAWN LN 6508 6520 DEERWOOD LN 6513 FAWN LN 601 6501 6507 600 485 6543 510 6537 453 641 695 6498 6441 RICE CT 655 473 6494 6491 65496517 681 881 OLD BIRCH ST 509 638 870 865 BIRCH ST 575 495 855 875 441 498 552 660 424 6526 HOKAH DR 6497 6495 6449 RICE CT 432416 6534 WARE RD 6495 6498 6490 6521 6498 6490 WARE RD 440 6509 6500 6501 6525 HOKAH DR 461 6491 6498 6457 RICE CT 6501 6514 DEERWOOD LN6520 FAWN LN 6519 FAWN LN 6502 6497 6498 6499 6485 717 725 733 741 749 LN DEERWOOD 6544 LN DEERWOOD 6538 LN DEERWOOD 6532 LAKES DR COUNTRY 720 LAKES DR COUNTRY 726 LAKES DR COUNTRY 738 LAKES DR COUNTRY 744 LAKES DR COUNTRY 750 LAKES DR COUNTRY 756 609 6508 6540 6540 651 651 638 575 6498 6492 6487 6482 6489 6490 WARE ROADHOKAH DRTOTEM TRAILTOMAHAWK TRAILW SHADOW LAKE DRDEERWOOD LANE DEERWOOD LANEOLD BIRCH STOLD BIRCH STLAKERESHANAUPATH & FILENAME:c:\users\aplowman\appdata\local\bentley\projectwise\workingdir\wsbeng-pw.bentley.com_wsbeng-pw-01\aplowman@wsbeng.com\dms04506\014400_Exhibit 7.dgnAnoka County, Minnesota 8' SHLD 10' TRAIL 300' X 13' RTL 12' THRU LANE 1:15 1:15 1:15 1:15 8' SHLD 12' THRU LANE 141' ICD 300' X 13' RTL 300' X 13' RTL 8' SHLD 8' SHLD 10' TRAIL N 0 100 ft 200 ft 300' X 13' LTL 300' X 13' LTL 14' THRU LANE 14' THRU LANE 14' THRU LANE 14' THRU LANE14' THRU LANE 14' THRU LANE 14' THRU LANE 763-324-3100 Department with any questions: Contact Anoka County Highway from this draft plan. The actual project plan may differ as shown in part or in whole. Anoka County to construct the project This draft document does not commit information only. change, and is provided for This document is a draft, subject to design concept only. This drawing represents a potential Disclaimer: 763-324-3100 Department with any questions: Contact Anoka County Highway from this draft plan. The actual project plan may differ as shown in part or in whole. Anoka County to construct the project This draft document does not commit information only. change, and is provided for This document is a draft, subject to design concept only. This drawing represents a potential Disclaimer: CSAH 34 (Birch Street) Geometric Layout BIRCH STREET BIRCH STREET14' THRU LANE 8' SHLD 8' TRAIL 8' TRAIL 8' TRAIL 1:10 RICE LAKE ELEMENTARY SCHOOL POTENTIAL POND 12'LANE 13'RTL 13'LTL 13'SHLD 14'LANE 1:15 12'LANE 13'LTL 14'LANE 13'RTL 13'LTL 14'LANE 13'RTL 1:15 1:15 Trail Median/Curb & Gutter Legend Roadway Shoulder Truck Apron Blvd/Central Island Driveway Apron SUBJECT TO CHANGE PRELIMINARY DRAFT SUBJECT TO CHANGE PRELIMINARY DRAFT Potential Pond Location Mill and Overlay 34 COUNTY 34 COUNTY WSB Project:CSAH 34 ROADWAY IMPROVEMENTS Project Location:ANOKA COUNTY, MN WSB Project No.:014400-000 Date:04/09/2020 Estimated Estimated Estimated Estimated Estimated Estimated Quantity Cost Quantity Cost Quantity Cost 2021.501 MOBILIZATION LUMP SUM $250,000.00 1.00 $250,000.00 0.89 $222,500.00 0.11 $27,500.00 2101.524 CLEARING TREE $250.00 24 $6,000.00 24.0 $6,000.00 2101.524 GRUBBING TREE $200.00 24 $4,800.00 24.0 $4,800.00 2104.502 REMOVE GATE VALVE EACH $300.00 5 $1,500.00 5.0 $1,500.00 2104.502 REMOVE HYDRANT EACH $250.00 3 $750.00 3.0 $750.00 2104.502 REMOVE DRAINAGE STRUCTURE EACH $300.00 20 $6,000.00 15.0 $4,500.00 5.0 $1,500.00 2104.502 REMOVE SIGN TYPE C EACH $35.00 42 $1,470.00 42.0 $1,470.00 2104.502 REMOVE SIGN TYPE D EACH $125.00 1 $125.00 1.0 $125.00 2104.502 REMOVE SIGN TYPE SPECIAL EACH $200.00 2 $400.00 2.0 $400.00 2104.502 SALVAGE SIGN TYPE SPECIAL EACH $90.00 4 $360.00 4.0 $360.00 2104.502 SALVAGE MAIL BOX SUPPORT EACH $50.00 13 $650.00 13.0 $650.00 2104.503 REMOVE WATER MAIN LIN FT $12.00 250 $3,000.00 250.0 $3,000.00 2104.503 SAWING BITUMINOUS PAVEMENT (FULL DEPTH)LIN FT $2.00 5000 $10,000.00 5000.0 $10,000.00 2104.503 REMOVE SEWER PIPE (STORM)LIN FT $20.00 780 $15,600.00 780.0 $15,600.00 2104.503 REMOVE CURB AND GUTTER LIN FT $5.00 2140 $10,700.00 2140.0 $10,700.00 2104.504 REMOVE CONCRETE DRIVEWAY PAVEMENT SQ YD $4.00 196 $784.00 196.0 $784.00 2104.504 REMOVE BITUMINOUS DRIVEWAY PAVEMENT SQ YD $3.00 922 $2,766.00 922.0 $2,766.00 2104.504 REMOVE BITUMINOUS PAVEMENT SQ YD $3.00 40899 $122,697.00 40899.0 $122,697.00 2104.518 REMOVE BITUMINOUS WALK SQ FT $1.00 51000 $51,000.00 51000.0 $51,000.00 2104.518 REMOVE CONCRETE WALK SQ FT $1.50 758 $1,137.00 758.0 $1,137.00 2106.507 EXCAVATION - COMMON CU YD $12.00 13826 $165,912.00 13826.0 $165,912.00 2106.507 EXCAVATION - SUBGRADE CU YD $14.00 10148 $142,072.00 10148.0 $142,072.00 2106.507 EXCAVATION - CHANNEL AND POND CU YD $16.00 2000 $32,000.00 2000.0 $32,000.00 2106.507 SELECT GRANULAR EMBANKMENT (CV)CU YD $22.00 9846 $216,612.00 9846.0 $216,612.00 2106.507 COMMON EMBANKMENT (CV) CU YD $3.00 5118 $15,354.00 5118.0 $15,354.00 2123.510 COMMON LABORERS HOUR $80.00 20 $1,600.00 20.0 $1,600.00 2123.510 DOZER HOUR $160.00 20 $3,200.00 20.0 $3,200.00 2123.510 10 CU YD TRUCK HOUR $180.00 20 $3,600.00 20.0 $3,600.00 2123.510 0.75 CU YD FRONT END LOADER HOUR $125.00 20 $2,500.00 20.0 $2,500.00 2123.610 STREET SWEEPER (WITH PICKUP BROOM)HOUR $140.00 20 $2,800.00 20.0 $2,800.00 2130.523 WATER M GALLON $40.00 10 $400.00 10.0 $400.00 2211.507 AGGREGATE BASE (CV) CLASS 5 CU YD $25.00 6357 $158,925.00 6357.0 $158,925.00 2232.504 MILL BITUMINOUS SURFACE (2.0")SQ YD $5.00 6217 $31,085.00 6217.0 $31,085.00 CITY Unit PriceDescriptionItem No.Unit PROJECT TOTAL COUNTY EXHIBIT B ENGINEER'S ESTIMATE Page 1 Engineer Estimate_(040920).xlsx Estimated Estimated Estimated Estimated Estimated Estimated Quantity Cost Quantity Cost Quantity Cost CITY Unit PriceDescriptionItem No.Unit PROJECT TOTAL COUNTY 2301.504 CONCRETE PAVEMENT 7.0"SQ YD $75.00 3092 $231,900.00 3092.0 $231,900.00 2301.504 CONCRETE PAVEMENT 7.0" SPECIAL SQ YD $80.00 645 $51,600.00 645.0 $51,600.00 2302.602 DRILL & GROUT REINF BAR (EPOXY COATED)EACH $22.00 161 $3,542.00 161.0 $3,542.00 2360.509 