Loading...
HomeMy WebLinkAbout05-06-2024 Council Work Session PacketCITY COUNCIL AGENDA · WORK SESSION · Monday, May 6, 2024 6:00 P.M. Council Chambers No Public Comment allowed at Work Sessions per the Rules of Decorum 1.Call to Order and Roll Call 2.Setting the Agenda: Additions or Deletions 3.Zoning Ordinance Text Amendment – Sacred Communities and Micro-Unit Dwellings, Katie Larsen 4.Water Treatment Plant Final Design Review, Michael Grochala & WSB 5.I-35E/CRJ Interchange – Centerville Rd/CRJ Intersection, Michael Grochala & Anoka County 6.Zoning Ordinance Text Amendment – Building Type and Construction, Katie Larsen 7.2025 Budget Goal Setting, Hannah Lynch 8.Q1 2024 Public Safety Update, John Swenson 9.Request for Proposals for Public Safety Consultant, John Swenson 10.Notices and Communications, City Council 11.Adjournment 1 CITY COUNCIL WORK SESSION STAFF REPORT ITEM NO. 3 STAFF ORGINATOR: Katie Larsen, City Planner DATE OF WORK SESSION: May 6, 2024 TOPIC: Zoning Ordinance Text Amendment-Sacred Communities and Micro-Unit Dwellings ______________________________________________________________________________ BACKGROUND At the Work Session, staff will present the May 13, 2024 Council staff report and proposed ordinance amendment. Beginning January 1, 2024, Minnesota Statue 327.30 requires that cities must allow religious institutions to site micro units on religious property. This is not related to the recently submitted land use application for Madinah Lakes PUD Concept Plan and their proposed Robinson Sod Farm development. This is a requirement of State law. REQUESTED COUNCIL DIRECTION None. Discussion only. ATTACHMENTS 1.May 13, 2024 Council Staff Report 2 CITY COUNCIL REGULAR MEETING STAFF REPORT AGENDA ITEM 6A STAFF ORIGINATOR: Katie Larsen, City Planner MEETING DATE: May 13, 2024 TOPIC: Consider 1st Reading of Ordinance No. 04-24 Zoning Ordinance Text Amendment-Sacred Communities and Micro-Unit Dwellings VOTE REQUIRED: Simple Majority ______________________________________________________________________________ INTRODUCTION Beginning January 1, 2024, Minnesota Statue 327.30 requires that cities must allow religious institutions to site micro units on religious property. This is not related to the recently submitted land use application for Madinah Lakes PUD Concept Plan and their proposed Robinson Sod Farm development. This is a requirement of State law. BACKGROUND See attached League of Minnesota Cities summary. During the 2023 legislative session, the Legislature passed a bill authorizing religious institutions beginning January 1, 2024 to site micro-unit dwellings on religious institution property. The State statute also requires cities to permit sacred settlements of micro units either via a permitted use or conditional use. See attached Minnesota Statute 327.30 for detailed requirements. State statute defines the following: (e) "Micro unit" means a mobile residential dwelling providing permanent housing within a sacredcommunity that meets the requirements of subdivision 4. (f) "Religious institution" means a church, synagogue, mosque, or other religious organization organizedunder chapter 315. (g) "Sacred community" means a residential settlement established on or contiguous to the grounds ofa religious institution's primary worship location primarily for the purpose of providing permanent housingfor chronically homeless persons, extremely low-income persons, and designated volunteers that meets therequirements of subdivision 3. Staff recommends a conditional use permit be required for sacred community and micro units as an accessory to public, educational, and religious uses. Public, educational, and religious uses Attachment 1: May 13, 2024 Council Staff Report 3 are currently allowed with a conditional use permit in the City’s rural, residential, LB-Limited Business, and GB-General Business zoning districts. RECOMMENDATION The Planning & Zoning Board held a public hearing on April 10, 2024. Board comments included concerns about setbacks, density and buffers. Public comments included concerns that religious institutions do not pay taxes and there will be an increased burden on City services. The Board voted 6-0 in favor of the proposed ordinance amendment. The Board also recommended staff review existing conditional use permit requirements for Public, Educational and Religious Uses. Staff is requesting Council consideration of the 1st reading of Ordinance No. 04-24. ATTACHMENTS 1. LMC Focus on New Laws: Sacred Settlements 2. Minnesota Statute 327.30 3. Ordinance No. 04-24 4 5 6 7 327.30 SACRED COMMUNITIES AND MICRO-UNIT DWELLINGS.​ Subdivision 1.Definitions.(a) For the purposes of this section, the following terms have the meanings​ given.​ (b) "Chronically homeless" means an individual who:​ (1) is homeless and lives or resides in a place not meant for human habitation, a safe haven, or in an​ emergency shelter;​ (2) has been homeless and living or residing in a place not meant for human habitation, a safe haven,​ or in an emergency shelter continuously for at least one year or on at least four separate occasions in the last​ three years; and​ (3) has an adult head of household, or a minor head-of-household if no adult is present in the household,​ with a diagnosable substance use disorder, serious mental illness, developmental disability, post-traumatic​ stress disorder, cognitive impairments resulting from a brain injury, or chronic physical illness or disability,​ including the co-occurrence of two or more of those conditions.​ (c) "Designated volunteers" means persons who have not experienced homelessness and have been​ approved by the religious institution to live in a sacred community as their sole form of housing.​ (d) "Extremely low income" means an income that is equal to or less than 30 percent of the area median​ income, adjusted for family size, as estimated by the Department of Housing and Urban Development.​ (e) "Micro unit" means a mobile residential dwelling providing permanent housing within a sacred​ community that meets the requirements of subdivision 4.​ (f) "Religious institution" means a church, synagogue, mosque, or other religious organization organized​ under chapter 315.​ (g) "Sacred community" means a residential settlement established on or contiguous to the grounds of​ a religious institution's primary worship location primarily for the purpose of providing permanent housing​ for chronically homeless persons, extremely low-income persons, and designated volunteers that meets the​ requirements of subdivision 3.​ Subd. 2.Dwelling in micro units in sacred communities authorized.Religious institutions are​ authorized to provide permanent housing to people who are chronically homeless, extremely low-income,​ or designated volunteers, in sacred communities composed of micro units subject to the provisions of this​ section. Each religious institution that has sited a sacred community must annually certify to the local unit​ of government that it has complied with the eligibility requirements for residents of a sacred community in​ this section.​ Subd. 3.Sacred community requirements.(a) A sacred community must provide residents of micro​ units access to water and electric utilities either by connecting the micro units to the utilities that are serving​ the principal building on the lot or by other comparable means, or by providing the residents access to​ permanent common kitchen facilities and common facilities for toilet, bathing, and laundry with the number​ and type of fixtures required for an R-2 boarding house under Minnesota Rules, part 1305.2902. Any units​ that are plumbed shall not be included in determining the minimum number of fixtures required for the​ common facilities.​ (b) A sacred community under this section must:​ Official Publication of the State of Minnesota​ Revisor of Statutes​ 327.30​MINNESOTA STATUTES 2023​1​ 8 (1) be appropriately insured;​ (2) have between one-third and 40 percent of the micro units occupied by designated volunteers; and​ (3) provide the municipality with a written plan approved by the religious institution's governing board​ that outlines:​ (i) disposal of water and sewage from micro units if not plumbed;​ (ii) septic tank drainage if plumbed units are not hooked up to the primary worship location's system;​ (iii) adequate parking, lighting, and access to units by emergency vehicles;​ (iv) protocols for security and addressing conduct within the settlement; and​ (v) safety protocols for severe weather.​ (c) Unless the municipality has designated sacred communities meeting the requirements of this section​ as permitted uses, a sacred community meeting the requirements of this section shall be approved and​ regulated as a conditional use without the application of additional standards not included in this section.​ When approved, additional permitting is not required for individual micro units.​ (d) Sacred communities are subject to the laws governing landlords and tenants under chapter 504B.​ Subd. 4.Micro unit requirements.