Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
05/02/2024 EDAC Combined Packet
CITY OF LINO LAKES ECONOMIC DEVELOPMENT ADVISORY COMMITTEE MEETING Thursday, May 2, 2024 8:00 A.M. Community Room AGENDA 1. Call to Order and Roll Call 2. Approval of Minutes: April 4, 2024 3. Discussion Items A. Industrial Project Approvals. Marshan Industrial Park B. Project Updates 4. Adjournment DRAFT MINUTES CITY OF LINO LAKES ECONOMIC DEVELOPMENT ADVISORY COMMITTEE MINUTES DATE: April 4, 2024 TIME STARTED: 8:00 a.m. TIME ENDED: 9:29 a.m. MEMBERS PRESENT: Andrew Cravero, Blakely LaCroix, Don Johnson, Patrick Kohler, Nathan Vojtech, Keith Hembre, Chris Spenner, Chad Wagner MEMBERS ABSENT: Jim Schueller, Steve Marchek STAFF PRESENT: Michael Grochala, Julie Whitney 1. CALL TO ORDER Mr. Grochala called the Economic Development Advisory Committee meeting to order at 8:00 a.m. on April 4, 2024. 2. APPROVAL OF MINUTES Mr. Vojtech made a motion to approve the March 7, 2024 meeting minutes. Motion was supported by Mr. LaCroix. Motion carried 8-0. 3. DISCUSSION ITEMS A. Anoka County Housing Study Anoka County completed a county wide housing study in early 2024. Karen Skepper, Director of Community and Government Relations for Anoka County, presented an overview of the study findings. This included some specifics regarding Lino Lakes. The City will be receiving over $140,000 dollars in housing added in 2024 with an additional $248,000 estimated for 2025 to assist with affordable housing programs. Staff is currently working with Ehlers’s and Associates to establish a housing trust fund to hold the proceeds. Key findings in the study were a robust household growth in Anoka County, labor shortages, an extremely tight rental market, a dramatic increase in home prices and a Economic Development Advisory Committee April 4, 2024 Page 2 DRAFT MINUTES demand for all types of housing between now and 2030. She stated the overall need in Anoka County was 18,041 new single family housing units. Key findings, specifically for the city of Lino Lakes, included the need for 1400 new households this decade and an additional 600 the following decade. The survey looked at available lots for single family homes in Lino Lakes. Ms. Skepper said there were 117 vacant developed lots that met zoning requirements and a potential for 493 future single family lots. They also found 10 vacant developed lots for multi-family homes. She stated the City of Lino Lakes has a demand for 718 single family homes and 307 multi family homes between now and 2030 and stated we were in a good position with available land and demand. Ms. Skepper is anticipating an acceleration in the demand for housing in the next 24 to 36 months. Ms. Skepper reviewed how rental units are broken up into two occupancies. One is general occupancy, anyone can live there, and senior housing. She stated by 2030 there will be a demand for 191 rental units with an additional 288 