Loading...
HomeMy WebLinkAbout2022-030 Council Resolution -Tb CITY OF LINO LAKES RESOLUTION NO.22-30 RESOLUTION APPROVING CONDITIONAL USE PERMIT FOR EARTH MOVING AND STOCKPILING AT REHBEINS BLACK DIRT (PIDS #24-31-22- 24-0002,#24-31-22-24-0008,AND#24-31-22-24-0009) WHEREAS, the City received a land use application for a Conditional Use Permit for earth moving and stockpiling on properties on 21'Avenue South and hereafter referred to as"Development"; and WHEREAS,the properties are zoned GB, General Business,and allow for earth removal, land reclamation, material storage or filling with a conditional use permit; and WHEREAS,the legal descriptions of the subject properties are as follows: Lot 2, Block 2, CLEARWATER CREEK BUSINESS CENTER,Anoka County, Minnesota; and, Outlot A, CLEARWATER CREEK BUSINESS CENTER,Anoka County, Minnesota; and, That part of the Southeast Quarter of the Northwest Quarter(SE '/4 of NW '/4)of Section 24, Township 31,Range 22, described as follows,to-wit: Commencing at the Southwest corner of said Southeast Quarter of Northwest Quarter(SE '/4 of NW 1/4) of Section 24, thence running East along the South line of said Southeast Quarter of Northwest Quarter (SE 1/4 of NW 1/4) a distance of 275 feet; thence running North parallel with the West line of said Southeast Quarter of Northwest Quarter(SE 1/4 of NW 1/4) a distance of 375 feet; thence West parallel with the South line of said Southeast Quarter of Northwest Quarter (SW 1/4 of NW 1/4) a distance of 275 feet to the West line of said Southeast Quarter of Northwest Quarter(SE %4 of NW 1/4); thence running South along the West line of said Southeast Quarter of Northwest Quarter(SE 1/4 of NW 1/4) a distance of 375 feet to the point of beginning;Anoka County,Minnesota. WHEREAS, City staff has completed a review of the land use application based on the following plans: • ALTA/NSPS Land Title Survey prepared by EG Rud & Sons, Inc. dated December 23,2021 • Site, Grading, Erosion and Sediment Control Plan prepared by Carlson McCain dated January 10, 2022 • Clearwater Creek Business Center North Wetland Delineation Report prepared by Kjolhaug Environmental Services Company, Inc., dated August 5, 2021 • Preliminary Geotechnical Exploration Report, Haugo Geotechnical Services, dated November 26, 2021 1 • Applicant's Rice Creek Watershed District permit application, dated January 10, 2022; and WHEREAS, a public hearing was held before the Planning&Zoning Board on February 9, 2022, and the Board recommended approval of the conditional use permit. NOW,THEREFORE BE IT RESOLVED by the City Council of the City of Lino Lakes hereby makes the following findings: FINDINGS OF FACT 1. The proposed development application has been found to be consistent with the policies and recommendations of the Lino Lakes Comprehensive Plan including: a. Land Use Plan. b. Transportation Plan. c. Utility(Sewer and Water)Plans. d. Local Water Management Plan. e. Capital Improvement Plan. f. Policy Plan. g. Natural Environment Plan. The proposed earth moving/black dirt stockpile is consistent with the Land Use, Utility, Local Water Management, Capital Improvement, Policy and Natural Environmental Plans and recommendations of the comprehensive plan with the required plan revisions as detailed in February 9, 2022, staff report. 2. The proposed development application is compatible with present and future land uses of the area. The proposed earth moving/black dirt stockpile is compatible with present and future land uses of the area. Present land use is vacant commercial and future land use is commercial. Earth moving is allowed in all zoning districts with conditions. 3. The proposed development application conforms to performance standards herein and other applicable City Codes. The proposed earth moving/black dirt stockpile conforms to the performance standards of the City Code with conditions as established. The plans have been reviewed by City staff and were submitted to the RCWD for review. 