(a) In order to be eligible to be placed within a sacred community,​ a micro unit must be built to the requirements of the American National Standards Institute (ANSI) Code​ 119.5, which includes standards for heating, electrical systems, and fire and life safety. A micro unit must​ also meet the following technical requirements:​ (1) be no more than 400 gross square feet;​ (2) be built on a permanent chassis and anchored to pin foundations with engineered fasteners;​ (3) have exterior materials that are compatible in composition, appearance, and durability to the exterior​ materials used in standard residential construction;​ (4) have a minimum insulation rating of R-20 in walls, R-30 in floors, and R-38 in ceilings, as well as​ residential grade insulated doors and windows;​ (5) have a dry, compostable, or plumbed toilet or other system meeting the requirements of the Minnesota​ Pollution Control Agency, Chapters 7035, 7040, 7049, and 7080, or other applicable rules;​ (6) have either an electrical system that meets NFPA 70 NEC, section 551 or 552 as applicable or a low​ voltage electrical system that meets ANSI/RVIA Low Voltage Standard, current edition;​ (7) have minimum wall framing with two inch by four inch wood or metal studs with framing of 16​ inches to 24 inches on center, or the equivalent in structural insulated panels, with a floor load of 40 pounds​ per square foot and a roof live load of 42 pounds per square foot; and​ (8) have smoke and carbon monoxide detectors installed.​ (b) All micro units, including their anchoring, must be inspected and certified for compliance with these​ requirements by a licensed Minnesota professional engineer or qualified third-party inspector for ANSI​ compliance accredited pursuant to either the American Society for Testing and Materials Appendix E541​ or ISO/IEC 17020.​ Official Publication of the State of Minnesota​ Revisor of Statutes​ 2​MINNESOTA STATUTES 2023​327.30​ 9 (c) Micro units that connect to utilities such as water, sewer, gas, or electric, must obtain any permits​ or inspections required by the municipality or utility company for that connection.​ (d) Micro units must comply with municipal setback requirements established by ordinance for​ manufactured homes. If a municipality does not have such an ordinance, micro units must be set back on​ all sides by at least ten feet.​ History: 2023 c 53 art 11 s 57​ Official Publication of the State of Minnesota​ Revisor of Statutes​ 327.30​MINNESOTA STATUTES 2023​3​ 10 CITY OF LINO LAKES ORDINANCE NO. 04-24 ORDINANCE AMENDING CITY CODE CHAPTER 1007 RELATED TO SACRED COMMUNITIES AND MICRO-UNIT DWELLINGS The City Council of Lino Lakes ordains: Section 1. Findings of Fact. The City Council finds that the zoning ordinance text amendment protects the public health, safety, comfort, convenience and general welfare of the residents of the community and is in compliance with Minnesota Statute 327.30. Section 2. Amendment. The Lino Lakes City Code Chapter 1007 is hereby amended as follows: • Section 1007.100(7) (k) Sacred communities and micro-unit dwellings accessory to religious uses in compliance with Minnesota Statute 327.30. • Section 1007.101(7) (h) Sacred communities and micro-unit dwellings accessory to religious uses in compliance with Minnesota Statute 327.30. • Section 1007.110(8) (e) Sacred communities and micro-unit dwellings accessory to religious uses in compliance with Minnesota Statute 327.30. • Section 1007.111(8) (e) Sacred communities and micro-unit dwellings accessory to religious uses in compliance with Minnesota Statute 327.30. • Section 1007.112(8) (d) Sacred communities and micro-unit dwellings accessory to religious uses in compliance with Minnesota Statute 327.30. • Section 1007.113(8) (d) Sacred communities and micro-unit dwellings accessory to religious uses in 11 compliance with Minnesota Statute 327.30. • Section 1007.114(11) (e) Sacred communities and micro-unit dwellings accessory to religious uses in compliance with Minnesota Statute 327.30. • Section 1007.115(11) (g) Sacred communities and micro-unit dwellings accessory to religious uses in compliance with Minnesota Statute 327.30. • Section 1007.131(8) (i) Sacred communities and micro-unit dwellings accessory to religious uses in compliance with Minnesota Statute 327.30. • Section 1007.132(8) (n) Sacred communities and micro-unit dwellings accessory to religious uses in compliance with Minnesota Statute 327.30. Section 3: Effect This ordinance shall be in force and effect from and after its passage and publication according to the Lino Lakes City Charter. Adopted by the Lino Lakes City Council this ____ day of ________________, 2024. BY: ____________________________ Rob Rafferty, Mayor ATTEST: ________________________ Hannah Lynch, City Clerk 12 Zoning Ordinance Text Amendment-Sacred Communities Council Work Session May 6, 2024 Introduction•Beginning January 1, 2024, Minnesota Statue 327.30 requires that all cities allow religious institutions to site micro units on religious property. •This is not related to the recently submitted land use application for Madinah Lakes PUD Concept Plan and their proposed Robinson Sod Farm development. •This is a requirement of State law. •Sacred Community = Sacred Settlement 2 BackgroundMinnesota Statute 327.30 defines the following: •(e) "Micro unit" means a mobile residential dwelling providing permanent housing within a sacred​ community that meets the requirements of subdivision 4.​ •(f) "Religious institution" means a church, synagogue, mosque, or other religious organization organized​ under chapter 315.​ •(g) "Sacred community" means a residential settlement established on or contiguous to the grounds of ​a religious institution's primary worship location primarily for the purpose of providing permanent housing-​for chronically homeless persons, extremely low-income persons, and designated volunteers that meets the​ requirements of subdivision 3.​ 3 Micro Unit Requirements•Annual certification to City compliant statutory requirements •Access to water, sanitary sewer, electricity •No more than 400sf and exterior materials compatible to residential •Between 33% and 40% units must be occupied by designated volunteers •(persons who have not experienced homelessness) •Setbacks = Manufactured Home Parks = R-6 •Street = 30 or 40ft Rear = 10ft Side = 10ft Adjacent to LDR = 35ft 4 Analysis•Only decision City has to make is whether sacred settlements should be a permitted use or conditional use. •Staff recommends conditional use permit (CUP) •CUP requires public hearing to notify public •Apply to rural, residential, LB-Limited Business, and GB-General Business zoning districts.5 P&Z Board Recommendation•Board held a public hearing on April 10, 2024. •Board comments about setbacks, density, and buffers. •Public comments included concerns that religious institutions do not pay taxes and there will be an increased burden on City services. •Board voted 6-0 in favor of the proposed ordinance amendment-CUP. •Board also recommended staff review existing conditional use permit requirements for Public, Educational and Religious Uses.6 Council Action•Consider 1st Reading of Ordinance No. 04-24 Zoning Ordinance Text Amendment-Sacred Communities and Micro-Unit Dwellings •Ordinance No. 04-24 example for R, Rural •Section 1007.100(7) •(k) Sacred communities and micro-unit dwellings accessory to religious uses in compliance with Minnesota Statute 327.30.7 CITY COUNCIL WORK SESSION STAFF REPORT ITEM NO. 4 STAFF ORIGINATOR: Michael Grochala, Community Development Director WORK SESSION DATE: May 6, 2024 TOPIC: Water Treatment Plant Architectural Design ______________________________________________________________________________ BACKGROUND WSB and Oertel Architects are preparing the final design plans for the Water Treatment Plant. Staff is anticipating requesting City Council approval of plans and specifications and authorization to advertise for bids at the May 13, 2024 regular council meeting. Project team members will be present at the meeting to discuss the design and exterior Architectural features. The project schedule is as follows: Description Date 100% Design May 10, 2024 City Building Permit Submittal May 10, 2024 City Council Approves Bidding Documents and Authorizes Ad for Bid May 13, 2024 DWRF Loan Application to PFA and Final Plans and Specs to MDH June 6, 2024 Bid Opening June 11, 2024 City Council Awards Construction Contract June 24, 2024 MDH Certification Deadline for Funding June 30, 2024 Construction Start Summer-Fall 2024 Substantial Completion & Startup Summer 2026 Final Completion Summer-Fall 2026 State Bonding Must be Spent/Encumbered May 2027 REQUESTED COUNCIL DIRECTION Staff is seeking comments on the proposed Architectural Design. 