HomeMy WebLinkAbout01/11/2023 P & Z Combined Packet
CITY OF LINO LAKES
PLANNING & ZONING BOARD MEETING
Wednesday, January 11, 2023
6:30 p.m.
Council Chambers
Please be courteous and turn off all electronic devices during the meeting.
AGENDA
1. CALL TO ORDER AND ROLL CALL
2. PLEDGE OF ALLEGIANCE
3. APPROVAL OF AGENDA
4. APPROVAL OF MINUTES: November 9, 2022
5. OPEN MIKE
6. ACTION ITEMS
A. PUBLIC HEARING: Phelps Road Stockpile Interim Use Permit, Kelsey Gelhar
7. DISCUSSION ITEMS
A. Project Updates
8. ADJOURN
Meeting guidelines on reverse side.
City of Lino Lakes Planning & Zoning Board
MEETING GUIDELINES
Open Mike – The purpose of a Board Meeting is to accomplish the business of the city. When
presenting at a meeting please remember to be respectful and follow these guidelines:
• Please address the meeting chair.
• State your name and address for the record.
• Please observe a 4 -minute limit.
• The topic must relate to city business.
• Open Mike is for items not on the agenda.
• A spokesperson must represent a group of five or more – groups will have 8 minutes.
• The Presiding Officer may limit duplicative presentations.
• Rememb er, the meeting is to discuss city business only.
Public Hearing – Held as a separate item of business on the agenda. The public hearing
segment is your opportunity to tell the Board how you feel about issues scheduled to be heard.
Typically, a hearing follows these steps:
• The Presiding Officer (Chair or Vice-Chair) will announce the proposal to be reviewed and ask
for the staff report. The presiding Officer shall maintain strict order and etiquette at all meetings.
• Staff will present their report on the proposal.
• Board members will then ask City Staff questions about the proposal.
• The Presiding Officer will then open up the public hearing for anyone present who wishes to
comment on the proposal. This is the time for the public to make comments or ask questions
about the proposal.
Comments should be limited to four (4) minutes unless further time is granted by the Presiding
Officer. All comments should be directed to the Board as a body and not to any individual Board
Member or City Staff Member unless permission is granted by the Presiding Officer. No person
shall be permitted to enter into any discussion, either directly or through a member of the Board
without the permission of the Presiding Officer.
• After everyone in the audience wishing to speak has given his/her comments, the Presiding
Officer shall close the public hearing.
• The Board will then discuss the proposal. No further public comments are allowed.
• The Board will then make a recommendation(s) and/or a decision.
When you are called upon for your comments, please step to the microphone at the podium and
state your name and address for the record.
Occasionally, the Board may continue a hearing to another meeting before taking action.
Meeting Etiquette
The Planning & Zoning Board must preserve order and decorum while the meeting is in
session. A resident shall not, by conversation or otherwise, delay or interrupt the proceedings
or the business of the Board, nor disturb any resident or Board Member while speaking or
refuse to obey the orders of the Board.
Planning & Zoning Board
November 9, 2022
pg. 1
DRAFT MINUTES
CITY OF LINO LAKES
PLANNING & ZONING BOARD MINUTES
1. CALL TO ORDER AND ROLL CALL
Vice Chair Root called the Lino Lakes Planning & Zoning Board meeting to order at 6:30
p.m. on November 9, 2022.
2. PLEDGE OF ALLEGIANCE
3. APPROVAL OF AGENDA
The agenda was approved as presented.
4. APPROVAL OF MINUTES
Mr. Root made two corrections to the minutes from October 12, 2022. Mr. Neil Evenson
moved to approve the October 12, 2022 minutes with corrections. Motion seconded by
Mr. Nathan Vojtech. Motion carried 5 – 0.
5. OPEN MIKE
Mr. Root declared open mike at 6:32 p.m.
There were no public comments.
DATE: November 9, 2022
TIME STARTED: 6:30 p.m.
TIME ENDED: 8:42 p.m.
MEMBERS PRESENT: Michael Root, Perry Laden, Neil
Evenson, Nathan Vojtech,
Issac Wipperfurth
MEMBERS ABSENT: None
STAFF PRESENT: Michael Grochala, Katie Larsen, Diane
Hankee, Kelsey Gelhar, Julie Whitney
Planning & Zoning Board
November 9, 2022
pg. 2
DRAFT MINUTES
Mr. Perry Laden moved to close open mike. Motion seconded by Mr. Evenson. Open
Mike was closed at 6:33 p.m.
6. ACTION ITEMS
None
7. DISCUSSION ITEMS
A. Otter Lake Road Master Plan
Mr. Michael Grochala, Community Development Director, reported the development
along Main Street has reached a point where trunk drainage improvements are required
to provide a storm water route to the I-35E crossing. These improvements also need to
consider a location and storm water requirements for the Otter Lake Road extension.
