HomeMy WebLinkAbout03/08/2023 P & Z Combined Packet
CITY OF LINO LAKES
PLANNING & ZONING BOARD MEETING
Wednesday, March 8, 2023
6:30 p.m.
Council Chambers
Please be courteous and turn off all electronic devices during the meeting.
AGENDA
1. CALL TO ORDER AND ROLL CALL
2. PLEDGE OF ALLEGIANCE
3. SWEARING IN OF BOARD MEMBERS
4. APPROVAL OF AGENDA
5. ELECTION OF CHAIR AND VICE CHAIR
6. APPROVAL OF MINUTES: February 8, 2023
7. OPEN MIKE
8. ACTION ITEMS
A. PUBLIC HEARING: Conditional Use Permit for Centennial Middle School
Tennis Court Relocation and Parking Lot Addition
B. Watermark PUD Concept Plan for Amendment #4-Land Use Plan
9. DISCUSSION ITEMS
A. Project Updates
10. ADJOURN
City of Lino Lakes Planning & Zoning Board
MEETING GUIDELINES
Open Mike – The purpose of a Board Meeting is to accomplish the business of the city.
When presenting at a meeting please remember to be respectful, and follow these
guidelines:
• Please address the meeting chair.
• State your name and address for the record.
• Please observe a 4-minute limit.
• The topic must relate to city business.
• Open Mike is for items not on the agenda.
• A spokesperson must represent a group of five or more – groups will have 8 minutes.
• The Presiding Officer may limit duplicative presentations.
• Remember, the meeting is to discuss city business only.
Public Hearing - Held as a separate item of business on the agenda. The public hearing
segment is your opportunity to tell the Board how you feel about issues scheduled to be
heard. Typically, a hearing follows these steps:
• The Presiding Officer (Chair or Vice-Chair) will announce the proposal to be reviewed and ask
for the staff report. The presiding Officer shall maintain strict order and etiquette at all
meetings.
• Staff will present their report on the proposal.
• Board members will then ask City Staff questions about the proposal.
• The Presiding Officer will then open up the public hearing for anyone present who wishes to
comment on the proposal. This is the time for the public to make comments or ask questions
about the proposal.
Comments should be limited to four (4) minutes unless further time is granted by the Presiding
Officer. All comments should be directed to the Board as a body and not to any individual
Board Member or City Staff Member unless permission is granted by the Presiding Officer.
No person shall be permitted to enter into any discussion, either directly or through a member
of the Board without the permission of the Presiding Officer.
• After everyone in the audience wishing to speak has given his/her comments, the Presiding
Officer shall close the public hearing.
• The Board will then discuss the proposal. No further public comments are allowed.
• The Board will then make a recommendation(s) and/or a decision.
When you are called upon for your comments, please step to the microphone at the podium
and state your name and address for the record.
Occasionally, the Board may continue a hearing to another meeting before taking action.
Meeting Etiquette
The Planning & Zoning Board must preserve order and decorum while the meeting is
in session. A resident shall not, by conversation or otherwise, delay or interrupt the
proceedings or the business of the Board, nor disturb any resident or Board Member
while speaking or refuse to obey the orders of the Board.
Meeting guidelines on reverse side.
DRAFT MINUTES
CITY OF LINO LAKES
PLANNING & ZONING BOARD MINUTES
1. CALL TO ORDER AND ROLL CALL
Vice Chair Michael Root called the Lino Lakes Planning & Zoning Board meeting to
order at 6:30 p.m. on February 8, 2023.
2. PLEDGE OF ALLEGIANCE
3. APPROVAL OF AGENDA
The agenda was approved as presented.
4. APPROVAL OF MINUTES
Mr. Isaac Wipperfurth moved to approve the January 11, 2023 meeting minutes. Motion
seconded by Mr. Neil Evenson. Motion carried 5 – 0.
5. OPEN MIKE
Mr. Root declared open mike at 6:31p.m.
There were no public comments.
Mr. Evenson moved to close open mike. Motion seconded by Mr. Wipperfurth. Open
mike was closed at 6:31 p.m.
6. ACTION ITEMS
DATE: February 8, 2023
TIME STARTED: 6:30 P.M.
TIME ENDED: 8:40 P.M.
MEMBERS PRESENT: Michael Root, Perry Laden, Neil Evenson
Nathan Vojtech, Isaac Wipperfurth
MEMBERS ABSENT: None
STAFF PRESENT: Michael Grochala, Katie Larsen, Julie Whitney
Planning & Zoning Board
February 8, 2023
Page 2
DRAFT MINUTES
A. Public Hearing: Sign Ordinance Amendment
Ms. Kristin Nierengarten with Rupp, Anderson, Squires, Waldspurger & Mace, presented
the staff report.
City Code Chapter 1010: Signs regulates signs. In 2014, the City amended the sign
ordinance. Staff is proposing another amendment to the ordinance to reflect changes that
have transpired from a federal court case.
Mr. Perry Laden asked at what point can the City regulate when a sign is obscene, violent
or pornographic in nature. Ms. Nierengarten stated the bar is high to enforce that issue.
She stated it has to be truly egregious in nature. Mr. Laden stated the City should have
some language in the ordinance to address it. Ms. Nierengarten stated it was possible to
add language to cover prohibited signs.
Mr. Nathan Vojtech questioned if business owners have to remove signs when a business
closes? Ms. Nierengarten stated the City could send out letters for an ordinance violation
or the City could do it if shown to be a safety risk.
Mr. Vojtech asked if the City had any definition of light pollution. Mr. Michael
Grochala, Community Development Director, indicated lighting is covered in the zoning
ordinance.
Mr. Vojtech asked if there was anything in the ordinance preventing the recognition of a
private individual on a sign. Ms. Nierengarten stated there was not and concluded that we
cannot regulate it within the sign ordinance. She did state the individual would have
other resources available to them if this were to occur.
Mr. Vojtech understood that a sign needed to be removed 10 days after the election. Ms.
Nierengarten said you can have a sign in your yard any time of year and that it does not
matter what the sign says. She went on to say it also means you are permitted to have
more signs during the time allowed for the election process regardless of content or size.
Mr. Evenson did not think the City required a permit for sandwich boards. He thought
the Board had eliminated them and he concluded it should be eliminated. Ms. Larsen
stated it is required but the City does not receive many requests. Ms. Larsen said weather
it is required or not we will still have the same number of signs around the City.
Mr. Wipperfurth questioned if the City cannot regulate content, can anyone put up as
many signs as they want for any reason. Ms. Nierengarten confirmed they could and that
there are some enforcements that can be taken in these instances. For example, if they
are in the right of way, a setback or safety concern. Mr. Wipperfurth asked if flags are
Planning & Zoning Board
February 8, 2023
Page 3
DRAFT MINUTES
regulated and if this could be used to circumvent the ordinance. Ms. Nierengarten stated
they were regulated and that it could be used to evade the ordinance.
Mr. Root would like a provision placed that neighborhood identification signs list the
City of Lino Lakes on them. Ms. Nierengarten said you could do it, but it could be
challenged. She thought it should be discussed with the builder. She did say a solution
would be to put a City of Lino Lakes sign in the right of way.
Mr. Root opened the public hearing at 7:09 p.m.
Mr. Mike Kasbohm, 12918 Cardinal Creek Road, Eden Prairie, is a digital sign
consultant and wanted the City of Lino Lakes to increase the size that is allowed in the
sign ordinance. He said due to the speed limit in that area the sign will need to be bigger
in order for it to be read.
Paul Selbitschker, 7910 Lake Drive, Lino Lakes MN 55014. Mr. Selbitschker informed
the Board that Mr. Kasbohm had a site analysis for his property if the Board would like to
review it. The Board received the analysis.
Mr. Vojtech moved to close public hearing. Motion seconded by Mr. Laden. The public
hearing was closed at 7:15 p.m.
The consensus with the board was to get further analysis for increasing the dynamic
display sign size and approve the ordinance as presented. Mr. Laden moved to adopt the
ordinance with exploration into an obscenity clause. Motion was seconded by Mr.
Evenson. Motion carried 5 – 0. There will be further discussion in the future regarding
the change in dimensions for dynamic display signs.
B. Villas on Vicky PUD Revised Concept Plan Review
Ms. Katie Larsen, City Planner, presented the staff report.
The applicant, Jon Blattman with Ranger Development, submitted a land use application
for PUD Concept Plan review in June 2022. The proposed residential development is
located on a 5-acre parcel west of CSAH 23 (Lake Drive) and south of Vicky Lane. The
applicant is proposing varying lot sizes, setbacks, and building design standards that
would require PUD flexibility. The applicant has submitted a revised concept plan for
review.
Mr. Wipperfurth questioned if the developer is responsible for the development of Vicky
Lane. Ms. Larsen stated they were responsible.
Mr. Laden asked about the road alignment. Ms. Larsen said it is a requirement to
develop the land.
Planning & Zoning Board
February 8, 2023
Page 4
DRAFT MINUTES
Mr. Root asked if changing the density would be just for this parcel. Ms. Larsen stated
that was correct.
Mr. Evenson asked what the estimated cost of the houses were. The developer, Jon
Blattman, 4247 117th Avenue NE, Blaine MN, stated they would start in the low
$400,000 range.
Mr. Blattman discussed the reason for the density request. Mr. Evenson asked if twin
homes could go into this development. Mr. Blattman believes building twin homes
would not achieve the density that the City is looking for.
Ms. Larsen asked questions to receive feedback regarding the development. The Board
agreed to adding infill, the concept of custom built homes, creative use of land and Vicky
Lane realignment would be beneficial to the City. The Board was also in agreement of
the PUD rezoning, comp plan amendment to lower the density by one degree, holding a
neighborhood meeting and decreasing the size of the garage.
7. DISCUSSION ITEMS
A. Project Updates
Staff provided an update on projects.
Mr. Evenson moved to adjourn the meeting. Motion seconded by Mr. Vojtech. Meeting
adjourned at 6:40 p.m.
Respectfully submitted,
Julie Whitney – Community Development Administrative Assistant
1
PLANNING & ZONING BOARD
AGENDA ITEM 8A
STAFF ORIGINATOR: Katie Larsen, City Planner
P & Z MEETING DATE: March 8, 2023
REQUEST: PUBLIC HEARING: Conditional Use Permit for
Centennial Middle School Tennis Court Relocation
and Parking Lot Addition
CASE NUMBER: CU2023-001
SP2023-001
APPLICANT: Centennial Middle School ISD #12
Attn: Patrick Chaffey
4707 North Road
Circle Pines, MN 55014
OWNER: Same
REVIEW DEADLINE:
Complete Application Date: February 13, 2023
60-Day Review Deadline: April 14, 2023
120-Day Review Deadline: June 13, 2023
Environmental Board Meeting: February 22, 2023
Park Board Meeting: N/A
Planning & Zoning Board Meeting: March 8, 2023
Tentative City Council Work Session: March 27, 2023
Tentative City Council Meeting: March 27, 2023
BACKGROUND
Centennial Middle School is located at 399 Elm Street. The applicant is proposing to
relocate the tennis court and a parking lot. The property is zoned PSP, Public and Semi-
Public and allows for schools (public and private) with a conditional use permit. Any
change involving a structural alteration requires an amendment to the conditional use
permit.
The Land Use Application is for the following:
2
• Conditional Use Permit Amendment
• Site and Building Plan Review
This staff report is based on the followings plan sets:
• Boundary Survey prepared by Sunde Land Surveying dated February 9, 2023
• Civil Plan Set prepared by Larson Engineering, Inc. dated February 7, 2023
• Parking Lot Cross Section of Parking Lot prepared by Larson Engineering, Inc.
dated February 7, 2023
• Stormwater Calculations prepared by Larson Engineering, Inc. dated February 7,
2023
• Geotechnical Evaluation Report prepared by Braun Intertec dated December 22,
2022
ANALYSIS
Background
The Centennial Middle School was constructed in 1997. The project will include the
construction of a new parking lot at the location of the existing tennis courts on the south
side of the school. Eight (8) new tennis courts will be constructed in the existing parking
lot located southeast of the school. The tennis courts will also be striped for pickleball. A
stormwater management basin will be constructed on the west side of the new parking
lot.
Existing Site Conditions
The existing site contains the Centennial Middle School, Blue Heron Elementary School
and associated parking lot and athletic fields.
Per the Geotechnical Evaluation Report prepared by Braun Intertec, dated December 22,
2022, native soils in the area consist of very fine-to medium-grained sand. Groundwater
was not observed at 11 foot boring depths.
Zoning and Land Use
The property is zoned PSP, Public and Semi-Public and allows for schools with a
conditional use permit.
Current Zoning PSP, Public and Semi-Public
Current Land Use Public School
Future Land Use per CP Civic/Institutional
Utility Staging Area 1A=2018-2025
3
Surrounding Zoning and Land Use
Direction Zoning Current Land Use Future Land Use
North LI, Light
Industrial Industrial Industrial
East LI, Light
Industrial Industrial and School Industrial and School
South
R-1, Single
Family
Residential
Single Family Residential Single Family
Residential
West
R-1, Single
Family
Residential
School Low Density
Residential
Site and Building Plan Review
Site Plan
Per the applicant’s narrative dated February 13, 2023:
This project will consist of work in two areas at the middle school site. The first area, is
the existing tennis courts, located on the south side of the school, that are currently in
poor condition and due for replacement. The existing 8 tennis courts will be demoed and
the area will be converted to a parking lot. The parking lot addition, will consist of 134
parking stalls, surrounding landscaping, and a stormwater infiltration basin located on the
west side of the parking lot. The proposed parking lot will provide better use of parking
area on the site and closer access to the athletic fields.
