HomeMy WebLinkAbout02/23/2022 EB Packet
CITY OF LINO LAKES
ENVIRONMENTAL BOARD MEETING
Wednesday, February 23, 2022
6:30 p.m.
Council Chambers
AGENDA
1. CALL TO ORDER AND ROLL CALL
2. PLEDGE OF ALLEGIANCE
3. APPROVAL OF AGENDA
4. APPROVAL OF MINUTES: January 26, 2022
5. OPEN MIKE
6. ACTION ITEMS
A. Amelia Lake Subwatershed Management Plan/Feasibility Study
7. DISCUSSION ITEMS
A. Earth Day Event at Wargo
8. UPDATES
A. Tree City and Growth Award for 2021
B. Recycling Update
9. ADJOURN
DRAFT MINUTES
CITY OF LINO LAKES
ENVIRONMENTAL BOARD MEETING
I. CALL TO ORDER AND ROLL CALL:
Mr. Sullivan called the Lino Lakes Environmental Board meeting to order at 6:30 p.m. on
January 26, 2022.
II. PLEDGE OF ALLEGIANCE
III. SWEARING IN OF BOARD MEMBERS
Mayor Rafferty swore in Mr. Parsons and Ms. Buchmeier.
IV. APPROVAL OF AGENDA
Mr. Sullivan stated to approve the Agenda as it stands.
V. ELECTION OF CHAIR AND VICE CHAIR
After voting the Chair and Vice Chair will remain the same.
Chair will remain Mr. Sullivan. Ms. McNulty MOTIONED and Mr. Parsons
seconded. Motioned passed 7 – 0.
Vice Chair will remain Mr. Schwartz. Mr. Parsons MOTIONED and Ms. Holmes
seconded. Motioned passed 7 – 0.
DATE : January 26, 2022
TIME STARTED : 6:30 P.M.
TIME ENDED : 7:27 P.M.
MEMBERS PRESENT : John Sullivan, Lindsay Buchmeier, Cassie Cavegn,
Shawn Holmes, Ella McNulty, Jonathan Parsons,
Alex Schwartz
MEMBERS ABSENT : None
STAFF PRESENT : Andy Nelson, Phillip Davis
Enivornmental Board
January 26, 2022
Page 2
DRAFT MINUTES
VI. APPROVAL OF MINUTES:
January 4, 2022
Mr. Sullivan asked for approval of the January 4, 2022 minutes. Ms. Buchmeier
MOTIONED to approve the minutes. Mr. Schwartz seconded the motion. Motion
passed 7 – 0.
VII. OPEN MIKE
Mr. Sullivan declared Open Mike at 6:37 p.m.
Open Mike declared closed at 6:37 p.m.
VIII. DISCUSSION ITEMS
A. Aquatic Invasive Species Program Overview – Jessica Leverty, Anoka County
Mr. Nelson introduced Jessica Leverty from Anoka County. Ms. Leverty presented an
overview of the Aquatic Invasive Species program with Anoka County.
In the 2014 Session Law Chapter 308 enacted by the Legislature provides Minnesota
counties a County Program Aid grant for Aquatic Invasive Species prevention.
The amount designated for each county is based on the number of watercraft trailer
launches as well as the number of watercraft trailer parking spaces within each county.
The Anoka County aid allocation for 2022 was $134,400. This budget is used to pay for
the inspectors and the coordinator.
Main categories of the Anoka County AIS Prevention Aid Program include education and
outreach events, watercraft inspection, prevention grant, monitoring and early detection.
In 2021, there were 6 outreach events. Educational materials are given to bait stores,
restaurants, bars, and pet stores. In 2019, there were 15 events.
There were questions about how a violation is handled.
Ms. Leverty stated that a violation is handled with a warning and education. The license
plate number is also taken. They can be denied launch and if they launch anyway they
can get a ticket.
Questions on how inspections are done such as do they prioritize certain lakes or certain
times for the inspectors and if violations are becoming more frequent.
Ms. Leverty stated that the inspectors are usually an internship job and they work
approximately 10 hours a day, including weekends and holidays. The lakes are ranked
based on the violations from the previous year.