400 acres lying north of Main Street and east of 35E are to be used in the master plan to
create a regional storm water plan and routing for the area.
Ms. Lori Johnson,WSB, presented the Otter Lake Road master plan. She presented
three alternative designs and the impact each would have on transportation, wetlands
and utilities. She also discussed trends in the market are the trending towards indust rial
land use. Ms. Johnson described recommendations for road alignment alternatives,
recommendations for future zoning, plans for utilities and wetland banks.
The Board discussed the following:
• Traffic movement from Otter Lk Road to 24th
• Timeline when this will be started.
• Clarification of impact area for the Corps of Engineers.
• Road placement around the wetland area.
• Why high density residential locations were suggested.
• Why not wait for developers to come in before putting this into place.
• How road placement was determined.
A. Promenade (aka Robinson Property) PUD Concept Plan Review #2
Ms. Katie Larsen, City Planner, presented to the Board a plan review submitted by
Integrate Properties, LLC, who submitted a land use application for Robinson Property
PUD Concept Plan that was reviewed by the Planning & Zoning Board in January 2022.
The proposed development is a master planned residential community on 158 acres
located on the Robinson property south of CSAH 14 (Main Street) and east of CR 53
(Sunset Avenue). The proposed development has been renamed Promenade.
Ms. Larsen requested the Board provide feedback for the developer to give some
direction regarding lot size and depth, PUD public benefit and a larger lot transition from
Planning & Zoning Board
November 9, 2022
pg. 3
DRAFT MINUTES
the Carl Street neighborhood. The Board was skeptical of the 55 ft. lot width and thinks
that we stick with the minimum standard but did think the 120 ft. lot depth to an open
space was permissible. Suggestion was made by Mr. Vojtech to provide better access to
the “lake area” for kayaking and picnicking. Mr. Laden wanted more information on how
the greenway corridor connects from neighborhood to neighborhood.
Ms. Larsen explained the benefits of trails and open spaces in the development.
Suggestions to the develo per were to increase the trail corridor from 20 ft. wide to 30 to
40 ft. wide and a neighborhood tot lot and dog park. Ms. Larsen said that architectural
standards could also be implemented.
Ms. Larsen covered the transition from Carl Street to larger SF lots. Ms. Kelsey Gelhar,
WSB, covered the site constraints the developer will face when designing the larger lots
to transition; for example, low floor elevations, existing overhead power and filling over
the Magellan gas pipeline. Mr. Grochala suggested running the pond around the south
side, take out a row of housing and shift across to create that buffer.
The Board was in agreement to have a more separation component. The Board was split
on architectural standards and agreed on the greenway component.
Mr. Root asked if any of the public who were in attendance wanted to come up and
speak.
Randy Rennaker – 379 Carl Street, Lino Lakes, MN 55014 stated he did not want the
East and West Carl Streets connected and does not want the new development connected
to Carl Street.
Nick Nelson – 7770 Clydesdale Circle, Lino Lakes, MN 55014 agreed with Mr.
Rennaker and stated there would also be increased traffic on Century Trail.
Ms. Larsen called for a final suggestion on the lot sizes. The Board did not have
confidence in the benefits we are getting are equal to giving up our standard lot size.
Bonnie Bigler – 346 Carl Street, Lino Lakes, MN 55014 did not want to see the new
development having a street onto Carl Street.
B. Project Updates
Staff provided an update on projects.
Mr. Evenson moved to adjourn the meeting at 8:42 p.m. Motion was seconded by Mr.
Vojtech and passed unanimously.
Planning & Zoning Board
November 9, 2022
pg. 4
DRAFT MINUTES
Respectfully submitted,
Julie Whitney – Community Development Administrative Assistant
1
PLANNING & ZONING BOARD
AGENDA ITEM 6A
STAFF ORIGINATOR: Kelsey Gelhar PE, Assistant City Engineer, WSB
P & Z MEETING DATE: January 11, 2023
REQUEST: PUBLIC HEARING
Phelps Road Stockpile
Interim Use Permit
CASE NUMBER: IUP 2022-001
APPLICANT: Mark Smith
2120 Otter Lake Drive
White Bear Lake, MN 55110
REVIEW DEADLINE:
Complete Application Date: December 16, 2022
Environmental Board Meeting: NA
Park Board Meeting: NA
Planning & Zoning Board Meeting: January 11, 2023
Council Meeting: February 13, 2023
60-Day Review Date: February 14, 2023
120-Day Review Date: April 15, 2023
BACKGROUND
Mark Smith submitted a Land Use Application for a conditional use permit for earth
moving and stockpiling on a property located on Phelps Road (PID #24-31-22-42-0004).
