Loading...
HomeMy WebLinkAboutResolution 24-102VAURTI-1AIMAIL • A ar-sil► IF�111 11• c ORION!i a � . 1 , - WHEREAS, the City Council finds that it would be in the best interest of the City to proceed with the preparation of plans and specifications for the 2025 Street Reconstruction and Sewer and Water Extension Project. The project includes the Colonial Woods neighborhood including 62nd Street (east of W Shadow Lake Dr.) and Red Maple Lane as well as the Pine Haven neighborhood including 81st Street, Elbe Street, and Danube Street. The project also includes an overlay of Diane Street and Evergreen Trail; and WHEREAS, on June 10, 2024 the City Council accepted the Feasibility Report for the 2025 Street Reconstruction and Sewer and Water Extension Project for the Colonial Woods and Pine Haven Neighborhoods. Public Hearings were held on July 8 and 22, 2024. Per the City's Charter the 60 day petition period passed and the City did not receive a valid petition against the project in either neighborhood; and WHEREAS, WSB, the City Engineer, has submitted a proposal to prepare plans and specifications for said improvements. NOW, THEREFORE BE IT RESOLVED by the City Council of Lino Lakes, Minnesota: 1. Authorizes the Preparation of the Plans and Specifications for the 2025 Street Reconstruction and Sewer and Water Extension Project. 2. WSB is designated as the engineer for this improvement and directed to prepare plans and specifications for the 2025 Street Reconstruction and Sewer and Water Extension Project for an amount not to exceed $445,000.00. Adopted by the Council of the City of Lino Lakes this 23rd day of September, 2024. Rob Rafferty, Mayor ATTEST: Zr�.' Roberta Colotti, City Clerk