Loading...
HomeMy WebLinkAbout05-11-2020 Council PacketEXPANDED AGENDA CITY COUNCIL AGENDA Monday, May 11, 2020 *********** City Council Meeting 6:30 p.m. Meeting to be held electronically Pursuant to MN Statute 13D.021 City Council: Mayor Rafferty, Councilmembers Cavegn, Lyden, Ruhland and Stoesz City Administrator: Jeff Karlson CITY COUNCIL MEETING, 6:30 P.M.  Call to Order and Roll Call - Councilmembers Stoesz, Lyden, Ruhland, Cavegn and Mayor Rafferty were present for the on-line meeting  Pledge of Allegiance  Open Mike / Public Comment (telephonically only) Jamie Jensen, St. Clair Estates developer, asked for assistance in finalizing his accounts with the City.  Setting the Agenda: Addition or Deletion of Agenda Items The agenda was approved as presented. 1. CONSENT AGENDA A) Consideration of Expenditures: i) May 11, 2020 (Check No. 112186 through 112241) in the amount of $158,863.97 B) Consider Approval of April 27, 2020 Work Session Minutes C) Consider Approval of April 27, 2020 Council Meeting Minutes D) Consider Approval of May 4, 2020 Board of Appeal Minutes Action Taken: Motion by Ruhland, seconded by Cavegn, to approve Consent Agenda Items 1A through 1D as presented, was adopted: Yeas, 5; Nays none 2. FINANCE DEPARTMENT REPORT No report 3. ADMINISTRATION DEPARTMENT REPORT A) Consider Pro Rata Fee Refunds and Payment Schedule Amendment for Annual Business Licenses, Julie Bartell How to Join the Meeting Phone: Dial 1 312 626 6799 Meeting ID: 865 3700 5267 Weblink: https://us02web.zoom.us/j/86537005267 Council Agenda -2- May 11, 2020 Action Taken: Motion by Ruhland, seconded by Lyden, to approve the fee changes as presented, was adopted: Yeas, 5; Nays none 4. PUBLIC SAFETY DEPARTMENT REPORT A) Consider Resolution 20-45 Approving Allina Ambulance as the Primary Ambulance Service for the City of Lino Lakes Action Taken: Motion by Lyden, seconded by Ruhland, to approve Resolution No. 20-45, the Lease Agreement with Allina Ambulance and the Allina Medical Direction & Training Agreement as presented, was adopted: Yeas, 5; Nays none 5. PUBLIC SERVICES DEPARTMENT REPORT No report 6. COMMUNITY DEVELOPMENT REPORT A) Nadeau Acres, Katie Larsen - i. Consider First Reading of Ordinance No. 02-20 Rezoning Property from R, Rural to R-1, Single Family Residential Action Taken: Motion by Stoesz, seconded by Cavegn, to approve the 1st Reading of Ordinance No. 02-20 as presented, was adopted: Yeas, 4; Nays, 1 (Lyden) ii. Consider Resolution No. 20-20 Approving Preliminary Plat and Opening Sub-District 3C & 3D of Utility Staging Area 2A (2020-2025) Action Taken: Motion by Stoesz, seconded by Ruhland, to approve Resolution No. 20-20 as presented, was adopted: Yeas, 3; Nays, 2 (Lyden, Cavegn) B) Lyngblomsten PUD Amendment #1, Katie Larsen i. Consider Resolution No. 20-44 Approving PUD Development Stage Plan Amendment #1-Site Plan and Grading & Drainage Plan Action Taken: Motion by Lyden, seconded by Stoesz, to approve Resolution No. 20-44 as presented, was adopted: Yeas, 5; Nays none C) Watermark 3rd Addition, Katie Larsen i. Consider Resolution No. 20-30 Approving PUD Final Plan/Final Plat Action Taken: Motion by Cavegn, seconded by Stoesz, to approve Resolution No. 20-30 as presented, was adopted: Yeas, 5; Nays none ii. Consider Resolution No. 20-31 Approving Development Agreement Action Taken: Motion by Cavegn, seconded by Ruhland, to approve Resolution No. 20-31 as presented, was adopted: Yeas, 5; Nays none D) Consider Resolution No. 20-46, Approving I-35E AUAR Update, Michael Grochala Action Taken: Motion by Cavegn, seconded by Lyden, to approve Resolution No. 20-46 as presented, was adopted: Yeas, 5; Nays none Council Agenda -3- May 11, 2020 7. UNFINISHED BUSINESS None 8. NEW BUSINESS None Adjournment Community Calendar – A Look Ahead May 11, 2020 through May 26, 2020 See meeting agendas for access information Tuesday, May 26 6:00 pm Council Work Session Tuesday, May 26 6:30 pm City Council Meeting Updated 5/8/2020 CITY COUNCIL AGENDA Monday, May 11, 2020 *********** City Council Meeting 6:30 p.m. Meeting to be held electronically Pursuant to MN Statute 13D.021 City Council: Mayor Rafferty, Councilmembers Cavegn, Lyden, Ruhland and Stoesz City Administrator: Jeff Karlson CITY COUNCIL MEETING, 6:30 P.M.  Call to Order and Roll Call  Pledge of Allegiance  Open Mike / Public Comment  Setting the Agenda: Addition or Deletion of Agenda Items 1. CONSENT AGENDA A) Consideration of Expenditures: i) May 11, 2020 (Check No. 112186 through 112241) in the amount of $158,863.97 B) Consider Approval of April 27, 2020 Work Session Minutes C) Consider Approval of April 27, 2020 Council Meeting Minutes D) Consider Approval of May 4, 2020 Board of Appeal Minutes 2. FINANCE DEPARTMENT REPORT No report 3. ADMINISTRATION DEPARTMENT REPORT A) Consider Pro Rata Fee Refunds and Payment Schedule Amendment for Annual Business Licenses, Julie Bartell 4. PUBLIC SAFETY DEPARTMENT REPORT A) Consider Resolution 20-45 Approving Allina Ambulance as the Primary Ambulance Service for the City of Lino Lakes How to Join the Meeting Phone: Dial 1 312 626 6799 Meeting ID: 865 3700 5267 Weblink: https://us02web.zoom.us/j/86537005267 Council Agenda -2- May 11, 2020 5. PUBLIC SERVICES DEPARTMENT REPORT No report 6. COMMUNITY DEVELOPMENT REPORT A) Nadeau Acres, Katie Larsen - Updated i. Consider First Reading of Ordinance No. 02-20 Rezoning Property from R, Rural to R-1, Single Family Residential ii. Consider Resolution No. 20-20 Approving Preliminary Plat and Opening Sub- District 3C & 3D of Utility Staging Area 2A (2020-2025) B) Lyngblomsten PUD Amendment #1, Katie Larsen i. Consider Resolution No. 20-44 Approving PUD Development Stage Plan Amendment #1-Site Plan and Grading & Drainage Plan C) Watermark 3rd Addition, Katie Larsen i. Consider Resolution No. 20-30 Approving PUD Final Plan/Final Plat ii. Consider Resolution No. 20-31 Approving Development Agreement D) Consider Resolution No.20-46, Approving I-35E AUAR Update, Michael Grochala 7. UNFINISHED BUSINESS None 8. NEW BUSINESS None Adjournment Community Calendar – A Look Ahead May 11, 2020 through May 26, 2020 See meeting agendas for access information Tuesday, May 26 6:00 pm Council Work Session Tuesday, May 26 6:30 pm City Council Meeting Expenditures May 11, 2020 Check #112186 to #112241 $158,863.97 City of Lino Lakes Activity Codes Code Description Code Description 401 Mayor/Council 817 Spring Fling 402 Administration 818 Winter Festival 403 Elections 819 Community Gardens 404 Cable TV 822 Family Corn Roast 405 Charter Administration 827 Gobbler Games 407 Finance 830 Adult Golf Lessons 414 Legal Consultants 835 Youth Skating Class 415 Economic Development 850 Golf Academy 416 Planning & Zoning 856 Youth Soccer 417 Engineering 857 Soccer Fundamentals 418 Community Development 860 Secret Shop 420 Police Protection 864 Preschool Playtime 421 Fire Protection 868 Little Goblins Party 422 Building Inspections 871 Flag Football 430 Streets 875 Snow Day 431 Fleet Management 876 Kite Day 432 Government Buildings 877 Rockin' in the Park 450 Parks 879 Movies in the Park 451 Recreation 890 Senior Programs 461 Environmental 462 Solid Waste Abatement 463 Forestry 494 Water 495 Sanitary Sewer 499 Other 802 Dodgeball Camp 806 Youth T-Ball 808 Youth Baseball Camp 810 Youth Playground 811 Youth Safety Camp 812 Youth Art Camps 814 Senior Programs/Book Club AP Checks by Account Number 05/11/2020 City Council Meeting Vendor Fund/Dept Account Amount Check # Description AFSCME Council #5 101-000 101-000-2040-000 411.92 112187 PR Batch 00002.05.2020 Union Dues AFSCME Fidelity Security Life Insurance Co. 101-000 101-000-2040-000 4.87 112211 May Vision Insurance Premiums International Union 101-000 101-000-2040-000 525.00 112189 PR Batch 00002.05.2020 Union Dues 49ers Law Enforcement Labor Services 101-000 101-000-2040-000 1,364.00 112190 PR Batch 00002.05.2020 Union Dues LELS Fidelity Security Life Insurance Co. 101-000 101-000-2048-000 90.95 112211 May Vision Insurance Premiums Noah Acquisitions LLC 101-000 101-000-3254-000 53.60 112227 No Permit Required for Water Softener Installation 101-000 Total 2,450.34 Shred-it c/o Stericycle Inc. 101-402 101-402-4410-000 26.24 112235 Document Destruction 101-402 Total 26.24 GDO Law 101-414 101-414-4303-000 8,500.00 112214 April Legal Prosecutor Contract 101-414 Total 8,500.00 Conney Safety 101-420 101-420-4211-000 66.95 112204 KC Kleenguard A40 Hoods Menards - Forest Lake 101-420 101-420-4211-000 33.80 112223 Gorilla Black Duct Tape Streicher's Inc. 101-420 101-420-4211-000 53.10 112238 Department Ammo Streicher's Inc. 101-420 101-420-4370-000 105.99 112238 Uniform Allowance - T. Vang Xcel Energy 101-420 101-420-4381-000 3.47 112191 Electric-Police Bureau of Criminal Apprehension 101-420 101-420-4410-000 390.00 112201 CJDN State GF & CJDN BCA Access Fee Metro Sales Incorporated 101-420 101-420-4410-000 36.00 112224 Copier Maintenance Ricoh/MP 4055SP Performance Plus LLC 101-420 101-420-4410-000 44.00 112230 Mask Fit Respirator - A. Ng Shred-it c/o Stericycle Inc. 101-420 101-420-4410-000 52.48 112235 Document Destruction 101-420 Total 785.79 Aspen Mills Inc. 101-421 101-421-4370-000 223.20 112197 Fire Uniform - V. Kasprowicz 101-421 Total 223.20 Frattallone's/Circle Pines Ace 101-430 101-430-4211-000 5.58 112212 Pipe Hex Nipple Menards - Forest Lake 101-430 101-430-4211-000 30.12 112223 Pine Boards Menards - Forest Lake 101-430 101-430-4211-000 52.56 112223 Lumber Midwest Groundcover 101-430 101-430-4211-000 5,400.00 112225 Hardwood Mulch Installation Street Smart Rental 101-430 101-430-4223-000 1,452.50 112237 Five Type III Portable Barricades Xcel Energy 101-430 101-430-4385-000 494.28 112191 Electric-Street Lights Roadkill Animal Control 101-430 101-430-4410-000 186.00 112233 March Deer Pick- up/Disposal Street Smart Rental 101-430 101-430-4415-000 350.00 112237 Two Arrow Board Trailers & Attenuator for Lake Dr. Median Work 101-430 Total 7,971.04 Batteries Plus Bulbs 101-431 101-431-4221-000 134.95 112198 #383 Battery Boyer Trucks Inc. 101-431 101-431-4221-000 212.32 112199 #434 Tank - Air. P Mounting Factory Motor Parts Company 101-431 101-431-4221-000 185.98 112209 #394 Caliper Asy Brakes Factory Motor Parts Company 101-431 101-431-4221-000 -112.00 112209 Caliper Asy Brakes Core Credit Factory Motor Parts Company 101-431 101-431-4221-000 102.45 112209 #119 Del 51Ps Frontier Ag & Turf 101-431 101-431-4221-000 149.38 112213 #135 5 Gal Hygards Frontier Ag & Turf 101-431 101-431-4221-000 22.41 112213 #144 Sec Air Filter Hugo Equipment Company 101-431 101-431-4221-000 18.99 112218 Buffalo Blower Air Filter Hydraulics Plus & Consulting 101-431 101-431-4221-000 96.46 112219 Grapple Bucket Attachment L.T.G. Power Equipment 101-431 101-431-4221-000 204.54 112222 #415 Oil Filter & Hydro Change Kit L.T.G. Power Equipment 101-431 101-431-4221-000 49.75 112222 #415 15W50 Oil O'Reilly Automotive Stores 101-431 101-431-4221-000 207.83 112229 #Stock Oil & Air Filters O'Reilly Automotive Stores 101-431 101-431-4221-000 68.45 112229 #135 Oil Filter & Hyd Filter O'Reilly Automotive Stores 101-431 101-431-4221-000 -43.36 112229 Parts Return/Credit O'Reilly Automotive Stores 101-431 101-431-4221-000 10.15 112229 #144 Fuel Filter O'Reilly Automotive Stores 101-431 101-431-4221-000 21.70 112229 #Stock Oil Filters Custom Fire Apparatus Inc. 101-431 101-431-4363-000 1,405.34 112207 #620 E-11 Extrication Tray Bent Claim 3-4-2020 Towmaster 101-431 101-431-4363-000 9,612.00 112239 #218 Plow Truck Scraper Claim 101-431 Total 12,347.34 O'Reilly Automotive Stores 101-432 101-432-4211-000 18.77 112229 Carpet & Upholstery Cleaner Menards - Forest Lake 101-432 101-432-4211-503 258.41 112223 Acrylic Sheet Sheet Cutter Stove Bolt Corner Brace Menards - Forest Lake 101-432 101-432-4211-503 61.18 112223 Brass Ball Eip Menards - Forest Lake 101-432 101-432-4211-503 23.56 112223 Com GR Bracket Winnick Supply Inc. 101-432 101-432-4211-503 3.27 112241 Sloan Vacuum Breaker Repair Kit Winnick Supply Inc. 101-432 101-432-4211-503 20.48 112241 5/8" Silver & Deming Bit Winnick Supply Inc. 101-432 101-432-4211-503 46.97 112241 Brass Closet Spud Sloan Vacuum Breaker & Spud Coupling Assembly Anoka County Property Records & Taxation 101-432 101-432-4300-500 328.40 112195 2020 Property Tax Solid Waste Management Charge Anoka County Treasury Office 101-432 101-432-4300-500 75.00 112196 May Cac Fiber Anoka County Property Records & Taxation 101-432 101-432-4300-501 545.16 112195 2020 Property Tax Solid Waste Management Charge Anoka County Treasury Office 101-432 101-432-4300-501 75.00 112196 May Cac Fiber Anoka County Property Records & Taxation 101-432 101-432-4300-502 545.16 112195 2020 Property Tax Solid Waste Management Charge Page 1 AP Checks by Account Number 05/11/2020 City Council Meeting Vendor Fund/Dept Account Amount Check # Description Anoka County Property Records & Taxation 101-432 101-432-4300-503 545.16 112195 2020 Property Tax Solid Waste Management Charge Anoka County Treasury Office 101-432 101-432-4300-503 75.00 112196 May Cac Fiber Wheeler Hardware Company 101-432 101-432-4300-503 9,880.00 112240 Exit Device Replacements Comcast 101-432 101-432-4321-502 352.28 112203 May Phone & Internet CenturyLink 101-432 101-432-4321-503 55.61 112188 Phone - Civic Complex Fire Protection Equipment Xcel Energy 101-432 101-432-4381-501 337.98 112191 Electric-Fire Station #1 Xcel Energy 101-432 101-432-4381-502 932.08 112191 Electric-Fire Station #2 Xcel Energy 101-432 101-432-4381-503 3,531.90 112191 Electric-Civic Complex CenterPoint Energy 101-432 101-432-4383-000 73.40 112202 Natural Gas - 7685 Lake Dr AmeriPride Services Inc. 101-432 101-432-4410-503 172.20 112193 Mats Metro Sales Incorporated 101-432 101-432-4410-503 142.77 112224 Copier Maintenance Ricoh/MP C307 101-432 Total 18,099.74 Hardwood Creek Lumber Inc. 101-450 101-450-4211-000 114.24 112216 48" Pine Lath 1"x2"x48" Hubs Xcel Energy 101-450 101-450-4381-000 126.91 112191 Electric-Parks All Seasons Rental Inc. 101-450 101-450-4415-000 60.35 112192 Chop Saw & Diamond Blade 101-450 Total 301.50 Gerten Greenhouses & Garden Center Inc. 101-461 101-461-4211-000 132.90 112215 Tree - Age Arborplugs Aquaneat Hardwood Creek Lumber Inc. 101-461 101-461-4211-000 114.24 112216 48" Pine Lath 1"x2"x48" Hubs 101-461 Total 247.14 Gerten Greenhouses & Garden Center Inc. 101-463 101-463-4211-000 2,377.20 112215 Tree - Age Arborplugs Aquaneat 101-463 Total 2,377.20 Anoka County Attorney's Office 207-420 207-420-4300-000 96.00 112194 Forfeiture Distribution ICR #17-085209-2 State of MN - Department of Finance 207-420 207-420-4300-000 48.00 112236 Forfeiture Distribution ICR #17-085209-2 207-420 Total 144.00 MN Department of Public Safety 208-420 208-420-4300-000 25.00 112226 Transfer & Title Fee for Seized Vehicle 2001 Chevrolet Silverado 208-420 Total 25.00 Northern Air Corporation 401-432 401-432-5000-000 16,320.00 112228 Main Contract LL Police Station Phase 2 TC 401-432 Total 16,320.00 Playpower LT Farmington Inc. 405-499 405-499-5000-120 65,848.50 112231 Playground Installation 405-499 Total 65,848.50 JAIN SAURABH 406-000 406-000-2020-000 1.16 112220 Refund Check 017849-000 703 EAGLE CT JOHNSON DARREN 406-000 406-000-2020-000 7.10 112221 Refund Check 014019-000 2231 TART LAKE RD 406-000 Total 8.26 Anoka County Property Records & Taxation 406-499 406-499-4300-000 1,494.52 112195 2020 Property Tax West Shadow Lake Dr Util Special Assessment 406-499 Total 1,494.52 JAIN SAURABH 601-000 601-000-2020-000 0.28 112220 Refund Check 017849-000 703 EAGLE CT JAIN SAURABH 601-000 601-000-2020-000 2.78 112220 Refund Check 017849-000 703 EAGLE CT JOHNSON DARREN 601-000 601-000-2020-000 35.42 112221 Refund Check 014019-000 2231 TART LAKE RD JOHNSON DARREN 601-000 601-000-2020-000 1.73 112221 Refund Check 014019-000 2231 TART LAKE RD 601-000 Total 40.21 Curtis 1000 Inc. 601-494 601-494-4200-000 723.45 112206 UB Statements Core & Main LP 601-494 601-494-4211-000 1,209.22 112205 FS1-724-15-CC4 6X15X1CC Tart Rep Clp 6.84-7.24 Od Core & Main LP 601-494 601-494-4211-000 196.47 112205 Kochek Storz Nozzle Caps Ferguson Waterworks #2518 601-494 601-494-4211-000 833.13 112210 LF 1 CC x Flr Ball Corp & F1-7.24 x 12.5 - CC4 Clmp Hawkins Inc. 601-494 601-494-4222-000 50.00 112217 Chlorine Cylinders Circle Pines Post Office 601-494 601-494-4322-000 441.60 112186 Utility Billing Postage Xcel Energy 601-494 601-494-4381-000 2,894.87 112191 Electric-Water 601-494 Total 6,348.74 JAIN SAURABH 602-000 602-000-2020-000 6.44 112220 Refund Check 017849-000 703 EAGLE CT JOHNSON DARREN 602-000 602-000-2020-000 39.57 112221 Refund Check 014019-000 2231 TART LAKE RD JOHNSON DARREN 602-000 602-000-2020-000 9.11 112221 Refund Check 014019-000 2231 TART LAKE RD 602-000 Total 55.12 Curtis 1000 Inc. 602-495 602-495-4200-000 723.45 112206 UB Statements Bryan Rock Products Inc. 602-495 602-495-4211-000 3,031.80 112200 3/4" With Fin Davids Hydro Vac Inc. 602-495 602-495-4300-000 5,303.00 112208 Vac Services - 1477 Snow Goose Trl. Davids Hydro Vac Inc. 602-495 602-495-4300-000 1,430.00 112208 Vac Services - 1477 Snow Goose Trl. Circle Pines Post Office 602-495 602-495-4322-000 441.60 112186 Utility Billing Postage Xcel Energy 602-495 602-495-4381-000 1,848.41 112191 Electric-Sewer 602-495 Total 12,778.26 Press Publications Inc. 801-000 801-000-2300-000 187.15 112232 Ord 03-20 Quad - 617 Apollo Drive Sharper Homes Inc. 801-000 801-000-2318-000 900.00 112234 Escrow Release - 6623 Enid Trail Anoka County Property Records & Taxation 801-000 801-000-2319-106 1,378.00 112195 2020 Property Tax NorthPointe 4th Addn Anoka County Property Records & Taxation 801-000 801-000-2339-102 6.68 112195 2020 Property Tax NorthPointe 5th Addn Page 2 AP Checks by Account Number 05/11/2020 City Council Meeting Vendor Fund/Dept Account Amount Check # Description 801-000 Total 2,471.83 Grand Total 158,863.97 Page 3 Electronic Funds Transfer MN Statute 471.38 Subd. 3 Council Meeting May 11, 2020 Transfer In/(Out) 4/27/2020 Wire from 4M Fund (2018A GO Bonds Acct) 150,000.00 4/27/2020 Wire from 4M Fund (Gen Acct) 600,000.00 4/27/2020 PD Patrol Holiday Pay 1/15/19 - 12/31/19 (22,461.05) 4/27/2020 PD Patrol Holiday Pay Federal Deposit (2,631.97) 4/27/2020 PD Patrol Holiday Pay PERA (8,549.12) 4/27/2020 PD Patrol Holiday Pay State (887.64) 5/1/2020 Council Payroll (3,364.82) 5/1/2020 Payroll #09 (135,023.91) 5/1/2020 Council Federal Deposit (146.60) 5/1/2020 Council PERA (367.62) 5/1/2020 Council State (34.06) 5/1/2020 Payroll #09 Federal Deposit (41,109.56) 5/1/2020 Payroll #09 PERA (44,874.04) 5/1/2020 Payroll #09 State (9,355.73) 5/1/2020 Payroll #09 Child Support (583.62) 5/1/2020 Payroll #09 H.S.A. Bank Pretax (3,165.50) 5/1/2020 Payroll #09 TASC Pretax (713.41) 5/1/2020 Payroll #09 ICMA 457 Def. Comp #301596 (4,665.00) 5/1/2020 Payroll #09 ICMA Roth IRA #706155 (615.75) 5/1/2020 Payroll #09 MSRS HCSP #98946-01 (3,090.77) 5/1/2020 Payroll #09 MSRS Def. Comp #98945-01 (3,210.00) 5/1/2020 Payroll #09 MSRS Roth IRS #98945-01 (575.00) CITY COUNCIL WORK SESSION DRAFT 1 CITY OF LINO LAKES 1 MINUTES 2 3 DATE : April 27, 2020 4 TIME STARTED : 6:00 p.m. 5 TIME ENDED : 6:30 p.m. 6 MEMBERS PRESENT : Council Member Stoesz, Lyden, Ruhland, 7 Cavegn and Mayor Rafferty 8 MEMBERS ABSENT : None 9 10 Staff members present: City Administrator Jeff Karlson; Finance Director Sarah Cotton; 11 Director of Public Safety John Swenson; Public Services Director Rick DeGardner; 12 Community Development Director Michael Grochala; City Engineer Diane Hankee; 13 Human Resources Manager Karissa Bartholomew; and City Clerk Julie Bartell 14 15 The council meeting was held telephonically on the Zoom Meeting platform and as 16 allowed by Minnesota Statutes 13D.021. 17 18 City Administrator Hiring Process – Human Resources Manager Bartholomew 19 explained that she is bringing forward a process proposed to fill the City Administrator 20 position since current Administrator Jeff Karlson will retire in August. The council has 21 previously approved a resolution including a preliminary offer of employment to Finance 22 Director Cotton. The process also considers filling the Finance Director position. 23 24 Council Member Stoesz asked how a compensation plan would fit into discussion. Ms. 25 Bartholomew explained that a proposal for an employment contract including 26 compensation will be part of the discussion. Council Member Stoesz said he is looking 27 forward to the transition. 28 29 Mayor Rafferty noted the proposed time line. He is wondering if the process is such that 30 there could be a little delay in hiring of another financial director. 31 32 Finance Director Cotton noted that staff is looking into an option should the finance 33 director position not be filled. Staff would intend to br ing forward that option. 34 35 Mayor Rafferty remarked that he understands that the position has been combined by 36 some cities so it comes to mind in this situation. The mayor asked Ms. Cotton about her 37 interest in the position and Ms. Cotton said she is very excited to serve the City in the 38 administrator positon. Mayor Rafferty said he has gotten to know and work with Ms. 39 Cotton. 40 41 Administrator Karlson said he is enthusiastically endorsing Ms. Cotton for the job. 42 43 Ms. Bartholomew indicated that she would work with the City Attorney on drafting an 44 employment contract. Mayor Rafferty suggested that the council would benefit from 45 CITY COUNCIL WORK SESSION DRAFT 2 seeing that document before being asked to vote on it. When asked about the four month 46 timeline, Ms. Bartholomew indicated that she has offered that time frame to allow 47 flexibility in filling the Finance Director position. 48 49 Council Member Lyden concurred with the Mayor’s remark that Ms. Cotton is thorough 50 and easy to work with. It’s a bonus to have someone coming in that already knows Lino 51 Lakes. He understands that filling the finance position is also driving the schedule. 52 53 Council Member Stoesz remarked that it should be clear in setting up an agreement what a 54 remote work environment would look like for both the administrator and finance director 55 position. 56 57 Mayor Rafferty noted the City Administrator job description currently and asked to see a 58 copy. Also he would like to see what has been rewritten into the position at this point. 59 He wants to fully understand what the administrator position entails and he asked that the 60 information be shared with all council members. 61 62 Review Regular Agenda of April 27, 2020 – 63 64 Item 2A – Finance Director explained that the resolution moves forward the process of 65 issuing and selling bonds for the water tower project. The process is fully laid out in the 66 staff report. She noted that financial consultant Terri Heaton of Baker Tilly will be 67 available to give a report at the council meeting. 68 69 Item 3A – Joint Cooperative Agreement with North Metro Telecommunications – 70 Administrator Karlson noted t hat his staff report includes a marked agreement indicating 71 the changes being requested. He will review at the council meeting. The changes are 72 fairly routine. 73 74 Item 3B – Protect Communit y Television Act – Administrator Karlson noted an order 75 issued by the FCC that would reduce certain franchise fees that go toward community 76 programming. The resolution supports protecting that funding source. 77 78 Item 4A – Public Safety Director Swenson explained the donation coming. The donation 79 relates to the City’s recent host role for an event for the canine organization. 80 81 Item 5A – Lift Station No. 5 – City Engineer Hankee explained that she has been working 82 with Utility staff on a situation with a force main. It is an important fixture and staff feels 83 its repair should be attended to as soon as possible. Based on cost estimates, a new line is 84 seen as more cost effective and two quotes will be presented. 85 86 Item 6B – Fog Seal on City Hall Parking Lot – City Engineer reviewed quotes received 87 and explained how the project could be coordinated. 88 89 CITY COUNCIL WORK SESSION DRAFT 3 Item 6C – Trail Grant – Community Development Director Grochala explained the 90 opportunity to apply for federal grant funding that would be very helpful in adding to a 91 trail on the north side of the city. 92 93 The meeting was adjourned at 6:30 p.m. 94 95 These minutes were considered, corrected and approved at the regular Council meeting held on 96 May 11 , 2020. 97 98 99 100 101 Julianne Bartell, City Clerk Rob Rafferty, Mayor 102 103 COUNCIL MINUTES DRAFT 1 CITY OF LINO LAKES 1 LINO LAKES CITY COUNCIL 2 REGULAR MEETING 3 MINUTES 4 5 DATE : April 27, 2020 6 TIME STARTED : 6:30 p.m. 7 TIME ENDED : 8:07 p.m. 8 MEMBERS PRESENT : Council Member Stoesz, Lyden, 9 Ruhland, Cavegn and Mayor Rafferty (via 10 Zoom) 11 MEMBERS ABSENT : 12 13 Staff members present: City Administrator Jeff Karlson; Finance Director Sarah Cotton; Director of 14 Public Safety John Swenson; Public Services Director Rick DeGardner; Community Development 15 Director Michael Grochala; City Engineer Diane Hankee; Utilities Supervisor Justin Williams; and 16 City Clerk Julie Bartell 17 18 The council meeting was held telephonically on the Zoom Meeting platform and as allowed by 19 Minnesota Statutes 13D.021. 20 21 PUBLIC COMMENT 22 Wayne LeBlanc, 1677 Peltier Lake Drive, representative of the environment for many years, 23 including working with restoring the Heron colony on Peltier Island. He works with the 24 Environmental Board. (He noted that comments were submitted by email to the council.) He has 25 concerns with the Rice Creek Watershed District (RCWD) and in particular the citizen advisory 26 operation which is supposed to be independent and listening to the public and should be free in their 27 discussion. Instead that advisory group is being controlled too much by the RCWD staff; he was 28 banned from discussing an issue. The information he wished to discuss was a water quality issue 29 and he noted the professional expertise behind it. His suggestion is to ask RCWD some questions 30 about the citizens committee (included in Mr. LeBlanc’s email to the City). Mayor Rafferty 31 thanked Mr. LeBlanc and suggested that the council see what answers can be obtained. 32 Mayor Rafferty read a message he’d received. Jamie Jensen, developer of St. Clair Estates in Lino 33 Lakes, asked the council for assistance in obtaining funds back from the City. 34 SETTING THE AGENDA 35 The agenda had been amended to remove Items 8A and 8B. 36 CONSENT AGENDA 37 Councilmember Stoesz moved to approve the Consent Agenda, Items 1A through 1E as presented. 38 Councilmember Lyden seconded the motion. Motion carried: Yeas, 5; Nays none. 39 40 ITEM ACTION 41 Consideration of Expenditures: 42 A) April 27, 2020 (Check No. 112088 through 112185) in 43 the Amount of $637,430.90. Approved 44 COUNCIL MINUTES DRAFT 2 B) Consider Approval of April 6, 2020 45 Work Session Minutes Approved 46 C) Consider Approval of April 13, 2020 47 Council Meeting Minutes Approved 48 D) Consider Approval of Noise Ordinance Signage Approved 49 E) Consider Approval of Resolution No. 20-37, Approving 50 a Permit for Consumer Firework Sales at Target 51 Store 1448 Approved 52 FINANCE DEPARTMENT REPORT 53 2A) Consider Resolution No. 20-43, Providing for the Issuance and Sale of General 54 Obligation Utility Revenue Bonds, Series 2020A, in the Proposed Aggregate Principal Amount 55 of $4,800,000 – Finance Director Cotton reviewed the written staff report. The recommendation is 56 to move forward with the issuance and sale of bonds to finance the approved water tower project. 57 The bonds will be repaid over a period of 15 years. 58 Mayor Rafferty asked if there are important elements about this project that the council should 59 know. Ms. Cotton noted that the council adopted a resolution some time ago allowing the City to 60 pay for work that is done prior to receiving the bond proceeds; additionally there are measures in 61 place recognizing the current market. 62 Terri Heaton, financial consultant with Baker Tilly, reported. She explained that the resolution 63 authorizes a competitve sale on June 8, 2020 but if the market becomes volitale it allo ws for 64 flexibility. Mayor Rafferty asked if there is something to be cautiously looking at? Ms. Heaton 65 noted that the market has been pretty stable for the last few weeks, barring some volitilty tied to 66 certain types of announcements. 67 Council Member Cavegn asked, if the market does become volitale and bonds aren’t sold, what is in 68 place to pay expenses? Ms. Cotton said expenses would be paid with cash on hand, specifically from 69 the trunk utility fund and she is comfortable that could go on for some time. 70 Ms. Heaton noted that, from the bond side, the flexibility would be needed probably only up to two 71 weeks to a month if a delay is necessary. 72 Council Member Ruhland noted that he’s been watching the market closely. He is wondering if 73 there is any connection to what is occuring in the mor tgage based securities market. Ms. Heaton 74 noted twenty year markets and she feels that is back to stable post pandemic; we are in the early days 75 of pandemic, however, and so there could be changes ahead. 76 Council Member Stoesz asked, if there is a delay in construction due to social distancing, would 77 there be an impact on the bonds? Ms. Heaton explained that the City will have up to three years to 78 spend bond proceeds; past that, you can actually spread it out longer if necessary. 79 Council Member Ruhland asked about the interest rate; Ms. Heaton noted 1.93% for fifteen years. 80 Council Member Cavegn moved to approve Resolution No. 20-43 as presented. Council Member 81 Ruhland seconded the motion. Motion carried: Yeas, 5; Nays none 82 ADMINISTRATION DEPARTMENT REPORT 83 COUNCIL MINUTES DRAFT 3 3A) Consider Resolution No. 20-38, Amending Joint Cooperative Agreement with North 84 Metro Telecommunications Commission – Administrator Karlson explained that the resolution 85 would amend the City’s cooperative agreement with North Metro. He reviewed changes proposed: 86 - Creates one budget instead of two; 87 - Membership – strikes requirements that cities be geographically contiguous; 88 - Voting – allows the number of directors present to constitute a quorum; voting is clarified so 89 as to remove overweighted votes (he noted that votes are normally unanimous); 90 - Powers of Commission – bonds can be payable through peg fees in addition to other sources. 91 Council Member Stoesz, Lino Lakes’ representative on and Chair of the North Metro Board, 92 reported that the agreement was reviewed extensivley by the Board and he feels this is well written; 93 he fully supports the changes proposed. 94 Council Member Lyden moved to approve Resolution No. 20-38 as presented. Council Member 95 Stoesz seconded the motion. Motion carried: Yeas, 5; Nays none 96 3B) Consider Resolution No. 20-41, Supporting the Protect Community Television Act, - 97 Administrator Karlson explained that the FCC has ruled that certain non monetary consideration can 98 be subtracted from the franchise fees received by communities. North Metro TV provides a lot of 99 good community programming that is funded by those fees. He recommmends that the City adopt 100 this resolution that supports continuing fees for community programming. 101 Council Member Stoesz remarked that this relates to a federal matter and, while the City of Lino 102 Lakes is small portion of the impact, he understands that this resolution sends a message that he 103 supports. 104 Council Member Stoesz moved to approve Resolution No. 20-41 as presented. Council Member 105 Cavegn seconded the motion. Motion carried: Yeas, 5; Nays none 106 PUBLIC SAFETY DEPARTMENT REPORT 107 4A) Consider Acceptance of Monetary Donation to Lino Lakes Public Safety Canine Unit – 108 Public S afety Director Swenson asked for the council’s approval to accept the donation laid out in 109 his report. The donation comes as a result of the City’s host role in the most recent canine event of 110 this organization. 111 Mayor Rafferty remarked that the event was very successful and he is thankful to the organization 112 for recognizing the City and for the donation. He supports the City’s canine unit; it’s a value to the 113 community. 114 Council Member Ruhland asked, what is the cost to train a canine? Director Swenson replied that 115 the cost of the dog and training for the most recent City canine was about $12,000 to $15,000. 116 Council Member Ruhland moved to accept the donation as presented. Council Member Lyden 117 seconded the motion. Motion carried: Yeas, 5; Nays none 118 PUBLIC SERVICES DEPARTMENT REPORT 119 5A) Consider Resolution No. 20-42, Accepting Quotes and Awarding a Construction Contract 120 for Lift Station No. 5 Force Main Repair – City Engineer Hankee explained the route of the sewer lines 121 in the Pheasant Hills neighborhood. A section of the line has been dug up for repairs in the past few 122 weeks and another section a couple years ago. Crews noted corrosion of those lines. She pointed out 123 COUNCIL MINUTES DRAFT 4 recent repairs and implications on a nearby trail. The watermain was also repaired and corrosion was 124 noted. Staff is concerned about the condition of the force main that serves a significant area of the City 125 and have discussed options. Staff is now recommending a directional drilling project to address the 126 situation. She noted the proposed project budget that includes extra funding for some exploratory work. 127 She explained the proposed project schedule. 128 Mayor Rafferty asked if this has anything to do with what goes down the sewer? Ms. Hankee said that 129 while there is additional clogging in certain areas that is probably related to , in this case, staff believes the 130 break relates to a corroded pipe. 131 Utility Supervisor Williams noted that staff is performing inspections on a regular basis to prevent larger 132 problems and there is an increase in certain things being flushed, but that isn’t related to this situation. 133 Council Member Lyden asked if this failure of the pipe is premature and, if so, related to what. City 134 Engineer Hankee, on the question of premature failure, said she’d have to evaluate that question further. 135 She noted that the life of the proposed new pipe is fifty to seventy years. There does seem to be more 136 failure in certain soils. 137 Utility Supervisor Williams added information on the new pipe type and it’s wear; the metal pipe that is 138 currently present is less resistant to certain corrosives. The new pipe is made of the best material for the 139 soil where it would be buryed. 140 Council Member Cavegn asked how much more of the metal pipe exists in the city. Also he’s concerned 141 about the funding source. Mr. Williams noted that this particular pipe is unique and he doesn’t see this 142 situation at other lift stations in the City at least for several years. Ms. Cotton noted that the project would 143 be paid from the Water Operating Fund which has over $6,000,000; those funds are intended to replace 144 existing infrastructure. 145 Council Member Cavegn asked if there is any expectation of loss of City funding either through property 146 taxes unpaid or people not paying utility bills. Ms. Cotton said she is monitoring the utility funds and isn’t 147 seeing an issue; on the property taxes, the City’s general fund reserve is available for a full six months of 148 expenses. 149 Council Member Stoesz asked about the resident impact; will there be service outages. Mr. Williams said 150 there should not be any service outages; further this is the least invasive type of repair to road surfaces. 151 Council Member Stoesz asked about communication to the residents. Ms. Hankee said there could be 152 mailings or door hangers; the homeowners association will be notified. 153 Council Member Stoesz asked if WSB & Associates will be doing the inspections. Ms. Hankee said staff 154 hasn’t gotten to the support level and she suspects that Mr. Williams will be able to do much of that. 155 Mayo r Rafferty thanked Mr. Williams for his good work; he’s unfortunately had to deal with a couple of 156 large breaks within a short period. He added that this is a proactive approach proposed by the City in a 157 situation of failure based on staff review and recommendation. 158 Council Member Lyden moved to approve Resolution No. 20-42 as presented. Council Member 159 Cavegn seconded the motion. Motion carried: Yeas, 5; Nays none 160 COMMUNITY DEVELOPMENT DEPARTMENT REPORT 161 6A) Item 6A regarding Watermark 3rd Addition had been removed from the agenda. 162 6B) Consider Resolution No. 20-39, Accepting Quotes and Awarding a Contract, City Hall 163 Parking Lot Fog Seal – City Engineer Hankee explained that the City Hall parking lot is in need of 164 COUNCIL MINUTES DRAFT 5 maintenance to preserve the surface. Staff has determined the best approach at this time is crack and 165 fog sealing. She was asked to contact the YMCA to see if they would like to join in a project and she 166 is checking with them. A low quote, funding and schedule were reviewed. 167 Mayor Rafferty asked what area is included. Ms. Hankee said it includes the drive to the doors, the 168 parking lot and the back of the lot by the Public Safety Department. 169 Council Member Stoesz asked if there can be more parking allowed (through striping) to accommodate 170 the many people who drop off at the day care center. Ms. Hankee said that staff did review striping 171 and found that t he way it is currently designed doesn’t leave much room for modification. There will 172 be an additional handicap parking spot on the north end of the lot. The front striping will remain the 173 same. 174 Council Member Cavegn asked if this should be delayed with less traffic at City Hall. Ms. Hankee 175 explained that staff has been trying to get the project going for several years and it fits into the overall 176 program this year; there is concern in delaying infrastructure projects and funding is in place currently 177 for the project. She added that a low traffic period is a good time for this type of project. 178 Public Services Director DeGardner remarked that this project could add another five to seven years to 179 the existing surface; otherwise a full mill and overlay may be required as early as next year. 180 Mayor Rafferty discussed timing and asked about the identified contractor. Ms. Hankee said they have 181 a good record. 182 Council Member Stoesz moved to approve Resolution No. 20-39 as presented. Council Member 183 Lyden seconded the motion. Motion carried: Yeas, 5; Nays none 184 6C) Consider Resolution No. 20-40, Authorizing 2020 Regional Solicitation Grant Submittal, 185 Main Street (CSAH 14) Multiuse Trail from Lino Lakes Elementary School to I-35W Overpass – 186 Community Development Director Grochala first noted that the City’s future plans include extension of 187 the trail on the north side of the City. He noted the history of the trail to date. The resolution 188 authorizes staff to seek a grant through a funding program that happens every two years. If approved, 189 the trail extension project planned would be covered up to 80%. He explained how the remainder is 190 planned to be funded. An extension of this trail would provide a good addition on the north side of the 191 city and he has received letters of support that will be submitted with the application. The City 192 received assistance from WSB & Associates on completing an application and would work with Anoka 193 County on a submission. Grant notification is probably in September. 194 Council Member Lyden noted that he is excited about the possibility of this project but he does see that 195 there is some movement from the north to south side of the street. Mr. Grochala remarked that there 196 would be a safety measure at a crossing. 197 Council Member Stoesz asked if there would be an impact to snowmobile trails and Mr. Grochala said it 198 will be investigated. 199 Council Member Cavegn asked if the trail could instead go north to south side at Lake Drive where 200 there is traffic control? Mr. Grochala indicated there could be wetland impacts but such an alignment 201 could be reviewed. 202 Council Member Stoesz moved to approve Resolution No. 20-40 as presented. Council Member 203 Ruhland seconded the motion. Motion carried: Yeas, 5; Nays none 204 6D) Consider Resolution No. 20-22, Approving Amendments to the Designated Municipal 205 State Aid Street System – City Engineer Hankee noted the City’s designation as a Municipal State 206 COUNCIL MINUTES DRAFT 6 Aid (MSA) city. There are certain streets within the City that are designated as MSA streets eligible 207 for MSA funds. Staff is recommending adding the following roadways to the list: Town Center 208 Parkway; Village Drive; Woods Edge Drive. 209 Council Member Lyden remarked that the new streets aren’t necessarily ones that are used by a large 210 number of residents. Ms. Hankee noted the current MSA designated roadways in the City and 211 requirements for MSA roadways. The majority of the high volume streets are County MSA roads. 212 Council Member Cavegn asked if Apollo Drive east of Lake Drive should be designated? Ms. 213 Hankee concurred that would be a good addition but it is disqualified as a dead end street. 214 Council Member Stoesz mo ved to approve Resolution No. 20-42 as presented. Council Member 215 Ruhland seconded the motion. Motion carried: Yeas, 5; Nays none 216 217 UNFINISHED BUSINESS 218 219 There was no Unfinished Business. 220 221 NEW BUSINESS 222 223 Items 8A and 8B, Closed Session regarding Employee Misconduct, were removed from the agenda. 224 225 ADJOURN 226 227 Council Member Ruhland noted that he’s heard that cities are experiencing increases in crimes such 228 as domestic abuse; what’s the situation in Lino Lakes? Public Safety Director Swenson remarked 229 that there are some increases being seen in other cities but thankfully Lino Lakes has not seen that. 230 231 There being no further business, Council Member Ruhland moved to adjourn at 8:07 p.m. Council 232 Member Stoesz seconded the motion. Motion carried on a voice vote. 233 234 These minutes were considered and approved at the regular Council Meeting on May 11, 2020. 235 236 237 238 239 Julianne Bartell, City Clerk Rob Rafferty, Mayor 240 241 BOARD OF REVIEW MINUTES May 4, 2020 DRAFT 1 CITY OF LINO LAKES 1 MINUTES 2 BOARD OF APPEAL AND EQUALIZATION 3 4 DATE : May 4, 2020 5 TIME STARTED : 6:00 p.m. 6 TIME ENDED : 6:20 p.m. 7 MEMBERS PRESENT : Councilmember Ruhland, Lyden, Cavegn, Stoesz 8 and Mayor Rafferty 9 MEMBERS ABSENT : none 10 11 Staff members present: City Clerk Julie Bartell; Finance Director Sarah Cotton 12 13 Anoka County Assessor Staff present: Scott Schutz, Assessment Compliance Coordinator, Shawn Halligan 14 (Residential Appraiser) & John Leone (Commercial Appraiser). 15 16 City Board of Appeal members who had completed training for the meeting were Councilmembers Lyden and 17 Ruhland. 18 19 Mayor Rafferty called the meeting to order; all members were present. 20 21 The council had reviewed the official board report (on file) at a recent work session. 22 23 There were no property owners wishing to speak. 24 25 Anoka County Residential Appraiser Halligan addressed the board. He’s had 37 calls this year, the 26 majority of which have been settled. For the calls that have come late in the process, he has told the 27 property owners that he would read the property into the record that they would retain the right to 28 come to the County Board of Appeal. Staff will work with them over the next few weeks to address 29 their concerns but they can go forward to that board if they choose. He noted that a list of property 30 owners was submitted to the City Clerk and they’d like those included in the record so as to retain that 31 right of future appeal. Mr. Halligan added that there were 410 sales in the City of which 216 were 32 qualified and used for study. The market value of City properties is included in the board report. 33 There were just over 100 new homes constructed. 34 35 Anoka County Commercial Appraiser Leone said he has received two calls and those have been 36 addressed. There were only three sales (one commercial and two industrial) this year. He noted that 37 as usual twenty percent of the properties were reviewed. 38 39 Mayor Rafferty asked about outstanding concerns that the County has heard from property owners. 40 Mr. Halligan noted the number of owners with which he has reached resolution. There are about five 41 outstanding where they have not and the County will continue working with them. He noted that 42 taxation notices were delivered to the property owners later than usual. 43 44 BOARD OF REVIEW MINUTES May 4, 2020 DRAFT 2 Councilmember Ruhland asked what took so long to get county taxes confirmed this year. Mr. 45 Schutz noted that the County has a new system (not updated since 2006) and it took a bit to get the 46 bugs out. Councilmember Ruhland noted that he’s heard some criticism of the website and he 47 wonders if the County is responding. County staff noted that the website is the crux of the upgrade 48 and they are still working at achieving the best product possible. Councilmember Ruhland confirmed 49 that the process for the County Board of Appeal is similar to the City. 50 51 Councilmember Lyden thanked county staff for their work and he hopes that they can reach resolution 52 with those property owners who have outstanding concerns. He also noted that he personally had 53 contacted the county assessor’s office with a question on his property taxes and he was served well. 54 55 Mayor Rafferty noted that the website to view property taxes is different. He has noticed that 56 information is provided differently. Will there be updates to past r ecords (sales, mortgages) as there 57 was in the past. County staff recommended that Mayor Rafferty contact Alex Guggenberger for 58 specific website questions. Mayor Rafferty explained that the councilmembers may occasionally use 59 the site to get background for property concerns that come up. 60 61 Councilmember Stoesz noted that county staff mentioned that there were 100 homes constructed in 62 the city in 2019 but he noticed a higher figure (165) in the report. Mr. Schutz explained that the 63 figure he gave (100) was just an estimate. 64 65 Mayor Rafferty asked if the new construction figure is established by permit being issued or certificate 66 of occupancy. Mr. Schutz explained that it would be closer to the permit or something like the 67 foundation being laid. 68 69 The properties listed on Exhibit A attached to these minutes were read into the record: 70 71 Motion by Cavegn to accept the referrals to the Anoka County Board of Equalization as indicated. 72 Council Member Ruhland seconded the motion. Motion adopted: Yeas, 5; Nays none. 73 74 These minutes were considered and approved at the regular Council Meeting on May 11, 2020 75 76 77 78 79 80 Julianne Bartell, City Clerk Rob Rafferty, Mayor 81 CITY COUNCIL AGENDA ITEM 3A STAFF ORIGINATOR: Julie Bartell, City Clerk MEETING DATE: May 11, 2020 TOPIC: Pro Rata Fee Refunds and Payment Schedule Amendment for Annual Business Licenses VOTE REQUIRED: 3/5 BACKGROUND The City issues annual licenses for intoxicating beverage sales and the renewal date for these licenses is July 1, 2020. The restaurants and bars in the City that hold these licenses have been greatly impacted by Governor Walz’s mandated closures related to the COVID 19 virus. Since these establishments have been mostly unable to sell on-sale beverages, staff has been looking at measures that could provide some type of refund or fee consideration. Minnesota Statutes provide that cities may refund a pro rata share of an annual license fee when a business ceases to be lawful for a reason other than a license revocation. Staff is asking that the City Council consider the following: - Pro rata refund of license fees for months when establishments were not able to be open for a majority of days in the month due to the Governor’s emergency orders; - The city code currently requires that all applications shall be accompanied by payment in full of the license fee. It is proposed that one half of the license fee be required upon application for the coming license period and one half be due after six months. - Since it is uncertain exactly how long these establishments will be mostly unable to sell beverages, any refund would be considered as a credit to future fees. - The refund and split fee option would apply only to On-Sale Liquor, On-Sale Wine, On- Sale Beer, On-Sale Club, On-Sale Taproom and Sunday Sales licenses. Investigation fees are not included. - The changes proposed relate only to the current emergency situation. Other Business Licenses. Other licenses issued by the City that have been impacted by the current emergency situation are Massage, Peddler and some Tobacco. Staff proposes that the Tobacco and Massage licenses be included in the refund and split fee option. Peddler licenses are issued for a period of six months; it is proposed that the impacted months for this activity be allowed as an extension to their license period. RECOMMENDATION Staff requests direction from the council on proceeding with proposed measures to address licensing in the current emergency situation. ATTACHMENTS List of Business Licenses License Type Business Name Type of License 12 Month Fee for License Liquor American Legion On-Sale Club/Sunday $300/$200 Liquor The Tavern on Main On-Sale/Sunday/Off-Sale $4,500/$200/$200 Liquor Trapper's Bar & Grill On-Sale/Sunday $4,500/$200 Liquor Chomonix Golf Course On-Sale/Sunday $4,500/$200 Liquor Fiesta Cancun On-Sale/Sunday $4,500/$200 Liquor Don Julio On-Sale/Sunday $4,500/$200 Liquor El Zocala Grill On-Sale/Sunday $4,500/$200 Liquor Hammerheart TR On-Sale/Sunday $500/$200 Liquor Chili Sushi & Thai Beer/Wine $300/$500 Tobacco Chomonix Golf Course Tobacco $50 Tobacco Lino Lakes Tobacco Tobacco $50 Tobacco Ecig Crib Tobacco $50 Massage Heather's Healing Hands Enterprise/2 Individual $200/$50/$50 Massage Allure Salon Enterprise/1 Individual $200/$50 Massage Self Essential Therapeutic Enterprise/1 Individual $200/$50 Massage Linnea Dufresne Enterprise/1 Individual $200/$50 Massage Monarch Massage Enterprise/1 Individual $200/$50 Peddler Pro Star Tree Care Peddler/Solicitor Approved to start 4/15/2020 - Check Cashed - Extend Date or Refund $250 Peddler Edward Jones D Chrzanowski Peddler/Solicitor Approved to start 4/15/2020 - Check Cashed - Extend Date or Refund $250 CITY COUNCIL AGENDA ITEM 4A STAFF ORIGINATOR: John Swenson, Public Safety Director MEETING DATE: May 11, 2020 TOPIC: Consideration of Resolution 20-45 Approving Allina Ambulance as the Primary Ambulance Service for the City of Lino Lakes VOTE REQUIRED: 3/5 INTRODUCTION On June 1, 2020 the ambulance service providing primary services will change as determined by current Emergency Medical Service Regulatory Board (EMSRB) Primary Service Area (PSA) maps. As a result of existing PSA overlaps, the City of Lino Lakes is able to choose between two ambulance service providers. Staff is recommending that Allina Ambulance service be designated as the primary ambulance provider for the City of Lino Lakes. BACKGROUND During 2018, 2019, and 2020, Staff have regularly update the Council on concerns with ambulance services in Lino Lakes, shortcomings of the current regulatory authority over ambulance in Minnesota, and the lack of local control. These issues were recently discussed at the December 2, 2019, December 9, 2019, March 2, 2020, and May 4, 2020 meetings with Council. Staff has learned that the entire City of Lino Lakes is covered by what the EMSRB refers to as “PSA overlap”. This means that when the PSA maps were created two ambulance providers own a PSA that covers our community. We know that MHealth Fairview (formally Fairview) as well as Allina Ambulance own a PSA that includes Lino Lakes. This has occurred in other areas of the state and when there is ambulance PSA overlap the local jurisdiction has the ability to choose between the ambulance providers that own the PSAs covering their community. I have attached two maps (Anoka County – Allina #0057 and Anoka County – Forest Lake #0084) obtained from the EMSRB which shows this overlap. Dating back to April of 2019, staff has met with both MHealth Fairview and Allina to gain the needed information on their respective ambulance services, medical dispatching capabilities, medical direction, and available EMS training for our staff. Based on this information, staff is recommending that we move forward with Allina Ambulance service effective June 1, 2020 as primary ambulance provider for the City of Lino Lakes. • Allina has a long standing operation in Anoka County with many positive comments regarding their ambulance services from other Anoka County jurisdictions currently being serviced by Allina Ambulance. • Allina is currently certified as a secondary medical dispatch center and has invested in an interface with Anoka County Computer Aided Dispatch (CAD) software. This has streamlined the ambulance dispatching process for other Anoka County communities resulting in faster dispatching of ambulances. • Allina has a large operation in Anoka County and will be adding one ambulance to provided services in PSA #0084 once Lino Lakes moves to their service. This will provide a high level of coverage with a robust number of ambulances to back-up coverage during times of peak demand for ambulance services in our community. • Allina has agreed to house an ambulance crew out of Lino Lakes Fire Station #1. • Allina will provide medical direction and training to all police and fire staff. The agreement for these services is attached for your review. Attached to this staff report is a letter dated May 7, 2020 from Allina Vice President, Operations Susan Long regarding the activities and commitments of Allina related to providing ambulance services to the Lino Lakes community. Allina Ambulance will be leasing space for one ambulance and crew at Lino Lakes Fire Station #1. Allina Ambulance will pay the City of Lino Lakes $700 per month as part of this lease agreement. This lease is attached for Council consideration. As required by law, we are required to have an agreement in place to receive medical direction from a Medical Doctor. Staff has met with staff from Allina to develop an agreement for medical direction services as well as on-going medical training for all staff. This medical training is required as part of the First Responder, EMT, and Paramedics re-certification and re-licensure. This agreement is also attached for Council consideration. In order for the Anoka County Dispatch Center to begin to dispatching Allina Ambulance for medical calls for service within the City of Lino Lakes, Council must approve Resolution 20-45 designating Allina Ambulance as the primary service provider and directing Anoka County Dispatch to dispatch Allina Ambulance. Resolution 20-45 is attached for Council consideration. RECOMMENDATION Staff recommends approval of Resolution 20-45 designating Allina Ambulance as the primary ambulance service for the City of Lino Lakes. Staff further recommends Council approve the lease agreement and medical direction/medical training agreements with Allina. ATTACHMENTS Resolution 20-45 Lease Agreement with Allina Ambulance Allina Medical Direction & Training Agreement EMSRB Ambulance PSA #0084 Map EMSRB Ambulance PSA #0057 Map Allina letter dated May 7, 2020 CITY OF LINO LAKES RESOLUTION NO. 20-45 RESOLUTION ESTABLISHING ALLINA AMBULANCE AS THE PRIMARY AMBULANCE SERVICE FOR CITY OF LINO LAKES WHEREAS, the Minnesota Emergency Medical Services Regulatory Board (EMSRB) is empowered to regulate and assign a Primary Service Area (PSA) for all ambulance services in the State of Minnesota; and WHEREAS, EMSRB PSA maps #0087 and #0057 demonstrate an overlap that covers the entire City of Lino Lakes; and WHEREAS, when ambulance PSA overlap occurs, local jurisdictions are authorized to select the ambulance service that meets the local jurisdictions ambulance needs; and WHEREAS, staff has conducted extensive research on the topic to determine which ambulance provider is best suited to provide high quality services in the City of Lino Lakes; and WHEREAS, the Anoka County Dispatch Center requires a formal action by the governing body of local jurisdiction to change ambulance provider dispatching protocols. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City o f Lino Lakes, Minnesota establishes Allina Ambulance Service as the primary ambulance provider for City of Lino Lakes, effective June 1, 2020. Adopted by the Council of the City of Lino Lakes this 11th day of May 2020. The motion for the adoption of the foregoing resolution was introduced by Councilmember _____________and was duly seconded by Councilmember ___________ and upon vote being taken thereon, the following voted in favor thereof: The following voted against same: ______________________________ Rob Rafferty, Mayor ATTEST: ________________________________ Julianne Bartell, City Clerk 1 LEASE AGREEMENT THIS LEASE AGREEMENT ("Lease"), is made and entered into this 1st day of June, 2020, by and between the City of Lino Lakes, a Minnesota municipal corporation ("Lessor"), and Allina Health System , a Minnesota nonprofit corporation ("Lessee") (collectively "Parties"). RECITALS WHEREAS, Lessor is the owner of real property located at 7741 Lake Drive, Lino Lakes, MN on which Fire Station No. 1 is located ("Station l"); and WHEREAS, Lessee desires to lease portions of Station 1 to store and operate its ambulances; and WHEREAS, Lessor is willing to lease to Lessee upon such terms and conditions as are expressed herein. NOW, THEREFORE, Lessor and Lessee hereby covenant and agree as follows: 1. LEASED PREMISES: Subject to, and upon the terms, provisions, and conditions hereinafter set forth, Lessor does hereby lease and demise unto Lessee, the following ("Leased Premises" or "Premises"): Station 1: Lessee shall not have any dedicated leased space in Station 1, but shall have the non-exclusive right to use the following areas of the first floor: dayroom, kitchen, restrooms, dispatch/staging room, decontamination restroom as needed, and the hallways, as highlighted on the attached Exhibit A. Lessee shall also have an exclusive the right to use the apparatus bay for one ambulance, with immediate emergency access to an exit (specific location to be assigned by the Public Safety Director), as well as two exterior parking stalls for Lessee's employees. The use of all areas is subject to the rules, regulations and policies of Lessor, which may change from time to time. There is no leased space above the first floor 2. TERM OF LEASE: The term of this Lease shall commence as of June 1st, 2020, and shall continue for a term of three years. 3. EARLY TERMINATION OF LEASE: The Lease may be terminated without cause prior to the end of the term by either Party by providing 180 days written notice to the other Party without penalty. Upon termination of this Lease, Lessee will promptly and peaceably surrender the Premises to Lessor in substantially the same condition existing on the commencement date of the Lease, ordinary and reasonable use, damage and wear excepted. Lessor acknowledges that Lessee does not have exclusive use of the Leased 2 Premises and is not responsible for any damage or use of the Leased Premises by other parties. 4. RENT: Lessee shall pay to Lessor Rent for the use of the Leased Premises in the amount of $700.00 per month. Rent shall be payable in advance on or before the first day of each and every month of this Lease. If Lessee fails to pay Rent after the 20th business day of the month in which such payment is due, Lessee shall automatically be assessed and shall pay, as additional Rent, a late charge equivalent to ten percent (10%) of the amount of such late payment. Lessor reserves the right to increase Rent by providing Lessee with written notice at least 240 days in advance of the effective date of the increase. 5. MAINTENANCE: a. Lessor shall be responsible for maintenance and repair of all structural components, heating, ventilation, air conditioning, electrical, plumbing and mechanical systems of the Premises. b. Lessor shall be responsible for maintaining the exterior and surrounding areas, including lawn care and snow removal. c. Lessee shall maintain and clean the dedicated leased area within Station 1 (ambulance day room), and shall otherwise clean any mess or clutter created by Lessee in all other areas to which it has access (including dishes, counters, refrigerator, etc.). d. Lessee shall be responsible for all damage arising out of its employees’ use of the Leased Premises, ordinary wear and tear excepted. 6. VISITOR AND PET RESTRICTIONS: Lessee shall not allow anyone other than its own personnel into the Premises unless authorized in advance by the Public Safety Director. Lessee shall not allow any pets or other non-service animals into the Premises. The Lessor acknowledges the Lessee does own a service animal which may visit the Premises with the crew at times. 7. LESSOR PROPERTY: Lessee acknowledges that this Lease does not grant Lessee unfettered access to Lessor's tools, equipment, furniture or fixtures outside of the leased and common areas. Lessee shall not use, borrow or take any Lessor tools or equipment without express prior authorization from the Public Safety Director. Tools and equipment include hand tools, power tools, audio visual equipment, computers, and firefighting and EMT apparatus and supplies. 8. INSURANCE: During the term of this Lease, Lessor shall obtain and maintain liability and property damage insurance for the entire property. 3 Lessee shall, at its own cost, maintain personal property and contents insurance, as well as maintain commercial general liability insurance in an amount sufficient to cover the liability limits of Minn. Stat. § 466.04, as amended. Lessee shall also maintain automobile liability insurance with a combined single limit of $1,500,000 for bodily injury and property damage with coverage for all owned, non-owned and hired vehicles. Lessor shall be named as an "additional insured" on commercial general liability insurance maintained by Lessee that relates to the Premises or its use. All insurance required to be maintained by Lessee under this Lease shall be effected under valid and enforceable policies issued by a reputable insurance company authorized to do business in the State of Minnesota or issued under a program of self-insurance. Not less than 10 days prior to the Lease term, Lessee shall deliver to Lessor certificates of all insurance required to be maintained hereunder. Should Lessee’s policies be cancelled before the expiration date thereof, notice will be delivered in accordance with the policy provisions. 9. INDEMNITY: Lessee agrees to indemnify, defend and hold Lessor harmless from and against any and all claims, actions, liability, and damages of every kind and nature, and from and against all costs and expenses, including reasonable attorney’s fees, to the extent proximately caused by the negligence or intentional tort of Lessee, its agents, employees, licensees, or invitees, in or about Station 1. In the event of any action or proceeding brought against Lessor, by reason of any such claim, upon notice from Lessor, Lessee covenants to defend such action or proceeding by counsel satisfactory to Lessor. Lessor agrees to indemnify, defend and hold Lessee and its directors, officers, employees, agents and representatives harmless from and against all loss, liability, damages and expense (including reasonable attorney's fees) caused by any act or omission of Lessor, its officers, employees, agents, invitees and representatives, except to the extent such loss, liability, damage or expense is covered by insurance maintained by Lessor. Lessor and Lessee hereby waive against the other any claims, liabilities or damages arising from or caused by any hazard covered by the insurance maintained or required by the waiving party. 10. NON-LIABILITY OF LESSOR: Except in the event of negligence or an intentional act by Lessor, its agents, employees, or contractors, Lessor shall not be liable for any loss or damage resulting from or caused by any failure to furnish heat, electricity, water, gas, air conditioning or sprinkler system, nor for any consequential damage arising from interruption of any utility or services. 4 11. ASSIGNMENT: Lessee shall not assign or transfer any of its rights under this Lease or sublease any part of the Premises. 12. DEFAULT: a. Should any voluntary or involuntary petition in bankruptcy be filed by or against Lessee, Lessor may, by written notice to Lessee, immediately terminate this Lease and terminate Lessee's right to possession of the Premises. If Lessee does not voluntarily quit the Premises upon receipt of notice of termination, Lessor may, in its discretion, recover sole possession of the Premises in an eviction (unlawful detainer) proceeding, and recover from Lessee all attorney fees, costs, and expenses relating to such proceeding. In addition, Lessor shall be entitled to recover all damages and other claims arising prior to the date of termination, including without limitation, all rent due through the end of the month of termination, damages, and attorney fees. b. If Lessee defaults in the payment of Rent, and such default continues for 20 days after Lessor's written notice thereof to Lessee, or Lessee defaults in the prompt and full performance of any other provision of this Lease and such default continues for 30 days after Lessor's written notice thereof to Lessee, or if Lessee makes an assignment for the benefit of creditors, or if a receiver is appointed for the property of Lessee, or if Lessee abandons the Premises, then, and in any such event, Lessor may by written notice to Lessee, immediately terminate this Lease and terminate Lessee's right to possession of the Premises. If Lessee does not voluntarily quit the Premises upon receipt of notice of termination, Lessor, may, in its discretion, recover sole possession of the Premises in an eviction (unlawful detainer) proceeding, and recover from Lessee all attorney fees, costs, and expenses relating to such proceeding. In addition, Lessor shall be entitled to recover all damages and pursue all claims arising prior to the date of termination, including without limitation all rent due through the end of the month of termination, damages, and attorney fees. 13. RIGHT OF ENTRY: Lessor and its employees or agents shall have the right, without any diminution of Rent, additional Rent or other charges payable hereunder by Lessee, to enter the Premises at all reasonable times and upon reasonable notice for the purpose of inspection, cleaning, repairing, altering or improving the same or the Premises, but nothing contained in this provision shall be construed so as to impose any obligation on Lessor to make any repairs, alterations or improvements. 