The applicant is requesting approval of a conditional use permit to place approximately
71,000 cubic yards (CY) of suitable fill material on the site for use during future
industrial development. The stockpiles are proposed to be up to 15 feet higher than the
existing grade of the site. Three separate stockpiles are proposed.
On January 5, 2023, a new City zoning ordinance went into effect. Earth Moving and
Land Reclamation is now processed as an interim use permit (IUP). Since the application
was received prior to January 5, 2023, but Council approval will occur after January 5,
2023, this land use application will be processed as an interim use permit.
2
The following staff report is based on the plan set prepared by Stantec dated December
15, 2022, and received by the City on December 15, 2022.
ANALYSIS
Section 1007.051 of the Zoning Ordinance effective January 5, 2023, establishes
requirements for earth moving and land reclamation. Earth removal, land reclamation,
material storage, or filling are permitted uses in all zoning districts. An interim use
permit is required when 5,000 cubic yards or more of material is planned to be removed
or deposited on any lot or parcel.
The existing parcel is approximately 14.39 acres and is located on the west end of Phelps
Road at the intersection with the Otter Lake Service Road. The site is adjacent to I-35E.
The northwest stockpile is proposed to have 4:1 side slopes, have a height of 15-ft, have a
footprint of approximately 1.96 acres, and be approximately 30,000 CY in volume. The
northeast stockpile is proposed to have 4:1 side slopes, have a height of 14-ft, have a
footprint of approximately 1.11 acres, and be approximately 14,000 CY in volume. The
southern stockpile is proposed to have 4:1 side slopes, have a height of 14-ft, have a
footprint of approximately 1.74 acres, and be approximately 27,000 CY in volume.
Access
The site is located at the intersection of Phelps Road and the Otter Lake Service Road.
The applicant is currently proposing access to the site via a rock construction entrance.
Wetlands
Wetlands are shown on the plan sheet and do not appear to be impacted by the placement
of fill material. An exhibit showing regulated wetlands and tributaries onsite was
prepared by Kjolhaug Environmental Services Company, Inc. However, the exhibit
contains a note that says that the wetland boundaries are approximate and do not
constitute an official survey product.
Drainage Ditches
Judicial Ditch No. 3 (Clearwater Creek) is located along the south portion of the site.
The applicant is not proposing any significant changes to the existing drainage patterns to
the drainage ditches.
Clearwater Creek is within the Natural Resource Conservation Area on the south side of
the site. The applicant is not proposing any work in the Natural Resource Conservation
Area.
Floodplain
3
FEMA records indicate Zone A floodplain on the site. The applicant is not proposing any
impacts to the floodplain on the site.
Grading and Drainage
Grading and erosion control plans were submitted and have been reviewed by the City
Engineer and Environmental Coordinator. Please see attached comments.
Comprehensive Plan and Zoning
The parcel is guided for industrial development and is currently zoned LI, Light
Industrial. Section 1007.051, Earth Moving and Land Reclamation states earth removal
shall be permitted in all zoning districts and establishes conditions that must be met.
Tree Preservation Plan
A tree preservation plan is not required. There are no significant trees within the project
area.
Surrounding Parcels
Direction Zoning Existing Land Use Future Land Use
North GB Vacant Commercial Commercial
South LI Commercial Industrial
East GI Industrial Industrial
West Otter Lake Service
Road & I-35E
Otter Lake Service
Road & I-35E
Otter Lake Service
Road & I-35E
Interim Use Permit
Per City Code Section 1007.017(2) Interim Use Permits:
(b) General Standards. An interim use shall comply with the following:
1. Meets the standards of a conditional use permit set forth in City Code
Section 1007.016.
The proposed earth moving and stockpiling operation meets the conditional use permit
standards as noted below.
2. Conforms to the applicable performance standards of this ordinance.
4
The proposed earth moving and stockpiling operation conform to the applicable
performance standards of this ordinance as detailed in this staff report
3. The use is allowed as an interim use in the respective zoning district.
The property is zoned LI, Light Industrial. Earth moving and land reclamation is an
allowed interim use in this zoning district.
4. The date or event that will terminate the use can be identified with certainty.
The proposed earth moving and stockpiling operations, including turf establishment, shall
be completed within 18 months of approval of the Interim Use Permit by City Council.
5. The use will not impose additional costs on the public if it is necessary for
the public to take the property in the future.
The proposed earth moving and stockpiling operation will not impose additional costs on
the public.
6. The user agrees to any conditions that the City Council deem appropriate
for permission of the use.