TYPE SP 9.5 WEARING COURSE MIXTURE (2,B)TON $85.00 951 $80,835.00 951.0 $80,835.00 2360.509 TYPE SP 12.5 NON WEARING COURSE MIXTURE (3,B)TON $75.00 2997 $224,775.00 2997.0 $224,775.00 2360.509 TYPE SP 12.5 WEARING COURSE MIXTURE (3,F)TON $80.00 5790 $463,200.00 5790.0 $463,200.00 2402.503 ORNAMENTAL METAL RAILING LIN FT $120.00 150 $18,000.00 150.0 $18,000.00 2411.618 MODULAR BLOCK RETAINING WALL SQ FT $60.00 750 $45,000.00 750.0 $45,000.00 2501.502 30" RC PIPE APRON EACH $1,150.00 3 $3,450.00 3.0 $3,450.00 2501.602 TRASH GUARD FOR 30" PIPE APRON EACH $1,500.00 3 $4,500.00 3.0 $4,500.00 2503.503 15" RC PIPE SEWER DESIGN 3006 CLASS V LIN FT $65.00 2216 $144,040.00 1995.0 $129,675.00 221.0 $14,365.00 2503.503 18" RC PIPE SEWER DESIGN 3006 LIN FT $68.00 1500 $102,000.00 1350.0 $91,800.00 150.0 $10,200.00 2503.503 21" RC PIPE SEWER DESIGN 3006 CLASS III LIN FT $70.00 377 $26,390.00 340.0 $23,800.00 37.0 $2,590.00 2503.503 24" RC PIPE SEWER DESIGN 3006 LIN FT $75.00 40 $3,000.00 37.0 $2,775.00 3.0 $225.00 2503.503 33" RC PIPE SEWER DESIGN 3006 LIN FT $135.00 54 $7,290.00 49.0 $6,615.00 5.0 $675.00 2503.602 CONNECT TO EXISTING STORM SEWER EACH $1,200.00 2 $2,400.00 1.8 $2,160.00 0.2 $240.00 2504.602 CONNECT TO EXISTING WATER MAIN EACH $1,500.00 4 $6,000.00 4.0 $6,000.00 2504.602 HYDRANT EACH $3,500.00 3 $10,500.00 3.0 $10,500.00 2504.602 16" GATE VALVE AND BOX EACH $4,500.00 4 $18,000.00 4.0 $18,000.00 2504.603 16" WATERMAIN DUCTILE IRON CL 51 LIN FT $220.00 600 $132,000.00 600.0 $132,000.00 2504.608 DUCTILE IRON FITTINGS POUND $6.00 2600 $15,600.00 2600.0 $15,600.00 2506.502 CASTING ASSEMBLY EACH $750.00 54 $40,500.00 49.0 $36,750.00 5.0 $3,750.00 2506.502 CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL 1 EACH $5,000.00 4 $20,000.00 3.6 $18,000.00 0.4 $2,000.00 2506.502 ADJUST FRAME AND RING CASTING EACH $500.00 15 $7,500.00 15.0 $7,500.00 2506.503 CONSTRUCT DRAINAGE STRUCTURE DESIGN H LIN FT $650.00 3 $1,950.00 2.7 $1,755.00 0.3 $195.00 2506.503 CONSTRUCT DRAINAGE STRUCTURE DESIGN SD-48 LIN FT $575.00 3 $1,725.00 2.7 $1,552.50 0.3 $172.50 2506.503 CONSTRUCT DRAINAGE STRUCTURE DESIGN SD-60 LIN FT $650.00 139 $90,350.00 125.1 $81,315.00 13.9 $9,035.00 2506.503 CONSTRUCT DRAINAGE STRUCTURE DESIGN 48-4020 LIN FT $750.00 184 $138,000.00 165.6 $124,200.00 18.4 $13,800.00 2506.503 CONSTRUCT DRAINAGE STRUCTURE DESIGN 60-4020 LIN FT $1,000.00 64 $64,000.00 57.6 $57,600.00 6.4 $6,400.00 2506.503 CONSTRUCT DRAINAGE STRUCTURE DESIGN 72-4020 LIN FT $1,300.00 14 $18,720.00 10.8 $14,040.00 3.6 $4,680.00 2521.518 4" CONCRETE WALK SQ FT $6.00 17208 $103,248.00 17208.0 $103,248.00 2521.518 6" CONCRETE WALK SQ FT $10.00 5408 $54,080.00 5408.0 $54,080.00 2531.503 CONCRETE CURB AND GUTTER DESIGN R418 LIN FT $35.00 609 $21,315.00 609.0 $21,315.00 2531.503 CONCRETE CURB AND GUTTER DESIGN B418 (MOD)LIN FT $24.00 6422 $154,128.00 6422.0 $154,128.00 2531.503 CONCRETE CURB AND GUTTER DESIGN