14. USE BY LESSEE: Lessee agrees to comply with all laws, ordinances, orders, rules, and regulations promulgated by all government agencies which relate to the use, condition, or occupancy of the Premises by Lessee. Lessee warrants that it will abide by Lessor's workplace policies and the Premises will remain 5 tobacco and chemical free. Lessee acknowledges and agrees that Lessor has the exclusive authority to reasonably modify and/or change its rules and regulations at any time. Lessee shall not make any alterations or improvements to the Premises without prior written consent of Lessor. All alterations and improvements to the Premises and fixtures shall become the property of Lessor. Trade fixtures may be removed by the Lessee. 1. SAFETY AND SECURITY: Lessee is solely responsible for the safety and security of its employees, guests, and invitees while they are on the Premises. The Lessee is also responsible for assuring building security of their designated areas while entering, exiting and based at the Premise as well as the confidentiality of any door codes, keys, entry devices and the like used to gain access into the Premise The Lessee is not responsible for others in the building related to the Lessors activities on the Premise. 2. SIGNS: Lessee agrees that no exterior or interior window or door sign, advertising media, or window or door lettering or placards or other signs or advertising materials shall be installed, erected, attached or affixed to any portion of the interior or exterior of the Premises or the buildings, without the express prior written consent of Lessor, which shall not be unreasonably withheld. 3. DAMAGE OR DESTRUCTION OF PREMISES: If the Premises are damaged or destroyed by fire or other casualty, Lessee shall have the right to terminate this Lease provided it gives written notice thereof to Lessor within 60 days after such damage or destruction, unless such fire, damage, or destruction is proved to be the fault of Lessee. Lessee’s rent shall be suspended from date the Building was no longer available as outline in section 1. 4. SUCCESSORS: It is agreed that the covenants, terms and conditions of this Lease shall extend, apply to and firmly bind the heirs, executors, administrators, successors, and assigns of the respective parties. 5. SEVERABILITY: If any term, condition, or provision of this Lease or the application thereof to any person or circumstance shall, to any extent, be held to be invalid or unenforceable, the remainder thereof and the application of such term, provision and condition to persons or circumstances other than those as to whom it shall be held invalid or unenforceable shall not be affected thereby, and this Lease and all terms, provisions and conditions hereof shall, in all other aspects, continue to be effective and to be complied with to the fullest extent permitted by law. 6. RELATIONSHIP: This Lease does not create the relationship of principal 6 and agent, partnership, joint venture, or any other association between Lessor and Lessee. 7. CONSTRUCTION OF LEASE: It is agreed that this Lease shall be governed by, construed, and enforced in accordance with the laws of the State of Minnesota. 8. ENTIRE AGREEMENT: This Lease shall constitute the entire agreement relating to the lease of the Premises between the Parties. Any prior understanding or representation of any kind preceding the date of this Lease shall not be binding upon either party except to the extent incorporated in this Lease. [The remainder of this page left blank.] IN WITNESS WHEREOF, the parties hereto caused these presents to be validly executed in their respective names, as of the day and year first above-written. CITY OF LINO LAKES ALLINA HEALTH SYSTEM By: __________________________ By: ____________________________ Its: __________________________ Its: ____________________________ Date: ________________________ Date: __________________________ Exhibit A To Lease Agreement between City of Lino Lakes and Allina Health System. Lino Lakes Fire Station No. 1 7741 Lake Drive Lino Lakes , MN 55014 Page 1 Business Associate Addendum Revised 3.2013 LINO LAKES PUBLIC SAFETY SERVICES AGREEMENT 6-1-2020 This Agreement is made and entered into 6-1-20 (“Effective Date”) by and between Allina Health System d/b/a Allina Health Emergency Medical Services (“AHEMS”), a Minnesota nonprofit corporation having principal office at 167 Grand Avenue, St. Paul, Minnesota 55102 and Lino Lakes Public Safety (“First Responder”) having principal office at 640 Town Center Parkway, Lino Lakes, MN, 55014. WHEREAS, First Responder is an entity engaged in providing emergency response, care, and treatment services to patients in its geographic service area; and WHEREAS, AHEMS is a licensed Education Institution in First Responder’s service area; and WHEREAS, AHEMS has the personnel and resources to meet the requirements of Minn. Stat. § 144E.265, and to provide medical direction and support services to First Responder; and WHEREAS, First Responder desires to engage AHEMS to provide Services (as defined below) in accordance with the terms and conditions of this Agreement. NOW THEREFORE, in consideration of the mutual covenants and promises specified below, the parties agree as follows. 1. Services. Beginning on the Effective Date, AHEMS will assign individuals to provide, and will provide, the Services set forth in Exhibit A (the “Services”), attached hereto and incorporated herein. 2. Qualifications. AHEMS will ensure that each individual it assigns to provide the Service is qualified, in terms of education and training to provide the Services, in accordance with all federal, state, and local statutes and regulations, and as may be further specified in Exhibit A and maintains in good standing and without limitations, exceptions or conditions, at all times while performing the Services, any license, registration, or certification necessary to provide the Services. 3. Fees and Payment. In exchange for the Services, First Responder will make payment of the amount due under this Agreement to AHEMS in a timely manner in response to receipt of an invoice supported by adequate documentation. First Responder will pay AHEMS for the Services as set forth in Exhibit B. If any of the fees owed are paid on a prospective annual basis, if AHEMS terminates this Agreement prior to the expiration of a full year term, AHEMS will refund to First Responder a prorate portion of such annual fee(s) paid for Services not performed as of the date of termination. For all other fees owed under this Agreement, in the event of early termination First Responder will make payment only for the Services performed prior to the effective date of termination. 4. Use of Space. Intentionally left blank. 5. Term and Termination. The term of this Agreement will commence on the Effective Date and continue for 2 years, unless earlier terminated. This Agreement may be terminated by either party for any reason upon 30 days’ prior written notice or by mutual agreement of the parties. Page 2 Business Associate Addendum Revised 3.2013 6. Indemnification. AHEMS will defend, hold harmless, and indemnify First Responder, its officers, directors, employees, and agents from any claims, liabilities, or expenses (including reasonable attorney’s fees) arising from or relating to AHEMS’s acts or omissions in connection with this Agreement. First Responder will defend, hold harmless, and indemnify AHEMS, its officers, directors, employees, and agents from any claims, liabilities, or expenses (including reasonable attorney’s fees) arising from or relating to First Responder’s acts or omissions in connection with this Agreement. 7. Insurance. AHEMS agrees to maintain such policies of insurance, self-insurance, or combinations thereof in amounts not less than $1,000,000.00 per occurrence and $3,000,000.00 aggregate. First Responder agrees to provide and maintain insurance with limits of not less than $1,000,000.00 per occurrence and $3,000,000.00 annual aggregate unless such entity is governmental entity. If First Responder is a government entity, First Responder agrees to provide and maintain liability insurance as set out in applicable state law. 8. Excluded Provider. Both parties hereby certify that neither it nor its employees, directors, officers, agents, or subcontractors are presently excluded, debarred, or otherwise ineligible to participate in Federal Health Care Programs or in federal procurement or non-procurement programs, and have not been convicted of a criminal offense within the scope of 42 U.S.C. § 1320a-7(a). Each party will immediately give written notice to the other of any debarment, exclusion, or other event that makes such party, or an employee, director, officer, agent, or subcontractor of such party, ineligible to participate in Federal Health Care Programs or in federal procurement or non-procurement programs. 9. Illegality. If, as determined by agreement of the parties’ counsel, or, if the parties’ counsel cannot agree, by a nationally recognized law firm with expertise in health care regulation jointly selected by the parties, any provision of this Agreement violates any applicable federal or state statute, rule, regulation, or administrative or judicial decision (collectively, the “Law”), then either party may give notice to the other to amend this Agreement solely to comply with the Law and the parties will negotiate in good faith with respect thereto. If they cannot agree on the terms and conditions of any such amendment within 15 days after such notice is given, then either party may terminate this Agreement immediately upon notice to the other without further liability, but, if the implementation of the Law is stayed, the right to amend or terminate the Agreement will also be stayed for the same period of time. When a question arises as to whether this Agreement complies with the Law, and before a determination is made, either party may suspend payments under the Agreement pending amendment or termination. 10. Independent Contractors. AHEMS including its employees, or agents, is an independent contractor of First Responder and nothing in this Agreement will be construed to create an employer/employee or joint venture relationship between First Responder and AHEMS or its employees, or agents. 11. Notices. Any notice pursuant to this Agreement must be in writing and must be personally delivered, sent by email, or sent by certified mail, addressed to the parties at the addresses below or at such other address as they specify in written notice. Notices are effective upon personal delivery or when sent by e-mail or certified mail. Page 3 Business Associate Addendum Revised 3.2013 If to First Responder: John Swenson __ If to AHEMS: Susan Long Public Safety Director_ 167 Grand Avenue 640 Town Center Parkway_ St. Paul, MN 55102 Lino Lakes, MN 55014_ Susan.long@allina.com Jswenson@linolakes.us 12. Miscellaneous. Neither party may assign, subcontract, or transfer its rights hereunder without the other party’s prior written consent. Nothing in this Agreement will create any obligations by AHEMS or First Responder to any person or entity not a party to this Agreement, including any individuals employed by or under contract with AHEMS or First Responder. This Agreement, together with its exhibits and attachments, constitutes the entire agreement between the parties with respect to the subject matter, and supersedes all prior agreements, understandings, promises, and representations made by either party to the other concerning the subject matter of this Agreement. This Agreement may be amended only upon mutual written agreement of the parties. If a court of competent jurisdiction holds any provision of this Agreement invalid or unenforceable, the remaining provisions will nonetheless be enforceable. If such court determines that any provision of this Agreement is held to be overbroad as written, such provision will be deemed amended to narrow its application to the extent necessary to make the provision enforceable according to applicable law and enforced as amended. The failure of any party to insist on the performance of any provision of this Agreement and to exercise any rights hereunder will not be construed as a waiver of future performance of any such provision or the future exercise of such right. 13. Governing Law. This Agreement will be governed by and construed in accordance with the laws of the State of Minnesota, without reference to conflict of laws principles. IN WITNESS WHEREOF the parties have caused this Agreement to be executed as follows: ALLINA HEALTH LINO LAKES PUBLIC SAFETY EMERGENCY MEDICAL SERVICES By ____________________________ By ____________________________ Title ____________________________ Title ____________________________ Dated ____________________________ Dated ____________________________ Page 4 Business Associate Addendum Revised 3.2013 EXHIBIT A Services AHEMS will designate a contact person whom First Responder may contact to arrange for the provision of Services. First Responder will make all efforts to provide reasonable advance notice of its need for any of the Services and AHEMS will make all commercially reasonable efforts to procure resources necessary to deliver the Services, provided, however, that with the exception of Medical Direction services (if applicable) AHEMS will have no obligation to provide the Services if AHEMS is unable to procure necessary resources or personnel to furnish the Services. Services provided pursuant to this Agreement include the following: 1. Medical Direction a) AHEMS agrees to provide medical director services to First Responder to support First Responder’s emergency medical program. Medical Director services will include: (i) Use of AHEMS protocols; (ii) Medical direction oversight by the AHEMS Medical Director or such other qualified physician as AHEMS may contract with from time-to-time for such services; b) As a prerequisite of condition to AHEMS providing the Medical Director services contemplated herein, the First Responder agrees that it will at all times during the term of this Agreement: (i) Operate under AHEMS services protocols; (ii) Utilize only trained Paramedics, EMTs, EMRs, and/or those trained and privileged to provide direct medical care; (iii) Consult with the AHEMS coordinator and/or Medical Director on major equipment purchases. c) First Responder will compensate AHEMS for Medical Direction Services in the amount of $200.00 per year in addition to the training cost. 2. Education and Training. a) AHEMS will provide the following training to First Responder personnel: Allina Health EMS will provide 2 separate training sessions of 4 hours per session. Each session will be given on 2 separate occasions for a total of 4, 4 hour training sessions per year for two years. Due to department size of approximately 40 personnel, 2 Allina instructors will be presenting the classes to maintain approximate 10:1 student instructor ratio. If classes grow beyond instructor span of control additional fees may be required to adequately cover class sizes. See Exhibit B for training locations and schedules per site. b) AHEMS will provide training supplies, including disposables. First Responder will reimburse AHEMS for such supplies in the amount of $100 (included in training site fee). 3. On-Scene Restocking. To the extent permitted by applicable law, AHEMS will provide First Responder with the supplies and drugs necessary to replace those used by First Responder’s personnel in the treatment and care of a patient on scene before such patient is transported or treated by AHEMS emergency medical professionals. If on-scene replacement is not possible, First Responder will provide AHEMS with the run number associated with the call. The Page 5 Business Associate Addendum Revised 3.2013 provision of any medications to any patient by AHEMS or First Responder will be consistent with applicable drug protocols established by the Medical Director. First Responder will not bill any patient or third party payer for any supplies or drugs provided pursuant to this paragraph. Additional Services. AHEMS will make the following additional services available to First Responder and First Responder will compensate AHEMS for such services as set forth below: a) Additional education sessions outside of the education and training described in Section 2 of this Exhibit A (“Additional Services”). The Additional Services may include: remediation, additional training, or consultation for large scale trainings; any additional trainings; if class sizes grow consistently beyond the span of control and observation is untenable for current contracted instructor number (s), additional instructors; psychomotor capabilities confirmation; and remediation if Allina acts as an agent for the First Responder. Any such Additional Services will be billed at $75.00 per instructor hour. Any AHA CPR cards requested by the First Responder will be billed at the current AHA card rate. If requested CPR cards will be billed at the current Heartsaver CPR rate. b) Any additional classes such as NCCR or additional trainings not covered by this contract will be given at contract customer rates. Any members of the First Responder Agency who take any Allina Health EMS classes will be offered those classes at contract customer rates. Page 6 Business Associate Addendum Revised 3.2013 EXHIBIT B Training: 2 separate 4 hour classes given twice for a total of 4, 4 hour sessions each year. Scheduling and locations to be mutually agreed upon by First Responder and Allina Health EMS. Training to include CPR recertification and card fees. FEES Total Services and Fees: $3840.00 annually. Fees may be paid in lump sum or $960.00 per quarter. )DLUYLHZ)RUHVW/DNH $/6 RYHUODSZLWK +HDOWK(DVW %/6 RYHUODSZLWK  &ROXPELD+HLJKWV %/6 RYHUODSZLWK   $OOLQD %/66 RYHUODSZLWK  $OOLQD %/6 RYHUODSZLWK  $OOLQD $/66 RYHUODSZLWK  $OOLQD $/6 RYHUODSZLWK  Fairview-Forest Lake ALS #0084 (overlap with 0057,0220,0335) HealthEast BLS # -0219 (overlap with 0055, 0057,0220,0344 Elk River ALS #0073 (overlap with 0057, 0220,0335) Columbia Heights BLS #0055 (overlap with 0057,0219, 0220,0344) Allina BLSS #0344 (overlap with 0055,0057, 0219,0220) Allina BLS #0335 (overlap with 0057, 0073,0084,0220) Allina ALSS #0220 (overlap with 0055,0057,0073, 0084,0219,0335,0344) Allina ALS #0057 (overlap with 0055,0073,0084, 0219,0220,0335,0344) Emergency Medical Services May 7, 2020 John Swenson – Public Safety Director Lino Lakes Public Safety Department 640 Town Center Parkway Lino Lakes, MN 55014 Dear Chief Swenson, On behalf of Allina Health it has been an honor to engage in the detailed EMS dialog and planning with you and your leaders. Allina Health-EMS strives to be a transparent, collaborative, cutting edge EMS organization and we are honored to have the opportunity provide our exceptional ambulance care and services for the residents and visitors of Lino Lakes. This document reflects the activities and commitments we have discussed to date and are moving to execute. These include:  Providing Advanced level ambulance service to the City of Lino Lakes pursuant to the requirements set in Minnesota Statute 144E.  Leasing Station 1 as a substation for $700 per month (lease is under review by our legal counsel).  EMS physician medical direction and training package from Allina EMS. The proposal has been submitted to the City.  Review of response metrics and demonstrating how the addition of Lina Lakes to our service area impacts response and staffing in our North Metro Region.  Allina EMS will add an additional 12 hours of cover per day in the evenings to supplement our dynamically deployed resources in the north metro region. This as a result of our assessment of current ambulance volumes in the City of Lino Lakes. Hours are adjusted as needed based on current volumes.  Review of response times and pre-hospital needs on a regular basis (monthly or quarterly per the City’s preference).  City to send Council proclamation redirecting ambulance calls to Allina Health EMS to the Anoka County Sheriff’s office.  Service implementation date prior to June 1st 2020, date to be mutually agreed upon. Allina Health EMS holds a Primary Service Area (PSA) license that encompass the City of Lino Lakes. Therefore no contractual agreement is necessary to make this transition other than the outlined lease and medical direction agreement for City’s public safety department. This is an overlapping PSA with Fairview currently served by North Memorial Medical Transportation and was to begin being served by Fairview M-Health on June 1, 2020. Where overlaps occur neither the State nor the agencies can mandate which agency shall responds. In these cases it is the municipality and primary PSAP that determines who will provide service in the overlap area. City Council action naming a service to the PSAP is typically how overlaps are resolved. We look forward to our partnership with the City and your public safety leaders! Please let me know if we answer further questions from any of your leaders or elected official. Susan Long Susan Long EMS Chief, Vice President of Operations Allina Health – EMS 1 CITY COUNCIL AGENDA ITEM 6A STAFF ORIGINATOR: Katie Larsen, City Planner MEETING DATE: May 11 , 2020 TOPIC: Nadeau Acres i. Consider First Reading of Ordinance No. 02-20 Rezoning Property from R, Rural to R-1, Single Family Residential ii. Consider Resolution No. 20-20 Approving Preliminary Plat and Opening Sub-District 3C & 3D of Utility Staging Area 2A (2020-2025) VOTE REQUIRED: 3/5 INTRODUCTION Staff presented Nadeau Acres to the City Council at the March 2, 2020 and May 4, 2020 Work Session. The following is an update since the May 4th Work Session: Stormwater Outlet. Staff met with the adjacent property owners (Vickers) on Thursday, May 7, 2020 to review options for a stormwater outlet. The owners explained their concerns over possible ditch erosion and ongoing maintenance concerns. As noted at the work session, if an easement is obtained, the City will be responsible for ongoing maintenance of the improvements including the outlet area. The owner informed staff of their preference for a piped outlet with a dissipater still incorporated with the understanding that it is city maintained. Staff is working with the developer’s engineer on a modified design. Great River Energy (GRE) Easement. The power line easement, running north/south, is owned by Great River Energy. The developer received approval from GRE on Tuesday, May 5, 2020 for work within the easement based on the existing plans. They are following up with GRE on a plan amendment to extend pipe across to ditch. Since the existing approvals include both sanitary, water and storm sewer lines, within the easement, we are not expecting any issues with the new extension. Josephine Lane and Utility Extension. The Vickers have raised concerns regarding the impact of street, sewer, and water extension to their property line (Josephine Lane). Staff’s discussions with the County Assessor’s office have indicated that the development of the Nadeau Property, not the proximity of sewer/water utility and street improvement to the property line, will drive any potential increase in value. However, staff is evaluating with the developers’ engineer an option to pull back the sanitary, water main and street improvements closer to the intersection. However in doing so, there will be an added cost to development of the Vickers property in the future. Staff would also note that if the street is pulled back, it 2 should be clear in the meeting record that the street will be extended in future. The extension of street stubs often becomes controversial after residents have moved in. Josephine Lane will be a through street providing access to 20th Avenue from the Vickers property and it will need to be clearly marked. Staff is requesting City Council consideration of rezoning and preliminary plat for Nadeau Acres. Complete Application Date: January 13, 2020 60-Day Review Deadline: March 13, 2020 120-Day Review Deadline: May 12, 2020 Environmental Board Meeting: January 29, 2020 Park Board Meeting: NA Planning & Zoning Board Meeting: February 12, 2020 City Council Work Session: March 2 & May 4, 2020 City Council Meeting: May 11 , 2020 BACKGROUND The applicant, BL Holdings, LLC, submitted a rezoning and preliminary plat land use application for Nadeau Acres. The proposed single family residential development is located north of CSAH 34 (Birch Street) and west of CSAH 54 (20th Avenue) across from NorthPointe. It contains two (2) parcels totaling approximately 33 gross acres. The applicant is proposing an R-1, Single Family Residential development on standard 80 foot wide lots. The initial plans presented to the Planning & Zoning Board on February 12, 2020 and the Council Work Session proposed 69 single family lots. The revised plan increases the size of Pond 100 for additional stormwater management, relocates the lift station and eliminates 1 single family lot. The total number of single family lots is now 68. The Land Use Applications are: • Rezone property from R, Rural to R-1, Single Family Residential • Preliminary Plat This staff report is based on review the following plan sets and documents: • Nadeau Acres Civil Plan Set prepared by Carlson McCain revision date March 20, 2020 • Stormwater Management Plan prepared by Carlson McCain revision date March 20, 2020 • Stormwater Pollution Prevention Plan prepared by Carlson McCain dated December 6, 2019 • Geotechnical Exploration Report prepared by Haugo Geotechnical Services dated December 6, 2019 3 • Wetland Permit Application prepared by Kjolhaug Environmental Services Company Inc. dated December 23, 2019 • Rare Plant Report prepared by Midwest Natural Resources dated December 12, 2019 • Traffic Impact Study by Spack Consulting dated December 6, 2019 ANALYSIS Existing Site Conditions The 30 acre site contains two (2) parcels currently addressed 6651 & 6677 20th Avenue and is located north of CSAH 34 (Birch Street) and west of CSAH 54 (20th Avenue) across from NorthPointe. The site consists of two (2) single family houses, accessory buildings, agricultural hay fields, and wetlands. The house located at 6677 20th Avenue will be moved onto a new lot and the house located at 6651 20th Avenue will remain in place. Accessory buildings will also be relocated. The existing septic systems shall be removed and wells capped. One NSP utility transmission overhead electric line runs north-south along the west boundary line and another NSP utility transmission line bisects the site diagonally. Both lines are covered by easements. Topography of the site generally slopes downward from the southeast to the northwest at elevations ranging from 925 EL to 905 EL. Groundwater was encountered at depths ranging from 4 to 19 feet. Topsoil was encountered at ½ to 1 foot. Below the topsoil, soils consist of glacial outwash sands and native clayey glacial till and are classified as hydrologic groups HSG D in the southern portion and HSG C in the north. Land Use and Zoning Current and Proposed Zoning The property is currently zoned R, Rural and is guided for low density residential land use. Per the zoning ordinance, land that is guided low density residential can be zoned R-1, Single Family Residential, R-1X, Single Family Executive Residential or R-2, Two Family Residential. The property is proposed to be rezoned to R-1, Single Family Residential. The R-1 zoning provides a natural transition from the current PUD, Planned Unit Development (R-2, Two- Family) zoning in the NorthPointe development to the east and the future medium density land use to the north in Lino Lakes and the northwest in the City of Centerville. At the time of submittal, the 2040 Comprehensive Plan was under review by Met Council and not formally adopted by the City Council. The 2030 Comprehensive Plan is still in effect. Current Zoning R, Rural Proposed Zoning R-1, Single Family Residential Current Land Use Rural Residential 2030 Future Land Use Low Density Residential (1.6 to 3.9 units per acre) 2040 Future Land Use Low Density Residential 4 (1.6 to 3.0 units per acre) 2030 Utility Staging Area 2A (2020-2025) 2040 Utility Staging Area 1A (2018-2025) Density The following chart implements Met Council’s formula for calculating net density. Gross Area (acres) 33.03 Wetlands & Water Bodies (0.65) Public Parks & Open Space 0.00 Arterial ROW (0.74) Other (Utility Transmission Easement) (1.69) Other (Wetland Buffer Area) 0.00 Net Area (acres) 29.95 # of Units 68 Gross Density (units/acre) 2.06 Net Density (units/acre) 2.27 Per the 2030 and 2040 Comprehensive Plan, the site is guided for low density residential development which requires a density of 1.6 to 3.9 and 1.6 to 3.0 units per acres, respectively. The proposed net density is 2.27 units per acre which is consistent with the 2030 & 2040 Comprehensive Plan’s guided land use and density. Surrounding Zoning and Land Use Direction Zoning Current Land Use Future Land Use North R, Rural Rural Residential Medium Density Sewered Residential South R, Rural Single Family Residential Low Density Sewered Residential East PUD Single Family Residential Medium Density Sewered Residential 5 West R, Rural Agricultural Low Density Sewered Residential Zoning Requirements The property is proposed to be rezoned from R, Rural to R-1, Single Family Residential. R-1 Requirements Nadeau Acres Min. Lot Size 10,800 sf Ave. 14,120 sf Min. Lot Width -Interior Lot 80 ft 80 ft -Corner Lot 100 ft 100 ft Min. Lot Depth 135 ft 135 ft Double Frontage Lots 145 ft 145 ft Building Setback -From Streets --Local Street 30 ft 30 ft --Collector or Arterial 40 ft 40 ft --Corner lot 30 ft 30 ft -Rear --Principal 30 ft 30 ft --Accessory 5 ft 5 ft -Side --Principal 10 ft 10 ft --Accessory 5 ft 5 ft --Corner lot 30 ft 30 ft Buffer 15’ if side or rear lot abuts collector or arterial street 15 ft buffer provided along CSAH 54 Per the subdivision ordinance, minimum lot area for urban lots shall consist of buildable land exclusive of utility transmission easements or water course easements that encumber lot development. The applicant submitted a spreadsheet detailing that minimum lot areas are 10,800 sf. The average lot size is 14,120 sf. 6 Building Type and Construction At the time of building permit, each individual single family dwelling unit will be reviewed for compliance with Section 1007.043(2)(a), General Building Provisions and Section 1007.090(4), Building Requirements regarding floor area, garage and design and construction standards. Per Section 1007.042(5)(b)1.e., air conditioning or heating equipment shall be five (5) feet from any rear lot line and ten (10) feet from any side lot line. No encroachment shall be permitted in existing or required drainage and utility easements. Subdivision Ordinance Conformity with the Comprehensive Plan and Zoning Code The preliminary plat is consistent with the comprehensive plan for low density residential development. The preliminary plat is also compliant with zoning ordinance performance standards for the R-1 zoning district with some minor revisions. Blocks and Lots The preliminary plat has been revised from 69 single family lots to 68 and from 6 outlots to 5. The outlots are for the following purposes: Outlot Purpose A Wetland and Stormwater Pond 400 B Stormwater Pond 100 C Road Easement for Future Development of 6687 20th Avenue D Omitted NSP Easement Corridor E D Stormwater Pond 200 F E Trail Corridor and Watermain Loop On the original preliminary plat, Outlot D contained NSP easement and storm sewer pipe. To minimize the City’s responsibility of mowing and maintaining manicured grass in this area, the outlot has been omitted and the lot lines extended through the NSP easement. The other outlots will be deeded to the City for ownership and maintenance. Streets and Alleys Internal road right-of-way widths are 60 feet and the paved roadway width is 32 feet back to back. This is consistent with the City’s engineering standards. Cul de sac paved widths have been revised to 32 feet back to back. 7 CSAH 54 (20th Avenue) is classified as an A-Minor Arterial Reliever and requires a full 120 feet of dedicated road right-of-way. The plat dedicates 60 feet of road right-of-way from section line as required. Turn lane plans have been submitted to Anoka County for review and comment. CSAH 34 (Birch Street) is classified as a Major Collector road along the section of the proposed development and requires a full 80 feet of road dedicated right-of-way. The section of the plat that abuts CSAH 34 (Birch Street) previously dedicated 60 feet of road right-of-way. No further road right-of-way is required. The length of Red Oak Lane cul de sac is 250 ft and Norma Way is 350ft. No permanent cul de sac length exceeds 500 feet as required by ordinance. Length requirements do not apply to temporary cul de sacs such as William Lane. A temporary cul de sac and easement are shown on the west end of William Lane. A separate recordable easement document will be recorded against the property and shall be terminated upon extension of William Lane. The future developer will be responsible for removal of the temporary cul de sac and restoration of the lot. Private Driveway-6709 20th Avenue In September 2015, the Nadeau’s owned and subdivided off the1 acre house parcel located at 6709 20th Avenue. Through the minor subdivision process, staff recommended the north driveway be removed and the south driveway access Red Oak Lane upon its extension. The Nadeau’s expressed concerns about removing the north driveway stating personal cars and trucks could not turn left into the garage from the south driveway without backing into the County road right-of-way. Staff agreed to leave the north driveway with the stipulation the south driveway be removed when the southbound turn lane into NorthPointe was constructed. Unfortunately, this south driveway onto CSAH 54 (20th Avenue) still remains. The driveway will need to be relocated to the west upon extension of Red Oak Lane due to its close proximity to the intersection. Staff Comments: • The applicant shall draft and record a temporary cul de sac easement. • The cul de sac shall be removed and the temporary easement released upon extension of William Lane. • “Future Road Extension” signs are required at the west end of William Lane and Red Oak Lane and at the north end of Heritage Avenue. Easements Standard drainage and utility easements at least 10 feet wide are provided along all lot lines. Drainage and utility easements are also dedicated over the outlots. Storm Water Management and Erosion and Sediment Control 8 A Storm Water Management Plan has been prepared by a licensed, professional engineer and reviewed for compliance by licensed, professional engineers from both WSB & Associates (City) and Houston Engineering (RCWD). The revised plan increases the size of Pond 100 and includes a plunge pool energy dissipator for additional stormwater management. Per the revised March 20, 2020 Stormwater Management Plan prepared by Carlson McCain: “The stormwater on the site flows to three different locations from the site. The majority of the site drains to an existing private ditch/wetland area to the north of the site. A small portion at the south of the site drains through an existing culvert along Birch St (CSAH 34). The western portion of the site drains to the northwest to an existing private ditch. The surface water will flow through three new ponds. Pond 200 located in the middle of the site will pick up surface water from the south portion of the site and direct it towards Pond 100. Pond 100 will pick up surface water from the majority of the site and discharge to the west to an existing private ditch. Pond 400 will receive the remaining surface water and discharge to an existing ditch to the north. After the project is completed, the site will include approximately 8.8 acres of new impervious surfaces including the streets, sidewalks, paths, parking lots, and rooftops. Due to poor soils in the south portion of the site and a high groundwater table in the north portion of the site, infiltration is not feasible. The applicant used a HydroCAD model based on the Atlas 14, 24-hour storms to design the storm sewer conveyance system and ponds. The site is designed to reduce site runoff rates for the 2-, 10-, and 100-year rainfall events.” Per the April 27, 2020 WSB City Engineer’s Review Memo: “During the public hearing held at the Planning and Zoning Board meeting on February 12, 2020 there were a number of questions regarding the proposed developments’ stormwater management plan. Below is a summary of findings and actions to address the questions: • The site outlets to two private ditches, one in the northwest, and one to the north. There is also a small area of the site that drains to the south. • The proposed project is required to mitigate surface water and address water quality through City, Watershed District and State Rules and Statues. This includes maintaining the existing rate or reducing the rate of runoff from the site, and providing water quality treatment for the proposed development. The project meets the City of Lino Lakes’ stormwater management requirements and RCWD rules. RCWD approved a CAPROC on April 8, 2020. o This project is proposing to reduce rates as detailed in the Stormwater Report, and will utilize stormwater ponding for water quality treatment. The stormwater management plan incorporates existing soils and time of concentrations to calculate the needed ponding systems to mitigate the new impervious surfaces. o The surface water from the new impervious surfaces will be accommodated through three new ponds. Pond 200, located in the middle of the site, will pick up surface water from the south portion of the site and direct it towards Pond 9 100. Pond 100 will pick up surface water from the northwest portion of the site and discharge to the west to an existing private ditch. Pond 400 will receive the remaining surface water and discharge to an existing ditch to the north. o The design includes a standard outlet control structure with pipe outlet. An outlet control structure is a device that holds water back in the proposed pond and then discharges it slowly into the ditch so that the flow to the downstream ditch is less than the existing condition flow into the ditch. o The original design included an outlet pipe to the ditch. The applicant was unable to obtain an easement for the outlet pipe to the ditch as required by the City and RCWD. The applicant revised the design and enlarged the pond to provide additional storage and added a plunge pool dissipater at the discharge location. • Adjacent property owners expressed concerns over the s stormwater runoff from the site and the downstream private ditches. Staff had multiple conversations and Zoom meetings with the property owners to better understand their concerns and explain the existing and proposed conditions. This included an onsite evaluation, reviewing topographic data, record plans, survey, and incorporation of the NorthPointe development drainage plan. The downstream systems appear to be working correctly and the NorthPointe development has reduced the surface water flow to the subwatershed in question. We will continue to work the property owners and provide information and findings. o The adjacent private ditch owners are responsible to perpetuate existing runoff rates and are to maintain the ditch flow through their property. Staff reviewed private ditch requirements with the City Attorney and RCWD staff. o 2019 was a record year for rainwater in Minneapolis-St. Paul area according to the Minnesota DNR Year to Date Precipitation Chart. Soil saturation in the fall of 2019 was similar to a spring snow melt condition where typically the fall is a dryer condition. These conditions have led to standing water due to soil saturation and higher flows in conveyance systems. o We are working with one of the downstream property owner to complete culvert maintenance on their property. • In addition, we are having the developer verify the downstream conditions to confirm their assumptions.” Per the RCWD CAPROC dated April 8, 2020: Soil conditions vary over the sloping site, with HSG D sandy lean clays (CL) at the higher elevations, and HSG A/B poorly graded sands and sands with silt (SP/SP-SM) with sandy lean clays below. The HSG D soils in addition to the high water table below the HSG A/B soils make infiltration infeasible for the site. Thus, stormwater ponds are acceptable to meet the water quality requirement. The pond sizing, and outlets and overflows are consistent with design criteria. 100% of the project area either flows to the ponds or meets design criteria. Additional TSS removal is not required. The applicant has met all the Water Quality requirements and the design criteria of RCWD Rule C: Stormwater Management Plans. 10 2-year (cfs) 10-year (cfs) 100-year (cfs) Existing Proposed Existing Proposed Existing Proposed North to Private Ditch 3.5 2.3 5.1 3.9 6.9 5.7 West to Private Ditch 11.6 9.2 34.1 28.7 82.8 74.7 South through Culvert under Birch Street 4.4 3.5 8.0 6.5 14.6 11.9 Totals* 19.2 12.5 46.7 35.6 103.3 87.8 *Difference due to time of concentration Post-development stormwater discharge rates are less than the pre-development rates. Phasing The site will be mass graded in one (1) phase and developed in two (2) phases. Phase 1 has 35 lots and Phase 2 has 33 lots. Utilities Public water, sanitary and storm sewer utilities will be installed within the development. Sanitary Sewer An 8”-10” sanitary sewer pipe, 4” forcemain and lift station will serve the site. Both existing houses located at 6651 and 6677 20th Avenue are served by private septic systems. The house located at 6677 20th Avenue is being relocated onto a new lot in the subdivision. Both houses are required to connect to the municipal sanitary sewer system. Watermain An 8” watermain will extend and loop from the east (NorthPointe) along Red Oak and from the south (Birch Street) and serve the site. The house located at 6651 20th Avenue is connected to municipal city water. The relocated house will also connect to municipal city water. Public Land Dedication The City will require cash in lieu of land dedication. Per the City’s Park, Greenway & Trail System Plan, a future neighborhood park is programmed to the west of this site. See Attachment #3. Sidewalks along the streets in the development will connect to future trail corridors along CSAH 34 (Birch Street) and CSAH 54 (20th Avenue). A 300 foot long trail will be constructed in Outlot F and will terminate at the lot line. This trail segment will eventually connect to a future trail along the north side of Birch Street. Terminating the trail at the lot line now will prevent vehicles from confusing the trail with a road. Credit will be given for the construction cost of the trail extension to Birch Street. 11 Nadeau Acres 68 lots x $3,150 = $214,200 -Trail Construction Cost TBD TOTAL = TBD Tree Preservation The Environmental Coordinator and Environmental Board reviewed the tree preservation and landscape plans. The goal of tree preservation is to minimize unnecessary loss of habitat, biodiversity and forest resource and to replace removed trees in areas where tree cover is most critical. The Tree Inventory Report prepared by Carlson McCain revised January 10, 2020 identifies 750 significant trees on site. Eighty-eight (88) trees were identified as non-significant (e.g. ash trees, elm trees etc.) and will be removed without mitigation requirements. Of the remaining 662 trees, 252 trees will be saved and 410 will be removed. Sheet T4, Tree Preservation Plan identifies the basic use area and environmentally sensitive areas. Five (5) trees are being removed within the natural resource conservation area. Fourteen (14) trees are being removed from the non-ESA and non-basic use areas. This requires 29 replacement trees for mitigation which are provided throughout the development. Landscaping Open area landscaping standards require 1 large tree and 3 large shrubs per 2,000 sf. Existing trees on site may be used to satisfy open area landscaping requirements if applicable by placement. This would only apply to the existing trees on Outlot A. The landscaping plan has been revised to provide adequate open space mitigation for Outlots B, D and E. Outlots C does not require mitigation because it is for future right-of way. Buffer and screen standards apply along CSAH 54 (20th Avenue), specifically Block 4, Lots 12- 15 that have a rear frontage on 20th Avenue. Approximately 475 linear feet of frontage will be screened by shrubs, new trees, and existing trees to provide a continuous planting screen year- round. The Preliminary Landscape Plan shows trees and shrubs planted on two separate berms. It was suggested these berms be combined to provide a continuous berm; however, an opening between the 2 berms is needed to provide rear yard drainage. A triangulated row of coniferous trees will be planted in addition to the berms that will provide appropriate screening. Boulevard trees are required at the rate of one (1) tree per lot frontage for single family. There are 68 single family lots that require 77 boulevard trees (interior and corner lots). Seventy-nine (79) trees are proposed which is compliant with the ordinance. Alternative Urban Areawide Review (AUAR) The site is not within the 2005 I-35E Corridor AUAR; therefore, no mitigation is required. 12 Traffic Study A Traffic Study was prepared by Spack Solutions on December 6, 2019. The study was based on a concept plan with 74 single family homes. Based on ITE standards and local data collected by Spack Solutions, the development is forecasted to generate approximately 685 new trips per day with 50 new trips in the a.m. peak hours (7-8am) and 65 trips in the p.m. peak hours (4:30 - 5:30pm). Traffic impacts are analyzed in terms of volume and capacity. Volume quantifies how many vehicles are using the road and capacity quantifies the number of vehicles the road can accommodate. Traffic Volumes Roadway Location Existing Daily Volumes1 2040 Forecasted Daily Volumes2 CSAH 54 (20th Avenue) North of Red Oak Lane 5,300/6,100 14,000 CSAH 54 (20th Avenue) South of Red Oak Lane 5,600/6,100 14,000 CSAH 54 (20th Avenue) South of CSAH 34 (Birch St) 2,900/3,000 14,000 CSAH 34 (Birch Street) West of CSAH 54 (20th Avenue) 3,500/3,150 10,000 1Spack Video Data Collection/2018 AADT Volumes 2Anoka County’s 2040 Transportation Plan Existing traffic volumes near the site are between 5,300-5,600 AADT (annual average daily traffic). Nadeau Acres will generate approximately 685 new trips per day. These new trips added to the existing daily trips are significantly less than the 2040 forecasted daily volumes. Traffic Capacity A ratio of volume to capacity is used to analyze traffic congestion. A road with a volume to capacity ratio of 1.0 means the traffic volume is nearly equal to the traffic capacity and will feel congested to motorists. Per the traffic study, three (3) sections of roadways (20th Ave north of Birch St, 20th Ave south of Birch St and Birch St) were analyzed under Existing, 2024 No- Build and 2024 Build scenarios. No volume to capacity ratio exceeded 0.45. None of study roadways are expected to exceed their daily capacities. Level of Service Level of Service (LOS) is used to describe the operating conditions of an intersection. Facilities are given letter designations from “A” (best operating conditions) to “F” (worst conditions). Section 1001.013(2)(c), Premature Subdivision of the City’s Subdivision Ordinance establishes minimum Level Of Service (LOS) requirements. The ordinance states that if the LOS is A or 13 B, the proposed subdivision shall not the degrade the LOS more than one grade. If the LOS is C or D, it shall not degrade the LOS. Intersections with a LOS of E or F must be improved to ensure a LOS of D or better. Existing Peak Hour LOS Proposed Peak Hour LOS Intersection A.M. Peak P.M. Peak A.M. Peak P.M. Peak 20th Ave & Red Oak Lane B B C C 20th Ave & Birch Street B C B C The proposed Levels of Service do not degrade by more than one (1) LOS; therefore the subdivision is not considered premature. The project is also under review by Anoka County Highway Department. They have identified the need for right and left turn lanes on CSAH 54 (20th Avenue). These details shall be provided by the developer. CSAH 34 (Birch Street) Corridor Study In April 2011, Anoka County and the City of Lino Lakes hired SRF Consulting Group to develop a corridor study along CSAH 34 (Birch Street). Per the recommended corridor plan, future full-access intersections near Nadeau Acres are every ¼ mile. No access (full or partial) is proposed onto CSAH 34 (Birch Street) from Nadeau Acres. A pedestrian (trail or sidewalk) corridor will connect Nadeau Acres to Birch Street. I-35E/CR J/Centerville Road Staff is aware of current traffic concerns at I-35E/CR J/Centerville Road but these are outside the scope of Nadeau Acres. These interchanges are currently under evaluation by other government agencies. Ramsey County is working on a federal transportation funding application to reconstruct bridge and ramp terminals and CR J/Centerville Road intersection. Local and County staffs are also working with state representatives on possible preliminary design funding in the State’s bonding bill. Anoka County is also considering a transportation funding application for improvement of the Centerville Road/CR J intersection. Wetlands Kjolhaug Environmental Services Company, Inc. prepared a Wetland Delineation Report dated October 29, 2019. A Notice of Decision was issued by RCWD on December 11, 2019. Kjolhaug Environmental Services Company, Inc. prepared a Wetland Permit Application dated December 23, 2019. Per the report, two (2) wetlands were delineated on site totaling 1.37 acres. Wetland 1 is a Type 1 wet meadow wetland. Wetland 2 is a partially-drained, wet meadow and scrub-shrub wetland. A portion of Wetland 2 southwest of the septic mound discharge outlet was created in upland and is incidental. The proposed project will require 30,826 square feet (sf) (0.7076 acre) of permanent 14 impact to four (4) wetland areas, one of which is incidental for WCA permitting. Replacement will be accomplished via the purchase of wetland banking credits. The site is inside of the boundaries of the Lino Lakes Comprehensive Wetland Protection and Management Plan (CWPMP) area; however, onsite wetlands do not fall within the landscape scale/preliminary Wetland Management Corridor (WMC). Therefore, no WMC buffer on wetlands is required with site development. Rare & Endangered Species Per the December 12, 2019 report prepared by Midwest Natural Resources, no habitats for state- listed plant species were observed during field review. No further surveys are recommended. Floodplain There is no FEMA floodplain on site. 2030 Comprehensive Plan At the time of this staff report, the draft 2040 Comprehensive Plan is under review by the Met Council and has not formally been adopted by the City of Lino Lakes. Therefore, the 2030 Comprehensive Plan is in effect. Nadeau Acres is consistent with the goals and policies of the comprehensive plan in regards to resource management, land use, housing, transportation and utilities. Resource Management System Plan Goals of the Resource Management System Plan include: • Natural Resources and Amenities o Goal #1: Identify, protect and preserve the desirable natural areas and ecological and aquatic resources of the community. • Land Use Policies o Goal #1: Ensure that well-planned, quality residential, commercial, industrial and institutional development to accommodate the city’s projected growth needs occurs in a manner that also conserves and enhances the city’s natural resources and amenities. The Nadeau Acres protects the natural resource by providing storm water management and vege tative buffers. Land Use Plan Goal 1: Create a unified vision and future for the city, promote a well-planned community, prevent fragmented development, address the impacts of development and redevelopment on natural resources, aesthetics and view corridors, and provide balanced land use and connectivity that ensures the integration of both sides of the regional park. 15 Goal 2: Ensure that zoning and subdivision ordinances and official maps are consistent with the intent and specific direction provided within the Comprehensive Plan. Policies: 1. Ensure developers meet the standards specified within the land-use plan and official controls, including zoning and subdivision ordinances and official maps. 2. Ensure compatibility of adjacent land uses. Nadeau Acres meets the land use goals by developing a single family residential subdivision that is consistent with low density residential development as guided by the Comprehensive Land Use Plan. Low density residential development allows for 1.6 to 3.9 units per net acre. The net density for the development is 2.27 units per net acre. This is consistent with density requirements. Housing Plan Goal 3: Ensure housing development is compatible with existing and adjacent land uses and provides accessibility to key community features and natural amenities. Policies include linking trails to parks, lakes and schools. Nadeau Acres meets the goal of the housing plan. The development is compatible with the existing adjacent residential homes. Sidewalk/trail will provide corridors to future trails along CSAH 54(20th Avenue) and CSAH 34 (Birch Street). Economic Development Nadeau Acres does not negatively impact the city’s economic development goals. Transportation Plan Goal 1: Plan for and achieve required street improvements and connectivity throughout the City of Lino Lakes. Goal 2: Ensure that streets and roads are as safe as possible. Nadeau Acres meets the goals of the 2030 Transportation Plan by providing a safe road connection between future neighborhoods, constructing turn lanes along CSAH 54 (20th Avenue) and controlling access management along County roads. Sanitary Sewer Plan Goal 1: Ensure that well-planned, quality residential, commercial, industrial and institutional development to accommodate the City's projected growth needs occurs in a manner that also conserves and enhances the city's natural resources and amenities. Goal 5: Maintain the City's residents and businesses with an affordable and safe sanitary sewer system. 16 Nadeau Acres meets the goals of the sanitary sewer plan. The site is located in Sanitary Sewer District 3 (Sub-district 3C and 3D) and is in 2030 Utility Staging Area 2A (2020-2025). The sanitary sewer system has capacity to serve the development. The sanitary sewer system will also be oversized to accommodate future development to the north and west. Per the 2030 Comprehensive Plan’s Growth Management Policy, the City Council will determine by resolution if the next 10 year, 2A (2020-2025) staging area shall be opened to development. Resolution No. 20-20 details the findings of fact. Water Supply Plan Goal 4: Provide the City's residents and businesses with affordable potable water that is safe and of high quality for daily consumption and fire demand. Nadeau Acres meets the goals of the water supply plan. The site is served by an 8” watermain extending from the east and loops south to Birch Street. The water system has capacity to serve this residential development. Environmental Board Comments The Environmental Board reviewed the proposed preliminary plat on January 29, 2020. They recommended approval of the project with conditions listed in the April 23, 2020 Memo from the Environmental Coordinator. Conditions include minor revisions to the open space landscaping, boulevard tree diversity and suggested tree species. Final Plat A land use application for final plat and Development Agreement shall be required. Planning & Zoning Board The Planning & Zoning Board held a public hearing on February 12, 2020. Board and resident comments included questions about access to NorthPointe Park, grading and drainage, driveway and turn lane construction, vehicle headlight glare and wetland impacts. The Board recommended approval with a 2-1 vote. Findings of Fact The Findings of Fact for the rezoning, preliminary plat and utility staging area are detailed in Ordinance No. 02-20 and Resolution No. 20-20, respectively. RECOMMENDATION The Planning and Zoning Board and staff recommend approval of the rezoning and preliminary plat for Nadeau Acres with conditions listed in the resolution. 17 ATTACHMENTS 1. Aerial Map 2. Future Land Use Map 3. Neighborhood Service Area Park Map 4. City Engineer Review Memo dated April 27, 2020 5. Environmental Coordinator Memo dated April 23, 2020 6. Revised Preliminary Plan Set dated March 20, 2020 prepared by Carlson McCain 7. Ordinance No. 02-20 8. Resolution No. 20-20 0 300 600150 Feet 662066201929192919691969 66776677 66256625 19491949 66336633 66516651 19091909 66876687 67286728 20092009 1997199719891989 20082008 205120512015201520212021202720272033203320392039 2050205020442044203820382032203220262026202020202014201420562056 67096709 CHESTNUT STCHESTNUT STCCYYPPRREESSSSSSTTCOTTONWOOD AVECOTTONWOOD AVER ED O A K L NRED O A K L N RR OOSSEEWW OOOODD SSTT R O S E WO O D S TROSEWOOD S T Aerial MapNadeau Acres µ CSAH 34 (Birch Street)CSAH 54 (20th Avenue) 0 600 1,200300 Feet IJ84 §¨¦I-35E OOTTTTEERRLLAAKKEERRDDCCEE DDAA RR SS TT ALBERT CTALBERT CTCC YY PP RREE SSSS SS TT CCYYPPRREESSSSSSTTBUTTERNUT STBUTTERNUT ST CHESTNUT STCHESTNUT STCOTTONWOOD AVECOTTONWOOD AVER ED W O O D STR ED W O O D STTTAARRTTLLAAKKEE RRDD LLAA CC AASSSSEEDD RR CCLLEEAARRWWAATTEERRCCRREE EEKK CCTT 2211SSTTAAVVEESSR ED OA K L NRED OA K L N TELE DRTELE DR LLAANNGGEERRLL NN21ST AVE21ST AVERR EE DD WW OO OO DD CC TTTELE LNTELE LNRROOSSEEWW OOOODD SSTT CEDAR STCEDAR ST RR OO SS EE WW OOOODDSSTT PALM STPALM STFuture Land Use MapNadeau Acres µ Legend Future Land Use 2030 (S tantec)Future Land Use 2030 (Stantec) Permanent Rural Urban Reserve Low Density Sewered Residential Medium Density Residential High Density Residential Commercial Mixed Use Industrial Civic/Institutional Park and Open Space Private Airfield Right-of-Way Open Water I-35W 10-10 Figure 10-2� Park Service Areas kj kj kj kj kj kj kj kj kj kjkj kj kj kj ú úúBaldwin Lake Rondeau Lake Bald Eagle Lake Wilkinson Lake Otter Lake Amelia Lake Reshanau LakeRice Lake Centerville Lake Marshan Lake George Watch Lake Peltier Lake Cedar Lake Li l a c S t 20th Ave S456721 456749 456721 456749 456714 456754 456714 456723 456754 456754 456714456714 20thAve20th Ave§¨¦35E §¨¦35W ")140 ")84 ")84 Ma in StMainStMain St Cedar St HodgsonRdLake DrElm St Birch St Birch StLake DrSunset AveRondeauLake Dr EAsh St Oak Ln Apollo Dr62nd St N Ash St RondeauLakeRd WCentervilleRdHolly Dr4th AveHolly Dr E Birch St 80th St E 64th St A B C D E I J H F GK L M N White Bear TownshipCity of BlaineCity of Circle PinesCity of Columbus City of HugoCity of North OaksCity of Shoreview !2 !3 !4 !5 !7 !10 !11 !12 !13 !14 !15 !16 !17 !19 !20 !21 !22 !23 !24 !25 !26 !18 !1 !6 !8 !9 ´ Figure 10-2 Neighborhood Service Areas Legend City of Centerville kj Future Neighborhood Park Search Area's ú Existing Tunnel ú Proposed Tunnel/Bridge Existing Asphalt Existing Concrete Trail Existing Boardwalk Trail Proposed Trails Existing Regional Trail Proposed Regional Trail Greenway System Undeveloped Park City Property City Parks Regional Parks School Neighborhood Park Service Area Open Water Municipal Boundary 3,500 0 3,5001,750 Feet Date: 11/12/2019 1 Arena Acres Park 10 Sunrise Park 19 Birchw ood A cres 2 Wollan Park 11 Rice Lake Estates 20 West Shadow P onds O/S 3 C ity H all Park 12 C ountry Lakes Park 21 Reshanau Lake E states O/S 4 C entury Farm N orth 13 Quail Ridge Property 22 Birch Park 5 B ehm's Park 14 Pheasants H ill Park 23 Brandy w ood Park 6 H ighland M eadow P ark 15 N orth Pointe Park 24 Recreation C omplex 7 Lino P ark 16 C learw ater C reek O/S 25 Woods of Baldw in Park 8 Sunset Oaks P ark 17 C learw ater C reek Park 26 Wenzel Famrs Park 9 M arshan P ark 18 Shenandoah Park Memorandum To: Katie Larsen, City Planner, City of Lino Lakes From: Kelsey Gelhar, WSB & Associates Diane Hankee, City Engineer, City of Lino Lakes Date: April 27, 2020 Re: Nadeau Acres Preliminary Plat Review 15306-000 WSB has reviewed the Preliminary Plat and Utility Plans for the Nadeau Acres development in Lino Lakes, MN, prepared by Carlson McCain. These comments are based on review of the following plan sets and documents: • Nadeau Acres Civil Plan Set prepared by Carlson McCain dated March 20, 2020 • Stormwater Management Plan prepared by Carlson McCain dated December 6, 2019, and revised March 20, 2020. • Turn Lane Exhibit prepared by Carlson McCain received March 30, 2020 • Turn Lane Grading Exhibit prepared by Carlson McCain received March 30, 2020 Carlson McCain responded to these comments in red. WSB reviewed the following and responded to Carlson McCain’s comments in blue: Engineering • Grading The Nadeau Acres development includes site grading for Red Oak Lane, Heritage Avenue, Josephine Court, Norma Way, and William Lane as well as the grading required for building pads, and Ponds 100, 200, and 400. Four retaining walls are proposed on the site. Comments: 1. Add additional labels to both existing and proposed contours. Labels added. 2. Retaining walls #1 & #4 shall be eliminated and the applicant shall obtain temporary grading easements with adjacent property owners or the applicant shall adjust the grading plans to eliminate the need for the walls. Retaining wall #1 revised. This wall cannot be removed entirely due to the lift station location and the unlikelihood of obtaining a grading easement from adjacent owner. This wall can be removed with future development to the north. Retaining Wall #4 removed and grading revised to maintain all grading on-site. Developer looking into the possibility of removing walls 2 & 3 if adjacent owner will allow slope grading onto their property. Retaining wall #1 eliminated due to new lift station location. 3. Additional topographic information is needed (minimum 100’ beyond preliminary plat boundary, including at the extensions of Red Oak Lane, Heritage Avenue, William Lane) Lidar added to existing topo to show this area. Current page layout does not show 100’ beyond the north limit of the project site. 4. Retaining walls #2 and #3 (now #1 and #2) exceed maximum allowed height. All retaining walls over 4-ft tall require structural design. Noted. These walls will be designed by a structural engineer and plans provided by the contractor. How will the retaining walls be maintained in the future? 5. Additional rear yard drainage and utility easement required on Lot 145. Lots revised so no drainage from adjacent lot drains into Lot 145. Ms. Katie Larsen 4/13/2020 Page 2 Nadeau Acres Engineering Review Grading revised. See comment 10 under the Stormwater Management section. 6. 10 foot side yard drainage and utility easement required on Lot 101. Revised 7. 10 foot side yard drainage and utility easement required on Lots158 and 159. Revised. Now lots 157 & 158, side yard drainage and utility easement added. 8. Drainage swales do not meet minimum 2% requirement at the following locations: rear lot line of Lots 116, 117,119, 121. Slopes revised Lot numbers have changed, but grading in the areas mentioned has been updated. 9. Grade break elevations needed on Lots 124, 139, 165. Spot elevations added at right-of-way for rear yard swale slope verification. Lot numbers have changed, but grading has been updated. 10. The development is a two-phase development. It is anticipated that grading for the entire site and for the stormwater ponds will be completed at once and not in two phases. Noted. 