Loading...
HomeMy WebLinkAbout06-25-2018 Council Meeting PacketEXPANDED AGENDA CITY COUNCIL AGENDA Monday, June 25, 2018 *********** 6:30 p.m. (Broadcast live: http://northmetrotv.com/local- meetings/lino-lakes/) City Council: Mayor Reinert, Councilmembers Maher, Manthey, Rafferty and Stoesz City Administrator: Jeff Karlson COUNCIL WORK SESSION, 6:00 P.M. Community Room (not televised) 1. Review Dates for Land Use Workshop with Jay Squires 2. Review Regular Agenda CITY COUNCIL MEETING, 6:30 P.M.  Roll Call - Council Members Rafferty, Stoesz, Manthey, Maher, and Mayor Reinert were present  Pledge of Allegiance  Open Mike / Public Comment - none  Setting the Agenda: Addition or deletion of agenda items The agenda was approved as presented 1. CONSENT AGENDA A) Consideration of Expenditures: i) June 25, 2018 (Check No. 108289 through 108398 in the amount of $827,004.45 B) Consider approval of June 4, 2018 Work Session Minutes Council Member Maher absent C) Consider approval of June 11, 2018 Council Minutes D) Consider approval of June 11, 2018 Liquor Compliance Hearing Minutes Council Members Rafferty & Maher absent E) Consider approval of June 11, 2018 Closed Council Session Minutes (Administrator Review) F) Consideration of Not Waiving Monetary Limits on Tort Liability per MN Statute 466.04 G) Consider Resolution 18-79, Approving a Peddler License for Renewal by Anderson H) Consider Resolution 18-80, Approving the Renewal of Liquor, Wine and Beer License for Don Julio Mexican Restaurant I) Consider approval of Advisory Board Appointment Council Agenda -2- June 25, 2018 J) Consider Resolution No. 18-81 Extension of Time for Recording the Final Plat of SS Properties Addition Action Taken Motion by Rafferty, seconded by Stoesz, to approve the Consent Agenda, Items 1A through 1J, except Item 1D, as presented, was adopted; Maher abstained from voting on Item 1B. Action Taken: Motion by Stoesz, seconded by Manthey, to approve Item 1D as presented, was adopted; Maher and Rafferty abstained from voting on Item 1D. 2. FINANCE DEPARTMENT REPORT No report 3. ADMINISTRATION DEPARTMENT REPORT A) Consider Lease Extension for New Creations Child Care, Jeff Karlson Action Taken: Motion by Maher, seconded by Manthey, to approve the lease extension agreement as presented, was adopted B) Consider Six-Month Extension of Recycling Intern, Jeff Karlson Action Taken: Motion by Manthey, seconded by Stoesz, to approve a six-month extension of employment for Environmental Intern Sayard Schultz as recommended, was adopted C) Consider Approval of 2018-2019 Labor Agreement with AFSCME, Local No. 2454, Jeff Karlson Action Taken: Motion by Stoesz, seconded by Rafferty, to approve the labor agreement as presented, was adopted 4. PUBLIC SAFETY DEPARTMENT REPORT No report 5. PUBLIC SERVICES DEPARTMENT REPORT No report 6. COMMUNITY DEVELOPMENT REPORT A) Nature’s Refuge, Katie Larsen i. Consider Second Reading of Ordinance No. 05-18 Rezoning Property from R-1, Single Family Residential to PUD, Planned Unit Development; Action Taken: Motion by Manthey, seconded by Maher, to approve the 2nd Reading and passage of Ordinance No. 05-18 as presented, was adopted; Yeas, 5; Nays none ii. Consider Resolution No. 18-70 Approving PUD Development Stage Plan/Preliminary Plat Council Agenda -3- June 25, 2018 Action Taken: Motion by Maher, seconded by Manthey, to approve Resolution No. 18-70 as presented, was adopted B) Saddle Club Fourth Addition, Katie Larsen i. Consider Second Reading of Ordinance No. 06-18 Rezoning Property from R-1, Single Family Residential to PUD, Planned Unit Development Action Taken: Motion by Stoesz, seconded by Maher, to approve the 2nd Reading and passage of Ordinance No. 06-18 as presented, was adopted; Yeas, 5; Nays none C) Consider Resolution 18-77, Accepting Quotes and Awarding a Construction Contract, 2018 Street Maintenance (Reclamite) Project, Diane Hankee Action Taken: Motion by Rafferty, seconded by Maher, to approve Resolution No. 18-77 as presented, was adopted D) Consider Resolution No. 18-78, Resolution of Support Federal Funding for I-35E and County Road J Interchange and the Centerville Road and County Road J Intersection Project, Diane Hankee Action Taken: Motion by Maher, seconded by Manthey, to approve Resolution No. 18-78 as presented, was adopted E) Consider 2nd Reading of Ordinance No. 07-18, Amending City Code Section 1007 Related Driveway Surfacing and Airplane Hangar and Hangar Access Performance Standards, Michael Grochala Action Taken: Motion by Rafferty, seconded by Manthey, to approve the 2nd Reading and passage of Ordinance No. 07-18 as presented, was adopted; Yeas, 5; Nays none 7. UNFINISHED BUSINESS None 8. NEW BUSINESS None Adjournment Motion by Manthey, seconded by Stoesz, to adjourn at 7:00 p.m. was adopted Community Calendar – A Look Ahead June 25, 2018 through July 9, 2018 Wednesday, June 27 6:30 pm, Council Chambers Environmental Board Monday, July 2 6:00 pm, Community Room Council Work Session Thursday, July 5 8:00 am, Community Room EDAC Monday, July 9 6:30 pm, Council Chambers Council Meeting Monday, July 9(resched) 6:30 pm, Community Room Park Board CITY COUNCIL AGENDA Monday, June 25, 2018 *********** 6:30 p.m. (Broadcast live: http://northmetrotv.com/local- meetings/lino-lakes/) City Council: Mayor Reinert, Councilmembers Maher, Manthey, Rafferty and Stoesz City Administrator: Jeff Karlson COUNCIL WORK SESSION, 6:00 P.M. Community Room (not televised) 1. Review Dates for Land Use Workshop with Jay Squires 2. Review Regular Agenda CITY COUNCIL MEETING, 6:30 P.M.  Call to Order and Roll Call  Pledge of Allegiance  Open Mike / Public Comment  Setting the Agenda: Addition or deletion of agenda items 1. CONSENT AGENDA A) Consideration of Expenditures: i) June 25, 2018 (Check No. 108289 through 108398 in the amount of $827,004.45 B) Consider approval of June 4, 2018 Work Session Minutes Council Member Maher absent C) Consider approval of June 11, 2018 Council Minutes D) Consider approval of June 11, 2018 Liquor Compliance Hearing Minutes Council Members Rafferty & Maher absent E) Consider approval of June 11, 2018 Closed Council Session Minutes (Administrator Review) F) Consideration of Not Waiving Monetary Limits on Tort Liability per MN Statute 466.04 G) Consider Resolution 18-79, Approving a Peddler License for Renewal by Anderson H) Consider Resolution 18-80, Approving the Renewal of Liquor, Wine and Beer License for Don Julio Mexican Restaurant I) Consider approval of Advisory Board Appointment Council Agenda -2- June 25, 2018 J) Consider Resolution No. 18-81 Extension of Time for Recording the Final Plat of SS Properties Addition 2. FINANCE DEPARTMENT REPORT No report 3. ADMINISTRATION DEPARTMENT REPORT A) Consider Lease Extension for New Creations Child Care, Jeff Karlson B) Consider Six-Month Extension of Recycling Intern, Jeff Karlson C) Consider Approval of 2018-2019 Labor Agreement with AFSCME, Local No. 2454, Jeff Karlson 4. PUBLIC SAFETY DEPARTMENT REPORT No report 5. PUBLIC SERVICES DEPARTMENT REPORT No report 6. COMMUNITY DEVELOPMENT REPORT A) Nature’s Refuge, Katie Larsen i. Consider Second Reading of Ordinance No. 05-18 Rezoning Property from R-1, Single Family Residential to PUD, Planned Unit Development *Council may vote to dispense with the full reading of the ordinance *Roll call vote is required for adoption of the ordinance ii. Consider Resolution No. 18-70 Approving PUD Development Stage Plan/Preliminary Plat B) Saddle Club Fourth Addition, Katie Larsen i. Consider Second Reading of Ordinance No. 06-18 Rezoning Property from R-1, Single Family Residential to PUD, Planned Unit Development *Council may vote to dispense with the full reading of the ordinance *Roll call vote is required for adoption of the ordinance C) Consider Resolution 18-79, Accepting Quotes and Awarding a Construction Contract, 2018 Street Maintenance (Reclamite) Project, Diane Hankee D) Consider Resolution No. 18-78, Resolution of Support Federal Funding for I-35E and County Road J Interchange and the Centerville Road and County Road J Intersection Project, Diane Hankee Council Agenda -3- June 25, 2018 E) Consider 2nd Reading of Ordinance No. 07-18, Amending City Code Section 1007 Related Driveway Surfacing and Airplane Hangar and Hangar Access Performance Standards, Michael Grochala 7. UNFINISHED BUSINESS None 8. NEW BUSINESS None Adjournment Community Calendar – A Look Ahead June 25, 2018 through July 9, 2018 Wednesday, June 27 6:30 pm, Council Chambers Environmental Board Monday, July 2 6:00 pm, Community Room Council Work Session Thursday, July 5 8:00 am, Community Room EDAC Monday, July 9 6:30 pm, Council Chambers Council Meeting Monday, July 9(resched) 6:30 pm, Community Room Park Board WS – Item 1 WORK SESSION STAFF REPORT Work Session Item No. 1 Date: June 25, 2018 To: City Council From: Jeff Karlson, City Administrator Re: Land Use Workshop with Jay Squires Background During the interview process for civil legal services, newly appointed City Attorney Jay Squires offered to conduct a few free workshops for the Council and staff. Mr. Squires suggested starting with a land use workshop. Jay has significant experience representing clients on land use issues and believes the Council and Planning Board would gain a better understanding of land use matters. Jay suggested one of the following dates: Thursday, September 13 or Thursday, September 20. Requested Council Direction Determine if the Council can schedule the workshop on one of the above dates. CITY COUNCIL WORK SESSION June 4, 2018 DRAFT 1 CITY OF LINO LAKES 1 MINUTES 2 3 DATE : June 4, 2018 4 TIME STARTED : 6:00 p.m. 5 TIME ENDED : 8:10 p.m. 6 MEMBERS PRESENT : Council Member Rafferty (arr. 6:08, 7 Manthey, Stoesz and Mayor Reinert 8 MEMBERS ABSENT : Council Member Maher 9 10 Staff members present: City Administrator Jeff Karlson; Public Safety Director John 11 Swenson; Community Development Director Michael Grochala; Finance Director Sarah 12 Cotton; City Planner Katie Larsen; Public Services Director Rick DeGardner; City 13 Engineer Diane Hankee; City Clerk Julie Bartell 14 15 1. Community Solar Gardens – City Planner Larsen noted the application received 16 from an organization wishing to develop solar gardens in the city. The city has no 17 regulations in the area at this time. She introduced consultant to the City, Kendra Lindahl 18 of Landform, to review options. 19 20 Ms. Lindahl noted the Planning and Zoning report and pointed out some key areas for the 21 council. 22 - Energy is cheaper to subscribers, through different models; 23 - Xcel Energy is required to work on solar; Connexus is not required; 24 - There are limitations to the amount of solar produced; 25 - Solar facilities is exempt from taxation, but not a complete loss; 26 - Application does not identify specific sight but applicant requests that the city clarify 27 that it will allow solar gardens; 28 - City should consider such things as minimum lot size, amount of time a garden could 29 function; are certain areas more appropriate for this use; full screening is not possible but 30 there are things to help; is permit process appropriate. 31 32 Staff wishes to get feedback from the council on the possibility of moving forward with a 33 text amendment to allow solar gardens. 34 35 Mayor Reinert remarked that this isn’t an area where there is much common knowledge. 36 He wonders about the current state of the technology. 37 38 Council Member Stoesz remarked that there can be glare and that was discussed by the 39 Planning and Zoning Board. Ms. Lindahl explained that there are mitigations for the 40 glare situation but only to eliminate the damaging glare. 41 42 Council Member Manthey remarked that he has also heard stories about some types of 43 alternative energy and the amount of subsidies that can be involved to develop and he 44 CITY COUNCIL WORK SESSION June 4, 2018 DRAFT 2 wonders, if that weren’t available to energy companies, the impact it could have on their 45 development plans. Ms. Lindahl said her knowledge is exclusive to the fact that Xcel is 46 required to have solar. 47 48 Mayor Reinert said he’d like to see the numbers; statistics about Minnesota solar 49 community gardens (energy produced year around, economics on how the money flows 50 and what kickbacks are involved). The council can educate and then decide if they want 51 to see the topic again. 52 53 A representative of applicant, Lino Lakes Solar LLC, explained that the Minnesota 54 Legislature has provided this program so that people can use solar even if they don’t have 55 a home that facilitates it. These farms are developed by a third party but will be owned 56 by the subscribers. The energy is eventually purchased from the subscriber by Xcel at a 57 bonus to the subscriber. The “kick-back” is renewable energy credits that the energy 58 company is required to maintain. He explained the amount of energy generally produced 59 by the facilities over a period of twenty years after which time the farm is removed. 60 Some communities require a bond to ensure the funds will be there for demolition at the 61 end. 62 63 Council Member Rafferty asked the developer if there is a specific location in mind. The 64 representative pointed out on a map the area of Lake Amelia and Molitor Drive. 65 66 Mayor Reinert said he is requesting additional information. He added that one question 67 in his mind is locking up developable land. 68 69 Council Member Stoesz asked if individual solar panel units are allowed under city code. 70 Ms. Lindahl said that is allowed today. Ms. Lindahl added that she will work with the 71 applicant and get together as much additional information as possible. 72 73 Council Member Manthey added that he’d like more information on how communities 74 have reacted and have been impacted by this type of development. The developer 75 explained that he is heavily involved in this process as far as attending and participating 76 in government as they consider and plan for this type of activity and he has seen that 77 government restrictions and involvement are across the board; he would be happy to work 78 with Ms. Lindahl on best practices in that area. 79 80 Council Member Rafferty asked for locations of other facilities. 81 2. Comprehensive Plan Update – Community Development Director Grochala 82 reviewed his written report. He noted the April Open House and comments and 83 suggestions received. Input was generally positive. There were certain specific requests 84 (Noren and Lundgren family) that that will be individually evaluated. Mr. Grochala 85 added that the city has been officially granted an extension for submission to the 86 Metropolitan Council and he reviewed the proposed schedule going forward (as included 87 in the staff report). Staff will return at the July work session. The Mayor indicated that 88 CITY COUNCIL WORK SESSION June 4, 2018 DRAFT 3 he has requested additional information from staff and is awaiting that. Mayor Reinert 89 said he doesn’t want to see the process rushed as it’s too important. 90 3. Review 2017 Annual Audit, Redpath & Company, Ltd. - Finance Director 91 Cotton introduced Andy Hering of Redpath & Company to share the results of the 2017 92 City Audit. 93 94 Mr. Herring reviewed a PowerPoint presentation outlining: 95 96 - City received Certificate of Excellence in Financial Reporting (Mayor asked if any cities 97 that apply and pay $500 are ever turned down; Mr. Herring remarked that there could be a 98 situation of denial; Ms. Cotton added that part of the value of the process is that the City 99 gets comments and can use that for the future; 100 - Follow Up on 2016 Findings (internal controls and Minnesota Legal Compliance); 101 - Reports Issued by Auditor (internal control, legal compliance, letter to council); 102 - Opinion on Financial Statements – based on financial statements, audited in accordance 103 with accepted standards, given with reasonable assurance; 104 - Report on Internal Controls - the controls were found suitable; 105 - Report on Minnesota Legal Compliance; 106 - Communication to Those Charged with Governance. 107 108 The findings are as good as it gets for audit reporting. 109 110 Mr. Hering continued with his presentation: 111 - Pension liabilities; Mayor Reinert asked if there is a point where there is enough 112 information to show a level future; Public Safety Director Swenson explained that the 113 pension fund set up for the firefighters is administered by PERA but there is no state 114 money involved; 115 - Summary of Financial Activity – snapshot of 2017; 116 - General Fund Summary & 5 Year History; 117 - General Fund Monthly Cash Balance; 118 - Special Revenue Funds (special notice of the federal narcotics funds that arrived in 119 2017; Mayor Reinert asked that staff provide a list of how that money is being used); 120 - Debt Service Funds; 121 - Capital Funds; 122 - Enterprise Funds – Change in Net Position & Cash Flow. 123 124 Mr. Hering added that the audit process was with everything well prepared by staff. 125 126 Council Member Rafferty noted a past City contribution to the Beyond the Yellow 127 Ribbon group that was eventually found to be inappropriate use of public funds and he 128 wonders how that is best rectified; what plan would be appropriate to return that funding. 129 Mr. Herring didn’t offer a plan but concurred that the funds should go back. 130 131 CITY COUNCIL WORK SESSION June 4, 2018 DRAFT 4 Council Member Stoesz asked about the real cost of running a city for one year? Ms. 132 Cotton said it’s about context and those things that are unique to cities. 133 134 The council will see the report for action at an upcoming council meeting. 135 4. Watermark Update - Community Development Director Grochala asked to give 136 an update on the project with some requests coming forward soon to the council. He 137 reviewed the written staff report which outlines current status and what’s anticipated 138 going forward. Mayor Reinert asked for a rendering of current first phase plans. 139 140 On Monday night, the council will be asked to approve a grading and trunk improvement 141 agreement. Mayor Reinert asked how much that commits the city to the development 142 plan. Mr. Grochala explained that the city has approved a preliminary plat and the final 143 plat will be held against that; staff doesn’t anticipate any changes except conditions 144 needed to receive approval. 145 5. City Website Redesign – Administrator Karlson noted that the council had 146 requested additional information on what a new website design would bring to the City. 147 He noted the example of three cities included in the staff report. Some benefits are 148 mobile friendly applications, enhanced image slider, more navigation friendly, and more 149 opportunity to put information on front page. The question is if the council wishes to 150 spend additional funds to upgrade the City website. The cost difference is about $2,500 151 annually for three years, and it could be paid through cable television funds. If the 152 council wishes to move forward, he will execute a contract with Gov Office on the 153 project. 154 155 Mayor Reinert suggested that he believes a majority of the council supports an update but 156 he recalls that Council Member Maher (who is absent tonight) asked for additional 157 information and that turned out to be very helpful. She will be contacted by staff on the 158 matter. 159 160 Council Member Stoesz noted his support for the improvements; Council Members 161 Manthey and Rafferty did as well. Council Member Stoesz added that he wants to see a 162 previously discussed URL change as well. 163 6. Council Direction on Park Board Opening – Administrator Karlson reviewed 164 the written report on a vacancy that has occurred on the Park Board. 165 166 The council would like to see the applications again; there were many good candidates 167 that were interviewed. Mayor Reinert asked that a ballot sheet be provided at the next 168 meeting for council decision. 169 CITY COUNCIL WORK SESSION June 4, 2018 DRAFT 5 7. Council Updates on Boards/Commissions, City Council – No report. 170 8. Monthly Progress Report – Administrator Karlson reviewed the written report. 171 172 Mayor Reinert asked that Mr. Karlson email the final offer (on the matter that is going to 173 arbitration). 174 175 Review Regular Council Agenda of 2018 – 176 177 Item 6A, Grading and Trunk Utility Agreement (Watermark) – City Engineer Hankee 178 briefly reviewed the staff report. The council had discussed the requested action as part 179 of the Watermark Update (regular work session agenda) 180 181 Item 6B, Nature’s Refuge: City Planner Larsen reviewed a PowerPoint presentation that 182 included information on: 183 - 62 residential subdivision application; 184 - Rezoning, PUD and preliminary plan under review; 185 - Location was described; 186 - Site conditions; 187 - Many high quality wetlands included in the area; 188 - Changes from the original site plan; concerns that brought those changes; 189 - Flexibility called for under PUD; 190 - Planning and Zoning Board review and action reviewed. 191 192 The council brought forward questions the changes requested in right/of/way, road width, 193 setbacks, 194 195 Mayor Reinert expressed concern that the plans are substandard as far as the city 196 requirements; a design change could address that. Community Director Grochala noted 197 other (conservation) developments in the City that have been treated similarly and the 198 benefits to being flexible. 199 200 Item 6C, Saddle Club, 4th Addition – City Planner Larsen reviewed a PowerPoint 201 presentation that included information on the proposal: 202 - Rezoning and PUD; 203 - Noted development of developer, Mr. Eibensteiner; Royal Oaks Reality is still in 204 place so staff is proceeding with consideration; 205 - 8 lot subdivision; last piece of the Foxborough Development; 206 - Density reviewed; 207 - Transportation connections and overall corridor; 208 - Concerns heard from residents that this will create a thoroughfare; staff attempted 209 to show why that shouldn’t happen; 210 211 212 CITY COUNCIL WORK SESSION June 4, 2018 DRAFT 6 213 Item 6D, Ordinance on Airpark Standards – Community Development Director Grochala 214 reviewed the proposed ordinance. Staff has worked through the zoning ordinance – 215 establishing driveway standards, moved hanger performance standards that were located 216 in another area of the code, adding in surfacing of driveway requirements, reducing 217 standard driveway setback, providing an exception to allow for shared driveways, 218 allowing driveways within utility easements, still must meet drainage requirements and 219 easements must be engineering approves, and impervious surface requirement change. 220 Public hearing was held at Planning and Zoning Board and this was approved by a 221 unanimous vote. People from both airparks came to the hearing and there was much 222 support. Staff is recommending approval. 223 224 The meeting was adjourned at 8:10 p.m. 225 226 These minutes were considered, corrected and approved at the regular Council meeting held on 227 June 25, 2018. 228 229 230 231 232 Julianne Bartell, City Clerk Jeff Reinert, Mayor 233 234 COUNCIL MINUTES June 11, 2018 DRAFT 1 CITY OF LINO LAKES 1 MINUTES 2 3 4 DATE : June 11, 2018 5 TIME STARTED : 6:30 p.m. 6 TIME ENDED : 8:00 p.m. 7 MEMBERS PRESENT : Council Member Rafferty, Maher, 8 Manthey, Stoesz and Mayor Reinert 9 MEMBERS ABSENT : 10 11 Staff members present: City Administrator Jeff Karlson; Community Development Director Michael 12 Grochala; Director of Finance Sarah Cotton; City Engineer Diane Hankee; City Planner Katie Larsen; 13 Director of Public Safety John Swenson; and City Clerk Julie Bartell 14 15 PUBLIC COMMENT 16 17 No one was present to address the council regarding a matter not on the agenda. 18 19 SETTING THE AGENDA 20 21 The agenda was approved as presented. 22 23 SPECIAL PRESENTATION 24 Promotion to Police Sergeant: Curt Boehme 25 American Legion Post 566, Presentation of Awards: 26 - Lino Lakes Police Officer of the Year: Curt Boehme 27 - Lino Lakes Firefighter of the Year: Brian Finke 28 It was noted that both Sergeant Boehme and Lieutenant Finke were selected as Officer/Firefighter of 29 the Year at the State level. 30 31 CONSENT AGENDA 32 33 Council Member Rafferty moved to approve the Consent Agenda, Items 1A through 1F, as presented. 34 Council Member Maher seconded the motion. Motion carried on a voice vote. 35 36 ITEM ACTION 37 38 Consideration of Expenditures: 39 40 June 11, 2018 (Check No. 108237 - 108288 in the 41 amount of $226,868.19) Approved 42 43 COUNCIL MINUTES June 11, 2018 DRAFT 2 May 29 , 2018 Council Work Session Minutes Approved 44 45 May 29 , 2018 City Council Meeting Minutes Approved 46 47 Consider Resolution 18-73, Approval the Renewal of 48 Liquor, Wine and Beer Licenses Approved 49 Consider Resolution 18-74, Approving the Renewal of 50 Tobacco Licenses Approved 51 Consider Resolution 18-75, Approving a Temporary 52 On-Sale Liquor License, a Cabaret License, Exemption 53 for Gambling Permit and Parade Run Permit for the 54 Annual St. Joseph’s Catholic Church’s August Festival Approved 55 56 FINANCE DEPARTMENT REPORT 57 2A) A) Consider Accepting 2017 Audit Report, Redpath and Company, Ltd., - Finance 58 Director Cotton introduced Andy Hering who noted that the council received a high level presentation 59 with opportunity for comments and questions at their last work session. He then presented an 60 abbreviated PowerPoint presentation that included information on the following: 61 - Certificate of Achievement for Financing Reporting 62 - Follow up on 2016 Findings (both corrected); 63 - 2017 Audit Process; 64 - Reports Issued by Auditor; 65 - Opinion on Finance Statements; 66 - Report on Internal Controls; 67 - Report on Minnesota Legal Compliance; 68 - Communication to Those Charged with Governance. 69 Mr. Hering noted that the audit process was smooth and there were no disagreements with staff. 70 Overall the audit had great results. 71 Council Member Maher moved to approve the 2017 Audit Report as presented. Council Member 72 Manthey seconded the motion. Motion carried on a voice vote. 73 74 ADMINISTRATION DEPARTMENT REPORT 75 3A) Consider Resolution No. 18-71, Supporting Councilmember Stoesz’s Nomination 76 to League of Minnesota Cities Board – Administrator Karlson explained that Council Member Stoesz 77 has submitted an application to serve on the League of Minnesota Cities Board. A resolution in support 78 of Mr. Stoesz’ appointment is before the council. 