The second area, is a portion of the existing parking lot (129 parking stalls), located on
the east side of the school. This parking lot doesn’t get used much due to the located from
the school and athletic fields. The existing parking lot will be demoed and the area will
be converted to tennis courts. The new tennis courts will be 2 sets of 4 courts with a 13’
wide walkway between them.
Existing tennis court count = 8
Proposed tennis court count = 8
Existing parking stalls (parking lot being removed) = 129
Proposed parking stalls (parking lot addition) = 134
Attachment #3, Site Plan Review Worksheet, details setback and performance standards.
Overall, the proposed tennis courts and parking lot meet these requirements with minor
revisions required.
4
Lot Size & Setbacks
PSP
Requirements
New
Tennis Courta
New
Parking Lot
Min. Lot Size 1 acre 80 acres 80 acres
Min. Lot Width
-Interior Lot 100 ft 500+ ft 500+ ft
-Corner Lot NA NA NA
Setbacks
-From Street Right-of-Way
--Localb (Elm St) or
Minor Collector Street 50 ft 340 ft NA
--Major Collector or
Arterial Street 50 ft NA NA
--Parking Lot 15 ft NA 250 ft
-Rear Lot Line of
Adjacent Residential Lots
--Principal 30 ft NA NA
--Accessory (tennis court) 10 ft NA NA
--Parking Lot 10 ft NA 46 ft
-Side Lot Line (west)c
--Principal 10 ft NA NA
--Accessory (tennis court) 20 ft 2,225ft NA
--Parking Lot 5 ft NA 980 ft
-Side Lot Line (east)c
--Principal 10 ft NA NA
--Accessory (tennis court) 20 ft 40 ft NA
--Parking Lot 5 ft NA 600+ ft
a For the purpose of measuring setbacks, the tennis court is considered to be an
accessory use.
b4th Avenue was vacated in 1997
c Conditional Use Permits for schools require the side yard setback to be doubled.
5
Architectural Plans and Exterior Building Materials
There are no principal buildings proposed with the project.
Outdoor Lighting
City Code Section 1007.043(6) details requirements for Outdoor Lighting.
Four (4) light poles with downlit hoods are proposed for the new parking lot. They are
27ft in height which is less than the 30ft maximum allowed. The photometric plan shows
0.1 foot candle compliance at the adjacent residential rear lot lines. This is less than the
allowed 0.4 foot candle. Lighting performance standards are met.
One (1) new light pole and three (3) existing light poles are proposed for the new tennis
courts. They are 27ft in height which is less than the 30 ft maximum allowed. The
photometric plan shows 0.4 foot candle compliance at the east lot line. This is equal to
the allowed 0.4 foot candle. Lighting performance standards are met.
Off-Street Parking Requirements
The existing parking lot has 129 stalls. The new parking lot has 134 stalls. Existing trail
will be reconstructed near the new parking lot. Off-street parking requirements are met.
Grading Plan and Stormwater Management
Per the City Engineer’s Memo dated March 1, 2023:
Stormwater from the existing tennis court area drains to the east and west of edges of the
existing tennis courts. Stormwater from the existing parking lot area drains to storm
sewer located in the northeast and southeast corners of the parking lot. The stormwater
from both areas ultimately drains through the 399 Elm Street site through private storm
sewer to the public pond.
The project is proposed to rehabilitate approximately 1.89 acres of impervious surface
and add new or reconstruct approximately 0.57 acres on the impervious area, according
to the Stormwater Management Report. The surface water from proposed improvements
will still ultimately flow to the existing pond, but the applicant is proposing to treat
stormwater at the proposed parking lot site through an infiltration basin. The proposed
tennis courts include a draintile system that outlets to existing private storm sewer.
A geotechnical evaluation report prepared by Braun Intertec was submitted with the
application. The report included soil borings which indicated that the native soils in the
area consist of very-fine to medium-grained sand and is locally silt-rich. Groundwater
was not observed in the borings.
The applicant used a HydroCAD model based on the Atlas 14, 24-hour storms to design
the storm sewer and infiltration basin. The proposed improvements are designed to
6
reduce site runoff rates for the 2-, 10-, and 100-year rainfall events. Runoff rates for the
10-day snow melt event were not provided at this time and are not required as basin
outlets are below the 100-year HWL.
Pre- and Post- Development Discharge Rates (cfs)
Condition 2-Year 10-Year 100-Year 10-Day
Snowmelt
Existing 9.49 15.82 32.09 Not provided
Proposed 8.00 12.87 28.64 Not provided
Additional engineering comments and revisions are provided in their attached memo.
Public Utilities
The tennis court and parking lot do not require municipal water or sanitary sewer utilities.
Tree Preservation and Mitigation Standards
The Environmental Coordinator’s Memo dated March 1, 2023 addresses tree preservation
and landscaping.
All tree removals planned for this project are within the basic use area. A survey, tree
preservation plan, and mitigation plan will not be required for this project.
Open Areas Landscape Standards
The open space for this project is the approximately 4,000 sq.ft. in and around the
stormwater infiltration basin west of the proposed parking lot. This would require 2 large
trees and 4 large shrubs. There are shrubs and trees provided along the fence to the south
of the parking lot that exceed the requirements for screen planting. The additional plants
along the fence will satisfy the open space planting requirements.
Open space planting requirements have been met.
Buffer and Screen Standards
A 6 foot fence with trees and shrubs is proposed to provide continuous, year-round
screening between the parking lot and the residential lots to the south.
Buffer and screen standards have been met.
Canopy Cover
7
Canopy cover standards call for a minimum of 40% canopy coverage. Canopy coverage
values are calculated per tree based on the anticipated size 15 years after planting, and the
distance to hardscape edge from the planting location.
Vehicular hardscape planned: 42,662 sq. ft.
Canopy cover requirement: 17,064 sq. ft.
Canopy cover provided: 17,125 sq. ft.
Canopy cover requirements have been met.
Foundation Landscaping
The foundation landscape requirements are not applicable for this project.
Sod and Ground Cover Standards
The site will be seeded with Mn DOT 25-131, a low maintenance fescue mix, and Mn
DOT 33-261, a native plant mix for use in stormwater ponds. The seed mix types are
appropriate for the site.
Note that the city native plant establishment requirements will be in effect for the areas
receiving native seed.
The sod and ground cover standards have been met.
Signage
No new signage is proposed.
Impervious Surface Coverage
The PSP, Public and Semi-Public zoning district allows for 65% impervious surface
coverage. The proposed impervious surface is 2.7 acres of the 80 acre site which is 3%.
Impervious surface coverage is met.
Traffic Study
A traffic study is not required. Elm Street is a local road and is capable of handling the
additional traffic volume generated by the five (5) additional parking spaces.
Public Land Dedication
Park land dedication or fees in lieu are not required. This is an existing lot of record and
not being subdivided.
Alternative Urban Areawide Review (AUAR)
8
The site is not within the AUAR environmental review boundary.
Wetlands
There are no wetlands located on site.
Shoreland District
The parcel is not located within the Shoreland District.
Floodplain
There are no floodplains located on site.
Comprehensive Plan
Resource Management System
The Resource Management System Plan goal of preserving surface water quality is
supported by the construction of stormwater management BMP’s such as curb, gutter and
infiltration basins.
Land Use Plan
The Comprehensive Plan guides this property for civic use. The proposed tennis court
and parking lot reconstruction are consistent with civic (school) land use.
Housing Plan
The goals and policies of Housing Plan are not negatively impacted by the proposed
PTAC development. A 6 feet high privacy fence with landscaping is provided between
the parking lot and the adjacent rear residential lot lines.
Transportation Plan
Goals of the Transportation Plan are to ensure that street and roads are as safe as possible.
Elm Street is a local road and is capable of handling the additional traffic volume generated
by the five (5) additional parking spaces.
Sanitary Sewer and Water Supply Plan
The tennis court and parking lot do not require municipal water or sanitary sewer utilities.
Anoka County Highway Department
Elm Street is a local road. Anoka County Highway Department did not need to review.
9
Public Safety Comments
The Fire and Police Divisions reviewed the plans and had no issues that needed to be
addressed.
Environmental Coordinator
The Environmental Coordinator reviewed the project and recommended approval with
conditions. Those conditions are summarized in the attached Environmental Memo dated
March 1, 2023.
Storm Water Maintenance Agreement
A Declaration for Maintenance of Stormwater Facilities is required.
Site Improvement Performance Agreement
A Site Improvement Performance Agreement and securities are required.
Findings of Fact-Conditional Use Permit
The property is zoned PSP, Public and Semi-Public and allows for schools with a
conditional use permit.
Per City Code Section 1007.016(3):
(e) The Planning and Zoning Board shall hold the public hearing and consider
possible adverse effects of the proposed conditional use. Its judgement shall be based upon,
but not limited to, the following factors:
1. The proposed development application has been found to be consistent
with the design standards listed in City Code Section 1007.020(4).
See below.
2. Will not involve uses, activities, processes, materials, equipment and
conditions of operation that will be detrimental to any persons, property, or the general
welfare because of excessive production of traffic, noise, smoke, fumes, glare, or odors.
The proposed tennis court and parking lot reconstruction will not involve activities
detrimental to any person, property, or the general welfare.
3. Will not result in the destruction, loss, or damage of a natural, scenic or
historic feature of major importance.
10
The proposed tennis court and parking lot reconstruction will not result in the destruction
of a natural, scenic, or historic feature of major importance.
Per City Code Section 1007.020:
(4) Performance Standards. Plans which fail to meet the following criteria shall not
be approved.
(a) The proposed development application must be consistent with the policies
and recommendations of the Lino Lakes Comprehensive Plan.
The proposed tennis court and parking lot reconstruction are consistent with the civic
(school) land use.
(b) The proposed development application is compatible with present and future
land uses of the area.
The proposed tennis court and parking lot reconstruction is compatible with present and
future land uses of the area. The facilities are already existing and are just being
relocated on site.
(c) The proposed development application conforms to performance standards
herein and other applicable City Codes.
The proposed tennis court and parking lot reconstruction conforms to City Code
performance standards with minor revisions as noted in this staff report.
(d) Traffic generated by a proposed development application is within the
capabilities of the City when:
1. If the existing level of service (LOS) outside of the proposed development
is A or B, traffic generated by a proposed development will not degrade
the level of service more than one grade.
2. If the existing LOS outside of the proposed development is C, traffic
generated by a proposed development will not degrade the level of service
below C.
3. If the existing LOS outside of the proposed development is D, traffic
generated by a proposed development will not degrade the level of service
below D.
4. The existing LOS must be D or better for all streets and intersections
providing access to the proposed development. If the existing level of
service is E or F, the developer must provide, as part of the proposed
project, improvements needed to ensure a level of service D or better.
11
5. Existing roads and intersections providing access to the proposed
development must have the structural capacity to accommodate projected
traffic from the proposed development or the developer will pay to correct
any structural deficiencies.
6. The traffic generated from a proposed development shall not require City
street improvements that are inconsistent with the Lino Lakes Capital
Improvement Plan. However, the City may, at its discretion, consider
developer-financed improvements to correct any street deficiencies.
7. The LOS requirements in paragraphs 1. to 4. above do not apply to the I-
35W/Lake Drive or I-35E/Main St. interchanges. At City discretion,
interchange impacts must be evaluated in conjunction with Anoka County
and the Minnesota Dept. of Transportation, and a plan must be prepared to
determine improvements needed to resolve deficiencies. This plan must
determine traffic generated by the proposed development project, how this
traffic contributes to the total traffic, and the time frame of the
improvements. The plan also must examine financing options, including
project contribution and cost sharing among other jurisdictions and other
properties that contribute to traffic at the interchange.
The proposed tennis court and parking lot reconstruction is within the capabilities of the
City. Elm Street is a local road and is capable of handling the additional traffic volume
generated by the five (5) additional parking spaces.
(e) The proposed development shall be served with adequate and safe water
supply.
The proposed tennis court and parking lot reconstruction does not require a water
supply.
(f) The proposed development shall be served with an adequate or safe sanitary
sewer system.
The proposed tennis court and parking lot reconstruction does not require sanitary
sewer.
(g) The proposed development shall not result in the premature expenditures of
City funds on capital improvements necessary to accommodate the proposed
development.
The proposed tennis court and parking lot reconstruction does not require City funds.
(h) Fire prevention and fighting equipment acceptable to the Board of Fire
Underwriters and City Council shall be readily available when any activity
12
involving the handling or storage of flammable or explosive materials is
carried on.
The proposed tennis court and parking lot reconstruction does not involve any activity
involving the handling or storage of flammable or explosive materials.
Specific Conditional Use Permit (CUP) Requirements
In addition to the above administrative requirements of a conditional use permit, the
following specific performance standards of City Code Section 1007.130(8) must also be
met:
(a) All schools (public and private) provided that:
1. Side yards shall be double that required for the district.
The side yard setbacks for the tennis courts and parking lot are more than doubled.
2. Adequate screening from abutting residential uses and landscaping is
provided in compliance with City Code Section 1007.043(17) of this
ordinance.
A six (6) foot high privacy fence with landscaping to the south of the new parking lot will
provide adequate screening from the residential lots.
3. Adequate off-street parking and access is provided on the site or on lots
directly abutting or directly across a public street or alley to the principal
use in compliance with City Code Section 1007.044 and that such parking
is adequately screened and landscaped from surrounding and abutting
residential uses in compliance with City Code Section 1007.043(17) this
ordinance.
The tennis courts and parking lots are existing facilities and are just being relocated.
Five (5) additional parking spaces are being added to provide adequate off-street
parking and access.