13 ATTACHMENTS 1. Building Elevations 2. Main Floor Plan 3. Landscape Plan 14 RENDER PACKAGE 05/01/2024LINO LAKES WATER TREATMENT PLANT Lino Lakes Water Treatment Plant Façade MaterialsPublic BuildingClass 1 Minimum 50% of all Exterior Walls 77%BrickNorth 53%East 37%South 67%West 69%GlassNorth 25%East 21%South 13%West 7%StoneNoneArchitectural PrecastNorth 2%East 6%South 2%West 0%Class 2 Undefined % of Exterior Walls23%Precast concrete with revealsNoneArchitectural CMUNoneCeramic TileNoneMasonry StuccoNoneArchitectural Metal Cladding North 20%East 36%South 19%West 23%Class 3 No more than 50% of all Exterior Walls 0%EIFSNoneFiber Cement SidingNoneGlass BlockNoneWoodNone15 RENDER PACKAGE 05/01/2024LINO LAKES WATER TREATMENT PLANT MANGANESE IRONSPOT BRICKIVORY VELOURBUFF PRECASTKALWALL DAYLIGHTING PANELCHARCOAL METAL SIDINGDARK CHARCOAL METAL FLASHING16 RENDER PACKAGE 05/01/2024LINO LAKES WATER TREATMENT PLANT 17 RENDER PACKAGE 05/01/2024LINO LAKES WATER TREATMENT PLANT 18 RENDER PACKAGE 05/01/2024LINO LAKES WATER TREATMENT PLANT 19 RENDER PACKAGE 05/01/2024LINO LAKES WATER TREATMENT PLANT 20 RENDER PACKAGE 05/01/2024LINO LAKES WATER TREATMENT PLANT 21 RENDER PACKAGE 05/01/2024LINO LAKES WATER TREATMENT PLANT 22 RENDER PACKAGE 05/01/2024LINO LAKES WATER TREATMENT PLANT 23 RENDER PACKAGE 05/01/2024LINO LAKES WATER TREATMENT PLANT 24 UP UP A-31 2 A-301A-30 A-31 2 11 1 R R 3 A-40 ELECTRICAL ROOM 105 CONFERENCE ROOM 103 1 A-42 1 A-41 LAB/ BREAK ROOM 108 CONTROL ROOM 110 RESTROOM 104 STORAGE ROOM 106 PERMANGANATE ROOM 113 HALLWAY 112 MECHANICAL ROOM 114 PHOSPHATE ROOM 115FLUORIDE ROOM 116 P P B B E E 4 4 K K 6 6 10 10 11 11 12 12 13 13 15 15 HALLWAY 102 VESTIBULE 101 2 2 5 5 2 A-42 4 A-41 3 A-42 2 A-41 2 A-40 115116 114113108A112A 101A101B110108B 22' - 0"13' - 6"17' - 1"16' - 4"16' - 4" 1' - 11" 14' - 6 3/4"1' - 6 1/4"18' - 3"47' - 8"18' - 4"21' - 5" 9"2' - 10" 8' - 8"84' - 0"7' - 3"16' - 0"22' - 0"6' - 0"6' - 4" 1' - 0" 7' - 0"17' - 4"1' - 6"21' - 4"2' - 6"16' - 8"1' - 9 1/4"6' - 0"1' - 6 3/4"6' - 8"23' - 4"4"7' - 8"16' - 0"2' - 0"16' - 0"4' - 0"86' - 5"36' - 3"66' - 0"22' - 2"11' - 6" 5' - 0"6' - 0" CHLORINE STORAGE ROOM 111 CHLORINE FEED ROOM 109 14 14 GARAGE 117 PUMP GALLERY 119 3 A-41 1 A-40 A A C C D D F F G G H H J J L L M M N N Q Q 3 3 3.2 3.2 7 7 8 8 9 9 109111A13' - 7 3/4"15' - 9 1/4"12' - 7"12' - 7"28' - 1"1' - 4"52' - 0"45' - 8"111B 6' - 0"STORAGE 118 1 A-43 A-17 21' - 8"1 A-52 112B106A118105104103106B3 A-52 A-82 2 A-821 47' - 8" - - 117E TW3 10' - 4"12' - 0" 8' - 8"5' - 6"1' - 1"909' - 0" T.O. WALL FFE 905' - 6" FFE 909' - 6" FFE A-32 1 A-325 5.03 48038THOMAS R. STROMSODTWSB PROJECT NO.: SHEETWATER TREATMENT PLANTCITY OF LINO LAKES,MINNESOTA021336-000 SCALE: PLAN BY: DESIGN BY: CHECK BY:REVISIONSNO. DATEDESCRIPTIONSHOWN I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED ARCHITECT UNDER THE LAWS OF THE STATE OF MINNESOTA. LIC. NO:DATE:03/29/2024PERMIT SETAutodesk Docs://021336-000/2323_Lino Lakes WTP_ARCH_v22.rvt4/4/2024 11:42:47 AMMAIN FLOOR PLAN A-13 Designer Checker Designer NORTH3/32" = 1'-0"1 MAIN FLOOR PLAN 3/29/202425 WET WET WET WET WET WET WET WET WET WET WET WET WETWETWETWETWETWETWETWETWETWETWETWETWETWETWETWETWETWETWETWETWETWETWETWETWETWETWET WET WET WET WET WETWETWETWETWETWETWETWETWETWETWETWET WET WET WET WET WET WET WET WET WET WET WET WET WET WET WET WET WET WET WET WET WET WET WET WET WET WET WET WET WETWETWETWETWETWETWETWETWET WETWETWETWETWETWETWETWETMBVLT44"SSSEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE OHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFSSSSSSOH OH OH OH OH OH OH OHEEEEEEEE OH OH OH OH OH OH OH OH OH F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F FFFFFFFFFF F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F FF F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F FFF FFFFFFFFFFFFFFF FFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFF F F F F F F F FFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGG885885890890890884884886886887887887888888888889889889891891890890890886887888888888889889889891891895900905891892893894896897898899901902903904906907 900905899901902903904906907908905910902903904906907908909895900891892893894896897898899901902903904DTLDTLDTLDTLDTLDTLDTLDTLDTLDTLDTLDTLDTLDTLDTLDTLDTLDTLDTLDTLDTLDTLDTLDTLDTLDTLDTLDTLDTLDTLDTLDTLDTLDTLDTLDTL DTL DTL DTL DTLDTLDTLDTLDTLDTLDTLDTLDTLDTLDTLDTLDTLDTLDTLDTL 33 OS3 WP WP3 3WP33a3b3 a 3 b3eWP3eWP 3dWP3dWP3c3 c 3 OSOSOSPC3D3OSWP 3DOSWPD3OSDOSSSSF OSOSM53+00.0054+00.0055+00.0056+00.0057+00.0058+00.0059+00.00EP: 59+00.0053+50.0054+50.0055+50.0056+50.0057+50.0058+50.00907 908908909909C.O.INV. 901.50C.O.INV. 901.50FFE 905.50FFE 905.50FFE 909.50BIRCH STREET (COUNTY RD 34)12TH AVEО О О ОООООООООООООООООООО О О О 33 OS3 WP WP3 3WP33a3b3 a 3 b3eWP3eWP 3dWP3dWP3c3 c 3 OSOSOSPC3D3OSWP 3DOSWPD3OSDOSSSSF OSOSMWATERLINE, SEE UTILITY PLANSSEWER LINE, SEEUTILITY PLANSWATERLINE, SEE UTILITY PLANSSTORM SEWER SEEUTILITY PLANSWATERLINE, SEEUTILITY PLANS3Black Hills Spruce8` B&B2Street Keeper Honey Locust2" Cal B&B1Street Keeper Honey Locust2" Cal B&B2Red Sunset® Maple2" Cal B&B3Black Hills Spruce8` B&B3White Pine8` B&B3Black Hills Spruce8` B&B1Swamp White Oak2" Cal B&B3Norway Spruce8` B&B3White Pine8` B&BTREE PROTECTIONFENCE, SEE DETAIL3Swamp White Oak2" Cal B&BSURMOUNTABLE CURBSEE SHEET C-041L-043White Pine8` B&BSURMOUNTABLE CURBSEE SHEET C-043Red Sunset® Maple2" Cal B&B2Red Sunset® Maple2" Cal B&B5Swamp White Oak2" Cal B&B3Kentucky Coffeetree2" Cal B&B2Kentucky Coffeetree2" Cal B&B3Kentucky Coffeetree2" Cal B&B3Street Keeper Honey Locust2" Cal B&B1Spring Snow Crabapple1.5" Cal._B&BFEET0H:INSCALE3060NOVERALL LANDSCAPE PLAN1L-01LEGENDTYPE III SEED MIX (MNDOT 33-261STORMWATER SOUTH & WEST)TYPE II SEED MIX (MNDOT 35-241 MESICPRAIRIE GENERAL)TYPE I SEED MIX (MNDOT 25-131 LOWMAINTENANCE TURF)PROPOSED CONTOUR965EXISTING CONTOUREXISTING DECIDUOUS TREEEXISTING CONIFER TREECONSTRUCTION LIMITSTYPE IV SEED MIX (MNDOT 34-181) TYP.TYPE II SEED MIX(MNDOT 35-241) TYP.TYPE I SEED MIX (MNDOT 25-131) TYP.OVERALLLANDSCAPEPLANL-01SHRUB AND PERENNIALENLARGEMENT, SEE SHEET L-02SHOWN021336-000WSB PROJECT NO.:SCALE:PLAN BY:DESIGN BY:CHECK BY:SHEETI HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL LANDSCAPE ARCHITECT UNDER THE LAWS OF THE STATE OF MINNESOTA. LIC. NO:DATE: REVISIONS NO.DATE DESCRIPTIONWATER TREATMENT PLANT CITY OF LINO LAKES, MINNESOTA K:\021336-000\Cad\Proposed\021336-000-LS-CONCEPT-PLAN.dwg 4/4/2024 2:38:42 AM JGJGPL3/29/2024 58254 JORDAN GEDROSE, PLA 0 3/29/2024 PERMIT SET TYPE IV SEED MIX (MNDOT 34-181 EMERGENTWETLAND)DOUBLE SHREDDED HARDWOOD MULCHTYPE III SEED MIX (MNDOT 33-261) TYP.NOTES1. NATURAL NET EROSION CONTROL BLANKET REQUIREDON ALL SLOPES 4:1 OR STEEPER26 City Council Work Session Water Treatment Plant –Architectural Review May 6, 2024 2 3 4 5 6 7 8 9 10 11 12 THANK YOU CITY COUNCIL WORK SESSION STAFF REPORT ITEM NO. 5 STAFF ORIGINATOR: Michael Grochala, Community Development Director WORK SESSION DATE: May 6, 2024 TOPIC: I-35E/CRJ Interchange – Centerville Rd & CR J Intersection ______________________________________________________________________________ BACKGROUND Final design for the I-35E Interchange is underway with construction proposed for spring of 2025. Recent discussion with the project management team has focused on the intersection of County Road J and Centerville Road. The western leg of this intersection accesses Wilkinson Lake Blvd, a private road. No other future accesses will be permitted between this intersection and the Ash Street/Centerville Road access to the north. Accordingly the design needs to accommodate future access to the northwest quadrant of the intersection, in Lino Lakes. North Oaks Company (NOC), owner of the property in the northwest quadrant of the intersection, has expressed interest in modification of this design to provide public street access to their property. An alternative design has been prepared the would shift the intersection northerly, providing direct public road access to the NOC property and allowing for Wilkinson Lake Blvd to that street. An third option would be to leave the intersection in it’s current location but curve the west approach northerly into Lino Lakes. Each of these options will likely require cost share and maintenance agreements between the parties involved. Shifting the road northerly would simplify these agreements and the road access would be entirely within Lino Lakes. Additionally, shifting the intersection northerly would allow for improved traffic operations during construction. Under this scenario the existing intersection could maintain traffic through most of construction. REQUESTED COUNCIL DIRECTION Staff is requesting City Council receptiveness to relocating the intersection and/or assuming jurisdiction of the west leg of the intersection. 