11. Provide construction details for the turf maintenance accesses. Individual lot surveys will be required to include the turf maintenance access locations (Lots 2 & 3 of Block 1, Lots 6 & 7 of Block 2, and Lots 7 & 8 of Block 6). Maintenance access detail added to detail sheet 12 • Stormwater Management The stormwater on the site flows to three different locations from the site. The majority of the site drains to an existing private ditch/wetland area to the north of the site. A small portion at the south of the site drains through an existing culvert along Birch St (CSAH 34). The western portion of the site drains to the northwest to an existing private ditch. The surface water will flow through three new ponds. Pond 200 located in the middle of the site will pick up surface water from the south portion of the site and direct it towards Pond 100. Pond 100 will pick up surface water from the northwest portion of the site and discharge to the west to an existing private ditch. Pond 400 will receive the remaining surface water and discharge to an existing ditch to the north. After the project is completed, the site will include approximately 8.8 acres of new impervious surfaces including the streets, sidewalks, paths, parking lots, and rooftops. Due to poor soils in the south portion of the site and a high groundwater table in the north portion of the site, infiltration is not feasible. Groundwater was encountered at depths ranging from 4 to 19 feet. Topsoil was encountered at ½ to 1 foot. Below the topsoil, soils consist of glacial outwash sands and native clayey glacial till and are classified as hydrologic groups HSG D in the southern portion and HSG C in the north. The applicant used a HydroCAD model based on the Atlas 14, 24-hour storms to design the storm sewer conveyance system and ponds. The site is designed to reduce site runoff rates for the 2-, 10-, and 100-year rainfall events. Pre- and Post- Development Discharge Rates (cfs) Condition 2-Year 10-Year 100-Year Pre-Development 18.9 19.2 46.4 46.7 103.4 103.3 Post-Development 13.1 12.5 41.7 35.6 91.9 87.8 Post-development stormwater discharge rates are less than the pre-development rates. Ms. Katie Larsen 4/13/2020 Page 3 Nadeau Acres Engineering Review During the public hearing held at the Planning and Zoning Board meeting on February 12, 2020 there were a number of questions regarding the proposed developments’ stormwater management plan. Below is a summary of findings and actions to address the questions: • The site outlets to two private ditches, one in the northwest, and one to the north. There is also a small area of the site that drains to the south. • The proposed project is required to mitigate surface water and address water quality through City, Watershed District and State Rules and Statues. This includes maintaining the existing rate or reducing the rate of runoff from the site, and providing water quality treatment for the proposed development. The project meets the City of Lino Lakes’ stormwater management requirements and RCWD rules. RCWD approved a CAPROC on April 8, 2020. o This project is proposing to reduce rates as detailed in the Stormwater Report, and will utilize stormwater ponding for water quality treatment. The stormwater management plan incorporates existing soils and time of concentrations to calculate the needed ponding systems to mitigate the new impervious surfaces. o The surface water from the new impervious surfaces will be accommodated through three new ponds. Pond 200, located in the middle of the site, will pick up surface water from the south portion of the site and direct it towards Pond 100. Pond 100 will pick up surface water from the northwest portion of the site and discharge to the west to an existing private ditch. Pond 400 will receive the remaining surface water and discharge to an existing ditch to the north. o The design includes a standard outlet control structure with pipe outlet. An outlet control structure is a device that holds water back in the proposed pond and then discharges it slowly into the ditch so that the flow to the downstream ditch is less than the existing condition flow into the ditch. o The original design included an outlet pipe to the ditch. The applicant was unable to obtain an easement for the outlet pipe to the ditch as required by the City and RCWD. The applicant revised the design and enlarged the pond to provide additional storage and added a plunge pool dissipater at the discharge location. • Adjacent property owners expressed concerns over the s stormwater runoff from the site and the downstream private ditches. Staff had multiple conversations and Zoom meetings with the property owners to better understand their concerns and explain the existing and proposed conditions. This included an onsite evaluation, reviewing topographic data, record plans, survey, and incorporation of the NorthPointe development drainage plan. The downstream systems appear to be working correctly and the NorthPointe development has reduced the surface water flow to the subwatershed in question. We will continue to work the property owners and provide information and findings. o The adjacent private ditch owners are responsible to perpetuate existing runoff rates and are to maintain the ditch flow through their property. Staff reviewed private ditch requirements with the City Attorney and RCWD staff. o 2019 was a record year for rainwater in Minneapolis-St. Paul area according to the Minnesota DNR Year to Date Precipitation Chart. Soil saturation in the fall of 2019 was similar to a spring snow melt condition where typically the fall is a dryer condition. These conditions have led to standing water due to soil saturation and higher flows in conveyance systems. o We are working with one of the downstream property owner to complete culvert maintenance on their property. • In addition, we are having the developer verify the downstream conditions to confirm their assumptions. Comments: 1. Pond 100 is discharging to a private ditch, which should be coordinated with the Rice Creek Watershed District and the City of Centerville. Discharge location is being verified with developer. Plunge Pool Energy Dissipator has been added to discharge location per discussion with watershed district and City. See comment 9 regarding the plunge pool energy dissipator design. 2. Sections of the storm sewer are located directly beneath the overhead powerlines and should be relocated. Revised. The storm sewer needs to be offset at least 20’ from the proposed structure on Lot 5 Block 4. 3. Adjust storm sewer that currently runs through Outlot C so that it follows the curb. Revised. Note that in order to force storm sewer to follow the curb for its entirety in this lot, 2 additional structures would be required. Catch basin moved further north to reduce the assumed future easement in a potential front yard. 4. The storm sewer that is part of the rear yard drainage system for Lots 6 & 7 of Block 2 is too close to the future houses. Applicant shall move the storm sewer to the west while maintaining a 20-ft offset from the overhead power line. Ms. Katie Larsen 4/13/2020 Page 4 Nadeau Acres Engineering Review Storm adjusted further back. Note that 20 feet from overhead power is not possible given the maintenance access location and the need to revise a storm manhole to a catch basin manhole for drainage purposes. We are still concerned that the storm sewer is too close to the proposed structures for Lots 6 & 7 of Block 2. 5. The north arrow is incorrect and wetlands on the figures should be labeled or noted in the legends on Stormwater Management Plan Figures 2 and 3 and Storm Sewer Catchment Figure 4. North arrow revised. Wetland line added to legend. 6. Show Proposed HydroCAD Pond “CB50” on Figure 3. CB50 added. 7. Proposed HydroCAD Pond P300 stage storage invert (911.0) does not match bottom contour shown on grading plan. (914) HydroCAD model updated to match grading plan. 8. Ponds modeled in HydroCAD for backyard drainage swales and depressions (P300, P30A, P30B, and CB50) should be modeled as a catch basin in HydroCAD (“pond with insignificant storage”). If they are modeled as ponds, they will need to be evaluated to meet freeboard requirements for detention basins (2’ of freeboard from the low entry in the 100-year storm event). Revised to ponds with insignificant storage. Note that CB 122/123 was modeled as ponds to determine by-pass flow (if any) to see if these would be directed towards a different pond/wetland or offsite. 9. Plunge Pool Energy Dissipator grading requires revision. The bottom of the plunge pool grading of 891.5 has no width in the middle of it and grading is not feasible. Recommend at least 4-feet bottom width to avoid erosion of slopes of pool. Confirm riprap size used at riprap check and overflow. Recommend a detail or notes regarding width and depth of riprap check and overflow, and note on how riprap size was determined. 10. Drainage Area S-10 is shown to flow to W-10. S-10 includes area east of Lots 12-20 of Block 4. Confirm the drainage path for flow to pass from south to north under proposed Red Oak Lane. 11. Roadway profile and storm sewer – the road profile shall be a minimum of 1% grade. Adjust road profile grade to move low points from intersections, Josephine and Red Oak. Storm sewer roadway catch basins are spaced too far apart, 350 ft min. please extend storm sewer and add catch basins. 12. For the downstream ditches / outlets please provide a baseline data report - Survey the bottom of the ditches. - Provide a ditch cross section every 200’ or where it is observed to have a change in section. - Shoot culverts and provide information on type, elevation and condition, document % full of water. • Water Supply There is existing 16-inch diameter ductile iron pipe (DIP) watermain along 20th Av enue (CSAH 54) east of the site and along Birch Street (CSAH 34) south of the site. The City of Lino Lakes Comprehensive Plan does not designate any trunk watermain going through this site. This has been revised with the latest water system plan. The applicant is proposing an 8-inch diameter DIP watermain to serve the entire development. The watermain will extend and loop from the east (North Pointe) along Red Oak Lane and from the south (Birch Street). Comments: 1. The watermain along Red Oak Lane shall be 12-inch diameter DIP. Trunk watermain credits will apply. Revised. This is to be updated to a 16 inch DIP trunk watermain along Red Oak and Josephine. Trunk water credits will apply. 2. A hydrant shall be installed by the lift station at the north end of Heritage Avenue. Revised. Note that hydrant elevation may need to be revised when Heritage Avenue extends to the north. Please put a temporary hydrant at the north end of Heritage Avenue. 3. Applicant shall add a temporary hydrant at the dead end of Red Oak Lane. Revised. Temporary hydrants added to site plans. 4. The City of Lino Lakes should consider installing water service stubs to serve the possible future development at 6687 20th Avenue (26-31-22-14-002). It is anticipated that this parcel will develop into five lots that have access off of Red Oak Lane. Ms. Katie Larsen 4/13/2020 Page 5 Nadeau Acres Engineering Review Per planning comments, these services can be added with final plans. Noted. • Sanitary Sewer There is an existing 10-inch diameter poly-vinyl chloride (PVC) sanitary sewer stub at the intersection of Red Oak Lane and 20th Avenue (CSAH 54). The invert of the stub is approximately 913.6 and is to be verified. The City of Lino Lakes Comprehensive Plan identifies a lift station to serve sanitary sewer districts 3D and 3G. The applicant is proposing to serve the development with 8-inch diameter PVC sanitary sewer, 10- inch diameter PVC sanitary sewer, a lift station located at the north edge of the development, and 4” PVC forcemain. The lift station will pump the waste through the 4-inch diameter PVC forcemain to the existing 10-inch diameter PVC gravity sewer located on Red Oak Lane, just east of 20th Avenue that was installed with the North Pointe development. The Lift Station location is now proposed at Outlot F. Comments: 1. Applicant shall extend the sanitary sewer on Red Oak Ln further to the east and provide a stub for future connections. Revised. The City of Lino Lakes should consider installing sanitary service stubs to serve the possible future development at 6687 20th Avenue (26-31-22-14-002). It is anticipated that this parcel will develop into five lots that have access off of Red Oak Lane. Per planning comments, these services can be added with final plans. Manhole moved further east. Noted. 2. Applicant shall submit a Lift Station Service Area Exhibit. Lift station service area exhibit attached. 3. It is anticipated that the lift station in its current position will need to be 3 to 4-ft deeper. The applicant shall review the necessary depth or consider moving the lift station to the area near the western end of Red Oak Lane. See attached service area exhibit. Lowered the line to provide separation from the culvert on abandoned county ditch 47. Deepening the sanitary line creates a deep sanitary line within the site and a secondary sanitary line has been added. Please upsize the force main to a 6” diameter. Trunk credits will apply. • Transportation 20th Avenue (CSAH 54) is classified as an A-minor Arterial Reliever and Birch Street (CSAH 34) is classified as a Major Collector road. Per the traffic study, Nadeau Acres will generate approximately 685 new trips per day with 50 new trips in the a.m. peak hours (7-8 a.m.) and 65 trips in the p.m. peak hours (4:30-5:30 p.m.). None of the proposed roadways are expected to exceed their daily capacities. The study also reviewed the existing and proposed Levels of Service for the 20th Avenue (CSAH 54) and Red Oak Lane intersection and the 20th Avenue (CSAH 54) and Birch Street (CSAH 34) intersection. The proposed Levels of Service do not degrade by more than allowed by the City’s Subdivision Ordinance. Red Oak Lane, Heritage Avenue, and William Lane are proposed to be 32-ft wide from the back of curb to the back of curb. The two cul-de-sacs, Josephine Court and Norma Way, are both proposed to be 28-ft wide from back of curb to back of curb with cul-de-sac radii of 46-ft from the center to the back of curb. The site will be accessed from 20th’Avenue (CSAH 54). The applicant is proposing widening 20th Avenue to allow for a left turn lane (to Nadeau Acres), a through lane, and a right turn lane (to North Pointe) going northbound and a right turn lane (to Nadeau Acres) and a left/through Ms. Katie Larsen 4/13/2020 Page 6 Nadeau Acres Engineering Review lane going southbound. Comments: 1. Anoka County is reviewing the traffic study and proposed turn lanes. It is anticipated that Anoka County will require a designated southbound through lane along with a designated left turn lane and right turn lane on 20th Avenue (CSAH 54). Noted. This will be coordinated with the county. Applicant shall show the proposed turn lane layout on both the site plan and the grading plan. Anoka County will review the detailed turn lane plan for lane lengths and widths. 2. Update the cul-de-sac street widths to be 32-ft wide from back of curb to back of curb to meet city requirements. Revised. 3. Applicant shall realign the southern driveway entrance for 6709 20th Avenue that currently provides access to 20th Avenue to Red Oak Lane. Notes added to site plan. Realign driveway more west ~ 100’ min from the intersection of Red Oak Lane and 20th Avenue. The applicant is to coordinate with property owner. 4. Applicant shall show the proposed driveway for the existing house on Lot 10, Block 5. Driveway added. 5. Red Oak Lane should have an eastbound through/left lane and a designated right turn lane at the intersection of Red Oak Lane and 20th Avenue. Lanes added. Designated right turn lane shall be the same length as the right turn lane on Red Oak Lane east of 20th Avenue. 6. Applicant shall identify the northern roadway limit of Heritage Avenue. End of road added to plans. Grading adjusted accordingly. 7. City should consider the location of the pedestrian crossing at Heritage Avenue and William Lane. Traffic maneuvering around the corner may not be expecting pedestrians crossing there. Options to consider include extending the trail to move the crossing or moving the sidewalk to the south side of William Lane and the east side of Heritage Avenue. Advanced warning signs can be installed as well as a crosswalk paint markings and signage at the crosswalk. Note that the turn from Heritage to William will require vehicles to slow down significantly while taking the tight turn. Sight lanes cannot be achieved for proper pedestrian safety. Applicant shall revise the sidewalk location. 8. The Heritage Avenue/William Lane cul-de-sac exceeds the City’s maximum of 500-ft. This can be allowed because the cul-de-sac is temporary. Noted. • Wetlands and Mitigation Plan Kjolhaug Environmental Services Company, Inc. prepared a Wetland Delineation Report dated October 29, 2019. A Notice of Decision was issued by RCWD on December 11, 2019. Per the report, two wetlands were delineated on site totaling 1.43 acres. Wetland 1 is a Type 1 wet meadow wetland. Wetland 2 is a partially-drained, wet meadow and scrub-shrub wetland. A portion of Wetland 2 southwest of the septic mound discharge outlet was created in upland and is incidental. The project area is not located within the Lino Lakes Comprehensive Wetland Protection and Management Plan (CWPMP) and outside of Wetland Management Corridor (WMC). The applicant is proposing 0.7 acres of disturbance and will be purchasing wetland banking credits. • Landscaping Open area landscaping standards require 1 large tree and 3 large shrubs per 2,000 sf. Buffer and screen standards apply along 20th Avenue (CSAH 54). Approximately 475 linear feet of frontage will be screened by shrubs, new trees, and existing trees to provide a continuous planting screen year- round. The Preliminary Landscape Plan shows trees and shrubs planted on two separate berms. Boulevard trees are required at the rate of one (1) tree per lot frontage for single family. Comments: Ms. Katie Larsen 4/13/2020 Page 7 Nadeau Acres Engineering Review 1. Boulevard trees should be shown within the city right-of-way. Updated 2. Move plantings off of proposed storm sewer and riprap areas. Noted. 3. Coniferous trees shall be 10-ft from trail edges. Deciduous trees shall be 15-ft from trail edges. Noted. Trees near trail extension to Birch Street do not meet the requirements listed above. • Floodplain There are no existing floodplains on Nadeau Acres. • Drainage and Utility Easements Drainage and utility easements are proposed within the site where there is proposed storm sewer, backyard swales, and stormwater management facilities. There is an existing 66-ft wide powerline easement that runs from northeast to southwest through the middle of the site, and an existing 85-ft wide powerline easement that runs along the western edge of the site. The applicant is dedicating a 60-ft right-of-way along 20th Avenue (CSAH 54) and an 80-ft right-of-way along Birch Street (CSAH 34). Comments: 1. Storm sewer between lots 108 and 109 is greater than 10-ft deep, therefore, the easement shall be twice as wide as the depth. Easement revised to 30-feet. Storm sewer is approximately 14.5 feet deep. 2. 10’ Turf Maintenance Access to be installed over all storm sewer utility proposed between lots. Include between lots 155 and 154, 150 and 149, 121 and 122, and 109 and 108, Added. Lot numbers changed, Turf Maintenance Access added. 3. Drainage and Utility Easements shall not be within powerline easements unless there is documentation from the powerline company to use this space as an easement. Easements revised. Prior to final plat approval, the applicant needs to submit documentation that the power company will grant drainage and utility easements. 4. Temporary grading easements on adjacent properties may be required (see Grading section for more details). Retaining walls removed from right-of -way and stub streets/temporary dead-ends pulled back to allow for grading on-site. 5. Provide documentation of grading and utility agreement within the NSP powerline easements (85-ft wide easement and 66-ft wide easement). In Process. – Permit Application submitted 02-24-2020 6. Grading for the outlet for Pond 100 is on adjacent private property (26-31-22-12-0006) and will require a drainage and utility easement approval from the property owner and NSP. Noted. will be coordinated with property owner. Plans will be adjusted accordingly if easement cannot be obtained. Plans have been adjusted. 7. Sheet 6 showing the ghost plat is missing from the plan set dated 3/20/2020. • Development Agreement A Development Agreement will be required with the final plat. Noted. • Grading Agreement A Grading Agreement is not applicable at this time. • Stormwater Maintenance Agreement The stormwater maintenance for public facilities will be covered under the City’s Programmatic Stormwater Management Agreement. Ms. Katie Larsen 4/13/2020 Page 8 Nadeau Acres Engineering Review • Permits Required 1. NPDES General Construction Permit 2. City of Lino Lakes Zoning Permit for Construction 3. Minnesota Pollution Control Agency Sanitary Sewer Extension Permit 4. Minnesota Department of Health 5. Rice Creek Watershed Permit- Note CAPROC 4/8/2020 6. Anoka County Right-of-Way Permit 7. Provide documentation of Northern States Power agreement or document of understanding of the work (permanent and temporary) to be done within the NSP easements on the site. If you or the applicant has any questions regarding these comments, please contact Diane Hankee at (651) 982-2430 or diane.hankee@ci.lino-lakes.mn.us. You may also contact Kelsey Gelhar at (612) 709- 4897 or kgelhar@wsbeng.com.  Page 1 Memo To: Katie Larsen From: Andy Nelson Date: April 23, 2020 Re: Environmental Coordinator comments for Nadeau Acres RZ PP V4 (3-23-20) Carlson McCain Comments Staff Comments The following recommendations were made by the Lino Lakes Environmental Board on Wednesday, January 29, 2020 concerning Nadeau Acres: 1. Open Space Landscape standard trees must be calculated per outlot/segment of open space, and not calculated as a total for the entire development. In other words, existing trees in Outlot A will not satisfy tree requirements for Outlot B, etc. Open space trees are still required for Outlots B, E, and F. Updated OK 2. Outlot C is a future right-of-way and will not require trees and shrubs, but area must be seeded. Noted OK 3. Outlot D will not require trees and shrubs because lots in this area are going to be expanded to eliminate this outlot. Noted OK 4. Staff will work with developer to increase within-block diversity of boulevard trees. Ultimately, City staff will select species and placement for boulevard trees. This will involve revisions to placement that ensure trees are in the right-of-way and provide Environmental  Page 2 Clear Vision Area for Local Residential Roads (Item #5 of the Landscaping Guidelines and Technical Requirements), which addresses visibility at intersections. Noted Species selected are all appropriate. City staff will work on exact placement in the field. 5. Buffer and screen standards call for a 6 foot high continuous screen on Block 5, Lots 7-10. Lots 7-9 should have a continuous 6 foot high berm with the trees and shrubs planted on top, rather than the two separate berms now called for on the plans. The existing trees on Block 5, Lot 10 should be left in place as proposed on the plan. Noted OK, Buffer can remain as two separate berms as shown on the plans dated 3/23/20. 6. Tree protection zones should be 1 foot radius away from the trunk per inch DBH (diameter at breast height), as described in the Details Plate, and Landscape Specifications on Preliminary Landscape Plan should be changed to match Details Plate. All Tree Protection Zones should be in place before any other construction activity begins on the site. Updated OK 7. Staff recommends 35-241 Mesic Prairie General to use on the portion of Outlots A, B, and E that are above the 100 year High Water Level. Updated OK 8. Replace Royal Purple Smoke Tree with Chokeberry in open area plantings for more value to wildlife. Updated OK 9. Species and placement changes for trees in outlots B and D. Move 5 Black Hills spruce from outlot B and place them in a line at the pavement edge of Heritage Avenue’s northern boundary (the stub). Replace remaining 6 Black Hills spruce and 2 Canadian hemlocks in outlot B with Swamp white, bur, or pin oaks. Replace 6 Canadian hemlocks in outlot D with oaks. 10. Replace Seed mix 35-241 Mesic Prairie General with 35-641 Mesic Prairie Southeast. 11. There are now 68 lots with 77 boulevard trees required, which accounts for one per frontage. Please update this in the City of Lino Lakes Landscape Requirements on the Preliminary Landscape Plan. >>|||||||||||||||||||||||||ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe oh e o h e ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h eugugugugugugugugugugugugugugugugugugugugugugugugugugugugugugugugueueueueueueueueueueueueueueueueueueueueueueueueueueueueueueueutvutvutvxxxxxx>> x xxxxxxxxxxxxxxxxoheohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe >>>>>>>>>> ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe oheueueueugugutut ohe ohe ohe ohe ohe ohe ohe ohe x >>>>>>>>>>>||||||||||||>>>>xxxxxx oheoheoheoh e oh e oh eoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheohe oheoheoheoheoheoheoheoheoheoheoheoheoheohe ohe ohe ||||||||||||||||||||||||||||||||||||||||||||||||||ohe ohe ohe ohe >>>>>>>>>>oheoheoheoheohe>>>>|oh e ohe ohe ohe ohe >>>> >>ueue ue ue ue uexxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx NADEAU ACRESLino Lakes, Minnesota VICINITY MAP ofof3890 Pheasant Ridge Drive NE, Suite 100Blaine, MN 55449Phone: (763) 489-7900Fax: (763) 489-7959www.carlsonmccain.comf:\jobs\8421 - 8440\8440 - nadeau parcel\cad c3d\engineering\prelim-plans\8440_cover.dwgSave Date:03/21/20environmentalengineeringsurveying···13Revisions:1. 1/10/20 Per City CommentsPrint Name:Signature:Date:License #:Drawn:Designed:Date:I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Professional Engineer underthe laws of the State of Minnesota12/6/19JJO12/6/19Brian J. Krystofiak, P.E.25063BJKBL HOLDINGS, LLC7517 162nd Avenue NEColumbus, MN 55025NADEAU ACRESLino Lakes, MinnesotaCOVER12. 2/7/20 Revise Sheets 9,10,&123. 2/21/20 Revise Per City Comments4. 3/20/20 Rev per new Pond 100 outlet. OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OW N E R :OWNER:OWNER:OWNER:OWNER:OW N E R :OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:EXCEPTION ZONING: RZONING: RZONING: RZONING: PUD ZONING: R ZONING: PUD ZONING: RCITY OF CENTERVILLEZONING: Rf:\jobs\8421 - 8440\8440 - nadeau parcel\cad c3d\survey\preliminary\8440_excon.dwgSave Date:01/13/20of3890 Pheasant Ridge Drive NE,Suite 100Blaine, MN 55449Phone: (763) 489-7900Fax: (763) 489-7959www.carlsonmccain.comNADEAU ACRESLino Lakes, Minnesotaenvironmentalengineeringsurveying···EXISTING CONDITIONSThomas R. Balluff, L.S.I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Land Surveyor underthe laws of the State of MinnesotaPrint Name:Signature:Date:License #:12/06/1940361DRAWN BY:ISSUE DATE:FILE NO:Revisions:1. 1/10/20 Per City Comments2067KCM12/06/19132LEGENDBL HOLDINGS, LLC7517 162nd Avenue NEColumbus, MN 55025 HERITAGE AVENUE HERITAGEAVENUEHERITAGE AVENUEWILLIAMLANENORMA WAYJOSEPHINECOURTRED OAKRED OAKRED OAK LANE(C.S.A.H. NO. 54)20TH AVENUE S.LANELANEOWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OW N E R :OWNER:OWNER:OWNER:OWNER:OW N E R :OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:EXCEPTIONSEE SHEET 5ZONING: RZONING: RZONING: RZONING: PUD ZONING: R ZONING: PUD ZONING: RCITY OF CENTERVILLEZONING: RSEE SHEET 4f:\jobs\8421 - 8440\8440 - nadeau parcel\cad c3d\survey\preliminary\8440_prp index.dwgSave Date:03/23/20of3890 Pheasant Ridge Drive NE,Suite 100Blaine, MN 55449Phone: (763) 489-7900Fax: (763) 489-7959www.carlsonmccain.comNADEAU ACRESLino Lakes, Minnesotaenvironmentalengineeringsurveying···PRELIMINARY PLAT INDEXThomas R. Balluff, L.S.I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Land Surveyor underthe laws of the State of MinnesotaPrint Name:Signature:Date:License #:12/06/1940361DRAWN BY:ISSUE DATE:FILE NO:Revisions:1. 1/10/20 Per City Comments2. 2/21/20 Per City Comments3. 3/20/20 Per Pond 100 Outlet Revision2067KCM12/06/19133LEGENDBL HOLDINGS, LLC7517 - 162nd Avenue NEColumbus, MN 55025 SITE DATA NADEAU ACRES OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER: OWNER:EXCEPTION HERITAGE AVENUE HERITAGE AVENUE HERITAGE AVENUENORMA WAYJOSEPHINECOURTRED OAKRED OAK LANE20TH AVENUE SOUTH LANEREDOAKLANEf:\jobs\8421 - 8440\8440 - nadeau parcel\cad c3d\survey\preliminary\8440_prp.dwgSave Date:03/21/20of3890 Pheasant Ridge Drive NE,Suite 100Blaine, MN 55449Phone: (763) 489-7900Fax: (763) 489-7959www.carlsonmccain.comNADEAU ACRESLino Lakes, Minnesotaenvironmentalengineeringsurveying···PRELIMINARY PLATThomas R. Balluff, L.S.I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Land Surveyor underthe laws of the State of MinnesotaPrint Name:Signature:Date:License #:12/06/1940361DRAWN BY:ISSUE DATE:FILE NO:2067KCM12/06/19134LEGENDBL HOLDINGS, LLC7517 162nd Avenue NEColumbus, MN 55025Revisions:1. 1/10/20 Per City Comments2. 2/21/20 Per City Comments3. 3/20/20 Per Pond 100 Outlet Revision OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OW N E R :OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:HERITAGE AVENUEHERITAGEAVENUEWILLIAMLANENORMA WAY(C.S.A.H. NO. 54)f:\jobs\8421 - 8440\8440 - nadeau parcel\cad c3d\survey\preliminary\8440_prp.dwgSave Date:03/21/20of3890 Pheasant Ridge Drive NE,Suite 100Blaine, MN 55449Phone: (763) 489-7900Fax: (763) 489-7959www.carlsonmccain.comNADEAU ACRESLino Lakes, Minnesotaenvironmentalengineeringsurveying···PRELIMINARY PLATThomas R. Balluff, L.S.I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Land Surveyor underthe laws of the State of MinnesotaPrint Name:Signature:Date:License #:40361DRAWN BY:ISSUE DATE:FILE NO:135LEGENDBL HOLDINGS, LLC7517 162nd Avenue NEColumbus, MN 5502512/06/19KCM12/06/192067Revisions:1. 1/10/20 Per City Comments2. 2/21/20 Per City Comments3. 3/20/20 Per Pond 100 Outlet Revision HERITAGE AVENUE HERITAGE AVENUEWILLIAMCOURTNORMA WAYRED OAKLANEJOSEPHINERED OAKRED OAK LANE(C.S.A.H. NO. 54)20TH AVENUE SOUTH LANELANEEXCEPTIONHERITAGE AVENUEf:\jobs\8421 - 8440\8440 - nadeau parcel\cad c3d\survey\preliminary\ghost plat.dwgSave Date:03/20/20of3890 Pheasant Ridge Drive NE,Suite 100Blaine, MN 55449Phone: (763) 489-7900Fax: (763) 489-7959www.carlsonmccain.comNADEAU ACRESLino Lakes, Minnesotaenvironmentalengineeringsurveying···GHOST PLATI hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Land Surveyor underthe laws of the State of MinnesotaPrint Name:Signature:Date:License #:DRAWN BY:ISSUE DATE:FILE NO:Revisions:1.Revised layout. 01/10/20202.Revised layout. 02/11/20203.Revised layout. 02/21/2020XXXC#12/06/19136BL HOLDINGS, LLC7517 162nd Avenue NEColumbus, MN 55025GHOSTPLATGHOSTPLATGHOSTPLAT ofof3890 Pheasant Ridge Drive NE, Suite 100Blaine, MN 55449Phone: (763) 489-7900Fax: (763) 489-7959www.carlsonmccain.comf:\jobs\8421 - 8440\8440 - nadeau parcel\cad c3d\engineering\prelim-plans\8440_site.dwgSave Date:03/21/20environmentalengineeringsurveying···13Revisions:1. 1/10/20 Per City CommentsPrint Name:Signature:Date:License #:Drawn:Designed:Date:I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Professional Engineer underthe laws of the State of Minnesota12/6/19JJO12/6/19Brian J. Krystofiak, P.E.25063BJKBL HOLDINGS, LLC7517 162nd Avenue NEColumbus, MN 55025NADEAU ACRESLino Lakes, MinnesotaSITE PLAN LEGENDPRELIMINARY SITE &UTILITY PLAN7PRELIMINARY SITE &UTILITY PLAN1. 1/10/20 Per City Comments2. 2/21/20 Per City Comments3. 3/20/20 Rev per new Pond 100 outlet. ofof3890 Pheasant Ridge Drive NE, Suite 100Blaine, MN 55449Phone: (763) 489-7900Fax: (763) 489-7959www.carlsonmccain.comf:\jobs\8421 - 8440\8440 - nadeau parcel\cad c3d\engineering\prelim-plans\8440_gr.dwgSave Date:03/21/20environmentalengineeringsurveying···13Revisions:1. 1/10/20 Per City CommentsPrint Name:Signature:Date:License #:Drawn:Designed:Date:I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Professional Engineer underthe laws of the State of Minnesota12/6/19JJO12/6/19Brian J. Krystofiak, P.E.25063BJKBL HOLDINGS, LLC7517 162nd Avenue NEColumbus, MN 55025NADEAU ACRESLino Lakes, MinnesotaPRELIMINARY GRADING INDEX82. 2/21/20 Per City Comments3. 3/20/20 Rev per new Pond 100 outlet. ofof3890 Pheasant Ridge Drive NE, Suite 100Blaine, MN 55449Phone: (763) 489-7900Fax: (763) 489-7959www.carlsonmccain.comf:\jobs\8421 - 8440\8440 - nadeau parcel\cad c3d\engineering\prelim-plans\8440_gr.dwgSave Date:03/21/20environmentalengineeringsurveying···13Revisions:1. 1/10/20 Per City CommentsPrint Name:Signature:Date:License #:Drawn:Designed:Date:I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Professional Engineer underthe laws of the State of Minnesota12/6/19JJO12/6/19Brian J. Krystofiak, P.E.25063BJKBL HOLDINGS, LLC7517 162nd Avenue NEColumbus, MN 55025NADEAU ACRESLino Lakes, MinnesotaPRELIMINARY GRADING& EROSION CONTROL PLAN92. 2/7/20 Revise Pond HWL's3. 2/21/20 Per City Comments4. 3/20/20 Rev per new Pond 100 outlet. ofof3890 Pheasant Ridge Drive NE, Suite 100Blaine, MN 55449Phone: (763) 489-7900Fax: (763) 489-7959www.carlsonmccain.comf:\jobs\8421 - 8440\8440 - nadeau parcel\cad c3d\engineering\prelim-plans\8440_gr.dwgSave Date:03/21/20environmentalengineeringsurveying···13Revisions:1. 1/10/20 Per City CommentsPrint Name:Signature:Date:License #:Drawn:Designed:Date:I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Professional Engineer underthe laws of the State of Minnesota12/6/19JJO12/6/19Brian J. Krystofiak, P.E.25063BJKBL HOLDINGS, LLC7517 162nd Avenue NEColumbus, MN 55025NADEAU ACRESLino Lakes, MinnesotaPRELIMINARY GRADING& EROSION CONTROL PLAN102. 2/7/20 Revise Pond HWL's3. 2/21/20 Per City Comments TREE PRESERVATION PLANINDEXofof3890 Pheasant Ridge Drive NE, Suite 100Blaine, MN 55449Phone: (763) 489-7900Fax: (763) 489-7959www.carlsonmccain.comf:\jobs\8421 - 8440\8440 - nadeau parcel\cad c3d\engineering\trees\8440_tree.dwgSave Date:03/23/20environmentalengineeringsurveying···13Revisions:1. 1/10/20 Per City CommentsPrint Name:Signature:Date:License #:Drawn:Designed:Date:I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Professional Engineer underthe laws of the State of Minnesota12/6/19JJO12/6/19Brian J. Krystofiak, P.E.25063BJKBL HOLDINGS, LLC7517 162nd Avenue NEColumbus, MN 55025NADEAU ACRESLino Lakes, MinnesotaT14 VICINITY MAP TREE PRESERVATION PLANofof3890 Pheasant Ridge Drive NE, Suite 100Blaine, MN 55449Phone: (763) 489-7900Fax: (763) 489-7959www.carlsonmccain.comf:\jobs\8421 - 8440\8440 - nadeau parcel\cad c3d\engineering\trees\8440_tree.dwgSave Date:03/23/20environmentalengineeringsurveying···13Revisions:1. 1/10/20 Per City CommentsPrint Name:Signature:Date:License #:Drawn:Designed:Date:I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Professional Engineer underthe laws of the State of Minnesota12/6/19JJO12/6/19Brian J. Krystofiak, P.E.25063BJKBL HOLDINGS, LLC7517 162nd Avenue NEColumbus, MN 55025NADEAU ACRESLino Lakes, MinnesotaT242. 3/20/20 Per P100 Outlet Revision TREE PRESERVATION PLANofof3890 Pheasant Ridge Drive NE, Suite 100Blaine, MN 55449Phone: (763) 489-7900Fax: (763) 489-7959www.carlsonmccain.comf:\jobs\8421 - 8440\8440 - nadeau parcel\cad c3d\engineering\trees\8440_tree.dwgSave Date:03/23/20environmentalengineeringsurveying···13Revisions:1. 1/10/20 Per City CommentsPrint Name:Signature:Date:License #:Drawn:Designed:Date:I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Professional Engineer underthe laws of the State of Minnesota12/6/19JJO12/6/19Brian J. Krystofiak, P.E.25063BJKBL HOLDINGS, LLC7517 162nd Avenue NEColumbus, MN 55025NADEAU ACRESLino Lakes, MinnesotaT34 TREE PRESERVATION PLANofof3890 Pheasant Ridge Drive NE, Suite 100Blaine, MN 55449Phone: (763) 489-7900Fax: (763) 489-7959www.carlsonmccain.comf:\jobs\8421 - 8440\8440 - nadeau parcel\cad c3d\engineering\trees\8440_tree.dwgSave Date:03/23/20environmentalengineeringsurveying···13Revisions:1. 1/10/20 Per City CommentsPrint Name:Signature:Date:License #:Drawn:Designed:Date:I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Professional Engineer underthe laws of the State of Minnesota12/6/19JJO12/6/19Brian J. Krystofiak, P.E.25063BJKBL HOLDINGS, LLC7517 162nd Avenue NEColumbus, MN 55025NADEAU ACRESLino Lakes, MinnesotaT443. 3/20/20 Per P100 Outlet Revision Know what'sbelow.before you dig.CallRPHASING PLANP1ofof3890 Pheasant Ridge Drive NE, Suite 100Blaine, MN 55449Phone: (763) 489-7900Fax: (763) 489-7959www.carlsonmccain.comf:\jobs\8421 - 8440\8440 - nadeau parcel\cad c3d\engineering\prelim-plans\8440_phasing_plan.dwgSave Date:03/23/20environmentalengineeringsurveying···13Revisions:1. 1/10/20 Per City CommentsPrint Name:Signature:Date:License #:Drawn:Designed:Date:I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Professional Engineer underthe laws of the State of Minnesota12/6/19JJO12/6/19Brian J. Krystofiak, P.E.25063BJKBL HOLDINGS, LLC7517 162nd Avenue NEColumbus, MN 55025NADEAU ACRESLino Lakes, MinnesotaPHASE IPHASE IIPHASE IPHASE II1NADEAU ACRESLino Lakes, Minnesota VICINITY MAP 2. 3/20/20 Per P100 Outlet Revision 1 1st Reading: Publication: 2nd Reading: Effective: CITY OF LINO LAKES ORDINANCE NO. 02-20 ORDINANCE TO REZONE PROPERTY FROM R, RURAL TO R-1, SINGLE FAMILY RESIDENTIAL FOR NADEAU ACRES The City Council of Lino Lakes ordains: Section 1: Findings of Fact 1. The City received a Land Use Application to rezone certain property from R, Rural to R-1, Single Family Residential. 2. The Planning and Zoning Board held a public hearing on February 12, 2020. 3. Per Section 1007.015 (5), the Planning and Zoning Board shall consider possible adverse effects of the proposed rezoning and its judgement shall be based upon, but not limited to, the following factors: (a) The proposed action has been considered in relation to the specific policies and provisions of and has been found to be consistent with the official City Comprehensive Plan. The proposed rezoning is consistent with the Comprehensive Plan and zoning ordinance. Per the zoning ordinance, land that is guided low density residential can be zoned R-1, Single Family Residential, R-1X, Single Family Executive Residential or R-2, Two Family Residential. The proposed Nadeau Acres residential subdivision is consistent with the goals and policies of the comprehensive plan in regards to resource management, land use, housing, transportation and utilities. The development is consistent with low density residential land use and compliant with density requirements. Safe transportation corridors and public utilities also serve the development. (b) The proposed use is or will be compatible with present and future land uses of the area. The proposed Nadeau Acres development is compatible with the present and future land uses of the area. Present land uses in the area are residential. Future land uses in the area are guided low and medium density residential. 2 (c) The proposed use conforms with all performance standards contained herein. The proposed Nadeau Acres development conforms with the zoning ordinance performance standards for R-1, Single Family Residential District. (d) The proposed use can be accommodated with existing public services and will not overburden the City’s service capacity. The proposed Nadeau Acres development can be accommodated with existing public services and will not overburden the City’s service capacity. The site is served by 8” watermain and 8”-10”sanitary sewer, forcemain and lift station. The public water and sanitary system is adequately sized for the development in the district. Section 2: Amendment The Zoning Ordinance of the City of Lino Lakes is hereby amended to rezone the following described property from R, Rural to R-1, Single Family Residential. Section 3: Legal Description That part of the East Half of the Northeast Quarter of Section 26, Township 31, Range 22, Anoka County, Minnesota, described as follows: Commencing at the Southeast corner of said East Half of the Northeast Quarter; thence North along the East line of said East Half of the Northeast Quarter, a distance of 941.14 feet to the North line of the South 941.00 feet thereof, also being the point of beginning; thence westerly, along said North line of the South 941.00 feet thereof, a distance of 865.13 feet to the West line of the East 865.00 feet of said East Half of the Northeast Quarter; thence southerly, along said westerly line, a distance of 196.03 feet to the North line of the South 745.00 feet of said East Half of the Northeast Quarter; thence westerly, along said North line, a distance of 135.02 feet to the West line of the East 1000.00 feet of said East Half of the Northeast Quarter; thence southerly, along said West line, a distance of 495.07 feet to the North line of EAST BIRCH ADDITION, according to the recorded plat thereof, Anoka County, Minnesota; thence easterly, along said North line of EAST BIRCH ADDITION, a distance of 611.39 feet to the Northwest corner of Outlot A, said EAST BIRCH ADDITION; thence southerly, along the West line of said Outlot A, a distance of 190.00 feet to the southerly line of said Outlot A; thence easterly, along said southerly line said Outlot A, a distance of 60.00 feet to the East line of said Outlot A; thence northerly, along said East line of said Outlot A, a distance of 148.74 feet to the North line of the South 208.71 feet of said East Half of the Northeast Quarter; thence easterly, along said North line, a distance of 120.02 feet to the West line of the East 208.71 feet of said East Half of the Northeast Quarter; thence northerly, along said West line, a distance of 417.46 feet to the North line of the South 626.11 feet of said East Half of the Northeast Quarter; thence easterly, along said North line, a distance of 208.74 feet to said East line of the East Half of the Northeast Quarter; thence northerly, along said East line, a distance of 314.94 to said point of beginning. 3 AND That part of the East Half of the Northeast Quarter of Section 26, Township 31, Range 22, Anoka County, Minnesota, described as follows: Commencing at the Southeast corner of said East Half of the Northeast Quarter; thence Northerly, along the East line of said Northeast Quarter, a distance of 1100.00 feet to the actual point of beginning; thence westerly along a line parallel with the South line of said East Half of the Northeast Quarter, a distance of 610.00 feet; thence northerly, along a line parallel with the East line of said East Half of the Northeast Quarter, a distance of 220.00 feet; thence westerly along a line parallel with the South line of said East Half of the Northeast Quarter, a distance of 48.00 feet; thence northerly, along a line parallel with the East line of said East Half of the Northeast Quarter, a distance of 345.00 feet; thence westerly, along a line parallel with the South line of said East Half of the Northeast Quarter, a distance of 659.7 feet, more or less, to the West line of said East Half of the Northeast Quarter; thence southerly, along said westerly line, a distance of 919.95 feet, more or less, to the North line of the South 745.00 feet of said East Half of the Northeast Quarter; thence easterly, along said northerly line, a distance of 449.55 feet, to the West line of the East 865.00 feet of said East Half of the Northeast Quarter; thence northerly, along said West line a distance of 196.03 feet, to the North line of the South 941.00 feet of said East Half of the Northeast Quarter; thence easterly along said North line, a distance of 865.13 feet, to the East line of said East Half of the Northeast Quarter; thence northerly, along said East line, a distance of 158.86 feet to said point of beginning. AND That part of the Northeast Quarter of Section 26, Township 31, Range 22, Anoka County, Minnesota, described as follows: Beginning at a point on the East line of and 1320.00 feet North of the Southeast corner of said Northeast Quarter; thence North along said East line, 345.00 feet; thence West on a line parallel with the South line of said Northeast Quarter 658.00 feet; thence South, parallel with said East line of the Northeast Quarter, 345.00 feet; thence East, parallel with said South line of the Northeast Quarter, 658.00 feet to the point of beginning, EXCEPT that part described as follows: Commencing at the Southeast corner of said Northeast Quarter; thence North 00 degrees 23 minutes 08 seconds West, assumed bearing along the East line of said Northeast Quarter, 1380.00 feet to the point of beginning; thence continuing North 00 degrees 23 minutes 08 seconds West, along said East line, 285.00 feet; thence North 89 degrees 24 minutes 11 seconds West, parallel with the South line of said Northeast Quarter, 262.00 feet; thence South 00 degrees 23 minutes 08 seconds East, 170.00 feet; thence South 31 degrees 05 minutes 22 seconds East, 135.12 feet to the North line of the South 1380.00 feet as measured along said East line of the Northeast Quarter, thence South 89 degrees 24 minutes 11 seconds East, along said North line 193.00 feet to said point of beginning. Section 4: Development Regulations 4 The development shall conform to the plans, requirements, and conditions of approval as listed in Council Resolution No. 20-20. Section 5: Effect This ordinance shall be in force and effect from and after its passage and publication according to the Lino Lakes City Charter and upon the filing of the final plat. Adopted by the Lino Lakes City Council this 11th day of May, 2020. The motion for the adoption of the foregoing ordinance was introduced by Council Member_____________and was duly seconded by Council Member ___________ and upon vote being taken thereon, the following voted in favor thereof: The following voted against same: ____________________________ Rob Rafferty, Mayor ATTEST: ________________________ Julianne Bartell, City Clerk 1 CITY OF LINO LAKES RESOLUTION NO. 20-20 APPROVING PRELIMINARY PLAT AND OPENING SUB-DISTRICT 3C & 3D OF UTILITY STAGING AREA 2A (2020-2025) FOR NADEAU ACRES WHEREAS, the City received a land use application for preliminary plat for Nadeau Acres hereafter referred to as Development; and WHEREAS, City staff has completed a review of the Development based on the following: • Nadeau Acres Civil Plan Set prepared by Carlson McCain revision date March 20, 2020 • Stormwater Management Plan prepared by Carlson McCain revision date March 20, 2020 • Stormwater Pollution Prevention Plan prepared by Carlson McCain dated December 6, 2019 • Geotechnical Exploration Report prepared by Haugo Geotechnical Services dated December 6, 2019 • Wetland Permit Application prepared by Kjolhaug Environmental Services Company Inc. dated December 23, 2019 • Rare Plant Report prepared by Midwest Natural Resources dated December 12, 2019 • Traffic Impact Study by Spack Consulting dated December 6, 2019; and WHEREAS, a public hearing was held before the Planning & Zoning Board on February 12, 2020 and the Board recommended approval of the Development with a 2-1; and WHEREAS, 2030 Comprehensive Plan’s Growth Management Policy requires the City Council to determine by resolution if the next 10 year utility staging is to be opened to development; and WHEREAS, the Development is located in Sanitary Sewer District 3 (Sub-District 3C and 3D) of 2030 Utility Staging Area 2A (2020-2025). NOW, THEREFORE BE IT RESOLVED by The City Council of The City of Lino Lakes hereby makes the following: FINDINGS OF FACT Preliminary Plat Per Section 1001.013, Premature Subdivision: (1) General. Any concept plan, preliminary plat or final plat deemed premature pursuant to the following criteria shall be denied by the City Council. (2) Conditions for establishing a premature subdivision. A subdivision may be deemed premature should any of the following conditions not be met. (a) Consistency with the Comprehensive Plan. Including any of the following: 2 1. Land use plan; 2. Transportation plan; 3. Utility (sewer and water) plans; 4. Local water management plan; 5. Capital improvement plan; and 6. Growth management policies, including MUSA allocation criteria. The proposed Nadeau Acres residential subdivision is consistent with the goals and policies of the comprehensive plan in regards to resource management, land use, housing, transportation, utilities, local water management, capital improvements and growth management. The development is consistent with low density residential land use and compliant with density requirements. Safe transportation corridors and public utilities also serve the development. (b) Consistency with infill policies. A proposed urban subdivision shall meet the city's infill policies. Nadeau Acres is consistent with infill policies. The development is within the 2030 Utility Staging Area 2A (2020-2025).The cost, operation and maintenance of the utility system is consistent with the normal costs projected by the water and sanitary system plans. No future utility costs are proposed. (c) Roads or highways to serve the subdivision. A proposed subdivision shall meet the requirements for level of service (LOS), as defined by the Highway Capacity Manual. A Traffic Impact Study was prepared by Spack Solutions on December 6, 2019 and concluded the additional 68 single family lots will not negatively impact the transportation system. Level of Service (LOS) requirement is met. (d) Water supply. A proposed subdivision shall be deemed to have an adequate water supply. Nadeau Acres meets the goals of the water supply plan. The site is served by an 8” watermain extending from the east and loops south to Birch Street. The water system has capacity to serve this residential development. (e) Waste disposal systems. A proposed subdivision shall be served with adequate waste disposal systems. Nadeau Acres meets the goals of the sanitary sewer plan. The site is located in Sanitary Sewer District 3 (Sub-district 3C and 3D) and is in 2030 Utility Staging area 2A (2020-2025). The sanitary sewer system has capacity to serve the development. Utility Staging Area Per the page 3-26 of the 2030 Comprehensive Plan’s Growth Management Policy: 6. Prior to reaching the time threshold for the next ten-year staging area, or five-year phase within a ten-year staging area, depicted on the staging plan, the City Council will determine by resolution if the next area is to be opened to development. The following 3 criteria will be used to determine where and when to open up the next ten-year staging area, or five-year phase within a staging area, in accordance with the timing indicated on the staging plan: a. Adequate infrastructure must be available to support development. Appropriate analysis will determine if adequate infrastructure is available and what utility extensions and transportation improvements are required to support new development. If infrastructure is not available and cannot be made available in a timely manner to support expanding into the next ten-year staging area or five year phase within a staging area, the city may refrain from opening up the next staging area, or portions thereof. Adequate infrastructure is available to support Nadeau Acres. The development is located in Sanitary Sewer District 3 (Sub-District 3C and 3D) and is in 2030 Utility Staging Area 2A (2020-2025). The sanitary sewer system has capacity to serve the development. Nadeau Acres also meets the goals of the 2030 Transportation Plan by providing a safe road connection between future neighborhoods, constructing turn lanes along CSAH 54 (20th Avenue) and controlling access management along County roads. b. Different areas of the city can be considered independently. A decision to open one area of the city to development does not automatically open a different area of the city. Decisions to open new areas to development should clearly define and map the area being opened. Only Sub-District 3C and 3D of Sanitary Sewer District 3 in 2030 Utility Staging Area 2A (2020- 2025) is being opened to development. c. This process does not require a comprehensive plan amendment because it is in accordance with the timing indicated on staging plan. BE IT FURTHER RESOLVED by the City Council of The City of Lino Lakes hereby establishes the following conditions of approval: 1. Outlots A, B, C, D and E shall be deeded to the City. 2. Outlot C shall be deeded to the City and dedicated for road right-of-way and drainage and utility purposes. 3. A temporary cul de sac easement shall be recorded over the west end of William Lane. 4. The temporary cul de sac shall be removed, ground restored and the temporary easement released upon extension of William Lane. 5. The private septic systems at 6677 20th Avenue and 6651 20th Avenue shall be removed. 6. The private well at 6677 20th Avenue shall be capped. 7. The existing house at 6651 20th Avenue shall hook up to municipal sanitary sewer. 8. The existing south driveway of 6709 20th Avenue shall be relocated west onto Red Oak Lane. 9. The existing driveway accesses from 6677 20th Avenue and 6651 20th Avenue shall be removed. 10. A building permit is required for the house relocation at 6677 20th Avenue. 4 11. The property owners of PID #26-31-22-12-0006 and #26-31-22-13-0001 (Vickers) have expressed concerns about Josephine Lane stubbing to their property line. It should be noted that if it is decided to pull back the sanitary sewer, watermain and street improvements along Josephine Lane, there will be an added cost to the development of their property in the future. It should also be noted that Josephine Lane will be extended in the future. BE IT FURTHER RESOLVED by The City Council of The City of Lino Lakes hereby approves the preliminary plat and utility staging area for Nadeau Acres subject to the following items being addressed: 1. Comments from WSB City Engineer memo dated April 27, 2020 shall be addressed. 2. Comments from the Environmental Coordinator memo dated April 23, 2020 shall be addressed. 3. It is the preferred option of the City to extend a stormwater pipe west from Pond 100 to the ditch on the Vickers property (PID# 26-31-22-12-0006). Staff is directed to work with the developer to provide a design for such extension, obtain easement, and coordinate with the property owner. 4. The applicant shall prepare the deeds for Outlots A, B, C, D and E for City review and approval prior to recording. a. Outlot C shall be dedicated for road right-of-way and drainage and utility purposes. 5. The applicant shall prepare the temporary cul de sac easements for City review and approval prior to recording. 6. Proof that the private septic systems at 6677 20th Avenue and 6651 20th Avenue have been properly removed shall be submitted to the City upon completion. 7. Proof that the private well located at 6677 20th Avenue has been properly capped shall be submitted to the City upon completion. 8. The applicant shall provide approval from NSP aka Xcel Energy allowing for public and private improvement within their easement e.g. stormwater pond, landscaping, streets, utilities etc. 9. “Future Road Extension” signs are required at the west end of William Lane and Red Oak Lane and at the north end of Heritage Avenue. a. These may be shown on the final plans. 10. Sheets 3-5, Preliminary Plat: a. On Sheet 3, the density calculations shall be revised to subtract the “Proposed Wetlands = 0.65 acres”. The Net Density then becomes 2.27 lots/acre. b. A minimum10 foot wide drainage and utility easement upland from the delineated wetland boundary is required. i. The easement on Lot 2 and Lot 3, Block 1 shall be revised. ii. The lot area summary Excel spreadsheet shall be revised. c. Josephine Court shall be revised to Josephine Lane. 11. Sheet 7, Preliminary Site & Utility Plan: a. Southbound left, right and through lanes from CSAH 54 (20th Avenue) onto Red Oak Lane shall be approved by Anoka County. b. Proper turn lanes from Red Oak Lane onto CSAH 54 (20th Avenue) are required. c. Utilities and services shall be provided for the future development of 6687 20th Avenue on the final plans. 12. Sheet 9, Preliminary Grading Plan & Erosion Control Plan: 5 a. Revise comment “Ex. House to be Moved to Lot 136” to Lot 135. 13. Sheet L1 & L2, Preliminary Landscape Plan: a. A row of coniferous trees shall be planted at the north end of Heritage Avenue to provide a screen from vehicle headlights shining into the adjacent house located at 6747 20th Avenue. 14. Phasing Plan: a. Phase I shall be revised to 35 lots. Adopted by the Council of the City of Lino Lakes this 11th day of May, 2020. The motion for the adoption of the foregoing resolution was introduced by Council Member _______________and was duly seconded by Council Member ________________ and upon vote being taken thereon, the following voted in favor thereof: The following voted against same: _______________________________ Rob Rafferty, Mayor ATTEST: ________________________ Julianne Bartell, City Clerk 1 CITY COUNCIL AGENDA ITEM 6A STAFF ORIGINATOR: Katie Larsen, City Planner MEETING DATE: May 11 , 2020 TOPIC: Nadeau Acres i. Consider First Reading of Ordinance No. 02-20 Rezoning Property from R, Rural to R-1, Single Family Residential ii. Consider Resolution No. 20-20 Approving Preliminary Plat and Opening Sub-District 3C & 3D of Utility Staging Area 2A (2020-2025) VOTE REQUIRED: 3/5 INTRODUCTION Staff presented Nadeau Acres to the City Council at the March 2, 2020 and May 4, 2020 Work Session. The following is an update since the May 4th Work Session: Stormwater Outlet. Staff met with the adjacent property owners (Vickers) on Thursday, May 7, 2020 to review options for a stormwater outlet. The owners explained their concerns over possible ditch erosion and ongoing maintenance concerns. As noted at the work session, if an easement is obtained, the City will be responsible for ongoing maintenance of the improvements including the outlet area. The owner informed staff of their preference for a piped outlet with a dissipater still incorporated with the understanding that it is city maintained. Staff is working with the developer’s engineer on a modified design. Great River Energy (GRE) Easement. The power line easement, running north/south, is owned by Great River Energy. The developer received approval from GRE on Tuesday, May 5, 2020 for work within the easement based on the existing plans. They are following up with GRE on a plan amendment to extend pipe across to ditch. Since the existing approvals include both sanitary, water and storm sewer lines, within the easement, we are not expecting any issues with the new extension. Josephine Lane and Utility Extension. The Vickers have raised concerns regarding the impact of street, sewer, and water extension to their property line (Josephine Lane). Staff’s discussions with the County Assessor’s office have indicated that the development of the Nadeau Property, not the proximity of sewer/water utility and street improvement to the property line, will drive any potential increase in value. However, staff is evaluating with the developers’ engineer an option to pull back the sanitary, water main and street improvements closer to the intersection. However in doing so, there will be an added cost to development of the Vickers property in the future. Staff would also note that if the street is pulled back, it 2 should be clear in the meeting record that the street will be extended in future. The extension of street stubs often becomes controversial after residents have moved in. Josephine Lane will be a through street providing access to 20th Avenue from the Vickers property and it will need to be clearly marked. Staff is requesting City Council consideration of rezoning and preliminary plat for Nadeau Acres. Complete Application Date: January 13, 2020 60-Day Review Deadline: March 13, 2020 120-Day Review Deadline: May 12, 2020 Environmental Board Meeting: January 29, 2020 Park Board Meeting: NA Planning & Zoning Board Meeting: February 12, 2020 City Council Work Session: March 2 & May 4, 2020 City Council Meeting: May 11 , 2020 BACKGROUND The applicant, BL Holdings, LLC, submitted a rezoning and preliminary plat land use application for Nadeau Acres. The proposed single family residential development is located north of CSAH 34 (Birch Street) and west of CSAH 54 (20th Avenue) across from NorthPointe. It contains two (2) parcels totaling approximately 33 gross acres. The applicant is proposing an R-1, Single Family Residential development on standard 80 foot wide lots. The initial plans presented to the Planning & Zoning Board on February 12, 2020 and the Council Work Session proposed 69 single family lots. The revised plan increases the size of Pond 100 for additional stormwater management, relocates the lift station and eliminates 1 single family lot. The total number of single family lots is now 68. The Land Use Applications are: • Rezone property from R, Rural to R-1, Single Family Residential • Preliminary Plat This staff report is based on review the following plan sets and documents: • Nadeau Acres Civil Plan Set prepared by Carlson McCain revision date March 20, 2020 • Stormwater Management Plan prepared by Carlson McCain revision date March 20, 2020 • Stormwater Pollution Prevention Plan prepared by Carlson McCain dated December 6, 2019 • Geotechnical Exploration Report prepared by Haugo Geotechnical Services dated December 6, 2019 3 • Wetland Permit Application prepared by Kjolhaug Environmental Services Company Inc. dated December 23, 2019 • Rare Plant Report prepared by Midwest Natural Resources dated December 12, 2019 • Traffic Impact Study by Spack Consulting dated December 6, 2019 ANALYSIS Existing Site Conditions The 30 acre site contains two (2) parcels currently addressed 6651 & 6677 20th Avenue and is located north of CSAH 34 (Birch Street) and west of CSAH 54 (20th Avenue) across from NorthPointe. The site consists of two (2) single family houses, accessory buildings, agricultural hay fields, and wetlands. The house located at 6677 20th Avenue will be moved onto a new lot and the house located at 6651 20th Avenue will remain in place. Accessory buildings will also be relocated. The existing septic systems shall be removed and wells capped. One NSP utility transmission overhead electric line runs north-south along the west boundary line and another NSP utility transmission line bisects the site diagonally. Both lines are covered by easements. Topography of the site generally slopes downward from the southeast to the northwest at elevations ranging from 925 EL to 905 EL. Groundwater was encountered at depths ranging from 4 to 19 feet. Topsoil was encountered at ½ to 1 foot. Below the topsoil, soils consist of glacial outwash sands and native clayey glacial till and are classified as hydrologic groups HSG D in the southern portion and HSG C in the north. Land Use and Zoning Current and Proposed Zoning The property is currently zoned R, Rural and is guided for low density residential land use. Per the zoning ordinance, land that is guided low density residential can be zoned R-1, Single Family Residential, R-1X, Single Family Executive Residential or R-2, Two Family Residential. The property is proposed to be rezoned to R-1, Single Family Residential. The R-1 zoning provides a natural transition from the current PUD, Planned Unit Development (R-2, Two- Family) zoning in the NorthPointe development to the east and the future medium density land use to the north in Lino Lakes and the northwest in the City of Centerville. At the time of submittal, the 2040 Comprehensive Plan was under review by Met Council and not formally adopted by the City Council. The 2030 Comprehensive Plan is still in effect. Current Zoning R, Rural Proposed Zoning R-1, Single Family Residential Current Land Use Rural Residential 2030 Future Land Use Low Density Residential (1.6 to 3.9 units per acre) 2040 Future Land Use Low Density Residential 4 (1.6 to 3.0 units per acre) 2030 Utility Staging Area 2A (2020-2025) 2040 Utility Staging Area 1A (2018-2025) Density The following chart implements Met Council’s formula for calculating net density. Gross Area (acres) 33.03 Wetlands & Water Bodies (0.65) Public Parks & Open Space 0.00 Arterial ROW (0.74) Other (Utility Transmission Easement) (1.69) Other (Wetland Buffer Area) 0.00 Net Area (acres) 29.95 # of Units 68 Gross Density (units/acre) 2.06 Net Density (units/acre) 2.27 Per the 2030 and 2040 Comprehensive Plan, the site is guided for low density residential development which requires a density of 1.6 to 3.9 and 1.6 to 3.0 units per acres, respectively. The proposed net density is 2.27 units per acre which is consistent with the 2030 & 2040 Comprehensive Plan’s guided land use and density. Surrounding Zoning and Land Use Direction Zoning Current Land Use Future Land Use North R, Rural Rural Residential Medium Density Sewered Residential South R, Rural Single Family Residential Low Density Sewered Residential East PUD Single Family Residential Medium Density Sewered Residential 5 West R, Rural Agricultural Low Density Sewered Residential Zoning Requirements The property is proposed to be rezoned from R, Rural to R-1, Single Family Residential. R-1 Requirements Nadeau Acres Min. Lot Size 10,800 sf Ave. 14,120 sf Min. Lot Width -Interior Lot 80 ft 80 ft -Corner Lot 100 ft 100 ft Min. Lot Depth 135 ft 135 ft Double Frontage Lots 145 ft 145 ft Building Setback -From Streets --Local Street 30 ft 30 ft --Collector or Arterial 40 ft 40 ft --Corner lot 30 ft 30 ft -Rear --Principal 30 ft 30 ft --Accessory 5 ft 5 ft -Side --Principal 10 ft 10 ft --Accessory 5 ft 5 ft --Corner lot 30 ft 30 ft Buffer 15’ if side or rear lot abuts collector or arterial street 15 ft buffer provided along CSAH 54 Per the subdivision ordinance, minimum lot area for urban lots shall consist of buildable land exclusive of utility transmission easements or water course easements that encumber lot development. The applicant submitted a spreadsheet detailing that minimum lot areas are 10,800 sf. The average lot size is 14,120 sf. 6 Building Type and Construction At the time of building permit, each individual single family dwelling unit will be reviewed for compliance with Section 1007.043(2)(a), General Building Provisions and Section 1007.090(4), Building Requirements regarding floor area, garage and design and construction standards. Per Section 1007.042(5)(b)1.e., air conditioning or heating equipment shall be five (5) feet from any rear lot line and ten (10) feet from any side lot line. No encroachment shall be permitted in existing or required drainage and utility easements. Subdivision Ordinance Conformity with the Comprehensive Plan and Zoning Code The preliminary plat is consistent with the comprehensive plan for low density residential development. The preliminary plat is also compliant with zoning ordinance performance standards for the R-1 zoning district with some minor revisions. Blocks and Lots The preliminary plat has been revised from 69 single family lots to 68 and from 6 outlots to 5. The outlots are for the following purposes: Outlot Purpose A Wetland and Stormwater Pond 400 B Stormwater Pond 100 C Road Easement for Future Development of 6687 20th Avenue D Omitted NSP Easement Corridor E D Stormwater Pond 200 F E Trail Corridor and Watermain Loop On the original preliminary plat, Outlot D contained NSP easement and storm sewer pipe. To minimize the City’s responsibility of mowing and maintaining manicured grass in this area, the outlot has been omitted and the lot lines extended through the NSP easement. The other outlots will be deeded to the City for ownership and maintenance. Streets and Alleys Internal road right-of-way widths are 60 feet and the paved roadway width is 32 feet back to back. This is consistent with the City’s engineering standards. Cul de sac paved widths have been revised to 32 feet back to back. 7 CSAH 54 (20th Avenue) is classified as an A-Minor Arterial Reliever and requires a full 120 feet of dedicated road right-of-way. The plat dedicates 60 feet of road right-of-way from section line as required. Turn lane plans have been submitted to Anoka County for review and comment. CSAH 34 (Birch Street) is classified as a Major Collector road along the section of the proposed development and requires a full 80 feet of road dedicated right-of-way. The section of the plat that abuts CSAH 34 (Birch Street) previously dedicated 60 feet of road right-of-way. No further road right-of-way is required. The length of Red Oak Lane cul de sac is 250 ft and Norma Way is 350ft. No permanent cul de sac length exceeds 500 feet as required by ordinance. Length requirements do not apply to temporary cul de sacs such as William Lane. A temporary cul de sac and easement are shown on the west end of William Lane. A separate recordable easement document will be recorded against the property and shall be terminated upon extension of William Lane. The future developer will be responsible for removal of the temporary cul de sac and restoration of the lot. Private Driveway-6709 20th Avenue In September 2015, the Nadeau’s owned and subdivided off the1 acre house parcel located at 6709 20th Avenue. Through the minor subdivision process, staff recommended the north driveway be removed and the south driveway access Red Oak Lane upon its extension. The Nadeau’s expressed concerns about removing the north driveway stating personal cars and trucks could not turn left into the garage from the south driveway without backing into the County road right-of-way. Staff agreed to leave the north driveway with the stipulation the south driveway be removed when the southbound turn lane into NorthPointe was constructed. Unfortunately, this south driveway onto CSAH 54 (20th Avenue) still remains. The driveway will need to be relocated to the west upon extension of Red Oak Lane due to its close proximity to the intersection. Staff Comments: • The applicant shall draft and record a temporary cul de sac easement. • The cul de sac shall be removed and the temporary easement released upon extension of William Lane. • “Future Road Extension” signs are required at the west end of William Lane and Red Oak Lane and at the north end of Heritage Avenue. Easements Standard drainage and utility easements at least 10 feet wide are provided along all lot lines. Drainage and utility easements are also dedicated over the outlots. Storm Water Management and Erosion and Sediment Control 8 A Storm Water Management Plan has been prepared by a licensed, professional engineer and reviewed for compliance by licensed, professional engineers from both WSB & Associates (City) and Houston Engineering (RCWD). The revised plan increases the size of Pond 100 and includes a plunge pool energy dissipator for additional stormwater management. Per the revised March 20, 2020 Stormwater Management Plan prepared by Carlson McCain: “The stormwater on the site flows to three different locations from the site. The majority of the site drains to an existing private ditch/wetland area to the north of the site. A small portion at the south of the site drains through an existing culvert along Birch St (CSAH 34). The western portion of the site drains to the northwest to an existing private ditch. The surface water will flow through three new ponds. Pond 200 located in the middle of the site will pick up surface water from the south portion of the site and direct it towards Pond 100. Pond 100 will pick up surface water from the majority of the site and discharge to the west to an existing private ditch. Pond 400 will receive the remaining surface water and discharge to an existing ditch to the north. After the project is completed, the site will include approximately 8.8 acres of new impervious surfaces including the streets, sidewalks, paths, parking lots, and rooftops. Due to poor soils in the south portion of the site and a high groundwater table in the north portion of the site, infiltration is not feasible. The applicant used a HydroCAD model based on the Atlas 14, 24-hour storms to design the storm sewer conveyance system and ponds. The site is designed to reduce site runoff rates for the 2-, 10-, and 100-year rainfall events.” Per the April 27, 2020 WSB City Engineer’s Review Memo: “During the public hearing held at the Planning and Zoning Board meeting on February 12, 2020 there were a number of questions regarding the proposed developments’ stormwater management plan. Below is a summary of findings and actions to address the questions: • The site outlets to two private ditches, one in the northwest, and one to the north. There is also a small area of the site that drains to the south. • The proposed project is required to mitigate surface water and address water quality through City, Watershed District and State Rules and Statues. This includes maintaining the existing rate or reducing the rate of runoff from the site, and providing water quality treatment for the proposed development. The project meets the City of Lino Lakes’ stormwater management requirements and RCWD rules. RCWD approved a CAPROC on April 8, 2020. o This project is proposing to reduce rates as detailed in the Stormwater Report, and will utilize stormwater ponding for water quality treatment. The stormwater management plan incorporates existing soils and time of concentrations to calculate the needed ponding systems to mitigate the new impervious surfaces. o The surface water from the new impervious surfaces will be accommodated through three new ponds. Pond 200, located in the middle of the site, will pick up surface water from the south portion of the site and direct it towards Pond 9 100. Pond 100 will pick up surface water from the northwest portion of the site and discharge to the west to an existing private ditch. Pond 400 will receive the remaining surface water and discharge to an existing ditch to the north. o The design includes a standard outlet control structure with pipe outlet. An outlet control structure is a device that holds water back in the proposed pond and then discharges it slowly into the ditch so that the flow to the downstream ditch is less than the existing condition flow into the ditch. o The original design included an outlet pipe to the ditch. The applicant was unable to obtain an easement for the outlet pipe to the ditch as required by the City and RCWD. The applicant revised the design and enlarged the pond to provide additional storage and added a plunge pool dissipater at the discharge location. • Adjacent property owners expressed concerns over the s stormwater runoff from the site and the downstream private ditches. Staff had multiple conversations and Zoom meetings with the property owners to better understand their concerns and explain the existing and proposed conditions. This included an onsite evaluation, reviewing topographic data, record plans, survey, and incorporation of the NorthPointe development drainage plan. The downstream systems appear to be working correctly and the NorthPointe development has reduced the surface water flow to the subwatershed in question. We will continue to work the property owners and provide information and findings. o The adjacent private ditch owners are responsible to perpetuate existing runoff rates and are to maintain the ditch flow through their property. Staff reviewed private ditch requirements with the City Attorney and RCWD staff. o 2019 was a record year for rainwater in Minneapolis-St. Paul area according to the Minnesota DNR Year to Date Precipitation Chart. Soil saturation in the fall of 2019 was similar to a spring snow melt condition where typically the fall is a dryer condition. These conditions have led to standing water due to soil saturation and higher flows in conveyance systems. o We are working with one of the downstream property owner to complete culvert maintenance on their property. • In addition, we are having the developer verify the downstream conditions to confirm their assumptions.” Per the RCWD CAPROC dated April 8, 2020: Soil conditions vary over the sloping site, with HSG D sandy lean clays (CL) at the higher elevations, and HSG A/B poorly graded sands and sands with silt (SP/SP-SM) with sandy lean clays below. The HSG D soils in addition to the high water table below the HSG A/B soils make infiltration infeasible for the site. Thus, stormwater ponds are acceptable to meet the water quality requirement. The pond sizing, and outlets and overflows are consistent with design criteria. 