The user agrees to the conditions detailed in the Council resolution.
Per City Code Section 1007.016(3) Conditional Use Permits:
(e) The Planning and Zoning Board shall hold the public hearing and consider
possible adverse effects of the proposed conditional use. Its judgement shall be
based upon, but not limited to, the following factors:
1. The proposed development application has been found to be consistent
with the design standards listed in City Code Section 1007.020(4).
The proposed earth moving and stockpiling operation is consistent with the design
standards as noted below.
2. Will not involve uses, activities, processes, materials, equipment and
conditions of operation that will be detrimental to any persons, property, or the general
welfare because of excessive production of traffic, noise, smoke, fumes, glare, or odors.
The proposed earth moving and stockpiling operation will not involve uses, activities,
processes, materials, equipment and conditions of operation that will be detrimental to any
persons, property, or the general welfare because of excessive production of traffic, noise,
smoke, fumes, glare, or odors.
5
3. Will not result in the destruction, loss, or damage of a natural, scenic or
historic feature of major importance.
The proposed earth moving and stockpiling operation will not result in the destruction,
loss, or damage of a natural, scenic or historic feature of major importance. The site does
contain a portion of the Natural Resource Conservation Area on the south side of the site.
However, the applicant is not proposing any work in or near the Natural Resource
Conservation Area.
Per City Code Section 1007.020(4) Site and Building Plan Review:
(a) The proposed development application must be consistent with the policies
and recommendations of the Lino Lakes Comprehensive Plan.
The proposed earth moving and stockpiling is consistent with the Comprehensive Plan.
The grading plan and earth moving operation have been reviewed by City staff and was
submitted to the Rice Creek Watershed District (RCWD) for review. The excavation and
filling will not have a negative impact on land use, transportation, utilities or the
environment.
(b) The proposed development application is compatible with present and future
land uses of the area.
The proposed earth moving and stockpiling is compatible with present and future
land uses of the area. Present land use is vacant industrial and future land use is industrial.
Earth moving is allowed in all zoning districts with conditions.
(c) The proposed development application conforms to performance standards
herein and other applicable City Codes.
The proposed earth moving and stockpiling conforms to the performance standards of the
City Code with conditions as established. The plans have been reviewed by City staff and
were submitted to the RCWD for review.
(d) Traffic generated by a proposed development application is within the
capabilities of the City when:
1. If the existing level of service (LOS) outside of the proposed development
is A or B, traffic generated by a proposed development will not degrade the level of service
more than one grade.
2. If the existing LOS outside of the proposed development is C, traffic
generated by a proposed development will not degrade the level of service below C.
3. If the existing LOS outside of the proposed development is D, traffic
generated by a proposed development will not degrade the level of service below D.
6
4. The existing LOS must be D or better for all streets and intersections
providing access to the proposed development. If the existing level of service is E or F,
the developer must provide, as part of the proposed project, improvements needed to ensure
a level of service D or better.
5. Existing roads and intersections providing access to the proposed
development must have the structural capacity to accommodate projected traffic from the
proposed development or the developer will pay to correct any structural deficiencies.
6. The traffic generated from a proposed development shall not require City
street improvements that are inconsistent with the Lino Lakes Capital Improvement Plan.
However, the City may, at its discretion, consider developer-financed improvements to
correct any street deficiencies.
7. The LOS requirements in paragraphs 1. to 4. above do not apply to the I-
35W/Lake Drive or I-35E/Main St. interchanges. At City discretion, interchange impacts
must be evaluated in conjunction with Anoka County and the Minnesota Dept. of
Transportation, and a plan must be prepared to determine improvements needed to resolve
deficiencies. This plan must determine traffic generated by the proposed development
project, how this traffic contributes to the total traffic, and the time frame of the
improvements. The plan also must examine financing options, including project
contribution and cost sharing among other jurisdictions and other properties that contribute
to traffic at the interchange.
A traffic study was not completed due to the fact that the work only includes earth moving
and stockpiling for future site needs. Traffic generated by the earth moving and
stockpiling operations will not permanently change the traffic on Phelps Road or the
Otter Lake Service Road nor will it permanently impact the intersections with Otter Lake
Road at this time. A traffic study will be required when the site is developed.
Phelps Road is a city street and was constructed to city standards from Otter Lake Road
to the eastern property line of the site. Phelps Road is a 9-ton design, but during spring
road restrictions, a 5-ton limit applies. The design of the Otter Lake Service Road is
unknown and should be restricted to 5-ton weight due to current conditions of the road.
Truck traffic will be limited to these weight restrictions. The hauling, dumping and grading
of excavated materials shall occur within the project boundaries as shown on the plans.