A six (6) foot high privacy fence with landscaping to the south of the new parking lot will
provide adequate screening from the residential lots.
4. Adequate off-street loading and service entrances are provided and
regulated where applicable by City Code Section 1007.045.
Off-street loading and service entrances currently exist and are not being reconstructed.
5. The provisions of City Code Section 1007.016 are considered and
determined to be satisfied.
13
The provisions of City Code Section 1007.016-Conditional Use Permits are satisfied.
RECOMMENDATION
Staff recommends approval of the conditional use permit and site plan review for
Centennial Middle School Tennis Court Relocation and Parking Lot Addition subject to
the following conditions:
1. A Site Improvement Performance Agreement and securities shall be executed.
2. A Declaration for Maintenance of Stormwater Facilities in favor of RCWD and
the City shall be executed and recorded.
3. A Permanent Drainage and Utility Easement with exhibit shall be executed and
recorded.
The following items shall be addressed prior issuance of any permits:
1. All comments from the City Engineer Memo dated March 1, 2023 shall be
addressed.
2. All comments from the Environmental Coordinator Memo dated March 1, 2023
shall be addressed.
3. City staff shall draft a Site Improvement Performance Agreement for Council
approval.
4. The applicant shall draft a Declaration for Maintenance of Stormwater Facilities
for staff review and approval.
5. The applicant shall draft a Permanent Drainage and Utility Easement with exhibit
for staff review and approval.
6. Lot lines shall be clearly marked and labeled on all plan sheets with a solid line.
7. Sheet C201, Parking Lot Addition Paving Plan:
a. Crosswalks shall be provided at both the west and east driveways into the
new parking lot.
b. Crosswalk shall be provided from the east side of the new parking lot
north to the existing sidewalk.
c. Detail for 4” wide striping shall be included.
ATTACHMENTS
1. Site Location Map
2. Applicant’s Narrative
3. Site Plan Review Worksheet
4. City Engineer Memo dated March 1, 2023
5. Environmental Coordinator Memo dated March 1, 2023
6. Civil Plan Set prepared by Larson Engineering, Inc. dated February 7, 2023
7. Parking Lot Cross Section of Parking Lot prepared by Larson Engineering, Inc. dated
February 7, 2023
0 400 800200
Feet
IJ23
IJ12 §¨¦35W
Lake DrLake DrApollo DrApollo DrAAqquu aa CCii rrJJoonnAAvveePPoossttRR ddForsham Lake Dr
Forsham Lake Dr
El m S tElm S t
Sunfish CtSunfish CtAqua Cir
Aqua Cir
Mar vy StMarvy St AAppooll
ll
ooCC
tt
Cinnamon Teal CtCinnamon Teal Ct2nd Ave2nd AveRRiicceeLLaakkeeDDrrRRiicceeLLaakkeeLLnnSSnnoowwOOwwllLLnnWWhhiippppoooorrwwiillllLLnnGGrraayyHHeerroonnDDrr4th Ave4th AveSite Location MapCentennial M iddle School µ
Larson Engineering, Inc.
3524 Labore Road
White Bear Lake, MN 55110-5126
651.481.9120 Fax: 651.481.9201
www.larsonengr.com
February 13, 2023
Re: Project Narrative
Centennial Middle School
Tennis Court Relocation and Parking Lot Addition
The project is located at the Centennial Middle School, 399 Elm Street in Lino Lakes. This
project will consist of work in two areas at the middle school site.
The first area, is the existing tennis courts, located on the south side of the school, that are
currently in poor condition and due for replacement. The existing 8 tennis courts will be demoed
and the area will be converted to a parking lot. The parking lot addition, will consist of 134
parking stalls, surrounding landscaping, and a stormwater infiltration basin located on the west
side of the parking lot. The proposed parking lot will provide better use of parking area on the site
and closer access to the athletic fields.
The second area, is a portion of the existing parking lot (129 parking stalls), located on the east
side of the school. This parking lot doesn’t get used much due to the located from the school and
athletic fields. The existing parking lot will be demoed and the area will be converted to tennis
courts. The new tennis courts will be 2 sets of 4 courts with a 13’ wide walkway between them.
Existing tennis court count = 8
Proposed tennis court count = 8
Existing parking stalls (parking lot being removed) = 129
Proposed parking stalls (parking lot addition) = 134
Watering of the proposed landscaping will consist of using buckets/hose or watering tree bags.
SITE PLAN REVIEW
WORKSHEET
PROJECT: Centennial Middle School Tennis Court and Parking Lot DATE:February 13, 2023
REVISED:
Planning & Zoning Board Date:March 8, 2023
City Council Date:April 10, 2023 To be addressed by applicant
ZONING/LAND USE
NOTES:
Zoning District PSP Public and Semi-Public
Future Land Use Plan Civic
Sewered or Unsewered Lot Sewered
CUP required?Yes Any change involving structural alteration
Comprehensive Plan Amendment?No
Rezoning required?No
Variance required?No
Required Proposed
Lot size (sf)1 acre 80 acres
Lot width (ft.)100 ft 500 ft
2/28/2023 1 Site Plan Worksheet-Centennial Middle School
Setbacks See PZ Staff Report table
Tennis Court Fence Required Proposed
Height 12 ft max 10 ft Tennis court fence
Setback (east lot line)10 ft 40 ft
Shoreland district?No
OHWL?NA
Impervious surface restrictions Permitted Proposed
65% max 3%Per RCWD CAPROC (2.7 acres / 80 acres = 3%)
GENERAL PROVISIONS
Building Type and Construction NA No principal buildings are being constructed.
Accessory buildings or structures Required Proposed
Number of structures 0 0
Size 400 sf NA
Refuse and recyclable materials enclosure NA
2/28/2023 2 Site Plan Worksheet-Centennial Middle School
Outdoor lighting Yes 4 light poles at parking lot and 4 light poles at tennis courts
1.0 ft candle allowance onto right of way NA
0.4 ft candle allowance onto adjacent prop.OK Parking lot = 0.1 fc Tennis Court = 0.4 fc
Hooded lights Yes
Required Proposed
Light Fixture Pole Height 30 ft max.27 ft Sheet E001
Light Fixture Location Required Proposed
Street ROW 10 ft NA
Side or rear 5 ft 108 ft Parking lot lights are 108ft from rear lot line of residential lots to the south
Smoke, Dust, Odors, Noise Minimal Typical construction activities.
Sewage Disposal (on-site)NA
Waste material Yes Typical construction waste material will be property disposed of.
Bulk storage (liquid)No
Radiation emission No
Electrical emission No
Exterior storage No
Off-Street Parking Required Proposed
Angle of parking 90 90
Space Width 9 ft 9 ft
Space Length 18 ft 18 ft
Aisle Width One Way 24 ft NA
Aisle Width Two Way 24 ft 24 ft
2/28/2023 3 Site Plan Worksheet-Centennial Middle School
Curb cut access 30 feet from intersection 50 ft
Curb cut access 40 feet from one another 270 ft
Curb cut and driveway 5 feet from side yard NA
Required Proposed
Curb cut width 36 feet max.24 ft
Grade elevation 5%0
Striping 4" wide 4"TBD Striping detail shall be added to Sheet C201
Continuous concrete perimeter curb barrier Yes
Six (6)+ stalls adjacent to street or residential
requires berm, wall or fence Yes 6ft high wood fence proposed btn parking lot and residential lots
Parking lot landscaping Yes
Six (6)+ stalls requires landscaping Yes
50+ space parking lots require
100 sf island per 25 spaces Yes 536 sf islands required 1,400 sf provided
Required Proposed
# stall requirements 129 134
# handicap stall requirements 5 5
Off-Street Loading NA
There will be 5 more parking spaces than existing
2/28/2023 4 Site Plan Worksheet-Centennial Middle School
SPECIAL REVIEW REGULATIONS
Shoreland District NA
Floodplain District NA
Town Center Design & Development Guide NA
Industrial Park Covenants NA
EAW/AUAR COMPLIANCE
Does an EAW/AUAR exist?No
Is an EAW/AUAR required?No
Is project in compliance?NA
Does EAU/AUAR need to be revised?NA
ADDITIONAL NOTES
See conditions listed in Site Plan Review Staff Report.
2/28/2023 5 Site Plan Worksheet-Centennial Middle School
178 E 9TH STREET | SUITE 200 | SAINT PAUL, MN | 55101 | 651.286.8450 | WSBENG.COM Memorandum
To: Katie Larsen, Lino Lakes City Planner
From: Kelsey Gelhar PE, WSB
Diane Hankee PE, WSB, Lino Lakes City Engineer
Date: March 1, 2023
Re: 399 Elm Street (Centennial Middle School)
Plan Review
022290-000
WSB reviewed the site plans and supporting documents for the project located at 399 Elm Street
(Centennial Middle School) in Lino Lakes, MN, received February 10, 2023. Comments were
made on the following documents:
• Boundary, Location, Topographic and Utility Survey prepared by Sunde Land Surveying,
dated February 9, 2023, received February 10, 2023.
• Centennial Middle School – I.S.D. #12 Tennis Court Relocation and Parking Lot Addition
site plans prepared by Larson Engineering, Inc., dated February 7, 2023, received
February 10, 2023.
• Centennial Middle School Tennis Court Relocation and Parking Lot Addition Stormwater
Calculations prepared by Larson Engineering, Inc., dated February 7, 2023, received
February 10, 2023.
• Geotechnical Evaluation Report – Centennial Middle School Pavement Improvements
prepared by Braun Intertec, dated December 22, 2022, received February 10, 2023.
The following review comments should be responded to in writing by the applicant.
Engineering
• General
The plans include converting existing tennis courts to a parking lot and converting an
existing parking lot to tennis courts. All of the work proposed is within the 399 Elm Street
(Centennial Middle School) property.
Comments:
1. (3/1/2023) Applicant to verify if the concrete walk area by the existing tennis
courts/proposed parking lot is being removed and replaced. It is shown as
the same hatch on all sheets.
2. (3/1/2023) Applicant to verify if drain tile in the proposed tennis courts is low
enough to avoid conflicts with existing and rerouted electrical work.
3. (3/1/2023) Contractor to note that any tree removals may be impacted by the
U.S. Fish & Wildlife Service classification of the northern long-eared bat as
endangered. This classification may require that tree removal within the
project area not take place until after the new NLEB determination key is
Ms. Katie Larsen
03/01/2023
Page 2
399 Elm St (Centennial Middle School) Engineering Review
used to determine if further coordination with the USFWS is required. The
new NLEB determination key is expected to be released in early 2023.
• Grading
The plans include grading for the proposed tennis courts, the proposed parking lot, and an
infiltration basin.
Comments:
1. (3/1/2023) Staff recommends that the swale grade on east side of proposed
parking lot is increased to 2%.
• Stormwater Management
Stormwater from the existing tennis court area drains to the east and west of edges of the
existing tennis courts. Stormwater from the existing parking lot area drains to storm sewer
located in the northeast and southeast corners of the parking lot. The stormwater from both
areas ultimately drains through the 399 Elm Street site through private storm sewer to the
public pond.
The project is proposed to rehabilitate approximately 1.89 acres of impervious surface and
add new or reconstruct approximately 0.57 acres on the impervious area, according to the
Stormwater Management Report. The surface water from proposed improvements will still
ultimately flow to the existing pond, but the applicant is proposing to treat stormwater at the
proposed parking lot site through an infiltration basin. The proposed tennis courts include a
draintile system that outlets to existing private storm sewer.
A geotechnical evaluation report prepared by Braun Intertec was submitted with the
application. The report included soil borings which indicated that the native soils in the area
consist of very-fine to medium-grained sand and is locally silt-rich. Groundwater was not
observed in the borings.
The applicant used a HydroCAD model based on the Atlas 14, 24-hour storms to design the
storm sewer and infiltration basin. The proposed improvements are designed to reduce site
runoff rates for the 2-, 10-, and 100-year rainfall events. Runoff rates for the 10-day snow
melt event were not provided at this time and are not required as basin outlets are below the
100-year HWL.
Pre- and Post- Development Discharge Rates (cfs)
Condition 2-Year 10-Year 100-Year 10-Day Snowmelt
Existing 9.49 15.82 32.09 Not provided
Proposed 8.00 12.87 28.64 Not provided
Comments:
1. (3/1/2023) Staff recommends adding cleanouts to the tennis court drain tile
system.
2. (3/1/2023) For the pipe connection from FES-2 to the existing CB, applicant
to verify if they can feasibly core drill another 12” RC pipe into the structure
Ms. Katie Larsen
03/01/2023
Page 3
399 Elm St (Centennial Middle School) Engineering Review
at that angle to the existing pipe. Based on pipe sizes and the acute angle,
the minimum structure diameter is 48”.
3. (3/1/2023) Applicant to add contours to utility sheets.
4. (3/1/2023) Applicant to revise Pond 1 outlet pipe modeling in HydroCAD to
match proposed inverts in plans. Modeling the existing pipe to the
catchbasin in the bituminous trail is also recommended.
5. (3/1/2023) Applicant to revise HydroCAD modeling to not include exfiltration
in Pond 1.
6. (3/1/2023) Applicant to specify casting on STMH-1 structure.
7. (3/1/2023) Applicant to include silt fence around the infiltration basin surface
until final stabilization has been achieved to prevent sediment clogging of
basin.
8. (3/1/2023) Applicant to include silt fence around FES-2 until final
stabilization has been achieved to prevent sediment loading into the storm
sewer network.
• Water Supply
There is an existing 8-inch diameter ductile iron pipe (DIP) watermain along 4th Avenue that
serves the school. No changes to the water system are proposed at this time.