Enivornmental Board
January 26, 2022
Page 3
DRAFT MINUTES
Ms. Leverty mentioned that there are a lot of new boaters, so there is a lot of education
that is being provided.
Zebra mussel spotting is done by volunteers.
Aqua weed stick stations were installed at 5 boat launches in Anoka County. They were
used over 1731 times, so the County is looking at expanding because they were used so
often.
Early weed detection and monitoring is also done by volunteers who are checking the
lakes and beaches for weeds that are invasive.
IX. UPDATES
A. Recycling and SCORE Grant Updates
Mr. Davis presented that at the last Saturday, January 15th, recycling day there were
120 participants recycling and 44 participants with paper shredding.
The Recycling Ambassador Class will be held March to early April. Check out the
Anoka County Recycling page for more information.
There will not be a Fix-It Clinic, there were not enough volunteers.
Score reimbursement for 2021 was $68,721.13 and this past July through December
we are being reimbursed $37,889.39.
Mr. Sullivan wanted to know what expenses are for the Saturday recycling event.
Mr. Davis stated that the expenses for Saturday recycling cover the cost of All
Appliance Disposal which runs the event and also 1st Choice Document Destruction
that provides the paper shredding service. Also what the residents pay on Saturday
goes to All Appliance Disposal which they use for the disposal of mattresses, etc. All
Appliances accepts some materials that other vendors can’t process.
Each Municipality has a recycling goal established by the County based on
population. The tonnage goal for 2021 was 2,334 tons. We reached 95.47% of that
goal which was 2,228.41 tons.
Mr. Schwartz asked if there is data on COVID impacting tonnage numbers.
Mr. Nelson will be reaching out to Anoka County for data on past goals and if we had
meet them or not, and to learn what resources are available for increasing tonnage
diverted from landfills.
Enivornmental Board
January 26, 2022
Page 4
DRAFT MINUTES
Mr. Schwartz asked if data is collected on tonnage that goes to landfills. If so, it
would be interesting to look at the ratio of diverted waste and waste that goes to
landfills to determine if our numbers for tonnage are lower because waste is
increasing, or if people are simply using less single-use products.
Mr. Nelson stated that the license agreements with haulers require tonnage data be
provided to the City for recycling, but not for solid waste. He stated that staff may
look into waste numbers in the future if this data is accessible.
Mr. Sullivan would like a copy of Mr. Davis’s presentation and maybe send them to
the board as well.
Mr. Parsons wanted to know if we get credit or another incentive for reaching
tonnage goals.
Mr. Nelson stated that there are neither incentives nor penalties tied to the goals. If a
city is not reaching tonnage goals, the County will meet with the city to see how to
improve their recycling program.
Mr. Parsons wanted to know if market prices for recyclable good are ever published
so that residents can make economically informed decisions about their recycling
habits. He was curious if targeted economical marketing has been used in recycling
outreach.
Mr. Nelson responded that the City prints outreach material sent by Anoka County in
all of the newsletters. More recycling and solid waste outreach content may be
posted in the future.
X. ADJOURNMENT
Ms. Holmes made a MOTION to adjourn the meeting at 7:27p.m. Motion was seconded
by Mr. Schwartz. Motion carried 7 - 0.
1
ENVIRONMENTAL BOARD
AGENDA ITEM 6A
STAFF ORIGINATOR: Andy Nelson, Environmental Coordinator
MEETING DATE: February 23rd, 2022
REQUEST: Motion to recommend Amelia Lake Feasibility Study
TOPIC: Amelia Lake Feasibility Study
BACKGROUND:
Amelia Lake is a natural environment lake located in the southeast portion of Lino Lakes.
The watershed area is approximately 754 acres. A private ditch serves as an outlet for
approximately 340 acres of the watershed. The ditch corridor and adjacent wetlands are
proposed components of the City’s parks, greenways, and trail system in the 2040
Comprehensive Plan.
Recently, there has been flooding in the ditch corridor due to limited maintenance and failure of
private culverts. This has raised concerns regarding long-term management of the system as
development pressure increases upstream.