2 4. Traffic generated by a proposed development application is within the capabilities of the City when: a. If the existing level of service(LOS) outside of the proposed subdivision is A or B,traffic generated by a proposed subdivision will not degrade the level of service more than one grade. b. If the existing LOS outside of the proposed subdivision is C,traffic generated by a proposed subdivision will not degrade the level of service below C. c. If the existing LOS outside of the proposed subdivision is D,traffic generated by a proposed subdivision will not degrade the level of service below D. d. The existing LOS must be D or better for all streets and intersections providing access to the subdivision. If the existing level of service is E or F, the subdivision developer must provide, as part of the proposed project, improvements needed to ensure a level of service D or better. e. Existing roads and intersections providing access to the subdivision must have the structural capacity to accommodate projected traffic from the proposed subdivision or the developer will pay to correct any structural deficiencies. f. The traffic generated from a proposed subdivision shall not require City street improvements that are inconsistent with the Lino Lakes Capital Improvement Plan. However, the City may, at its discretion, consider developer-financed improvements to correct any street deficiencies. g. The LOS requirements in paragraphs a.to d. above do not apply to the I- 35W/Lake Drive or I-35E/Main St. interchanges. At City discretion, interchange impacts must be evaluated in conjunction with Anoka County and the Minnesota Dept. of Transportation, and a plan must be prepared to determine improvements needed to resolve deficiencies. This plan must determine traffic generated by the subdivision project,how this traffic contributes to the total traffic, and the time frame of the improvements. The plan also must examine financing options, including project contribution and cost sharing among other jurisdictions and other properties that contribute to traffic at the interchange. h. The City does not relinquish any rights of local determination. The black dirt stockpile operation currently exists south of the proposed relocation on the Centerville side of 21"Avenue S. The applicant estimates a maximum of 50 trucks per day will access the site. A traffic study was not completed due to the fact that the existing operation is relocating to a nearby site and the current location will cease 3 operations. Traffic generated by the black dirt operation will not change the traffic on 21"Avenue S or at the 21"Avenue S/Main Street intersection. 21"Avenue S is a 9-ton design, but during spring road restrictions a 5-ton limit applies. The truck traffic will be limited to these weight restrictions. The hauling, dumping and grading of excavated materials shall occur within the project boundaries as shown on the plans. The site will be limited to one access. 5. The proposed development shall be served with adequate and safe water supply. The proposed earth moving/black dirt stockpile does not require a water service as proposed. Municipal water main is located along 21 s`Avenue S and in the drainage and utility easement on the properties should the applicant wish to connect in the future. 6. The proposed development shall be served with an adequate and safe sanitary sewer system. The proposed earth moving/black dirt stockpile does not require service by sanitary sewer. However,facilities should be provided on site for any employees of the black dirt operation. Municipal sanitary sewer is located along 2Pt Avenue S and in the drainage and utility easement on the properties should the applicant wish to connect in the future. 7. The proposed development shall not result in the premature expenditures of City funds on capital improvements necessary to accommodate the proposed development. The proposed earth moving/black dirt stockpile will not expend City funds. 8. The proposed development will not involve uses, activities,processes, materials, equipment and conditions of operation that will be detrimental to any persons, property, or the general welfare because of excessive production of traffic,noise, smoke, fumes, glare, or odors. The proposed earth moving/black dirt stockpile will not be detrimental to any persons or property. Hours of operation, noise control measures, and erosion/dust control measures will be enforced. 9. The proposed development will not result in the destruction, loss, or damage of a natural, scenic or historic feature of major importance. The proposed earth moving/black dirt stockpile should not result in the destruction, loss or damage of natural, scenic or historic features as no known natural, scenic or historic features exist in the area. The existing wetlands and jloodplain will not be affected by the activities as currently proposed. 