27 ATTACHMENTS 1. General Location Map 2. Intersection Alternatives 28 29 COUNTY LINE4/18/202411:46:07 AMX:\PT\R\RAMSE\162277\4-prelim-dsgn-rpts\43-prelim-dsgn\Figures\CP628153_ORIGINAL ALT_Figure_CTY59_CTYJ.dgn1 ImprovementscflorFIGURE DATE: SP 6281-53 APRIL 2024 CSAH 59 AT COUNTY RD. J INTERSECTION IMPROVEMENTS 1 "LAYOUT" MB M M M F M M WILKINSON LAKE BLVD PERIMETER 30 FT REM 35 SF AREA 15 SF PERIMETER 30 FTREM 35 SFAREA 15 SF PERIMETER 30 FT REM 35 SF AREA 15 SF PERIMETER 30 FT REM 35 SF AREA 15 SF AREA = 15 SQ'REM = 48 SQ 'PERIMETER = 30 'PERIMETER 30 FT REM 35 SFAREA 15 SFPERIMETER 30 FTREM 35 SF AREA 15 SF PERIMETER 30 FTREM 35 SFAREA 15 SF AREA = 15 SQ'REM = 48 SQ 'PERIMETER = 30 ' PERIMETER 30 FT REM 35 SF AREA 15 SF PERIMETER 30 FT REM 35 SFAREA 15 SF AREA = 40 SQ 'PERIMETER = 70 'REMOVAL = 150 SQ ' AREA = 40 SQ 'PERIMETER = 70 ' REMOVAL = 150 SQ 'AREA = 40 SQ 'PERIMETER = 70 'REMOVAL = 150 SQ 'AREA = 40 SQ ' PERIMETER = 70 'REMOVAL = 150 SQ ' PERIMETER 30 FTREM 35 SFAREA 15 SF PERIMETER 30 FT REM 35 SF AREA 15 SF PERIMETER 30 FT REM 35 SFAREA 15 SF 100 SCALE IN FEET PROPOSED CONCRETE MEDIAN BARRIER PROPOSED CONCRETE TRUCK APRON PROPOSED SHOULDER PROPOSED VEGETATION AREA PROPOSED ROADWAY PROPOSED WALK PROPOSED RAISED MEDIAN, CURB LEGEND SUBJECT TO CHANGE PRELIMINARY DRAFT 763-324-3100 Department with any questions: Contact the Anoka County Highway from this plan. The actual project plan may differ as shown in part or in whole. Anoka County to construct the project This draft document does not commit information only. change, and is provided for This document is a draft, subject to design concept only. This drawing represents a potential Disclaimer: (CO RD J / ASH ST)ANOKA CO-CSAH 2 1 (CENTERVILLE RD)RAMSEY CO-CSAH 59(CO RD J / ASH ST) RAMSEY CO-CSAH 81 30 COUNTY LINE4/18/202411:40:40 AMX:\PT\R\RAMSE\162277\4-prelim-dsgn-rpts\43-prelim-dsgn\Figures\CP628153_NEW ALT_Figure_CTY59_CTYJ.dgn1.1B - Proposed ImprovementscflorFIGURE OVAL 1DATE: SP 6281-53 APRIL 2024 CSAH 59 AT COUNTY RD. J INTERSECTION IMPROVEMENTS MB M M M F M M WILKINSON LAKE BLVD PERIMETER 30 FT REM 35 SF AREA 15 SF PERIMETER 30 FTREM 35 SFAREA 15 SF PERIMETER 30 FT REM 35 SF AREA 15 SF PERIMETER 30 FT REM 35 SF AREA 15 SF AREA = 15 SQ'REM = 48 SQ 'PERIMETER = 30 'PERIMETER 30 FT REM 35 SF AREA 15 SF PERIMETER 30 FT REM 35 SF AREA 15 SF PERIMETER 30 FTREM 35 SFAREA 15 SF AREA = 15 SQ'REM = 48 SQ 'PERIMETER = 30 ' PERIMETER 30 FT REM 35 SFAREA 15 SF PERIMETER 30 FT REM 35 SF AREA 15 SF AREA = 40 SQ 'PERIMETER = 70 'REMOVAL = 150 SQ ' AREA = 40 SQ 'PERIMETER = 70 'REMOVAL = 150 SQ 'AREA = 40 SQ 'PERIMETER = 70 'REMOVAL = 150 SQ ' AREA = 40 SQ ' PERIMETER = 70 ' REMOVAL = 150 SQ ' PERIMETER 30 FTREM 35 SFAREA 15 SF PERIMETER 30 FT REM 35 SFAREA 15 SF PERIMETER 30 FT REM 35 SFAREA 15 SF 100 SCALE IN FEET PROPOSED CONCRETE MEDIAN BARRIER PROPOSED CONCRETE TRUCK APRON PROPOSED SHOULDER PROPOSED VEGETATION AREA PROPOSED ROADWAY PROPOSED WALK PROPOSED RAISED MEDIAN, CURB LEGEND SUBJECT TO CHANGE PRELIMINARY DRAFT 763-324-3100 Department with any questions: Contact the Anoka County Highway from this plan. The actual project plan may differ as shown in part or in whole. Anoka County to construct the project This draft document does not commit information only. change, and is provided for This document is a draft, subject to design concept only. This drawing represents a potential Disclaimer: (CO RD J / ASH ST)ANOKA CO-CSAH 2 1 (CENTERVILLE RD)RAMSEY CO-CSAH 59(CO RD J / ASH ST) RAMSEY CO-CSAH 81 31 >>>> > > WILKINSON LAKE G U U FO FO U FO FO U UFO MB V OHLVOHLOHLOHLOHLOHLOHLOHLOHLOHLOHLOHLGGGGGGFBOFBOFBOFBOU EX GGV OHL OHL GOHLOHLOHLOHLOHLOHLOHLOHLOHLOHLOHLOHLU U G U U U GU G U OH L OH L OH L OH L OH L OH L OH L OH L OH L OHL OHL OHL OHL OHL OH L OH L OH L OH L OH L OH L OH L OH L OH L OHL OHL OHL OHL OHL STM STM exposed storm pipe OHL OHLOHLOHL OHL OHL OHL OHLOHLOHLOHLOHLOHLOHLOHLOHL VG OH L OH L OH L OH L OH L OH L OH L OH L OH L OH L WILKINSON LAKE BLVD CENTERVILLE RD ASH STREET ISGInc.comArchitecture + Engineering + Environmental + Planning DWG LOCATION: S:\PROJECTS\30000 PROJ\30600-30699\30671 LINO LAKES DEVELOPMENTMASTER P-LINO LAKES MN\30671 PRODUCTION FILES\30671 CIVIL 3D\NON PRODUCTION DWGS\CONCEPTS-EXHIBITS\30671 CONCEPT 3.DWG SAVED BY: JAMIE.STEINBORN CONCEPT 3 N0 SCALE IN FEET 150 300 ISG PROJECT NO. 24-30671 WILKINSON WATERS DEVELOPMENT LINO LAKES, MINNESOTA - 04/23/2024 60' RIGHT OF WAY 15' PARKING SETBACK 40' BUILDING SETBACK 32 City Council Work Session CRJ & Centerville Road Intersection May 6, 2024 2 3 4 5 THANK YOU CITY COUNCIL WORK SESSION STAFF REPORT ITEM NO. 6 STAFF ORGINATOR: Katie Larsen, City Planner DATE OF WORK SESSION: May 6, 2024 TOPIC: Zoning Ordinance Text Amendment-Building Type and Construction ______________________________________________________________________________ BACKGROUND At the Work Session, staff will present the May 13, 2024 Council staff report and proposed ordinance amendment. Recent site and building plan reviews have led staff and the Planning & Zoning Board to consider amending the City’s zoning ordinance related to building exterior materials. REQUESTED COUNCIL DIRECTION None. Discussion only. ATTACHMENTS 1.May 13, 2024 Council Staff Report 33 CITY COUNCIL REGULAR MEETING STAFF REPORT AGENDA ITEM 6B STAFF ORIGINATOR: Katie Larsen, City Planner MEETING DATE: May 13, 2024 TOPIC: Consider 1st Reading of Ordinance No. 05-24 Zoning Ordinance Text Amendment- Building Type and Construction VOTE REQUIRED: Simple Majority ______________________________________________________________________________ INTRODUCTION Recent site and building plan reviews have led staff and the Planning & Zoning Board to consider amending the City’s zoning ordinance related to building exterior materials. BACKGROUND In January 2024, 424 Apollo Drive (Rice Industries) formally appealed staff’s interpretation of the zoning code relating to building type and construction and exterior wall finishes. The applicant proposed to use pre-engineered Kingspan Granitstone Insulated Metal Panels (IMP’s) with embossed stucco coating for a building addition. They considered the product to be a Class 2 material of masonry stucco and architectural metal cladding. Staff supported treating the Insulated Metal Panel (IMP) similar to Class 3 Exterior Insulation and Finish System (EIFS). The material would be limited to no more than 25% per wall elevation of the building addition. The City Council concurred. The applicant resubmitted plans proposing another type of insulated wall panel system claiming it as architectural metal cladding which it is not. Ordinance Amendment Staff met with an independent architect to review the City’s zoning ordinance to see if there were any changes we should make to help clarify definitions and allowed exterior materials. The architect felt the City’s ordinance is clearly written and that our 3 classes of primary materials are consistent with current industry standards. Staff and the Planning & Zoning Board recommend reclassifying Masonry Stucco from Class 2 to Class 3. Staff also recommends amendments to clarify that primary material requirements apply to each exterior wall. RECOMMENDATION Attachment 1: May 13, 2024 Council Staff Report 34 The Planning & Zoning Board held a public hearing on April 10, 2024. There were no public comments. The Board voted 6-0 in favor of the proposed ordinance amendment. Staff is requesting Council consideration of the 1st reading of Ordinance No. 05-24. ATTACHMENTS 1. Ordinance No. 05-24 35 CITY OF LINO LAKES ORDINANCE NO. 05-24 ORDINANCE AMENDING CITY CODE CHAPTER 1007 RELATED TO BUILDING TYPE AND CONSTRUCTION The City Council of Lino Lakes ordains: Section 1. Findings of Fact. The City Council finds that the zoning ordinance text amendment protects the public health, safety, comfort, convenience and general welfare of the residents of the community. Section 2. Amendment. The Lino Lakes City Code Chapter 1007 is hereby amended as follows: • City Code Section 1007.043(2): (c) Multiple-Family Dwelling Construction Standards. All multiple-family dwellings shall comply with the following requirements: 1. The exterior walls of multiple-family dwelling structures shall include a variation in building materials which are to be distributed throughout the building walls and coordinated into the architectural design of the structure to create an architecturally balanced appearance. 2. A minimum of At least 33% of all each building exterior walls of a structure shall have an exterior finish be composed of brick, natural stone, or artificial stone. 3. For the purposes of this section, the area of the building each exterior wall shall not include area devoted to windows, entrance doors, garage doors, or roof areas. 4. Each building elevations exterior wall shall be articulated to add visual interest. Large blank exterior walls shall be prohibited. Variation in elevations exterior walls can be accomplished with projections or recesses, material changes, or other methods of building articulation. • City Code Section 1007.043(2): (d) Commercial, industrial, and institutional. All buildings constructed on land within commercial, industrial, public and semi-public zoning districts, and all institutional buildings (such as public, education, and religious buildings) in residential and rural zoning districts shall conform with the following: 36 1. Definitions. For the purpose of this section and §§ 1007.044 through 1007.051, the following definitions shall apply: ARCHITECTURAL METAL CLADDING. Refers to decorative, metal cladding systems such as copper, zinc, titanium, stainless steel and painted steel components fixed to the outside of the primary wall system. ARCHITECTURAL REVEALS. A groove or a step in a panel face generally used to create a desired architectural effect. 2. All sides exterior walls of the principal and accessory structures are to have essentially the same or a coordinated harmonious finish treatment. 