100% of the project area either flows to the ponds or meets design criteria. Additional TSS removal is not required. The applicant has met all the Water Quality requirements and the design criteria of RCWD Rule C: Stormwater Management Plans. 10 2-year (cfs) 10-year (cfs) 100-year (cfs) Existing Proposed Existing Proposed Existing Proposed North to Private Ditch 3.5 2.3 5.1 3.9 6.9 5.7 West to Private Ditch 11.6 9.2 34.1 28.7 82.8 74.7 South through Culvert under Birch Street 4.4 3.5 8.0 6.5 14.6 11.9 Totals* 19.2 12.5 46.7 35.6 103.3 87.8 *Difference due to time of concentration Post-development stormwater discharge rates are less than the pre-development rates. Phasing The site will be mass graded in one (1) phase and developed in two (2) phases. Phase 1 has 35 lots and Phase 2 has 33 lots. Utilities Public water, sanitary and storm sewer utilities will be installed within the development. Sanitary Sewer An 8”-10” sanitary sewer pipe, 4” forcemain and lift station will serve the site. Both existing houses located at 6651 and 6677 20th Avenue are served by private septic systems. The house located at 6677 20th Avenue is being relocated onto a new lot in the subdivision. Both houses are required to connect to the municipal sanitary sewer system. Watermain An 8” watermain will extend and loop from the east (NorthPointe) along Red Oak and from the south (Birch Street) and serve the site. The house located at 6651 20th Avenue is connected to municipal city water. The relocated house will also connect to municipal city water. Public Land Dedication The City will require cash in lieu of land dedication. Per the City’s Park, Greenway & Trail System Plan, a future neighborhood park is programmed to the west of this site. See Attachment #3. Sidewalks along the streets in the development will connect to future trail corridors along CSAH 34 (Birch Street) and CSAH 54 (20th Avenue). A 300 foot long trail will be constructed in Outlot F and will terminate at the lot line. This trail segment will eventually connect to a future trail along the north side of Birch Street. Terminating the trail at the lot line now will prevent vehicles from confusing the trail with a road. Credit will be given for the construction cost of the trail extension to Birch Street. 11 Nadeau Acres 68 lots x $3,150 = $214,200 -Trail Construction Cost TBD TOTAL = TBD Tree Preservation The Environmental Coordinator and Environmental Board reviewed the tree preservation and landscape plans. The goal of tree preservation is to minimize unnecessary loss of habitat, biodiversity and forest resource and to replace removed trees in areas where tree cover is most critical. The Tree Inventory Report prepared by Carlson McCain revised January 10, 2020 identifies 750 significant trees on site. Eighty-eight (88) trees were identified as non-significant (e.g. ash trees, elm trees etc.) and will be removed without mitigation requirements. Of the remaining 662 trees, 252 trees will be saved and 410 will be removed. Sheet T4, Tree Preservation Plan identifies the basic use area and environmentally sensitive areas. Five (5) trees are being removed within the natural resource conservation area. Fourteen (14) trees are being removed from the non-ESA and non-basic use areas. This requires 29 replacement trees for mitigation which are provided throughout the development. Landscaping Open area landscaping standards require 1 large tree and 3 large shrubs per 2,000 sf. Existing trees on site may be used to satisfy open area landscaping requirements if applicable by placement. This would only apply to the existing trees on Outlot A. The landscaping plan has been revised to provide adequate open space mitigation for Outlots B, D and E. Outlots C does not require mitigation because it is for future right-of way. Buffer and screen standards apply along CSAH 54 (20th Avenue), specifically Block 4, Lots 12- 15 that have a rear frontage on 20th Avenue. Approximately 475 linear feet of frontage will be screened by shrubs, new trees, and existing trees to provide a continuous planting screen year- round. The Preliminary Landscape Plan shows trees and shrubs planted on two separate berms. It was suggested these berms be combined to provide a continuous berm; however, an opening between the 2 berms is needed to provide rear yard drainage. A triangulated row of coniferous trees will be planted in addition to the berms that will provide appropriate screening. Boulevard trees are required at the rate of one (1) tree per lot frontage for single family. There are 68 single family lots that require 77 boulevard trees (interior and corner lots). Seventy-nine (79) trees are proposed which is compliant with the ordinance. Alternative Urban Areawide Review (AUAR) The site is not within the 2005 I-35E Corridor AUAR; therefore, no mitigation is required. 12 Traffic Study A Traffic Study was prepared by Spack Solutions on December 6, 2019. The study was based on a concept plan with 74 single family homes. Based on ITE standards and local data collected by Spack Solutions, the development is forecasted to generate approximately 685 new trips per day with 50 new trips in the a.m. peak hours (7-8am) and 65 trips in the p.m. peak hours (4:30 - 5:30pm). Traffic impacts are analyzed in terms of volume and capacity. Volume quantifies how many vehicles are using the road and capacity quantifies the number of vehicles the road can accommodate. Traffic Volumes Roadway Location Existing Daily Volumes1 2040 Forecasted Daily Volumes2 CSAH 54 (20th Avenue) North of Red Oak Lane 5,300/6,100 14,000 CSAH 54 (20th Avenue) South of Red Oak Lane 5,600/6,100 14,000 CSAH 54 (20th Avenue) South of CSAH 34 (Birch St) 2,900/3,000 14,000 CSAH 34 (Birch Street) West of CSAH 54 (20th Avenue) 3,500/3,150 10,000 1Spack Video Data Collection/2018 AADT Volumes 2Anoka County’s 2040 Transportation Plan Existing traffic volumes near the site are between 5,300-5,600 AADT (annual average daily traffic). Nadeau Acres will generate approximately 685 new trips per day. These new trips added to the existing daily trips are significantly less than the 2040 forecasted daily volumes. Traffic Capacity A ratio of volume to capacity is used to analyze traffic congestion. A road with a volume to capacity ratio of 1.0 means the traffic volume is nearly equal to the traffic capacity and will feel congested to motorists. Per the traffic study, three (3) sections of roadways (20th Ave north of Birch St, 20th Ave south of Birch St and Birch St) were analyzed under Existing, 2024 No- Build and 2024 Build scenarios. No volume to capacity ratio exceeded 0.45. None of study roadways are expected to exceed their daily capacities. Level of Service Level of Service (LOS) is used to describe the operating conditions of an intersection. Facilities are given letter designations from “A” (best operating conditions) to “F” (worst conditions). Section 1001.013(2)(c), Premature Subdivision of the City’s Subdivision Ordinance establishes minimum Level Of Service (LOS) requirements. The ordinance states that if the LOS is A or 13 B, the proposed subdivision shall not the degrade the LOS more than one grade. If the LOS is C or D, it shall not degrade the LOS. Intersections with a LOS of E or F must be improved to ensure a LOS of D or better. Existing Peak Hour LOS Proposed Peak Hour LOS Intersection A.M. Peak P.M. Peak A.M. Peak P.M. Peak 20th Ave & Red Oak Lane B B C C 20th Ave & Birch Street B C B C The proposed Levels of Service do not degrade by more than one (1) LOS; therefore the subdivision is not considered premature. The project is also under review by Anoka County Highway Department. They have identified the need for right and left turn lanes on CSAH 54 (20th Avenue). These details shall be provided by the developer. CSAH 34 (Birch Street) Corridor Study In April 2011, Anoka County and the City of Lino Lakes hired SRF Consulting Group to develop a corridor study along CSAH 34 (Birch Street). Per the recommended corridor plan, future full-access intersections near Nadeau Acres are every ¼ mile. No access (full or partial) is proposed onto CSAH 34 (Birch Street) from Nadeau Acres. A pedestrian (trail or sidewalk) corridor will connect Nadeau Acres to Birch Street. I-35E/CR J/Centerville Road Staff is aware of current traffic concerns at I-35E/CR J/Centerville Road but these are outside the scope of Nadeau Acres. These interchanges are currently under evaluation by other government agencies. Ramsey County is working on a federal transportation funding application to reconstruct bridge and ramp terminals and CR J/Centerville Road intersection. Local and County staffs are also working with state representatives on possible preliminary design funding in the State’s bonding bill. Anoka County is also considering a transportation funding application for improvement of the Centerville Road/CR J intersection. Wetlands Kjolhaug Environmental Services Company, Inc. prepared a Wetland Delineation Report dated October 29, 2019. A Notice of Decision was issued by RCWD on December 11, 2019. Kjolhaug Environmental Services Company, Inc. prepared a Wetland Permit Application dated December 23, 2019. Per the report, two (2) wetlands were delineated on site totaling 1.37 acres. Wetland 1 is a Type 1 wet meadow wetland. Wetland 2 is a partially-drained, wet meadow and scrub-shrub wetland. A portion of Wetland 2 southwest of the septic mound discharge outlet was created in upland and is incidental. The proposed project will require 30,826 square feet (sf) (0.7076 acre) of permanent 14 impact to four (4) wetland areas, one of which is incidental for WCA permitting. Replacement will be accomplished via the purchase of wetland banking credits. The site is inside of the boundaries of the Lino Lakes Comprehensive Wetland Protection and Management Plan (CWPMP) area; however, onsite wetlands do not fall within the landscape scale/preliminary Wetland Management Corridor (WMC). Therefore, no WMC buffer on wetlands is required with site development. Rare & Endangered Species Per the December 12, 2019 report prepared by Midwest Natural Resources, no habitats for state- listed plant species were observed during field review. No further surveys are recommended. Floodplain There is no FEMA floodplain on site. 2030 Comprehensive Plan At the time of this staff report, the draft 2040 Comprehensive Plan is under review by the Met Council and has not formally been adopted by the City of Lino Lakes. Therefore, the 2030 Comprehensive Plan is in effect. Nadeau Acres is consistent with the goals and policies of the comprehensive plan in regards to resource management, land use, housing, transportation and utilities. Resource Management System Plan Goals of the Resource Management System Plan include: • Natural Resources and Amenities o Goal #1: Identify, protect and preserve the desirable natural areas and ecological and aquatic resources of the community. • Land Use Policies o Goal #1: Ensure that well-planned, quality residential, commercial, industrial and institutional development to accommodate the city’s projected growth needs occurs in a manner that also conserves and enhances the city’s natural resources and amenities. The Nadeau Acres protects the natural resource by providing storm water management and vege tative buffers. Land Use Plan Goal 1: Create a unified vision and future for the city, promote a well-planned community, prevent fragmented development, address the impacts of development and redevelopment on natural resources, aesthetics and view corridors, and provide balanced land use and connectivity that ensures the integration of both sides of the regional park. 15 Goal 2: Ensure that zoning and subdivision ordinances and official maps are consistent with the intent and specific direction provided within the Comprehensive Plan. Policies: 1. Ensure developers meet the standards specified within the land-use plan and official controls, including zoning and subdivision ordinances and official maps. 2. Ensure compatibility of adjacent land uses. Nadeau Acres meets the land use goals by developing a single family residential subdivision that is consistent with low density residential development as guided by the Comprehensive Land Use Plan. Low density residential development allows for 1.6 to 3.9 units per net acre. The net density for the development is 2.27 units per net acre. This is consistent with density requirements. Housing Plan Goal 3: Ensure housing development is compatible with existing and adjacent land uses and provides accessibility to key community features and natural amenities. Policies include linking trails to parks, lakes and schools. Nadeau Acres meets the goal of the housing plan. The development is compatible with the existing adjacent residential homes. Sidewalk/trail will provide corridors to future trails along CSAH 54(20th Avenue) and CSAH 34 (Birch Street). Economic Development Nadeau Acres does not negatively impact the city’s economic development goals. Transportation Plan Goal 1: Plan for and achieve required street improvements and connectivity throughout the City of Lino Lakes. Goal 2: Ensure that streets and roads are as safe as possible. Nadeau Acres meets the goals of the 2030 Transportation Plan by providing a safe road connection between future neighborhoods, constructing turn lanes along CSAH 54 (20th Avenue) and controlling access management along County roads. Sanitary Sewer Plan Goal 1: Ensure that well-planned, quality residential, commercial, industrial and institutional development to accommodate the City's projected growth needs occurs in a manner that also conserves and enhances the city's natural resources and amenities. Goal 5: Maintain the City's residents and businesses with an affordable and safe sanitary sewer system. 16 Nadeau Acres meets the goals of the sanitary sewer plan. The site is located in Sanitary Sewer District 3 (Sub-district 3C and 3D) and is in 2030 Utility Staging Area 2A (2020-2025). The sanitary sewer system has capacity to serve the development. The sanitary sewer system will also be oversized to accommodate future development to the north and west. Per the 2030 Comprehensive Plan’s Growth Management Policy, the City Council will determine by resolution if the next 10 year, 2A (2020-2025) staging area shall be opened to development. Resolution No. 20-20 details the findings of fact. Water Supply Plan Goal 4: Provide the City's residents and businesses with affordable potable water that is safe and of high quality for daily consumption and fire demand. Nadeau Acres meets the goals of the water supply plan. The site is served by an 8” watermain extending from the east and loops south to Birch Street. The water system has capacity to serve this residential development. Environmental Board Comments The Environmental Board reviewed the proposed preliminary plat on January 29, 2020. They recommended approval of the project with conditions listed in the April 23, 2020 Memo from the Environmental Coordinator. Conditions include minor revisions to the open space landscaping, boulevard tree diversity and suggested tree species. Final Plat A land use application for final plat and Development Agreement shall be required. Planning & Zoning Board The Planning & Zoning Board held a public hearing on February 12, 2020. Board and resident comments included questions about access to NorthPointe Park, grading and drainage, driveway and turn lane construction, vehicle headlight glare and wetland impacts. The Board recommended approval with a 2-1 vote. Findings of Fact The Findings of Fact for the rezoning, preliminary plat and utility staging area are detailed in Ordinance No. 02-20 and Resolution No. 20-20, respectively. RECOMMENDATION The Planning and Zoning Board and staff recommend approval of the rezoning and preliminary plat for Nadeau Acres with conditions listed in the resolution. 17 ATTACHMENTS 1. Aerial Map 2. Future Land Use Map 3. Neighborhood Service Area Park Map 4. City Engineer Review Memo dated April 27, 2020 5. Environmental Coordinator Memo dated April 23, 2020 6. Revised Preliminary Plan Set dated March 20, 2020 prepared by Carlson McCain 7. Ordinance No. 02-20 8. Resolution No. 20-20 0 300 600150 Feet 662066201929192919691969 66776677 66256625 19491949 66336633 66516651 19091909 66876687 67286728 20092009 1997199719891989 20082008 205120512015201520212021202720272033203320392039 2050205020442044203820382032203220262026202020202014201420562056 67096709 CHESTNUT STCHESTNUT STCCYYPPRREESSSSSSTTCOTTONWOOD AVECOTTONWOOD AVER ED O A K L NRED O A K L N RR OOSSEEWW OOOODD SSTT R O S E WO O D S TROSEWOOD S T Aerial MapNadeau Acres µ CSAH 34 (Birch Street)CSAH 54 (20th Avenue) 0 600 1,200300 Feet IJ84 §¨¦I-35E OOTTTTEERRLLAAKKEERRDDCCEE DDAA RR SS TT ALBERT CTALBERT CTCC YY PP RREE SSSS SS TT CCYYPPRREESSSSSSTTBUTTERNUT STBUTTERNUT ST CHESTNUT STCHESTNUT STCOTTONWOOD AVECOTTONWOOD AVER ED W O O D STR ED W O O D STTTAARRTTLLAAKKEE RRDD LLAA CC AASSSSEEDD RR CCLLEEAARRWWAATTEERRCCRREE EEKK CCTT 2211SSTTAAVVEESSR ED OA K L NRED OA K L N TELE DRTELE DR LLAANNGGEERRLL NN21ST AVE21ST AVERR EE DD WW OO OO DD CC TTTELE LNTELE LNRROOSSEEWW OOOODD SSTT CEDAR STCEDAR ST RR OO SS EE WW OOOODDSSTT PALM STPALM STFuture Land Use MapNadeau Acres µ Legend Future Land Use 2030 (S tantec)Future Land Use 2030 (Stantec) Permanent Rural Urban Reserve Low Density Sewered Residential Medium Density Residential High Density Residential Commercial Mixed Use Industrial Civic/Institutional Park and Open Space Private Airfield Right-of-Way Open Water I-35W 10-10 Figure 10-2� Park Service Areas kj kj kj kj kj kj kj kj kj kjkj kj kj kj ú úúBaldwin Lake Rondeau Lake Bald Eagle Lake Wilkinson Lake Otter Lake Amelia Lake Reshanau LakeRice Lake Centerville Lake Marshan Lake George Watch Lake Peltier Lake Cedar Lake Li l a c S t 20th Ave S456721 456749 456721 456749 456714 456754 456714 456723 456754 456754 456714456714 20thAve20th Ave§¨¦35E §¨¦35W ")140 ")84 ")84 Ma in StMainStMain St Cedar St HodgsonRdLake DrElm St Birch St Birch StLake DrSunset AveRondeauLake Dr EAsh St Oak Ln Apollo Dr62nd St N Ash St RondeauLakeRd WCentervilleRdHolly Dr4th AveHolly Dr E Birch St 80th St E 64th St A B C D E I J H F GK L M N White Bear TownshipCity of BlaineCity of Circle PinesCity of Columbus City of HugoCity of North OaksCity of Shoreview !2 !3 !4 !5 !7 !10 !11 !12 !13 !14 !15 !16 !17 !19 !20 !21 !22 !23 !24 !25 !26 !18 !1 !6 !8 !9 ´ Figure 10-2 Neighborhood Service Areas Legend City of Centerville kj Future Neighborhood Park Search Area's ú Existing Tunnel ú Proposed Tunnel/Bridge Existing Asphalt Existing Concrete Trail Existing Boardwalk Trail Proposed Trails Existing Regional Trail Proposed Regional Trail Greenway System Undeveloped Park City Property City Parks Regional Parks School Neighborhood Park Service Area Open Water Municipal Boundary 3,500 0 3,5001,750 Feet Date: 11/12/2019 1 Arena Acres Park 10 Sunrise Park 19 Birchw ood A cres 2 Wollan Park 11 Rice Lake Estates 20 West Shadow P onds O/S 3 C ity H all Park 12 C ountry Lakes Park 21 Reshanau Lake E states O/S 4 C entury Farm N orth 13 Quail Ridge Property 22 Birch Park 5 B ehm's Park 14 Pheasants H ill Park 23 Brandy w ood Park 6 H ighland M eadow P ark 15 N orth Pointe Park 24 Recreation C omplex 7 Lino P ark 16 C learw ater C reek O/S 25 Woods of Baldw in Park 8 Sunset Oaks P ark 17 C learw ater C reek Park 26 Wenzel Famrs Park 9 M arshan P ark 18 Shenandoah Park Memorandum To: Katie Larsen, City Planner, City of Lino Lakes From: Kelsey Gelhar, WSB & Associates Diane Hankee, City Engineer, City of Lino Lakes Date: April 27, 2020 Re: Nadeau Acres Preliminary Plat Review 15306-000 WSB has reviewed the Preliminary Plat and Utility Plans for the Nadeau Acres development in Lino Lakes, MN, prepared by Carlson McCain. These comments are based on review of the following plan sets and documents: • Nadeau Acres Civil Plan Set prepared by Carlson McCain dated March 20, 2020 • Stormwater Management Plan prepared by Carlson McCain dated December 6, 2019, and revised March 20, 2020. • Turn Lane Exhibit prepared by Carlson McCain received March 30, 2020 • Turn Lane Grading Exhibit prepared by Carlson McCain received March 30, 2020 Carlson McCain responded to these comments in red. WSB reviewed the following and responded to Carlson McCain’s comments in blue: Engineering • Grading The Nadeau Acres development includes site grading for Red Oak Lane, Heritage Avenue, Josephine Court, Norma Way, and William Lane as well as the grading required for building pads, and Ponds 100, 200, and 400. Four retaining walls are proposed on the site. Comments: 1. Add additional labels to both existing and proposed contours. Labels added. 2. Retaining walls #1 & #4 shall be eliminated and the applicant shall obtain temporary grading easements with adjacent property owners or the applicant shall adjust the grading plans to eliminate the need for the walls. Retaining wall #1 revised. This wall cannot be removed entirely due to the lift station location and the unlikelihood of obtaining a grading easement from adjacent owner. This wall can be removed with future development to the north. Retaining Wall #4 removed and grading revised to maintain all grading on-site. Developer looking into the possibility of removing walls 2 & 3 if adjacent owner will allow slope grading onto their property. Retaining wall #1 eliminated due to new lift station location. 3. Additional topographic information is needed (minimum 100’ beyond preliminary plat boundary, including at the extensions of Red Oak Lane, Heritage Avenue, William Lane) Lidar added to existing topo to show this area. Current page layout does not show 100’ beyond the north limit of the project site. 4. Retaining walls #2 and #3 (now #1 and #2) exceed maximum allowed height. All retaining walls over 4-ft tall require structural design. Noted. These walls will be designed by a structural engineer and plans provided by the contractor. How will the retaining walls be maintained in the future? 5. Additional rear yard drainage and utility easement required on Lot 145. Lots revised so no drainage from adjacent lot drains into Lot 145. Ms. Katie Larsen 4/13/2020 Page 2 Nadeau Acres Engineering Review Grading revised. See comment 10 under the Stormwater Management section. 6. 10 foot side yard drainage and utility easement required on Lot 101. Revised 7. 10 foot side yard drainage and utility easement required on Lots158 and 159. Revised. Now lots 157 & 158, side yard drainage and utility easement added. 8. Drainage swales do not meet minimum 2% requirement at the following locations: rear lot line of Lots 116, 117,119, 121. Slopes revised Lot numbers have changed, but grading in the areas mentioned has been updated. 9. Grade break elevations needed on Lots 124, 139, 165. Spot elevations added at right-of-way for rear yard swale slope verification. Lot numbers have changed, but grading has been updated. 10. The development is a two-phase development. It is anticipated that grading for the entire site and for the stormwater ponds will be completed at once and not in two phases. Noted. 11. Provide construction details for the turf maintenance accesses. Individual lot surveys will be required to include the turf maintenance access locations (Lots 2 & 3 of Block 1, Lots 6 & 7 of Block 2, and Lots 7 & 8 of Block 6). Maintenance access detail added to detail sheet 12 • Stormwater Management The stormwater on the site flows to three different locations from the site. The majority of the site drains to an existing private ditch/wetland area to the north of the site. A small portion at the south of the site drains through an existing culvert along Birch St (CSAH 34). The western portion of the site drains to the northwest to an existing private ditch. The surface water will flow through three new ponds. Pond 200 located in the middle of the site will pick up surface water from the south portion of the site and direct it towards Pond 100. Pond 100 will pick up surface water from the northwest portion of the site and discharge to the west to an existing private ditch. Pond 400 will receive the remaining surface water and discharge to an existing ditch to the north. After the project is completed, the site will include approximately 8.8 acres of new impervious surfaces including the streets, sidewalks, paths, parking lots, and rooftops. Due to poor soils in the south portion of the site and a high groundwater table in the north portion of the site, infiltration is not feasible. Groundwater was encountered at depths ranging from 4 to 19 feet. Topsoil was encountered at ½ to 1 foot. Below the topsoil, soils consist of glacial outwash sands and native clayey glacial till and are classified as hydrologic groups HSG D in the southern portion and HSG C in the north. The applicant used a HydroCAD model based on the Atlas 14, 24-hour storms to design the storm sewer conveyance system and ponds. The site is designed to reduce site runoff rates for the 2-, 10-, and 100-year rainfall events. Pre- and Post- Development Discharge Rates (cfs) Condition 2-Year 10-Year 100-Year Pre-Development 18.9 19.2 46.4 46.7 103.4 103.3 Post-Development 13.1 12.5 41.7 35.6 91.9 87.8 Post-development stormwater discharge rates are less than the pre-development rates. Ms. Katie Larsen 4/13/2020 Page 3 Nadeau Acres Engineering Review During the public hearing held at the Planning and Zoning Board meeting on February 12, 2020 there were a number of questions regarding the proposed developments’ stormwater management plan. Below is a summary of findings and actions to address the questions: • The site outlets to two private ditches, one in the northwest, and one to the north. There is also a small area of the site that drains to the south. • The proposed project is required to mitigate surface water and address water quality through City, Watershed District and State Rules and Statues. This includes maintaining the existing rate or reducing the rate of runoff from the site, and providing water quality treatment for the proposed development. The project meets the City of Lino Lakes’ stormwater management requirements and RCWD rules. RCWD approved a CAPROC on April 8, 2020. o This project is proposing to reduce rates as detailed in the Stormwater Report, and will utilize stormwater ponding for water quality treatment. The stormwater management plan incorporates existing soils and time of concentrations to calculate the needed ponding systems to mitigate the new impervious surfaces. o The surface water from the new impervious surfaces will be accommodated through three new ponds. Pond 200, located in the middle of the site, will pick up surface water from the south portion of the site and direct it towards Pond 100. Pond 100 will pick up surface water from the northwest portion of the site and discharge to the west to an existing private ditch. Pond 400 will receive the remaining surface water and discharge to an existing ditch to the north. o The design includes a standard outlet control structure with pipe outlet. An outlet control structure is a device that holds water back in the proposed pond and then discharges it slowly into the ditch so that the flow to the downstream ditch is less than the existing condition flow into the ditch. o The original design included an outlet pipe to the ditch. The applicant was unable to obtain an easement for the outlet pipe to the ditch as required by the City and RCWD. The applicant revised the design and enlarged the pond to provide additional storage and added a plunge pool dissipater at the discharge location. • Adjacent property owners expressed concerns over the s stormwater runoff from the site and the downstream private ditches. Staff had multiple conversations and Zoom meetings with the property owners to better understand their concerns and explain the existing and proposed conditions. This included an onsite evaluation, reviewing topographic data, record plans, survey, and incorporation of the NorthPointe development drainage plan. The downstream systems appear to be working correctly and the NorthPointe development has reduced the surface water flow to the subwatershed in question. We will continue to work the property owners and provide information and findings. o The adjacent private ditch owners are responsible to perpetuate existing runoff rates and are to maintain the ditch flow through their property. Staff reviewed private ditch requirements with the City Attorney and RCWD staff. o 2019 was a record year for rainwater in Minneapolis-St. Paul area according to the Minnesota DNR Year to Date Precipitation Chart. Soil saturation in the fall of 2019 was similar to a spring snow melt condition where typically the fall is a dryer condition. These conditions have led to standing water due to soil saturation and higher flows in conveyance systems. o We are working with one of the downstream property owner to complete culvert maintenance on their property. • In addition, we are having the developer verify the downstream conditions to confirm their assumptions. Comments: 1. Pond 100 is discharging to a private ditch, which should be coordinated with the Rice Creek Watershed District and the City of Centerville. Discharge location is being verified with developer. Plunge Pool Energy Dissipator has been added to discharge location per discussion with watershed district and City. See comment 9 regarding the plunge pool energy dissipator design. 2. Sections of the storm sewer are located directly beneath the overhead powerlines and should be relocated. Revised. The storm sewer needs to be offset at least 20’ from the proposed structure on Lot 5 Block 4. 3. Adjust storm sewer that currently runs through Outlot C so that it follows the curb. Revised. Note that in order to force storm sewer to follow the curb for its entirety in this lot, 2 additional structures would be required. Catch basin moved further north to reduce the assumed future easement in a potential front yard. 4. The storm sewer that is part of the rear yard drainage system for Lots 6 & 7 of Block 2 is too close to the future houses. Applicant shall move the storm sewer to the west while maintaining a 20-ft offset from the overhead power line. Ms. Katie Larsen 4/13/2020 Page 4 Nadeau Acres Engineering Review Storm adjusted further back. Note that 20 feet from overhead power is not possible given the maintenance access location and the need to revise a storm manhole to a catch basin manhole for drainage purposes. We are still concerned that the storm sewer is too close to the proposed structures for Lots 6 & 7 of Block 2. 5. The north arrow is incorrect and wetlands on the figures should be labeled or noted in the legends on Stormwater Management Plan Figures 2 and 3 and Storm Sewer Catchment Figure 4. North arrow revised. Wetland line added to legend. 6. Show Proposed HydroCAD Pond “CB50” on Figure 3. CB50 added. 7. Proposed HydroCAD Pond P300 stage storage invert (911.0) does not match bottom contour shown on grading plan. (914) HydroCAD model updated to match grading plan. 8. Ponds modeled in HydroCAD for backyard drainage swales and depressions (P300, P30A, P30B, and CB50) should be modeled as a catch basin in HydroCAD (“pond with insignificant storage”). If they are modeled as ponds, they will need to be evaluated to meet freeboard requirements for detention basins (2’ of freeboard from the low entry in the 100-year storm event). Revised to ponds with insignificant storage. Note that CB 122/123 was modeled as ponds to determine by-pass flow (if any) to see if these would be directed towards a different pond/wetland or offsite. 9. Plunge Pool Energy Dissipator grading requires revision. The bottom of the plunge pool grading of 891.5 has no width in the middle of it and grading is not feasible. Recommend at least 4-feet bottom width to avoid erosion of slopes of pool. Confirm riprap size used at riprap check and overflow. Recommend a detail or notes regarding width and depth of riprap check and overflow, and note on how riprap size was determined. 10. Drainage Area S-10 is shown to flow to W-10. S-10 includes area east of Lots 12-20 of Block 4. Confirm the drainage path for flow to pass from south to north under proposed Red Oak Lane. 11. Roadway profile and storm sewer – the road profile shall be a minimum of 1% grade. Adjust road profile grade to move low points from intersections, Josephine and Red Oak. Storm sewer roadway catch basins are spaced too far apart, 350 ft min. please extend storm sewer and add catch basins. 12. For the downstream ditches / outlets please provide a baseline data report - Survey the bottom of the ditches. - Provide a ditch cross section every 200’ or where it is observed to have a change in section. - Shoot culverts and provide information on type, elevation and condition, document % full of water. • Water Supply There is existing 16-inch diameter ductile iron pipe (DIP) watermain along 20th Av enue (CSAH 54) east of the site and along Birch Street (CSAH 34) south of the site. The City of Lino Lakes Comprehensive Plan does not designate any trunk watermain going through this site. This has been revised with the latest water system plan. The applicant is proposing an 8-inch diameter DIP watermain to serve the entire development. The watermain will extend and loop from the east (North Pointe) along Red Oak Lane and from the south (Birch Street). Comments: 1. The watermain along Red Oak Lane shall be 12-inch diameter DIP. Trunk watermain credits will apply. Revised. This is to be updated to a 16 inch DIP trunk watermain along Red Oak and Josephine. Trunk water credits will apply. 2. A hydrant shall be installed by the lift station at the north end of Heritage Avenue. Revised. Note that hydrant elevation may need to be revised when Heritage Avenue extends to the north. Please put a temporary hydrant at the north end of Heritage Avenue. 3. Applicant shall add a temporary hydrant at the dead end of Red Oak Lane. Revised. Temporary hydrants added to site plans. 4. The City of Lino Lakes should consider installing water service stubs to serve the possible future development at 6687 20th Avenue (26-31-22-14-002). It is anticipated that this parcel will develop into five lots that have access off of Red Oak Lane. Ms. Katie Larsen 4/13/2020 Page 5 Nadeau Acres Engineering Review Per planning comments, these services can be added with final plans. Noted. • Sanitary Sewer There is an existing 10-inch diameter poly-vinyl chloride (PVC) sanitary sewer stub at the intersection of Red Oak Lane and 20th Avenue (CSAH 54). The invert of the stub is approximately 913.6 and is to be verified. The City of Lino Lakes Comprehensive Plan identifies a lift station to serve sanitary sewer districts 3D and 3G. The applicant is proposing to serve the development with 8-inch diameter PVC sanitary sewer, 10- inch diameter PVC sanitary sewer, a lift station located at the north edge of the development, and 4” PVC forcemain. The lift station will pump the waste through the 4-inch diameter PVC forcemain to the existing 10-inch diameter PVC gravity sewer located on Red Oak Lane, just east of 20th Avenue that was installed with the North Pointe development. The Lift Station location is now proposed at Outlot F. Comments: 1. Applicant shall extend the sanitary sewer on Red Oak Ln further to the east and provide a stub for future connections. Revised. The City of Lino Lakes should consider installing sanitary service stubs to serve the possible future development at 6687 20th Avenue (26-31-22-14-002). It is anticipated that this parcel will develop into five lots that have access off of Red Oak Lane. Per planning comments, these services can be added with final plans. Manhole moved further east. Noted. 2. Applicant shall submit a Lift Station Service Area Exhibit. Lift station service area exhibit attached. 3. It is anticipated that the lift station in its current position will need to be 3 to 4-ft deeper. The applicant shall review the necessary depth or consider moving the lift station to the area near the western end of Red Oak Lane. See attached service area exhibit. Lowered the line to provide separation from the culvert on abandoned county ditch 47. Deepening the sanitary line creates a deep sanitary line within the site and a secondary sanitary line has been added. Please upsize the force main to a 6” diameter. Trunk credits will apply. • Transportation 20th Avenue (CSAH 54) is classified as an A-minor Arterial Reliever and Birch Street (CSAH 34) is classified as a Major Collector road. Per the traffic study, Nadeau Acres will generate approximately 685 new trips per day with 50 new trips in the a.m. peak hours (7-8 a.m.) and 65 trips in the p.m. peak hours (4:30-5:30 p.m.). None of the proposed roadways are expected to exceed their daily capacities. The study also reviewed the existing and proposed Levels of Service for the 20th Avenue (CSAH 54) and Red Oak Lane intersection and the 20th Avenue (CSAH 54) and Birch Street (CSAH 34) intersection. The proposed Levels of Service do not degrade by more than allowed by the City’s Subdivision Ordinance. Red Oak Lane, Heritage Avenue, and William Lane are proposed to be 32-ft wide from the back of curb to the back of curb. The two cul-de-sacs, Josephine Court and Norma Way, are both proposed to be 28-ft wide from back of curb to back of curb with cul-de-sac radii of 46-ft from the center to the back of curb. The site will be accessed from 20th’Avenue (CSAH 54). The applicant is proposing widening 20th Avenue to allow for a left turn lane (to Nadeau Acres), a through lane, and a right turn lane (to North Pointe) going northbound and a right turn lane (to Nadeau Acres) and a left/through Ms. Katie Larsen 4/13/2020 Page 6 Nadeau Acres Engineering Review lane going southbound. Comments: 1. Anoka County is reviewing the traffic study and proposed turn lanes. It is anticipated that Anoka County will require a designated southbound through lane along with a designated left turn lane and right turn lane on 20th Avenue (CSAH 54). Noted. This will be coordinated with the county. Applicant shall show the proposed turn lane layout on both the site plan and the grading plan. Anoka County will review the detailed turn lane plan for lane lengths and widths. 2. Update the cul-de-sac street widths to be 32-ft wide from back of curb to back of curb to meet city requirements. Revised. 3. Applicant shall realign the southern driveway entrance for 6709 20th Avenue that currently provides access to 20th Avenue to Red Oak Lane. Notes added to site plan. Realign driveway more west ~ 100’ min from the intersection of Red Oak Lane and 20th Avenue. The applicant is to coordinate with property owner. 4. Applicant shall show the proposed driveway for the existing house on Lot 10, Block 5. Driveway added. 5. Red Oak Lane should have an eastbound through/left lane and a designated right turn lane at the intersection of Red Oak Lane and 20th Avenue. Lanes added. Designated right turn lane shall be the same length as the right turn lane on Red Oak Lane east of 20th Avenue. 6. Applicant shall identify the northern roadway limit of Heritage Avenue. End of road added to plans. Grading adjusted accordingly. 7. City should consider the location of the pedestrian crossing at Heritage Avenue and William Lane. Traffic maneuvering around the corner may not be expecting pedestrians crossing there. Options to consider include extending the trail to move the crossing or moving the sidewalk to the south side of William Lane and the east side of Heritage Avenue. Advanced warning signs can be installed as well as a crosswalk paint markings and signage at the crosswalk. Note that the turn from Heritage to William will require vehicles to slow down significantly while taking the tight turn. Sight lanes cannot be achieved for proper pedestrian safety. Applicant shall revise the sidewalk location. 8. The Heritage Avenue/William Lane cul-de-sac exceeds the City’s maximum of 500-ft. This can be allowed because the cul-de-sac is temporary. Noted. • Wetlands and Mitigation Plan Kjolhaug Environmental Services Company, Inc. prepared a Wetland Delineation Report dated October 29, 2019. A Notice of Decision was issued by RCWD on December 11, 2019. Per the report, two wetlands were delineated on site totaling 1.43 acres. Wetland 1 is a Type 1 wet meadow wetland. Wetland 2 is a partially-drained, wet meadow and scrub-shrub wetland. A portion of Wetland 2 southwest of the septic mound discharge outlet was created in upland and is incidental. The project area is not located within the Lino Lakes Comprehensive Wetland Protection and Management Plan (CWPMP) and outside of Wetland Management Corridor (WMC). The applicant is proposing 0.7 acres of disturbance and will be purchasing wetland banking credits. • Landscaping Open area landscaping standards require 1 large tree and 3 large shrubs per 2,000 sf. Buffer and screen standards apply along 20th Avenue (CSAH 54). Approximately 475 linear feet of frontage will be screened by shrubs, new trees, and existing trees to provide a continuous planting screen year- round. The Preliminary Landscape Plan shows trees and shrubs planted on two separate berms. Boulevard trees are required at the rate of one (1) tree per lot frontage for single family. Comments: Ms. Katie Larsen 4/13/2020 Page 7 Nadeau Acres Engineering Review 1. Boulevard trees should be shown within the city right-of-way. Updated 2. Move plantings off of proposed storm sewer and riprap areas. Noted. 3. Coniferous trees shall be 10-ft from trail edges. Deciduous trees shall be 15-ft from trail edges. Noted. Trees near trail extension to Birch Street do not meet the requirements listed above. • Floodplain There are no existing floodplains on Nadeau Acres. • Drainage and Utility Easements Drainage and utility easements are proposed within the site where there is proposed storm sewer, backyard swales, and stormwater management facilities. There is an existing 66-ft wide powerline easement that runs from northeast to southwest through the middle of the site, and an existing 85-ft wide powerline easement that runs along the western edge of the site. The applicant is dedicating a 60-ft right-of-way along 20th Avenue (CSAH 54) and an 80-ft right-of-way along Birch Street (CSAH 34). Comments: 1. Storm sewer between lots 108 and 109 is greater than 10-ft deep, therefore, the easement shall be twice as wide as the depth. Easement revised to 30-feet. Storm sewer is approximately 14.5 feet deep. 2. 10’ Turf Maintenance Access to be installed over all storm sewer utility proposed between lots. Include between lots 155 and 154, 150 and 149, 121 and 122, and 109 and 108, Added. Lot numbers changed, Turf Maintenance Access added. 3. Drainage and Utility Easements shall not be within powerline easements unless there is documentation from the powerline company to use this space as an easement. Easements revised. Prior to final plat approval, the applicant needs to submit documentation that the power company will grant drainage and utility easements. 4. Temporary grading easements on adjacent properties may be required (see Grading section for more details). Retaining walls removed from right-of -way and stub streets/temporary dead-ends pulled back to allow for grading on-site. 5. Provide documentation of grading and utility agreement within the NSP powerline easements (85-ft wide easement and 66-ft wide easement). In Process. – Permit Application submitted 02-24-2020 6. Grading for the outlet for Pond 100 is on adjacent private property (26-31-22-12-0006) and will require a drainage and utility easement approval from the property owner and NSP. Noted. will be coordinated with property owner. Plans will be adjusted accordingly if easement cannot be obtained. Plans have been adjusted. 7. Sheet 6 showing the ghost plat is missing from the plan set dated 3/20/2020. • Development Agreement A Development Agreement will be required with the final plat. Noted. • Grading Agreement A Grading Agreement is not applicable at this time. • Stormwater Maintenance Agreement The stormwater maintenance for public facilities will be covered under the City’s Programmatic Stormwater Management Agreement. Ms. Katie Larsen 4/13/2020 Page 8 Nadeau Acres Engineering Review • Permits Required 1. NPDES General Construction Permit 2. City of Lino Lakes Zoning Permit for Construction 3. Minnesota Pollution Control Agency Sanitary Sewer Extension Permit 4. Minnesota Department of Health 5. Rice Creek Watershed Permit- Note CAPROC 4/8/2020 6. Anoka County Right-of-Way Permit 7. Provide documentation of Northern States Power agreement or document of understanding of the work (permanent and temporary) to be done within the NSP easements on the site. If you or the applicant has any questions regarding these comments, please contact Diane Hankee at (651) 982-2430 or diane.hankee@ci.lino-lakes.mn.us. You may also contact Kelsey Gelhar at (612) 709- 4897 or kgelhar@wsbeng.com.  Page 1 Memo To: Katie Larsen From: Andy Nelson Date: April 23, 2020 Re: Environmental Coordinator comments for Nadeau Acres RZ PP V4 (3-23-20) Carlson McCain Comments Staff Comments The following recommendations were made by the Lino Lakes Environmental Board on Wednesday, January 29, 2020 concerning Nadeau Acres: 1. Open Space Landscape standard trees must be calculated per outlot/segment of open space, and not calculated as a total for the entire development. In other words, existing trees in Outlot A will not satisfy tree requirements for Outlot B, etc. Open space trees are still required for Outlots B, E, and F. Updated OK 2. Outlot C is a future right-of-way and will not require trees and shrubs, but area must be seeded. Noted OK 3. Outlot D will not require trees and shrubs because lots in this area are going to be expanded to eliminate this outlot. Noted OK 4. Staff will work with developer to increase within-block diversity of boulevard trees. Ultimately, City staff will select species and placement for boulevard trees. This will involve revisions to placement that ensure trees are in the right-of-way and provide Environmental  Page 2 Clear Vision Area for Local Residential Roads (Item #5 of the Landscaping Guidelines and Technical Requirements), which addresses visibility at intersections. Noted Species selected are all appropriate. City staff will work on exact placement in the field. 5. Buffer and screen standards call for a 6 foot high continuous screen on Block 5, Lots 7-10. Lots 7-9 should have a continuous 6 foot high berm with the trees and shrubs planted on top, rather than the two separate berms now called for on the plans. The existing trees on Block 5, Lot 10 should be left in place as proposed on the plan. Noted OK, Buffer can remain as two separate berms as shown on the plans dated 3/23/20. 6. Tree protection zones should be 1 foot radius away from the trunk per inch DBH (diameter at breast height), as described in the Details Plate, and Landscape Specifications on Preliminary Landscape Plan should be changed to match Details Plate. All Tree Protection Zones should be in place before any other construction activity begins on the site. Updated OK 7. Staff recommends 35-241 Mesic Prairie General to use on the portion of Outlots A, B, and E that are above the 100 year High Water Level. Updated OK 8. Replace Royal Purple Smoke Tree with Chokeberry in open area plantings for more value to wildlife. Updated OK 9. Species and placement changes for trees in outlots B and D. Move 5 Black Hills spruce from outlot B and place them in a line at the pavement edge of Heritage Avenue’s northern boundary (the stub). Replace remaining 6 Black Hills spruce and 2 Canadian hemlocks in outlot B with Swamp white, bur, or pin oaks. Replace 6 Canadian hemlocks in outlot D with oaks. 10. Replace Seed mix 35-241 Mesic Prairie General with 35-641 Mesic Prairie Southeast. 11. There are now 68 lots with 77 boulevard trees required, which accounts for one per frontage. Please update this in the City of Lino Lakes Landscape Requirements on the Preliminary Landscape Plan. >>|||||||||||||||||||||||||ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe oh e o h e ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h e o h eugugugugugugugugugugugugugugugugugugugugugugugugugugugugugugugugueueueueueueueueueueueueueueueueueueueueueueueueueueueueueueueutvutvutvxxxxxx>> x xxxxxxxxxxxxxxxxoheohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe >>>>>>>>>> ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe ohe oheueueueugugutut ohe ohe ohe ohe ohe ohe ohe ohe x >>>>>>>>>>>||||||||||||>>>>xxxxxx oheoheoheoh e oh e oh eoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheoheohe oheoheoheoheoheoheoheoheoheoheoheoheoheohe ohe ohe ||||||||||||||||||||||||||||||||||||||||||||||||||ohe ohe ohe ohe >>>>>>>>>>oheoheoheoheohe>>>>|oh e ohe ohe ohe ohe >>>> >>ueue ue ue ue uexxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx NADEAU ACRESLino Lakes, Minnesota VICINITY MAP ofof3890 Pheasant Ridge Drive NE, Suite 100Blaine, MN 55449Phone: (763) 489-7900Fax: (763) 489-7959www.carlsonmccain.comf:\jobs\8421 - 8440\8440 - nadeau parcel\cad c3d\engineering\prelim-plans\8440_cover.dwgSave Date:03/21/20environmentalengineeringsurveying···13Revisions:1. 1/10/20 Per City CommentsPrint Name:Signature:Date:License #:Drawn:Designed:Date:I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Professional Engineer underthe laws of the State of Minnesota12/6/19JJO12/6/19Brian J. Krystofiak, P.E.25063BJKBL HOLDINGS, LLC7517 162nd Avenue NEColumbus, MN 55025NADEAU ACRESLino Lakes, MinnesotaCOVER12. 2/7/20 Revise Sheets 9,10,&123. 2/21/20 Revise Per City Comments4. 3/20/20 Rev per new Pond 100 outlet. OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OW N E R :OWNER:OWNER:OWNER:OWNER:OW N E R :OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:EXCEPTION ZONING: RZONING: RZONING: RZONING: PUD ZONING: R ZONING: PUD ZONING: RCITY OF CENTERVILLEZONING: Rf:\jobs\8421 - 8440\8440 - nadeau parcel\cad c3d\survey\preliminary\8440_excon.dwgSave Date:01/13/20of3890 Pheasant Ridge Drive NE,Suite 100Blaine, MN 55449Phone: (763) 489-7900Fax: (763) 489-7959www.carlsonmccain.comNADEAU ACRESLino Lakes, Minnesotaenvironmentalengineeringsurveying···EXISTING CONDITIONSThomas R. Balluff, L.S.I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Land Surveyor underthe laws of the State of MinnesotaPrint Name:Signature:Date:License #:12/06/1940361DRAWN BY:ISSUE DATE:FILE NO:Revisions:1. 1/10/20 Per City Comments2067KCM12/06/19132LEGENDBL HOLDINGS, LLC7517 162nd Avenue NEColumbus, MN 55025 HERITAGE AVENUE HERITAGEAVENUEHERITAGE AVENUEWILLIAMLANENORMA WAYJOSEPHINECOURTRED OAKRED OAKRED OAK LANE(C.S.A.H. NO. 54)20TH AVENUE S.LANELANEOWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OW N E R :OWNER:OWNER:OWNER:OWNER:OW N E R :OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:EXCEPTIONSEE SHEET 5ZONING: RZONING: RZONING: RZONING: PUD ZONING: R ZONING: PUD ZONING: RCITY OF CENTERVILLEZONING: RSEE SHEET 4f:\jobs\8421 - 8440\8440 - nadeau parcel\cad c3d\survey\preliminary\8440_prp index.dwgSave Date:03/23/20of3890 Pheasant Ridge Drive NE,Suite 100Blaine, MN 55449Phone: (763) 489-7900Fax: (763) 489-7959www.carlsonmccain.comNADEAU ACRESLino Lakes, Minnesotaenvironmentalengineeringsurveying···PRELIMINARY PLAT INDEXThomas R. Balluff, L.S.I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Land Surveyor underthe laws of the State of MinnesotaPrint Name:Signature:Date:License #:12/06/1940361DRAWN BY:ISSUE DATE:FILE NO:Revisions:1. 1/10/20 Per City Comments2. 2/21/20 Per City Comments3. 3/20/20 Per Pond 100 Outlet Revision2067KCM12/06/19133LEGENDBL HOLDINGS, LLC7517 - 162nd Avenue NEColumbus, MN 55025 SITE DATA NADEAU ACRES OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER: OWNER:EXCEPTION HERITAGE AVENUE HERITAGE AVENUE HERITAGE AVENUENORMA WAYJOSEPHINECOURTRED OAKRED OAK LANE20TH AVENUE SOUTH LANEREDOAKLANEf:\jobs\8421 - 8440\8440 - nadeau parcel\cad c3d\survey\preliminary\8440_prp.dwgSave Date:03/21/20of3890 Pheasant Ridge Drive NE,Suite 100Blaine, MN 55449Phone: (763) 489-7900Fax: (763) 489-7959www.carlsonmccain.comNADEAU ACRESLino Lakes, Minnesotaenvironmentalengineeringsurveying···PRELIMINARY PLATThomas R. Balluff, L.S.I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Land Surveyor underthe laws of the State of MinnesotaPrint Name:Signature:Date:License #:12/06/1940361DRAWN BY:ISSUE DATE:FILE NO:2067KCM12/06/19134LEGENDBL HOLDINGS, LLC7517 162nd Avenue NEColumbus, MN 55025Revisions:1. 1/10/20 Per City Comments2. 2/21/20 Per City Comments3. 3/20/20 Per Pond 100 Outlet Revision OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OW N E R :OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:OWNER:HERITAGE AVENUEHERITAGEAVENUEWILLIAMLANENORMA WAY(C.S.A.H. NO. 54)f:\jobs\8421 - 8440\8440 - nadeau parcel\cad c3d\survey\preliminary\8440_prp.dwgSave Date:03/21/20of3890 Pheasant Ridge Drive NE,Suite 100Blaine, MN 55449Phone: (763) 489-7900Fax: (763) 489-7959www.carlsonmccain.comNADEAU ACRESLino Lakes, Minnesotaenvironmentalengineeringsurveying···PRELIMINARY PLATThomas R. Balluff, L.S.I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Land Surveyor underthe laws of the State of MinnesotaPrint Name:Signature:Date:License #:40361DRAWN BY:ISSUE DATE:FILE NO:135LEGENDBL HOLDINGS, LLC7517 162nd Avenue NEColumbus, MN 5502512/06/19KCM12/06/192067Revisions:1. 1/10/20 Per City Comments2. 2/21/20 Per City Comments3. 3/20/20 Per Pond 100 Outlet Revision HERITAGE AVENUE HERITAGE AVENUEWILLIAMCOURTNORMA WAYRED OAKLANEJOSEPHINERED OAKRED OAK LANE(C.S.A.H. NO. 54)20TH AVENUE SOUTH LANELANEEXCEPTIONHERITAGE AVENUEf:\jobs\8421 - 8440\8440 - nadeau parcel\cad c3d\survey\preliminary\ghost plat.dwgSave Date:03/20/20of3890 Pheasant Ridge Drive NE,Suite 100Blaine, MN 55449Phone: (763) 489-7900Fax: (763) 489-7959www.carlsonmccain.comNADEAU ACRESLino Lakes, Minnesotaenvironmentalengineeringsurveying···GHOST PLATI hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Land Surveyor underthe laws of the State of MinnesotaPrint Name:Signature:Date:License #:DRAWN BY:ISSUE DATE:FILE NO:Revisions:1.Revised layout. 01/10/20202.Revised layout. 02/11/20203.Revised layout. 02/21/2020XXXC#12/06/19136BL HOLDINGS, LLC7517 162nd Avenue NEColumbus, MN 55025GHOSTPLATGHOSTPLATGHOSTPLAT ofof3890 Pheasant Ridge Drive NE, Suite 100Blaine, MN 55449Phone: (763) 489-7900Fax: (763) 489-7959www.carlsonmccain.comf:\jobs\8421 - 8440\8440 - nadeau parcel\cad c3d\engineering\prelim-plans\8440_site.dwgSave Date:03/21/20environmentalengineeringsurveying···13Revisions:1. 1/10/20 Per City CommentsPrint Name:Signature:Date:License #:Drawn:Designed:Date:I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Professional Engineer underthe laws of the State of Minnesota12/6/19JJO12/6/19Brian J. Krystofiak, P.E.25063BJKBL HOLDINGS, LLC7517 162nd Avenue NEColumbus, MN 55025NADEAU ACRESLino Lakes, MinnesotaSITE PLAN LEGENDPRELIMINARY SITE &UTILITY PLAN7PRELIMINARY SITE &UTILITY PLAN1. 1/10/20 Per City Comments2. 2/21/20 Per City Comments3. 3/20/20 Rev per new Pond 100 outlet. ofof3890 Pheasant Ridge Drive NE, Suite 100Blaine, MN 55449Phone: (763) 489-7900Fax: (763) 489-7959www.carlsonmccain.comf:\jobs\8421 - 8440\8440 - nadeau parcel\cad c3d\engineering\prelim-plans\8440_gr.dwgSave Date:03/21/20environmentalengineeringsurveying···13Revisions:1. 1/10/20 Per City CommentsPrint Name:Signature:Date:License #:Drawn:Designed:Date:I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Professional Engineer underthe laws of the State of Minnesota12/6/19JJO12/6/19Brian J. Krystofiak, P.E.25063BJKBL HOLDINGS, LLC7517 162nd Avenue NEColumbus, MN 55025NADEAU ACRESLino Lakes, MinnesotaPRELIMINARY GRADING INDEX82. 2/21/20 Per City Comments3. 3/20/20 Rev per new Pond 100 outlet. ofof3890 Pheasant Ridge Drive NE, Suite 100Blaine, MN 55449Phone: (763) 489-7900Fax: (763) 489-7959www.carlsonmccain.comf:\jobs\8421 - 8440\8440 - nadeau parcel\cad c3d\engineering\prelim-plans\8440_gr.dwgSave Date:03/21/20environmentalengineeringsurveying···13Revisions:1. 1/10/20 Per City CommentsPrint Name:Signature:Date:License #:Drawn:Designed:Date:I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Professional Engineer underthe laws of the State of Minnesota12/6/19JJO12/6/19Brian J. Krystofiak, P.E.25063BJKBL HOLDINGS, LLC7517 162nd Avenue NEColumbus, MN 55025NADEAU ACRESLino Lakes, MinnesotaPRELIMINARY GRADING& EROSION CONTROL PLAN92. 2/7/20 Revise Pond HWL's3. 2/21/20 Per City Comments4. 3/20/20 Rev per new Pond 100 outlet. ofof3890 Pheasant Ridge Drive NE, Suite 100Blaine, MN 55449Phone: (763) 489-7900Fax: (763) 489-7959www.carlsonmccain.comf:\jobs\8421 - 8440\8440 - nadeau parcel\cad c3d\engineering\prelim-plans\8440_gr.dwgSave Date:03/21/20environmentalengineeringsurveying···13Revisions:1. 1/10/20 Per City CommentsPrint Name:Signature:Date:License #:Drawn:Designed:Date:I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Professional Engineer underthe laws of the State of Minnesota12/6/19JJO12/6/19Brian J. Krystofiak, P.E.25063BJKBL HOLDINGS, LLC7517 162nd Avenue NEColumbus, MN 55025NADEAU ACRESLino Lakes, MinnesotaPRELIMINARY GRADING& EROSION CONTROL PLAN102. 2/7/20 Revise Pond HWL's3. 2/21/20 Per City Comments TREE PRESERVATION PLANINDEXofof3890 Pheasant Ridge Drive NE, Suite 100Blaine, MN 55449Phone: (763) 489-7900Fax: (763) 489-7959www.carlsonmccain.comf:\jobs\8421 - 8440\8440 - nadeau parcel\cad c3d\engineering\trees\8440_tree.dwgSave Date:03/23/20environmentalengineeringsurveying···13Revisions:1. 