4 BE IT FURTHER RESOLVED by The City Council of Lino Lakes in addition to the administrative requirements of a conditional use permit,the following standards of Section 1007.050, are being met: (a) Properly fence any pit or excavation, and barricade entrances to prevent the general public from depositing garbage or refuse. The proposed plans indicate earth moving for a stockpile, not a pit. The proposed plans do not currently show any fencing around the earth moving/black dirt stockpile operation or any barricades at the entrance. Staff is proposing that silt fence be placed around the stockpile as a condition of this permit. (b) Slope the banks, and otherwise guard and keep any pit or excavation in such condition as not to be dangerous because of sliding or caving banks. The proposed earth moving/black dirt stockpile is proposed with 3:1 side slopes on all sides, except for the working side, reducing the risk of sliding or caving banks. Areas not being excavated shall be established with turf within seven (7) days of placement to avoid sliding. (c) Properly drain, fill, or level off any pit or excavation so as to make the same safe and healthful as the permitting authority may determine. The proposed earth moving/black dirt stockpile site is designed to drain in a similar manner as the existing conditions. Approximately half of the stockpile will drain towards the existing wetland east of the site and the other half will drain towards 21" Avenue S. Erosion control is proposed and will be needed to ensure that sediment is prevented from entering the wetland and storm sewer systems. (d) Limit the depth of such excavation to an elevation no lower than the minimum floor elevation for building construction as established by the City Engineer, so as not to diminish development potential of the parcel. Not applicable to this project. (e) Limit any fill material to clean fill, defined as rock, sand, gravel, clay, or other like and similar non-decomposable material. Concrete, asphalt,metal,wood, and other debris shall be prohibited. The project is only proposing stockpiling black dirt. The site will be limited to this type of material. The City will reserve the right to test the material. (f) Require that all decomposable material, or other unsuitable foundation material,be removed from an area before deposition of fill begins. Not applicable to this project. 5 (g) Prepare a site plan showing existing and proposed grade elevations and effect of storm water drainage on adjacent areas. A site plan showing the existing and proposed grade elevations for the proposed earth moving/black dirt stockpile was provided. (h) Specify a time when the excavation or land reclamation project shall be completed. The proposed earth moving/black dirt operations will occur in the summer months. The conditional use permit will be reviewed every three (3)years for renewal. Renewal shall be approved by City Council. (i) Place a minimum of four(4) inches of top soil over the completed project and establish appropriate ground cover within sixty(60) days of completion, or in a time period consistent with the City's stormwater management and pollution prevention plan. The proposed black dirt stockpile shall be seeded or hydromulched within seven (7) days of initial placement. Once the stockpile has been relocated to the site, at least 50%of the stockpile shall be stabilized and remain stabilized with vegetation at all times. (j) Reimburse the City for the cost of periodic inspections by the City for the purpose of determining that the terms under which the permit has been issued are being complied with. The City will maintain a$5,000 non-interest bearing escrow account provided by the owner that shall be reestablished annually by January 15`h. This escrow will be for inspection, erosion control, and other City costs associated with the operation of the stockpile. If the above escrow amount is insufficient, the owner shall make such additional deposits as required by the City. The City shall have a right to reimburse itself from the Escrow with suitable documentation supporting the charges. (k) Implement the tree preservation plan. Not applicable to this site. (1) In addition to a conditional use permit,the City Engineer may determine that permits in excess of twenty-five thousand(25,000)cubic yards require the applicant to conduct a neighborhood meeting and to notify affected property owners within one- quarter(1/4)mile. Properties within 350 feet, as required for CUP's, and the City of Centerville were notified.A neighborhood meeting is not proposed at this time. 6 (m) Post a form of security and sum as the permitted authority may require, running to the City, conditioned to pay the City the cost and expense of repairing or cleaning any highways, streets, or other public ways within the City made necessary by the special burden resulting from transporting thereon by the applicant material to or from the site,the amount of such cost to be determined by the Council; and conditioned further to comply with all the requirements of this Ordinance and the particular permit, and to save the City