B424 LIN FT $22.00 9112 $200,464.00 4556.0 $100,232.00 4556.0 $100,232.00 2531.504 6" CONCRETE DRIVEWAY PAVEMENT SQ YD $60.00 915 $54,900.00 915.0 $54,900.00 2531.618 TRUNCATED DOMES SQ FT $42.00 772 $32,424.00 772.0 $32,424.00 2545.502 LIGHTING UNIT TYPE 9-40 EACH $4,500.00 16 $72,000.00 4.0 $18,000.00 12.0 $54,000.00 2545.502 LIGHT FOUNDATION DESIGN E EACH $1,000.00 16 $16,000.00 4.0 $4,000.00 12.0 $12,000.00 2545.502 SERVICE CABINET -TYPE L1 (MOD)EACH $2,500.00 2 $5,000.00 0.5 $1,250.00 1.5 $3,750.00 Page 2 Engineer Estimate_(040920).xlsx Estimated Estimated Estimated Estimated Estimated Estimated Quantity Cost Quantity Cost Quantity Cost CITY Unit PriceDescriptionItem No.Unit PROJECT TOTAL COUNTY 2545.502 SERVICE EQUIPMENT EACH $1,500.00 2 $3,000.00 0.5 $750.00 1.5 $2,250.00 2545.502 EQUIPMENT PAD B EACH $1,250.00 2 $2,500.00 0.5 $625.00 1.5 $1,875.00 2545.503 1.5" NON-METALLIC CONDUIT LIN FT $1.50 2000 $3,000.00 500.0 $750.00 1500.0 $2,250.00 2545.503 UNDERGROUND WIRE 1/C 8 AWG LIN FT $0.75 8000 $6,000.00 2000.0 $1,500.00 6000.0 $4,500.00 2554.615 IMPACT ATTENUATOR ASSEMBLY $2,000.00 2 $4,000.00 2.0 $4,000.00 2563.601 TRAFFIC CONTROL LUMP SUM $100,000.00 1.00 $100,000.00 0.89 $89,000.00 0.11 $11,000.00 2563.613 PORTABLE CHANGEABLE MESSAGE SIGN UNIT DAY $1,000.00 29 $29,000.00 29.0 $29,000.00 2564.518 SIGN PANELS TYPE C SQ FT $30.00 500 $15,000.00 500.0 $15,000.00 2564.518 SIGN PANELS TYPE D SQ FT $45.00 400 $18,000.00 400.0 $18,000.00 2573.501 STABILIZED CONSTRUCTION EXIT LUMP SUM $2,000.00 1 $2,000.00 1.0 $2,000.00 2573.502 STORM DRAIN INLET PROTECTION EACH $250.00 58 $14,500.00 58.0 $14,500.00 2573.502 CULVERT END CONTROLS EACH $200.00 3 $600.00 3.0 $600.00 2573.503 SILT FENCE, TYPE MS LIN FT $4.00 1500 $6,000.00 1500.0 $6,000.00 2573.503 SEDIMENT CONTROL LOG TYPE WOOD FIBER LIN FT $3.00 1000 $3,000.00 1000.0 $3,000.00 2574.508 FERTILIZER TYPE 3 POUND $1.00 1305 $1,305.00 1305.0 $1,305.00 2575.505 SEEDING ACRE $1,000.00 1 $1,300.00 1.3 $1,300.00 2575.508 SEED MIXTURE 25-121 POUND $10.00 228 $2,280.00 228.0 $2,280.00 2575.508 HYDRAULIC STABILIZED FIBER MATRIX POUND $2.00 9475 $18,950.00 9475.0 $18,950.00 2575.523 RAPID STABILIZATION METHOD 3 M GALLON $300.00 45 $13,500.00 45.0 $13,500.00 2582.503 4" SOLID LINE MULTI-COMPONENT GROUND IN LIN FT $1.00 19451 $19,451.00 19451.0 $19,451.00 2582.503 6" SOLID LINE MULTI-COMPONENT GROUND IN LIN FT $1.00 9800 $9,800.00 9800.0 $9,800.00 2582.503 4" DOUBLE SOLID LINE MULTI-COMPONENT GROUND IN LIN FT $1.00 9750 $9,750.00 9750.0 $9,750.00 2582.503 12" DOTTED LINE MULTI-COMPONENT GROUND IN (WR)LIN FT $3.00 143 $429.00 143.0 $429.00 2582.518 PAVEMENT MESSAGE PREFORM THERMOPLASTIC GROUND IN SQ FT $26.00 278 $7,228.00 278.0 $7,228.00 2582.518 CROSSWALK PREFORM THERMOPLASTIC GROUND IN SQ FT $20.00 1134 $22,680.00 1134.0 $22,680.00 ROADWAY CONSTRUCTION TOTAL $4,269,398.00 $3,792,863.50 $476,534.50 Page 3 Engineer Estimate_(040920).xlsx