1/10/20 Per City CommentsPrint Name:Signature:Date:License #:Drawn:Designed:Date:I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Professional Engineer underthe laws of the State of Minnesota12/6/19JJO12/6/19Brian J. Krystofiak, P.E.25063BJKBL HOLDINGS, LLC7517 162nd Avenue NEColumbus, MN 55025NADEAU ACRESLino Lakes, MinnesotaT14 VICINITY MAP TREE PRESERVATION PLANofof3890 Pheasant Ridge Drive NE, Suite 100Blaine, MN 55449Phone: (763) 489-7900Fax: (763) 489-7959www.carlsonmccain.comf:\jobs\8421 - 8440\8440 - nadeau parcel\cad c3d\engineering\trees\8440_tree.dwgSave Date:03/23/20environmentalengineeringsurveying···13Revisions:1. 1/10/20 Per City CommentsPrint Name:Signature:Date:License #:Drawn:Designed:Date:I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Professional Engineer underthe laws of the State of Minnesota12/6/19JJO12/6/19Brian J. Krystofiak, P.E.25063BJKBL HOLDINGS, LLC7517 162nd Avenue NEColumbus, MN 55025NADEAU ACRESLino Lakes, MinnesotaT242. 3/20/20 Per P100 Outlet Revision TREE PRESERVATION PLANofof3890 Pheasant Ridge Drive NE, Suite 100Blaine, MN 55449Phone: (763) 489-7900Fax: (763) 489-7959www.carlsonmccain.comf:\jobs\8421 - 8440\8440 - nadeau parcel\cad c3d\engineering\trees\8440_tree.dwgSave Date:03/23/20environmentalengineeringsurveying···13Revisions:1. 1/10/20 Per City CommentsPrint Name:Signature:Date:License #:Drawn:Designed:Date:I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Professional Engineer underthe laws of the State of Minnesota12/6/19JJO12/6/19Brian J. Krystofiak, P.E.25063BJKBL HOLDINGS, LLC7517 162nd Avenue NEColumbus, MN 55025NADEAU ACRESLino Lakes, MinnesotaT34 TREE PRESERVATION PLANofof3890 Pheasant Ridge Drive NE, Suite 100Blaine, MN 55449Phone: (763) 489-7900Fax: (763) 489-7959www.carlsonmccain.comf:\jobs\8421 - 8440\8440 - nadeau parcel\cad c3d\engineering\trees\8440_tree.dwgSave Date:03/23/20environmentalengineeringsurveying···13Revisions:1. 1/10/20 Per City CommentsPrint Name:Signature:Date:License #:Drawn:Designed:Date:I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Professional Engineer underthe laws of the State of Minnesota12/6/19JJO12/6/19Brian J. Krystofiak, P.E.25063BJKBL HOLDINGS, LLC7517 162nd Avenue NEColumbus, MN 55025NADEAU ACRESLino Lakes, MinnesotaT443. 3/20/20 Per P100 Outlet Revision Know what'sbelow.before you dig.CallRPHASING PLANP1ofof3890 Pheasant Ridge Drive NE, Suite 100Blaine, MN 55449Phone: (763) 489-7900Fax: (763) 489-7959www.carlsonmccain.comf:\jobs\8421 - 8440\8440 - nadeau parcel\cad c3d\engineering\prelim-plans\8440_phasing_plan.dwgSave Date:03/23/20environmentalengineeringsurveying···13Revisions:1. 1/10/20 Per City CommentsPrint Name:Signature:Date:License #:Drawn:Designed:Date:I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Professional Engineer underthe laws of the State of Minnesota12/6/19JJO12/6/19Brian J. Krystofiak, P.E.25063BJKBL HOLDINGS, LLC7517 162nd Avenue NEColumbus, MN 55025NADEAU ACRESLino Lakes, MinnesotaPHASE IPHASE IIPHASE IPHASE II1NADEAU ACRESLino Lakes, Minnesota VICINITY MAP 2. 3/20/20 Per P100 Outlet Revision 1 1st Reading: Publication: 2nd Reading: Effective: CITY OF LINO LAKES ORDINANCE NO. 02-20 ORDINANCE TO REZONE PROPERTY FROM R, RURAL TO R-1, SINGLE FAMILY RESIDENTIAL FOR NADEAU ACRES The City Council of Lino Lakes ordains: Section 1: Findings of Fact 1. The City received a Land Use Application to rezone certain property from R, Rural to R-1, Single Family Residential. 2. The Planning and Zoning Board held a public hearing on February 12, 2020. 3. Per Section 1007.015 (5), the Planning and Zoning Board shall consider possible adverse effects of the proposed rezoning and its judgement shall be based upon, but not limited to, the following factors: (a) The proposed action has been considered in relation to the specific policies and provisions of and has been found to be consistent with the official City Comprehensive Plan. The proposed rezoning is consistent with the Comprehensive Plan and zoning ordinance. Per the zoning ordinance, land that is guided low density residential can be zoned R-1, Single Family Residential, R-1X, Single Family Executive Residential or R-2, Two Family Residential. The proposed Nadeau Acres residential subdivision is consistent with the goals and policies of the comprehensive plan in regards to resource management, land use, housing, transportation and utilities. The development is consistent with low density residential land use and compliant with density requirements. Safe transportation corridors and public utilities also serve the development. (b) The proposed use is or will be compatible with present and future land uses of the area. The proposed Nadeau Acres development is compatible with the present and future land uses of the area. Present land uses in the area are residential. Future land uses in the area are guided low and medium density residential. 2 (c) The proposed use conforms with all performance standards contained herein. The proposed Nadeau Acres development conforms with the zoning ordinance performance standards for R-1, Single Family Residential District. (d) The proposed use can be accommodated with existing public services and will not overburden the City’s service capacity. The proposed Nadeau Acres development can be accommodated with existing public services and will not overburden the City’s service capacity. The site is served by 8” watermain and 8”-10”sanitary sewer, forcemain and lift station. The public water and sanitary system is adequately sized for the development in the district. Section 2: Amendment The Zoning Ordinance of the City of Lino Lakes is hereby amended to rezone the following described property from R, Rural to R-1, Single Family Residential. Section 3: Legal Description That part of the East Half of the Northeast Quarter of Section 26, Township 31, Range 22, Anoka County, Minnesota, described as follows: Commencing at the Southeast corner of said East Half of the Northeast Quarter; thence North along the East line of said East Half of the Northeast Quarter, a distance of 941.14 feet to the North line of the South 941.00 feet thereof, also being the point of beginning; thence westerly, along said North line of the South 941.00 feet thereof, a distance of 865.13 feet to the West line of the East 865.00 feet of said East Half of the Northeast Quarter; thence southerly, along said westerly line, a distance of 196.03 feet to the North line of the South 745.00 feet of said East Half of the Northeast Quarter; thence westerly, along said North line, a distance of 135.02 feet to the West line of the East 1000.00 feet of said East Half of the Northeast Quarter; thence southerly, along said West line, a distance of 495.07 feet to the North line of EAST BIRCH ADDITION, according to the recorded plat thereof, Anoka County, Minnesota; thence easterly, along said North line of EAST BIRCH ADDITION, a distance of 611.39 feet to the Northwest corner of Outlot A, said EAST BIRCH ADDITION; thence southerly, along the West line of said Outlot A, a distance of 190.00 feet to the southerly line of said Outlot A; thence easterly, along said southerly line said Outlot A, a distance of 60.00 feet to the East line of said Outlot A; thence northerly, along said East line of said Outlot A, a distance of 148.74 feet to the North line of the South 208.71 feet of said East Half of the Northeast Quarter; thence easterly, along said North line, a distance of 120.02 feet to the West line of the East 208.71 feet of said East Half of the Northeast Quarter; thence northerly, along said West line, a distance of 417.46 feet to the North line of the South 626.11 feet of said East Half of the Northeast Quarter; thence easterly, along said North line, a distance of 208.74 feet to said East line of the East Half of the Northeast Quarter; thence northerly, along said East line, a distance of 314.94 to said point of beginning. 3 AND That part of the East Half of the Northeast Quarter of Section 26, Township 31, Range 22, Anoka County, Minnesota, described as follows: Commencing at the Southeast corner of said East Half of the Northeast Quarter; thence Northerly, along the East line of said Northeast Quarter, a distance of 1100.00 feet to the actual point of beginning; thence westerly along a line parallel with the South line of said East Half of the Northeast Quarter, a distance of 610.00 feet; thence northerly, along a line parallel with the East line of said East Half of the Northeast Quarter, a distance of 220.00 feet; thence westerly along a line parallel with the South line of said East Half of the Northeast Quarter, a distance of 48.00 feet; thence northerly, along a line parallel with the East line of said East Half of the Northeast Quarter, a distance of 345.00 feet; thence westerly, along a line parallel with the South line of said East Half of the Northeast Quarter, a distance of 659.7 feet, more or less, to the West line of said East Half of the Northeast Quarter; thence southerly, along said westerly line, a distance of 919.95 feet, more or less, to the North line of the South 745.00 feet of said East Half of the Northeast Quarter; thence easterly, along said northerly line, a distance of 449.55 feet, to the West line of the East 865.00 feet of said East Half of the Northeast Quarter; thence northerly, along said West line a distance of 196.03 feet, to the North line of the South 941.00 feet of said East Half of the Northeast Quarter; thence easterly along said North line, a distance of 865.13 feet, to the East line of said East Half of the Northeast Quarter; thence northerly, along said East line, a distance of 158.86 feet to said point of beginning. AND That part of the Northeast Quarter of Section 26, Township 31, Range 22, Anoka County, Minnesota, described as follows: Beginning at a point on the East line of and 1320.00 feet North of the Southeast corner of said Northeast Quarter; thence North along said East line, 345.00 feet; thence West on a line parallel with the South line of said Northeast Quarter 658.00 feet; thence South, parallel with said East line of the Northeast Quarter, 345.00 feet; thence East, parallel with said South line of the Northeast Quarter, 658.00 feet to the point of beginning, EXCEPT that part described as follows: Commencing at the Southeast corner of said Northeast Quarter; thence North 00 degrees 23 minutes 08 seconds West, assumed bearing along the East line of said Northeast Quarter, 1380.00 feet to the point of beginning; thence continuing North 00 degrees 23 minutes 08 seconds West, along said East line, 285.00 feet; thence North 89 degrees 24 minutes 11 seconds West, parallel with the South line of said Northeast Quarter, 262.00 feet; thence South 00 degrees 23 minutes 08 seconds East, 170.00 feet; thence South 31 degrees 05 minutes 22 seconds East, 135.12 feet to the North line of the South 1380.00 feet as measured along said East line of the Northeast Quarter, thence South 89 degrees 24 minutes 11 seconds East, along said North line 193.00 feet to said point of beginning. Section 4: Development Regulations 4 The development shall conform to the plans, requirements, and conditions of approval as listed in Council Resolution No. 20-20. Section 5: Effect This ordinance shall be in force and effect from and after its passage and publication according to the Lino Lakes City Charter and upon the filing of the final plat. Adopted by the Lino Lakes City Council this 11th day of May, 2020. The motion for the adoption of the foregoing ordinance was introduced by Council Member_____________and was duly seconded by Council Member ___________ and upon vote being taken thereon, the following voted in favor thereof: The following voted against same: ____________________________ Rob Rafferty, Mayor ATTEST: ________________________ Julianne Bartell, City Clerk 1 CITY OF LINO LAKES RESOLUTION NO. 20-20 APPROVING PRELIMINARY PLAT AND OPENING SUB-DISTRICT 3C & 3D OF UTILITY STAGING AREA 2A (2020-2025) FOR NADEAU ACRES WHEREAS, the City received a land use application for preliminary plat for Nadeau Acres hereafter referred to as Development; and WHEREAS, City staff has completed a review of the Development based on the following: • Nadeau Acres Civil Plan Set prepared by Carlson McCain revision date March 20, 2020 • Stormwater Management Plan prepared by Carlson McCain revision date March 20, 2020 • Stormwater Pollution Prevention Plan prepared by Carlson McCain dated December 6, 2019 • Geotechnical Exploration Report prepared by Haugo Geotechnical Services dated December 6, 2019 • Wetland Permit Application prepared by Kjolhaug Environmental Services Company Inc. dated December 23, 2019 • Rare Plant Report prepared by Midwest Natural Resources dated December 12, 2019 • Traffic Impact Study by Spack Consulting dated December 6, 2019; and WHEREAS, a public hearing was held before the Planning & Zoning Board on February 12, 2020 and the Board recommended approval of the Development with a 2-1; and WHEREAS, 2030 Comprehensive Plan’s Growth Management Policy requires the City Council to determine by resolution if the next 10 year utility staging is to be opened to development; and WHEREAS, the Development is located in Sanitary Sewer District 3 (Sub-District 3C and 3D) of 2030 Utility Staging Area 2A (2020-2025). NOW, THEREFORE BE IT RESOLVED by The City Council of The City of Lino Lakes hereby makes the following: FINDINGS OF FACT Preliminary Plat Per Section 1001.013, Premature Subdivision: (1) General. Any concept plan, preliminary plat or final plat deemed premature pursuant to the following criteria shall be denied by the City Council. (2) Conditions for establishing a premature subdivision. A subdivision may be deemed premature should any of the following conditions not be met. (a) Consistency with the Comprehensive Plan. Including any of the following: 2 1. Land use plan; 2. Transportation plan; 3. Utility (sewer and water) plans; 4. Local water management plan; 5. Capital improvement plan; and 6. Growth management policies, including MUSA allocation criteria. The proposed Nadeau Acres residential subdivision is consistent with the goals and policies of the comprehensive plan in regards to resource management, land use, housing, transportation, utilities, local water management, capital improvements and growth management. The development is consistent with low density residential land use and compliant with density requirements. Safe transportation corridors and public utilities also serve the development. (b) Consistency with infill policies. A proposed urban subdivision shall meet the city's infill policies. Nadeau Acres is consistent with infill policies. The development is within the 2030 Utility Staging Area 2A (2020-2025).The cost, operation and maintenance of the utility system is consistent with the normal costs projected by the water and sanitary system plans. No future utility costs are proposed. (c) Roads or highways to serve the subdivision. A proposed subdivision shall meet the requirements for level of service (LOS), as defined by the Highway Capacity Manual. A Traffic Impact Study was prepared by Spack Solutions on December 6, 2019 and concluded the additional 68 single family lots will not negatively impact the transportation system. Level of Service (LOS) requirement is met. (d) Water supply. A proposed subdivision shall be deemed to have an adequate water supply. Nadeau Acres meets the goals of the water supply plan. The site is served by an 8” watermain extending from the east and loops south to Birch Street. The water system has capacity to serve this residential development. (e) Waste disposal systems. A proposed subdivision shall be served with adequate waste disposal systems. Nadeau Acres meets the goals of the sanitary sewer plan. The site is located in Sanitary Sewer District 3 (Sub-district 3C and 3D) and is in 2030 Utility Staging area 2A (2020-2025). The sanitary sewer system has capacity to serve the development. Utility Staging Area Per the page 3-26 of the 2030 Comprehensive Plan’s Growth Management Policy: 6. Prior to reaching the time threshold for the next ten-year staging area, or five-year phase within a ten-year staging area, depicted on the staging plan, the City Council will determine by resolution if the next area is to be opened to development. The following 3 criteria will be used to determine where and when to open up the next ten-year staging area, or five-year phase within a staging area, in accordance with the timing indicated on the staging plan: a. Adequate infrastructure must be available to support development. Appropriate analysis will determine if adequate infrastructure is available and what utility extensions and transportation improvements are required to support new development. If infrastructure is not available and cannot be made available in a timely manner to support expanding into the next ten-year staging area or five year phase within a staging area, the city may refrain from opening up the next staging area, or portions thereof. Adequate infrastructure is available to support Nadeau Acres. The development is located in Sanitary Sewer District 3 (Sub-District 3C and 3D) and is in 2030 Utility Staging Area 2A (2020-2025). The sanitary sewer system has capacity to serve the development. Nadeau Acres also meets the goals of the 2030 Transportation Plan by providing a safe road connection between future neighborhoods, constructing turn lanes along CSAH 54 (20th Avenue) and controlling access management along County roads. b. Different areas of the city can be considered independently. A decision to open one area of the city to development does not automatically open a different area of the city. Decisions to open new areas to development should clearly define and map the area being opened. Only Sub-District 3C and 3D of Sanitary Sewer District 3 in 2030 Utility Staging Area 2A (2020- 2025) is being opened to development. c. This process does not require a comprehensive plan amendment because it is in accordance with the timing indicated on staging plan. BE IT FURTHER RESOLVED by the City Council of The City of Lino Lakes hereby establishes the following conditions of approval: 1. Outlots A, B, C, D and E shall be deeded to the City. 2. Outlot C shall be deeded to the City and dedicated for road right-of-way and drainage and utility purposes. 3. A temporary cul de sac easement shall be recorded over the west end of William Lane. 4. The temporary cul de sac shall be removed, ground restored and the temporary easement released upon extension of William Lane. 5. The private septic systems at 6677 20th Avenue and 6651 20th Avenue shall be removed. 6. The private well at 6677 20th Avenue shall be capped. 7. The existing house at 6651 20th Avenue shall hook up to municipal sanitary sewer. 8. The existing south driveway of 6709 20th Avenue shall be relocated west onto Red Oak Lane. 9. The existing driveway accesses from 6677 20th Avenue and 6651 20th Avenue shall be removed. 10. A building permit is required for the house relocation at 6677 20th Avenue. 4 11. The property owners of PID #26-31-22-12-0006 and #26-31-22-13-0001 (Vickers) have expressed concerns about Josephine Lane stubbing to their property line. It should be noted that if it is decided to pull back the sanitary sewer, watermain and street improvements along Josephine Lane, there will be an added cost to the development of their property in the future. It should also be noted that Josephine Lane will be extended in the future. BE IT FURTHER RESOLVED by The City Council of The City of Lino Lakes hereby approves the preliminary plat and utility staging area for Nadeau Acres subject to the following items being addressed: 1. Comments from WSB City Engineer memo dated April 27, 2020 shall be addressed. 2. Comments from the Environmental Coordinator memo dated April 23, 2020 shall be addressed. 3. It is the preferred option of the City to extend a stormwater pipe west from Pond 100 to the ditch on the Vickers property (PID# 26-31-22-12-0006). Staff is directed to work with the developer to provide a design for such extension, obtain easement, and coordinate with the property owner. 4. The applicant shall prepare the deeds for Outlots A, B, C, D and E for City review and approval prior to recording. a. Outlot C shall be dedicated for road right-of-way and drainage and utility purposes. 5. The applicant shall prepare the temporary cul de sac easements for City review and approval prior to recording. 6. Proof that the private septic systems at 6677 20th Avenue and 6651 20th Avenue have been properly removed shall be submitted to the City upon completion. 7. Proof that the private well located at 6677 20th Avenue has been properly capped shall be submitted to the City upon completion. 8. The applicant shall provide approval from NSP aka Xcel Energy allowing for public and private improvement within their easement e.g. stormwater pond, landscaping, streets, utilities etc. 9. “Future Road Extension” signs are required at the west end of William Lane and Red Oak Lane and at the north end of Heritage Avenue. a. These may be shown on the final plans. 10. Sheets 3-5, Preliminary Plat: a. On Sheet 3, the density calculations shall be revised to subtract the “Proposed Wetlands = 0.65 acres”. The Net Density then becomes 2.27 lots/acre. b. A minimum10 foot wide drainage and utility easement upland from the delineated wetland boundary is required. i. The easement on Lot 2 and Lot 3, Block 1 shall be revised. ii. The lot area summary Excel spreadsheet shall be revised. c. Josephine Court shall be revised to Josephine Lane. 11. Sheet 7, Preliminary Site & Utility Plan: a. Southbound left, right and through lanes from CSAH 54 (20th Avenue) onto Red Oak Lane shall be approved by Anoka County. b. Proper turn lanes from Red Oak Lane onto CSAH 54 (20th Avenue) are required. c. Utilities and services shall be provided for the future development of 6687 20th Avenue on the final plans. 12. Sheet 9, Preliminary Grading Plan & Erosion Control Plan: 5 a. Revise comment “Ex. House to be Moved to Lot 136” to Lot 135. 13. Sheet L1 & L2, Preliminary Landscape Plan: a. A row of coniferous trees shall be planted at the north end of Heritage Avenue to provide a screen from vehicle headlights shining into the adjacent house located at 6747 20th Avenue. 14. Phasing Plan: a. Phase I shall be revised to 35 lots. Adopted by the Council of the City of Lino Lakes this 11th day of May, 2020. The motion for the adoption of the foregoing resolution was introduced by Council Member _______________and was duly seconded by Council Member ________________ and upon vote being taken thereon, the following voted in favor thereof: The following voted against same: _______________________________ Rob Rafferty, Mayor ATTEST: ________________________ Julianne Bartell, City Clerk 1 CITY COUNCIL AGENDA ITEM 6B STAFF ORIGINATOR: Katie Larsen, City Planner MEETING DATE: May 11, 2020 TOPIC: Lyngblomsten Senior Living Community i. Consider Resolution No. 20-44 Approving PUD Development Stage Plan Amendment #1-Site Plan and Grading & Drainage Plan VOTE REQUIRED: 3/5 INTRODUCTION The applicant, Lyngblomsten, has submitted a land use application for PUD Development Stage Plan Amendment #1 to omit the clubhouse and revise the site plan and grading & drainage plans. The original PUD Development Stage Plan/Preliminary Plat was approved by City Council on April 8, 2019 by Resolution No. 19-42. The original plans included a centrally located stand- alone clubhouse. The clubhouse is now being omitted in order to enlarge the stormwater pond. This staff report is based on the following submittal documents: • PUD Amendment Narrative prepared by Lyngblomstem dated March 9, 2020 • Revised Site Plan and Grading Plan prepared by AJA Associates, Inc. dated December 31, 2019 • Stormwater Management Report prepared by AJA Associates, Inc. revised February 28, 2020 ANALYSIS The April 8, 2019 Council Staff Report, Ordinance No. 07-19 and Resolution No. 19-42 detail the project’s compliance with the Comprehensive Plan, Master Planning Study-Hodgson Road & CR J and Subdivision Ordinance. Ordinance No. 07-19 rezoned the property to PUD, Planned Unit Development in order to implement the goals of the Master Planning Study. The Ordinance details permitted, accessory and conditional uses allowed within the development. Resolution No. 19-42 approved the PUD Development Stage Plan/Preliminary Plat that includes the preliminary plat, site plan, grading & drainage plans, utility plans, landscaping plans, architectural building elevations etc. The resolution also establishes the development’s framework in regards to lot and yard requirement, height regulations, impervious surface coverage and design guidelines. 2 The amendment is to the site plan and grading & drainage plan of the PUD Development Stage Plan. If approved, all plans sheets of the PUD Development Stage Plan and Preliminary Plat will be revised to reflect the amendment and other comments listed in Resolution No. 19-42. The applicant will then submit PUD Final Plan/Final Plat for Council approval. Original Site Plan and Grading & Drainage Plan Overview Site Plan Resolution No. 19-42 approving the PUD Development Stage Plan/Preliminary Plat included an overall general site plan and grading & drainage plan of the 20 acre development. Per the original site plan, Lyngblomsten is proposing a 3 phased approach to redevelopment of 6 parcels totaling 20 acres located in the northwest quadrant of CSAH49 (Hodgson Road) and CR J (Ash Street). • Phase 1 is the senior living community consisting of the following housing options: • Cottage Homes = 20 units • Senior Living Campus o Independent Living = 100 units o Assisted-living = 50 units o Skilled Nursing Facility = 48 units o TOTAL UNITS = 218 total units The market rate cottage homes are 1,400 sf single level cottages with 2 bedrooms and an attached 21’ x 21’ garage. The senior living community independent and assisted-living units are market-rate and mid- range in price with a variety of 1- and 2-bedroom units and heated underground parking. The community also includes complementary campus amenities such as a Life Enrichment Center (2nd Half Lyngblomsten), main floor town center with bistro style or fine dining, a pub, cinema, chapel, fitness center and gift shop. The development also includes a 4,600 sf club house with game room, kitchen and lounge. • Phase 2 is a stand-alone 6,000 sf restaurant with outdoor patio • Phase 3 is future commercial development The senior living community and restaurant are located on one existing 17 acre parcel. The future commercial development will be a redevelopment of the remaining 5 parcels (3 acres) which is currently occupied by an insurance business, vacant liquor store and recently demolished 49 Club. Grading & Drainage Plan Per the original Storm Water Management Report prepared by Anderson-Johnson Associates dated March 11, 2019, rate control is being accomplished using a combination of a dry pond 3 and a storm water treatment pond. The proposed rate is less than 80% of the existing rate of runoff. Water quality treatment is accomplished at the single stormwater treatment pond. True infiltration was considered during the design phase, but several factors contributed to not pursuing infiltration practices. First, shallow groundwater exists on site. Secondly, the site has been maximized and there is not adequate space for effective infiltration practices. Instead, a stormwater pond was to be constructed. The stormwater pond, in addition to providing rate control, has been sized to provide adequate dead storage to meet water quality requirements. Finally, an irrigation pumping station will be constructed at the stormwater pond to draw water from the pond to irrigate the surrounding areas. The clubhouse was strategically located adjacent to the landscaped stormwater pond as a site amenity. Proposed PUD Amendment #1 to Site Plan and Grading & Drainage Plan The amendment proposes to omit the stand-alone clubhouse and associated parking lot and expand the size of the stormwater pond. Per the applicant’s March 9, 2020 PUD Amendment Narrative: “The following changes have been made to the original PUD Application: • Rice Creek Watershed District’s (RCWD) sent comments to the design team on 4/12/2019, regarding the proposed pond. The normal water level (NWL) of the pond was questioned by both RCWD and the city of Lino Lakes due to high groundwater table. Lyngblomsten hired Braun Intertec in April of 2019 to monitor the site’s groundwater. We discussed these findings with the city, and as the result, had to propose addition site storage to satisfy RCWD’s comments. There are two options to accommodate the additional stormwater storage: o A second pond would be required. However, the location of the second pond would have to be in the commercial parcel, limiting the developable land and restricting how much development could occur on the commercial parcel. The city has long seen this intersection as the gateway to Lino Lakes and the neighborhood oriented commercial amenities have been consistently identified by the neighborhood and city leadership as one of the major benefits of this project. o Therefore, in lieu of the second pond, we are proposing adding the capacity to the current central pond to accommodate additional impervious surface, including the 3+ acre corner lot, purchased after the original PUD application. In doing so, the pond’s size increased significantly and would need to consume the area previously allotted for the Clubhouse and its associated parking lot. • The development and design team have successfully included all of the amenities from the Clubhouse into the Town Center of the main senior living building. o In the proposal presented to the neighborhood group in August of 2018, the amenity and administrative spaces within the Clubhouse was approximately 4,450 square feet. The Town Center at the time was approximately 10,200 square feet. 4 o In the final construction documents, our Town Center is 18,185 square feet. This additional 8,000 square feet of common and amenity space more than makes up in both size and function for the loss of the Clubhouse space. The Town Center is designed to welcome the neighborhood beyond our immediate live-in residents. Some of the additional amenities include:  A vendor space for outside vendors like service dog or banking organizations  Additional space to accommodate a community based Adult Day program  Larger multi-purpose room, available for larger events like concerts and community meeting space  Larger lap pool for water exercise classes  A larger Wellness Center  A larger Salon with capacity for nail care  Designated spaces for a 50-seat formal dining, 25-seat informal dining (café), 57-seat indoor/outdoor pub, and a 16-seat party room.” Pond Size Comparison Original Pond 3P Enlarged Pond 3P Surface Area 0.56 acres 0.82 acres Volume 2.810 acre feet 3.869 acre feet RCWD issued an amended Conditional Approval Pending Receipt of Changes (CAPROC) on March 13, 2020. The District Engineer finds the revised grading and stormwater management plans compliant with RCWD rules. In general, the rest of the overall site plan and building layout remains the same. The number of housing units is still 218. Some notable changes include: • The northeast cul de sac in the private road in the cottage home neighborhood was flipped to the south allowing the cottage homes pads to be slightly adjusted but the number remains 20 units. • The northwest parking stalls have been moved to the end of the cul de sac. • The applicant purchased 275 Ash Street and the main public road will now align with St. Albans Street to the south as supported by Resolution No. 19-42. • Joint parking facilities and shared driveways were incorporated into the commercial area as required. A final detailed site plan review will be completed upon submission of the PUD Final Plan/Final Plat. The intent of PUD Amendment is to obtain Council approval of omitting the clubhouse and enlarging the stormwater pond before the applicant moves forward on final plans. Findings of Fact 5 The Findings of Fact for the PUD Development Stage Plan Amendment #1 are detailed in Resolution No. 20-44. RECOMMENDATION The Planning & Zoning Board held a public hearing on April 8, 2020. Public comments were more related to the buffers and landscaping screening than the clubhouse omission and stormwater pond size. The buffers and screening are being addressed with the PUD Final Plan/Final Plat. The Planning & Zoning Board voted 5-0 in favor of the PUD Development Stage Plan Amendment #1. Staff is requesting Council consideration of the following: 1. Resolution No. 20-44 ATTACHMENTS 1. Resolution No. 20-44 2. Original 3D Rendering 3. Revised 3D Rendering 4. Original Site Plan dated March 11, 2019 5. Original Grading & Drainage Plan dated March 11, 2019 6. Revised Site Plan dated December 31, 2019 7. Revised Grading & Drainage Plan dated December 31, 2019 1 CITY OF LINO LAKES RESOLUTION NO. 20-44 APPROVING PUD DEVELOPMENT STAGE PLAN AMENDMENT #1-SITE PLAN AND GRADING & DRAINAGE PLAN FOR LYNGBLOMSTEN WHEREAS, the City received an application for PUD Development Stage Plan Amendment #1 for Lyngblomsten hereafter referred to as Amendment; and WHEREAS, the City Council approved the PUD Development Stage Plan/Preliminary Plat on April 8, 2019 by Resolution No. 19-42 that included a stand-alone clubhouse and associated parking lot; and WHEREAS, the Amendment proposes to omit the stand-alone clubhouse and associated parking lot and enlarge the stormwater pond in order to meet RCWD and City stormwater management regulations; and WHEREAS, the Amendment consists of the following plan sets and documents: • PUD Amendment Narrative prepared by Lyngblomstem dated March 9, 2020 • Revised Site Plan and Grading Plan prepared by AJA Associates, Inc. dated December 31, 2019 • Stormwater Management Report prepared by AJA Associates, Inc. revised February 28, 2020; and WHEREAS, a public hearing was held before the Planning & Zoning Board on April 8, 2020 and the Board recommended approval of the Amendment with a 5-0 vote; and NOW, THEREFORE BE IT RESOLVED by The City Council of The City of Lino Lakes hereby makes the following: FINDINGS OF FACT PUD Development Stage Plan Amendment #1: Per Section 1007.024(1) Purpose and Intent, the PUD, by allowing deviation from the strict provisions of this Ordinance related to setbacks, heights, lot area, width and depths, yards, etc., by conditional use permit or a mixture of uses by rezoning to a PUD District, is intended to encourage: 1. A development pattern in harmony with the objectives of the Comprehensive Plan. The Amendment is consistent with the goals and policies of the Comprehensive Plan and the Master Plan. 2. Innovations in development that address growing demands for all styles of economic expansion, greater variety in type, design, architectural standards, and siting of structures through the conservation and more efficient use of land in such developments. 2 The Amendment continues to implement the Master Plan’s vision to create an urban form for the area. Buildings are pulled towards the main collector roads and away from existing residential homes. 3. The preservation and enhancement of desirable site characteristics such as existing vegetation, natural topography and geologic features and the prevention of soil erosion. The existing wetland on site will not be impacted by the Amendment. A wetland buffer and conservation easement will provide additional protection of the natural resource. 4. A creative use of land and related physical development which allows a phased and orderly transition of varying land uses in close proximity to each other. The Amendment continues to transition development from existing low density single family homes to cottage home to a senior living campus consisting of independent living, assisted living and skilled nursing facilities to restaurant and commercial use. Building heights are tiered from single level cottage homes to two, three and then four story senior living campus as the development progresses towards CSAH 49 (Hodgson Road) and CR J (Ash Street). 5. An efficient use of land resulting in smaller networks of utilities and streets thereby lowering development costs and public investments. The Amendment does not change the road right-of-way widths. The public road right-of-way width is the standard 60 foot wide with a 32 foot wide paved road surface. The cottage home private road is 26 feet wide and the commercial private road is 26 feet wide. Both private roads will be owned and maintained by a private entity. 6. Promotion of a desirable and creative environment that might be prevented through the strict application of City zoning and subdivision regulations. The Amendment continues to implement the Master Plan’s vision to create an urban form for the area. Buildings are pulled towards the main collector roads and away from existing residential homes. BE IT FURTHER RESOLVED the requirements of Ordinance No. 07-19 and Resolution No. 19-42 are still in effect; and BE IT FURTHER RESOLVED by The City Council of The City of Lino Lakes hereby approves the PUD Development Stage Plan Amendment #1-Site Plan and Grading & Drainage Plans for Lyngblomsten subject to the following conditions: 1. If approved, the PUD Development Stage Plan/Preliminary Plat and Design Guidelines shall be revised and submitted to staff for review that addresses all items listed in Resolution No. 19-42 and subsequent resolution. a. The revised plans shall show the entire full build development (cottage homes, senior complex and commercial area). b. The “Dashed Area = Future” can be shown on the PUD Final Plans for each phase of development. 3 2. A PUD Final Plan/Final Plat land use application and submittal is required for Planning and Zoning Board review and Council approval. 3. All plan sheets shall include a trail along the north side of CR J (Ash Street). 4. Dumpsters, trash compactor and generators for the senior building shall be located underground in the garage area. 5. The trail easement shall be outside of the cottage home Lot #16. Adopted by the Council of the City of Lino Lakes this 11th day of May, 2020. The motion for the adoption of the foregoing resolution was introduced by Council Member _______________and was duly seconded by Council Member ________________ and upon vote being taken thereon, the following voted in favor thereof: The following voted against same: _______________________________ Rob Rafferty, Mayor ATTEST: ________________________ Julianne Bartell, City Clerk 0$7&+/,1(0$7&+/,1($&&(66,%/(6<0%2/ 7<3 $&&(66,%/(6,*1 7<3 '''%%%%%%%%%%%% ; 67$//6 7<3 3$,17675,3(# 2&:,7+:25'6123$5.,1* 7<3 $&&(66,%/(6<0%2/ 7<3 123$5.,1* 123$5.,1* 123$5.,1* 123$5.,1*3$,17675,3(# 2&:,7+:25'6123$5.,1* 7<3 $&&(66,%/(6,*1 7<3  ; 67$//6 7<3  ; 67$//6 7<3 12.0 0':+,7(3$,17675,3( ; 67$//6 7<3 123$5.,1*123$5.,1*3$,17675,3(# 2&:,7+:25'6123$5.,1* 7<3 $&&(66,%/(6<0%2/ 7<3 $&&(66,%/(6,*1 7<3 ƒ3$5.,1* 7<3,&$/ 19.01' (TYP) 16.00' (TYP) ; 67$//6 7<3 &21&5(7((175$1&(&21&5(7((175$1&( ; 67$//6 7<3 %&/8%+286(5(67$85$175()(572$5&+,7(&785$/)25/$<287$1'',0(16,2165()(572$5&+,7(&785$/)25/$<287$1'',0(16,216727$/67$//6$&&(66,%/(67$//65(48,5(' $&&(66,%/(67$//63529,'(' 727$/67$//6$&&(66,%/(67$//65(48,5(' $&&(66,%/(67$//63529,'(' 3$,17('',5(&7,21$/$552: 7<3,&$/ 0$,13$5.,1*&/8%+286(3$5.,1*727$/67$//6$&&(66,%/(67$//65(48,5(' $&&(66,%/(67$//63529,'(' 1257+:(673$5.,1*5(67$85$173$5.,1*727$/67$//6$&&(66,%/(67$//65(48,5(' $&&(66,%/(67$//63529,'(' 3$,17('',5(&7,21$/$552: 7<3,&$/ 3$,17('',5(&7,21$/$552: 7<3,&$/ &21&5(7((175$1&(67236,*167236,*1123$5.,1*%0$,1%8,/',1*/27/27/27/27/27/27/27/27/27/27/27/27/27/27/27/27/27/27/27/271257+($673$5.,1*727$/67$//6$&&(66,%/(67$//65(48,5(' $&&(66,%/(67$//63529,'(' &21&5(7((175$1&(352326('3523(57</,1(352326('3523(57</,1(+($9<'87<3$9(0(17+($9<'87<3$9(0(17+($9<'87<3$9(0(17+($9<'87<3$9(0(17+($9<'87<3$9(0(17+($9<'87<3$9(0(17+($9<'87<3$9(0(17+($9<'87<3$9(0(17+($9<'87<3$9(0(17+($9<'87<3$9(0(17+($9<'87<3$9(0(17+($9<'87<3$9(0(17+($9<'87<3$9(0(170(',80'87<3$9(0(170(',80'87<3$9(0(170(',80'87<3$9(0(170(',80'87<3$9(0(170(',80'87<3$9(0(170(',80'87<3$9(0(1738.01' ; 67$//6 7<3 $&&(66,%/(6,*1 7<3 $&&(66,%/(6<0%2/ 7<3 3$,17675,3(# 2&:,7+:25'6123$5.,1* 7<3 123$5.,1* 123$5.,1*6287+3$5.,1*727$/67$//6$&&(66,%/(67$//65(48,5(' $&&(66,%/(67$//63529,'(' 5(7$,1,1*:$//5()(572$5&+,7(&785$/)25/$<287$1'',0(16,2165(7$,1,1*:$//:(7/$1'(;,67,1*<5+:/ (;,67,1*<5+:/ 352326('<5+:/ (;,67,1*<5+:/ 352326('<5+:/ 352326('<5+:/ 352326('3523(57</,1(352326('3523(57</,1(352326('3523(57</,1(352326('3523(57</,1(352326('3523(57</,1(352326('3523(57</,1(5(7$,1,1*:$//5(7$,1,1*:$//5$,6('0(',$1,6/$1'5$,6('0(',$1,6/$1'5$,6('0(',$1,6/$1'5$,6('0(',$1,6/$1'5$,6('0(',$1,6/$1'5$,6('0(',$1,6/$1'5$,6('0(',$1,6/$1'5$,6('0(',$1,6/$1'LANDSCAPE ARCHITECTURE SITE PLANNING CIVIL ENGINEERINGANDERSON - JOHNSONASSOCIATES,INC.7575 GOLDEN VALLEY ROAD SUITE 200 MINNEAPOLIS. MN 55427FAX (763) 544-0531 PH (763) 544-7129DateRegistration NumberCheckDrawnDate:CommI hereby certify that this plan, specification or report was prepared byme or under my direct supervision and that I am a duly Licensedunder the laws of the State ofRevisionsDescription Date NumScale:North6,7(3/$129(5$//'$9,'$5(<;;;;;;;;;;;%-''$5  &&,7<68%0,77$/5(9,6,21'$7(0,11(627$352)(66,21$/(1*,1((5/<1*%/2067(11415 ALMOND AVE WST. PAUL, MN 55108HODGSON ROADLINO LAKES, MN 55014/<1*%/2067(16(1,25&20081,7,(66,*1$*(.(<127(60Q087&'5 [ $0Q087&'5 [ %6,0,/$5720Q087&'5 [ 3$5.,1*&127(6 5()(5726+((7&6,7(3/$11257+)25127(6 5()(5726+((7&*5$',1*$1''5$,1$*(3/$11257+)25*(1(5$/127(6/(*(1'5()(5(1&(.(<726,7('(7$,/6'(7$,/,'180%(5 723 '(7$,/6+((7180%(5 %27720 352326('&21&5(7(:$/.352326('&21&5(7(6/$%352326('/,*+7'87<%,780,12863$9(0(17352326('0(',80'87<%,780,12863$9(0(17352326('+($9<'87<%,780,12863$9(0(17352326('123$5.,1*675,3,1*352326('75$)),&&21752/6,*16,*1$*(.(<127(352326('%2//$5'3$,17('$&&(66,%/(6<0%2/352326('0$1+2/( 0+ 352326('&$7&+%$6,1 &% 352326(')/$5('(1'6(&7,21 )(6 352326('+<'5$17 +<' 352326('*$7(9$/9( *9 352326('3267,1',&$7259$/9( 3,9 352326(')/$*32/(5()(572$5&+,7(&785$/3/$16352326('%8,/',1*672235()(572$5&+,7(&785$/3/$16352326('/,*+732/(5()(572(/(&75,&$/3/$163523(57</,1($1C2.111257+($673$5.,1*727$/67$//6 $&&(66,%/(67$//65(48,5(' $&&(66,%/(67$//63529,'(' 1257+:(673$5.,1*727$/67$//6 $&&(66,%/(67$//65(48,5(' $&&(66,%/(67$//63529,'(' &/8%+286(3$5.,1*727$/67$//6 $&&(66,%/(67$//65(48,5(' $&&(66,%/(67$//63529,'(' 5(67$85$173$5.,1*727$/67$//6 $&&(66,%/(67$//65(48,5(' $&&(66,%/(67$//63529,'(' 6287+3$5.,1*727$/67$//6 $&&(66,%/(67$//65(48,5(' $&&(66,%/(67$//63529,'(' 0$,13$5.,1*727$/67$//6 $&&(66,%/(67$//65(48,5(' $&&(66,%/(67$//63529,'(' 6,7(67$7,67,&6030 60 10.598.598.510.510.510.510.510.510.510.510.510.510.510.510.510.510.510.510.510.510.510.505.504.202.604.906.406.406.406.806.801.3 ME03.407.205.704.204.098.503.903.905.005.408.708.801.905.798.398.5886895895896896896 899899900900900 900901 901901902902902 902 902902 902902902902902 903903903 903 903 903903 90390390390490490490406.806.306.7 EOF05.206.0 EOF05.105.6 EOF04.906.0 EOF05.405.104.806.806.506.505.905.906.2 EOF07.206.007.505.690490490490490405.903.806.298.303.998.398.598.598.307.007.007.007.106.905.605.504.903.506.507.101.5 EOF03.290490490406.604.705.8905905905905905 905905905 90590590505.907.006.3 EOF05.304.705.306.407.006.706.105.806.306.0 EOF905905905906906906906906906 906906906906906906 906906906906906906906 06.205.404.808.008.008.005.5 EOF04.505.805.104.704.805.305.806.706.406.405.506.006.206.105.507.207.407.108.207.207.307.007.507.206.506.906.707.190690690690690607.105.306.305.605.905.606.206.506.206.007.006.706.405.706.507.806.4906906906906906906907907 907907907907 907907907907907907 907907 907907907907 04.309.109.409.108.508.007.109.008.709.209.509.009.310.210.209.509.508.507.708.608.508.505.605.905.607.206.906.906.306.906.909.410.209.609.609.603.705.604.404.704.402.404.6907907907907907907 05.506.305.805.506.706.790790790790790790707.205.405.605.406.390708.008.010.710.490890890890890890890806.705.803.503.603.403.403.303.908.708.608.508.408.608.908.608.608.308.307.807.507.407.404.506.405.305.605.506.906.406.706.406.307.707.708.005.305.398.001.2 EOF02.3 ME07.507.507.510.006.506.5908908 90807.507.3 ME02.303.003.304.004.404.004.905.805.804.904.203.203.302.903.002.202.302.502.501.702.002.401.701 2 ME01.605.305.602.1 EOF01.604.905.204.905.304.904.805.306.206.205.405.706.604.104.803.703.402.402.702.602.902.602.302.602.301.902.502.802.500.9 ME01.7 ME06.706.405.805.905.706.906.805.305.405.805.904.004.108.508.307.309.809.309.007.706.906.907.406.106.1 EOF06.006.007.407.406.006.006.006.206.206.207.107.107.107.307.307.307.307.107.107.107.307.307.307.307.308.508.508.507.607.607.608.508.508.508.308.308.307.007.007.007.807.807.807.007.007.007.207.207.207.507.507.507.607.607.607.007.007.006.306.306.3908908 908908908 908909909909909909909 909 909 909 909 909909910910910910910910910 91091091007.4 EOF06.406.706.507.506.506.806.706.407.307.204.106.106.806.700.1 EOF07.3 EOF05.9 EOF05.8 EOF05.9 EOF05.9 EOF07.3 EOF06.3 EOF06.606.5 EOF03.1 EOF05.0 EOF02.602.602.602.602.602.602.602.602.602.60$7&+/,1(0$7&+/,1(&/8%+286(5(67$85$17))( ))( 0$,1%8,/',1*))( 321'3%27720 +:/ 1:/ :(7/$1'(;,67,1*<5+:/ (;,67,1*<5+:/ 352326('<5+:/ (;,67,1*<5+:/ 352326('<5+:/ 352326('<5+:/ 352326('3523(57</,1(*5$',1*/,0,76*5$',1*/,0,76*5$',1*/,0,76*5$',1*/,0,76*5$',1*/,0,76*5$',1*/,0,76*5$',1*/,0,76*5$',1*/,0,76*5$',1*/,0,76352326('3523(57</,1(352326('3523(57</,1(*5$',1*/,0,76*5$',1*/,0,76352326('3523(57</,1(352326('3523(57</,1(352326('3523(57</,1(352326('3523(57</,1(352326('3523(57</,1(352326('3523(57</,1(352326('3523(57</,1(352326('3523(57</,1(352326('3523(57</,1(352326('3523(57</,1( 6$)(7<%(1&+ 0$,17(1$1&($&&(660$;5811,1*6/23(0$;&52666/23(321'3%27720 +:/ 352326('3523(57</,1(030 60LANDSCAPE ARCHITECTURE SITE PLANNING CIVIL ENGINEERINGANDERSON - JOHNSONASSOCIATES,INC.7575 GOLDEN VALLEY ROAD SUITE 200 MINNEAPOLIS. MN 55427FAX (763) 544-0531 PH (763) 544-7129DateRegistration NumberCheckDrawnDate:CommI hereby certify that this plan, specification or report was prepared byme or under my direct supervision and that I am a duly Licensedunder the laws of the State ofRevisionsDescription Date NumScale:North*5$',1*$1''5$,1$*(3/$129(5$//'$9,'$5(<;;;;;;;;;;;%-''$5  &&,7<68%0,77$/5(9,6,21'$7(0,11(627$352)(66,21$/(1*,1((5/<1*%/2067(11415 ALMOND AVE WST. PAUL, MN 55108HODGSON ROADLINO LAKES, MN 55014/<1*%/2067(16(1,25&20081,7,(6 5()(5726+((7&*5$',1*$1''5$,1$*(3/$11257+)25*(1(5$/127(6127(6/(*(1'5()(5(1&(.(<726,7('(7$,/6'(7$,/,'180%(5 723 '(7$,/6+((7180%(5 %27720 (;,67,1*&217285(;,67,1*6327(/(9$7,21352326('&217285352326('6327(/(9$7,210( 0$7&+(;,67,1*352326('*5$',1*/,0,76352326('6$1'68%%$6($7)5267)227('672236$3352;,0$7(62,/%25,1*/2&$7,21352326('0$1+2/( 0+ 352326('&$7&+%$6,1 &% 352326(')/$5('(1'6(&7,21 )(6 352326('+<'5$17 +<' 352326('*$7(9$/9( *9 352326('3267,1',&$7259$/9( 3,9 352326('%8,/',1*672235()(572$5&+,7(&785$/3/$163523(57</,1(1C2.1195554.6*(27(&+1,&$/7$%/(5()(57263(&($57+:25.$1'81,735,&(6127('(37+6/,67(',17$%/(%(/2:'2127,1&/8'(5(029$/2)68,7$%/(62,/5(48,5('720((7352326('*5$'(6%RULQJ(VWLPDWHG&XW )7 ** %(1&+0$5.01'2702180(17/2&$7('$77+(6287+($6748$'5$172)6816(7$9(18(29(5:(OHYDWLRQ  1*9' 6,7(%(1&+0$5.7231872)+<'5$17/2&$7('$77+(6287+:(6748$'5$172)$6+675((7$1'+2'*62152$'(OHYDWLRQ  1*9' 6,7(%(1&+0$5.7231872)+<'5$17/2&$7('$77+(6287+($6748$1'5$172)$6+675((7$1'+2'*62152$'(OHYDWLRQ  1*9' 6,7(%(1&+0$5.7+5(6+2/'(/(9$7,2121($676,'(2)%8,/',1*/2&$7('$7+2'*62152$'(OHYDWLRQ  1*9' %(1&+0$5.6 ),(/'9(5,)<%()25(86,1* LOT 4DRY BASIN 4P"S" DESIGNREFER TO LANDSCAPINGPLANS FOR JOINTING OFTHIS AREA24C2.12"S" DESIGN"S" DESIGN"S" DESIGN"S" DESIGN"S" DESIGN"S" DESIGN1C2.138C2.131C2.131C2.131C2.137C2.1320AC2.12REFER TO ARCHITECTURALFOR ALL TOWNHOME LAYOUTAND DIMENSIONS (TYP)19C2.12"S" DESIGNB6186C2.1322C2.1222C2.1220BC2.12WETLAND 1REFER TO ARCHITECTURAL PLANS FORLAYOUT AND DIMENSIONS"S" DESIGNMATCHLINE25' TERMINATOR20' TERMINATOR17' TERMINATOR17' TERMINATORNOPARKIN G NOPARKIN G NOPARKIN G NOPARKIN G LOT 9STALL COUNT:153 REGULAR STALLS6 ACCESSIBLE STALLS PROVIDED6 REQUIRED ACCESSIBLE STALLSEXISTING 2YR HWL = 899.66LOT 3PROPOSED 2YR HWL = 899.68PROPOSED 100YR HWL = 900.33PROPOSED 10YR HWL = 900.03MAIN BUILDINGEXISTING 100YR HWL = 900.72LOT 1LOT 6LOT 5LOT 20EXISTING 10YR HWL = 900.13LOT 13LOT 2LOT 15LOT 17LOT 12LOT 10LOT 16LOT 14LOT 7POND 3P NORTH PONDLOT 11LOT 8LOT 19LOT 18"S" DESIGNC2.135C2.134C2.135C2.134MAIN PARKINGNORTHWEST PARKINGNORTHEAST PARKINGDASHED AREA= FUTUREC2.135C2.134C2.135C2.134C2.135C2.13420AC2.128C2.138C2.138C2.138C2.138C2.138C2.1323C2.1223C2.1223C2.1223C2.1223C2.1223C2.1223C2.1223C2.1223C2.1223C2.1223C2.1223C2.1223C2.1224C2.1224C2.1224C2.1224C2.1224C2.1224C2.1224C2.128C2.138C2.138C2.138C2.138C2.131C2.131C2.131C2.131C2.1324C2.121C2.131C2.137C2.1324C2.1224C2.121C2.1324C2.1220AC2.127C2.1320AC2.12TRASNFORMER - REFER TOELECTRICAL FOR LAYOUTAND DIMENSIONS.20AC2.124C2.1316C2.1320AC2.1216C2.133C2.1319C2.1219C2.12REFER TO ARCHITECTURALFOR ALL TOWNHOME LAYOUTAND DIMENSIONS (TYP)B618B618B61819C2.1219C2.1219C2.12B618B618B61819C2.1219C2.12B618B61819C2.1219C2.1219C2.1219C2.12B61824C2.1219C2.1219C2.1219C2.1219C2.1219C2.126C2.1319C2.126C2.1319C2.124C2.136C2.136C2.136C2.136C2.136C2.136C2.136C2.136C2.136C2.136C2.136C2.1319C2.126C2.136C2.136C2.136C2.136C2.1324C2.1222C2.12B618DASHED AREA= FUTURE19C2.12B61819C2.12B61819C2.12B61819C2.12B61819C2.12B61819C2.12B61819C2.12B61819C2.12B61819C2.12B618C2.1318C2.1317C2.1318C2.1317C2.1318C2.1317C2.1318C2.131723C2.1223C2.1223C2.1224C2.121C2.1324C2.127C2.137C2.137C2.1320AC2.1220AC2.12B61819C2.1219C2.12B6186C2.136C2.136C2.1322C2.1219C2.1221C2.1219C2.12B61819C2.12B61824C2.1224C2.12BUILDING COLUMNS - REFER TOARCHITECTURAL PLANS20AC2.1220AC2.12MATCH EXISTING CURB STYLE23C2.126C2.136C2.136C2.136C2.1323C2.12FLAGPOLE - REFER TOARCHITECTURAL PLANS.DUMPSTERS - REFER TOARCHITECTURAL PLANS.TRASH COMPACTOR - REFERTO ARCHITECTURAL PLANS.GENERATOR - REFER TOELECTRICAL PLANS.19C2.13C2.1318C2.131726272046641226175LANDSCAPE ARCHITECTURE SITE PLANNING CIVIL ENGINEERINGANDERSON - JOHNSONASSOCIATES,INC.7575 GOLDEN VALLEY ROAD SUITE 200 MINNEAPOLIS. MN 55427FAX (763) 544-0531 PH (763) 544-7129DateRegistration NumberCheckDrawnDate:CommI hereby certify that this plan, specification or report was prepared byme or under my direct supervision and that I am a duly Licensedunder the laws of the State ofRevisionsDescription Date NumScale:NorthSITE PLANDAVID A. REY10/04/20194018019601510/04/2019BJDDAR1" = 60'C1.2APUD DEVELOPMENT STAGE AMENDMENT PLAN 12/31/19MINNESOTAPROFESSIONAL ENGINEERLYNGBLOMSTEN1415 ALMOND AVE WST. PAUL, MN 55108Lyngblomsten LinoLakes CampusNOTES:1. REFER TO SHEET C1.21, SITE PLAN NORTH, FOR NOTES.2. REFER TO SHEET C1.31, GRADING AND DRAINAGE PLAN NORTH, FOR GENERAL NOTES.NORTHEAST PARKINGTOTAL STALLS = 6ACCESSIBLE STALLS REQUIRED = 1ACCESSIBLE STALLS PROVIDED = 0NORTHWEST PARKINGTOTAL STALLS = 5ACCESSIBLE STALLS REQUIRED = 1ACCESSIBLE STALLS PROVIDED = 0MAIN PARKINGTOTAL STALLS = 77ACCESSIBLE STALLS REQUIRED = 4ACCESSIBLE STALLS PROVIDED = 7SITE STATISTICS:030 60LEGENDREFERENCE KEY TO SITE DETAILS DETAIL I.D NUMBER (TOP) DETAIL SHEET NUMBER (BOTTOM)PROPOSED CONCRETE WALKPROPOSED CONCRETE SLABPROPOSED BITUMINOUS TRAIL PAVEMENTPROPOSED MEDIUM DUTY BITUMINOUS PAVEMENTPROPOSED URBAN STREET PAVEMENTPROPOSED RETAINING WALLPROPOSED DECORATIVE METAL FENCEPROPOSED TRAFFIC CONTROL SIGNPROPOSED BOLLARDPAINTED ACCESSIBLE SYMBOLPROPOSED MANHOLE (MH)PROPOSED CATCH BASIN (CB)PROPOSED FLARED END SECTION (FES)PROPOSED HYDRANT (HYD)PROPOSED GATE VALVE (GV)PROPOSED POST INDICATOR VALVE (PIV)PROPOSED BUILDING STOOP - REFER TO ARCHITECTURAL PLANSPROPOSED FLAGPOLE - REFER TO ARCHITECTURAL PLANSPROPERTY LINE1C2.1124C2.118C2.1222C2.111C2.122C2.1211C2.1212C2.1213C2.1223C2.1224C2.124C2.133C2.135C2.138C2.137C2.136C2.1310C2.1316C2.1311C2.1312C2.1313C2.1314C2.1315C2.1317C2.1318C2.13 LOT 4 DRY BASIN 4P WETLAND 1 LOT 9 STALL COUNT: 153 REGULAR STALLS 6 ACCESSIBLE STALLS PROVIDED 6 REQUIRED ACCESSIBLE STALLS EXISTING 2YR HWL = 899.66 LOT 3 PROPOSED 2YR HWL = 899.68 PROPOSED 100YR HWL = 900.33 PROPOSED 10YR HWL = 900.03 MAIN BUILDING EXISTING 100YR HWL = 900.72 LOT 1LOT 6 LOT 5 LOT 20 EXISTING 10YR HWL = 900.13 LOT 13 LOT 2 LOT 15 LOT 17 LOT 12 LOT 10 LOT 16 LOT 14 LOT 7 POND 3P NORTH POND LOT 11 LOT 8 LOT 19 LOT 18 06.5 98.5 98.5 10.5 10.5 10.5 10.5 10.5 10.5 10.5 10.5 10.5 10.5 10.5 10.5 10.5 10.5 10.5 01.8 07.2 05.7 02.9 98.2 05.0 05.4 08.7 08.8 05.7 98.5 98.2 06.3 06.7 EOF 05.2 05.4 05.0 06.0 EOF05.3 06.0 EOF 05.4 05.104.8 06.8 06.5 06.5 05.9 06.2 EOF 07.2 06.0 07.5 02.2 EOF 98.5 98.5 98.2 98.2 98.5 07.1 01.9 EOF 05.1 07.2 EOF 06.0 EOF 06.1 EOF 05.8 05.9 07.0 06.3 EOF 05.8 04.5 05.8 05.1 04.7 04.8 05.3 05.8 06.7 06.4 06.4 05.5 06.0 06.2 06.1 05.5 07.6 07.8 07.1 06.5 05.6 05.9 05.6 06.2 06.5 06.2 07.3 06.0 07.0 06.4 05.7 06.5 06 . 0 05.9 09.1 09.4 09.1 08.5 08.0 06.6 07.5 07.4 08.3 08.7 08.2 08.5 10.1 09.7 09.7 08.6 08.5 08.2 05.6 05.9 05.6 07.2 06.9 06.9 06.3 06.9 06.9 04.6 10.1 10.3 10.3 05.5 06.3 05.8 05.5 07.1 05.4 05.6 05.4 06.7 05.8 01.5 08.7 08.6 08.5 08.4 08.6 08.9 08.6 08.6 08.3 08.3 07.8 10.0 06.4 06.4 07.7 07.7 08.0 98.002.3 ME 03.1 03.2 02.9 02.9 02.2 07.5 07.3 ME 09.8 09.8 09.806.2 06.2 06.2 09.898.7 98.5 02.7 04.1 01.2 01.5 00.2 01.3 ME 99.0 99.099.0 99.2 99.2 05.3 05.6 04.9 05.2 04.905.3 04.9 04.7 02.5 02.7 02.2 02.4 06.7 06.4 07.1 07.0 03.4 03.2 08.3 08.3 09.7 09.209.106.9 06.9 07.6 06.2 07.0 07.6 07.6 07.3 07.3 07.3 07.3 07.1 07.1 07.1 07.3 07.3 07.307.3 07.3 08.708.7 08.7 07.6 07.6 07.6 08.7 08.7 08.7 07.4 07.4 07.4 08.2 08.2 08.2 07.0 07.5 07.5 07.5 07.6 06.3 06.3 06.3 06.407.008.006.507.006.8 06.4 03.4 00.1 EOF 05.9 EOF 05.9 EOF 06.6 06.5 EOF 02.9 02.9 02.9 02.9 02.9 02.9 02.9 02.9 02.9 02.9 99.999.7 99.9 00.1 98.5 10.5 09.8 09.8 09.809.8 10.5 10.5 10.5 10.5 10.5 10.5 10.5 10.5 06.9 06.8 06.9 10.0 09.9 09.9 10.0 10.0 10.0 10.0 10.0 10.009.805.8 01.7 98.5 10.010.0 10.009.809.809.809.810.0 10.4 10.4 10.0 10.0 10.0 10.0 07.2 ME 07.4 ME 07.5 ME 07.6 ME 07.7 ME 07.8 ME 07.8 ME 07.1 ME 07.5 ME 06.9 ME 06.7 ME 05.8 05.9 ME 06.2 ME 06.1 06.2 06.3 06.5 10.0 10.0 09.8 10.0 09.8 09.8 06.0 05.1 05.0 10.5 09.9 12.0 11.1 09.0 08.9 09.8 09.9 09.4 10.109.8 10.0 09.9 10.0 09.3 05.2 00.1 01.4 01.0 00.600.2 00.6 00.7 00.4 00.4 00.5 00.8 02.1 02.1 01.9 01.9 01.7 02.0 01.7 01.2 01.5 01.2 01.6 02.6 02.9 02.6 02.1 01.5 02.2 02.2 01.9 01.9 01.4 01.5 01.9 02.1 01.8 01.7 02.0 02.3 02.0 02.3 05.3 05.6 05.6 05.9 06.4 06.4 ME 03.4 02.7 02.8 02.8 02.7 02.6 02.5 02.4 02.3 02.5 02.6 02.3 02.4 02.2 01.5 01.4 01.4 01.3 01.9 01.8 01.9 01.8 03.2 03.3 03.3 03.2 02.6 02.5 01.9 02.5 02.6 01.9 02.2 02.1 02.102.202.1 03.3 03.2 02.6 01.7 02.0 02.1 02.1 02.2 02.7 02.6 02.6 02.7 03.5 03.6 03.5 03.2 03.8 03.9 05.2 05.3 05.9 05.6 05.9 06.0 06.0 05.5 05.5 05.6 07.0 07.1 06.3 06.3 06.2 06.4 07.5 06.7 07.8 06.1 02.6 02.5 02.5 02.6 04.6 04.5 04.6 04.5 03.9 04.2 03.9 06.3 06.6 06.0 06.7 06.0 06.6 06.7 05.9 05.9 07.8 08.4 08.4 08.5 07.0 09.8 09.9 09.8 09.7 09.3 09.3 09.2 08.509.209.308.909.009.108.909.008.2 08.1 08.7 08.8 07.6 07.5 07.9 07.7 07.8 08.1 08.7 08.2 08.1 07.5 07.8 08.4 09.2 09.8 09.2 09.5 08.6 09.9 09.2 09.1 08.7 08.9 08.6 08.8 08.9 07.8 08.4 07.3 08.1 06.9 06.7 06.3 06.1 06.3 EOF 06.2 06.3 07.5 07.5 07.6 04.7 03.7 05.1 EOF 04.2 07.1 07.1 07.1 06.5 06.5 06.5 05.7 05.9 05.805.8 05.906.106.005.505.706.7 06.6 08.0 07.9 08.4 08.5 08.9 09.0 09.1 09.2 09.3 09.2 09.1 09.2 08.6 08.7 07.6 07.5 06.2 06.1 05.9 07.5 07.6 06.8 06.4 06.7 06.8 07.2 06.9 07.0 08.4 07.1 07.5 07.5 07.3 07.9 07.5 06.9 07.0 06.5 06.0 05.9 07.4 06.6 06.3 06.9 07.0 06.3 07.5 07.5 07.5 07.2 07.4 07.6 07.3 07.1 07.2 07.5 07.0 07.5 06.9 06.3 06.6 06.3 06.906.1 06.0 06.9 06.4 EOF05.506.006.106.1 06.0 05.9 05.6 05.9 05.6 06.0 06.2 04.9 06.2 06.3 06.4 0 05.9 06.3 04.7 06.2 06.3 02.9 02.9 02.9 02.9 02.9 02.9 02.9 02.9 00.9 ME 01.6 ME 02.2 ME01.8 ME 02.0 ME 02.4 ME 02.4 ME 02.7 ME 02.8 ME 02.5 ME 02.3 ME 02.7 ME 02.2 02.4 02.1 03.1 ME 02.2 02.5 ME 01.0 ME 03.4 ME 03.3 ME 04.0 ME 04.4 ME 03.6 ME 02.4 02.2 01.6 07.4 ME 02.7 ME 03.6 ME 03.5 ME 02.8 ME 02.2 ME 02.9 99.2 ME 00.5 ME 00.8 ME 01.7 ME 00.6 ME 00.2 ME 01.4 ME 02.3 ME 02.4 ME 02.5 ME 02.2 ME 01.8 ME 02.2 ME 02.1 ME 98.7 ME 00.7 ME 00.9 ME 99.0 ME 02.3 ME 02.9 ME 03.1 ME 03.3 ME 03.4 ME 99.2 ME 00.1 ME99.5 ME 00.4 ME 99.3 ME 99.6 ME 99.7 ME 99.8 ME 99.7 ME 99.8 ME 99.8 ME 99.8 ME 99.8 ME 00.5 ME 00.3 ME 06.8 ME 08.7 ME 10.1 ME 06.1 ME 06.2 ME 06.2 ME 06.8 ME 04.8 ME 06.8 ME 07.7 ME 07.0 06.1 06.0 ME 06.1 ME 05.7 ME 05.5 ME 05.2 ME 04.9 05.0 05.1 04.8 ME 04.8 ME 02.7 ME 01.7 ME 01.7 ME00.9 ME00.8 ME 00.8 ME00.8 ME 03.4 02.0 EOF 06.806.709.8 10.1 09.6 09.8 09.5 09.4 02.8 02.7 02.8 00.600.500.500.506.3 06.4 06.0 06.1 06.3 06.5 07.1 08.9 09.0 05.7 ME 06.1 ME 05.1 04.9 05.1 05.2 06.9 05.607.0 07.0 07.0 04.704.6 07.4 07.4 07.4 07.0 07.0 07.0 07.0 07.0 08.307.3 07.2 08.9 08.9 08.9 07.3 07.5 07.7 08.0 07.7 07.5 06.7 07.2 07.2 07.7 07.7 08.1 08.6 08.2 08.3 08.4 08.6 08.6 08.6 07.9 08.2 08.5 06.6 07.2 07.1 08.0 07.9 8 8 6 887889895 895 895895896 896 896896897 897 897 898 899899 89 9 900 900900 900 901 901901 901 901902902 902 902902902 90290 2 902 9029 0 2 902902 90 2903903903903 903 903903 9039039 0 3 903 90 3 904904 904904 904904 904904 904904 905 9059059059 0 5 905 905 905905 905905 90590590 6 906906 906906 90 6 906906906 906906 90 6 906 906 90690690 6 906906906 90 6906 906906906906906907 907 907 9079 0 7 907907 9 0 7 907907 907 907 907907 907907 907907907907 907907907907 907 907907907 90 7 908908 908 90890890 8 908 908 908 9 0 8 908 908 908908908 908 908908908909 909909909 909909909909 909909909910910910 910910910 910 910 911 0 30 60 1.REFER TO SHEET C1.31, GRADING AND DRAINAGE PLAN NORTH, FOR GENERAL NOTES. NOTES LEGEND EXISTING CONTOUR EXISTING SPOT ELEVATION PROPOSED CONTOUR PROPOSED SPOT ELEVATION ME = MATCH EXISTING PROPOSED GRADING LIMITS PROPOSED MANHOLE (MH) PROPOSED CATCH BASIN (CB) PROPOSED FLARED END SECTION (FES) PROPOSED HYDRANT (HYD) PROPOSED GATE VALVE (GV) PROPOSED POST INDICATOR VALVE (PIV) FLOW ARROW PROPOSED BUILDING STOOP - REFER TO ARCHITECTURAL PLANS PROPERTY LINE 955 54.6 BENCHMARK: MNDOT MONUMENT LOCATED AT THE SOUTHEAST QUADRANT OF SUNSET AVENUE OVER 35W Elevation = 929.283 (NGVD29) SITE BENCHMARK: TOP NUT OF HYDRANT LOCATED AT THE SOUTHWEST QUADRANT OF ASH STREET AND HODGSON ROAD. Elevation = 906.81 (NGVD29) SITE BENCHMARK: TOP NUT OF HYDRANT LOCATED AT THE SOUTHEAST QUANDRANT OF ASH STREET AND HODGSON ROAD. Elevation = 903.48 (NGVD29) SITE BENCHMARK: THRESHOLD ELEVATION ON EAST SIDE OF BUILDING LOCATED AT 6011 HODGSON ROAD. Elevation = 905.36 (NGVD29) BENCHMARKS (FIELD VERIFY BEFORE USING) PROFESSIONAL ENGINEER LANDSCAPE ARCHITECTURE SITE PLANNING CIVIL ENGINEERING ANDERSON - JOHNSON ASSOCIATES, INC. 7575 GOLDEN VALLEY ROAD SUITE 200 MINNEAPOLIS. MN 55427 FAX (763) 544-0531 PH (763) 544-7129 DateRegistration Number Check Drawn Date: Comm I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed under the laws of the State of Revisions Description Date Num Scale: North Lyngblomsten Lino Lakes Campus 14115 ALMOND AVE W ST. PAUL, MN 55108 LYNGBLOMSTEN MINNESOTA DAVID A. REY 40180 10/04/2019 196015 10/04/2019 BJD DAR GRADING AND DRAINAGE PLAN OVERALL 1"=60' C1.30PUD DEVELOPMENT STAGE AMENDMENT PLAN 12/31/2019 NOTE: ALL DEVELOPMENT ON SITE SHALL OCCUR CONCURRENTLY NOTE: ALL DEVELOPMENT ON SITE SHALL OCCUR CONCURRENTLY Lyngblomsten City Council Meeting May 11, 2020 Background•May 11 th Council •Land Use Application •PUD Dev Stage Plan-Amendment #1 •Omission Clubhouse •Revise Site Plan and Grading & Drainage Plans 2 3 April 8, 2019: CC approved PUD Development Stage Plan-Lyngblomsten Senior Community PHASE 1 •Senior Living Community •Cottage Homes •Senior Campus (IL, AL & SNF) •Club House •PHASE 2= Restaurant •PHASE 3 = Commercial •50 ft buffer along west edge (Woodridge Ln) •30 ft buffer along north edge (Rohavic Oaks) 4 Clubhouse •2 level •Game Room •Kitchen •Lounge •Unique Design May 11, 2020: PUD Development Stage Plan Amend #1-Omit Clubhouse to Enlarge SW Pond 5 Original Grading Plan •Per CC approved PUD Dev Stage Plan •Dry Basin 4P •SW Pond 3P •Irrigation pumping 6 Revised Grading Plan •Per RCWD & City Comments •Additional stormwater storage needed •Option #1 •2nd SW pond in Commercial Area •Valuable commercial land •Gateway to City •Option #2 •Increase capacity of SW Pond 3P •Omit Clubhouse and parking lotOriginal Pond 3P Enlarged Pond 3P Surface Area 0.56 acres 0.82 acres Volume 2.810 acre feet 3.869 acre feet Clubhouse & Town Center Amenities •Original Proposal •Clubhouse = 4,450 sf •Lounge •Kitchen •Dining •Game/Rec Room •Conference Room •Outdoor patio •Town Center = 10,200 sf •Main Floor of Senior Building 7 Revised Town Center•Increased to 18,185 sf •8,000 sf additional common and amenity space •Open to Neighborhood and Live-In Residents •Outside Vendor Space •Service dogs or banking •Community Based Adult Day Program 8 Revised Town Center•Larger Multi-Purpose Room •Concerts and community meeting space •Larger Lap Pool for Water Exercises •Larger Wellness Center •Larger Salon w/ Nail Care •Additional Dining •50 seat formal, 25 seat informal café, pub and party room 9 Planning & Zoning Board•April 8, 2020: Public Hearing •Public comments were regarding more landscaping screening and buffer •Focus of Discussion is Regarding Omission of Clubhouse to Enlarge SW Pond •Recommend approval 5-0 vote •PUD Final Plans/Final Plat will finalize details regarding site plan, landscaping, trees, fences etc. 10 Council Consideration•Consider Resolution No. 20-44 Approving PUD Development Stage Plan Amendment #1-Site Plan and Grading & Drainage Plan 11 UNUSED SLIDES 12 13 Site Design, Urban Form •Varying Building Heights •1 story cottage home •2 story SNF •3 story AL •4 story IL 1 2 3 4 14 Revised Site Plan •NE Private Road Cul De Sac flipped south •NW parking stall moved to end of cul de sac •As supported by Res No 19-42: •275 Ash St Purchased •South end of Main Public Road aligns with St Albans Street •Joint Parking Facilities and Share Driveways in commercial area •Full Review with PUD Final Plan 15 Building Envelope-Setbacks Hodgson Road •Cottage Home = 40 ft •Senior Campus = 25 ft •Restaurant = 10 ft •Commercial = 10 ft CR J •Commercial = 10 ft Public Road •Cottage Homes = 25 ft •Clubhouse = 25 ft •Senior Campus = 12 ft •Corner only •Restaurant = 15 ft •Commercial = 15 ft Private Road •Cottages = 23 ft curb or sidewalk •Commercial = 15 ft curb or sidewalk North Lot Line = 30 ft West Lot Line = 50 ft 15’ 40’ 25’ 10’ 10’ 15’ 12’ 50’ 30’ 25’ Summary•PUD flexibility for building setbacks •PUD Benefits Gained •Increased buffer from Woodridge Neighborhood •Implementation of Master Plan’s Urban Form Vision •Redevelopment of City gateway •Provide economic value and stimulus •Provides social value with senior programs and amenities •Higher SF home standards •Increased landscaping •Clubhouse and amenities •Wetland buffer 16 1 CITY COUNCIL AGENDA ITEM 6C STAFF ORIGINATOR: Katie Larsen, City Planner MEETING DATE: May 11 , 2020 TOPIC: Watermark 3rd Addition i. Consider Resolution No. 20-30 Approving PUD Final Plan/Final Plat ii. Consider Resolution No. 20-31 Approving Development Agreement VOTE REQUIRED: 3/5 INTRODUCTION Staff reviewed this application with Council at the April 6, 2020 Work Session. Watermark is a 372 acre master planned residential community consisting of 692 single family lots and 172 townhome units totaling 864 housing units. Lennar submitted a Land Use Application for Watermark 3rd Addition PUD Final Plan/Final Plat. The plat proposes 96 single family lots, 79 townhome lots and 1 outlot. Previous Council approvals include: • June 13, 2016: Resolution No. 16-51 approving PUD Development Stage Plan/Preliminary Plat • October 9, 2017: Resolution No. 17-95 approving Amendment #1 to Land Use Plan • December 11, 2017: Resolution No. 17-133 approving Amendment #2 to Architectural Design Standards • October 14, 2019: Resolution No. 19-131 approving Amendment #3 to Architectural Design Standards This staff report is based on the following information: • Watermark 3rd Addition Final Plat prepared by Carlson McCain date stamped January 28, 2020 • Watermark 3rd Addition Sanitary Sewer, Watermain, Storm Sewer and Street Construction Plans prepared by Carlson McCain dated January 10, 2020 • Watermark 3rd Addition Landscape Plans L1-L4 prepared by Carlson McCain dated February 21, 2020 • Watermark 3rd Addition Home Plans Booklet prepared by Lennar dated February 3, 2020 • Watermark Architectural Standards Matrix 2 ANALYSIS PUD Development Stage Plan/Preliminary Plat The PUD Development Stage Plan approved by Resolution No. 16-51 establishes Watermark’s overall land use plan, street and utility layout, parks and open space plan, architectural design standards, landscaping and lot development standards. These standards are summarized in the PUD Master Plan Booklet and are incorporated as part of the Master Development Agreement. Each phase (i.e. addition) of development shall submit a PUD Final Plan consistent with the PUD Development Stage Plan. In October 2017, Council approved an amendment to the PUD Development Stage Plan’s overall Land Use Plan. The Land Use Plan established 871 housing units. As the applicant has worked through final plan design to address City and RCWD comments from the preliminary plat, the number of 55’ wide Villas was reduced from 127 units to 120 units. The net number of housing units is now 864. The net density is 3.39 units per acre and is consistent with the 2030 Comprehensive Plan’s required 3.0 to 4.5 units per acre. October 2018 Gross Area (acres) 372.24 Wetlands & Water Bodies 45.09 Public Parks & Open Space 66.25 Arterial ROW 5.46 Other (Undevelopable) 0.62 Net Area (acres) 254.82 # of Housing Units 864 Gross Density (units/acre) 2.32 Net Density (units/acre) 3.39 Grading and Trunk Utility Improvements Lennar commenced grading and trunk utility improvements in September 2018. Phase I grading limits incorporate approximately 150 acres (south 1/3 of the development). The 3rd Addition is within the Phase I grading limits. PUD Final Plan Watermark 3rd Addition creates 96 single family lots, 79 townhome lots and 1 outlot. The PUD Final Plan is consistent with the PUD Development Stage Plan in regards to the land use plan, street and utilities, parks and open space, lot standards and landscaping. The following housing types and products proposed for the 3rd Addition are consistent with the approved Land Use Plan. 3 Housing Type Lot Width Housing Product # Lots Single Family 65’ - 75’ Landmark 64 Single Family 55’ - 60’ Discovery 32 Townhomes 32’-42’ Colonial Patriot (row) 55 Townhomes 32’-45’ Colonial Manor (back-back) 24 TOTAL 175 Architectural Standards Resolution No. 17-133 and Resolution No. 19-131 detail architectural design standards for the entire Watermark development. As required, a Watermark 3rd Addition Home Plans summary booklet and Architectural Standards Matrix were submitted. The booklet and matrix detail compliance of the housing products with the resolutions in regards to exterior materials and styles, house elevations and garage and porch requirements. There are 20 different single family house plans with multiple facade and elevation options for a combination of over 100 different housing styles proposed for the 3rd Addition. The townhome products also meet the architectural design standards. Color packages and anti-monotony plans will be included with each building permit application to ensure that the homes elevations are varied with a minimum of five different styles and those homes in proximity to each other not look alike in terms of the combination of color of siding, accent and roofing materials. Coventry by Alside vinyl siding with .042” panel thickness is proposed on all the housing units. All houses have minimum 4” window trim on the side and rear elevations to meet resolution requirements to incorporate an architectural feature into those elevations that are visible from 20th Avenue (CSAH 54), 21st Avenue N. and the public park. In summary, the Watermark 3rd Addition single family housing types and products and townhomes meet the architectural design standards requirements of Resolution No. 17-133 and Resolution No. 19-131. Landscaping The Watermark 3rd Addition Site Landscape Plan has been reviewed by staff and is consistent with the PUD Development Stage Landscaping Plan. A 6 ft high screen vinyl fence is being installed along CSAH 54 (20th Avenue) that is also consistent with the plans. The Environmental Coordinator Memo dated February 27, 2020 notes some minor comments such as seed mix types, clear vision areas and planting details. The Watermark Open Space Maintenance Plan has been revised to reflect correct seed mixes and management plan. Staff will be meeting with Lennar and Prairie Restorations, Inc. to determine the best practices for implementing this plan. Subdivision Ordinance Conformity with the Comprehensive Plan and Zoning Code 4 The Watermark 3rd Addition final plat has been reviewed for compliance with the comprehensive plan, zoning and subdivision ordinance. The proposed final plat meets the performance standards of the subdivision and zoning ordinance and is consistent with the PUD Development Stage Plan/Preliminary Plat and Final Plan. Plat Phases The following summarizes the number of lots platted per addition: Addition # SF Lots Remaining #SF Lots # TH Lots Remaining #TH Lots Total # Lots Remaining 692 172 864 1st 100 592 93 79 671 2nd 57 535 0 79 614 3rd 96 439 79 0 439 Blocks and Lots The final plat creates 96 single family lots, 79 townhome lots and 1 outlot. The following chart summarizes the purpose of the outlot: Outlot Purpose A Wetland and Open Space Outlot A will be deeded, owned and maintained by a Homeowners Association (HOA). A copy of the recorded deed shall be submitted to the City. Easements Standard drainage and utility easements are being dedicated on individual lots and over Outlot A. Street and Utilities The 3rd Addition proposes construction of the following streets which are consistent with the PUD Development Stage Plan: Street Name Right-of-Way Width Street Width (Back to Back) Crane Drive 60 feet 32 feet Watermark Way 60 feet 32 feet 5 Johanna Circle 60 feet 32 feet Itasca Circle 60 feet 32 feet Private Road (Townhomes) Ada Drive NA 28 feet Jasper Court, Island Court, Heron Court NA 24 feet Sheets 24-26 of the Watermark 3rd Addition Sanitary Sewer, Watermain, Storm Sewer and Street Construction Plans include “Road will be Extended in the Future” sign and street lighting locations. Watermain, sanitary sewer main, stormwater facilities, sidewalks and trails are being constructed consistent with the PUD Development Stage Plan. Sidewalk is being installed along Crane Drive and Watermark Way as required. Public Land Dedication and Fees As approved with Resolution No. 16-51, the City will require the following combination of land dedication and cash is lieu of land dedications: 1. Land dedication for the public and private parks will be credited from the total payment in lieu. 2. Costs for public park improvements and trail construction will be credited from the total payment in lieu. 3. Improvements to the private parks and recreational center will not be credited from the total payment in lieu. In the 3rd Addition, an 8.5 ft wide bituminous trail will be constructed 1,200 lf along the eastern berm. A Permanent Trail Easement was recorded in March 2019 that includes this trail section. A 10 ft wide bituminous trail will be constructed 1,000 lf along CSAH 54 (20th Avenue) within Outlot A. A Permanent Trail Easement with Description Sketch has been drafted; however, there is a trail section from the townhome neighborhood to the south property line that needs to be included in the easement and Trail Construction Plan Sheet 27. Park dedication fees will also be credited for the private park land platted as Watermark, Outlot K and Outlot I. These are the private parks in the Discovery neighborhood near Crane Drive and the tot lot in the townhome neighborhood. Per the Master Developer Agreement (MDA), the park dedication fees are based on an appraisal of fair market value. An appraisal was prepared in December 2018 by Insight Realty Advisors, Inc. The credited value of Outlot K, Watermark is $32,000 and Outlot I, Watermark is $33,000. Lennar stated the tot lot and play equipment in the townhome neighborhood will be developed by August 30, 2021. Per Resolution No. 16-51, credit will not be given for theses private park improvements. The 3rd Addition Landscape Plans shall include details from the Overall Landscape Plan detailing the tot lot site plan, landscaping and equipment. 