free and harmless from all suits or claims for damages resulting from the negligent excavation,removal, storage, or filling of rock, sand, dirt, gravel, clay, or other like material within the City. The City will collect a form of security at the time of approval of the Site Performance Agreement. (n) Other conditions deemed appropriate to the application by the permitting authority. This Conditional Use Permit, if approved by City Council, shall only be valid for three (3)years and the owner will have to apply for renewal. Renewal must be approved by the City Council. BE IT FURTHER RESOLVED by The City Council of the City of Lino Lakes hereby approves the conditional use permit for earth moving and stockpiling located on 21s' Avenue South(PID#24-31-22-24-0002, #24-31-22-24-0008, and#24-31-22-24-0009) subject to the following conditions: 1. Stockpile operations shall be limited to the areas identified in the plans prepared by Carlson McCain, dated January 10, 2022, and any revisions to the plans approved by the City. 2. Comments from the City Engineer letter dated February 4, 2022, shall be addressed. 3. Comments from the City Environmental Coordinator letter dated January 18th, 2022, shall be addressed. 4. The vehicles accessing or exiting the site shall not track sediment on 2 Pt Avenue S. The onsite facilitates and site circulation shall be sufficient to provide sediment removal prior to accessing City roadways. 5. Stockpile to be at least 80-ft from property lines shared with 2110 Northern Lights Blvd(currently Dairy Queen). 6. Stockpile shall be at least 50-ft from the road right-of-way. 7. The stockpile shall not exceed 118,000 square feet in area. 8. Silt fence should be used instead of the sediment control logs shown on the plan. Double silt fence shall be installed where adjacent to wetlands. 9. The type of stockpile material is limited to topsoil borrow as identified in Minnesota Department of Transportation's 2020 Standard Specification, Section 3877. Other materials are not allowed and will be required to be removed within 24 hours. 10. Maximum stockpile height is to be limited to 40-ft above the natural grade of the site. 7 11. Maximum side slope of stockpile to be 3:1, expect for the working face. The working face shall not be more than 150 ft in length at the base of the stockpile. 12. Maximum stockpile volume to be limited to 100,000 cubic yards. 13. The finished product pile shall not exceed 500 cubic yards in volume and 15-ft in height. 14. Any erosion control BMP that becomes non-functional or half full of sediment must be repaired, replaced, or supplemented by the end of the next day after discovery. BMP's shall remain in place throughout the duration of the CUP. 15.At least 50%of the stockpile surface area shall be established with vegetation at all times to prevent erosion. 16. Any street tracking that does occur from vehicles entering or leaving the site must be swept within one calendar day of discovery. The sediment removal facilities on site such as the gravel entrance must be maintained to prevent tracking. On site signage regarding tracking is required. 17. A trained individual with current certification in erosion and sediment control must perform inspections at a minimum every seven (7) days and within 24 hours after a rainfall event greater than %2 inch in 24 hours. Inspection records must be retained with the SWPPP and include information detailed in section 11.11 of the Construction Stormwater General Permit. Contact information for the inspector must be provided to the City. Inspection records must be provided to the City Environmental Coordinator on a monthly basis. Inspection records per NPDES standards shall be submitted on a monthly basis throughout the duration of the CUP. 18. Water suppression, soil binding agents, wind blocks, or other dust suppression methods will be required if dust leaving the site becomes an issue as identified by the City. Obtaining water to be used for dust control is the responsibility of the owner. 19. Hours of operation shall be limited to 7:00 a.m. to 5:00 p.m. during the summer months (April 1 through November 1). 20. Sanitation facilities must be provided on site. Portable toilets shall be serviced regularly and screened from visibility of neighboring properties. 21. Equipment on site shall be limited to what is necessary for stockpile operations, including mobile dirt screener, mobile dirt conveyer, loading and hauling equipment, and equipment needed for grading. Non-functioning equipment is not allowed to be stored on site. All equipment shall be screened from public view. 22. Vehicles entering and leaving the site shall adhere to the 9-ton road weight restriction. 