WSB staff does not have any comments at this time.
• Sanitary Sewer
There is an existing 10-inch diameter polyvinyl chloride (PVC) sanitary sewer along 4th
Avenue that serves the school. No changes to the sanitary sewer system are proposed at
this time.
WSB staff does not have any comments at this time.
• Transportation
The proposed improvements are completely within the 399 Elm Street (Centennial Middle
School) site and do not affect any public roadways or intersections. A traffic study is not
required. The proposed improvements are not anticipated to affect traffic volumes at the
site.
The proposed parking lot has two access points off of another parking area on the school
site. The entrances to the proposed parking lot and the drive lanes are all proposed to be
24-ft wide. All parking stalls are shown at 9 ft x 18 ft. The curb and gutter is proposed as a
B612 design along the north and west sides of the lot and a surmountable design along
the west and south sides of the lot. The parking lot has five handicap accessible stalls
proposed near the west entrance. A bituminous trail is proposed to be reconstructed and
realigned with the parking lot improvements. The existing parking lot has a total of 129
parking stalls and the proposed lot has 134 parking stalls.
New curb and gutter is proposed along the western edge of the proposed tennis court
area. Concrete sidewalk is proposed between the two court areas (four courts to the north
and four courts to the south). A bituminous trail is proposed to be reconstructed and
realigned with the tennis court improvements.
Ms. Katie Larsen
03/01/2023
Page 4
399 Elm St (Centennial Middle School) Engineering Review
Comments:
1. (3/1/2023) Applicant to add ADA compliant pedestrian ramps where the
trails cross or enter driveways or drive lanes. Crosswalk markings should be
included per the City Planner’s comments.
2. (3/1/2023) Sheet C200 shows that the bituminous patching along the new
curb line by the proposed tennis courts is the same section as the
bituminous trail. Applicant to confirm if the trail section is to be used for this
area of parking lot pavement.
• Wetlands and Mitigation Plan
There are no existing wetlands near the areas of construction. There are wetlands near
the pond where the stormwater from the site ultimately drains.
• Landscaping
The City’s Environmental Coordinator to review landscaping and provide in-depth
comments.
• Floodplain
There are no known existing floodplains on the 399 Elm Street (Centennial Middle School)
site.
• Drainage and Utility Easements
Both areas of work on located on the 399 Elm Street parcel (PID 18-31-22-44-0010). The
existing parcel is part of the Auditors Subdivision Number 54 plat. The survey does not
indicate any easements near the existing tennis court area (proposed parking lot area).
There is a public utility easement over 4th Avenue near the existing parking lot area
(proposed tennis court area).
The applicant is not proposing any changes to the plat at this time.
Comments:
1. (3/1/2023) Applicant to record drainage and utility easements around the
stormwater facilities. Easements shall extend 10-ft beyond the NWL per City
Code.
• Development Agreement
A Site Performance Agreement will be required.
• Grading Agreement
Grading agreement not required.
• Stormwater Maintenance Agreement
The stormwater facilities will be privately maintained and a Declaration for Maintenance of
Stormwater Facilities will be required. RCWD and the City of Lino Lakes shall be parties to
Ms. Katie Larsen
03/01/2023
Page 5
399 Elm St (Centennial Middle School) Engineering Review
the Declaration. The Declaration is to include the existing facilities on the entire school
property. City staff can help provide information on the existing facilities. Applicant and City
to coordinate with the Rice Creek W atershed District.
• Permits Required
1. NPDES General Construction Permit
2. City of Lino Lakes Zoning Permit for Grading
3. Rice Creek Watershed District Permit
If you or the applicant have any questions regarding these comments, please contact Kelsey
Gelhar at 612.709.4897 or kgelhar@wsbeng.com. You may also contact Diane Hankee at
651.982.2430 or dhankee@linolake.us.
Page 1
To: Katie Larsen
From: Andy Nelson
Date: March 1st, 2023
Re: Environmental staff comments/Centennial Middle School Tennis Court
Relocation and Parking Lot Addition
1. The City Tree Protection Fence Detail shall be added to the Details. Any
trees to be preserved must follow requirements in this detail. This may apply
to trees to the south of the proposed parking lot.
2. A note must be added to the erosion control blanket installation detail noting
that only natural net type erosion blanket will be used.
3. A second rock entrance should be added to the west entrance of the
proposed parking lot unless access through this entrance will be restricted.
Environmental Memo
111111122222222222567777793524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.com3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.0NORTH102040DRAWING NUMBERCPROJECT #1222066.000DRAWN BYDATE02-07-2023DRAWING TITLEDateRevision DescriptionDRAWINGSCONSTRUCTIONKK/JMJNCHECKED BYMADISON, WIMILWAUKEE, WIMAPLE GROVE, MNTHIS DRAWING IS PROPERTY OFNEXUS SOLUTIONS, LLC. USE OR REPRODUCTIONWITHOUT WRITTEN PERMISSION IS PROHIBITED.Nexus Solutions, LLCJUSTIN NIELSEN, P.E.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, ORREPORT WAS PREPARED BY ME OR UNDER MY DIRECTSUPERVISION AND THAT I AM A DULY LICENSEDPROFESSIONAL ENGINEER UNDER THE LAWS OF THESTATE OF MINNESOTA.PRINTED NAME:SIGNATURE:DATE: REG. NO.52687CENTENNIAL MIDDLE SCHOOL ISD#12TENNIS COURT RELOCATIONAND PARKING LOT ADDITION399 ELM STREETLINO LAKES, MN 5501402/07/2023P:\Projects\Projects - 2022\12226066 - Centennial MS Tennis Courts\C. Design\Drawing Files\12226066 C100-C101 - Demo.dwgDEMOLITION NOTES1.Verify all existing utility locations.2.It is the responsibility of the Contractor to perform or coordinate all necessaryutility demolitions and relocations from existing utility locations to all onsiteamenities and buildings. These connections include, but are not limited to,water, sanitary sewer, cable tv, telephone, gas, electric, site lighting, etc.3.Prior to beginning work, contact Gopher State Onecall (651-454-0002) tolocate utilities throughout the area under construction. The Contractor shallretain the services of a private utility locator to locate the private utilities.4.Sawcut along edges of pavements, sidewalks, and curbs to remain.5.All construction shall be performed in accordance with state and localstandard specifications for construction.C100TENNIS COURTRELOCATIONDEMOLITION PLANRECLAIM EXISTING BITUMINOUSPAVEMENT SECTION(TO A DEPTH OF 8")REMOVE AND DISPOSE OF EXISTINGCONCRETE PAVEMENT SECTIONSYMBOL LEGENDKEY NOTESREMOVE AND DISPOSE OF EXISTING CONCRETE CURB AND GUTTER.REMOVE AND DISPOSE OF EXISTING TREE, STUMP, AND ROOTS.REMOVE AND DISPOSE OF EXISTING FENCE INCLUDING ALL FABRIC,POSTS, GATES, MOWSTRIPS, AND FOOTINGS.REMOVE AND DISPOSE OF EXISTING TENNIS NET POSTS ANDFOOTINGS.REMOVE AND DISPOSE OF EXISTING STORM SEWER PIPE AND/ORSTRUCTURE.REMOVE AND DISPOSE OF EXISTING MANHOLE CASTING ANDADJUSTMENT RINGS.REMOVE AND SALVAGE EXISTING LIGHT POLE. REMOVE ANDDISPOSE OF EXISTING CONCRETE BASE/FOOTING, AND RELATEDCONDUIT/WIRING. COORD. WITH ELECTRICAL.CLEAR AND GRUB AS NEEDED FOR CONSTRUCTION.BULKHEAD PIPE STUB OR FILL OPENING IN THE EXISTINGSTRUCTURE WITH BRICK AND MOTOR.12345678NOT TO SCALEKEY PLAN9
5511223333333333444444448883524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.com3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.0NORTH102040DRAWING NUMBERCPROJECT #1222066.000DRAWN BYDATE02-07-2023DRAWING TITLEDateRevision DescriptionDRAWINGSCONSTRUCTIONKK/JMJNCHECKED BYMADISON, WIMILWAUKEE, WIMAPLE GROVE, MNTHIS DRAWING IS PROPERTY OFNEXUS SOLUTIONS, LLC. USE OR REPRODUCTIONWITHOUT WRITTEN PERMISSION IS PROHIBITED.Nexus Solutions, LLCJUSTIN NIELSEN, P.E.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, ORREPORT WAS PREPARED BY ME OR UNDER MY DIRECTSUPERVISION AND THAT I AM A DULY LICENSEDPROFESSIONAL ENGINEER UNDER THE LAWS OF THESTATE OF MINNESOTA.PRINTED NAME:SIGNATURE:DATE: REG. NO.52687CENTENNIAL MIDDLE SCHOOL ISD#12TENNIS COURT RELOCATIONAND PARKING LOT ADDITION399 ELM STREETLINO LAKES, MN 5501402/07/2023P:\Projects\Projects - 2022\12226066 - Centennial MS Tennis Courts\C. Design\Drawing Files\12226066 C100-C101 - Demo.dwgC101PARKING LOTADDITIONDEMOLITION PLANSYMBOL LEGENDDEMOLITION NOTES1.See Sheet C100 for Demolition Notes.KEY NOTESRECLAIM EXISTING BITUMINOUSPAVEMENT SECTION(TO A DEPTH OF 8")REMOVE AND DISPOSE OF EXISTINGCONCRETE PAVEMENT SECTION12345678REMOVE AND DISPOSE OF EXISTING CONCRETE CURB AND GUTTER.REMOVE AND DISPOSE OF EXISTING TREE, STUMP, AND ROOTS.REMOVE AND DISPOSE OF EXISTING FENCE INCLUDING ALL FABRIC,POSTS, GATES, MOWSTRIPS, AND FOOTINGS.REMOVE AND DISPOSE OF EXISTING TENNIS NET POSTS ANDFOOTINGS.REMOVE AND DISPOSE OF EXISTING STORM SEWER PIPE AND/ORSTRUCTURE.REMOVE AND DISPOSE OF EXISTING MANHOLE CASTING ANDADJUSTMENT RINGS.REMOVE AND SALVAGE EXISTING LIGHT POLE. REMOVE ANDDISPOSE OF EXISTING CONCRETE BASE/FOOTING, AND RELATEDCONDUIT/WIRING. COORD. WITH ELECTRICAL.CLEAR AND GRUB AS NEEDED FOR CONSTRUCTION.BULKHEAD PIPE STUB OR FILL OPENING IN THE EXISTINGSTRUCTURE WITH BRICK AND MOTOR.9NOT TO SCALEKEY PLAN
13'8'11166788889(TYP. OF 4)9(TYP. OF 4)10(TYP. OF 4)10(TYP. OF 4)1111111111118'3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.com3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.0NORTH102040DRAWING NUMBERCPROJECT #1222066.000DRAWN BYDATE02-07-2023DRAWING TITLEDateRevision DescriptionDRAWINGSCONSTRUCTIONKK/JMJNCHECKED BYMADISON, WIMILWAUKEE, WIMAPLE GROVE, MNTHIS DRAWING IS PROPERTY OFNEXUS SOLUTIONS, LLC. USE OR REPRODUCTIONWITHOUT WRITTEN PERMISSION IS PROHIBITED.Nexus Solutions, LLCJUSTIN NIELSEN, P.E.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, ORREPORT WAS PREPARED BY ME OR UNDER MY DIRECTSUPERVISION AND THAT I AM A DULY LICENSEDPROFESSIONAL ENGINEER UNDER THE LAWS OF THESTATE OF MINNESOTA.PRINTED NAME:SIGNATURE:DATE: REG. NO.52687CENTENNIAL MIDDLE SCHOOL ISD#12TENNIS COURT RELOCATIONAND PARKING LOT ADDITION399 ELM STREETLINO LAKES, MN 5501402/07/2023P:\Projects\Projects - 2022\12226066 - Centennial MS Tennis Courts\C. Design\Drawing Files\12226066 C200-C201 - Paving.dwgC200TENNIS COURTRELOCATIONPAVING PLANSYMBOL LEGENDKEY NOTESKEY NOTESTENNIS COURT PAVING(OVER RECLAIMED AREA)SEE DETAIL 4/C500TENNIS COURT PAVING(NEW AREA)SEE DETAIL 5/C500NEW BITUMINOUS TRAILPAVEMENTSEE DETAIL 3/C500NEW CONCRETEPAVEMENTSEE DETAIL 6/C500SAWCUT CONTROL JOINTSEE DETAIL 4/C500 & 5/C500NEW LIGHT POLE,SEE ELECTRICAL PLANNOTE: THE CONCRETE JOINTS ARE SHOWN ONLY FORGENERAL REFERENCE TO SIGNIFY CONCRETEPAVEMENT. ACTUAL JOINTS SHALL BE CONSTRUCTEDPER PROJECT SPECIFICATIONS.NEW B612 CURB AND GUTTER, SEE DETAIL 7/C500NEW SURMOUNTABLE CURB AND GUTTER, SEE DETAIL 8/C500NEW B612 CURB CUT, SEE DETAIL 9/C500NEW SURMOUNTABLE CURB CUT, SEE DETAIL 10/C500TRANSITION CURB FROM B612 TO SURMOUNTABLE OVER 5 FEETNEW DOUBLE SWING FENCE GATE, SEE DETAIL 2/C501NEW SINGLE SWING FENCE GATE, SEE DETAIL 11/C500NEW TENNIS COURT FENCE ACCESS, SEE DETAIL 12/C500NEW TENNIS COURT NET POST AND ANCHOR, SEE DETAIL 15/C500TENNIS COURT STRIPING AND PICKLEBALL STRIPING LAYOUT, SEE DETAIL 13/C500 & 14/C500NEW CHAIN-LINK FENCE, SEE DETAIL 1/C501NEW WOOD FENCE, SEE DETAIL 4/C501NEW ADA PARKING SIGN AND BOLLARD DETAIL, SEE DETAIL 7/C50112345678910111213NOT TO SCALEKEY PLAN
24'24'18'24'18'18'24'
18'9'9'18'9'18'24'24'(TYP.)(TYP.)