6 The following is a summary of the land dedication and fees: Watermark 3rd Addition Total # Units = 175 x Park Dedication Fee $3,150 = Cash in Lieu Value $551,250 - Land dedication value (Outlot K, Watermark) ($32,000) - Land dedication value (Outlot I, Watermark) ($33,000) - Trail Construction Costs ($39,000) TOTAL CASH FEE DUE = $447,250 Wetlands Wetland delineations were approved by RCWD and USACE in 2015. The delineation identified 28 wetlands totaling approximately 20 acres in size. The original approved WCA Sequencing Application proposed wetland impacts, wetland creation, wetland restoration and upland buffer establishment. In April 2018, the developer revised the application to purchase 3.3671 acres of wetland banking credits as the proposed compensatory mitigation action. The wetland fill, impacts and mitigation (wetland bank credits) occurred within the Phase I grading limits and are complete. The establishment of the greenway corridor including wetlands, trails and open space on the north end of the Watermark development is a critical component of the project and will be developed in future phases. The Master Development Agreement details the timing, establishment and management of that corridor. An Open Space Easement has been dedicated over outlots containing wetlands, open space, stormwater ponds, berms etc. The Watermark 3rd Addition Final Landscape Plan details the location of required “Protected Open Space Area” signs. A Conservation Easement and Declaration establishing wetland buffer (both favor of RCWD) have been recorded over Wetland 17 (Outlot G, Preliminary Plat) as required by RCWD. When the lots abutting this buffer are graded in the future, these signs will be located along the rear lots lines. Development Agreement Master Development Agreement 7 A Master Development Agreement was recorded in March 2019. The Agreement covers the entire 372 acre site and details the terms and conditions of City approvals, the Development Plans, the required public and private improvements as part of the first and subsequent phase, the standards for the timing and financing of the improvements, required HOA documents and the terms of payment. Development Agreement and Planned Unit Development Agreement The City will also require our standard Development Agreement specific to each phase of development. This agreement further details required improvements and securities. The City Engineer has drafted this Agreement and it shall be approved by the City Council. The complete land use application for the 3rd Addition final plat was submitted in February 2020 prior to the COVID-19 pandemic. Due to the current economic situation, Lennar is requesting the Development Agreement securities be broken into Phase 3A and 3B. The 3rd Addition will be completed in 2 phases. 3A has 64 units and 3B has 111 units for a total of 175 units. The Development Agreement includes a Schedule C for each phase. Phase 3A shall include the construction of the Stormwater Reuse System, the Trail and Trunk Sanitary Sewer extension to Watermark Way and 20th Avenue. Developer shall post security, in a form acceptable to the City, for all fees and charges in Exhibit C pertaining to Phase 3B that are being deferred until work begins in Phase 3B. Homeowner’s Association (HOA) Prior to release of the final plat mylars, Lennar shall submit to the City the applicable HOA documents and annexation amendments. The City Attorney shall review and comment prior to recording. Title Commitment The City Attorney has reviewed the title commitment and final plat and notes the title commitment shall be updated. Stormwater Maintenance Agreement A recorded Declaration for Maintenance of Stormwater Facilities between RCWD and Lennar covers Ponds 100, 200, 300 and 20. These stormwater facilities and Pond 400 will be eventually covered under the City’s Programmatic Stormwater Management Agreement after they have been installed and accepted by the City A recorded stormwater declaration is required for the private facilities in the townhome area. The current declarations include additional facilities that in the future will be covered by the City’s Programmatic agreement in the future. Findings of Fact 8 The Findings of Fact for Watermark 3rd Addition PUD Final Plan/Final Plat are detailed in Resolution No. 20-30. RECOMMENDATION The Planning & Zoning Board reviewed the Watermark 3rd Addition PUD Final Plan/Final Plat on March 11, 2020 and recommended approval with a 3-0 vote. ATTACHMENTS 1. Resolution No. 20-30 2. Final Plat 3. Resolution No. 20-31 4. Development Agreement 1 CITY OF LINO LAKES RESOLUTION NO. 20-30 RESOLUTION APPROVING THE PUD FINAL PLAN/FINAL PLAT FOR WATERMARK 3RD ADDITION WHEREAS, the City received an application for Watermark 3rd Addition PUD Final Plan/Final Plat approval hereafter referred to as Development; and WHEREAS, City staff has completed a review of the proposed Development based on the following plans and information: • Watermark 3rd Addition Final Plat prepared by Carlson McCain date stamped January 28, 2020 • Watermark 3rd Addition Sanitary Sewer, Watermain, Storm Sewer and Street Construction Plans prepared by Carlson McCain dated January 10, 2020 • Watermark 3rd Addition Landscape Plans L1-L4 prepared by Carlson McCain dated February 21, 2020 • Watermark 3rd Addition Home Plans Booklet prepared by Lennar dated February 3, 2020 • Watermark Architectural Standards Matrix; and WHEREAS, the City Council the approved the PUD Development Stage Plan/Preliminary Plat with Resolution No. 16-51 on June 13, 2016; and WHEREAS, the Planning & Zoning Board reviewed and recommended approval of the Development on March 11, 2020; and WHEREAS, the proposed Development is not considered premature and meets the performance standards of the subdivision and zoning ordinance; and NOW, THEREFORE BE IT RESOLVED by The City Council of The City of Lino Lakes hereby makes the following: FINDINGS OF FACT 1. The final plat substantially conforms to the approved preliminary plat subject to the conditions listed below. 2. The City Attorney reviewed the status of title/property ownership related to the final plat and notes the title commitment shall be updated. 3. A 3rd Addition Development Agreement has been drafted and shall be executed. 4. Conditions attached to approval of the preliminary plat have been fulfilled or secured by the Development Agreement. 5. All fees, charges and escrow related to the preliminary or final plat have been paid in full. 2 BE IT FURTHER RESOLVED by the City Council of the City of Lino Lakes hereby approves Watermark 3rd Addition PUD Final Plan/Final Plat subject to the following conditions: 1. Outlot A is preserved as permanent Open Space and shall be improved by the Developer in accordance with the approved plans and upon completion and acceptance by the city, of such improvements, it shall be owned and maintained by a Homeowner’s Association in accordance with an approved Restoration and Management Plan. 2. A separate fence permit is required for the fencing along CSAH 54 (20th Avenue). BE IT FURTHER RESOLVED by the City Council of the City of Lino Lakes hereby approves the Development subject to the following items being addressed prior to release of final plat mylars: 1. The 3rd Addition Development Agreement shall be approved by the City Council, executed and recorded against the property. a. The Development Agreement will include park dedication credit for the platted private parks, Outlot K and Outlot I, Watermark. 2. Any staff comments requiring revisions to the final plat. 3. The title commitment shall be updated. 4. A draft copy of the deed for Outlot A shall be submitted to the City for review and approval. 5. Draft copies of the applicable Homeowner’s Association (HOA) documents shall be submitted to the City for review and approval. a. All applicable HOA documents shall be amended to include the revised Open Space Maintenance Plan. 6. The Permanent Trail Easement with Description Sketch for the trail on Outlot A shall be revised to include the trail section from the townhome neighborhood to the south lot line. BE IT FURTHER RESOLVED by the City Council of the City of Lino Lakes hereby approves the Development subject to the following items being addressed prior to issuance of building permit within the 3rd Addition: 1. All comments from the City Engineer Letter dated March 4, 2020 shall be addressed. 2. All comments from Environmental Coordinator Memo dated March 4, 2020 shall be addressed. 3. Copies of the recorded the Homeowner’s Association (HOA) documents shall be submitted to the City. a. All applicable HOA documents shall be amended to include the revised Open Space Maintenance Plan. 4. A co py of the recorded deed for Outlot A shall be submitted to the City. 5. A copy of the recorded Permanent Trail Easement with Description Sketch for the trail on Outlot A and Townhome Neighborhood shall be submitted to the City. 6. Watermark 3rd Addition Landscape Plan Sheets: 3 a. The plans shall include landscaping and foundation planting details for townhome neighborhood consistent with the Overall Landscape Plan. b. The plans shall include details for the tot lot site plan, landscaping, and play equipment, etc. consistent with the Overall Landscape Plan. c. The City’s January 2019 “Protected Open Space Area” sign detail shall be used. d. The plans shall include fence details. e. The plan sheet shall clearly note which sections of fence have already been installed and which sections are going to be installed with 3rd Addition. Adopted by the Council of the City of Lino Lakes this 11th day of May, 2020. The motion for the adoption of the foregoing resolution was introduced by Council Member _______________and was duly seconded by Council Member ________________ and upon vote being taken thereon, the following voted in favor thereof: The following voted against same: ______________________________ Rob Rafferty, Mayor ATTEST: ________________________ Julianne Bartell, City Clerk ENVIRONMENTAL ◦ ENGINEERING ◦ SURVEYINGWATERMARK 3RD ADDITIONCRANE DRIVEBALSAMWAY CRANE DR.JOHANNA CIRCLEWATE R M A R K WA YITASCACIRCLEWATERMAR K W A Y INSET 'C'of 5 sheets)(see sheet 4INSET 'D'(see sheet 5of 5 sheets)INSET 'A'(see sheet 2of 5 sheets)INSET 'B'(see sheet 3of 5 sheets) ENVIRONMENTAL ◦ ENGINEERING ◦ SURVEYINGWATERMARK 3RD ADDITIONCRANEDRIVEBAL S A M W A Y INSET 'A' ENVIRONMENTAL ◦ ENGINEERING ◦ SURVEYINGWATERMARK 3RD ADDITIONINSET 'B'SEE DETAIL 'A'SEE DETAIL 'B'DETAIL 'A'DETAIL 'B'DETAIL 'C'SEE DETAIL 'C' ENVIRONMENTAL ◦ ENGINEERING ◦ SURVEYINGWATERMARK 3RD ADDITIONCRANE DRIVE JOHANNA CIRCLEWAT E R M A R K W A Y INSET 'C' ENVIRONMENTAL ◦ ENGINEERING ◦ SURVEYINGWATERMARK 3RD ADDITIONITASCACIRCLEWATERMAR K W A Y INSET 'D' CITY OF LINO LAKES RESOLUTION NO. 20-31 RESOLUTION APPROVING DEVELOPMENT AGREEMENT FOR WATERMARK 3RD ADDITION WHEREAS, the City Council approved the PUD Final Plan/Final Plat for Watermark 3rd Addition with Resolution No. 20-30 on May 11 , 2020; and WHEREAS, the City’s subdivision ordinance and conditions of approval require the execution of a development agreement between the Developer and the City of Lino Lakes. NOW, THEREFORE BE IT RESOLVED by The City Council of The City of Lino Lakes hereby approves the Development Agreement between US Home Corporation and the City of Lino Lakes for Watermark 3rd Addition and authorizes the Mayor and City Clerk to execute such agreement on behalf of the City. Adopted by the Council of the City of Lino Lakes this 11th day of May, 2020. The motion for the adoption of the foregoing resolution was introduced by Council Member _______________and was duly seconded by Council Member ________________ and upon vote being taken thereon, the following voted in favor thereof: The following voted against same: _______________________________ Rob Rafferty, Mayor ATTEST: ________________________ Julianne Bartell, City Clerk DEVELOPMENT AGREEMENT and PLANNED UNIT DEVELOPMENT AGREEMENT Watermark 3rd Addition THIS AGREEMENT is made this _____ day of ______________, 2020, by and between the City of Lino Lakes, a Minnesota municipal corporation, and U.S. Home Corporation, A Delaware corporation d/b/a Lennar Corporation (“Developer”). 1. Subdivision. Developer received preliminary plat approval from the City by Resolution No. No. 16-51 for a plat known as Watermark (“Subdivision”). Unless otherwise stated, all terms and conditions of this Agreement relate to work within the Subdivision. 2. Final Plat Approval/Phasing of Work. The City’s approval of the final plat of Watermark 3rd Addition, as legally described on Exhibit A attached hereto, is contingent upon execution and delivery of this agreement and all required petitions, bonds, security, and documents, and satisfaction of all conditions of approval required by Resolution No. 20- 30. The Final Plat is attached hereto as Exhibit B. The Developer intends to undertake work in the 3rd Addition in two distinct phases, hereafter referred to as Phases 3A and 3B. The phases are identified in Exhibit B. No work may be begin in the Phase 3B area until the City Engineer has confirmed that all Phase 3B fees, escrows, and letters of credit required by this Agreement for Phase 3B have been paid and posted. 3. Phased Development. The City may refuse to approve final plats of subsequent additions of the plat if the Developer has breached this Agreement and the breach has not been remedied. Development of subsequent phases may not proceed until Development Agreements for such phases are approved by the City. 4. Developer Plans. a. The Subdivision shall be developed in accordance with the following Developer Plans, original copies of which are on file with the City Engineer. The Developer Plans may be prepared and revised after entering into this Agreement but must be approved by the City before commencement of any work. If the plans vary from the written terms of this Agreement, this Agreement shall control. b. The Developer Plans as of the date of this Agreement are: i. Watermark 3rd Addition Final Plat, containing 5 sheets, prepared by Carlson McCain date stamped January 28, 2020. Watermark 3rd Addition Development Agreement May 11, 2020 page 2 ii. Watermark 3rd Addition Sanitary Sewer, Water Main, Storm Sewer and Street Construction plan set containing 30 sheets, prepared by Carlson McCain dated January 10, 2020. iii. Watermark Grading, Development & Erosion Control Plan, containing 27 sheets, prepared by Carlson McCain revised and submitted on December 13, 2019. iv. Watermark 3rd Addition Landscape Plans, containing 4 sheets, prepared Carlson McCain dated February 21, 2020. 5. Permits. The Developer shall be responsible for securing all site grading and development approvals and permits from all appropriate Federal, State, Regional and Local jurisdictions prior to the commencement of site grading or construction and prior to the City awarding construction contracts for public improvements. 6. Developer Improvements. The Developer shall secure a contractor to install these improvements, hereinafter referred to as the “Developer Improvements ,” which contractor shall be approved by the City in its absolute discretion. The cost of Developer Improvements is as shown on Exhibit C attached hereto. All Developer Improvements shall require City inspection and approval and, where appropriate, the approval of any other governmental agency having jurisdiction. The Developer shall construct and install at the Developer's expense the following improvements according to the following terms and conditions: a. Site Grading i. No grading shall commence until all requirements of the Rice Creek Watershed District (RCWD) have been satisfied. ii. All site grading shall be conducted in accordance with the grading plan as approved by the City and in accordance with NPDES and RCWD requirements. The Developer shall perform the work in accordance with a Storm Water Pollution Prevention Plan (SWPPP) pursuant to Minnesota Pollution Control Agency (MPCA) requirements. b. Grading and Erosion Control i. The Developer shall grade the site to within 0.2 foot of the grades shown on the approved grading plan. No deviations will be allowed unless a revised plan is submitted and approved by the City and all other regulatory agencies. Watermark 3rd Addition Development Agreement May 11, 2020 page 3 ii. The street right-of-way, storm water storage ponds, and surface water drainage ways shall be graded prior to commencement of utility construction. iii. The Developer shall be responsible for ascertaining that site geotechnical and groundwater conditions are adequate and conforming with the grading and site improvement as proposed. iv. The Developer’s engineer shall certify in writing, with an as-built survey, that all grading complies with the approved grading plan prior to issuance of any building permits. v. The Developer shall promptly clear dirt and debris within public right -of- ways and drainage and utility easements resulting from construction by the Developer, its purchasers, builders and contractors within five (5) days after notification by the City. The Developer shall be responsible for all necessary street and storm sewer maintenance, including street sweeping, until all home construction is completed, unless otherwise released by the City. Warning signs shall be placed when hazards develop in streets to prevent the public from traveling on them, including detour signs if necessary. If and when the streets become impassable, such streets shall be barricaded and closed. The Developer shall maintain a smooth, hard driving surface and adequate drainage on all temporary streets. c. Final street grading, subbase, gravel base, concrete curb and gutter, and bituminous base course and wear course shall be furnished and installed. d. Sidewalks, paths and street lighting as required by the City. e. Storm sewers, when determined to be necessary by the City Engineer, including all necessary laterals, catch basins, inlets and other appurtenances, shall be furnished and installed. f. Sanitary sewer mains, laterals or extensions, including all necessary building services and other appurtenances, shall be furnished and installed. g. Water mains, laterals or extensions, including all necessary building services, hydrants, valves and other appurtenances, shall be furnished and installed. h. The Developer shall place iron monuments at all lot, block, and outlot corners and at all other angle points on boundary lines consistent with the final plat. Iron monuments shall be placed after all street and lawn grading has been completed in order to preserve the lot markers for future property owners. Lot Watermark 3rd Addition Development Agreement May 11, 2020 page 4 corner irons on the back property line shall be installed so that th e top of the iron corresponds to the finished ground elevation in accordance with the approved grading plan. Guard stakes shall be appropriately installed to mark these irons. i. Landscaping shall be furnished and installed in accordance with the approved plans, including boulevard trees. j. The Developer shall arrange for all gas, telephone, cable TV and electric utility services to the Subdivision in accordance with City Code and State law. The utilities are required to be located within a joint trench. Stree t light installations shall be initiated by the Developer with City Engineer approval. The Developer is solely responsible for the cost of utility installation. k. The Developer shall install mailboxes in accordance with Federal and Postal Service regulations. l. The Developer shall install conservation easement signs per City standard detail plates prior to the issuance of building permits. 7. Time of Performance. The Developer shall install all required improvements enumerated in Paragraph 6 by November 30, 2021. The Developer shall install the Tot Lot by Aug 30, 2021. The Developer may request a reasonable extension of time from the City. If the extension is granted, it shall be conditioned upon updating the security posted by the Developer to reflect cost increases and the extended completion date. 8. Record Drawings. a. Upon project completion, Developer shall submit record drawings, in electronic format, of all public and private infrastructure improvements, including grading, sanitary sewer, watermain, storm sewer facilities, and roads, constructed by Developer. The files shall be drawn in Anoka County NAD 83 Coordinate system and provided in both AutoCAD .dwg and Adobe .pdf file formats. The plans shall include accurate locations, dimensions, elevations, grades, slopes and all other pertinent information concerning the complete work. b. The Developer shall submit certified compaction testing results for the site grading operations. c. A summary of the record plan attribute data for the storm sewer, watermain, and sanitary sewer structures and pipes shall be submitted in the form of an Excel Spreadsheet as provided by the City Engineer. d. No securities will be fully released until all record drawings have been submitted and accepted by the City Engineer. Watermark 3rd Addition Development Agreement May 11, 2020 page 5 9. Faithful Performance of Construction Contracts and Security. a. The Developer will fully and faithfully comply with all terms and conditions of any and all contracts entered into by the Developer for the installation and construction of all Developer Improvements. Concurrent with the execution hereof by the Developer, the Developer will furnish to, and at all times thereafter maintain with the City, a cash deposit, certified check, or Irrevocable Letter of Credit, based on one hundred fifty (150%) percent of the total estimated cost of Developer's Improvements. The Developer may elect to post separate security for Phases 3A and 3B. b. Irrevocable Letter of Credit. If an Irrevocable Letter of Credit is utilized, it shall be for the exclusive use and benefit of the City of Lino Lakes and shall state that it is issued to guarantee and assure performance by the Developer of all the terms and conditions of this Development Agreement and construction of all required improvements referenced therein in accordance with the ordinances and specifications of the City. The letter shall be in a form, and from a bank, as approved by the City. The City reserves the right to draw, in whole or in part, on any portion of the Irrevocable Letter of Credit for the purpose of guaranteeing the terms and conditions of this agreement. The Irrevocable Letter of Credit shall be automatically extended for additional periods of one year from present or future expiration dates on an annual basis, unless at least sixty (60) days prior to the expiration date, the Community Development Director and City Engineer, are notified by certified mail or overnight courier, that the Letter of Credit will not be extended. c. Alternatively, the Developer may enter into a Public Improvement Surety Agreement, subject to City approval. d. Reduction of Security. The Developer may request reduction of the Letter of Credit or cash deposit based on prepayment or the value of the completed improvements at the time of the requested reduction. 10. Warranty. The Developer warrants all utility work required to be performed by it against poor material and faulty workmanship for a period of two years after its completion and acceptance by the City. All new streets shall be warranted by the developer for a period of one year from the time the final inspection of the street is completed and accepted by the City. All trees, grass and sod shall be warranted to be alive, of good quality and disease free for 12 months after planting. Prior to final acceptance of the Developer Improvements the City shall require a Performance Bond or Cash Escrow to cover the warranty provisions of this Agreement. The amount shall be determined by the City Engineer. Watermark 3rd Addition Development Agreement May 11, 2020 page 6 11. Dedication. The Developer shall dedicate to the City, at no cost to the City, any permanent or temporary easements that may be necessary for the construction and installation of the Developer Improvements. All such easements required by the City shall be in writing, in recordable form, containing such terms and conditions as the City shall determine. 12. Ownership of Improvements. Upon completion and City acceptance of the work and construction required by this Agreement, the public improvements lying within public right-of-way and easements shall become City property without further notice or action unless the improvements are to be deemed private infrastructure. 13. Recording and Release. The Developer agrees that the terms of this Development Agreement shall be a covenant on any and all property included in the Subdivision. The Developer agrees that the City shall have the right to record a copy of this Development Agreement with the Anoka County Recorder to give notice to future purchasers and owners. This shall be recorded against the Subdivision described on Page 1. 14. Escrow for City’s Costs. a. The Developer agrees to establish a non-interest bearing escrow accounts for Phases 3A and 3B with the City in amounts determined by the City Administrator or his designee for the payment of all costs incurred by the City related to the development of the Subdivision including, but not limited to, the following (See Exhibit C for breakdown of costs for Phases 3A and 3B escrows): i. Planning/ Review ii. Administration - 3% of Developer Improvement Costs iii. City Engineering iv. Street lighting installation (by utility company, developer to initiate) v. Traffic signing improvements vi. Boulevard tree planting vii. Street, storm sewer and pond maintenance viii. Property Taxes. Should the recording of the Final Plat occur after July 1st, any and all property taxes on any public property dedicated as a part of this plat shall be the responsibility of the Developer. b. If the above escrow amounts are insufficient, the Developer shall make such additional deposits as required by the City. The City shall have a right to Watermark 3rd Addition Development Agreement May 11, 2020 page 7 reimburse itself from the Escrow with suitable documentation supporting the charges. 15. Developer Fees. At the time of execution of this Agreement, the Developer shall pay the following fees related to the development of the Subdivision (See Exhibit C for breakdown of costs): a. Park Dedication All park dedication fees will be collected with phase 3A. Park dedication fees will be credited for the private park land platted as Watermark, Outlot K and Outlot I. Per the Master Developer Agreement (MDA), the park dedication fees are based on an appraisal of fair market value. An appraisal was prepared in December 2018 by Insight Realty Advisors, Inc. The credited value of Outlot K, Watermark is $32,000 and Outlot I, Watermark is $33,000. The tot lot, play equipment and associated landscaping on Outlot I, Watermark shall be completed by August 30, 2021. Per Resolution No. 16-51, credit will not be given for theses private park improvements. Park dedication fees will also be credited for trail construction costs. The Park Dedication Fee for this site is calculated as follows: Watermark 3rd Addition Total # Units = 175 x Park Dedication Fee $3,150 = Cash in Lieu Value $551,250 - Land dedication value (Outlot K, Watermark) ($32,000) - Land dedication value (Outlot I, Watermark) ($33,000) - Trail Construction Costs ($39,000) TOTAL CASH FEE DUE = $447,250 b. The Developer shall pay 15 months of maintenance and energy costs for street lights installed within the Subject Property at the rate of $8/month/light. After that the City will assume the costs. Watermark 3rd Addition Development Agreement May 11, 2020 page 8 c. Sealcoating. The Developer will pay the cost of sealcoating the streets within the development at a cost of $73,260. The sealcoating will be completed within three to seven years following completion of the wear course placement. d. GIS Mapping Fees e. Trunk Sewer Connection Fees The City established trunk utility connection fees to uniformly distribute the costs of public trunk sanitary sewer infrastructure. The Trunk Utility Connection Fee consists of two components; a Trunk Charge and an Availability Charge. Trunk Charge The trunk charge for Phase 3Ashall be paid at the time of subdivision approval or at the time of hook-up, whichever is first. The trunk charge for Phase 3B shall be paid prior to any work on Phase 3B. Residential trunk charges are based on one unit per dwelling unit. Commercial/Industrial/Institutional (CII) trunk charges are based on a factor of 2.92 units per acre. Sanitary Sewer $1,606.00 Per Unit Availability Charge For residential properties, the availability charge for Phase 3Ashall be paid at the time of subdivision approval or at the time of hook-up, whichever is first. The availability charge for Phase 3B shall be paid prior to any work on Phase 3B. Commercial/Industrial/Institutional availability charges shall be paid at the time of building permit. Fees are based on the number of sanitary access charge (SAC) units assigned by Metropolitan Council Environmental Services (MCES). Residential uses shall be assigned one unit per dwelling unit unless otherwise noted by MCES. City Sewer (CSAC) $1,502.00 Per SAC Unit Trunk sewer unit charges addressed under this paragraph are in addition to any SAC charges imposed by Metropolitan Council Environmental Services. An estimate of the total charge and the trunk utility credit for de veloper installed trunk oversizing is specified in Exhibit C. f. Trunk Water Connection Fees Watermark 3rd Addition Development Agreement May 11, 2020 page 9 The City established trunk utility connection fees to uniformly distribute the costs of public trunk water infrastructure. The Trunk Utility Connection Fee consists of two components; a Trunk Charge and an Availability Charge. Trunk Charge The trunk charge for Phase 3A shall be paid at the time of subdivision approval or at the time of hook-up, whichever is first. The trunk charge for Phase 3B shall be paid prior to any work on Phase 3B. Residential trunk charges are based on one unit per dwelling unit. Commercial/Industrial/Institutional (CII) trunk charges are based on a factor of 2.92 units per acre. Water $2,306.00 Per Unit Availability Charge For residential properties, the availability charge for Phase 3A shall be paid at the time of subdivision approval or at the time of hook-up, whichever is first. The availability charge for Phase 3B shall be paid prior to any work on Phase 3B. Commercial/Industrial/Institutional availability charges shall be paid at the time of building permit. Fees are based on the number of sanitary access charge (SAC) units assigned by Metropolitan Council Environmental Services (MCES). Residential uses shall be assigned one unit per dwelling unit unless otherwise noted by MCES. City Water (CWAC) $1,451.00 Per SAC Unit An estimate of the total charge and the trunk utility credit for developer installed trunk oversizing is specified in Exhibit C. g. Surface Water Management Area Charges The City established a trunk area charge to uniformly distribute the costs of public trunk surface water infrastructure and water quality improvements. The Surface Water Management Charge shall be based on developable acreage, in the amount specified in Exhibit C. The charge for Phase 3A shall be paid at the time of subdivision approval. The charge for Phase 3B shall be paid prior to any work on Phase 3B. Watermark 3rd Addition Development Agreement May 11, 2020 page 10 16. Assessment of Charges and Waiver of Rights. a. In consideration of the construction of City Improvements listed in Paragraph 8 and /or provision of sewer, water and storm water services, the Developer agrees that the costs of City Improvements together with Trunk Sewer Unit Charge, Trunk Water Unit Charge and the Surface Water Management Area Charge (collectively, “the Charges”) may be assessed against the Subdivision parcels. The Developer hereby waives any and all procedural and substantive objections to the special assessments, including notice and hearing requirements, any claim that the assessments exceed the benefit to the properties, and any right to appeal. b. Unless the Developer pays the entire balance owed for the Charges contemporaneously with the execution of this Agreement, the Developer shall provide to the City a cash escrow or irrevocable letter of credit in an amount equal to 35% of the total assessments for the Charges as estimated by the City Engineer (see Exhibit C). The letter of credit shall be in a form, and from a bank, as approved by the City. The letter of credit or cash escro w may be used by the City upon default by Developer in the payment of special assessments. The cash escrow or letter of credit shall remain in place throughout the term of the special assessments. The letter of credit may not be terminated without the City’s written consent. c. Developer, its heirs, successors or assigns, agrees that within 30 days after the date of sale of a lot, the Developer, its heirs, successors or assigns, at its own cost and expense, shall pay the entire unpaid charges assessed or to be assessed under this agreement against such property. d. If a certificate of occupancy is issued before the special assessments have been levied, the Developer, its heirs, successors or assigns shall pay the City the sum of cash equal to 120% of the Engineer's estimate of the special assessments for such Charges that would be levied against the property. Upon such payment the City shall issue a certificate showing the assessments are paid in full. Notwithstanding the issuance of said certificate, the Devel oper shall be liable to the City for any deficiency and the City shall pay the Developer any surplus arising from the payment based upon such estimate. e. Acceleration upon Default. In the event the Developer violates any of the covenants, conditions or agreements herein, violates any ordinance, rule or regulation of the City, County of Anoka, State of Minnesota or other governmental entity having jurisdiction over the plat or development, or fails to pay when due any installment of any special assessment levied pursuant to this agreement, or any interest thereon, the City at its option, in addition to its rights and remedies hereunder, after 10 days written notice to the Developer, may Watermark 3rd Addition Development Agreement May 11, 2020 page 11 declare all of the unpaid special assessments which are then estimated or levied pursuant to this agreement due and payable in full, with interest. The City may seek recovery of such special assessments due and payable from the security provided herein. In the event that such security is insufficient to pay the outstanding amount of such special assessments plus accrued interest the City may certify such outstanding special assessments in full to the County Auditor pursuant to Minnesota Statutes section 429.061, subdivision 3, for collection the following year. The City, at its option, may commence legal action against the Developer to collect the entire unpaid balance of the special assessments then estimated or levied pursuant hereto, with interest, including reasonable attorney's fees, and Developer shall be liable for such special assessments and, if more than one, such liability shall be joint and several. In addition to any other rights and remedies upon Developer’s default, the City may refuse to issue building permits and/or Certificates of Occupancy for any property within the Subdivision until such time as such default has been corrected to the satisfaction of the City. The Developer agrees to reimburse the City for all costs incurred by the City in the enforcement of this agreement, or any portion thereof, including court costs and reasonable engineering and attorneys' fees, if the City prevails in any enforcement action. 17. Building Permits. No building permits shall be issued until: a. Site grading, certified compaction testing, City sewer, water, storm sewer, curb and gutter, and bituminous base construction of the streets, temporary street signs, gas, electric, and telephone are completed and approved by the City, except as provided below. i. Sidewalks and trails shall be installed within 6 months of the bituminous base course. Extensions may be approved by the City Engineer, due to weather conditions, upon receipt of a written request in writing by the Developer to the City. In no case shall such extension extend beyond one year from the date of installation of bituminous base course. ii. Model Homes: Structures may be installed as model homes consistent with City ordinance upon approval of the final plat. A record drawing of the site grading for the model home lots shall be submitted prior to issuance of building permits for the model homes. iii. If any building permits for model homes are issued prior to the completion and acceptance of public improvements, the Developer assumes all liability and costs resulting in delays in completion of public improvements and damage to public improvements caused by the City, the Developer, its contractors, subcontractors, material men, employees, Watermark 3rd Addition Development Agreement May 11, 2020 page 12 agents or third parties. Any such costs shall be reimbursed from Developer’s escrow. 18. Special Provisions. a. Watermark 3rd Addition will be completed in 2 phases 3A and 3B. This Agreement includes a Schedule C for each phase. Phase 3A shall include the construction of the Stormwater Reuse System, and the Trail. Developer shall post security, in a form acceptable to the City, for all fees and charges in Exhibit C pertaining to Phase 3B that are being deferred until work begins in Phase 3B. b. The Developer shall submit a sanitary sewer plan sheet, to be included with the construction plans, for construction of the trunk sewer along 20th Ave from manhole 9 where it exists today to Watermark Way. Said plan sheet shall be approved by the City. c. Outlot A is preserved as permanent Open Space and shall be improved by the Developer in accordance with the approved plans and upon complet ion and acceptance by the city of such improvements, it shall be owned and maintained by a Homeowner’s Association in accordance with an approved Restoration and Management Plan. d. A separate fence permit is required for the fencing along CSAH 54 (20th Avenue). 19. Hours of Construction Activity. All construction activity shall be limited to the hours as follows: Monday through Friday 7:00 a.m. to 7:00 p.m. Saturday 9:00 a.m. to 5:00 p.m. Sunday and Holidays No working hours allowed 20. Insurance. Developer or its general contractor shall take out and maintain until one year after the City accepted the Developer Improvements, public liability and property damage insurance covering personal injury, including death, and claims for property damage which may arise out of the Developer's or general contractor’s work, as the case may be, or the work of its subcontractors or by one directly or indirectly employed by any of them. Limits for bodily injury and death shall be not less than Five Hundred Thousand and no/100 ($500,000.00) Dollars for one person and One Million and no/100 ($1,000,000.00) Dollars for each occurrence; limits for property damage shall be not less than One Million and no/100 ($1,000,000.00) Dollars for each occurrence; or a combination single limit policy of Two Million and no/100 ($2,000,000.00) Dollars or more. The City, its employees, its agents and assigns shall be named as an additional insured on the policy, and the Developer or its general contractor shall file with the City a certificate evidencing coverage prior to the City signing the plat. The certificate shall Watermark 3rd Addition Development Agreement May 11, 2020 page 13 provide that the City must be given ten days advance written notice of the cancellation of the insurance. The certificate may not contain any disclaimer for failure to give the required notice. 21. Developer’s Default. In the event of default by the Developer as to any of the work to be performed by it hereunder, the City may, at its option, perform the work and the Developer shall promptly reimburse the City for any expense incurred by the City, provided the Developer is first given notice of the work in default, not less than 48 hours in advance. This Agreement is a license for the City to act, and it shall not be necessary for the City to seek a court order for permission to enter the land. When the City does any such work, the City may, in addition to its other remedies, levy the cost in whole or in part as a special assessment against the Subject Property. Developer waives its rights to notice of hearing and hearing on such assessments and its right to appeal such assessments pursuant to Minnesota Statutes, chapter 429. 22. General. a. Binding Effect The terms and provisions hereof shall be binding upon and inure to the benefit of the heirs, representatives, successors and assigns of the parties hereto and shall be binding upon all future owners of all or any part of the Subdivision and shall be deemed covenants running with the land, unless otherwise released pursuant to section 14 of this Agreement. b. Validity. If a portion, section, subsection, sentence, clause, paragraph or phrase in this agreement is for any reason held to be invalid by a court of competent jurisdiction, such decision shall not affect or void any of the other provisions of the Development Agreement. c. Notices Whenever in this agreement it shall be required or permitted that notice or demand be given or served by either party to this agreement to or on the other party, such notice or demand shall be delivered personally or mailed by United States mail to the addresses below by certified mail (return receipt requested). Such notice or demand shall be deemed timely given when delivered personally or when deposited in the mail in accordance with the above. The addresses of the parties are as set forth until changed by notice given as above. Attn: Joe Jablonski Watermark 3rd Addition Development Agreement May 11, 2020 page 14 U.S Home Corporation 16305 36th Avenue, Suite 600 Plymouth, MN 55446 Community Development Director City of Lino Lakes 600 Town Center Parkway Lino Lakes, MN 55014 23. Land Use Controls - Planned Unit Development. a. Watermark is a Planned Unit Development (PUD) as approved by the City Council by Ordinance No. 04-16, Resolution No. 16-151, Resolution No. 19-137, and Resolution No. 20-30. 24. Master Development Agreement. Watermark is governed by the terms of this Agreement, as well as the terms of the Master Development Agreement between the Developer and City. The two Agreements shall be construed together, and the requirements and obligations of the Agreements are cumulative. In the event of a direct conflict between the two Agreements, the Agreement imposing the greater obligation on Developer shall govern. Watermark 3rd Addition Development Agreement May 11, 2020 page 15 DEVELOPER CITY OF LINO LAKES By ______________________ By _________________________ Mayor Its ______________________ ATTEST By _________________________ City Clerk STATE OF MINNESOTA ) ) SS COUNTY OF ANOKA ) This instrument was acknowledged before me on ________ day of ____________, 2020, by Rob Rafferty as Mayor of the City of Lino Lakes on behalf of said City. _______________________________ Notary Public STATE OF MINNESOTA ) ) SS COUNTY OF ANOKA ) This instrument was acknowledged before me on ________ day of ____________, 2020 by Julianne Bartell as City Clerk of the City of Lino Lakes on behalf of said City. _______________________________ Notary Public Watermark 3rd Addition Development Agreement May 11, 2020 page 16 STATE OF MINNESOTA ) ) SS COUNTY OF __________ ) On this _______ day of _______________, 2020, before me, a Notary Public within and for said County, personally appeared ____________, __________________ of ___________________. (Developer), who executed the foregoing instrument. ______________________________ Notary Public This instrument was drafted by: City of Lino Lakes 600 Town Center Parkway Lino Lakes, Minnesota 55014 Watermark 3rd Addition Development Agreement May 11, 2020 page 17 EXHIBIT A Legal Description Outlots H and L, WATERMARK, according to the recorded plat thereof, Anoka County, Minnesota. AND Outlot B, WATERMARK 2ND ADDITION, according to the recorded plat thereof, Anoka County, Minnesota. Watermark 3rd Addition Development Agreement May 11, 2020 page 18 EXHIBIT B Final Plat with Phase 3A and 3B ENVIRONMENTAL ◦ ENGINEERING ◦ SURVEYINGWATERMARK 3RD ADDITIONCRANE DRIVEBALSAMWAY CRANE DR.JOHANNA CIRCLEWATE R M A R K WA YITASCACIRCLEWATERMAR K W A Y INSET 'C'of 5 sheets)(see sheet 4INSET 'D'(see sheet 5of 5 sheets)INSET 'A'(see sheet 2of 5 sheets)INSET 'B'(see sheet 3of 5 sheets) ENVIRONMENTAL ◦ ENGINEERING ◦ SURVEYINGWATERMARK 3RD ADDITIONCRANEDRIVEBAL S A M W A Y INSET 'A' ENVIRONMENTAL ◦ ENGINEERING ◦ SURVEYINGWATERMARK 3RD ADDITIONINSET 'B'SEE DETAIL 'A'SEE DETAIL 'B'DETAIL 'A'DETAIL 'B'DETAIL 'C'SEE DETAIL 'C' ENVIRONMENTAL ◦ ENGINEERING ◦ SURVEYINGWATERMARK 3RD ADDITIONCRANE DRIVE JOHANNA CIRCLEWAT E R M A R K W A Y INSET 'C' ENVIRONMENTAL ◦ ENGINEERING ◦ SURVEYINGWATERMARK 3RD ADDITIONITASCACIRCLEWATERMAR K W A Y INSET 'D' Watermark 3rd Addition Development Agreement May 11, 2020 page 19 EXHIBIT C Phase 3A Securities, Escrows & Fees 5/1/2020 EXHIBIT C Securities, Escrows & Fees PROJECT: Watermark 3rd Addition Phase 3A NUMBER OF REU's (utility):64 APPLICANT: US Home Corporation NUMBER OF REU's (park):175 IMPROVEMENTS COST DEVELOPER IMPROVEMENT COSTS (Public) SITE GRADING $0 EROSION CONTROL $10,000 LANDSCAPING $140,000 TRAIL $39,000 STREETS $701,383 STORM SEWER CONST.$386,654 SANITARY SEWER CONST.$361,575 WATERMAIN CONST.$241,840 ENGINEERING & SURVEYING $45,000 Total $1,925,452.00 Letter of Credit Amount X 150%$2,888,178.00 ESCROW for CITY'S COSTS PLANNING/ REVIEW $3,800 ADMINISTRATION $57,770 ENGINEER PLAN REVIEW $19,255 ENGINEER CONSTRUCTION SERVICES $67,391 PROJECT FINAL DOCUMENTS & CITY ENGINEER $5,000 STREET LIGHT INSTALLATION $15,000 STREET & STORMWATER MAINTENANCE $5,000 PROPERTY TAXES $0 TRAFFIC AND SIGNING IMPROVEMENTS $2,400 BOULEVARD TREE PLANTING $0 Total $175,616 DEVELOPMENT FEES PARK DEDICATION (Includes 3A & 3B)$551,250 PARK DEDICATION CREDIT (Includes 3A & 3B) ($104,000) Subtotal Park Dedication Fee $447,250 AUAR $0 SEAL COATING FEE $36,630 GIS MAPPING FEE $5,760 STREET LIGHTING OPERATION $720 Total $490,360 TRUNK SANITARY SEWER TRUNK CHARGE PER (ACRE OR UNIT)$102,784 AVAILABILITY CHARGE PER SAC UNIT $96,128 TRUNK SANITARY SEWER CREDIT TRUNK WATERMAIN TRUNK CHARGE PER (ACRE OR UNIT)$147,584 AVAILABILITY CHARGE PER SAC UNIT $92,864 TRUNK WATERMAIN CREDIT TOTAL TRUNK SEWER & WATER FEES $439,360 Letter of Credit Amount X 35% $153,776 SURFACE WATER MANAGEMENT $158,085 SURFACE WATER MANAGEMENT CREDIT $0 TOTAL SURFACE WATER MANAGEMENT FEES $158,085 SUMMARY OF SECURITIES, ESCROW & FEES SECURITY: DEVELOPER IMP'MENT COSTS $2,888,178.00 ESCROW FOR CITY COSTS $175,616.00 DEVELOPMENT FEES $648,445.00 SECURITY: TRUNK FEES $153,776.00 Watermark 3rd Addition Development Agreement May 11, 2020 page 20 EXHIBIT D Phase 3B Securities, Escrows & Fees 5/1/2020 EXHIBIT D Securities, Escrows & Fees PROJECT: Watermark 3rd Addition Phase 3B NUMBER OF REU's (utility):111 APPLICANT: US Home Corporation NUMBER OF REU's (park):0 IMPROVEMENTS COST DEVELOPER IMPROVEMENT COSTS (Public) SITE GRADING $0 EROSION CONTROL $11,000 LANDSCAPING $145,000 TRAIL $0 STREETS $812,568 STORM SEWER CONST.$277,710 SANITARY SEWER CONST.$771,411 WATERMAIN CONST.$370,350 ENGINEERING & SURVEYING $45,000 Total $2,433,039.00 Letter of Credit Amount X 150%$3,649,558.50 ESCROW for CITY'S COSTS PLANNING/ REVIEW $3,800 ADMINISTRATION $73,000 ENGINEER PLAN REVIEW $24,330 ENGINEER CONSTRUCTION SERVICES $85,156 PROJECT FINAL DOCUMENTS & CITY ENGINEER $5,000 STREET LIGHT INSTALLATION $15,000 STREET & STORMWATER MAINTENANCE $5,000 PROPERTY TAXES $0 TRAFFIC AND SIGNING IMPROVEMENTS $2,400 BOULEVARD TREE PLANTING $0 Total $213,686 DEVELOPMENT FEES PARK DEDICATION $0 PARK DEDICATION CREDIT $0 Subtotal Park Dedication Fee $0 AUAR $0 SEAL COATING FEE $36,630 GIS MAPPING FEE $9,990 STREET LIGHTING OPERATION $720 Total $47,340 TRUNK SANITARY SEWER TRUNK CHARGE PER (ACRE OR UNIT)$178,266 AVAILABILITY CHARGE PER SAC UNIT $166,722 TRUNK SANITARY SEWER CREDIT ($294,559) TRUNK WATERMAIN TRUNK CHARGE PER (ACRE OR UNIT)$255,966 AVAILABILITY CHARGE PER SAC UNIT $161,061 TRUNK WATERMAIN CREDIT ($6,691) TOTAL TRUNK SEWER & WATER FEES $460,765 Letter of Credit Amount X 35% $161,268 SURFACE WATER MANAGEMENT $274,179 SURFACE WATER MANAGEMENT CREDIT $0 TOTAL SURFACE WATER MANAGEMENT FEES $274,179 SUMMARY OF SECURITIES, ESCROW & FEES SECURITY: DEVELOPER IMP'MENT COSTS $3,649,558.50 ESCROW FOR CITY COSTS $213,686.00 DEVELOPMENT FEES $321,519.00 SECURITY: TRUNK FEES $161,268.00 Watermark 3rd Addition City Council May 11, 2020 1 Watermark Overview•April 6, 2020: Work Session •Reviewed overall Watermark development •Reviewed 3rd Addition •Tonight’s Meeting •Watermark 3rd Addition PUD Final Plan/Final Plat •Development Agreement 2 3Main Street I-35E•Comprised 12 individual parcels 4 •372 acre master planned residential community •692 single family lots + 172 townhome units = 864 housing units total •Different neighborhoods with varying lot widths & sizes •55’ to 75’ width •130’ deep PUD Final Plan/Final Plat•Each phase (i.e. addition) of development shall submit a PUD Final Plan/Final Plat. •City’s responsibility in reviewing and approving final plans and final plats is to determine that they substantially conform to with the previously approved PUD Development Stage Plan and Preliminary Plat. 5 6•96 SF lots •79 TH lots •175 total lots •1 outlot (wetland and open space) 7 Housing Type Lot Width Housing Product # Lots Single Family 65’ -75’Landmark 64 Single Family 55’ -60’Discovery 32 Townhomes 32’-42’Colonial Patriot (row)55 Townhomes 32’-45’Colonial Manor (back-back)24 TOTAL 175 Architectural Standards•Res No 17 -133 detailed arch design standards for Watermark •Exterior materials & styles and House elevations •Garage and porch requirements •Watermark 3rd Addition Home Plans booklet •Architectural Standards Matrix •20 different single family house plans •Combination of over 100 different elevations and floor plans •Color packages and anti-monotony are submitted with BP 8 9 Park Dedication •3 sections of trail construction •Credit for Private Parkland •TH Tot Lot Construction by Aug 2021 Watermark 3rd Addition Total # Units =175 x Park Dedication Fee $3,150 = Cash in Lieu Value $551,250 -Land dedication value (Outlot K, Watermark)($32,000) -Land dedication value (Outlot I, Watermark)($33,000) -Trail Construction Costs ($39,000) TOTAL CASH FEE DUE =$447,250 Plat Phases 10 Addition # SF Lots Remaining #SF Lots # TH Lots Remaining #TH Lots Total # Lots Remaining 692 172 864 1st 100 592 93 79 671 2nd 57 535 0 79 614 3rd 96 439 79 0 439 Development Agreements•Master Development Agreement •Covers entire 372 acre site •Lennar, Mattamy Homes and City are parties •Details terms establishing overall Watermark development •Development Agreement and PUD Agreement •Standard DA specific to each addition •3A and 3B •HOA Documents recorded prior to issuance of building permits 11 123A = 64 units 3B = 111 units 3rd Addition PUD Final Plan/Final Plat •PUD Final Plan is consistent with the PUD Development Stage Plan in regards to: •land use plan •street •utilities •parks and open space •lot standards •landscaping •Final Plat is consistent with Preliminary Plat 13 Planning & Zoning Board•March 11, 2020 •Recommended approval with a 3-0 vote 14 Council Action •Consider Resolution No. 20-30 Approving PUD Final Plan/Final Plat •Consider Resolution No. 20-31 Approving Development Agreement 15 CITY COUNCIL AGENDA ITEM 6D STAFF ORIGINATOR: Michael Grochala MEETING DATE: May 11, 2020 TOPIC: Consider Resolution No. 20-46 Adopting AUAR Update for I-35E Corridor VOTE REQUIRED: 3/5 INTRODUCTION Staff is requesting City Council action to adopt the AUAR update for the I-35E Corridor. BACKGROUND The I-35E Corridor Alternative Urban Areawide Review (AUAR) is an environmental review document that analyzed potential impacts of development within a study area of 4,500 acres. The City of Lino Lakes prepared the AUAR in accordance with MN Rules 4410. The final document was adopted by the Lino Lakes City Council on October 24, 2005. The AUAR serves as a substitute environmental review. As long as a development project is consistent with the assumptions of the analyses in the AUAR, no additional environmental review is required. In order to remain valid as a substitute form of environmental review, the AUAR must be revised under certain criteria. One of the criteria is the passing of five years. The City has previously approved updates in 2010 and 2015. The 2020 update identifies development or changes that have occurred during the last five years. The document was updated to reflect changes which included the modification of the three development scenarios investigated. These include: 1) Draft 2040 Comprehensive Plan Full Build Out Land Use 2) Modified Full Build Out with increased residential and commercial development and reduction in industrial development 3) The City’s existing 2030 Comprehensive Plan WSB and Associates, the City’s Engineer, completed the draft update in February of 2020. Notice, of the documents availability for review, was published in the Environmental Quality Board (EQB) Monitor and made available for public and state agency review. The City received comments from four agencies: • Metropolitan Council • Minnesota Pollution Control Agency • Minnesota Department of Administration/State Historic Preservation Office • Minnesota Department of Natural Resources A summary of the comments and the City’s response is included in Appendix I of the document. A fifth agency, the Minnesota Department of Transportation, responded that they had reviewed the update and had no comment. ANALYSIS The original I-35E AUAR was a very comprehensive document covering the City’s 35E corridor from Birch Street to our northern city limits. The most significant developments over the past five years include the 372 acre Watermark residential development and the 402,000 square foot Distribution Alternatives fulfillment center on 21st Avenue. Each of these projects were subject to the mitigation requirements of the AUAR including, but not limited to transportation and water management improvements. The AUAR update generally provides an assessment of current conditions based on changes over the past five years and assessment of comprehensive plan and development scenario changes. Each of the revised scenarios are within the development thresholds assumed in the original AUAR. The Mitigation Plan, included in Appendix H, was updated to reflect changing conditions or regulatory requirements as necessary. Once the update is approved, a copy of the resolution will be forwarded to all required government agencies and the Environmental Quality Board (EQB). ENVIRONMENTAL BOARD The Environmental Board reviewed the document on April 29, 2020 and recommended approval of the update. RECOMMENDATION Staff is recommending approval of Resolution No. 20-46. ATTACHMENTS 1. Resolution No. 20-46 2. Draft AUAR Update, dated April 15, 2020 CITY OF LINO LAKES RESOLUTION NO. 20-46 A RESOLUTION ADOPTING THE UPDATE TO THE ALTERNATIVE URBAN AREAWIDE REVIEW (AUAR) FOR THE LINO LAKES I-35E CORRIDOR WHEREAS, an AUAR Update has been completed for the project pursuant to Minnesota Rules 4410 and identifies and assesses the environmental impacts and mitigation measures associated with the I-35E Corridor Area; WHEREAS, the I-35E Corridor Area is located on approximately 4,500 acres located in the northeastern portion of Lino Lakes; WHEREAS, the AUAR was updated pursuant to Minnesota Rules 4410.3610; WHEREAS, the AUAR Update was distributed for the required 10-day comment period and published in the EQB Monitor; WHEREAS, comments received on the AUAR Update have generated information adequate to determine mitigation measures associated with the potential development in this area; WHEREAS, no agency objections were filed for the AUAR Update; WHEREAS, the comments received and responses developed are included in the public record for the AUAR; WHEREAS, development in the I-35E Corridor Area is expected to comply with all Lino Lakes and review agency standards as well as the mitigation measures outlined in the AUAR Update. NOW, THEREFORE BE IT RESOLVED by The City Council of The City of Lino Lakes hereby adopts the I-35E Corridor Area Alternative Urban Areawide Review Update dated April 15, 2020. Adopted by the Council of the City of Lino Lakes this 11th day of May, 2020. The motion for the adoption of the foregoing resolution was introduced by Council Member _______________and was duly seconded by Council Member ________________ and upon vote being taken thereon, the following voted in favor thereof: The following voted against same: _______________________________ Rob Rafferty, Mayor ATTEST: ________________________ Julianne Bartell, City Clerk 2020 ALTERNATIVE URBAN AREAWIDE REVIEW UPDATE I-35E CORRIDOR AUAR UPDATE LINO LAKES, MN APRIL 15, 2020 Prepared for: City of Lino Lakes 600 Town Center Parkway Lino Lakes, MN 55014 WSB PROJECT NO. 015144-000 I-35E Corridor AUAR Update April 15, 2020 Page 1 I-35E CORRIDOR AUAR UPDATE This document provides for an update to the Lino Lakes I-35E Corridor AUAR. The original AUAR was completed in 2005. Updates were adopted in 2010 and 2015. This document serves as the 2020 five-year update. An abbreviated version of the EAW questionnaire form has been used for this update to assist in the review of this AUAR Update. The following figures and appendices are included in this Update. Figures Figure 1 – Project Location Figure 2 – Revised Scenario 1 Figure 3 – Revised Scenario 2 Figure 4 – 2030 Comprehensive Plan Figure 5 – Developments Appendices Appendix A – Figures Appendix B – Stormwater Management Memo Appendix C – Water Appropriation Memo Appendix D – Wastewater Management Memo Appendix E – Transportation Memo Appendix F – SHPO and DNR Information Appendix G – Contamination Review Memo Appendix H – Mitigation Plan Appendix I – Responses to Comments 1. Project title: Lino Lakes I-35E Corridor AUAR Update 2. Proposer: NA 3. RGU City of Lino Lakes Contact person: Michael Grochala Title: Community Development Director Address: 600 Town Center Pkwy City, State, ZIP: Lino Lakes, MN 55014 Phone: (651) 982-2427 Email: mgrochala@linolakes.us 4. Reason for EAW Preparation: (check one) NA 5. Project Location: County: Anoka City/Township: Lino Lakes 6. Project Description: Overview The City of Lino Lakes adopted the I-35E Corridor AUAR in conformance with Minnesota Rules 4410 in 2005. The City has subsequently updated the AUAR every five years. The AUAR study area is approximately 4,500 acres and is located in the northeastern portion of the City as shown in Figure 1. Development Scenarios Three development scenarios were included in the 2005 AUAR and Updates. The City has since updated its 2040 Comprehensive Plan and reviewed the scenarios. Three updated scenarios are included in this update and are consistent with the original AUAR. These revised scenarios are within the original density thresholds of the original AUAR. Revised Scenario 1 – Draft 2040 Full Build Out Land Use This scenario is in conformance with the current, draft 2040 Comprehensive Plan. This scenario has a higher industrial use and less residential than the Revised Scenario 2. It is still within the assumptions of the original AUAR. Table 1 provides a summary of this uses for this scenario. I-35E Corridor AUAR Update April 15, 2020 Page 2 Figure 2 shows the studied land uses. Revised Scenario 2 This scenario has higher residential and commercial land use, with less industrial than Revised Scenario 1. It is still within the assumptions of the original AUAR. Table 1 provides a summary of this uses for this scenario. Figure 3 shows the studied land uses. 2030 Comprehensive Plan To address comments obtained during the AUAR Update comment period, the current 2030 Comprehensive Plan scenario has been included. This scenario is in conformance with the currently approved Comprehensive Plan. It is the lowest in terms of residential development, has slightly less commercial development, and similar industrial development anticipated to the other two scenarios. Figure 4 shows the 2030 Comprehensive Plan land use. Table 1: Summary of 2005 and 2020 AUAR Scenarios Land Use 2005 AUAR Scenarios (Old Scenarios) 2020 Scenarios (Revised Scenarios) Scenario 1 Revised Scenario 1 Residential (units) 2,237 4,888 Commercial (sf) 2,985,733 5,084,819 Industrial (sf) 11,175,035 12,817,289 Scenario 2 Revised Scenario 2 Residential (units) 5,715 7,403 Commercial (sf) 5,617,890 5,306,914 Industrial (sf) 9,570,045 10,053,499 Scenario 3 2030 Comprehensive Plan Residential (units) 8,659 2,455 Commercial (sf) 4,141,554 3,228,667 Industrial (sf) 5,829,722 10,128,296 Development timing is dependent on market conditions and is anticipated to continue over the next 5- 40 years. Some development has occurred within the study area as shown in Figure 5. Planned Infrastructure Development in the study area will require infrastructure improvements. The analysis for the stormwater, water, wastewater, and traffic have been updated as part of this AUAR Update to evaluate the revised scenarios. These analyses are included in the appendices. Stormwater: The stormwater analysis was updated based on the revised development scenarios. Additionally, rules and regulations have changed over the years regarding stormwater management in the study area since the original AUAR was completed. Stormwater will be required to be managed based on local, regional, and state water resource rules. The updated analysis indicates that runoff volumes will be reduced by approximately 70% compared to existing conditions based on implementation of stormwater management controls. This will also reduce downstream pollutant loading. Appendix B contains the stormwater management analysis. I-35E Corridor AUAR Update April 15, 2020 Page 3 Water: The projected water demands for the revised scenarios have remained within the parameters discussed in the original AUAR. These scenarios are anticipated to increase the annual water use above the current authorized appropriated volume for the City, similarly as anticipated in the original AUAR. The mitigation measures for water appropriation and use have been reviewed and minor revisions were made. Appendix C contains the water appropriation analysis. Wastewater: Wastewater within the study area would be conveyed with existing and future sanitary sewer and then directed to two Metropolitan Council Environmental Services (MCES) interceptors. Wastewater is then conveyed through the regional collection system to the Metropolitan Wastewater Treatment Plant. The revised analysis projects less wastewater flow than anticipated in the original AUAR. The mitigation measures have been revised and no changes were needed with this Update. Appendix D contains the wastewater management analysis. Traffic: The traffic analysis was updated based on the revised scenarios. This incorporated the current existing conditions and projected 2040 conditions. The analysis shows that future traffic generated with the revised development scenarios will be less than those assumed in the original AUAR. No changes to the mitigation measures are needed. Appendix E contains the traffic analysis. Approved Development within the Study Area Since the 2015 AUAR Update, some anticipated development did not occur, and some projects were constructed within the study area. Figure 5 shows the areas that have developed in the study area. Since the 2015 Update, the following has occurred in the study area: • Watermark: Phase 1 for Watermark (formerly planned as the Hardwood Creek Site) is under development. The full plan includes a total of 864 residential units (692 single family and 172 townhomes). • Distribution Alternatives: A 402,000 SF distribution facility was completed in 2016. • 21st Avenue: A ½ mile extension of 21st Avenue was completed in 2016. • Eastside Villas: A 32 lot single-family subdivision is under construction. • Main Street Shoppes: A 9,000 SF multi-tenant commercial building was completed. • Moon Marsh and Main Street Villages that were noted in previous updates were not constructed and their permits expired. AUAR Mitigation Plan The mitigation plan that has been developed as part of the AUAR process has been revised with his Update. It is included in Appendix H. 7. Cover types: Estimate the acreage of the site with each of the following cover types before and after development: The original AUAR sites the Minnesota Land Cover Classification System (MLCCS). This data is applicable today. Some areas as shown in Figure 5 have developed. The land cover continues to be consistent with the original AUAR with planted or cultivated areas, urban areas, wooded and shrub areas, and wetlands. I-35E Corridor AUAR Update April 15, 2020 Page 4 The Conservation Design Framework outlined in the AUAR has continued to be carried forward in the mitigation plan. This framework outlines open space and corridor space where some areas would be preserved, and some areas would be reviewed for development that could be inclusive to open space. 