23. Owner to limit speed of trucks entering of leaving the site and along 2 1"Avenue to 25 miles per hour. 24. Maximum noise emitted at the property line shall conform to the noise regulations contained in City Code Section 901.03(4) and the owner shall not violate other nuisance regulations contained in Chapter 901. 25. Owner shall submit to the City a monthly accounting of material hauled in to the site and hauled off the site. This accounting of material hauled from the site shall be in the form of a log of loads hauled out each day and documenting the quantity of material in each load together with copies of truck load tickets and/or bills of sale. 8 26. Owner to protect municipal utilities on site from damage. Sanitary sewer main and water main are located in the drainage and utility easement on the property. Repair cost shall be the responsibility of the Owner. 27.No fill may be placed in the delineated wetlands or in the FEMA floodplain on the site. Stockpile shall not encroach within 50-ft of the delineated wetland boundaries and the FEMA floodplain. 28. Owner will follow the applicable standards and requirements of the City of Lino Lakes,Rice Creek Watershed District,Army Corp of Engineers,Minnesota Pollution Control Agency, and any other agency having jurisdiction over the property and shall secure and file with the City, copies of any permits required by outside agencies. Owner will file with the City within ten(10)days of receipt, copies of any permits and/or notice of enforcement actions by these agencies. 29. Owner will permit a City Inspector to view the premises during normal business hours. 30. The CUP shall only be valid for three (3) years. The permit may be extended by the City Council following a written request by the applicant submitted at least three months prior to expiration, and review at a public hearing. A new CUP will be needed for work(grading, other material stockpiles, excavation of material, etc.)that is not stated in this CUP. 31. A Site Performance Agreement shall be executed and recorded. These conditions are to be addressed prior to issuance of a grading permit. Adopted by the Council of the City of Lino Lakes this 14th day of March, 2022. The motion for the adoption of the foregoing resolution was introduced by Councilmember Ruhland and was duly seconded by Councilmember Cavegn and upon vote being taken thereon,the following voted in favor thereof: Ruhland, Lyden, Stoesz, Cavegn,Rafferty The following voted against same: None s P-- Rob Rafferty,Mayor ATTEST: e Bartell, C ty Cler 9 CITY COUNCIL AGENDA ITEM 6A STAFF ORIGINATOR: Diane Hankee P.E., City Engineer Kelsey Gelhar, Project Engineer MEETING DATE: March 14, 2022 TOPIC: Rehbeins Black Dirt i. Consider Resolution No. 22-30 Approving Conditional Use Permit ii. Consider Resolution No. 22-31 Approving Site Improvement Performance Agreement VOTE REQUIRED: 3/5 INTRODUCTION Staff is requesting City Council consideration of the Conditional Use Permit for earth moving and a black dirt stockpile on the properties located on 215t Avenue South (PID #24-31-22-24- 0002, #24-31-22-24-0008, and#24-31-22-24-0009). Complete Application Date: January 12, 2022 60-Day Review Deadline: NA 120-Day Review Deadline: NA Environmental Board Meeting: February 9, 2022 Park Board Meeting: NA Planning&Zoning Board Meeting: March 14, 2022 City Council Work Session: March 13, 2022 City Council Meeting: May 12, 2022 BACKGROUND Gerald Rehbein submitted a Land Use Application for a conditional use permit for earth moving/black dirt stockpile on the properties located on 21 st Avenue South. The black dirt stockpile operation will replace the existing location at 692121 st Avenue S, Centerville, Minnesota. Operations at 692121 st Avenue S will cease once the Lino Lakes site is operational. The applicant stated the material from the stockpile will be available for public and local business use during the summer months from 7:00 a.m. to 5:00 p.m. This staff report is based on the following plan sets: 1 • ALTA/NSPS Land Title Survey prepared by EG Rud & Sons, Inc. dated December 23, 2021 • Site, Grading, Erosion and Sediment Control Plan prepared by Carlson McCain dated January 10, 2022 • Clearwater Creek Business Center North Wetland Delineation Report prepared by Kjolhaug Environmental Services Company, Inc., dated August 5, 2021 • Preliminary Geotechnical Exploration Report, Haugo Geotechnical Services, dated November 26, 2021 • Applicant's Rice Creek Watershed District permit application, dated January 10, 2022 ANALYSIS Section 1007.050 of the Zoning Ordinance establishes requirements for earth moving and land