In an effort to evaluate long-term stormwater management options for this subwatershed area,
staff is proposing to develop a Lake Amelia Subwatershed Management Plan/Feasibility Study in
partnership with the Vadnais Lake Area Water Management Organization (VLAWMO). The
study will develop alternative concepts aimed at enhancing water quality, preserving flood
storage, and providing for potential recreational and wildlife corridor features.
The partnership with VLAWMO will include a cost match for professional services required to
complete the feasibility study, with the City and VLAWMO each contributing 50% of the cost,
with the total cost not to exceed $30,000. City staff will also be managing the consultant
developing the study.
A Request for Services was sent to four qualified engineering firms. City and VLAWMO staff
reviewed the four responses, and reached consensus that WSB and Associates is the
recommended firm for development of the study, based on their experience with City drainage in
the area, and the overall strength of their proposal.
Highlights from the Scope of Work for this study include:
1. Four meetings and one site visit
2. Existing conditions review and summary
3. Survey of topography of the ditch, slopes, erosion, stormwater structures, and grades
4. Monitoring pollutant data for the lake
2
5. Water quality and drainage modeling
6. Surface water improvement options based on different ownership scenarios
7. Permitting requirements and funding options
8. Final Report
ENVIRONMENTAL DIRECTION:
Recommendation to the City Council on whether to proceed with the feasibility study.
ATTACHMENTS:
1. Amelia Lake Study Area Map
2. Request for Services: Lake Amelia Subwatershed Management Plan
3. WSB: Scope of Work for Stormwater Management Options Feasibility Study
Ameila RMU
CentervilleRMU
ClearwaterCreek RMU
Sherman RMU
Wilkinson RMU
City of Lino Lakes
Lake Amelia Legend
Private_Ditch
Study Area
Lake_Amelia_watershed
1 inch = 900 feet
Subwatershed Study Area
REQUEST FOR SERVICES
Lake Amelia Subwatershed Management Plan
Request
The City of Lino Lakes, in partnership with the Vadnais Lakes Water Management Organization
(VLAWMO), is requesting a scope of work and cost estimate from qualified consulting firms to
conduct a Feasibility Study evaluating long term storm water management options for the
subwatershed north of Lake Amelia.
Background Information
Lino Lakes is located in Anoka County, Minnesota, and is home to approximately 22,000
residents. Located in the southeast corner of the county and on the northeastern edge of the
Twin Cities metropolitan area the community is a fast growing suburb. Lake Amelia is a natural
environment lake, with a watershed area of approximately 754 acres. The lake lies upstream of
Wilkinson Lake which is an impaired water.
Purpose
Drainage conveyance from properties lying north of Lake Amelia is provided by an existing
private ditch which serves as an outlet for approximately 340 acres. There is no available
information on the creation of the drainage system and it is not managed by a public agency.
The ditch corridor and adjacent wetlands are identified as a proposed component of the City’s
parks, greenways and trail system in the 2040 Comprehensive Plan. Lake Amelia is also
identified as a lake of biological significance by the Minnesota Department of Natural Resources,
due to a high quality colonial waterbird nesting area.
The ditch corridor has seen recent flooding due to limited maintenance and failure of private
culverts. This has raised concerns regarding long term management of the system as
development pressure increases upstream.
The purpose of the study is to:
1. Identify a preferred long term water quality and quantity management strategy for the
ditch system.
2. Develop alternative concepts for BMP implementation along the corridor that enhances
water quality, preserves flood storage and provides a potential recreational and wildlife
habitat corridor.
Scope of Work
The Scope of Services should include the following:
1. Meeting with City and VLAWMO staff to kick-off the project and up to 4 additional
meetings as necessary to complete tasks detailed below.
2. Review and summary of existing conditions including but not limited to delineation of
drainage area, existing land use, flood plain, and high level wetland
location/type/quality and issue identification.
3. Preparation of water quality, and Hydrologic and Hydraulic modeling of existing and full
build scenarios.
4. Recommendation on possible phasing plan for transition of the private ditch system
into a publicly (City) managed system.
5. Development of site specific ditch corridor improvement concepts, phasing plan and
alternatives analysis including but not limited to modification of the stream corridor
to improve water quality and habitat, placement of other future site appropriate
BMP’s, and /or wetland restoration. The scope of work should identify the
approximate number of concepts that would be developed.