8. Permits and approvals required: List all known local, state and federal permits, approvals, certifications, and financial assistance for the project. Include modifications of any existing permits, governmental review of plans and all direct and indirect forms of public financial assistance including bond guarantees, Tax Increment Financing, and infrastructure. All of these final decisions are prohibited until all appropriate environmental review has been completed. See Minnesota Rules, Chapter 4410.3100. Unit of Government Type of Application Status Federal Army Corps of Engineers Section 404 Permit To be Applied for State Minnesota Environmental Quality Board Environmental Assessment (AUAR) In progress Minnesota Pollution Control Agency Section 401 Water Quality Certificate To be Applied for NPDES/SDS General Permit To be Applied for Sanitary Sewer Extension Permit To be Applied for State Historic Preservation Office Cultural Resources Review To be Applied for Minnesota Department of Transportation Use of or Work within MnDOT right of way To be Applied for Drainage Permit To be Applied for Minnesota Department of Natural Resources Water Appropriations Permit To be Applied for Preliminary Well Construction Assessment To be Applied for Public Waters Work Permit To be Applied for General Permit 97-0005 for Temporary Water Appropriations (need if more than 10,000 gpd of water is appropriated To be applied for, if necessary Minnesota Department of Health Watermain Extension Approval To be Applied for Sanitary Sewer Extension Permit Approval To be Applied for Well Location and Construction Approval To be Applied for Regional Rice Creek Watershed District Erosion and Sediment Control Plan Approval To be Applied for Stormwater Management Plan Approval To be Applied for Wetland Delineation Boundary Confirmation To be approved upon completion of wetland delineation Certificate of Wetland Exemption To be Applied for Wetland Impact/Replacement Application To be approved upon completion of wetland delineation I-35E Corridor AUAR Update April 15, 2020 Page 5 Unit of Government Type of Application Status Metropolitan Council Sanitary Sewer Service Connection Approval To be Applied for County Anoka County County Roadway Access Permits To be Applied for Local City of Lino Lakes Site Plan Approval To be Applied for AUAR and Mitigation Plan Approval Ongoing Planned Unit Development Approval To be Applied for Preliminary Plat Approval To be Applied for Final Plat (multiple) Approval To be Applied for Grading, Excavation and Foundation Permits (multiple) To be Applied for Building Permits (multiple) To be Applied for Sanitary Sewer Connection Permit (multiple) To be Applied for Municipal Water Connection Permit (multiple) To be Applied for Use Permit – Floodplain District To be Applied for City Roadway Access/Crossing Permits To be Applied for Comprehensive Plan Amendment(s) To be Applied for 9. Land use: No significant changes to the original AUAR are noted for this section. The surrounding land uses are residential, highway, commercial, industrial, agricultural, and open space. The scenarios are consistent with development that has occurred in the area and compatible with adjacent land uses. 10. Geology, soils, and topography/land forms: The soils and geology of the study area have not changed from the original AUAR. The area is within the Anoka Sandplain and has a flat topography. The Anoka County Soil Survey shows numerous types of soils in the study area including loamy fine sands, fine sandy loams, and hydric soils in wetland areas. 11. Water Resources: a. Describe surface water and groundwater features on or near the site in a.i. and a.ii. below. i. Surface water – lakes, streams, wetlands, intermittent channels, and county/judicial ditches. Include any special designations such as public waters, trout stream/lake, wildlife lakes, migratory waterfowl feeding/resting lake, and outstanding resource value water. Include water quality impairments or special designations listed on the current MPCA 303d Impaired Waters List that are within 1 mile of the project. Include DNR Public Waters Inventory number(s), if any. Surface water in the study are remains the same as the original AUAR and includes numerous wetlands and water bodies. Of note continues to be Peltier Lake (#2000400), Rondeau Lake (#2001500), Clearwater Creek (#82006a), and Hardwood Creek (#0213a). Based on a review of information from the MPCA, impaired waters in the study area include: • Peltier Lake • Clearwater Creek I-35E Corridor AUAR Update April 15, 2020 Page 6 • Hardwood Creek Additional information can be found in Appendix B which contains an updated analysis of stormwater management for the study area. ii. Groundwater – aquifers, springs, seeps. Include: 1) depth to groundwater; 2) if project is within a MDH wellhead protection area; 3) identification of any onsite and/or nearby wells, including unique numbers and well logs if available. If there are no wells known on site or nearby, explain the methodology used to determine this. As indicated in the original AUAR, the study area has shallow groundwater. Additional information about groundwater can be found in Appendix C. b. Describe effects from project activities on water resources and measures to minimize or mitigate the effects in Item b.i. through Item b.iv. below. i. Wastewater – For each of the following, describe the sources, quantities and composition of all sanitary, municipal/domestic and industrial wastewater produced or treated at the site. 1) If the wastewater discharge is to a publicly owned treatment facility, identify any pretreatment measures and the ability of the facility to handle the added water and waste loadings, including any effects on, or required expansion of, municipal wastewater infrastructure. 2) If the wastewater discharge is to a subsurface sewage treatment systems (SSTS), describe the system used, the design flow, and suitability of site conditions for such a system. 3) If the wastewater discharge is to surface water, identify the wastewater treatment methods and identify discharge points and proposed effluent limitations to mitigate impacts. Discuss any effects to surface or groundwater from wastewater discharges. Updated analysis on the wastewater system can be found in Appendix D. ii. Stormwater – Describe the quantity and quality of stormwater runoff at the site prior to and post construction. Include the routes and receiving water bodies for runoff from the site (major downstream water bodies as well as the immediate receiving waters). Discuss any environmental effects from stormwater discharges. Describe stormwater pollution prevention plans including temporary and permanent runoff controls and potential BMP site locations to manage or treat stormwater runoff. Identify specific erosion control, sedimentation control or stabilization measures to address soil limitations during and after project construction. Updated analysis on the stormwater impacts system can be found in Appendix B. iii. Water appropriation – Describe if the project proposes to appropriate surface or groundwater (including dewatering). Describe the source, quantity, duration, use, and purpose of the water use and if a DNR water appropriation permit is required. Describe any well abandonment. If connecting to an existing municipal water supply, identify the wells to be used as a water source and any effects on, or required expansion of, municipal water infrastructure. Discuss environmental effects from water appropriation, including an assessment of the water resources available for appropriation. Identify any measures to avoid, minimize, or mitigate environmental effects from the water appropriation. Updated analysis on water system impacts can be found in Appendix C. I-35E Corridor AUAR Update April 15, 2020 Page 7 iv. Surface Waters a) Wetlands – Describe any anticipated physical effects or alterations to wetland features such as draining, filling, permanent inundation, dredging and vegetative removal. Discuss direct and indirect environmental effects from physical modification of wetlands, including the anticipated effects that any proposed wetland alterations may have to the host watershed. Identify measures to avoid (e.g., available alternatives that were considered), minimize, or mitigate environmental effects to wetlands. Discuss whether any required compensatory wetland mitigation for unavoidable wetland impacts will occur in the same minor or major watershed and identify those probable locations. b) Other surface waters – Describe any anticipated physical effects or alterations to surface water features (lakes, streams, ponds, intermittent channels, county/judicial ditches) such as draining, filling, permanent inundation, dredging, diking, stream diversion, impoundment, aquatic plant removal and riparian alteration. Discuss direct and indirect environmental effects from physical modification of water features. Identify measures to avoid, minimize, or mitigate environmental effects to surface water features, including in-water Best Management Practices that are proposed to avoid or minimize turbidity/sedimentation while physically altering the water features. Discuss how the project will change the number or type of watercraft on any water body, including current and projected watercraft usage. Impacts to wetlands and surface waters include potential impacts associated with filling or draining as development occurs. These impacts were contemplated in the original AUAR. Estimates of wetland impact for the study area are difficult to anticipate without specific site plans. However, these impacts are anticipated to be typical of development and are subject to local, state, and federal wetland rules through the Rice Creek Watershed District, Wetland Conservation Act, US Corps of Engineers, Minnesota Department of Natural Resources, and the Minnesota Pollution Control Agency. Hardwood Creek and Peltier Lake are impaired waters. Impacts will need to meet the sequencing requirements or water quality regulations and wetland replacement and/or treatment may be needed. Replacement could occur on-site or through the purchase of wetland banking credits. No significant difference in analysis from the original AUAR is needed for this Update. 12. Contamination/Hazardous Materials/Wastes: a. Pre-project site conditions – Describe existing contamination or potential environmental hazards on or in close proximity to the project site such as soil or ground water contamination, abandoned dumps, closed landfills, existing or abandoned storage tanks, and hazardous liquid or gas pipelines. Discuss any potential environmental effects from pre-project site conditions that would be caused or exacerbated by project construction and operation. Identify measures to avoid, minimize or mitigate adverse effects from existing contamination or potential environmental hazards. Include development of a Contingency Plan or Response Action Plan. No significant changes to existing conditions in relation to existing contamination or hazards have occurred based on a review of “What’s In My Neighborhood.” A summary of the review is included in Appendix G. b. Project related generation/storage of solid wastes – Describe solid wastes generated/stored during construction and/or operation of the project. Indicate method of disposal. Discuss potential environmental effects from solid waste handling, storage and disposal. Identify measures to avoid, minimize or mitigate adverse effects from the generation/storage of solid waste including source reduction and recycling. I-35E Corridor AUAR Update April 15, 2020 Page 8 There are no changes from the original AUAR in terms of solid waste assumptions. c. Project related use/storage of hazardous materials – Describe chemicals/hazardous materials used/stored during construction and/or operation of the project including method of storage. Indicate the number, location and size of any above or below ground tanks to store petroleum or other materials. Discuss potential environmental effects from accidental spill or release of hazardous materials. Identify measures to avoid, minimize or mitigate adverse effects from the use/storage of chemicals/hazardous materials including source reduction and recycling. Include development of a spill prevention plan. As indicated in the original AUAR, there is the potential for location gas stations to be included as development occurs with the appropriate land use and zoning per scenario. A gas station or convenience store would have underground storage tanks. There may also be light industrial development that includes storage of diesel fuel for operations. These types of developments would be required to meet all other state and federal permitting and guidance for operations. d. Project related generation/storage of hazardous wastes – Describe hazardous wastes generated/stored during construction and/or operation of the project. Indicate method of disposal. Discuss potential environmental effects from hazardous waste handling, storage, and disposal. Identify measures to avoid, minimize or mitigate adverse effects from the generation/storage of hazardous waste including source reduction and recycling. Generation of significant amounts of hazardous wastes are not anticipated with development of either of the scenarios. Waste generated will be of similar nature to residential, light industrial, and commercial uses and will be required to comply with applicable state laws. 13. Fish, wildlife, plant communities, and sensitive ecological resources (rare features): a. Describe fish and wildlife resources as well as habitats and vegetation on or in near the site. b. Describe rare features such as state-listed (endangered, threatened or special concern) species, native plant communities, Minnesota County Biological Survey Sites of Biodiversity Significance, and other sensitive ecological resources on or within close proximity to the site. Provide the license agreement number (LA-____) and/or correspondence number (ERDB- 20200206) from which the data were obtained and attach the Natural Heritage letter from the DNR. Indicate if any additional habitat or species survey work has been conducted within the site and describe the results. c. Discuss how the identified fish, wildlife, plant communities, rare features and ecosystems may be affected by the project. Include a discussion on introduction and spread of invasive species from the project construction and operation. Separately discuss effects to known threatened and endangered species. d. Identify measures that will be taken to avoid, minimize, or mitigate adverse effects to fish, wildlife, plant communities, and sensitive ecological resources. Information from the DNR Natural Heritage Information Database was obtained for the AUAR Update. This information is similar to the information obtained in the previous updates and the original AUAR. The mitigation plan contains measures that acknowledge the natural resource features in the area. The DNR NHIS information is included in Appendix F. I-35E Corridor AUAR Update April 15, 2020 Page 9 14. Historic properties: Describe any historic structures, archeological sites, and/or traditional cultural properties on or in close proximity to the site. Include: 1) historic designations, 2) known artifact areas, and 3) architectural features. Attach letter received from the State Historic Preservation Office (SHPO). Discuss any anticipated effects to historic properties during project construction and operation. Identify measures that will be taken to avoid, minimize, or mitigate adverse effects to historic properties. The State Historic Preservation Office was contacted regarding historic resources in the area. The resources are similar to past updates (Appendix F). The City has a robust review for cultural resources when development is proposed, and the mitigation plan is adequate to address this issue. 15. Visual: Describe any scenic views or vistas on or near the project site. Describe any project related visual effects such as vapor plumes or glare from intense lights. Discuss the potential visual effects from the project. Identify any measures to avoid, minimize, or mitigate visual effects. No changes from previous AUARs. 16. Air: a. Stationary source emissions – Describe the type, sources, quantities and compositions of any emissions from stationary sources such as boilers or exhaust stacks. Include any hazardous air pollutants, criteria pollutants, and any greenhouse gases. Discuss effects to air quality including any sensitive receptors, human health or applicable regulatory criteria. Include a discussion of any methods used assess the project’s effect on air quality and the results of that assessment. Identify pollution control equipment and other measures that will be taken to avoid, minimize, or mitigate adverse effects from stationary source emissions. Not applicable to an AUAR. b. Vehicle emissions - Describe the effect of the project’s traffic generation on air emissions. Discuss the project’s vehicle-related emissions effect on air quality. Identify measures (e.g. traffic operational improvements, diesel idling minimization plan) that will be taken to minimize or mitigate vehicle-related emissions. An updated traffic study is included in Appendix E. The traffic generation is within the parameters of the original AUAR. c. Dust and odors - Describe sources, characteristics, duration, quantities, and intensity of dust and odors generated during project construction and operation. (Fugitive dust may be discussed under item 16a). Discuss the effect of dust and odors in the vicinity of the project including nearby sensitive receptors and quality of life. Identify measures that will be taken to minimize or mitigate the effects of dust and odors. No changes from the original AUAR. 17. Noise: Describe sources, characteristics, duration, quantities, and intensity of noise generated during project construction and operation. Discuss the effect of noise in the vicinity of the project including 1) existing noise levels/sources in the area, 2) nearby sensitive receptors, 3) conformance to state noise standards, and 4) quality of life. Identify measures that will be taken to minimize or mitigate the effects of noise. No changes from the original AUAR. I-35E Corridor AUAR Update April 15, 2020 Page 10 18. Transportation a. Describe traffic-related aspects of project construction and operation. Include: 1) existing and proposed additional parking spaces, 2) estimated total average daily traffic generated, 3) estimated maximum peak hour traffic generated and time of occurrence, 4) indicate source of trip generation rates used in the estimates, and 5) availability of transit and/or other alternative transportation modes. b. Discuss the effect on traffic congestion on affected roads and describe any traffic improvements necessary. The analysis must discuss the project’s impact on the regional transportation system. If the peak hour traffic generated exceeds 250 vehicles or the total daily trips exceeds 2,500, a traffic impact study must be prepared as part of the EAW. Use the format and procedures described in the Minnesota Department of Transportation’s Access Management Manual, Chapter 5 (available at: http://www.dot.state.mn.us/accessmanagement/resources.html) or a similar local guidance. c. Identify measures that will be taken to minimize or mitigate project related transportation effects. An updated traffic study is included in Appendix E. 19. Cumulative potential effects: (Preparers can leave this item blank if cumulative potential effects are addressed under the applicable EAW Items) NA to AUAR 20. Other potential environmental effects: If the project may cause any additional environmental effects not addressed by items 1 to 19, describe the effects here, discuss the how the environment will be affected, and identify measures that will be taken to minimize and mitigate these effects. No additional environmental effects have been identified. Appendix A Figures %&d( %&c( %&c( GnWX GnWX GÀWX GÀWX G¦WX CENTERVILLE RDOTTERLAKE RDMAIN ST20TH AVE80TH ST BIRCH ST WARDS LAKE SHERMAN LAKE CENTERVILLELAKE GEORGEWATCHLAKE PELTIER LAKE RONDEAU LAKE RICE CREEK CHAIN OFLAKES PARK RESERVE CITYHALLPARK CLEARWATER CREEK PARK PHEASANTHILLS PARK BRANDYWOODPARK LAURIELAMOTTEMEMORIAL PARK TRACIE MCBRIDEMEMORIAL PARK ACORNCREEKPARK EAGLE PARK HIDDENSPRING PARK CORNERSTONEPARK ROYALMEADOWSPARK Study Area City Boundary 0 2,700Feet¯Figure 1 - Project Location I-35 Corridor AUAR Project Lino Lakes, MN Document Path: K:\015144-000\GIS\Maps\AUAR\Figure1_ProjectLocation.mxd Date Saved: 12/17/2019 8:51:15 AM1 inch = 2,700 f eet %&d( %&c( %&c( GnWX GnWX GÀWX GÀWX G¦WX CENTERVILLERDOTTERLAKE RDMAIN ST20TH AVE80TH ST BIRCH ST WARDS LAKE SHERMANLAKE CENTERVILLELAKE GEORGEWATCHLAKE PELTIER LAKE RONDEAULAKE Study Area City Boundary Full Build Land Use Per manent Rural Low Density R esidential Low Density M ixedResidential Medium D ensityResidential High D ensity Residential Planned Residential /Commercial Office Residential Commercial Business Campus Industrial Civic/Institutional Par k & Open Space 0 2,700Feet¯Figure 2 - Revised Scenario 1Draft 2040 Full Build Out Land UseI-35 Corridor AUAR ProjectLino Lakes, MN Document Path: K:\015144-000\GIS\Maps\AUAR\Figure2_RevisedScenario12040FullBuild.mxd Date Saved: 4/15/2020 11:53:32 AM1 inch = 2,700 f eet %&d( %&c( %&c( GnWX GnWX GÀWX GÀWX G¦WX CENTERVILLE RDOTTERLAKE RDMAIN ST20TH AVE80TH ST BIRCH ST WARDS LAKE SHERMAN LAKE CENTERVILLELAKE GEORGEWATCHLAKE PELTIER LAKE RONDEAU LAKE Study Area City Boundary Scenario 2 Full Build Land Use Per manent Rural Low Density R esidential Low Density M ixedResidential Medium D ensityResidential High D ensity Residential Planned Residential /Commercial Commercial Business Campus Industrial Civic/Institutional Par k & Open Space 0 2,700Feet¯Figure 3 - Revised Scenario 2 I-35 Corridor AUAR Project Lino Lakes, MN Document Path: K:\015144-000\GIS\Maps\AUAR\Figure3_RevisedScenario2.mxd Date Saved: 12/30/2019 7:01:10 AM1 inch = 2,700 f eet %&d( %&c( %&c( GnWX GnWX GÀWX GÀWX G¦WX CENTERVILLERDOTTERLAKE RDMAIN ST20TH AVE80TH ST BIRCH ST WARDS LAKE SHERMANLAKE CENTERVILLELAKE GEORGEWATCHLAKE PELTIER LAKE RONDEAULAKE Study Area City Boundary 2030 Land Use Permanent Rural Urban Reserve Low Density Residential Medium DensityResidential High Density Residential Commercial Mixed Use Business Campus Industrial Civic/Institutional Park & Open Space 0 2,700Feet¯Figure 4 - 2030 Comp PlanI-35 Corridor AUAR ProjectLino Lakes, MN Document Path: K:\015144-000\GIS\Maps\AUAR\Figure4_2030CompPlanMap.mxd Date Saved: 4/1/2020 2:51:16 PM1 inch = 2,700 f eet %&d( %&c( %&c( GnWX GnWX GÀWX GÀWX G¦WX Watermark Park-n-Ride Two Industrial Projects in Centerville 21st Ave Extension North Pointe Eastside Villas Distribution Alternatives Main Street Shoppes 2nd Addition McDonalds Interchange CENTERVILLE RDOTTERLAKE RDMAIN ST20TH AVE80TH ST BIRCH ST WARDS LAKE SHERMAN LAKE CENTERVILLELAKE GEORGEWATCHLAKE PELTIER LAKE RONDEAU LAKE RICE CREEK CHAIN OFLAKES PARK RESERVE CITYHALLPARK CLEARWATER CREEK PARK PHEASANTHILLS PARK BRANDYWOODPARK LAURIELAMOTTEMEMORIAL PARK TRACIE MCBRIDEMEMORIAL PARK ACORNCREEKPARK EAGLE PARK HIDDENSPRING PARK CORNERSTONEPARK ROYAL MEADOWS PARK Study Area City Boundary 2020 Update 2015 Update 2010 Update 0 2,700Feet¯Figure 5 - Developments Map I-35 Corridor AUAR Project Lino Lakes, MN Document Path: K:\015144-000\GIS\Maps\AUAR\Figure4_DevelopmentsMap.mxd Date Saved: 1/29/2020 9:42:40 AM1 inch = 2,700 feet Appendix B Stormwater Management Memo K:\015144-000\Admin\Docs\AUAR - Update 2020\Stormwater\MEMO - 040920 - Stormwater AP.docx 701 XENIA AVENUE S | SUITE 300 | MINNEAPOLIS, MN | 55416 | 763.541.4800 | WSBENG.COM Final Technical Memorandum To: Michael Grochala, City of Lino Lakes From: Madison Rogers, WSB Andi Moffatt, WSB Date: April 8, 2020 Re: Stormwater Management – I-35 Corridor AUAR City of Lino Lake, Minnesota WSB Project No. R-015144-000 INTRODUCTION The original Alternative Urban Areawide Review (AUAR) was completed and approved in September 2005. The AUAR analyzed the stormwater impacts of the three development scenarios. Based on the analysis, a Mitigation Plan was developed. AUAR updates are required every five years from the original date of the approved AUAR. Updates were prepared in 2010 and 2015. Each assumed no change in the proposed development land use scenarios and included discussion of mitigation improvements that had been completed at the time. Since the 2015 AUAR update was prepared, the City has completed an updated Comprehensive Plan. This AUAR Update includes review of three revised scenarios. The information and analysis outlined within this memo is intended to complete a portion of the AUAR Update related to Item # 11.ii – Water Resources – Stormwater related to revising of the three revised scenarios. This memo is intended to update the stormwater analysis provided in the original AUAR where applicable. WATER RESOURCES – STORMWATER ii. Stormwater - Describe the quantity and quality of stormwater runoff at the site prior to and post construction. Include the routes and receiving water bodies for runoff from the site (major downstream water bodies as well as the immediate receiving waters). Discuss any environmental effects from stormwater discharges. Describe stormwater pollution prevention plans including temporary and permanent runoff controls and potential BMP site locations to manage or treat stormwater runoff. Identify specific erosion control, sedimentation control or stabilization measures to address soil limitations during and after project construction. Procedures and Methods Followed The procedures and methods used to estimate the runoff volumes and pollutants loads within the AUAR were based on the Natural Resource Conservation Service (NRCS) runoff curve number method and event mean concentration pollutant values from the Minnesota Stormwater Manual. Any development within the study area will be required to meet the stormwater standards of the City of Lino Lakes and Rice Creek Watershed District (RCWD). These standards include: • Promote volume control and groundwater recharge. • Protect water quality from nutrients, heavy metals, and other urban pollutants. Mr. Michael Grochala April 8, 2020 Page 2 K:\015144-000\Admin\Docs\AUAR - Update 2020\Stormwater\MEMO - 040920 - Stormwater AP.docx • Protect life, public and private property, and the natural resources from damage resulting from runoff and the dangers associated with flooding. Existing Conditions The study area currently consists of agricultural area, rural residential, and park and open space areas. The impervious surface is primarily made up of the existing roadways. The major roads include 20th Avenue, 80th Street, County Road 14, and Interstates 35E and 35W. There are four major watersheds within the study area. The west and central portion of the study area is part of the Peltier subwatershed. The north part of the study area is within the Hardwood Creek subwatershed and Upper Rice Creek subwatershed, and the southeast part is within the Clearwater Creek subwatershed. All of these subwatersheds drain to Peltier Lake through tile drain or county ditch systems. Future development will need to address any requirements that are established due to current regulatory standards adopted by the RCWD, City of Lino Lakes, and Minnesota Pollution Control Agency (MPCA). The MPCA has listed three water resources within the study area as impaired: Peltier Lake, Hardwood Creek, and Clearwater Creek. Peltier Lake and Hardwood Creek have approved Total Maximum Daily Load (TMDL) that provides additional guidance and requirements for pollutant loads. Approximately 68% of the study area consists of Group D soils, and the remaining area consists of Group A and B soils. These soil ratings are based on hydrologic soil classifications with A soils having high infiltration rates even when thoroughly wetted. The infiltration rates for A soils range from 0.8 to 1.63 inches per hour (Minnesota Stormwater Manual). These soils consist chiefly of deep, well drained to excessively drained sands and gravel. Group A soils have a high rate of water transmission, therefore resulting in a low runoff potential. Group B soils have moderate infiltration rates ranging from 0.3 to 0.6 inches per hour when thoroughly wetted. Group B soils consist of deep moderately well to well drained soils with moderately fine to moderately coarse textures. Infiltration is very low in areas with Group D soils, and the design of infiltration basins is not recommended in areas with Group D soils (per the MPCA National Pollution Discharge Elimination System Construction General Permit). Proposed Conditions The three revised scenarios were considered in this analysis in the proposed conditions. Due to the conceptual nature of the development scenarios, the Land Use type classifications for each scenario were evaluated using curve numbers from the NRCS. The existing conditions and three proposed revised land use scenarios were evaluated. Stormwater management for any scenario can be provided through a combination of wet detention ponds and infiltration and filtration features. Achieving volume reduction and pollutant reduction through the use of infiltration may be challenging for a majority of the study area due to a majority D soils with low infiltration rates, and a high groundwater table. Stormwater management via green infrastructure such as stormwater reuse will be encouraged by the City of Lino Lakes and RCWD to achieve volume reduction and pollutant removal requirements. Mr. Michael Grochala April 8, 2020 Page 3 K:\015144-000\Admin\Docs\AUAR - Update 2020\Stormwater\MEMO - 040920 - Stormwater AP.docx Local Stormwater Management Requirements Stormwater management within the future development of the study area must be in conformance with local requirements of the City of Lino Lakes, RCWD, and MPCA. Some requirements are more stringent than others. However, the development in the study area will need to demonstrate that all local standards are being met under proposed stormwater management techniques. The following is a summary of major stormwater management requirements: • Rice Creek Watershed District The RCWD rules (approved December 14, 2016) require that for rate control, proposed peak runoff rates shall not exceed existing for the 2, 10, 100-year 24-hour rainfall events. Proposed projects must not adversely affect off-site water levels or resources supported by local recharge, or increase potential for off-site flooding, during or after construction. The RCWD requires a water quality treatment volume depending on the area of new or reconstructed impervious surface. Applicants can use BMPs including infiltration, water reuse, filtration, and stormwater ponds to achieve the required water quality treatment volume. Each BMP design variation has a different pollutant removal factor, and applicants must provide sufficient treatment volume depending on the BMP used for the site. The RCWD has an approved Comprehensive Stormwater Management Plan (CSMP) for a portion of the AUAR area (Northeast Lino Lakes Drainage Area CSMP). This purpose of the CSMP is to present an alternative means to meet the RCWD rules. Projects within the CSMP area must conform to design requirements detailed in the CSMP report as applicable. • City of Lino Lakes The City’s Stormwater, Erosion, and Sediment Control Ordinance (adopted October 26, 2015) requires proposed development to maintain or decrease runoff volume and flow frequency, duration and peak runoff rates. Proposed development must also increase infiltration or filtration opportunities, maintain existing flow patterns, and provide storage of stormwater runoff on site. Stormwater BMPs must provide infiltration where feasible, but if infiltration is shown as not feasible for a site due to physical or contamination limitations, then another stormwater BMP may be used. Water discharged to BMPs shall be pretreated to National Urban Runoff Program (NURP) standards. • National Pollution Discharge Elimination System (NPDES) Standards The MPCA is responsible for implementing NPDES standards. The NPDES requirements in the AUAR area will be from the NPDES Construction General Permit (effective August 1, 2018) and the NPDES Municipal Separate Storm Sewer System (MS4) Permit (effective August 1, 2013). The NPDES Construction General Permit will require that for sites replacing pervious surfaces with one acre or more of impervious surface, a water quality volume equivalent to 1 inch of runoff from the new impervious surface should be treated. This can be met through wet sedimentation basins, infiltration/filtration, or regional ponding. There are three impaired waterbodies within the study area, and sites that are within one mile of impaired water bodies require additional BMPs. Mr. Michael Grochala April 8, 2020 Page 4 K:\015144-000\Admin\Docs\AUAR - Update 2020\Stormwater\MEMO - 040920 - Stormwater AP.docx The NPDES MS4 permit requires permittees to provide post-construction water quality standards adopted at the local level. The NPDES MS4 Permit is currently drafted and out for public review (available for comment through January 11, 2020). The MS4 permit will require permittees to meet the requirements of future TMDLs. Currently there is a TMDL Implementation Plan proposed for discharges to Peltier Lake and Hardwood Creek, they are identified as the Peltier Lake and Centerville Lake TMDL and the Hardwood Creek Impaired Biota (Fish) and Dissolved Oxygen TMDL. Depending on the location and proximity to impaired waters, development within the AUAR area may need to complete an anti-degradation analysis for the impaired water. Water Quantity and Quality Analysis A water quantity and quality analysis was completed for the existing and proposed conditions within the study area. This quantitative analysis uses the NRCS runoff curve number method to calculate runoff and the results are summarized in Table 1 and Table 2. Table 1 summarizes the total runoff volumes for each development scenario compared to the existing condition. Table 1. Existing and Proposed Annual Runoff Volumes1 Existing conditions (AC-FT) 2020 Scenario 1 w/o Volume Reduction (AC-FT) 2020 Scenario 1 with Volume Reduction2 (AC-FT) 2020 Scenario 2 w/o Volume Reduction (AC-FT) 2020 Scenario 2 with Volume Reduction2 (AC-FT) 2020 Comp Plan (2030) w/o Volume Reduction (AC-FT) 2020 Comp Plan (2030) with Volume Reduction2 (AC-FT) AUAR Area 11,201 11,363 3,326 11,381 3,328 11,383 4,678 1Annual runoff volumes are based on an average of 32 inches of rainfall for the state of Minnesota. 21.1 inches represents approximately 90% of all rain events in Minnesota (Minnesota Minimal Impact Design Standards, MPCA), therefore volume reduction of 90% was assumed in all land use areas for proposed scenarios, except Permanent Rural, Urban Reserve and Right-of Way, which are assumed to not require any future stormwater management. Table 2 summarizes the total pollutant loads for each development scenario compared to the existing condition. Table 2. Total Suspended Solids and Total Phosphorus Annual Loads Pollutant1 Existing conditions 2020 Scenario 1 w/o Volume Reduction 2020 Scenario 1 with Volume Reduction 2020 Scenario 2 w/o Volume Reduction 2020 Scenario 2 with Volume Reduction 2020 Scenario 2 w/o Volume Reduction 2020 Scenario 2 with Volume Reduction AUAR Area TSS (tons/yr) 906 946 299 957 301 925 372 TP (lbs/yr) 8,522 8,407 3,059 8,573 3,076 8,344 4,679 1Pollutant loading was determined using Event Mean Concentration values from the MPCA Stormwater Manual, based on Land Use classification for the AUAR area. Mr. Michael Grochala April 8, 2020 Page 5 K:\015144-000\Admin\Docs\AUAR - Update 2020\Stormwater\MEMO - 040920 - Stormwater AP.docx To achieve compliance with regulatory requirements, future development must provide annual volume and pollutant load reductions in the amounts required by Local Stormwater Management Regulations and comply with the TMDL. The values presented in Tables 1 and 2 show the estimated annual volume and pollutant load reductions based on the conceptual analysis, and don’t include any site-specific constraints for individual developments within the AUAR area. Potential Impact to Downstream Receiving Waters The analysis within the AUAR area shows that the runoff volumes will be reduced by approximately 70 percent for each of the three revised land use scenarios as compared to existing conditions. This is achieved through implementing City of Lino Lakes, RCWD, and NPDES volume reduction requirements. This reduction in runoff translates directly to the reduction in pollutant loads shown in Table 2. Mr. Michael Grochala April 8, 2020 Page 6 K:\015144-000\Admin\Docs\AUAR - Update 2020\Stormwater\MEMO - 040920 - Stormwater AP.docx Review and Update of the Mitigation Plan The table below provides the mitigation plan for stormwater management. These mitigation measures have been reviewed and revised as needed for this AUAR Update. Table 3. Water Quantity and Quality Mitigation Plan Item No. Mitigation Description Update 17.3 Require stormwater management systems to be developed in accordance with the current version of the Rice Creek Watershed District Rules (these rules assist in achieving the goals of the Resource Management Plan – 3) and all other local, state, and federal stormwater management requirements. Updated to be inclusive of the current version of the rules. The RCWD rules are intended to meet the goals of the Resource Management Plan-3 that was included in the 2010 AUAR Update. Appendix C Water Appropriation Memo K:\015144-000\Admin\Docs\AUAR - Update 2020\Water Wastewater\MEMO - 040820 - Water.docx 701 XENIA AVENUE S | SUITE 300 | MINNEAPOLIS, MN | 55416 | 763.541.4800 | WSBENG.COM Final Technical Memorandum To: Michael Grochala, City of Lino Lakes From: Jon Christensen, WSB Andi Moffatt, WSB Date: April 8, 2020 Re: Water Appropriations – I-35 Corridor AUAR City of Lino Lakes, Minnesota WSB Project No. R-015144-000 INTRODUCTION The original Alternative Urban Areawide Review (AUAR) was completed and approved in September 2005. The AUAR analyzed the stormwater impacts of the three development scenarios. Based on the analysis, a Mitigation Plan was developed. AUAR updates are required every five years from the original date of the approved AUAR. Updates were prepared in 2010 and 2015. Each assumed no change in the proposed development land use scenarios and included discussion of mitigation improvements that had been completed at the time. Since the 2015 AUAR update was prepared, the City has completed an updated Comprehensive Plan. This AUAR Update includes review of three scenarios. The information and analysis outlined within this memo is intended to complete a portion of the AUAR Update related to Item # 11.b.iii – Water Resources – Water Appropriation related to revising of the three scenarios. This memo is intended to update the water analysis provided in the original AUAR where applicable. WATER RESOURCES – WATER APPROPRIATIONS 11.b.iii - Water appropriation - Describe if the project proposes to appropriate surface or groundwater (including dewatering). Describe the source, quantity, duration, use and purpose of the water use and if a DNR water appropriation permit is required. Describe any well abandonment. If connecting to an existing municipal water supply, identify the wells to be used as a water source and any effects on, or required expansion of municipal water infrastructure. Discuss environmental effects from water appropriation, including an assessment of the water resources available for appropriation. Identify any measures to avoid, minimize, or mitigate environmental effects from the water appropriation. Existing Conditions Currently, the majority of the study area is served by private wells. The Minnesota Well Index indicates there are approximately 90 wells within the study area which are nearly all for domestic use. No information is available regarding these private wells beyond the Minnesota Well Index. The municipal water supply system has a DNR water appropriation permit. The water distribution system exists in the southern portion of the study area and currently extends north of Main Street on either side of I-35E. The system will continue to be extended as development progresses. Mr. Michael Grochala April 8, 2020 Page 2 K:\015144-000\Admin\Docs\AUAR - Update 2020\Water Wastewater\MEMO - 040820 - Water.docx The southern portion of the study area overlaps with a moderate vulnerability portion of the City of Lino Lakes Drinking Water Supply Management Area (DWSMA) that is delineated in the City’s Wellhead Protection Plan. The geology of the City’s existing wells is consistent with other communities in the Twin Cities Metro Area. The Paleozoic sedimentary rocks around the Twin Cities Metro area have three primary aquifers (in descending order): Prairie du Chien–Jordan, Tunnel City-Wonewoc (formerly the Franconian-Ironton-Galesville (FIG)), and Mt. Simon-Hinckley. Each of these are separated by a confining layer that essentially separates the aquifers. The Prairie du Chien–Jordan aquifer is the highest yielding aquifer in the Metro Area. Although these two formations have different names and are geologically different, the two units have been shown to be hydraulically connected. All of the City’s existing production wells are located in the Prairie du Chien–Jordan aquifer, and all future wells are anticipated to be as well. Existing and future water demands for the entire City are detailed in the City’s 2040 Comprehensive Water Supply Plan (Plan). Future infrastructure needs for the City, encompassing the AUAR study area, were developed in the Plan. A future well field was preliminarily located within the study area. The water system currently has six wells and two water towers. Tower No. 3 is currently under construction, and Well No. 7 is under investigation. Well capacities range from 600 gallons per minute (gpm) to 1,800 gpm. The existing system firm capacity (with the largest well out of service) is 4,350 gpm. From 2014-2018, the City averaged a total water demand of 79 gallons per capita per day and a maximum day to average day ratio (peaking factor) of 2.8. For the existing population served of approximately 18,000, this results in an average day demand of 1.42 million gallons per day (MGD) and a maximum day demand of 3.98 MGD. Proposed Conditions Three possible development scenarios were considered. These were revised from the 2005 Original AUAR. The 2040 Comprehensive Plan corresponds to revised Scenario 1. Scenario 2 has also been revised. The third scenario considered is the 2030 Comprehensive Plan Scenario. Based on the planned land uses for each scenario, the projected water demand is summarized below. New development within the study area will connect to the municipal water system. Mr. Michael Grochala April 8, 2020 Page 3 K:\015144-000\Admin\Docs\AUAR - Update 2020\Water Wastewater\MEMO - 040820 - Water.docx 2020 Scenario 1 The projected water demands within the study area for 2020 Scenario 1 are shown in Table 1. There are a number of properties within the southern portion of the study area that already receive municipal water, so these areas have been removed from the areas listed in Table 1. Table 1. Projected Water Demand for 2020 Scenario 1 Land Use Type Area (acres) Density (units/acre) Demand Assumption (gpd/acre) * Average Day Demand (gpd) Max Day Demand (gpd) Low Density Sewered Residential 282.6 2.3 449 126,752 354,906 Low Density Mixed Residential 376.9 3.5 683 257,234 720,257 Medium Density Residential 180.5*** 5.0 975 175,968 492,710 High Density Residential 39.0 7.0 1,365 53,257 149,119 Planned Residential / Commercial** 89.9 9.0 1,378 123,902 346,926 Office Residential** 139.5 5.0 988 137,747 385,692 Mixed Use 0.0 2.3 449 0 0 Commercial 348.9*** N/A 1,000 348,907 976,940 Business Campus**** 624.0 N/A 1,000 623,978 2,047,138 Industrial 472.4*** N/A 1,000 472,434 1,322,815 Civic/Institutional 1.0 N/A 750 775 2,169 Urban Reserve 0.0 N/A N/A N/A N/A Permanent Rural 358.1 N/A N/A N/A N/A Park & Open Space 837.5 N/A N/A N/A N/A Right-of-Way 3.7 N/A N/A N/A N/A Total 3,754.1 N/A N/A 2,320,954 6,798,672 *Based on residential per capita water use of 62.5 gallons per capita per day (historical average from 2014-2018) and 3.12 persons per household (projected 2020 household size per Comp Plan). **Assumes 50% residential and 50% commercial development. ***Areas for properties within the southern portion of the study area that already receive municipal water have been removed. ****Includes contingency for higher intensity max day water demands. Mr. Michael Grochala April 8, 2020 Page 4 K:\015144-000\Admin\Docs\AUAR - Update 2020\Water Wastewater\MEMO - 040820 - Water.docx 2020 Scenario 2 The projected water demands within the study area for Scenario 2 are shown in Table 2. There are a number of properties within the southern portion of the study area that already receive municipal water, so these areas have been removed from the areas listed in Table 2. Table 2. Projected Water Demand for 2020 Scenario 2 Land Use Type Area (acres) Density (units/acre) Demand Assumption (gpd/acre) * Average Day Demand (gpd) Max Day Demand (gpd) Low Density Sewered Residential 173.2 2.3 449 77,698 217,555 Low Density Mixed Residential 376.9 3.5 683 257,234 720,257 Medium Density Residential 240.9*** 5.0 975 234,853 657,588 High Density Residential 391.1 7.0 1,365 533,908 1,494,942 Planned Residential / Commercial** 89.9 9.0 1,378 123,902 346,926 Office Residential** 0.0 5.0 988 0 0 Mixed Use 0.0 2.3 449 0 0 Commercial 348.9*** N/A 1,000 348,907 976,940 Business Campus**** 362.6 N/A 1,000 362,561 1,315,171 Industrial 480.3*** N/A 1,000 480,285 1,344,797 Civic/Institutional 90.9 N/A 750 68,195 190,947 Urban Reserve 0.0 N/A N/A N/A N/A Permanent Rural 358.1 N/A N/A N/A N/A Park & Open Space 837.5 N/A N/A N/A N/A Right-of-Way 3.7 N/A N/A N/A N/A Total 3,754.1 N/A N/A 2,487,544 7,265,123 *Based on residential per capita water use of 62.5 gallons per capita per day (historical average from 2014-2018) and 3.12 persons per household (projected 2020 household size per Comp Plan). **Assumes 50% residential and 50% commercial development. ***Areas for properties within the southern portion of the study area that already receive municipal water have been removed. ****Includes contingency for higher intensity max day water demands. Mr. Michael Grochala April 8, 2020 Page 5 K:\015144-000\Admin\Docs\AUAR - Update 2020\Water Wastewater\MEMO - 040820 - Water.docx 2030 Comprehensive Plan Scenario The projected water demands within the study area for the 2030 Comp Plan Scenario are shown in Table 3. There are a number of properties within the southern portion of the study area that already receive municipal water, so these areas have been removed from the areas listed in Table 3. Table 3. Projected Water Demand for 2030 Comp Plan Scenario Land Use Type Area (acres) Density (units/acre) Demand Assumption (gpd/acre) * Average Day Demand (gpd) Max Day Demand (gpd) Low Density Sewered Residential 47.1 2.3 449 21,124 59,148 Low Density Mixed Residential 0.0 3.5 683 0 0 Medium Density Residential 140.6*** 5.0 975 137,068 383,791 High Density Residential 39.0 7.0 1,365 53,253 149,107 Planned Residential / Commercial** 0.0 9.0 1,378 0 0 Office Residential** 0.0 5.0 988 0 0 Mixed Use 374.0 2.3 449 167,739 469,669 Commercial 293.0*** N/A 1,000 292,962 820,293 Business Campus**** 276.8 N/A 1,000 276,826 1,075,113 Industrial 572.9*** N/A 1,000 572,888 1,604,086 Civic/Institutional 1.0 N/A 750 775 2,169 Urban Reserve 820.0 N/A N/A N/A N/A Permanent Rural 361.3 N/A N/A N/A N/A Park & Open Space 824.4 N/A N/A N/A N/A Right-of-Way 4.0 N/A N/A N/A N/A Total 3,754.2 N/A N/A 1,522,635 4,563,377 *Based on residential per capita water use of 62.5 gallons per capita per day (historical average from 2014-2018) and 3.12 persons per household (projected 2020 household size per Comp Plan). **Assumes 50% residential and 50% commercial development. ***Areas for properties within the southern portion of the study area that already receive municipal water have been removed. ****Includes contingency for higher intensity max day water demands. Mr. Michael Grochala April 8, 2020 Page 6 K:\015144-000\Admin\Docs\AUAR - Update 2020\Water Wastewater\MEMO - 040820 - Water.docx All three scenarios will trigger the need for additional municipal water supply infrastructure. The additional wells and storage needed are summarized in Table 4. The storage needs assume that Water Tower No. 3 (1.5 MG) will be constructed and in use by the time of development. Table 4. Supply and Storage Summary Existing System With Scenario 1 With Scenario 2 With 2030 Comp Plan Average Day Demand (MGD) 1.42 3.74 3.91 2.94 Maximum Day Demand (MGD) 3.98 10.78 11.25 8.54 Additional Wells Required N/A 3 to 4 3 to 4 2 Additional Storage Required (MG) N/A 0 to 0.3 0 to 0.4 N/A The City’s existing authorized appropriation volume is 900 million gallons per year (MGY), and the City’s historical water use from 2014-2018 was 470 MGY. All three scenarios are projected to increase the annual water use beyond 900 MGY. Therefore, the City will likely require an amendment to its appropriation volume prior to full build out of the study area. The City’s historical water use shows a decreasing trend in per capita use, which will likely decrease these projections by the time of development. Water Demand Projection Comparison Table 5 summarizes the projected average water demands from the 2005 Original AUAR and this 2020 AUAR Update for the scenarios outlined above. Table 5. Comparison of Average Water Demand Projections Scenario 2005 Original AUAR 2020 AUAR Update Scenario 1 1.86 MGD 2.32 MGD Scenario 2 2.45 MGD 2.49 MGD Scenario 3 2.61 MGD N/A 2030 Comp Plan N/A 1.52 MGD The projected water demands have remained within the parameters discussed in the original AUAR. The expansion and layout of the water supply system will generally conform to the layout identified in the 2005 Original AUAR. The 2005 Original AUAR identified the need for 1.0 MG of additional storage, approximately four additional wells, and trunk and lateral watermains. Water Tower No. 3 (1.5 MG) is currently under construction, and this AUAR Update reiterates the need for three to four additional wells. Computer modeling completed as part of the City’s 2040 Comprehensive Plan Update confirmed the adequacy of the planned 16-inch trunk watermain loop. Mr. Michael Grochala April 8, 2020 Page 7 K:\015144-000\Admin\Docs\AUAR - Update 2020\Water Wastewater\MEMO - 040820 - Water.docx Review and Update of the Mitigation Plan The table below provides the mitigation plan for water appropriations. These mitigation measures have been reviewed and revised as needed for this AUAR Update. Table 6. Water Use Item No. Mitigation Description Update 13.1 Monitor water usage and do not permit new development to proceed if it exceeds the capacity of the water supply and distribution system. This mitigation measure is ongoing. 13.2 Construct the water supply and distribution system in accordance with Minnesota Department of Health standards and with the goals, policies, and recommendations set forth in the City’s Comprehensive Water Supply Plan. This mitigation measure is ongoing. 13.3 As necessary, amend the City’s Comprehensive Water Supply Plan and Capital Improvement Plan to be consistent with any future amendments or updates to the Comprehensive Plan that would necessitate expansions or alterations to the water system. This mitigation measure is ongoing. No updates have been needed to date for the study area. 13.4 Follow the adopted Wellhead Protection Plans for Lino Lakes and Centerville. As necessary, amend the City’s Wellhead Protection Plan for new wells. This mitigation measure is ongoing. 13.5 Require abandoned private wells to be sealed in compliance with the Minnesota Department of Health regulations. This mitigation measure is ongoing. 13.6 Require that the installation of any private individual wells be constructed and installed in accordance with the Minnesota Department of Health regulations (Minnesota Well Code). This mitigation measure is ongoing. 13.7 Continue to implement the City’s adopted water conservation policies which are intended to attenuate peak water demands throughout the City. This mitigation measure is ongoing. 13.8 Mitigation will be regulated through the City’s development approval and permitting process. Proposed master development plans, planned unit development and subdivision applications, plats, and/or site plans must This mitigation measure is ongoing. Mr. Michael Grochala April 8, 2020 Page 8 K:\015144-000\Admin\Docs\AUAR - Update 2020\Water Wastewater\MEMO - 040820 - Water.docx Item No. Mitigation Description Update address relevant water conservation mitigation measures prior to final approval by the City. Implementation of mitigation measures will be assured through developer agreements with the City, which will require a financial security for land and infrastructure improvements and/or revoke the right to acquire building permits and/or certificates of occupancy until all relevant mitigation measures have been addressed. Appendix D Wastewater Management Memo K:\015144-000\Admin\Docs\AUAR - Update 2020\Water Wastewater\MEMO - 040820 - Wastewater.docx 701 XENIA AVENUE S | SUITE 300 | MINNEAPOLIS, MN | 55416 | 763.541.4800 | WSBENG.COM Final Technical Memorandum To: Michael Grochala, City of Lino Lakes From: Jon Christensen, WSB Andi Moffatt, WSB Date: April 8, 2020 Re: Wastewater Management – I-35 Corridor AUAR City of Lino Lakes, Minnesota WSB Project No. R-015144-000 The original Alternative Urban Areawide Review (AUAR) was completed and approved in September 2005. The AUAR analyzed the wastewater impacts of the three development scenarios. Based on the analysis, a Mitigation Plan was developed. AUAR updates are required every five years from the original date of the approved AUAR. Updates were prepared in 2010 and 2015. Each assumed no change in the proposed development land use scenarios and included discussion of mitigation improvements that had been completed at the time. Since the 2015 AUAR update was prepared, the City has completed an updated Comprehensive Plan. This AUAR Update includes review of three scenarios. The information and analysis outlined within this memo is intended to complete a portion of the AUAR Update related to Item # 11.b.i – Water Resources – Wastewater related to revising of the three scenarios. This memo is intended to update the wastewater analysis provided in the original AUAR where applicable. WATER RESOURCES – WASTEWATER Describe effects from project activities on water resources and measures to minimize or mitigate the effects in Item b.i. through Item b.iv. below. i. Wastewater - For each of the following, describe the sources, quantities and composition of all sanitary, municipal/domestic and industrial wastewater produc ed or treated at the site. 1) If the wastewater discharge is to a publicly owned treatment facility, identify any pretreatment measures and the ability of the facility to handle the added water and waste loadings, including any effects on, or required exp ansion of, municipal wastewater infrastructure. 2) If the wastewater discharge is to a subsurface sewage treatment systems (SSTS), describe the system used, the design flow, and suitability of site conditions for such a system. 