(TYP.)8'9.5'
8'19.9'19.8'8'111111122233445512121213TYPICAL OF 8(5 ADA PARKING STALL SIGN)(3 ACCESS AISLE SIGN)123524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.com3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.0NORTH102040DRAWING NUMBERCPROJECT #1222066.000DRAWN BYDATE02-07-2023DRAWING TITLEDateRevision DescriptionDRAWINGSCONSTRUCTIONKK/JMJNCHECKED BYMADISON, WIMILWAUKEE, WIMAPLE GROVE, MNTHIS DRAWING IS PROPERTY OFNEXUS SOLUTIONS, LLC. USE OR REPRODUCTIONWITHOUT WRITTEN PERMISSION IS PROHIBITED.Nexus Solutions, LLCJUSTIN NIELSEN, P.E.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, ORREPORT WAS PREPARED BY ME OR UNDER MY DIRECTSUPERVISION AND THAT I AM A DULY LICENSEDPROFESSIONAL ENGINEER UNDER THE LAWS OF THESTATE OF MINNESOTA.PRINTED NAME:SIGNATURE:DATE: REG. NO.52687CENTENNIAL MIDDLE SCHOOL ISD#12TENNIS COURT RELOCATIONAND PARKING LOT ADDITION399 ELM STREETLINO LAKES, MN 5501402/07/2023P:\Projects\Projects - 2022\12226066 - Centennial MS Tennis Courts\C. Design\Drawing Files\12226066 C200-C201 - Paving.dwgC201PARKING LOTADDITIONPAVING PLANSYMBOL LEGENDKEY NOTESKEY NOTESNOTE: THE CONCRETE JOINTS ARE SHOWN ONLY FORGENERAL REFERENCE TO SIGNIFY CONCRETEPAVEMENT. ACTUAL JOINTS SHALL BE CONSTRUCTEDPER PROJECT SPECIFICATIONS.NEW BITUMINOUS PAVEMENT(OVER RECLAIMED AREA)SEE DETAIL 1/C500NEW BITUMINOUS PAVEMENTSEE DETAIL 2/C500NEW BITUMINOUS TRAILPAVEMENTSEE DETAIL 3/C500NEW CONCRETEPAVEMENTSEE DETAIL 6/C500SAWCUT CONTROL JOINTSEE DETAIL 4/C500 & 5/C500NEW LIGHT POLE,SEE ELECTRICAL PLANNEW B612 CURB AND GUTTER, SEE DETAIL 7/C500NEW SURMOUNTABLE CURB AND GUTTER, SEE DETAIL 8/C500NEW B612 CURB CUT, SEE DETAIL 9/C500NEW SURMOUNTABLE CURB CUT, SEE DETAIL 10/C500TRANSITION CURB FROM B612 TO SURMOUNTABLE OVER 5 FEETNEW DOUBLE SWING FENCE GATE, SEE DETAIL 2/C501NEW SINGLE SWING FENCE GATE, SEE DETAIL 11/C500NEW TENNIS COURT FENCE ACCESS, SEE DETAIL 12/C500NEW TENNIS COURT NET POST AND ANCHOR, SEE DETAIL 15/C500TENNIS COURT STRIPING AND PICKLEBALL STRIPING LAYOUT, SEE DETAIL 13/C500 & 14/C500NEW CHAIN-LINK FENCE, SEE DETAIL 1/C501NEW WOOD FENCE, SEE DETAIL 4/C501NEW ADA PARKING SIGN AND BOLLARD DETAIL, SEE DETAIL 7/C50112345678910111213NOT TO SCALEKEY PLAN
0.45%2.0%0.85%2.0%0.85%2.0%0.85%2.0%0.85%2.0%0.85%2.0%0.85%0.45%0.45%0.45%0.45%0.45%
0.45%0.45%903.7 TC*903.2 GL*903.6 TC*903.1 GL*903.5 TC*903.0 GL*903.4 TC*902.9 GL*905.0 TC*904.5 GL*905.9 TC*905.4 GL*905.82 TC/GL904.00 C904.00 C/B904.54 C904.54 C905.73 C905.73 C906.27 C906.27 C905.90 TC905.40 GL906.05 TC905.55 GL903.87 B904.41 B904.41 C/B903.87 B906905905904904905906905904904903905
906.30 TC905.80 GL906.30 TC905.80 GL43524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.com3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.0NORTH102040DRAWING NUMBERCPROJECT #1222066.000DRAWN BYDATE02-07-2023DRAWING TITLEDateRevision DescriptionDRAWINGSCONSTRUCTIONKK/JMJNCHECKED BYMADISON, WIMILWAUKEE, WIMAPLE GROVE, MNTHIS DRAWING IS PROPERTY OFNEXUS SOLUTIONS, LLC. USE OR REPRODUCTIONWITHOUT WRITTEN PERMISSION IS PROHIBITED.Nexus Solutions, LLCJUSTIN NIELSEN, P.E.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, ORREPORT WAS PREPARED BY ME OR UNDER MY DIRECTSUPERVISION AND THAT I AM A DULY LICENSEDPROFESSIONAL ENGINEER UNDER THE LAWS OF THESTATE OF MINNESOTA.PRINTED NAME:SIGNATURE:DATE: REG. NO.52687CENTENNIAL MIDDLE SCHOOL ISD#12TENNIS COURT RELOCATIONAND PARKING LOT ADDITION399 ELM STREETLINO LAKES, MN 5501402/07/2023P:\Projects\Projects - 2022\12226066 - Centennial MS Tennis Courts\C. Design\Drawing Files\12226066 C300-C301 - Grading.dwgLEGEND1.See Sheet C301 for Erosion Control Notes.EROSION CONTROL NOTESGRADING NOTESTENNIS COURTRELOCATIONGRADING AND EROSIONCONTROL PLANC300PROPOSED CONTOURS - MAJOR INTERVALGRADE BREAK LINEPROPOSED CONTOURS - MINOR INTERVAL949950950EXISTING CONTOURS2.0%950.00 TC949.50 GLGRADE SLOPESPOT ABBREVIATIONS:SEDIMENT LOG, SEE DETAIL 12/C501RIP-RAP / ROCK CONST. ENTRANCEINLET PROTECTION, SEE DETAIL 11/C501CONCRETE WASHOUT STATION(LOCATE DURING CONSTRUCTION)TC - TOP OF CURBGL - GUTTER LINEB - BITUMUNOUSC - CONCRETEOF - OVERFLOWTW - TOP OF WALLBW - BOTTOM OF WALL (F/G)(*) - EXISTING TO BE VERIFIEDTS - TOP OF STEPBS - BOTTOM OF STEPEROSION CONTROL BLANKET, SEE DETAIL 13/C501KEY NOTESKEY NOTESRIP RAP AT CURB CUT, SEE DETAIL 9/C501RIP RAP AT RAIN GUARDIAN STRUCTURE, SEE DETAIL 2/C502INFILTRATION BASIN, SEE DETAIL 1/C502ROCK CONSTRUCTION ENTRANCE, SEE DETAIL 8/C50112341.See Sheet C301 for Grading Notes.NOT TO SCALEKEY PLAN
905.00 GL908.21 TC907.71 GL908.87 B908.09 B908.21 TC907.71 GL905.00 CC905.00 CC905.60 TC905.10 GL904.29 B904.39 B905.47 TC905.17 GL906.17 TC905.67 GL905.54 TC/GL905.17 TC/GL906.22 TC905.72 GL905.60 TC/GL905.21 TC/GL906.22 TC905.72 GL905.69 TC/GL905.37 TC/GL905.30 TC*904.80 GL*905.34 TC*904.84 GL*906.34 TC905.84 GL905.75 TC/GL905.37 TC/GL906.65 TC906.15 GL906.27 TC905.77 GL906.15 TC905.65 GL906.36 TC905.86 GL906.04 TC905.54 GL904.6 B/EOF*904.5 B*905.32 B905.29 B905.55 TC905.05 GL905.2 B905.72 B906.10 B905.60 TC905.10 GL906.10 TC905.60 GL906.41 TC905.91 GL905.81 TC905.31 GL906.10 TC905.60 GL906.30 TC*905.80 GL*905.90 TC*905.40 GL*904.6 C/B*904.72 B905.3 B/C*904.3 B*904.3 B*906.60 TC906.10 GLINFILTRATION BASIN 1100-YR HWL = 904.45BTM = 902.00906.68 TC/GL906.98 B907.36 TC906.89 GL907.36 B906.80 B905.80 B905.00 GL906.03 TC905.73 GL906.95 TC906.45 GL906.76 TC906.26 GL907.39 TC906.89 GL907.01 TC906.51 GL907.02 TC906.52 GL906.69 TC906.19 GL906.85 TC906.35 GL906.85 TC906.35 GL906.64 TC906.14 GL906.64 TC906.14 GL907.02 TC906.52 GL906.69 TC906.19 GL904906907908 907907906908906907907906906 906906906906905905905905906906908
9029039049072% MAX SLOPE INADA PARKING AREAFOR THE INFILTRATION BASIN BOTTOM,OVER-EXCAVATE APPROX. 1.7' - 2'TO REMOVE EXISTING TOPSOIL FILLMATERIAL. BACKFILL WITH A CLEAN,FREE DRAINING MATERIAL GRADEDACCORDING TO MEET MN/DOT 3149.2JSPECIFICATIONS.1122343524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.com3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.0NORTH102040DRAWING NUMBERCPROJECT #1222066.000DRAWN BYDATE02-07-2023DRAWING TITLEDateRevision DescriptionDRAWINGSCONSTRUCTIONKK/JMJNCHECKED BYMADISON, WIMILWAUKEE, WIMAPLE GROVE, MNTHIS DRAWING IS PROPERTY OFNEXUS SOLUTIONS, LLC. USE OR REPRODUCTIONWITHOUT WRITTEN PERMISSION IS PROHIBITED.Nexus Solutions, LLCJUSTIN NIELSEN, P.E.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, ORREPORT WAS PREPARED BY ME OR UNDER MY DIRECTSUPERVISION AND THAT I AM A DULY LICENSEDPROFESSIONAL ENGINEER UNDER THE LAWS OF THESTATE OF MINNESOTA.PRINTED NAME:SIGNATURE:DATE: REG. NO.52687CENTENNIAL MIDDLE SCHOOL ISD#12TENNIS COURT RELOCATIONAND PARKING LOT ADDITION399 ELM STREETLINO LAKES, MN 5501402/07/2023P:\Projects\Projects - 2022\12226066 - Centennial MS Tennis Courts\C. Design\Drawing Files\12226066 C300-C301 - Grading.dwgLEGENDGRADING NOTESPARKING LOT ADDITIONGRADING AND EROSIONCONTROL PLANC3011.Owner and Contractor shall obtain MPCA-NPDES permit.Contractor shall be responsible for all fees pertaining to thispermit. The SWPPP shall be kept onsite at all times.2.Install temporary erosion control measures (inlet protection,silt fence, and rock construction entrances) prior tobeginning any excavation or demolition work at the site.3.Erosion control measures shown on the erosion control planare the absolute minimum. The contractor shall installtemporary earth dikes, sediment traps or basins, additionalsiltation fencing, and/or disk the soil parallel to the contoursas deemed necessary to further control erosion. Allchanges shall be recorded in the SWPPP.4.All construction site entrances shall be surfaced withcrushed rock across the entire width of the entrance andfrom the entrance to a point 50' into the construction zone.5.The toe of the silt fence shall be trenched in a minimum of6”. The trench backfill shall be compacted with a vibratoryplate compactor.6.All grading operations shall be conducted in a manner tominimize the potential for site erosion. Sediment controlpractices must be established on all down gradientperimeters before any up gradient land disturbing activitiesbegin.7.All exposed soil areas must be stabilized as soon aspossible to limit soil erosion but in no case later than 7 daysafter the construction activity in that portion of the site hastemporarily or permanently ceased. Temporary stockpileswithout significant silt, clay or organic components (e.g.,clean aggregate stockpiles, demolition concrete stockpiles,sand stockpiles) and the constructed base components ofroads, parking lots and similar surfaces are exempt from thisrequirement.8.All storm sewer catch basins not needed for site drainageduring construction shall be covered to prevent runoff fromentering the storm sewer system. Catch basins necessaryfor site drainage during construction shall be provided withinlet protection.9.In areas where concentrated flows occur (such as swalesand areas in front of storm catch basins and intakes) theerosion control facilities shall be backed by stabilizationstructure to protect those facilities from the concentratedflows.10.Inspect the construction site once every seven days duringactive construction and within 24 hours after a rainfall eventgreater than 0.5 inches in 24 hours. All inspections shall berecorded in the SWPPP.11.All silt fences must be repaired, replaced, or supplementedwhen they become nonfunctional or the sediment reaches1/3 of the height of the fence. These repairs must be madewithin 24 hours of discovery, or as soon as field conditionsallow access. All repairs shall be recorded in the SWPPP.12.If sediment escapes the construction site, off-siteaccumulations of sediment must be removed in a mannerand at a frequency sufficient to minimize off-site impacts.13.All soils tracked onto pavement shall be removed daily.14.All infiltration areas must be inspected to ensure that nosediment from ongoing construction activity is reaching theinfiltration area and these areas are protected fromcompaction due to construction equipment driving acrossthe infiltration area.15.Temporary soil stockpiles must have silt fence or othereffective sediment controls, and cannot be placed in surfacewaters, including stormwater conveyances such as curb andgutter systems, or conduits and ditches unless there is abypass in place for the stormwater.16.Collected sediment, asphalt and concrete millings, floatingdebris, paper, plastic, fabric, construction and demolitiondebris and other wastes must be disposed of properly andmust