by the year 2040. The study recommends that rental townhomes or an elevator style building would be appropriate for our City. She also said multi family vacancy rates in the City are below 2.5% which makes for a tight rental market. There is still some demand for senior housing but with the new senior building, it has captured some of that demand for the short term. She also said the demand would still continue. Ms. Skepper and Mr. Grochala responded to the board’s questions. B. Project Updates Mr. Grochala updated the committee on current City projects. 4. ADJOURNMENT Mr. Grochala adjourned the meeting at 9:29 a.m. Respectfully submitted, Julie Whitney, Community Development Administrative Assistant ECONOMIC DEVELOPMENT ADVISORY COMMITTEE AGENDA ITEM 3A STAFF ORIGINATOR: Mike Grochala, Community Development Director EDAC MEETING DATE: May 2, 2024 TOPIC: Industrial Development Projects, Marshan Industrial Park BACKGROUND Two industrial development projects are currently under review in the Marshan Industrial Park. Additionally, Planning and Zoning Board has requested consideration of a Lake Drive Architectural Overlay District Lino Lakes Tech Center & Storage Facility, 440 park Court The City Council approved a Conditional Use Permit for Lariat Companies, Inc., to construct a multi-tenant industrial and indoor self-storage building on the south half of the property. The north half is occupied by Lino Lakes Storage (mini storage). The project includes 11 bays available for small business startups or construction related uses. During the review of the Tech Center project the Planning & Zoning Board proposed the creation of a Lake Drive Architectural Design Overlay District. The intent would be to have a increased design requirements for buildings adjacent to Lake Drive. Staff will be preparing a project scope for consideration at a future meeting, but is requesting discussion by the EDAC. Fiji Cube, 455 Park Court Fiji Cube is proposing a 32,000 Square foot office/warehouse building at 455 Park Court. The property will serve as the headquarters and distribution point for Fiji Cube, an aquarium designer and manufacturer. Site and Building Plan review has been completed and approvals are pending submittal of revisions. EDAC CONSIDERATION None. Discussion only. ATTACHMENTS 1. General Location Map 2. Tech Center Plans 3. Fiji Cube Plans ParkCt StageCoac hTr l 23 Legend Address Labels Parcels April 25, 2024 Map Powered By Datafi ± 1 in = 200 Ft Marshan Industrial Park Projects 35,477 SF +/-15' REAR YARD SETBACK50' F R O N T Y A R D S E T B A C K EXISTINGINFILTRATIONBASINBUILDING(12,043 SF) 10' SIDE YARD SETBACK 8-~26'X56' BAYS3 BAYS(3,071 SF)MECH RMINFILTRATIONBASIN30' FRONT YARD SETBACK 10' SIDE YARD SETBACKXX X X X X X X X X X X X41116 EXISTINGPRETREATMENTBASIN11XXX X X X X X X X X X X X X XXXXTR33.4'23'170'15' 9'18'24'DRAINAGE & UTILITYEASEMENTWETLAND10' DRAINAGE & UTILITY EASEMENT20' D R A I N A G E & U T I L I T Y E A S E M E N T50.67'TYP211.2'24'3.2'18'17' WIDE DOUBLESWING GATETYP9'61.5'170.6'(C .S .A .H N O . 