79 COUNCIL MINUTES June 11, 2018 DRAFT 3 Council Member Stoesz noted that this position is unpaid, includes twelve meetings per year, and it 80 represents an organization that does a good job representing cities in the state. He asks for the council’s 81 support. 82 Council Member Manthey moved to approve Resolution No. 18-71 as presented. Council Member 83 Maher seconded the motion. Motion carried on a voice vote; Council Member Stoesz abstained from 84 voting. 85 3B) Consider Appointment of Paid On-Call Fire Lieutenant – Human Resources Manager 86 Bartholomew reviewed the written report, including the process that brings the candidate forward and 87 the recommendation to hire Mr. Craig Menne. 88 Council Member Manthey moved to approve the appointment of Craig Menne as recommended. 89 Council Member Maher seconded the motion. Motion carried on a voice vote. 90 3C) Consider Appointment of Police Officer – Human Resources Manager Bartholomew 91 reviewed the recommendation to hire Mr. Garrett Ellertson to the position of Police Officer for the 92 city. She reviewed the candidate’s qualifications, the selection process and the staff hiring 93 recommendation. 94 Council Member Manthey moved to approve the appointment of Garrett Ellertson as recommended. 95 Council Member Stoesz seconded the motion. Motion carried on a voice vote. 96 3D) Consider Resolution 18-76, Liquor Compliance Violation – City Clerk Bartell reported that 97 earlier in the evening, the council held a liquor compliance hearing to consider liquor code violations 98 reported at the Don Julio Mexican Restaurant. The results of that hearing are that the board 99 recommended civil penalities of $2,000 and a 10-day liquor license suspension. That recommendation 100 is forwarded for formal council consideration. 101 Council Member Rafferty and Maher asked if they should automatically abstain from voting since they 102 missed the hearing. Staff suggested that wouldn’t be necessary if the council members are comfortable 103 voting for the board’s recommendation. 104 Council Member Manthey moved to approve Resolution No. 18-76 as presented. Council Member 105 Maher seconded the motion. Motion carried on a voice vote. 106 107 PUBLIC SAFETY DEPARTMENT REPORT 108 109 There was no report from the Public Safety Department. 110 111 PUBLIC SERVICES DEPARTMENT REPORT 112 113 There was no report from the Public Services Department. 114 115 COMMUNITY DEVELOPMENT DEPARTMENT REPORT 116 117 COUNCIL MINUTES June 11, 2018 DRAFT 4 6A) Consider Resolution 18-69, Approving Grading and Trunk Utility Agreement, 118 Watermark - City Engineer Hankee reviewed the written staff report. She noted the specifics of the 119 agreement. 120 121 Council Member Stoesz noted the hours of construction activity. He wonders if, because of the 122 location far from anything, the developer has expressed interest in extending working hours. Ms. 123 Hankee said the hours included in the agreement mirror those in city code. Community Development 124 Director Grochala added that staff is currently working on an amendment dealing with a variance 125 process for construction noise. 126 127 Council Member Manthey moved to approve Resolution No. 18-69 as presented. Council Member 128 Maher seconded the motion. Motion carried on a voice vote. 129 130 6B) Nature’s Refuge – i. Consider First Reading of Ordinance No. 05-18 Rezoning 131 Property from R-1, Single Family Residential to PUD, Planned Unit Development; ii. Consider 132 Resolution No. 18-70 Approving PUD Development Stage Plan/Preliminary Plat – City Planner 133 Larsen reviewed a PowerPoint presentation including information on: 134 - Aerial view of proposed development; 135 - Council’s expressed concern about some of the PUD flexibility; staff spoke with 136 developer and they will work on lots to bring them to minimum standards; 137 - With that, staff would still like to review the proposal so as to hear any other concerns 138 or questions at this time; 139 - History on original Nature’s Refuge development; 140 - Existing site conditions, includng acreage, tree cover, wetland complex, rare plant and 141 animal species, 142 - Ditch and easement present; 143 - Density implications (low end of spectrum); 144 - Original site plan compared to current revised site plan; 145 - Trail location; 146 - Preliminary Plat (noted that it will be amended as previously discussed); 147 - Tree preservation plan (including tree buffers); 148 - Traffic study and level of service (C); 149 - Wetland impact review; 150 - Findings of Fact are included in council resolution; 151 - PUD Flexibility Summary (and what will be omitted). 152 153 Planner Larsen noted that the council could elect to approve the actions, with the changes outlined 154 understood, or to table the matter. 155 156 Mayor Reinert thanked staff for the extra effort in responding to his concerns about a certain element of 157 the PUD proposed. He doesn’t think that flexibility is a bad thing, however, he sees that the City’s 158 ordinances are generally upheld and very few variances are allowed. He had concerns with the PUD 159 presented at the work session so he brought those forward. He’d like to have further discussion about 160 the City’s R1 zoning designation; is it still correct for this City? He sees the development is nice and 161 COUNCIL MINUTES June 11, 2018 DRAFT 5 he appreciates the amendments proposed by the developer. He’d prefer to act on 1st reading of the 162 ordinance and to wait until next council meeting to consider the resolution. 163 164 Council Member Manthey moved to approve the 1st Reading of Ordinance No. 05-18 as presented. 165 Council Member Maher seconded the motion. Motion carried on a voice vote. 166 167 Resolution No. 18-70 was not acted upon. 168 169 6B) Saddle Club Fourth Addition – i. Consider First Reading of Ordinance No. 06-18 170 Rezoning Property from R-1, Single Family Residential to PUD, Planned Unit Development; ii. 171 Consider Resolution No. 18-72 Approving PUD Development Stage Plan/Preliminary Plat – City 172 Planner Larsen reviewed a PowerPoint presentation including information on: 173 - Background on the development (developer passed away recently but Royal Oaks Realty 174 still exists); 175 - 4th Addition of Saddle Club development; 176 - The current proposal includes 8 lots; 177 - Review of aerial of Saddle Club and adjacent development; 178 - Analyis including Fox Road connection, parcel to be developed was owned by Comcast; 179 - Historical data on land acquisition; 180 - Zoning and density implications; 181 - Preliminary plat; 182 - Street and utility plans; 183 - Transportation Plan (some concern about increased traffic moving to/from Birch Street; but 184 connection is absolutely planned for local residents); 185 - Park dedication fees; 186 - Cultural resources implications. 187 188 In summary, Ms. Larsen reported that the plans concur with the city’s requirements and the Planning 189 and Zoning Board hearing (that included resident’s concerns) that resulted in a vote approving of the 190 plans. 191 192 Mayor Reinert remarked that the land was originally the second largest saddle club in the state and the 193 City was happy for the development (as proposed by Marcel Eibensteiner). He added that he was at the 194 Planning and Zoning Board and heard the area resident’s concerns but he would note that many years 195 previous, the council heard about not becoming a city of cul-de-sacs for public safety reasons. The 196 City started putting up signs in places where there was a ghost plat for additional development. 197 198 Council Member Stoesz asked about deeding outlots to the city? Ms. Larsen suggested that would 199 depend on the overall plans and what’s appropriate. She confirmed that the City isn’t giving up any 200 tax benefit. Council Member Stoesz also confirmed that staff will be returning with a discussion of the 201 R-1 zoning designation. 202 203 Council Member Rafferty moved to approve the 1st Reading of Ordinance No. 06-18 as presented. 204 Council Member Maher seconded the motion. Motion carried on a voice vote. 205 206 COUNCIL MINUTES June 11, 2018 DRAFT 6 Council Member Rafferty moved to approve Resolution No. 18-72 as presented. Council Member 207 Maher seconded the motion. Motion carried on a voice vote. 208 209 6C) Consider 1st Reading Ordinance No. 07-18, Amending City Code Section 1007 Related 210 Driveway Surfacing and Airplane Hangar and Hangar Access Performance Standards – 211 Community Development Director Grochala reviewed the request for 1st reading of an ordinance that 212 will set certain standards relating to the city’s airparks. The standards will relate to hangars, driveway 213 surfacing, and modifications included in a new section related to sideyard setbacks. He also noted 214 that the ordinance would increase the maximum impervious surface (related to driveway expansion 215 216 Mayor Reinert noted that the city seemed to be receiving more and more requests for variances from 217 the city’s standards. It makes sense that an airpark may need special consideration. 218 219 Council Member Stoesz received confirmation that all impacted residents were informed. 220 221 Council Member Rafferty moved to approve the 1st Reading of Ordinance No. 07-18 as presented. 222 Council Member Maher seconded the motion. Motion carried on a voice vote. 223 224 UNFINISHED BUSINESS 225 226 There was no Unfinished Business. 227 228 NEW BUSINESS 229 230 There was no New Business. 231 232 COMMUNITY CALENDAR 233 234 Community Calendar – A Look Ahead 235 June 11, 2018 through June 25, 2018 236 237 Wednesday, June 13 6:30 pm, Council Chambers Planning & Zoning Board 238 Monday, June 18 6:00 pm, Community Room Jt. Mtg w/Advisory Bds 239 Monday, June 25 6:30 pm, Community Room Council Work Session 240 Monday, June 25 6:30 pm, Council Chambers City Council Meeting 241 242 ADJOURN 243 244 There being no further business, Council Member Rafferty moved to adjourn at 8:00 p.m. Council 245 Member Maher seconded the motion. Motion carried. 246 247 These minutes were considered and approved at the regular Council Meeting, June 25, 2018 248 249 250 251 Julianne Bartell, City Clerk Jeff Reinert, Mayor 252 LIQUOR COMPLIANCE HEARING June 11, 2018 DRAFT 1 CITY OF LINO LAKES 2 MINUTES 3 4 5 DATE : June 11, 2018 6 TIME STARTED : 6:05 p.m. 7 TIME ENDED : 6:25 p.m. 8 MEMBERS PRESENT : Council Members Stoesz, Manthey and Mayor 9 Reinert 10 MEMBERS ABSENT : Council Member Rafferty, Maher 11 12 Staff members present: City Administrator Jeff Karlson; Public Safety Director John Swenson; 13 and City Clerk, Julie Bartell 14 15 HEARING ON LIQUOR CODE VIOLATION 16 17 Public Safety Director Swenson reported that the Police Division regularly conducts compliance 18 checks at the city’s licensed liquor establishments. On November 21, 2017, an underaged 19 person was served at Don Julio’s Mexican Restaurant; the bartender who served the alcohol was 20 charged and eventually plead guilty in court. Additionally, on February 18, 2018, police 21 personnel responded to a call from Don Julio’s Mexican Restaurant and came upon an assault in 22 progress; it was determined that two bar employees had served an individual under the age of 21 23 and charges were brought against two individual and the outcomes are outlined in the written 24 staff report. Director Swenson explained that the matter of these three violations is now before 25 the city council for consideration of civil action as allowed by the city code. Based on the city’s 26 Best Practices Grid, staff is recommending the imposition of civil penalties of $2,000 and a 10-27 day suspension of the liquor license for Don Julio’s Mexican Restaurant. 28 29 The licensee was not present at the hearing. 30 31 Mayor Reinert remarked that the case is clear. The offense screams of this situation needing 32 attention and action. The action recommended by the Grid, $2,000 and 10 day suspension, 33 would be incentive for the owners to clean things up. This type of activity has to stop. He 34 supports the staff recommendation. 35 36 Director Swenson noted that the license for this business will be coming up for consideration of 37 renewal. Staff thought it appropriate to deal with these violations (which occurred in the 38 previous license period) before the council considers renewal for the next licensing period. 39 40 Council Member Stoesz and Manthey expressed support for following at least the Grid 41 recommendation. 42 43 Council Member Stoesz moved to approve a civil penalty of $2,000 and a 10-day suspension. 44 Motion seconded by Council Member Manthey. Motion carried on a voice vote. Council 45 Member Rafferty and Maher absent. 46 47 Action on the matter will be considered as part of the regular council meeting that will follow 48 COMPLIANCE HEARING MINUTES 2 June 11, 2018 DRAFT adjournment of the hearing. 49 50 The meeting was adjourned at 6:25 p.m. 51 52 These minutes were considered and approved at the regular City Council Meeting on June 25, 53 2018. 54 55 56 57 __ 58 Julianne Bartell, City Clerk Jeff Reinert, Mayor 59 60 CLOSED COUNCIL SESSION June 11, 2018 DRAFT 1 1 CITY OF LINO LAKES 2 MINUTES 3 CLOSED COUNCIL SESSION 4 5 DATE : June 11, 2018 6 TIME STARTED : 8:08 p.m. 7 TIME ENDED : 9:15 p.m. 8 MEMBERS PRESENT : Council Members Rafferty, Manthey, 9 Maher, Stoesz and Mayor Reinert 10 MEMBERS ABSENT : None 11 12 Staff present: City Administrator Jeff Karlson. 13 14 Mayor Reinert called the meeting to order at 8:08 p.m. in the Council Workroom at Lino 15 Lakes City Hall. 16 17 The meeting was convened as a closed session of the city council pursuant to the Open 18 Meeting Law for the express purpose of discussing the city administrator performance 19 review. 20 21 The meeting was recorded. 22 23 The meeting was adjourned at 9:15 p.m. 24 25 These minutes were considered, corrected and approved at the regular Council meeting held on 26 June 25, 2018. 27 28 29 30 31 Julianne Bartell, City Clerk Jeff Reinert, Mayor 32 33 CITY COUNCIL CONSENT AGENDA ITEM 1F STAFF ORIGINATOR: Sarah Cotton, Finance Director MEETING DATE: June 25, 2018 TOPIC: Consideration of Not Waiving Monetary Limits on Tort Liability per MN Statute 466.04 VOTE REQUIRED: 3/5 INTRODUCTION As a part of the annual insurance renewal process the City Council is being asked by the League of Minnesota Cities Insurance Trust to update the Liability Coverage Waiver Form. BACKGROUND Each year, the City has the option of waving its monetary limits on tort liability to the extent of the coverage purchased. The decision to waive or not to waive the statutory limits has the following effects: If the city does not waive the statutory tort limits, an individual claimant would be able to recover no more than $500,000 on any claim to which the statutory tort limits apply. The total which all claimants would be able to recover for a single occurrence to which the statutory tort limits apply would be limited to $1,500,000. These statutory tort limits would apply regardless of whether or not the city purchases the optional excess liability coverage If the city does waive the statutory tort limits and does not purchase excess liability coverage, a single claimant could potentially recover up to $2,000,000 on a single occurrence (under this option, the tort cap liability limits are waived to the extent of the city’s liability coverage limits, and the LMCIT per occurrence limit is $2,000,000). The total which all claimants would be able to recover for a single occurrence to which the statutory limits apply would also be limited to $2,000,000, regardless of the number of claimants. If the city does waive the statutory tort limits and purchases excess liability coverage, a single claimant could potentially recover an amount up to the limit of the coverage purchased. The total which all claimants would be able to recover for a single occurrence to which the statutory tort limits apply would also be limited to the amount of coverage purchased, regardless of the number of claimants. Claims to which the statutory municipal tort limits do not apply are not affected by this decision. The city carries $1,000,000 in excess liability coverage ($1,000,000 per occurrence and annual limit). The City of Lino Lakes has never waived its’ monetary limits on tort liability. RECOMMENDATION The city does not wish to waive the monetary limits on municipal tort liability established by Minnesota Statutes, Section 466.04 ATTACHMENT Liability Coverage – Waiver Form CITY COUNCIL AGENDA ITEM 1G STAFF ORIGINATOR: Lisa Hogstad-Osterhues, Deputy Clerk MEETING DATE: June 25, 2018 TOPIC: Resolution No. 18-79, Approving a Peddler License for Renewal by Andersen VOTE REQUIRED: 3/5 BACKGROUND Renewal by Andersen, 2050 7th Avenue, North St. Paul, Minnesota 55019 has submitted a peddler’s license application to the city clerk's office. The company representatives who will be working in Lino Lakes are Jacob Belanger, Laine Fischer, Alexandros Balasis, Matthew Johnson Jr., Peter Knefelkamp, Trevor Hartman, Thomas Storlien, Ryan Miller, Aspen Florey, Isak Larson, Jeffrey Lane, Luke Meulepas, Samuel Halloran, Mitchell Munson, Luke Johnson, Minh Le, Emily Magistad, Thomas Heil, Abubakar Dhanke, John Logan, Noah Wondimu, Travis Weis, Seamus McNiff, David, Anderson, Nicholas Schmidt, Jennifer Afamefune and Halle scheer. They plan to travel through Lino Lakes’ neighborhoods setting up appointments for free estimates. The City has received all the necessary forms required to issue this company a license. This license is contingent upon the Lino Lakes Public Safety Department’s background checks. The application and all other required information is on file in the city clerk's office for review. RECOMMENDATION Approve Resolution No. 18-79, Approving the issuance of a peddler license for Renewal by Andersen for a six month period June 26, 2018 through December 26, 2018. CITY OF LINO LAKES COUNTY OF ANOKA RESOLUTION NO. 18-79 APPROVING A PEDDLER LICENSE FOR RENEWAL BY ANDERSEN WHEREAS, Renewal by Andersen has submitted a peddlers license application to the city clerk's office; and WHEREAS, Renewal by Andersen has complied with all of the provisions of Chapter 613 of the Lino Lakes City Code for obtaining the necessary license for a for-profit business; and WHEREAS, a background check on the company representatives who will be working in Lino Lakes have been completed by the Public Safety Department; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Lino Lakes, Minnesota: Jacob Belanger, Laine Fischer, Alexandros Balasis, Matthew Johnson Jr., Peter Knefelkamp, Trevor Hartman, Thomas Storlien, Ryan Miller, Aspen Florey, Isak Larson, Jeffrey Lane, Luke Meulepas, Samuel Halloran, Mitchell Munson, Luke Johnson, Minh Le, Emily Magistad, Thomas Heil, Abubakar Dhanke, John Logan, Noah Wondimu, Travis Weis, Seamus McNiff, David, Anderson, Nicholas Schmidt, Jennifer Afamefune and Halle scheer of Renewal by Andersen are hereby authorized to vend for a period of six-months beginning June 26, 2018 and ending December 26, 2018. Adopted by the Council of the City of Lino Lakes this 25th day of June, 2018. The motion for the adoption of the foregoing resolution was introduced by Council Member _____________ and was duly seconded by Council Member ___________ and upon vote being taken thereon, the following voted in favor thereof: The following voted against same: _____________________ Jeff Reinert, Mayor ATTEST: ________________________ Julianne Bartell, City Clerk CITY COUNCIL AGENDA ITEM 1H STAFF ORIGINATOR: Lisa Hogstad-Osterhues, Deputy City Clerk MEETING DATE: June 25, 2018 TOPIC: Resolution 18-80 Approving the Renewal of Liquor, Wine and Beer License for Don Julio Mexican Restaurant VOTE REQUIRED: 3/5 BACKGROUND All liquor, wine and beer (3.2) licenses in the City of Lino Lakes expire on June 30, 2018. Staff has been working with license holder on meeting the requirements for renewal so as to allow the council to consider approval at this time. Under city policy, applicants applying for license renewal are required to undergo a background investigation each year. The Lino Lakes Public Services Department performs the investigation and reports any information that would make applicants ineligible for license renewal. Each license is contingent upon the background investigation. Don Julio’s Mexican Restaurant has had three liquor violations with their past licensing year. The 10 day license suspension and $2,000 penalty has been paid. Licensees are also required to submit verification of liquor liability and workers’ compensation insurance as well as pay appropriate fees. No license will be released until all requirements are met. The city code requires that when the city council considers the issuance of a liquor license, opportunity shall be given to any person to be heard for or against the granting of the license. RECOMMENDATION Adopt Resolution 18-80, council consideration for approval of renewal of liquor, wine and beer licenses for the period of July 1, 2018 through June 30, 2019. ATTACHMENTS Resolution 18-80 CITY OF LINO LAKES RESOLUTION NO. 18-80 Approving the Renewal of Don Julio’s Mexican Restaurant’s Liquor, Wine and Beer licenses for the 2018/2019 licensing period WHEREAS, the licensing period for liquor, wine and beer licenses in the City of Lino Lakes is one year, commencing on July 1 and ending on June 30 the following year; WHEREAS, the City Council is required to approve the renewal of liquor and wine licenses; WHEREAS, City staff has reviewed the renewal application submitted by Don Julio’s Mexican Restaurant that has been submitted and verified that local licensing regulations are met; WHERAS, the Lino Lakes Public Service Department has conducted the required background investigations for license renewals; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LINO LAKES, MINNESOTA: The City of Lino Lakes hereby approves the renewal of Don Julio’s Mexican Restaurant liquor, wine and beer license, with said approval contingent upon applicants meeting all city and state requirements for said licenses. Adopted by the Council of the City of Lino Lakes this 25th day of June, 2018. The motion for the adoption of the foregoing resolution was introduced by Council Member _____________and was duly seconded by Council Member _____________ and upon vote being taken thereon, the following voted in favor thereof: The following voted against same: ________________________ Jeff Reinert, Mayor ATTEST: ________________________ Julianne Bartell, City Clerk CITY COUNCIL AGENDA ITEM 1I STAFF ORIGINATOR: Lisa Hogstad-Osterhues, Deputy Clerk MEETING DATE: June 25, 2018 TOPIC: Consider Approval of Park Board Appointment VOTE REQUIRED: 3/5 INTRODUCTION Appoint a new Park Board Member to a recently open position. BACKGROUND The City Council interviewed 5 candidates earlier this year to fill a board opening. The incumbent was selected to continue to serve on the Park Board. Since the yearly appointment process, 1 Park Board member is no longer able to serve on the board creating an open position. The council has reviewed the previously interviewed candidate’s applications and made a selection for board appointment of Andrea Schmidt. RECOMMENDATION Approve advisory board appointment of Andrea Schmidt. 