It is anticipated that the Otter Lake Service Road will need to be upgraded with future
development.
(e) The proposed development shall be served with adequate and safe water supply.
The proposed earth moving and stockpiling does not require a water service as proposed.
Municipal water main is located along Phelps Road and can be extended to the property
should the applicant wish to connect in the future.
7
(f) The proposed development shall be served with an adequate or safe sanitary
sewer system.
The proposed earth moving and stockpiling does not require service by sanitary
sewer. Municipal sanitary sewer is located along is located along Phelps Road and can
be extended to the property should the applicant wish to connect in the future.
(g) The proposed development shall not result in the premature expenditures of
City funds on capital improvements necessary to accommodate the proposed development.
The proposed earth moving and stockpiling operation will not expend City funds.
(h) Fire prevention and fighting equipment acceptable to the Board of Fire
Underwriters and City Council shall be readily available when any activity involving the
handling or storage of flammable or explosive materials is carried on.
The proposed earth moving and stockpiling operation does not involve any activity
handling or storing flammable or explosive materials.
In addition to the criteria established under Section 1007.017, Interim Use Permits,
Section 1007.051(4), Earth Moving and Land Reclamation establishes the following
conditions that shall be met:
(a) Properly fence any pit or excavation, and barricade entrances to prevent
the general public from depositing garbage or refuse.
The proposed plans indicate earth moving for stockpiling, not a pit. The proposed plans
do not currently show any fencing around the earth moving areas or any barricades at
the entrance, other than silt fence.
(b) Slope the banks, and otherwise guard and keep any pit or excavation in
such condition as not to be dangerous because of sliding or caving banks.
The fill stockpiles are proposed with 4:1 side slopes on all sides, reducing the risk of
sliding or caving banks. Areas not being worked shall be established with turf within
seven (7) days of placement to avoid sliding.
(c) Properly drain, fill, or level off any pit or excavation so as to make the
same safe and healthful as the City may determine.
The proposed earth moving and stockpiling site is designed to drain in a similar manner
as the existing conditions. The majority of the site will drain towards the existing
wetlands and Clearwater Creek. Erosion control is proposed and will be needed to
ensure that sediment is prevented from entering the wetlands and Clearwater Creek.
8
(d) Limit the depth of such excavation to an elevation no lower than the
minimum floor elevation for building construction as established by the City Engineer, so
as not to diminish development potential of the parcel.
Not applicable to this project.
(e) Limit any fill material to clean fill, defined as rock, sand, gravel, clay, or
other like and similar non-decomposable material. Concrete, asphalt, metal, wood, and
other debris shall be prohibited.
The project is only proposing moving and stockpiling “suitable fill material”. The site
will be limited to this type of material. The City will reserve the right to test the material.
(f) Require that all decomposable material, or other unsuitable foundation
material, be removed from an area before deposition of fill begins.
Not applicable to this project.
(g) Prepare a site plan showing existing and proposed grade elevations and
effect of storm water drainage on adjacent areas.
A site plan showing the existing and proposed grade elevations for the proposed earth
moving stockpiling was provided.
(h) Specify a time when the excavation or land reclamation project shall be
completed.
The proposed earth moving and stockpiling operations, including turf establishment,
shall be completed within 18 months of approval of the Interim Use Permit.
(i) Place a minimum of four (4) inches of top soil over the completed project
and establish ground cover in a time period consistent with the City’s stormwater
management and pollution prevention plan.
The disturbed areas shall be seeded or hydromulched within seven (7) days of initial
placement.
(j) Reimburse the City for the cost of periodic inspections by the City for the
purpose of determining that the terms under which the permit has been issued are being
complied with.
The City will maintain a $5,000 escrow provided by the owner that shall be reestablished
annually by January 15th. This escrow will be for inspection, erosion control, and other
City costs associated with the earth moving and filling.
9
If the above escrow amount is insufficient, the owner shall make such additional deposits
as required by the City. The City shall have a right to reimburse itself from the Escrow
with suitable documentation supporting the charges.
(k) Implement the tree preservation plan.
Not applicable to this site.
(l) Post a form of security and sum as the permitted authority may require,
running to the City, conditioned to pay the City the cost and expense of repairing or
cleaning any highways, streets, or other public ways within the City made necessary by
the special burden resulting from transporting thereon by the applicant material to or
from the site, the amount of such cost to be determined by the Council; and conditioned
further to comply with all the requirements of this Ordinance and the particular permit,
and to save the City free and harmless from all suits or claims for damages resulting from
the negligent excavation, removal, storage, or filling of rock, sand, dirt, gravel, clay, or
other like material within the City.
The City will collect a form of security at the time of approval of the Site Performance
Agreement.