2 3 )PARK COURTLAK E D R I V E 10' WETLANDBUFFERSN O W S T O R A G E HEAVY DUTYBITUMINOUS PAVEMENTSECTION (TYP)E1C-5013' TRANSITION FROM6" TO 4" CURBB612 CURB &GUTTER (TYP)B5C-501LIGHT DUTYBITUMINOUS PAVEMENTSECTION (TYP)E2C-501B612 CURB &GUTTER (TYP)B4C-501WALL MOUNTEDACCESSIBLE SIGNAGE(TYP)C5C-5018'20'4'24'8'8'R3.67'9'6'MODULAR BLOCKRETAINING WALL9'7'10'TYPTYPTYP18.5'4.5'PROOF OF PARKINGCURBMODIFICATIONAT CATCH BASIN(TYP)A1C-501R3.29 '4'8' HIGH CHAIN LINKSECURITY FENCE4' WIDE GATEREINSTALLSTOP SIGNREINSTALLSIGN15.67'24.7'DRAINAGE & UTILITYEASEMENTCONCRETE STOOPSEE ARCH (TYP)CONCRETE STOOPSEE ARCH (TYP)CONCRETE STOOPSEE ARCH (TYP)SIDEWALKJOINT (TYP)C1C-501EXISTING FENCECONCRETE WALKWAYPAVEMENT SECTION(TYP)E5C-501CONCRETE PAVEMENTJOINT (TYP)C2C-5013' TRANSITION FROM6" TO 4" CURBD412 CURB &GUTTER (TYP)123.5'171.6'B612 CURB &GUTTER (TYP)MAX 6" GAPBETWEEN FENCE &EXISTING BUILDING3' TRANSITION FROM6" TO 4" CURBD412 CURB & GUTTERTAPER LAST 5' OF GUTTERTO MATCH BLDG CORNER40'D412 CURB &GUTTER (TYP)B4L-501B4L-501FDCTRASH & RECYCLEROOMTURF AT PROOF OFPARKINGE6C-501R50'24.6'3' TRANSITION FROM6" TO 4" CURBSN O W ST O R A G ESNOW STORAGE IF PROOFOF PARKING IS BUILTPRIMARY SNOW STORAGENOTE: EACH TENANT SPACE HAS THE POTENTIALFOR AN ACCESSIBLE PARKING STALL IN FRONT OFTHEIR SPACE UTILIZING THE AREA IN FRONT OF THEOVERHEAD DOOR AND CROSS HATCHED ACCESSAISLE IN FRONT OF THE MAN-DOOR.CONCRETE AT BUILDINGSEE ARCH (TYP)26.3'36.1'20'4' WIDE CURBOPENING4' HIGH CHAIN LINKSECURITY FENCE(TYP)X X X XXXXXX X X.S .A .H N O . 2 3 )PARK COURTLAK E D R I V E260' FIRE HOSEFROM NORTH285' FIRE HOSEFROM EAST9030SCALE IN FEET Know what's below. Call before you dig. RA1SITE PLAN1" = 30'C-101SITE PLANLEGENDHEAVY DUTY BITUMINOUS PAVEMENTCONCRETE PAVEMENTLIGHT DUTY BITUMINOUS PAVEMENTSITE PLAN NOTES1.VERIFY ALL FIELD CONDITIONS AND UTILITY LOCATIONS PRIOR TO EXCAVATION/CONSTRUCTION.IF ANY DISCREPANCIES OR UNKNOWN UTILITIES ARE FOUND THAT IMPACT DESIGN OR IMPAIRCONSTRUCTION, THE ENGINEER AND OWNER SHOULD BE IMMEDIATELY NOTIFIED.2.DIMENSIONS SHOWN ON THIS PLAN ARE TO FACE OF CURB AND EXTERIOR FACE OF BUILDINGUNLESS NOTED OTHERWISE.3.MEET AND MATCH EXISTING CONDITIONS. PROVIDE TRANSITION AS NECESSARY.4.ON-SITE CURB TO BE B612 AND D412 CONCRETE CURB & GUTTER. RIGHT-OF-WAY CURB TO BEB618 CURB & GUTTER.5.ALL CURBS TO HAVE 3/4" EXPANSION JOINTS AT A MAXIMUM OF 100'-0" AND CONTROL JOINTS AT AMAXIMUM OF 10'-0".6.ALL PARKING STALLS TO BE PAINTED WITH A 4" WIDE WHITE STRIPING. ACCESSIBLE SYMBOLS TOBE PAINTED IN WHITE AND ACCESSIBLE ACCESS AISLES TO BE PAINTED WITH A 4" WIDE WHITEPAINTED STRIPE 18 INCHES ON CENTER AND AT 45 DEGREE ANGLES TO STALL, WITH 'NO PARKING'MARKED. REFLECTORIZED PAINT SHALL COMPLY WITH MNDOT 3592.AMC23004PROJECT NO.SHEETCERTIFICATIOND E S I G NCIVIL ENGINEERING | LANDSCAPE ARCHITECTURE310 4TH AVE