comply with MPCA disposal requirements.17.Oil, gasoline, paint and any hazardous substances must beproperly stored, including secondary containment, to preventspills, leaks or other discharge. Restricted access tostorage areas must be provided to prevent vandalism.Storage and disposal of hazardous waste must be incompliance with MPCA regulations.18.External washing of trucks and other construction vehiclesmust be limited to a defined area of the site. Runoff must becontained and waste properly disposed of. No enginedegreasing is allowed onsite.19.All liquid and solid wastes generated by concrete washoutoperations must be contained in a leak-proof containmentfacility or impermeable liner. A compacted clay liner thatdoes not allow washout liquids to enter ground water isconsidered an impermeable liner. The liquid and solidwastes must not contact the ground, and there must not berunoff from the concrete washout operations or areas.Liquid and solid wastes must be disposed of properly and incompliance with MPCA regulations. A sign must be installedadjacent to each washout facility to inform concreteequipment operators to utilize the proper facilities.20.Upon completion of the project and stabilization of all gradedareas, all temporary erosion control facilities (silt fences, haybales, etc.) shall be removed from the site.21.Contractor shall submit Notice of Termination forMPCA-NPDES permit within 30 days after FinalStabilization.EROSION CONTROL NOTESPROPOSED CONTOURS - MAJOR INTERVALGRADE BREAK LINEPROPOSED CONTOURS - MINOR INTERVAL949950950EXISTING CONTOURS2.0%950.00 TC949.50 GLGRADE SLOPESPOT ABBREVIATIONS:SEDIMENT LOGRIP-RAP / ROCK CONST. ENTRANCEINLET PROTECTIONCONCRETE WASHOUT STATION(LOCATE DURING CONSTRUCTION)TC - TOP OF CURBGL - GUTTER LINEB - BITUMUNOUSC - CONCRETEOF - OVERFLOWTW - TOP OF WALLBW - BOTTOM OF WALL (F/G)(*) - EXISTING TO BE VERIFIEDTS - TOP OF STEPBS - BOTTOM OF STEPEROSION CONTROL BLANKETKEY NOTESKEY NOTESRIP RAP AT CURB CUT, SEE DETAIL 9/C501RIP RAP AT RAIN GUARDIAN STRUCTURE, SEE DETAIL 2/C502INFILTRATION BASIN, SEE DETAIL 1/C502ROCK CONSTRUCTION ENTRANCE, SEE DETAIL 8/C50112341.Tree protection consisting of snow fence or safety fence installed at thedrip line shall be in place prior to beginning any grading or demolitionwork at the site.2.All elevations with an asterisk (*) shall be field verified. If elevationsvary significantly, notify the Engineer for further instructions.3.Grades shown in paved areas represent finish elevation.4.Restore all disturbed areas with 4” of good quality topsoil and seed.5.All construction shall be performed in accordance with state and localstandard specifications for construction.6.Provide an as-built survey of the infiltration basin, showingcompliance with the project documents.NOT TO SCALEKEY PLAN
3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.com3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.0NORTH102040DRAWING NUMBERCPROJECT #1222066.000DRAWN BYDATE02-07-2023DRAWING TITLEDateRevision DescriptionDRAWINGSCONSTRUCTIONKK/JMJNCHECKED BYMADISON, WIMILWAUKEE, WIMAPLE GROVE, MNTHIS DRAWING IS PROPERTY OFNEXUS SOLUTIONS, LLC. USE OR REPRODUCTIONWITHOUT WRITTEN PERMISSION IS PROHIBITED.Nexus Solutions, LLCJUSTIN NIELSEN, P.E.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, ORREPORT WAS PREPARED BY ME OR UNDER MY DIRECTSUPERVISION AND THAT I AM A DULY LICENSEDPROFESSIONAL ENGINEER UNDER THE LAWS OF THESTATE OF MINNESOTA.PRINTED NAME:SIGNATURE:DATE: REG. NO.52687CENTENNIAL MIDDLE SCHOOL ISD#12TENNIS COURT RELOCATIONAND PARKING LOT ADDITION399 ELM STREETLINO LAKES, MN 5501402/07/2023P:\Projects\Projects - 2022\12226066 - Centennial MS Tennis Courts\C. Design\Drawing Files\12226066 C600-C601 - Landscape.dwgC600TENNIS COURTRELOCATIONLANDSCAPE PLANLANDSCAPING NOTES1.Landscape Contractor is responsible for coordination with other contractors toprotect the new improvements during landscape work activities. Report anydamage to the Construction Manager immediately.2.Plant size and species substitutions must be approved in writing prior toacceptance in the field.3.Landscape Contractor is responsible for ongoing maintenance of all newlyinstalled material until time of owner acceptance. Any acts of vandalism ordamage which may occur prior to owner acceptance shall be the responsibility ofthe contractor. Contractor shall provide the owner with a maintenance programincluding, but not limited to, pruning, fertilization and disease/pest control.4.Landscape Contractor shall provide the owner with a watering scheduleappropriate to the project site conditions and to plant material growthrequirements.5.Landscape Contractor shall guarantee newly planted material through onecalendar year from the date of written owner acceptance. Plants that exhibit morethan 10% die-back damage shall be replaced at no additional cost to the owner.The contractor shall also provide adequate tree wrap and deer/rodent protectionmeasures for the plantings during the warranty period.6.All trees not planted in landscaped areas shall have shredded hardwood mulchplaced around the tree at 4' diameter and 6" deep.7.Restore all disturbed turf areas with 4" of good quality topsoil and seed, asindicated. Topsoil shall not be placed in infiltration basin. For infiltration basin arearefer to detail 1/C502 for construction and restoration.SYMBOL LEGENDSEED, ALL DISTURBED AREAS (MNDOT MIX #25-131)TOTAL AREA:10,676 SQUARE FEETNOT TO SCALEKEY PLAN
3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.com3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.0NORTH102040DRAWING NUMBERCPROJECT #1222066.000DRAWN BYDATE02-07-2023DRAWING TITLEDateRevision DescriptionDRAWINGSCONSTRUCTIONKK/JMJNCHECKED BYMADISON, WIMILWAUKEE, WIMAPLE GROVE, MNTHIS DRAWING IS PROPERTY OFNEXUS SOLUTIONS, LLC. USE OR REPRODUCTIONWITHOUT WRITTEN PERMISSION IS PROHIBITED.Nexus Solutions, LLCJUSTIN NIELSEN, P.E.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, ORREPORT WAS PREPARED BY ME OR UNDER MY DIRECTSUPERVISION AND THAT I AM A DULY LICENSEDPROFESSIONAL ENGINEER UNDER THE LAWS OF THESTATE OF MINNESOTA.PRINTED NAME:SIGNATURE:DATE: REG. NO.52687CENTENNIAL MIDDLE SCHOOL ISD#12TENNIS COURT RELOCATIONAND PARKING LOT ADDITION399 ELM STREETLINO LAKES, MN 5501402/07/2023P:\Projects\Projects - 2022\12226066 - Centennial MS Tennis Courts\C. Design\Drawing Files\12226066 C600-C601 - Landscape.dwgC601PARKING LOTADDITIONLANDSCAPE PLANPARKING LOT LANDSCAPINGTOTAL PARKING=134 STALLSCANOPY COVER :42,662 SF (VEHICLE HARDSCAPE) X 0.4= 17,064 SQUARE FEET (REQUIRED)INTERIOR ISLANDS (6 TREES @ 1200 SF)= 7,200 SQUARE FEETINTERIOR ISLANDS (2 TREES @ 950 SF)= 1,900 SQUARE FEETWITHIN 7' OF HARDSCAPE (11 TREES @ 600 SF)= 6,600 SQUARE FEETEXISTING 12+ DBH WITHIN 7' OF HARDSCAPE = 1,425 SQUARE FEETTOTAL PROVIDED= 17,125 SQUARE FEETLANDSCAPING NOTES1.Landscape Contractor is responsible for coordination with other contractors toprotect the new improvements during landscape work activities. Report anydamage to the Construction Manager immediately.2.Plant size and species substitutions must be approved in writing prior toacceptance in the field.3.Landscape Contractor is responsible for ongoing maintenance of all newlyinstalled material until time of owner acceptance. Any acts of vandalism ordamage which may occur prior to owner acceptance shall be the responsibility ofthe contractor. Contractor shall provide the owner with a maintenance programincluding, but not limited to, pruning, fertilization and disease/pest control.4.Landscape Contractor shall provide the owner with a watering scheduleappropriate to the project site conditions and to plant material growthrequirements.5.Landscape Contractor shall guarantee newly planted material through onecalendar year from the date of written owner acceptance. Plants that exhibit morethan 10% die-back damage shall be replaced at no additional cost to the owner.The contractor shall also provide adequate tree wrap and deer/rodent protectionmeasures for the plantings during the warranty period.6.All trees not planted in landscaped areas shall have shredded hardwood mulchplaced around the tree at 4' diameter and 6" deep.7.Restore all disturbed turf areas with 4" of good quality topsoil and seed, asindicated. Topsoil shall not be placed in infiltration basin. For infiltration basin arearefer to detail 1/C502 for construction and restoration.Sienna Glen MapleAcer x freemanii 'sienna'2-1/2" CalB & BTREE PLANTING SCHEDULECOMMON NAMEBOTANICAL NAMESIZECONTAINERQTY10DECIDUOUS TREES-Autumn Blaze MapleAcer x freemanii 'jeffersred'2-1/2" CalB & B5-B & BSwamp White Oak4-2-1/2" CalQuercus bicolorBlack Hills SprucePicea glauca densata6' Min.B & B8CONIFEROUS TREES-Highbush CranberryViburnum trilobumNo. 3POTSHRUB PLANTING SCHEDULECOMMON NAMEBOTANICAL NAMESIZECONTAINERQTY14-Isanti DogwoodCornus sericea 'Isanti'No. 3POT14-NOT TO SCALETREE PLANTING DETAILXC601EQUALS TWICE BALLDIAMETER12"MIN.18"MIN.OPTIONAL STAKINGMETHOD - 6' METALPOSTS AND RUBBERHOSE STRAPSHOSE LOOPS3 GUYS EACH OF10 GAUGE TWISTEDWIRE 120 DEGREESAPART AROUND TREECOLOREDFLAGS1 PER WIRETURNBUCKLE6" DEEP MULCH, HOLDBACK 2" FROM STEM.SOD24" STAKE TYP.PLACE PLANTINGMEDIUM SOILSFOLD BACKBURLAP ANDREMOVE ALLTIES &/ORWIRES FROMTOP OF BALLSCARIFY ALL SIDESAND BOTTOM OFEXCAVATED HOLEDECIDUOUS TREEAS PER SCHEDULECONIFEROUS TREEAS PER SCHEDULEPREPARE SOIL IN THE ENTIRE BED8" TO 12"CUT WEED BARRIER FABRICTHE MINIMUM NEEDED FORPLANTING.CONTAINER-GROWN PLANTWITH ROOTS PULLED OUT OF BALL -COMPLETLY REMOVE CONTAINER.BALLED AND BURLAPPED PLANT REFER ALSO TOSPECIFICATIONS FOLD BACK BURLAP AND REMOVE ALLTIES &/OR WIRES FROM TOP OF BALL.FOLD BURLAP FROM TOP OFROOT BALL DOWN INTO GROUND;SET TOP OF BALL SLIGHTLYABOVE FINISH GRADE4" DEEP MULCH (DO NOTPUT MULCH AGAINSTTHE BASE OF THE PLANT)12" TO 18" (FORLARGER SHRUBROOT BALLS,MAKE DEPTHMIN. 4" DEEPERTHAN BALL)SCARIFY ALL FACES AND BOTTOM OFEXCAVATED HOLEPLACE PLANTING MEDIUM SOILSNOTES1. FOR CONTAINER-GROWN SHRUBS, USE FINGERS OR SMALLHAND TOOLS TO PULL THE ROOTS OUT OF THE OUTER LAYEROF POTTING SOIL; THEN CUT OR PULL APART ANY ROOTS THATCIRCLE THE PERIMETER OF THE CONTAINER.2. INCORPORATE COMMERCIALLY PREPARED MYCORRHIZASPORES IN THE SOIL IMMEDIATELY AROUND THE ROOT BALLAT RATES SPECIFIED BY THE MANUFACTURER.3. CONFIRM THAT WATER DRAINS OUT OF THE SOIL DURINGTHE PLACEMENT PHASE; ALTER DRAINAGE SYSTEMS ASREQUIRED.4. IF PLANTS ARE TO BE PRUNED, BRANCHES SHALL BEPRUNED AT THE BRANCH BARK RIDGE, NOT FLUSH WITH THEBARK.NOT TO SCALESHRUB PLANTING DETAILXC601SYMBOL LEGENDSTORMWATER SEED MIX (MNDOT MIX #33-261)TOTAL AREA:2,668 SQUARE FEETSEED, ALL DISTURBED AREAS (MNDOT MIX #25-131)TOTAL AREA:23,350 SQUARE FEETNOT TO SCALEKEY PLAN