reclamation. Earth removal, land reclamation, material storage or filling is a permitted use in all zoning districts. A conditional use permit is required when 5,000 cubic yards or more of material is planned to be removed or deposited on any lot or parcel. The three parcels are approximately 18.36 acres and are located between 21 st Avenue S and I- 35E. The proposed stockpile will be approximately 2.7 acres in area,will have a maximum height of 40 feet, and will be approximately 100,000 cubic yards of black dirt according to the plans. The applicant estimates there will be a maximum of 50 trucks per day accessing the site. Access The site is located at the intersection of 21 st Avenue S and Commerce Drive. The applicant is currently proposing access to the site from 21 st Avenue S via a rock construction entrance that will be converted to a gravel entrance after the initial import of the black dirt material. Wetlands Wetlands are shown on the plan sheet and do not appear to be impacted by the black dirt stockpile. A wetland delineation was completed onsite in June of 2021 by Kjolhaug Environmental Services Company, Inc. The Wetland Delineation Report dated August 5, 2021 states there are five (5)wetlands onsite. The estimated wetland boundaries are shown to be at a sufficient distance from the proposed areas of disturbance. As the proposed,the project will not impact any wetlands. Drainage Ditches Judicial Ditch No. 3 (Clearwater Creek) borders adjacent property to the south of the site and a private drainage ditch runs on the easterly side of the property. The applicant is not proposing any changes to the existing drainage patterns to the drainage ditches. Floodplain The 2015 DFIRM indicates Zone A floodplain on the site. The applicant is not proposing any impacts to the floodplain on the site. 2 Grading and Drainage A Grading, Drainage & Erosion Control plan was submitted and has been reviewed by the City Engineer and Environmental Coordinator. Please see attached comments. Comprehensive Plan and Zoning The parcels are guided for commercial development and are currently zoned GB, General Business. Section 1007.050, Earth Moving and Land Reclamation states earth removal shall be permitted in all zoning districts and establishes conditions that must be met. Tree Preservation Plan A tree preservation plan is not required. There are no significant trees within the project area. Surrounding Parcels r . North GB Commercial &Vacant Commercial Commercial South GB Vacant Commercial Commercial East I-35E I-35E 1-35E West 21St Ave S & City 21st Ave S & City of 215t Ave S & City of of Centerville Centerville Centerville Environmental Review The Environmental Coordinator has reviewed the proposal and recommendations are attached. Site Performance Agreement Site Performance Agreement shall be required. A grading permit and securities shall be deposited by the applicant. Planning and Zoning Board The Planning&Zoning Board held a public hearing on February 9, 2022. Representatives of the applicant introduced themselves to the Planning &Zoning Board.No other public comments were made at the public hearing. The Board recommended approval with a 4-0 vote with conditions as detailed in Resolution No. 22-30. Findings of Fact Resolution No. 22-30 details the Conditional Use Permit Findings of Fact. 3 RECOMMENDATION Staff and Planning&Zoning Board recommend approval of the Conditional Use Permit for the proposed earth moving operation on 21St Avenue South. ATTACHMENTS 1. Site, Grading, Erosion and Sediment Control Plan 2. City Engineer Memo dated February 4, 2022 3. Environmental Coordinator Memo dated January 18th, 2022 4. Resolution No. 22-30 5. Resolution No. 22-31 6. Site Improvement Performance Agreement 4 W. .,.{ ± TI' f1 kw Or 4 i♦4. k�..a •+y.40' �9wi0•y'i0 ►•`OiJ' *�ir�04w•+�f:•i4kAliiii►dirr ytf:� . `�r•Oi b. ♦+.r1ri•�•i4APi•+A.•A1i►4y� W.,4��r .•P9~wA►i•+•s►+aOw.1+++'rAlw9ib..+ ♦.r+.wi. .w..0i .1ii•O'wr+i•awriL4w4.'�w'Si�4+.�` }❖►iO�iiic a v.o a11JPOJ✓i r. .sohw�ys••:00.�Aiwe►O.r•1.rwr�ii•y "i'�1.1G�.•w•4w111•.i.41•+•i111.wS•�Or11►O�.•w•.1C•.� rA11i1wwi*,►Ais+flil.A�ifilfr4iiA "OA►wwoD1.•40k.i•1.t�w♦w.4�.w�.°.:�a.1.p•1w.w O•i�F�+wp•00i+pryOw*.k�iwi041wwwiw �w i. �I >y•�►i�1�ia�oi•ii�•i4iA+•iir�•11iri1ili i�i is%%%%i%i��%%%%i�i��%iri��%%i�� IF�w� .N." hA�sowr.►.wwi.�.w��®t dis���•.•.pppp•.p},.pp++�yp•.•pp.4.+�>'.y�i•wpppAOp rill.�rf.❖i•1.4�.iw1•.1w•1•.4.1.1w►.1.1••.4��.A44.`i•i1w4.►.1 �•1w41ww.w.•A11w.+f1.•. . ♦4•A.Y..4.w..11111i11i1..1.1A�..+..14.1�114i 4..4i♦ �i4J1'�i.'►1'.ii•1•wiA►.++•i•141►i•1+w►w•.1wf.►.1.•w•.1w•w•.►••wii•.�w•.w.•.ii•1w4•111f0•A��1•.►.114iiA - sA._•......•.•.•...•..+1.♦♦.11.r1...1.♦or..w.r.4•+1..i.41 .'