SOUTH, SUITE 1006MINNEAPOLIS, MN 55415www.elanlab.comp 612.260.7980f 612.260.7990123456EDCBA I hereby certify that this plan, specification or reportwas prepared by me, or under my direct supervision,and that I am a duly Licensed Professional Engineerunder the laws of the state of MINNESOTA.Stephen M. Johnston1891401/25/2024NOT FORCONSTRUCTIONREGISTRATION NO.DATERESPONSE TO CITYCOMMENTS01/25/2024LINO LAKESINDUSTRIAL ANDSTORAGE CENTERLINO LAKES, MINNESOTAISSUEDATESHEET INDEXPROJECTAMCON6121 BAKER RD, SUITE 101MINNETONKA, MINNESOTA 55345651-379-9090LARIAT COMPANIES INC.8345 Crystal View Rd. #200Eden Prairie, Minnesota, 55344OWNERZONED:L - I LIGHT INDUSTRIALSITE 249,763 SF ( 5.73 AC) EXISTING PROPOSED IMPERVIOUS 89,931 SF. (36%) 148,274 SF. (59%)(75% MAX.ALLOWANCE)BUILDING 40,682 SF. (16%) 40,682 SF. (16%)PHASE II BUILDING 35,477 SF. (14%)PARKING, WALK, & TRASH 49,249 SF. (20%) 66,215 SF. (27%)PROOF OF PARKING 5,900 SF. ( 2%)NOT PROPOSED TO BE CONSTRUCTED AT THIS TIMEPERVIOUS AREA 159,832 SF. (64%) 101,489 SF. (41%)SETBACKS REQUIRED PROPOSEDFRONT50' LAKE DRIVE61.5' (LAKE DRIVE)50' (EXISTING)30' PARK COURT42.8' (EXISTING)SIDE10'170.6' (BUILDING), 123.5' (PARKING)REAR15'15'PARKING SUMMARYREQUIRED 40 STALLSLIGHT MANUFACTURING8 UNITS: 12,000 SF/ 500 = 24 STALLS(1/ 500 GFA) 3 UNITS: 3,000 SF/ 500 = 6 STALLSWAREHOUSING19,997 SF/ 2,000 = 10 STALLS(1/ 2,000 GFA)PROPOSED 31 CONSTRUCTED STALLS + 11 PROOF OF PARKING STALLS2 - 9' X 18' ACCESSIBLE STALLS29 - 9' X 18' STANDARD STALLS(1 STANDARD STALLS WILL BE LOST TO BUILD PROOF OF PARKING)ADDITIONAL 11 STALLS COULD BE BUILT IF NEEDED TO MEET THE DEMAND OF THE BUILDING USERS.THESE STALLS WILL NOT BE BUILT UNLESS THERE IS THE DEMAND.PROJECT SUMMARYA6FIRE TRUCK CIRCULATION (37.5' SPARTAN GLADIATOR AERIAL)1" = 80'PERVIOUS AREATURF AT PROOF OF PARKING1WATERSHED / CITY COMMENTS 03/08/20241222CITY COMMENTS 03/26/20241222NO PARKING AREA STRIPING22 (C .S .A .H N O . 2 3 )PARK COURTLAK E D R I V E DECIDUOUS TREEPLANTING(TYP)D1L-501CONIFEROUS TREEPLANTING(TYP)A1L-501SHRUBPLANTING(TYP)D3L-501EDGING ATPLANTINGBED (TYP)A3L-501MAINTENANCE STRIP(TYP)E3L-501EXISTING FENCE4' HIGH BERM4' HIGH BERMSPADEEDGE(TYP)A5L-501TREE REPLACEMENTSEE SHEET L-010 TREEPRESERVATION PLAN FORSUMMARY (TYP)TREE REPLACEMENTSEE SHEET L-010 TREEPRESERVATION PLANFOR SUMMARYEXISTING TREES REPLACED SHRUBSSNOWSTORAGESNOWSTORAGETREE REPLACEMENTSEE SHEET L-010 TREE PRESERVATIONPLAN FOR SUMMARYMODULAR BLOCKRETAINING WALLB4L-5018' CHAIN LINKSECURITY FENCE(TYP)B4L-501ROCK STRIP BETWEEN CURBAND RETAINING WALLSNOW STORAGE IF PROOFOF PARKING IS BUILTPRIMARY SNOW STORAGESPADED TREESFROM EXISTINGVEHICULARHARDSCAPE(TYP)SPADED TREESFROM BUFFER &SCREEN (TYP)REPLACEDSHRUBS(TYP)FILL STUMP GRILDING AREASWITH SOIL AS NEEDED.APPLY TOPSOIL & RESEED.BERM RE-ESTABLISHMENTSPOT TREATMENT ALL NOXIOUS WEEDSUSING APPROVED BOARDLEAF HERBICIDE.DO NOT DISPOSE NOXIOUS WEEDS.REPAIR & OVERSEED BERM WITH NO MOWLAWN SEEDING4' CHAIN