3. Classes of primary materials. For the purpose of this section, primary materials shall be divided into class 1, class 2, and class 3 categories as follows: Classes of Primary Materials Class 1 Class 2 Class 3 Brick Precast concrete panels with at least two architectural reveals per panel Exterior Insulation and Finish Systems (EIFS) Glass, or other glazing materials Specialty concrete block including textured, burnished block or rock faced block Fiber Cement Exterior Siding Natural or cultured stone Ceramic Tile (masonry, stone or clay), Glass Block Architecturally textured concrete precast or poured in place panels Masonry Stucco Masonry Stucco Architectural metal cladding Wood Other materials not listed that are of equal quality to materials in a specific class may be approved for use by the Community Development Director. 4. Buildings shall incorporate classes of primary material in the following manner: a. Commercial, public, educational and religious buildings. At least 50% of all each exterior wall finishes shall be composed of at least three class 1 materials. Class 3 materials shall not comprise more than 25% of each exterior wall finishes. 37 b. Industrial and warehouse buildings, multi-tenant office/industrial/warehouse or showroom/warehouse or other combinations. At least 75% of all each exterior wall finishes shall be composed of at least two different class 1 or 2 materials. Class 3 materials shall not comprise more than 25% of the building each exterior wall. c. To be counted as a primary material, the product must comprise at least 5% of the exterior wall surface. 17. For the purposes of this section, the area of each exterior wall shall not include area devoted to garage doors, window trim, and flashing shall not constitute required materials that make up exterior finish of a building for purposes of this section. Section 3: Effect This ordinance shall be in force and effect from and after its passage and publication according to the Lino Lakes City Charter. Adopted by the Lino Lakes City Council this ____ day of ________________, 2024. BY: ____________________________ Rob Rafferty, Mayor ATTEST: ________________________ Hannah Lynch, City Clerk 38 CITY COUNCIL WORK SESSION STAFF REPORT ITEM NO. 7 STAFF ORIGINATOR: Hannah Lynch, Finance Director WORK SESSION DATE: May 6, 2024 TOPIC: 2025 Budget Goal Setting ______________________________________________________________________________ INTRODUCTION To kick off the 2025 budget process, the City Council should identify goals to be incorporated in the draft 2025 budget and tax levy which will be first reviewed in August 2024. Key dates in the process are presented on the attached 2025 Budget Calendar. BACKGROUND As a starting point for Council discussion, the 2024-2028 Financial Plan outlines the following for 2025 (see also the attached 2024-2028 Financial Plan Tax Summary): • Tax rate increasing to 38.907% from 36.007% • 5.00% increase in General Fund expenditures resulting in a 5.50% increase in the General Fund operating tax levy o Includes day to day operations for the following departments:  Administration  Community Development  Public Safety  Public Services • Continuation of the following operating tax levies: o Rookery Activity Center ($500,000) o Blue Heron Days ($10,000) o Capital Fire Water Tender Replacement ($221,565)  Slightly lower than what the plan shows as the amount was bought down with Public Safety Aid in December 2023 o Office Equipment ($25,000) o Park & Trail Improvements ($90,000) • Increase in the Capital Equipment Fund operating tax levy to $810,000 from $600,000 • Increase in the Pavement Management Fund operating tax levy to $1,138,500 from $990,000 • Increase in the debt tax levy for the 2024 Street Reconstruction Project (estimated at $461,825) 39 In regards to the assumed increase in the tax rate, estimated market value for taxes payable 2025 (2024 assessment) increased 2.20%, primarily due to new construction, as presented at this evening’s Local Board of Appeals and Equalization meeting. The 2024-2028 Financial Plan assumed a 0.70% increase in tax capacity. Note: Estimated market value is adjusted for several factors, most notably the homestead market value exclusion, to arrive at taxable market value. Then, the taxable market value is multiplied by a property type class rate to arrive at tax capacity. The class rate for residential homestead properties up to $500,000 is 1.00%. Above is a Lino Lakes property close to the median value of $406,300. For taxes payable 2024, the homestead exclusion phased out for properties valued over $413,800. For taxes payable 2025, the maximum exclusion amount was increased and isn’t phased out until properties are valued over $517,200. The above property’s estimated market value decreased 3.57% while the taxable market value decreased 5.42%. Therefore, the increase in estimated market value city-wide may not result in increased tax capacity due to taxable market value decreasing at a larger rate for a median value home. Providing city services at current levels with tax capacity decreasing or increasing at a lower rate than the tax levy results in an increased city tax rate. 40 REQUESTED COUNCIL DIRECTION City Council goals should be identified to be incorporated in the draft 2025 budget and tax levy. ATTACHMENTS 1. 2025 Budget Calendar 2. 2024-2028 Financial Plan Tax Summary 41  2025 Budget Calendar 2024 Date 2025 Budget Item May 6 City Council Work Session: Budget Goal Setting  By May 17 Budget worksheets distributed to Department Directors Jun 14 Department Directors submit 2025 budget and 2025‐2029 CIP requests Jul 30 City Administrator reviews budget and CIP requests with Department Directors Aug 5 City Council receives draft 2025 Budget Book and draft 2025‐2029 Financial Plan Aug 12 City Council Work Session: Tax Levy, 2025 CIP, General Fund Budget Aug 26 City Council Work Session: Rookery & Enterprise Fund Budgets Sep 23 City Council adopts Proposed 2025 Budget and Tax Levy and sets Public Hearing date Sep 30 Preliminary Tax Levy and Public Hearing date are certified to Anoka County Oct‐Dec Follow‐up City Council Work Sessions Mid‐Nov County mails Truth in Taxation notices to taxpayers Dec 9 City Council holds Public Hearing and adopts Final 2025 Budget and Tax Levy City Council accepts 2025‐2029 Financial Plan Dec 30 Final Tax Levy is certified to Anoka County 42 2024 2025 2026 2027 2028 Operating Levy 101 General Fund 10,369,384$ 10,940,940$ 11,542,637$ 12,176,028$ 12,842,747$ 202 Rookery Activity Center 500,000 500,000 500,000 500,000 500,000 205 Blue Heron Days 10,000 10,000 10,000 10,000 10,000 402 Capital Equipment Replacement 600,000 810,000 972,000 1,166,400 1,399,680 402 Capital Fire Water Tender Replacement 248,820 246,558 244,296 242,034 239,772 403 Office Equipment Replacement 25,000 25,000 25,000 25,000 25,000 421 Pavement Management 990,000 1,138,500 1,309,300 1,505,700 1,731,500 425 Park & Trail Improvements 90,000 90,000 90,000 90,000 90,000 Total Operating Levy 12,833,204 13,760,998 14,693,233 15,715,162 16,838,699 Annual % Change 13%7%7%7%7% Debt Levy 338 2015A G.O. Bonds 219,857 216,182 269,798 222,364 222,626 338 2015A G.O. Bonds - Abatement Portion 54,732 53,682 - - - 339 2015 EDA Lease Revenue Bonds 319,765 318,557 317,192 315,669 319,239 344 2018A G.O. Bond 485,475 484,215 482,640 485,527 482,114 346 2021A G.O. Bond 207,895 209,575 211,150 207,370 208,840 New 2024 Street Reconstruction Funding - 461,825 452,270 442,715 433,160 New 2027 Street Reconstruction Funding - -- - 436,450 Total Debt Levy 1,287,724 1,744,036 1,733,050 1,673,645 2,102,429 Annual % Change -18%35%-1%-3%26% Total Tax Levy 14,120,928 15,505,034 16,426,283 17,388,807 18,941,128 Less: Fiscal Disparities Distribution (1,260,837) (1,337,021) (1,488,051) (1,541,432) (1,607,061) Net Tax Levy 12,860,091 14,168,014 14,938,232 15,847,375 17,334,067 Annual % Change 12%10%5%6%9% 2024 2025 2026 2027 2028 Tax Capacity Personal and Real Estate 38,937,906$ 38,548,527$ 39,704,983$ 40,896,132$ 42,123,016$ Assumed New Growth - Residential - 649,994 1,338,988 2,068,737 2,841,066 Assumed New Growth - Commercial - -- - - Total Tax Capacity 38,937,906 39,198,521 41,043,971 42,964,869 44,964,082 Less: Fiscal Disparities Contribution (1,820,393) (1,875,005) (1,931,255) (1,989,193) (2,048,868) Less: Tax Increment Captured Value (1,402,012) (908,610) (935,869) (963,945) (992,863) Net Tax Capacity 35,715,501 36,414,906 38,176,848 40,011,732 41,922,350 9%2%5%5%5% 2024 2025 2026 2027 2028 City Tax Rate 36.007% 38.907% 39.129% 39.607% 41.348% Tax Capacity Summary Tax Rate Summary City of Lino Lakes 2024-2028 Financial Plan Tax Levy Summary 11 43 CITY COUNCIL WORK SESSION STAFF REPORT ITEM NO. 8 STAFF ORIGINATOR: John Swenson, Public Safety Director WORK SESSION DATE: May 6, 2024 TOPIC: Public Safety Update ______________________________________________________________________________ Update Staff will be on hand to present the 1st Quarter 2024 Public Safety Update ATTACHMENTS Q1 Quarterly Report 44 NFR'S Q1 2023 Q1 2024 100 Fire 5 4 200 Overpressure Explosion, Overheat - No Fire 0 0 300 Rescue & EMS Incidents 121 91 400 Hazardous Conditions - No Fire 15 7 500 Service Call 37 32 600 Good Intent Call 24 28 700 False Alarms & False Calls 17 29 800 Severe Weather & Natural Disaster 0 0 900 Special Incident 0 0 TOTAL 219 191 FIRE DIVISION • Average Response Time (emergency & non-emergency) 5 minutes and 29 seconds. • 2024 Q1 Average emergency response for medicals, 4 minutes and 