6. For each conceptual BMP listed in #5 above include rough cost estimate, estimated
load reductions and high level assessment of feasibility of each conceptual BMP.
7. Summary of permitting requirements and identification of potential funding sources
for any proposed improvements.
8. Final Report.
City of Lino Lakes and VLAWMO Responsibilities
The City of Lino Lakes will provide a GIS data set including:
Parcel and property information
Storm water infrastructure
2 foot contours
2020 aerial photos
The VLAWMO will provide:
Prior wetland inventories and delineations
Bathymetry survey conducted in 2021
Macrophyte survey conducted in 2021
Additional aerial photos as needed (available through Nearmap)
GIS layers (or city) including but not limited to NWI, soils, roads/streams, land use
(2010)
Anticipated Timeline For Completion
The agencies are requesting completion of the study within 6 months of notice to proceed.
Submittal Requirements
Firms replying to this request are required to submit the following information (please limit
submittal to 5 pages or less):
1. Scope of work including proposed tasks and deliverables.
2. Cost estimate with approximate rate and hours per each proposed task and any additional
expenses
3. Specify a timetable for completion of the study.
Evaluation of Proposals
Evaluation scope of work will include review by City and VLAWMO staff based upon, but not
limited to, demonstrated success on similar projects, qualifications/expertise of staff assigned to
the project, budget detail, overall cost, and references. An interview may be part of the
evaluation process.
Questions
Questions should be emailed to Michael Grochala, Community Development Director, at
mgrochala@linolakes.us
Submittal Deadline
Proposals will be accepted U.S. mail or E-mail. If submitting a hard copy by mail please include
one electronic copy in a .pdf format.
Hard Copies Submit to: City of Lino Lakes
ATTN: Andy Nelson
600 Town Center Parkway
Lino Lakes, MN 55014
E-mail anelson3@linolakes.us
Deadline: 4:30 PM, Wednesday, February 9, 2021
Format: Include 1 electronic copy of document in a pdf format.
The entire submittal package must be received by or before the time and date indicated
above. Time and date deadlines for submittal will not be waived; however, the City reserves
the right to extend the submittal deadline.
Attachments
1. Study Area Map
Ameila RMU
CentervilleRMU
ClearwaterCreek RMU
Sherman RMU
Wilkinson RMU
City of Lino Lakes
Lake Amelia Legend
Private_Ditch
Study Area
Lake_Amelia_watershed
1 inch = 900 feet
Subwatershed Study Area
A Proposal for Lake Amelia Subwatershed Management Plan for the City of Lino Lakes | 1
Mr. Andrew Nelson
Environmental Coordinator
City of Lino Lakes
600 Town Center Parkway
Lino Lakes, MN 55014-1182
Re: Lake Amelia – Scope of Work for Stormwater Management Options Feasibility Study
Dear Mr. Nelson:
WSB is pleased to submit this scope of work and cost estimate to complete a Feasibility Study on stormwater management
options for the subwatershed north of Lake Amelia in the City of Lino Lakes (City), and Vadnais Lakes Area Water Management
Organization (VLAWMO).
Task 1 – Staff Meetings (18 hours $2,000)
Four meetings and one site visit are anticipated and can be adjusted based on the recommendation of the City and watershed
staff. An initial kick-off meeting will serve as an opportunity to review the goals of the study, the approach, and the schedule.
Subsequent meetings are anticipated for Tasks 3, 4 and 8.
Task 2 – Existing Conditions Review (26 hours $3,300)
WSB will assemble all available data in a single GIS database. The data will include parcel information, stormwater
infrastructure, topography, aerial imagery, wetlands, bathymetry, biological survey, land use and soil data. Most of the data will
be available from the City, VLAWMO, and public sources. The terrain data will be used to identify the drainage area limits and
develop a catchment level delineation.
WSB will send a survey crew on-site to obtain detailed topography of the ditch, slopes, erosion, stormwater structures, and
adjacent grades to better analyze the current drainage system and help plan the proposed improvements.
As part of the existing conditions review, WSB will perform monitoring to better understand the water quality and hydrology
within the ditch and in Lake Amelia.
TP and TSS samples will be taken once a month through the growing season at a minimum of two locations within the lake.