LINKSECURITY FENCE(TYP)XX X X X X X X X X X X XXXXXXXXXXXXXXXXXXXX 9030SCALE IN FEET Know what's below. Call before you dig. RA1LANDSCAPE PLAN1" = 30'L-102LANDSCAPE PLANAMC23004PROJECT NO.SHEETCERTIFICATIOND E S I G NCIVIL ENGINEERING | LANDSCAPE ARCHITECTURE310 4TH AVE SOUTH, SUITE 1006MINNEAPOLIS, MN 55415www.elanlab.comp 612.260.7980f 612.260.7990123456EDCBA NOT FORCONSTRUCTION I hereby certify that this plan was prepared by me, orunder my direct supervision, and that I am a dulyLicensed Landscape Architect under the laws of thestate of MINNESOTA.Pilarsinee SaraithongREGISTRATION NO.01/25/2024DATE45059RESPONSE TO CITYCOMMENTS01/25/2024LINO LAKESINDUSTRIAL ANDSTORAGE CENTERLINO LAKES, MINNESOTAISSUEDATESHEET INDEXPROJECTAMCON6121 BAKER RD, SUITE 101MINNETONKA, MINNESOTA 55345651-379-9090LARIAT COMPANIES INC.8345 Crystal View Rd. #200Eden Prairie, Minnesota, 55344OWNERLEGENDSOD 3,975 SF.NO MOW LAWN SEEDING 27,435 SF.NATIVE SEEDING 7,925 SF.LANDSCAPE NOTES1.LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR FINISHED GRADING ANDPOSITIVE SURFACE DRAINAGE IN ALL LANDSCAPE AREAS. LANDSCAPECONTRACTOR MUST ENSURE THAT THE FINAL GRADES ARE MET ASSHOWN ON GRADING PLAN. IF ANY DISCREPANCIES ARE FOUND,IMMEDIATELY NOTIFY LANDSCAPE ARCHITECT FOR RESOLUTION.2.ALL PLANT MATERIALS ARE TO CONFORM WITH STATE & LOCALCONSTRUCTION STANDARDS AND THE CURRENT ADDITION OF THEAMERICAN ASSOCIATION OF NURSERYMEN STANDARDS. ALL PLANTMATERIALS ARE TO BE HEALTHY, HARDY STOCK, AND FREE FROM ANYDISEASES, DAMAGE, AND DISFIGURATION.3.QUANTITIES OF PLANTS LISTED ON THE PLAN ARE TO GOVERN ANYDISCREPANCY BETWEEN THE QUANTITIES SHOWN ON THE PLANTSCHEDULE AND PLAN. PLACE PLANTS IN PROPER SPACING FOLLOWINGLAYOUT FIGURES.4.TOPSOIL TO BE MNDOT 3877.2B LOAM TOPSOIL BORROW FORLANDSCAPED AREAS AND PLANTING BEDS. PROVIDE ROOTING TOPSOILBORROW MNDOT 3877.2E FOR PLANT RESTORATION, WATER QUALITY, ANDFILTRATION PLANTING.5.PLANTING SOIL TO BE CONSISTED OF 50% SELECT TOPSOIL BORROW(MNDOT 3877) AND 50% GRADE 2 COMPOST (MNDOT 3890). PLANTING SOILTO HAVE A PH BETWEEN 6.5-7.5, BE FREE OF CHEMICAL CONTAMINANTS,DEBRIS, LARGE ROCKS GREATER THAN 1/ 2" DIAMETER, AND FRAGMENTSOF WOOD. SUBSOIL SHALL BE SCARIFIED TO A DEPTH OF 4" BEFOREPLANTING SOIL IS SPREAD.6.SPREAD PLANTING SOIL AT MINIMUM EIGHTEEN (18) INCH DEEP IN ALLPLANTING BEDS PRIOR TO PLANTING. THOROUGHLY WATER TWICE TOFACILITATE CONSOLIDATION PRIOR TO PLANTING. DO NOT OVERLYCOMPACT SOIL.7.MULCH TO BE SHREDDED HARDWOOD BARK MULCH (MNDOT 3882 TYPE 6),CONSISTED OF RAW WOOD MATERIAL FROM TIMBER AND BE A PRODUCTOF A MECHANICAL CHIPPER, HAMMER MILL, OR TUB GRINDER. THEMATERIAL SHALL BE SUBSTANTIALLY FREE OF MOLD, DIRT, SAWDUST, ANDFOREIGN MATERIAL AND SHALL NOT BE IN AN ADVANCED STATE OFDECOMPOSITION. THE MATERIAL SHALL NOT CONTAIN CHIPPED UPMANUFACTURED BOARDS OR CHEMICALLY TREATED WOOD, INCLUDING,BUT NOT LIMITED TO, WATER BOARD, PARTICLE BOARD, AND CHROMATEDCOPPER ARSENATE (CCA) OR PENTA TREATED