28 seconds. • 2024 Q1 Average non-emergency response for medicals, 5 minutes and 17 seconds. • Police staff responded to all 356 medical calls for service (CFS) and Fire staff responded to 71 medical CFS. FIRE DIVISION YEAR Q1 Q2 Q3 Q4 TOTAL 2024 3,205 3,205 2023 3,238 3,238 CASE NUMBERS GENERATED YEAR Q1 Q2 Q3 Q4 TOTAL 2024 11:45:36 11:45:36 2023 13:55:30 13:55:30 STACKED CALLS REPORT YEAR Q1 Q2 Q3 Q4 TOTAL 2024 356 356 2023 307 307 MEDICAL CALLS FOR SERVICE Lino Lakes Public Safety Department QUARTERLY REPORT Q1 2024 01/01/2024 – 03/31/2024 45 YEAR Station 1 Station 2 Duty Crew Total Cross-trained Police Staff 2024 49 26 116 191 1 of the 191 calls 2023 51 29 126 206 8 of the 219 calls Lino Lakes Public Safety Calls by Month and Station Q1 Q1 Q2 Q3 Q4 TOTAL 2024 13 13 2023 16 16 MUTUAL AID GIVEN Q1 Q2 Q3 Q4 TOTAL 2024 1 1 2023 2 2 MUTUAL AID RECEIVED 46 POLICE DIVISION NIBRS Description - Group A Off Arrest Off Arrest Animal Cruelty 0 0 0 0 Arson 0 0 0 0 Aggravated Assault 1 1 2 2 Simple Assault 18 14 8 8 Intimidation 4 4 7 7 Burglary/Breaking & Entering 0 0 5 2 Counterfeiting/Forgery 3 2 3 0 Destruction / Damage / Vandalism of Property 4 1 16 5 Drugs/Narcotic Violation 8 8 12 9 Drug Equipment Violations 7 6 0 0 Embezzlement 0 0 0 0 Extortion / Blackmail 3 0 0 0 False Pretenses/Swindle/Con 3 1 6 0 Credit Card/Automated Teller Machine Fraud 2 0 3 0 Wire Fraud 0 0 0 0 Impersonation 6 6 1 1 Identity Theft 7 0 9 0 Hacking/Computer Invasion 1 0 0 0 Kidnapping/Abduction 1 1 1 1 Murder & Nonnegligent Manslaughter Person 0 0 0 0 Purse-Snatching 0 0 1 0 Pocket-Picking 0 0 0 0 Shoplifting 4 4 8 6 Theft from Building 3 1 4 1 Theft from Motor Vehicle 1 1 5 0 Theft of Motor Vehicle Parts or Accessories 0 0 2 0 All other Larceny 13 7 10 3 Motor Vehicle Theft 4 4 0 0 Robbery 0 0 0 0 Pornography/Obscene Material 1 0 0 0 Forcible Rape 1 0 0 0 Forcible Sodomy 0 0 0 0 Forcible Fondling 2 1 1 1 Stolen Property Offenses 1 1 0 0 Weapon Law Violations 0 0 3 2 TOTAL 98 63 107 48 Solve Rate 45% Qtr 1 2023 Qtr 1 2024 64% 47 Q1, 2024 Notable Actions & Events • February 8, Girl Scout Troop Personal Safety Seminar • February 15, Lyngblomsten Personal Safety Seminar • February 23, 8th Annual Guns N Hoses Charity Classic Hockey Game • March 22, Lino Lakes STEM Donuts with Grown-ups • March 26, Career Fair MN State University Mankato NIBRS Description - Group B Off Arrest Off Arrest Bad Checks 0 0 0 0 Curfew/Loitering/Vagrancy Violation 0 0 2 1 Disorderly Conduct 17 13 10 7 Driving Under Influence 64 64 39 39 Family Offenses, Nonviolent 0 0 0 0 Liquor Law Violations 4 4 3 3 Trespass of Real Property 0 0 7 5 TOTAL 85 81 61 55 SOLVE RATE Qtr 1 2024 90% Qtr 1 2023 95% 2023/2024 Overall Clearance Rate Off Arrest Off Arrest Group A 98 63 107 48 Group B 85 81 61 55 TOTAL 183 144 168 103 SOLVE RATE 79% Q1 2024 61% Q1 2023 2023/2024 Clearance Rate Off Arrest Solve Rate Off Arrest Solve Rate Property Crimes 52 28 54%73 18 25% Violent Crimes 23 17 74%12 12 100% Q1 2023 Q1 2024 YEAR Q1 Q2 Q3 Q4 TOTAL 2024 17 17 2023 11 11 FELONY CASE FILE SUBMISSIONS 48 Lino Lakes Public Safety One Vision. One Mission. John Swenson Public Safety Director Quarterly Update March 31, 2024 One Vision. One Mission. The mission of the Lino Lakes Public Safety Department is to collaborate with the community to provide: •a healthy and safe community; •a focus on prevention; •a commitment to life safety; •aggressive pursuit of criminals; •respectful communication; •encouragement for volunteerism. One Vision. One Mission. First Quarter Statistics One Vision. One Mission. Average Response Time (emergency & non-emergency) 5 minutes and 29 seconds One Vision. One Mission. •2024 Q1 Average emergency response for medicals, 4 minutes and 28 seconds. •2024 Q1 Average non-emergency response for medicals, 5 minutes and 17 seconds. •Police staff responded to all 356 medical calls for service (CFS) and Fire staff responded to 71 medical CFS. One Vision. One Mission. One Vision. One Mission. One Vision. One Mission. One Vision. One Mission. Group A Offenses and Arrests: One Vision. One Mission. Group B Offenses and Arrests: One Vision. One Mission. One Vision. One Mission. First Quarter Notable Events February 8, Girl Scout Troop Personal Safety Seminar February 15, Lyngblomsten Personal Safety Seminar February 23, 8th Annual Guns N Hoses Charity Classic Hockey Game March 22, Lino Lakes STEM Donuts with Grown-ups March 26, Career Fair MN State University Mankato One Vision. One Mission. Public Safety Staff Update –May 1, 2024 Police –25 personnel (authorized 28) Fire –31 personnel (authorized 2 FTE, 40 Paid-on-Call Firefighters, and 15 PT Firefighters) Administration –5 personnel (authorized 4 FTE, 3 part-time) Police Officer Hiring Process –One candidate received a conditional job offer, one candidate in background, and currently accepting applications. Community Service Officer Hiring Process –Two candidates currently in background. Part-time Firefighter Hiring Process –Three candidates in background and currently accepting applications. Paid-on-Call Firefighter Hiring Process –One candidate received a conditional job offer, four candidates in background, and currently accepting applications. One Vision. One Mission. 2024 Areas of Focus UPDATE •Employee Wellness •Firefighter and Police Officer Recruitment •Employee Retention CITY COUNCIL WORK SESSION STAFF REPORT ITEM NO. 9 STAFF ORIGINATOR: John Swenson, Public Safety Director WORK SESSION DATE: May 6, 2024 TOPIC: Request for Proposal for Public Safety Consultant ______________________________________________________________________________ BACKGROUND During the April 1, 2024 Council Work Session, staff was directed by a majority of the Council develop a draft Request for Proposals (RFP) to identify a consultant to develop options for the delivery of fire service in the community. Council also expressed a desire to examine the creation of a stand-alone Fire Department and Police Department and interview police staff on crossing training of police officers to serve as firefighters. Staff contacted other agencies in the Twin Cities that have contracted with a consultant to evaluate public safety services and reviewed their RFP documents to serve as guide in the development of the attached draft RFPs. Given the Council discussion regarding the creation of stand-alone Fire and Police Departments, staff created two draft RFPs for Council to review. One of the draft RFPs only involves the delivery of fire service and the other draft RFP involves the delivery of fire and police services. Given the integrated nature of public safety services in Lino Lakes, it is important that any work by a consultant examine all public safety service. This would ensure that any potential changes to any one public safety service is thoroughly analyzed from all perspectives. REQUESTED COUNCIL DIRECTION Staff seeks Council direction on draft RFPs ATTACHMENTS DRAFT Lino Lakes Consultant RFP Fire and Police DRAFT Lino Lakes Consultant RFP Fire Only 49 City of Lino Lakes Request for Proposals for Professional Services Operational Study STUDY OBJECTIVE The City of Lino Lakes is seeking a qualified professional consultant to develop a plan for guiding the future delivery of fire services to the Lino Lakes community in the most efficient and effective manner. The City Council would like to look at all available options. SCOPE When completed, the operational study will include: • Provide Council with options for a staffing plan to meet the needs and expectations for fire services with estimated costs. Some potential options: o Evaluate current model of delivery of fire services with recommendation for improvement; o Collaborate with other jurisdictions to provide fire services to all jurisdictions; o Contract for the delivery of fire services in Lino Lakes with another fire agency; o Create a stand-alone Fire Department within the City; and, o Provide any other fire service delivery model(s) that would serve the Lino Lakes community effectively and efficiently. • Provide detailed planning for any facility or asset changes required related to proposed delivery of services. • A comprehensive review of OSHA and NFPA standards and how all service delivery options will meet these standards. • Provide milestones that will guide future fire staffing decisions as the Lino Lakes community grows. In the spirit of the city’s organizational culture, development of the plan will be inclusive of decision makers, including fire and police personnel of various ranks. Community Profile The City of Lino Lakes, incorporated in 1955, is a growing community in the southeast corner of Anoka County. It covers an area of 33 square miles and has a population of approximately 21,976. The population has more than doubled from the 1990 census figure of 8,807 and has grown by 31% since 2000. Within the City’s borders lies the 5,500 - acre Rice Creek Chain of Lakes Regional Park. Access to St. Paul and Minneapolis is provided by I-35W and I-35E. 50 The City Charter, as amended, establishes a mayor-council form of government and grants the City Council full policy-making and legislative authority to the Mayor and four Council Members. The City Council is responsible, among