Base flow rates will also be measured in the ditch to quantify hydrology from the drainage area.
We anticipate monitoring to continue beyond completion of the final report in Task 8. The samples and flow rate
measurements will provide detailed pollutant loading information from the ditch and corridor along with providing baseline
water quality data for Lake Amelia. As the Lake Amelia drainage area develops, having this baseline information will be useful
in tracking any changes in water quality due to land use changes within the watershed.
WSB will coordinate with the City to obtain access to the site for a field reconnaissance visit and survey. City and VLAWMO
staff will be invited to share their expertise and knowledge of the study area.
SCOPE OF WORK
BACKGROUND
Located in the southeastern corner of the City, Lake Amelia is a valuable natural resource identified as a lake of biological
significance. The lake does not have any current water quality impairments, however, Lake Wilkinson located downstream
is listed as impaired for nutrients. WSB recently completed TMDL reporting for Lake Wilkinson which provides for a detailed
understanding of the project area and the TMDL requirements.
A private ditch flows from northeast to southwest collecting drainage from approximately 340 acres. Portions of the ditch are
flanked by wetlands and the ditch corridor is situated in a Zone A floodplain. Currently, the ditch is showing signs of erosion,
sediment build up, and failing culverts. The City has been required to perform maintenance to temporarily alleviate these
drainage issues. WSB understands that a long term solution and management plan is sought by the City and VLAWMO to not
only relieve the current issues, but plan for additional amenities and improvements within the study area.
A Proposal for Lake Amelia Subwatershed Management Plan for the City of Lino Lakes | 2
Task 3 –Water Quality and Drainage (H&H) Modeling (40
hours $5,000)
To assess the existing conditions, WSB plans to develop
two models:
-A drainage model to assess the surface water bounce
during wet seasons and critical rainfall events (2, 10,
100-yr, 24-hr precipitation and 100-yr, 10-day snowmelt
events).
-A water quality model to assess the pollutant transport
into Lake Amelia. (Total Phosphorus (TP) in particular).
Subject to City and VLAWMO preference and
recommendations, the drainage model will be developed
using HEC-RAS software. HEC-RAS provides reliable
computations, good visualization, and two-way data
portability with GIS. HydroCAD will be used to estimate
flow rates to the ditch for the critical events using the SCS
curve number method, and checked against the flow
monitoring in Task 2.
For the water quality modeling, WSB will use P8. Land use
information gathered in the Wilkinson Lake TMDL study
along with the other land use data in the drainage area
will be used to determine pollutant loading. Information
gathered from the flow monitoring and water quality
sampling will be used to update the modeling and show the
most current pollutant loading.
WSB will use the existing models as a baseline to
determine a minimalist, hybrid, and full-build scenario.
Once the models have been completed, the results will
be summarized and sent to the City and VLAWMO to be
discussed. The second meeting will discuss the results of
the models and refine strategies for developing the future
corridor concepts including phasing options.
Task 4 – Ownership Phasing (10 hours $1,200)
A key element in the transition is the ownership transfer
from the current residents and developers into public
domain. Ideally, as part of this transfer, the existing ditch
corridor will become public domain. Likely a phased
approach of gaining ownership of the corridor will be
implemented, including acquisition upon redevelopment,
and obtaining easements from existing property owners.
WSB will document the formal legal steps and permitting
needed to accomplish:
(a) easement acquisition along the private ditch, and
(b) future transfer into the public domain of the entire
corridor.
Task 5 – Surface Water Improvement Options
(38 hours $4,300)
Based on the ownership transition phasing discussed in
Task 4, WSB anticipates three improvement concepts
including a minimalist, hybrid, and full build scenario.
Minimalist Scenario: This assumes drainage easement
acquisition along the ditch but no ownership transfer
in the initial phase. This will allow for immediate access
to the corridor to address current ditch failures and to
begin to resolve the drainage concerns. WSB will identify
the measures needed to stabilize the slope along with
improving stormwater conveyance. This option will focus
solely on in ditch improvements to repair erosion, stabilize
slopes, and improve the function and drainage of the ditch
to reduce localized flooding and inundation to adjacent
properties.