(m) Other conditions deemed appropriate to the application by the City
Engineer.
This interim use permit, if approved by City Council, shall only be valid for 18 months
and the owner will have to apply for renewal. All grading, stockpiling, and final turf
establishment must be completed within the 18 months. Renewal must be approved by the
City Council.
Environmental Review
The Environmental Coordinator has reviewed the proposal and recommendations are
attached.
Site Performance Agreement
Site Performance Agreement shall be required. A grading permit and securities shall be
deposited by the applicant.
RECOMMENDATION
Staff recommends approval of the interim use permit for earth moving and filling subject
to the following conditions:
10
1. Fill stockpiles shall be limited to the areas identified in the plans prepared by
Stantec. dated December 15, 2022, and received by the City on December 15,
2022, and any revisions to the plans approved by the City.
2. Comments from the City Engineer letter dated January 4, 2023, shall be
addressed.
3. Comments from the City Environmental Coordinator letter dated January 4, 2023,
shall be addressed.
4. The vehicles accessing or exiting the site shall not track sediment on Phelps Road
or Otter Lake Service Road. Any street tracking that does occur from vehicles
entering or leaving the site must be swept within one calendar day of discovery.
The sediment removal facilities on site, such as the gravel entrance, must be
maintained to prevent tracking.
5. Fill stockpiles shall be at least 50-ft from the road easement and property lines.
6. The total fill stockpiles shall not exceed 210,000 square feet in area.
7. The northwestern stockpile shall have a maximum top elevation of 925, the
northeastern stockpile shall have a maximum top elevation of 924, and the
southern fill stockpile shall have a maximum top elevation of 922.
8. Maximum side slope of fill stockpiles to be 4:1.
9. Equipment on site shall be limited to what is necessary for earth moving and
filling operations, including loading and hauling equipment, and equipment
needed for grading. Non-functioning equipment is not allowed to be stored on
site.
10. Vehicles entering and leaving the site shall adhere to the road weight restrictions
for each roadway.
11. No fill may be placed in the delineated wetlands, the Natural Resource
Conservation Area, or the FEMA floodplain on the site.
12. Owner will follow the applicable standards and requirements of the City of Lino
Lakes, Rice Creek Watershed District, Army Corp of Engineers, Minnesota
Pollution Control Agency, Minnesota Department of Natural Resources and any
other agency having jurisdiction over the property and shall secure and file with
the City, copies of any permits required by outside agencies. Owner will file with
the City within ten (10) days of receipt, copies of any permits and/or notice of
enforcement actions by these agencies.
13. Owner will permit a City Inspector to view the premises during normal business
hours.
14. The Interim Use Permit shall only be valid for 18 months once approved by City
Council. All grading, stockpiling, and final turf establishment must be completed
within the 18 months. The permit may be extended by the City Council following
a written request by the applicant submitted at least three months prior to
expiration, and review at a public hearing.
15. A Site Performance Agreement shall be executed and recorded.
ATTACHMENTS
1. Site Location and Aerial Map
2. City Engineer letter dated January 4, 2023
11
3. City Environmental Coordinator letter dated January 4, 2023
4. IUP Application Grading Plan dated December 15, 2022
Phelps Rd
OtterLakeServiceRdPhelps Rd
Legend
Address Labels
Parcels
City Mask
December 28, 2022
±
Map Powered By Datafi
1 in = 200 Ft
I-35E
Site Location & Aerial Map
Phelps Road Stockpile
178 E 9TH STREET | SUITE 200 | SAINT PAUL, MN | 55101 | 651.286.8450 | WSBENG.COM Memorandum
To: Katie Larsen, Lino Lakes City Planner
From: Kelsey Gelhar PE, WSB
Diane Hankee PE, Lino Lakes City Engineer
Date: January 4, 2023
Re: Phelps Road Stockpile IUP
Plan Review
WSB Project Number – 021977-000
WSB has reviewed the final plans for the Phelps Road Stockpile project in Lino Lakes, MN,
prepared by Stantec, received on December 15, 2022. These comments are based on the
following documents:
• Stockpile Construction Plan prepared by Stantec, dated December 15, 2022, received
December 15, 2022.
• ALTA/NPS Land Title Survey prepared by Landform, dated December 17, 2021, received
December 15, 2022.
• Regulated Wetlands and Tributaries exhibit prepared by Kjolhaug Environmental
Services Company, received December 15, 2022.
Applicant to respond to these comments in writing on this word document. Any changes to the
plans that are not associated with these comments shall be identified by either a summary in the
response or in the plans with a revision cloud or note.