WOOD. THE MATERIALSHALL BE TWICE-GROUND/ SHREDDED, SUCH THAT; NO INDIVIDUAL PIECESHALL EXCEED 2 INCHES IN ANY DIMENSION.8.APPLY FOUR (4) INCH DEPTH OF SHREDDED HARDWOOD BARK MULCH INFOUR (4) FOOT DIAMETER RING AROUND ALL TREES.9.EDGE ALL SHRUB BEDS WITH 3/16" X 5.5" MILL FINISHED ALUMINUM EDGINGWITH STAKES. ALL EDGING TO BE COMMERCIAL GRADE.10.APPLY FOUR (4) INCH DEPTH OF SHREDDED HARDWOOD BARK MULCH INALL SHRUB AREAS. PRIOR TO MULCHING, APPLY PRE-EMERGENTHERBICIDE TO ALL PLANTING BEDS.11.APPLY PRE-EMERGENT TO MULCH IN PLANTING AREAS TO PROHIBIT WEEDGROWTH. APPLICATION RATE TO BE PER MANUFACTURER'SRECOMMENDATIONS. IF WEEDS APPEAR IN TREATED AREAS DURING THEFIRST YEAR, LANDSCAPE CONTRACTOR TO REMOVE ALL WEEDS AT NOADDITIONAL COST.12.APPLY THREE (3) INCH DEPTH OF 2-3 INCH TRAP ROCK MULCH OVER WEEDBARRIER FABRIC IN MAINTENANCE AREAS INDICATED ON PLAN.13.WEED BARRIER FABRIC TO BE BLACK POLYPROPYLENE SHEET 5 OZ/SQ.YD.TENSILE STRENGTH PER ASTM D-4632, PRODUCT BY DEWITT COMPANY ORAPPROVED EQUAL.14.SOD SHOWN ON LANDSCAPE PLAN TO BE INSTALLED BY LANDSCAPECONTRACTOR. SOD TO BE MNDOT 3878.2A, DENSE, AND OF UNIFORMTEXTURE, FREE OF WEEDS AND DISEASE. APPLY MINIMUM SIX (6) INCHESOF SELECT TOPSOIL BORROW AND THOROUGHLY APPLY FERTILIZER TOTOP TWO (2) INCHES BEFORE LAYING SOD. LANDSCAPE CONTRACTOR TOMAINTAIN SODDED AREAS IN HEALTHY CONDITION UNTIL FIRMLY ROOTED.15.LANDSCAPE AREAS IN FRONT OF BUILDINGS AND BOULEVARD AREASSHALL BE IRRIGATED WITH AN UNDERGROUND IRRIGATION SYSTEM. NOWATER IS ALLOWED ON ANY PAVEMENT, PARKING, WALKWAY, ANDBUILDING. THE IRRIGATION CONTRACTOR IS TO DESIGN AND SUBMIT SHOPDRAWING OF IRRIGATION DESIGN AND CALCULATIONS TO LANDSCAPEARCHITECT FOR REVIEW 5 DAYS PRIOR TO PURCHASING ANDINSTALLATION. IRRIGATION DESIGN IS TO MEET ALL CITY AND STATEPLUMBING CODES AND REQUIREMENTS.16.FOLLOW LANDSCAPE DETAILS FOR ALL INSTALLATION, UNLESSOTHERWISE NOTED.17.LANDSCAPE CONTRACTOR SHALL MAINTAIN PLANTS IN HEALTHYCONDITION THROUGHOUT WARRANTY PERIOD. THE WARRANTY PERIOD ISTWO FULL YEARS FROM DATE OF PROVISIONAL ACCEPTANCE UNTIL FINALACCEPTANCE. WARRANTY PERIOD FOR PLANT MATERIAL INSTALLEDAFTER JUNE 1ST SHALL COMMENCE THE FOLLOWING YEAR.STORMWATER SEEDING 4,185 SF.SEE SHEET C-203 FOR SEEDING NOTESSEE SHEET L-101 FOR PLANT SCHEDULETURF AT PROOF OF PARKING 6,280 SF.WATERSHED / CITY COMMENTS 03/08/2024122WATERSHED / CITY COMMENTS 03/08/202411CITY COMMENTS 03/26/20242112 EAST ELEVATION1A301SCALE: 1/8" = 1'-0"NORTH ELEVATION2A301SCALE: 1/8" = 1'-0"WEST ELEVATION3A301SCALE: 1/8" = 1'-0"SOUTH ELEVATION4A301SCALE: 1/8" = 1'-0"MATERIAL & COLOR LEGENDMATERIAL CALCMATERIAL CALCMATERIAL CALCMATERIAL CALCCOMBINED MATERIAL CALCA301© ISSUES / REVISIONS:DESIGN/BUILD | CONSTRUCTION MANAGEMENT | GENERAL CONTRACTING 6121 BAKER ROAD, SUITE 101 MINNETONKA, MINNESOTA 55345 PHONE: 651-379-9090 FAX: 651-379-9091 CERTIFICATION LINO LAKES TECH CENTER AND PROPOSED NEW BUILDING 440 PARK COURT, LINO LAKES, MN 55014 STORAGE FACILITY