1 CITY COUNCIL AGENDA ITEM 1J STAFF ORIGINATOR: Katie Larsen, City Planner MEETING DATE: June 25, 2018 TOPIC: Consider Resolution No. 18-81 Approving an Extension of Time for Recording the Final Plat of SS Properties Addition VOTE REQUIRED: 3/5 INTRODUCTION The applicants, Scott and Shelly Carlson, are requesting another 90 day extension for recording the final plat of SS Properties Addition. This is in relation to the construction of a new All Seasons Rental building at 7932 Lake Drive. BACKGROUND On January 22, 2018, the City Council passed Resolution No. 18-03 approving the final plat for SS Properties Addition. Per Section 1001.059(3), the developer shall record the plat within 90 days after the date of approval, otherwise the approval of the final plat shall be considered void, unless the developer requests and receives an extension from the City Council. On April 9, 2018, the City Council passed Resolution No. 18-37 granting a 90 day extension for the recording the final plat. The filing deadline is currently July 21, 2018. The applicants have requested another 90 day extension in order to finalize details related to construction financing. The new extended filing deadline would be October 19, 2018. RECOMMENDATION Staff recommends approval of Resolution No. 18-81 granting another 90 day extension until October 19, 2018 for recording the final plat and related documents for SS Properties Addition. ATTACHMENTS 1. Resolution No. 18-81 1 CITY OF LINO LAKES RESOLUTION NO. 18-81 RESOLUTION APPROVING AN EXTENSION OF TIME FOR RECORDING THE FINAL PLAT OF SS PROPERTIES ADDITION WHEREAS, review and approvals of plats are governed by Minnesota Statutes and City of Lino Lakes ordinances; and WHEREAS, the final plat for SS Properties Addition was approved by the City Council on January 22, 2018 with Resolution No. 18-03; and WHEREAS, Section 1001.059(3) states the developer shall record the plat within 90 days after the date of approval, otherwise the approval of the final plat shall be considered void, unless the developer requests and receives an extension from the City Council; and WHEREAS, on April 9, 2018, the City Council passed Resolution No. 18-37 granting a 90 day extension for the recording the final plat to July 21, 2018; and WHEREAS, the applicants, Scott and Shelly Carlson, have requested another 90 day extension in order to finalize details related to construction financing. NOW, THEREFORE BE IT RESOLVED by The City Council of The City of Lino Lakes the final plat and related documents for SS Properties Addition shall be recorded with Anoka County by October 19, 2018 unless an additional extension is granted by the City Council. Adopted by the Council of the City of Lino Lakes this 25th day of June, 2018. The motion for the adoption of the foregoing resolution was introduced by Council Member _______________and was duly seconded by Council Member ________________ and upon vote being taken thereon, the following voted in favor thereof: The following voted against same: _______________________________ Jeff Reinert, Mayor ATTEST: ________________________ Julianne Bartell, City Clerk CITY COUNCIL AGENDA ITEM 3A STAFF ORIGINATOR: Jeff Karlson, City Administrator MEETING DATE: June 25, 2018 TOPIC: Lease Extension for New Creations VOTE REQUIRED: 3/5 INTRODUCTION The Council is requested to approve a lease extension for New Creations Child Care & Learning Center. BACKGROUND Kevin Peck of KW Commercial negotiated the lease extension with New Creations. Mr. Peck recommended increasing the rent by three percent every year of the lease. He proposed starting the new lease with $9.91 per square foot starting July 1, 2019, and adding three percent annually. Peck also added the option of terminating the lease after five years after a 12-month notice. RECOMMENDATION Approve lease extension for New Creations Child Care. ATTACHMENTS Lease Amendment No. 3 Kevin Peck kpeck@kwcmidwest.com www.kwcmidwest.com direct 651.262.1030 cell 612.834.2250 3464 Washington Dr. #100, Eagan, MN 55122 April 17, 2018 Ryan Carlson New Creations Child Care and Learning Center 620 Town Center Parkway Lino Lakes, MN 55014 Dear Mr. Carlson: On behalf of the owner of 620 Town Center Parkway, Lino Lakes, I am providing a proposal for your review. We appreciate the opportunity to present this proposal to you. Please consider the following: BUILDING NAME: Lino Lakes Civic Complex BUILDING: 620 Town Center Parkway, Lino Lakes, MN 55014 PREMISES: Approximately 9,138 Rentable Square Feet (SF). TENANT New Creations Child Care and Learning Center OWNER: City of Lino Lakes LEASE COMMENCE: July 1, 2019. VOICE/DATA: Tenant is solely responsible for verifying that the voice/data access to the property is acceptable for its needs. PARKING: Tenant will have access to the common parking area. CONDITION OF THE PROPERTY: Owner will deliver premises in “as-is” condition. Any additional costs are the Tenant’s sole responsibility. Tenant is solely responsible for verifying that Premises meets all, or will cause the Premise to meet all, requirements to operate is childcare operations. Tenant will be allowed, at is sole cost, to install new carpet and perform other improvements, subject to Landlord’s written approval. COMMON AREA MAINTENANCE (CAM) and UTILITIES: In addition to the net rent, Tenant shall be responsible for its pro- rata share of CAM and utilities. Kevin Peck kpeck@kwcmidwest.com www.kwcmidwest.com direct 651.262.1030 cell 612.834.2250 3464 Washington Dr. #100, Eagan, MN 55122 LEASE TERMS & RENT: Months Sq. Ft. Rent per Sq. Ft. Annual Rent 1 to 12 9,138 $8.91 $81,419.58 13 to 24 9,138 $9.18 $83,886.84 25 to 36 9,138 $9.45 $86,354.10 37 to 48 9,138 $9.74 $89,004.12 49 to 60 9,138 $10.03 $91,654.14 61 to 72 9,138 $10.33 $94,395.54 73 to 84 9,138 $10.64 $97,228.32 85 to 96 9,138 $10.96 $100,152.48 97 to 108 9,138 $11.29 $103,168.02 109 to 120 9,138 $11.63 $106,274.94 REAL ESTATE TAXES: The property is currently tax exempt. Tenant will be responsible for any and all real estate taxes due because of its tenancy. OPTION TO TERMINATE: Landlord will have an ongoing option to terminate the Lease with no less than 12 months written notice to Tenant any time after the 61-month of this Lease. The lease can only be terminated by the Landlord if the space will be used by the City of Lino Lakes or another governmental agency. NON-BINDING: The foregoing does not constitute a lease agreement and contains only some of the basic terms and conditions that are normally contained in a commercial lease agreement of this size and nature. Neither Owner nor Tenant is bound to lease any portion of the described premises unless a lease agreement, acceptable to both parties, is executed by and delivered to both parties. CONTINGENCY: This proposal is contingent upon mutual execution of a lease agreement. Thank you for the opportunity to present this proposal. If the above terms are acceptable, please have the appropriate person sign and return this proposal. We look forward to your response. Sincerely, Kevin Peck Director KW Commercial Agreed and Accepted by: Ryan Carlson: New Creations Child Care and Learning Center LEASE AMENDMENT #3 DATED: July 1, 2019 WHEREAS, City of Lino Lakes, A Minnesota municipal corporation , ("LANDLORD") and New Creations Child Care and Learning Center, LLC., Limited Liability Company (Domestic) ("TENANT") entered into a Lease Agreement dated July 1, 2014 ("LEASE") for the property located at 620 Town Center Parkway, Lino Lakes, MN 55014 ("PREMISES); and WHEREAS, LANDLORD and TENANT agree to amend the LEASE as follows: 1. The Lease is hereby amended by deleting Article 4, subsection (b) and replacing them with the following: (a) Payment of Gross Rent. Tenant shall pay the annual Base Rent in monthly installments, equal to one-twelfth (1/12th) of the then applicable annual Base Rent. Each monthly installment of Base Rent shall be payable in advance without demand and without any reduction, abatement, coun- terclaim or offset, to Landlord on or before the first day of each month (or the next succeeding busi- ness day in the event the first day of such month is not a business day). Tenant shall pay to the Landlord Tenant’s “Proportionate Share” of Basic Operating Costs, without any reduction, abatement, counterclaim or offset, within ten (10) days of receipt of the billing for such Basic Oper- ating Costs from Landlord. The term “Proportionate Share” means a fraction, the numerator of which is the square footage of the Leased Premises and the denominator of which is the total square footage of the Building, or the percentage identified in Exhibit B for utility costs. The Proportion- ate Share is as follows: Rent per Months Sq. Ft. Sq. Ft. Annual Rent 1 to 12 9,138 $8.91 $81,419.58 13 to 24 9,138 $9.18 $83,886.84 25 to 36 9,138 $9.45 $86,354.10 37 to 48 9,138 $9.74 89,004.12 49 to 60 9,138 $10.03 $91,654.14 61 to 72 9,138 $10.33 $94,395.54 73 to 84 9,138 $10.64 $97,228.32 85 to 96 9,138 $10.96 $100,152.48 97 to 108 9,138 $11.29 $103,168.02 109 to 120 9,138 $11.63 $106,274.94 If any Gross Rent is not paid within ten (10) days of the due date, Tenant shall pay a late penalty of Five Hundred and No/100 Dollars ($500.00). 2. Landlord will have on ongoing option to terminate the Lease with no less than 12 months written notice to Tenant any time after the 61-month of this Lease. The lease can only terminated by the Landlord is the space will be used by the City of Lino Lakes or another gov- ernment agency 3. Tenant shall not, without the prior written consent of Landlord, make alterations, improvements, or additions to the Leased Premises subject to Article 5, Alterations. All other terms, conditions and covenants of this LEASE shall remain in full force and effect. IN WITNESS WHEREOF, the parties hereto have executed this Amendment as of the day and year first above written. Landlord: City of Lino Lakes: By: __________________________________ Its: City Administrator By: __________________________________ Its: City Clerk Tenant: New Creations Child Care and Learning Center, LLC: By: __________________________________ Its: ______________________________ CITY COUNCIL AGENDA ITEM 3B STAFF ORIGINATOR: Karissa Bartholomew, Human Resources Manager MEETING DATE: June 25, 2018 TOPIC: Internship Extension for Recycling Intern VOTE REQUIRED: 3/5 INTRODUCTION The Council is being asked to extend Sayard Schultz’s Recycling Intern position for an additional six months. BACKGROUND Sayard Schultz started her six-month internship on January 11, 2018. Staff is requesting that her employment be extended through January 11, 2019. This position is funded through the Anoka County SCORE Grant program. Schultz will work for 29 hours a week at $13.00 an hour. RECOMMENDATION Approve the six-month internship extension for Sayard Schultz. CITY COUNCIL AGENDA ITEM 3C STAFF ORIGINATOR: Jeff Karlson MEETING DATE: June 25, 2018 TOPIC: Labor Agreement with AFSCME, Local No. 2454 VOTE REQUIRED: 3/5 INTRODUCTION We have reached a tentative two-year agreement with AFSCME, Local No. 2454 for 2018 and 2019. After several negotiation meetings, including two mediation sessions, the union voted in favor of accepting the following terms: 1. WAGES: 2.75 percent wage increase retroactive to January 1, 2018, and 2.5 percent wage increase, effective January 1, 2019. 2. HEALTH INSURANCE: Article 16.1 revised to read: a) Effective January 1, 2018, Employer will contribute $566.73 toward the monthly premium for single coverage and $1,182.26 toward the monthly premium for family coverage. b) Effective January 1, 2019, Employer will contribute 100% of the base single plan and $1,182.26 plus 50% of the 2019 premium increase toward the family plan. c) The Employer’s contributions toward the Health Savings Accounts and the cash option for waiving coverage are the same. 3. FUNERAL LEAVE: An employee shall be granted paid funeral leave of up to three days for a mother-in-law and father-in-law. 4. PROBATIONARY PERIODS: Probationary period increased from three months to six months for employees promoted to another position. 5. REST PERIODS: Employees scheduled to work an 8-hour day may, with supervisor approval, combine their paid rest periods and unpaid lunch break at or near the midpoint of their scheduled shift. RECOMMENDATION Authorize execution of 2018-2019 labor agreement between the City of Lino Lakes and AFSCME, Local No. 2454. ATTACHMENTS City’s Final Offer to Union 2018-2019 LABOR AGREEMENT BETWEEN CITY OF LINO LAKES AND AFSCME LOCAL 2454 LAST, BEST, FINAL OFFER FROM EMPLOYER 05-07-2018 Article 4: Hours of Work 4.3 Change to read: All employees work schedules shall provide for at least one 15-minute rest period during each one-half shift. Employees scheduled to work an 8-hour day may, with supervisor approval, combine their paid rest periods and unpaid lunch break at or near the mid-point of their scheduled shift. The rest period shall be scheduled at the middle of each one-half shift, whenever possible. Employees who are authorized to work beyond their regular quitting timeschedule shall receive a rest period if one is necessary due to length of overtime authorization.. TA: 11-27-17 Article 10: Miscellaneous Leaves 10.1 Add to funeral leave: Three days for the death of a mother-in-law or father-in-law. TA: 11-27-17 Article 11: Wages 11.9 Remove in its entirety. For the purposes of step/ wage increases, all members of this group hired after January 1, 2006, shall have as their anniversary date, the date they were hired. Employees hired prior to January 1, 2006, will have an anniversary date of January 1 until they reach the top of their wage scale. TA: 11-27-2017 Article 13: Grievance Procedures 13.4 Add at the end of first statement: “. . . unless by mutual agreement the Employer and the Union agree to a higher step.” TA: 12-7-17 Article 14: Seniority 14.4 Probationary periods: 3. Promoted employees will serve a three monthsix-month probationary period with a review after three months. TA: 12-7-17 Article 16: Insurance 16.1 50/50 split on premium increases; no change to HSA contribution 16.6 Move to Article 9, new Section 9.3: The employee agrees to establish a Post-Retirement Health Saving Account for eligible employees. The Employer will forward 100% of the eligible sick leave severance upon termination of employment to the plan administrator. TA: 11-27-17 Article 22: Duration – Two years Appendix A: Wage Schedule 1) List exempt positions alphabetically as annual salary amounts. TA: 11-27-17 2) List non-exempt positions alphabetically as hourly amount. TA: 11-27-17 3) 2018: 2.75% ATB wage increase 4) 2019: 2.50% ATB wage increase 1 CITY COUNCIL AGENDA ITEM 6A STAFF ORIGINATOR: Katie Larsen, City Planner MEETING DATE: June 25, 2018 TOPIC: Nature’s Refuge i. Consider Second Reading of Ordinance No. 05-18 Rezoning Property from R-1, Single Family Residential to PUD, Planned Unit Development *Council may vote to dispense with the full reading of the ordinance *Roll call vote is required for adoption of the ordinance ii. Consider Resolution No. 18-70 Approving PUD Development Stage Plan/Preliminary Plat VOTE REQUIRED: 3/5 INTRODUCTION Preferred Builders, Inc. submitted a third set of revised plans for Nature’s Refuge, a conservation residential subdivision, located north of Main Street and west of Lino Lakes Elementary School. The original development proposed 60 single family lots and the second revised plan proposed 62 lots. The third revised plan set proposes 61 single family lots that all meet the minimum 10,800 sf net area. The development contains 3 parcels totaling approximately 95 gross acres. The Land Use Applications are:  Rezone property from R-1, Single Family Residential to PUD, Planned Unit Development  PUD Development Stage Plan/Preliminary Plat This staff report is based on review the following plan sets and documents:  June 15, 2018: Preliminary Plan Set prepared by Carlson McCain  June 16, 2018: HydroCAD report prepared by Carlson McCain  June 15, 2018: Tree Inventory Report, prepared by Carlson McCain  June 4, 2018: Traffic Study prepared by Spack Consulting  April 18, 2018: Revised WCA Wetland Permit Application, prepared by Kjolhaug Environmental Services Company 2 At the June 4, 2018 Council Work Session, the City Council reviewed the development and expressed concerns about the proposed PUD flexibilities and those lots that did not meet the minimum 10,800 sf net area. Resolution No. 18-70 includes and omits the following PUD flexibilities that resulted from the June 4th and June 11, 2018 City Council meetings: 1. Reduced minor collector road right-of-way width from 80 feet to 60 feet on Street A and Street C 2. Reduced front setback from 40 feet to 30 feet on Street A and Street C 3. Reduced paved road surface width from 32 feet to 28 30 feet (back to back) on cul de sac Street D and cul de sac Street E 4. Reduced local road right-of-way width from 60 feet to 50 feet on Street E 5. Reduced front setback from 30 feet to 25 feet for Lots 1-5, Block 1 along Street E 6. Reduced lot depth from 135 feet to 120-125 feet for Lots 1-4, Block 5 along Street C 7. Landscaping shall be allowed in the drainage and utility easements covering the 15 foot wide landscape buffer area in Outlot E and Outlot F. BACKGROUND History The concept of Nature’s Refuge was first presented to the City in 2006 as a conservation subdivision. The original site was 232 gross acres (approximately 100 acres upland and 132 acres wetlands/conservation easements) and 278 single family units were proposed. A mandatory Environmental Assessment Worksheet (EAW) was prepared because the 278 housing units exceeded the 250 housing unit Environmental Review Record (ERR) threshold. It was determined the project did not have the potential for significant environmental effects and the Council passed Resolution No. 07-06 making a Negative Declaration on the Need for an EIS. The original project did not materialize past the EAW process due to the decline in the housing market and no preliminary plat was ever submitted. The proposed project is smaller in scope and size with 62 single family units on 95 gross acres. Existing Site Conditions The 95 gross acre site is north of CSAH 14 (Main Street), west of CSAH 23 (Lake Street) and immediately west of Lino Lakes Elementary School. The southern and central parts of the site consist of annually-tilled cropland. The northeastern part of the site consists of a large wetland complex. The northwestern part of the site includes woodlands. Rare plants and animal species (Blanding’s Turtle) have been documented on site. Ground elevations on the site range from 912 feet above msl in the southern part of the site where an equipment building is located, down to 902 feet above msl in the open water parts of the large wetland in the northeastern part of the site. Anoka County Ditch 32 (ACD 32) flows across the site from east to west. The upland soils beneath the topsoil are poorly graded sand with silt, not hydric and are classified as hydrologic groups A and B/D that signifies the soils are generally suitable for storm water infiltration. Groundwater was encountered at depths ranging from 4 to 11 feet which could affect infiltration. 3 A large lot (2+ acre) rural subdivision exists along Wood Duck Trail immediately to the west of the proposed development. Four (4) single family homes exist along the north side of CSAH 14 (Main Street). Highland Meadows West, an R-1 residential subdivision, was platted in 2001 south of Main Street. Zoning Current and Proposed Zoning The property is currently zoned R-1, Single Family Residential and will be rezoned to PUD, Planned Unit Development to allow flexibility in right-of-way width and setback to support the conservation subdivision. Street A and Street C to the north are considered minor collector roads per the 2030 Transportation Plan. Standard ordinance requirements are 80 foot wide right-of-way with 40 foot setbacks. The intent of these requirements is to allow for any future road widening on major collector roads and provide greater separation along higher capacity roads. A 60 foot wide right-of-way with 30 foot setbacks is proposed to minimize quality wetland and rare plant species impacts. These standards are consistent with local roads and R-1 single family residential standards. The PUD development process implements the goals and policies of the comprehensive plan by providing flexibility from the strict standards of the zoning ordinance to allow for this type conservation subdivision development. Current Zoning R-1, Single Family Residential Proposed Zoning PUD, Planned Unit Development Current Land Use Agricultural Future Land Use per CP Low Density Residential (1.6 to 3.9 units per acre) Utility Staging Area 1A=2008-2015 Density The site is guided for low density residential development which requires a density of 1.6 to 3.9 units per net acre. The proposed net density is 1.70 units per acre which is consistent with the Comprehensive Plan’s guided land use and density. Wetlands and wetland buffers make up 57 acres (60%) of protected open space. The following chart implements Met Council’s formula for calculating net density. Gross Area (acres) 95.05 Wetlands & Water Bodies (42.33) Public Parks & Open Space 0.00 Arterial ROW (1.33) 4 Other (Utility Transmission Easement) (0.40) Other (Wetland Buffer Area) (15.10) Net Area (acres) 35.89 # of Units 61 Gross Density (units/acre) 0.64 Net Density (units/acre) 1.70 Surrounding Zoning and Land Use Direction Zoning Current Land Use Future Land Use North R-X, Rural Executive & R-1, Single Family Agricultural Low Density Sewered Residential South R-1, Single Family Single Family Residential Low Density Sewered Residential East R-1, Single Family & PSP, Public Semi-Public Single Family Residential & School Low Density Sewered Residential & Civic/Institutional West R, Rural Rural Residential Urban Reserve Zoning Requirements The site will be rezoned to PUD, Planned Unit Development to allow flexibility in right-of-way width and setback from minor collector road. The regulations and performance standards of the R-1, Single Family Residential zoning district will be in effect unless otherwise stated in Council resolution or Development Agreement. Lot Comparison R-1 vs. Nature’s Refuge Standard R-1 Requirements Proposed Nature’s Refuge Min. Lot Size1 10,800 sf Min. = 10,800 sf Ave. = 12,530 sf Min. Lot Width 80 ft Min. = 80 ft Min. Lot Depth 135 ft Min. = 135 ft Building Setback (feet) 5 -From Local Streets 30 ft 30 ft -From Collector or Arterial Streets 40 ft 30 ft (Street A-E)2 40 ft (Main Street) -Rear --Principal 30 ft 30 ft -Accessory 5 ft 5 ft -Side --Principal 10 ft 10 ft --Accessory 5 ft 5 ft Buffer Adjacent to Collector 15 foot Required Impervious Surface 40% Required 1Net area required is 10,800 sf of contiguous buildable land 2PUD flexibility approved by Council A 15 foot wide landscape buffer has been provided along CSAH 14 (Main Street) outside of the existing 100 foot wide private utility easement and is contained in an outlot that will owned and maintained by a homeowner’s association (HOA). A 6 foot high privacy fence is proposed along Lot 1, Block 7 that will provide screening along CSAH 14. Shrubs and plantings are provided along the exterior side of the fence. Building Type and Construction At the time of building permit, each individual single family dwelling unit will be reviewed for compliance with Section 1007.043(2)(a) General Building Provisions and the R-1, Single Family Residential requirements regarding floor area, garage and design and construction standards. Subdivision Ordinance Conformity with the Comprehensive Plan and Zoning Code The preliminary plat is consistent with the comprehensive plan for a conservation subdivision as discussed below. The PUD provides flexibility from the strict standards of the zoning ordinance. Blocks and Lots The preliminary plat has 61 single family lots and 6 outlots. The outlots are for stormwater management facilities, wetland areas, open space and trail corridors. Ownership of each outlot (City, HOA, developer etc.) shall be determined at the time of final plat approval. 6 Outlot F has been extended along the south boundary of Lot 1, Block 7 and incorporates the existing private utility easement. Instead of a 15 foot wide landscape buffer, a 6 foot high privacy fence is proposed along Lot 1, Block 7 that will provide screening along CSAH 14. The original preliminary plat indicated a ghost plat of potentially 8 more single family lots north of ACD 32. Due to a redesign in the sanitary sewer, the area north of ACD 32 can now be serviced. The revised preliminary plat proposes 5 single family lots north of ACD 32. A new ghost plat now extends further north onto the adjacent parcel. Streets and Alleys CSAH 14 (Main Street) is a Principal Arterial road. Streets A and Street C (north of Street A) are identified as minor collector roads in the Transportation Plan and provide a north-south corridor. The 1999 Anoka County TH 242/CSAH 14 Access Management Plan identifies at- grade full access at Wood Duck Trail and CSAH 23 (Lake Drive) and restricted movements along the site’s corridor. The site plan has been reviewed by Anoka County Highway Department. They have identified the need for additional right-of-way (70-75 feet) and right and left turn lanes on CSAH 14 (Main Street). Twelve foot wide east bound and west bound turn lanes have been shown on the site plan. Detailed construction plans shall be required with the PUD Final Plan/Final Plat. The internal road system (Streets A thru C) has 60 foot wide right-of-ways and 32 foot wide (back to back) paved road surface. Street D and Street E are cul de sacs with 60 foot wide right-of-way and 30 foot wide (back to back) paved road surface. The intersection of Street A and CSAH 14 (Main Street) has an 80 foot wide right-of-way and 42 foot wide (back to back) paved road surface. Sidewalks are proposed along the east side of both Street A and Street C. Street C terminates in a temporary dead-end to the west, abutting 8024 Wood Duck Trail. This stub provides opportunity for future extension and residential development to Wood Duck Trail. This is consistent with the County Access Management Plan. Street C also terminates in a temporary cul de sac to the north and provides opportunity for future extension to the north. The revised plans propose full street, utility and trail construction of Street C north of ACD 32 to the property line. Five lots are proposed along the west side of the street. Street B provides future access to Lino Lakes Elementary School to the east. In 2017, the school began a building remodeling and parking lot reconstruction project. An opportunity to eliminate the school’s west driveway and connect with Nature’s Refuge was identified as a safety benefit. The City and Anoka County are working with the school district to complete this connection. Ultimately, it is the school districts decision when to make this connection. The Traffic Study was revised on June 4, 2018 by Spack Consulting in relation to the Nature’s Refuge development. The results of the study are explained further in this staff report. Easements Standard drainage and utility easements at least 10 feet wide are provided along all lot lines. Easements at least 20 feet wide are provided over utility pipes. 7 Drainage and utility easements are required to be dedicated 10 feet above the high water level over stormwater drainage ponds and 10 feet outward from the delineated wetland boundary. This requirement is satisfied because easements will be dedicated over the entire outlots. Rear lot lines also have a minimum 10 foot wide easement. Conservation easements shall be required over Outlots A, B, C and D. A 100 foot wide private utility easement in favor of Great River Energy exists along the southern boundary of the development. Landscaping shall be allowed in the drainage and utility easements covering the 15 foot wide landscape buffer area in Outlot E and Outlot F. Storm Water Management and Erosion and Sediment Control Per the revised Stormwater Management Plan prepared by Carlson McCain dated April 11, 2018, all of the site’s stormwater eventually flows to ACD 32 and to the west. Stormwater leaves the project boundary at two locations: via ACD 32 and a small portion of the property discharges to a ditch along Main Street. The total proposed post-development impervious surface area is approximately 10.4 acres. Soils on the site are classified as Hydrologic Soil Group A/D. Groundwater elevations ranged from 898 feet to 904 feet. The Stormwater Management Plan and plan sheets identify four (4) stormwater ponds, one (1) infiltration basin and Wetland C on site. Pond 100 and Pond 400 are required for stormwater management. Pond 200 and Pond 300 are material excavation ponds. The storm water ponds and trails are located near the wetlands and upland buffers. This strategic design is the basis of the City’s greenway system by creating a multi-functional greenway corridor intended to provide areas for stormwater management, upland buffers for wetland protection and natural resource conservation, and open space and trails for people. A maintenance access trail is shown around Pond 200. This access trail will be graded but will not require gravel or paved improvements. Ownership of each outlot (City, HOA, developer etc.) shall be determined by the time of final plat approval. The site will be mass graded in one (1) phase. Residential home development will occur over several years. Utilities Public water, sanitary and storm sewer utilities will be installed within the development. 