. . .rvt> w.-1.-.. . -. w.. ♦♦ 1:.'.'v�'�.w�.��14�wii'1�����i�.`�i.i��.4fiAw.4.1.41•.1.1.1.���w•i�.1.i.1.~1•ii4�A•4A�1'►i•.*.+.'► ... A.Iw.:i ♦..♦ .1.1i.'.�i . 4C"v ♦...i!' '♦..♦......w........fw.t.11.11i1...Jw....1w4♦Ai11♦1•♦ @.+1• 4 di!.!m�!'♦'a.•.A!A���1t0�.1a.•��w�'i..°49b.i�•i•1.i1i1iiiwil•4i1i1i4iri4iiiiiiii4wiwi.i..liiiw.w1i111i1�►1J�f4fi4AfAAw1114f11w.41A41i1fAA11w i+Je ,-�..'s+z +o+.+•:!w+4s+0+�.�V c1�.�w�.�p�ri.4lr.w..������������+�i����.�p1�iO�.00O`.�.•.�i�iq••i�iw4w.��ii�i*i "W+".3.1`♦ •y. w44.rA wY•i.+i'0 S+H 46��JAf.❖ww.4w•.1.w1iO.•1►w'}A}w►ii•.1��,►11�.•.1.•4►w1i•1ri1. -•.i.+.•f�b•1A�•..�.s.way+i AA11•�4�...�r�:�,�e•.•••.•.wi��o•i•A�.•w•1Y►•w•,►1i�411.•iwwlww.►�`A•.i. `1♦•�ii t�fi+;+fiili•,�+��w� }:'~,*Oi�iiJ+1 � .440+i1 •1...+•111..1 .. i 4iA.1w4.•..14..w.1w. 0 IL t i14♦ ♦..♦14i.w1...A ' ♦.•..4ri4.11..1.r.r♦11♦ ,7 r.1.r.4.♦ r ♦w.vai... zu OKA— Ai:..ow�+*www���ww.lw+.wwAry+a.iww. �w+•iwOi w•i0lifi�i�iwrii}.wi�r- awrl oAo.1.11.A.J •u144w.++i.w1.4.. a+i1•A......1•w.. 1 qi'A}1w+'w•}i1`14A+11`.r.1+1.A,w1 �: ♦wwAA.lAlw.www..♦ 11 N.1114.111..w♦ y1'Y� ♦.A1......114 w,w�I ly7�i1i.141.,►wA.1.w.A+iry ...' i_ '.. ,;.;:. I. �Y��1�wJ�•ri►.1.•.iA11►iYi1•11• i.MA.1♦1..11i1..'t♦ >wA1 +.♦ ♦4f❖♦4♦ i�s►���i�iiii•AAiiiilA�'►#1i i"iw'�4•A"oi ii'A�iw+Ai•+ibA`� Call befor.you dig., ii"lliwi�i`:iW�iiwiwiswh•+� - ' ♦.11.i.Ji ♦♦ .b♦ ���.•oi�4�Ork+ii�►1�+•. !w'slww�ws.•.4•OPi 4t1• /�4y�Yii►iA!•i1Pc1i•A1i1��i+'i J s..Y.1.♦ ♦w..♦ I 8�� , WS Memorandum To: Katie Larsen, City Planner, City of Lino Lakes From: Kelsey Gelhar, EIT,WSB Diane Hankee, City Engineer, City of Lino Lakes Date: February 4, 2022 Re: Rehbein Black Dirt CUP Plan Review WSB Project Number—019710-000 WSB has reviewed the final plat for the NorthPointe Garden Estates development in Lino Lakes, MN, prepared by Carlson McCain, received on January 10, 2022. These comments are based on the following final plan sets and plat documents: 0 • Rehbein Black Dirt Site, Grading, Erosion And Sediment Control Plan prepared by Z Carlson McCain, dated January 10, 2022, received January 10, 2022. m . ALTA/NPS Land Title Survey prepared by E.G. Rud & Sons, Inc., dated December 23, 3 2021, received January 10, 2022 Lo Applicant to respond to these comments in writing on this word document.Any changes to the plans that are not associated with these comments shall be identified by either a summary in the co response or in the plans with a revision cloud or note. N to Engineering • General The Rehbein Black Dirt development proposes to stockpile black dirt for commercial use. The site will be accessed from 21 st Avenue S and is adjacent to I-35E. The three parcels being utilized for the black dirt operation are approximately 18.36 acres. a The proposed stockpile will be approximately 2.7 acres in area, will have a maximum height a of 40 feet, and be approximately 103,000 cubic yards of black dirt based on the plans. u) o Comments: N 1. Applicant to update pile location with setbacks of 80-ft from the northern property ~ line (shared with Dairy Queen)and 50-ft from the 215'Avenue S right-of-way. co 2. Applicant to provide details on screening (trees, fences, etc.) needed for onsite equipment. W W Grading, Erosion Control &Stormwater Management The Rehbein Black Dirt operation will require site grading for the proposed site entrance W and the proposed black dirt stockpile. The stockpile is proposed to have 3:1 side slopes. rco - One side of the stockpile is designated as the"working face of pile". The proposed project Ms.Katie Larsen 2/4/2022 Page 2 is within the Rice Creek Watershed District(RCWD). The applicant is proposed sediment control log to surround the stock pile. Comments: 1. Applicant to update plans to address comments provided by the City's Environmental Coordinator regarding erosion control. 2. Applicant to add turf establishment details to the plans (i.e. seed mix type and application rate, hydromulch type and application rate, etc.) 3. No work shall be completed until a Rice Creek Watershed District permit has been obtained. • Water Supply There is currently an existing 8-inch diameter ductile iron pipe (DIP)water main along 215t Avenue S and existing 16-inch diameter DIP water main in an easement in Outlot A of the Clearwater Creek Business Center Plat(PID 24-31-22-24-0009). The applicant is not proposing any connections to the municipal water system with this plan. Staff does not have any comments at this time. • Sanitary Sewer There is currently an existing 8-inch diameter polyvinyl chloride(PVC)sewer main along 21st Avenue S on the north end of the site and existing 21-inch diameter PVC sanitary sewer in an easement in Outlot A of the Clearwater Creek Business Center Plat(PID 24- 31-22-24-0009). The applicant is not proposing any connections to the municipal sanitary sewer system with this plan. Comments: 1. Applicant to provide sanitation facilities on site for employees. • Transportation The site is located at the intersection 21st Avenue S and Commerce Drive. The applicant is proposing access the site on 215t Avenue S via a gravel driveway. 