Engineering
• General
The Phelps Road Stockpile project proposes to stockpile soil on the parcel located at the
west end of Phelps Road. The applicant stated that the intent is to bring in sufficient fill to
prepare for future industrial development on the site. The site will be accessed from Phelps
Road and is adjacent to I-35E. The parcel being utilized for the three proposed stockpiles is
approximately 14.39 acres.
The proposed stockpiles will be approximately 4.81 acres in total area, will not exceed a
height of 15 feet, and be a total of approximately 71,000 cubic yards of fill soil based on the
plans.
Comments:
1. A geotechnical report and a traffic study will be required for any future
development of buildings, utilities, etc.
• Grading, Erosion Control & Stormwater Management
Ms. Katie Larsen
01/04/2023
Page 2
Phelps Road Stockpile IUP Engineering Review
The Phelps Road Stockpile project will require site grading for the proposed fill soil
stockpiles. The northwest stockpile is proposed to have 4:1 side slopes, have a height of
15-ft, have a footprint of approximately 1.96 acres, and be approximately 30,000 CY in
volume. The northeast stockpile is proposed to have 4:1 side slopes, have a height of 14-
ft, a footprint of approximately 1.11 acres, and be approximately 14,000 CY in volume.
The southern stockpile is proposed to have 4:1 side slopes, have a height of 14-ft, a
footprint of approximately 1.74 acres, and be approximately 27,000 CY in volume. The
proposed project is within the Rice Creek Watershed District (RCWD). The applicant is
proposing to use silt fence to surround the stock pile areas and to protect wetlands and
floodplain on the site. No significant changes to existing drainage patterns are proposed.
Comments:
1. Applicant to update plans to address any comments provided by the City’s
Environmental Coordinator regarding erosion control.
2. Applicant to verify if existing topsoil onsite is being removed prior to stockpiling.
3. No work is allowed until a Rice Creek Watershed District permit has been
obtained.
• Water Supply
There is currently an existing 8-inch diameter ductile iron pipe (DIP) water main along
Phelps Road that terminates at the east edge of the site. The applicant is not proposing
any connections to the municipal water system with this plan.
Staff does not have any comments at this time.
• Sanitary Sewer
There is currently an existing polyvinyl chloride (PVC) sewer main along Phelps Road that
terminates at the east edge of the site. The applicant is not proposing any connections to
the municipal sanitary sewer system with this plan.
Comments:
1. Applicant to provide sanitation facilities on site for employees while stockpile
operations are underway.
• Transportation
The site is located at the intersection Phelps Road and the Otter Lake Service Road. Phelps
Road and the Otter Lake Service Road are local streets. Phelps Road is within a Public
Street and Utility Easement that is 60-ft in width. The Otter Lake Service Road is within the
MN DOT right-of -way in a road easement.
Phelps Road was constructed to city standards from Otter Lake Road to the eastern
property line of the site. Phelps Road is a 9-ton design, but during spring road restrictions, a
5-ton limit applies. The design of the Otter Lake Service Road is unknown and should be
restricted to 5-ton weight due to current conditions of the road.
Comments:
Ms. Katie Larsen
01/04/2023
Page 3
Phelps Road Stockpile IUP Engineering Review
1. Applicant to submit a hauling plan with truck weights and associated volume of
material and the number of trips for the pile construction. This plan should meet
the road restrictions.
• Wetlands and Mitigation Plan
There are two existing wetlands on the site according to the Regulated Wetlands
and Tributaries exhibit prepared by Kjolhaug Environmental Services Company.
The applicant is not proposing any wetland impacts with this project.
Clearwater Creek is within the Natural Resource Conservation Area on the south
side of the site. The applicant is not proposing any work in the Natural Resource
Conservation Area.
Staff does not have any comments at this time.
• Landscaping
The applicant did not propose any landscaping at this time. If submitted, landscaping will be
reviewed in depth by the City’s Environmental Coordinator.
• Floodplain
There is a FEMA Zone A floodplain on the southern portion of the site near Clearwater
Creek. The applicant is not proposing any impacts to the floodplain on the site.
Staff does not have any comments at this time.
• Drainage and Utility Easements
The proposed work is located within the western most parcel on Phelps Road (PID 24-31-
22-42-0004). Phelps Road is within a Public Street and Utility Easement that is 60-ft in
width. The Otter Lake Service Road is within a road easement in the Minnesota Department
of Transportation right-of -way. There are drainage and utility easements and access
easements along the northern property line.
The applicant is not proposing any changes to the plat at this time.
• Site Performance Agreement
A Site Performance Agreement will be required.
• Grading Agreement
A Grading Agreement is not applicable at this time.
• Stormwater Maintenance Agreement
A Stormwater Maintenance Declaration is not applicable at this time.