NO PARKINGNO PARKINGNO PARKINGAA5(E)(E)AA51.51.41.21.00.90.80.80.90.90.91.01.01.01.01.01.01.11.11.11.11.01.01.01.01.01.00.90.90.91.01.01.11.21.41.41.21.81.71.61.31.11.01.01.11.11.21.31.41.31.31.21.21.21.31.31.21.21.21.31.31.31.31.21.11.11.11.21.41.61.71.81.72.22.12.01.61.21.01.11.21.31.51.61.71.71.61.41.31.31.41.41.31.31.41.51.71.71.61.51.31.21.21.41.72.02.12.22.03.12.62.21.71.21.01.11.31.51.72.02.12.01.81.61.51.41.41.41.41.51.61.82.02.12.01.71.51.31.31.41.82.32.53.12.63.22.82.31.71.21.11.21.41.72.02.22.32.22.11.91.61.51.41.41.51.61.92.12.22.32.22.01.71.41.31.41.82.32.63.23.13.32.82.31.71.21.11.21.51.82.12.32.12.22.32.01.71.51.51.51.51.72.02.22.22.12.32.11.91.51.41.51.82.32.73.34.33.32.82.21.71.21.11.21.51.92.12.32.12.22.22.01.71.51.51.51.51.72.02.32.22.12.32.21.91.51.41.51.92.32.73.34.43.12.72.31.71.21.01.21.41.72.02.22.32.32.11.91.61.51.51.51.51.61.92.12.22.32.22.01.81.51.31.41.82.32.73.23.23.02.62.21.71.21.11.11.31.51.82.02.12.11.91.71.51.41.41.41.41.51.71.92.12.12.01.81.61.41.31.51.92.42.63.22.62.12.11.91.51.21.11.11.21.31.51.71.81.81.61.51.41.41.41.41.41.41.51.61.81.81.71.61.41.31.31.51.82.12.22.32.11.81.71.51.31.11.01.11.11.21.31.41.51.41.41.41.31.31.41.41.31.31.31.41.41.51.41.31.31.21.31.41.61.81.92.01.81.41.31.21.00.90.90.91.01.11.21.31.31.31.31.31.31.31.31.21.21.11.11.11.11.21.21.21.21.31.31.31.41.61.71.71.50.10.10.10.10.10.10.10.10.00.00.00.00.00.00.00.00.00.10.10.10.10.00.00.00.00.00.00.00.00.00.10.10.10.10.10.10.20.20.20.20.20.10.10.10.10.00.00.00.00.10.10.10.10.10.10.10.10.10.10.00.00.00.00.10.10.10.10.20.20.20.20.10.20.30.40.40.30.30.20.20.10.10.10.10.10.10.10.10.20.20.20.20.20.20.10.10.10.10.10.10.10.10.20.20.30.30.40.30.30.40.50.60.50.50.40.30.30.30.30.20.20.20.20.20.30.30.40.40.40.40.30.30.20.20.20.20.20.20.30.30.40.50.50.60.60.50.70.90.90.80.60.60.50.50.50.50.50.50.50.50.50.50.60.60.70.70.60.60.50.50.50.50.50.50.50.50.60.60.70.70.80.90.7(E)(E)(E)AA25.44.74.03.73.42.92.82.82.62.42.32.22.12.01.91.71.62.02.22.32.42.42.21.81.51.31.21.21.21.00.90.80.70.50.50.40.40.30.20.20.25.65.04.13.83.53.23.23.12.92.62.62.62.52.42.32.22.02.42.72.92.82.82.72.31.91.71.71.71.61.31.21.00.90.80.70.60.50.40.30.30.25.03.93.02.42.01.51.00.70.50.30.20.10.10.10.00.00.00.00.00.00.03.43.43.02.21.81.41.00.70.50.30.20.10.10.10.00.00.00.00.00.00.02.72.82.52.21.81.41.00.70.50.30.20.10.10.10.00.00.00.00.00.00.02.22.22.31.91.51.10.80.60.40.30.20.10.10.10.10.00.00.00.00.00.01.41.41.51.41.10.90.70.50.40.30.20.10.10.10.10.10.00.00.00.00.00.90.90.90.90.80.70.60.50.30.30.20.20.10.10.10.10.10.00.00.00.00.80.80.80.80.80.60.50.50.30.30.20.20.20.10.10.10.10.00.00.00.01.11.11.11.11.00.80.60.50.40.40.20.20.20.10.10.10.10.10.00.00.01.81.91.81.61.31.00.80.70.50.40.20.30.30.20.20.10.10.10.10.00.02.52.52.42.11.71.31.10.90.70.60.20.40.40.30.20.20.10.10.10.00.03.23.12.82.21.91.61.21.11.01.00.50.80.60.40.30.20.20.10.10.10.03.93.53.02.52.01.71.41.11.21.41.21.20.80.60.50.40.30.20.20.10.15.04.33.63.23.03.03.02.82.92.82.62.82.52.22.01.61.20.80.70.50.33.53.63.53.23.02.82.82.93.13.22.72.82.62.21.91.71.31.00.80.60.43.03.22.92.92.82.72.72.62.52.82.52.32.21.91.71.51.20.90.80.50.42.42.72.62.42.12.22.02.01.91.91.81.71.61.41.21.20.90.80.60.40.41.61.71.91.71.51.51.41.31.21.21.11.00.90.90.80.70.60.50.40.40.31.11.11.21.11.11.00.90.90.80.70.60.60.50.50.40.40.40.30.30.20.20.91.01.01.00.90.80.70.60.50.40.30.30.30.20.20.20.20.20.20.20.11.21.31.31.20.90.80.60.50.40.30.20.20.20.10.10.10.10.10.10.10.11.92.11.91.71.31.00.80.60.40.30.20.20.10.10.10.10.10.10.10.10.12.52.62.42.11.61.20.90.60.40.30.20.10.10.10.10.10.00.00.00.00.03.33.22.82.21.81.30.90.70.50.30.20.10.10.10.00.00.00.00.00.00.03.83.42.82.21.81.41.00.70.40.30.20.10.10.10.00.00.00.00.00.00.0Calculation SummaryLabelCalcTypeUnitsAvgMaxMinAvg/MinMax/MinParking LotIlluminanceFc1.644.40.82.055.50Pathway_TopIlluminanceFc2.025.60.210.1028.00South Property LineIlluminanceFc0.260.90.0N.A.N.A.Tennis Court 1_TopIlluminanceFc0.735.00.0N.A.N.A.Tennis Court 2_TopIlluminanceFc1.195.00.0N.A.N.A.DRAWING NUMBERCPROJECT #2023-02DRAWN BYDATE02-07-2023DRAWING TITLEDateRevision DescriptionDRAWINGSCONSTRUCTIONRO/JBMADISON, WIMILWAUKEE, WIMAPLE GROVE, MNTHIS DRAWING IS PROPERTY OFNEXUS SOLUTIONS, LLC. USE OR REPRODUCTIONWITHOUT WRITTEN PERMISSION IS PROHIBITED.Nexus Solutions, LLCJeffrey A. BlakeI HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, ORREPORT WAS PREPARED BY ME OR UNDER MY DIRECTSUPERVISION AND THAT I AM A DULY LICENSEDPROFESSIONAL ENGINEER UNDER THE LAWS OF THESTATE OF MINNESOTA.PRINTED NAME:SIGNATURE:DATE: REG. NO.41083CHECKED BYJABCENTENNIAL MIDDLE SCHOOL ISD #12
TENNIS COURT RELOCATION
AND PARKING LOT ADDITION
399 ELM STREET
LINO LAKES, MN 5501402/07/2023Design, P.C.ElectricalElectrical Consulting Engineers6885 Sycamore Ln N, Suite 210Maple Grove, MN 55369763.486.0965jeff@jbelectricaldesign.comJBED Proj. No. 2023-02c 2023 by JB Electrical Design, PCE103NEW PARKING LOTAND TENNIS COURTSPHOTOMETRICS1" = 20'-0"E1032NEW PARKING LOT PLAN - PHOTOMETRICS1" = 20'-0"E1031NEW TENNIS COURT AREA - PHOTOMETRIC
EXISTINGHOUSEPROPERTYLINE33'14'~78'~75'PROPOSED SCREENING PLANTINGSPROPOSED WOOD FENCEPARKING LOTEXISTING TREES/UNDERBRUSHEXISTING TREES/UNDERBRUSH3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.com3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.DRAWING NUMBERCPROJECT #1222066.000DRAWN BYDATE02-07-2023DRAWING TITLEDateRevision DescriptionDRAWINGSCONSTRUCTIONKK/JMJNCHECKED BYMADISON, WIMILWAUKEE, WIMAPLE GROVE, MNTHIS DRAWING IS PROPERTY OFNEXUS SOLUTIONS, LLC. USE OR REPRODUCTIONWITHOUT WRITTEN PERMISSION IS PROHIBITED.Nexus Solutions, LLCJUSTIN NIELSEN, P.E.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, ORREPORT WAS PREPARED BY ME OR UNDER MY DIRECTSUPERVISION AND THAT I AM A DULY LICENSEDPROFESSIONAL ENGINEER UNDER THE LAWS OF THESTATE OF MINNESOTA.PRINTED NAME:SIGNATURE:DATE: REG. NO.52687CENTENNIAL MIDDLE SCHOOL ISD#12TENNIS COURT RELOCATIONAND PARKING LOT ADDITION399 ELM STREETLINO LAKES, MN 5501402/07/2023P:\Projects\Projects - 2022\12226066 - Centennial MS Tennis Courts\C. Design\Drawing Files\12226066 C200-C201 - Paving.dwgEXHIBIT ACROSS SECTION OFPARKING LOTLOOKING WESTAASECTION A-A
1
PLANNING & ZONING BOARD
AGENDA ITEM 8B
STAFF ORIGINATOR: Katie Larsen, City Planner
P & Z MEETING DATE: March 8, 2023
REQUEST: Watermark PUD Concept Plan for Amendment #4-Land
Use Plan
CASE NUMBER: PC2022-002
APPLICANT: U.S. Home, LLC
Attn: Josh Metzer
16305 36th Avenue N. Suite 600
Plymouth, MN 55446
OWNER: Same
REVIEW SCHEDULE:
Complete Application Date: September 13, 2022
60-Day Review Deadline: November 12, 2022
Environmental Board Meeting: N/A
Park Board Meeting: N/A
Planning & Zoning Board Meeting: October 12, 2022
March 8, 2023
City Council Work Session: November 7, 2022
April 3, 2023
BACKGROUND
The applicant, U.S. Home, LLC (dba Lennar), submitted a Land Use Application for PUD
Concept Plan review in September 2022. They proposed an amendment to the north end of
Watermark PUD Land Use Plan in regards to housing product and lot widths. Staff, Boards, and
Council provided feedback. The applicant has submitted two (2) more concept plans for review.
Previous Council approvals related to the PUD Development Stage Plan include:
• June 13, 2016: Resolution No. 16-51 approving PUD Development Stage
Plan/Preliminary Plat
• October 9, 2017: Resolution No. 17-95 approving Amendment #1 to Land Use Plan
• December 11, 2017: Resolution No. 17-133 approving Amendment #2 to Architectural
Design Standards
2
• October 14, 2019: Resolution No. 19-131 approving Amendment #3 to Architectural
Design Standards
ANALYSIS
Watermark is a 372 acre master planned residential community consisting of 692 single family
lots and 172 townhome units totaling 864 housing units. Lennar is proposing an amendment to
the north end of the Watermark PUD Development Stage Plan and Land Use Plan to modify lot
sizes and housing product types to address demand changes in the housing market. The proposed
amendment does not change any architectural requirements or the total number of housing units.
Current Land Use Plan dated August 27, 2018
The current Land Use Plan details 55ft, 60ft, 65ft and 75ft lot widths and associated housing
products.
• 94 lots @ 65 ft
• 67 lots @ 55-60 ft
• 1.05 acre private park
PUD Concept Plan dated September 9, 2022
On October 12, 2022, the Planning & Zoning Board reviewed the PUD Concept Plan dated
September 9, 2022. Those proposed changes included:
• 74 townhome units
• 6 lots @ 65 ft
• 37 lots @ 60 ft
• 26 lots @ 55 ft
• 18 lots @ 45 ft
• 14.7 acres open space
Staff comments:
• Less street and utility infrastructure maintenance costs to the City
• A tot lot shall be included in the townhome private park similar to existing townhome
neighborhood
• A trail connection shall be added from existing trail to townhome neighborhood then to
the north.
• The ditch easement along the north lot line of the development shall be shown and
accounted for on the lots
• All lot sizes shall be continuous buildable land and at a minimize size of Lot Width x
130ft.
• Setbacks will remain the same
o Front = 25ft
3
o Side = 7.5 ft
o Rear = 25ft
• All housing products shall meet Watermark architectural standards
The Planning & Zoning Board had the following questions and comments. Applicant and staff
responses are in italics.
• Why is Lennar proposing amendment now?
o Forest Lake School District expressing more interest.
o Villa product not performing as well as Lennar expected.
o Amendment process takes time and all civil plans would need to be revised.
• Concern that eliminating the villas homes takes away from the mixed use of housing
types
• How many 45ft wide do we have now?
o None but the original approved Watermark land use plan under Mattamy had 84
lots that were 44ft wide.
• Lack of general support for 45ft wide lots.
• Additional townhomes would require variation in exterior colors.
• The same number of housing units but closer together making it feel denser.
• What is PUD benefit?
o More open space
o Less street and utility maintenance costs for City
• General support for dog park and tot lot near townhome neighborhood.
• Would garage sizes need to meet previously approved Watermark standards as shown in
chart above or the proposed zoning ordinance update of 520sf (20ft wide x 26ft deep)?