other things, for passing ordinances, adopting the budget, appointing committees, and hiring a City Administrator. The City Administrator has the responsibility of carrying out the policies and ordinances of the City Council and for overseeing the day-to-day operations of the City. The City Council is elected at-large on a non-partisan basis, with Council Members serving four- year terms and the Mayor serving a two-year term. Elections are held every two years with two council seats and the Mayor being up for election each election cycle. The City provides a full range of municipal services. These services include: general government, public safety (police, fire and building inspections), public works (street and fleet), culture and recreation (parks and recreation), conservation of natural resources (environmental, solid waste abatement, forestry), community development, public improvements, and providing and maintaining water, sewer, and storm water infrastructure. The City of Lino Lakes Comprehensive Plan is available here and provides detailed information regarding the City’s projected plans through 2040. About the Lino Lakes Public Safety Department The Lino Lakes Public Safety Department provides emergency management, fire, and police services to the Lino Lakes community. We have strong interagency collaboration through the Anoka County Fire Protection Council (ACFPC) and Joint Law Enforcement Council (JLEC) that have resulted in many efficiencies for all public safety agencies in Anoka County. The Public Safety Department current staffing is: Position Authorized Actual Public Safety Director 1 FTE 1 FTE Deputy Director - Police 1 FTE 1 FTE Deputy Director - Fire 1 FTE 1 FTE Public Safety Captain 1 FTE 1 FTE Fire Lieutenant / Inspector 1 FTE 1 FTE Police Sergeant 5 FTE 5 FTE Police Officer 20 FTE 17 FTE Administrative Assistant 1 FTE 1 FTE Investigative Assistant 1 FTE 1 FTE Community Service Officer 3 PTE 2 PTE Firefighter 15 PTE 10 PTE Paid On-Call District Chief 2 POC 0 POC 51 Paid On-Call Fire Lieutenant 4 POC 4 POC Paid On-Call Firefighter 34 POC 15 POC The Public Safety Director, serving as the Fire and Police Chief, provides leadership, management, and oversight of all public safety services (emergency management, fire, & police) in the Lino Lakes community. The Lino Lakes Fire Division is a combination department, staffed weekdays from 6 AM to 6 PM with a Deputy Director – Fire Division, Fire Lieutenant / Inspector, and three part-time firefighters. After 6 PM on weekdays and all weekends, primary fire response is handled by paid on-call firefighters. The Public Safety Department currently has 4 cross-trained police/firefighters. The Fire Division operates out of Fire Station #1 (7741 Lakes Dr., Lino Lakes, MN) and Fire Station #2 (1710 Birch St., Lino Lakes, MN). Fire staff responds to all fire calls for service in Lino Lakes, as well as some emergency medical calls for service (Unconscious, Difficulty Breathing, Not Breathing, Choking, Drown, Heart, Seizure, Fall, Stroke, Misc Priority Medical). For the year of 2023, fire staff responded to 825 calls for service. The Lino Lakes Police Division provides 24-hour police service to the community, serving as the primary responder on all medical calls for service. The Police Division is staffed with 26 licensed Police Officers, 4 civilian office staff, 2 Community Service Officers and operates out of the Public Safety Department (640 Town Center Pkwy, Lino Lakes, MN). For the year of 2023, police staff responded to 13,263 calls for service. Advanced Life Support EMS service is provided by a private hospital based ambulance service, Allina EMS. DELIVERABLES This project is expected to meet the above-noted objective within the described scope and produce a realistic plan for meeting the City of Lino Lakes’ future fire service needs. At a minimum, the plan will provide the following specific deliverables. 1. Identification of 2024 baseline Fire Division services, service levels and budgets, including response times, ISO rating, staffing, facilities, major equipment and any other applicable factors (this should be a minor part of the final report). 2. A comprehensive standards of coverage document analyzing resource deployment, determining whether the department is properly deployed to meet its community’s fire service needs. 3. Provide Council with options for a staffing plan to meet the needs identified in the standards for in the short and long term with estimated costs. Some potential options: a. Evaluate current model of delivery of fire services with recommendation for improvement; b. Collaborate with other jurisdictions to provide fire services to all jurisdictions; 52 c. Contract for the delivery of fire services in Lino Lakes with another fire agency; d. Create a stand-alone Fire Department within the City; and, e. Provide any other fire service delivery model that would serve the Lino Lakes community effectively and efficiently. 4. Provide detailed planning for any facility or asset changes required related to proposed delivery of services. 5. Provide milestones that will guide future fire staffing decisions as the Lino Lakes community grows. 6. Assess the current delivery of emergency medical first response services and make recommendations as appropriate. 7. Identification of the barriers to achieving the desired service levels. PROPOSAL REQUIREMENTS Submittals must include the following items: 1. A description of the firm and qualifications, including any specialized experience related to the study. 2. A list of similar studies the firm has completed. Include contact information for references. 3. Project timetables, including estimate of hours, breakdown of hours by activity, number and type of meetings, description of study participants and estimated completion date. 4. Designation of a firm principal who will be in charge of the project. 5. Designation of the primary staff who will conduct the study. 6. A list of all subcontractors and a delineation of their roles. 7. Resumes and complete contact information (addresses, voice and fax telephone numbers, and email addresses) of all staff, including subcontractors, who will work on the study. 8. Estimate of cost to complete the study, outline of fee schedule (including reimbursable expenses), and payment schedule. 9. Provide a project timeline ensuring the work product is actionable and fact based. The City of Lino Lakes is interested in moving this forward as expeditiously as possible. SELECTION City personnel will review the proposals, and interview firms as needed to compile a list of finalists to be reviewed by Council. The successful contractor will be required to enter into an agreement for professional services with the City of Lino Lakes. Proposals will be evaluated using, but not limited to, the following criteria: 1. Quality and thoroughness of the proposal. 2. Past experience, expertise and demonstrated ability to work with city staff. 53 3. References and/or recommendations from past clients. 4. Costs associated with developing, preparing and presenting the study. 5. Financial stability and ability of the firm, and the firm’s subcontractors, to provide the services requested. 6. Ability to meet the conditions of the professional services agreement, including documentation of applicable insurance requirements. The City of Lino Lakes reserves the right to reject any and all proposals and waive all technicalities. SUBMITTALS All proposals must be delivered to the city no later than 4:30 p.m. on Friday, _____________. Proposers are solely responsible for delivery of their proposals to the city before the deadline. Any proposal received after the deadline will not be considered and will be returned. Please submit electronic copy (PDF) of the proposal to: Lino Lakes Public Safety Department John Swenson, Public Safety Director jswenson@linolakes.us Questions regarding this study or the processes may be directed to Public Safety Director John Swenson at 651-982-2301 or jswenson@linolakes.us. 54 City of Lino Lakes Request for Proposals for Professional Services Operational Study STUDY OBJECTIVE The City of Lino Lakes is seeking a qualified professional consultant to develop a plan for guiding the future delivery of fire & police services to the Lino Lakes community in the most efficient and effective manner. The City Council would like to look at all available options. SCOPE When completed, the operational & physical asset study will include: • Provide Council with options for a staffing plan to meet the needs and expectations for fire & police services with estimated costs. Some potential options: o Evaluate current model of delivery of fire & police services with recommendation for improvement; o Collaborate with other jurisdictions to provide fire & police services to all jurisdictions; o Contract for the delivery of fire & police services in Lino Lakes with another fire agency; o Create stand-alone Fire & Police Departments within the City; and, o Provide any other fire & police service delivery model(s) that would serve the Lino Lakes community effectively and efficiently. • Provide detailed planning for any facility or asset changes required related to