8 Sanitary Sewer A 21” trunk sanitary sewer main located along CSAH 14 (Main Street) serves the site. An 8” and 10” sanitary sewer pipe serves the site internally. Future development to the north will potentially require a lift station. Sanitary sewer will also be stubbed to the west to accommodate future development. Watermain A 12” trunk watermain located along CSAH 14 (Main Street) serves the site. An 8” and 16” watermain serve the site internally and loops the system to CSAH 14 (Main Street). Watermain will be stubbed to the west and north property boundaries for future development. Public Land Dedication The City will require cash in lieu of land dedication. Per the City’s Park, Greenway & Trail System Plan, a neighborhood park is not programmed for this area. Lino Lakes Elementary School is immediately adjacent to the development and provides a joint-use opportunity between the city and school for shared use of facilities. Nature’s Refuge 61 lots x $3,000 = $183,000 The Park, Greenway & Trail System Plan identifies the need for a future city trail running north-south through the development along greenway corridor. Due to concerns regarding potential impacts to the rare plant species behind Lots 1-4, Block 5, an 8.5 foot wide paved trail will be constructed on the west side of the development along Pond 100 and 200 utilizing the maintenance access path. Outlot C of the revised plans accommodates a 25 foot wide trail corridor as required in the original review comments. Staff and the applicant will further evaluate whether a 25 foot wide outlot or trail easement will be required. Plans have been revised to include a 10 foot wide trail along CSAH 14 (Main Street). The timing of this trail construction is to be determined based on available funds. The section of sidewalk extending along Street A from Main Street to Street B shall also be revised to be an 8.5 foot wide trail. Credit will be given for trail construction. The Park Board reviewed the plans on February 5, 2018. The Board recommends collecting park fees to potentially fund enhancements at Lino Lakes Elementary School. Tree Preservation The goal of tree preservation is to minimize unnecessary loss of habitat, biodiversity and forest resource and to replace removed trees in areas where tree cover is most critical. The revised 9 Tree Inventory Report prepared by Carlson McCain dated June 15, 2018 identifies 1,151 significant trees on site and 950 will be saved. The Tree Preservation Plan identifies the basic use area and environmentally sensitive areas. There are 201 trees within these areas proposed for removal. This requires 138 replacement trees for mitigation. The developer and Environmental Coordinator shall determine the best location for these replacement trees. The Environmental Coordinator also reviewed the Tree Preservation Plan and made suggestions for removal of hazardous or unhealthy trees. There are 14 non-significant trees proposed for removal. No mitigation is required for these trees. Landscaping Boulevard trees are required at the rate of one (1) tree per lot frontage for single family. There are 61 single family lots and 105 boulevard trees are proposed which is compliant with the ordinance. Open area landscaping standards required 1 large tree and 3 large shrubs per 2,000 sf. Per the Landscape Plan, there is 449,471 sf of open area requiring 224 overstory trees and 673 large shrubs. Desirable existing trees may be used to fulfill open area landscape requirements. The Environmental Coordinator shall detail the locations where open area mitigation trees shall be planted. Special attention will be made to preserve and/or create a landscape buffer along the west side of the development abutting the residential properties along Wood Duck Trail. A 15 foot wide landscape buffer has been provided along CSAH 14 (Main Street) outside of the existing 100 foot wide private utility easement and is contained in an outlot that will owned and maintained by a homeowner’s association (HOA). A 6 foot high privacy fence is proposed along Lot 1, Block 7 that will provide screening along CSAH 14. Shrubs and plantings are provided along the exterior side of the fence. Landscaping shall be allowed in the drainage and utility easements covering the 15 foot wide landscape buffer area in Outlot E and Outlot F. Environmental Assessment Worksheet (EAW) As previously noted, in 2006 a mandatory Environmental Assessment Worksheet (EAW) was prepared for the original Nature’s Refuge concept because the proposed 278 housing units exceeded the 250 housing unit threshold. The EAW thoroughly analyzed potential impacts to wetlands, rare plant and animal species, floodplain, water quality, noise, traffic and archeology. It was determined the project did not have the potential for significant environmental effects and the Council passed Resolution No. 07-06 making a Negative Declaration on the Need for an EIS. The scope and size of the current proposed Nature’s Refuge (61 housing units on 95 gross acres) is much smaller than the original 2006 proposal (278 housing units on 232 gross acres). An EAW is not required for the current proposed Nature’s Refuge because the 62 housing units do not exceed the 250 housing unit threshold. 10 Traffic Study A revised Traffic Study was prepared by Spack Consulting on June 4, 2018 based on 60 single family lots. Although the revised plans indicate 61 new single family lots, the data of the traffic study is still relevant. The development is forecasted to generate approximately 565 new trips per day with 45 new trips in the a.m. peak hour and 60 trips in the p.m. peak hour. Traffic impacts are analyzed in terms of volume and capacity. Volume quantifies the number of trips and capacity quantifies the number of vehicles the road can accommodate. Traffic Volumes Roadway Location Existing AADT Volumes1 2030 Forecasted Volumes2 CSAH 14 (Main Street) West of 4th Avenue 8,400 21,900 CSAH 14 (Main Street) Near Site 8,400 20,500 CSAH 14 (Main Street) East of CSAH 23 (Lake Drive) 8,200 10,950 CSAH 23 (Lake Drive) South of CSAH 14 (Main St) 11,000 14,600 CSAH 14 (Main Street) North of CSAH 14 (Main St) 8,700 15,300 1Year 2015 AADT Volumes from MnDOT Traffic Mapping Application 2Includes traffic from Nature’s Refuge Existing traffic volumes near the site are 8,400 AADT (annual average daily traffic). Nature’s Refuge will generate approximately 565 new trips per day. These projected traffic volumes are included in the 2030 forecasts. The traffic study also projected future development to the north of Nature’s Refuge. A potential of 99 single family homes could generate 934 new trips per day and Street B connection to Lino Lakes Elementary School could generate 482 trips per day. The traffic study notes the City’s 2030 Transportation Plan identifies CSAH 14 as a future four-lane divided road by the year 2030. It should be noted there is no timeframe as to when these improvements will occur. Traffic Capacity A ratio of volume to capacity is used to analyze traffic congestion. Per the traffic study, a 2- lane road is considered congested when volumes reach 8,900 to 18,300 vehicles per day. The existing 2015 AADT of 8,400 trips plus the proposed Nature’s Refuge trips of 565 equals approximately 8,965 trips per day near the site. Future development to the north and the school connection would increase to 10,381 trips per day. 11 Level of Service Level of service is a term to measure how traffic operates in intersections. An “A” level of service represents best conditions and an “F” represents the worse. Roadway Location Current 2015 LOS 2021 Build LOS CSAH 14 (Main Street) West of 4th Avenue C C CSAH 14 (Main Street) Near Site C C CSAH 14 (Main Street) East of CSAH 23 (Lake Drive) C C CSAH 23 (Lake Drive) South of CSAH 14 (Main St) C C CSAH 14 (Main Street) North of CSAH 14 (Main St) C C Per Section 1001.013(2)(c), a proposed subdivision shall meet the following requirements: 2. If the existing LOS outside of the proposed subdivision is C, traffic generated by a proposed subdivision will not degrade the level of service below C. Per the traffic study, the existing LOS is C and the 2021 Build LOS is C. The proposed development meets the subdivision ordinance requirements. The traffic study notes the added roadway traffic due to the proposed Nature’s Refuge develop will have an impact on the surrounding roadways but that impact is minor. To mitigate impacts and improve safety, right and left turn lanes on CSAH 14 (Main Street) are being constructed. A southbound right turn lane from Street A onto CSAH 14 (Main Street) is also being constructed. This is supported by Anoka County Highway Department. The City and County are also working with Lino Lake Elementary School to eliminate their westerly driveway and connect with Nature’s Refuge. Wetlands A WCA Notice of Decision for the wetland boundary delineation was approved by RCWD on June 16, 2016. Seven (7) wetlands were delineated on site totaling 41.91 acres. ACD 32 is not classified as a wetland. A revised WCA Permit Application for wetland sequencing and mitigation was prepared by Kjolhaug Environmental Services on April 18, 2018. The project area is located within in the RCWD Lino Lakes Comprehensive Wetland Protection and Management Plan (CWPMP) area. The intent of the CWPMP is to preserve/enhance high-priority wetlands/wetland corridors. Six (6) of the 7 wetlands are in the Wetland Management Corridor (WMC). The exception is Wetland 1. Wetland buffer easements covering 14.2 upland acres will protect the WMC. 12 In summary, post-development wetland hydrological regime is equal to predevelopment conditions, wetland water quality is higher overall than pre-development conditions, and wildlife habitat structure improves overall post-development likely due to removal/conversion of cropland to permanent upland buffer. Per Sheet W1, Wetland Buffer Exhibit prepared by Carlson McCain revision dated June 15, 2018 and the Kjolhaug Wetland Application: Wetland Summary Total Delineated Wetlands 41.9 acres Wetland Fill 1.6 acres Wetland Enhancement 3.8 acres Vegetation Restoration 4.4 acres WMC Buffer Area 14.2 acres Wetland Bank Credit 0.0976 acres Conservation easements shall be required over Outlots A, B, C and D. Rare & Endangered Species Minnesota endangered and threatened species must be considered when submitting a wetland replacement plan. A rare plant survey identified portions of three populations of state- threatened plant species that would be impacted by the development. A Takings Permit Application has been submitted to the MNDNR for their review and approval. Impacts to this habitat have been minimized by reducing the road right-of-way width and setback and relocating the trail to the west side of the development. Federal endangered species of concern in the region include the northern long-eared bat (NLEB). Based on the tree species present onsite and the fact that there are no known NLEB hibernacula or roosting colonies in the project vicinity, negative effects to the NLEB or its habitat are not expected. Floodplain The 2015 DFIRM indicates Zone A floodplain on site, mainly over the easterly wetland complex and along ACD 32. Per RCWD modeling data, the east floodplain base flood elevation is 904.5 and the west floodplain elevation is 904.2. Per Sheet FP, Floodplain Exhibit, 215 cy of floodplain fill is required. Proposed floodplain mitigation is 47,700 cy. The floodplain impacts on the east side of the development are related to the stormwater pond and trail construction. Trail and storm pond design has been revised to avoid the need for any floodplain fill. 13 A FEMA Conditional Letter of Map Revision (CLOMR) or Letter of Map Revision (LOMR) is not required because floodplain impacts do not encroach into any single family lots. Growth Management Policy Per the Comprehensive Plan (page 3-27), an annual average of 230 units per year over each 5 year phasing period not to exceed 345 units in any 1 year is allowed. At the end of the 5 year phasing period unallocated units will be averaged out over the next 5 years. Nature’s Refuge is proposed to be graded and developed in one (1) phase. Homeowner’s Association (HOA) A homeowner’s association shall be required to maintain landscape buffer areas, any common area/signage and possibly certain stormwater ponds (i.e. Pond 300). Details regarding ownership and maintenance will be finalized during the final plat process. Comprehensive Plan Resource Management System Plan The Resource Management System Plan provides the conservation design framework for the Comprehensive Plan and sustainable decisions regarding growth and development. It provides a unified system approach to natural resource management and natural resource based amenities. Goals of the Resource Management System Plan include:  Parks, Trails, Open Space and Recreation o Goal #3: Develop, maintain, and connect the current and proposed trails in the City of Lino Lakes and Rice Creek Regional Park in a manner that preserves and sustains the natural environment.  Natural Resources and Amenities o Goal #1: Identify, protect and preserve the desirable natural areas and ecological and aquatic resources of the community. o Goal #2: Initiate and continue vigorous collaborations and programs to address, restore, and preserve the water quality of the region’s lakes, wetlands and other aquatic assets.  Land Use Policies o Goal #1: Ensure that well-planned, quality residential, commercial, industrial and institutional development to accommodate the city’s projected growth needs occurs in a manner that also conserves and enhances the city’s natural resources and amenities. The Resource Management System Plan identifies the following needs in the area: 14  Proposed designated bike route  Trails  Greenway system connectivity An 8.5 foot wide trail is provided along the wetland corridor and greenway system. A 10 foot wide trail corridor is provided along CSAH 14 (Main Street). Future trail extensions to the north between the storm water ponds and wetland corridor would connect and further enhance the greenway and park system. Nature’s Refuge addresses the goals of the Resource Management System by creating a residential conservation subdivision and multi-functional greenway corridor that integrates the stormwater management system, wetland management and open space areas and trails into one unified system. Land Use Plan Goal 1: Create a unified vision and future for the city, promote a well-planned community, prevent fragmented development, address the impacts of development and redevelopment on natural resources, aesthetics and view corridors, and provide balanced land use and connectivity that ensures the integration of both sides of the regional park. Policies established to obtain this goal include: 1. Provide clearly defined incentives to achieve significant and discernable public values not achievable under conventional development standards. These public values include, but are not limited to: a. Preserving open space, providing park dedication and trails, and/or providing stormwater management areas, in excess of minimum standards to implement the Resource Management System Plan, as amended, and Rice Creek Watershed District’s Lino Lakes Resource Management Plan, as amended b. Restoring/enhancing ecological systems c. Managing stormwater using natural filtration and other ecologically based approaches d. Providing life-cycle and affordable housing e. Diversifying the tax base to lessen the tax burden on residential properties f. Providing infrastructure that benefits community beyond the project site that would otherwise not be financially feasible 2. Identify and define incentives offered to developers for achieving specific public values not achievable under conventional development standards. These incentives may include, but are not limited to: a. Reduced street and right-of-way widths b. Trunk utility and stormwater management fee credits c. Staging plan flexibility 3. Encourage master planning to accomplish the objectives of the Comprehensive Plan including, but not limited to, implementing the Resource Management System Plan, as amended, implementing Rice Creek Watershed District’s Lino Lakes Resource Management Plan, as amended, providing life-cycle housing, and diversifying the city’s tax base. 15 As previously discussed, the site is guided for low density residential development which requires a density of 1.6 to 3.9 units per acres. The proposed net density is 1.70 units per acre which is consistent with the Comprehensive Plan’s guided land use and density. Wetlands and wetland buffers make up 57 acres (60%) of protected open space. Nature’s Refuge meets the land use goals by creating a residential conservation subdivision that supports public values by integrating the stormwater conveyance systems, wetland restoration and open space areas and trails into a multi-functional greenway corridor. The development implements the Resource Management Plan, provides housing, promotes pedestrian connectivity and diversifies the city’s tax base. Housing Plan Goal 3: Ensure housing development is compatible with existing and adjacent land uses and provides accessibility to key community features and natural amenities. Policies include linking trails to parks, lakes and schools. Nature’s Refuge meets the goal of the housing plan. The development is compatible with the existing adjacent residential and institutional (elementary school) land uses. Trails and sidewalk link the development to the natural resource, school and CSAH 14 (Main Street). Economic Development Goal 1: Expand and diversify the city’s tax base by encouraging mixed-use and nodal development to lessen the tax burden on residential properties. Policies include developing walkable neighborhoods with commercial nodes and amenities for residents. Nature’s Refuge meets the goals of the economic development plan. It is less than ½ mile west of the intersection of CSAH 14 (Main Street) and CSAH 23 (Lake Drive) which has been identified as a mixed use and commercial node in the city. The development provides an internal sidewalk and trail system to CSAH 14 (Main Street). A proposed regional trail corridor along CSAH 14 (Main Street) has been identified that will provide a future link from the residential development to the commercial node. Transportation Plan Goal 1: Plan for and achieve required street improvements and connectivity throughout the City of Lino Lakes. Goal 2: Ensure that streets and roads are as safe as possible. Goal 6: Promote alternative transportation such as bicycling, walking, transit and rail. Policies: 1. Work to physically connect neighborhoods with roads and pedestrian/bicycle links. 2. Encourage sidewalks and separated pathways along all arterial collector, and local streets in developing residential and commercial areas. 16 Goal 7: Maintain and coordinate the transportation system with adjacent communities, Anoka County, Washington County, Metropolitan Council and Mn/DOT. Policies: 1. Use the functional classification system to define and plan existing and new roadways. 2. Develop and utilize access management guidelines in conjunction with Anoka County. 3. Continue to work with surrounding jurisdictions, state and federal agencies to ensure an integrated transportation system. Nature’s Refuge meets the goals of the 2030 Transportation Plan. The Plan identifies the need for a north/south minor collector road through this development. Street A and Street C are the minor collector roads that will eventually extend north to Pine Street upon future development. Sidewalks and trails throughout the Nature’s Refuge provide alternative modes of transportation. The 1999 Anoka County TH 242/CSAH 14 Access Management Plan identifies at-grade full access at Wood Duck Trail and CSAH 23 and restricted movements in between. Nature’s Refuge is consistent with the access management plan. Sanitary Sewer Plan Goals of the sanitary sewer plan are to ensure well-planned, quality residential development that conserves and enhances the city’s natural resources and to provide an affordable and safe sanitary sewer system. Nature’s Refuge meets the goals of the sanitary sewer plans. The site is located in Sanitary Sewer District 2 (Sub-district 2B) and is ultimately served by MCES Interceptor 83-61, a 24- inch gravity sewer located in North Road which is adequately sized for the development in the district. The site is located in Utility Staging area 1A=2008-2015. Water Supply Plan A goal of the water supply plan is to provide residents affordable potable water that is safe and of high quality for daily consumption and fire demand. Nature’s Refuge meets the goals of the water supply plan. The site is served by a 12” watermain located along CSAH 14 (Main Street). The water system has capacity to serve this residential development. Planning Districts The site is located in Planning District 2 and is guided for low density residential development. A recommendation for District 2 is to implement the Main Street Access Management Study. Nature’s Refuge implements this plan. 17 The site is located within the Marshan resource management unit (RMU) that identifies wetlands, the wetland preservation corridor and greenway system. Wetland buffers and conservation easements will protect the natural resources. PUD Final Stage Plan/Final Plat A land use application for PUD Final Plan/Final Plat shall be required. Findings of Fact The Findings of Fact for the Rezoning and PUD Development Stage Plan/Preliminary Plat are detailed in Ordinance No. 05-18 and Resolution No. 18-70, respectively. RECOMMENDATION The Planning & Zoning Board held a public hearing on February 14, 2018 and continued the hearing to May 9, 2018. Public comments included concerns regarding groundwater and wetland impacts, tree removal and additional traffic onto Main Street. The Planning & Zoning Board voted 6-0 in favor of the Rezoning and PUD Development Stage Plan/Preliminary Plat for Nature’s Refuge. At the June 4, 2018 Council Work Session and June 11, 2018 Council meeting, the City Council reviewed the development and expressed concerns regarding the proposed PUD flexibilities, especially those lots that did not meet a minimum 10,800 sf net area. The plans were revised to address these concerns. ATTACHMENTS 1. Aerial Map 2. City Engineer Letter dated June 22, 2018 3. Ordinance No. 05-18 4. Resolution No. 18-70 5. Preliminary Plan Set revision date June 15, 2018 prepared by Carlson McCain 0 1,000 2,000500 Feet MAIN STMAIN ST LAKE DR LAKE DR PINE ST NEPINE ST NE HENRY LNHENRY LN DIANE ST DIANE ST EVA ST EVA ST 81ST ST81ST ST EVERGREEN TRLEVERGREEN TRL DANUBE ST DANUBE ST HIGHLAND DRHIGHLAND DR BL A C K B I R D L N BL A C K B I R D L N WOODDUCK TRL WOODDUCK TRL ANDALL STANDALL ST EE LL BB EE SS TT BB LLUUEEBBIILLLL LLNN MAPLE STMAPLE ST ORANGE STORANGE ST OLIVE STOLIVE ST AAEENNOONN PPLL Aerial MapNature's Refuge µ   Building a legacy – your legacy. 701 Xenia Avenue South  Suite 300  Minneapolis, MN 55416  Tel:  763‐541‐4800  Fax:  763‐541‐1700    Memorandum   To: Katie Larsen, City Planner From: Diane Hankee PE, City Engineer Dane Ekdom, EIT   Date: June 22, 2018   Re: Nature’s Refuge Preliminary Plat Review WSB Project No. 011406-000       We have reviewed the Preliminary Plat documents received June 18, 2018 for the Nature’s Refuge development including:   • June 15, 2018: Preliminary Plan Set prepared by Carlson McCain • June 16, 2018: HydroCAD report prepared by Carlson McCain • December 5, 2017: WCA Wetland Permit Application, prepared by Kjoulhaug Environmental Services Company   The following are our review comments that should be responded to in writing by the applicant. City comments are in blue. The applicant shall submit an updated Geotechnical Report, SWMP, and RCWD approval for ACD 10-22-32 realignment, per our comments below.   Engineering   • General   The Nature’s Refuge development includes 95 acres north of CSAH 14 (Main Street), west of CSAH 23 (Lake Street) and east of Wood Duck Trail. The revised project proposes 62 single family houses and associated infrastructure. This property was originally part of a larger development of which an Environmental Assessment Worksheet (EAW) was prepared. The evaluation concluded that the project did not have the potential for significant environmental effects. The EAW included a comprehensive analysis of the area which we incorporated as part of our review for Nature’s Refuge.   The site has relatively flat topography, with elevations ranging from 904 to 914. Much of the site is below 905, which is the approximate elevation of the delineated wetlands on the site. The geotechnical conditions of the site indicate that there is one foot of topsoil overlaying glacier outwash including silty sand and poorly graded sand. Sandy lean clay   was found 29 and 40 feet below grade. The groundwater elevation at the south end of the site is 904 and 898 at the north end of the site.       1. Street C shall be extended to the north side of Anoka County Ditch (ACD) 10-22-32. This includes the extension of sanitary sewer and watermain and culvert crossing reconstruction/extension. The road bed shall be graded and restored for future extension and paving. Street C extended to the north extents of the property. 2. Sheet 13 (Preliminary Site and Utility Plan) shows an Outlot C in the same locations as previously identified Outlot B. Outlot lettering updated 3. Each plan sheet should include an accurate legend. Legend updated. 4. This project is assumed to be phased with Blocks 3, 4, & 5 being constructed as Phase 2. Noted. 2 phases proposed. 5. Standard Detail Plates from the City of Lino Lakes General Specifications and Standard Detail Plates dated February 2018 should be used in the “Details” section of the plans. Contact Ed Youngquist at the City of Lino Lakes for PDF versions. The city detail plates will be added in with final grading plans as well as final street and utility plans. 6. Applicant to include pedestrian curb ramps in final plat.   • Grading, Erosion and Sediment Control   The Nature’s Refuge development proposes the mass grading of 62 new single-family lots. It includes the extension of streets and utilities northerly from Main Street (CSAH 14). A project SWPPP was submitted and reviewed.   Comments:   1.The applicant shall submit the earthwork volume data for excavation and embankment. Earthwork balance is attached. 2.The applicant shall ensure that the proposed grading is not in conflict with the existing elevation south of Street B at the edge of the site. FES added to catch runoff in the created low area. 3. Label pre-drainage and post-drainage directional flow arrows. This is shown on the drainage figures in the SWMP. Drainage arrow need to be shown. Drainage arrows added. 4. Show locations for stockpiles and BMP measures for stockpile management. Stockpile locations will be determined by the grading contractor. BMP measures are detailed in the SWPPP. 5.The applicant shall show a screening berm along Main Street (CSAH 14) and grades to accommodate a trail, see comments in the transportation section. A berm is not possible with the drainage swale in the Outlot D. A 15’ landscape easement has been added along B4 L15-17 and a screening fence along B7 L1.   • Stormwater Management   The existing site is undeveloped and has Anoka County Ditch (ACD) 10-22-32 flowing   through the site from east to west. The site also contains several wetlands. The Nature’s Refuge development proposes a storm sewer and ponding system. The system shall meet the City’s and Rice Creek Watershed District’s (RCWD) Stormwater Management requirements. The total proposed impervious surface is 7.8 acres. They are proposing that the impervious areas be managed through storm water ponds, infiltration basins and wetlands and discharging to ACD 10-22-32.   Basin   NWL   HWL   Pond 100   902.5   905.2   Pond 200   901.5   902.6   Pond 300   902.0 Confirm   902.5   Pond 400   901.8   902.7   Basin 10   N/A   907.3   Wetland C   902.0   903.1   Per the submitted modeling the rate control for the site does not increase. The majority of the discharge leaving the site is through ACD 10-22-32.   Comments:   1. RCWD is the ditch authority for ACD 10-22-32 and is responsible for the maintenance, function and capacity of the ditch. The City of Lino Lakes would be responsible for Pond 200 maintenance and function. The ditch, and its associated rights, extend east and shall not be routed through the pond. The easement will extend around the north end of the pond to provide RCWD with the access needed. This has been discussed with the watershed. Applicant shall address water quality calculations, and confirm whether Pond 200 is necessary for water quality treatment for the impervious surface increase. If the pond is not necessary to meet water quality treatment, then similar to Pond 300, Pond 200 is recommended to be private and be maintained by the Home Owners Association. If Pond 200 is necessary for water quality treatment, the applicant shall work with the City as well as the RCWD Ditch Authority. Pond 200 should be 2 cells separating ACD 10-22-32 into one basin, and the City Pond into a second basin as needed for water quality. Pond 200 is not necessary to meet NURP requirements. Pond 200 and Pond 300 are not necessary to meet NURP requirements and should be identified as something other than a pond (lake, basin, etc.) and are also recommended to be maintained by the Homeowners Association. 2. Pond 300 is not considered a stormwater pond. It doesn’t meet the requirements for water quality treatment due to the depth. It was not included as part of the water quality calculations. It is recommended that this borrow area should be private and maintained by the Home Owners Association.. Comment Noted This shall be called out in the agreement and provided by the developer. 3. The applicant needs to adjust the location of the outlet control structures such that City can access and maintain. Specific to Pond 200. Access is provided to outlet control structures. 3A. Applicant to confirm that RCWD Ditch Authority to maintain outlets and   culverts within ACD 10-22-32 easement and submit information to the City. Waiting for verification from RCWD. 4.The applicant shall include the 10-day snowmelt event in modeling and update the proposed 10-day snowmelt HWLs on the plans. 10-day snow melt added to the models and report. Applicant shall include the modeled 10-day snowmelt HWLs on the plans. 10-day snow melt results are shown on the plans and will be included in the updated SWMP. 5.The applicant shall confirm the amount of new impervious. There are different numbers in Section 1.2 and Section 2.5 of the Stormwater Management Plan, Section 2.2 of the Stormwater Pollution Prevention Plan (SWPPP), and the HydroCAD modeling. New impervious area has been recalculated and confirmed. Addressed for Stormwater Management Plan and HydroCAD. Applicant shall update the SWPPP. SWPPP updated per SWMP updates. 6.See Table C3 in RCWD Rule C: Stormwater Management Plans for maximum curve numbers for existing conditions and adjust modeling accordingly. See section 4b for adjustments to curve numbers for proposed conditions. Curve numbers changed to match RCWD rules 7.The applicant shall confirm that the names of wetlands match between the existing conditions map and the existing conditions HydroCAD model. Node IDs are changed 8.The applicant shall provide the wetland susceptibility class, bounce, and inundation periods for impacted wetlands. See Table C4 and section 8 in RCWD Rule C. None of the wetlands provide retention or significant bounce in existing or proposed conditions because there is not a well-defined storage or outlet component. The submitted HydroCAD model indicates that wetlands on the site have storage and outlets. Please provide wetland susceptibility class, bounce, and inundation periods for impacted wetlands. Summary will be provided in the updated SWMP. The total bounce in the wetlands is less than 1 foot for the 100-year rainfall event. The outlets and storage are modeled as natural overflow weirs with typical undulating bottoms for storage. 9.The applicant shall refer to Table C5 in RCWD Rule C for soil infiltration rates. Comment Noted Applicant shall update infiltration rate in HydroCAD model for IB10 to be consistent with soil boring and Table C5. Soil boring SB-2 was placed in the infiltration area. The soil was described as silty sand overlying coarse-grained sand. This is consistent with an infiltration rate of 0.45. 10.The applicant shall update water quality standards to be consistent with the requirement to treat 1.1-inches of runoff for new or reconstructed impervious surface per section 6c of RCWD Rule C. See Table C1 in RCWD Rule C for the TP removal factor for stormwater ponds and apply as necessary. The applicant shall verify that the site is meeting water quality treatment standards. Meeting the standards is not feasible on this site due to the high water table. The applicant needs to meet water quality standards for the site. Please update Appendix C to account for the TP removal factor indicated for stormwater ponds (Table C1 in RCWD Rule C or Table 2 in Lino Lakes Code of Ordinances Chapter 1011). The applicant shall consider including a water quality discussion in Section 2 of the Stormwater Management Plan.   Updated TP removals will be included in the updated SWMP 11.The applicant shall verify HWLs for ponds. In some instances, they differ between the HydroCAD modeling and the plans. HWLs confirmed. The applicant shall revise the HWLs on the plans to match HydroCAD modeling. Plans are updated. Applicant shall clarify why two different 100-yr HWL and 10-day Snowmelt elevations are shown on the plans. 12.The applicant shall clarify the intent of the low area on Outlot D. If intended to be a stormwater pond, please include it in modeling. Node added 13.The applicant shall revise the ACD number it varies throughout the Stormwater Management Plan and SWPPP narratives. Comment Noted and ditch ID consistent in report Addressed in Stormwater Management Plan. Applicant shall update the SWPPP. SWPPP updated per the SWMP. 14.The applicant shall verify the lot lines on Lot 12 Block 4, Lot 4 Block 1, and Lot 5 Block 1. It appears the structures may encroach on the drainage and utility easements. Plan updated. The applicant shall verify the lot lines on Lot 24 Block 7. It appears the structure may encroach on the drainage and utility easement. Lot lines revised in this area as well as pad locations. 15.The applicant shall include the bottom elevation of the infiltration basin on the grading plans. Elevations added. Applicant shall verify the bottom elevation, as it differs between HydroCAD model, plans, and Appendix C. Verify the culvert outlet elevation; outlet should be above the exfiltration elevation. As a note: planting medium is not necessary below the bottom of the infiltration basin. The infiltration is not intended to provide above-ground retention to prevent oversaturating the back yards of the adjacent lots. The area is a flat infiltration swale area. The plan and HydroCAD Model now show the outlet elevation equal to the infiltration basin bottom. Note that with this design, infiltration volume credit cannot be claimed for IB10 and the SWMP must be updated. Volume of infiltration is the ponded volume (volume from basin bottom to the outlet elevation). 16.The applicant shall verify the retention volume calculation for Pond 400 in Appendix C as there appears to be an error. The volumes are correct. 17.If needed, the opportunity may exist to maximize infiltration at the infiltration basin by constructing the basin to minimize the separation between the bottom of the basin and the water table. The basin needs minimum 3 feet separation from the water table and cannot be lowered. 18.The applicant shall verify that the HWL of the Infiltration Basin is 2.0 feet below the low entry elevations of surrounding buildings. Separation requirement is met 19.The applicant shall display and label emergency overflows with spot elevations and drainage arrows at all ponds and sags, specifically at the intersection of Street A and Street C and at the cul-de-sac of Street C. EOF’s added. 20. The applicant shall confirm that there is a 10-ft. setback between the HWL of the   infiltration basin and the drainage and utility easements. HWL is covered by easement. 21. The applicant shall verify that the top berm of stormwater ponds is 2 ft. above the HWL of the pond. Berm updated. 22.The applicant shall label the safety bench on the plans. It shall be at least 10-ft wide. The pond slope cannot be greater than a 3:1 slope. Comment noted. The applicant shall label the safety bench on the plans. Safety bench label added. 23. The storm sewer system and grading in the rear yards of Lot 1-3 Block 1 should be evaluated to eliminate the middle structure and provide one EOF. The CB between Lot1 & 2 should be moved north onto Lot 2 so that it is not on the property line. This is not possible to maintain minimum slopes. 24. The applicant shall update the drainage area characteristics for Pond 100 in Appendix C. While the calculations appear to be correct, the applicant shall update all ponds in Appendix C to indicate that 1.1” of runoff is the required water quality volume for new impervious area. Included in the updated SWMP 25. The applicant shall confirm the elevations of the broad crested rectangular weir outlets of Ponds P200. Weir elevation updated in the model 26. The applicant shall verify NWLs (Pond 300, Wetland C) and 100-year HWLs (Pond 400) in Table 1. Note that infiltration basins do not have NWLs. Normal water levels verified. 27. It is highly recommended (MPCA Stormwater Manual) that pond liners be installed at wet ponds in A or B soils. The MPCA stormwater manual recommends a liner for ponds in A or B soil to maintain permanent pool. The ponds on the development intersect the water table so a liner is not necessary. The applicant shall note that proposed water quality ponds are not within a Source Water Protection Area therefore they are not required to have a liner. However, it will be the responsibility of the Developer to show that the proposed dead pool volume can be maintained after construction. 28. The applicant shall confirm that the starting elevations for the HydroCAD modeled storm pond storage start at the bottom of the pond (and not below). Specific to Ponds P200.   Pond 200 starts at 901.5 and the v‐notch weir is set at 901.5.  29. On the Anoka County ditch system, there shall be consideration for beaver guards at all surface water structures Beaver guards will be discussed and confirmed with the ditch authority.    • Water Supply   There is an existing 12 inch diameter trunk watermain located along CSAH 14 (Main Street). The Nature’s Refuge development is proposed to be served by extending 8-inch diameter DIP watermain from an existing 8-inch diameter DIP watermain stub where Street A meets Main Street (CSAH 14), and installing 1-inch diameter Type K copper services. The City’s Comprehensive Plan requires that a 16 inch diameter trunk main be extended north/south in this area. The proposed watermain extends west and north for future connection / looping.     Comments:   1.The applicant shall loop the system along the west side of Lot 25 Block 4 from Street C to Main Street. Watermain loop added. The watermain on L1B8 shall be located (moved east) under the trail in the outlot verses in an easement on the west side of the lot. 2.The applicant shall install 16 inch diameter trunk watermain from Main Street north through the development. Along west side of Lot 25 Block 4 and to the north extents of Street C. Trunk oversizing credits will apply. Watermain sizing updated. 3.Watermain shall be extended north along Street C under ACD 10-22-32. Watermain extended to the northern property line.   • Sanitary Sewer There is an existing 21 inch diameter trunk sanitary sewer located along CSAH 14 (Main Street). The Nature’s Refuge development is proposed to be served by extending 8-inch diameter PVC sanitary sewer throughout the development from an existing sanitary sewer manhole in Main Street (CSAH 14) just south of Outlot E, and installing 4-inch diameter Schedule 40 PVC services. The City’s Comprehensive Plan requires that the sanitary system serves the future lift station and forcemain of Sanitary Sewer Sub-District 2K, discharging to the northernmost proposed manhole in Street C.   Comments:   1.The applicant shall increase the mainline sanitary sewer in Street C and D to 10 inch diameter at minimum grade 0.28%. Trunk oversizing credits will apply. Sanitary sewer sizing updated. 2.The existing sanitary sewer stub at Main St and Street A shall be properly abandoned and plugged at the Manhole. Note added to abandon. 3.The applicant shall add a note that sanitary services require the contractor to provide X, Y and Z GPS coordinates of wyes and service ends for future locating requirements. This will be noted on final construction plans. 4.The applicant shall add a note that sanitary sewer pipe be installed with a tracer wire. A tracer wire box shall be provided at the surface for the ends of the sanitary sewer service tracer wire to provide access to wire ends for future locating requirements. This will be noted on the final construction plans. 5.Sanitary Sewer shall be extended north along Street C under ACD 10-22-32. Sanitary sewer extended to the northern property line. 6.Sanitary Sewer shall be extended west along Street C from the most westerly manhole to the same extent as the watermain. Sanitary stub added.   • Transportation   The Nature’s Refuge subdivision is proposed on the north side of Main Street (CSAH 14) between Lake Drive (CSAH 23) and 4th Avenue. Access will be from a new street connection (Street A) to Main Street (CSAH 14). The development will be set for future extensions to the west, north, and to Lino Lakes Elementary. To improve access control on Main Street, the City is working with School to remove their west access and connect to Nature’s Refuge.     A Traffic Study evaluating the Nature’s Refuge development was submitted by Spack Consulting. The development includes 60 single family homes that are anticipated to generate approximately 565 new trips per day, 45 new trips in the a.m. peak hour and 60 trips in the p.m. peak hour.   Comments:   1. The Study needs to provide an analysis of the existing LOS with and without the proposed development as outlined in the Section 1001.013(2)(c). See revised memo from Spack. The revised Traffic Study addressed a portion of this comment. The Study should also consider what the impacts are for an interim analysis a year after the development is completed as well as the no-build conditions without development for comparison. The May 17, 2018 revised Traffic Study addressed a portion of this comment: on page 5 for the planning level screening analysis by including the 2015 no-build analysis. However, an interim year was not considered to address when improvements with a two lane facility may be need prior to the 4 lane facility being constructed. In addition, the Intersection Analysis on page 7 and 8 did not include the 2015 no-build or interim year analysis.   Following discussions with the developers engineer an updated revised Traffic Study dated June 4, 2018 was prepared to address the remaining portion of the comment. The Study now includes the analysis of the interim 2021 conditions with the proposed development with existing geometric conditions.   Noted per comment above.   2.Projected traffic from any future phases of development (extension of Street B, Street C, and Lino Lakes Elementary) that would use Street A to access Main Street (CSAH 14) should be included in the analysis. See revised memo from Spack. 3.It is anticipated that Street A would require designated turn lanes at Main Street. The Study should evaluate the intersection of the new Site Access Street (Street A) and Main Street (CSAH 14) for both safety and operations. It is anticipated that Anoka County Highway Department will require right and left turn lanes on CSAH 14 (Main Street). The turn lane construction shall be add throughout the preliminary plat documents. Turn lanes denoted throughout the plans. Detailed turn lane construction plans will be part of the final construction plans. 4. Upgrading Main Street (CSAH 14) to a 4-lane roadway has been identified by both Anoka County and the City for some time in the future but has not been programed. Therefore, should the analysis show that existing conditions do not require improvements at Street A and Main Street (CSAH 14), documentation should be provided of when in the future with the existing lane configurations the improvements would be needed. See revised memo from Spack. 5.Assuming that the intersection of Main Street (CSAH 14) and Lake Drive (CSAH 23)   will be addressed in the future, no further analysis over what is included in the current Traffic Study would be required. Comment noted. 6. Street A and Street C shall be 32 feet wide from face of curb to face of curb. The plans currently show back of curb. As discussed, 32’ back to back is acceptable. 7.The cul-du-sac widths can be reduced to 28 feet wide from face of curb to face of curb. Cul-de-sacs have been updated to 28’ back to back. As discussed, 28’ back to back is acceptable. Cul-de-sacs shall be 30’ back to back. Cul-de-sac widths updated to 30’ back to back. 8.The ACD 10-22-32 crossing shall be wide enough to accommodate the road, a 5 foot buffer and an 8.5 foot wide trail with 4:1 side slope tapers. Ditch crossing updated. Street C extended to the northern property line. 9.The future trail extension along 10-22-32 should be relocated to the same crossing as Street C. Thus there would only be one ditch crossing. Ditch crossing updated. 10.There is a future trail planned along the north side of Main Street. The plans shall include the grading for this trail. This will likely also require hydrant relocation. Grading for a future trail has been incorporated. Hydrants will be relocated at the time of trail construction. 11.The applicant shall remove the trees identified in the Landscaping Plan from the sight line triangle of Street A and Main Street (CSAH) 14. Revised per city comments. 12.A bituminous trail is recommended through this site. As noted in the wetland section of this report the proposed location, along Lots 1-6 Block 3, is within the 25 foot buffer and should be relocated. The proposed trail location is allowed by RCWD rules and will therefore not be relocated. According to RCWD Rule F 6(e)(7)(iii) – Buffer may enclose a linear surface for non-motorized travel no more than 10 feet in width. The linear surface must be at least 25 feet from the wetland edge. The area of the linear surface will not be eligible for replacement credit. For projects proposing non- motorized travel no more than 10 feet in width, the linear surface may be reduced to less than 25 feet from the wetland edge based on compelling need and a TEP recommendation to the District in support that the wetland protection afforded is reasonable given the circumstances. Per Kjolhaug Environmental Services. 13.The proposed sidewalks were reviewed. Pedestrian curb ramps will be required, and reviewed with the final construction plans. Comment noted. 14.Street C temporary cul du sac should have continual curb and gutter and temporary paved eyebrows. The storm sewer will need to be adjusted. Temporary cul-de-sac and storm sewer has been updated. 15. The Revised Traffic Study provided a summary of the Level of Service for each intersection movement for CSAH 14 and Street A. It concludes that in the build 2030 and build 2030+ conditions the southbound left turn would operate at a LOS F. Are the recommended improvements discussed on page 9 of the Study included with the build analysis? If not, what is the change in Level of Service with these improvements? What is the Level of Service for the interim year (see comment #1)? What is the Level of Service in the no-build condition? This comment was not addressed in the May 17, 2018 revised Traffic Study. Following discussion with the developers engineer an updated revised Traffic Study, dated June 4, 2018 was prepared which did address the comment. The Study concluded that a southbound right turn lane would be needed at the CSAH 14 and Street A intersection. It   appears the preliminary plat roadway width accommodates this and should be verified with the final plat (striping plan). Noted per comment above. 16. The applicant shall move the trail crossing to the intersection of Street C and Street E. 17. The applicant shall widen the sidewalk in front of Block 8, Lot 1 to 8.5 feet between the trail connections. 18. The applicant shall show striped crosswalks for the trail crossings with the final plat. 19. Applicant shall adjust slopes on the back side of the trail to be a 4:1 specifically at the ACD 10-22-32 ditch crossing. This may require extending the culvert length. 20. The applicant should install a fence or guardrail on the east side of the trail near Sta. 8+25. 21. It is suggested that the applicant move the trail crossing near Sta. 8+25 to the south, away from the ditch crossing. Note: the low point location would be adjusted so that the catch basins do not interfere with the pedestrian ramps.   • Wetlands and Mitigation Plan   The Nature’s Refuge development site includes 7 wetlands on 41.55 acres as outlined in the WCA Notice of Decision approved by RCWD. The plan proposes to fill 2 acres of wetlands, some of which are denoted as “high priority wetlands” in the city’s Comprehensive Plan. A wetland sequencing application was submitted by Kjolhaug Environmental Services to RCWD on January 8, 2018 and is currently incomplete. Approval of a complete sequencing application and submittal and approval of a wetland replacement plan will be required prior to issuance of a grading permit.   Wetlands on the project are located within the Wetland Management Corridor and will require mitigation as noted in Rice Creek Watershed District’s Rule F (Wetland Alteration), Section 6(b). Wetland 1 is not located within the WMC. All other wetlands are located within the WMC. Per Kjolhaug Environmental Services.   1. An average 50-foot buffer (25-foot minimum) will be required around all wetland areas following construction. It does not appear that the proposed buffers meet the minimum buffer requirement in all locations. In an effort to minimize impacts to wetlands yet meet project purpose and need, proposed WMC buffer does not meet minimum requirements along some areas of proposed wetland fill. A variance application for these areas will be submitted to RCWD for review with the revised Wetland Permit. Per Kjolhaug Environmental Services. 2. A 10-foot bituminous trail is proposed within the upland buffer adjacent to the wetland in Outlot B. This trail must maintain 25-feet from the edge of the wetland. The City’s Environmental Coordinator is reviewing the wetland buffer areas. Noted. 3. Two deep (30+ foot deep) ponds (Pond 200 and Pond 300) are proposed adjacent to wetlands within the project. The adjacent wetlands are denoted as “high priority wetlands” in the city’s Comprehensive Plan and are noted as having exceptional vegetative diversity. The applicant shall take steps to ensure that the ponds will not drain the adjacent wetland areas. In the WCA Wetland Replacement Plan, the developer shall   provide a plan to protect adjacent wetlands, the plan shall also include a mitigation plan if the wetlands are impacted post construction. With regards to pond construction and potential drainage effects on adjacent wetlands:   • Pond 300 in the northeast portion of the development area will be a maximum of 22 feet deep, has a predicted NWL of 902-ft, and has no outlet (no outlet structure or emergency overflow). In reality, the open water portion of Pond 200 will be the elevation of the local water table and will vary throughout the year as the water table does because the pond does not have a controlled outlet to stabilize water levels. Because the pond does not have an outlet to drawn water down, it will not drain nearby wetlands (there is no where to drain the water if there is no outlet). For these reasons, drainage effects to Wetlands 3, 3a, or 3b from Pond 200 construction are not expected to occur. A similar pond with no outlet was constructed onsite sometime after 1991 near the proposed wetland banking wetland. That large, deep, open-water pond was excavated adjacent to wetland and has not resulted in wetland drainage.   • Pond 200 will be excavated in around the west end of ACD 10-22-32 (west of the current ditch crossing). The ditch currently drains freely to the west (no controlled outlet). Water levels in the ditch were measured at 901.5-feet by the engineer. Therefore, newly constructed Pond 200 will have an OSC with V notch weir invert of 901.5-ft with the top of the weir at 902.5-ft. The adjacent wetland the southeast (Wetland 2) will have a NWL of 902.0-ft, and will have a raised outlet (EOF only) at 902.5-ft. Wetland 2 will need to be inundated with over 6 inches of water to outlet to Pond 200. That occurrence alone, usually occurring early in the growing season, will meet wetland hydrology requirements. For the remainder of the growing season, Pond 200 and adjacent Wetland 2 water levels will fluctuate with precipitation events and normal seasonal water table level variations. For these reasons, drainage effects to Wetland 2 from Pond 200 construction are not expected to occur.   • Wetland 4 to the northwest of Pond 200 will not have an outlet, will not be connected to Pond 200, and will be physically separated by the pond maintenance bench/berm. For these reasons, drainage effects to Wetland 4 from Pond 200 construction are not expected to occur.   • The current and proposed ditch crossing culvert invert elevations and size are equal pre and post development. Therefore, drainage effects to upstream wetlands are not expected to occur.   Per Kjolhaug Environmental Services   Applicant is submitting a geotechnical report addressing the existing wetland & soil conditions and present any proposals to protect the adjacent wetlands as needed. See attached Wetland permit application. Geotechnical report to be submitted when received.   4.A review of the DNR’s Natural Heritage Information System (NHIS) Database revealed that rare features have been recorded in or near the wetlands on the property. In 2002, toothcup (Rotala ramosior), a state threatened species, was located within one wetland   that is proposed to be filled. Autumn fimbry (Fimbristylis autumnalis) and Blanding’s turtle (Emydoidea blandingii) have also been recorded near the project site. The developer will need to coordinate with the DNR to obtain a permit for the take (destroy, dig up, dispose of, possess, or transport) of threatened or endangered species. MnRAM guidance and the 2017 Native Plant Communities Assessment Final Report prepared by CCES have been reviewed. Based on this review and for WCA/RCWD purposes, vegetation quality for all wetlands onsite was determined to be low, with an associated RCWD wetland degradation status of marginally to severely degraded. Specifically: (1) rare plants found onsite are not persistent and therefore item i of the special features tab in MnRAM does not apply and vegetation quality is Low, and (2) although the Native Plant Communities Assessment Final Report identified rare species onsite, the report also states that (paraphrasing) “these rare species were located within areas dominated by crops or agricultural weeds. While state-listed species do occur within cropland and farmed wetland areas, their presence alone is not enough to classify these areas as native plant communities or rare native plant communities.” Rare plants were primarily found in disturbed, annually farmed wetland fringe areas. Per Kjolhaug Environmental Services. 5.The ghost plat shown in Outlot B on the north end of the project (Sheet 10) appears to propose future wetland impacts. These impacts should be taken into account during the sequencing efforts discussed by the Wetland Conservation Act Technical Evaluation Panel. Road alignments should be considered that would minimize future wetland impacts. The ghost plat is now shown to be proposed and has been modified to prevent wetland impacts. A permit to take has been submitted to DNR by CCES for all rare species located in the development footprint (areas that will be physically altered/graded/converted to another use). It is important to note that the presence of rare species onsite is largely a function annual soil disturbance/farming practices. Once farming practices on the site cease (with or without development), rare species occurrence on the site is predicted to drop. Per Kjolhaug Environmental Services.   • Geotechnical   A geotechnical evaluation was completed in response to the concerns over draining the adjacent Pin Oak wetland and impacts to adjacent wells.   1. The introductory paragraph and overall report shall provide recommendations for not only “dewatering” but also reference the” large borrow areas (Ponds 200 & 300) adjacent to existing wetlands”. To be provided with updated Geo report. 2. The applicant shall provide a map of identifying the location and quantity of piezometers and another map of auger probes. To be provided with updated Geo report. 3. The applicant shall provide an evaluation of subsurface geologic feature mapping that can suspend water, or drain with the ground water flow in the absence of geologic “lens”. The Minnesota Geologic survey would be a good reference and soil augerings, mentioned above, to verify lens or no lens.   To be provided with updated Geo report. 4. The applicant shall provide a document specifically outline the plan to address well impacts and a plan to address wetland impacts that may occur as a result of this development. The plan may include items suggested in geotechnical memo, clay berms and clay lining of the borrow areas. To be provided with updated Geo report. 5. We recommend that the City, through the Development Agreement, require securities for mitigation costs associated with protecting the adjacent Pin Oak wetland and adjacent wells. Noted.           • Floodplain   The floodplain within the Nature’s Refuge development is a Zone A. The 2015 DFIRM base flood elevation (BFE) from RCWD modeling identifies the BEF elevations of 904.5 (easterly floodplain) and 904.2 (westerly floodplain). The applicant is proposing to fill 37 cubic yards of floodplain and mitigate onsite. There are 29,533 cubic yards of floodplain mitigation proposed on site.   1. Floodplain impacts are proposed on site due to stormwater ponding and structures, and Lots 4-5 Block 3. A LOMR will be required. The applicant shall provide a copy of the CLOMR application to the City. The LOMR is to be in place prior to final plat. This is not required as the floodplain boundary does not encroach any of the lots. Noted.   • Drainage and Utility Easements   The municipal infrastructure proposed with the Nature’s Refuge Preliminary Plat is generally within public right of way, easements and outlot.   1. Anoka County requires 75 foot right of way be dedicated along Main Street (CSAH 14). Right of way updated along Main Street. 75 feet of right of way provided. 2.The right of way shown in the Ghost Plat shall be dedicated with the Plat. Ghost plat is now shown to be proposed. 3.Street A, at Main Street (CSAH 14), will require turn lanes and thus additional right of way. Turn lanes added. No further Right of Way required. 4.Lot 25 Block 1 shall have a 20 foot drainage and utility easement for watermain looped connection. Easement added. 5.Lot 5 Block 1 shall be chamfered at the northeast corner to accommodate future access to Pond 100. Plan updated and access path added. 6.Bituminous trails shall be within 25 foot easements if not within right of way or outlot. Bituminous trail is only proposed in right of way or an outlot.       • Development Agreement   A development agreement will be required with the final plat. Comment noted. • Grading Agreement   Not applicable at this time. Comment noted.   • Stormwater Maintenance Agreement A Stormwater Maintenance agreement will be required with the final plat. Comment noted.       • Permits Required The following permits shall be obtained prior to the issuance of a grading permit.   Comment noted. Permits will be obtained. Permits #3 & #4 will be obtained prior to final utility construction.   Comments:   1. NPDES Construction General Permit 2. City of Lino Lakes Zoning Permit for Grading 3. Minnesota Department of Health Watermain Extension Permit 4. MPCA Sanitary Sewer Extension Permit 5. Anoka County Permit for Work Within the ROW 6. Rice Creek Watershed Permit for Erosion and Sediment Control 7. Rice Creek Watershed Permit for Wetland Alteration 8. Rice Creek Watershed Permit for Stormwater Management (Rule C) 9. Rice Creek Watershed Permit for Floodplain Alteration (Rule E) 10. Rice Creek Watershed Permit for ACD 10-22-32 Alteration 11. FEMA Letter of Map Revision 12. DNR Permit for the Take or Endangered or Threatened Species Incidental to a Development Project. 13. DNR Water Appropriations Permit (for Construction Dewatering) • US Army Corps of Engineers Section 404 Permit   If you or the applicant has any questions regarding these comments, please contact Diane Hankee at (651) 982-2430 or diane.hankee@ci.lino-lakes.mn.us. You may also contact Dane Ekdom at (763)762-2815 or dekdom@wsbeng.com. 1 1st Reading: Publication: 2nd Reading: Effective: CITY OF LINO LAKES ORDINANCE NO. 05-18 ORDINANCE TO REZONE PROPERTY FROM R-1, SINGLE FAMILY RESIDENTIAL TO PUD, PLANNED UNIT DEVELOPMENT FOR NATURE’S REFUGE The City Council of Lino Lakes ordains: Section 1: Findings of Fact 1. The City received a Land Use Application to rezone certain property from R-1, Single Family Residential to PUD, Planned Unit Development. 2. The Planning and Zoning Board held a public hearing on February 14, 2018 and continued the hearing to May 9, 2018. 3. Per Section 1007.015 (5), the Planning and Zoning Board shall consider possible adverse effects of the proposed rezoning and its judgement shall be based upon, but not limited to, the following factors: (a) The proposed action has been considered in relation to the specific policies and provisions of and has been found to be consistent with the official City Comprehensive Plan. The proposed Nature’s Refuge PUD conservation subdivision is consistent with the goals and policies of the comprehensive plan in regards to resource management, land use, housing, transportation and utilities. The development upholds the City’s public values by creating a multi-functional open space greenway corridor integrated with the stormwater conveyance system, wetland management and trails. Nature’s Refuge is consistent with residential land use and density requirements. Safe transportation corridors and public utilities also serve the development. (b) The proposed use is or will be compatible with present and future land uses of the area. The proposed Nature’s Refuge development is compatible with the present and future land uses of the area. Existing and future land use to the north, south, east and west is residential. Lino Lakes Elementary School is immediately east of the site. (c) The proposed use conforms with all performance standards contained herein. 2 The proposed Nature’s Refuge development conforms with all PUD performance standards as outlined in Section 1007.024(2) General Requirements and Standards: 1. Ownership. Preferred Builders, Inc. is the owner of the property. 2. Comprehensive Plan Consistency. The proposed PUD shall be consistent with the City Comprehensive Plan. The proposed Nature’s Refuge residential development is consistent with the goals and policies of the comprehensive plan in regards to resource management, land use, housing, transportation and utilities. The development upholds the City’s public values by creating a multi-functional open space greenway corridor integrated with the stormwater conveyance system, wetland management and trails. Nature’s Refuge is compatible with existing and adjacent land uses. Safe transportation corridors and public utilities also serve the development. 3. Public or Common Open Space. Wetlands and wetland buffers make up 57 acres (60%) of protected open space. A park trail system is also proposed throughout the greenway corridor and along CSAH 14 (Main Street). 4. Operating and Maintenance Requirements for PUD Common Open Space/Facilities. A homeowners association shall be created and Declaration of Covenants and Conditions shall be recorded against the property at the time of final plat. Trail corridors will be deeded to the City. Drainage & utility easements and conservation easements will be dedicated to the City and/or RCWD. 5. Utilities. Public municipal utilities (water and sanitary) shall serve each individual single family lot. 6. Roadways, Private. There are no private roadways proposed in Nature’s Refuge. 7. Development Agreement. A Development Agreement detailing developer responsibilities and securities will be executed with the final plat. 3 (d) The proposed use can be accommodated with existing public services and will not overburden the City’s service capacity. The proposed Nature’s Refuge development can be accommodated with existing public services and will not overburden the City’s service capacity. The site is ultimately served by MCES Interceptor 83-61that is adequately sized for the development in the district. The existing water supply and water distribution system can provide adequate water volume and fire protection. Section 2: Amendment The Zoning Ordinance of the City of Lino Lakes is hereby amended to rezone the following described property from R-1, Single Family Residential to PUD, Planned Unit Development. Section 3: Legal Description PARCEL DESCRIPTION: (Per Schedule A of Title Commitment LT File No. 550831, with a commitment date of January 24, 2017 at 8:00 A.M., prepared by Land Title, Inc. issuing agent for First American Title Insurance Company) Parcel A: The Northeast Quarter of the Southeast Quarter (NE 1/4 of SE 1/4) of Section 5, Township 31, Range 22, except the South 208.74 feet of the East 208.74 feet thereof, Anoka County, Minnesota. (Abstract property) Parcel B: The Southwest Quarter of the Southeast Quarter of Section 5, Township 31, Range 22, Anoka County, Minnesota. Except the following described tracts: 1. Beginning at the Southeast corner of the said Section 5, thence North along East line thereof for 33 feet, thence West parallel to South line thereof for 2,219 feet to the actual point of beginning; thence continuing West on same course for 135 feet; thence North 3 degrees 26 minutes East for 242 feet; thence East parallel to described 1st course for 135 feet; thence South parallel to described 2nd course for 242 feet and to the actual point of beginning. 2. Beginning at the Southwest corner of said Southwest Quarter of Southeast Quarter; thence North along West line thereof a distance of 275 feet; thence East parallel with South line thereof a distance of 100 feet; thence South parallel with said West line a distance of 275 feet to said South line; thence West along said South line for a distance of 100 feet to the actual point of beginning. 3. Commencing at Southeast corner of said Southwest Quarter of Southeast Quarter; thence North along the East line thereof for a distance of 233 feet; thence West parallel to the South line thereof for a distance of 100 feet; thence South parallel to described 1st course 233 feet and to the South line of said Southwest Quarter of Southeast Quarter; thence East along said South line to the point of beginning. 4 4. That part of the Southeast Quarter of Section 5, Township 31, Range 22, Anoka County, Minnesota, described as commencing at the Southeast corner thereof; thence Northerly along the East line thereof for 33.00 feet; thence on an assumed bearing of North 89 degrees 19 minutes 35 seconds West and parallel with the South line of said Southeast Quarter for 2219.00 feet to the actual point of beginning; thence North 4 degrees 06 minutes 25 seconds East 242.00 feet; thence South 74 degrees 11 minutes 56 seconds East 204.14 feet; thence South 4 degrees 06 minutes 25 seconds West a distance of 221.68 feet to the South line of said Southeast Quarter; thence North 89 degrees 19 minutes 35 seconds West along said South line a distance of 200.27 feet to its intersection with a line that bears South 4 degrees 06 minutes 25 seconds West from the point of beginning; thence North 4 degrees 06 minutes 25 seconds East a distance of 33.05 feet to the point of beginning. 5. Parcel 13, Anoka County Highway Right of Way Plat No. 25 according to the map or plat thereof on file and of record in the office of the Anoka County Recorder. Parcel C: The South half of the Northwest Quarter of the Southeast Quarter of Section 5, Township 31, Range 22, Anoka County, Minnesota. (Abstract Property) Section 4: Development Regulations The development shall conform to the plans, requirements, and conditions of approval as listed in Council Resolution No. 18-70. Section 5: Effect This ordinance shall be in force and effect from and after its passage and publication according to the Lino Lakes City Charter and upon the filing of the final plat. Adopted by the Lino Lakes City Council this 25th day of June, 2018. The motion for the adoption of the foregoing ordinance was introduced by Council Member_____________and was duly seconded by Council Member ___________ and upon vote being taken thereon, the following voted in favor thereof: The following voted against same: ____________________________ Jeff Reinert, Mayor ATTEST: ________________________ Julianne Bartell, City Clerk 1 CITY OF LINO LAKES RESOLUTION NO. 18-70 APPROVING PUD DEVELOPMENT STAGE PLAN/PRELIMINARY PLAT FOR NATURE’S REFUGE WHEREAS, the City received an application for PUD Development Stage Plan/Preliminary Plat for Nature’s Refuge hereafter referred to as “Development”; and WHEREAS, City staff completed a review of the “Development” based on the following:  June 15, 2018: Preliminary Plan Set prepared by Carlson McCain  June 16, 2018: HydroCAD report prepared by Carlson McCain  June 15, 2018: Tree Inventory Report, prepared by Carlson McCain  June 4, 2018: Traffic Study prepared by Spack Consulting  April 18, 2018: Revised WCA Wetland Permit Application, prepared by Kjolhaug Environmental Services Company; and WHEREAS, a public hearing was held before the Planning & Zoning Board on February 14, 2018 and continued to May 9, 2018 and the Board recommended approval of the “Development”; and NOW, THEREFORE BE IT RESOLVED by The City Council of The City of Lino Lakes hereby makes the following: FINDINGS OF FACT PUD, Planned Unit Development Per Section 1007.024(1) Purpose and Intent, the PUD, by allowing deviation from the strict provisions of this Ordinance related to setbacks, heights, lot area, width and depths, yards, etc., by conditional use permit or a mixture of uses by rezoning to a PUD District, is intended to encourage: a. A development pattern in harmony with the objectives of the Comprehensive Plan. The proposed Nature’s Refuge PUD conservation subdivision is consistent with the goals and policies of the comprehensive plan in regards to resource management, land use, housing, transportation and utilities. The development upholds the City’s public values by creating a multi-functional open space greenway corridor integrated with the stormwater conveyance system, wetland management and trails. Nature’s Refuge is consistent with residential land use and density requirements. Safe transportation corridors and public utilities also serve the development. b. Innovations in development that address growing demands for all styles of economic expansion, greater variety in type, design, architectural standards, and siting of structures through the conservation and more efficient use of land in such developments. 2 Flexible site design with narrower minor collector road right-of-way and reduced setbacks allows Nature’s Refuge to develop a residential conservation subdivision and construct of an extensive greenway corridor and storm water management system. c. The preservation and enhancement of desirable site characteristics such as existing vegetation, natural topography and geologic features and the prevention of soil erosion. Restoration and enhancements within Wetland 2 and Wetland 3 (wetland bank area) will boost vegetative diversity through release and stimulation of existing native seeds. Rare plant species will also thrive and expand as a result of the restoration. d. A creative use of land and related physical development which allows a phased and orderly transition of varying land uses in close proximity to each other. Nature’s Refuge creates a multi-functional greenway corridor by integrating the stormwater management system, wetland management and open space areas and trails into one unified system. The trails and sidewalks connect the residential development to the elementary school and Main Street. e. An efficient use of land resulting in smaller networks of utilities and streets thereby lowering development costs and public investments. Reduced minor collector road right-of-way widths and setbacks provide an efficient use of land and lowers development and public investments. f. Promotion of a desirable and creative environment that might be prevented through the strict application of City zoning and subdivision regulations. Strict application of an 80 foot right-of-way width and 40 foot setback would result in greater impacts to the wetlands and natural resources. Preliminary Plat Per Section 1001.013, Premature Subdivision: (1) General. Any concept plan, preliminary plat or final plat deemed premature pursuant to the following criteria shall be denied by the City Council. (2) Conditions for establishing a premature subdivision. A subdivision may be deemed premature should any of the following conditions not be met. (a) Consistency with the Comprehensive Plan. Including any of the following: 1. Land use plan; 2. Transportation plan; 3. Utility (sewer and water) plans; 4. Local water management plan; 5. Capital improvement plan; and 3 6. Growth management policies, including MUSA allocation criteria. Nature’s Refuge is consistent with the goals and policies of the comprehensive plan in regards to resource management, land use, housing, transportation and utilities. The development is also consistent with the local water management plan, capital improvement plans and growth management policies. (b) Consistency with infill policies. A proposed urban subdivision shall meet the city's infill policies. Nature’s Refuge is consistent with infill policies. The development is within the current Utility Staging Area 1A (2008-2015). The cost, operation and maintenance of the utility system is consistent with the normal costs projected by the water and sanitary system plans. No future utility costs are proposed. (c) Roads or highways to serve the subdivision. A proposed subdivision shall meet the requirements for level of service (LOS), as defined by the Highway Capacity Manual. Nature’s Refuge meets the requirements for level of service. The Traffic Study states the traffic impacts at intersections along CSAH 14 (Main Street) will continue to operate acceptably at a Level of Service C. Right and left turn lanes on CSAH 14 (Main Street) are being constructed. This is supported by Anoka County Highway Department. The City and County are also working with Lino Lake Elementary School to eliminate their westerly driveway and connect with Nature’s Refuge. (d) Water supply. A proposed subdivision shall be deemed to have an adequate water supply. Nature’s Refuge will have an adequate water supply. A 12” trunk watermain located along CSAH 14 (Main Street) serves the site. An 8” and 16” watermain serve the site internally and loops the system to CSAH 14 (Main Street). Watermain will be stubbed to the west and north property boundaries for future development. (e) Waste disposal systems. A proposed subdivision shall be served with adequate waste disposal systems. Nature’s Refuge will be served with an adequate waste disposal system. A 21” trunk sanitary sewer main located along CSAH 14 (Main Street) serves the site. An 8” and 10” sanitary sewer pipe serves the site. Future development to the north will potentially require a lift station. Sanitary sewer will also be stubbed to the west to accommodate future development; and BE IT FURTHER RESOLVED by The City Council of The City of Lino Lakes hereby provides the following PUD, Planned Unit Development flexibility for Nature’s Refuge: 1. Reduced minor collector road right-of-way width from 80 feet to 60 feet on Street A and Street C 2. Reduced front setback from 40 feet to 30 feet on Street A and Street C 3. Reduced paved road surface width from 32 feet to 30 feet (back to back) on cul de sac Street D and cul de sac Street E; and 4 BE IT FURTHER RESOLVED by The City Council of The City of Lino Lakes hereby approves the PUD Development Stage Plan/Preliminary Plat for Nature’s Refuge subject to the following conditions: 1. Comments from WSB City Engineer letter dated June 22, 2018 shall be addressed. 2. Comments from the Environmental Coordinator letter dated April 30, 2018 shall be addressed. 3. Comments from Anoka County Transportation Division letter dated February 26, 2018 shall be addressed. 4. Applicant shall provide preliminary details for any proposed development monument/identification signs. 5. Details for right and left hand turn lanes on CSAH 14 (Main Street) shall be provided to the City and County at the time of PUD Final Plan/Final Plat submittal. 6. Staff and the developer will further analyze if the trail corridors shall be dedicated via trail easement or deeded by outlot. 7. A separate plan sheet shall be created showing a Conservation Easement over all wetlands, buffers, ponds, trail and open space. a. The area of the Conservation Easement shall be calculated and consistent with the data shown on the preliminary plat. 8. Sheet 2, Preliminary Plat & Existing Conditions: a. The density chart shown on page 3-4 of the Council staff report shall be included on the plan sheet. 9. Sheet 13, Preliminary Site and Utility Plan a. The section of sidewalk extending from Main Street to Street B shall also be revised to be an 8.5 foot wide trail. 10. Sheet L1 & L2, Site Landscape Plan: a. The developer and Environmental Coordinator shall determine the best location for replacement trees, and open area landscape trees and shrubs. b. Plans shall be revised to show the landscape buffer/planting screen in Outlot E and Outlot F a minimum double row of 6 foot tall coniferous trees with triangulated spacing. c. No deciduous trees shall be planted within 10 feet of the paved trail. d. No coniferous trees shall be planted within 15 feet of the paved trail. e. No trees or shrubs shall be planted east of Blocks 5 or 6 to protect the rare plant species. f. No trees or shrubs shall be planted in the rear yards of Block 6. Preliminary comments to be addressed at a further specified date are as follows: 1. Sheet 4, Existing Conditions: a. Sheet 4 shows an existing garage structure in the southeast corner of Outlot A. It is assumed this garage belongs to 801 Main Street. i. The applicant shall work with the property owner to have the structure properly located on their property. ii. A zoning permit is required. iii. This shall be resolved prior to issuance of a grading permit. 2. Sheet 7, Existing Conditions: 5 a. The existing pole barn and garage near 635 Main Street structures shall be removed prior to issuance of a grading permit. i. A demolition permit is required. b. The existing gravel driveway access onto CSAH 14 (Main Street) shall be removed with the issuance of a grading permit. 