At the November 7, 2022 Work Session, the Council reviewed the same concept plan and had
the following comments:
• Lack of support for smaller lot sizes
• Potential support for swapping out some of the housing styles (from villa to Heritage
and Venture).
• Potential support to allow 50 foot lots instead of the 45 foot lots proposed if they
were disbursed through the development and not all side by side.
• The Council was divided on the change to townhomes.
Revised PUD Concept Plan A dated February 10, 2023 (Lennar’s Preferred Plan)
• 57 townhome units
• 6 lots @ 65 ft
• 37 lots @ 60 ft
• 40 lots @ 55 ft
• 21 lots @ 50 ft
• 12.6 acres open space with trails and tot lot
4
All 45-foot lots were enlarged to 50-foot lots;
No more than two 50-foot lots located adjacent to each other with exception of 4-lot
block bounded by open space, pipeline easement, and trail;
17 townhomes converted to single family homes;
Trails and tot lot location added.
Revised PUD Concept Plan B dated February 14, 2023
• 68 townhome units
• 6 lots @ 65 ft
• 37 lots @ 60 ft
• 33 lots @ 55 ft
• 17 lots @ 50 ft
• 14.3 acres open space with trails and tot lot
All 45-foot lots were enlarged to 50-foot lots;
No more than two 50-foot lots located adjacent to each other with exception of 4-lot
block bounded by open space, pipeline easement, and trail;
6 townhomes converted to single family homes;
Trails and tot lot location added.
Summary
Current Land
Use Plan
(August 2018)
Original
Concept
(Sept 2022)
Concept A
(Feb 2023)
Concept B
(Feb 2023)
Townhomes 0 74 57 68
65-foot lots 94 6 6 6
60-foot lots 67 37 37 37
55-foot lots 26 40 33
50-foot lots 0 0 21 17
45-foot lots 0 18 0 0
TOTAL UNITS 161 161 161 161
Open Space 1.05 acres 14.7 acres 12.6 acres 14.3 acres
RECOMMENDATION
The City’s review and comments on the concept plan’s relation to the Comprehensive Plan and
development regulations does not grant any rights to the applicant to develop the property as
depicted by the concept plan.
Staff is requesting feedback from the Planning & Zoning Board on the proposed Land Use Plan
amendment. City Engineer and Environmental Coordinator comments have not changed.
5
ATTACHMENTS
1. Current Land Use Plan dated August 27, 2018
2. Original Concept Plan dated September 9, 2022
3. Concept Plan A dated February 10, 2023
4. Concept Plan B dated February 14, 2023
5. City Engineer Memo dated October 5, 2022
6. Environment Coordinator Memo dated October 4, 2022
>>>>||||>>>20TH AVENUE NORTH (CSAH 54)INTERSTATE HIGHWAY NO. 35E73RD ST.
ST.REHBEIN
WATERMARKf:\jobs\6721 - 6740\6731 - watermark\cad c3d\survey\ne revision exhibits\6731_exhibit 1 - approved pre-plat.dwgSave Date:02/07/23Brian J. Krystofiak, P.E.1of2WATERMARKLino Lakes, MinnesotaI hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Professional Engineer underthe laws of the State of MinnesotaPrint Name:Signature:Date:License #:25063Drawn:Designed:Date:06/19/17BJKC#Revisions:1. 06/22/17 Revise Legend.2. 07/10/17 Revise layout.3. 04/30/18 Revise layout.4. 06/01/18 Revise layout.5. 08/27/18 Per City comments.environmentalengineeringsurveying···Cente
rv
i
l
leLake Pel
t
ie
rLakeRice
C
reekChain
o
f
lakesReserveLakeReshanau
Ci
ty
o
f
Cente
rv
i
l
le RondeauLake LOCATION MAP 3890 Pheasant Ridge Drive NE,Suite 100Blaine, MN 55449Phone: (763) 489-7900Fax: (763) 489-7959www.carlsonmccain.comLENNAR16305 - 36TH Avenue N. Suite 600Plymouth, Minnesota 55446 LEGEND 20TH AVENUE NORTH (CSAH 54)73RD ST.
ST.REHBEIN
SITE DATA SOIL BORINGS WETLANDS OWNER CONTACT APPROVED PRE-PLATLAND USE PLANSEE DETAILON SHEET 2
W A T E R M A R K
APPROVED PRE-PLAT
LAND USE PLAN
f:\jobs\6721 - 6740\6731 - watermark\cad c3d\survey\ne revision exhibits\6731_exhibit 1 - approved pre-plat.dwgSave Date:02/07/23
Brian J. Krystofiak, P.E.2
of
2
WATERMARK
Lino Lakes, Minnesota
I hereby certify that this plan, specification
or report was prepared by me or under my
direct supervision and that I am a duly
Licensed Professional Engineer under
the laws of the State of Minnesota
Print Name:
Signature:
Date:License #:25063
Drawn:
Designed:
Date:
BJK
C#
environmental
engineering
surveying
·
·
·
3890 Pheasant Ridge Drive NE,
Suite 100
Blaine, MN 55449
Phone: (763) 489-7900
Fax: (763) 489-7959
www.carlsonmccain.com
LENNAR
16305 - 36TH Avenue N. Suite 600
Plymouth, Minnesota 55446
LEGEND INTERSTATE HIGHWAY NO. 35E20TH AVENUE NORTH (CSAH 54)ST.
REHBEIN
06/19/17
Revisions:
1. 06/22/17 Revise Legend.
2. 07/10/17 Revise layout.
3. 04/30/18 Revise layout.
4. 06/01/18 Revise layout.
5. 08/27/18 Per City comments.
W A T E R M A R K
2022 CONCEPT PLAN
LAND USE PLAN
f:\jobs\6721 - 6740\6731 - watermark\cad c3d\survey\ne revision exhibits\6731_exhibit 2 - 2022 concept plan.dwgSave Date:02/10/23
Brian J. Krystofiak, P.E.1
of
1
WATERMARK
Lino Lakes, Minnesota
I hereby certify that this plan, specification
or report was prepared by me or under my
direct supervision and that I am a duly
Licensed Professional Engineer under
the laws of the State of Minnesota
Print Name:
Signature:
Date:License #:25063
Drawn:
Designed:
Date:02/14/23
BJK
C#
environmental
engineering
surveying
·
·
·
3890 Pheasant Ridge Drive NE,
Suite 100
Blaine, MN 55449
Phone: (763) 489-7900
Fax: (763) 489-7959
www.carlsonmccain.com
LENNAR
16305 - 36TH Avenue N. Suite 600
Plymouth, Minnesota 55446
Revisions:
LEGEND INTERSTATE HIGHWAY NO. 35E20TH AVENUE NORTH (CSAH 54)ST.
REHBEIN
TO BE CONVERTED TO OPEN SPACE
TO B
E
C
O
N
V
E
R
T
E
D
T
O
O
P
E
N
S
P
A
C
E
W A T E R M A R K
2023 CONCEPT PLAN A
LAND USE PLAN
f:\jobs\6721 - 6740\6731 - watermark\cad c3d\survey\ne revision exhibits\6731_exhibit 3 - 2023 concept plan a.dwgSave Date:02/07/23
Brian J. Krystofiak, P.E.1
of
1
WATERMARK
Lino Lakes, Minnesota
I hereby certify that this plan, specification
or report was prepared by me or under my
direct supervision and that I am a duly
Licensed Professional Engineer under
the laws of the State of Minnesota
Print Name:
Signature:
Date:License #:25063
Drawn:
Designed:
Date:02/10/23
BJK
C#
environmental
engineering
surveying
·
·
·
3890 Pheasant Ridge Drive NE,
Suite 100
Blaine, MN 55449
Phone: (763) 489-7900
Fax: (763) 489-7959
www.carlsonmccain.com
LENNAR
16305 - 36TH Avenue N. Suite 600
Plymouth, Minnesota 55446
Revisions:
LEGEND INTERSTATE HIGHWAY NO. 35E20TH AVENUE NORTH (CSAH 54)ST.
REHBEIN
TOT
LOT
TO B
E
C
O
N
V
E
R
T
E
D
TO O
P
E
N
S
P
A
C
E
TO BE CONVERTED TO OPEN SPACE
W A T E R M A R K
2023 CONCEPT PLAN B
LAND USE PLAN
f:\jobs\6721 - 6740\6731 - watermark\cad c3d\survey\ne revision exhibits\6731_exhibit 4 - 2023 concept plan b.dwgSave Date:02/10/23
Brian J. Krystofiak, P.E.1
of
1
WATERMARK
Lino Lakes, Minnesota
I hereby certify that this plan, specification
or report was prepared by me or under my
direct supervision and that I am a duly
Licensed Professional Engineer under
the laws of the State of Minnesota
Print Name:
Signature:
Date:License #:25063
Drawn:
Designed:
Date:02/14/23
BJK
C#
environmental
engineering
surveying
·
·
·
3890 Pheasant Ridge Drive NE,
Suite 100
Blaine, MN 55449
Phone: (763) 489-7900
Fax: (763) 489-7959
www.carlsonmccain.com
LENNAR
16305 - 36TH Avenue N. Suite 600
Plymouth, Minnesota 55446
Revisions:
LEGEND INTERSTATE HIGHWAY NO. 35E20TH AVENUE NORTH (CSAH 54)ST.
REHBEIN
TOT
LOT
TO B
E
C
O
N
V
E
R
T
E
D
TO O
P
E
N
S
P
A
C
E
TO BE CONVERTED TO OPEN SPACE
178 E 9TH STREET | SUITE 200 | SAINT PAUL, MN | 55101 | 651.286.8450 | WSBENG.COM Memorandum
To: Katie Larsen, Lino Lakes City Planner
From: Kelsey Gelhar PE, WSB
Diane Hankee PE, Lino Lakes City Engineer
Date: October 5, 2022
Re: Watermark PUD Amendment #4
Plan Review
021411-000
WSB reviewed the PUD Amendment #4 for the Watermark Development in Lino Lakes, MN,
received September 12, 2022. Amendment #4 proposes to change the northeast area of the
Watermark PUD to replace Villa Lots with additional Heritage, Venture, and Townhome lot
products.
Engineering
• Erosion Control & Grading
The Watermark PUD plans include site grading for the proposed streets, homes, and
storm water facilities. PUD Amendment #4 will require an updated grading plan as it is
proposed to remove some of the roadways and lots. The switch from Villa lot widths to
Heritage and Venture lot widths will also require grading revisions.
• Stormwater Management
Stormwater management for the northeast area of the Watermark PUD is designed to flow
through storm sewer and a series of ponds. PUD Amendment #4 will require revisions to the
storm layout and updates to stormwater modeling. PUD Amendment #4 reduces the
impervious surface and adds additional open space to the northeast area. The downstream
storm sewer systems will be sufficient for the proposed changes.
• Water Supply
The Watermark PUD proposes 16” water main along Lotus Lane, 12” water main along Rainy
Lane, and 8” water main on the other streets within the northeast area. PUD Amendment #4
does not propose any changes to the water main at this time. The proposed 8” watermain will
be sufficient to serve the proposed homes and townhomes in PUD Amendment #4.
• Sanitary Sewer
The Watermark PUD proposes 10” sanitary sewer along Lotus Lane and 8” sanitary sewer on
the other streets within the northeast area. PUD Amendment #4 does not propose any
changes to the sanitary sewer at this time. The proposed 8” sanitary sewer will be sufficient to
serve the proposed homes and townhomes in PUD Amendment #4.
Ms. Katie Larsen
10/05/2022
Page 2
Watermark PUD Amendment #4 Engineering Review
• Transportation
The applicant is proposing to eliminate several legs of proposed city streets and is
proposing to add a private street through the townhome area. Street widths, lengths, and
profiles will be reviewed with future submittals.
• Wetlands and Mitigation Plan
Wetlands were delineated for the Watermark PUD development. PUD Amendment #4
does not appear to impact the existing wetlands in this area as the street layout near the
existing wetlands in not proposed to change. Wetland impacts will be reviewed with future
submittals.
• Landscaping
Landscaping to be reviewed with future submittals and shall meet City zoning requirements.
Landscaping will be reviewed in depth by the City’s Environmental Coordinator.
• Floodplain
There are no existing floodplains in the area of the proposed PUD Amendment #4.
• Drainage and Utility Easements
Drainage and Utility easements must meet City Code requirements and will be reviewed
with future additions of the plat.
• Development Agreement
A Development Agreement will be required with any final plats of future additions.
• Grading Agreement
Grading agreement not required at this time.
• Stormwater Maintenance Agreement
Stormwater Maintenance Agreements will be required with any final plats of future additions.
Public facilities will be covered by the City’s Programmatic Maintenance Agreement.
• Permits Required
No permits are required at this time.
If you or the applicant have any questions regarding these comments, please contact Kelsey
Gelhar at (612) 709-4897 or kgelhar@wsbeng.com . You may also contact Diane Hankee at
(651) 982-2430 or dhankee@linolake.us.
Page 1
To: Katie Larsen
From: Andy Nelson
Date: October 4th, 2022
Re: Environmental Comments/October 4th, 2022/Watermark PUD Concept Plan-
Amend #4
1. One option for the additional open space would be to establish park in the
north near the property line and use the rest for establishment of mesic prairie.
A trail could be added through the prairie area to connect with the park in the
north.
This would require grading the area flat (aside from the berm on the east
perimeter) and preparing for seeding.
Any new trees required for buffer and/or screening should be kept east of the
crest of the berm, keeping the highpoint of the berm free of trees to allow for
future management of the prairie area with fire.
Environmental Memo