proposed delivery of services. • A comprehensive review of applicable standards and how all fire & police service delivery options will apply. • Provide milestones that will guide future fire & police staffing decisions as the Lino Lakes community grows. In the spirit of the city’s organizational culture, development of the plan will be inclusive of decision makers, including fire and police personnel of various ranks. Community Profile The City of Lino Lakes, incorporated in 1955, is a growing community in the southeast corner of Anoka County. It covers an area of 33 square miles and has a population of approximately 21,976. The population has more than doubled from the 1990 census figure of 8,807 and has grown by 31% since 2000. Within the City’s borders lies the 5,500 - acre Rice Creek Chain of Lakes Regional Park. Access to St. Paul and Minneapolis is provided by I-35W and I-35E. 55 The City Charter, as amended, establishes a mayor-council form of government and grants the City Council full policy-making and legislative authority to the Mayor and four Council Members. The City Council is responsible, among other things, for passing ordinances, adopting the budget, appointing committees, and hiring a City Administrator. The City Administrator has the responsibility of carrying out the policies and ordinances of the City Council and for overseeing the day-to-day operations of the City. The City Council is elected at-large on a non-partisan basis, with Council Members serving four- year terms and the Mayor serving a two-year term. Elections are held every two years with two council seats and the Mayor being up for election each election cycle. The City provides a full range of municipal services. These services include: general government, public safety (police, fire and building inspections), public works (street and fleet), culture and recreation (parks and recreation), conservation of natural resources (environmental, solid waste abatement, forestry), community development, public improvements, and providing and maintaining water, sewer, and storm water infrastructure. The City of Lino Lakes Comprehensive Plan is available here and provides detailed information regarding the City’s projected plans through 2040. About the Lino Lakes Public Safety Department The Lino Lakes Public Safety Department provides emergency management, fire, and police services to the Lino Lakes community. We have strong interagency collaboration through the Anoka County Fire Protection Council (ACFPC) and Joint Law Enforcement Council (JLEC) that have resulted in many efficiencies for all public safety agencies in Anoka County. The Public Safety Department current staffing is: Position Authorized Actual Public Safety Director 1 FTE 1 FTE Deputy Director - Police 1 FTE 1 FTE Deputy Director - Fire 1 FTE 1 FTE Public Safety Captain 1 FTE 1 FTE Fire Lieutenant / Inspector 1 FTE 1 FTE Police Sergeant 5 FTE 5 FTE Police Officer 20 FTE 17 FTE Administrative Assistant 1 FTE 1 FTE Investigative Assistant 1 FTE 1 FTE Community Service Officer 3 PTE 2 PTE Firefighter 15 PTE 10 PTE Paid On-Call District Chief 2 POC 0 POC 56 Paid On-Call Fire Lieutenant 4 POC 4 POC Paid On-Call Firefighter 34 POC 15 POC The Public Safety Director, serving as the Fire and Police Chief, provides leadership, management, and oversight of all public safety services (emergency management, fire, & police) in the Lino Lakes community. The Lino Lakes Fire Division is a combination department, staffed weekdays from 6 AM to 6 PM with a Deputy Director – Fire Division, Fire Lieutenant / Inspector, and three part-time firefighters. After 6 PM on weekdays and all weekends, primary fire response is handled by paid on-call firefighters. The Public Safety Department currently has 4 cross-trained police/firefighters. The Fire Division operates out of Fire Station #1 (7741 Lakes Dr., Lino Lakes, MN) and Fire Station #2 (1710 Birch St., Lino Lakes, MN). Fire staff responds to all fire calls for service in Lino Lakes as well as some emergency medical calls for service (Unconscious, Difficulty Breathing, Not Breathing, Choking, Drown, Heart, Seizure, Fall, Stroke, Misc Priority Medical). For the year of 2023, fire staff responded to 825 calls for service. The Lino Lakes Police Division provides 24-hour police service to the community, serving as the primary responder on all medical calls for service. The Police Division is staffed with 26 licensed police officers, 4 civilian office staff, 2 Community Service Officers and operates out of the Public Safety Department (640 Town Center Pkwy, Lino Lakes, MN). For the year of 2023, police staff responded to 13,263 calls for service. Advanced Life Support EMS service is provided by a private hospital based ambulance service, Allina EMS. DELIVERABLES This project is expected to meet the above-noted objective within the described scope and produce a realistic plan for meeting City of Lino Lakes’ future fire & police service needs. At a minimum, the plan will provide the following specific deliverables. 1. Identification of 2024 baseline Fire & Police Divisions services, service levels and budgets, including response times, ISO rating, staffing, facilities, major equipment and any other applicable factors (this should be a minor part of the final report). 2. A comprehensive standards of coverage document analyzing resource deployment, determining whether the department is properly deployed to meet its community’s fire & police needs. 3. Provide Council with options for staffing plans to meet the community needs identified in the short term and long term with estimated costs. Some potential options: a. Evaluate current model of delivery of fire & police services with recommendation for improvement; 57 b. Collaborate with other jurisdictions to provide fire & police services to all jurisdictions; c. Contract for the delivery of fire & police services in Lino Lakes with another agency; d. Create a stand-alone Fire & Police Departments within the City; and e. Provide any other fire & police service delivery model(s) that would serve the Lino Lakes community effectively and efficiently. 4. Provide detailed planning for any facility or asset changes required related to proposed delivery of services. 5. Provide milestones that will guide future fire & police staffing decisions as the Lino Lakes community grows. 6. Assess the current delivery of emergency medical first response services and make recommendations as appropriate. 7. Identification of the barriers to achieving the desired service levels. PROPOSAL REQUIREMENTS Submittals must include the following items: 1. A description of the firm and qualifications, including any specialized experience related to the study. 2. A list of similar studies the firm has completed. Include contact information for references. 3. Project timetables, including estimate of hours, breakdown of hours by activity, number and type of meetings, description of study participants and estimated completion date. 4. Designation of a firm principal who will be in charge of the project. 5. Designation of the primary staff who will conduct the study. 6. A list of all subcontractors and a delineation of their roles. 7. Resumes and complete contact information (addresses, voice and fax telephone numbers, and email addresses) of all staff, including subcontractors, who will work on the study. 8. Estimate of cost to complete the study, outline of fee schedule (including reimbursable expenses), and payment schedule. 9. Provide a project timeline ensuring the work product is actionable and fact based. The City of Lino Lakes is interested in moving this forward as expeditiously as possible. SELECTION City personnel will review the proposals, and interview firms as needed to compile a list of finalists to be reviewed by Council. The successful contractor will be required to enter into an agreement for professional services with the City of Lino Lakes. Proposals will be evaluated using, but not limited to, the following criteria: 58 1. Quality and thoroughness of the proposal. 2. Past experience, expertise and demonstrated ability to work with city staff. 3. References and/or recommendations from past clients. 4. Costs associated with developing, preparing and presenting the study. 5. Financial stability and ability of the firm, and the firm’s subcontractors, to provide the services requested. 6. Ability to meet the conditions of the professional services agreement, including documentation of applicable insurance requirements. The City of Lino Lakes reserves the right to reject any and all proposals and waive all technicalities. SUBMITTALS All proposals must be delivered to the city no later than 4:30 p.m. on Friday, _____________. Proposers are solely responsible for delivery of their proposals to the city before the deadline. Any proposal received after the deadline will not be considered and will be returned. Please submit electronic copy (PDF) of the proposal to: Lino Lakes Public Safety Department John Swenson, Public Safety Director jswenson@linolakes.us Questions regarding this study or the processes may be directed to Public Safety Director John Swenson at 651-982-2301 or jswenson@linolakes.us. 59