Hybrid Scenario: In this scenario, WSB will explore
options for enhancement outside of the streambank either
within obtained easements or publicly owned land. This
includes streambank regrading, conveyance improvement,
expanding existing wetland perimeters, and constructing
stormwater BMPs. This option looks more in-depth at water
quality improvements and pollutant load reductions within
the corridor.
Full Build Scenario: This scenario assumes the broader
corridor will redevelop, and the ditch will become
public domain. This scenario envisions a comprehensive
transformation of the existing drainage ditch into a
naturally looking channel corridor of enriched bio-habitat,
improved water quality and enhanced aesthetics. WSB
will explore the creation of a wider meandering corridor
designed to maximize these functions. This concept
may include an in-channel vegetated bench to maximize
pollutant removals, along with potential wetland banking
and floodplain restoration. A third meeting will be
scheduled to discuss the improvement concepts in terms
of feasibility, benefits, challenges, and costs.
An intermediary concept may emerge from discussions
with the City and VLAWMO.
Task 6. Improvement Concepts Evaluation – Pollutant
Load Reduction and Cost Estimates (16 hours $2,000)
Once the improvement concepts are established, WSB
will proceed with a detailed evaluation of the pollutant
load reduction, hydrology and hydraulics model, and cost
estimates. The cost estimates will be CIP style estimates and
can be used later for budgeting and grant funding.
A Proposal for Lake Amelia Subwatershed Management Plan for the City of Lino Lakes | 3
Task 7. Permitting Requirements and Funding Options
(36 hours $4,200)
WSB will assess each concept evaluated in Task 6 and
will identify the permitting requirements at local, state,
and federal level. Additionally, WSB will identify potential
funding sources and partnerships that can assist towards
implementation. Permits will likely be required for wetland
and floodplain impacts and for the CIty and VLAWMO.
Task 8. Final Report (48 hours $5,900)
WSB will first prepare and distribute a Preliminary Report to
summarize the improvement concepts, including the key
maps, figures, tables, and appendices containing the full
evaluation. The report will also include permitting needs and
funding options. A fourth meeting will be held to discuss
the report and determine whether any additional data or
clarifications are needed. WSB will collect feedback and
proceed with the preparation of the Final Report.
MT. OLIVET AND PARKERS LAKE STREAMBANK IMPROVEMENTS
SEPT 2020 – PRESENT | CITY OF PLYMOUTH AND BASSETT CREEK WATERSHED CREEK WATERSHED MANAGEMENT
COMMISSION (BCWMC)
WSB worked with the City of Plymouth and BCWMC to address erosion along two intermittent streams in the City. The goal
of the project at both sites, Mt. Olivet and Parkers Lake, was to slow the velocity of water through the channels and provide
permanent stabilization of the streambanks to reduce the pollutant loads to the downstream impaired water bodies. Multiple
techniques were employed to meet these goals including rock and log ditch checks, the installation of plunge pools,
regrading and widening the channel, native seeding, and hard armoring.
WSB completed hydraulic modeling using HEC-RAS 2D to determine the areas along the streambanks with the highest
velocities and shear stresses. Water quality was modeled to quantify the reductions in downstream Total Phosphorus (TP)
and Total Suspended Solids (TSS) loads. The project included approximately 0.67 acres of wetland restoration at the Mt.
Olivet project site and required significant coordination with the City of Plymouth, BCWMC, and other permitting agencies
and stakeholders.
REFERENCE: BEN SCHARENBROICH, WATER RESOURCES SUPERVISOR, 763.494.6354
PROJECT EXAMPLES
WATERTOWN STREAMBANK FEASIBILITY STUDY
MAY 2021 - OCT 2021 | CARVER COUNTY WATER MANAGEMENT ORGANIZATION (CCWMO)
AND CARVER COUNTY SOIL AND WATER CONSERVATION DISTRICT (CCSWCD)
WSB teamed with CCWMO and CCSWCD staff to survey all streambanks along the South Fork of the Crow River within the
City of Watertown. The survey documented 19 properties with erosion issues ranging from minimal to severe. Working with
CCWMO staff, WSB developed a feasibility level stabilization plan for each site which favored vegetation-based stabilization
methods over hard armoring techniques and included a feasibility-level cost estimate. WSB developed estimates of sediment
loading from each site to quantity proposed water quality improvements and related them to the existing Total Maximum Daily
Load (TMDL) which is in place for the South Fork of the Crow River. Finally, WSB made quantitative assessments of the relative
instability of each site and the risk of no action if stabilization activities were not completed.