3) If the wastewater discharge is to surface water, identify the wastewater treatment methods and identify discharge points and proposed effluent limitations to mitigate impacts. Discuss any effects to surface or groundwater from wastewater discharges. Mr. Michael Grochala April 8, 2020 Page 2 K:\015144-000\Admin\Docs\AUAR - Update 2020\Water Wastewater\MEMO - 040820 - Wastewater.docx Existing Conditions Within the City of Lino Lakes, there are approximately 5,200 connections to the municipal sanitary sewer system. Of the 5,200 connections to the public sanitary sewer system, most are single family residential with some multi-family residential, commercial/ industrial, and institutional connections. The City has approximately 1,705 properties that are served by on-site septic systems. Based on Metropolitan Council Environmental Services (MCES) meter data from 2014 - 2018, the City’s existing average daily wastewater flow is 1.04 million gallons per day (MGD). Since the wastewater generated within the City of Lino Lakes is primarily from residential units, the wastewater characteristics are assumed to be of typical domestic strength. Table 1 is a summary of the estimated existing wastewater characteristics for Lino Lakes. Table 1. Estimated Existing Wastewater Characteristics and Total Average Loading Parameter Concentration (mg/L) Average Load (lbs/day) Biochemical Oxygen Demand 220 1,909 Total Suspended Solids 220 1,909 Ammonia – Nitrogen 25 217 Total Phosphorous 8 69 Wastewater generated within the City is collected by a series of laterals, trunk sewer mains, and lift stations and is then directed to one of three interceptor sewers that are owned, operated, and maintained by MCES (Interceptors 9106, 8361, and 9708). Wastewater is then conveyed through the MCES regional collection system to the Metropolitan WWTP. The Metropolitan WWTP has a design capacity of 314 MGD and currently receives an average daily flow of 191 MGD. Proposed Conditions Three possible development scenarios were considered. The 2040 Comprehensive Plan corresponds to revised Scenario 1. Scenario 2 has also been revised. The third scenario considered is the 2030 Comprehensive Plan Scenario. The projected wastewater flow for each scenario is based on the planned land uses as described below. The municipal collection system currently extends to Main Street on either side of I-35E. The municipal trunk sewers will continue to be extended as development progresses. As detailed in the 2040 Comprehensive Sanitary Sewer Plan, development within Sanitary Sewer District 3 and 5 will require at least one large regional lift station and several smaller lift stations. The majority of the wastewater generated within the study area will discharge to MCES Interceptor 802325 which is currently stubbed at the City boundary at the intersection of Main Street and Elmcrest Avenue. The remainder will discharge to MCES Interceptor 7651 which currently serves the existing Sanitary Sewer District 3. All of the flow generated within the study area will be conveyed through the MCES regional collection system to the Metropolita n WWTP. 2020 Scenario 1 The proposed development within the study area for revised Scenario 1, the assumed wastewater flow for each land use type, and the projected wastewater flow for that development are summarized in Table 2. There are a number of properties within the southern portion of the study area that are already sewered, so these areas have been removed from the areas listed in Table 2. Mr. Michael Grochala April 8, 2020 Page 3 K:\015144-000\Admin\Docs\AUAR - Update 2020\Water Wastewater\MEMO - 040820 - Wastewater.docx Table 2. Projected Average Daily Flow for 2020 Scenario 1 Land Use Type Area (acres) Density (units/acre) Flow Assumption (gpd/acre) Average Flow (gpd) Low Density Sewered Residential 282.6 2.3 414 117,002 Low Density Mixed Residential 376.9 3.5 630 237,447 Medium Density Residential 180.5** 5.0 900 162,432 High Density Residential 39.0 7.0 1,260 49,160 Planned Residential / Commercial* 89.9 9.0 1,210 108,836 Office Residential* 139.5 5.0 850 118,567 Mixed Use 0.0 2.3 414 0 Commercial 348.9** N/A 800 279,126 Business Campus*** 624.0 N/A 800 799,182 Industrial 472.4** N/A 800 377,947 Civic/Institutional 1.0 N/A 600 620 Urban Reserve 0.0 N/A N/A N/A Permanent Rural 358.1 N/A N/A N/A Park & Open Space 837.5 N/A N/A N/A Right-of-Way 3.7 N/A N/A N/A Total 3,754.1 N/A N/A 2,250,319 *Assumes 50% residential and 50% commercial development. **Areas for properties within the southern portion of the study area that are already sewered have been removed. ***Includes contingency for higher intensity wastewater flow. Table 3 summarizes the projected wastewater flow by MCES connection point under Scenario 1. Note that the flows listed in Table 3 include only additional flows generated within the study area. Table 3. Projected Additional Regional Wastewater Flow by MCES Connection Point for 2020 Scenario 1 MCES Interceptor City Sanitary Sewer District Average Flow (MGD) Peak Hourly Flow (MGD) 7651 3 0.62 2.11 802325 5 1.63 4.73 Table 4 summarizes the projected wastewater characteristics and additional loading for the wastewater that will be generated under Scenario 1. Table 4. Projected Wastewater Characteristics and Additional Total Average Daily Wastewater Loading for 2020 Scenario 1 Parameter Concentration (mg/L) Average Load (lbs/day) Biochemical Oxygen Demand 220 4,131 Total Suspended Solids 220 4,131 Ammonia –Nitrogen 25 469 Total Phosphorous 8 150 Mr. Michael Grochala April 8, 2020 Page 4 K:\015144-000\Admin\Docs\AUAR - Update 2020\Water Wastewater\MEMO - 040820 - Wastewater.docx 2020 Scenario 2 The proposed development within the study area for Scenario 2, the assumed wastewater flow for each land use type, and the projected wastewater flow for that development are summarized in Table 5. There are a number of properties within the southern portion of the study area that are already sewered, so these areas have been removed from the areas listed in Table 5. Table 5. Projected Average Daily Flow for 2020 Scenario 2 Land Use Type Area (acres) Density (units/acre) Flow Assumption (gpd/acre) Average Flow (gpd) Low Density Sewered Residential 173.2 2.3 414 71,721 Low Density Mixed Residential 376.9 3.5 630 237,447 Medium Density Residential 240.9** 5.0 900 216,787 High Density Residential 391.1 7.0 1,260 492,838 Planned Residential / Commercial* 89.9 9.0 1,210 108,836 Office Residential* 0.0 5.0 850 0 Mixed Use 0.0 2.3 414 0 Commercial 348.9** N/A 800 279,126 Business Campus*** 362.6 N/A 800 590,049 Industrial 480.3** N/A 800 384,228 Civic/Institutional 90.9 N/A 600 54,556 Urban Reserve 0.0 N/A N/A N/A Permanent Rural 358.1 N/A N/A N/A Park & Open Space 837.5 N/A N/A N/A Right-of-Way 3.7 N/A N/A N/A Total 3,754.1 N/A N/A 2,435,589 *Assumes 50% residential and 50% commercial development. **Areas for properties within the southern portion of the study area that are already sewered have been removed. ***Includes contingency for higher intensity wastewater flow. Table 6 summarizes the projected wastewater flow by MCES connection point under Scenario 2. Note that the flows listed in Table 6 include only those generated within the study area. Table 6. Projected Regional Wastewater Flow by MCES Connection Point for 2020 Scenario 2 MCES Interceptor City Sanitary Sewer District Average Flow (MGD) Peak Hourly Flow (MGD) 7651 3 0.64 2.18 802325 5 1.79 5.19 Mr. Michael Grochala April 8, 2020 Page 5 K:\015144-000\Admin\Docs\AUAR - Update 2020\Water Wastewater\MEMO - 040820 - Wastewater.docx Table 7 summarizes the projected wastewater characteristics and additional loading for the wastewater that will be generated under Scenario 2. Table 7. Projected Wastewater Characteristics and Additional Total Average Daily Wastewater Loading for 2020 Scenario 2 Parameter Concentration (mg/L) Average Load (lbs/day) Biochemical Oxygen Demand 220 4,471 Total Suspended Solids 220 4,471 Ammonia –Nitrogen 25 508 Total Phosphorous 8 163 2030 Comprehensive Plan Scenario The proposed development within the study area for the 2030 Comp Plan Scenario, the assumed wastewater flow for each land use type, and the projected wastewater flow for that development are summarized in Table 8. There are a number of properties within the southern portion of the study area that are already sewered, so these areas have been removed from the areas listed in Table 8. Table 8. Projected Average Daily Flow for 2030 Comp Plan Scenario Land Use Type Area (acres) Density (units/acre) Flow Assumption (gpd/acre) Average Flow (gpd) Low Density Sewered Residential 47.1 2.3 414 19,499 Low Density Mixed Residential 0.0 3.5 630 0 Medium Density Residential 140.6** 5.0 900 126,524 High Density Residential 39.0 7.0 1,260 49,156 Planned Residential / Commercial* 0.0 9.0 1,210 0 Office Residential* 0.0 5.0 850 0 Mixed Use 374.0 2.3 414 154,836 Commercial 293.0** N/A 800 234,369 Business Campus*** 276.8 N/A 800 521,461 Industrial 572.9** N/A 800 458,310 Civic/Institutional 1.0 N/A 600 620 Urban Reserve 820.0 N/A N/A N/A Permanent Rural 361.3 N/A N/A N/A Park & Open Space 824.4 N/A N/A N/A Right-of-Way 4.0 N/A N/A N/A Total 3,754.1 N/A N/A 1,564,776 *Assumes 50% residential and 50% commercial development. **Areas for properties within the southern portion of the study area that are already sewered have been removed. ***Includes contingency for higher intensity wastewater flow. Mr. Michael Grochala April 8, 2020 Page 6 K:\015144-000\Admin\Docs\AUAR - Update 2020\Water Wastewater\MEMO - 040820 - Wastewater.docx Table 9 summarizes the projected wastewater flow by MCES connection point under the 2030 Comp Plan Scenario. Note that the flows listed in Table 9 include only additional flows generated within the study area. Table 9. Projected Additional Regional Wastewater Flow by MCES Connection Point for 2030 Comp Plan Scenario MCES Interceptor City Sanitary Sewer District Average Flow (MGD) Peak Hourly Flow (MGD) 7651 3 0.52 1.77 802325 5 1.04 3.22 Table 10 summarizes the projected wastewater characteristics and additional loading for the wastewater that will be generated under the 2030 Comp Plan Scenario. Table 10. Projected Wastewater Characteristics and Additional Total Average Daily Wastewater Loading for 2030 Comp Plan Scenario Parameter Concentration (mg/L) Average Load (lbs/day) Biochemical Oxygen Demand 220 2,873 Total Suspended Solids 220 2,873 Ammonia –Nitrogen 25 326 Total Phosphorous 8 104 Wastewater Projection Comparison Table 11 summarizes the projected average wastewater flows from the 2005 Original AUAR and this 2020 AUAR Update for the scenarios outlined above. The 2005 Original AUAR used flow assumptions of 274 gpd/unit for residential development and 1,500 gpd/acre for commercial and industrial development. The 2005 flow assumptions were very conservative, so the 2020 flow assumptions used in this update have been revised to agree more closely with metered wastewater flows from the last five years. Table 11. Comparison of Average Wastewater Flow Projections Scenario 2005 Original AUAR 2020 AUAR Update Scenario 1 2.529 MGD 2.250 MGD Scenario 2 3.646 MGD 2.436 MGD Scenario 3 3.733 MGD N/A 2030 Comp Plan N/A 1.565 MGD The projected wastewater flows have decreased in this update. Due to topography constraints, the expansion and layout of the sanitary sewer system will generally conform to the layout identified in the 2005 Original AUAR. However, the exact sizing of trunk facilities may be revised based on the most current wastewater flow projections. Mr. Michael Grochala April 8, 2020 Page 7 K:\015144-000\Admin\Docs\AUAR - Update 2020\Water Wastewater\MEMO - 040820 - Wastewater.docx Review and Update of the Mitigation Plan The table below provides the mitigation plan for wastewater management. These mitigation measures have been reviewed and revised as needed for this AUAR Update. Table 12. Water Quality: Wastewater Item No. Mitigation Description Update 18.1 Monitor wastewater flows and not permit new development to proceed if it exceeds the capacity of the wastewater system. This mitigation measure is ongoing. 18.2 Construct the major infrastructure improvements needed to expand the capacity of the wastewater system (i.e. lift stations, forcemains, and upgrades to the existing systems) in accordance with the Comprehensive Sanitary Sewer Plan and Capital Improvement Plan. This mitigation measure is ongoing. 18.3 Adequately phase capacity improvements. This mitigation measure is ongoing. 18.4 Amend the Comprehensive Sanitary Sewer Plan and Capital Improvement Plan to be consistent with any amendments to the Comprehensive Plan that would necessitate expansions or alterations to the sanitary sewer system and regional capacity needs. This mitigation measure is ongoing. No updates have been needed to date for the study area. 18.5 Each proposed development will be required to provide a detailed projection of wastewater generation and flows. These calculations will be checked by the City’s Engineering Consultant. This mitigation measure is ongoing. 18.6 The City will create a year-end report to evaluate wastewater increases by major sewer lines and overall system usage in relation to capacity. Results of this assessment will become the targets for growth for the following year. This mitigation measure is ongoing. Appendix E Transportation Memo K:\015144-000\Admin\Docs\AUAR - Update 2020\Traffic\MEMO - 040820 - Transportation.docx 701 XENIA AVENUE S | SUITE 300 | MINNEAPOLIS, MN | 55416 | 763.541.4800 | WSBENG.COM Final Technical Memorandum To: Michael Grochala, City of Lino Lakes From: Chuck Rickart PE, PTOE, WSB Andi Moffatt, WSB Date: April 8, 2020 Re: Transportation – I-35 Corridor AUAR City of Lino Lakes, Minnesota WSB Project No. R-015144-000 INTRODUCTION The original Alternative Urban Areawide Review (AUAR) was completed and approved in September 2005. The AUAR analyzed the transportation impacts of the three development scenarios for the years 2030 and post 2030. Based on the analysis, a Mitigation Plan was developed. Mitigation included adding new roadway connections, intersection control, turn lanes, and widening roads as necessary as development occurs throughout the area. AUAR updates are required every five years from the original date of the approved AUAR. Updates were prepared in 2010 and 2015. Each assumed no change in the proposed development land use scenarios and included discussion of mitigation improvements that had been completed at the time. In both cases no additional mitigation was recommended. Since the 2015 AUAR update was prepared, the City has completed an updated Comprehensive Plan including a Transportation Plan for the 2040 forecast year. TRAFFIC AND TRANSPORTATION UPDATE There have been several developments in the study area that have been approved since the original AUAR was completed in 2005 including: • Park-and-Ride in the northwest quadrant of I-35E and CSAH 14 • McDonald’s restaurant and Main Street Shoppes east of I-35E on CSAH 14 • NorthPointe residential development north of Birch Street between I-35E and CSAH 54 • Watermark residential development west of I-35E, north of CSAH14 • Clearwater Creek commercial development west of I-35E south of CSAH 14 on 21st Avenue In addition, there have been roadway improvements completed since the original AUAR including: • CSAH 14 Improvements west of I-35E • I-35E at CSAH 14 Interchange Improvements As previously discussed, three development scenarios were included in the original AUAR and Updates. The City has since updated its Comprehensive Plan and reviewed the scenarios. Two consolidated scenarios are now included in this update and are still consistent with the original AUAR. Mr. Michael Grochala April 8, 2020 Page 2 K:\015144-000\Admin\Docs\AUAR - Update 2020\Traffic\MEMO - 040820 - Transportation.docx Traffic Generation The original AUAR include traffic generation for the three land use scenarios using the Institute of Transportation Engineers (ITE) “Trip Generation Manual, 7th Edition.” The traffic generation was prepared for both the 2030 base year and the Post 2030 conditions. For comparison purposes, the Post 2030 conditions were used. Tables 1 – 3 shows the Post 2030 Traffic Generation from the original AUAR. Table 1. 2005 AUAR Scenario 1 – City Comprehensive Plan Land Use Unit Size AM Peak PM Peak ADT Rural Land Use DU 125 93 127 1,196 Low Density Res DU 510 383 516 4,880 Med Density Res DU 1,129 416 496 6,078 High Density Res DU 473 241 294 3,178 Commercial SF 2,985,000 5,090 6,773 63,598 Industrial SF 11,175,000 7,912 8,270 68,872 Total 14,135 16,476 147,802 Table 2. 2005 AUAR Scenario 2 – Commercial / Industrial Emphasis Land Use Unit Size AM Peak PM Peak ADT Rural Land Use DU 44 33 44 422 Low Density Res DU 118 88 119 1,130 Low/Med Density Res DU 2,419 1,439 1,060 18,662 Med/High Density Res DU 2,173 954 1,149 13,150 High Density Res DU 981 490 596 6,458 Commercial SF 5,617,000 9,577 12,745 119,676 Industrial SF 9,570,000 6,775 7,082 58,980 Total 19,356 22,795 218,478 Mr. Michael Grochala April 8, 2020 Page 3 K:\015144-000\Admin\Docs\AUAR - Update 2020\Traffic\MEMO - 040820 - Transportation.docx Table 3. 2005 AUAR Scenario 3 – Residential Emphasis Land Use Unit Size AM Peak PM Peak ADT Rural Land Use DU 43 32 43 412 Low Density Res DU 118 88 119 1,130 Low/Med Density Res DU 3,685 2,192 1,614 28,430 Med/High Density Res DU 3,247 1,425 1,718 19,650 High Density Res DU 1,566 799 971 10,524 Commercial SF 4,141,000 7,060 9,396 88,228 Industrial SF 5,829,000 4,127 4,313 35,924 Total 15,723 18,174 184,298 For this 2020 AUAR Update, the traffic generation was updated based on the revised development scenarios. Traffic generation rates from the current ITE Trip Generation Manual “Trip Generation Manual, 10h Edition” were used to determine the updated traffic forecasts. Table 4, Table 5, and Table 6 show the updated Scenario traffic generation. Table 4. 2020 AUAR Update Scenario 1 – City 2040 Comprehensive Plan Land Use Unit Size AM Peak PM Peak ADT Low Density Res DU 2,335 1,728 2,312 22,042 Med Density Res DU 1,675 687 838 11,089 High Density Res DU 678 312 380 4,963 Commercial SF 5,085,000 3,865 4,831 67,936 Industrial SF 12,817,000 5,127 4,999 41,014 Total 11,718 13,358 147,044 Mr. Michael Grochala April 8, 2020 Page 4 K:\015144-000\Admin\Docs\AUAR - Update 2020\Traffic\MEMO - 040820 - Transportation.docx Table 5. 2020 AUAR Update Scenario 2 Land Use Unit Size AM Peak PM Peak ADT Low Density Res DU 2,283 1,689 2,260 21,552 Med Density Res DU 1,977 811 989 13,088 High Density Res DU 3,143 1,446 1,760 23,007 Commercial SF 5,307,000 4,033 5,042 77,270 Industrial SF 10,054,000 4,022 3,921 32,173 Total 12,001 13,971 167,089 Table 6. 2020 AUAR Update Scenario 3 – City 2030 Comprehensive Plan Land Use Unit Size AM Peak PM Peak ADT Low Density Res DU 190 140 188 1,794 Med Density Res DU 1,991 816 996 13,180 High Density Res DU 273 126 153 1,998 Commercial SF 3,229,000 2,454 3,068 47,014 Industrial SF 10,128,000 4,051 3,950 32,410 Total 7,588 8,354 96,396 Comparing the land use scenarios shows that the future traffic generated with the updated land uses will be less than that from the original AUAR. The percent reduction in traffic generation is shown below in Table 7. Table 7. Scenario Comparison 2006 Scenario 2020 Updated Scenario AM Peak % Reduction PM Peak % Reduction ADT % Reduction Scenario 1 Scenario 1 21% 23% 1% Scenario 2 Scenario 2 61% 63% 31% Scenario 3 Scenario 2 31% 30% 10% Scenario 1 Scenario 3 86% 97% 53% Traffic Analysis The Transportation Study completed as part of the original AUAR analyzed the effects the land use scenarios had on the local and regional roadway systems. The analysis was based on existing traffic counts at the time and the Anoka County version of the Metropolitan Council’s Travel Demand Forecasting Model. Mr. Michael Grochala April 8, 2020 Page 5 K:\015144-000\Admin\Docs\AUAR - Update 2020\Traffic\MEMO - 040820 - Transportation.docx The Traffic analysis focused on the operation of the primary roadways and their intersections during the peak travel periods (a.m. and p.m. peak hours), which is typically the time when the most severe traffic congestion is incurred. The results found that mitigation improvements would be required for each Scenario for the transportation system to operate at acceptable levels. Based on the analysis a Mitigation Plan was developed. Mitigation included adding new roadway connections, intersection control, turn lanes and widening roads as necessary as development occurs throughout the area. The improvements were intended to represent the minimum level of infrastructure investment that would be needed to meet acceptable level of service standards. Additional roadway and non-motorized improvements, beyond the minimum level, may be identified to accommodate specific development needs. Updated traffic forecasts were developed for 2040 and Post 2040 with the Cities “Draft 2040 Transportation Plan”. The forecasts assumed a roadway network consistent with the AUAR mitigation improvements. Figure 1 shows the forecasted 2040 and Post 2040 Average Daily Traffic volumes with the future roadway network. Based on the comparison of the forecasted traffic generation from the AUAR area and the forecasted 2040 traffic volumes, the traffic analysis conducted, and Mitigation Plan recommended with the 2005 AUAR and the 2010 and 2015 updated AUAR’s remains valid for this AUAR Update. Mr. Michael Grochala April 8, 2020 Page 6 K:\015144-000\Admin\Docs\AUAR - Update 2020\Traffic\MEMO - 040820 - Transportation.docx Review and Update of the Mitigation Plan The table below provides the mitigation plan for Transportation. These mitigation measures have been reviewed and revised as needed for this AUAR Update. Table 7. Transportation Item No. Mitigation Description Update 21.1 Create a monitoring program that closely evaluates traffic impacts from proposed developments within the AUAR area. Traffic Impact Studies are required for proposed developments showing the impact on the transportation system and consistency with the AUAR. 21.2 Implement traffic mitigation measures as development occurs within the AUAR area. Specific mitigation measures for the three development scenarios are discussed in Item 21 and depicted on Figures 21-8, 21-9, and 21-10. These mitigation measures improve overall traffic operations for the respective development scenarios. The improvements are intended to represent the minimum level of infrastructure investment that would be needed to meet acceptable level of service standards. Additional roadway and non-motorized improvements, beyond the minimum level, may be identified to accommodate specific development needs that are identified within the AUAR area. Primary improvements, regardless of land use scenario, include: 21.2.1 Develop frontage road system in compliance with local, county and state access management guidelines to serve local and regional traffic. 21.2.2 Work with appropriate road authorities to reconstruct and provide additional capacity for CSAH 21. 21.2.3 Work with appropriate road authorities to construct Northerly Bypass with new interchanges at I-35W and I-35E (80th Street East) to improve traffic operations and access to and within the AUAR area. As recommended by FHWA and Mn/DOT, a phasing plan should be established to construct each piece of the Northerly Connector as it becomes necessary to maintain the serviceability of the transportation system. CSAH 14 improvement was completed in 2009 and noted in the 2010 AUAR Update CSAH 54 with CSAH 14 (formerly CSAH 21) 20th Avenue North intersection improvements were completed and noted in the 2010 AUAR Update. I-35E Interchange reconstruction was completed in 2011. This mitigation measure is complete. Mr. Michael Grochala April 8, 2020 Page 7 K:\015144-000\Admin\Docs\AUAR - Update 2020\Traffic\MEMO - 040820 - Transportation.docx Item No. Mitigation Description Update Phase Improvement 1. CSAH 14, I-35W to I-35E (funded and programmed for construction) 2. CSAH 14, I-35E Interchange 3. CR 140 (80th Street)/I-35E Interchange 4. CSAH 14 across Peltier Lake (Northerly Bypass/Connector) 5. CSAH 14/I-35W Interchange As part of these improvements, the following steps should be taken as the opportunity is presented:  Inclusion of the northerly bypass and proposed interchanges in future transportation and comprehensive plans  Preservation of right of way through official mapping or other process  Right of way dedication through the platting process 21.3 Require a traffic impact analysis for all development projects within the AUAR area. The traffic impact analysis will assist the City and other road authorities in determining the appropriate mitigation measures that are required to mitigate impacts of a specific development proposal. This mitigation measure is ongoing. 21.4 Work with appropriate road authorities to mitigate the impact of the additional traffic on the on the regional system, specifically Interstates 35W and 35E, by reconstructing each to provide a six-lane cross-section consistent with the recommendations outlined in the I-35 IRC. It should be noted that it was determined that an expansion will be necessary even without the development scenarios used in this analysis. As the interstates serve a much larger area, the projected growth of the entire Twin Cities region should warrant expansion by the year 2030. This mitigation measure is ongoing. 21.5 Prioritize alternative travel modes within the AUAR study area and require project proposers to address alternative travel modes (e.g., buses, bicyclists, and pedestrians) by identifying appropriate accommodations. This mitigation measure is ongoing. Mr. Michael Grochala April 8, 2020 Page 8 K:\015144-000\Admin\Docs\AUAR - Update 2020\Traffic\MEMO - 040820 - Transportation.docx Item No. Mitigation Description Update 21.6 Consider the need for additional infrastructure improvements (see item #21.2) in future updates or amendments to the Comprehensive Plan. Submit the plan update to the appropriate agencies (i.e., FHWA, MnDOT, Met Council, etc.). This mitigation measure is ongoing. 21.7 Require project proposers to follow all appropriate guidelines and policies related to traffic nose and noise walls. This mitigation measure is ongoing. 21.8 Require that site plans for each of the developments include measures such as appropriate setback distances, earthen berms, noise walls, and appropriate site design to reduce the impact of traffic noise to residential areas. This mitigation measure is ongoing. 21.9 Continue to require the implementation of the conditions of approval for the Eagle Brook Church relating to mitigating traffic impacts. This mitigation measure is ongoing. 21.10 Achieve effective traffic operations within the city by requiring that site plans make use of access management practices to promote safe, effective traffic flow. This mitigation measure is ongoing. 21.11 Require project proposers to follow the Anoka County Highway Department Development Review Process Manual (updated June 2013). This mitigation measure is ongoing and has been updated to reflect the newest manual. 21.12 Continue to coordinate capital improvement programming with applicable transportation authorities. This mitigation measure is ongoing. !? !? "S %&d( %&c( %&c( GnWX GnWX GÀWX GÀWX G¦WX 62,00045,80016,00012,30012,10035,000 36,0003,0002,40020,0005,90060,00043,00010,0008,40017,1008,50041,00032,400 11,1006,40014,0005,80010,0004,200 61,00055,1006,500CENTERVILLE RDOTTERLAKE RDMAIN ST20TH AVE80TH ST BIRCH ST WARDS LAKE SHERMAN LAKE CENTERVILLELAKE GEORGEWATCHLAKE PELTIER LAKE RONDEAU LAKE RICE CREEK CHAIN OFLAKES PARK RESERVE CITYHALLPARK CLEARWATER CREEK PARK PHEASANTHILLS PARK BRANDYWOODPARK LAURIELAMOTTEMEMORIAL PARK TRACIE MCBRIDEMEMORIAL PARK ACORNCREEKPARK EAGLE PARK HIDDENSPRING PARK CORNERSTONEPARK ROYALMEADOWSPARK 0 2,700Feet¯Figure 1 - Transportation I-35 Corridor AUAR Project Lino Lakes, MN Document Path: K:\015144-000\GIS\Maps\AUAR_Transportation\Figure1_ProjectLocation.mxd Date Saved: 1/21/2020 9:14:58 AM1 inch = 2,700 f eet Study Area City Boundary Future Roadway !?Future Interchange "S Future Overpass XXX Post 2040 Full Build ADT VolumeXXX 2040 Forecasted ADT Volumes Appendix F SHPO and DNR Information HISTORY/ARCHITECTURE INVENTORYCOUNTY CITYTWP PROPNAME ADDRESS TOWNSHIP RANGE SECTIONQUARTERSUSGS REPORTNUM NRHP CEF DOE INVENTNUMAnokaCentervillehouse 7238 Main St.31 22 14SW-SW Centerville AN-2005-1H AN-CVC-009house 1695 Sorel Rd.31 22 22SW-NW Centerville AN-2005-1H AN-CVC-035Lino LakesBridge 9830 CSAH 14 over I35 W 2.2 miles NE of Junctin TH4931 22 10SE-NW CentervilleAN-LKC-009Bridge 02802 CR 140 over I 35E 1.5 miles S of Junction TH 35W31 22 12NE-NW CentervilleAN-LKC-011 ARCHAEOLOGICAL SITE LOCATIONSCOUNTY SITENUM SITENAME TOWNSHIP RANGE SECTION XQUARTERS ACRES WORKTYPE DESCRIPT TRADITION CONTEXT ReportNum Natreg CEF DOEAnoka21AN000331 22 11C-S-S62EW, ASW-1 Ps-2, SO-2 AN-01-1121AN0037Paul31 22 10SE-NE-NW-SE,SE-NE-SW-NE161ASW-121AN0038Hensel31 22 22NA-NW801,2ASW-1,PL-2MW-1, LW-2,Pl-2 AN-16-1321AN0039Wards Lake31 22 22W-NW-SW262,1ASW-121AN0040Cartier31 22 10SW-SE-SE601ASA-2, W-1AL-2, HR-1, LW-2 AN-02-0321AN004131 22 10N-S-SW251ASW-1 RA-131 22 10SE-NW-SW251ASW-1 RA-131 22 10SW-NE-SW251ASW-1 RA-121AN0049Dupre31 22 14SW-NW-SW211,2ASPL-1,A-1,W-1Pl-1,AL-1,HR-2,SO-1,Ka-2Dupre31 22 14NW-SW-SW211,2ASPL-1,A-1,W-1Pl-1,AL-1,HR-2,SO-1,Ka-221AN0060Peltier Island31 22 11W-SW502ASW-1 MW-1 AN-02-0321AN006731 22 3SW-SE-NE-NW31ASA-121AN0071(overlaps w/21AN72)31 22 14SE-NE-SE-NW11ASW-2 MW-221AN0072(overlaps w/ 21AN71)31 22 14NE-SE-SE-NW11ASW-2 MW-221AN008331 22 2S-NE-SW, N-SE-SW151ASW-121AN008931 22 10C-NE-NW-NW31LSA-221AN009031 22 2C-N-NW-SW61ASW-1Anoka21AN009131 22 2S-NW-NE-NW, N-SW-NE-NW51ASW-1, O-221AN009531 22 2SE-SE; E-NW-NE-NE241ASW-1 LW-131 22 11 241ASW-1 LW-121AN012831 22 22NE-SE-SW-SW0.51LS21AN0132Iverson III31 22 12NE-NE05LS21AN014331 22 14SW-SE-SW2.41AS,LSA-3,W-1 AN-97-0221AN016631 22 22NW-SW-SW-SW11LS21AN0168Paul Farm (east)31 22 10SW-SE191ASW-1 RA-121AN0174Old Willow31 22 1SW-SW-NW-SW0.11LS21ANd31 22 14C-SW 5LS Appendix G Contamination Review Memo K:\015144-000\Admin\Docs\AUAR - Update 2020\Contamination Review\0 - Contamination Review Memo - AUAR 2020 - text.docx 701 XENIA AVENUE S | SUITE 300 | MINNEAPOLIS, MN | 55416 | 763.541.4800 | WSBENG.COM Memorandum To: Michael Grochala, City of Lino Lakes From: Ryan Spencer, WSB Andi Moffatt, WSB Date: January 31, 2020 Re: Desktop Contamination Review – I-35 Corridor AUAR Lino Lakes, Minnesota WSB Project No. R-015144-000 INTRODUCTION WSB reviewed public database information to identify sites that pose a contamination risk to the Lino Lakes I-35E Corridor located in Lino Lakes, Minnesota (the Project Area). A map showing the Project Area is included as Figure 1. The following online databases were reviewed on January 30, 2020 as part of this desktop environmental review: • Minnesota Pollution Control Agency (MPCA) "What's in My Neighborhood?" website • Minnesota Department of Agriculture (MDA) "What's in My Neighborhood?" website This desktop contamination review is not intended to replace a Phase I Environmental Site Assessment (ESA) performed per ASTM E1527-13. WSB did not verify the database information for accuracy. Therefore, further environmental review is recommended prior to performing any follow-up investigation work (e.g. subsurface borings) to verify WIMN source information. Based on this desktop review, the following information is provided: Project Area Sites Thirty-three (33) sites were identified at the Project Area (see Figures 2, 2A, and 2B). The sites are associated with 50 database listings, summarized below: • Twenty-one (21) stormwater permit listings (18 construction and 3 industrial); • Fifteen (15) hazardous waste generator listings. Inclusion on the hazardous waste generator database indicates the site generates hazardous waste requiring a permit; • Five (5) listings were for sites with aboveground tanks (AST) and/or underground tanks (USTs) but do not directly indicate a petroleum spill or release; • Two (2) air quality permit listings; and • One (1) site assessment listing. Site Assessment sites are places where contamination or regulated waste activities have been reported to the MPCA. If it is determined that little or no exposure potential exists and no further remedial actions are planned, the site is closed and listed as inactive. None of the identified Project Area listings indicate a hazardous material spill or release except for the following six (6) listings: Michael Grochala January 31, 2020 Page 2 K:\015144-000\Admin\Docs\AUAR - Update 2020\Contamination Review\0 - Contamination Review Memo - AUAR 2020 - text.docx Site 1 – Rehbein Shop/Office, 6805 20th Avenue South, Centerville, MN • Leak Site LS0015707: The identified leak was discovered in 2003, consisted of diesel, did not impact groundwater, and was issued site closure by the MPCA in 2006. Site closure does not mean that the site is free of contamination. Site 5 – Acton Construction, 2209 Phelps Road, Lino Lakes, MN • Leak Site LS0001284: The identified leak was discovered in 1989, consisted of fuel oil #1 & #2 and leaded gasoline, impacted groundwater, and was issued site closure by the MPCA in 1992. Site closure does not mean that the site is free of contamination. • Brownfields VP3340: The site entered the Voluntary Investigation and Cleanup (VIC) Program from 1992 to 1997. Brownfields are potentially contaminated sites where the MPCA is assisting with environmental investigations and/or redevelopment activities. • Brownfields BF0001207: A second VIC listing associated with Site 5 was listed as active from June 2019 to December 2019. Site 25 – Eagle Trucking Inc, 7087 20th Avenue, Centerville, MN • Leak Site LS0013133: The identified leak was discovered in 1999, consisted of diesel, and was issued site closure by the MPCA in 2000. Site closure does not mean that the site is free of contamination. Site 33 – Lakes 1 Stop, 7090 21st Avenue South, Centerville, MN • Leak Site LS0013380: The identified leak was discovered in 2000, consisted of gasoline, and was issued site closure by the MPCA in 2003. Site closure does not mean that the site is free of contamination. Adjacent Sites Ten (10) sites were identified adjacent to the Project Area (see Figures 2, 2A, and 2B). The sites are associated with 14 listings, summarized below: • Two (2) construction stormwater listings; • Two (2) hazardous waste generator listings. Inclusion on the hazardous waste generator database indicates the site generates hazardous waste requiring a permit; • Two (2) listings were for sites with USTs but do not directly indicate a petroleum spill or release; and • One (1) feedlot listing. None of the listings identified adjacent to the Project Area indicate a hazardous material spill or release except for the following seven (7) listings: Site 8 – Corner Express, 1990 Main Street, Centerville, MN • Leak Site LS0018115: The identified leak was discovered in 2010, consisted of unleaded gasoline, impacted groundwater, and was issued site closure by the MPCA in 2011. Site closure does not mean that the site is free of contamination. • Leak Site LS0020747: The identified leak was discovered in June 2018, consisted of gasoline, and was issued site closure by the MPCA in August 2018. Site closure does not mean that the site is free of contamination. Site 10 – Jim Stevens Construction, 7007 20th Avenue, Centerville, MN • Leak Site LS0009694: The identified leak was discovered in 1996, consisted of diesel and gasoline, impacted groundwater, and was issued site closure by the MPCA in 1998. Site closure does not mean that the site is free of contamination. Site 20 – Hugo 30 Acres, 4330 170th Street North, Hugo, MN Michael Grochala January 31, 2020 Page 3 K:\015144-000\Admin\Docs\AUAR - Update 2020\Contamination Review\0 - Contamination Review Memo - AUAR 2020 - text.docx • Brownfields PB4670: The site entered the Petroleum Brownfield (PB) Program from September 2014 to December 2014. • Brownfields VP31840: A second VIC listing associated with Site 20 was listed as active from September 2014 to January 2015. Brownfields are potentially contaminated sites where the MPCA is assisting with environmental investigations and/or redevelopment activities. Site 42 – Mcneely Residence, 6687 20th Avenue South, Lino Lakes, MN • Leak Site LS0015090: The identified leak was discovered in 2003, consisted of fuel oil #1 and #2, impacted groundwater, and was issued site closure by the MPCA in 2005. Site closure does not mean that the site is free of contamination. Site 43 – Lino Lakes Well #4, 6786 Clearwater Creek Drive, Lino Lakes, MN • Leak Site LS0014107: The identified leak was discovered in 2000 and was issued site closure by the MPCA in 2003. The type of product released is not known. Site closure does not mean that the site is free of contamination. Surrounding Area Sites - Within 500 Feet Three sites (Sites 21, 36, and 41) were identified in the surrounding area (beyond adjacent) within 500 feet of the Project Area and are associated with four (4) listings. The surrounding area listings are for stormwater and hazardous waste permits and do not indicate the presence of contamination. CONCLUSION All identified Project Area leaks and VIC listings (Sites 1, 5, 25, and 33) and adjoining leak or VIC/PB listings (Sites 8, 10, 20, 42, and 43) pose a contamination risk if future redevelopment involves excavation activities in the vicinity of these sites. Prior to redevelopment in the vicinity of the identified leak or VIC/PB sites, it is recommended that subsurface environmental investigations be conducted to determine if contaminated soil and/or groundwater will need to be managed during redevelopment. If evidence of contamination or regulated materials are discovered during construction, it is recommended that WSB’s Environmental Group is contacted immediately to ensure all materials are managed in accordance with local, state, and federal regulations. If you have any questions or need additional information, please contact me at 763-231-4854 or rspencer@wsbeng.com. Enclosures: Figure 1 – Project Location Figure 2, 2A, and 2B – MPCA/MDA What’s in My Neighborhood Search Results %&d( %&c( %&c( GnWX GnWX GÀWX GÀWX G¦WX CENTERVILLERDOTTERLAKE RDMAIN ST20TH AVE80TH ST BIRCH ST Study Area City Boundary 0 2,700Feet¯Figure 1 - Project LocationContamination ReviewI-35 Corridor AUAR ProjectLino Lakes, MN Document Path: K:\015144-000\GIS\Maps\AUAR_ContaminationReview\Figure1_ProjectLocation.mxd Date Saved: 1/30/2020 6:23:35 AM1 inch = 2,700 f eet #* #* #* #* #* #* !H !H #* !H ") !H ") #* ") ") ") #* #*!H !H !H !H #* #* !H ") #* ") !( #* ") #* ") ") ") ") #*#* #* #*#* #* #*!( !( !(!( !H !(") #* ") #* !H #* #* #* #* #* !H ") ") ") ") #* #* #* ") #* #* #* #*#*!H !H !H #* #* !H #* ") #* #* ") #* #* ") #* #* #* #* ") #* #* !H #* !( !( !( #* #* ") #* %&d( %&c( %&c( GnWX GnWX GÀWX GÀWX G¦WXCENTERVILLERD OTTERLAKE RDMAIN ST20TH AVE80TH ST BIRCH ST 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 1819 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 Study Area 500ft Buffer City Boundary WIMN Search Results ")Feedlot ")Hazardous Waste !(Investigation and Cleanup !(Solid Waste #*Tanks and Leaks #*Water !H Multiple Activities 0 2,700Feet¯Figure 2 - MPCA/MDA WIMN Search ResultsContamination ReviewI-35 Corridor AUAR ProjectLino Lakes, MN Document Path: K:\015144-000\GIS\Maps\AUAR_ContaminationReview\Figure2_WIMN.mxd Date Saved: 1/30/2020 6:46:54 AM1 inch = 2,700 f eet ") ") #*!H #* #* !( ") #*!H GnWX %&d( %&c(MAIN ST20TH AVE80TH ST 7 9 11 14 17 20 1 inch = 2,000 f eet Document Path: K:\015144-000\GIS\Maps\AUAR_ContaminationReview\Figure2A_WIMN.mxd Date Saved: 1/30/2020 6:51:40 AMContam ination ReviewI-35 Corridor AUAR ProjectLino Lakes, MN Study Area500ft BufferCity BoundaryWIMN Sear ch Results ")Feedlot ")Hazardous Waste !(Solid Waste #*Tanks and Leaks #*Water !H Multiple A ctivities Figure 2A - MPCA/MDA WIMN Search Results 0 2,000Feet¯ #* #* #* #* #* #* !H !H #* !H ") !H #* ") ") #* !H !H !H !H ") ") #* ") #* ") ") ") #*#*#*#* #* #*!( !( !(!( !( ") #* ") #* !H #* #* #* #* !H ") ") ") ") #* #* ") #* #* #*#* !H !H !H #* #* !H #* ") #* #* ") #* #* ") #* #* #* ") #* #* !H #* !( !( !( #* #* ") #* GnWX %&c(20TH AVECENTERVILLE RDMAIN ST OTTER LAKE RDBIRCH ST 01 2 3 4 5 6 8 10 12 13 15 16 1819 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 3940 41 42 43 44 45 1 inch = 1,700 f eet Document Path: K:\015144-000\GIS\Maps\AUAR_ContaminationReview\Figure2B_WIMN.mxd Date Saved: 1/30/2020 6:57:46 AMContam ination ReviewI-35 Corridor AUAR ProjectLino Lakes, MN Study Area500ft BufferCity BoundaryWIMN Sear ch Results ")Hazardous Waste !(Investigation and Cleanup #*Water !H Multiple A ctivities Figure 2B - MPCA/MDA WIMN Search Results 0 1,700Feet¯ Appendix H Mitigation Plan 1 Mitigation Plan Update – 2020 January 31, 2020 MITIGATION PLAN The AUAR Mitigation Plan is outlined below. ITEM 8. PERMITS AND APPROVALS REQUIRED As projects are proposed, the project proposer will be required to obtain permits and approvals. Projects proposed since the original AUAR have obtained proper approvals. Additional permits that may not be listed here may also be required. Unit of Government Type of Application Status Federal Army Corps of Engineers Section 404 Permit To be Applied for Federal Highway Administration Interchange Access Request To be Applied for State Minnesota Environmental Quality Board Environmental Assessment (AUAR) In progress Minnesota Pollution Control Agency Section 401 Water Quality Certificate To be Applied for NPDES/SDS General Permit To be Applied for Sanitary Sewer Extension Permit To be Applied for State Historic Preservation Office Cultural Resources Review To be Applied for Minnesota Department of Transportation Use of or Work within MnDOT right of way To be Applied for Drainage Permit To be Applied for Minnesota Department of Natural Resources Water Appropriations Permit To be Applied for Preliminary Well Construction Assessment To be Applied for Public Waters Work Permit To be Applied for General Permit 97-0005 for Temporary Water Appropriations (need if more than 10,000 gpd of water is appropriated To be applied for, if necessary Minnesota Department of Health Watermain Extension Approval To be Applied for Sanitary Sewer Extension Permit Approval To be Applied for Well Location and Construction Approval To be Applied for Regional Rice Creek Watershed District Erosion and Sediment Control Plan Approval To be Applied for 2 Mitigation Plan Update – 2020 January 31, 2020 Unit of Government Type of Application Status Stormwater Management Plan Approval To be Applied for Wetland Delineation Boundary Confirmation To be approved upon completion of wetland delineation Certificate of Wetland Exemption To be Applied for Wetland Impact/Replacement Application To be approved upon completion of wetland delineation Metropolitan Council Sanitary Sewer Service Connection Approval To be Applied for County Anoka County County Roadway Access Permits To be Applied for Roadway Plan Approval on County Roads To be Applied for Local City of Lino Lakes Site Plan Approval To be Applied for AUAR and Mitigation Plan Approval Ongoing Planned Unit Development Approval To be Applied for Preliminary Plat Approval To be Applied for Final Plat (multiple) Approval To be Applied for Grading, Excavation and Foundation Permits (multiple) To be Applied for Building Permits (multiple) To be Applied for Sanitary Sewer Connection Permit (multiple) To be Applied for Municipal Water Connection Permit (multiple) To be Applied for Use Permit – Floodplain District To be Applied for City Roadway Access/Crossing Permits To be Applied for Comprehensive Plan Amendment(s) To be Applied for 3 Mitigation Plan Update – 2020 January 31, 2020 ITEM 11. FISH, WILDLIFE, ECOLOGICALLY SENSITIVE RESOURCES Item No. Mitigation Description Update 11.1 Implement the Conservation Design Framework (CDF, see Figure 10-3), which includes conservation of “Core” and “Outlier” habitat areas, buffering these natural resources, and establishing greenway corridors throughout the AUAR area to provide connectivity for ecological and wildlife corridors, regional stormwater collection and conveyance, and passive recreational opportunities. This mitigation measure is ongoing. 11.2 Add the “Core” and “Outlier” habitat areas to the City’s Parks, Natural Open Space/Greenways, and Trail System Plan map. This has been added to Fig 2-9 in the Comprehensive Plan. 11.3 Require public land dedication of priority natural open space areas through the subdivision process. This mitigation measure is ongoing. 11.4 Require that cash in lieu of public land dedication for subdivisions within the AUAR area be spent within the AUAR area to purchase, restore, and/or maintain priority natural open space areas. This mitigation measure is ongoing. 11.5 Consider provisions for conserving “Other” habitat areas (see Figure 10-2) during the development review process. This mitigation measure is ongoing. 11.6 Establish mechanisms for ecological restoration, management, stewardship, and education. This mitigation measure is ongoing and implemented through the Comprehensive Wetland Protection and Management Plan. 11.7 Provide for turtle and other wildlife passage by continuing to require surmountable curbing in new residential developments and encouraging ecologically sensitive site design. This mitigation measure is ongoing. Residential developments that have occurred within the study area have all incorporated surmountable curbs. 11.8 Consult with the DNR and/or US Fish and Wildlife Service to determine appropriate mitigation strategies for activities near the Bald Eagle’s nests within the AUAR area before development occurs within the vicinity of the nests, including reviewing recommended disturbance limit guidelines developed by the DNR. This mitigation measure is ongoing. 11.9 Continue to enforce the Peltier Lake No-Wake Zone ordinance and establish buffers to protect the Peltier Lake Heron Rookery. This mitigation measure is ongoing. 4 Mitigation Plan Update – 2020 January 31, 2020 Item No. Mitigation Description Update 11.9A The City will limit development within 300 meters of the edge of a heron colony and not allow disturbance in or near colonies from March to August. Measure was included in original AUAR within the text. 11.10 Require rare plant surveys, by qualified personnel, prior to development in wetland areas and of areas of banded soils between muck soils and adjacent Isanti, Soderville, or Zimmerman soil map units. These surveys shall be conducted by qualified professionals at an appropriate time of year to identify the rare plants. This mitigation measure is ongoing. 11.11 Encourage ecologically sensitive design and construction practices for the proposed northerly bypass that would connect I-35W and I-35E. This mitigation measure is ongoing. 11.12 Implement the Conservation Design Framework (CDF) of the AUAR (Figure 10-3 and 10-2). The CDF includes consideration of: • Conservation of the most ecologically significant natural resources within the AUAR area (in particular, the “Core” and “Outlier” habitats as shown in Figure 10-2 of the original AUAR). • Protection of ecologically significant natural resources from adjacent land uses by implementing buffering. • Connection of ecologically significant natural resources via multi- functional greenway corridors. Measure was included in original AUAR within the text. 5 Mitigation Plan Update – 2020 January 31, 2020 ITEM 12. WATER RESOURCES: WETLANDS Item No. Mitigation Description Update 12.1 Delineate wetlands in accordance with the Corps of Engineers Wetlands Delineation Manual and classify wetlands according to Wetlands of the United States (Circular 39) and Wetlands and Deepwater Habitats of the United States. This mitigation measure is ongoing. 12.2 Follow sequencing process of wetland avoidance, minimization, rectification, and mitigation as outlined in the Wetland Conservation Act (WCA) if wetlands area altered. This mitigation measure is ongoing. 12.3 Apply for applicable wetland permits to obtain authorization for wetland alterations under WCA and Section 404 prior to project construction if development activities will impact a jurisdictional wetland. This mitigation measure is ongoing. 12.4 Mitigate areas of wetland impacts according to the requirements of the Wetland Conservation Act. This mitigation measure is ongoing. 12.5 Submit wetland permit applications and replacement plans, as appropriate, to the Minnesota Board of Water and Soil Resources, Rice Creek Watershed District, and the City of Lino Lakes. This mitigation measure is ongoing. 12.6 Follow the requirements for wetland alterations delineated by the Rice Creek Watershed District (RCWD). This mitigation measure is ongoing. 12.7 Minimize or avoid totally any filling of public waters through careful design. This mitigation measure is ongoing. 6 Mitigation Plan Update – 2020 January 31, 2020 ITEM 13. WATER USE Item No. Mitigation Description Update 13.1 Monitor water usage and do not permit new development to proceed if it exceeds the capacity of the water supply and distribution system. This mitigation measure is ongoing. 13.2 Construct the water supply and distribution system in accordance with Minnesota Department of Health standards and with the goals, policies, and recommendations set forth in the City’s Comprehensive Water Supply Plan. This mitigation measure is ongoing. 13.3 As necessary, amend the City’s Comprehensive Water Supply Plan and Capital Improvement Plan to be consistent with any future amendments or updates to the Comprehensive Plan that would necessitate expansions or alterations to the water system. This mitigation measure is ongoing. No updates have been needed to date for the study area. 13.4 Follow the adopted Wellhead Protection Plans for Lino Lakes and Centerville. As necessary, amend the City’s Wellhead Protection Plan for new wells. This mitigation measure is ongoing. 13.5 Require abandoned private wells to be sealed in compliance with the Minnesota Department of Health regulations. This mitigation measure is ongoing. 13.6 Require that the installation of any private individual wells be constructed and installed in accordance with the Minnesota Department of Health regulations (Minnesota Well Code). This mitigation measure is ongoing. 13.7 Continue to implement the City’s adopted water conservation policies which are intended to attenuate peak water demands throughout the City. This mitigation measure is ongoing. 13.8 Mitigation will be regulated through the City’s development approval and permitting process. Proposed master development plans, planned unit development and subdivision applications, plats, and/or site plans must address relevant water conservation mitigation measures prior to final approval by the City. Implementation of mitigation measures will be assured through developer agreements with the City, which will require a financial security for land and infrastructure improvements and/or revoke the right to acquire building permits and/or certificates of occupancy until all relevant mitigation measures have been addressed. This mitigation measure is ongoing. 7 Mitigation Plan Update – 2020 January 31, 2020 ITEM 15. WATER SURFACE USE Item No. Mitigation Description Update 15.1 Consider restricting individual lake access and dock construction along public and private shorelands by encouraging the use of clustered access and dock facilities. This mitigation measure is ongoing. ITEM 16. EROSION AND SEDIMENTATION Item No. Mitigation Description Update 16.1 Require project proposers to acquire NPDES/SDS General Stormwater Permit for Construction Activity from the MPCA prior to initiating earthwork. This mitigation measure is ongoing. 16.2 Require project proposers to meet the erosion and sediment control regulations in all applicable regulations, ordinances and rules of the City and MPCA, and Rice Creek Watershed District. This mitigation measure is ongoing. 16.3 Require project proposers to minimize runoff, improve the quality of runoff, and provide erosion control through BMPs and other low impact development techniques. This mitigation measure is ongoing. 16.4 Provide construction oversight to ensure designed sediment and erosion control measures are being implemented. This mitigation measure is ongoing. 16.5 Implement the Conservation Design Framework (CDF, Figure 10-3). This mitigation measure is ongoing. ITEM 17. WATER QUALITY: SURFACE WATER RUNOFF Item No. Mitigation Description Update 17.3 Require stormwater management systems to be developed in accordance with the current version of the Rice Creek Watershed District Rules (these rules assist in achieving the goals of the Resource Management Plan – 3) and all other local, state, and federal stormwater management requirements. Updated to be inclusive of the current version of the rules. The RCWD rules are intended to meet the goals of the Resource Management Plan-3 that was included in the 2010 AUAR Update. 8 Mitigation Plan Update – 2020 January 31, 2020 ITEM 18. WATER QUALITY: WASTEWATER Item No. Mitigation Description Update 18.1 Monitor wastewater flows and not permit new development to proceed if it exceeds the capacity of the wastewater system. This mitigation measure is ongoing. 18.2 Construct the major infrastructure improvements needed to expand the capacity of the wastewater system (i.e. lift stations, forcemains, and upgrades to the existing systems) in accordance with the Comprehensive Sanitary Sewer Plan and Capital Improvement Plan. This mitigation measure is ongoing. 18.3 Adequately phase capacity improvements. This mitigation measure is ongoing. 18.4 Amend the Comprehensive Sanitary Sewer Plan and Capital Improvement Plan to be consistent with any amendments to the Comprehensive Plan that would necessitate expansions or alterations to the sanitary sewer system and regional capacity needs. This mitigation measure is ongoing. No updates have been needed to date for the study area. 18.5 Each proposed development will be required to provide a detailed projection of wastewater generation and flows. These calculations will be checked by the City’s Engineering Consultant. This mitigation measure is ongoing. 18.6 The City will create a year-end report to evaluate wastewater increases by major sewer lines and overall system usage in relation to capacity. Results of this assessment will become the targets for growth for the following year. This mitigation measure is ongoing. 9 Mitigation Plan Update – 2020 January 31, 2020 ITEM 19. SOIL AND GROUNDWATER CONTAMINATION Item No. Mitigation Description Update 19.1 Require the removal of all tanks and associated underground piping in accordance with applicable state and federal laws. This mitigation measure is ongoing. 19.2 Require that any party that may discover residual petroleum contamination shall follow state law and report the information to the MPCA for further investigation and potential remediation. This mitigation measure is ongoing. ITEM 21. TRANSPORTATION Item No. Mitigation Description Update 21.1 Create a monitoring program that closely evaluates traffic impacts from proposed developments within the AUAR area. Traffic Impact Studies are required for proposed developments showing the impact on the transportation system and consistency with the AUAR. 21.2 Implement traffic mitigation measures as development occurs within the AUAR area. Specific mitigation measures for the three development scenarios are discussed in Item 21 and depicted on Figures 21-8, 21-9, and 21-10. These mitigation measures improve overall traffic operations for the respective development scenarios. The improvements are intended to represent the minimum level of infrastructure investment that would be needed to meet acceptable level of service standards. Additional roadway and non-motorized improvements, beyond the minimum level, may be identified to accommodate specific development needs that are identified within the AUAR area. Primary improvements, regardless of land use scenario, include: 21.2.1 Develop frontage road system in compliance with local, county, and state access management guidelines to serve local and regional traffic. 21.2.2 Work with appropriate road authorities to reconstruct and provide additional capacity for CSAH 21. CSAH 14 improvement was completed in 2009 and noted in the 2010 AUAR Update CSAH 54 (formerly CSAH 21) 20th Avenue North intersection improvements were completed and noted in the 2010 AUAR Update. I-35E Interchange reconstruction was completed in 2011. This mitigation measure is complete. 10 Mitigation Plan Update – 2020 January 31, 2020 Item No. Mitigation Description Update 21.2.3 Work with appropriate road authorities to construct Northerly Bypass with new interchanges at I-35W and I-35E (80th Street East) to improve traffic operations and access to and within the AUAR area. As recommended by FHWA and Mn/DOT, a phasing plan should be established to construct each piece of the Northerly Connector as it becomes necessary to maintain the serviceability of the transportation system. Phase Improvement 1. CSAH 14, I-35W to I-35E (funded and programmed for construction) 2. CSAH 14, I-35E Interchange 3. CR 140 (80th Street)/I-35E Interchange 4. CSAH 14 across Peltier Lake (Northerly Bypass/Connector) 5. CSAH 14/I-35W Interchange As part of these improvements, the following steps should be taken as the opportunity is presented: • Inclusion of the northerly bypass and proposed interchanges in future transportation and comprehensive plans • Preservation of right of way through official mapping or other process • Right of way dedication through the platting process 21.3 Require a traffic impact analysis for all development projects within the AUAR area. The traffic impact analysis will assist the City and other road authorities in determining the appropriate mitigation measures that are required to mitigate impacts of a specific development proposal. This mitigation measure is ongoing. 11 Mitigation Plan Update – 2020 January 31, 2020 Item No. Mitigation Description Update 21.4 Work with appropriate road authorities to mitigate the impact of the additional traffic on the on the regional system, specifically Interstates 35W and 35E, by reconstructing each to provide a six-lane cross-section consistent with the recommendations outlined in the I-35 IRC. It should be noted that it was determined that an expansion will be necessary even without the development scenarios used in this analysis. As the interstates serve a much larger area, the projected growth of the entire Twin Cities region should warrant expansion by the year 2030. This mitigation measure is ongoing. 21.5 Prioritize alternative travel modes within the AUAR study area and require project proposers to address alternative travel modes (e.g., buses, bicyclists, and pedestrians) by identifying appropriate accommodations. This mitigation measure is ongoing. 21.6 Consider the need for additional infrastructure improvements (see item #21.2) in future updates or amendments to the Comprehensive Plan. Submit the plan update to the appropriate agencies (i.e., FHWA, MnDOT, Met Council, etc.). This mitigation measure is ongoing. 21.7 Require project proposers to follow all appropriate guidelines and policies related to traffic nose and noise walls. This mitigation measure is ongoing. 21.8 Require that site plans for each of the developments include measures such as appropriate setback distances, earthen berms, noise walls, and appropriate site design to reduce the impact of traffic noise to residential areas. This mitigation measure is ongoing. 21.9 Continue to require the implementation of the conditions of approval for the Eagle Brook Church relating to mitigating traffic impacts. This mitigation measure is ongoing. 21.10 Achieve effective traffic operations within the city by requiring that site plans make use of access management practices to promote safe, effective traffic flow. This mitigation measure is ongoing. 21.11 Require project proposers to follow the Anoka County Highway Department Development Review Process Manual (updated June 2013). This mitigation measure is ongoing and has been updated to reflect the newest manual. 21.12 Continue to coordinate capital improvement programming with applicable transportation authorities. This mitigation measure is ongoing. 12 Mitigation Plan Update – 2020 January 31, 2020 ITEM 25. CULTURAL RESOURCES / FARMLANDS Item No. Mitigation Description Update 25.1 Consult the map that shows areas with a high potential for archaeological sites when development applications are submitted for review. Given the sensitive nature of this information, this map cannot be included in the AUAR document, nor can it be made available to the public. If a development application falls within an area that is considered to have a high potential for archaeological sites, the City will require that the following steps and procedures involved in the identification and analysis of any archaeological sites is followed prior to development:  Conduct a Phase I archaeological survey within the area of potential effect (APE). The objective of the archaeological fieldwork is to determine if there are archaeological sites in the areas identified as having high potential for such and define the extent of those sites that may be impacted by development plans.  Conduct a Phase II archaeological survey. If archaeological resources are uncovered within the APE that may be eligible for listing on the National Register of Historic Places (NRHP) a Phase II survey should be conducted. The objective of the investigation is to determine whether archaeological resources are eligible for listing on the NRHP.  Plan for avoidance or conduct Phase III data recovery. If a significant archaeological site is identified that will be impacted by development, avoidance is recommended. If this is not possible, then a data recovery of the site should occur.  If human remains are recovered at any time during archaeological investigation or development, all activities must stop, and consultation initiated with the Office of the State Archaeologist and Minnesota Indian Affairs Council. This mitigation measure is ongoing. 13 Mitigation Plan Update – 2020 January 31, 2020 Item No. Mitigation Description Update 25.2 Consider preservation of agricultural heritage sites by implementing thoughtful interpretive planning. As development plans for the two Century Farms come to fruition, the City can encourage landscaping and other amenities that reflect the agricultural heritage of this city. In addition, the City can continue to reflect the agricultural heritage of the community in public buildings and gathering places (for example, City Hall reflects elements of the community’s agricultural heritage). This mitigation measure is ongoing. ITEM 27. COMPATIBILITY WITH PLANS Item No. Mitigation Description Update 27.1 Use the information contained in the AUAR during future considerations of updates or amendments to the adopted Comprehensive Plan and Zoning Ordinance. Any future consideration of amendments or updates to the Comprehensive Plan and Ordinances would follow the City’s set procedures and guidelines for such amendments. The City has completed the 2040 Comprehensive Plan. 27.2 Require that tools such as clustering, buffering, and/or screening be incorporated into future development plans to mitigate potential land use conflicts. This mitigation measure is ongoing. Appendix I Responses to Comments 1 Comment Response 1. The 2030 Comprehensive Plan scenario has been added into the AUAR Update. The traffic, sewer, water, and stormwater technical memos has been reviewed and updated to include this scenario in the appendices. This has been added to the AUAR Update in response to this comment. 1. 2 Comment Response 2. As part of the long-term planning process, the City of Lino Lakes is anticipating the future need for 80th Street to connect to the west. The planned timing for this connection is post 2040. The City recognizes the need to begin this dialogue between the Met Council and Anoka County and therefore has indicated this future road connection in its transportation plan and in this AUAR. This project could be subject to a separate environmental review process and would be evaluated for environmental review at that time. 3. We understand that these improvements are not identified by Met Council 2040 Transportation Policy Plan. However, the City has identified the improvements in the current 2040 Comprehensive Plan update in the “Post-2040” conditions. It is also understood that as the area develops these improvements or other improvements would be considered. If environmental review for the future roadway connection is required, it will be completed at that time. 2. 3. 3 Comment Response 1. Comment noted. 2. As the area develops the traffic noise will be addressed on a case by case basis. 3. Comment noted. 1. 2. 3. 4 Comment Response 5 Comment Response 1. An extensive cultural resource review was completed with the original AUAR. The mitigation plan requires Phase I studies within sites that fall within areas of high potential for archaeological sites. These are mitigation measures 25.1 and 25.2. 2. Comment Noted. 1. 2. 6 Comment Response Mr. Grochala, The DNR has reviewed the I-35E Corridor AUAR Update and would like to provide the following comments: 1. Page 2, Water. When planning for additional municipal water supply infrastructure, please apply for a Preliminary Well Construction Assessment through MPARS, MNDNR’s online permitting and reporting system. The City of Lino Lakes is required to request the amendment of the City of Lino Lakes DNR Water Appropriation Permit 1985-6168 at least 6-12 months prior to exceeding the authorized volume of DNR Water Appropriation Permit 1985-6168. 2. Page 3, Approved Development. Please note that a DNR Water Appropriation Permit is required for the pumping of groundwater, pond water, or surface water in volumes that exceed 10,000 gallons per day, or one million gallons per year, to allow grading, building construction, pond construction, stream crossing construction and the construction of utilities. 3. Page 5, Water Resources. Under Section 11.a.i., please include MNDNR Public Waters Inventory numbers for Peltier Lake, Rondeau Lake, Clearwater Creek, and Hardwood Creek. 4. Page 6, Stormwater. The DNR urges the City of Lino Lakes to consider using stormwater to irrigate landscaping as a means of conserving groundwater. Minnesota Statutes exempt stormwater use from DNR Water Appropriation Permit requirements. 5. Page 7, Surface Waters. Under Section 11.b.iv., please include MNDNR in the list of agencies under which future projects affecting water resources may be regulated. 6. Page 7, Surface Waters. Please note that Hardwood Creek and Peltier Lake are impaired waters. Every effort must be made to reduce further impact to these public waters. The planned increase in impervious surfaces will also increase the amount of road salt used in the project area. Chloride released into local lakes and streams does not break down, and instead accumulates in the environment, potentially reaching levels that are toxic to aquatic wildlife and plants. Consider promoting local business and city applicator participation in the Smart Salting Training offered through the Minnesota Pollution Control Agency. More information and resources can be found at this website. Many winter maintenance staff who have attended the Smart Salting training — both from cities and counties and from private companies — have used their knowledge to reduce salt use and save money for their organizations. 7. Page 8, Fish, wildlife, plant communities, and sensitive ecological resources (rare features). Items 13.a-d. do not provide any discussion of natural resources. The 2/20/2020 Natural Heritage letter was not included in AUAR attachments. Please see a copy of this letter (attached to this email) and include it, and a discussion of its contents, in the AUAR and Mitigation Plan. The City of Lino Lakes contains many natural resources which could be impacted by this project. 8. Appendix C, Water Appropriation Memo, Page 5. Appendix C indicates that the City of Lino Lakes will need to construct an additional three wells to serve the growth in 1. The City will obtain any necessary permits and reviews for city-lead projects. The Preliminary Well Construction Assessment has been added to Item 8 in the Update and the Mitigation Plan. 2. Comment noted. This permit was listed in the AUAR Update. 3. These PWI numbers have been added to the Update. 4. Comment note. This will be taken into consideration as development is proposed in the study area. 5. The DNR has been added to this section. 6. These waters have been noted as impaired in this section. 7. The DNR NHIS letter has been added to the Update in the appendix and referenced in this section. The information from the NHIS system is similar to information obtained during the original AUAR and its subsequent updates. The mitigation plan acknowledges the areas contained within the Minnesota Biological Survey Sites of Biological Significance. 8. This Assessment has been added to the AUAR and Mitigation Plan as noted in Response #1 above. 7 population of the City of Lino Lakes. Please note that the DNR will need to conduct a “Well Construction – Preliminary Assessment” for each of the new wells within 6-12 months prior to the construction of the well. 9. The majority of the area covered by the I-35E AUAR is within the Drinking Water Supply Management Area of the City of Lino Lakes. This is an area where groundwater pollution will enter the water system of the City of Lino Lakes within 10 years of the initial contamination event. Care should be taken in the handling of potential pollutants in this area. 10. Due to entanglement issues with small animals, use of erosion control blankets throughout the project should be limited to ‘bio-netting’ or ‘natural netting’ types, and specifically not products containing plastic mesh netting or other plastic components. These are Category 3N or 4N in the 2016 & 2018 MnDOT Standards Specifications for Construction. Also be aware that hydro-mulch products may contain small synthetic (plastic) fibers to aid in its matrix strength. These loose fibers could potentially re-suspend and make their way into Public Waters. As such, please review mulch products and do not allow any materials with synthetic (plastic) fiber additives in areas that drain to Public Waters. Thank you for the opportunity to comment. Please let me know if you have any questions. Thank you, Melissa Collins Regional Environmental Assessment Ecologist | Ecological and Water Resources Pronouns: She/her Minnesota Department of Natural Resources 1200 Warner Road St. Paul, MN 55106 Phone: 651-259-5755 Email: melissa.collins@state.mn.us mndnr.gov 9. This comment is noted. 10. The comment is noted and will be reviewed when development is proposed in the study area.