3. Ownership and maintenance responsibilities of each outlot shall be determined at the time of final plat. a. The applicant shall specifically detail the ownership, maintenance and conservation easement type proposed for the wetland bank land. 4. Draft homeowner’s association documents shall be submitted with the final plat application. Adopted by the Council of the City of Lino Lakes this 25th day of June, 2018. The motion for the adoption of the foregoing resolution was introduced by Council Member _______________and was duly seconded by Council Member ________________ and upon vote being taken thereon, the following voted in favor thereof: The following voted against same: _______________________________ Jeff Reinert, Mayor ATTEST: ________________________ Julianne Bartell, City Clerk of 3890 Pheasant Ridge Drive NE, Suite 100 Blaine, MN 55449 Phone: (763) 489-7900 Fax: (763) 489-7959 www.carlsonmccain.com f:\jobs\5401 - 5420\5412 - natures refuge\cad\engineering\preliminary\5412_cover.dwgSave Date:06/17/18 environmental engineering surveying · · ·18 Revisions:Print Name: Signature: Date:License #: Drawn: Designed: Date: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota 11/14/17 11/14/17 Brian J. Krystofiak, P.E. 25063 BJK NATURES REFUGE Lino Lakes, Minnesota PREFERRED BUILDERS, INC. 10500 Bren Road E. Minnetonka, MN 55343 COVER 1 Know what's below. before you dig.Call R VICINITY MAP 35W BENCHMARK JJO 1. 1/15/18 Rev. Shts 15 & 16 Add USACE Wetland Natures Refuge Lino Lakes, Minnesota 2. 4/11/18 per City Comments 3. 6/15/18 per City Comments P A R C E L A P A R C E L C EX C E P T I O N EX C E P T I O N EX C E P T I O N P A R C E L B (C.S.A.H. NO. 14)MAIN STREET EXCEPTION (5) OW N E R : OW N E R : OW N E R : OW N E R : OW N E R : OWNER: OWNER:OWNER:OWNER: OWNER: OWNER: OWNER: OWNER: OWNER: OWNER: OW N E R : OW N E R : OWNER: OWNER: OWNER: OWNER: EXCEPTION OW N E R : OWNE R : OWNER: OWNER: OWNER: OW N E R : OW N E R : OWNER: OWNER: OWNER: OWNER: OW N E R : OWNER: SEE SHEET 3 (8) OWNER: OWNER: OWNER: OWNER: (1 ) (2 ) (4 ) EX C E P T I O N (3 ) SEE SHEET 4 (9)SEE SHEET 5 (10) SEE SHEET 6 (11) SEE SHEET 7 (12) LEGEND BENCHMARK LEGAL DESCRIPTION SITE DATA PROPOSED SETBACKS VICINITY MAP of 3890 Pheasant Ridge Drive NE, Suite 100 Blaine, MN 55449 Phone: (763) 489-7900 Fax: (763) 489-7959 www.carlsonmccain.com NATURES REFUGE Lino Lakes, Minnesota f:\jobs\5401 - 5420\5412 - natures refuge\cad\survey\preliminary plat\5412_prp-index.dwgSave Date:06/18/18 DRAWN BY: ISSUE DATE: FILE NO: environmental engineering surveying · · · PRELIMINARY PLAT & EXISTING CONDITIONS INDEX Revisions: 4/11/18 Revised Layout 6/15/18 Revised Layout 957 JAB 11/14/2017 Thomas R. Balluff, L.S.I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Land Surveyor under the laws of the State of Minnesota. Print Name: Signature: Date:License #:11/14/2017 40361 18 2 Natures Refuge PREFERRED BUILDERS, INC. 10500 Bren Road E. Minnetonka, MN 55343 SHEET NOTE P A R C E L A OWNER: OWNER: OWNER: OWNER: OWNER: OWNER: OWNER: OWNER: OWNER: OW N E R : LEGEND of 3890 Pheasant Ridge Drive NE, Suite 100 Blaine, MN 55449 Phone: (763) 489-7900 Fax: (763) 489-7959 www.carlsonmccain.com NATURES REFUGE Lino Lakes, Minnesota f:\jobs\5401 - 5420\5412 - natures refuge\cad\survey\preliminary plat\5412_prp.dwgSave Date:06/14/18 DRAWN BY: ISSUE DATE: FILE NO: environmental engineering surveying · · · Thomas R. Balluff, L.S.I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Land Surveyor under the laws of the State of Minnesota. Print Name: Signature: Date:License #:40361 18 8JAB 95711/14/2017 11/14/2017 PRELIMINARY PLAT PREFERRED BUILDERS, INC. 10500 Bren Road E. Minnetonka, MN 55343 Revisions: 4/11/18 Revised Layout 6/15/18 Revised Layout P A R C E L A OWNER: OWNER: OWNER: OWNER: OWNER: OW N E R : OWNER: OW N E R : OWNER: OWNER: OWNER: EXCEPTION LEGEND of 3890 Pheasant Ridge Drive NE, Suite 100 Blaine, MN 55449 Phone: (763) 489-7900 Fax: (763) 489-7959 www.carlsonmccain.com NATURES REFUGE Lino Lakes, Minnesota f:\jobs\5401 - 5420\5412 - natures refuge\cad\survey\preliminary plat\5412_prp.dwgSave Date:06/14/18 DRAWN BY: ISSUE DATE: FILE NO: environmental engineering surveying · · · Thomas R. Balluff, L.S.I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Land Surveyor under the laws of the State of Minnesota. Print Name: Signature: Date:License #:40361 18 9 957 JAB 11/14/2017 11/14/2017 PRELIMINARY PLAT PREFERRED BUILDERS, INC. 10500 Bren Road E. Minnetonka, MN 55343 Revisions: 4/11/18 Revised Layout 6/15/18 Revised Layout P A R C E L C OW N E R : OW N E R : OW N E R : OWNER: ST R E E T C S T R E E T C LEGEND OWNER: of 3890 Pheasant Ridge Drive NE, Suite 100 Blaine, MN 55449 Phone: (763) 489-7900 Fax: (763) 489-7959 www.carlsonmccain.com NATURES REFUGE Lino Lakes, Minnesota f:\jobs\5401 - 5420\5412 - natures refuge\cad\survey\preliminary plat\5412_prp.dwgSave Date:06/14/18 DRAWN BY: ISSUE DATE: FILE NO: environmental engineering surveying · · · Thomas R. Balluff, L.S.I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Land Surveyor under the laws of the State of Minnesota. Print Name: Signature: Date:License #:40361 18 10 957 JAB 11/14/2017 11/14/2017 PRELIMINARY PLAT PREFERRED BUILDERS, INC. 10500 Bren Road E. Minnetonka, MN 55343 Revisions: 4/11/18 Revised Layout 6/15/18 Revised Layout EXCEPTION P A R C E L B OWNER: OWNER: OW N E R : OW N E R : OW N E R : OW N E R : OW N E R : STREET C ST R E E T A STREET B ST R E E T C ST R E E T C STR E E T D ST R E E T E STREET A LEGEND of 3890 Pheasant Ridge Drive NE, Suite 100 Blaine, MN 55449 Phone: (763) 489-7900 Fax: (763) 489-7959 www.carlsonmccain.com NATURES REFUGE Lino Lakes, Minnesota f:\jobs\5401 - 5420\5412 - natures refuge\cad\survey\preliminary plat\5412_prp.dwgSave Date:06/14/18 DRAWN BY: ISSUE DATE: FILE NO: environmental engineering surveying · · · Thomas R. Balluff, L.S.I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Land Surveyor under the laws of the State of Minnesota. Print Name: Signature: Date:License #:40361 18 11 95711/14/2017 11/14/2017 JAB PRELIMINARY PLAT PREFERRED BUILDERS, INC. 10500 Bren Road E. Minnetonka, MN 55343 Revisions: 4/11/18 Revised Layout 6/15/18 Revised Layout EXCEPTION EXCEPTION EXCEPTION P A R C E L B (C.S.A.H. NO. 14) MAIN STREET EXCEPTION OWNER: OWNER: OWNER: OW N E R : OW N E R : OW N E R : OW N E R : OW N E R : STREET C ST R E E T A STREET B ST R E E T C STR E E T D ST R E E T E ST R E E T A EXCEPTION STREET A MAIN STREET LEGEND of 3890 Pheasant Ridge Drive NE, Suite 100 Blaine, MN 55449 Phone: (763) 489-7900 Fax: (763) 489-7959 www.carlsonmccain.com NATURES REFUGE Lino Lakes, Minnesota f:\jobs\5401 - 5420\5412 - natures refuge\cad\survey\preliminary plat\5412_prp.dwgSave Date:06/14/18 DRAWN BY: ISSUE DATE: FILE NO: environmental engineering surveying · · · Thomas R. Balluff, L.S.I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Land Surveyor under the laws of the State of Minnesota. Print Name: Signature: Date:License #:40361 18 12 957 JAB 11/14/2017 11/14/2017 PRELIMINARY PLAT PREFERRED BUILDERS, INC. 10500 Bren Road E. Minnetonka, MN 55343 Revisions: 4/11/18 Revised Layout 6/15/18 Revised Layout of 3890 Pheasant Ridge Drive NE, Suite 100 Blaine, MN 55449 Phone: (763) 489-7900 Fax: (763) 489-7959 www.carlsonmccain.com f:\jobs\5401 - 5420\5412 - natures refuge\cad\engineering\preliminary\5412_site.dwgSave Date:06/17/18 environmental engineering surveying · · ·18 Revisions:Print Name: Signature: Date:License #: Drawn: Designed: Date: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota 11/14/17 11/14/17 Brian J. Krystofiak, P.E. 25063 BJK NATURES REFUGE Lino Lakes, Minnesota PREFERRED BUILDERS, INC. 10500 Bren Road E. Minnetonka, MN 55343 PRELIMINARY SITE & UTILITY PLAN 13 SITE PLAN LEGEND Know what's below. before you dig.Call R JJO BENCHMARK 1. 4/11/18 per City Comments 2. 6/15/18 per City Comments of 3890 Pheasant Ridge Drive NE, Suite 100 Blaine, MN 55449 Phone: (763) 489-7900 Fax: (763) 489-7959 www.carlsonmccain.com f:\jobs\5401 - 5420\5412 - natures refuge\cad\engineering\preliminary\5412_grade.dwgSave Date:06/18/18 environmental engineering surveying · · ·18 Revisions:Print Name: Signature: Date:License #: Drawn: Designed: Date: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota 11/14/17 11/14/17 Brian J. Krystofiak, P.E. 25063 BJK NATURES REFUGE Lino Lakes, Minnesota PREFERRED BUILDERS, INC. 10500 Bren Road E. Minnetonka, MN 55343 PRELIMINARY GRADING & EROSION CONTROL PLAN 14 BENCHMARK Know what's below. before you dig.Call R LOC 1. 4/11/18 per City Comments 2. 6/15/18 per City Comments of 3890 Pheasant Ridge Drive NE, Suite 100 Blaine, MN 55449 Phone: (763) 489-7900 Fax: (763) 489-7959 www.carlsonmccain.com f:\jobs\5401 - 5420\5412 - natures refuge\cad\engineering\preliminary\5412_grade.dwgSave Date:06/18/18 environmental engineering surveying · · ·18 Revisions:Print Name: Signature: Date:License #: Drawn: Designed: Date: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota 11/14/17 11/14/17 Brian J. Krystofiak, P.E. 25063 BJK NATURES REFUGE Lino Lakes, Minnesota PREFERRED BUILDERS, INC. 10500 Bren Road E. Minnetonka, MN 55343 PRELIMINARY GRADING & EROSION CONTROL PLAN 15 BENCHMARK LOC 1. 1/15/18 Add USACE Wetland 2. 4/11/18 per City Comments 3. 6/15/18 per City Comments of 3890 Pheasant Ridge Drive NE, Suite 100 Blaine, MN 55449 Phone: (763) 489-7900 Fax: (763) 489-7959 www.carlsonmccain.com f:\jobs\5401 - 5420\5412 - natures refuge\cad\engineering\preliminary\5412_grade.dwgSave Date:06/18/18 environmental engineering surveying · · ·18 Revisions:Print Name: Signature: Date:License #: Drawn: Designed: Date: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota 11/14/17 11/14/17 Brian J. Krystofiak, P.E. 25063 BJK NATURES REFUGE Lino Lakes, Minnesota PREFERRED BUILDERS, INC. 10500 Bren Road E. Minnetonka, MN 55343 PRELIMINARY GRADING & EROSION CONTROL PLAN 16 BENCHMARK LOC 1. 1/15/18 Add USACE Wetland 2. 4/11/18 per City Comments 3. 6/15/18 per City Comments of 3890 Pheasant Ridge Drive NE, Suite 100 Blaine, MN 55449 Phone: (763) 489-7900 Fax: (763) 489-7959 www.carlsonmccain.com f:\jobs\5401 - 5420\5412 - natures refuge\cad\engineering\preliminary\5412_grade.dwgSave Date:06/18/18 environmental engineering surveying · · ·18 Revisions:Print Name: Signature: Date:License #: Drawn: Designed: Date: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota 11/14/17 11/14/17 Brian J. Krystofiak, P.E. 25063 BJK NATURES REFUGE Lino Lakes, Minnesota PREFERRED BUILDERS, INC. 10500 Bren Road E. Minnetonka, MN 55343 PRELIMINARY GRADING & EROSION CONTROL PLAN 17 BENCHMARK LOC 1. 4/11/18 per City Comments 2. 6/15/18 per City Comments 905 910 915 920 925 of 3890 Pheasant Ridge Drive NE, Suite 100 Blaine, MN 55449 Phone: (763) 489-7900 Fax: (763) 489-7959 www.carlsonmccain.com f:\jobs\5401 - 5420\5412 - natures refuge\cad\engineering\preliminary\5412_tree.dwgSave Date:06/17/18 environmental engineering surveying · · ·T7 1. Revisions:Print Name: Signature: Date:License #: Drawn: Designed: Date: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota 11/14/17 ADB 11/14/17 Brian J. Krystofiak, P.E. 25063 BJK NATURES REFUGE Lino Lakes, Minnesota PREFERRED BUILDERS 10500 Bren Road E. Minnetonka, MN 55343 TREE PRESERVATION PLAN T1 BENCHMARK Know what's below. before you dig.Call R VICINITY MAP 35W 1. 4/11/18 per City Comments 2. 6/15/18 per City Comments of 3890 Pheasant Ridge Drive NE, Suite 100 Blaine, MN 55449 Phone: (763) 489-7900 Fax: (763) 489-7959 www.carlsonmccain.com f:\jobs\5401 - 5420\5412 - natures refuge\cad\engineering\preliminary\5412_tree.dwgSave Date:06/17/18 environmental engineering surveying · · ·T7 1. Revisions:Print Name: Signature: Date:License #: Drawn: Designed: Date: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota 11/14/17 ADB 11/14/17 Brian J. Krystofiak, P.E. 25063 BJK NATURES REFUGE Lino Lakes, Minnesota PREFERRED BUILDERS 10500 Bren Road E. Minnetonka, MN 55343 T2 BENCHMARK TREE PRESERVATION PLAN 1. 4/11/18 per City Comments 2. 6/15/18 per City Comments of 3890 Pheasant Ridge Drive NE, Suite 100 Blaine, MN 55449 Phone: (763) 489-7900 Fax: (763) 489-7959 www.carlsonmccain.com f:\jobs\5401 - 5420\5412 - natures refuge\cad\engineering\preliminary\5412_tree.dwgSave Date:06/17/18 environmental engineering surveying · · ·T7 1. Revisions:Print Name: Signature: Date:License #: Drawn: Designed: Date: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota 11/14/17 ADB 11/14/17 Brian J. Krystofiak, P.E. 25063 BJK NATURES REFUGE Lino Lakes, Minnesota PREFERRED BUILDERS 10500 Bren Road E. Minnetonka, MN 55343 T3 BENCHMARK TREE PRESERVATION PLAN 1. 4/11/18 per City Comments 2. 6/15/18 per City Comments of 3890 Pheasant Ridge Drive NE, Suite 100 Blaine, MN 55449 Phone: (763) 489-7900 Fax: (763) 489-7959 www.carlsonmccain.com f:\jobs\5401 - 5420\5412 - natures refuge\cad\engineering\preliminary\5412_tree.dwgSave Date:06/17/18 environmental engineering surveying · · ·T7 1. Revisions:Print Name: Signature: Date:License #: Drawn: Designed: Date: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota 11/14/17 ADB 11/14/17 Brian J. Krystofiak, P.E. 25063 BJK NATURES REFUGE Lino Lakes, Minnesota PREFERRED BUILDERS 10500 Bren Road E. Minnetonka, MN 55343 T4 BENCHMARK TREE PRESERVATION PLAN 1. 4/11/18 per City Comments 2. 6/15/18 per City Comments of 3890 Pheasant Ridge Drive NE, Suite 100 Blaine, MN 55449 Phone: (763) 489-7900 Fax: (763) 489-7959 www.carlsonmccain.com f:\jobs\5401 - 5420\5412 - natures refuge\cad\engineering\preliminary\5412_tree.dwgSave Date:06/17/18 environmental engineering surveying · · ·T7 1. Revisions:Print Name: Signature: Date:License #: Drawn: Designed: Date: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota 11/14/17 ADB 11/14/17 Brian J. Krystofiak, P.E. 25063 BJK NATURES REFUGE Lino Lakes, Minnesota PREFERRED BUILDERS 10500 Bren Road E. Minnetonka, MN 55343 T5 BENCHMARK TREE PRESERVATION PLAN 1. 4/11/18 per City Comments 2. 6/15/18 per City Comments of 3890 Pheasant Ridge Drive NE, Suite 100 Blaine, MN 55449 Phone: (763) 489-7900 Fax: (763) 489-7959 www.carlsonmccain.com f:\jobs\5401 - 5420\5412 - natures refuge\cad\engineering\preliminary\5412_tree.dwgSave Date:06/17/18 environmental engineering surveying · · ·T7 1. Revisions:Print Name: Signature: Date:License #: Drawn: Designed: Date: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota 11/14/17 ADB 11/14/17 Brian J. Krystofiak, P.E. 25063 BJK NATURES REFUGE Lino Lakes, Minnesota PREFERRED BUILDERS 10500 Bren Road E. Minnetonka, MN 55343 T6 BENCHMARK TREE PRESERVATION PLAN 1. 4/11/18 per City Comments 2. 6/15/18 per City Comments 905 910 915 920 925 of 3890 Pheasant Ridge Drive NE, Suite 100 Blaine, MN 55449 Phone: (763) 489-7900 Fax: (763) 489-7959 www.carlsonmccain.com f:\jobs\5401 - 5420\5412 - natures refuge\cad\engineering\preliminary\5412_tree_mitigation.dwgSave Date:06/15/18 environmental engineering surveying · · ·T7 1. Revisions:Print Name: Signature: Date:License #: Drawn: Designed: Date: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota 11/14/17 ADB 11/14/17 Brian J. Krystofiak, P.E. 25063 BJK NATURES REFUGE Lino Lakes, Minnesota PREFERRED BUILDERS 10500 Bren Road E. Minnetonka, MN 55343 TREE PRESERVATION PLAN T7 BENCHMARK 1. 4/11/18 per City Comments 2. 6/15/18 per City Comments SEE WETLAND REPLACEMENT PLAN PREPARED BY KJOLHAG ENVIRONMENTAL FOR WETLANDS AND BUFFER SEEDING REQUIREMENTS SOD IN R.O.W.(TYP.) SOD I N R . O . W . ( T Y P . ) MNDOT 25-131 SEED MIX SEE WETLAND REPLACEMENT PLAN PREPARED BY KJOLHAG ENVIRONMENTAL FOR WETLANDS AND BUFFER SEEDING REQUIREMENTS SEE WETLAND REPLACEMENT PLAN PREPARED BY KJOLHAG ENVIRONMENTAL FOR WETLANDS AND BUFFER SEEDING REQUIREMENTS SEE WETLAND REPLACEMENT PLAN PREPARED BY KJOLHAG ENVIRONMENTAL FOR WETLANDS AND BUFFER SEEDING REQUIREMENTS SOD (TYP.) EXISTING TREES TO REMAIN 6' PRIVACY FENCE OPEN SPACE 1 238,469 sf OPEN SPACE 3 83,306 sf OPEN SPACE 2 46,896 sf OPEN SPACE 4 32,488 sf OPEN SPACE 5 36,552 sf OPEN SPACE 6 11,760 sf A of 3890 Pheasant Ridge Drive NE, Suite 100 Blaine, MN 55449 Phone: (763) 489-7900 Fax: (763) 489-7959 www.carlsonmccain.com f:\jobs\5401 - 5420\5412 - natures refuge\cad\engineering\preliminary\5412_landscape.dwgSave Date:06/18/18 environmental engineering surveying · · · Revisions: NATURES REFUGE Lino Lakes, Minnesota PREFERRED BUILDERS, INC. 10500 Bren Road E. Minnetonka, MN 55343 Print Name: Signature: Date:License #: Drawn: Designed: Date: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Landscape Architect under the laws of the State of Minnesota 11/14/2017 JAK 11/14/2017 James A. Kalkes RLA 45071 JAK SITE LANDSCAPE PLAN L1 2 WETLAND FRINGE MN SEED MIX 33-261 (OLD BWSR U6) MNDOT 260 MN SEED MIX 25-131 (OLD MNDOT 260) ALL AREAS DISTURBED BY CONSTRUCTION (USE EROSION CONTROL BLANKET NOT INTENDED TO BE SODDED, OR FOR SLOPES OVER 3:1)RETENTION BASINS HARDWOOD MULCH (NATURAL COLOR) SHREDDED HARDWOOD MULCH COMMERCIAL TURF - SOD HIGHLAND SOD (PEAT SOD IS UNACCEPTABLE) (FOR ALL SHEETS) SEED MIXTYPESYM. SEED MIX LEGEND (FOR ALL SHEETS) BOTANICAL NAME DECIDUOUS TREES KEY COMMON NAME 2.5"BB 5 SIZE ROOT QTY. 2.5"BB 43 Gleditsia triacanthos SHADEMASTER HONEYLOCUST 2.5"BB 24Celtis occidentalis HACKBERRY 2.5"BB 46Acer rubrum 'Nothwoods'NORTHHWOODS MAPLE var. inermis 'Shademaster'HL BL HB RM Quercus rubra RED OAK ORNAMENTAL TREES EVERGREEN TREES BLACK HILLS SPRUCE 6'BB 22Picea glauca var. DensataBH FU L L F O R M T O G R A D E LANDSCAPE LEGEND ST R A I T L E A D E R N O " V " C R O T C H 2.5"BB 46Ulmus x "Cathedral'CATHEDRAL ELMSM -SCOTCH PINE 6'BBPinus sylvestrisSP INSTALL HEIGHT MATURE HEIGHT 10'50' 15'60' 15'50' 14'50' 14'50' 6'40' 6'50' CH CANADIAN HEMLOCKTsuga canadensis 416'BB 6'40' EXISTING GRADE GUY WIRE WITH WEBBING FLAGGING- ONE PER WIRE PLANTING SOIL MIXTURE (SEE SPEC.) MINIMUM 1/2 WIDTH OF ROOT BALL 4"-6" SHREDDED BARK MULCH UNDISTURBED OR STABILIZED SUBSOIL NOTE: GUY ASSEMBLY OPTIONAL BUT CONTRACTOR ASSUMES FULL RESPONSIBILITY FOR MAINTAINING TREE IN A PLUMB POSITION FOR THE DURATION OF THE GUARANTEE PERIOD GUY ASSEMBLY- 16" POLYPROPYLENE OR POLYETHYLENE (40 MIL) 1-1/2" WIDE STRAP (TYP) DOUBLE STRAND 10 GA. WIRE, 2-7" ROLLED STEEL POSTS (MnDOT 3401) @ 180° O.C. (SEE STAKING DIAGRAM) COORDINATE STAKING TO INSURE UNIFORM ORIENTATION OF GUY LINES AND STAKES 2. TRIM OUT DEAD WOOD AND WEAK AND/OR DEFORMED TWIGS. DO NOT CUT A LEADER. DO NOT PAINT CUTS. 4. PLACE PLANT IN PLANTING HOLE WITH BURLAP AND WIRE BASKET, (IF USED), INTACT. BACKFILL WITHIN APPROXIMATELY 12" OF THE TOP OF ROOTBALL, WATER PLANT. REMOVE TOP 1/3 OF THE BASKET OR THE TOP TWO HORIZONTAL RINGS, WHICHEVER IS GREATER. REMOVE ALL BURLAP AND NAILS FROM TOP 1/3 OF THE BALL. REMOVE ALL TWINE. 3. SET PLANT ON UNDISTURBED NATIVE SOIL OR THOROUGHLY COMPACTED BACKFILL SOIL. INSTALL PLANT SO THE ROOT FLARE IS AT OR UP TO 2" ABOVE THE FINISHED GRADE. 6. WATER TO SETTLE PLANTS AND FILL VOIDS. 5. PLUMB AND BACKFILL WITH BACKFILL SOIL. 7. WATER WITHIN TWO HOURS OF INSTALLATION. WATERING MUST BE SUFFICIENT TO THOROUGHLY SATURATE ROOT BALL AND PLANTING HOLE. 8. PLACE MULCH WITHIN 48 HOURS OF THE SECOND WATERING UNLESS SOIL MOISTURE IS EXCESSIVE. 1. SCARIFY BOTTOM AND SIDES OF HOLE PRIOR TO PLANTING PLAN TREE WRAP BACKFILL MIX PAINTED FLUORESCENT ORANGE WHITE FLAGGING (TYP.) DOUBLE STRAND 12 GAUGE WIRE 8" 2-PLY NYLON STRAPS 8' STEEL TEE POST- 4 INCHES HARDWOOD MULCH FROM TOP 1/3 OF THE BALL REMOVE BURLAP & ROPE UNDISTURBED SUBSOIL 4 INCH DEEP SAUCER NOTE: SEE PLANTING NOTES FOR THE TYPE OF MULCH MATERIAL TO USE. 12" 6" 2' ( M I N . ) 6" 6"3 REQUIRED AT 120 AMERICAN LARCHLarix laricinaAL 306'BB 6'60' 2.5"BB 31Quercus bicolor SWAMP WHITE OAKWO 15'50' EXISTING TREES ONSITE TO REMAIN EXISTING TREES TO REMAIN ·OPEN AREA LANDSCAPE STANDARDS (DOES NOT INCLUDE SINGLE FAMILY LOTS) ··ONE TREE & 3 LARGE SHRUBS PER 2000sf OF SITE OPEN SPACE (COMMON AREAS) ···AREA "1" 238,469 sf = 119 TREES & 357 SHRUBS ···AREA "2" 46,896 sf = 23 TREES & 70 SHRUBS ···AREA "3" 83,306 sf = 42 TREES & 124 SHRUBS ···AREA "4" 32,488 sf = 16 TREES & 49 SHRUBS ···AREA "5" 36,552 sf = 18 TREES & 55 SHRUBS ···AREA "6" 11,760 sf = 6 TREES & 18 SHRUBS ····TOTAL = 224 TREES & 673 SHRUBS ··1 OVERSTORY TREE = 2 UNDERSTORY TREES ··1 LARGE SHRUB = 3 SMALL SHRUBS ·TREE PRESERVATION REPLACEMENT TREES =138 ·BUFFER AND SCREEN STANDARDS ··BETWEEN RESIDENTIAL AND ARTERIAL/COLECTOR STREETS =6' ht ···OVERSTORY 50lf / UNDERSTORY 25lf ·BOULEVARD TREE STANDARDS ··ONE TREE PER LOT & ··TREES SHALL BE PLACED WITHIN 14' OF THE BACK OF CURB ··OVERSTORY / UNDERSTORY TREES = 105 ·PROPOSED TREES ··OPEN AREAS TREES/TREE PRESERVATION =224 ··OPEN AREAS SHRUBS =673 ··BOULEVARD TREES =105 ··BUFFER TREES =11 CITY of LINO LAKES LANDSCAPE CODE 2"BB 20 AUTUMN BRILLIANCE 2"BB 17Amelanchier x grandiflora 'Autumn Brilliance' RB SB ST R A I T L E A D E R NO " V " C R O T C H SPRING SNOW CRABAPPLE 2"BB 10Malus x 'Spring Snow'SS CL U M P FO R M JAPANESE TREE LILAC 2"BB 3Syringa ReticulataTL SERVICEBERRY 8'25' 8'20' 8'20' 8'25' SHILOH SPLASH RIVER BIRCHBetula nigra 'Shilo Splash' 1. 6/15/18 per City Comments 910 905 925 920 915 PR O P E R T Y LI N E RO W LI N E MAIN STREET PROPOSED HOUSE of 3890 Pheasant Ridge Drive NE, Suite 100 Blaine, MN 55449 Phone: (763) 489-7900 Fax: (763) 489-7959 www.carlsonmccain.com f:\jobs\5401 - 5420\5412 - natures refuge\cad\engineering\preliminary\5412_landscape.dwgSave Date:06/18/18 environmental engineering surveying · · · Revisions: NATURES REFUGE Lino Lakes, Minnesota PREFERRED BUILDERS, INC. 10500 Bren Road E. Minnetonka, MN 55343 Print Name: Signature: Date:License #: Drawn: Designed: Date: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Landscape Architect under the laws of the State of Minnesota 11/14/2017 JAK 11/14/2017 James A. Kalkes RLA 45071 JAK L2 2LANDSCAPE DETAILS #5 CONT.-DBW Salix purpurea 'Nana'DWARF BLUE ARCTIC WILLOW 1'3'x4' #5 CONT.-BLACK CHOKEBERRYAronica melonocarpa elata 1.5'4'X4'BCB #5 CONT.-RED TWIG DOGWOODCornus Sericea 'Bailey'1.5'5'x5'RTD Ilex verticillata WINTERBERRY #5 CONT.WIN - Cornus racemosa GRAY DOGWOOD #5 CONT.SPF - 1.5'5'x5' 1.5'4'x4' SHRUBS BOTANICAL NAMEKEY COMMON NAME SIZE ROOT QTY.REMARKS LANDSCAPE LEGEND INSTALL HEIGHT MATURE HEIGHT QUANTITIES SHOWN IN THE PLANTING SCHEDULE ARE FOR THE CONTRACTOR'S CONVENIENCE. CONTRACTOR TO VERIFY QUANTITIES SHOWN ON THE PLAN. 2' ( M I N . ) 6"12" UNDISTURBED SUBSOIL ( SEE LANDSCAPE NOTES FOR TYPE OF MULCH ) REMOVE BURLAP & ROPE FROM TOP 1/3 OF BALL IF SHRUB IS B & B, THEN BACKFILL MIX 4 INCHES MULCH 1. 6/15/18 per City Comments FLOODPLAIN EXHIBIT JJO FPof 3890 Pheasant Ridge Drive NE, Suite 100 Blaine, MN 55449 Phone: (763) 489-7900 Fax: (763) 489-7959 www.carlsonmccain.com f:\jobs\5401 - 5420\5412 - natures refuge\cad\engineering\preliminary\5412_floodplain exhibit.dwgSave Date:06/15/18 environmental engineering surveying · · ·18 Revisions:Print Name: Signature: Date:License #: Drawn: Designed: Date: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota 11/14/17 11/14/17 Brian J. Krystofiak, P.E. 25063 BJK NATURES REFUGE Lino Lakes, Minnesota PREFERRED BUILDERS, INC. 10500 Bren Road E. Minnetonka, MN 55343 1 1. 6/15/18 Per City Comments of 3890 Pheasant Ridge Drive NE, Suite 100 Blaine, MN 55449 Phone: (763) 489-7900 Fax: (763) 489-7959 www.carlsonmccain.com f:\jobs\5401 - 5420\5412 - natures refuge\cad\engineering\preliminary\5412_wetland buffer ex.dwgSave Date:06/18/18 environmental engineering surveying · · ·2 1. 6/15/18 per City Comments Revisions:Print Name: Signature: Date:License #: Drawn: Designed: Date: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota 4/11/18 4/11/18 Brian J. Krystofiak, P.E. 25063 BJK NATURES REFUGE Lino Lakes, Minnesota PREFERRED BUILDERS, INC. 10500 Bren Road E. Minnetonka, MN 55343 WETLAND BUFFER EXHIBIT W1 BENCHMARK Know what's below. before you dig.Call R ADB W2 BENCHMARK Know what's below. before you dig.Call R ADB WETLAND BUFFER EXHIBIT of 3890 Pheasant Ridge Drive NE, Suite 100 Blaine, MN 55449 Phone: (763) 489-7900 Fax: (763) 489-7959 www.carlsonmccain.com f:\jobs\5401 - 5420\5412 - natures refuge\cad\engineering\preliminary\5412_wetland buffer ex.dwgSave Date:06/18/18 environmental engineering surveying · · ·2 Revisions:Print Name: Signature: Date:License #: Drawn: Designed: Date: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota 4/11/18 4/11/18 Brian J. Krystofiak, P.E. 25063 BJK NATURES REFUGE Lino Lakes, Minnesota PREFERRED BUILDERS, INC. 10500 Bren Road E. Minnetonka, MN 55343 1. 6/15/18 per City Comments 1 CITY COUNCIL AGENDA ITEM 6B STAFF ORIGINATOR: Katie Larsen, City Planner MEETING DATE: June 25, 2018 TOPIC: Consider Second Reading of Ordinance No. 06-18 Rezoning Property from R-1, Single Family Residential to PUD, Planned Unit Development for Saddle Club Fourth Addition *Council may vote to dispense with full reading of ordinance * Roll call vote is required for adoption of the ordinance VOTE REQUIRED: 3/5 INTRODUCTION Staff is requesting City Council consideration of the 2nd reading of the proposed ordinance to rezone property from R-1, Single Family Residential to PUD, Planned Unit Development for Saddle Club Fourth Addition. The 1st reading was approved by Council on June 11, 2018. BACKGROUND The applicant, Royal Oaks Realty, Inc., submitted a land use application for rezoning and PUD Development Stage/Preliminary Plat review. The proposed residential development is an 8 lot single family conservation subdivision located north of Foxborough and west of Saddle Club. It contains 1 parcel totaling approximately 5.25 gross acres. The development is called Saddle Club Fourth Addition. The property requires rezoning to PUD, Planned Unit Development to allow for the following flexibilities as detailed in Resolution No. 18-72. 1. Reduced road right-of-way width from 60 feet to 50 feet 2. Reduced front and rear setbacks from 30 feet to 25 feet; and The rezoning is consistent with the Zoning Ordinance and Comprehensive Plan as well as the adjacent Foxborough and Saddle Club conservation subdivisions. RECOMMENDATION The Planning & Zoning Board held a public hearing on May 9, 2018. Public comments included concerns regarding increased traffic, speed, tree removal and wetland impacts. The Board voted 2 6-0 in favor of the Rezoning and PUD Development Stage Plan/Preliminary Plat for Saddle Club Fourth Addition. ATTACHMENTS 1. Site Location Map 2. Ordinance No. 06-18 0 1,000 2,000500 Feet BIRCH ST BIRCH ST BLACK DUCK DR BLACK DUCK DR OLD BIRCH ST OLD BIRCH ST F O X CIR F O X CIR DEERWOOD LN DEERWOOD LN FOX CVFOX CV HOLLY CTHOLLY CT MINERAL PT MINERAL PT BEAVER CIR BEAVER CIR BEAVER TRLBEAVER TRL LANTERN LNLANTERN LN RED BIRCH CT RED BIRCH CT TA M A R A C K L NTAMARACK L N AA SS PP EE NN LL NN HUDSON TRLHUDSON TRL K I L L D E E R D R K I L L D E E R D R W HITE O W L D R W HITE O W L D R RR EE DD FF OO XX RR DD C H I P P E W A T R L C H I P P E W A T R L RIV E R BIR C H PL RIV E R BIR C H PL FF AA WW NN LL NN HOLLY DR HOLLY DR FOX RD FOX RD LLIINNDDEENNLLNN HH AA WW TT HH OO RRNN RRDD PHEASANT RUN S PHEASANT RUN S CC OO UU NN TT RR YY LL AA KK EE SS DD RR WEST SHADOW LAKE DR WEST SHADOW LAKE DR RESHANAU LAKEOHWL 883.5FIRM BFE 887FIS BFE 887 RICE LAKEOHWL 883.1FIRM BFE 887FIS BFE 887 CEDAR LAKEOHWL892.9 Site Location Map µ Saddle Club 4th Addition 1 1st Reading: Publication: 2nd Reading: Effective: CITY OF LINO LAKES ORDINANCE NO. 06-18 ORDINANCE TO REZONE PROPERTY FROM R-1, SINGLE FAMILY RESIDENTIAL TO PUD, PLANNED UNIT DEVELOPMENT FOR SADDLE CLUB FOURTH ADDITION The City Council of Lino Lakes ordains: Section 1: Findings of Fact 1. The City received a Land Use Application to rezone certain property from R-1, Single Family Residential to PUD, Planned Unit Development. 