REFERENCE: TIM SUNDBY, WATER RESOURCES TECHNICIAN, 952.361.1816
A Proposal for Lake Amelia Subwatershed Management Plan for the City of Lino Lakes | 4
GREENWOOD DITCH STUDY AND CONSTRUCTION SERVICES
AUG 2021 - PRESENT | CITY OF MAHTOMEDI, MN
WSB worked with City of Mahtomedi staff to complete a study to determine options to stabilize Greenwood ditch, reduce
erosion, improve conveyance, and protect existing structures. These options included culvert extension, clearing and
grubbing, minor realignments and grading, and hard armoring. WSB used the Board of Water and Soil Resources (BWSR) Water
Erosion Pollution Reduction Estimator 2.0 to determine the TSS and TP removal of each proposed solutions. Guidance on
easement acquisition and detailed cost estimates were also developed for each option. After selection of the preferred option
by the City, WSB provided final design services including development of construction plans and specifications, permitting
and watershed coordination, and construction staking and observation.
REFERENCE: SCOTT NEILSON, CITY ADMINISTRATOR, 651.426.3344
DAN MURPHY, PE
PROJECT MANAGER
Dan Murphy is a water resources engineer with
over 15 years of experience in water resources
design and modeling across the United States.
He applies his engineering background to support work in
public infrastructure design and construction and has broad
experience in water quality and flood mitigation projects in
the municipal, federal, energy and private sectors. He has
worked on and managed projects ranging from large-scale
federal flood control works to small-scale infiltration BMP
designs for private property owners. Dan’s well rounded water
resources experience, familiarity with the City of Lino Lakes
and solid communication skills make him well suited to lead
WSB’s team.
DAN CAZANACLI, PHD, PE
DRAINAGE MODELING
Dan has over fifteen years of experience in
water resources engineering covering flood
studies in urban and rural areas, drainage
design, surface water quality, erosion control. He is an
expert in river flow analysis, sediment transport, and
channel morphology. Dan often combines advanced
computer modeling with a more basic analysis, tailored to
the project context. He has supported many clients with
the design of practical solutions to address flooding and
water quality treatment.
TOM HOFFMAN
WATER RESOURCES ENGINEERING
TECHNICIAN
Tom has over five years of experience
working for municipalities to provide project
management, stormwater inspections, stormwater
inspections and maintenance, streambank stabilization,
ordinance, code and design guide updates, and MS4
inspections and reporting. He also has significant
experience in the private sector providing consulting in
all environmental fields along with municipal projects. His
municipal background allows him to have insight into what
clients are looking for and to help avoid issues that cities
commonly encounter with projects and future maintenance.
His field experience includes managing stream and ditch
stabilization projects, stormwater pond dredging, and street
reconstructions. He has significant experience working
closely with property owners to devise individual solutions
for drainage projects as well as gaining access to complete
improvements.
PROJECT TEAM
A Proposal for Lake Amelia Subwatershed Management Plan for the City of Lino Lakes | 5
LUKE LUNDE, CPSS, PSS, PSC
QA/QC
Luke is a Minnesota Professional Soil Scientist
and has twenty years of natural resource
and environmental review experience. Luke’s experience
includes soil survey mapping, wetland delineation, wetland
banking, wetland mitigation, habitat restoration, invasive
species management, grant writing, habitat restoration,
invasive species management, natural resource planning,
and environmental permitting and compliance for many
projects throughout the Midwest. He is very knowledgeable
in stream survey assessment, stream habitat restoration
design, floodplain restoration, vegetation management,
habitat conservation/ improvement, forest management,
precision conservation and water resources planning.
KENDRA FALLON, PE, CFM
WATER QUALITY MODELING
Kendra is a Project Engineer with over
four years of water resources engineering
experience. Kendra has experience with hydrologic and
hydraulic modeling and water quality modeling, pond
restoration, storm sewer design, writing local watershed
management plans, interpreting and reviewing for City
Thank you for the opportunity to propose on this project. Please do not hesitate to contact me at 612.246.9346 or
thavranek@wsbeng.com if you have any questions or comments.