• Permits Required
Ms. Katie Larsen
01/04/2023
Page 4
Phelps Road Stockpile IUP Engineering Review
1. NPDES General Construction Permit
2. City of Lino Lakes Zoning Permit for Grading
3. Rice Creek Watershed District
If you or the applicant has any questions regarding these comments, please contact Kelsey
Gelhar at (612) 709-4897 or kgelhar@wsbeng.com. You may also contact Diane Hankee at
(651) 982-2430 or dhankee@linolakes.us.
Page 1
To: Kelsey Gelhar
From: Andy Nelson
Date: 1/03/23
Re: Environmental Comments/January 4th, 2023/Phelps Road Stockpile
1. A seed mix for final stabilization must be specified and shown on sheet C-201, Grading and Post-Construction Stabilization Plan. 2. The construction entrance proposed for Phelps road must be replaced with a construction entrance for each site, one north and one south of Phelps Road.
Environmental Memo
IP OPENRLS 17551IP OPENFD MAG NAILSSMHRE 910.77IE 896.88SSMHFD IPGAS VALVE7' RCP FES895.60RLS 9808FES895.3512" CMPIE 909.5412" CMPIE 909.24CO 4IN910915906907 908 909 911912913 913913914916905910906
9079079079089099
1
0 910910910910909909909911911910908908909909909910915
908909911912
913914916
906
9009058978988999019029039041111133330,000 CY STOCKPILETOP ELEV: 925.0'910
915
920
925
911 912 913 914
916 917 918 919
921 922 923 924
910
915
920
911912913914
916917918919
9219229239249109159209089099119129139149169179189199219224:1 4:14:1
4:14:1
4:14:14:14:1
4:14:1 4:1157.7'910 911 912906907908
14,000 CY STOCKPILETOP ELEV: 924.0'27,000 CY STOCKPILETOP ELEV: 922.0'91152.1'51.4'60.8'910908
908
9099112
DWN BY:ISSUE DATE:PROJECT NO.:U:\227704820\5_DESIGN\1_CAD\3 PLANSHEETS\C-201 POST-CONSTRUCTION STABILIZATION.dwg 12/15/2022 KUECHLE, HALEY
DESCRIPTION:DATE:ISSUE NO.:ISSUE NO.:SHEET NO.:SHEET TITLE:12/15/2022 9:38:31 AM
PROJECT TITLE:CHK'D BY:APP'D BY:CERTIFICATION:7500 OLSON MEMORIAL HWYSUITE 300GOLDEN VALLEY, MN 55427PHONE: 763-252-6800FAX: 952-831-1268WWW.STANTEC.COMLINO LAKES INDUSTRIAL
CITY OF LINO LAKES
ANOKA COUNTY, MINNESOTA227704820HKKJRAJRA12/15/20221OWNER:112/15/2022 PERMIT SUBMITTALDATE:I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION, OR REPORT WASPREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM ADULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THESTATE OF MINNESOTA.LICENSE NO.:5929612/15/2022JACK R. AMMERMAN( IN FEET )GRAPHIC SCALE01 inch = 60 ft.60120601.SEE SHEET C-002 FOR ADDITIONAL PROJECT NOTES.2.CONSTRUCTION SITE SHALL HAVE STABILIZED EXIT AT ALLTIMES THROUGHOUT THE DURATION OF THE PROJECT.CONTRACTOR IS ULTIMATELY RESPONSIBLE TO PROTECTDOWNSTREAM WATERS FROM CONSTRUCTION RUNOFF.3.CONSTRUCTION LIMITS AND SILT FENCE SHOWN OFFSET FROMPROPERTY LINE FOR CLARITY, WHERE APPLICABLE.4.UNTRENCHED SILT FENCE OR ORANGE SNOW FENCE MAY BEUSED FOR TREE PROTECTION.5.CLEAR AND GRUB AS NEEDED WITHIN LIMITS OF DISTURBANCENOTES1.SILT FENCE - SEE DETAIL 1/C-8012.ROCK CONSTRUCTION ENTRANCE - SEE DETAIL 2/C-8013.TEMPORARY STABILIZATIONKEYNOTES#C-201GRADING ANDPOST-CONSTRUCTIONSTABILIZATION PLANLOT LINEEASEMENT LINESETBACK LINERIGHT OF WAY LINESECTION LINEQUARTER LINEEXISTING EASEMENT LINEEXISTING PROPERTY LINEPROPERTY BOUNDARYLEGENDROCK CONSTRUCTION EXITSILT FENCETEMPORARY STABILIZATIONEXISTING MINOR CONTOUREXISTING MAJOR CONTOURPROPOSED MINOR CONTOUR901PROPOSED MAJOR CONTOUR900