2. The Planning and Zoning Board held a public hearing on May 9, 2018. 3. Per Section 1007.015 (5), the Planning and Zoning Board shall consider possible adverse effects of the proposed rezoning and its judgement shall be based upon, but not limited to, the following factors: (a) The proposed action has been considered in relation to the specific policies and provisions of and has been found to be consistent with the official City Comprehensive Plan. The proposed Saddle Club Fourth Addition PUD conservation subdivision is consistent with the goals and policies of the comprehensive plan in regards to resource management, land use, housing, transportation and utilities. The development upholds the City’s public values by creating a multi-functional open space greenway corridor integrated with the stormwater conveyance system and wetland management. Saddle Club Fourth Addition is consistent with residential land use and density requirements. Safe transportation corridors and public utilities also serve the development. (b) The proposed use is or will be compatible with present and future land uses of the area. The proposed Saddle Club Fourth Addition development is compatible with the present and future land uses of the area. Existing and future land use to the north, south, east and west is residential. (c) The proposed use conforms with all performance standards contained herein. 2 The proposed Saddle Club Fourth Addition development conforms with all PUD performance standards as outlined in Section 1007.024(2) General Requirements and Standards: 1. Ownership. Dupont Holdings LLC is the owner of the property. 2. Comprehensive Plan Consistency. The proposed PUD shall be consistent with the City Comprehensive Plan. The proposed Saddle Club Fourth Addition residential development is consistent with the goals and policies of the comprehensive plan in regards to resource management, land use, housing, transportation and utilities. The development upholds the City’s public values by creating a multi-functional open space greenway corridor integrated with the stormwater conveyance system and wetland management. Saddle Club Fourth Addition is compatible with existing and adjacent land uses. Safe transportation corridors and public utilities also serve the development. 3. Public or Common Open Space. Wetlands and wetland buffers make up 2.94 acres (56%) of protected open space. 4. Operating and Maintenance Requirements for PUD Common Open Space/Facilities. Drainage & utility easements and conservation easements will be dedicated to the City and/or RCWD for operation and maintenance. 5. Utilities. Public municipal utilities (water and sanitary) shall serve each individual single family lot. 6. Roadways, Private. There are no private roadways proposed in Saddle Club Fourth Addition. 7. Development Agreement. A Development Agreement detailing developer responsibilities and securities will be executed with the final plat. (d) The proposed use can be accommodated with existing public services and will not overburden the City’s service capacity. The proposed Saddle Club Fourth Addition development can be accommodated with existing public services and will not overburden the City’s service capacity. The site is 3 served by MCES Lift Station L69 and is adequately sized for the development in the district. The existing water supply and water distribution system can provide adequate water volume and fire protection. Section 2: Amendment The Zoning Ordinance of the City of Lino Lakes is hereby amended to rezone the following described property from R-1, Single Family Residential to PUD, Planned Unit Development. Section 3: Legal Description The South 550.00 feet of the East 330.00 feet of the Southwest Quarter of the Southwest Quarter of Section 28, Township 31, Range 22, Anoka County, Minnesota. Outlot B, Saddle Club Third Addition, Anoka County, Minnesota. Section 4: Development Regulations The development shall conform to the plans, requirements, and conditions of approval as listed in Council Resolution No. 18-72. Section 5: Effect This ordinance shall be in force and effect from and after its passage and publication according to the Lino Lakes City Charter and upon the filing of the final plat. Adopted by the Lino Lakes City Council this 25th day of June, 2018. The motion for the adoption of the foregoing ordinance was introduced by Council Member_____________and was duly seconded by Council Member ___________ and upon vote being taken thereon, the following voted in favor thereof: The following voted against same: ____________________________ Jeff Reinert, Mayor ATTEST: ________________________ Julianne Bartell, City Clerk CITY COUNCIL AGENDA ITEM 6C STAFF ORIGINATOR: Diane Hankee PE, City Engineer MEETING DATE: June 25, 2018 TOPIC: Resolution No. 18-77, Accepting Quotes and Awarding a Construction Contract, 2018 Street Maintenance (Reclamite) Project VOTE REQUIRED: 3/5 Vote Required INTRODUCTION Staff is requesting Council authorization to accept quotes and award the construction contract for a 2018 Street Maintenance (Reclamite) Project. BACKGROUND As part the City’s annual street maintenance program quotes were received to complete a maltene-based asphalt rejuvenator project. Enclosed is project location map. The maltene-based asphalt rejuvenator product is recommended in lieu of the traditional seal coat. It is a product that many metro area Cities are using to avoid delamination. The project budget is $90,000.00. Quotes were received for the above-referenced project on June 18, 2018. CONTRACTOR TOTAL QUOTE Corrective Asphalt Materials $87,730.80 Lino Lakes Blacktop Did not Quote Allied Blacktop Did not Quote Arcade Asphalt Did not Quote The low quote was submitted by Corrective Asphalt Materials, LLC., South Roxana, IL, in the amount of $87,730.80. The completion date for this project is August 30, 2018. RECOMMENDATION Staff recommends adoption of Resolution No. 18-77 accepting quotes and awarding a construction contract for a 2018 Street Maintenance (Reclamite) Project, in the amount of $87,730.80 to Corrective Asphalt Materials, LLC. ATTACHMENTS 1. Resolution No. 18-77 2. Project Map CITY OF LINO LAKES RESOLUTION NO. 18-77 RESOLUTION ACCEPTING QUOTES, AND AWARDING A CONSTRUCTION CONTRACT, 2018 STREET MAINTENANCE (RECLAMITE) PROJECT WHEREAS, pursuant to a request for quotes for the construction of a 2018 Street Maintenance (Reclamite) Project, quotes were received: CONTRACTOR TOTAL QUOTE Corrective Asphalt Materials $87,730.80 Lino Lakes Blacktop Did not Quote Allied Blacktop Did not Quote Arcade Asphalt Did not Quote WHEREAS, it appears that Corrective Asphalt Materials, LLC. is the lowest responsible quote. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Lino Lakes that the Mayor and Clerk are hereby authorized and directed to enter into a contract with Corrective Asphalt Materials LLC., in the name of the City of Lino Lakes for the construction of a 2018 Street Maintenance (Reclamite) Project according to the plans on file in the office of the City Clerk; and Adopted by the Council of the City of Lino Lakes this 25th day of June, 2018. The motion for the adoption of the foregoing resolution was introduced by Council Member _______________and was duly seconded by Council Member ________________ and upon vote being taken thereon, the following voted in favor thereof: The following voted against same: _______________________________ Jeff Reinert, Mayor ATTEST: ________________________ Julianne Bartell, City Clerk %&d(%&c( )s Rondeau Lake Peltier Lake Marshan Lake Centerville Lake George Watch Lake Sherman Lake Wards Lake Reshanau Lake Rice Lake Golden Lake Baldwin Lake Bald Eagle Lake Amelia Lake Otter Lake Cedar Lake Rice Creek Marsh Blaine Blaine Lino Lakes oreview Circle Pines Lexington Ci r c l e P in e s Li n o L a k e s Columbus Lino Lakes Hugo Lino Lakes Hugo White Bear Twp. Lino Lakes North Oaks Lino Lakes Shoreview Lino Lakes White Bear Twp. Lino Lakes Centerville Elm St Village Dr 4t h A ve M- 3 7 3 LakeDr Lak e D r 20th Ave N Mill R d 20th Ave N Lois La Hodg s o n Rd Main St 77th St W Ma in S t Marshan L a H o d g s o n R d Ot t er Lak e Rd Elmcrest Ave NNordi n S t Deer Pass Tr DianeSt Ruff ed Grouse R d OspreyCt Elmcrest Ave N Ea g l e T r Short St No rd in St Ki l l d e e r D r BehmLa W Shadow L ak e D r C ountr y Lak es D r S Glen Tr Sa nd p ip er Dr S ta ge coac h Tr F o x C ir Fox Holw Robinson Dr Sunset Ave NE Hokah D r Killdeer Ct Highland D r Highland Tr Town C en t e r Pkwy Painted TurtleR d S t e ll a C i r La n g e r C i r An telope Dr Cent e rvill e R d E a gl e Tr El m c r e s t A v e N El l e n C t Egret La CarlSt Br i a n Dr Birch St Linda Ave Ti mber w o lf Tr TartLakeRd Iro nw ood Cir W o o d d u c k Tr Jan e A v e Cr ysta l C t Trappers C r o S Sioux Ct Br i a n Dr War e Cir Red F o x Rd Jo s e ph Ct Diane St Wh it e P in e C ir A u g u s t C i r Timo th y C t Ca i ne C t Prairie FlowerRd Mar i l y n D r Wa yne Ci r Langer La Ruffed Grouse R d Gol d e n r o d Cir La c as s e Ci r Sorel St Peltier Lake D r W h i t e Oak Rd M e a d o w v i e w C t Deerwood L a D u p r e e Rd Gord on A v e Sunflower La P h e as a n t H il l s Dr Partridge Pl C l e a r w a t e r CreekDr F a w n L a Ware Rd Linda Cir L a c a s s e Dr Ce nt u r y Tr Shadow Ct Gl e n C i r Dupre R d Woo d ridg e Ct Bla ck D u c k D r Holly Dr Sh e r m a n L a k e C ir Wolf Cir D e l ina Cir Ar a b ia n Ci r Gr o u s e H ol w Moun d Tr Re d H awk T r Broke n Oak Ct Apollo D r Un i t y Av e Widgeon C ir Sh e r m a n L a ke Rd Apol l o D r Lilac St Tel e La To u r v i l l e C i r Gr a n ge V iew A p o ll o D r Apollo Dr Totem Tr Apollo D r Teckla Ct LakotaTr Port a g e Wa y 20th Ave S CrippleCreekPass Gladstone Cir SiouxL a Timberwole Cir La m otteDr Mo u n d C t Cly d esd al e C i r 20 t h A v e S Tomahawk T r Co y o t e C t Black Duck Ct Stoneybrook D r C hero kee T r Center St StonetbrookDr Wa r e R d Lau re ne A v e Sedge Ct Terra C t S tella La R u f f e d Grouse Ct 2n d A v e Su m ac C t Cinnam o n T e a l C t LakeDr Trappe r s C t Mi l l R d Heritage St M- 1 9 8 Pin t o La Sorel St D e e r C t 12th Ave S Fox Cove Ca ssio pe i a C t Glen v ie w L a Oak Cir Smoketree La Muskrat Run High Land Ct Ta r t C t Flora C t Coyote Tr B ri a n C t OakCt ClearwaterRd Le a C t Linda L a Iv y Ct Appaloosa Ct Wildflower Dr O l d M ill Rd Fox R d Peterson Tr Whitetail Tr M ea d o w Ct Mu s t a n g L a Pheasant L a Trappers C r o ShermanLake R d Malla rd L a Eva S t Bald EagleBlvd W Ce nt e r vi l l e R d Westview St Go if f o n R d Snow Owl La Glenview Dr 81stSt W SnowOwlCir Ravens Ct S herma n L a k eRd P h e a s a n t Hills Dr Meadow La Fox Run Town Rd Marshan Ct Gladstone Dr Ulmer Dr G r a yHeron Dr KellySt Hawthorn Rd 73rd St Northern Lights Blvd Na nc y D r Mustang Ct Linda Ave R i c e C t Beaver Pond Way 62nd St E l mSt Center S t Green Briar Dr 21st Ave N Prairie Dr Phea sant Run S Clearwater Creek Ct 74th St Black D u ck Cir Clear R d g He a t h e r Ct Rohavic La Oak v ie w Ct 64th St ShadowLakeCt Dupre R d Min eral P t 79th St Gateway Cir ChokecherryRd Elizabeth La Bl a c k D u c k D r Par t r i d ge C t Savann a C t PalominoLa Henery La Pione e r L a Kin g f is h e r C t Karth Rd Hokah Dr C h i p p e w a Tr Sh ei l a A v e Whi te t ail R dg RedMapleLa AppaloosaLa BloomCt Ph e a s an t Ru n S Linda Ct 133rd Ave Oak La 77th St W S c hl a vi n C t Dan ub e S t Blue Heron D r Hollow La Ma l la rd W a y Glenview Ave Hok ahDr Sherwood La Rondeau LakeRdW Barbara La Village Dr Lantern La S Robin La Parkview Dr H o u l eCir Prairie View La Elmcrest Ave N Merganser Ct W Cardinal Dr Beaver Tr EShadow LakeDr Me a d ow Ct Cedar St E RoyalP l Ba l d w i n L a k e R d A s p e nLa ParkCt Iverson Ct R o lli n g HillsDr H u n t e r s Tr Canfield Rd Tamarack La Ric e L ak e C t Red Clover La Oakwood La Palomino La De e r P a s s D r Greenwood La Wh i t e Birc h Ct 82nd St E Foxtail Dr L o n e so m e Pine Tr Woodchuck Ct Bradley St Fairmount Dr Smoketree La W o o d s E d g e D r Meadow Cir Twin Lakes Rd Tele Dr La nter n C i r River B i r c h Pl Marvy St 77th St E 140th St N Connie La Jon A v e Je ann e D r Patti e D r LakeDr Wo od D uc k T r Andall St Wild TurkeyTr Blackbird La Sou i x Loo k Wh i t e O w l D r 65th St G St Hayfield Rd Br i an W a y Marcia La F o x t a i lCt Molitor Dr R u sticLa Gaa ge L a Co untry L a S arge ntCtN Co tto nw o o d Ct Lamotte Cir Oak La W ShadowLakeDr Elb e S t Sand h ill D r Lois La Reiling Rd 72nd St Green Briar Dr Bl ue b i l l L a Maple St Linda Ave 64th St Hun ters Rdg L a k e l a n dCir K nol l D r Lilac St W o o d r i d g e L a Ojib w ay P at h Quebec St AenonPl Na nc y Dr Ta l l e La 77th St W 81st St W O tt e rLake Dr DeerwoodLa Hunters Ridge La PostRd 4t h A v e Lake vie w D r Thomas St No t t i n g h a m L a LindenLa Ro nd eau R d W Main St Phelps Rd Vicki La 4th A v e S t a ll i o n La P elic a n Pl Pine St Commerce Dr C aroleDr Partridge Pl IST H 35 E Mead o w V i e w T r Le o n a r d A v e P e lti e r Cir IvyRidge La H S t Ri ce L ak e D r Lilac ST Lilac St Otter Lake Rd 81st St E 22ndAveS Holly Ct I STH 3 5 W IS TH 3 5 E Jo y e r L a Wo odland Dr Carl St Rehbeins St OldBirch St ISTH 3 5 W Parkway Rd EvergreenTr James St Peltier Lake Dr F St RondeauLakeRdE G St Ash St Fr e e w a y D r 80th St E Aqua L a El m c r e s t A v e N Birc h St M-304 MapleLa Maple L a GnWX GnWX GwWX GwWX GwWX GwWX GuWX GnWX GuWX GuWX GiWX GiWX GiWX Document Path: K:\012232-000\GIS\Maps\2018RoadwayMaintenanceProjects.mxd Date Saved: 6/7/2018 10:14:50 AM 2018 Roadway Maintenance Projects City of Lino Lakes, Minnesota 0 3,500 Feet¯1 inch = 3,500 feet 2018 Roadway Maintenance Projects Streams City Boundaries Lakes/Ponds Parks CITY COUNCIL AGENDA ITEM 6D STAFF ORIGINATOR: Diane Hankee PE, City Engineer MEETING DATE: June 25, 2018 TOPIC: Resolution of Support Federal Funding for I 35E and County Road J Interchange, and the Centerville Road and County Road J Intersection Project VOTE REQUIRED: 3/5 Vote Required INTRODUCTION Staff is requesting Council consideration for supporting federal funding for the Interstate (I) 35E and County Road J Interchange, and the Centerville Road and County Road J Intersection Projects. BACKGROUND The City Council passed a resolution on October 9, 2017 approving the Intersection Control Evaluation (ICE) Report for the Centerville Road and County Road J intersection. The intersection is under the jurisdiction of multiple agencies including: the City of Lino Lakes, City of North Oaks, Anoka County and Ramsey County. These agencies along with the Minnesota Department of Transportation (MnDOT) approved the report. The ICE report identified that under existing conditions the southbound approach and the westbound right turn movements were having unsatisfactory levels of service in the a.m. and p.m. peak periods. The study used the City’s existing traffic (2018), and projected traffic based on future land use (2038), to determine acceptable levels of service. The analysis concluded that either a traffic signal system or roundabout would address the unsatisfactory levels of service, and provide adequate levels of service through 2038. As part of the MnDOT I 35E corridor planning they laid out a concept plan for the I 35E and CR J Interchange. Due to continued congestion and access issues in this corridor, Ramsey County in coordination with Anoka County are applying for Federal Funding for the I-35E and CR J interchange, and the Centerville Road and County Road J intersection improvements. RECOMMENDATION Staff recommends adoption of Resolution No. 18-78 supporting Federal Funding for the I-35E and County Road J Interchange, and the Centerville Road and County Road J Intersection Projects. ATTACHMENTS Resolution No. 18-78 CITY OF LINO LAKES RESOLUTION NO. 18-78 RESOLUTION OF SUPPORT FEDERAL FUNDING FOR INTERSTATE 35E & COUNTY ROAD J INTERCHANGE, AND THE CENTERVILLE ROAD & COUNTY ROAD J INTERSECTION PROJECTS WHEREAS, the City Council passed Resolution 17-115 on October 9, 2017 approving the Intersection Control Evaluation (ICE) Report for Centerville Road (CSAH 21/CSAH 59) at Ash Street (CR J)/Wilkinson Lake Blvd; and WHEREAS, the roadways of Interstate (I) 35E, Centerville Road (CSAH 21/CSAH 59) and Ash Street (CR J)/Wilkinson Lake Blvd are under the jurisdiction of multiple agencies including the City of Lino Lakes, the City of North Oaks, Anoka County and Ramsey County and the Minnesota Department of Transportation; and WHEREAS, interchange improvements have been laid out by the Minnesota Department of Transportation for I 35E and CR J, and WHEREAS, Ramsey County in coordination with Anoka County are applying for Federal Funding for the I 35E and CR J interchange improvements, and the Centerville Road (CSAH 21/CSAH 59) at Ash Street (CR J)/Wilkinson Lake Blvd intersection improvements. NOW, THEREFORE BE IT FURTHER RESOLVED by The City Council of The City of Lino Lakes that the City Council hereby supports Federal Funding for the I-35E & County Road J Interchange, and the Centerville Road & County Road J Intersection Improvements. Adopted by the Council of the City of Lino Lakes this 25th day of June, 2018. The motion for the adoption of the foregoing resolution was introduced by Council Member _____________and was duly seconded by Council Member and upon vote being taken thereon, the following voted in favor thereof: The following voted against same: _____________________ Jeff Reinert, Mayor ATTEST: ________________________ Julianne Bartell, City Clerk 1 CITY COUNCIL AGENDA ITEM 6E STAFF ORIGINATOR: Michael Grochala, Community Development Director MEETING DATE: June 25, 2018 TOPIC: Consider 2nd Reading of Ordinance No. 07-18, Amending City Code Section 1007 Related to Driveway Surfacing, Airplane Hangar and Hangar Access Performance Standards VOTE REQUIRED: Simple Majority INTRODUCTION Staff is requesting City Council consideration to amend City Code Section 1007 to amend driveway, airplane hangar and hangar access performance standards. BACKGROUND Within the City of Lino Lakes are two unique residential developments that are constructed around private airports. Both Lino Air Park/Century Farm North and Surf Side Addition provide for the construction of airplane hangars and taxiway access to the airports. In December of 2017 the City Council was approached by representatives of Lino Air Park concerning hangar access from public roads. The representatives requested modification of existing City Zoning Ordinance requirements to provide additional flexibility to access airplane hangars from public streets. The City Council directed staff to work with the Air Park to develop a solution that would accommodate the needs of the property owners. The City Council approved the 1st Reading of the ordinance at the June 11, 2018 regular meeting. ANALYSIS The City Zoning Ordinance establishes performance standards for accessory buildings, driveway construction, driveway access to public streets, driveway setbacks, and maximum impervious surface. Proposed Amendment Staff has worked with the City Attorney to address and clarify driveway surfacing requirements and develop a general provision section of the zoning ordinance that would relate specifically to air parks including both Lino Air Park and Surfside Addition. The provisions include the following: 2 1. Amends Section 1007.044 (3) h. to clarify requirements for surfacing of driveways. (Applies to all driveways and parking areas). Driveway must be hard surfaced unless property is 1 acre in size or greater. 2. Provides for a construction of a 3,200 square foot hangar at both private airports. The current ordinance only applies to Lino Airpark. 3. Allows for a 3 foot side yard driveway setback. Encroachment into the setback is allowed as a shared driveway with an access and maintenance agreement with abutting property owners. 4. Allows for improvements within drainage easement subject to City Engineer approval. The property owner is responsible for any removal costs. 5. Allows for a secondary access if principal driveway cannot be extended or expanded without encroachment into setback, abutting property or prohibited areas of front yard. 6. The allowable Maximum Impervious Surface percentage is increased to 65%. 7. Deletes the existing hangar provisions in Section 1007.043(4)(i)4.h. RECOMMENDATION Staff is recommending approval of the 2ndt Reading of Ordinance No. 07-18 ATTACHMENTS 1. Ordinance No. 07-18. 1st Reading: Publication: 2nd Reading: Effective: CITY OF LINO LAKES ORDINANCE NO. 07-18 AN ORDINANCE AMENDING CITY CODE SECTION 1007 RELATED TO DRIVEWAY SURFACING AND AIRPLANE HANGAR AND ACCESS PERFORMANCE STANDARDS The City Council of Lino Lakes ordains: Section 1. Findings. The City Council finds that private airfields within the city are an existing land use supported in the City’s Comprehensive Plan. The development of performance standards for driveway surfacing, hanger construction and hangar access are in the best interests of the city to ensure safe operation and continued compatibility with adjacent land uses. Section 2. Amendment. Lino Lakes City Code Chapter 1007.043(4)(i)4.h. is hereby repealed as set forth below: 1007.043, (4)(i)4.h. Lots that have shared ownership/membership in the Lino Airpark may have a three thousand two hundred (3,200) square foot accessory building as an airplane hangar provided that: i. The hangar be earth tone in color. ii. The hangar conform to Building Code standards for hangar use. iii. The hangar location has direct taxiway access to the Lino Airpark runway. Section 3. Amendment. Lino Lakes City Code Chapter 1007.044(3)(h) is hereby amended as set forth below to include the following: 16. All driveways, approaches, sales lots, and parking areas, shall be hard surfaced using concrete, asphalt or equivalent paving materials as approved by the city engineer. a. In Commercial, Industrial and Public and Semi-public zoning districts the city may allow up to 25 percent of the required parking stalls be provided as green parking with a turf surface supported by a city approved parking lot sub-base and a turf-guard fabric. b. In Rural and Residential zoning districts, on lots one acre in size or greater, driveways, approaches, and parking areas shall be surfaced with asphalt, concrete, class 5 gravel or other surfacing material as may be approved by the City Engineer. Section 4. Amendment. Lino Lakes City Code Chapter 1007.044(11)(a) 1. is hereby amended as set forth below to include the following: 1. They are parked on an appropriate surface. Appropriate surface shall include asphalt, concrete, pavers, and environmentally conscious materials when approved by the city engineer. On properties over one acres in size, appropriate surface may also include rock or stone, when approved by the city engineer. in compliance with Section 1007.044(3)(h)16. Section 5. Amendment. Lino Lakes City Code Chapter 1007 is hereby amended as set forth below to include the following: 1007.057. AIR PARK HANGAR AND ACCESS PERFORMANCE STANDARDS (1) Purpose. The purpose of this section is to provide standards for the size of airplane hangars and access to airplane hangars constructed on single family lots that have taxiway access to an approved private use airport. (2) Definitions. The following definitions apply to this section: Air Park. A residential subdivision with permitted access to a private use airport. Airplane Hangar. An accessory building constructed on a single family lot where aircraft are stored. Such use is considered a residential accessory use incidental to the dwelling. Single Family Lot. A parcel of record or platted parcel containing a single family detached dwelling. (3) General Standards. The following standards shall apply to all air park single family lots: (a) Airplane Hangar. Air Park lots may have one airplane hangar not exceeding 3,200 square feet, provided that: a. The airplane hangar location has direct taxiway access to the runway. b. The airplane hangar be earth tone in color. (b) Driveways shall not be constructed closer than three feet to the property line. Exception. Encroachment into the three foot setback may be allowed for purposes of constructing a shared driveway with the abutting property owner provided that any shared driveway shall include a maintenance and access agreement executed by each property owner and recorded against each property with Anoka County. (c) The plans for driveways proposed to be placed within a drainage and utility easement must meet drainage requirements and be approved by the City Engineer prior to construction. Driveways placed within a drainage and utility easement are placed, by the owner, at the owner's risk of removal by the City or other agencies that may have legal use of the easement. Replacement of driveways removed for drainage or utility work shall be at the owner’s expense. (d) All driveways and approaches shall be hard surfaced in accordance with Section 1007.044(3)(h)16. (e) An air park single family lot may have one secondary public street driveway access subject to approval of the City Engineer and the following conditions: 1. The property owner demonstrates that the principal driveway access serving the single family dwelling cannot be extended or expanded to serve an airplane hangar without encroaching into required setbacks or abutting property or without violating section 1007.044(5)(g). 2. Secondary driveway width shall not exceed 12 feet. 3. No secondary driveway shall be within three feet of the property line unless a shared driveway access and maintenance agreement is executed by each property owner and recorded against each property with Anoka County. (f) Impervious Surface Coverage Area. The impervious surface of the property shall not exceed 65%. (g) All other provisions of Chapter 1007 and the City Code shall be applicable to the extent not in conflict with this section. Section 6. Effective Date. This Ordinance shall be effective from and after its passage and publication according to the Lino Lakes City Charter. Adopted by the Lino Lakes City Council this 11th day of June, 2018. The motion for the adoption of the foregoing ordinance was introduced by Council Member_____________and was duly seconded by Council Member ___________ and upon vote being taken thereon, the following voted in favor thereof: The following voted against same: ____________________________ Jeff Reinert, Mayor ATTEST: ________________________ Julianne Bartell, City Clerk