Tony Havranek
Director of Fisheries/Principal
SCHEDULE
TASK SCHEDULED COMPLETION
1. KICK-OFF MEETING MARCH 15, 2022
2. EXISTING CONDITIONS REVIEW APRIL 1, 2022
3. WATER QUALITY AND DRAINAGE MODELING APRIL 29, 2022
4. OWNERSHIP PHASING MAY 13, 2022
5. SURFACE WATER IMPROVEMENT OPTIONS APRIL 29, 2022
6. POLLUTANT LOAD REDUCTION AND COST ESTIMATE MAY 13, 2022
7. PERMITTING AND FUNDING JUNE 17, 2022
8. FINAL REPORT JULY 1, 2022
stormwater requirements, and writing state and local
agency permit applications. She has experience working
with a variety of software including HydroCAD, GIS, P8,
XPSWMM, Civil 3D and all Microsoft Office programs to
help meet and exceed clients’ expectations.
ROXY ROBERTSON
SENIOR ENVIRONMENTAL SPECIALIST
Roxy is educated with a master’s degree in
ecology and is a Certified Associate Ecologist
with over nine years of experience. Roxy is proficient in
water resources permitting, wetland delineation, and habitat
restoration. She has completed DNR River Health and
Restoration training workshops, including stream survey
training and stream design. Her permitting experience
includes Wetland Conservation Act Decisions, Army Corps
of Engineer’s Section 404 and Section 10 Permits including
individual permits, Department of Natural Resources (DNR)
Public Waters Work Permit, DNR Utility Crossing Licenses,
Section 401 CWA individual certification, the National
Pollutant Discharge Elimination System Construction
Stormwater Permit, and Watershed District Permits. She
also has experience in construction observation, wetland
monitoring, habitat restoration design, and avian studies.
The cost to complete Tasks 1-8 is not to exceed $27,900. The anticipated work schedule is assuming a notice to proceed date
of March 1st, 2022.
COST ESTIMATE
1
ENVIRONMENTAL BOARD
AGENDA ITEM 8A
STAFF ORIGINATOR: Andy Nelson
MEETING DATE: February 23, 2022
REQUEST: Update only
TOPIC: Tree City and Growth Award for 2021
BACKGROUND:
The Tree City USA program, sponsored by the Arbor Day Foundation in partnership with the
U.S. Forest Service and the National Association of State Foresters, recognizes cities that show
their commitment to the environment through active management of their urban forests.
Cities become a Tree City USA by meeting four standards:
1. Maintaining a tree board or department (Environmental Board)
2. Having a community tree ordinance
3. Spending at least $2 per capita on urban forestry
4. Celebrating Arbor Day (waived for the past 2 years due to COVID)
Highlights of 2021 forestry activities:
• Removed 88 ash trees
• Removed 20 boulevard trees with major defects
• 6 contracted removals
• Pruned over 70 boulevard trees
• 102 ash injections (performed by Rainbow Tree Care)
• Planted 106 trees in boulevards and parks
Lino Lakes has received Tree City USA recognition for 2021, marking the City’s 31st year of
recognition in the program.
The majority of the tree removals mentioned were completed by Parks staff, with the Streets
Department contributing many hours of boulevard pruning. The City would not receive this
important recognition without the continued efforts of these crews.
The Tree City USA Growth Award is presented to participating Tree City USA communities that
demonstrate increased levels of tree care and community engagement.
Highlights of our forestry program that contributed to Growth Award recognition include:
• Applying for 2 or more grants for specific community forestry projects or programs
• City-supported staff training opportunities including the Shade Tree Short Course
2
• Tree inventory updates are ongoing
• Continued tree planting on public property
• Tree protection required and monitored for development projects
• Restoration work, including prescribed burning and invasive plant management
• New tree board (Environmental Board) members
• Educational material provided to residents on tree care and EAB.
2021 marks the 3rd year that Lino Lakes has been recognized with the Growth Award.
ENVIRONMENTAL DIRECTION:
Update only.