21st Avenue S is a local street on the Centerville/Lino Lakes border. The existing right-of-way along 21st Avenue S varies in width from 50-ft to 73-ft. The applicant estimates that the maximum truck traffic will be 50 trucks per day visiting the site. The applicant has an existing black dirt facility on 21st Avenue S south of this project in Centerville. Comments: 1. Tracking on 21st Ave S has been an issue with the existing stock pile operations. The applicant shall extend the proposed gravel entrance to reduce tracking. Access should come off of Commerce Drive easterly stub. Rehbein Black Dirt CUP Engineering Review Ms.Katie Larsen 2/4/2022 Page 3 2. Applicant to submit truck turning template at access point. 3. Applicant to submit a hauling plan with truck weights and associated volume of material and the number of trips for the initial pile construction. This plan should meet the 9 ton road restriction. • Wetlands and Mitigation Plan There is five existing wetlands on the site according to the Delineation Report prepared by Kjolhaug Environmental Services Co. in 2021. The applicant is not proposing any wetland impacts with this project. Comments: 1. Applicant to show all wetlands on the site. It appears the Kjolhaug identified a wetland just south of Northern Lights Blvd that is not shown on the site plan. 2. Applicant to provide double silt fence adjacent to wetlands. • Landscaping The applicant did not propose any landscaping at this time. If submitted, landscaping will be reviewed in depth by the City's Environmental Coordinator. • Floodplain The 2015 DFIRM indicates Zone A floodplain on the site. The applicant is not proposing any impacts to the floodplain on the site. • Drainage and Utility Easements The proposed work is located within Lot 2 Block 2 and Outlot A of the Clearwater Creek Business Center Plat. Lot 2 Block 2 has a 10-ft wide drainage and utility easement along the lot lines. There is an existing 60-ft wide drainage and utility easement in Outlot A that connects the Northern Lights Blvd right-of-way to the south limit of the plat. The applicant is not proposing any changes to the plat. • Site Performance Agreement A Site Performance Agreement will be required. • Grading Agreement A Grading Agreement is not applicable at this time. • Stormwater Maintenance Agreement A Stormwater Maintenance Declaration is not applicable at this time. • Permits Required 1. NPDES General Construction Permit 2. City of Lino Lakes Zoning Permit for Grading Rehbein Black Dirt CUP Engineering Review Ms.Katie Larsen 2/4/2022 Page 4 3. Minnesota Pollution Control Agency If you or the applicant has any questions regarding these comments, please contact Diane Hankee at(651) 982-2430 or dhankee@linolakes.us. You may also contact Kelsey Gelhar at (612) 709-4897 or kgelhar@wsbeng.com. Rehbein Black Dirt CUP Engineering Review C I T O F Environmental Memo INORK!;3E To: Diane Hankee, Kelsey Gelhar From: Andy Nelson Date: January 18th, 2022 Re: Environmental Comments/Rehbein black dirt pile 1. A trained individual with current certification in erosion and sediment control must perform inspections at a minimum every 7 days and within 24 hours after a rainfall event greater than '/2 inch in 24 hours. Inspection records must be retained with the SWPPP and include information detailed in 11.11 of the Construction Stormwater General Permit. Contact information for the inspector must be provided to the city prior to any soil disturbance on the site. 2. Silt fence should be used instead of the sediment control logs shown on the plan. A trench 1-2' deep on the stockpile side of the silt fence is recommended to minimize maintenance of the silt fence. Note that BMPs that become non-functional or'/2 full of sediment must be repaired, replaced, or supplemented by the end of the next day after discovery. 3. Street tracking generated must be swept within one calendar day of discovery. 4. Water suppression, soil binding agents, wind blocks, or other dust suppression methods may be required if dust leaving the site becomes an issue as identified by the city. 5. Rock construction entrance will require regular maintenance. 6. Portions of the stockpile that are not in regular use should be stabilized with seed and hyrdomulch. •Page 1